					                                                                  A       N       N        E        X     U      R       E
                           Short N.I.T NO:-05/2008-09 of Executive Engineer,RCFA Division-I,PHE Dte.
                                           Ref Memo No:-1136/RCD-I dated:- 14.11.08
                                                                                                                              Date of
                                                                                                          Last Date of
                                                                                                                              Issue of      Date of
                                                                                              Cost of     Submission
 SL NO/                               Estimated Cost           Earnest Money                                                  Tender      Droping of    Time of
                NAME OF WORK                                                               Tender Paper   Application                                                  Eligibility for Perticipants
 GROUP                                     (Rs)                     (Rs)                                                       Paper     Tender Paper Completion
                                                                                               (Rs)          upto
                                                                                                                             upto 4.00   up to 3.00 PM
                                                                                                           2.00 PM.
                                                                                                                                PM.
   1                   2                    3                         4                         5                6                7           8              9                     10

          Supplying & laying UPVC pipe                  Initially deposit Rs 20000.00 of
          line for distribution system of                 tender amount & remaining                                                                                   Enlisted class-I contractors
                                                                                                                                                         2(Two)
Group-A   Bila ,Baliapur,Amdiha (Part) 1155916.00      balance to be deposited at time       105.00           01.12.08       04.12.08      08.12.08                    of PHE Dte having valid
                                                                                                                                                         Months
          mouzas under Itapara W/s                       of performing formal tender                                                                                          enlistment
          Scheme                                                    agreement



          Supplying & laying UPVC pipe                  Initially deposit Rs 20000.00 of
          line for distribution system of                 tender amount & remaining                                                                                   Enlisted class-I contractors
                                                                                                                                                         2(Two)
Group-B   Itapara,Amlala & Bila (part) 1301800.00      balance to be deposited at time       105.00           01.12.08       04.12.08      08.12.08                    of PHE Dte having valid
                                                                                                                                                         Months
          mouzas under Itapara W/s                       of performing formal tender                                                                                          enlistment
          Scheme                                                    agreement



          Supplying & laying UPVC pipe                  Initially deposit Rs 20000.00 of                                                                              Bonafide outsiders having
          line for distribution system of                 tender amount & remaining                                                                                     credential of 60% of the
                                                                                                                                                         2(Two)
Group-C   ,Amdiha (Part),Bordanga (Part) 1128615.00    balance to be deposited at time       105.00           01.12.08       04.12.08      08.12.08                     value put to tender in a
                                                                                                                                                         Months
          mouzas under Itapara W/s                       of performing formal tender                                                                                 single work order within the
          Scheme                                                    agreement                                                                                               last three years


          Supplying & laying UPVC pipe                  Initially deposit Rs 20000.00 of                                                                              Bonafide outsiders having
          line for distribution system of                 tender amount & remaining                                                                                     credential of 60% of the
                                                                                                                                                         2(Two)
Group-D   Khoyerbandh & Bordanga 1248395.00            balance to be deposited at time       105.00           01.12.08       04.12.08      08.12.08                     value put to tender in a
                                                                                                                                                         Months
          (part) mouzas under Itapara                    of performing formal tender                                                                                 single work order within the
          W/s Scheme                                                agreement                                                                                               last three years




                                                                                                                                                    Executive Engineer
                                                                                                                                                  RCFA Division-I,PHE Dte.
                                                                        A     N        N        E      X    U         R   E
                             Short N.I.T. NO:-01/2008-09 of Assistant Engineer-II,RCFA Division-I,PHE Dte.
                                             Ref Memo No:- 90/AE-II/RCD-I dated:-14.11.08

                                                                                                         Last Date of     Date of Issue      Date of
                                                                        Token Earnest Cost of Tender
SL NO/                                                 Estimated Cost                                    Submission         of Tender     Submission of     Time of
                       NAME OF WORK                                        Money          Paper                                                                              Eligibility for Perticipants
GROUP                                                       (Rs)                                       Application upto       Paper       Tender paper     Completion
                                                                            (Rs)           (Rs)
                                                                                                          2.00 PM.        upto 3.00 PM.   upto 3.30 PM.
   1                          2                              3               4              5                 6                7               8               9                         10
Group-A
          Construction of one no (Two stored) Rest
                                                                                                                                                                         Bonafied outsider agency of PHE
          Shed for head work site at Darbardanga
                                                     Rs 9,04,234=00     Rs 18,085=00    Rs 105=00          01.12.08         02.12.08        04.12.08      1(One)Month    Dte having credential to execute
          under Augmentation of Jamuria Municipality
                                                                                                                                                                            the similar nature of work.
          W/s Scheme under RCFA Division-I,PHE Dte

Group-B
          Casting of base slab with ready mix concrete
          for bottom pluging work in collector well at                                                                                                     07(Seven)
                                                       Rs 6,49,818=00   Rs 12,996=00    Rs 80=00           01.12.08         02.12.08        04.12.08                                     Do
          Darbardanga under Jamuria Augmentation                                                                                                             Days
          W/s Scheme.

Group-C
          Construction of service road for movemnt of
          heavy vehicle to the collector well site at
                                                      Rs 1,89,880=00    Rs 3,798=00     Rs 55=00           01.12.08         02.12.08        04.12.08      10(Ten) Days                   Do
          Darbardanga under Augmentation W/s
          scheme.




                                                                                                                                                              Assistant Engineer -II
                                                                                                                                                             RCFA Division-I,PHE Dte.
                                                                       A     N       N         E      X    U         R   E

                             Short N.I.T. NO:-02/2008-09 of Assistant Engineer-II,RCFA Division-I,PHE Dte.
                                            Ref Memo No:- 91/AE-II/RCD-I dated:-29.12.2008

                                                                                                        Last Date of     Date of Issue      Date of
                                                                       Token Earnest Cost of Tender
SL NO/                                                Estimated Cost                                    Submission         of Tender     Submission of    Time of
                       NAME OF WORK                                       Money          Paper                                                                              Eligibility for Perticipants
GROUP                                                      (Rs)                                       Application upto       Paper       Tender paper    Completion
                                                                           (Rs)           (Rs)
                                                                                                         2.00 PM.        upto 3.00 PM.   upto 3.30 PM.
   1                          2                             3               4              5                 6                7               8              9                          10

        Boring & drilling for soil investigation
                                                                                                                                                                       Enlisted Class contactor's of PHE
        including collection of sample & submission
                                                                                                                                                         15(Fifteen)   Dte OR Working agency of PHE
Group-A of report at Billa mouza inconnection with    Rs 111628=00     Rs 2235=00      Rs 30=00           15.01.09         16.01.09        19.01.09
                                                                                                                                                            Days        Dte having credential in similar
        construction of 30000 gallon capacity OHR
        under ITAPARA W/s Scheme.
                                                                                                                                                                                nature of work.

        Making & Supply of MS SIMLESS 50 mm dia                                                                                                                         Enlisted Class contactor's of PHE
        pipe railing over approach bridge of                                                                                                             15(Fifteen)   Dte OR Outsider agency of PHE Dte
Group-B                                               Rs 532631=00     Rs 10660=00     Rs 205=00          15.01.09         16.01.09        19.01.09
        Collector well at Darbadanga under Jamuria                                                                                                          Days       having credential in similar nature of
        W/s Scheme .                                                                                                                                                                  work.

                                                                                                                                                                       Enlisted Class -III agency of PHE Dte
            Laying of 150 mm dia DI Rising Main for                                                                                                      30(Thirty)
Group-C                                               Rs 3,36,075=00   Rs 6725=00      Rs 80=00           15.01.09         16.01.09        19.01.09                    having credential in similar nature of
          Itapara W/S Scheme under RCFA Div-I. P.H.E.                                                                                                      Days
                                                                                                                                                                                        work.




                                                                                                                                                            Assistant Engineer -II
                                                                                                                                                           RCFA Division-I,PHE Dte.
                                                              A     N     N       E    X        U     R    E
                         Short N.I.Q NO:-03/2008-09 of Executive Engineer,RCFA Division-I,PHE Dte.
                                         Ref Memo No:-1506/RCD-I dated:-21.01.09
                                                                                                       Date of
                                                                                       Last Date of                 Date of
                                                                           Cost of                     Issue of
                                                                                       Submission                 Droping of
 SL NO/                                             Earnest Money         Quotatiion                  Quotation                   Time of
                    NAME OF WORK                                                       Application                 Quotation                         Eligibility for Perticipants
 GROUP                                                   (Rs)               Paper                       Paper                   Completion
                                                                                           upto                   Paper up to
                                                                             (Rs)                     upto 4.00
                                                                                        2.00 PM.                    3.00 PM
                                                                                                         PM.
   1                      2                               3                   4             5             6           7               8                           9

          Supply & delivery of Sluice Valves   Earnest money to be                                                                              Bonafide Manufacturer/Suppliers/
          (IVC/IVI/Kriloshkar/Durga/ Audco    deposited @2% on the                                                                              Bonafide agency of PHE Dte having
                                                                                                                                 7(Seven)
Group-A   /Corlay & Roy) for Augmentation of quoted rate at the time of   Rs 405=00     02.02.09      03.02.09     04.02.09                    credential of Rs 10.00 lakh in a single
                                                                                                                                   Days
          Jamuria W/s Scheme under RCFA         performing tender                                                                              work-order in similar nature of work
          Division-I, PHE Dte (Gr-A)               agreement.                                                                                         during last five years.



          Supply & delivery of Sluice Valves
          (IVC/IVI/Kriloshkar/Durga/ Audco
                                                                                                                                 7(Seven)
Group-B   /Corlay & Roy)for Augmentation of              Do               Rs 405=00     02.02.09      03.02.09     04.02.09                                      DO
                                                                                                                                   Days
          Jamuria W/s Scheme under RCFA
          Division-I, PHE Dte (Gr-B)


          Supply & delivery of Sluice Valves
          (IVC/IVI/Kriloshkar/Durga/ Audco
                                                                                                                                 7(Seven)
Group-C   /Corlay & Roy)for Augmentation of              Do               Rs 405=00     02.02.09      03.02.09     04.02.09                                      DO
                                                                                                                                   Days
          Jamuria W/s Scheme under RCFA
          Division-I, PHE Dte (Gr-C)




                                                                                                                                  Executive Engineer
                                                                                                                                RCFA Division-I,PHE Dte.
                                                                    A      N     N     E       X     U     R        E
                          Short N.I.T NO:-09/2008-09 of Executive Engineer,RCFA Division-I,PHE Dte.
                                        Ref Memo No:-1480/RCD-I dated:- 15.01.2009
                                                                                                                         Date of
                                                                                                     Last Date of
                                                                                                                         Issue of      Date of
                                                                                         Cost of     Submission
 SL NO/                                           Estimated Cost    Earnest Money                                        Tender      Droping of    Time of
                      NAME OF WORK                                                    Tender Paper   Application                                                   Eligibility for Perticipants
 GROUP                                                 (Rs)              (Rs)                                             Paper     Tender Paper Completion
                                                                                          (Rs)           upto
                                                                                                                        upto 4.00   up to 3.00 PM
                                                                                                      2.00 PM.
                                                                                                                           PM.
    1                        2                           3                   4             5              6                 7            8              9                      10

          Emergent Repairing & changing damaged
          cable and yard lighting and other allied                                                                                                                  Contactors having valid
Group-A                                            Rs 227368.00         Rs 4550.00     Rs 55.00       02.02.09          03.02.09     04.02.09     5(Five)Days
          works at Tirat Mouza (Damalia) pump                                                                                                                          Electrical licence
          house under RCFA Part-II W/s Scheme



          Construction of Garrage portion of
          building road & other allied works for the                                                                                               15(Fifteen)    Enlisted Class-II contactors
Group-B                                              Rs 930625.00       Rs 18615.00    Rs 105.00      02.02.09          03.02.09     04.02.09
          office of the SE/RCFA W/s Circle, PHEdte                                                                                                    Days                of PHE Dte
          under RCFA Part-II W/s Scheme


          Supplying fitting & fixing of Porcelin tiles
          paver block market for flooring
          ornamental grils and concrete work for
                                                                                                                                                   15 (Fifteen)   Enlisted Class-II contactors
Group-C   roof treatment for the office of the Rs 958506.00             Rs 19170.00    Rs 105.00      02.02.09          03.02.09     04.02.09
                                                                                                                                                       days               of PHE Dte
          SE/RCFA W/s Circle,PHE Dte at
          Vivekananda Pally, Ismile under RCFA
          Part-II W/s Scheme.

         Repairing & painting ,colour washing of
         collector well pier 700 mm dia CI Pipe &                                                                                                                 Enlisted Class-III contactors
Grroup-D                                            Rs 254544.00        Rs 5100.00     Rs 55.00       02.02.09          03.02.09     04.02.09     5 (Five) Days
         allied works at Kalajhoria head works site                                                                                                                        of PHE Dte
         under RCFA Part-II W/s Scheme




                                                                                                                                               Executive Engineer
                                                                                                                                             RCFA Division-I,PHE Dte.
                                                                A      N     N     E       X     U     R        E
                        Short N.I.T NO:-10/2008-09 of Executive Engineer,RCFA Division-I,PHE Dte.
                                      Ref Memo No:-1512/RCD-I dated:- 22.01.2009
                                                                                                                     Date of
                                                                                                 Last Date of
                                                                                                                     Issue of      Date of
                                                                                     Cost of     Submission
SL NO/                                         Estimated Cost   Earnest Money                                        Tender      Droping of    Time of
                    NAME OF WORK                                                  Tender Paper   Application                                                  Eligibility for Perticipants
GROUP                                               (Rs)             (Rs)                                             Paper     Tender Paper Completion
                                                                                      (Rs)           upto
                                                                                                                    upto 4.00   up to 3.00 PM
                                                                                                  2.00 PM.
                                                                                                                       PM.
   1                     2                         3                     4             5              6                 7            8              9                     10
        Laying 450 mm dia Raising main over
        pond near Darbardanga & other allied                                                                                                    7(Seven)     Enlisted Class-II contactors
Group-A                                      Rs 827180.00           Rs 16545.00    Rs 105.00      09.02.09          10.02.09     11.02.09
        works under Jamuria Municipality W/s                                                                                                      Days               of PHE Dte
        Scheme.
        Supply &fitting fixing of 450 mm dia 9.5
        mm thick MS pipe which is replacing 450                                                                                                 5 (Five)         Enlisted Class-II
Group-B                                          Rs 213531.00       Rs 4271.00     RS 55.00       09.02.09          10.02.09     11.02.09
        mm dia damaged CI R/M at Kalajharia                                                                                                      Days         contactors of PHE Dte
        H/W site under RCFA Pt-II W/S Scheme

        Protection work of the bank of river Ajoy
                                                                                                                                                5 (Five)        Enlisted Class-I/II
Group-C at Amuliaghat under Kharabor W/s Rs 447474.00               Rs 8949.00     Rs 80.00       09.02.09          10.02.09     11.02.09
                                                                                                                                                 Days         contactors of PHE Dte
        Scheme .
        Protection work on the bank of river Ajoy
                                                                                                                                                                 Enlisted Class-II
Group-D at Runakuraghat under Jamgram-Panuria Rs 447474.00          Rs 8949.00     Rs 80.00       09.02.09          10.02.09     11.02.09     5(Five) days
                                                                                                                                                              contactors of PHE Dte
        W/s Scheme .



                                                                                                                                           Executive Engineer
                                                                                                                                         RCFA Division-I,PHE Dte.
                                                                    A     N       N    E        X    U   R   E
                          Short N.I.T NO:-09/2008-09 of Executive Engineer,R
                                         Ref Memo No:-1480/RCD-I dated:- 15

                                                                                         Cost of
 SL NO/                                            Estimated Cost   Earnest Money
                      NAME OF WORK                                                    Tender Paper
 GROUP                                                  (Rs)             (Rs)
                                                                                          (Rs)


    1                        2                           3                  4              5

          Laying 450 mm dia Raising main over
          pond near Darbardanga & other allied
Group-A                                        Rs 827180.00             Rs 16545.00    Rs 105.00
          works under Jamuria Municipality W/s
          Scheme.



          Emergent Repairing & changing damaged
          cable and yard lighting and other allied
Group-B                                            Rs 227368.00                            Rs
          works at Tirat Mouza (Damalia) pump
          house under RCFA Part-II W/s Scheme



          Construction of Garrage portion of
          building road & other allied works for the
Group-C                                              Rs 930625.00
          office of the SE/RCFA W/s Circle, PHEdte
          under RCFA Part-II W/s Scheme


          Supplying fitting & fixing of Porcelin tiles
          paver block market for flooring
          ornamental grils and concrete work for
Group-D   roof treatment for the office of the Rs 958506.00
          SE/RCFA W/s Circle,PHE Dte at
          Vivekananda Pally, Ismile under RCFA
          Part-II W/s Scheme.

         Repairing & painting ,colour washing of
         collector well pier 700 mm dia CI Pipe &
Grroup-E                                          Rs 254544.00
         allied works at Kalajhoria head works
         site under RCFA Part-II W/s Scheme
                                                                     Tender paper
SL        Rate Chart for Purchase of Tender Paper                       Cost
     1)   75000                                      15 .00   5.00          20.00
     2)   75001-150000.00                            25.00    5.00          30.00
     3)   150001-300000.00                           50.00    5.00          55.00
     4)   300001-750000.00                           75.00    5.00          80.00
     5)   750001.00-5000000.00                      100.00    5.00         105.00
E   X   U     R        E
utive Engineer,RCFA Division-I,PHE Dte.
RCD-I dated:- 15.01.2009
                            Date of
        Last Date of
                            Issue of      Date of
        Submission
                            Tender      Droping of    Time of
        Application                                                  Eligibility for Perticipants
                             Paper     Tender Paper Completion
            upto
                           upto 4.00   up to 3.00 PM
         2.00 PM.
                              PM.
             6                 7            8            9                       10


                                                      7(Seven)      Enlisted Class-II contactors
         02.02.09          03.02.09      04.02.09
                                                        Days                of PHE Dte




                                                                      Contactors having valid
         02.02.09          03.02.09      04.02.09   5(Five)Days
                                                                         Electrical licence




                                                    15(Fifteen)     Enlisted Class-II contactors
         02.02.09          03.02.09      04.02.09
                                                       Days                 of PHE Dte




                                                    15 (Fifteen)    Enlisted Class-II contactors
         02.02.09          03.02.09      04.02.09
                                                        days                of PHE Dte




                                                                    Enlisted Class-III contactors
         02.02.09          03.02.09      04.02.09   5 (Five) Days
                                                                             of PHE Dte
  Executive Engineer
RCFA Division-I,PHE Dte.
                                                       A      N N E X U R E
                                                              SPORT QUOTATION
                                         Ref Memo No:-1340/RCD-I dated:- 29.12.08
                                                                                   Date of Application
                                                                                                         Date of Submission
 SL NO/                                          Estimated Cost   Earnest Money   & issue of Quotation                            Time of         Eligibility Criteria Of
                     NAME OF WORK                                                                        of Quotation Paper
 GROUP                                                (Rs)             (Rs)         paper up to 12.30                           Completion             Participants
                                                                                                            up to 2.00 PM
                                                                                           PM
    1                         2                          3             4                   5                     6                   7                      8
          Trial Run and other allied works at Andal
          North Bazar, Dignala and its adjoining
          areas (Ph-II) under on-going Andal W/s                                                                                  3(Three)     Enlisted Contactor of PHE
Group-A   Scheme (w.e.f 01.01.2009 to 31.03.09)     Rs 66260.00    Rs 1657.00          29.12.08              29.12.08
                                                                                                                                  months                  Dte



          Trial Run and other allied works at
          Ramprosad Pur ,Andal South Bazar areas
          and its adjoining areas (Ph-I)under on-                                                                                 3(Three)     Enlisted Contactor of PHE
Group-B                                           Rs 66260.00      Rs 1657.00          29.12.08              29.12.08
          going Andal W/s Scheme (w.e.f                                                                                           months                  Dte
          01.01.2009 to 31.03.09)

          Trial Run and other allied works at
          Shreerampur and its adjoining areas (Ph-
          I) under on-going Andal W/s Scheme Rs 66260.00                                                                          3(Three)      Engineers Co-Operative
Group-C                                                            Rs 1657.00          29.12.08              29.12.08
          (w.e.f 01.01.2009 to 31.03.09)                                                                                          months              Society Ltd


         Trial Run and other allied works at Andal
         Gram, Bhadur Village & R/M of Phase-I &
                                                                                                                                  3(Three)      Engineers Co-Operative
Grroup-D II and its adjoining areas under on-going Rs 66260.00     Rs 1657.00          29.12.08              29.12.08
                                                                                                                                  months              Society Ltd
         Andal W/s Scheme (w.e.f 01.01.2009 to
         31.03.09)




                                                                                                                               Assistant Engineer-I
                                                                                                                              RCFA Division-I,PHE Dte
                                                                     A     N        N      E    X      U      R        E
                                          Short N.I.T NO:-05/2008-09/AE-I/RCFA Division-I/PHE Dte.
                                                 Ref Memo No:-1597/RCD-I dated:-09.02.2009
                                                                                                           Last Date of    Date of Issue
                                                                                                                                            Date of
                                                                                              Cost of      Submission       of Tender
 SL NO/                                                   Estimated Cost   Earnest Money                                                  Droping of    Time of
                         NAME OF WORK                                                      Tender Paper    Application        Paper                                 Eligibility for Perticipants
 GROUP                                                         (Rs)             (Rs)                                                     Tender Paper Completion
                                                                                               (Rs)            upto         upto 4.00
                                                                                                                                         up to 3.00 PM
                                                                                                            2.00 PM.           PM.

    1                           2                               3               4                5              6               7            8            9                     10

          Repairing & renovation of RCC Eleveted
                                                                                                                                                                   Enlisted /Outsider agency
Group-A   Reservoir of including weather coat at Rs 293602.00                5872.00           55.00        17.02.09        18.02.09     20.02.09      20 days
                                                                                                                                                                           of PHE Dte
          Chinchuria under RCFA Part-II W/S Scheme



          Construction of Cement concrete road at
                                                                                                                                                                   Enlisted /Outsider agency
Group-B   Madanpur H/W site near Pump House under Rs 190416.00               3808.00           55.00        17.02.09        18.02.09     20.02.09      15 days
                                                                                                                                                                           of PHE Dte
          RCFA Part-II W/S Scheme


          Supply & fitting fixing of 200 mm dia 8.00 mm
          thick MS pipe which is replacing 200 mm dia
                                                                                                                                                                   Enlisted /Outsider agency
Group-C   damage CI R/M & construction of valve Rs 128951.00                 2579.00           30.00        17.02.09        18.02.09     20.02.09      7 days
                                                                                                                                                                           of PHE Dte
          chamber at Kalajharia H/W site under RCFA Part-
          II W/S Scheme


          Surging and washing and cleaning of 10 nos of                                                                                                            Enlisted Class-III / Special
Group-D   river bed tube well at Kalajharia under RCFA Rs 322241.00          6445.00           80.00        17.02.09        18.02.09     20.02.09      7 days      class contractor of P.H.E.
          Part-II W/S Scheme .                                                                                                                                                Dte

          Repairing of 10 Hp submerssible Pump Motor
                                                                                                                                                                   Agency of PHE Dte having
Group-E   set defective cable line andother allied works at Rs 126993.00     2540.00           30.00        17.02.09        18.02.09     20.02.09      3 days
                                                                                                                                                                    valid electrical license
          Union Para under RCFA Part-II W/S Scheme.
          Repairing & renovation including showeem of
                                                                                                                                                                   Enlisted Class-III of P.H.E.
Group-F   Amrit nagar over Head Reservoir under RCFA Rs 293602.00            5872.00           55.00        17.02.09        18.02.09     20.02.09      20 days
                                                                                                                                                                              Dte
          Part-II W/S Scheme.
          Jungle cutting & allied work for Kalajharia store
                                                                                                                                                                   Enlisted Class-IV of P.H.E.
Group-G   room site and pump house site under Kalajharia Rs 88705.00         2218.00           30.00        17.02.09        18.02.09     20.02.09      7 days
                                                                                                                                                                              Dte
          H/W site
          Repairing and Installation of LT /Panel board (10
          Hp & 20 Hp) & other allied works at                                                                                                                      Agency of PHE Dte having
Group-H                                                     Rs 341067.00     6821.00           80.00        17.02.09        18.02.09     20.02.09      7 days
          Pandabeswar river bed pump house under                                                                                                                    valid electrical license
          Bidyanathpur W/S Scheme.
          Special repairing of 350 mm dia R/M
          distribution system & 200 mm dia distribution
          system near Railway tannel ,Ranisayer More,                                                                                       Enlisted Class-III of P.H.E.
Group-I                                                   Rs 315860.00   6320.00   80.00   17.02.09   18.02.09   20.02.09      7 days
          Puranmal Colliery & amritnagar village at                                                                                                    Dte
          Amritnagar distribution zone under RCFA Part-II
          W/S Scheme.




                                                                                                                         Assistant Engineer-I
                                                                                                                        RCFA Division-I,PHE Dte.
                                                                     A      N         N     E    X      U      R        E
                                         Short N.I.T NO:-08/2008-09/AE-I/RCFA Division-I/PHE Dte.
                                                Ref Memo No:-1690/RCD-I dated:-20.02.2009
                                                                                                            Last Date of    Date of Issue
                                                                                                                                             Date of
                                                                                               Cost of      Submission       of Tender
SL NO/                                                     Estimated Cost   Earnest Money                                                  Droping of    Time of
                         NAME OF WORK                                                       Tender Paper    Application        Paper                                 Eligibility for Perticipants
GROUP                                                           (Rs)             (Rs)                                                     Tender Paper Completion
                                                                                                (Rs)           upto          upto 4.00
                                                                                                                                          up to 3.00 PM
                                                                                                             2.00 PM.           PM.

   1                            2                                3                4              5               6               7            8            9                     10

        Construction of Guard wall (Balance portion)
        of 150 mm dia CI Pipe line Takur Pukur at                                                                                                                   Enlisted /Working agencies
Group-A                                                      119477.00          2390.00         30.00        03.03.09        04.03.09     06.03.09      20 days
        Bhadurpur of Chinchuria under RCFAPart-II                                                                                                                           of PHE Dte
        W/S Scheme


        Laying of 90 mm dia (OD) UPVC pipe line at
                                                                                                                                                                     Enlisted agencies of PHE
Group-B Andal gram near BDO office under On-Going            218675.00          4375.00         55.00        03.03.09        04.03.09     06.03.09      10 days
                                                                                                                                                                                Dte
        Andal W/s Scheme


        Renewing lead jointed to CI pipes and specials
                                                                                                                                                                     Enlisted agencies of PHE
Group-C from Kalajhoria H/w site to Searsole H/w site        257024.00          5140.00         55.00        03.03.09        04.03.09     06.03.09      10 days
                                                                                                                                                                                Dte
        under RCFA Pt-II W/s Scheme


          Laboratory building reparing at Kalajhoria H/w                                                                                                            Enlisted Class-IV agencies
Group-D                                                      172633.00          3455.00         55.00        03.03.09        04.03.09     06.03.09      15 days
          site under RCFA Pt-II W/s Scheme                                                                                                                                  of PHE Dte
        Construction of Boundary wall at Tirat colliery
                                                                                                                                                                    Enlisted /Working agencies
Group-E pump house (length 120 mtr) under Tirat              223551.00          4475.00         55.00        03.03.09        04.03.09     06.03.09      30 days
                                                                                                                                                                            of PHE Dte
        Colliery W/s scheme
        Remodeling of 100 mm dia AC pipe line
        converted to 160 mm dia UPVC pipe line for
                                                                                                                                                                     Enlisted agencies of PHE
Group-F smooth water supply in Kunushtroria area and         242380.00          4850.00         55.00        03.03.09        04.03.09     06.03.09      10 days
                                                                                                                                                                                Dte
        Taposi viallge of Searsole under RCFA Pt-II
        W/s Scheme
        Repairing & renovation of Old annexe building
                                                                                                                                                                    Enlisted class-IV agencies
Group-G at Kalyaneswari Inspection bungalow under            104476.00          2090.00         30.00        03.03.09        04.03.09     06.03.09      15 days
                                                                                                                                                                            of PHE Dte
        RCFA Pt-II W/s Scheme
        Remove damage CI spiral stair case supplying
        & fitting fixing of CI spiral stair case & other                                                                                                             Enlisted agencies of PHE
Group-H                                                      134280.00          2690.00         30.00        03.03.09        04.03.09     06.03.09      7 days
        allied work at Mohishila OHR under RCFA Pt-II                                                                                                                           Dte
        W/s Scheme.
          Watching Kalyaneswri inspection bungalow
          old annex , New annex of Bankim Nibas at                                                                                           Enlisted /Working agencies
Group-I                                                   193350.00   3870.00   55.00   03.03.09   04.03.09   06.03.09          15 days
          Kalyaneswari is nurising and inspection                                                                                                    of PHE Dte
          bungalow under RCFA Pt-I W/s Scheme.

        Construction of cement concrete road from
        office building to wards main entrance (Ph-II)                                                                                       Enlisted Class-IV agencies
Group-J                                                   133046.00   2665.00   30.00   03.03.09   04.03.09   06.03.09          15 days
        inside the campus of the office of the EE/RCD-                                                                                               of PHE Dte
        I under RCFA Pt-II W/s scheme (Mtc 2008-09).

        Construction of internal road & development
        of base of OHR including drain for                                                                                                   Enlisted Class-IV agencies
Group-K                                                   107473.00   4850.00   30.00   03.03.09   04.03.09   06.03.09          15 days
        Ramprasadpur OHR site within Andal W/s                                                                                                       of PHE Dte
        Scheme under RCFA W/S Division,PHE Dte.
          Fitting & fixing 100 mm dia NRV & collecting
                                                                                                                                              Enlisted agencies of PHE
Group-L   mains & brick pillar at Kalajharia under RCFA   125878.00   2520.00   30.00   03.03.09   04.03.09   06.03.09           3 days
                                                                                                                                                         Dte
          Part-II W/S Scheme

        Surging of 5 Nos R/B tube wells (200 mm dia)
        and repairing of 2 (Two) nos of collecting main                                                                                      Enlisted Class-IV agencies
Group-M                                                   165002.00   3300.00   55.00   03.03.09   04.03.09   06.03.09           7 days
        of R/B damodar at DP Colony under DP Colony                                                                                                  of PHE Dte
        W/S Scheme within RCFA Division-I, PHE Dte

          Urgent repairing of Panel Board & 20 Hp
                                                                                                                                              Outsider agencies of PHE
          centrifugal Pump set mark -II & other allied
Group-N                                                   111713.00   2235.00   30.00   03.03.09   04.03.09   06.03.09           7 days       Dte having valid Electrical
          Electrical work of Ballavpur Rural Hospital
                                                                                                                                                      License .
          under Ballavpur W/S Scheme .




                                                                                                                          Assistant Engineer-I
                                                                                                                         RCFA Division-I,PHE Dte.
                                                                    A      N         N     E     X      U      R        E
                                        Short N.I.T NO:-07/2008-09/AE-I/RCFA Division-I/PHE Dte.
                                                Ref Memo No:-1660/RCD-I dated:-17.02.09
                                                                                                            Last Date of    Date of Issue
                                                                                                                                             Date of
                                                                                              Cost of       Submission       of Tender
SL NO/                                                    Estimated Cost   Earnest Money                                                   Droping of    Time of
                        NAME OF WORK                                                       Tender Paper     Application        Paper                                       Eligibility for Perticipants
GROUP                                                          (Rs)             (Rs)                                                      Tender Paper Completion
                                                                                               (Rs)            upto          upto 4.00
                                                                                                                                          up to 3.00 PM
                                                                                                             2.00 PM.           PM.

   1                           2                                3                4               5               6               7            8                 9                      10

        Laying of UPVC pipe line at bhangadhowa
                                                                                                                                                                         Enlisted contactors of PHE
Group-A villages & its adjoining areas at Pariharpur        961172.00        19225.00          105.00        03.03.09        04.03.09     06.03.09          20 days
                                                                                                                                                                                    Dte
        under RCFA Part-II W/S Scheme

          Repairing of RCC Elevated reservoir 124960
          gallon capacity & other allied works at                                                                                                                         Enlisted Class-III agencies
Group-O                                                     391509.00          7850.00         80.00         03.03.09        04.03.09     06.03.09           7 days
          Pariharpur H/W Site under RCFA Division-I,PHE                                                                                                                           of PHE Dte
          Dte under RCFA Part-I W/S Scheme




                                                                                                                                                      Assistant Engineer-I
                                                                                                                                                     RCFA Division-I,PHE Dte.
                                                                                    A      N      N        E   X       U     R      E
                                                       Short N.I.T NO:-09/2008-09/AE-I/RCFA Division-I/PHE Dte.
                                                               Ref Memo No:-1696/RCD-I dated:-23.02.09
                                                                                                                                           Date of
                                                                                                                           Last Date of
                                                                                                                                           Issue of      Date of
                                                                                                              Cost of      Submission
SL NO/                                                                    Estimated Cost   Earnest Money                                   Tender      Droping of    Time of
                                NAME OF WORK                                                               Tender Paper    Application                                                     Eligibility for Perticipants
GROUP                                                                          (Rs)             (Rs)                                        Paper     Tender Paper Completion
                                                                                                               (Rs)           upto
                                                                                                                                          upto 4.00   up to 3.00 PM
                                                                                                                            2.00 PM.
                                                                                                                                             PM.
   1                                   2                                        3                4              5               6             7            8            9                              10

        Surging of 9(Nine) Nos of river bed tube well (200 mm dia) of
                                                                                                                                                                                   Enlisted Class-III /Specials agencies of
Group-A river Damodar at Union Para ,Madanpur under RCFA Part-II W/S        264564.00          5295.00         55.00        12.03.09      13.03.09      16.03.09    20 days
                                                                                                                                                                                                  PHE Dte
        Scheme .

        Emergent reparing and restoration work of distribution network
Group-B of RONAI and Madanpur village under RCFA Part-II W/S                383603.00          7672.00         80.00        12.03.09      13.03.09      16.03.09    10 days        Enlisted Class-III agencies of PHE Dte
        Scheme.

        Sinking of 2 (Two) Nos Tubewells an surging work of existing
Group-C tubewells at river bed of Ajoy under Baidyanathpur W/S              378059.00          7565.00         80.00        12.03.09      13.03.09      16.03.09    15 days             Enlisted agencies of PHE Dte
        Scheme.

        Urgent surging work of 10 nos river bed tube well 200 mm dia
                                                                                                                                                                                  Enlisted Class-III/Special Class agencies
Group-D of river Damodar at Suryanagar H/W site under Suryanagar W/S        293960.00          5880.00         55.00        12.03.09      13.03.09      16.03.09    15 days
                                                                                                                                                                                                 of PHE Dte
        Scheme (Ph-II).

        Urgent suring work of 10 nos river bed tube well 200 mm dia of
                                                                                                                                                                                  Enlisted /Special Class agencies of PHE
Group-E river damodar at Suryanagar H/W site under Suryanagar W/S           293960.00          5880.00         55.00        12.03.09      13.03.09      16.03.09    20 days
                                                                                                                                                                                                     Dte
        Scheme (Ph-I).

        Urgent suring work of 6 nos river bed tube well 200 mmia of
                                                                                                                                                                                 Enlisted/Special Class/ Outsider agencies
Group-F river Damodar at Suryanagar H/W site under Suryanagar W/S           176376.00          3530.00         55.00        12.03.09      13.03.09      16.03.09    15 days
                                                                                                                                                                                                of PHE Dte
        Scheme (Ph-III).
          Surging & washing & Cleaning of 10 nos river bed tube well at                                                                                                          Enlisted class-III/Specials Class agencies
Group-G                                                                     309615.00          6195.00         80.00        12.03.09      13.03.09      16.03.09    15 days
          Kalajharia under RCFA Part-II W/S Scheme.                                                                                                                                              of PHE Dte




                                                                                                                                                                      Assistant Engineer-I
                                                                                                                                                                     RCFA Division-I,PHE Dte.
                                                                    A      N         N     E     X      U      R        E
                                         Short N.I.T NO:-10/2008-09/AE-I/RCFA Division-I/PHE Dte.
                                                 Ref Memo No:-1704/RCD-I dated:-24.02.09
                                                                                                                             Date of
                                                                                                            Last Date of
                                                                                                                             Issue of      Date of
                                                                                              Cost of       Submission
SL NO/                                                    Estimated Cost   Earnest Money                                     Tender      Droping of    Time of
                        NAME OF WORK                                                       Tender Paper     Application                                               Eligibility for Perticipants
GROUP                                                          (Rs)             (Rs)                                          Paper     Tender Paper Completion
                                                                                               (Rs)            upto
                                                                                                                            upto 4.00   up to 3.00 PM
                                                                                                             2.00 PM.
                                                                                                                               PM.
   1                            2                               3                4               5               6               7           8              9                     10
        Urgent reparing work of pipe line laying of
        UPVC 90 mm dia (OD)at Sidhuli Chasepara,
                                                                                                                                                                     Enlisted Class-IV/Outsider
Group-A Primary School of Chora OHRsite under RCFA          130354.00          2610.00         30.00         12.03.09       13.03.09      16.03.09      10 days
                                                                                                                                                                       agencies of PHE Dte
        Part-II W/S Scheme and under RCFA Division-
        I, PHE Dte.

        Leakage repairing of 150 mm dia & 200 mm dia
                                                                                                                                                                     Enlisted Class-IV/Outsider
Group-B HDPE pipe line at 37 no ward under RCFA             22225.00           560.00          20.00         12.03.09       13.03.09      16.03.09       3 days
                                                                                                                                                                       agencies of PHE Dte
        Division-I Part-II W/S Scheme

        Repairing and renovation incuding painting
        work of Mohishila RCC Elevated Reservoir
                                                                                                                                                                     Enlisted Class-III agencies
Group-C 1.75 lakh gallon capacity and boundary wall         292796.00          5860.00         55.00         12.03.09       13.03.09      16.03.09      20 days
                                                                                                                                                                             of PHE Dte
        other allied works at Mohishila OHR site under
        RCFA Part-II W/S Scheme .

        Construction of room on the 2nd floor of office
                                                                                                                                                                     Enlisted Class-III/Outsider
Group-D buildingof RCFA Division-I & other allied           465774.00          9315.00         80.00         12.03.09       13.03.09      16.03.09      20 days
                                                                                                                                                                       agencies of PHE Dte
        works under RCFA Part-II W/S Scheme

        Laying 2 nos of 100/80 mm dia GI collecting
                                                                                                                                                                     Enlisted agencies of PHE
Group-E main for 2 nos of newly sunk tube wells on          595650.00        11913.00          80.00         12.03.09       13.03.09      16.03.09      20 days
                                                                                                                                                                                Dte
        river Ajoy under Baidyanathpur W/S Scheme
        Laying 160 mm dia (OD) UPVC Pipe line
                                                                                                                                                                     Enlisted Class-II/Outsider
Group-F towards RONAI village at Mangalpur under            863161.00        17265.00          105.00        12.03.09       13.03.09      16.03.09      20 days
                                                                                                                                                                       agencies of PHE Dte
        RCFA Part-II W/S Scheme.
        Repairing & renovation including painting
                                                                                                                                                                     Enlisted Class-III agencies
Group-G work of Mangalpur OHR under RCFA Part-II            352206.00          7045.00         80.00         12.03.09       13.03.09      16.03.09      20 days
                                                                                                                                                                             of PHE Dte
        W/S Scheme.


                                                                                                                                                  Assistant Engineer-I
                                                                                                                                                 RCFA Division-I,PHE Dte.
                                                                           A      N N E X U R E
                                                                                  SPORT QUOTATION
                                                            Ref Memo No:-1571/RCD-I dated:-04.02.09
                                                                                                                                                     Last Date of
                                                                                                       Last Date of                                 Submission of
                                                                                                                           Last Date of issue
 SL NO/                                                   Estimated Cost     Earnest Money        Application & issue of                         Quotation Paper up        Time of         Eligibility Criteria Of
                        NAME OF WORK                                                                                     Quotation Paper up to
 GROUP                                                         (Rs)               (Rs)            Quotation paper up to                             to 3.00 PM &         Completion             Participants
                                                                                                                               3.00 P.M.
                                                                                                        12.30 PM                                 Opening Quotation
                                                                                                                                                 paper up to 3.30 PM
    1                          2                                3                   4                      5                      6                      7                    8                      9
          Renewing cement base paint ,painting work etc
          at Ramprasadpur H/W site for commissioning                       .@.2.00% at the time
                                                                                                                                                                                       Enlisted contactors of PHE
Group-A   of Andal W/S Scheme under Andal W/S Scheme       106601.00         of perforforming           04.02.09               04.02.09               04.02.09             15 days
                                                                            tender agreement                                                                                                      Dte
          .
         Emergent work of MS pipe of 250 mm dia & 350
         mm dia & allied works on Singanaron bridge                        .@.2.00% at the time
                                                                                                                                                                                       Enlisted contactors of PHE
Grroup-B and infront of Dignala OHR site under Andal       493945.00         of perforforming           04.02.09               04.02.09               04.02.09             15 days
                                                                            tender agreement                                                                                                      Dte
         W/S Scheme.




                                                                                                                                                                        Assistant Engineer-I
                                                                                                                                                                       RCFA Division-I,PHE Dte
                                                                           A      N N E X U R E
                                                                                  SPORT QUOTATION
                                Ref Memo No:-Camp (Andal Inauguration)/AE-I/RCD-I dated:-02.02.09
                                                                                                                                                     Last Date of
                                                                                                       Last Date of                                 Submission of
                                                                                                                           Last Date of issue
 SL NO/                                                   Estimated Cost     Earnest Money        Application & issue of                         Quotation Paper up        Time of         Eligibility Criteria Of
                        NAME OF WORK                                                                                     Quotation Paper up to
 GROUP                                                         (Rs)               (Rs)            Quotation paper up to                             to 3.00 PM &         Completion             Participants
                                                                                                                               3.00 P.M.
                                                                                                        12.30 PM                                 Opening Quotation
                                                                                                                                                 paper up to 3.30 PM

   1                             2                              3                   4                      5                      6                      7                    8                      9
          Supplying fitting & fixing of Black Granite
          ,Marble slab including lettering embossing as
                                                                           .@.2.00% at the time
          per specimen in connection with inauguration
Group-A                                                    160245.00         of perforforming           03.02.09               03.02.09               03.02.09              2 days     Enlisted agency of PHE Dte
          of Andal W/S Scheme at Pump House under                           tender agreement
          RCFA Division-I, PHE Dte .

         Supplying fitting & fixing on hire basis
         decorative Chair ,Table ,Pandel etc in                            .@.2.00% at the time
                                                                                                                                                                                       Reserved for Engineers-Co-
Grroup-B connection with foundation stone laying at 160413.00                of perforforming           03.02.09               03.02.09               03.02.09              2 days
                                                                            tender agreement                                                                                             Operative Society Ltd
         Andal JK ropeways ground under RCFA Division-
         I ,PHE Dte




                                                                                                                                                                        Assistant Engineer-I
                                                                                                                                                                       RCFA Division-I,PHE Dte
                                                               A      N    N         E   X        U     R    E
                                       Short N.I.Q NO:-78/2008-09/AE-I/RCFA Division-I/PHE Dte
                                             Ref Memo No:- 1604/RCD-I dated:-10.02.2009
                                                                                                         Date of
                                                                                         Last Date of                 Date of
                                                                            Cost of                      Issue of
                                                                                         Submission                 Droping of
SL NO/                                              Earnest Money          Quotatiion                   Quotation                   Time of
                   NAME OF WORK                                                          Application                 Quotation                         Eligibility for Perticipants
GROUP                                                    (Rs)                Paper                        Paper                   Completion
                                                                                             upto                   Paper up to
                                                                              (Rs)                      upto 4.00
                                                                                          2.00 PM.                    3.00 PM
                                                                                                           PM.
  1                       2                                3                   4              5              6          7               8                           9


         Renovation work of 700 mm dia R/M
         after replacing existing GRP pipe by   .@. 2.00% on Quoted rate
  1)     using MS pipe over IISCO Bridge &        deposit at the time of    125.00        04.03.09      05.03.09     09.03.09       20 days      Enlisted Class-II agencies of PHE Dte
         other allied work under RCFA Part-II    performing agreement.
         W/S Scheme .




                                                                                                                                   Assistant Engineer-I
                                                                                                                                  RCFA Division-I,PHE Dte.
                                                                    A      N         N     E    X      U      R        E
                                        Short N.I.T NO:-12/2008-09/AE-I/RCFA Division-I/PHE Dte.
                                                Ref Memo No:-1736/RCD-I dated:-27.02.09
                                                                                                           Last Date of    Date of Issue
                                                                                                                                            Date of
                                                                                              Cost of      Submission       of Tender
SL NO/                                                    Estimated Cost   Earnest Money                                                  Droping of    Time of
                        NAME OF WORK                                                       Tender Paper    Application        Paper                                       Eligibility for Perticipants
GROUP                                                          (Rs)             (Rs)                                                     Tender Paper Completion
                                                                                               (Rs)           upto          upto 4.00
                                                                                                                                         up to 3.00 PM
                                                                                                            2.00 PM.           PM.

   1                            2                               3                4              5               6               7            8                 9                      10
        Renewing lead joint and supply ,fitting fixing
                                                                                                                                                                         Enlisted agencies of PHE
Group-A 450 mm dia MJ at Kalajharia to Dhenua under         270693.00          5414.00         55.00        09.03.09        12.03.09     16.03.09          07 days
                                                                                                                                                                                    Dte
        RCFA Part-II W/s Scheme
        Renewing lead joint and supply ,fitting fixing
                                                                                                                                                                         Enlisted agencies of PHE
Group-B 450 mm dia MJ at Dhenua to Benali OHR under         279121.00          5582.00         55.00        09.03.09        12.03.09     16.03.09          07 days
                                                                                                                                                                                    Dte
        RCFA Part-II W/s Scheme
        Urgent basis repairng of busting 450 mm dia
        R/M and construction of retaining wall (Brick )                                                                                                                  Enlisted agencies of PHE
Group-C                                                     257101.00          5142.00         55.00        09.03.09        12.03.09     16.03.09          07 days
        near Dhenua under Kalajharia Part-II W/S                                                                                                                                    Dte
        Scheme




                                                                                                                                                     Assistant Engineer-I
                                                                                                                                                    RCFA Division-I,PHE Dte.
                                                                     A      N         N     E     X      U      R        E
                                          Short N.I.T NO:-11/2008-09/AE-I/RCFA Division-I/PHE Dte.
                                                  Ref Memo No:-1706/RCD-I dated:-25.02.09
                                                                                                             Last Date of    Date of Issue
                                                                                                                                              Date of
                                                                                               Cost of       Submission       of Tender
SL NO/                                                     Estimated Cost   Earnest Money                                                   Droping of    Time of
                         NAME OF WORK                                                       Tender Paper     Application        Paper                                 Eligibility for Perticipants
GROUP                                                           (Rs)             (Rs)                                                      Tender Paper Completion
                                                                                                (Rs)             upto         upto 4.00
                                                                                                                                           up to 3.00 PM
                                                                                                              2.00 PM.           PM.

   1                            2                                3                4               5               6               7            8            9                     10

        Withdraing damaged 80 mm dia AC pipe &
        laying 75 mm dia UPVC Pipe at Panihati work                                                                                                                   Engineers Co-Operative
Group-A                                                      134938.00          2700.00         30.00         09.03.09         12.03.09    16.03.09      15 days
        shop Benali OHR site under RCFA Part-II W/S                                                                                                                        Society Ltd
        Scheme

        Emergency withdrawing 80 mm dia AC pipe
        line and laying of 110/90 mm dia (OD) UPVC
                                                                                                                                                                     Enlisted Class-III/Outsider
Group-B pipe line at Bahadurpur village Panchayet            237234.00          4745.00         55.00         09.03.09         12.03.09    16.03.09      07 days
                                                                                                                                                                       agencies of PHE Dte
        office para of Chinchuria Zone under RCFA
        Part-II W/S Scheme (Mtc 08-09)

        Laying MS pipe under clavert near Andal More
        for distribution line of Andal village and Andal                                                                                                              Engineers Co-Operative
Group-C                                                      954210.00        19084.00          105.00        09.03.09         12.03.09    16.03.09      15days
        More & allied works for Andal W/S Scheme                                                                                                                           Society Ltd
        under RCFA Division-I,PHE Dte
        Supplying & laying of 90 mm dia (OD) UPVC
        pipe line at new jamsol village at Bahadurpur                                                                                                                Enlisted Class-III/Outsider
Group-D                                                      264265.00          5285.00         55.00         09.03.09         12.03.09    16.03.09      15 days
        of Chinchuria zone under RCFA Part-II W/S                                                                                                                      agencies of PHE Dte
        Scheme (Mtc 08-09)

        Remodeling of 450 mm dia R/M by MS pipe
                                                                                                                                                                     Enlisted Class-II/Outsider
Group-E over Nunia khal for ASTA W/S Scheme under            677028.00        13541.00          80.00         09.03.09         12.03.09    16.03.09      15 days
                                                                                                                                                                       agencies of PHE Dte
        RCFA Division-I PHE Dte

        Repairing for bursting of 450 mm dia R/M at
        Surjyanagar and Renovation work of 450 mm                                                                                                                    Enlisted Class-IV agencies
Group-F                                                      175100.00          3502.00         55.00         09.03.09         12.03.09    16.03.09      07 days
        dia R/M near Kulti Bridge for ASTA W/S                                                                                                                               of PHE Dte
        Scheme under RCFA Division-I PHE Dte

          Reparing & laying of 80 mm dia UPVC pipe line
          and other allied works at Dhakinkhanda near                                                                                                                 Engineers Co-Operative
Group-G                                                      116989.00          2340.00         30.00         09.03.09         12.03.09    16.03.09      10 days
          Khandra OHR & S.V. Chamber reparing under                                                                                                                        Society Ltd
          RCFA Division-I during the year 2008-09

          Repairing of spout construction of drain &
                                                                                                                                                                     Enlisted agencies of PHE
Group-H   washout chamber at Mohishila ohr site under        70245.00           1756.00         20.00         03.03.09         04.03.09    06.03.09      10 days
                                                                                                                                                                                Dte
          RCFA Part-II W/S Schem
 Assistant Engineer-I
RCFA Division-I,PHE Dte.
                                                              A     N     N         E   X        U     R    E
                                      Short N.I.Q NO:-79/2008-09/AE-I/RCFA Division-I/PHE Dte
                                            Ref Memo No:- 1726/RCD-I dated:-26.02.2009
                                                                                                        Date of
                                                                                        Last Date of                 Date of
                                                                           Cost of                      Issue of
                                                                                        Submission                 Droping of
SL NO/                                             Earnest Money          Quotatiion                   Quotation                   Time of
                   NAME OF WORK                                                         Application                 Quotation                         Eligibility for Perticipants
GROUP                                                   (Rs)                Paper                        Paper                   Completion
                                                                                            upto                   Paper up to
                                                                             (Rs)                      upto 4.00
                                                                                         2.00 PM.                    3.00 PM
                                                                                                          PM.
  1                      2                                3                   4              5             6           7               8                           9


         Supply & delivery of 450 mm dia       .@. 2.00% on Quoted rate
  1)     S/V at Searsole store under RCFA        deposit at the time of     80.00        09.03.09      12.03.09     13.03.09       15 days      Enlisted Class-II agencies of PHE Dte
         Part -II W/S Scheme                    performing agreement.




         Supply & delivery of 450 mm dia
                                               .@. 2.00% on Quoted rate
         Bolted Coller & Mechanical Joint at
  2)                                             deposit at the time of     80.00        09.03.09      12.03.09     13.03.09       15 days      Enlisted Class-II agencies of PHE Dte
         Searsole store under RCFA Part -II     performing agreement.
         W/S Scheme




                                                                                                                                  Assistant Engineer-I
                                                                                                                                 RCFA Division-I,PHE Dte.
                                                                               A     N          N    E       X     U     R        E
                                               Short N.I.T NO:-07/2008-09/AE-II/RCFA Division-I/PHE Dte.
                                                     Ref Memo No:-102/AE-II/RCD-I dated:-12.03.09
                                                                                                                                       Date of
                                                                                                                   Last Date of
                                                                                                                                       Issue of      Date of
                                                                                                       Cost of     Submission
SL NO/                                                        Estimated Cost       Earnest Money                                       Tender      Droping of    Time of
                         NAME OF WORK                                                               Tender Paper   Application                                                  Eligibility for Perticipants
GROUP                                                              (Rs)                 (Rs)                                            Paper     Tender Paper Completion
                                                                                                        (Rs)           upto
                                                                                                                                      upto 4.00   up to 3.00 PM
                                                                                                                    2.00 PM.
                                                                                                                                         PM.
  1                              2                                  3                    4               5              6                  7           8           9                        10

                                                                                                                                                                            Bonafied Outsider agency of PHE
         Reparing bathroom,Water Supply system of
                                                                                                                                                                             Dte having credential of similar
  1)     Office of the SE/RCFA W/S Circle under RCFA            36798.00              920.00           20.00        25.03.09          26.03.09      27.03.09     5 days
                                                                                                                                                                            nature of work /Enlisted agency of
         Division-I,PHE Dte
                                                                                                                                                                                         PHE Dte


         Jungle cutting ,chillchelling ,dressing cleaning
  2)     etc surrounding Kalyaneswari Township under            99657.00              2500.00          30.00        25.03.09          26.03.09      27.03.09     5 days                     DO
         RCFA Part-I W/S Scheme.


         Additional work in connection with the work of
         repairing of surface road surrounding staff
  3)                                                            88044.00              2201.00          30.00        25.03.09          26.03.09      27.03.09     7 days                     DO
         quarter & WTP premises at Kalyaneswari town
         ship under RCFA Pt-I W/S Scheme .


         Making round -O-Clock guarding arrangement
         through Govt Registered Ex-military security                                                                                                                       Enlisted/Outsider agency of PHE
  4)     agency in different places of Darbardanga H/W          338599.00             6800.00          80.00        25.03.09          26.03.09      27.03.09     1 year      Dte having credential in similar
         site and Nandi OHR site under RCFA Division-                                                                                                                                nature of work .
         I,PHE Dte (w.e.f 01.04.09 to 31.03.2010)


         Remodeling of internal road and beutification
  5)     of Nandi OHR site under Jamuria W/S Scheme             261887.00             5240.00          55.00        25.03.09          26.03.09      27.03.09    10 days                     Do
         .

         Day to day temporary guarding arrangment of
         pipe & specials civil structures all other related                                                                                                                 Enlisted/Outsider agency of PHE
  6)     to the same at Barul OHR site under Aug of             95112.00              2380.00          30.00        25.03.09          26.03.09      27.03.09     1 year      Dte having credential in similar
         Jamuria Municipality W/S Scheme (w.e.f                                                                                                                                      nature of work .
         01.04.09 to 31.03.10)
         Construction of Guard wall with in pump house
                                                                                                                                                                            Enlisted/Outsider agency of PHE
         & CWR and allied works at Nandi OHR site
  7)                                                            436283.00            10907.00          80.00        25.03.09          26.03.09      27.03.09    12 days      Dte having credential in similar
         under Aug of Jamuria W/S Scheme under RCFA
                                                                                                                                                                                     nature of work .
         Division-I ,PHE Dte
         Laying of 63 mm dia (OD) UPVC pipe line as                                                                                                                         Enlisted/Outsider agency of PHE
  8)     urgent basis at Gourandi forest office under           58855.00              1471.00          20.00        25.03.09          26.03.09      27.03.09    10 days      Dte having credential in similar
         Jamgram -Panuria W/S Scheme                                                                                                                                                 nature of work .
      Urgent basis withdrawing of 80 mm dia 100
      mm dia AC pipe line & laying 90 (OD) and 110
                                                                                                                                          Enlisted/Outsider agency of PHE
      mm dia (OD) UPVC pipe line near Kapista More
9)                                                       149370.00   3000.00    55.00   25.03.09   26.03.09   27.03.09      5 days         Dte having credential in similar
      & construction of SV Chamber stand post &
                                                                                                                                                   nature of work .
      other allied works under Kharabor W/s Scheme
      .
      Urgent basis repairing & reconstruction of
                                                                                                                                          Enlisted/Outsider agency of PHE
      boundary wall north & south (part) portion at
10)                                                      213418.00   4268.00    55.00   25.03.09   26.03.09   27.03.09      7 days         Dte having credential in similar
      Baraboni OHR site under RCFA Part-I W/S
                                                                                                                                                   nature of work .
      Scheme (Length =60 mtr).
      Balance work in connection with the work of
      emergency basis repairing and reconstruction
                                                                                                                                         Enlisted Class-II agency of PHE Dte
11)   of existing damaged top dome of RCC elevated       838834.00   16800.00   80.00   25.03.09   26.03.09   27.03.09      10 days
                                                                                                                                                            .
      reservoir of capacity 2.00 lakh gallon at
      Baraboni under RCFA Part-I W/s Scheme.
      Repairing & construction of flower glories
      concrete road including laying pavers at
                                                                                                                                          Enlisted /Outsider agency of PHE
12)   Kalyaneswari WTP near Upper Garden & lower         617627.00   12400.00   80.00   25.03.09   26.03.09   27.03.09      7 days
                                                                                                                                                        Dte .
      garden near coddle & swimming pull under
      RCFA Part-I W/S Scheme.
      Cleaning & jungles cutting at 13 OHR site under
                                                                                                                                          Enlisted/Outsider agency of PHE
13)   RCFA Part-I W/S Scheme under RCFA Division-I,      25755.00     650.00    20.00   25.03.09   26.03.09   27.03.09       7days
                                                                                                                                                        Dte .
      PHE Dte.
      Construction of Boundary wall Amulia Ghat site
14)   under Jamgram-Panuria (extension) Kharabar         241783.00   4840.00    55.00   25.03.09   26.03.09   27.03.09      15 days          Enlisted agency of PHE Dte
      W/S Scheme (80 mtr)
      Construction of Boundary wall Amulia Ghat site
15)   under Jamgram-Panuria (extension) Kharabar         182948.00   3660.00    55.00   25.03.09   26.03.09   27.03.09      15 days          Enlisted agency of PHE Dte
      W/S Scheme (60 mtr) (Pt-V)

      Construction of Boundary wall Amulia Ghat site
16)   under Jamgram-Panuria (extension) Kharabar         182948.00   3660.00    55.00   25.03.09   26.03.09   27.03.09      15 days          Enlisted agency of PHE Dte
      W/S Scheme (60 mtr) (Pt-VII)

      Repairing & maintenance of one room (small) 4
                                                                                                                                          Enlisted/Outsider agency of PHE
17)   Nos staff Quarter at Kalyaneswari township         108021.00   2160.00    30.00   25.03.09   26.03.09   27.03.09      15 days
                                                                                                                                                        Dte .
      under RCFA Part-I W/S Scheme.

      Repairing & reconstruction of plinth protection
      including surface drain surrounding filter house                                                                                    Enlisted /Outsider agency of PHE
18)                                                      217406.00   4350.00    55.00   25.03.09   26.03.09   27.03.09      10 days
      at Chemical House building at W.T.P at                                                                                                            Dte .
      Kalyneswari under Part-I W/S Scheme.




                                                                                                                          Assistant Engineer-II
                                                                                                                         RCFA Division-I,PHE Dte.
                                                                             A    N         N    E     X        U       R       E
                                               Short N.I.T NO:-08/2008-09/AE-II/RCFA Division-I/PHE Dte.
                                                         Ref Memo No:-103/RCD-I dated:-13.03.09
                                                                                                                                     Date of
                                                                                                                    Last Date of
                                                                                                                                     Issue of      Date of
                                                                                                    Cost of         Submission
SL NO/                                                         Estimated Cost    Earnest Money                                        Tender     Droping of    Time of
                          NAME OF WORK                                                           Tender Paper       Application                                               Eligibility for Perticipants
GROUP                                                               (Rs)              (Rs)                                             Paper    Tender Paper Completion
                                                                                                     (Rs)               upto
                                                                                                                                    upto 4.00   up to 3.00 PM
                                                                                                                     2.00 PM.
                                                                                                                                        PM.
  1                               2                                  3                  4             5                  6               7           8           9                        10
         Construction of Boundary wall Amulia Ghat site
                                                                                                                                                                          Enlisted /Outsider agency of PHE
  1)     under Jamgram-Panuria (extension) Kharabar W/S          182948.00          3660.00          55.00           25.03.09       26.03.09      27.03.09    15 days
                                                                                                                                                                                         Dte
         Scheme (60 mtr) (Pt-IV)
         Construction of Boundary wall Amulia Ghat site
  2)     under Jamgram-Panuria (extension) Kharabar W/S          182948.00          3660.00          55.00           25.03.09       26.03.09      27.03.09    15 days                     DO
         Scheme (60 mtr) (Pt-VI)
         Construction of Boundary wall Amulia Ghat site
  3)     under Jamgram-Panuria (extension) Kharabar W/S          182948.00          3660.00          55.00           25.03.09       26.03.09      27.03.09    15 days                     DO
         Scheme (60 mtr) (Pt-I)
         Construction of Boundary wall Amulia Ghat site
  4)     under Jamgram-Panuria (extension) Kharabar W/S          182948.00          3660.00          55.00           25.03.09       26.03.09      27.03.09    15 days                     Do
         Scheme (60 mtr) (Pt-II)
         Construction of Boundary wall Amulia Ghat site
  5)     under Jamgram-Panuria (extension) Kharabar W/S          182948.00          3660.00          55.00           25.03.09       26.03.09      27.03.09    15 days                     DO
         Scheme (60 mtr) (Pt-III)
         Construction of Guard Room at Kalyaneswari
  6)                                                             422605.00          8452.00          80.00           25.03.09       26.03.09      27.03.09    60 days       Enlisted agency of PHE Dte
         Bungalow under RCFA Part-I W/S Scheme
         Supply of plants ,seeds & tools for IB garden at
                                                                                                                                                                          Enlisted /Outsider agency of PHE
  7)     Kayaneswari under RCFA Part-I W/S Scheme (For           125028.00          2501.00          30.00           25.03.09       26.03.09      27.03.09    15 days
                                                                                                                                                                                         Dte
         1998-99)

         Day to dosing of Hypo chloride solution /Bleaching
  8)     powder /Chlorine tablet in the CWR at Ramnagar          39348.00             790.00         20.00           25.03.09       26.03.09      27.03.09    5 months      Enlisted agency of PHE Dte .
         under Kulti W/S Schem (w.e.f 01.04.09 to 31.08.09)

         Trial run including operation and mtc different dia
         AC distribution line at Gourbazar ,Khayerboni
  9)     Jamjuri, Bindudi village and its adjoining areas        92880.00           1860.00          30.00           25.03.09       26.03.09      27.03.09    4 months      Enlisted agency of PHE Dte .
         under Aug extension of Jamgram panuria
         (Khorabar) W/S Scheme (w.e.f 01.04.09 to 31.07.09)
      Repairing & renovation of Guard room at Nandi
                                                                                                                                            Enlisted /Outsider agencies of PHE
10)   under Aug: of Jamuria W/s Scheme under RCFA          481610.00   9632.20    80.00    25.03.09   26.03.09   27.03.09      15 days
                                                                                                                                                            Dte
      Division-I, PHE Dte.
      Balance work in connection with the work of
      repairing & maintenance of two room (Big) staff
                                                                                                                                             Enlisted /Outsider agency of PHE
11)   quarter no -8 & one room staff quarter no-81 at      63441.00    1270.00    20.00    25.03.09   26.03.09   27.03.09      15 days
                                                                                                                                                            Dte
      Kalyaneswari Twon ship under RCFA Part-I W/S
      Scheme.
      O & Mtc of IE plant at Churulia river bed H/W site
12)   under Churulia W/S Scheme (w.e.f 01.04.09 to         80366.00    1607.00    30.00    25.03.09   26.03.09   27.03.09      1 years          Enlisted agency of PHE Dte
      31.03.2010)
      Balance work in connection with the work of
      emergency basis repairing and reconstruction of
13)   existing damaged top dome of RCC elevated            820320.00   16406.00   105.00   25.03.09   26.03.09   27.03.09      15 days          Enlisted agency of PHE Dte
      reservoir of capacity 1.75 lakh gallon at Ethora
      under RCFA Part-I W/s Scheme.
      Reparing & reconstruction of road side drain extra
      earth cutting & chilchalling of raod side flank at                                                                                     Enlisted /Outsider agency of PHE
14)                                                        186406.00   3728.00    55.00    25.03.09   26.03.09   27.03.09      15 days
      Kalyaneswari town ship under RCFA Part-I W/S                                                                                                          Dte
      Scheme.
      Survey of Birkulti ,Hijolgora ,Patharchur mouza or                                                                                    Enlisted/Outsider agencies having
15)                                                        242400.00   4848.00    55.00    25.03.09   26.03.09   27.03.09      10 days
      rural part under Jamuria W/S Scheme.                                                                                                              credential
      Reparing & reconstruction of boundary wall back
                                                                                                                                             Enlisted /Outsider agency of PHE
16)   side (Part) at Gangutia OHR under RCFA Part-I W/S    156024.00   3120.00    55.00    25.03.09   26.03.09   27.03.09      15 days
                                                                                                                                                            Dte
      Scheme.




                                                                                                                             Assistant Engineer-II
                                                                                                                            RCFA Division-I,PHE Dte.
                                                                      A      N          N    E     X        U      R       E
                                                  Short N.I.T NO:-14/2008-09/EE/RCD-I/PHE Dte.
                                                    Ref Memo No:-1785/RCD-I dated:- 09.03.09
                                                                                                            Last Date of   Date of Issue
                                                                                                                                            Date of
                                                                                                Cost of     Submission      of Tender
SL NO/                                                      Estimated Cost   Earnest Money                                                Droping of    Time of
                         NAME OF WORK                                                        Tender Paper   Application       Paper                                    Eligibility for Perticipants
GROUP                                                            (Rs)             (Rs)                                                   Tender Paper Completion
                                                                                                 (Rs)           upto        upto 4.00
                                                                                                                                         up to 3.00 PM
                                                                                                             2.00 PM.          PM.

  1                             2                                 3                 4              5               6            7            8            9                        10

                                                                                                                                                                    Bonafide agency of PHE Dte
         Repairing for 1.75 lakh gallon capacity OHR at
                                                                                                                                                                    having credential in similar
  1)     Nandi Under Jamuria W/s Scheme under RCFA           448489.00           8970.00         80.00          25.03.09    26.03.09     27.03.09      15 days
                                                                                                                                                                   nature of work / Construction
         Division-I ,PHE Dte (OG)
                                                                                                                                                                   OHR at least 1.75 lakh gallon.


         Withdraing 100 mm dia damaged AC pipe line &
         relaying 160 mm dia UPVC at CL Jambandh to
  2)                                                         393365.00           7870.00         80.00          25.03.09    26.03.09     27.03.09      5 days      Enlisted Class-III/IV of PHE Dte
         Siduli ground under Chora distribution head
         work site under RCFA Part-II W/S Scheme.(Mtc)


         Laying MS/DI pipe & allied works at Dignala OHR
                                                                                                                                                                     Reserved for Engineers Co-
  3)     wihtin Andal W/s Scheme under RCFA Division-I,      479292.00           9590.00         80.00          25.03.09    26.03.09     27.03.09      7 days
                                                                                                                                                                       Operative Society Ltd
         PHE Dte (OG)

         Pushing 600 mm dia RCC pipe unde the road by
         Hydraulic Jack pushing method including pushing
                                                                                                                                                                     Bonafide agency of PHE Dte
         150 mm dia MS pipe inside of 600 mm dia and
                                                                                                                                                                     having credential in similar
  4)     inter connection of existing line for laying        782256.00         15645.00          80.00          25.03.09    26.03.09     27.03.09      7 days
                                                                                                                                                                   nature of work i.e. Jack Pushing
         distribution system and other allied works under
                                                                                                                                                                         work in last 3 years
         Augmentation of Jamuria W/S Scheme near
         Birkulti village (Part-A).(OG)

         Pushing 600 mm dia RCC pipe unde the road by
         Hydraulic Jack pushing method including pushing
         150 mm dia MS pipe inside of 600 mm dia and
  5)     inter connection of existing line for laying        705342.00         14110.00          80.00          25.03.09    26.03.09     27.03.09      7 days                      DO
         distribution system and other allied works under
         Augmentation of Jamuria W/S Scheme near
         Birkulti village (Part-B).(OG)
      Construction of Guard wall & other allied works                                                                                Bonafide contactors of PHE Dte
      (western Side) in connection to 5.00 MGD                                                                                        having sufficient credential in
6)    Collector well at Darbardanga H/W site under        906841.00   18140.00   105.00   25.03.09   26.03.09   27.03.09   5 days          Collector well works,
      Augmentation of Jamuria W/S Scheme (Part-I)                                                                                   Clariflocculator works during last
      (OG)                                                                                                                                        5 years.

      Construction of Guard wall & other allied works
      (Easten Side) in connection to 5.00 MGD
7)    Collector well at Darbardanga H/W site under        887128.00   17745.00   105.00   25.03.09   26.03.09   27.03.09   5 days                  DO
      Augmentation of Jamuria W/S Scheme (Part-II)
      (OG)

      Costruction of surface drain interconnection of
      distribution pipe line from OHR fencing for front
      of Boundary wall pinth protection of Chlorine
                                                                                                                                     Enlisted Class-III agency of PHE
8)    room development of land dismantalling existing     423841.00   8480.00    80.00    25.03.09   26.03.09   27.03.09   7 days
                                                                                                                                                   Dte
      shed and other allied work at Barul OHR site
      under Augmentation of Jamuria Municipality
      W/S Scheme (OG)

      Laying of 100 mm dia GI collecting main including
      Guard pilling and sinking of new tube well at                                                                                  Enlisted Class-II agency of PHE
9)                                                        755004.00   15100.00   105.00   25.03.09   26.03.09   27.03.09   7 days
      Madanpur on the river bed of Damodar under                                                                                                   Dte
      RCFA Part-II W/S scheme. (Mtc)

                                                                                                                                      Bonafide agency of PHE Dte
      Pushing of 600 mm dia RCC (NP3) Hume pipe at
                                                                                                                                      having credential in similar
10)   Bijay Nagar More by Jackpushing method under        631250.00   12625.00   80.00    25.03.09   26.03.09   27.03.09   7 days
                                                                                                                                    nature of work i.e. Jack Pushing
      RCFA Division-I,PHE Dte (OG)
                                                                                                                                          work in last 3 years

      Laying of 600 mm dia RCC (NP3) hume pipe
      including supply & laying 150 mm dia MS pipe &                                                                                  Enlisted Class-II/III agency of
11)                                                       690294.00   13806.00   80.00    25.03.09   26.03.09   27.03.09   7 days
      other allied works by special technic at Amdiha                                                                                            PHE Dte
      More under Itapara W/S Scheme (Part-A) (OG)

      Reparing /Renovation of CWR one B type quarter
12)   and allied works at Surjanagar under ASTA W/S       212157.00   4245.00    55.00    25.03.09   26.03.09   27.03.09   7 days     Working agency of PHE Dte
      Scheme.(Mtc)
      Repairing /renovation of Boundary wall and
      allied works at Nandi OHR site under                                                                                           Enlisted Class-II agency of PHE
13)                                                       528627.00   10573.00   80.00    25.03.09   26.03.09   27.03.09   7 days
      Augmentation of Jamuria W/S Scheme RCFA                                                                                                      Dte
      Division-I PHE Dte . (OG)

      Aditional work in connection with the work of                                                                                    Enlisted Class-II/ Working
      construciton of one no two stored rest shed for                                                                                  agency of PHE Dte having
14)                                                       708601.00   14172.00   80.00    25.03.09   26.03.09   27.03.09   7 days
      head work site at Darbardanga under Aug: of                                                                                    sufficient credential in similar
      Jamuria Municipality W/S Scheme . (OG)                                                                                                 nature of work.
      Balance work in connection with the work of
      construction of one no two storied rest shed for
15)                                                       829664.00   16595.00   105.00   25.03.09   26.03.09   27.03.09        7 days                   DO
      H/W site at Darbardanga under Aug: of Jamuria
      Municipality W/s Scheme.(OG)


      Cleaning of pond near Inspection Bunglow under                                                                                        Enlisted Class-II agnencies of
16)                                                       510000.00   10200.00   80.00    25.03.09   26.03.09   27.03.09        7 days
      RCFA Part-I W/S Scheme . (Mtc)                                                                                                                  PHE Dte.


      Special emergency repairing & reconstruction of                                                                                        Working agnecy of PHE Dte
      concrete road including laying pavers in front of                                                                                   having at least 70% credential in
17)                                                       199091.00   3985.00    55.00    25.03.09   26.03.09   27.03.09        7 days
      filter house at Kalyaneswari WTP area under                                                                                          similar nature of work in single
      RCFA Part-I W/S Scheme (Part-C)(OG)                                                                                                         order in PHE Dte.

      Laying of 600 mm dia RCC (NP3) hume pipe
      including supply & laying 150 mm dia MS pipe &
                                                                                                                                           Bonafide agency having similar
18)   other allied works by special technic without       690294.00   13806.00   80.00    25.03.09   26.03.09   27.03.09        7 days
                                                                                                                                             nature of work in PHE Dte.
      earth cutting at Amdiha More under Itapara W/S
      Scheme (Part-B) (OG)




                                                                                                                             Executive Engineer
                                                                                                                           RCFA Division-I,PHE Dte.
                                                                       A      N          N    E     X        U      R       E
                                                   Short N.I.T NO:-15/2008-09/EE/RCD-I/PHE Dte.
                                                     Ref Memo No:-1786/RCD-I dated:- 09.03.09
                                                                                                             Last Date of   Date of Issue
                                                                                                                                             Date of
                                                                                                 Cost of     Submission      of Tender
SL NO/                                                       Estimated Cost   Earnest Money                                                Droping of    Time of
                          NAME OF WORK                                                        Tender Paper   Application       Paper                                    Eligibility for Perticipants
GROUP                                                             (Rs)             (Rs)                                                   Tender Paper Completion
                                                                                                  (Rs)           upto        upto 4.00
                                                                                                                                          up to 3.00 PM
                                                                                                              2.00 PM.          PM.

  1                             2                                  3                 4              5               6            7            8            9                        10

         Construction of cement concrete road (Width 5
         mtr) including laying pavers & other allied works                                                                                                           Enlisted Class-II/III agency of
  1)                                                          943207.00         18865.00          105.00         25.03.09    26.03.09     27.03.09      10 days
         surrounding Darbardanga H/W site under Aug: of                                                                                                                         PHE Dte
         Jamuria W/S Scheme (Part-A)

         Construction of cement concrete road (Width 4
         mtr) including laying pavers & other allied works                                                                                                          Enlisted Class-II agency of PHE
  2)                                                          938874.00         18777.00          105.00         25.03.09    26.03.09     27.03.09      10 days
         surrounding Darbardanga H/W site under Aug: of                                                                                                                           Dte
         Jamuria W/S Scheme (Part-B)

         Inter connection with delivery line by 450 mm
         dia MS pipe line and allied works at Nandi OHR                                                                                                              Enlisted Class-II/III agency of
  3)                                                          292830.00           5860.00         55.00          25.03.09    26.03.09     27.03.09      7 days
         site for Jamuria W/S Scheme under RCFA                                                                                                                                 PHE Dte
         Division-I, PHE Dte

         Repairing & remodeling of AC pipe line with
                                                                                                                                                                       Enlisted Class-II/Bonafide
         laying of 90 mm dia (OD) UPVC pipe line at
                                                                                                                                                                     outsider agencies of PHE Dte
  4)     Deshermohan ,Andandapur Gobindapur,Churulia          409040.00           8181.00         80.00          25.03.09    26.03.09     27.03.09      5 days
                                                                                                                                                                      having credential in similar
         Sekhpara & Churulia village under Churulia W/S
                                                                                                                                                                            nature of work.
         Scheme (Part-A)
         Repairing & remodeling of AC pipe line with
         laying of 90 mm dia (OD) UPVC pipe line at
  5)     Deshermohan ,Andandapur Gobindapur,Churulia          410086.00           8202.00         80.00          25.03.09    26.03.09     27.03.09      7 days                      DO
         Sekhpara & Churulia village under Churulia W/S
         Scheme (Part-B)

         Construction of delivery line (Part) by MS pipe
         for new OHR at Nandi and Old OHR at Nandi &
                                                                                                                                                                    Engineers Co-Operative Society
  6)     plinth protection ,drain ,KOTA stone and allied      628004.00         12560.00          80.00          25.03.09    26.03.09     27.03.09      7 days
                                                                                                                                                                                 Ltd
         work for Jamuria W/S Scheme under RCFA
         Division-I,PHE Dte.

         Interconnection by MS pipe from pump house to
         new OHR and old OHR at Nandi and allied works                                                                                                              Enlisted Class-II agency of PHE
  7)                                                          869719.00         17395.00          105.00         25.03.09    26.03.09     27.03.09      7 days
         for Jamuria W/S Scheme under RCFA Division-                                                                                                                              Dte
         I,PHE Dte.
      Laying 150 mm dia & 100 mm dia GI pipe for                                                                                             Bonafide agency of PHE Dte
      collecting main including Guard pilling including                                                                                    having valid Electrical license &
8)                                                        765656.00   15315.00   105.00   25.03.09   26.03.09   27.03.09       10 days
      Connection to Pump motor at Tirat Colliery on                                                                                         sufficient credential in similar
      river Damador under Tirat Colliery W/S Scheme .                                                                                               nature of work.

      Repairing & renovation of diversion road for
                                                                                                                                           Enlisted Class-I/II agency of PHE
9)    villagers at Darbardanga H/W site under Aug: of     970623.00   19415.00   105.00   25.03.09   26.03.09   27.03.09        7 days
                                                                                                                                                          Dte
      Jamuria W/S Scheme


      Laying of 90 mm dia UPVC pipe line at Palasban                                                                                         Enlisted Class-III/IV agency
10)   village of Mangalpur distribution zone under        286035.00   5721.00    55.00    25.03.09   26.03.09   27.03.09       10 days      /Bonafide outsiders agency of
      RCFA Part-II W/S Scheme.                                                                                                                        PHE Dte .

      Surging of 8 nos river bed tube well (200 mm dia
                                                                                                                                           Enlisted Specials class agency of
11)   ) for river Damodar at Andal under RCFA Division- 235168.00     4703.00    55.00    25.03.09   26.03.09   27.03.09        7 days
                                                                                                                                                       PHE Dte
      I PHE Dte

      Repairing of boundary wall ,drain road allied
                                                                                                                                           Enlisted Class-III agency of PHE
12)   works a Pariharpur OHR site under RCFA Part-I       252627.00   5053.00    55.00    25.03.09   26.03.09   27.03.09       10 days
                                                                                                                                                         Dte
      W/S Scheme

      Construction of protection wall including
      concrete pillar for 450 mm dia CI R/M & other                                                                                        Enlisted Class-II agency of PHE
13)                                                       631378.00   12630.00   80.00    25.03.09   26.03.09   27.03.09        5 days
      allied works at Kalajhoria under RCFA Part-II W/S                                                                                                  Dte
      Scheme.

      Construction of plinth protection ,Gate ,Drain
      with Hume pipe and allied works under Aug: of                                                                                        Enlisted Class -II agency of Phe
14)                                                       652793.00   13056.00   80.00    25.03.09   26.03.09   27.03.09       10 days
      Jamuria W/S Scheme under RCFA Division-I, PHE                                                                                                      Dte
      Dte

                                                                                                                                             Bonafide agency of PHE Dte
      Construction of Latrine bathroom at Kalajharia
15)                                                       162062.00   3241.00    55.00    25.03.09   26.03.09   27.03.09       10 days       having credential in similar
      H/W site under RCFA Part-II W/S Scheme
                                                                                                                                                  nature of work.
      Urgent pipe line works of 90 mm dia UPVC pipes
      stand posts 25 mm dia GI trap line and other
16)   allied works at Khandra & Chora OHR ,Siduli         402817.00   8060.00    80.00    25.03.09   26.03.09   27.03.09       10 days                    Do
      Kutch Majhi Para near Chora OHR under RCFA
      Part-II W/S Scheme




                                                                                                                             Executive Engineer
                                                                                                                           RCFA Division-I,PHE Dte.
                                                                                        A N N E X U R E
                                                                                    Short N.I.Q NO:06/2008-09/EE/RCD-I/PHE Dte.
                                                                                     Ref Memo No:-1807/RCD-I dated:-16.03.09
                                                                                                                      Last Date of Date of Issue    Date of
                                                                                                                     Submission of of Quotation Submission of
                                                                                                    Cost of Tender                                             Date of Opening of
SL NO                                                                                                                 Application     Paper        Quotation                           Time of
                        NAME OF WORK                                Earnest Money (Rs)                  Paper                                                   Quotation Paper                                      Eligibility for Participants
GROUP                                                                                                                    upto      upto 4.00 PM. upto 3.00 PM.                        Completion
                                                                                                         (Rs)                                                    up to 3.30 PM
                                                                                                                       2.00 PM.

  1                            2                                             3                            4               5              6             7                8                 9                                      10
        Repairing & reconstruction of concrete road         E.Money to be deposited @ 2.0% on
        including laying pavers in front of filter house   Quoted value at time performing formal                                                                                                    Enlisted Class-III /Bonafide Outsider agencies of PHE
 1)                                                                                                  Rs 105.00         25.03.09      26.03.09      27.03.09         27.03.09        5 (Five) Days
        at Kalyaneswari WTP area under RCFA Part-I          agreement in the form of Bank Draft                                                                                                      Dte having credential in similar nature of work.
        W/S Scheme (Part-A)                                       /P.O/Treasury Challan.
        Repairing & reconstruction of concrete road         E.Money to be deposited @ 2.0% on
        including laying pavers in front of filter house   Quoted value at time performing formal                                                                                                    Enlisted Class-II /Bonafide Outsider agencies of PHE Dte
 2)                                                                                                  Rs 105.00         25.03.09      26.03.09      27.03.09         27.03.09        5 (Five) Days
        at Kalyaneswari WTP area under RCFA Part-I          agreement in the form of Bank Draft                                                                                                             having credential in similar nature of work.
        W/S Scheme (Part-B)                                       /P.O/Treasury Challan.

        Laying 75 mm dia UPVC pipe & construction          E.Money to be deposited @ 2.00% on
        of community Tank at Taposi (Maji Para,Bouri       Quoted value at time performing formal                                                                                                    Enlisted Class-II /Bonafide Outsider agencies of
 3)                                                                                                   Rs 80.00         25.03.09      26.03.09      27.03.09         27.03.09        7 (Seven) Days
        Para & Janbazar Primary School) under RCFA          agreement in the form of Bank Draft                                                                                                      PHE Dte having credential in similar nature of work.
        Part-II W/S Scheme.                                       /P.O/Treasury Challan.


                                                           E.Money to be deposited @ 2.50% on
        Supply & delivery of computer peripherals for
                                                           Quoted value at time performing formal                                                                                                    Bonafide outsider agency of PHE Dte having
 4)     use for office of the EE/RCFA Division-I/PHE                                                    20.00          25.03.09      26.03.09      27.03.09         27.03.09        5 (Five) Days
                                                            agreement in the form of Bank Draft                                                                                                      sufficient credential in computer in PHE Dte
        Dte (w.e.f 01.04.09 to 31.08.09)
                                                                  /P.O/Treasury Challan.

        Supply & fitting fixing of 500 mm dia & 450        E.Money to be deposited @ 2.00% on
        mm dia Double flaanged Cast Iron Butterfly         Quoted value at time performing formal                                                                                                    Manufactures/Dealers/Suppliers of PHE Dte having
 5)                                                                                                     55.00          25.03.09      26.03.09      27.03.09         27.03.09        7 (Seven) Days
        valves at Searsol CWR under RCFA Part-II            agreement in the form of Bank Draft                                                                                                      credential of similar nature of Work.
        W/S Scheme.                                               /P.O/Treasury Challan.

                                                           E.Money to be deposited @ 2.00% on
        Supply of CI Bolted Collar for the Mtc of ASTA     Quoted value at time performing formal
 6)                                                                                                     55.00          25.03.09      26.03.09      27.03.09         27.03.09        7 (Seven) Days                              DO
        R/M under ASTA W/S Scheme                           agreement in the form of Bank Draft
                                                                  /P.O/Treasury Challan.

                                                           E.Money to be deposited @ 2.00% on
        Supply of 700 mm dia CI M.J. Collar at
                                                           Quoted value at time performing formal
 7)     Searsole store under RCFA Part-II W/S                                                           55.00          25.03.09      26.03.09      27.03.09         27.03.09        7 (Seven) Days                              DO
                                                            agreement in the form of Bank Draft
        Scheme.
                                                                  /P.O/Treasury Challan.

        Fitting fixing of Sluice valve for different Mtc   E.Money to be deposited @ 2.00% on
                                                                                                                                                                                                   Manufactures/Dealers/Suppliers of PHE Dte having
        work and on-going work system for supply &         Quoted value at time performing formal
 8)                                                                                                     80.00          25.03.09      26.03.09      27.03.09         27.03.09        5 (Five) Days credential of similar nature of Work/Enlisted Class-II
        laying of different dia Sluice valve under          agreement in the form of Bank Draft
                                                                                                                                                                                                                   agency of PHE Dte
        Jamuria W/S Scheme.                                       /P.O/Treasury Challan.




                                                                                                                                                                                            Executive Engineer
                                                                                                                                                                                          RCFA Division-I,PHE Dte.
                                                                     A      N          N    E     X        U      R       E
                                                Short N.I.T NO:-13/2008-09/AE-I/RCD-I/PHE Dte.
                                                   Ref Memo No:-1822/RCD-I dated:-17.03.09
                                                                                                           Last Date of   Date of Issue
                                                                                                                                           Date of
                                                                                               Cost of     Submission      of Tender
SL NO/                                                     Estimated Cost   Earnest Money                                                Droping of    Time of
                         NAME OF WORK                                                       Tender Paper   Application       Paper                                     Eligibility for Perticipants
GROUP                                                           (Rs)             (Rs)                                                   Tender Paper Completion
                                                                                                (Rs)           upto        upto 4.00
                                                                                                                                        up to 3.00 PM
                                                                                                            2.00 PM.          PM.

  1                            2                                 3                 4              5               6            7            8              9                       10

         Withdrawing 80 mm dia AC pipe line & laying 90
         mm dia (OD) UPVC pipe line as urgent basis from
                                                                                                                                                                      Enlisted Class-I/II agnecy
  1)     Kankurdanga ,Murgasol & Gopal danga (Part)         862736.00         17300.00          105.00         26.03.09    27.03.09     30.03.09       15 days
                                                                                                                                                                        agency of PHE Dte .
         under Amritnagar distribution zone under RCFA
         Part-II W/S Scheme.

         Withdrawing 80 mm dia AC pipe line & laying
         110/90 mm dia (OD) UPVC pipe line as urgent
                                                                                                                                                                      Enlisted Class-II/III agnecy
  2)     basis for Baliabethan(Part),Jordanga & Gopal       873621.00         17500.00          105.00         26.03.09    27.03.09     30.03.09       15 days
                                                                                                                                                                         agency of PHE Dte .
         danga (Part) under Amritnagar distribution zone
         under RCFA Part-II W/S Scheme.

         Withdrawing 80 mm dia AC pipe line & laying 90
         mm dia (OD) UPVC pipe line as urgent basis at
                                                                                                                                                                      Enlisted Class-II/III agnecy
  3)     Jamari ,Chalbalpur,Baliabathan (Part) under        814926.00         16300.00          105.00         26.03.09    27.03.09     30.03.09       15 days
                                                                                                                                                                         agency of PHE Dte .
         Amritnagar distribution zone under RCFA Part-II
         W/S Scheme.
         Laying of 90/75 mm dia (OD) UPVC distribution
         pipe line at Chapoi ,Ratibati Bogra Choti                                                                                                                 Enlisted Class-II agnecy agency
  4)                                                        615527.00         12311.00          80.00          26.03.09    27.03.09     30.03.09       10 days
         ,Kashinathpur & Subhaspally under RCFA Part-II                                                                                                                      of PHE Dte .
         W/S Scheme.
         Repairing & mtc works including 90 mm dia (OD)
                                                                                                                                                                     Enlisted Class-III/IV agnecy
  5)     UPVC pipe line for Raghunathchak & adjoining       471324.00           9430.00         80.00          26.03.09    27.03.09     30.03.09        10 days
                                                                                                                                                                         agency of PHE Dte .
         areas under Narankuri W/S Scheme

         Reparing & renovation work of 450 mm dia CI
                                                                                                                                                       21 days       Reserved for Engineers Co-
  6)     R/M from Ramkrishan Mishan School to Nunia         707254.00         14150.00          80.00          26.03.09    27.03.09     30.03.09
                                                                                                                                                        days           Operative Society Ltd
         bridge under ASTA W/S Schem (Mtc )




                                                                                                                                                    Assistant Engineer-I
                                                                                                                                                   RCFA Division-I,PHE Dte.
                                                                       A      N      N        E    X      U       R          E
                                                   Short N.I.T NO:-14/2008-09/AE-I/RCD-I/PHE Dte.
                                                      Ref Memo No:-1845/RCD-I dated:-18.03.09
                                                                                                                                  Date of
                                                                                                              Last Date of
                                                                                                                                  Issue of      Date of
                                                                                                 Cost of      Submission
SL NO/                                                       Estimated Cost   Earnest Money                                       Tender      Droping of    Time of
                         NAME OF WORK                                                         Tender Paper    Application                                                  Eligibility for Perticipants
GROUP                                                             (Rs)             (Rs)                                            Paper     Tender Paper Completion
                                                                                                  (Rs)            upto
                                                                                                                                 upto 4.00   up to 3.00 PM
                                                                                                               2.00 PM.
                                                                                                                                    PM.
  1                             2                                  3                 4              5              6                  7           8           9                        10

         Emergent pipe laying works 80 mm dia UPVC pie
         line stand & Sluice Valve chamber works at                                                                                                                     Enlisted Class-IV /Bonafide
  1)                                                          141095.00           2825.00         30.00        26.03.09          27.03.09     30.03.09     10 days
         Dobrano village under Chichuria OHR works                                                                                                                      Outsider agency of PHE Dte
         under RCFA Part-II W/S Schem ,PHE Dte

         Laying of 75 mm dia (OD) UPVC Pipe line for SSK
         centre and ICDS centre and allied works at                                                                                                                      Reserved for Engineers Co-
  2)                                                          183946.00           3670.00         55.00        26.03.09          27.03.09     30.03.09      7 days
         Pandabeswar under Baidyanathpur W/s Scheme                                                                                                                        Operative Society Ltd
         RCFA Division-I PHE Dte

         Construction of concrete road OHR base and
                                                                                                                                                                          Enlisted Class-IV agnecy
         including weather coat of RCC elevated reservoir
  3)                                                          199334.00           3990.00         55.00        26.03.09          27.03.09     30.03.09     10 days     /Bonafide outsiders agency of
         and other allied work at Chinchuria H/W site
                                                                                                                                                                                 PHE Dte .
         under RCFA Part-II W/S Scheme
         Colour washing at Kalajharia store godown                                                                                                                     Enlisted Class-IV agency of PHE
  4)                                                           76004.00           1520.00         30.00        26.03.09          27.03.09     30.03.09     10 days
         under RCFA Part-II W/S Scheme                                                                                                                                               Dte
         Withdrawing of 80 mm dia AC pipe line & laying
         of 90 mm dia (OD) UPVC pipe line as urgent basis                                                                                                               Enlisted Class-IV /Bonafide
  5)                                                          194346.00           3890.00         55.00        26.03.09          27.03.09     30.03.09     10 days
         at Rambagan to Panjabi More site at Searsole                                                                                                                   outsider agnecy of PHE Dte.
         H/W site under RCFA Part-II W/S Scheme .

         Lavelling of land at Ramprasadpur OHR site and
         laying UPVC pipe line at Nagirabandh                                                                                                                          Enlisted Class-IV agency of PHE
  6)                                                          143283.00           2870.00         30.00        26.03.09          27.03.09     30.03.09      5 days
         ,Mohisinabandh & allied works under Andal W/s                                                                                                                               Dte
         Scheme under under RCFA Division-I, PHE Dte

         Construction of Drain at Searsol H/W site under                                                                                                                 Enlisted Class-IV/Bonafide
  7)                                                          125765.00           2515.00         30.00        26.03.09          27.03.09     30.03.09      7 days
         RCFA Part-II W/S Scheme                                                                                                                                        outsider agency of PHE Dte

         Withdrawing 100/80 mm dia AC pipe line &
         laying 100/80 mm dia UPVC pipe line for smooth
                                                                                                                                                                       Enlisted Class-IV agency of PHE
  8)     water supply at Jadudanga & Katagoria of             198830.00           3980.00         55.00        26.03.09          27.03.09     30.03.09      7 days
                                                                                                                                                                                     Dte
         Searsole distribution zone under Part-II W/S
         Scheme
         Renovation work of RCC Elevated Reservoir
         (capacity 1.5 lakh gallon) including weather coat                                                                                                             Enlisted Class-III agnecy of PHE
  9)                                                          287256.00           5750.00         55.00        26.03.09          27.03.09     30.03.09      7 days
         and other allied works at Ramprasadpur H/W                                                                                                                                  Dte
         site under Andal W/S Scheme
      Guard room (C2) mtc & allied work at Mohisila                                                                                      Enlisted Class-IV agency of PHE
10)                                                       70260.00    1405.00   20.00   26.03.09   27.03.09   30.03.09       10 days
      OHR site under RCFA Part-II W/S Scheme                                                                                                           Dte

      Guard room (C1) mtc & allied work at Mohisila                                                                                         Enlisted Class-IV/Bonafide
11)                                                       70260.00    1405.00   20.00   26.03.09   27.03.09   30.03.09        7 days
      OHR site under RCFA Part-II W/S Scheme                                                                                               outsider agency of PHE Dte

      Guard room mtc & allied work at Pariharpur                                                                                            Enlisted Class-IV/Bonafide
12)                                                       67442.00    1350.00   20.00   26.03.09   27.03.09   30.03.09       10 days
      OHR site under RCFA Part-II W/S Scheme                                                                                               outsider agency of PHE Dte
      Supply & fitting fixing of 300 mm dia 9.5 mm
      thick MS pipe which is replace 300 mm dia CI                                                                                         Reserved for Engineers-Co-
13)                                                       233426.00   4680.00   55.00   26.03.09   27.03.09   30.03.09       10 days
      R/M at Benali OHR site under RCFA Part-II W/s                                                                                          Operative Society Ltd
      Scheme
      Repairing & renovation Guard room and pump
                                                                                                                                         Enlisted Class-IV agency of PHE
14)   house and other allied works at Gopalpur under      127608.00   2560.00   30.00   26.03.09   27.03.09   30.03.09        5 days
                                                                                                                                                       Dte
      ASTA W/S Scheme
      Repairing & renovation work of CWR and pump
                                                                                                                                         Enlisted Class-IV agency of PHE
15)   house at Damalia H/W site under RCFA Part-II        200806.00   4020.00   55.00   26.03.09   27.03.09   30.03.09       10 days
                                                                                                                                                       Dte
      W/S Scheme
      Urgent basis withdrawing of 80 mm dia AC pipe
      line & laying 90 mm dia UPVC pipe line toward                                                                                        Enlisted Class-IV/Bonafide
16)                                                       174729.00   3495.00   55.00   26.03.09   27.03.09   30.03.09        7 days
      doctor quarter staff quarter at SD Hospital under                                                                                   outsiders agency of PHE Dte
      SD Hospital W/S Scheme.
      White /Colour washing painting jungle cutting
      raod and reparing work at Madanpur (RBT)                                                                                             Enlisted Class -IV/Bonafide
17)                                                       157112.00   3145.00   55.00   26.03.09   27.03.09   30.03.09       10 days
      pumping station under RCFA Part-II W/S                                                                                               Outsider agency of Phe Dte
      Scheme.
      Reparing & renovation Guard Room and 2 Nos
      Staff Quarter and other allied works at                                                                                              Enlisted class-IV/Bonafide
18)                                                       157152.00   3145.00   55.00   26.03.09   27.03.09   30.03.09        7 days
      Pandabeswar H/W site under Bidyanathpur W/s                                                                                          outsider agency of PHE Dte
      Scheme
      Emergent & essential repair and restoration the
      200 mm dia CI pipe line at Kankardanga for                                                                                        Bonafide outsider agency of PHE
19)                                                       55796.00    1120.00   20.00   26.03.09   27.03.09   30.03.09        5 days
      Amritnagar distribution system under RCFA Part-                                                                                                 Dte
      II W/S Scheme
      Emergent work for laying UPVC ,GI & CI pipe of
      different dia & CI Specials etc including                                                                                              Enlisted Class-IV agnecy
20)   interconnectin work near Chakdola More and its      170418.00   3410.00   55.00   26.03.09   27.03.09   30.03.09       10 days      /Bonafide outsiders agency of
      adjoing of Chichuria Zone under RCFA Part-II                                                                                                  PHE Dte .
      W/S Scheme




                                                                                                                           Assistant Engineer-I
                                                                                                                         RCFA Division-I,PHE Dte.
                                                                                     A N N E X U R E
                                                                               Short N.I.Q NO:80/2008-09/AE-I/RCD-I/PHE Dte.
                                                                                 Ref Memo No:-1821/RCD-I dated:-17.03.09
                                                                                                                   Last Date of Date of Issue    Date of
                                                                                                                  Submission of of Quotation Submission of
                                                                                                 Cost of Tender                                             Date of Opening of
SL NO                                                                                                              Application      Paper       Quotation                           Time of
                       NAME OF WORK                              Earnest Money (Rs)                  Paper                                                   Quotation Paper                                      Eligibility for Participants
GROUP                                                                                                                 upto      upto 4.00 PM. upto 3.00 PM.                        Completion
                                                                                                      (Rs)                                                    up to 3.30 PM
                                                                                                                    2.00 PM.

  1                          2                                            3                            4               5              6             7                8                 9                                      10
        Emergent reparing and rectification work of      E.Money to be deposited @ 2.0% on
        panel board and Electrical accessary & others   Quoted value at time performing formal                                                                                    3 (Three)      Bonafide outsider agencies of PHE Dte having valid
 1)
        allied works at SD Hospital under SD
                                                                                                  Rs 55.00         26.03.09      27.03.09       30.03.09        30.03.09
                                                         agreement in the form of Bank Draft                                                                                        Days         Electrical licence.
        Hosipital W/S Scheme                                   /P.O/Treasury Challan.
                                                         E.Money to be deposited @ 2.0% on
                                                                                                                                                                                                   Bonafide Manufactures /Dealer/Suppliers/Outsider
        Supply of HDPE pipe and fitting at Kalajharia   Quoted value at time performing formal                                                                                    3 (Three)
 2)
        store under RCFA part -II W/S Scheme
                                                                                                  Rs 55.00         26.03.09      27.03.09       30.03.09        30.03.09                         agencies of PHE Dte having credential of similar nature
                                                         agreement in the form of Bank Draft                                                                                        Days                              of works.
                                                               /P.O/Treasury Challan.

        Laying of cable line & installation of          E.Money to be deposited @ 2.00% on
        submersible pump motor sets & other allied      Quoted value at time performing formal                                                                                    7 (Seven)      Bonafide outsider agencies of PHE Dte having valid
 3)
        works at river bed Damodar at Union Para
                                                                                                  Rs 80.00         26.03.09      27.03.09       30.03.09        30.03.09                         Electrical licence.
                                                         agreement in the form of Bank Draft                                                                                         Days
        under RCFA Part-II W/S scheme`                         /P.O/Treasury Challan.


        Repairing & rewinding of submersible and        E.Money to be deposited @ 2.00% on
        centrifugal pump set at Pandabeswar under       Quoted value at time performing formal                                                                                    7 (Seven)      Bonafide outsider agencies of PHE Dte having valid
 4)
        Baidyanathpur W/S Schem ,RCFA Division-
                                                                                                  Rs 80.00         26.03.09      27.03.09       30.03.09        30.03.09                         Electrical licence.
                                                         agreement in the form of Bank Draft                                                                                         Days
        I,PHE Dte                                              /P.O/Treasury Challan.

        Emergent reparing 20 Hp Centrifugal pump &      E.Money to be deposited @ 2.00% on
        motor set and installation of LT panel board    Quoted value at time performing formal                                                                                    7 (Seven)      Bonafide outsider agencies of PHE Dte having valid
 5)
        and other works at Tirat Colliery under RCFA
                                                                                                  Rs 80.00         26.03.09      27.03.09       30.03.09        30.03.09                         Electrical licence.
                                                         agreement in the form of Bank Draft                                                                                         Days
        Part-II W/S Scheme                                     /P.O/Treasury Challan.

        Emergent reparing & rewing of submersible       E.Money to be deposited @ 2.00% on
        pump motor set 20 Hp and allied works at        Quoted value at time performing formal                                                                                                   Bonafide outsider agencies of PHE Dte having valid
 6)
        Naranyankuri river bed site under RCFA Part-     agreement in the form of Bank Draft
                                                                                                  Rs 30.00         26.03.09      27.03.09       30.03.09        30.03.09         5 (Five) Days                   Electrical licence.
        II W/S Scheme                                          /P.O/Treasury Challan.

        Supplying ,delivery ,fitting & fixing of MS
        Tumbler post, metal tamp fabrication and        E.Money to be deposited @ 2.00% on
        errection and surgging 1 no tube well and       Quoted value at time performing formal                                                                                                   Bonafide outsider agencies of PHE Dte having valid
 7)
        other allied works at Tirat mouza (Damalia       agreement in the form of Bank Draft
                                                                                                  Rs 55.00         26.03.09      27.03.09       30.03.09        30.03.09         5 (Five) Days                   Electrical licence.
        Pump House) under RCFA Part-II W/S                     /P.O/Treasury Challan.
        Scheme.




                                                                                                                                                                                        Assistant Engineer-I
                                                                                                                                                                                       RCFA Division-I,PHE Dte.
                                                                     A      N       N       E     X        U      R       E
                                                Short N.I.T NO:-16/2008-09/AE-I/RCD-I/PHE Dte.
                                                  Ref Memo No:-2067/RCD-I dated:- 27.03.09
                                                                                                                           Date of
                                                                                                           Last Date of
                                                                                                                           Issue of      Date of
                                                                                               Cost of     Submission
SL NO/                                                     Estimated Cost   Earnest Money                                  Tender      Droping of    Time of
                         NAME OF WORK                                                       Tender Paper   Application                                                Eligibility for Perticipants
GROUP                                                           (Rs)             (Rs)                                       Paper     Tender Paper Completion
                                                                                                (Rs)           upto
                                                                                                                          upto 4.00   up to 3.00 PM
                                                                                                            2.00 PM.
                                                                                                                             PM.
  1                            2                                 3                 4              5               6            7           8             9                        10
         Remodeling of distributionline from Royality
         More to Sreerampur village (200/150 mm dia)
                                                                                                                                                                  Engineers Co-Operative Society
  1)     pipe line with DI/MS /UPVC instead of AC pipe      819847.00           16400.00        105.00         17.04.09   20.04.09     21.04.09       20 days
                                                                                                                                                                               Ltd
         within Andal W/S scheme under RCFA Division-
         I,PHE Dte

         Reparing & remodellling of 80/100 mm dia AC                                                                                                                Enlisted agency /Bonafide
         Pipe line including 90/110 OD UPVC pipe line of                                                                                                            outsider agency of PHE Dte
  2)                                                        494619.00           9900.00         80.00          17.04.09   20.04.09     21.04.09       15 days
         different places at Nupur & Ballavpur under                                                                                                                having credential of similar
         Balvpur Union Para W/S Scheme.                                                                                                                                   nature of work.

         Reparing & remodellling of 80/100 mm dia AC                                                                                                                Enlisted agency /Bonafide
         Pipe line including 90/110 OD UPVC pipe line of                                                                                                            outsider agency of PHE Dte
  3)                                                        483408.00           9700.00         80.00          17.04.09   20.04.09     21.04.09       15 days
         different places at Harabhanga ,Tirat Colliery                                                                                                             having credential of similar
         ,Tirat Village under Tirat W/S Scheme.                                                                                                                           nature of work.




                                                                                                                                                    Assistant Engineer-I
                                                                                                                                                  RCFA Division-I,PHE Dte.
                                                                       A      N      N        E    X      U       R          E
                                                   Short N.I.T NO:-15/2008-09/AE-I/RCD-I/PHE Dte.
                                                     Ref Memo No:-1904/RCD-I dated:- 19.03.09
                                                                                                                                  Date of
                                                                                                              Last Date of
                                                                                                                                  Issue of      Date of
                                                                                                 Cost of      Submission
SL NO/                                                       Estimated Cost   Earnest Money                                       Tender      Droping of    Time of
                         NAME OF WORK                                                         Tender Paper    Application                                                    Eligibility for Perticipants
GROUP                                                             (Rs)             (Rs)                                            Paper     Tender Paper Completion
                                                                                                  (Rs)            upto
                                                                                                                                 upto 4.00   up to 3.00 PM
                                                                                                               2.00 PM.
                                                                                                                                    PM.
  1                             2                                  3                 4              5              6                  7           8             9                        10
         Reparing & reconstruction of pathway Slab of
                                                                                                                                                                           Enlisted Class-IV/Bonafide
  1)     collector well bridge at Kalajharia H/W site         106168.00           2125.00         30.00        30.03.09          30.03.09     31.03.09       15 days
                                                                                                                                                                               agency of PHE Dte
         under RCFA Part-II W/s Scheme
         Construction of cement concrete road from
         exisitng road towards guard room of 24 nos of
  2)                                                          148878.00           2980.00         30.00        30.03.09          30.03.09     31.03.09       15 days       Enlisted agency of PHE Dte
         river bed tubewell at Kalajharia head works site
         under RCFA Part-II W/S Scheme
         Construction of Stair painting and other allied
                                                                                                                                                                           Enlisted Class-IV /Bonafide
  3)     works at IISCO bridge under RCFA Part-II W/S          86593.00           2165.00         30.00        30.03.09          30.03.09     31.03.09       15 days
                                                                                                                                                                                agency of PHE Dte
         Scheme
         Jungle cutting bush cutting and uprooting &
                                                                                                                                                                           Enlisted Class-IV /Bonafide
  4)     removing plants etc at Searsole H/W site under        48480.00           1212.00         20.00        30.03.09          30.03.09     31.03.09        7 days
                                                                                                                                                                                agency of PHE Dte
         RCFA Part-II W/S Scheme
         Supply of plants seeds & Fatilizer for Guardening                                                                                                                Bonafide outsider of PHE Dte
  5)     at Andal pump house site within Andal W/S             97365.00           2435.00         30.00        30.03.09          30.03.09     31.03.09        7 days       having credential of similar
         Scheme under RCFA Division-I, PHE Dte.                                                                                                                                 nature of works.




                                                                                                                                                           Assistant Engineer-I
                                                                                                                                                         RCFA Division-I,PHE Dte.
                                                                               A     N          N   E   X   U   R
                                               Short N.I.T NO:-09/2008-09/AE-II/RCFA D
                                                          Ref Memo No:-   /AE-II/RCD-I

SL NO/                                                        Estimated Cost       Earnest Money
                         NAME OF WORK
GROUP                                                              (Rs)                 (Rs)



  1                              2                                  3                    4

         Making round -O-Clock guarding arrangement
         through Govt Registered Ex-military security
  1)     agency in different places of Darbardanga H/W
         site and Nandi OHR site under RCFA Division-
         I,PHE Dte (w.e.f 01.04.09 to 31.03.2010)

         Day to day temporary guarding arrangment of
         pipe & specials civil structures all other related
  2)     to the same at Barul OHR site under Aug of
         Jamuria Municipality W/S Scheme (w.e.f
         01.04.09 to 31.03.10)

         Maintenance & caretaking etc. for Kalyaneswari
         Inspection Bungalow, New & Old Annexe &
  3)     Bankim Nibas etc. within Kalyaneswari Head             268746.00             5375.00
         Works Site under R.C.F.A. Part-I, W/S Scheme.
         (w.e.f. 01-04-09 to 31-03-2010).
SL          Rate Chart for Purchase of Tender Paper
     1)   75000                                        15 .00   5.00
     2)   75001-150000.00                              25.00    5.00
     3)   150001-300000.00                             50.00    5.00
     4)   300001-750000.00                             75.00    5.00
     5)   750001.00-5000000.00                        100.00    5.00
A   N   N    E       X     U     R        E
09/2008-09/AE-II/RCFA Division-I/PHE Dte.
emo No:-   /AE-II/RCD-I dated:-
                           Last Date of   Date of Issue
                                                           Date of
               Cost of     Submission      of Tender
                                                         Droping of    Time of
            Tender Paper   Application       Paper
                                                        Tender Paper Completion
                (Rs)           upto        upto 4.00
                                                        up to 3.00 PM
                            2.00 PM.          PM.

                 5              6                7          8             9




                            30.03.09          31.03.09   31.03.09       1 year




                            30.03.09          31.03.09   31.03.09       1 year




               55.00        30.03.09          31.03.09   31.03.09       1 Year




                                                                     Assistant Engineer-II
                                                                    RCFA Division-I,PHE Dte.
Tender paper
   Cost
       20.00
       30.00
       55.00
       80.00
      105.00
Dte.



                        Eligibility for Perticipants



                                    10



                  Enlisted/Outsider agency of PHE Dte
                   having credential in similar nature
                               of work .




                  Enlisted/Outsider agency of PHE Dte
                   having credential in similar nature
                               of work .




                   Enlisted /Outsider agency of PHE
                                 Dte .




   Assistant Engineer-II
  RCFA Division-I,PHE Dte.
                                                                          A N N E X U R E
                                                                      Short N.I.Q NO:09/2008-09/EE/RCD-I/PHE Dte.
                                                                       Ref Memo No:-1900/RCD-I dated:-18.03.09
                                                                                             Last Date of Date of Issue    Date of
                                                                                            Submission of of Quotation Submission of
                                                                                                                                      Date of Opening of
SL NO                                                                                        Application     Paper        Quotation                          Time of
                       NAME OF WORK                            Earnest Money (Rs)                                                      Quotation Paper                                      Eligibility for Participants
GROUP                                                                                           upto      upto 4.00 PM. upto 3.00 PM.                       Completion
                                                                                                                                        up to 3.30 PM
                                                                                              2.00 PM.

  1                          2                                         3                         4              5             6                7                8                                        9


        Supply & delivery of 12 nos Submersible E.Money to be deposited @ 2.00% on
                                                                                                                                                                           Manufactures/Dealers/Suppliers /Enlisted agency of PHE
 1)     pumps at Searsole Deptt store under RCFA Quoted value at time performing formal       25.03.09      27.03.09      30.03.09         30.03.09        5 (Five) Days
                                                                                                                                                                           Dte having valid Electrical licence.
        Part-II W/S Scheme .                     agreement in the form of Bank Draft /P.O




                                                                                                                                                                   Executive Engineer
                                                                                                                                                                 RCFA Division-I,PHE Dte.
                                                                               A N N E X U R E
                                                                          Short N.I.Q NO:07/2008-09/EE/RCD-I/PHE Dte.
                                                                           Ref Memo No:-1892/RCD-I dated:-18.03.09
                                                                                                   Last Date of Date of Issue    Date of
                                                                                                  Submission of of Quotation Submission of
                                                                                                                                            Date of Opening of
SL NO                                                                                              Application      Paper       Quotation                          Time of
                        NAME OF WORK                               Earnest Money (Rs)                                                        Quotation Paper                                      Eligibility for Participants
GROUP                                                                                                 upto      upto 4.00 PM. upto 3.00 PM.                       Completion
                                                                                                                                              up to 3.30 PM
                                                                                                    2.00 PM.

  1                            2                                           3                           4              5             6                7                8                                        9

        Supply & delivery of different dia Specials at E.Money to be deposited @ 2.00% on
                                                                                                                                                                                 Manufactures/Dealers/Suppliers of PHE Dte having
 1)     Departmental Store under RCFA Division- Quoted value at time performing formal              25.03.09      26.03.09      27.03.09         27.03.09        5 (Five) Days
                                                                                                                                                                                 credential in similar nature of Work.
        I,PHE Dte (Part-A)                             agreement in the form of Bank Draft /P.O


        Supply & delivery of different dia Specials at E.Money to be deposited @ 2.00% on
                                                                                                                                                                                 Manufactures/Dealers/Suppliers of PHE Dte having
 2)     Departmental Store under RCFA Division- Quoted value at time performing formal              25.03.09      26.03.09      27.03.09         27.03.09        5 (Five) Days
                                                                                                                                                                                 credential in similar nature of Work.
        I,PHE Dte (Part-B)                             agreement in the form of Bank Draft /P.O


        Supply & delivery of different dia Specials & E.Money to be deposited @ 2.00% on
                                                                                                                                                                                 Manufactures/Dealers/Suppliers of PHE Dte having
 3)     Valves at Departmental Store under RCFA Quoted value at time performing formal              25.03.09      26.03.09      27.03.09         27.03.09        5 (Five) Days
                                                                                                                                                                                 credential in similar nature of Work.
        Division-I,PHE Dte (Part-C)                   agreement in the form of Bank Draft /P.O




                                                                                                                                                                         Executive Engineer
                                                                                                                                                                       RCFA Division-I,PHE Dte.
                                                                                A N N E X U R E
                                                                           Short N.I.Q NO:08/2008-09/EE/RCD-I/PHE Dte.
                                                                            Ref Memo No:-1894/RCD-I dated:-18.03.09
                                                                                                    Last Date of Date of Issue    Date of
                                                                                                   Submission of of Quotation Submission of
                                                                                                                                             Date of Opening of
SL NO                                                                                               Application      Paper       Quotation                          Time of
                        NAME OF WORK                                Earnest Money (Rs)                                                        Quotation Paper                                      Eligibility for Participants
GROUP                                                                                                  upto      upto 4.00 PM. upto 3.00 PM.                       Completion
                                                                                                                                               up to 3.30 PM
                                                                                                     2.00 PM.

  1                            2                                            3                           4              5             6                7                8                                        9

        Supply & delivery of different dia Sluice valve E.Money to be deposited @ 2.00% on
                                                                                                                                                                                  Manufactures/Dealers/Suppliers of PHE Dte having
 1)     & Specials at Deptt store under RCFA Quoted value at time performing formal                  25.03.09      26.03.09      27.03.09         27.03.09        5 (Five) Days
                                                                                                                                                                                  credential in similar nature of Work.
        Division-I, PHEDte (Part-I)                     agreement in the form of Bank Draft /P.O


        Supply & delivery of different dia Sluice valve E.Money to be deposited @ 2.00% on
                                                                                                                                                                                  Manufactures/Dealers/Suppliers of PHE Dte having
 2)     & Specials at Deptt store under RCFA Quoted value at time performing formal                  25.03.09      26.03.09      27.03.09         27.03.09        5 (Five) Days
                                                                                                                                                                                  credential in similar nature of Work.
        Division-I, PHEDte (Part-II)                    agreement in the form of Bank Draft /P.O


        Supply & & Delivery of different dia Sluice E.Money to be deposited @ 2.00% on
                                                                                                                                                                                  Manufactures/Dealers/Suppliers of PHE Dte having
 3)     Valve at Deptt store under RCFA Division-I Quoted value at time performing formal            25.03.09      26.03.09      27.03.09         27.03.09        5 (Five) Days
                                                                                                                                                                                  credential in similar nature of Work.
        ,PHE Dte (Part-III)                         agreement in the form of Bank Draft /P.O


        Supply & delivery of different dia Sluice E.Money to be deposited @ 2.00% on
                                                                                                                                                                                  Manufactures/Dealers/Suppliers of PHE Dte having
 4)     Valves at Deptt store under RCFA Division- Quoted value at time performing formal            25.03.09      26.03.09      27.03.09         27.03.09        5 (Five) Days
                                                                                                                                                                                  credential in similar nature of Work.
        I,PHE Dte (Part-A)                         agreement in the form of Bank Draft /P.O


        Supply & delivery of different dia Sluice E.Money to be deposited @ 2.00% on
                                                                                                                                                                                  Manufactures/Dealers/Suppliers of PHE Dte having
 5)     Valves at Deptt store under RCFA Division- Quoted value at time performing formal            25.03.09      26.03.09      27.03.09         27.03.09        5 (Five) Days
                                                                                                                                                                                  credential in similar nature of Work.
        I,PHE Dte (Part-B)                         agreement in the form of Bank Draft /P.O




                                                                                                                                                                          Executive Engineer
                                                                                                                                                                        RCFA Division-I,PHE Dte.
                                                         A      N        N        E      X       U          R      E
                                      Short N.I.T NO:-01/2009-10/EE/RCD-I/PHE Dte.
                                         Ref Memo No:-13/RCD-I dated:- 07.04.09
                                                                                                                 Date of
                                                                                             Last Date of
                                                                                                                 Issue of      Date of
                                                                                 Cost of     Submission
SL NO/                                Estimated Cost     Earnest Money                                            Tender     Droping of    Time of
                 NAME OF WORK                                                 Tender Paper   Application                                                    Eligibility for Perticipants
GROUP                                      (Rs)               (Rs)                                                 Paper    Tender Paper Completion
                                                                                  (Rs)           upto
                                                                                                                upto 4.00   up to 3.00 PM
                                                                                              2.00 PM.
                                                                                                                    PM.
  1                    2                    3                   4                  5              6                  7           8             9                        10

                                                        Intially deposit Rs
         Survey of balance portion of Kulti
                                                       20000.00 & balance
         Municipality area for proposed w/s                                                                                                              Outsider agency of PHE Dte
                                                          amount to be
  1)     scheme under JNNURM, Churulia 2289064.00                               105.00        27.04.09          28.04.09     30.04.09       15 days    having credential at least 40% in
                                                         deposited at the
         scheme, Lalbazar village scheme &                                                                                                             similar nature of work last year.
                                                       time of performing
         Sirishdanga scheme.
                                                        tender agreement




                                                                                                                                          Executive Engineer
                                                                                                                                        RCFA Division-I,PHE Dte.
                                                                        A     N         N     E     X        U      R       E
                                                    Short N.I.T NO:-02/2009-10/EE/RCD-I/PHE Dte.
                                                     Ref Memo No:-145/RCD-I dated:- 27.04.2009
                                                                                                                                 Date of
                                                                                                             Last Date of
                                                                                                                                 Issue of      Date of
                                                                                                 Cost of     Submission
SL NO/                                                       Estimated Cost   Earnest Money                                      Tender      Droping of    Time of
                         NAME OF WORK                                                         Tender Paper   Application                                                    Eligibility for Perticipants
GROUP                                                             (Rs)             (Rs)                                           Paper     Tender Paper Completion
                                                                                                  (Rs)           upto
                                                                                                                                upto 4.00   up to 3.00 PM
                                                                                                              2.00 PM.
                                                                                                                                   PM.
  1                             2                                  3                4               5               6                7           8             9                        10

                                                                                                                                                                        Enlisted Class-II agency of PHE
         Laying 250 mm dia DI Rising main for                                                                                                                          Dte/Bonafide agency of PHE Dte
  1)     Augmentation of Churulia W/S Scheme under            944482.00         18900.00          105.00     14.05.2009         15.05.09     18.05.09       30 days      having credential in similar
         RCFA Division-I.                                                                                                                                              nature of R/M work during last
                                                                                                                                                                         three years in single order.
         Supply, delivery & installation of Bulk water
                                                                                                                                                                          Bonafide agency of PHE Dte
         flow meter with strainers & Remote Reading
                                                                                                                                                                        having credential in supply of
         Sensor display unit for OHR at Nandi H/W site
                                                                                                                                                                       different dia materials as well as
  2)     under Jamuria W/S Scheme at inletpoint from          671409.00         13500.00          80.00      14.05.2009         15.05.09     18.05.09       15 days
                                                                                                                                                                       work in PHE line /Semi Govt firm
         R/M from & fitting different CI fittings for RCFA
                                                                                                                                                                        value not less than 70% of the
         Division-I ,PHE Dte under RCFA Part-II W/S
                                                                                                                                                                             work in single order.
         Scheme

         Supply, delivery & installation of Bulk water
         flow meter with strainers & Remote Reading
         Sensor display unit for OHR inlet of R/M from
  3)                                                          671409.00         13500.00          80.00          14.05.09       15.05.09     18.05.09       15 days                     DO
         Madanpur & fitting different CI fittings for
         RCFA Division-I ,PHE Dte under RCFA Part-II W/S
         Scheme




                                                                                                                                                          Executive Engineer
                                                                                                                                                        RCFA Division-I,PHE Dte.
                                                                        A      N         N     E        X    U       R     E
                                                 Short N.I.T NO:-04/2009-10/EE/RCD-I/PHE Dte.
                                                  Ref Memo No:-190/RCD-I dated:- 11.05.2009
                                                                                                                            Date of
                                                                                                            Last Date of
                                                                                                                            Issue of      Date of
                                                                                   Earnest      Cost of     Submission
SL NO/                                                        Estimated Cost                                                Tender      Droping of    Time of
                          NAME OF WORK                                             Money     Tender Paper   Application                                              Eligibility for Perticipants
GROUP                                                              (Rs)                                                      Paper     Tender Paper Completion
                                                                                     (Rs)        (Rs)           upto
                                                                                                                           upto 4.00   up to 3.00 PM
                                                                                                             2.00 PM.
                                                                                                                              PM.
  1                              2                                  3                4             5             6             7            8           9                        10
         Suply & delivery 2 nos of submersible pump
                                                                                                                                                                  Bonafide outsiders agency of
         motor set , cable line river bed tube well (2 Nos)
                                                                                                                                                                 PHE Dte having valid Electrical
  1)     & GI R/M and other allied works at Tirat mouza        926644.00       18550.00        105.00       25.05.2009     26.05.09     28.05.09     15 days
                                                                                                                                                                     License with sufficient
         (Damalia) at Damodar river under RCFA Part-II
                                                                                                                                                                          Credentials.
         W/S Scheme.
                                                                                                                                                                   Class-III agency of PHE Dte &
         Repairing & Renovation of pump house & guard
                                                                                                                                                                 outside agency having sufficient
  2)     room at Tirat Mouza (Damalia) W/S Scheme              220837.00       4420.00          55.00       25.05.2009     26.05.09     28.05.09     15 days
                                                                                                                                                                  credentials in similar nature of
         under RCFA Division-I, PHE Dte .
                                                                                                                                                                                work .
         Laying on emergent basis of 110 mm dia (OD)                                                                                                               Class-III agency of PHE Dte &
         UPVC pipe line from Jhantidanga to new Basti                                                                                                               outside agency having 70%
  3)                                                           403255.00       8065.00          80.00       25.05.2009     26.05.09     28.05.09     15 days
         of Raniganj Municipal area under RCFA Part-II                                                                                                             credentials in UPVC pipe line
         W/S Scheme.                                                                                                                                                           works.
         Laying on emergent basis of 160/110 mm dia
         (OD) UPVC pipe line from Satgram Dahar More                                                                                                              Enlisted Class-II agency of PHE
  4)                                                           655377.00       13108.00         80.00       25.05.2009     26.05.09     28.05.09     15 days
         towards Satgram North Brooke colliery colony                                                                                                                           Dte
         under RCFA Part-II W/S Scheme
         Laying of 100 mm dia GI Collecting main (No-25)                                                                                                         Enlisted Specials Class agency of
         incluidng Guard pilling at Kalajharia on the                                                                                                               PHE Dte /Outsider agency
  5)                                                           865232.00       17305.00        105.00       25.05.2009     26.05.09     28.05.09     15 days
         rever bed Damodar under RCFA Part-II W/S                                                                                                                  having credential in similar
         Scheme (Part-D)                                                                                                                                                  nature of work.
         Laying of 100 mm dia GI Collecting main                                                                                                                 Enlisted Specials Class agency of
         incluidng Guard pilling & sinking of new Tube                                                                                                              PHE Dte /Outsider agency
  6)                                                           949564.00       18995.00        105.00       25.05.2009     26.05.09     28.05.09     15 days
         well (No-26) at Kalajharia on the rever bed                                                                                                               having credential in similar
         Damodar under RCFA Part-II W/S Scheme.                                                                                                                           nature of work.

         Laying of 100 mm dia GI Collecting main
         incluidng Guard pilling & sinking of new Tube
  7)                                                           949564.00       18995.00        105.00       25.05.2009     26.05.09     28.05.09     15 days                     DO
         well (No-27) at Kalajharia on the rever bed
         Damodar under RCFA Part-II W/S Scheme.
     Laying of 100 mm dia GI Collecting main
     incluidng Guard pilling & sinking of new Tube
8)                                                   949564.00   18995.00   105.00   25.05.2009   26.05.09   28.05.09       15 days                DO
     well (No-28) at Kalajharia on the rever bed
     Damodar under RCFA Part-II W/S Scheme.

     Laying of 100 mm dia GI Collecting main
     incluidng Guard pilling & sinking of new Tube
9)                                                   949564.00   18995.00   105.00   25.05.2009   26.05.09   28.05.09       15 days                DO
     well (No-29) at Kalajharia on the rever bed
     Damodar under RCFA Part-II W/S Scheme.




                                                                                                                          Executive Engineer
                                                                                                                        RCFA Division-I,PHE Dte.
                                                                A      N    N         E   X        U     R    E
                                       Short N.I.Q NO:-01/2009-10/AE-I/RCFA Division-I/PHE Dte
                                               Ref Memo No:- 191/RCD-I dated:-11.05.09
                                                                                                          Date of
                                                                                          Last Date of                 Date of
                                                                             Cost of                      Issue of
                                                                                          Submission                 Droping of
SL NO/                                               Earnest Money          Quotatiion                   Quotation                   Time of
                   NAME OF WORK                                                           Application                 Quotation                         Eligibility for Perticipants
GROUP                                                     (Rs)                Paper                        Paper                   Completion
                                                                                              upto                   Paper up to
                                                                               (Rs)                      upto 4.00
                                                                                           2.00 PM.                    3.00 PM
                                                                                                            PM.
  1                       2                                 3                   4              5             6           7               8                           9


         Supply & delivery Air Valve & Non-      .@. 2.00% on Quoted rate                                                                          Manufactures/Dealers/Suppliers of
  1)     return valve etc under RCFA Division-     deposit at the time of    205.00        25.05.09      26.05.09     28.05.09        5 days      PHE Dte /Bonafide outsider agency of
         I, PHE Dte .                             performing agreement.                                                                                       PHE Dte .




                                                                                                                                    Assistant Engineer-I
                                                                                                                                   RCFA Division-I,PHE Dte.
                                                                A     N       N       E    X        U     R    E
                        Short N.I.Q NO:-02/2009-10 of Executive Engineer,RCFA Division-I,PHE Dte.
                                        Ref Memo No:-232/RCD-I dated:-29.05.2009
                                                                                                           Date of
                                                                                           Last Date of                 Date of
                                                                               Cost of                     Issue of
                                                                                           Submission                 Droping of
SL NO/                                               Earnest Money            Quotatiion                  Quotation                   Time of
                  NAME OF WORK                                                             Application                 Quotation                         Eligibility for Perticipants
GROUP                                                     (Rs)                  Paper                       Paper                   Completion
                                                                                               upto                   Paper up to
                                                                                 (Rs)                     upto 4.00
                                                                                            2.00 PM.                    3.00 PM
                                                                                                             PM.
  1                      2                                 3                      4             5              6          7               8                           9

         Maintenance & caretaking etc. for
         Kalyaneswari Inspection Bungalow,     Initially deposit Rs 5000.00
         New & Old Annexe & Bankim Nibas       as earnest money. Balance                                                                          Enlisted/Bonafide Outsider agency of
  1)     etc. within Kalyaneswari Head        amount to be deposit at the     Rs 105=00     08.06.09      09.06.09     11.06.09     30.06.2010     PHE Dte having credential in similar
         Works Site under R.C.F.A. Part-I,     time of performing tender                                                                                    nature of work .
         W/S Scheme. (w.e.f. 15-6-09 to 30-              agreement.
         06-2010).




                                                                                                                                      Executive Engineer
                                                                                                                                    RCFA Division-I,PHE Dte.
                                                                   A     N       N       E    X        U     R        E
                         Short N.I.Q NO:-03/2009-10 of Executive Engineer,RCFA Division-I,PHE Dte.
                                         Ref Memo No:-233/RCD-I dated:-29.05.2009
                                                                                              Last Date of   Date of Issue   Date of
                                                                                  Cost of
                                                                                              Submission     of Quotation Droping of
SL NO/                                                  Earnest Money            Quotatiion                                                Time of
                   NAME OF WORK                                                               Application        Paper      Quotation                         Eligibility for Perticipants
GROUP                                                        (Rs)                  Paper                                                 Completion
                                                                                                  upto         upto 4.00   Paper up to
                                                                                    (Rs)
                                                                                               2.00 PM.           PM.        3.00 PM

  1                       2                                   3                      4             5              6             7              8                           9
         Making round–o–clock guarding
         arrangement       through     Govt.                                                                                                        Highly reputed ,reliable ,experienced
                                                 Initially deposit Rs 10000.00                                                                         ,resourcefull and bonafide Govt
         Registered    Ex-military   security
                                                  as earnest money. Balance                                                                         registered Ex-Military Security having
         Agency in different places of
  1)                                             amount to be deposit at the     Rs 105=00     08.06.09       09.06.09      11.06.09     31.05.2010 sufficient experience in similar nature
         Darbardanga Head Works Site and
                                                  time of performing tender                                                                            of work in any Govt ./Semi Govt
         Nandi O.H.R. Site under RCFA Div – I,                                                                                                       organization for providing round the
                                                           agreement.
         P.H.E. Dte. (w.e.f. 15.06.2009 to                                                                                                                   clock security service.
         31.05.2010)




                                                                                                                                           Executive Engineer
                                                                                                                                         RCFA Division-I,PHE Dte.
                                                                       A       N     N          E   X      U       R     E
                            Short N.I.T. NO:-01/2009-10 of Assistant Engineer-II,RCFA Division-I,PHE Dte.
                                           Ref Memo No:-01/AE-II/RCD-I dated:-27.05.2009
                                                                                                                        Date of
                                                                                                    Last Date of
                                                                                                                        Issue of      Date of
                                                                                        Cost of     Submission
SL NO/                                              Estimated Cost   Earnest Money                                      Tender      Droping of    Time of
                    NAME OF WORK                                                     Tender Paper   Application                                                      Eligibility for Perticipants
GROUP                                                    (Rs)             (Rs)                                           paper     tender Paper Completion
                                                                                         (Rs)           upto
                                                                                                                       upto 4.00   up to 3.00 PM
                                                                                                     2.00 PM.
                                                                                                                          PM.
  1                         2                             3                4                5              6                7           8             9                          10
  1)
         Laying of 100/80 mm dia GI collecting
         main including Guard Pilling and sinking
         of one nos 200 mm dia River Bed Tube         485632.00       Rs 9750.00         Rs 80.00       15.06.09       16.06.09      18.06.09     10 days       Enlisted Class-III agency of PHE Dte
         well on Barakar river bed at Ramnagar
         under Kulti W/s Scheme

         Making Guarding arrangemnt cum
         vlave opeation at Barul OHR site under
  2)                                                  137195.00       Rs 2750.00      Rs 30=00          15.06.09       16.06.09     18.06.09    06.06.2010 Enlisted Class-III/IV agency of PHE Dte
         RCFA Division-I ,PHE Dte (w.e.f
         20.06.09 to 06.06.2010)



                                                                                                                                                 Assistant Engineer-II
                                                                                                                                                RCFA Division-I,PHE Dte.

				