Supplier PPAP Submission Checklist Submission Date

Document Sample
Supplier PPAP Submission Checklist Submission Date Powered By Docstoc
					                                   Supplier PPAP Submission Checklist
                                                                                             Submission Date:
                                                     Supplier
        Supplier:                                                                                         XXXXXX QE:
                                                        Rep:
                                                                                                           Rev Level &
         Part No:                                 Part Name:
                                                                                                                 Date:

                    Sample part submission required           Sample part submission not required
                                  PPAP AND CONTROL PLAN SUBMISSION LEVELS
                    Prototype                       Pre-production                 Production
        APPROVE     REJECT   N/A                 The following sections are numbered per AIAG PPAP 4th Edition
1         n/a       Design Records of Saleable Product
    a                              Drawing must have an authorized XXXXXX approval signature or stamp.
    b                              Detailed top level drawing must have detailed part drawing for all components.
    c                              All specifications must be referenced on drawing.
    d                              A sequentially numbered drawing which correlates to the numbered dimensional/material/test report.
                                   All notes, specifications and material references must be numbered. The numbers must correlate to
    e
                                   documents contained within the dimensional, material or test certification sections.
                                   Notes that apply globally to a drawing should also be numbered and conformance indicated. (i.e. “all
    f
                                   unspecified radii is +/- .2mm).
    g                              Other requirements:


2         n/a       Engineering Change Documents, if any
    a                              Must provide all engineering change documents not yet recorded in the design record but incorporated in the


3        n/a        Customer Engineering approval, if required
                                   Use of written Deviation/Waiver detailing all prototype processes & non-conforming dimensional/functional
    a
                                   requirements.
    b                              DVPR (Design Validation Product & Reliability) approval by XXXXXX Engineer.


4         n/a       Design FMEA, if applicable
                                   DFMEA (Design Failure Mode & Effect Analysis) approval by XXXXXX Product Engineer is required for all
    a
                                   products which the supplier is design responsible.
    b                              Other requirements:


5         n/a       Process Flow Diagrams(PFD)
    a                              Must be representative of the actual process flow including any offline operations.(Including rework ,re-test etc.)
    b                              Must have correct part number and current revision level.
    c                              Must follow numbering scheme of Control Plan and Process FMEA.(PFD ,Control Plan ,PFMEA -Process sequence # must match )
    d                              Other requirements:

6         n/a       Process FMEA
    a                              Must be in the current AIAG or XXXXXX approved format.
    b                              Must follow numbering scheme of Process Flow Chart and Control Plan.
    c                              Must have correct part number and current revision level.
    d                              Other requirements:

7         n/a       Control Plan
    a                              Must be in the current AIAG or XXXXXX approved format.
    b                              Must address Prototype, Pre-Production (If applicable) and Production stages
    c                              Must identify frequency of inspections, method of inspection, and responsibility.
    d                              Must identify reaction plan for non-conformances.
    e                              Must have correct part number and current revision level.
    f                              Must follow numbering scheme of Process Flow Diagram and process FMEA.
    g                              Other requirements:




        1 of 9                                                  Supplier PPAP Submission Checklist
                                                                                                                                      D:\Docstoc\Working\pdf\44e3522f-1b00-46b1-98b4-d50203464d56.xls
         APPROVE    REJECT      N/A
8          n/a     Measurement System Analysis Studies
                                       Supplier must have applicable MSA studies such as Gage R&R for all equipment used for new or modified
     a
                                       gages, measurement, and test equipment.
     b                                 Must be conducted as required in the current AIAG standard “Measurement Systems Analysis”.
                                       Less than 10% gage error is preferred. Gage error between 10% - 30% may be acceptable if accompanied by
     c
                                       a XXXXXX approved action plan or sign off by XXXXXX supplier quality representative.
                                       ndc (number of discriminate units) should be equal to or greater than 5, and should be equal to
                                       or greater than 10 of used for variable SPC
     d                                 Gage error over 30% is not allowed. Actions must be taken and documented to reduce gage error.
     e                                 Gage Study must be current within one (1) calendar year
     f                                 Other requirements:

9          n/a     Dimensional Results
           n/a     5 Piece Full Layout (per cavity or production stream if applicable)
                                   Typically required on new parts, major changes to existing parts, movement of production equipment, or annual
     a
                                   re-submission.
     b                             All dimensions on drawing are required including radii, angles and GD&T.

     c                                 All notes must be sequentially ballooned/numbered (see item #1) including material and test specifications.
                                       Must be reported on the current AIAG Production Part Approval, Dimensional Results (Form # CFG – 1003,
     d
                                       current revision) or XXXXXX approved format.
     e                                 Samples must be identified as Sample #1 to Sample #5, which correlate to the dimensional report.
                                       If drawing does not specify SC's, supplier is required to choose significant characteristics to measure based
     f
                                       upon their expertise of the product and provide data.
     g                                 Supplier must identify and retain one of the parts measured from each cavity as the master sample.
     h                                 Other requirements:

           n/a     5 Piece Partial Layout (per cavity or production stream if applicable)
     i                                 Typically required on engineering changes.
                                       All dimensions, specifications or notes affected by the engineering change must be addressed on dimensional
     j
                                       report.
     k                                 Must be reported on the AIAG Production Part Approval, Dimensional Results (Form # CFG – 1003) or
                                       XXXXXX approved format.
     l                                 Samples must be identified as Sample #1 to Sample #5, which correlate to the dimensional report.
     m                                 Supplier must identify and retain one of the parts measured from each cavity as the master sample.
     n                                 Other requirements:


10         n/a     Material / Performance Test Results
                                       Must be reported on the AIAG Production Part Approval, Material Test Results (Form # CFG – 1004, current
     a
                                       revision) or XXXXXX approved format.
     b                                 Material Certifications are required for all raw materials used.
     c                                 Actual test specifications must be attached to the test reports.
     d                                 Must be current within one (1) calendar year.
     e                                 MSDS sheets are required if applicable.
     f                                 Must have raw material lab data for all components.
     g                                 Other Requirements:




         2 of 9                                                     Supplier PPAP Submission Checklist
                                                                                                                                            D:\Docstoc\Working\pdf\44e3522f-1b00-46b1-98b4-d50203464d56.xls
         APPROVE   REJECT   N/A
11         n/a     Initial Process Study
     a                             300 piece Sample Run required unless authorized by XXXXXX quality representative.
     b                             If a SC is affected, a 300 Piece run is required for capability reporting purposes.
                                   Process capability for normal distribution processes must be from 100 samples (20 subgroups of 5 parts)
     c
                                   randomly selected out of a 300 piece run unless otherwise authorized by the XXXXXX quality representative
     d                             The process must be in statistical control before capability can be demonstrated.
                                   For bilateral normal distributions, after statistical control is established, then a minimum Ppk of 1.67 must be
     e
                                   achieved for new processes. Existing processes must be in control and a minimum Cpk of 1.33.
     f                             Other requirements:


12         n/a     Qualified Laboratory Documentation
                                   If applicable Supplier shall have a laboratory scope and documentation showing that laboratories used are
     a
                                   accredited by A2LA, SSC, or equivalent.
                                   In the event of special notes on a drawing (i.e. “Must comply with FMVSS302”) a report from a certified lab
     b
                                   (preferably a 3rd party) must be presented indicating conformance to that particular specification.
     c                             Actual specification must be attached to the test report.
     d                             Test report must be numbered which correlates to the number on the ballooned drawing (see item#1).
                                   When a commercial laboratory is used, test results must be submitted on the laboratory letterhead or normal
     e
                                   laboratory report format.
     f                             Other requirements:


13         n/a     Appearance Approval Report, if applicable
     a                             Required on components where texture or color is specified.
     b                             Must be documented on the current AIAG Appearance Approval Report (Form # CFG – 1002, current revision).
     c                             Other requirements:


14         n/a     Sample Product
     a                             Supplier shall provide sample product as requested by the customer and as defined by the submission request.


15         n/a     Master Sample
     a                             Supplier must retain a master sample identified as such with the customer approval date on the sample.
     b                             Each cavity must have a master sample.


16         n/a     Checking Aids
                                   The supplier must certify that all aspects of the checking aid agree with part dimensional requirements (e.g.
     a
                                   CCM report).




         3 of 9                                                 Supplier PPAP Submission Checklist
                                                                                                                                         D:\Docstoc\Working\pdf\44e3522f-1b00-46b1-98b4-d50203464d56.xls
         APPROVE   REJECT   N/A
17         n/a     Records of Compliance with Customer-Specific Requirements
     a                            Supplier Onsite Process Approval required.
     b                            Run at Rate required.
                                  Must be submitted with all 18 sections addressedin an electronic (preferred) tabbed file (.pdf or other approved
     c
                                  format) or in a tabbed, soft-sided three-ring binder
     d                            Sample barcode label to XXXXXX specifications (reference Supplier Manual).
     r                            Special Handling labels marked ____________ on outside of each container shipped for PPAP parts.
     f                            Sub-component approvals (warrants etc).
                                  Early production containment is required for 90 days after Start of Production, unless otherwise approved by
     g
                                  XXXXXX quality representative
     h                            Other requirements:


18         n/a     Part Submission Warrant (PSW)
     a                            Must be AIAG standard (Form # CFG – 1001, current revision), or XXXXXX approved.
     b                            Must include part weight in Kg to 4 decimal places.
     c                            Must include IMDS number
     d                            Must include purchase order number
     e                            Must include customer information.
     f                            Must include correct part number and/or XXXXXX part number.
     g                            Must have detailed explanation in declaration section, if anything is reported to be out of specification.
     h                            Must signify cavity numbers and percent regrind (if virgin material blend is not used) in the
                                  “EXPLANATION/COMMENTS” section.
     i                            Must have production rate (blank completed in "Declaration" section of PSW
     j                            Other requirements:



If any requirements cannot be met by the supplier, it is the supplier's responsibility to complete and submit a
request for a written deviation or waiver with the package, detailing the deviation request and number of parts
effected and/or length of time needed.

           These requirements have been reviewed by XXXXXX quality representative for product approval.
          Submission is:      Approved     Interim Approval until:                    Rejected

  Other Notes:




                                                XXXXXX Quality Representative Date

Submit package to the attention of:


                                                XXXXXX Purchasing Representative
                                                        XXXXXX Mfg.




         4 of 9                                                 Supplier PPAP Submission Checklist
                                                                                                                                          D:\Docstoc\Working\pdf\44e3522f-1b00-46b1-98b4-d50203464d56.xls
                                 Supplier Submission Requirements Checklist
                                              (PPAP/ISIR/ISR)
                                              Location Change
                                                                                                Submission Date:
        Supplier:                                Supplier Rep:                                              Hi-Stat QE:

           Part No:                                  Part Name:                                              Rev Level &
                                                                                                                   Date:

              = Sample Submission Required                                           = Sample Submission NOT Required

              = Prototype                                       = Pre-Production                           = Production

           APPROVE REJECT      N/A    APPROVE
   1     Design Records of Saleable Product                     n/a
       a                    Drawing must have an authorized Hi-Stat approval signature or stamp.
       b                    Detailed top level drawing must have detailed part drawing for all components.
       c                    All specifications must be referenced on drawing.
       d                             A sequentially numbered drawing which correlates to the numbered dimensional/material/test report.
                                     All notes, specifications and material references must be numbered. The numbers must correlate to
       e
                                     documents contained within the dimensional, material or test certification sections.
                                     Notes that apply globally to a drawing should also be numbered and conformance indicated. (i.e. “all
       f
                                     unspecified radii is +/- .2mm).
       g                             Other requirements:

   2     Engineering Change Documents, if any                 n/a
                           Must provide all engineering change documents not yet recorded in the design record but incorporated
       a
                           in the product, part or tooling.

   3     Customer Engineering approval, if required                          n/a
                           Use of Deviation/Waiver detailing all prototype processes & non-conforming dimensional/functional
       a
                           requirements.
       b                   DVPR (Design Validation Product & Reliability) approval by Hi-Stat Engineer.

   4     Design FMEA, if applicable          n/a

       a                    DFMEA (Design Failure Mode & Effect Analysis) approval by Hi-Stat Release Engineer is required for
                            all products which the supplier is design responsible.
       b                    Other requirements:

   5       Process Flow Diagrams              n/a

       a                      Must be representative of the actual process flow including any offline operations.
       b                      Must have correct part number and revision level.
       c                      Must follow numbering scheme of Control Plan and Process FMEA.
       d                      Other requirements:

   6       Process FMEA                  n/a

       a                             Must be in the AIAG or other approved format.
       b                             Must follow numbering scheme of Process Flow Chart and Control Plan.
       c                             Must have correct part number and current revision level.
       d                             Other requirements:




44e3522f-1b00-46b1-98b4-d50203464d56.xls                         Page 5 of 9                                                        Production
                                   Supplier Submission Requirements Checklist
                                                (PPAP/ISIR/ISR)
                                                Location Change
                                                                                                        Submission Date:
        Supplier:                                  Supplier Rep:                                                      Hi-Stat QE:

            Part No:                                   Part Name:                                                      Rev Level &
                                                                                                                             Date:
   7        Dimensional Results                      n/a

            5 Piece Full Layout (per cavity or production stream if applicable)
                                  Typically required on new parts, major changes to existing parts, movement of production equipment,
       a
                                  or annual re-submission.
       b                          All dimensions on drawing are required including radii, angles and GD&T.
                                  All notes must be sequentially ballooned/numbered (see item #1) including material and test
       c
                                  specifications.
                                  Must be reported on the AIAG Production Part Approval, Dimensional Results (Form # CFG – 1003,
       d
                                  current revision).
       e                          Samples must be identified as Sample #1 to Sample #5, which correlate to the dimensional report.
                                  If drawing does not specify KPC's, supplier is required to choose critical characteristics to measure
        f
                                  based upon their expertise of the product and provide data.
       g                          Supplier must identify one of the parts measured from each cavity as the master sample.
       h                                Other requirements:

          5 Piece Partial Layout (per cavity or production stream if applicable)
       i                        Typically required on engineering changes.
                                All dimensions, specifications or notes affected by the engineering change must be addressed on
        j
                                dimensional report.
       k                             Must be reported on the AIAG Production Part Approval, Dimensional Results (Form # CFG – 1003).
        l                            Samples must be identified as Sample #1 to Sample #5, which correlate to the dimensional report.
       m                             Supplier must identify one of the parts measured from each cavity as the master sample.
       n                                 Other requirements:

   8        Material / Performance Test Results                              n/a

       a                             Must be reported on the AIAG Production Part Approval, Material Test Results (Form # CFG – 1004).

       b                             Material Certifications are required for all raw materials used.
       c                             Actual test specifications must be attached to the test reports.
       d                             Must be current within one (1) calendar year.
       e                             MSDS sheets are required if applicable.
       f                             Must be on OEM approved supplier list, if applicable.
       g                             Must have raw material lab data for all components.
       h                             Other Requirements:

   9        Initial Process Study                       n/a

       a                             300 piece Sample Run required unless authorized by an Hi-Stat Q.E. representative.
       b                             If a KPC is affected, a 300 Piece run is required for capability reporting purposes.




44e3522f-1b00-46b1-98b4-d50203464d56.xls                             Page 6 of 9                                                     Production
                                Supplier Submission Requirements Checklist
                                             (PPAP/ISIR/ISR)
                                             Location Change
                                                                                                    Submission Date:
         Supplier:                                Supplier Rep:                                                   Hi-Stat QE:

            Part No:                                  Part Name:                                                   Rev Level &
                                                                                                                         Date:
                                   Process capability for normal distribution processes must be from 100 samples (20 subgroups of 5 parts)
                                   randomly selected out of a 300 piece run unless otherwise authorized in writing by the Hi-Stat Q.E. Precision
                                   machining: Studies must be 30 sequential individual values. For processes with little tool wear or adjustment,
        c                          adjusted sampling rate (e.g. every other piece or every third piece) may be used. Each sample measurement for
                                   diameters must indicate the largest and smallest diameter of the measured section. Each sample measurement
                                   for lenghts must indicate the longest and shortest length of the measured section. Control limits are to be 75% of
                                   the total tolerance or less.
        d                          The process must be in statistical control before capability can be demonstrated.
                                   For bilateral normal distributions, after statistical control is established, then a minimum Ppk of 1.67 must be
        e
                                   achieved for new processes. Existing processes must be in control and a minimum Cpk of 1.33.
        f                          Other requirements:

   10     Measurement System Analysis Studies                 n/a
                           Supplier must have applicable MSA studies such as Gage R&R for all equipment used for new or
        a
                           modified gages, measurement, and test equipment.
        b                  Must be conducted as required in the AIAG standard “Measurement Systems Analysis”.
                           Less than 10% gage error is preferred. Gage error between 10% - 30% may be acceptable if
        c                  accompanied by a Hi-Stat approved action plan or sign off by Hi-Stat plant supplier quality/corporate
                           supplier development.
                                 n/a
        d                          Gage error over 30% is not allowed. Actions must be taken and documented to reduce gage error.
        e                          Gage
                                 n/a     Study must be current within one (1) calendar year.
        f                          Other requirements:
                                 n/a


   11     Qualified Laboratory Documentation                      n/a
                              Supplier shall have a laboratory scope and documentation showing that laboratories used are
                            n/a
        a
                              accredited by A2LA, SSC, or equivalent.
                                 n/a
                                   In the event of special notes on a drawing (i.e. “Must comply with FMVSS302”) a report from a certified
        b
                                   lab (preferably a 3rd party) must be presented indicating conformance to that particular specification.

        c                          Actual
                                 n/a        specification must be attached to the test report.
                                 n/a
        d                          Test report must be numbered which correlates to the number on the ballooned drawing (see item#1).
                                   When
                                 n/a     a commercial laboratory is used, test results must be submitted on the laboratory letterhead or
        e
                                   normal laboratory report format.
        f                          Other requirements:
                                 n/a


   12       Control Plan                n/a

        a                          Must
                                 n/a    be in the AIAG or other approved format.
        b                          Must address Prototype, Pre-Production and Production stages.
                                 n/a

        c                          Must identify frequency of inspections, method of inspection, and responsibility.
                                 n/a

        d                          Must identify reaction plan for non-conformances.
                                 n/a

        e                          Must have correct part number and revision level.
                                 n/a

        f                          Must follow numbering scheme of Process Flow Chart and process FMEA.
                                 n/a

        g                          Other requirements:
                                 n/a



44e3522f-1b00-46b1-98b4-d50203464d56.xls                          Page 7 of 9                                                               Production
                                  Supplier Submission Requirements Checklist
                                               (PPAP/ISIR/ISR)
                                               Location Change
                                                                                                   Submission Date:
         Supplier:                                Supplier Rep:                                                 Hi-Stat QE:

            Part No:                                  Part Name:                                                 Rev Level &
                                   n/a                                                                                 Date:


   13       Part Submission Warrant (PSW)                         n/a

        a                      Must be AIAG standard (Form # CFG – 1001).
                             n/a

        b                      Must include weight, purchase order #, customer information.
                             n/a

        c                      Must include correct part number and/or Hi-Stat part number.
                             n/a

                                   n/a
        d                            Must have detailed explanation in declaration section, if anything is reported to be out of specification.
                                     Must
                                   n/a    signify cavity numbers and percent regrind (if virgin material blend is not used) in the
        e
                                     “EXPLANATION/COMMENTS” section.
        f                            Must be signed and dated by an authorized supplier representative.
                                   n/a

        g                            Other requirements:
                                   n/a


   14       Appearance Approval Report, if applicable                        n/a

        a                     Required on components where texture or color is specified.
        b                     Must be documented on the AIAG Appearance Approval Report (Form # CFG – 1002).
        c                     Other requirements:

   15     Bulk Material Requirements Checklist, if applicable                             n/a

        a                     Required on bulk material PPAP submissions only
        b                     Bulk Materials Requirements Checklist or as agreed to by customer
        c                     Other requirements:

   16       Sample Product                n/a
                                     Supplier shall provide sample product as requested by the customer and as defined by the submission
        a
                                     request.

   17       Master Sample                 n/a

        a                            Supplier must retain a master sample identified as such with the customer approval date on the sample.
        b                            Each cavity must have a master sample.

   18       Checking Aids                 n/a
                                     The supplier must certify that all aspects of the checking aid agree with part dimensional requirements
        a
                                     (e.g. CCM report).

   19       Records of Compliance with Customer-Specific Requirements                                      n/a
        a                     SOPA (Supplier Onsite Process Approval) required.
        b                     Run at Rate required.
                              Manufacturing Floor Plan must show processing sequence, method and equipment used at each
        c
                              station.
                              Manufacturing Floor Plan must illustrate number of operators required per station including inspection &
        d
                              repair/rework stations.
                              Manufacturing Floor Plan must illustrate entire manufacturing process from receiving of raw materials
        e
                              through shipping operations.


44e3522f-1b00-46b1-98b4-d50203464d56.xls                           Page 8 of 9                                                           Production
                             Supplier Submission Requirements Checklist
                                          (PPAP/ISIR/ISR)
                                          Location Change
                                                                                           Submission Date:
       Supplier:                           Supplier Rep:                                                Hi-Stat QE:

          Part No:                             Part Name:                                               Rev Level &
                                                                                                              Date:
     f                         Must be submitted in a tabbed, soft-sided three-ring binder.
     g                         Completed, signed checklist submitted with the package.
                               Packaging design form (carton and pallet size, cartons per pallet, parts per carton, expendable vs.
     h
                               returnable).
      i                        Process Mapping (reference Supplier Manual).
      j                        Supplier contact list.
      k                        Sample barcode label to Hi-Stat specifications (reference Supplier Manual).
                               Customs Documentation (see Hi-Stat Supplier Manual, Section XI, Miscellaneous, Paragraph D,
      l
                               Customs Documentation) if applicable.
     m                         Digital picture of each component with accompanying terminology for identification.
     n                         Bright pink labels marked ____________ on outside of each container shipped - (prototype).
     o                         Yellow labels marked ___________ on outside of each container shipped - (pre-production).
     p                         Green labels marked ___________ on outside of each container shipped - (production).
     q                         Sub-component approvals (warrants, MATSPC, etc).
      r                        Early production containment is required for 45 days after Start of Production.
     s                         Other requirements:
   If any requirements cannot be met by the supplier, it is the supplier's responsibility to complete and submit a
   request for Deviation/Waiver with the package, detailing the deviation request and number of parts effected
   and/or length of time needed.
              These requirements have been reviewed by Hi-Stat quality representative for product approval.
          Submission is:        Approved            Interim Approval until:                                 Rejected
   Other Notes:




                                           Hi-Stat Quality Representative               Date

   Submit package to the attention of:
                                                               Bob Doering
                                                             APQP Engineer
                                                  Hi-Stat Mfg. - A Division of Stoneridge
                                                           345 South Mill Street
                                                          Lexington, Ohio 44904




44e3522f-1b00-46b1-98b4-d50203464d56.xls                     Page 9 of 9                                                       Production

				