									DETAILED ENERGY ANALYSIS

The following three (3) spreadsheets must be completed as part of the Detailed Energy Analysis (DEA)
and inserted into the submitted PDF document as Tables 1, 2, and 3 in the introduction to the DEA.

         DEA.1    Baseline Building Electricity & Fuel Consumption
                  This spreadsheet represents the building's energy usage over the twelve-month
                  period of the evaluation.

                  Additionally, current maintenance costs for the existing equipment and any additional
                  costs must be entered. Any subsidies or other revenue received by the building
                  must also be accounted for.

                  This spreadsheet automatically determines the building's Total Annual Expenditures
                  (for Energy and Maintenance).
         DEA.2    Proposed CHP System Performance and Project Summary
                  This spreadsheet reflects the monthly net electricity production of the CHP system
                  and the waste heat utilization to automatically determine the system's efficiency.

                  The Project Summary, including NYSERDA's incentive, is also presented in this
                  spreadsheet. The Annual Fuel Saved (MMBtus) in this chart is calculated as the
                  input fuel (HHV) required to achieve the Recovered Output Useful Thermal Energy
                  for each thermal end use based on the efficiencies of the proposed equipment
                  recommended in the Energy Reduction Plan involved with each thermal end use.
                  The Net Annual Energy Cost Savings ($) is then the sum of the value of the Net
                  Annual Generated Electricity of the CHP system multiplied by the annual average
                  Bundled Rate for electricity from DEA.1 and the value of the Annual Fuel Saved
                  multiplied by the annual average Unit Fuel Cost from DEA.1 for each type of fuel
                  offset by the CHP system.

                  The Program Checks in the Project Summary table will be calculated once the CHP
                  application tabs have been completed. At that point the NYSERDA incentive shall
                  also be calculated automatically for this project.
         DEA.3    Proposed Building Overall Cost Analysis
                  This spreadsheet represents the total estimated energy consumption of the project
                  after the installation of the CHP system and the energy efficiency measures. To
                  insure that interactive effects due to the other measures of the workscope are taken
                  into consideration, the Costs of Electricity and Fuel tables should represent the
                  building's projected energy usage based on the model from the Energy Reduction
                  Plan.
        DEA.1: Baseline Building Electricity and Fuel Consumption
        Project Name
                                             (Must be same as Participant/Company name from Section J
        Applicant Name                         of Program Application and Participation Agreement)
        NYSERDA Contract Number
        INSTRUCTIONS: The baseline consumption data entered into this spreadsheet may be EITHER the building's actual consumption or the building's actual weather-normalized consumption.
        Whichever you enter, the baseline consumption must correspond to that used in the savings analysis for the project. As such, the difference between this baseline consumption and the projected system performance and
        supplemental needs described in the following tabs, must equal the savings that the DEA is projecting.

        Note: If you propose to install a CHP system at an existing building, with no plans for expansion, please complete the form below by providing the actual electricity and fuel consumption/cost provided by the local utility for the previous 12 months.
        Baseline Building Electricity Consumption
         Month                                                                                                                                  Total Electric           Total Electric            Total Electric
                      On-Peak Demand          Off-Peak Demand         On-Peak Energy          Off-Peak Energy         Total Electric Energy                                                                             Total Electric Bill     Bundled Rate
         (Year:                                                                                                                                 Energy Cost              Demand Cost             Miscellaneous Costs
                           (kW)                     (kW)                  (kWh)                    (kWh)                     (kWh)                                                                                             ($)                ($/kWh)
         _____ )                                                                                                                                     ($)                      ($)                        ($)

        January                                                                                                                        0.00                                                                                            $0.00               $0.000
        February                                                                                                                       0.00                                                                                            $0.00               $0.000
        March                                                                                                                          0.00                                                                                            $0.00               $0.000
        April                                                                                                                          0.00                                                                                            $0.00               $0.000
        May                                                                                                                            0.00                                                                                            $0.00               $0.000
        June                                                                                                                           0.00                                                                                            $0.00               $0.000
        July                                                                                                                           0.00                                                                                            $0.00               $0.000
        August                                                                                                                         0.00                                                                                            $0.00               $0.000
        September                                                                                                                      0.00                                                                                            $0.00               $0.000
        October                                                                                                                        0.00                                                                                            $0.00               $0.000
        November                                                                                                                       0.00                                                                                            $0.00               $0.000
        December                                                                                                                       0.00                                                                                            $0.00               $0.000
        Total                         0.00                    0.00                     0.00                    0.00                    0.00                  $0.00                   $0.00                     $0.00                   $0.00               $0.000

        Please note that the energy of all fuel inputs are to be summed to units of millions of Btus (MMBtus). Conversion factor tables are provided below for reference and verification.
        Baseline Building Fuel Consumption
         Month                                                        Distillate Oil #2 -     Distillate Oil #6 -                                                                                 Other: _______ -      Total Fuel Energy -
                     Natural Gas - HHV         Propane - HHV                                                              Coal - HHV            Wood - HHV              Con Edison Steam                                                       Total Fuel Costs     Unit Fuel Cost
         (Year:                                                              HHV                     HHV                                                                                               HHV                     HHV
                         (MMBtus)                (MMBtus)                                                                 (MMBtus)               (MMBtus)                  (MMBtus)                                                                   ($)           ($ / MMBtus)
         _____ )                                                         (MMBtus)                (MMBtus)                                                                                           (MMBtus)                (MMBtus)

        January                                                                                                                                                                                                                         0.00                                   $0.000
        February                                                                                                                                                                                                                        0.00                                   $0.000
        March                                                                                                                                                                                                                           0.00                                   $0.000
        April                                                                                                                                                                                                                           0.00                                   $0.000
        May                                                                                                                                                                                                                             0.00                                   $0.000
        June                                                                                                                                                                                                                            0.00                                   $0.000
        July                                                                                                                                                                                                                            0.00                                   $0.000
        August                                                                                                                                                                                                                          0.00                                   $0.000
        September                                                                                                                                                                                                                       0.00                                   $0.000
        October                                                                                                                                                                                                                         0.00                                   $0.000
        November                                                                                                                                                                                                                        0.00                                   $0.000
        December                                                                                                                                                                                                                        0.00                                   $0.000
        Total                         0.00                    0.00                     0.00                    0.00                    0.00                      0.00                     0.00                   0.00                   0.00                $0.00              $0.000

                             Fuel                              Conversion Factors                 Conversion Factors                   Conversion Factors                                                                Workspace for Conversions
                        Natural Gas:                      100,000       Btu/Therm                100      MBtu/Therm                  0.10     MMBtu/Therm
                        Natural Gas:                      102,800        Btu/CCF               102.8       MBtu/CCF               0.102800      MMBtu/CCF
                          Propane:                         91,600       Btu/Gallon              91.6      MBtu/Gallon               0.0916     MMBtu/Gallon
                      Distillate Oil #2:                  139,000       Btu/Gallon               139      MBtu/Gallon                0.139     MMBtu/Gallon
                      Distillate Oil #6:                  154,000       Btu/Gallon               154      MBtu/Gallon                0.154     MMBtu/Gallon
                            Coal:                          13,648          Btu/lb             13.648        MBtu/lb               0.013648       MMBtu/lb
                           Wood:                           10,230          Btu/lb             10.230        MBtu/lb                0.01023       MMBtu/lb
           Con Edison Steam (delivered at 125 psig):        1,200          Btu/lb                1.2        MBtu/lb                 0.0012       MMBtu/lb

        Provide the total annual maintenance cost for all existing equipment (boilers, hot water heaters, etc.):
        Provide all additional annual energy costs not already accounted for above (attach an itemized list to the proposal):
        Provide all applicable annual revenues from enrollment programs/export of power not already accounted for above (attach an itemized list to the proposal - e.g., ICAP, EDRP):
        Provide all applicable annual energy subsidies not already accounted for above (attach an itemized list to the proposal - e.g., ECSP):

                          Total Annual Expenditures (Energy and Maintenance) for Existing Facility ($):                                                                   $0.00




CHP Application                                                                                                                                                         DEA.1                                                                                                                      Page 2 of 11
PON 1101                                                                                                                                               f7baed2d-615a-42f4-aee9-0c3828359067.xls                                                                                         Date Printed: 7/28/2011
NYSERDA Enhanced C/I Performance Program                                                                                                                              Version 3.0                                                                                                       Time Printed: 11:59 AM
        DEA.2: Proposed CHP System Performance And Project Summary
       Project Name                                                       0
                                          (Must be same as Participant/Company name from Section J
       Applicant Name                       of Program Application and Participation Agreement)
       NYSERDA Contract Number                                                           0



                   Proposed CHP System Performance                                                                                               Overall CHP System Efficiency - LHV (%) =               0%

                                                                                                                                                                                    Overall
                                                                                                                                                                                                Overall CHP
         Month                                                                                                         Recovered Output      Un-Recovered Output     Electrical    Recovered
                    Input Fuel - HHV        Gross Output         Parasitic Electricity       Net Annual Electricity                                                                                System
         (Year:                                                                                                         Thermal Energy         Thermal Energy       Efficiency -    Thermal
                       (MMBtus)            Electricity (kWh)        Usage (kWh)                Generated (kWh)                                   (MMBtus)
                                                                                                                                                                                                 Efficiency -
         _____ )                                                                                                          (MMBtus)                                  HHV (%)        Efficiency -
                                                                                                                                                                                                 HHV (%)
                                                                                                                                                                                   HHV (%)

       January                                                                                                  0.00                  0.00                   0.00
       February                                                                                                 0.00                  0.00                   0.00
       March                                                                                                    0.00                  0.00                   0.00
       April                                                                                                    0.00                  0.00                   0.00
       May                                                                                                      0.00                  0.00                   0.00
       June                                                                                                     0.00                  0.00                   0.00
       July                                                                                                     0.00                  0.00                   0.00
       August                                                                                                   0.00                  0.00                   0.00
       September                                                                                                0.00                  0.00                   0.00
       October                                                                                                  0.00                  0.00                   0.00
       November                                                                                                 0.00                  0.00                   0.00
       December                                                                                                 0.00                  0.00                   0.00
       Total                       0.00                   0.00                     0.00                         0.00                  0.00                   0.00


                   Breakdown of Recovered Output Useful Thermal Energy
         Month                                                                                                                                                      Total Recovered Output
                     Process Heating       Process Cooling         Space Heating                Space Cooling          Domestic Hot Water      Other: _______
         (Year:                                                                                                                                                        Thermal Energy
                       (MMBtus)              (MMBtus)               (MMBtus)                     (MMBtus)                 (MMBtus)               (MMBtus)
         _____ )                                                                                                                                                           (MMBtus)

       January                                                                                                                                                                            0.00
       February                                                                                                                                                                           0.00
       March                                                                                                                                                                              0.00
       April                                                                                                                                                                              0.00
       May                                                                                                                                                                                0.00
       June                                                                                                                                                                               0.00
       July                                                                                                                                                                               0.00
       August                                                                                                                                                                             0.00
       September                                                                                                                                                                          0.00
       October                                                                                                                                                                            0.00
       November                                                                                                                                                                           0.00
       December                                                                                                                                                                           0.00
       Total                       0.00                   0.00                     0.00                         0.00                  0.00                   0.00                         0.00


        Project Summary




CHP Application                                                                                DEA.2                                                                                                    Page 3 of 11
PON 1101                                                                      f7baed2d-615a-42f4-aee9-0c3828359067.xls                                                                       Date Printed: 7/28/2011
NYSERDA Enhanced C/I Performance Program                                                     Version 3.0                                                                                     Time Printed: 11:59 AM
       DEA.3: Proposed Building Overall Cost Analysis
           Project Name                                                     0
                                          (Must be same as Participant/Company name from Section J
        Applicant Name                      of Program Application and Participation Agreement)
        NYSERDA Contract Number                                                        0



      Operating Costs of Proposed CHP System
        Month
        (Year:      Input Fuel - HHV (MMBtus)                Fuel Cost ($)                      Maintenance Cost ($)                Total ($)
        _____ )

      January                                  0.00                                                                                              $0.00
      February                                 0.00                                                                                              $0.00
      March                                    0.00                                                                                              $0.00
      April                                    0.00                                                                                              $0.00
      May                                      0.00                                                                                              $0.00
      June                                     0.00                                                                                              $0.00
      July                                     0.00                                                                                              $0.00
      August                                   0.00                                                                                              $0.00
      September                                0.00                                                                                              $0.00
      October                                  0.00                                                                                              $0.00
      November                                 0.00                                                                                              $0.00
      December                                 0.00                                                                                              $0.00
      Total                                    0.00                             $0.00                                  $0.00                     $0.00


      Cost of Supplemental Grid-Supplied Electricity based on modelled consumption from Energy Reduction Plan
        Month       As-Used Average          As-Used Daily        Electric Energy                                                    Contract Demand
                                                                                           Electric Energy Cost   Contract Demand                        Total Costs
        (Year:       Daily Demand            Demand Cost           Consumption                                                           Charge
                                                                                                    ($)                (kW)                                  ($)
        _____ )          (kW)                     ($)                  (kWh)                                                               ($)

      January                                                                                                                                                          $0.00
      February                                                                                                                                                         $0.00
      March                                                                                                                                                            $0.00
      April                                                                                                                                                            $0.00
      May                                                                                                                                                              $0.00
      June                                                                                                                                                             $0.00
      July                                                                                                                                                             $0.00
      August                                                                                                                                                           $0.00
      September                                                                                                                                                        $0.00
      October                                                                                                                                                          $0.00
      November                                                                                                                                                         $0.00
      December                                                                                                                                                         $0.00
      Total                                             $0.00                   0.00                      $0.00                                  $0.00                 $0.00


      Cost of Supplemental Fuel and Maintenance for all equipment excluding the DG/CHP System based on
      modelled consumption from Energy Reduction Plan
      (boilers, chillers, hot water heaters, etc.)

        Month
                      Fuel Consumption - HHV                    Fuel Cost                        Maintenance Cost                    Total
        (Year:
                             (MMBtus)                              ($)                                 ($)                            ($)
        _____ )

      January                                                                                                                                    $0.00
      February                                                                                                                                   $0.00
      March                                                                                                                                      $0.00
      April                                                                                                                                      $0.00
      May                                                                                                                                        $0.00
      June                                                                                                                                       $0.00
      July                                                                                                                                       $0.00
      August                                                                                                                                     $0.00
      September                                                                                                                                  $0.00
      October                                                                                                                                    $0.00
      November                                                                                                                                   $0.00
      December                                                                                                                                   $0.00
      Total                                     -                               $0.00                                  $0.00                     $0.00




CHP Application                                                                       DEA.3                                                                          Page 4 of 11
PON 1101                                                             f7baed2d-615a-42f4-aee9-0c3828359067.xls                                             Date Printed: 7/28/2011
NYSERDA Enhanced C/I Performance Program                                            Version 3.0                                                           Time Printed: 11:59 AM
      CHP.1: General Contact Information
      Project Name                                              0
                                    (Must be same as Participant/Company name from Section J
      Applicant Name                  of Program Application and Participation Agreement)


      Developer or Owner Information (as entered on Program application)
      Company Name:
      Federal Tax ID #:
      Contact Name:                                                        Title:
      Contact Address:                                                     Phone Number:
                                                                           Fax Number:
                                                                           E-mail Address:

      Project Information
      Project Name:                                                                 0
      Building Age:                                                        Project Status:
      Square Footage:                                                      Percent Heated:
      Number of Floors:                                                    Percent Cooled:

      Multifamily Performance Partner Information
      Company Name:
      Partner Contact Name:
      Contact Address:                                                     Phone Number:
                                                                           Fax Number:
                                                                           E-mail Address:

      Engineering Design Firm Information
      Firm Name:
      Parent Company:
      Corporate Parent Federal Tax ID Number:
      Contact Name:                                                        Title:
      Contact Address:                                                     Phone Number:
                                                                           Fax Number:
                                                                           E-mail Address:

      CHP System Installer
      If same as any other contact, just indicate in "Installer Name" below.
      Installer Name:
      Parent Company:
      Corporate Parent Federal Tax ID Number:
      Contact Name:                                                         Title:
      Contact Address:                                                      Phone Number:
                                                                            Fax Number:
                                                                            E-mail Address:

      Equipment Operator Information
      Operator Name:
      Parent Company:
      Corporate Parent Federal Tax ID Number:
      Contact Name:                                                        Title:
      Contact Address:                                                     Phone Number:
                                                                           Fax Number:
                                                                           E-mail Address:

      Person Completing CHP Application Information
      If same as any other contact, just indicate in "Company Name" below.
      Company Name:
      Contact Name:                                                     Title:
      Contact Address:                                                  Phone Number:
                                                                        Fax Number:
                                                                        E-mail Address:




CHP Application                                                         CHP.1                                Page 5 of 11
PON 1101                                               f7baed2d-615a-42f4-aee9-0c3828359067.xls   Date Printed: 7/28/2011
NYSERDA Enhanced C/I Performance Program                              Version 3.0                 Time Printed: 11:59 AM
      CHP.2: Host Site Summary
      Project Name                                                           0
                                           (Must be same as Participant/Company name from Section J
      Applicant Name                         of Program Application and Participation Agreement)

      Instructions:
      Step 1: Complete the Application Forms (CHP.1 through CHP.6) and supply the following REQUIRED documentation.
                           REQUIRED Documentation:                                    Additional RECOMMENDED Documentation:
        The following information MUST be included with your Application. Attached
                                                                                     Proposed Equipment Cutsheets
      Attached                   (Please check all enclosed)                      Logs of the equipment affected by proposed CHP System
                 CHP Application Forms: CHP.1 through CHP.6                          Chiller Logs (Representative sample)
                 Detailed Energy Analysis (DEA)                                      Boiler Logs (Representative sample)
                 Copy of Recent Utility Bills (Electric, Gas, Other)                 DHW Logs (Representative sample)
                 Environmental Assesment Form (EAF)                                  Industrial Process Logs (Representative sample)
                                                                                     EMS Trend Logs (Representative sample)
                                                                                     Other Plant Logs (Representative sample)

      Step 2:     Mail the Application and all required documentation to                                           Print ALL of the CHP Forms
                  the project's Project Coordinator.
                                                                                                                                   Print ALL CHP Forms


                              If you have questions about the Multifamily Performance Program, please contact NYSERDA toll free at
                                                 1-(877)-NY-SMART (1-877-697-6278) or email: mtc@nyserda.org

                   Complete the following information pertaining to the Host Site                                          Circle the appropriate response to each
           Fuel Commodity Supplier(s):                                                                                            question/statement below.
           Fuel Distribution Supplier(s):                                                                          The Host Site …
                  Fuel Peak Period:                                                                                … receives/will receive subsidized power from NYPA.
          Electric Commodity Supplier(s):                                                                                                                  Y             N
         Electric Distribution Supplier(s):                                                                        … pays the System Benefits Charge (SBC).
          Main Electric Account Number:                                                                                                                    Y             N
        Annual Electric Consumption (kWh):                                                                         … pays the Monthly Adjustment Clause (MAC).
           Electric Billing Peak Period*:                                                                                                                  Y             N
         Maximum Billing Demand (kW):                                                                              … consumes Consolidated Edison steam.
             Utility Electric Rate/Class                                                                                                                   Y             N
               Utility Fuel Rate/Class                                                                         If yes, then fill in the following:
      *Definition of Summer On Peak: Summer on-peak is the period May 1 to October 31 and the hours between 12       Current Usage (MMBtus):
                                pm and 6 pm, Monday to Friday, excluding holidays.                                  Proposed Usage (MMBtus):

            Type of Technology                          CHP System (Make/Model)                              Nameplate kW (kW)              Input Fuel - HHV (MMBtus)


      For Systems to be installed within the five Boroughs of New York City (pick one, and provide MEA number if it exists):
                 A Materials Equipment Acceptance (MEA) number exists, and is:
                 A letter from the Original Equipment Manufacturer (OEM) attesting that they will apply for an MEA is attached.


          CHP System             NOx (lbs/MWh)            SOx (lbs/MWh)            PM (lbs/MWh)            CO (lbs/MWh)           VOC (lbs/MWh)            CO2 (lbs/MWh)
         Emissions Rate




CHP Application                                                                    CHP.2                                                                                 Page 6 of 11
PON 1101                                                          f7baed2d-615a-42f4-aee9-0c3828359067.xls                                                    Date Printed: 7/28/2011
NYSERDA Enhanced C/I Performance Program                                         Version 3.0                                                                  Time Printed: 11:59 AM
      CHP.3: Applicant Short-Form Agreement
      Project Name                                                   0
                                       (Must be same as Participant/Company name from Section J
      Applicant Name                     of Program Application and Participation Agreement)



                                                                              (Applicant), the undersigned participant
      (Must be same as Participant/Company name from Section J of Program Application and Participation Agreement)in the New York Energy
      $mart SM Multifamily Performance Program administered by NYSERDA (hereafter, "the Performance Program"), recognizes and
      accepts that inclusion of a combined heat and power system in the Energy Reduction Plan, and receipt of any advanced measures
      incentive payments, is dependent upon the Applicant following all guidelines and procedures established for the Performance Program.
      Failure to comply with all Program guidelines and procedures could result in the repayment of any paid incentives and/or forfeit of any
      unpaid incentives.

      These requirements include, but are not limited to:

          o     Following program procedures as detailed in NYSERDA's CHP Systems Manual for Multifamily Projects.
          o     Meeting all submittal progress timelines.
          o     Meeting all documentation requests to NYSERDA's satisfaction.
          o     Preparing an acceptable M&V plan or agreeing to NYSERDA's M&V plan.
          o     Scheduling and providing access to project sites for inspections conducted by NYSERDA or its Technical Consultants.
          o     Being present at all inspections conducted by NYSERDA or its Technical Consultants.

      The Applicant understands that its eligibility for Performance Program advanced measures incentive payments is contingent on its meeting all
      of the requirements in the CHP Systems Manual for Multifamily Projects.




                     Applicant Representative Name                                             Applicant Representative Title




                   Applicant Representative Signature                                                      Date




CHP Application                                                              CHP.3                                                                 Page 7 of 11
PON 1101                                                    f7baed2d-615a-42f4-aee9-0c3828359067.xls                                    Date Printed: 7/28/2011
NYSERDA Enhanced C/I Performance Program                                   Version 3.0                                                  Time Printed: 11:59 AM
          CHP.4: Site Control Letter
          Project Name                                                   0
                                          (Must be same as Participant/Company name from Section J
          Applicant Name                    of Program Application and Participation Agreement)


          (Must be same as Participant/Company name from Section J of Program (Applicant), the undersigned Applicant, certifies that the Installer
          0                                                          is authorized to install the CHP System at the facility located at the address
          indicated below.




                                                                       (Project Address)

          The CHP system in this Multifamily Performance Program project is expected to achieve the following:

          Project Summary
                                                       Net Annual Energy Cost           Net Annual Electricity Generated                Program Checks
             Total Project Installed Cost ($)
                                                             Savings ($)                            (kWh)
                                                 $0                               $0                                        0.00      Consolidated Edison?
                                                                                                                                             FALSE
              Contracted Summer On-Peak                                                                                                  Project Status
                                                         Nameplate kW (kW)                  NOx Emissions (LB/MWh)
               Demand Reduction (kWspc)
                                               0.00                             0.00                                       0.00          Incentive Level
                                                                                                                                             $750.00
                                                          Annual Fuel Saved             Total Recovered Output Thermal                    Incentive Cap
               Annual Gas Used (MMBtus)
                                                             (MMBtus)                          Energy (MMBtus)                            $1,000,000.00
                                                                                                                                              S.I.R.
                                               0.00                             0.00                                        0.00
                                                                                                                                                0
                                                   Total CHP Incentive ($)
                                                                  $0

          The Applicant acknowledges that this Site Control Letter is needed to apply to NYSERDA for the CHP advanced measures incentives offered
          under the Multifamily Performance Program, but that NYSERDA shall not pay these incentives until the Applicant submits the deliverables
          indicated in the CHP Systems Manual for Multifamily Projects and fulfills its corresponding obligations as outlined in the Participation
          Agreement. In signing this form the Host Site also agrees to the following:

             A.     I hereby release NYSERDA, its officers, directors, members, agents, and employees from any and all claims, demands, losses,
                    judgments, penalties, causes of action, damages, costs, and expenses (including, without limitation, attorneys' fees and expenses), and
                    legal liability arising out of or in any way connected with, directly or indirectly, either the approval of this CHP project for advanced
                    measures incentives under the Multifamily Performance Program or the installation of the project, or both, including but not limited to
                    those in any way related to or arising from:
                                (1) injury or death of persons;
                                (2) injury to natural resources;
                                (3) violation of any local, State, or federal law or regulation, including, but not limited to, environmental laws or regulations;
                                (4) strict liability imposed by any law or regulation;
                                (5) equipment malfunctions; or
                                (6) energy savings shortfalls arising out of, or related to, or in any way connected with the project, or any actions or
                    The obligations under this paragraph shall survive any expiration or termination of the Participation Agreement that may be executed in
                    connection with this site.

             B.     I understand that NYSERDA, its officers, directors, members, agents, and employees have made no warranty or representation
                    regarding the qualifications of the Multifamily Performance Partner, Engineering Design Firm, CHP Installer, or Equipment Operator.
                    I understand that the Applicant is solely responsible for the selection of these entities to implement the project.

             C.     I will provide project site access for inspections and oversight of performance measurements for the CHP System to the Multifamily
                    Performance Partner, equipment installers, NYSERDA, and its Technical Consultant(s) during the term of the Participation Agreement
                    related to the project.

             D.     I agree that NYSERDA, its officers, directors, members, agents, and employees will have no role in resolving any disputes between the
                    Host Site and CHP Installer.

             E.     I certify that the CHP system (including equipment and supplies) included in this application was not purchased or installed prior to the
                    execution date of the Participation Agreement under the Multifamily Performance Program.


CHP Application                                                                 CHP.4                                                                             Page 8 of 11
PON 1101                                                       f7baed2d-615a-42f4-aee9-0c3828359067.xls                                                Date Printed: 7/28/2011
NYSERDA Enhanced C/I Performance Program                                      Version 3.0                                                              Time Printed: 11:59 AM
             F.    I guarantee that I have authority to contract, on behalf of the legal owners of the project site, for installation of the CHP system.

             G.    I certify that the electricity charges for the facility(ies) in the Application include either the System Benefits Charge (SBC) or Monthly
                   Adjustment Clause (MAC). Copies of recent electric distribution bill payment of the SBC or MAC or documentation from the
                   distribution utility must be attached. I hereby grant NYSERDA permission to request, and the distribution utility and electric supplier
                   to release, information about the account(s).

             H.    Publicity: NYSERDA may publicize the project's participation in the Performance Program, the results, the amount of incentives paid
                   to the Applicant and any other information that reasonably relates to the Applicant's participation, including photographs of the funded
                   CHP System.




                      Applicant Representative Signature                                                           Date




             Sworn to before me this                                             day of                                              , 200_____.




                                 Notary Public Signature                                           Stamp of Notary Public




CHP Application                                                                CHP.4                                                                             Page 9 of 11
PON 1101                                                      f7baed2d-615a-42f4-aee9-0c3828359067.xls                                                Date Printed: 7/28/2011
NYSERDA Enhanced C/I Performance Program                                     Version 3.0                                                              Time Printed: 11:59 AM
      CHP.5: Steam Customer Certification (if applicable)
     Project Name                                                   0
                                      (Must be same as Participant/Company name from Section J
     Applicant Name                     of Program Application and Participation Agreement)



     (Must be same as Participant/Company name from Section J        (Applicant) understands that the installation of the proposed Combined

     Heat and Power (CHP) system at                                           0                                   (Project Address) may

     change the building's applicable steam service tariff from Service Classification 2 to Service Classification 4 (Back-up / Supplementary

                                                                                    (Applicant) understands and accepts the
     Service). (Must be same as Participant/Company name from Section J of Program Application and Participation Agreement) implications

     of such a potential change, and will service at such applicable tariff when the CHP system is operational.


                                                            Applicant Signature Block




                    Applicant Representative Name                                               Applicant Representative Title




                  Applicant Representative Signature                                                         Date




CHP Application                                                             CHP.5                                                                    Page 10 of 11
PON 1101                                                   f7baed2d-615a-42f4-aee9-0c3828359067.xls                                        Date Printed: 7/28/2011
NYSERDA Enhanced C/I Performance Program                                  Version 3.0                                                      Time Printed: 11:59 AM
      CHP.6: Environmental Assessment Checklist
      Project Name                                               0
                                     (Must be same as Participant/Company name from Section J
      Applicant Name                   of Program Application and Participation Agreement)

       Please refer to Section 10.0 page 24 of the CHP Systems Manual for Instructions to complete the following.

        Line # CHP Unit Information
          1       Unit Manufacturer
          2         Model Number              0
          3           Model Year
          4      Nameplate kW (kW)            0
          5           Fuel Type               Natural Gas
          6     Distance to receptor (ft)

        Line # Noise
               Question                                                                                             Response
          7    What is the equipment noise rating in dBA?
          8    Does the unit comply with local noise code or ordinances? (where no local code exists use NYC code).    Y       N
          9    Will sound attenuation equipment (mufflers, silencers) be required to meet noise code?                  Y       N
          10   What sound attenuation equipment will be installed?
          11   If sound attenuation equipment is required, what will be the resultant noise rating in dBA?

        Line # Air Quality
               Question                                                                                             Response
          12   Q1. Is proposed unit between 60 kW and 5 MW?                                                            Y       N
          13   Q2. Is Annual Capacity between 30 to 75%?                                                               Y       N
          14   Q3. Are the emission factors equal to or less than the following?
          15            Q3a. NOx: 1.6 lb/MW-hr with CHP                                                                Y       N
         16a            Q3b. PM10: 0.21 lbs/MW-hr                                                                      Y       N
         16b            Q3b. PM2.5: 0.21 lbs/MW-hr                                                                     Y       N
          17            Q3c. CO: 6.33 lbs/MW-hr                                                                        Y       N
          18            Q3d. VOC: 2.26 lbs/MW-hr                                                                       Y       N
          19   Q4. Is the proposed CHP exhaust stack located on the tallest building onsite where reasonable?          Y       N

        Line # NYSERDA Air Quality Screening Assessment: Supplemental Datasheet Information
               Question                                     Response
          20   Q5. Exhaust Stack Height (feet above grade)                                                                 feet
          21   Q6. Exhaust Stack Internal Diameter (inches)                                                              inches
          22   Q7. Exhaust Gas Exit Velocity (ft/s)                                                                        ft/s
          23   Q8. Exhaust Gas Flowrate (acfm)                                                                            acfm
          24   Q9. Exhaust Gas Temperature (deg F)                                                                        deg F
          25   Q10. Exhaust NOx Emission Rate lbs/MW-hr                                                                lbs/MW-hr
         26a   Q11. Exhaust PM10 Emission Rate lbs/MW-hr                                                               lbs/MW-hr
         26b Q11. Exhaust PM2.5 Emission Rate lbs/MW-hr                                                                lbs/MW-hr
          27   Q12. Exhaust CO Emission Rate lbs/MW-hr                                                                 lbs/MW-hr
          28   Q13. Exhaust VOC Emission Rate lbs/MW-hr                                                                lbs/MW-hr




CHP Application                                                          CHP.6                                                               Page 11 of 11
PON 1101                                                f7baed2d-615a-42f4-aee9-0c3828359067.xls                                   Date Printed: 7/28/2011
NYSERDA Enhanced C/I Performance Program                               Version 3.0                                                 Time Printed: 11:59 AM

								