Quality Control Measures the Offeror Uses to Ensure Acceptable Subcontractor Performance

Description

Quality Control Measures the Offeror Uses to Ensure Acceptable Subcontractor Performance. document sample

Shared by: gbm14561
Categories
Tags
-
Stats
views:
13
posted:
8/1/2011
language:
English
pages:
7
Document Sample
scope of work template
							Data Access and Dissemination System (DADS) II                                                                            Section J-3




                                                  ATTACHMENT J-3

           QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

  1.    PURPOSE AND SCOPE...................................................................................................... 2

  2.    DOCUMENT REFERENCES............................................................................................. 2

  3.    GOVERNMENT ROLES AND RESPONSIBILITIES .................................................... 2

  4.    METHODS OF SURVEILLANCE..................................................................................... 3

  5.    QUALITY ASSURANCE LOCATION.............................................................................. 4

  6.    REPORTING ........................................................................................................................ 5

  7.    NONCONFORMING PRODUCTS OR SERVICES ........................................................ 5

  8.    TRANSFER OF OWNERSHIP AND RISK OF LOSS .................................................... 6

  9.    PERFORMANCE MEASURES – CRITERIA FOR SUCCESS ..................................... 6

  APPENDIX A – DRAFT SURVEILLANCE ACTIVITY CHECKLIST ................................ 7




                                               Page 1 of 7                                                        SOLICITATION NO.
                                                                                                                  YA1323-06-RP-0001
Data Access and Dissemination System (DADS) II                                             Section J-3




  1. PURPOSE AND SCOPE
  The Quality Assurance Surveillance Plan (QASP) is used in the administration of systematic
  quality assurance methods on the DADS II performance based contract. The intent is to ensure
  that the Contractor performs in accordance with acceptable quality levels, and the Government
  receives the quality of services and products called for in the contract.

  The QASP was developed to comply with the Federal Acquisition Regulation (FAR), Subpart
  37.6 - Performance Based Contracting. Subpart 37.602-2 Quality Assurance, states agencies shall
  develop quality assurance surveillance plans when acquiring services. The Government
  surveillance focuses on the level of performance achieved by the Contractor, rather than the
  methodology used by the Contractor in the performance of work.

  The Contractor, and not the Government, is responsible for management and quality control
  actions necessary to achieve quality in the delivery of products and services required in the
  DADS II contract. The Offeror develops and submits a Quality Management Approach (see
  Section C.5.12, Quality Management) that describes the Offeror’s quality system, including
  quality assurance and quality control policies, processes, products, roles and responsibilities,
  reviews, and reports. The Quality Management Approach shall integrate with the Offeror’s
  system life cycle, be consistent with processes described in the QASP. The Contractor shall
  submit a Quality Management Plan (QMP) (see Section C.5.12, Quality Management) for
  Government approval in compliance with contract deliverables. Once accepted, the Contractor
  then uses the QMP as a guide to implement the required management and quality control
  procedures.

  The QASP provides a description of the Government’s surveillance and oversight of the
  Contractor’s quality control efforts. The QASP is not intended to duplicate the Contractor’s
  QMP. The Government is providing the Contractor an information copy of the QASP as an
  Attachment to the solicitation to support the Offeror’s efforts in developing a Quality
  Management Approach that will interrelate with the Government’s QASP.


  2. DOCUMENT REFERENCES
     •  Performance Work Statement (Section C)
     •  Award Fee Determination Plan (Section J-2)
     •  Contract Deliverables List (Section J-14)
     •  Performance Measures (Section J-4)
     •  Systems Requirements Document (Section J-1)


  3. GOVERNMENT ROLES AND RESPONSIBILITIES


      •    Contracting Officer (CO) – A person duly appointed with the authority to enter into,
           administer, or terminate contracts and make related determinations and findings on behalf
           of the Government. The CO ensures performance of all necessary actions for effective
           contracting, ensures compliance with the terms of the contract and safeguards the
           interests of the United States in the contractual relationship. It is the CO that assures the
                                       Page 2 of 7                                   SOLICITATION NO.
                                                                                     YA1323-06-RP-0001
Data Access and Dissemination System (DADS) II                                           Section J-3



           Contractor receives impartial, fair, and equitable treatment under the contract. The CO is
           ultimately responsible for the final determination of the adequacy of the Contractor’s
           performance.

      •    Program Manager (PM) – An individual responsible for the overall management of the
           DADS II program. The PM is responsible for oversight of both Government and
           Contractor performance. The PM has overall responsibility for the planning,
           implementation, and documentation of the Government’s surveillance of Contractor
           quality.

      •    Contracting Officer’s Technical Representative (COTR) – An individual designated
           in writing by the Contracting Officer to act as an authorized representative to assist in
           administering a contract. The source and authority for a COTR is the Contracting Officer.
           COTR limitations are contained in the written letter of designation. The COTR is
           responsible for technical administration of the project and assures proper Government
           surveillance of the Contractor’s performance. The COTR is not empowered to make any
           contractual commitments or to authorize any contractual changes on the Government’s
           behalf. Any changes that may affect contract, price, terms, or conditions shall be referred
           to the Contracting Officer for action. Any changes that may affect contract, price, terms,
           or conditions shall be referred to the Contracting Officer for action.

      •    Award Fee Determination Board (AFDB) – The AFDB is a group chartered by the CO
           to review the Contractor’s performance at the conclusion of each Award Fee Period and
           recommend the percentage of the award fee pool that the Contractor will receive. The
           AFDB and the AFDB Chairman are responsible for briefing the Contractor on Award Fee
           related performance and oversee the Award Fee review and process. The AFDB is also
           responsible for the review, update and approval of the AFDB Plan and evaluation
           categories and the evaluation weights.

      •    Technical Monitors (TM) – Individuals responsible for the technical administration of
           specific areas under the contract. Technical Monitors provide detailed technical
           oversight of the Contractor’s performance and report findings to the AFDB in a timely,
           complete and impartial fashion (see Section J-2, Award Fee Determination Plan). While
           the Technical Monitors may serve as a direct conduit to provide Government guidance
           and feedback to the Contractor on technical matters, the TMs are not empowered to make
           any contractual commitments or to authorize any contractual changes on the
           Government’s behalf.

  4. METHODS OF SURVEILLANCE
  The QASP describes the Government’s quality assurance surveillance of the products and
  services required in the Performance Work Statement, including interim work products, contract
  deliverables and Contractor quality control processes. The methods of surveillance may
  include:

      •    Process Monitoring – This level of inspection involves oversight of the Contractor
           processes. Process monitoring may include evaluation of the ability of Contractor
           documented processes to ensure deliverables meet Government requirements, as well as
           assessing whether the Contractor is following processes documented in the QMP.

                                       Page 3 of 7                                 SOLICITATION NO.
                                                                                   YA1323-06-RP-0001
Data Access and Dissemination System (DADS) II                                          Section J-3



      •
      •    Random Sampling – This level of inspection involves reviewing selected samples of
           deliverables for a thorough examination. Sampling frequency may be increased or
           decreased depending on the initial results.

      •    Comprehensive Inspections – This level of inspection involves a thorough examination
           of the deliverable to ensure that it meets the quality requirements of the contract.

      •    Deliverable and Work Product Review and Evaluation – This level of inspection
           ensures that all deliverables and work products performed under the DADS II contract
           adhere to quality criteria of the DADS Program. Deliverables and work products may be
           reviewed and evaluated forth following:
               a. Content Criteria
                       i. Is the deliverable clearly written or presented?
                      ii. Is the deliverable at the appropriate and agreed upon level of detail?
                     iii. Is the deliverable written or presented for the appropriate audience?
                     iv. Does the deliverable meet the criteria and expectations of the requirement?
                       v. Has the requirements traceability matrix/tool been updated to indicate
                          where this document satisfies or traces to the requirements?
               b. Administrative Criteria
                       i. Was it delivered on time? If not, did the Program Manager grant a waiver
                          for the late delivery prior to the deliverable submission?
                      ii. Was the required number of copies delivered?
                     iii. Was the deliverable submitted in the agreed upon format, media and
                          version?
                     iv. Does the deliverable clearly identify the associated contract requirement?
                      v. Were there performance metrics collected for this deliverable review? If
                          so, do the metrics indicate any negative trends or concerns? Are there
                          reasonable explanations for the trends or problems?

       •     Customer Feedback – Customer feedback may be obtained either from the results of
             formal customer satisfaction surveys or from informal customer feedback. Customer
             feedback includes both internal Census Bureau staff that the DADS Program supports
             and the general public.

       •     Third Party Audits or Assessments – This level of inspection allows for an outside
             auditor that is independent of the Government and the Contractor to assess compliance
             with an industry standard. All documentation supplied to, and produced by, the third
             party shall be made available to the Government by the Contractor.



  5. QUALITY ASSURANCE LOCATION
  The U.S. Census Bureau will conduct Quality Assurance (QA) activity at the U. S. Census
  Bureau, Suitland Federal Center in Suitland, Maryland and/or any location where activities
  supporting the DADS II contract are conducted. Census Bureau staff will interface with the
  Contractor to facilitate the DADS process and help to ensure the delivery of quality products.
  The U.S. Census Bureau also will conduct quality assurance surveillance of the products and
  services required in the Performance Work Statement, including interim work products, contract
  deliverables and Contractor quality control processes.
                                       Page 4 of 7                                SOLICITATION NO.
                                                                                  YA1323-06-RP-0001
Data Access and Dissemination System (DADS) II                                          Section J-3




  Quality assurance on subcontracted products and services may be performed at the discretion of
  the Government. This activity does not relieve the Contractor of any responsibilities under the
  contract. The Government may perform quality assurance at the subcontract level when it is
  determined to be in the Government’s interest. The Government envisions this activity as
  exceptional activity that:

       •     Will not affect the contractual relationship between the prime Contractor and the
             Government
       •     Will not affect the contractual relationship between the prime Contractor and the
             subcontractor(s)
       •     Will not establish a contractual relationship between the Government and the
             subcontractor(s)
       •     Will not constitute a waiver of the Government’s right to approve or disapprove the
             products or services.


  6. REPORTING
  The Government will document inspection. The Draft Surveillance Activity Checklist (see
  Appendix A) is an example of how the Government may document results. This checklist may be
  generated and submitted by any Government employee that carries out QA assessment activities.
  The COTR will determine the content of the checklist. Appendix A is an example of a checklist
  the DADS Program may use.


  7. NONCONFORMING PRODUCTS OR SERVICES
     •    Disapproval
     The COTR will return disapprovals to the Contractor for rework. The weekly Program
     Management Meeting is the forum for tracking and discussing rework of these deliverables.
     Notices of disapproval must include the reasons for disapproval and be furnished promptly
     to the Contractor. Promptness (normally within 20 calendar days of delivery) in giving this
     notice is essential in order to maintain the delivery schedule. The notice must be in writing
     (email is considered in writing). The Program Manager, and the COTR will assess rework
     activity to determine if excessive rework is occurring and report excessive rework to the CO.

       •    Approval with deviations
       In those instances where deviation from the above policy is found to be in the Government’s
       interest, such products or services may be approved only as follows. The CO ordinarily must
       give the Contractor an opportunity to correct or replace nonconforming products or services.
       The CO or the COTR ordinarily must disapprove products or services when the
       nonconformance is critical or major or the products or services are otherwise incomplete.
       However, there may be circumstances (e.g., reasons of economy or urgency) when the CO
       determines approval of products or services is in the best interest of the Government. The
       CO must make this determination based upon advice of the technical staff that the item is
       suitable for its intended purpose and upon information regarding the nature and extent of the
       nonconformance or otherwise incomplete products or services. The COTR must furnish this
       data to the CO in writing, except that in urgent cases it may be furnished orally and later
       confirmed in writing. Only the CO may make the determination to approve the product or
       service that deviates from the above policy statement.

                                       Page 5 of 7                                SOLICITATION NO.
                                                                                  YA1323-06-RP-0001
Data Access and Dissemination System (DADS) II                                             Section J-3



       •    Approval of Conforming Products or Services
       Approval constitutes acknowledgment that the products or services conform to applicable
       contract quality and technical requirements. Products or services shall ordinarily not be
       approved before completion of DADS II contract quality assurance actions. Approval of
       products or services is the responsibility of the CO and is herein delegated to the COTR.
       Approval shall ordinarily be evidenced by execution of an approval certificate on an
       inspection report form or by letter from the COTR. The DADS staff conducts the final QA
       evaluation of deliverables, but the Contracting Officer, through the COTR has the
       responsibility for notifying the Contractor of the approval of the deliverables.

  8. TRANSFER OF OWNERSHIP AND RISK OF LOSS
  Ownership of products shall pass to the Government upon formal approval, regardless of when or
  where the Government takes physical possession. Unless the contract specifically provides
  otherwise, risk of loss of or damage to products shall remain with the Contractor until delivered
  and approved by the Government. Nonconforming products remain with the Contractor until
  approval or cure. The Contractor shall not be liable for loss of or damage to products caused by
  the negligence of officers, agents, or employees of the Government acting within the scope of
  their employment.

  9. PERFORMANCE MEASURES – CRITERIA FOR SUCCESS
  The Government will not develop the detailed performance measures until after contract award.
  Types of questions that the surveillance process may answer include:

      •    Does the Contractor follow the methodologies established in all of the plans and
           specification documents developed for the DADS Program?

      •    Do deliverables meet the requirements specified in the DADS II contract, and the criteria
           set in the Contractor’s detailed technical solution?

      •    Does the Contractor identify problems and/or deficiencies, self-correct them, and update
           the DADS Program in a timely manner?

     • Is the Contractor meeting cost and schedule baselines ?
  Has the Contractor met its staffing schedule, and is staffing sufficient for the work?



      •    Does the Contractor’s technical implementation meet all security requirements stated in
           the Performance Work Statement?




                                       Page 6 of 7                                  SOLICITATION NO.
                                                                                    YA1323-06-RP-0001
Data Access and Dissemination System (DADS) II                                Section J-3



  APPENDIX A – DRAFT SURVEILLANCE ACTIVITY CHECKLIST



                    DRAFT DADS SURVEILLANCE ACTIVITY CHECKLIST

Required              Performance         Method of     Date           Compliance
Deliverable           Standard            Measurement   Accomplished




                                       Page 7 of 7                       SOLICITATION NO.
                                                                         YA1323-06-RP-0001

						
Other docs by gbm14561
Quality Management for Furniture Sector
Views: 50  |  Downloads: 1
Pyschology Template - PDF
Views: 11  |  Downloads: 0
Qms Contracts Procedure
Views: 17  |  Downloads: 1
Qfii Technology - Excel
Views: 2727  |  Downloads: 0
Qualification Certificate or Statement
Views: 12  |  Downloads: 0
Quaility Management
Views: 2  |  Downloads: 0
Quality Management in Exports
Views: 3  |  Downloads: 0
Quality Consultant Job Contract
Views: 15  |  Downloads: 0
Qualite Management
Views: 13  |  Downloads: 0