Refusal to a Sale Proposal Sample Letter

W
Description

Refusal to a Sale Proposal Sample Letter document sample

Shared by: dua51718
Categories
Tags
-
Stats
views:
122
posted:
8/2/2011
language:
English
pages:
47
Document Sample
scope of work template
							                                     S&W SAWMILL
                                      Site File Guide
                                           4/21/11
Notes: 1.      (**) indicates a specific item within the file is confidential
       2.      Montana Department of Health and Environmental Sciences (MDHES)
               became Montana Department of Environmental Quality (MDEQ) on July
               1, 1995.
       3.      A bullet indicates a specific document located within the file



Project File - Table of Contents

31     S & W Sawmill ( SWS )

31     01      SWS Billing Summary

31     01      01     SWS Billing Correspondence
31     01      02     Billing Summaries

31     02      General Information

31     02      01     Facility Summary
                          Site Summary
                          Draft Chain of Deeds (5/99)
31     02      02     CECRA Ranking / Database Forms

31     03      Site Investigation Work (pre-RI)

31     03      01     1988 GW Monitoring Report (797/17G801)
31     03      01     01     Missoula Area Site Investigation Tour Report
31     03      02     MDHES / EPA Preliminary Assessment
31     03      03     1988 Envirocon Report
31     03      04     MSE SI Submittal Letters
31     03      05     DHES Comments on Phase II Sampling
31     03      06     Phase II SI Report Correspondence
                       Facility Map
                       Phone Record R. Reep (6/30/89)
                       DEQ Letter to R. Reep- site investigation (7/10/89)
                       R. Reep letter to DEQ-site investigation (7/14/89)




                                                                              Page 1 of 47
31   03   06   (Continued - Phase II SI Report Correspondence)
                MSE Task Order (9/19/88)
                DEQ letter to D. Tuesday regarding site inspection (7/14/89)
                DEQ memo regarding site visit (10/5/89)
                MSE submittal to site history & sampling plan (10/13/89)
                Submittal of sampling plan to D. Evans (10/19/89)
                DEQ letter to R. Reep- submittal of sampling plan (10/19/89)
                DEQ changes to sampling plan (10/27/89)
                Bogart Env. To Valley Bank-Darby lumber (8/17/89)
                Environcon draft sampling plan comments (10/31/89)
                DEQ letter to D. Tuesday-site history & sampling plan
                  (10/31/84)
                DEQ letter to M. Babits concerning Environcon comments to
                  sampling plan (11/2/89)
                GR letter to DEQ-sampling (11/6/89)
                MSE letter to DEQ-site History Report (11/13/89)
                DEQ letter to B. Douglass regarding final sampling plan
                  (11/21/89)
                DEQ letter to R. Reep- final site sampling plan (11/22/89)
                GR letter to DEQ- receipt of attachments (11/28/89)
                GRS letter to DEQ concerning final sampling plan (12/11/89)
                DEQ letter to M. Babits concerning sampling plan (12/14/89)
                GRS letter to DEQ concerning sampling time (3/6/90)
                DEQ to R. Reep concerning sampling schedule (3/8/90)
                GRS letter to DEQ-meeting schedule (7/10/90)
                DEQ comments on draft SAR & ARR (7/25/90)
                EPA to DEQ-collect additional info (9/4/90)
                DEQ letter to R. Reep concerning SSI (1/10/91)
                GPS letter to DEQ- site evaluation (1/16/91)
                Darby lumber change of address (1/24/91)
                MSE letter-submitting Phase II sampling plan (1/29/91)
                DEQ comments on Phase II sampling plan (2/4/91)
                DEQ letter to R. Reep-scheduled sampling (2/4/91)
                MSE letter to DEQ-sampling plan (2/5/91)
                DEQ letter to R. Reep regarding sampling plan (2/7/91)
                DEQ letter to B. Douglass Phase II sampling plan ( 2/7/91)
                DEQ letter to B. Douglass & K. Smith- follow-up investigation
                  (2/27/91)




                                                                    Page 2 of 47
31   03   06     (Continued - Phase II SI Report Correspondence)
                  DEQ letter to Darby lumber regarding follow-up investigation
                    (2/27/91)
                  GW Phenol lab results (MSE, (4/19/91)
                  GW PAH lab results (MSE, 4/19/91)
                  MSE letter to DEQ regarding Phase II sampling results
                    (5/10/91)
                  MSE letter to DEQ regarding Phase II sampling results
                    (5/23/91)
                  DEQ letter to Bob Russell concerning lab results (6/3/91)
                  MSE preliminary HRS scoring (6/10/91)
                  EPA evaluation (6/12/91)
                  DEQ letter to R. Bertram follow-up SI submission (6/12/91)
                  DEQ to B. Douglass concerning lab reports (6/20/91)
                  DEQ letter to L. Guerrero concerning lab results (6/20/91)
31   03   07     1994 MDHES Site Investigation Report
31   03   08     1989 Final Site Sampling Plan (797/17G801)
31   03   09     1989 Final Site History Report (797/17G801)
31   03   10     1990 Final SI Report (797/17G801)
31   03   11     1991 Phase II SAP (797/17G801)
31   03   11     01     1991 Revised Phase II SAP (797/17G801)
31   03   12     1991 Sampling and Analytical Results Report (797/17G801)
31   03   12     01     Draft 1991 Sampling and Analytical Results Report
                        (797/17G801)

31   04   Phase I and Phase II Remedial Investigation (RI) 1998-2001

31   04   01     Drafts of Phase I Workplan
31   04   01     01      Draft Remedial Investigation Workplan (3/21/98)
31   04   01     02      Final Draft Remedial Investigation Workplan (7/1/98)
                         (796/17H706)
31   04   01     03      Phase I RI Workplan Correspondence
                          Operational Histories Example (7/1/99)
                          R. Reep letter to DEQ w/copy of revisions to Workplan
                            (7/9/98)
31   04   02     Draft Remedial Investigation Report Vol I-II (2/4/00)
                 (796/17G801)
31   04   02     01      Phase I RI Report Correspondence
                          DEQ letter to IP granting extension (3/16/01)
                          IP letter to DEQ regarding scheduling (326/01)




                                                                       Page 3 of 47
31   04   02     01      (Continued - Phase I RI Report Correspondence)
                          DEQ letter to IP regarding scheduling (3/26/01)
31   04   03      July 12, 2001 Final Phase II Remedial Investigation Workplan
31   04   03      01     Phase II Workplan Correspondence (Documents
                         dated before 8/30/01 are not itemized)
                              Arrowhead Engineering letter to DEQ re: Update on
                                 RI Activities (8/30/01)
                              Northern Analytical Lab Report (9/27/01)
31   04   03      02     QAPP Update
                              DEQ/Roll & AEI/Cosgriff emails re: Updating
                                 QAPP (2/25/11)
31   05   Comprehensive Phase I and Phase II Remedial
          Investigation Report (2002-2003)

31   05   01     Reports
31   05   01     01     Draft Comprehensive RI Report (10/1/02) (796/17G801)
31   05   01     02     Red-line/Strike-out Draft of
                        Comprehensive RI Report (3/24/02)
                             Red-line/Strike-out 2nd Draft of
                                Comprehensive RI Report (3/24/03) (797/17G801)
31   05   01     03     Final Comprehensive RI Report (October 29, 2004)
31   05   01     03     01      Final Draft Comprehensive RI Report - Review
                                Copy (June 7, 2004) (797/17G801)
31   05   01     03     02      Final Draft Comprehensive RI Report
                                Red-line/Strike-out copy (April 30, 2004)
                                (796/17G801)
31   05   02     Comprehensive RI Correspondence
                     Phone Log – DEQ to Douglass Inc re: Sample location
                        #4025 (11/30/00)
                     DEQ letter to IP Company re: DEQ Scope of Work &
                        Schedule (5/1/01)
                     Arrowhead Engineering letter to DEQ re: Access to
                        Townsend/Parameter Property for sampling (11/30/01)
                     Arrowhead letter to DEQ re: SPLP Testing – PCP (Soil
                        Sample) (2/11/02)
                     DEQ letter to IP re: Additional soil data needs to be
                        collected (6/21/02)
                     DEQ & IP emails re: Additional sampling (7/1/02)
                     DEQ comments on the Draft Comprehensive RI Report
                        (February 12, 2003)




                                                                      Page 4 of 47
                       Email regarding IP response to DEQ letter of Feb. 12
                        (February 24, 2003)
                       DEQ’s comments on the Draft Comprehensive RI
                        (February 25, 2003)
                       Email regarding RI discussion (February 26, 2003)
                       Meeting notes (February 28, 2003)

31   05   02     (Continued - Comprehensive RI Correspondence)
                     Email regarding UST discussion in the RI (March 18,
                        2003)
                     Email regarding RI and UST issues (March 21, 2003)
                     IP’s submittal letter and comments for 2nd Draft
                        Comprehensive Remedial RI Report
                     DEQ’s comments on the 2nd Draft Comprehensive RI
                        (March 11, 2004)
                     DEQ Final Draft RI comments (June 2, 2004)
                     IP Report submittal letter (July 9, 2004)
                     DEQ Responsiveness Summary (October 20, 2004)

31   06   Interim Actions

31   06   01     Free Product Recovery Evaluation
31   06   01     01     Reports
                            Free Product Recovery Evaluation (6/10/02)
                            Final Free Product Recovery Evaluation (7/29/02)
                            Final Interim Action-Free Product Recovery
                               Evaluation (2/24/03)
31   06   01     02     Free Product Recovery Evaluation Correspondence
                         DEQ comments on FPRE (7/2/02)
                         DEQ comments on Free Product Recovery evaluation
                           (1/21/03)
                         DEQ & Arrowhead emails re: Comments to Bio-Study
                           Work Plan (8/22/07)
31   06   02     Groundwater Monitoring Program
31   06   02     01     Groundwater Monitoring Plan Reports
                            GW Monitoring Plan (7/29/02) (796/17H706)
                            Final Draft Groundwater Monitoring Plan (1/20/03)
                               (750/21B906)
                            Draft Groundwater Monitoring Plan (2/11/03)
                               (750/21B906)




                                                                        Page 5 of 47
                          Final Groundwater Monitoring Plan (2/26/03)
                           (796/17H706/)
                        Draft 2004 Groundwater Monitoring Plan (4/17/04)
                           (750/21B906)
                        Final 2004 Groundwater Monitoring Plan (8/10/04)
                           (796/17H706)
                        Final 2005 Groundwater Monitoring Plan (2/25/05)
31   06   02   01   (Continued - Groundwater Monitoring Plan Reports)
                        Final 2007 Groundwater Monitoring Plan
                           (Arrowhead, 4/24/07)
                        Final 2008 Groundwater Monitoring Plan
                           (Arrowhead, 4/23/08)
                        Final 2009 Groundwater Monitoring Plan
                           (Arrowhead, 3/16/09)
                        Final 2010 Groundwater Monitoring Plan + CD
                           (Arrowhead, 2/24/10
31   06   02   02   Groundwater Monitoring Plan Correspondence
                        Meeting notes (1/6/02)
                        DEQ comments to IP regarding GW monitoring
                           plan (11/13/02)
                        IP, DEQ email regarding GW monitoring plan
                           revisions (12/18/02)
                        DEQ approval letter for 2003 GW monitoring plan
                           (2/6/03)
                        DEQ requirements to 2003 GW monitoring plan
                           (2/20/03)
                        IP email regarding intent to GW sampling (2/25/03)
                        DEQ email to IP re: Follow-up sampling (11/3/03)
                        DEQ letter to IP re: Revisions regarding Draft 2004
                           GW Monitoring Plan (7/22/04)
                        Arrowhead Engineering letter to DEQ re: Final
                           2004 GW Monitoring Plan (8/10/04)
                        DEQ email to IP re: GW monitoring at S&W
                           (2/1/05)
                        Arrowhead letter to DEQ re: Proposed GW
                           Monitoring Plan for 2005 (2/9/05)
                        DEQ letter to IP re: 2005 GW Monitoring Plan
                           (2/15/05)
                        IP email to DEQ re: S&W NWA monitoring
                           proposal for August 2006 (8/16/06)




                                                                  Page 6 of 47
                          Arrowhead letter to DEQ re: IP’s Proposed GWMP
                           for 2007 (1/3/07)
                          DEQ email to IP & Arrowhead re: Proper Dioxin
                           TEF values (2/2/07)
                          DEQ email to IP & Arrowhead re: Explanation of
                           TEFs for Dioxin calculation (2/2/07)

31   06   02   02   (Continued - Groundwater Monitoring Plan
                    Correspondence)
                        DEQ letter to IP re: DEQ comments to 2007
                           GWMP (4/6/07)
                        T Richardson email to DEQ re: IP’s questions on
                           DEQ’s GWMP & UST Comments (4/12/07)
                        ** DEQ internal email re: DEQ’s comments to IP’s
                           GWMP (4/16/07)
                        DEQ letter to T Richardson/IP: Response to GWP,
                           spill complaint & UST issues (4/17/07)
                        DEQ email to T Richardson re: GWMP & UST
                           issues (4/18/07)
                        Arrowhead email to DEQ re: Final GWMP & Well
                           locations (4/27/07)
                        DEQ Letter to T Richardson re: Approval of 2007
                           GW Monitoring Plan (4/30/07)
                        DEQ letter to IP re: 2008 GW Monitoring Plan
                           (2/7/08)
                        DEQ/IP emails re: Expedite resampling of
                           MW1006 for dioxin (11/4/08)
                        DEQ/IP/Arrowhead emails re: Rush dioxin/furan
                           MW1006 results (11/12/08)
                        DEQ/Arrowhead emails re: Broken sample bottle
                           (11/17/08)
                        AEI/Cosgriff email to DEQ/Seyler re: Draft
                           Proposed GW Monitoring Plan for 2009 (2/9/09)
                        DEQ/Seyler letter to IP re: 2009 GW monitoring
                           Plan (3/10/09)
                        **DEQ/Seyler internal email re: MW 1006 and
                           possible installation of new well (6/29/09)
                        **DEQ/Seyler & Martin internal emails re: MW
                           1006 and possible installation of new well (7/2/09)




                                                                    Page 7 of 47
                          DEQ/Roll email to AEI re: Purge water collection
                           for MW 1006 (10/29/09)
                          Technical Memorandum – Plume Stability Analysis
                           (Premier Environmental Services, 11/20/09)
                          DEQ/Roll & AEI/Cosgriff re: 2010 GMP
                           correspondence – containment questions (1/19/10)
                          DEQ/Roll letter to IP/Richardson re: Plume
                           Stability Analysis (1/25/10)

31   06   02   02   (Continued - Groundwater Monitoring Plan
                    Correspondence)
                        ** DEQ internal emails re: Plume Stability Analysis
                           (1/26/10)
                        DEQ/Roll & AEI/Cosgriff emails re: Proposed
                           submittal of table (1/27/10)
                        IP/AEI/Cosgriff letter to DEQ/Roll re: Proposed
                           Modifications to GW Monitoring Plan for 2010
                           (2/1/10)
                        DEQ/Roll letter to IP/Richardson re: DEQ
                           comments on the Technical Memorandum – Plume
                           Stability Analysis (2/11/10)
                        DEQ/Roll letter to IP/Richardson re: Proposed
                           Modifications to 2010 GW Monitoring Plan
                           (2/11/10)
                        Phone Log – DEQ/Roll & AEI/Cosgriff re:
                           Clarification of DEQ comment on DEQ 2/11/10
                           letter (2/17/10)
                        AEI/Cosgriff email to DEQ/Roll re: Attachment –
                           Proposed tables for 2010 GWMP (2/17/10)
                        DEQ/Roll & IP/Richardson emails re: Robak
                           monitoring well sampling in 2011 (1/6/11)
                        DEQ/Roll & AEI/Cosgriff emails re: 2011
                           Groundwater Monitoring Plan Proposal (2/9/11)
                        AEI/Cosgriff email to DEQ/Roll re: Attachment
                           Draft 2011 GW Monitoring Plan for review
                           (2/24/11)
                        DEQ/Roll email to IP/Richardson re: DEQ
                           comments on Draft 2011 GW Monitoring Plan
                           (3/4/11)




                                                                  Page 8 of 47
                            DEQ letter to IP/Richardson re: DEQ comments on
                             Draft 2011 GW Monitoring Plan (3/4/11)
                            DEQ/Roll & AEI/Cosgriff emails re: GW
                             Monitoring Plan, tubing, low flow, & sample
                             locations (3/4-3/8/11)
                            AEI/Cosgriff email to DEQ/Roll re: Attachment –
                             Final Draft Monitoring Well Installation Work Plan
                             (3/14/11)

31   06   02   02     (Continued - Groundwater Monitoring Plan
                      Correspondence)
                          AEI/Cosgriff & DEQ/Roll emails re: GW
                             Monitoring Plan (3/18/11)
                          DEQ/Roll letter to IP/Richardson re: DEQ approval
                             of the 2011 GW Monitoring Plan (3/23/11)
31   06   03   Quarterly Monitoring Reports (empty)
31   06   03   01     2002 Quarterly Monitoring Reports (750/21B906)
                          2nd Qtr (7/25/02)
                          3rd Qtr (10/30/02)
                          4th Qtr (1/7/03)
31   06   03   02     2003 Quarterly Monitoring Reports (750/21B906)
                          1st Qtr (4/24/03)
                          2nd Qtr (7/17/03)
                          3rd Qtr (10/30/03)
                          4th Qtr (1/18/04)
31   06   03   03     2004 Quarterly Monitoring Reports (797/17G801)
                          1st Qtr (4/14/04)
                          2nd Qtr (7/21/04)
                          3rd Qtr (10/29/04)
                          4th Qtr (1/25/05)
31   06   03   04     2005 Quarterly Monitoring Reports (797/17G801)
                          1st Qtr (4/19/05)
                          2nd Qtr (7/28/05)
                          High Water Well Monitoring/226-00-322 (9/13/05)
                          3rd Qtr (10/27/05)
31   06   03   04     (Continued - 2005 Quarterly Monitoring Reports
                      (797/17G801)
                          4th Qtr Well Monitoring/226-00-322 (12/13/05)
31   06   03   05     2006 Quarterly Monitoring Reports
                          1st Qtr GW lab results (4/3/06)




                                                                     Page 9 of 47
                          1st Qtr Progress report (4/28/06)
                          2nd Qtr Progress report (7/28/06)
                          3rd Qtr GW Sampling/266-00-322 (9/11/06)
                          3rd Qtr Sample Analysis (9/12/06)
                          3rd Qtr Progress report (10/31/06)
                          4th Qtr Progress report (1/24/07)
                          2nd Qtr Progress Report (7/28/07)


31   06   03   06   2007 Quarterly Monitoring Reports
                        1st Qtr Progress Report (4/27/07)
                        3rd Qtr Lab Results (9/21/07)
                        3rd Qtr Progress Report (10/31/07)
                        4th Qtr Progress Report (1/31/08)
31   06   03   07   2008 Quarterly Progress Reports
                        1st Qtr Progress Report (4/28/08)
                        2nd Qtr Progress Report (7/31/08)
                        3rd Qtr Progress Report (10/31/08)
                        DEQ/IP/Arrowhead emails re: Rush Dioxin/Furan
                          MW-1006 results (11/12/08)
                        4th Qtr Progress Report (1/31/09)
                        4th Qtr Progress Report (1/31/09)
31   06   03   08   2009 Quarterly Progress Reports
                        1st Qtr Progress Report (4/30/09)
                        2nd Qtr Progress Report (7/27/09)
                        3rd Qtr Progress Report (10/30/09)
                        DEQ/AEI emails re: 3rd Quarter Progress Report
                          (11/4/09)
                        DEQ/AEI emails re: Chaney GW sample results
                          and CAS analytical data (12/16/09)
                        4th Qtr Progress Report 2009 (1/27/10)
31   06   03   09   2010 Quarterly Progress Reports
                        1st Qtr Progress Report (Arrowhead, 4/30/10)
                        2nd Qtr Progress Report (Arrowhead, 7/23/10)
                        DEQ/Roll email to IP/Richardson re: Comments to
                          IP re: 2nd Qtr Progress Report (8/13/10)
                        AEI/D Cosgriff email to DEQ/Roll re: Attachment
                          – Updated electronic files for 2nd Qtr Progress
                          Report (8/14/10)




                                                                Page 10 of 47
                          DEQ/Roll email to IP & Arrowhead re: Attachment
                           – P&E letter (9/8/10)
                          DEQ/Roll letter to IP/Richardson re: Sample of Mr
                           Chaney’s well (9/8/10)
                          DEQ/Roll & IP emails re: Chaney re-sample (9/8-
                           9/9/10)
                          AEI/Cosgriff email to DEQ/Roll re: Semi-annual
                           GW sampling schedule (9/27/10)
                          3rd quarter Progress Report + CD (Arrowhead,
                           10/27/10)
                          AEI/Cosgriff email to DEQ/Roll re: 4th quarter GW
                           sampling notification (11/1/10)
                          DEQ/Roll email to IP/Richardson re: 3rd quarter
                           Results Table edits (11/3/10)
                          AEI/Cosgriff & DEQ/Roll emails re: 3rd Quarter
                           Progress Report – missing dioxin data (11/4/10)

31   06   03   09   (Continued - 2010 Quarterly Progress Reports)
                        DEQ/Roll & AEI/Cosgriff emails re: Missing data
                           (11/4/10)
                        DEQ/Roll & AEI/Cosgriff emails re: Changes to 3rd
                           quarter Report (11/5/10)
                        D Cosgriff & DEQ/Roll emails re: 4th quarter
                           sampling (11/19/10)
                        DEQ/Roll & AEI/Cosgriff emails re: Purge water
                           tank (12/31/10)
                        4th Quarter Progress Report + CD (Arrowhead,
                           1/31/11)
                        DEQ/Roll email to IP/Richardson re: DEQ
                           comments to 4th Quarter Progress Report (2/10/11)
                        DEQ/Roll email to IP/Richardson re: Additional
                           DEQ comments to 4th Quarter Progress Report
                           (2/10/11)
                        IP/Richardson email to DEQ/Roll re: 4th quarter
                           comments – daughter products (2/14/11)
                        Addendum to 4th Quarter Progress Report (AEI,
                           2/21/11)
31   06   03   10   2011 Quarterly Progress Reports
                        DEQ/Roll & AEI/Cosgriff emails re: Regulated
                           waste generator number (1/4/11)




                                                                 Page 11 of 47
                             DEQ/Roll & AEI/Cosgriff emails re: Purge water
                              tank (1/4/11)
                           ** DEQ Legal/Brooks & Roll internal emails re:
                              Purge water waiver (1/4/11)
                           AEI/Cosgriff email to DEQ/Roll re: Purge water
                              treatment (1/4/11)
                           Douglass email to DEQ/Roll re: Clean Harbors and
                              purge water tank (1/6/11)
                           AEI/Cosgriff email to DEQ/Roll re: Coordination
                              with Clean Harbors to take purge water (1/10/11)
                           Douglass email to DEQ/Roll re: Sampling schedule
                              for Chaney & Robak wells (1/13/11)
                           Douglass email to DEQ/Roll re: IP notification of
                              sampling event at Chaney’s well (1/19/11)
                           Douglass email to Robak cc to DEQ/Roll re: PCP
                              results from well (2/2/11)
31   06   04   Fencing Contaminated Soils
                   DEQ letter to IP re: Fencing required around surface soil
                      contamination (4/16/02)
                   Proposed Fencing Areas Map (4/26/02)
                   Arrowhead letter to DEQ re: Specifications for new fencing
                      (4/26/02)
                   DEQ letter to Arrowhead re: Approval of fencing
                      specifications (5/16/02)
                   Arrowhead letter to DEQ re: Status of fence repairs
                      (1/5/07)
31   06   05   Anonymous Spill Complaint Investigation
                   DEQ internal email re: Spill complaint information
                      (2/23/07)
                   Ravalli Republic email re: Possible spill complaint and
                      follow up (2/23/07)
                   DEQ letter to IP re: Spill complaint & UST issues (3/2/07)
                   DEQ email to Mr. Miller re: Pictures of planer building and
                      possible spill site (3/6/07)
                   DEQ internal email re: Phone log - DEQ & Mr. Miller re:
                      Verification of spill complaint location (3/6/07)
                   IP letter to DEQ re: Spill Complaint & UST issues
                      (4/13/07)
                   ** DEQ & IP emails re: IP email to DEQ - discussing IP’s
                      UST & Spill response (4/16/07)




                                                                    Page 12 of 47
                     DEQ letter to T Richardson/IP re: UST access authorization
                      (6/26/07)
                   AEI letter to DEQ re: Proposed Soil Sampling – Former
                      Sump Investigation (9/2/09)
                   DEQ Comment letter to AEI re: Sept. 2, 2009 Proposed
                      Soil Sampling – Former Sump Investigation (10/26/09)
                   DEQ/AEI emails re: Sump Comment Letter (11/6/09)
                   DEQ/AEI emails re: Sump investigation comment letter
                      (11/12/09)
                   DEQ/AEI emails re: Soil Screening (11/19/09)
                   AEI Sump Investigation Comment Letter Response
                      (11/27/09)
31   06   05   (Continued - Anonymous Spill Complaint Investigation)
                   AEI Draft Sump Investigation Work Plan (11/27/09)
                   **DEQ internal emails re: sump investigation (11/27/09)
                   AEI Response Letter and revised Former Sump
                      Investigation Work Plan (12/1/09)
                   DEQ Approval letter to IP/AEI for Sump Investigation
                      (12/3/09)
                   AEI letter report to DEQ/Roll re: Soil Sample Results –
                      Sump Investigation & Background Sampling (2/13/10)
                   DEQ/Roll internal email re: Data/laboratory questions
                      (4/1/10)
                   Revised Soil Sample Results – Sump Investigation &
                      Background sampling + CD of 2/13/10 report (AEI,
                      4/16/10)
31   06   06   Fungal Bioremediation Pilot-scale Test
                   Draft, Work Plan for Performance of a Pilot-Scale
                      Treatability Study Using Fungal-Based Soil Remediation
                      (EarthFax, 7/2/2004)
                   Revised Draft, Work Plan for Performance of a Pilot-Scale
                      Treatability Study Using Fungal-Based Soil Remediation
                      (EarthFax, 7/19/2004)
                   Final Work Plan – Fungal Bioremediation Treatability
                      Study (EarthFax, 7/30/2004)
                   First Progress Report – Status of Fungal Bioremediation
                      Pilot Test (EarthFax 10/20/04)
                   Second Progress Report – Status of Fungal Bioremediation
                      Pilot Test (EarthFax 2/8/05)




                                                                    Page 13 of 47
                    Final Report – Large-Scale Production and Field Testing of
                     Pelleted Fungal Inocula for Use in Fungal-Based
                     Remediation of Contaminated Soil (EarthFax, Aug. 2005)
31   06   06   01    Fungal Bioremediation Pilot-scale Test Correspondence
                          IP email to DEQ re: Pilot Test proposal (6/30/04)
                          DEQ meeting notes with EarthFax/IP (6/30/04)
                          DEQ letter to EarthFax re: Comments to Work Plan
                             (7/12/04)
                          EarthFax email to DEQ re: comment receipt
                             (7/13/04)
                          DEQ/EarthFax emails re: Work Plan (7/16/04)
                          EarthFax email/letter to DEQ re: Comment
                             responses (7/19/04)
                          EarthFax email to DEQ, Degradation of Dioxins by
                             White Rot Fungi (7/21/04)
                          DEQ comment letter to EarthFax re: Revised Draft
                             Work Plan (7/27/04)
                          DEQ letter to IP/EarthFax re: Area of
                             Contamination Authorization for Pilot-Scale
                             Treatability Study (7/30/04)
                          DEQ letter to EarthFax re: Work Plan approval
                             (8/3/04)
                          EarthFax email to DEQ re: Pilot Schedule (8/5/04)
                          DEQ/EarthFax emails re: attempts to contact
                             Russell’s and Rick Reep and give activity update
                             (8/10/04)
                          DEQ email to EarthFax re: 1st Progress Report
                             Questions (11/11/04)
                          Earthfax email to DEQ re: Final grant SBIR report
                             (9/22/05)
                          DEQ email to IP + cc re: DEQ approval of work
                             plan schedules (6/29/06)
31   06   07   UST Investigation
                   DEQ Enforcement Case files, Facility ID 41-00853
                   DEQ Individual Activity Report, UST Inspection
                     (1/23/2003)
                   DEQ internal email re: UST issue (3/21/03)
                   DEQ letter to IP re: Requirement to investigate USTs
                     (5/16/05)
                   IP legal letter to DEQ re: USTs at S&W (6/15/05)




                                                                    Page 14 of 47
                     DEQ legal letter to IP legal re: USTs at S&W (6/24/05)
                     IP legal letter to DEQ legal re: USTs at S&W (6/29/05)
                     IP letter to DEQ re: UST information at S&W (8/9/05)
                     DEQ internal email re: Phone call from Ravalli Republic
                      and UST discussion (12/12/06)
                    DEQ internal email re: Discussion of unresolved UST
                      issues (2/26/07)
                    ** DEQ internal email re: Discussion of unresolved UST
                      issues (2/26/07)
                    DEQ & IP emails re: UST issues (6/26/07)
                    DEQ internal emails re: UST requirements, John German’s
                      property splitting, and spill complaint investigation (8/8/07)
                    DEQ letter to IP re: UST non compliance & burn pile
                      issues (9/4/07)
                    DEQ & IP emails re: UST product removal (9/17/07)
                    DEQ/Arrowhead emails re: UST inspection report question
                      (1/23/08)
                    DEQ/Roll email to AEI re: UST tank status (1/6/10)
                    DEQ/Roll, Seyler & Hendrix internal emails re: UST tank
                      status (1/6/10)
                    DEQ/Roll & AEI/Cosgriff re: UST testing (12/7/10)
                    DEQ/Roll & AEI/Cosgriff emails re: UST cathodic
                      protection system testing (12/7/10)
                    DEQ/Roll & Three Rivers/Smith emails re: Three Rivers
                      test results – bent pipes (12/13/10)
                    DEQ/Roll & AEI/Cosgriff emails re: Bent UST pipes
                      (12/17/10)
31   06   08   Soil Sampling Investigation – Milton Property
                    DEQ internal email re: Phone log w/Al Milton across
                      HWY 93 (10/11/07)
                    DEQ & D Cosgriff emails re: Al Milton property results
                      and revised penta 0.014mg/kg SSLDAF 10 value
                      (11/15/07)
                    Arrowhead letter report to DEQ re: Al Milton Property –
                      Soil Sample Results Report (12/31/07)
                    DEQ letter to Al Milton re: Soil Sampling results (1/8/08)
31   06   09   Chemical Oxidation & Bioremediation Investigations
                    Arrowhead letter to DEQ re: 4th Qtr Activities notice
                      (10/1/07)




                                                                        Page 15 of 47
                       ** DEQ internal emails re: Termination of ISCO column
                        test (4/25/08)
                       Phone Log – conference call D Cosgriff & T Richardson re:
                        Chem – ox & Bio Treatability Studies (5/5/08)
                       ** DEQ/Roll, Brooks, & Bucy internal emails re: Bio-
                        Study submittal (3/23/11)
31   06   09   01       Chemical Oxidation Bench Study
                       Meeting notes w/B Douglass re: Pilot Column Study
                        (1/3/07)
                       DEQ letter to B Douglass re: DEQ comments to Draft
                        Chemical Oxidation Work Plan (4/24/07)
                       DEQ & B Douglass emails re: Comments to Chemical
                        Oxidation Bench Scale Work Plan (5/21/07)
                       Final Draft Chemical Oxidation Evaluation Work Plan +
                        CD (5/26/07)
                       Carus Corporation letter to B Douglass re: Carus NOD
                        report of soil used in pilot studies (10/31/07)
                       Internal DEQ email re: column study sampling
                        requirements (12/4/07)
                       DEQ & B Douglass emails & tables re: Chemox column
                        study’s total oxidant demand (1/9/08)
                       DEQ/B Douglass emails re: Termination of permanganate
                        column test (4/10/08-4/25/08)
                       DEQ/Arrowhead emails re: DEQ comments chem-ox work
                        plan (8/8/08)
                       Final Treatability Study Work Plan – Chemical Oxidation
                        (Arrowhead, 8/20/08)
                       Arrowhead email to DEQ re: Permanganate NOD results
                        (9/3/08)
                       Permanganate Chemical Oxidation Evaluation Report
                        (Douglass, Inc 11/11/08)
                       DEQ/AEI email with Persulfate Test Kit Results (12/3/08)
                       AEI email to DEQ with ChemOx data (12/16/08)
                       AEI email to DEQ re: ChemOx data (2/25/09)
                       Draft Treatability Study Summary Report (Arrowhead,
                        5/29/09)
                       AEI email to DEQ re: Draft ChemOx Report (6/2/09)
                       DEQ Comment letter re: May 29, 2009 Chem-Ox Bench
                        Test Summary Report (10/26/09)




                                                                      Page 16 of 47
                       DEQ/AEI correspondence re: ChemOx report deadline
                        (11/24/09)
                       Red-line strike out version Final Draft Treatability Study
                        Summary Report Chemical Oxidation Bench Test
                        (12/11/09)
                       DEQ/Roll & AEI/Cosgriff emails re: Draft Chem Ox report
                        review prior to finalizing (12/21/09)
31   06   09   01       (Continued - Chemical Oxidation Bench Study)
                       AEI/Cosgriff & DEQ/Roll emails re: Chem Ox Summary
                        report (12/22/09)
                       AEI letter to DEQ/Roll re: Response to DEQ 10/26/09
                        comments on the Draft Treatability Study Summary Report
                        (12/28/09)
                       Final Treatability Study Summary Report Chemical
                        Oxidation Bench Test + CD (AEI, 12/28/09)
                       DEQ/Roll letter to IP/Richardson re: DEQ approval letter
                        for Chem Ox Summary Report (1/8/10)
31   06   09   02       Biological Treatment Bench Study
                       Draft Treatability Study Work Plan Composting Biological
                        Treatment (Arrowhead, 7/21/06)
                       DEQ letter to Arrowhead re: DEQ’s comments to Draft
                        Compost Biotreatability Work Plan (8/2/07)
                       DEQ & Arrowhead emails re: DEQ approval of the Bio
                        Study Work Plan (9/4/07)
                       Arrowhead letter to DEQ re: Arrowhead Engineers
                        comments to Bio Study Work Plan (9/10/07)
                       Final Draft – Treatability Study Work Plan – Composting
                        Biological Treatment - Bench Test (Arrowhead, 9/10/07)
                       DEQ/Arrowhead emails re: Continuation of X-19
                        biotreatability study (3/14/08)
                       DEQ/Arrowhead emails re: Contamination of X-19
                        biostudy (7/21/08)
                       AEI email to DEQ re: X-19 bio-study results (6/3/09)
                       DEQ email to AEI re: X-19 results and sampling protocol
                        (6/8/09)
                       AEI email to DEQ re: X-19 bio-study results and
                        recommended additional sampling (7/15/09)
                       DEQ email to AEI re: X-19 sampling (10/19/09)
                       DEQ/Roll & AEI emails re: Bio-Study update (12/11/09)




                                                                       Page 17 of 47
                     DEQ/Roll & AEI/Funk emails re: Bio-Study lab results &
                      data validation calculation errors (12/16/10)
                     AEI/Cosgriff & DEQ/Roll emails re: Bio-Study Report
                      (3/22/11)
                     DEQ/Roll email to AEI/Cosgriff re: Bio-Study submittal
                      (3/23/11)


31   06   10   Soil Sampling on Behalf of Germann Enterprises
                    **DEQ internal emails re: PBS&J soil evaluation info
                      request (consultant for Mr. Germann) (9/3/09)
                    **DEQ internal emails re: Phone conversation with PBS&J
                      (environmental consultant for Mr. Germann) (9/9/09)
                    PBS&J Work Plan on behalf of Germann Enterprises re:
                      Preliminary Surface/Subsurface Soil Investigation
                      Sampling & Analysis Plan (9/30/09)
                    **DEQ internal emails re: Phone conversation with
                      PBS&J re: soil investigation plan (10/5/09)
                    DEQ/PBS&J emails re: Dioxin Sample Results (11/9/09)
                    PBJ&J Draft – Preliminary Surface/Subsurface Soil
                      Investigation (11/16/09)
                    ** Site visit, meeting summary with Germann and Roark
                      (11/27/09)
                    DEQ/Roll & PBS&J emails re: Soil sampling detection
                      limits (3/30/10)
                    AEI letter report to DEQ re: AEI data validation of PBS&J
                      results (4/29/10)
31   06   11   Background Soil Concentration Samples
                    DEQ/PBS&J email correspondence re: Background
                      samples (11/13/09)
                    AEI email to DEQ re: Dioxin Background samples
                      (11/14/09)
                    DEQ/PBS&J email correspondence re: Background
                      Samples (11/16/09)
                    **DEQ internal email re: background sampling (11/16/09)
                    DEQ letter to IP re: Background Sampling Requirement
                      (11/18/09)
                    DEQ email to PBS&J re: background sampling (11/25/09)
                    AEI email to DEQ re: background sampling and sump
                      investigation update (11/27/09)




                                                                   Page 18 of 47
                     AEI response letter to background sampling request
                      (12/1/09)
                   DEQ response to IP/AEI re: background sampling
                      (12/3/09)
                   **DEQ internal emails re: background sampling (12/8/09)
                   DEQ/AEI emails re: background sampling (12/8/09)
                   AEI work plan for background sample (12/9/09)
                   Arrowhead(AEI)/Cosgriff letter report to DEQ/R Roll re:
                      AEI Final Proposal Soil Sampling – Background Soil
                      Sampling Work Plan (12/9/09)
                   DEQ approval for background sampling (12/10/09)
                   (See 31-06-05 for background sampling results and report
                      contained, performed with Sump Investigation)
31   06   12   Vapor Intrusion Investigation
                   DEQ/AEI/Douglass emails re: Soil Vapor Sampling
                      (3/8/10)
                   Draft Vapor Intrusion SAP (IP, 3/8/10)
                   DEQ/Roll letter to IP/Richardson re: VI SAP (3/12/10)
                   Final Vapor Intrusion Investigation SAP (Douglass,
                      3/12/10)
                   ** DEQ Legal/Brooks & Roll emails re: VI SAP (3/15/10)
                   DEQ/Roll letter to IP/Richardson re: Approval of VI SAP
                      (3/15/10)
                   Douglass Inc email to DEQ/Roll re: Preliminary SV results
                      (4/21/10)
                   Douglass Inc & Columbia Lab emails forwarded to
                      DEQ/Roll re: Lab analyticals, possible higher DLS’s
                      (4/21/10)
                   Draft VI Investigation Report (6/27/10)
                   DEQ/Roll letter to IP/Richardson re: DEQ comment letter
                      to VI Report (7/28/10)
                   Revised VI Report – text (Douglass, 8/27/10)
                   DEQ/Roll email to B Douglass re: 8/27/10 VI Report
                      (10/19/10)
                   Revised VI Report + CD of modifiable files and soil data
                      tables & figures (10/22/10)
                   DEQ/Roll letter to IP/Richardson re: DEQ approval letter
                      for Revised VI Investigation Report (10/25/10)
                   DEQ/Roll & B Douglass emails re: DEQ comments to
                      Douglass on VI SAP Addendum (11/18/10)




                                                                  Page 19 of 47
                     VI SAP Addendum + CD (Douglass Inc, 11/18/10)

31   06   12   (Continued - Vapor Intrusion Investigation)
                   B Douglass & DEQ/Roll & Cote emails re: VI sampling
                      schedule (11/22/10)
                   DEQ/Roll & Douglass emails re: Air sampler rental
                      (12/2/10)
                   DEQ/Roll letter to IP/Richardson re: DEQ approval letter
                      for VI SAP Addendum (12/2/10)
                   DEQ/Roll & IP/Richardson emails re: VI Approval letter
                      (12/3/10)
                   DEQ/Roll email to Douglass & AEI/Cosgriff re: New APH
                      VI calculator (1/27/11)
                   1st Draft Vapor Intrusion Investigation Report (IP, 2/11/11)
                   DEQ/Roll letter to IP/Richardson re: DEQ comments on
                      the Final Vapor Intrusion Report (3/14/11)
                   Douglass & DEQ/Roll emails re: Douglass VI report
                      questions (3/28/11)
                   Douglass email to DEQ/Roll re: Attachment – VI Report
                      replacement pages (3/28/11)
                   Final Vapor Intrusion Report (Douglass & AEI, 3/28/11)
                   DEQ/Roll email to IP/Richardson re: Attachment – DEQ
                      approval letter for Final VI Investigation Report & Letter –
                      Alternate Water Supply System, Well #1006 & Well #1011
                      Sampling frequency (4/8/11)
31   06   13   Supplemental Soil Investigation
                   DEQ letter to IP/Richardson re: DEQ Soil Investigation
                      Order & Sump Investigation comments (4/2/10)
                   Draft Supplemental Soil Investigation SAP (AEI, 4/20/10)
                   ** DEQ Legal/Brooks & Roll internal emails re: SAP
                      questions (5/6/10)
                   DEQ/Roll & AEI/Cosgriff emails re: Additional sampling
                      on parcel A (5/20/10)
                   DEQ/Roll letter to IP/Richardson re: DEQ comment letter
                      on Soil Sampling SAP (5/21/10)
                   DEQ/Roll & AEI/Cosgriff emails re: Analytical methods
                      (5/24/10)
                   DEQ/Roll & AEI/Cosgriff emails re: Submittal of Revised
                      SAP for DEQ review (5/24/10)




                                                                      Page 20 of 47
                     DEQ/Roll email to AEI/Cosgriff re: DEQ edits to Revised
                      SAP (5/24/10)
                   Final SAP for Supplemental Soil Investigation + CD
                      (Arrowhead, 5/27/10)
                   DEQ/Roll letter to IP/Richardson re: DEQ approval letter
                      for Soil Investigation SAP (6/2/10)
                   DEQ/Roll email to AEI/Cosgriff re: Soil sample results
                      (8/11/10)
31   06   13   (Continued - Supplemental Soil Investigation)
                   Arrowhead email to DEQ/Roll re: Error on duplicate
                      sample (8/14/10)
                   Arrowhead & DEQ/Roll emails re: Attachment – Sample
                      description table (8/17/10)
                   Arrowhead email to DEQ/Roll re: Soil results (8/18/10)
                   DEQ/Roll & Douglass/Douglass emails re: RSLs (8/23/10)
                   Douglass/Douglass email to DEQ/Roll re: Attachment –
                      Supplemental Soil Investigation Results & Figures
                      (8/26/10)
                   Draft Supplemental Soil Investigation Results received
                      (Arrowhead, 8/30/10)
                   DEQ/Roll 7 Arrowhead emails re: Validation of soil results
                      (9/1/10)
                   DEQ/Roll & AEI emails re: Validation sheet (9/7/10)
                   DEQ letter to IP/Richardson re: 2nd round of Supplemental
                      Soil Investigation; revisions to 1st round data (10/6/10)
                   B Douglass & DEQ/Roll emails re: Spigot contact
                      (10/22/10)
                   B Douglass email to DEQ/Roll re: Land ownership
                      surrounding the facility (11/1/10)
                   DEQ/Roll & B Douglass emails re: SAP Addendum
                      (11/2/10)
                   DEQ/Roll letter to IP/Richardson re: DEQ approval for Soil
                      Sampling Addendum (11/4/10)
                   DEQ/Roll email to IP/Richardson re: Attachment - Soil
                      Addendum SAP (11/5/10)
                   AEI/Cosgriff email to DEQ/Roll re: Soil sampling schedule
                      (11/6/10)
                   B Douglass & DEQ/Roll emails re: Resident access
                      (11/10/10)




                                                                    Page 21 of 47
                     B Douglass email to DEQ/Roll re: Resident soil sampling
                      (11/12/10)
                   DEQ/Roll & B Douglass emails re: Contact for Otten
                      (11/12/10)
                   ** DEQ Legal/Brooks & Roll internal emails re: Resident
                      contacts for soil sampling (11/16/10)
                   DEQ/Roll & B Douglass emails re: Mr Robak (11/19/10)
                   DEQ/Roll & Douglass emails re: Contacting T Robak
                      (12/1/10)
31   06   13   (Continued - Supplemental Soil Investigation)
                   DEQ/Roll & Douglass emails re: Landowner permission
                      status (12/2/10)
                   DEQ/Roll 7 Douglass emails re: Resident permission
                      (12/6/10)
                   AEI/Cosgriff email to DEQ/Roll re: Attachment –
                      Preliminary soil results for top two feet of onsite soils
                      (12/7/10)
                   DEQ/Roll email to AEI/Cosgriff re: DEQ response to
                      Preliminary soil results & schedule (12/17/10)
                   Douglass email to DEQ/Roll re: Phyllis Paramenter signed
                      access agreement (12/22/10)
                   DEQ Legal/Brooks & Roll internal emails re: Contact with
                      Mark Smith’s attorney (1/11/11)
                   DEQ/Roll & Douglass emails re: Soil Sampling approval
                      (1/19/11)
                   AEI/Cosgriff & DEQ/Roll emails re: Spigot property
                      sample locations (3/16/11)
                   AEI/Cosgriff email to DEQ/Roll re: Attachment – Map of
                      Proposed soil sampling locations for April sampling
                      (3/17/11)
                   AEI/Cosgriff & DEQ/Roll emails re: Soil sampling depths
                      & schedule (3/18-3/23/11)
                   DEQ/Roll & AEI/Cosgriff emails re: Scheduling (4/7/11)

31   06   14   Alternate Water Supply / Resident Well #1006 Replacement
                    DEQ/Roll & AEI/Cosgriff emails re: Chaney well (9/7/10)
                    IP/AEI email to DEQ/Roll re: Notification of well #1006
                      excedence (9/7/10)
                    DEQ/Roll & IP emails re: Chaney well and bottled water
                      (9/13-9/15/10)




                                                                    Page 22 of 47
                     3rd QTR re-sampling of Chaney well results (9/20/10)
                     3rd QTR re-sampling of Chaney well Final results (9/20/10)
                     DEQ/Roll & Brooks internal emails re: Phone call with
                      AEI/Cosgriff – Chaney’s well (9/22/10)
                     DEQ/Roll email to IP re: Letter to IP re: Chaney’s well
                      (9/29/10)
                     PCP/Dioxin chart for well #1006 (9/29/10)
                     Fecal/Total coliform information

31   06   14   (Continued- Alternate Water Supply / Resident Well #1006
               Replacement)
                   DEQ/Roll letter to IP/Richardson re: Requirement for
                      Interim Action – Alternate water supply (9/29/10)
                   B Douglass & DEQ/Roll emails re: Extension to IP on
                      Chaney Water Supply Work Plan (10/4/10)
                   DEQ/Roll & AEI/ Cosgriff emails re: AEI field blank
                      questions (10/5/10)
                   Douglass Inc letter to DEQ/Roll re: ALT water proposal
                      (10/15/10)
                   DEQ/Roll email to IP/Richardson re: Attachment -DEQ
                      Comment letter on Alternate water supply (10/26/10)
                   DEQ/Roll letter to IP/Richardson re: DEQ Comments on
                      Alternate water supply proposal (10/26/10)
                   Douglass letter to DEQ/Roll re: Final AIT Water Supply
                      Proposal (10/28/10)
                   DEQ/Roll letter to IP/Richardson re: DEQ approval of
                      Alternate water supply (11/3/10)
                   DEQ/Roll email to IP/Richardson re: Attachment - DEQ
                      approval of Alternate water supply (11/3/10)
                   IP/Richardson email to DEQ/Roll re: Alternate water
                      proposal (11/4/10)
                   B Douglass email to DEQ/Roll re: Alternate water supply
                      installation schedule (11/5/10)
                   Phone Log – DEQ/Roll & B Douglass re: Chaney water
                      supply sampling (11/16/10)
                   IP/Richardson email to DEQ/Roll re: Chaney bacteria
                      results (11/22/10)
                   AEI/Cosgriff email to DEQ/Roll re: Attachment – 4th
                      Quarter Chaney PCP results (12/3/10)




                                                                     Page 23 of 47
                     AEI/Cosgriff email to DEQ/Roll re: Attachment – 4th
                      Quarter Chaney Dioxin results (12/6/10)
                     ** DEQ/Roll & Brooks emails re: 1st round Chaney results
                      (12/9/10)
                     Douglass email to DEQ/Roll re: Response to DEQ/Roll
                      12/9/10 letter – 1st round Chaney results (12/9/10)
                     DEQ/Roll letter to IP/Richardson re: Alternate water
                      supply performance, Chaney drinking water we;; # 1006
                      (12/9/10)

31   06   14   (Continued – Alternate Water Supply / Resident Well #1006
               Replacement)
                   AEI/Cosgriff email to DEQ/Roll re: Attachment – IP
                      email/letter – Chaney 1st monthly alternate water sampling
                      (12/13/10)
                   DEQ/Roll email to IP/AEI re: IP’s 12/13/10 letter & 1st
                      monthly sampling of Chaney’s well (12/17/10)
                   DEQ/Roll & Douglass emails re: Chaney 2nd monthly
                      coliform results (12/21/10)
                   DEQ/Roll & Douglass emails re: Coliform results at
                      Chaney well & replacement well (12/27/10)
                   Douglass Inc/IP letter to DEQ/Roll re: Alternate water
                      supply evaluation – Long-term options/recommendations
                      (12/29/10)
                   DEQ/Roll & Douglass/IP emails re: Review schedule of
                      replacement well proposal (1/3/11)
                   ** DEQ Legal & Roll internal emails re: Well replacement
                      letter (1/6/11)
                   DEQ/Roll email/letter to IP re: Chaney alternate water
                      evaluation (1/6/11)
                   DEQ/Roll letter to IP/Richardson re: Alternate water
                      supply evaluation – Long-term options/recommendations –
                      Chaney well – well 1006 (1/6/11)
                   Douglass email to DEQ/Roll re: Chaney Alternative water
                      system, 2nd monthly sampling, PCP results (1/7/11)
                   Douglass letter to DEQ/Roll re: Alternate Water Supply
                      Evaluation – Long Term Options (1/16/11)
                   Douglass email to DEQ/Roll re: Attachment – Dioxin
                      results for 2nd sampling of alternate water supply – Chaney
                      well (1/17/11)




                                                                      Page 24 of 47
                     Douglass email to DEQ/Roll re: Attachment – Alternate
                      Water Supply Proposal (1/17/11)
                   AEI/Cosgriff email to DEQ/Roll re: GAC Treatment
                      System performance (1/18/11)
                   DEQ/Roll letter to IP/Richardson re: Alternate Water
                      Supply Evaluation – Long Term Options
                      /Recommendations, Chaney well requirement for
                      installation of new monitoring wells (1/27/11)
                   **DEQ Legal/Brooks, Martin & Roll internal emails re:
                      Private well abandonment (1/27/11)
31   06   14   (Continued- Alternate Water Supply / Resident Well #1006
               Replacement)
                   DEQ/Roll & Douglass emails re: January 2011 sampling of
                      alternate water supply & Robak well (2/2/11)
                   AEI/Cosgriff & DEQ/Roll emails re: Requirements for well
                      drilling/installation (2/4/11)
                   DEQ/Roll & AEI/Cosgriff emails re: Robak dioxin data &
                      January alternate water samples (2/8-2/9/11)
                   Douglass, DEQ/Roll, & AEI/Cosgriff emails re: Well
                      locations & Chaney well coliform results (2/24/11)
                   Douglass email to DEQ/Roll re: New Chaney well PCP
                      results (3/2/11)
                   Douglass email to DEQ/Roll re: New Chaney well
                      dioxin/furan results (3/3/11)
                   DEQ/Roll & Douglass emails re: New Chaney well iron
                      results (3/10/11)
                   Douglass & DEQ/Roll emails re: Well #1006 results &
                      monitoring well installation (3/17/11)
                   AEI/Cosgriff email to DEQ/Roll re: Attachment – March
                      2011 Chaney well and system results (3/23/11)
                   DEQ/Roll & AEI/Cosgriff emails re: Alternate water
                      system (3/23/11)
                   AEI/Cosgriff email to DEQ/Roll re: Attachment – February
                      2011 Chaney well & system results (3/23/11)
                   Douglass email to DEQ/Roll re: Attachment - March 2011
                      results of Chaney’s new well, old well, & system (4/7/11)
                   DEQ/Roll email to IP/Richardson re: Attachment – Letter
                      for change on well #1006 sample frequency & DEQ
                      approval letter for the Final Vapor Intrusion Investigation
                      Report (4/8/11)




                                                                     Page 25 of 47
31   06   15   Monitoring Well Installation – #3015 through #3018
                  DEQ/Roll letter to IP/Richardson re: Alternate Water
                     Supply Evaluation – Long Term Options
                     /Recommendations, Chaney well requirement for
                     installation of new monitoring wells (1/27/11)
                  DEQ tables & figures of wells 1006, 3003, 3004, 3005.1, &
                     3011.1 (1/31/11)
                  DEQ/Roll & Douglass emails re: Resident access
                     agreement (2/11/11)

31   06   15   (Continued – Monitoring Well Installation – #3015 through #3018)
                   DEQ/Roll internal email to Legal/Brooks re: Access
                      agreements (2/15/11)
                   Resident/Wildey email to DEQ/Roll re: Attachment - IP
                      access agreement (2/15/11)
                   DEQ/Roll email to Resident/Wildey re: IP access
                      agreement (2/15/11)
                   DEQ/Roll & Legal/Brooks internal emails re: Wildey
                      access agreement (2/16/11)
                   DEQ/Roll email to IP/Richardson re: Access Agreements
                      (2/16/11)
                   Douglass & DEQ/Roll emails re: Locatelli property
                      (2/23/11)
                   AEI/Cosgriff email to DEQ/Roll re: Attachment – Draft
                      Monitoring Well Installation Work Plan (2/24/11)
                   DEQ/Roll & AEI/Cosgriff emails re: Field work schedule
                      (2/25/11)
                   DEQ/Roll email to IP/Richardson re: Attachment – Draft
                      Work Plan, Monitoring Well Installation (3/2/11)
                   DEQ/Roll letter to IP/Richardson re: Draft Work Plan,
                      Monitoring Well Installation (3/2/11)
                   Douglass & Renfroe emails re: Access (3/7/11)
                   AEI/Cosgriff & DEQ/Roll emails re: Secondary
                      containment (3/11/11)
                   Douglass, IP/Richardson, & AEI/Cosgriff emails re: Access
                      Agreement from Chaney for monitoring well installation
                      (3/15/11)
                   DEQ/Roll & AEI/Cosgriff emails re: Chaney property well
                      location (3/16/11)




                                                                    Page 26 of 47
                        DEQ/Roll letter to IP/Richardson re: Monitoring well
                         installation (3/16/11)
                        DEQ/Roll & IP/Richardson emails re: Approval letter for
                         Final Draft Monitoring Well Installation Work Plan
                         (3/16/11)

31   07   Baseline Risk Assessment
31   07   01     Workplans



31   07   01    01   Draft Baseline Risk Assessment
                     Work Plan (10/31/02)
                          Final Draft Baseline Risk Assessment
                             Work Plan (6/24/05)
                          Final Baseline Risk Assessment Work Plan CD
                             (MFG, 6/06)
31   07   02    BRA Workplan Correspondence
                   Email regarding Conceptual Exposure Model (August
                     2002)
                   Meeting notes (August 13, 2002)
                   Email regarding Conceptual Exposure Model (September
                     19, 2002)
                   Meeting notes (October 16, 2002)
                   Exposure point concentration information sent from DEQ
                     to IP (October 18, 2002)
                   DEQ’s Draft Baseline Risk Assessment comments
                     (February, 25, 2005)
                   Email regarding IP response to DEQ comments (March 11,
                     2005)
                   Meeting notes (March 14, 2005)
                   IP’s response to DEQ’s comments on the Draft BRA (April
                     12, 2005)
                   DEQ’s Draft BRA Workplan comments (May 16, 2005)
                   Meeting notes (May 24, 2005)
                   ** DEQ internal emails re: IP BRA response letter (3/8/10)
31   07   03    BRA Reports
31   07   04    BRA Report Correspondence
                   DEQ internal email re: Phone Log – DEQ & L Nicolai
                     (2/15/07)




                                                                       Page 27 of 47
                        DEQ internal email re: phone log w/Laura Nicolai
                         (3/16/07)
                       DEQ letter to L Nicolai re: BRA status update (3/26/07)
                       DEQ letter to L Nicolai re: Site status update (11/18/08)
                       DEQ/Roll letter to IP/Richardson re: DEQ comments on
                         the Draft BRA Requirement foe Additional Investigations
                         (2/11/10)
                       IP/Richardson letter to DEQ/Roll re: BRA RSL Proposal
                         (3/8/10)
                       DEQ/Roll email to AEI/Cosgriff re: BRA response letter
                         (3/12/10)
31   08   Feasibility Study (empty)
31   09   Environmental Requirements, Criteria, or Limitations (ERCLs) (empty)
31   10   Proposed Plan (empty)
31   11   Legal (empty)
31   11   01     Controlled Allocation of Liability Act (CALA)
31   11   01     01      CALA Discovery Correspondence
31   11   01     02      CALA Notice Letters
31   11   01     02      01      Notice letters correspondence
                                      DEQ letter to BKBH re: General notice
                                         receipt confirmation (6/7/01)
                                      BKBH letter to DEQ legal re: Notice date
                                         clarification (6/13/01)
31   11   01     03      CALA Stipulated Agreement
31   11   01     04      2000-2001 CALA Correspondence
                          R. Reep letter to DEQ regarding allocation for
                             investigation (2/6/98)
                          R. Reep application to begin allocation (11/13/98)
                          DEQ letter to Ravalli Commissioners (12/3/98)
                          DEQ letter to R. Reep & Champain (12/3/98)
                          Public notice (12/3/98)
                          Public notice (12/9/99)
                          D. McClung email regarding database search (7/29/99)
                          Phone record- Janet Kirkland (7/29/99)
                          Sec. of State letter concerning Hoener Waldorf Corp.
                             (7/29/99)
                          Phone record-Sec. of State office (7/29/99)
                          Phone record-Greg Murfitt (7/29/99)
                          Phone record-Sec. of States office (7/30/99)
                          D. McClung email regarding search (8/2/99)




                                                                       Page 28 of 47
                      Phone record-Bill Potts (8/2/99)
                      Phone record-Mark Hall (8/2/99)
                      DEQ email of current addresses (8/17/99)
                      Phone record-Sec. of States office (9/9/99)
                      Phone record-Sec. of States office (9/10/99)
                      Phone record-L. Townsend (11/8/00)
                      Phone record-D. Walker (11/13/00)
                      DEQ letter to L. Townsend regarding property access
                       (11/13/00)
                     DEQ letter to B. Walker regarding certified mail
                       (11/14/00)
31   11   01   04   (Continued - 2000-2001 CALA Correspondence)
                     DEQ email –notice letters (11/17/00)
                     Phone record-D. Walker (11/17/00)
                     ** Meeting notes- RueAnne Thomas (11/29/00)
                     BKBH letter to DEQ regarding representation
                       (11/29/00)
                     IP letter to DEQ requesting extension (11/29/00)
                     DEQ letter to IP regarding extension (12/1/00)
                     R. Reep letter to DEQ regarding CALA participation
                       (12/8/00)
                     DEQ letter to R.Reep regarding CALA participation
                       (12/8/00)
                     DEQ letter to liable parties-CALA discovery (12/12/00)
                     R. Reep letter to DEQ regarding allocators decision
                       (12/22/00)
                     ** Meeting notes-D. Rodli (12/26/00)
                     ** Meeting notes-Mark Phares (12/26/00)
                     Pigot letter to DEQ regarding CALA (12/27/00)
                     DEQ letter to BKBH regarding lead person designation
                       (12/28/00)
                     WTH letter to DEQ regarding representation (12/28/00)
                     DEQ email regarding noticed parties (11/28/00)
                     BKBH letter to DEQ regarding written agreement
                       (12/29/00)
                     BKBH letter to DEQ regarding lead persons (12/29/00)
                     BKBH fax (12/29/00)
                     DEQ letter to liable persons –lead parties (1/2/01)
                     DEQ email regarding Forest Tech (1/11/01)




                                                                 Page 29 of 47
                       WTH letter to DEQ regarding lead persons (1/16/01)
                       R. Reep letter to DEQ regarding lead persons (1/17/01)
                       DEQ letter to liable persons regarding determination
                        (1/18/01)
                       DEQ letter to R. Reep regarding lead persons (1/19/01)
                       Meeting agenda (3/12/01)
                       DEQ letter to various parties regarding agenda (3/2/01)
                       R. Reep letter to DEQ regarding CALA (3/7/01)
                       DEQ letter to R. Reep regarding settlement conference
                        (3/8/01)

31   11   01   04   (Continued - 2000-2001 CALA Correspondence)
                     DEQ letter to J. Cermak regarding Montana law
                       (3/9/01)
                     D. Walker letter to DEQ regarding authorities (3/11/01)
                     RGS letter to D. Walker regarding Russell property
                       (11/21/00)
                     DEQ letter regarding negotiation meeting (3/13/01)
                     DEQ letter to D. Rodli regarding CALA negotiations
                       (3/13/01)
                     D. Rodli letter to DEQ granting permission to contact
                       L. Otten (3/14/01)
                     DEQ letter regarding negotiation session (3/21/01)
                     Stipulated Agreement (5/01)
                     Jenkens and Gilchrist request for reimbursement of
                       response costs (10/23/01)
31   11   01   04   01     CALA Correspondence 2002-
                               Jenkens & Gilchrist letter/fax to DEQ re:
                                  Comments on Allocation percentages
                                  (3/28/01)
                               DEQ letter/fax to PLPs attorneys - M
                                  Phares, J Cermak Jr., M Etchart, BNSF, &
                                  Forest Tech re: Notification of instituting a
                                  remediation action (4/5/01)
                               DEQ letter/fax to PLPs re: Error on pg 2 of
                                  stipulated agreement (4/5/01)
                               DEQ letter/fax to PLPs re: Stipulated
                                  agreement (4/5/01)




                                                                    Page 30 of 47
                               Jenkens & Gilchrist letter/fax to DEQ re:
                                Objections to Stipulated Agreement
                                (4/10/01)
                             BKBH fax to DEQ re: Phone log- DEQ &
                                BKBH re: Changes to Stipulated Settlement
                                (4/11/01)
                             DEQ letter/fax to PLPs Attorneys re:
                                Amended Stipulated Agreement (4/12/01)
                             DEQ letter/fax to PLPs Attorneys re:
                                Revision of Forrest Tech’s liability
                                percentage notification (4/12/01)
                             DEQ letter/fax to PLPs Attorneys re:
                                Revised Stipulation Agreement (4/12/01)
31   11   01   04   01   (Continued - CALA Correspondence 2002- )
                             DEQ letter/fax to PLPs Attorneys re: Faxed
                                Stipulation Agreement/clean copy (4/12/01)
                             R Reep letter to DEQ re: Darby Lumber
                                bankruptcy possibilities (4/13/01)
                             Jenkens & Gilchrist fax to DEQ re:
                                Curriculum vitae for Judge Layn Phillips
                                (4/18/01)
                             D Rodli Law Offices letter to DEQ re:
                                Spigot’s rejection of Stipulated Agreement
                                (4/1901)
                             R Reep letter to DEQ re: Robert Russell’s
                                signed agreement to the Stipulated
                                Agreement (4/19/01)
                             BKBH letter/fax to DEQ re: BNSF issues
                                with Stipulated Agreement (4/20/01)
                             BKBH letter to DEQ re: Allocation
                                nomination of Frank Crowley (4/20/01)
                             M Thares letter to DEQ re: Assuring
                                Stipulation Agreement signatures of Bill &
                                Doug Walker (4/20/01)
                             Forrest Tech letter to DEQ re: Forrest
                                Tech’s signed Stipulation Agreement
                                (4/24/01)
                             ** Phone Log – DEQ & John Cermak re:
                                Forrest Tech’s site activities (4/25/01)




                                                               Page 31 of 47
                               DEQ letter to BKBH re: BNSF ownership
                                (4/30/01)
                             DEQ letter/fax to D Rodli re: DEQs
                                response to Spigot Resources’ refusal to sign
                                Stipulated Agreement (5/1/01)
                             Jenkens & Gilchrist fax to DEQ re: IP’s
                                letter revising Forrest Tech’s 2 percent share
                                (5/4/01)
                             R Reep Letter to DEQ re: Mr. Russell’s
                                prior signature valid (5/7/01)
                             PLP cover letters and signed Stipulation
                                Agreement (5/4-5/10/01)
                             DEQ letter/fax to PLP attorneys re:
                                Reminder of Stipulation Agreement (5/8/01)
31   11   01   04   01   (Continued - CALA Correspondence 2002- )
                             M Thares fax to DEQ re: Doug & Bill
                                Walker’s signed Stipulation Agreement
                                (5/8/01)
                             BKBH letter to DEQ re: Ravalli County
                                Commissioner’s signed Stipulation
                                Agreement (5/9/01)
                             ** Phone Log – DEQ & Forrest Tech re:
                                Liability & remediation questions (5/9/01)
                             DEQ letter/fax to PLP attorneys re: All
                                PLPs have signed the Stipulated Agreement
                                (5/14/01)
                             DEQ letter/fax to D Rodli & G Callihan re:
                                Stating who has agreed to the Stipulation
                                Agreement (5/15/01)
                             DEQ letter to J Cermak Jr. re: Cermak info
                                request for CALA petition & general notice
                                letter to Forrest Tech (5/23/01)
                             R Reep letter to DEQ legal re: Darby
                                Lumber’s notice of its inability to comply
                                with order due to lack of funds (7/25/01)
                             DEQ letter to R Reep re: DEQ request for
                                terms of lease & assets of Darby Lumber
                                (9/14/01)




                                                                  Page 32 of 47
                                   DEQ letter to R Reep re: DEQ clarification
                                    of Darby Lumber’s status and requirements
                                    under the orphan share program (8/2/01)
                                   R Reep letter to DEQ legal re: Darby
                                    Lumber requests to be considered as
                                    bankrupt or defunct under orphan share
                                    statute (8/29/01)
                                   DEQ letter to R Reep re: DEQ requirements
                                    for Darby Lumber be designated as an
                                    orphan (10/29/01)
                                   DEQ letter to Don Torgenrud, P.C. re:
                                    Darby Lumber CALA rejection (5/14/04)
                                   ** Phone Log – J Cermak to DEQ re: IP
                                    request for Institutional Controls (7/12/04)


31   11   01   04    01     (Continued - CALA Correspondence 2002- )
                                 ** DEQ internal email re: Discussion
                                    w/potential buyer of property associated
                                    with S&W (3/7/05)
                                 R Samson, Esq. fax to DEQ re: Info request
                                    /has site assessment been done & is it a
                                    Superfund Site (8/30/05)
                                 DEQ letter to R Samson re: Response to
                                    Info request (10/7/05)
                                 DEQ & Jenkens & Gilchrist emails re: DEQ
                                    request for status of amended claims
                                    (1/25/06)
31   11   02   Bankruptcy Correspondence
                ** DEQ internal email re: Indication of Darby Lumber filing
                  bankruptcy (3/8/02)
                ** DEQ internal emails re: Discussions regarding bankruptcy
                  of Darby Lumber (3/11/02)
                ** DEQ internal email re: Darby Lumber bankruptcy (3/11/02)
                RSG information request to DEQ (4/22/02)
                DEQ chapter 7 Bankruptcy letter to John Cermak (5/15/02)
                RSG letter to DEQ (5/29/02)
                Bankruptcy order (7/3)
                Complaint for turnover of property (7/9/02)
                Answer in bankruptcy adversary proceeding (7/19/02)




                                                                     Page 33 of 47
                  Bankruptcy order (7/29)
                  Bankruptcy order (7/24)
                  Internal DEQ memo regarding motion (8/1/02)
                  Objection to Modify stay (8/6/02)
                  Bankruptcy order (8/23)
                  Bankruptcy order (9/25)
                  Notice to abandon property (10/03/02)
                  Motion to sign fee agreement (10/17/02)
                  MDSB fax to DEQ (11/18/02)
                  Motion to modify stay (12/6/02)
                  Bankruptcy forms (3/31/03)
                  Notice of Motion for Order - Darby Lumber (10/15/03)
                  US Bankruptcy Court Notice to Parties in Interest (10/6/06)
                  ** DEQ & Baker Law emails re: Bankruptcy update & PPA
                   negotiations (8/14/07)

31   11   02   (Continued - Bankruptcy Correspondence)
                US Bankruptcy Court Notice for Payment of Administrative
                  Expenses (1/30/08)
                US Bankruptcy Court Notice of Application for Professional
                  Fees & Costs (1/30/08)
                US Bankruptcy Court Notice for Motion for authorization to
                  turnover funds to IRS (3/7/10)
                US Bankruptcy Court Notice of Trustee’s Final Report &
                  Applications for Compensation 7 Deadline to Object (NFR)
                  (12/7/10)
31   11   02   01      Legal Filings
31   11   03   Restrictive Covenants Correspondence
                ** DEQ internal email re: Phone Log – DEQ & IP re:
                  Institutional controls (9/24/02)
                ** DEQ internal emails re: Institutional Controls (9/27/02)
                DEQ email to J. Cermak-deed restrictions (9/27/02)
                DEQ denial of IC’s email (12/9/02)
                ** DEQ internal emails re: IP’s response to IC denial
                  (12/10/02)
                DEQ email to J. Cermak – institutional controls (12/16/02)
                DEQ email to J. Cermak –Draft declaration of restrictive
                  covenants (1/14/03)
                DEQ email to J. Cermak-comments on IC document (1/16/03)




                                                                      Page 34 of 47
                 Declaration of restrictive covenants email to J. Cermak
                  (1/27/03)
                ** DEQ internal email re: Institutional Controls (2/1/05)
31   11   04   Misc. Legal Correspondence
                IP letter to DEQ re: Notice of IP’s purchase of Champion
                  (8/31/00)
                DEQ letter to IP re: Scope of Work (3/5/01)
                DEQ letter to R. Reep regarding Forrest Tech (5/10/01)
                DEQ letter to R Reep re: Signage requirements and trespass
                  information (6/19/01)
                DEQ letter to M Black re: Response to info request (6/21/01)
                DEQ letter to IP re: Signage and trespassing at facility
                  (8/20/01)
                DEQ letter to M Black re: Response to info request (10/12/01)
                ** DEQ email regarding Doug Wold (1/2/02)
                R. Reep request for info (1/3/02)
                D. Rodli letter to DEQ regarding COS (1/16/02)
31   11   04   (Continued - Misc. Legal Correspondence)
                DEQ letter to David Rodli regarding COS (1/23/02)
                IES-Claims Service letter to Sandi Olsen –request for
                  documents (4/18/01)
                DEQ letter to R. Reep regarding 1991 letter & SI report
                  (3/28/02)
                DEQ letter to G. HagEstad regarding trial subpoenas (3/29/02)
                DEQ letter to R. Reep regarding creditors meeting (4/23/02)
                R. Reep letter to DEQ regarding fencing (4/24/02)
                DEQ letter to R. Reep regarding fencing (4/29/02)
                DEQ letter to R. Reep regarding fencing (5/2/02)
                R. Reep letter to DEQ regarding automatic stay (5/7/02)
                R. Reep letter to DEQ regarding facility costs (5/7/02)
                ** DEQ email regarding facility costs (5/8/02)
                DEQ letter to R. Reep regarding costs (5/14/02)
                Non-applicability of automatic stay (6/26/02)
                Thomas Orr letter regarding Forest Tech (12/01/03)
                DEQ fax to Thomas Orr (12/01/03)
                DEQ letter to Thomas Orr regarding Forest Tech (12/09/03)
                9th Circuit Court publication (filed 2/6/04)
                DEQ letter to Mr. Richardson re: Fencing issues (12/19/06)




                                                                    Page 35 of 47
                 ** DEQ internal emails re: John German phone log & site
                  options (5/20/08)
                Ryan Law Offices letter to DEQ re: J German’s attorney’s
                  response to trespassing & building maintenance (6/12/08)
                DEQ email to Dave Ryan, J. Germann’s Atty re: building
                  demolition (8/7/09)
                Ryan Law Offices letter to DEQ re: J Germann’s Atty
                  comments regarding Aug 2009 meeting, property development
                  issues (8/12/09)
                DEQ letter to Ryan Law Offices, response to 8/12/09 letter
                  (8/20/09)
31   11   05   CALA Reimbursement
                   BNSF letter to IP re: Reimbursement of 1 percent
                      (11/1/01)
                   IP’s reimbursement to date (1997-3/04)
                   Jenkens & Gilchrist letter to DEQ legal re: IP’s
                      reimbursement agreement (5/5/04)
                   Baker & Hostetler letter to DEQ re: Reimbursement of
                      Remedial Action Costs + CD (8/26/09)
31   11   05   (Continued - CALA Reimbursement)
                   DEQ/IP emails re: Early reimbursement (10/30/09)
                   ** DEQ internal email re: S&W cost estimate (3/2/10)
                   Baker & Hostetler letter to DEQ Legal/Brooks re:
                      Reimbursement of Remedial Action Costs + CD (12/16/10)
31   11   05   01     CALA Reimbursement Correspondence
                           DEQ letter to J Cermak/Jenkens & Gilchrist re: IP’s
                              claim for reimbursement (6/1/01)
                           Jenkens & Gilchrist letter to DEQ re: Request for
                              reimbursement from IP (9/24/01)
                           Baker& Hostetler letter to DEQ re: Reimbursement
                              of Remedial Action Costs (7/26/07)
                           DEQ letter to Baker & Hostetler Law re: IP’s
                              remedial action costs (8/30/07)
                           ** DEQ internal email re: New invoices for past
                              costs (3/9/10)
                           ** DEQ internal emails re: Orphan Share site status
                              (1/3/11)
                           ** DEQ/Olsen, Brooks, Roll & Martin internal
                              emails re: Orphan share reimbursement (1/10/11)




                                                                    Page 36 of 47
                               ** DEQ/Seyler internal email to Wooley re: Orphan
                                share expenses through June 2013 (3/4/11)
31   11   06     Miscellaneous Legal Correspondence 2006-2007
                      Karlberg letter to DEQ re: Sale of 151 Bunkhouse Rd
                        property (1/3/07)
                      Ravalli County Sanitarian fax to DEQ re: Darby
                        Distribution septic system installation (1/4/07)
                      ** DEQ internal emails & Arrowhead re: Property
                        ownership of N. Peirano’s estate & Darby Distribution
                        (1/4/07)
                      ** DEQ internal email re: New property owner (1/4/07)
                      Darby Distribution fax to DEQ re: Well abandonment
                        information (1/9/07)
                      Darby Distribution email to DEQ re: On site well
                        abandonment (1/12/07)
                      DNRC letter to Brown Excavating re: Notification of
                        improper well abandonment (1/23/07)
31   11   07     Miscellaneous Legal Correspondence 2008-Present
                      **DEQ internal email re: conversation with Dave Ryan, J.
                        Germann’s attorney regarding site development (5/15/09)
31   11   07     (Continued - Miscellaneous Legal Correspondence 2008-Present)
                      Ryan Law (Mr. Germann’s Atty) Letter to notify of Public
                        Meeting with Ravalli County (5/29/09)
                      **DEQ internal email re: Forrest Tech bankruptcy and
                        Spigot Resources failure (9/10/09)
                      DEQ Legal/Brooks Letter to Jenkins & Gilchrist Re:
                        Forrest Tech and Spigot Orphan Share (9/14/09)
                      ** Phone Log – DEQ & Ravalli County (11/3/10)
                      DEQ Legal/Brooks letter to Jenkens & Gilchrist re: Spigot
                        Resources orphan share (1/4/11)
31   12   Enforcement
31   12   01     Deeds
31   12   02     Information Request Responses 1999
31   12   03     P&E Letters (empty)
31   12   03     01     Darby Response (empty)
31   12   03     02     Champion Response (empty)
31   12   04     March 2001 Scope Of Work (SOW)
31   12   05     Enforcement Correspondence
                      DEQ letter to R Reep/Forest Tech re: Activities at facility
                        (5/10/01)




                                                                       Page 37 of 47
                       R Reep letter to DEQ re: Forest Tech lease info (7/25/01)
                       DEQ internal email re: Spill complaint sent to enforcement
                        (5/3/02)
                     DEQ/Roll email to Robert Smith re: Spill Complaint
                        Report (3/4/10)
                     ** DEQ internal emails re: Spill report (3/8/10)
                     DEQ/Enforcement internal email re: Spill report returned
                        from enforcement (3/15/10)
                     ** DEQ internal emails re: Spill complaint, enforcement
                        response (3/15/10)
                     ** DEQ internal email re: Site visit/spill complaint
                        (3/29/10)
                     DEQ internal email re: Spill complaint sent to Enforcement
                        (3/31/10)
                     DEQ Enforcement email to DEQ/Roll re: Complaint/Spill
                        Report for observed spill during 3/25/10 fieldwork
                        (5/10/10)
                     DEQ/Roll & David C emails re: Dumped material clean-up
                        (6/25/10)
31   13   Correspondence
31   13   01     Public
                     Contact Lists
31   13   01     01     2001 – 2002 Resident Letters
                         DEQ letter to Larry Townsend re: Access to property
                            issues (12/5/01)
                         DEQ letter to N. Peirano (7/10/02)
                         DEQ letter to J. Chaney (7/10/02)
                         DEQ letter to J. Willis (7/10/02)
                         DEQ letter to E Hallock (7/10/02)
                         DEQ letter to J. Hollingsworth (7/10/02)
                         DEQ letter to C. Hammer (7/10/02)
31   13   01     02     2002 Resident Letter/Laboratory Info
                         Well 1003 N. Analytical lab report (2002)
                         Well 1006 Pace lab report (2002)
                         Well 1003 energy lab report (2002)
                         Dioxin results for GW since 8/2001 (7/1/02)
31   13   01     03     2003 Resident Letters and Correspondence
                         Darby resident addresses (2/11/02)
                         Current ownership email (3/11/03)
                         Email about contacting Darby residents (2/18/03)




                                                                       Page 38 of 47
                      IP’s letters to residents regarding follow-up GW
                       sampling (2/26/03)
                     DEQ letters to residents regarding follow-up GW
                       sampling (2/24/03
                     DEQ letter to David Rodriguez (2/24/03)
                     DEQ letter to current tenant (well 1002) (2/24/03)
                     DEQ letter to Eileen Hallock (2/27/03)
                     DEQ’s letter to Kaydell Bowles (2/28/03)
                     IP’s letters to residents regarding GW sampling (July
                       14, 2003)
31   13   01   04   2004 Resident Letters and Correspondence
                        IP’s letters to residents regarding groundwater
                           sampling event
31   13   01   05   2005 Resident Letters and Correspondence
31   13   01   06   2002-2003 General Public Correspondence
                     Email regarding N. Peirano address (2/13/02)
                     DEQ email regarding skate park (4/1/02)
                     Skate park meeting notes involving Tom Ross (4/2/02)
                     Skate park proposal meeting notes (4/2/02)
                     DEQ letter to F. Itayes regarding RI report (4/15/02)
                     DEQ email regarding Ravalli Republic phone call
                       (4/17/02)
                     Darby letter to DEQ regarding fencing (4/18/02)
                     Conversation w/Terry Bergran (10/1/02)
                     DEQ internal email re: Phone Log with party interested
                       in leasing (10/14/03)
31   13   01   07   2006 -2007 Resident Correspondence
                        Arrowhead letter to S Bachman re: Sampling
                           notification (3/5/06)
                        Arrowhead letter to T Boone re: Sampling
                           notification (3/5/06)
                        Arrowhead letter to Steve & Judy Wills re:
                           Sampling notification (3/5/06)
                        Arrowhead letter to Russ & Sherry Wildey re:
                           Sampling notification (3/5/06)
                        Arrowhead letter to J Chaney re: Sampling
                           notification (3/5/06)
                        Arrowhead letter to Christine Hammer re: Sampling
                           notification (3/5/06)




                                                                 Page 39 of 47
                         Arrowhead letter to Gerald Chaney re: Sampling
                          notification (3/5/06)
                        DEQ letter to D Rodriquez re: Sampling results
                          (12/29/06)
                        DEQ letter to Christine Hammer re: Sampling
                          results (12/29/06)
                        DEQ letter to Russ & Sherry Wildey re: Sampling
                          results (12/29/06)
                        DEQ letter to Steve & Judy Wills re: Sampling
                          results (12/29/06)
                        DEQ letter to J Chaney re: Sampling results
                          (12/29/06)
                        DEQ letter to Gerald Chaney re: Sampling results
                          (12/29/06)
                        DEQ letter to Tom Boone re: Sampling results
                          (12/29/06)
                        DEQ letter to D & K Stevenson re: GW sampling
                          3rd qtr results (1/11/07)
31   13   01   08   2008-2009 Resident Correspondence
                        DEQ letter to Steve & Judy Wills re: Sampling
                          results (2/18/08)
                        Arrowhead letter to Residents re: 2008 Sampling
                          notification (7/9/08)
                        DEQ August 2008 residential results letters
                          (12/2/08)
                        DEQ letter to Gerald Chaney re: Sampling results
                          (2/18/09)
                        DEQ letter to Christine Hammer re: Sampling
                          results (2/18/09)
                        DEQ letter to Russ & Sherry Wildey re: Sampling
                          results (2/18/09)
                        Arrowhead letter to J Germann re: Sampling
                          notification (4/17/09)
                        Arrowhead letter to G. Honey re: Sampling
                          notification (4/17/09)
                        Arrowhead letter to Russ & Sherry Wildey re:
                          Sampling notification (4/17/09)
                        Arrowhead letter to Gerald Chaney re: Sampling
                          notification (4/17/09)




                                                                Page 40 of 47
                         Arrowhead letter to Steve and Judy Wills re:
                          Sampling notification (4/17/09)
                        Arrowhead letter to Christine Hammer re: Sampling
                          notification (4/17/09)
                        DEQ/Seyler letter to Gerald Chaney re: %/22/09
                          sampling results (8/6/09)
                        DEQ letter to Gerald Chaney re: Sampling Results
                          (11/5/09)
                        DEQ letter to Russ & Sherry Wildey re: Sampling
                          Results (11/5/09)
                        DEQ letter to Christine Hammer re: Sampling
                          Results (11/5/09)
                        DEQ letter to Steve & Judy Wills re: Sampling
                          Results (11/5/09)
                        AEI letter to Steve & Judy Wills re: Sampling
                          notification (2/23/10)
                        DEQ/Roll letter to G Chaney re: Sampling results
                          (5/24/10)
                        AEI letter to J Germann re: Notification of soil
                          sampling activities (5/27/10)
31   13   01   09   2010-2011 Resident Correspondence
                        DEQ letter to G Chaney re: Sampling results
                          (2/1/10)
                        DEQ letter to Steve & Judy Wills re: Sampling
                          results (2/1/10)
                        DEQ letter to Russ & Shirley Wildey re: Sampling
                          results (2/1/10)
                        DEQ letter to Christine Hammer re: Sampling
                          results (2/1/10)
                        DEQ/Roll & AEI/Cosgriff emails re: Chaney’s well
                          (6/2/10)
                        AEI/Cosgriff email to DEQ/Roll re: Chaney’s well
                          results (6/4/10)
                        DEQ/Roll letter to G Chaney re: Sampling results
                          (8/13/10)
                        DEQ/Roll letter to C Hammer re: Sampling results
                          (11/8/10)
                        DEQ letter to Russ & Shirley Wildey re: Sampling
                          results (11/8/10)




                                                               Page 41 of 47
                            DEQ letter to Steve & Judy Wills re: Sampling
                             results (11/10/10)

31   13   01   09    (Continued - 2010-2011 Resident Correspondence)
                          DEQ letter to G Chaney re: Sampling results
                            (11/10/10)
                          DEQ/Roll letter to Renfroe re: Chaney/Hammer
                            results & site update (1/31/11)
                          DEQ/Roll letter to Robak re: Sampling results
                            (2/16/11)
                          DEQ/Roll letter to Russ & Sherry Wildey re:
                            Sampling results (2/16/11)
                          DEQ/Roll letter to Steve & Judy Wills re: Sampling
                            results (2/16/11)
                          DEQ/Roll letter to Christine Hammer re: Sampling
                            results (2/16/11)
                          DEQ/Roll letter to Gerald Chaney re: Sampling
                            results (2/16/11)
31   13   02   1989-2000 S&W General Correspondence
31   13   02   01    2001-2008 General Correspondence
                          IP letter to DEQ re: New Project Manager/Tom
                            Ross (8/28/01)
                          DEQ Activity Report: phone log with John German
                            re: status of S&W sawmill (1/11/06)
                          DEQ Activity Report: phone log with Mike
                            Dembiski re: well 1002 at 3300 Old Darby Road
                            near facility (2/3/06)
                          IP email to DEQ re: New Project Manager for S&W
                            (12/13/06)
                          DEQ internal emails re: IP’s estimated expenditures
                            for the S&W cleanup (1/26-1/29/07)
                          DEQ letter to Laura Nicolai re: Providing updated
                            site information in response to phone call (8/7/07)
                          DEQ Phone Log: Western Groundwater Services
                            re: water supply project in H.S. softball complex
                            (11/16/07)
                          DEQ letter to John German re: Property issues
                            (5/30/08)
                          DEQ letter to German re: Salvaging of buildings
                            (12/9/08)




                                                                    Page 42 of 47
31   13   02   02   2009 – Present – General Correspondence
                        Memo to Gov. Schweitzer from R. Opper (DEQ) re:
                           S. Burner (1/28/09)
                        **DEQ internal emails re: possible redrawing of
                           facility boundary and VCP conversation with J.
                           Germann’s Consultant (4/15 and 4/16/09)
                        S. Burner email to DEQ re: trash clean-up (4/27/09)
                        **DEQ internal emails addressing S. Burner email
                           (4/28 and 4/30/09)
                        Sandra Burner Letter to Governor Re: Site building
                           disrepair (4/29/09)
                        DEQ email response to S. Burner re: 4/27/09 email
                           (5/5/09)
                        DEQ email to Rep. Stoker to answer questions re:
                           5/4/09 Ravalli Republic Article (5/8/09)
                        DEQ email to Sen. Laible to answer questions re:
                           5/4/09 Ravalli Republic article (5/11/09)
                        **DEQ internal email re: info request from Sen.
                           Laible (5/11/09)
                        **DEQ internal emails re: Ravalli County
                           Sanitarian concern about buildings/flying tin
                           (5/11/09)
                        S. Burner/Ravalli County Sanitarian emails re: site
                           buildings (5/11 & 5/12/09)
                        DEQ memo to Governor re: Sandra Burner Letter
                           (5/27/09)
                        **DEQ internal email: S&W phone log for
                           conversation with Sen. Liable and Rep. Stoker
                           (8/12/09)
                        **DEQ internal email: Phone Log with Senator
                           Liable (8/26/09)
                        **DEQ internal email re: conversation summary
                           with Senator Liable (9/1/09)
                        DEQ email to Senator Laible re: Building disrepair /
                           demolition (9/1/09)

31   13   02   02   (Continued) 2009 – Present – General Correspondence
                        **DEQ internal email re: Conversation with Mr.
                           Germann’s Atty, building disrepair, demolition
                           (9/1/09)




                                                                  Page 43 of 47
                          DEQ internal email re: Visit from Ravalli County
                           Commissioners, update of activities (9/25/09)
                          Fax to Cal Ruark re: Brownfields info (12/3/09)
                          ** DEQ/Roll internal email re: Conversation with
                           Cal Ruark and possible new owner of first trust
                           deed (1/6/10)
                          DEQ/Roll fax to South Valley Event Center/C
                           Ruark re: Brownfields information (1/6/10)
                          Cal Ruark/South Valley Event Center fax to
                           DEQ/Roll re: TBA application materials for review
                           (1/12/10)
                          DEQ/Roll letter to C Ruark re: EPA TBA
                           application review comments (1/15/10)
                          DEQ/Roll email to Ravalli Commissioners
                           (3/29/10)
                          DEQ/Roll internal email – phone log re: Germann
                           & Roll re: June 2010 soil sampling (6/3/10)
                          DEQ/Roll & Ravalli Co/Grandstaff emails re:
                           CALA agreement (6/11/10)
                          ** DEQ/Roll internal email re: Site update from
                           June visit (6/11/10)
                          ** DEQ/Roll internal email re: Question on
                           Southern boundary (6/15/10)
                          DEQ/Olsen, Martin, Roll, Dunwell, Seyler &
                           Peterson internal emails re: Fact Sheet for
                           Legislative Meeting (6/29/10)
                          Ravalli County/Grandstaff email to DEQ/Roll re:
                           Title search (7/28/10)

31   13   02   02   (Continued) 2009 – Present – General Correspondence
                        ** DEQ/Roll internal email to Brooks re: Phone
                           conversation with Mr Germann (8/27/10)
                        DEQ/Roll & Ravalli County
                           Commissioner/Grandstaff re: NPL/CECRA
                           (8/30/10)
                        Ravalli Co Commissioner email to DEQ/Roll re:
                           Attachment – Property Title information – Darby
                           Lumber (9/9/10)
                        Ravalli Co Commissioner email to DEQ/Roll re:
                           Supplemental soil results (9/9/10)




                                                                  Page 44 of 47
                            Letter from Germann attorney to Ravalli County
                             (9/10/10)
                            DEQ/Seyler internal email re: Phone call with
                             Ravalli Co/Grandstaff (9/10/10)
                            DEQ/Seyler email to Ravalli Co
                             Commissioner/Grandstaff re: Attachment – S&W
                             phone log re: VCRA & Brownfield information
                             (9/13/10)
                            DEQ/Roll & Ravalli County
                             Commissioner/Grandstaff re: Hazardous Ranking
                             score (9/23/10)
                            DEQ/Roll email to Ravalli Co/Browder re:
                             Attachment – S&W file guide (9/27/10)
                            DEQ/Roll & Ravalli County
                             Commissioner/Grandstaff re: Deed restriction &
                             property ownership (9/29/10)
                            AEI/Cosgriff email to DEQ/Roll re: Douglass Inc.
                             (12/15/10)
                            ** DEQ Legal/Brooks & Roll internal emails re;
                             Conversation with Ravalli County Attorney
                             (12/16/10)
                            DEQ internal emails re: Fact Sheet for legislative
                             session (1/19/11)

31   13   02   02     (Continued) 2009 – Present – General Correspondence
                          DEQ/Roll & Ravalli County/Perkins emails re:
                             Germann & roof issues (2/15/11)
                          Ravalli County/Bowder email to DEQ/Roll re:
                             Attachment – Restraining Order, Ravalli Co.,
                             Germann vs Jim Ellingson (3/9/11)
                          ** DEQ/Bucy, Dunwell & Peterson internal emails
                             re: Site information and health concern request
                             (4/7/11)
                          DEQ/Roll & A Grissom emails re: Information &
                             health concern request (4/8-4/11/11)
31   13   03   Scheduling Correspondence
31   13   04   Miscellaneous Technical Correspondence (not itemized)
31   13   04   01     Miscellaneous Technical Documentation
31   13   05   General Correspondence – Cost Recovery




                                                                     Page 45 of 47
                           DEQ letter to Tom Orr re: Copy of IP’s check to DEQ
                            (4/22/05)
                           Graham Law firm letter to DEQ re: Forwarded DEQ letter
                            to Trustee (11/8?05)
                           Graham Law firm letter to DEQ re: Request to remove
                            name from mailing list (3/27/06)
31   14   Photos / Slides
31   14   01     Photos
31   14   02     Slides

31   15   Technical Info
31   15   01     Maps & Blueprints
31   15   02     Field Notebooks
                      Aimee Reynolds 11/01 field notebook site visits &
                         sampling
                      Sampling results from A Reynolds 11/01 sampling
                      DEQ Field notes & Pictures of spill (3/3/10)
31   16   News/Articles
31   16   01     News Articles
                      DEQ internal email re: Ravalli Republic press contact
                         (12/0/06)
                      DEQ email to Ravalli Republic re: Scans of Maps for
                         Facility (12/6/06)
                      DEQ email to Ravalli Republic re: Request for electronic
                         RI/BRA (12/7/06)
31   16   01     (Continued - News Articles)
                      DEQ internal email re: phone conversation & questions
                         with Ravalli Republic reporter (12/13/06)
                      DEQ emails to Ravalli Republic re: Comments & questions
                         to a 5 part newspaper story (12/1406)
                      Ravalli Republic News Story Part 1 of 5 (12/18/06)
                      Ravalli Republic News Story Part 2of 5 (12/19/06)
                      Ravalli Republic News Story Part 3of 5 (12/20/06)
                      Ravalli Republic News Story Part 4of 5 (12/26/06)
                      Ravalli Republic News Story – “Darby Mill site A
                         Quagmire” (5/4/09)
                      Ravalli Republic News Story – “ Event Center Proposed
                         for Darby” (5/13/09)




                                                                        Page 46 of 47
                      DEQ/Seyler email to Tom Richardson re: Recent Darby
                       Events Center stories – KPAX – (5/20/09, 6/1/09, &
                       6/15/09)
                     Ravalli Republic News Story – “Darby Mill Site plan
                       inches forward” (8/6/09)
                     Ravalli Republic News Story – “Old lumber mill in Darby
                       may turn into events center (12/24/09)
                     Ravalli Republic News Story –“County voices support for
                       Darby Center” (12/24/09)
                     Ravalli Republic News Story – “Grading Project in Darby
                       questioned” (4/16/10)
                     Ravalli Republic News Story – “County to pay for title
                       search on Darby Mill (8/2/10)
                     Ravalli Republic News Story – “Foss, Grandstaff square
                       off in debate” (8/16/10)
                     Ravalli Republic News Story – “County, Darby split
                       polluted mill site’s title search cost” (9/19/10)
                     Ravalli Republic News Story – “Ravalli County
                       Commission considers foreclosure of Darby Mill Site”
                       (11/11/10)
31   16   02     General Press Correspondence
                     DEQ internal email re: Press contact w/Joel Gallob
                     DEQ fax to Joel Gallob/Ravalli Republic re: Response to
                       info request (12/13/06)
                     DEQ internal email re: Press Contact with John Cramer of
                       Ravalli Republic (5/1/09)

31   16   02     (Continued - General Press Correspondence)
                      ** DEQ internal emails re: Ravalli Republic May 4,2009
                         story (5/5/09)
                      DEQ internal email re: Press Contact with John Cramer of
                         Ravalli Republic (5/12/09)
                      Phone Log – DEQ/Roll & Ravalli Republic/Perry Backus
                         re: Press contact (11/19-11/22/10)
31   17   Public Meetings
              August 2004 Meeting Information + CD
              Ravalli County Commissioners meeting minutes re: Germann tax
                 notice (11/8/10)




                                                                     Page 47 of 47

						
Related docs
Other docs by dua51718
Rehab Release Form
Views: 35  |  Downloads: 0
Reimbursement Form Xls
Views: 5  |  Downloads: 0
Reimbursment Agreement
Views: 2  |  Downloads: 0
Registered Nurse Recommendation Letter Sample
Views: 1156  |  Downloads: 1
Sample Va Divorce Form
Views: 9  |  Downloads: 0
Sample Travel Proposal
Views: 388  |  Downloads: 0
Register Domain Template - Excel
Views: 15  |  Downloads: 0