Re Inspection Template

Document Sample
Re Inspection Template Powered By Docstoc
					                                                THE CITY OF STARKVILLE
                                                  BUILDING DEPARTMENT
                                             CITY HALL, 101 E. LAMPKIN STREET
                                             STARKVILLE, MISSISSIPPI 39759-2944

  EROSION PREVENTION AND SEDIMENT CONTROL INSP ECTION R EP ORT

Project Name: _________________________________________ Erosion Control Permit #: _______________________

Inspection Date: _____ /_____ /_____         Time: _________ am / pm          Inspector: ____________________________

Property Owner / Builder / Developer: ________________________________________________________________

Violation of Ordinance Number 2007-02:
□ Activity without Erosion Control Permit (clearing, clear cutting, grading, excavating, filling)
□ Sediment Pollution of adjacent properties
Corrective Action Required:
□ Remove Silt/ Sediment from Roadway          □ Install Silt Fencing               □ Install Construction Entrance
□ Remove Silt/ Sediment from Storm Inlet      □ Replace/ Re-install Silt Fencing □ Improve Construction Entrance
□ Stabilize disturbed areas with seed & mulch □ Remove Silt/ Sediment from adjacent properties
□ Install Inlet Protection                    □ Remove Silt/ Sediment from sediment pond/ detention pond
□ Improve Inlet Protection                    □ Acquire an Erosion Control Permit
□ Other: ___________________________________________________________________________________________
Notification of Ordinance Violation:
□ Verbal by: __________________________ to __________________________ on ___ /___ /___ Time: _____ am / pm
□ Fax by: __________________________ to __________________________ on ___ /___ /___ Time: _____ am / pm
□ Email by: __________________________ to __________________________ on ___ /___ /___ Time: _____ am / pm
Follow up Inspection (after 24 hours):

Inspection Date: _____ /_____ /_____         Time: _________ am / pm          Inspector: ______________________________
□ No Corrective Action Taken
□ Corrective Action Taken- Additional Action Required (see additional Erosion Prevention and Sediment Control
Inspection Report.)
□ Corrective Action Taken- No Additional Action Required.
Code Enforcement:
□ Issue Stop Work Order by: ___________________ to ___________________ on ___ /___ /___ Time: ____ am/pm
□ Schedule Hearing Date for _____ /_____ /_____ Time: ______ am/pm
□ Issue Notice to Appear Letter and include hearing date and time along with dates of prior notices as well as fines & fees to
be assessed.




                                                                                  EPSC Inspection Report- Revised 04/28/08

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:13
posted:7/28/2011
language:English
pages:1
Description: Re Inspection Template document sample