Recommendations for Inventory System Proposals
W
Description
Recommendations for Inventory System Proposals document sample
Document Sample


The Lee College Planning Committee
Recommendations Regarding New Spending: 2005-06
25 April 2005
Introduction The Planning Committee began the process of developing these
recommendations in January, 2005 when it met to review the process and procedures
used in past years and to establish a calendar for the committee’s actions this year. The
process adopted by the committee included the following steps.
• January 24. The committee issued a call for Proposals for New Spending. The
call included instructions, a format for the proposals, and a calendar regarding
committee meetings and deadlines. Note that the members of the Planning
Committee, their college affiliation, and their terms are included in Table 5.
• March 15. The committee began receiving proposals from deans and other
administrators who report to the president.
• March 29 and April 5. The committee conducted hearings. The faculty and staff
members who had submitted proposals were invited and given the opportunity to
explain their proposals and answer questions. The meetings were open to all
Lee College employees.
• April 5. The committee toured the campus to see the equipment, furniture and
physical facilities that were addressed by proposals.
• April 12. The committee agreed on the ranking of the proposals vis a vis the
goals they addressed.
• April 19. The committee agreed on the overall ranking of the proposals and
tentatively agreed on the contents of its report to the president.
• April 25. The committee gave final approval to the overall ranking of the
proposals and to this report.
The Overall Rankings of the Proposals The committee’s overall ranking of the
proposals is presented in Table 1. Tables 2 and 3 include the same data as Table 1;
however, they present the proposals that call for additional personnel and furniture
separately. Note that the “Name/File Reference” column in the tables refers to the MS
Word files that contain the full text of the proposals.
Notes Regarding the Proposals The committee elected to attach notes to some of the
proposals. Some of these notes are in response to a request from the president that
proposals regarding personnel and furniture be ranked separately; others include
committee recommendations that address specific proposals. The notes’ meanings are
outlined below.
Note Meaning
1. The committee attached this note to all of the proposals that addresses the need
for additional personnel or the need to upgrade existing personnel positions. The
committee did so in response to the president’s request that these proposals be
presented separately. These proposals are “noted” in Table 1 and are presented
separately in Table 2.
The committee relied in part on data from Table 4 when ranking the proposals
regarding personnel. Table 4 shows for example, that while overall student
enrollment growth has been modest over the past five years, there has been
significant growth in the some areas, particularly in the numbers of students
attempting biology, physics, and the number of students who apply for financial
aid.
2. This note is used to designate the proposals that address the need for classroom
and/or lab furniture. These proposals are listed separately in Table 3 as per the
president’s request.
3. The committee asked the SACS coordinator to review the list of proposals and
identify those that have some bearing on the college’s Quality Enhancement
Plan. Two proposals were identified; ACAD-11, Developmental Reading
Instructor and SS-3, IR Assistant. The former proposal calls for a new faculty
position, the latter calls for an existing staff position to be upgraded from half-time
to full-time.
4. One proposal, ASCE-1, addressed the need to provide funds for the replacement
of the bulbs used in “media classroom” projectors. These bulbs cost about $500
each.
The committee recommends that the cost of replacing these bulbs and the other
electronic equipment used in media classrooms not be charged to the budgets of
the instructional departments. Instead, the committee recommends that the
college establish a special supply center for these classrooms and maintain an
inventory of bulbs and other electronic items that are used in the classrooms.
Doing so will allow the replacement parts to be purchased in bulk and will ensure
that spares are on hand when equipment fails. The latter will serve students by
helping minimize “down-time” due to equipment failures.
5. One proposal, ACAD-6, calls for the creation of eleven new media classrooms.
The committee recommends that this proposal be broken down into categorical
requests ranked by priority so that the college can fund some, if not all of the
eleven that were requested.
6. Three proposals, ADMN-1, ADMN-7, and ASCE-9 call for infrastructure repairs or
upgrades. The estimated cost of implementing these proposals will be $100,000
or more for each. The committee recommends that these items be funded with
reserves or revenue bonds.
Proposals Regarding Safety and Proposals that Address Conditions that Threaten to
Undermine the Operation of the College In past semesters the committee has reviewed
the proposals it received to see if any meet either of these criteria. The committee did
so again this semester but determined that none of the proposals met either criterion.
The Technical Advisory Committee’s Recommendations These recommendations are
presented in a separate document that is appended to this report.
Planning Committee: Spring 2005
Table 1: Overall Ranking; All Proposals
Overall
Name/File Reference Description Goal Est Cost Rank Note
1 ACAD-1 Biology Instructor.doc . New Position: Biology Instructor 4 50,295 1 1
2 ASCE-6 HITT Faculty Member.doc New Position: Health Information Technology Instructor 4 63,295 2 1
3 ACAD-11 Reading Instructor.doc New Position: Developmental Reading Instructor 4 37,000 3 1,3
4 ACAD-4 Replace Biology Lab Microscopes.doc Replace the microscopes in the biology laboratories 2 60,200 4
5 SS-2 Financial Aid Receptionist.doc Upgraded Position: Financial Aid Receptionist from half- 4 15,725 5 1
time to full-time.
6 ASCE-11 Renovate CSME.doc Provide new work-stations and styling chairs for the 2 20,600 6 2
cosmetology lab
7 ACAD-3 Writing Lab Coordinator.doc New Position: Writing Center Coordinator 4 37,000 7 1
8 ASCE-1 Replace Bulbs and Monitors in Replace the projector bulbs and provide SmartBoard 2 7,000 8 4
ATC.doc Monitors for ATC classrooms and labs
9 ADMN-1 Roofs; MHC, etc.doc Repair roofs at two buildings: McNulty Haddick Complex 7 590,000 9 6
& TV-2,3,4
10 ADMN-5 Student Email Server Provide student E-mail accounts by purchasing a server 3 20,000 10
and software
11 ACAD-7 ChemMath Instructor.doc New Position: Full-Time Chemistry/Math Instructor 4 50,295 11 1
12 ADMN-2 Improved Data Backup Upgrade the backup system for the People Soft and 8 88,085 12
iCampus applications with a Storage Area Network
Solution (SAN)
13 ASCE-3 Desks and Chairs.doc Replace desks and chairs in the electrical classrooms in 2 21,689 13 2
TV3 and TV4
Table 1, Continued
Overall
Name/File Reference Description Goal Est Cost Rank Note
14 ADMN-9 Network Technician.doc New Position: Network Services Technician 4 45,000 14 1
15 ASCE-4 Labor and Delivery Facility.doc Construct a customized labor and delivery laboratory 2 5,615 15
facility
16 SS-3 IR Assistant.doc Upgraded Position: Institutional Research Assistant from 4 20,712 16 1,3
half-time to full-time.
17 ADMN-3 New Network Backup Upgrade/replace the college's current network backup 8 15,000 17
solution
18 ACAD-10 Theater Sound System.doc Replace the sound system in the (MHC) theatre 2 15,000 18
19 ADMN--6 Improve Ice Plant Improve the reliability of the air conditioning system by 7 60,000 19
creating redundancy in the current system
20 ACAD-9 Furniture for SJM Classrooms.doc Replace/upgrade the furniture in classrooms at San 2 11,820 20 2
Jacinto Mall and other classrooms via bulk purchase
21 IA-1 Electronic Sign.doc Provide an electronic entrance sign for installation near 3 24,360 21
the entrance to the college
22 SS-5 People Soft Training.doc Provide People Soft training for Student Services 8 20,012 22
personnel
23 SS-1 Student Data Reporting Coordinator.doc New Position: Student Data Coordinator, will report to 4 50,000 23 1
the Dean of Students or Registrar
24 ADMN-10 Upgrade Edyth Olde Upgrade the sound and projection equipment in the 2 6,180 24
Edyth Olde Studio
25 ACAD-2 Wireless Lab.doc Provide wireless network access for the Architecture and 2 68,450 25
Fine Arts Computer Lab; MHC-W11
26 ACAD-5 Science Lab Coordinator.doc New Position: Science Lab Supervisor/Coordinator and 4 12,000 26 1
Computer/Media Specialist
27 ASCE-5 Upgrade lab software.doc Provide software upgrades for the library and the Open 2 5,400 27
Lab housed in the library
28 ADMN-8 Sidewalk MH to SC Provide additional sidewalks between Moler Hall, 7 40,000 28
Student Center, parking lot, etc.
Table 1, Continued
Overall
Name/File Reference Description Goal Est Cost Rank Note
29 ADMN-4 iCampus Load Balancing Purchase an automatic load balancing system that will 8 50,000 29
improve the efficiency of the college's current network
servers
30 SS-4 Renovate Career Center.doc Consolidate and improve the Career Development and 5 27,952 30
Transfer Center (CTC) and Job Placement Office (JPO)
in one location
31 ASCE-8 Furniture for MHC Classrooms.doc Complete the replacement/upgrade of chairs and tables 2 18,000 31 2
in nursing classrooms; MHC
32 ACAD-8 Sign Language Instructor.doc New Position: Sign Language Instructor 4 37,000 32 1
33 ACAD-6 Media Classrooms.doc . Provide additional media classrooms 2 87,000 33 5
34 ASCE-7 Lab Benches for Instrumentation Provide new lab benches for the Instrumentation 2 12,520 34 2
Lab.doc Technology Lab; TV2-101
35 ADMN-7 Generator for Server Room Purchase a generator that will provide back-up electrical 8 100,000 35 6
power for the server room in the event of a power failure
36 SS-6 Staffing for Career Center.doc New Positions: one Career Counselor and two part-time 4 98,908 36 1
Peer Recruiters for the (expanded) Career Development
and Transfer Center (CTC) and Job Placement Office
(JPO)
37 ASCE-10 Automotive Scan Tool.doc Provide diagnostics scan tools for troubleshooting 2 5,500 37
automobile problems for the Liberty High School
Automotive Repair Program
38 ASCE-9 Renovate 2nd Floor, MHC.doc Renovate the second floor of the McNulty-Haddick 7 250,000 38 6
Building
Planning Committee: Spring 2005
Table 2: Overall Ranking; Proposals Regarding Personnel
Overall
Name/File Reference Description Goal Est Cost Rank Note
1 ACAD-1 Biology Instructor.doc . New Position: Biology Instructor 4 50,295 1 1
2 ASCE-6 HITT Faculty Member.doc New Position: Health Information Technology Instructor 4 63,295 2 1
3 ACAD-11 Reading Instructor.doc New Position: Developmental Reading Instructor 4 37,000 3 1,3
4 SS-2 Financial Aid Receptionist.doc Upgraded Position: Financial Aid Receptionist from half- 4 15,725 5 1
time to full-time.
5 ACAD-3 Writing Lab Coordinator.doc New Position: Writing Center Coordinator 4 37,000 7 1
6 ACAD-7 ChemMath Instructor.doc New Position: Full-Time Chemistry/Math Instructor 4 50,295 11 1
7 ADMN-9 Network Technician.doc New Position: Network Services Technician 4 45,000 14 1
8 SS-3 IR Assistant.doc Upgraded Position: Institutional Research Assistant from 4 20,712 16 1,3
half-time to full-time.
9 SS-1 Student Data Reporting Coordinator.doc New Position: Student Data Coordinator, will report to the 4 50,000 23 1
Dean of Students or Registrar
10 ACAD-5 Science Lab Coordinator.doc New Position: Science Lab Supervisor/Coordinator and 4 12,000 26 1
Computer/Media Specialist
11 ACAD-8 Sign Language Instructor.doc New Position: Sign Language Instructor 4 37,000 32 1
12 SS-6 Staffing for Career Center.doc New Positions: one Career Counselor and two part-time 4 98,908 36 1
Peer Recruiters for the (expanded) Career Development
and Transfer Center (CTC) and Job Placement Office
(JPO)
Planning Committee: Spring 2005
Table 3: Overall Ranking; Proposals Regarding Furniture
Overall
Name/File Reference Description Goal Est Cost Rank Note
1 ASCE-11 Renovate CSME.doc Provide new work-stations and styling chairs for the 2 20,600 6 2
cosmetology lab
2 ASCE-3 Desks and Chairs.doc Replace desks and chairs in the electrical classrooms in 2 21,689 13 2
TV3 and TV4
3 ACAD-9 Furniture for SJM Classrooms.doc Replace/upgrade the furniture in classrooms at San 2 11,820 20 2
Jacinto Mall and other classrooms via bulk purchase
4 ASCE-8 Furniture for MHC Classrooms.doc Complete the replacement/upgrade of chairs and tables 2 18,000 31 2
in nursing classrooms; MHC
5 ASCE-7 Lab Benches for Instrumentation Provide new lab benches for the Instrumentation 2 12,520 34 2
Lab.doc Technology Lab; TV2-101
Planning Committee: Spring 2005
Table 4: Student Enrollment and Contact Hours
2000 2001 2002 2003 2004
Hdcnt Contact Hrs Hdcnt Contact Hrs Hdcnt Contact Hrs Hdcnt Contact Hrs Hdcnt Contact Hrs
HITT 95 5,088 156 8,064 221 10,912 291 15,136 327 17,440
MATH 1,584 80,128 71,440 1,422 65,600 1,311 66,576 1,346 61,584 1,237
BIOL 496 46,320 605 55,632 690 63,168 832 76,608 881 81,024
CHEM 107 10,272 96 9,216 103 9,840 100 9,600 137 13,104
PHYS 47 4,512 59 5,664 62 5,952 90 8,640 102 9,744
Combined 650 61,104 760 70,512 855 78,960 1,022 94,848 1,120 103,872
ENGL 1,150 55,136 1,253 60,112 1,287 61,776 1,354 64,992 1,281 61,488
READ 248 11,840 213 10,160 240 11,520 260 12,480 276 13,248
Combined 1,398 66,976 1,466 70,272 1,527 73,296 1,614 77,472 1,557 74,736
LC Baytown
Total 4,893 802,288 5,100 832,784 5,234 867,648 5,321 945,424 4,858 901,152
Financial Aid
Recipients NA 2,181 2,288 2,995 2,882
(Unduplicated)
Tec hnol ogy Ad visory C ommitt ee Members
Thanks to you we were able to accomplish a lot of work in such as short period of time! The final rankings and
recommendations are attached. The next meeting for committee members will be held in June to formalize
recommendations for the upcoming academic year.
Recommendations
• The TAC recommends that any funds left over from bulk purchases be allocated to fund more lab upgrades.
• Library will utilize web appliances since library patrons/students only use the computers for Internet research and
the Library web site.
• The Office of Information Technology will submit proposal requests to TAC for computer lab upgrades
accompanied by appropriate documentation (warranty, helpdesk logs, system requirements, matrix, etc.).
• OIT will continue maintaining the annual inventory on the Computer Lab Matrix.
• Divisions submit proposals for additional computer labs, changes to programs that require new software/hardware
or computer-related peripherals (printers, projectors, multimedia equipment, program specific equipment, etc.).
• Purchase extended 5 year warranty from selected vendor.
Carolyn
------------------------------------------------------------------------------------------------------
Lee College Technology Advisory Committee
Office: 281-425-6455
Fax: 281-425-6877
Email: clightfoot@lee.edu
TAC PROPOSAL RANKING - SPRING 2005
SECT/
TAC RANK DEAN PROGRAM/MATRIX LOCATION ENROLLMENT ITEMS EST. COST** SCORE
Replacement of 8 old computers &
TAC-1 ACAD 1 MESE - Matrix SB 134 6/96 peripherals for Physics laboratories $31,213.00 1350
TAC-2 ASCE 1 Allied Health Matrix E04/W09 17/69 36 computers, 1 laser printer, Software $68,000.00 1230
Information
TAC-3 ADMN 5 ADMN - New Technology Campus Wide Student E-mail Server & Software $20,000.00 1155
24 computers, 2 laser printers,
TAC-4 ASCE 2I HITT - New ATC 234 13/157 Maintenance & Software $54,000.00 1150
Computer Lab/Open lab 25 computers, 1 laser printer,NetOp
TAC-5 ASCE 2G overflow Matrix ATC 209 3/64 software $52,900.00 1140
26 computers, 1 laser printer,
TAC-6 ASCE 2B Computer Matrix SJMall 18/265 Maintenance/software $49,337.00 1130
English/Humanities - Computer replacement 22 computers -
TAC-7 ACAD 2 Matrix BH 222 7/73 Matrix $44,000.00 1075
Computer Maintenance- TV1, 114, 116, 117, 4 Adran 550 CCNP Telecom Simulator
TAC-8 ASCE 4 New Software 119 20/369 Bundles $18,400.00 940
TAC-9 ASCE 3 Electrical - New TV3 106 3/33 20 computers, CMH Software $41,500.00 935
TAC-10 ASCE 2H Computer Matrix ATC 235 18/398 24 computers $39,374.00 925
Replacement of 7 old computers &
peripherals for environmental science
TAC-11 ACAD 3 MESE - Matrix SB 128 8/108 laboratories $20,246.00 885
Replacement of 7 old computers &
TAC-12 ACAD4 MESE - Matrix SB 123 3/58 peripherals for Chemistry Laboratories $22,956.00 880
LCD projector, Touch panel/control
TAC-13 ADMN 10 ADMN -New Edyth Olde Studio Campus Wide unit, VGA cable, speakers, computer $6,180.00 880
TAC-14 ASCE 2C * Office Tech Matrix ATC 320 7/117 25 computers 1 laser printer $51,000.00 860
TAC-15 ASCE 2A * Drafting Matrix ATC 216 8/79 14 computers, 1 instr workstation $30,000.00 835
TAC-16 ASCE 2E * Computer Matrix ATC 314 8/123 24 computers, 1 laser printer $49,000.00 790
TAC-17 LIB 1 Computer Matrix Library Campus Wide 28 computers, 1 printer $34,750.00 760
Visual/Performing Arts -
TAC-18 ACAD 6 New W09, W11 17/69, 4/52 Hi-Fi Jet Printer $15,995.00 735
Front desk, monitoring
TAC-19 ASCE 8 Cosmetology - New Cosmetology & time clock software 2 computers & printers, software $6,400.00 735
TAC-20 ASCE 2F * Computer Matrix ATC 319 7/113 24 computers, 1 laser printer $49,000.00 715
25 computers, 2 laser printers, NetOp
TAC-21 ASCE 2D * Computer Matrix ATC 207 11/242 Software $54,900.00 685
Computer Maintenance -
TAC-22 ASCE 6 New TV1 116, 119 10/185 2 Teaching Podium Completion $20,000.00 685
TAC-23 ASCE 5 Electrical -New TV3 101 5/80 8 Variable Frequency Drive Units $28,500.00 665
Relocate CTC/JPO
to Phyllis Davis
TAC-24 STD SERV 1 Student Services - New Room Campus Wide Computers,Printer, on-line technology $ 8,320.00 635
Wireless Architecture/Fine Arts
Computer Lab (new) 21 wireless
Visual/Performing Arts - laptops, 1 HP DesignJet 30n printer, 1 $68,450.00
TAC-25 ACAD 5 New MHC W11 4/52 PC workstation, wireless networking (new lab) 550
TAC-26 LIB 2 Library - New Library Campus Wide Printer Server $4,005.00 505
24 computers, 1 server w/ switch,
ASCE 7 Computer - Matrix . Huntsville-Cleveland Cleveland network wiring $35,308.18
$855,284.18
Score the proposals above with the lowest ranking proposal having a score of 5 (increasing by intervals of five) and the
highest ranking proposal having a score of 130.
The HCLC proposal is ranked separatly, so do not include it in your scoring from 5 to 130.
*Under Warranty
**Estimated cost will change when purchased in bulk