Docstoc

Delhi - Doordarshan Maintenance - CE_NZ_

Document Sample
Delhi - Doordarshan Maintenance - CE_NZ_ Powered By Docstoc
					   DOORDARSHAN KENDRA DELHI                                        February, 2010


                                             izlkj Hkkjrh
                                        Hkkjrh; izlkj.k fuxe
                                     nwjn’kZu dsUnz % ubZ fnYyh


   lañ MhñMhñdsñ@Mhñ,yñ,pñ@9¼1½@2009&b3                                  fnukad % 15-03-2010

   eq[; vfHk;ark ¼mñ {ksñ½
   ¼uker% Jh t¢ÛihÛflag eq[; vfHk;ark ¼MhMh,e½
   vkdk’kOkk.kh ,ao nwjn’kZu] tkeuxj gkml]
   ‘kkgtgka jksM+] ubZ fnYyh

   fo”k; % LVwfM;ks ,oa lEcn~/k miLdjksa ds dk;Zpkyu ij Qjojh]2010 ekg gsrq ekfld
fjiksVZ

   egksn;]

            d`i;k Qjojh 2010 ekg gsrq nwjn’kZu dsUnz] fnYyh ds LVwfM;ks ,oa lEcn~/k miLdjksa
            ds dk;Zpkyu ls lacf/kr layXu ekfld fjiksVZ izkIr djs A


                                              Hkonh;



                                                                       ¼ Hkkjr Hkw”k.k ‘kekZ ½
                                                                              v/kh{kd vfHk;ark

   izfr %

   egkfuns’kd ¼Jh dsñ lqczefu;e] funs’kd vfHk;a=.k] uker%½ nwjn’kZu] nwjn’kZu Hkou]
   dksijfuDl ekxZ]
   ubZ fnYyhA



                                                                                dsUnz vfHk;ark
                                                                                    2|Page
DOORDARSHAN KENDRA DELHI                            February, 2010




    IMPORTANT TELEPHONE NUMBERS / FAX / E-MAIL
                  E – mail address:- sgddknd@rediffmail.com
                                      sgddknd@gmail.com

DESIGNATION               OFFICE     RESIDENCE    MOBILE       FAX
Superintending
                          23097540 24352703       9868240907   23097541
Engineer
Director                  23097555 23344255       9810909292   23097556
SE(K K Rao)               23097554                9868990408
SE(A K Dohare)            23097581                9868158902
SE(S. Yadav)              23097542                9868149245
SE ( R. DEV)              23097545                9868240910
SE (C K Jain)             23097569                9810360062

MCR/Feed Room             23097525                             23097529
Earth Station             23388684
PCR DD National           23097543
TCR DD Bharati            23097533
PCR Studio B              23097523
PCR Studio M              23097524
DVB-H                     23421232




                                                                3|Page
 DOORDARSHAN KENDRA DELHI                       February, 2010




                             PART (A)


                     TRANSMISSION FIGURES


S No   Transmission    DD National DD Bharati DD National     RSTV
                         (Hrs)      (Hrs)     (Direct Plus)   (Hrs.)

   1   Local                112          -                          -
   2   Network Relay        620          -                          -
   3   Total                672         672                       7.34
   4   Progressive         8016        8016                      278.01
       Total
                                   `
                           Break Down Details

   1   Gear                  -           -                         -
   2   Power supply          -           -                         -
   3   Other charges         -           -                         -




                                                              4|Page
                                                                STUDIO




                                  1(B)




                         3(M)



             5 (CB1)
                       1100-    1100 -
         -                               Shift
                       1820     1820

                                         Hrs.    Recording
         -             139.20   132.00
                                         (a)
                                                               SHIFT
                                                              ALLOTED
                       1100-    1100 -
         -                               Shift
                       1820     1820
                                                  Xmission

         672           29.20    36.40    Hrs.
                                                                                                                                                                     DOORDARSHAN KENDRA DELHI




                       1100-    1100-    Shift
         -
                       1820     1820      (b)
                                                                                                                                                          PART (B)




                                                 Recording
         -             124.40   88.40    Hrs.
                                                               ACTUAL
                                                             UTILISATION
                       1100-    1100-
                                         Shift
                       1820     1820
                                                  Xmission

         672*          35.20    42.40    Hrs.

                                                             % Utility of
                                                                            1. STUDIO / TRANSMISSION CONTROL ROOM




             100       94.86     77.87                         Studio
                                                                                                                                                                     February, 2010




                                                                                                                    UTILIZATION OF TECHNICAL FACILITIES




                                                             (b/a x 100)




5|Page
                                                               Remarks
 DOORDARSHAN KENDRA DELHI                                     February, 2010


  TCR




                                                                            100
                                       672




                                                                    672
BHARATI


            -


                      -



                               -




                                                -



                                                     -
 *Includes 25.31 hrs of live Transmission from studio 5 (CB1)




                      a)           POST PRODUCTION

                                   LINEAR EDIT SUITES
            FACILITY                Date of     No. of days      Total      Location
                                   Commissi      for which    Utilization
                                     oning           the      during the
                                                equipment       Month
                                                   is not        Hrs.
                                                utilized at
                                                      all

 1    A/B Roll Edit Suite 1        31.8.2005        4            270          331
 2    A/B Roll Edit Suite 2        8.11.2005        5            222          317
 3    A/B Roll Edit Suite 3        9.11.2005        5            242          308
 4    A/B Roll Edit Suite 4        20.4.2006        4            230          305
 5    A/B Roll Edit Suite 5        3.3.2006         4            235          304
 6    A/B Roll Edit Suite 6        20.5.2006        5            250          301
 7    Edit Suite 7                 20.5.2006        5            260         336-A
 8    Edit Suite 8                 20.5.2006        5            285         336-B
 9    A/B Roll Edit Suite 9        28.7.2006        4            190          111
 10   Edit Suite 10                20.5.2006        4            265         124-A
 11   A/B Roll Edit Suite 11       20.5.2006        4            265         124-B
 12    A/B Roll Edit Suite12       03.06.200        15           140          224
                                   9 (shifted
                                      from
                                   R.No.213)




                                                                            6|Page
DOORDARSHAN KENDRA DELHI                           February, 2010




               NON LINEAR EDITING SUITES
        FACILITY        Date of     No. of days       Total      Location
                       Commissio   for which the   Utilization
                         ning       equipment      during the
                                    not utilized   Month Hrs.
                                       at all
1    Non Linear Edit
                        28.7.06         4              72          111
     Suite-1(8.2)
2    Non Linear Edit
                       15.12.05         8              10          117
     Suite-2(8.2)
3    Non Linear Edit
                        28.7.06         0             198          301
     Suite-3(8.2)
4    Non Linear Edit
                       22.07.06         0             198          301
     Suite-4(8.2)
5    Non Linear Edit
                       11.05.06         5             250          331
     Suite-5(8.2)
6    Non Linear Edit
                        20.5.06         7             260          334
     Suite-6(8.2)
7    Non Linear Edit
                       21.08.06         10            220          102
     Suite-7(8.2)
8    Non Linear Edit
                       21.01.08         4             192          111
     Suite-8(HD)
9    Non Linear Edit
                       21.01.08         8              03          117
     Suite-9(HD)
10   Non Linear Edit
                       21.01.08         5             260          124
     Suite-10(HD)
11   Non Linear Edit
                       20.08.08         5             275          124
     Suite-11(HD)
12   Non Linear Edit
                       20.08.08         5             250          304
     Suite-12(HD)
13   Non Linear Edit
                       20.08.08         7             240          316
     Suite-13(HD)
14   Non Linear Edit
                       20.08.08         6             265          334
     Suite-14(HD)
15   Non Linear Edit
                       20.08.08         7             161          425
     Suite-15(HD)


                                                                 7|Page
DOORDARSHAN KENDRA DELHI                             February, 2010

16   Non Linear Edit
                        25.1.2010        15             20           103
     Suite-16(Matrox)
17   Non Linear Edit
                        25.1.2010        15             50           103
     Suite-17(Matrox)
18   Non Linear Edit
                        15.1.2010        17             30           104
     Suite-18(Matrox)

                        GRAPHIC SYSTEMS
          FACILITY          Date of    No. of days      Total      Location
                           Commissi     for which    Utilization
                             oning          the      during the
                                       equipment       Month
                                          is not        Hrs.
                                       utilized at
                                             all

1    GRAPHIC-1(3DMAX)      28.7.2006       8            03           117
2    GRAPHIC-2(3DMAX)      28.7.2006       19           01           118
3    GRAPHIC-4(3DMAX)      28.7.2006       5            180          331
4    GRAPHIC-5                             14           02           117
                           28.7.2006
     (SOFT IMAGE)
5    GRAPHIC-6(SMOKE)      1.1.2007        28            0           118
6    GRAPHIC-7(SMOKE)      1.1.2007        28            0           118
7    GRAPHIC-8(FLAME)      1.1.2007        5             4           118


                  CHARACTER GENERATORS

          FACILITY          Date of    No. of days      Total      Location
                           Commissi     for which    Utilization
                             oning          the      during the
                                       equipment       Month
                                          is not        Hrs.
                                       utilized at
                                             all

1    CG-1(move cg2001)    28.7.2006        28            0           117
2    CG-2(power cg)       28.7.2006        4            190          117
3    CG-3(power cg)       28.7.2006        4            180          117
4    CG-4                 28.7.2006        5            120          331

                                                                   8|Page
DOORDARSHAN KENDRA DELHI                        February, 2010




                    FIELD COVERAGE UNIT

                               NO. OF COVERAGE
S.N.       FACILITY                                     REMARKS
                         NEWS      PROG.    TOTAL

 1     BETA CAMCORDERS   NIL       -        -

 2     DVC PRO 25 Mbps   NIL       -        -

                                                     Total hrs. of
 3     DVC PRO 50 Mbps             182Nos   182Nos
                                                     recording-109Hrs

 4     D9 CAMCORDERS     NIL       -        -
       MINI DV
 5                       NIL       -        -
       CAMCORDERS


NOTE:   ALL ENG COVERAGES ARE DONE ON DVCPRO 50 CAMCODERS
          ONLY.




                                                            9|Page
    DOORDARSHAN KENDRA DELHI                                                     February, 2010




                                                  OB/ EFP VAN

                      NO. OF
                                                         Duration of coverage
                     COVERAGE
          FACILITY




                                                                                                          REMARKS
                                               DEPLOY-
                                   TOTAL




                                                                                       TOTAL
                                               MENT
                     LIVE




                                                                LIVE
S.No




                            REC.




                                                                           REC
         8                                                                                     4cameras for DD
1                    1       -      1      6.02.10          7.02.10    -         2 days
       Camera                                                                                  News
                                                                                               4cameras for
                                           5.02.10          7.02.10    -         3 days
       Digital                                                                                 DD1 & DD News
2                    2       -      2
       Van                                                                                     4cameras for DD
                                           26.02.10         27.02.10   -         2 days
                                                                                               News
                                                                                               Up-link for DD
                                           6.02.10          7.02.10    -         2 days
                                                                                               News
                                                                       10.02.                  Recording with 4
       EFP-                                10.02.10         -                    1 day
                                                                       10                      Cameras
3      DSNG          4       -      4
                                                                                               4cameras for DD
       Van                                 19.02.10         20.02.10   -         2 days
                                                                                               Sports Up-link
                                                                                               Up-link for
                                           26.02.10         27.02.10   -         2 days
                                                                                               DDNews
                                                                                               Up-link for DD
       ENG-                                5.02.10          7.02.10    -         2 days
                                                                                               News
4      DSNG          2       -      2
                                                                                               Up-link for DD
       VAN                                 15.02.10         27.02.10   -         13 days
                                                                                               Sports

                                                                                               6cameras for DD
5      HD VAN        1       -      1      15.02.10         27.02.10   -         13 days
                                                                                               Sports

       DSNG-
6      02             -      -      -      -                -          -         Nil           Nil
       Flyaway

       DSNG
7      Ku             -      -      -      -                -          -         Nil           Nil
       Band


                                                                                                     10 | P a g e
  DOORDARSHAN KENDRA DELHI                                    February, 2010




      (B M Bakshi)                                         (B B Sharma)
        Director                                Superintending Engineer
                                                           
        STATUS OF TECHNICAL PREVIEW OF DD
          NATIONAL TRANSMISSION TAPES



Period of the Telecast                              01.2.10 to 28.2.10
*Total No of Sponsored Program scheduled for the
                                                 48
transmission
*Total No of the tapes received for preview
                                                 48
( Sponsored )
Total No of Tapes actually previewed                48

Technical Quality of Program                        Nil

       1.       Excellent                           Nil

       2.       Very Good                           Nil

       3.       Good                                04

       4.       Average                             44

       5.       Rejected                            Nil
Total No of Program played back even though
                                                    Nil
rejected
Revised Tapes not received for preview              Nil


  Two tapes dropped because of ODI Cricket match and Union Budget.


                                                                         11 | P a g e
 DOORDARSHAN KENDRA DELHI                      February, 2010




          ARCHIVE MONTHLY REPORT

S. No                    Facility                      Utilization

  1              BCN to DVCPro Dubbing                   54 Hrs
  2         Betacam SP TO Betacam SP Dubbing             14 Hrs
  3          DVCPro50 TO DVC- Pro50 Dubbing             63 Hrs.
  4         Betacam SP TO DVC-Pro50 Dubbing             124Hrs
  5         DVCPro TO DigiBetacam SP Dubbing             11Hrs.
  6           U-Matic TO DVC-Pro50 Dubbing              58 Hrs.
  7             Digi Beta TO Beta Dubbing                01Hrs
  8                  Betacam Preview                      92Tapes
  9                  U-Matic Preview                   415Tapes.
 10                    BCN Preview                      94Tapes
 11                    DVC Preview                     221 Tapes
 12               Cleaner Utilization BCN              361Tapes
 13             Cleaner Utilization U-Matic            366Tapes
 14             Cleaner Utilization Betacam             42Tapes
 15               Cleaner Utilization DVC               24Tapes
 16                     DVD Write                        67Hrs
 17              U-Matic TO Beta Dubbing                 03Hrs.
 18              BCN to Betacam Dubbing                  02Hrs.
 19             Digi Beta TO DVC Dubbing                 09Hrs.
 20           DVCPro TO Betacam SP Dubbing               11Hrs.




                                                          12 | P a g e
 DOORDARSHAN KENDRA DELHI                               February, 2010




                       PART (D)
           Statement of Defects and Servicing

                         VTR-Maintenance
S.N   Equipment Type      Fault         Period out of         Action Taken
                         Noticed        Commission
                                      From        To
 1    PVW-2800           No colour   04.02.10   04.02.10   TBC card repaired &
      Sl.No.36533         show in                          VTR tested working
                           video                           O.K.
 2    DVC Pro50 AJ-      Error-29    04.02.10   04.02.10   Defective Holder
      SD955               Holder                           flexible assembly
      Sl.No.A3TRA0033     flexible                         (P.No.VEK7715)
                         assembly                          replaced & VTR tested
                          broken                           working O.K.
 3    DVC Pro50 AJ-        Error-    08.02.10   08.02.10   Thrust screw (Part
      SD955                61,71                           No.VXQ0556) &Pinch
      Sl.No.H4TRA0219    Auto Off                          roller (Part No.
                                                           VXL3040) replaced &
                                                           VTR tested working
                                                           O.K.
 4    DVC Pro50 AJ-       Error-     12.02.10   12.02.10   Cylinder unit VEG
      SD965               01/02                            1683 replaced & VTR
      Sl.No.C6TRC0290R                                     tested working O.K.
                          Low RF
 5    IBM VGA monitor       No       13.02.10   13.02.10   Power supply repaired
      (IT Section)        display                          & monitor tested
                                                           working O.K.
 6    DVC Pro50 AJ-      Error-39    21.02.10   21.02.10   Holder flexible
      SD955              Cassette                          assembly
                            not                            (P.No.VEK7715)
                         inserting                         replaced & VTR tested
                                                           working O.K.
 7    DVC Pro50 AJ-       Small      27.02.10   28.02.10   M-Rid lock release R-
      SD955              cassette                          Assy (P/No-VXL-

                                                                     13 | P a g e
     DOORDARSHAN KENDRA DELHI                                February, 2010

       Sl.No J6TRC0508         not                               3237). replaced &
                            accepting                            VTR tested working
                                                                 O.K.




                                          NLE
                                             Period out of
         Equipment/          Fault           Commission             Action Taken /
S.N
            Type            Noticed                                  Service Done
                                           From         To
       NLE Velocity 8.2     Windows       01.02.10 01.02.10      The 3 volts battery
       Room no.334         not booting                           for mother board
 1
                                                                 was replaced &
                                                                 system tested OK.
       Compositing          Blinking      1.02.10    Till date   Complaint registered
 2     system, ”            display                              again with Shaf
       smoke”                                                    Broadcast.
       Celeron             No display     04.02.10 08.02.10      128 MB RAM Module
       assembled P-4                                             was replaced with
 3
                                                                 256 MB RAM &
                                                                 system tested OK.
       HP work station        New         14.02.10 14.02.10      Nortan antivirus
       Room no.-816         software                             2009 and
 4                                                               MSOffice2007
                                                                 installed & system
       NLE Matrox Pro          New        29.02.10 29.02.10      New set up installed
       with 3D max         installation                          with Beta player and
 5
       graphic system                                            DVC pro recorder &
       Room no.104                                               system tested OK.


                              STUDIO-B & M
S.N    Equipment /          Fault           Period out of          Action Taken /
       Type                 Notice           commission             Service Done
                                           From       To
1.     Floor points St#B   not OK.        8.02.10 10.02.10       2 Nos. of 100 mA
                                                                 fuse were replaced
                                                                 & Floor points
                                                                 tested OK.
2.     Lighting Grid H3,   Up/Down        28.02.10   28.02.10    Contactor coil
       H18 & H21           not                                   repaired &

                                                                          14 | P a g e
     DOORDARSHAN KENDRA DELHI                                February, 2010

         Make: Canara        working                              Lighting Grid tested
         St#L                                                     OK.
3.       Lighting Grid H18   Up/Down       28.02.10   28.02.10    Three phase moter
         & H21 Make:         not                                  replaced & Lighting
         Canara St#L         working                              Grid tested OK.


              STATEMENT OF OTHER WORKS


                             VTR-Maintenance
                Date                              Work/Purpose

Sr No.
     1         19.02.10                Preview DDDG office, Mandi House, Ph-1.
     2         22.02.10                    Preview PTI Building CEO office




                             NLE-Maintenance
                Date                              Work/Purpose

Sr No.
                             NLE Matrox Pro with 3D max graphic system with Beta
     1         16.02.10
                             player and DVC pro recorder installed in Room No.103.
                             NLE Matrox Pro with 3D max graphic system with Beta
     2         25.02.10
                             player and DVC pro recorder installed in Room No.103.




                                                                             15 | P a g e
    DOORDARSHAN KENDRA DELHI                            February, 2010




                                      PART (E)

          STATEMENT OF NEW EQUIPMENT / STORES

 1.        NEW EQUIPMENT / SPARES RECEIVED

                                                               Status of
                                                    Date of
S.N     Equipment / Type                  Qty                  Deployment/
                                                    Receipt
                                                               Utilization
        DVD Recorder, Panasonic                                Issued to VTR
1                                          2        08.02.10
        DMR-EH-69                                              section
        8.4"Battery operated TFT
2       Monitor, Marshal V-R841            2        18.02.10   Kept in Stores
        DPAFHD
3       Energy Efficient Light Kit         2        18.02.10   Kept in Stores




                        2.           VIDEO TAPES


                                         Duration    QTY. in        QTY. in
S.N                Format
                                        (Minutes)    Stores       Circulation
    1   DVC PRO 33                         15           105          1891

    2   DVC PRO 66                         30           201          17282

    3   DVC PRO 94                         45           207          8868



                                                                    16 | P a g e
DOORDARSHAN KENDRA DELHI                                February, 2010


4    DVC PRO 126                         60            957          18804

5    DVC PRO 184                         92            27            423




     Action Taken Report on Annual Technical
      Inspection & Maintenance of DDK Delhi


•   Proper Power flow & signal flow diagram, by-passing arrangement and other
    technical drawings are displayed at the prime locations.

•   Action initiated to attend/ repair defective equipments.

•   Standby equipments (including bypassing/emergency arrangements) are
    tested on regular basis.

•   Trainings sessions arranged at Kendra from time to time for updating
    technical knowledge and general awareness of staff.

•   Physical verification is under progress.

•   Unserviceable and obsolete equipments are being identified.




                                                                   17 | P a g e

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:104
posted:7/31/2011
language:English
pages:17