									 Jobs Bidding                                                                 April 7, 2008
------------------- APRIL 7 --------------------         ------------------- APRIL 7 --------------------
                                                         PLAN 098.01                           ROSEVILLE
PLAN 026.02                             NEWARK
                                                         BIDS 4/7/2008 AT 3:00 PM
BIDS 4/7/2008 AT 2:00 PM
                                                         2008 CAPE-SLURRY SEAL PROJECT
CLASSROOM FINISHES MODERNIZATIONS AT
                                                         DESCRIPTION: This project consists of cape and
GRAHAM AND SNOW ELEMENTARY SCHOOLS
                                                         slurry seal.
DESCRIPTION: Note: The Specs can be found in
                                                         PLANS AT SACRAMENTO/ROSEVILLE
Addenda 1F Folder Note: Plan Sheets A-3, D-1, D-
                                                         Online 08-00744
2 and all the Electrical plans were removed and are
no longer part of this project, an addendum will be      PLAN 205.05                         PLACER CO.
issued soon to explain it. This project consists of      BIDS 4/7/2008 AT 3:30 PM
modernization of existing elementary school
complexes, including complete with heating,              PLACER COUNTY SLURRY SEAL AT VARIOUS
ventilating and air conditioning system, plumbing        LOCATIONS SUMMER 2008
system, electrical system, fire protection system,       DESCRIPTION: This project consists of the
fixtures and equipment.                                  placement of Type I or II slurry seal on approx.
PLANS AT SACRAMENTO/ROSEVILLE                            sixteen (16) miles of County roads and streets. Type
Online 08-00562                                          II micro-surfacing on approx. nine (9) miles of County
                                                         roads and streets, and asphalt pavement seal coat
PLAN 029.01                        SISKIYOU CO           on approx. six (6) miles of County bike/pedestrian
BIDS 4/7/2008 AT 3:00 PM                                 PLANS AT SACRAMENTO/ROSEVILLE
                                                         Online 08-00761
NEW TAXIWAY - SCOTT VALLEY AIRPORT
DESCRIPTION: This project consists of the                PLAN 376.03                    SAN FRANCISCO
constructing of a new common-use hangar area             BIDS 4/7/2008 AT 2:00 PM
taxiway. The base bid also includes drainage and
painting work.                                           ULLOA ELEMENTARY SCHOOL MODERNIZATION
PLANS AT SACRAMENTO/ROSEVILLE                            AND INTERIM HOUSING
Online 08-00393                                          DESCRIPTION: This project consists of general
                                                         school modernization and reconstruction including
PLAN 041.03               WEST SACRAMENTO                accessibility and fire/life-safety upgrades, including
BIDS 4/7/2008 AT 2:00 PM                                 but not limited to interior and exterior painting at
                                                         affected areas that is part of the scope of work,
BRIDGEWAY LAKE TREES AT 3895 HENSHAW
                                                         installation of wheelchair lift, doors and door
ROAD
                                                         hardware, toilet partitions and accessories, fire alarm
DESCRIPTION: The work consists of the installation
                                                         devices and sprinkler system, play structure and
of an irrigation system, five valves and connection to
                                                         surfacing, stage stairs, handrails, guard rails and
an existing controller and the planting of approx. 157
                                                         drinking fountains, placement of six (6) relocatable
15-gallon trees. In addition, the work shall also
                                                         classroom buildings and ramps, misc. site work,
include the replacement of any pavement, sidewalk,
                                                         hazardous material/Asbestos remediation and other
curb and gutter or public and private improvements
                                                         misc. interior renovation work.
removed or damaged as a consequence of the
                                                         PLANS AT SACRAMENTO
execution of the Contract as well as, all necessary
                                                         Online 08-00544
traffic control.
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00706




Jobs Bidding                                                                                    April 7, 2008
 Jobs Bidding                                                                                           April 7, 2008


------------------- APRIL 8 --------------------              ------------------- APRIL 8 --------------------
                                                              PLAN 036.01                        SACRAMENTO
PLAN 007.07                        WOODLAND
                                                              BIDS 4/8/2008 AT 2:00 PM
BIDS 4/8/2008 AT 2:00 PM
                                                              BIKE LANE IMPROVEMENTS
2008 ROAD MAINTENANCE
                                                              DESCRIPTION: This project consists of striping bike
DESCRIPTION: This project consists of placing Type
                                                              lanes, and installing signs on San Juan Road
II slurry seal, Type II Scrub Cape Seal, Type II
                                                              (650 feet east of Zenobia Way/Pelican Court to
Scrub Cape Seal with Fabric, Type II MIcrosurfacing,
                                                              Northgate Blvd), J Street (from 55th Street to Carlson
Type II Micro Scrub Cape Seal, Type II Micro
                                                              Drive), and 43rd Avenue (from Riverside Drive to
Double Chip Scrub Cape Seal, Type II Micro Scrub
                                                              14th Street).
Seal with Fabric, and placing pavement stripes and
                                                              PLANS AT SACRAMENTO/ROSEVILLE
markings as well as other misc. work described in the
                                                              Online 08-00675
documents.
PLANS AT SACRAMENTO                                           PLAN 054.05                                 PINOLE
Online 08-00550                                               BIDS 4/8/2008 AT 10:30 AM
PLAN 012.02                           REDDING                 PINOLE SENIOR VILLAGE REPAIRS
BIDS 4/8/2008 AT 4:00 PM                                      DESCRIPTION: This project consists of installing
                                                              subdrains at the perimeter of part of the building and
SITE WORK FOR SHASTA HIGH SCHOOL
                                                              within the crawlspace, plugging existing underground
DESCRIPTION: This project consists of site grading,
                                                              lines at the building perimeter, protection and
site utilities and site improvements.
                                                              relocation of building utilities, a trench drain and
PLANS AT SACRAMENTO/ROSEVILLE
                                                              other items not mentioned that are required.
Online 08-00631
                                                              PLANS AT SACRAMENTO
PLAN 020.02                            NEWARK                 Online 08-00510
BIDS 4/8/2008 AT 2:00 PM                                      PLAN 071.01                              UC DAVIS
CLASSROOM FINISHES MODERNIZATIONS AT                          BIDS 4/8/2008 AT 2:00 PM
MULANI-MUSICK AND SCHILLING ELEM.
                                                              TRANSLATIONAL SHARED RESEARCH FACILITY
DESCRIPTION: Note: The Specs can be found in
                                                              DESCRIPTION: Note: There is a list of prequalified
Addenda 1F Folder Note: Plan Sheets A-3, D-1, D-2
                                                              design builders for this project. This project consists
and all the Electrical plans were removed and are no
                                                              of design and construct an approx. 2,500 GSF,
longer part of this project, an addendum will be
                                                              prefabricated modular BSL-2 laboratory building
issued soon to explain it. This project consists of
                                                              mounted on a concrete grade beam and pier
modernization of existing elementary school
                                                              foundation with a ventilated recessed concrete slab
complexes, including complete with heating,
                                                              crawl space. Provide complete utilities, site
ventilating and air conditioning system, plumbing
                                                              development and landscaping to form a complete
system, electrical system, fire protection system,
                                                              and habitable environment for the research functions.
fixtures and equipment.
                                                              Work includes, site grading, paving and landscape;
PLANS AT SACRAMENTO/ROSEVILLE
                                                              form work and concrete foundation; prefabricated
Online 08-00563
                                                              building modular fabrication and installation;
PLAN 032.07                          OAKLAND                  complete electrical, plumbing and mechanical
BIDS 4/8/2008 AT 2:30 PM                                      service including fire alarm and fire sprinklers; and all
                                                              other items required to complete a functional
OAKLAND TECHNICAL HIGH SCHOOL ACCESS                          laboratory facility.
CONTROLS AND MODIFICATIONS                                    PLANS AT SACRAMENTO
DESCRIPTION: This project consists of addition and            Online 08-00648
modifications to the site access control system.
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00472




Jobs Bidding                                                                                           April 7, 2008
                                                        -2-
 Jobs Bidding                                                                                       April 7, 2008


------------------- APRIL 8 --------------------               ------------------- APRIL 8 --------------------
                                                               PLAN 171             10-ALP-207 ALPINE CO.
PLAN 072.02                            MODESTO
                                                               BIDS 4/8/2008 AT 2:00 PM
BIDS 4/8/2008 AT 11:00 AM
                                                               DOT 10-0M8404 RESURFACING HIGHWAY WITH
DOWNSTREAM WATER SYSTEM IMPROVE-
                                                               HMA
MENTS TIER 1 PRIORITY 1 - 2 TURNOUTS
                                                               DESCRIPTION: This project consists of resurfacing
DESCRIPTION: No description given. Per the Table
                                                               highway with HMA.
of Contents bids needed for the following work:
                                                               PLANS AT SACRAMENTO
Site work; concrete; misc. metals; finishes;
                                                               Online 08-00542
equipment mounting; turnout building; mechanical
PLANS AT SACRAMENTO/ROSEVILLE                                  PLAN 171       03-SAC-104 SACRAMENTO CO.
Online 08-00483                                                BIDS 4/8/2008 AT 2:00 PM
PLAN 115.03                          VACAVILLE                 DOT 03-2M9704 SEAL COAT AND REPLACE AC
BIDS 4/8/2008 AT 2:00 PM                                       SURFACING
                                                               DESCRIPTION: This project consists of seal coat
2008 SLURRY SEAL
                                                               and replace AC surfacing.
DESCRIPTION: This project consists of the
                                                               PLANS AT SACRAMENTO
placement of crack seal, slurry seal, traffic stripes,
                                                               Online 08-00610
pavement markings, pavement markers and removal
and replacement of street signs to meet current                PLAN 171              03-NEV, SAC, SUT-49
standards on various City streets, bike paths, parking                             NEV, SAC & SUTTER CO
lots and other misc. City properties; placement of
                                                               BIDS 4/8/2008 AT 2:00 PM
surface seal coat and striping on sport courts; and
performance, placement, construction or installation           DOT 03-2E9004 COLD PLANE-PLACE AC-OPEN
of such other items or details not mentioned above,            GRADED AC-MBGR-MODIFY LIGHTING
which are required by the plan set.                            DESCRIPTION: This project consists of col plane,
PLANS AT SACRAMENTO/ROSEVILLE                                  place AC, open graded AC, and MBGR; modify
Online 08-00558                                                PLANS AT SACRAMENTO
                                                               Online 08-00612
PLAN 118.01                          ELK GROVE
BIDS 4/8/2008 AT 2:00 PM
                                                               PLAN 171              02-TEH-5 TEHAMA CO.
                                                               BIDS 4/8/2008 AT 2:00 PM
FIRE ALARM-LOW VOLTAGE INFRASTRUCTURE
AT ELK GROVE HIGH SCHOOL                                       DOT 02-0C3004 SCOUR MITIGATION
DESCRIPTION: Work includes installation of fire                DESCRIPTION: This project consists of scour
alarm and low voltage infrastructure, patching of roof         mitigation.
and ceiling tiles where cutting occurs, painting of            PLANS AT SACRAMENTO
exposed conduit, and other associated work.                    Online 08-00615
PLANS AT SACRAMENTO/ROSEVILLE                                  PLAN 171        01-HUM-101 HUMBOLDT CO.
Online 08-00749
                                                               BIDS 4/8/2008 AT 2:00 PM
PLAN 171                     04-SOL, NAP-80                    DOT 01-479804 REPLACE ASPHALT CONCRETE
                         SOLANO & NAPA CO.                     SURFACING
BIDS 4/8/2008 AT 2:00 PM                                       DESCRIPTION: This project consists of replace
DOT 04-4A5344 INSTALL WIRELESS                                 asphalt concrete surfacing.
MAGNETOMETER VEHICLE DETECTION                                 PLANS AT SACRAMENTO
STATION                                                        Online 08-00616
DESCRIPTION: This project consists of install
wireless magnetometer vehicle detection station at
various locations.
PLANS AT SACRAMENTO
Online 08-00417



Jobs Bidding                                                                                       April 7, 2008
                                                         -3-
 Jobs Bidding                                                                                       April 7, 2008


------------------- APRIL 8 --------------------            ------------------- APRIL 8 --------------------
                                                            PLAN 203.03                          PITTSBURG
PLAN 171        04-CC-680 CONTRA COSTA CO.
                                                            BIDS 4/8/2008 AT 2:00 PM
BIDS 4/8/2008 AT 2:00 PM
                                                            2008 CAPE-SLURRY SEAL PROGRAM
DOT 04-4A2404 REPLACE EXISTING RETAINING
                                                            DESCRIPTION: The work consists of placing a cape
WALL
                                                            seal and slurry seal on various streets in the City of
DESCRIPTION: This project consists of replace
                                                            Pittsburg.
existing retaining wall.
                                                            PLANS AT SACRAMENTO/ROSEVILLE
PLANS AT SACRAMENTO
                                                            Online 08-00689
Online 08-00617
                                                            PLAN 209.03                                  LODI
PLAN 171            04-ALA-13 ALAMEDA CO.
                                                            BIDS 4/8/2008 AT 10:00 AM
BIDS 4/8/2008 AT 2:00 PM
                                                            LOCKEFORD ELEMENTARY SCHOOL ADDITIONS
DOT 04-3A5904 CONSTRUCT CONCRETE
                                                            INC. 3 MODULAR BUILDINGS
BARRIER AND RAMP WIDENING
                                                            DESCRIPTION: This project consists of site and/or
DESCRIPTION: This project consists of construct
                                                            building modifications on the Lockeford Elementary
concrete barrier and ramp widening.
                                                            School Addition, Increment 3, Modular Buildings. In
PLANS AT SACRAMENTO
                                                            preparing your proposal, please take into
Online 08-00618
                                                            consideration the following requirements: The
PLAN 171           10-SJ-5 SAN JOAQUIN CO.                  construction delivery method shall be Lease
BIDS 4/8/2008 AT 2:00 PM                                    Leaseback. A facilities and site lease will be
                                                            executed for the project.
DOT 10-0M5004 CONCRETE SLAB                                 PLANS AT SACRAMENTO
REPLACEMENT                                                 Online 08-00693
DESCRIPTION: This project consists of concrete
slab replacement.                                           PLAN 264.01                          PITTSBURG
PLANS AT SACRAMENTO                                         BIDS 4/8/2008 AT 11:00 AM
Online 08-00624
                                                            2008 PATCH PAVING PROGRAM
PLAN 175.07                     SACRAMENTO                  DESCRIPTION: The Patch Paving Program Contract
BIDS 4/8/2008 AT 2:00 PM                                    involves removing failed asphalt concrete and base
                                                            material, compaction of existing sub-base material,
JOHN F. KENNEDY HIGH SCHOOL METAL                           and replacing the same with an equivalent amount of
ROOFING REPLACEMENT                                         asphalt concrete at various locations in the city.
DESCRIPTION: This project consists of metal roof            PLANS AT SACRAMENTO
replacement.                                                Online 08-00645
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00469                                             PLAN 273.01                        MENLO PARK
PLAN 184.04                              PINOLE             BIDS 4/8/2008 AT 2:00 PM
BIDS 4/8/2008 AT 10:00 AM                                   TERMINAL AVENUE SITE REMEDIATION
                                                            DESCRIPTION: This project consists of excavation
STORM DRAIN IMPROVEMENTS WRIGHT                             support, excavation, stockpiling, loading,
AVENUE AT TOWNS COURT                                       transportation and legal disposal of impacted soil and
DESCRIPTION: This project consists of installation          debris; backfill of excavation, and management and
of CIPP at various locations throughout the City of         disposal of groundwater including all necessary
Pinole.                                                     labor, equipment, materials, transportation and
PLANS AT SACRAMENTO/ROSEVILLE                               disposal fees described in the scope of work as
Online 08-00680                                             outlined in the technical specs.
                                                            PLANS AT SACRAMENTO/ROSEVILLE
                                                            Online 08-00659




Jobs Bidding                                                                                       April 7, 2008
                                                      -4-
 Jobs Bidding                                                                                            April 7, 2008


------------------- APRIL 8 --------------------               ------------------- APRIL 8 --------------------
                                                               PLAN 530.04                               NOVATO
PLAN 284.01                           OAKDALE
                                                               BIDS 4/8/2008 AT 2:00 PM
BIDS 4/8/2008 AT 2:00 PM
                                                               WELLS FARGO BANK TENANT IMPROVEMENTS
ROYSE MEMORIAL POOL SURFACE
                                                               DESCRIPTION: This project consists of tenant
RENOVATION - RECOAT
                                                               improvements to an existing approx. 4,000 SF
DESCRIPTION: This project consists of recoat the
                                                               building. Bids needed for, but not limited to,
Royse Memorial Pool surface. Work to be performed
                                                               demolition (hard and soft), testing and inspections
between 5/5/08 and 6/6/08.
                                                               (rebar, vault concrete slab), concrete patch, rebar,
PLANS AT SACRAMENTO/ROSEVILLE
                                                               structural steel, misc. metals, metal stud framing and
Online 08-00759
                                                               drywall, carpentry, building insulation, roofing (patch),
PLAN 371.03                        MENDOCINO                   flashing and associated sheet metal, sealant and
BIDS 4/8/2008 AT 2:00 PM                                       caulking, metal and wood doors and frames, finish
                                                               hardware, storefront, glass and glazing, gypsum
MENDOCINO K-8 CAMPUS                                           drywall, painting, suspended acoustical ceiling, FRP,
DESCRIPTION: This project generally consists of the            resilient flooring, tile, carpeting, identifying devices,
development of a new K-8 campus on the current                 toilet accessories, signs, fire extinguisher and
Grammar and Middle School Campuses over a three                cabinets, plumbing, HVAC, fire protection and fire
phase project of the following general sequence:               alarm. ELECTRICAL is by others.
Phase 1 - Site access, utility provisions,                     PLANS AT SACRAMENTO
modernization of existing grammar school building              Online 08-00751
and construction of four new type V, single story
structures and associated site work. Phase 2 -                 ------------------- APRIL 9 --------------------
modernization of existing middle school buildings,
provision of hardtop play courts and associated site           PLAN 017.01                               MERCED
work. Phase 3 - removal of existing portable                   BIDS 4/9/2008 AT 2:00 PM
classroom infrastructure and remainder of site work.
PLANS AT SACRAMENTO                                            ACADEMIC AFFAIRS MODULAR UNITS -
Online 08-00426                                                TRAILERS - TRADE PACKAGES 1.1 AND 1.2
                                                               DESCRIPTION: This project consists of two trade
PLAN 375.03                   SAN FRANCISCO                    packages as follows: Trade Package 1.1 - Site
BIDS 4/8/2008 AT 2:00 PM                                       utilities, earthwork, paving, grading, curbs, gutters
                                                               and sidewalks. Trade Package 1.2 - Site Electrical.
CCSF OCEAN CAMPUS-BALBOA RESERVOIR
                                                               PLANS AT SACRAMENTO/ROSEVILLE
DEV. SITE WORK PACKAGES 1.1 - 1.4
                                                               Online 08-00677
DESCRIPTION: NOTE: The following Bid Packages
are bidding on two different dates as follows: BP              PLAN 063.10                           LIVERMORE
1.1 & BP 1.2 bids on 4/15; BP 1.3 and BP 1.4 bids on           BIDS 4/9/2008 AT 2:30 PM
4/8. NOTE: Some of the Plan Sheets were received
unreadable, they are from 1940 when the project was            WATER RECLAMATION PLANT COGENERATION
originally built. Note: There are four (4) Bid                 SYSTEM SITE PREPARATION
Packages for this project as follows: 1.1 Geothermal           DESCRIPTION: The work comprises the
System, horizontal piping, trenching and backfill; 1.2         construction of site work, a concrete pad, digester
Grading and Backfill for Joint use facility and area           gas piping improvements, hot water system
west of joint use facility; 1.3 Abatement and                  improvements, potable water, compressed air and
demolition of Gymnasiums and Dance Studio; and                 drainage improvements and electrical and
1.4 Construct 2 new parking lots +/- 70,000                    instrumentation improvements required to support
PLANS AT SACRAMENTO                                            installation o by other of future Cogeneration System.
Online 08-00498                                                The work also comprises of providing a 480V draw-
                                                               out walk-in switchgear, a liquid filled substation
                                                               transformer, related civil, structural and electrical
                                                               work.
                                                               PLANS AT SACRAMENTO/ROSEVILLE
                                                               Online 08-00630

Jobs Bidding                                                                                            April 7, 2008
                                                         -5-
  Jobs Bidding                                                                                          April 7, 2008

------------------- APRIL 9 --------------------                 ------------------- APRIL 9 --------------------
PLAN 064.04                           VACAVILLE                  PLAN 103.03                          CONCORD
BIDS 4/9/2008 AT 2:00 PM                                         BIDS 4/9/2008 AT 11:00 AM
DOBBINS ST-EAST MONTE VISTA AVE                                  TENANT IMPROVEMENTS PHASE 1 STUDENT
INTERSECTION IMPROVEMENTS-BRIDGE                                 UNION AT CSU EAST BAY
WIDENING                                                         DESCRIPTION: NOTE: THIS IS A COMBINED BID
DESCRIPTION: This project consists of bridge                     PROJECT WITH PLAN NO. 111.06 SBXS08-00431
widening, roadway improvements and widening the                  WHICH IS PHASE 2. This project consists of the
intersection of Dobbins Street and East Monte Vista              Interior remodel of former food service kitchen space
Avenue and the Ulatis Creek Bridge. Additional work              to retail/prepackaged food market. New lighting and
includes construction of a right turn pock on                    improved acoustical absorption will be provided at
northbound Dobbins Street, traffic signal                        the Cafe seating space. This phase also includes
improvements to all four corners of the intersection,            upgrades to accessibility components for toilets;
street lighting, roadway reconstruction and asphalt              drinking fountains; phones and signage.
concrete overlay on Dobbins Street and East Monte                PLANS AT SACRAMENTO/ROSEVILLE
Vista Avenue, minor concrete work, water and storm               Online 08-00430
drainage improvements, utility relocation's, bridge
construction work, stream improvements to Ulatis                 PLAN 111.06                          CONCORD
Creek, signing, striping and all other work                      BIDS 4/9/2008 AT 11:00 AM
appurtenant and incidental to completion of the                  TENANT IMPROVEMENTS PHASE 2 STUDENT
PLANS AT SACRAMENTO/ROSEVILLE                                    UNION AT CSU EAST BAY
Online 08-00632                                                  DESCRIPTION: NOTE: THIS IS A COMBINED BID
                                                                 PROJECT WITH PLAN NO. 103.03 SBXS08-00430
PLAN 079.01                                 TRACY                WHICH IS PHASE 1. This project consists of the
BIDS 4/9/2008 AT 3:00 PM                                         interior remodel to open up the existing student
CIVIC CENTER EXPANSION PHASE 3B AND 3C                           lounge area by removing glass block walls and
DESCRIPTION: NOTE: Plan Sheet M2.1D is not                       upgrading finishes. The multi-purpose room (former
legible. This project consists of, but not limited to,           Bookstore space) also has upgraded finishes to
non-structural room configurations, replacement floor            improve its functionality and acoustics.
and ceiling finishes, ADA upgrades, re-roofing,                  PLANS AT SACRAMENTO/ROSEVILLE
replacement of HVAC system, structural                           Online 08-00431
improvements, replacement of electrical switchgear,
lighting, telephone and data, fire alarm systems, fire           PLAN 131.01                           OAKLAND
sprinkler system, mechanical screening, painting,                BIDS 4/9/2008 AT 2:00 PM
carpeting and other minor improvements. The work                 PERALTA ELEMENTARY SCHOOL
for Phase 3C includes but not limited to installation of         MODERNIZATION
emergency power generator system including                       DESCRIPTION: This project consists of
enclosure.                                                       modernization of the existing Peralta Elementary
PLANS AT SACRAMENTO/ROSEVILLE                                    School: Toilet room renovations including some ADA
Online 08-00667                                                  upgrades, playground and courtyard paving, site and
                                                                 interior lighting, acoustic separation of classrooms,
PLAN 097.02                       SACRAMENTO                     ADA accessibility for Multipurpose room and misc.
BIDS 4/9/2008 AT 2:00 PM                                         other repairs and improvements.
GRANT HIGH SCHOOL PAVING PROJECT                                 PLANS AT SACRAMENTO/ROSEVILLE
DESCRIPTION: This project consists of grading,                   Online 08-00588
installation of new sub-base, repair and replacement
of existing parking lots, drive aisles including
pulverization, new asphaltic concrete paving,
Portland cement concrete paving and striping.
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00709



Jobs Bidding                                                                                           April 7, 2008
                                                           -6-
 Jobs Bidding                                                                                        April 7, 2008


------------------- APRIL 9 --------------------                ------------------- APRIL 9 --------------------
                                                                PLAN 171           03-NEV-5711 NEVADA CO.
PLAN 134.02               CONTRA COSTA CO.
                                                                BIDS 4/9/2008 AT 2:00 PM
BIDS 4/9/2008 AT 1:30 PM
                                                                DOT 03-2C8104 NEW SAND STORAGE FACILITY
SAN PABLO DAM SEISMIC UPGRADES
                                                                TO BE BUILT
DESCRIPTION: This project consists of: Excavation
                                                                DESCRIPTION: This project consists of new sand
of existing downstream buttress; in-situ treatment of
                                                                storage facility to be built.
alluvium beneath existing buttress using cement
                                                                PLANS AT SACRAMENTO
deep soil mixing techniques; construction of a new
                                                                Online 08-00613
enlarged downstream buttress; construction of
retaining wall around outlet portal structure; install-         PLAN 171                03-SIE-89 SIERRA CO.
lation of geotechnical instrumentation; re-grading and          BIDS 4/9/2008 AT 2:00 PM
re-paving of service road; and site restoration.
PLANS AT SACRAMENTO/ROSEVILLE                                   DOT 03-0E7704 INSTALL WILDLIFE CROSSING -
Online 08-00429                                                 CULVERT
                                                                DESCRIPTION: This project consists of install
PLAN 138.09                   CASTRO VALLEY                     wildlife crossing (culvert).
BIDS 4/9/2008 AT 3:00 PM                                        PLANS AT SACRAMENTO
                                                                Online 08-00614
CANYON MIDDLE SCHOOL LIBRARY - SCIENCE
ALTERATIONS                                                     PLAN 171             04-SOL-80 SOLANO CO.
DESCRIPTION: No description given. Per the Table                BIDS 4/9/2008 AT 2:00 PM
of Contents bids needed from all trades EXCEPT
Div-04 Masonry, Div-11 Equipment, Div-12 Special                DOT 04-0E8104 TREAT BRIDGE DECK-REPLACE
Construction and Div 14-Conveying Systems.                      JOINT SEALS-REPAIR APPROACH SLABS
PLANS AT SACRAMENTO                                             DESCRIPTION: This project consists of treat bridge
Online 08-00769                                                 deck, replace joint seals and repair approach
                                                                PLANS AT SACRAMENTO
PLAN 153.01                    SAN FRANCISCO                    Online 08-00620
BIDS 4/9/2008 AT 2:00 PM                                        PLAN 171          10-M[A-140 MARIPOSA CO.
MARSHALL ELEMENTARY SCHOOL                                      BIDS 4/9/2008 AT 2:00 PM
MODERNIZATION
DESCRIPTION: This project consists of general                   DOT 10-0G1504 CONSTRUCT TURNOUT AND
school modernization and reconstruction including               PAVE SHOULDER
ADA access and fire/life-safety upgrades, including             DESCRIPTION: This project consists of construct
but not limited to interior and exterior painting at            turnout and pave shoulder.
affected areas, elevator upgrade, misc. site work,              PLANS AT SACRAMENTO
play structure installation, hazardous material/                Online 08-00625
asbestos remediation and other misc. interior                   PLAN 171                 06-KER-58 KERN CO.
renovation work.
                                                                BIDS 4/9/2008 AT 2:00 PM
PLANS AT SACRAMENTO
Online 08-00578                                                 DOT 06-0H8404 PLACE RUBBERIZED HMA
                                                                BONDED WEARING COURSE
PLAN 171               04-CC, ALA-4                             DESCRIPTION: This project consists of place
        ALAMEDA & CONTRA COSTA CO                               rubberized HMA bonded wearing course.
BIDS 4/9/2008 AT 2:00 PM                                        PLANS AT SACRAMENTO
                                                                Online 08-00627
DOT 04-4A5354 INSTALL WIRELESS
MAGNETOMETER VEHICLE DETECTION
STATION
DESCRIPTION: This project consists of install
wireless magnetometer vehicle detection station.
PLANS AT SACRAMENTO
Online 08-00418


Jobs Bidding                                                                                        April 7, 2008
                                                          -7-
  Jobs Bidding                                                                                         April 7, 2008


------------------- APRIL 9 --------------------                ------------------- APRIL 9 --------------------
                                                                PLAN 208.01                           MARTINEZ
PLAN 171              06-FRE-180 FRESNO CO.
                                                                BIDS 4/9/2008 AT 2:00 PM
BIDS 4/9/2008 AT 2:00 PM
                                                                DAFT POLYMER SYSTEM IMPROVEMENTS -
DOT 06-0G5604 INSTALL CURED-IN-PLACE PIPE
                                                                REBID
LINERS
                                                                DESCRIPTION: The work generally consists of
DESCRIPTION: This project consists of install cured-
                                                                demolition of dry polymer batching equipment and
in-place pipe liners.
                                                                construction of new liquid polymer batching
PLANS AT SACRAMENTO
                                                                equipment.
Online 08-00628
                                                                PLANS AT SACRAMENTO/ROSEVILLE
PLAN 180.01                         MERCED CO.                  Online 08-00555
BIDS 4/9/2008 AT 2:00 PM                                        PLAN 250.01                        SUNNYVALE
REPLACEMENT OF EIGHT 156 INCH BUTTERFLY                         BIDS 4/9/2008 AT 3:00 PM
VALVES AT GIANELLI PUMPING PLANT
                                                                ROOF REPLACEMENT-UPPER FLEET-LOWER
DESCRIPTION: This project includes, but is not
                                                                FLEET-MIDDLE FLEET-METER SHOP AND
limited to the following principal features: 1. Removal
                                                                STORE
of existing equipment including set of eight 156-inch
                                                                DESCRIPTION: This project consists of removing the
pump-turbine isolation (PTI) valve assemblies
                                                                existing roof system and replacing it with a modified
including pipe spools, valve actuators, hydraulic
                                                                bitumen system according to plans and specs.
power units (HPU), sleeve couplings, and
                                                                PLANS AT SACRAMENTO/ROSEVILLE
appurtenances and disposal of the above equipment
                                                                Online 08-00714
from the work site to safe disposal site as the
Contractor's property. 2. Designing, fabricating and            PLAN 280.02                           BELMONT
testing a bi-plane PTI valve assembly model and                 BIDS 4/9/2008 AT 2:00 PM
furnishing a PTI model test program report. 3.
Designing, manufacturing, delivering to the work site,          SANITARY SEWER REHABILITATION - PIPE
assembling, installing and testing eight 156-inch PTI           LINING AND SPOT REPAIR, ETC.
valve assemblies and appurtenances to replace                   DESCRIPTION: This project consists of installing
existing equipment. 4. Design, installation and                 approx. 7,398 LF of 6-inch in streets and 1,707 LF of
testing requirement, etc. See specification Notice to           6-inch pipeliner in easements using folded and
PLANS AT SACRAMENTO/ROSEVILLE                                   reformed PVC liner or polyester resin impregnated
Online 08-00259                                                 cured in place pipe and pipe burst 721 LF of 6-inch
                                                                VCP with 6-inch HDPE. Work also includes 16 spot
PLAN 196.02                       PLACERVILLE                   repairs, 4 new manholes (replacing cleanouts), and
BIDS 4/9/2008 AT 2:00 PM                                        79 manhole rehabilitations. There area
                                                                approx. 207 service connections to be reestablished
BUILDINGS A AND B COOLING TOWER
                                                                in the sections to be lined.
REPLACEMENT
                                                                PLANS AT SACRAMENTO
DESCRIPTION: This project involves replacement of
                                                                Online 08-00672
the existing cooling tower for Buildings A and B with
a new energy efficient, factory assembled, cross flow           PLAN 380.03                          BERKELEY
cooling tower with vertical air discharge.                      BIDS 4/9/2008 AT 5:00 PM
PLANS AT SACRAMENTO
Online 08-00760                                                 THE OLD GROVE DEVELOPMENT PROJECT - 148
                                                                RENTAL APARTMENTS
                                                                DESCRIPTION: This project consists of the
                                                                construction of 148 rental apartments, underground
                                                                parking, and ground-floor retail. This is Bid Package
                                                                2: All scopes of work needed EXCEPT Demo,
                                                                Earthwork, Shoring, Dewatering and Fire Sprinkler.
                                                                PLANS AT SACRAMENTO
                                                                Online 08-00597


Jobs Bidding                                                                                          April 7, 2008
                                                          -8-
  Jobs Bidding                                                                                           April 7, 2008

------------------- APRIL 9 --------------------                ------------------ APRIL 10 --------------------
PLAN 438.05                       SACRAMENTO                    PLAN 060.05                               ARCATA
BIDS 4/9/2008 AT 2:00 PM                                        BIDS 4/10/2008 AT 3:00 PM
STEVE JONES PARK - ONLINE ONLY                                  CREEKVIEW RESIDENCE HALL EXTERIOR
DESCRIPTION: This project consists of, but not                  PAINTING AT HUMBOLDT STATE UNIVERSITY
limited to, clearing, grubbing, grading, drainage,              DESCRIPTION: This project consists of painting the
irrigation, landscaping, concrete pavement, picnic              exterior of the Creekview Residence Hall Complex,
area, play equipment, shade structure and open                  which includes four 4-story residence halls and the 2-
PLANS AT ONLINE                                                 story Creekside Lounge building.
Online 08-00592                                                 PLANS AT SACRAMENTO
                                                                Online 08-00699
------------------ APRIL 10 --------------------
                                                                PLAN 065.09                          ELK GROVE
PLAN 003.06                          ELK GROVE                  BIDS 4/10/2008 AT 10:00 AM
BIDS 4/10/2008 AT 2:00 PM                                       KUNSTING FAMILY PARK
COSUMNES CSD YOUTH CENTER BUILDING                              DESCRIPTION: This project consists of the
ROOF REPLACEMENT                                                construction of a 7.8 acre park site, which generally
DESCRIPTION: This project consists of removal and               includes: clearing, grubbing, grading and drainage;
replacement of roof of the CCSD Youth Center                    construction of a parking lot, two half-court basketball
Building.                                                       courts, concrete walkways, curbing, mowing strips
PLANS AT SACRAMENTO                                             and a decomposed granite jogging path; construction
Online 08-00750                                                 of a meditation/reflex9ology area; a children's water
                                                                play area and playground and skate board area;
PLAN 039.07                  SACRAMENTO CO.                     installation of adult fitness equipment, park furniture,
BIDS 4/10/2008 AT 2:00 PM                                       shade structures and prefabricated restroom; lighting
Q STREET-RIO LINDA BLVD STORM DRAIN                             and other electrical work; an irrigation system and
IMPROVEMENT                                                     the establishment of landscaping.
DESCRIPTION: This project consists of installing                PLANS AT SACRAMENTO
approx. 2,340 LF of storm drain pipe, 11 drainage               Online 08-00633
inlets, 14 manholes, one outfall structure, eliminating
358 LF of roadside ditches, removing and replacing
curb gutter and sidewalk, relocating sewer services
and all other work specified on the plans
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00508
PLAN 044.01                            SAN JOSE
BIDS 4/10/2008 AT 3:00 PM
PAVING MAINTENANCE 2008
DESCRIPTION: This project consists of asphalt joint
and crack filling, grading, connecting to existing drop
inlet, asphalt concrete paving, chain link fencing,
parking bumpers, asphalt pavement repair, site
demolition, lime soil stabilization, storm drainage,
pavement marking, headerboards, asphalt emulsion
sealer, site utility repair.
PLANS AT SACRAMENTO
Online 08-00767




Jobs Bidding                                                                                            April 7, 2008
                                                          -9-
  Jobs Bidding                                                                                                April 7, 2008


------------------ APRIL 10 --------------------                    ------------------ APRIL 10 --------------------
                                                                    PLAN 125.02                              OAKLAND
PLAN 073.02                            BUTTE CO.
                                                                    BIDS 4/10/2008 AT 2:00 PM
BIDS 4/10/2008 AT 10:00 AM
                                                                    OAKLAND HS WILLIAMS SETTLEMENT REPAIRS
CONSTRUCTION OF AGUAS FRIAS ROAD
                                                                    - LIGHTING PRE-ORDER
BRIDGE ACROSS BUTTE CREEK
                                                                    DESCRIPTION: This project consists of providing
DESCRIPTION: Note: Plans are on 11 x 17 inch
                                                                    lighting fixtures, lamps, etc., as designed from the
paper. This project will replace two existing bridges
                                                                    plans and specs.
(12C-0233) and (12C-00234) and a sharp "S"
                                                                    PLANS AT SACRAMENTO/ROSEVILLE
roadway curvature with a new 318 meter (1,043 ft)
                                                                    Online 08-00650
long bridge and raised approach fill roadway on a
north-south tangent alignment touching down to                      PLAN 135.02                 AMERICAN CANYON
existing Aguas Frias Road approx. 283 and 419                       BIDS 4/10/2008 AT 2:00 PM
meters (928 ft and 1,375 ft) respectively from both
north and south levees. The new two-lane bridge will                AMERICAN CANYON HIGH SCHOOL INC. 1 -
provide 8.5 meter (28 ft) clear roadway between                     SITEWORK - 10 BID PACKAGES
concrete barrier railings. The new prestressed box                  DESCRIPTION: Note: Addenda 1 has been
girder type bridge will consist of six 43 meter (141 ft)            incorporated into the plan set. Increment 2 plans are
long spans and two 30 meter (98 ft) long end spans,                 for reference. There are 10 separate bid packages
all supported on single column bents and end                        as follows: 01-sitework; 02-site concrete; 03-tennis
abutments. At least two of the proposed column                      court surfacing; 04-fencing and backstops; 05-
bents will be constructed within the live channel of                synthetic turf; 06-track surfacing; 07-striping; 08-
Butte Creek. Adjacent levee approaches will be re-                  shotcrete retaining wall; 09-concrete bridge; and 10-
configured to conform to the new structure resulting                site electrical. This project consists of, but not limited
in the replacement of a drainage outfall into Butte                 to, site demolition, earthwork, grading, asphalt
Creek and the realignment of two irrigation                         concrete paving, SWPPP/erosion control, lime
PLANS AT SACRAMENTO                                                 treatment of existing soils, utilities including storm,
Online 08-00649                                                     sewer, water, gas, hazmat controls, site concrete,
                                                                    site concrete reinforcement, tennis court surfacing;
PLAN 100.08                    SAN FRANCISCO                        stripings, synthetic turf, track surfacing, fencing and
BIDS 4/10/2008 AT 3:00 PM                                           site electrical and utility company installation.
                                                                    PLANS AT SACRAMENTO/ROSEVILLE
MISSION BAY BLDG 20 HOUSING RETAIL BUILD-
                                                                    Online 08-00774
OUT ATM INSTALLATION
DESCRIPTION: Prior to any work, Contractor is to x-                 PLAN 148.02                            SAN MATEO
ray ceiling slab above for location of existing post                BIDS 4/10/2008 AT 2:00 PM
tension cables. New work shall consist of, but is not
limited to, selective demolition of existing walls,                 SATELLITE WAGERING FACILITY AT SAN MATEO
flooring, and plumbing located at existing retail space             CO. EVENT CENTER
on the ground floor of the east building. Contractor                DESCRIPTION: This project will include: Remodel
shall cap all abandoned power, utilities, and receive               approx. 16,100 SF of existing building 2wit 4,000 SF
approval from the University before starting any new                of new construction and additive alternate of approx.
work. Work also includes construction of new walls,                 8,000 SF of new construction.
doors, floor, painting, wall finishes, and new                      PLANS AT SACRAMENTO
installation of automated teller machines (ATM).                    Online 08-00694
ATMs to be supplied and anchored to finished
concrete floor by ATM vendor (Hamilton Pacific).
New electrical, mechanical, fire alarm and sprinkler
work are also part of this project.
PLANS AT SACRAMENTO
Online 08-00745




Jobs Bidding                                                                                                 April 7, 2008
                                                           - 10 -
 Jobs Bidding                                                                                               April 7, 2008


------------------ APRIL 10 --------------------                  ------------------ APRIL 10 --------------------
                                                                  PLAN 221.04                                OAKLEY
PLAN 151.04                             REDDING
                                                                  BIDS 4/10/2008 AT 2:00 PM
BIDS 4/10/2008 AT 2:00 PM
                                                                  2008 SLURRY SEAL
FAIRFIELD INN AND SUITES
                                                                  DESCRIPTION: This project consists, in general, of
DESCRIPTION: NOTE: Bids are NOT being
                                                                  surface preparation, digouts, crack sealing, slurry
requested for the following trades: Material Testing,
                                                                  seal, striping, signing and traffic control, and various
Special Inspections, Construction Staking, Div-02
                                                                  other items.
Earthwork, Site Utilities, Paving, Sealing and
                                                                  PLANS AT SACRAMENTO/ROSEVILLE
Striping. Bids needed from all other trades.
                                                                  Online 08-00701
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00690                                                   PLAN 223.05                                OAKLEY
PLAN 154.02                            MODESTO                    BIDS 4/10/2008 AT 2:00 PM
BIDS 4/10/2008 AT 3:00 PM                                         NEROLY ROAD RECONSTRUCTION PROJECT
                                                                  DESCRIPTION: This project consists, in general, of
SOMERSET MIDDLE SCHOOL NEW CLASSROOM
                                                                  reconstruction of roadway, including: AC pavement
AND MULTI-USE BUILDINGS
                                                                  pulverization and grading; excavation; paving;
DESCRIPTION: This project consists of: A.
                                                                  shoulder backing; striping; signing and traffic control;
Demolition and removal of 10 existing portable
                                                                  and various other items as specified.
buildings. B. Construction of one (1) new concrete
                                                                  PLANS AT SACRAMENTO/ROSEVILLE
tilt-up and steel framed, classroom building, one (1)
                                                                  Online 08-00702
new concrete tilt-up and steel framed, multi-use and
cafeteria building totaling 21,382 SF. Installation of            PLAN 235.03                                   NAPA
on-site improvements including one (1) parking lot                BIDS 4/10/2008 AT 2:00 PM
and landscaping.
PLANS AT SACRAMENTO/ROSEVILLE                                     EAST SPRING STREET-MONTECITO BLVD
Online 08-00572                                                   SEWER REHABILITATION PHASE 1
                                                                  DESCRIPTION: NOTE: All Questions must be
PLAN 185.05                   CASTRO VALLEY                       submitted by Fax to HDR Engineering, Inc., Attn: Tim
BIDS 4/10/2008 AT 3:00 PM                                         Monnahan Fax: 925-974-2533. This project
                                                                  includes: Rehabilitation of approx. 400 LF of existing
PLAY YARD RENOVATION-RE-PAVING AT
                                                                  4-inch diameter, 3,900 LF of existing 6-inch diameter
CANYON MIDDLE SCHOOL
                                                                  and 10,200 LF of existing 8-inch diameter vitrified
DESCRIPTION: No description given. Per the Table
                                                                  clay or asbestos cement main line sewer pipes with
of Contents bids needed from the following bid
                                                                  cured-in-place plastic (CIPP) pipe.
divisions: Div-02 Site Work and Div-03 Concrete;
                                                                  PLANS AT SACRAMENTO/ROSEVILLE
PLANS AT SACRAMENTO
                                                                  Online 08-00582
Online 08-00681
                                                                  PLAN 237.01                                   NAPA
PLAN 207.01                            YOLO CO.
                                                                  BIDS 4/10/2008 AT 3:00 PM
BIDS 4/10/2008 AT 3:00 PM
                                                                  FIRST STREET BRIDGE OVER THE NAPA RIVER
SACRAMENTO RIVER - PUMP REPLACEMENT
                                                                  DESCRIPTION: This project consists of replacing the
DESCRIPTION: This project consists of a new
                                                                  existing First Street Bridge with a three-span
Sacramento River Pumping Plant, including
                                                                  reinforced concrete tee-beam bridge approx. 167 feet
structure, pump and motor, electrical controls and
                                                                  long and corresponding approach roadway
appurtenances.
                                                                  PLANS AT SACRAMENTO/ROSEVILLE
PLANS AT SACRAMENTO
                                                                  Online 08-00584
Online 08-00763




Jobs Bidding                                                                                               April 7, 2008
                                                         - 11 -
  Jobs Bidding                                                                                           April 7, 2008


------------------ APRIL 10 --------------------                  ------------------ APRIL 10 --------------------
                                                                  PLAN 276.02                        SAN MATEO
PLAN 242.04                                 DIXON
                                                                  BIDS 4/10/2008 AT 2:00 PM
BIDS 4/10/2008 AT 3:00 PM
                                                                  POPLAR AVENUE AND VARIOUS LOCATIONS
ATHLETIC FIELD MAINTENANCE
                                                                  REHABILITATION
DESCRIPTION: This project consists of athletic field
                                                                  DESCRIPTION: This project consists of roadway
maintenance. A minimum of five years experience in
                                                                  rehabilitation at Poplar Avenue and other various
maintaining athletic turf fields is required.
                                                                  locations.
PLANS AT SACRAMENTO/ROSEVILLE
                                                                  PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00713
                                                                  Online 08-00661
PLAN 243.03                             VALLEJO
                                                                  PLAN 378.03                           UC DAVIS
BIDS 4/10/2008 AT 2:00 PM
                                                                  BIDS 4/10/2008 AT 10:00 AM
2008 CITYWIDE SLURRY SEAL PROJECT
                                                                  HEALTH AND WELLNESS CENTER
DESCRIPTION: This project consists of applying
                                                                  DESCRIPTION: Note: There are several Pre-
slurry seal, traffic stripes, pavement markings and
                                                                  Qualified Trades for this project. Please check the
markers and traffic control on various City streets.
                                                                  front end documents for this list . NO Bids Are
PLANS AT SACRAMENTO
                                                                  Needed for these Trades. NOTE: There are 39 Work
Online 08-00772
                                                                  Categories all bidding the same date at different
PLAN 245.03                            ALAMEDA                    times as follows: WC 1 - 15 bids due at 10 a.m.; WC
BIDS 4/10/2008 AT 2:00 PM                                         16 - 25 bids due at 12 noon; and WC 26 - 39 bids
                                                                  due at 2 p.m. See the Invitation to Bid for the Work
LANDSCAPE MAINTENANCE OF MEDIAN STRIPS                            Category break downs. This project consists of a
AND SPECIAL AREAS                                                 new 3-story Health and Wellness Center. The
DESCRIPTION: This project consists of doing all                   building is a structural steel (buckling restrained
work associated with landscape maintenance of                     braces) frame setting on conventional pad footings.
specified median strops and special areas.                        The exterior is comprised of metal stud framing with
PLANS AT SACRAMENTO/ROSEVILLE                                     CMU veneer plaster, curtain wall and composite
Online 08-00432                                                   metal panes with decorative metal sunshades. TPO
PLAN 256.02              SANTA BARBARA CO.                        membrane roofing will be used with a steel framed
                                                                  metal panel clad roof screen. The new building is
BIDS 4/10/2008 AT 2:00 PM
                                                                  located in the middle of the campus with a lot of
CONSTRUCTION OF JALAMA ROAD STORM                                 pedestrian traffic. The SF of the new facility is
DAMAGE REPAIRS                                                    75,000 SF.
DESCRIPTION: This project consists of construction                PLANS AT SACRAMENTO/ROSEVILLE
of Jalama Road storm damage repairs 7.7 miles west                Online 08-00570
of SR 1
PLANS AT SACRAMENTO/ROSEVILLE                                     PLAN 449.05                         VACAVILLE
Online 08-00637                                                   BIDS 4/10/2008 AT 2:00 PM
PLAN 274.02                   SAN JOAQUIN CO.                     WILL C WOOD HS MODERNIZATION INC. 2 -
                                                                  ONLINE ONLY
BIDS 4/10/2008 AT 1:30 PM
                                                                  DESCRIPTION: This project consists of parking lot
GAWNE ROAD RESURFACING - MARIPOSA RD                              re-paving, quad remodel and new water main.
TO VAN ALLEN RD                                                   PLANS AT ONLINE
DESCRIPTION: The work, in general, consists of                    Online 08-00657
resurfacing 3.13 miles of existing rural roadway with
asphalt concrete, placing pavement reinforcing
fabric, construction of gravel shoulders on both sides
of the roadway, and any other items or details that
are required.
PLANS AT SACRAMENTO
Online 08-00660


Jobs Bidding                                                                                            April 7, 2008
                                                         - 12 -
  Jobs Bidding                                                                                              April 7, 2008


------------------ APRIL 10 --------------------                   ------------------ APRIL 11 --------------------
                                                                   PLAN 101.04                      MONTEREY CO.
PLAN 526.04                       BAKERSFIELD
                                                                   BIDS 4/11/2008 AT 3:00 PM
BIDS 4/10/2008 AT 2:00 PM
                                                                   THORN ROAD BRIDGE AT ARROYO SECO RIVER
HAMPTON INN AND SUITES
                                                                   DESCRIPTION: This project consists of the
DESCRIPTION: This project consists of the
                                                                   construction of a new two-lane bridge adjacent to
construction of a four (4) story, wood frame, 94 unit,
                                                                   and on the existing alignment, associated approach
56,693 SF building on 2.33 acres. Bids needed from
                                                                   embankment grading and paving, removal of the
all trades EXCEPT Mass Earthwork and grading.
                                                                   existing bridge and associated improvements.
PLANS AT SACRAMENTO
                                                                   PLANS AT SACRAMENTO
Online 08-00553
                                                                   Online 08-00746
------------------ APRIL 11 --------------------                   PLAN 259.03                           STOCKTON
PLAN 078.08                          ELK GROVE                     BIDS 4/11/2008 AT 10:00 AM
BIDS 4/11/2008 AT 2:00 PM                                          ASSEMBLY OF MODULAR PORTABLE UNIT AT
                                                                   SAN JOAQUIN DELTA COMM COLLEGE
WHITELOCK PARKWAY STREETSCAPE                                      DESCRIPTION: This project consists of assemble 60
MEDIANS AND SOUTH FRONTAGE SEG. 1 AND 2                            x 60 portable, provide power, data and parking.
DESCRIPTION: The work includes construction of                     PLANS AT SACRAMENTO/ROSEVILLE
median landscaping consisting of staking, grading,                 Online 08-00642
concrete flatwork, irrigation, shrub and tree planting.
Note that all improvements shown on the drawings                   PLAN 384.03                           VACAVILLE
on the South side of Whitelock Parkway have been                   BIDS 4/11/2008 AT 2:00 PM
separately contracted, as described in
                                                                   VACAVILLE CENTER FOR SOLANO CO.
PLANS AT SACRAMENTO
                                                                   COMMUNITY COLLEGE DISTRICT
Online 08-00781
                                                                   DESCRIPTION: This project consists of the
PLAN 092.01                                  NAPA                  construction of a new building with a total floor area
BIDS 4/11/2008 AT 3:00 PM                                          of approx. 40,600 SF and associated exterior site
                                                                   improvements. A portion of the building is single
1ST AND 2ND ST UNDERGROUND UTILITY DIST                            story construction and a portion is two-story. Work
ELECTRIC PANEL CONVERSION-STREET                                   includes, but is not limited to, civil, landscape,
LIGHTING IMPROVEMENT                                               architectural, structural, mechanical, plumbing and
DESCRIPTION: The work consists of electric panel                   electrical work.
conversion on private property, overhead to                        PLANS AT SACRAMENTO
underground, for approx. 100 parcels and the                       Online 08-00775
installation of approx. 60 street lights with conduit
and conductor. The City has secured rights of entry                PLAN 525.04                              LINCOLN
for the panel conversion work. The Contractor shall                BIDS 4/11/2008 AT 2:00 PM
coordinate his/her work with PG&E, property owners
                                                                   BURRIS FAMILY RESIDENCE
and occupants.
                                                                   DESCRIPTION: This project consists of new
PLANS AT SACRAMENTO
                                                                   construction of main house, garage and guest house,
Online 08-00695
                                                                   including site work. Provide an allowance for
                                                                   casework with Formica and marble counter tops, light
                                                                   fixtures, plumbing fixtures and flooring. Owner
                                                                   requesting bids from General Contractors and
                                                                   Subcontractors.
                                                                   PLANS AT SACRAMENTO/ROSEVILLE
                                                                   Online 08-00551




Jobs Bidding                                                                                               April 7, 2008
                                                          - 13 -
  Jobs Bidding                                                                                               April 7, 2008


------------------ APRIL 14 --------------------                    ------------------ APRIL 14 --------------------
                                                                    PLAN 145.01                             OAKLAND
PLAN 042.01                             OAKLAND
                                                                    BIDS 4/14/2008 AT 2:00 PM
BIDS 4/14/2008 AT 2:00 PM
                                                                    PARK AND STREET IMPROVEMENTS OF EL
COLISEUM BART STATION AREA
                                                                    EMBARCADERO AND LAKESHORE AVENUE
UNDERGROUND UTILITY DIST. 235 PANEL
                                                                    DESCRIPTION: This project consists of demolition of
CONVERSION
                                                                    existing features, and reconstruction of park
DESCRIPTION: This project consists of panel
                                                                    landscape and street features on and adjacent to
conversion works, including surveying for
                                                                    Lakeshore Avenue between El Embarcadero and
underground interference, rendering an underground
                                                                    East 18th Street and on and adjacent to El
map of any conflicting utilities, potholing, trenching,
                                                                    Embarcadero between Grande Avenue and
testing of excavated materials, transporting,
                                                                    Lakeshore Avenue. Park reconstruction includes
disposing of excavated materials including
                                                                    earthwork, concrete and decomposed granite paths,
hazardous waste, backfilling, restoring surface to
                                                                    planting, irrigation, site furnishings, including custom
prior condition, and installing duct banks and boxes
                                                                    fabrication, masonry, electrical and related work.
in private property as well as in the public right of
                                                                    Street reconstruction includes new curb and gutter,
way. The work also includes installing 10 panel
                                                                    asphalt paving, striping, signals, electrical, storm
conversion, one 4-inch PVC Schedule 40 sweep at
                                                                    drainage utility and related work. Traffic control will
SV5 location, and up to 19 2-inch PVC Schedule 40
                                                                    be required for the duration of the work.
sweeps on the project - up to two sweeps at each of
                                                                    PLANS AT SACRAMENTO
the 10 locations for phone and cable.
                                                                    Online 08-00738
PLANS AT SACRAMENTO
Online 08-00739                                                     PLAN 455.05                       SACRAMENTO
PLAN 086.04         TAHOE CITY, PLACER CO.                          BIDS 4/14/2008 AT 2:00 PM
BIDS 4/14/2008 AT 3:30 PM                                           SECTION 32 HOMEOWNERSHIP BLOCK Q - 3
                                                                    LOCATIONS - ONLINE ONLY
LAKE FOREST EROSION CONTROL AREA A -
                                                                    DESCRIPTION: This project consists of remodel
DOLLAR POINT
                                                                    three single family homes in preparation for sale
DESCRIPTION: The scope of work, in general,
                                                                    through Section 32 Homeownership Program at 3537
includes, but is not limited to, general erosion control
                                                                    and 3728 Cypress Street and 1245 Grant
facilities that include channel lining, curb and gutter,
                                                                    PLANS AT ONLINE
culverts, an infiltration gallery, and re vegetation.
                                                                    Online 08-00753
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00503




Jobs Bidding                                                                                                April 7, 2008
                                                           - 14 -
  Jobs Bidding                                                                                                April 7, 2008


------------------ APRIL 14 --------------------                    ------------------ APRIL 14 --------------------
                                                                    PLAN 531.04                            ROSEVILLE
PLAN 456.05                      HUMBOLDT CO.
                                                                    BIDS 4/14/2008 AT 2:00 PM
BIDS 4/14/2008 AT 2:00 PM
                                                                    HYATT SUMMERFIELD SUITES - SPECS ARE
CAL FIRE IFB 8CA07016 CASPAR CREEK FISH
                                                                    ONLINE ONLY
LADDER REPLACEMENT - ONLINE ONLY
                                                                    DESCRIPTION: Trades involved: rebar, flagpole,
DESCRIPTION: The Department of Forestry and Fire
                                                                    concrete pavers, concrete, landscaping/irrigation,
Protection (CAL FIRE) is seeking bidders to replace
                                                                    swimming pool, masonry, rough carpentry, structural
and construct two fish ladders in the Caspar Creek
                                                                    steel, wall covering, painting, roofing, lath and
North and South Forks, located in the Jackson
                                                                    plaster, toilet accessories, linen chutes, insulation,
Demonstration State Forest, Mendocino County
                                                                    sheet metal flashing, drywall/metal studs, doors/
(please see Sample Contract, Exhibit G). The work
                                                                    frames/hardware, fireproofing, windows, finish
will consist of furnishing all labor, equipment,
                                                                    carpentry, cabinets/casework, FF&E installation,
materials, and supervision for the demolition of an
                                                                    caulking, sealed concrete, granite/marble, fireplace,
existing fish ladder, earthwork, construction of a
                                                                    ceramic tile, flooring, gypcrete, acoustical ceilings
concrete spillway and fish ladder, rehabilitation of the
                                                                     storefront, FRP, elevators, plumbing, HVAC, fire
existing concrete flow measurement weir, grading,
                                                                    sprinkler, electrical, fire alarm, low voltage, and auto
placement of engineered streambed material, and
                                                                    doors.
rock slope protection for both the North and South
                                                                    PLANS AT ONLINE
Fork Caspar Creek Project sites. The fish ladders
                                                                    Online 08-00776
have been designed by Winzler & Kelly Consulting
Engineers. The fish ladder designs must be                          ------------------ APRIL 15 --------------------
incorporated with the existing experimental weirs.
Project components include: · Concrete weir fish                    PLAN 013.01                     CITRUS HEIGHTS
ladder with summer low-flow removable weirs ·                       BIDS 4/15/2008 AT 2:00 PM
Viewport structure with observation windows for
monitoring fish behavior · Spillway structure with                  SAN JUAN HS - ADA STADIUM UPGRADE
vertically adjustable weir gates · Roughened riffle                 DESCRIPTION: No description given. Per the Table
downstream of fish ladder · Catwalk for access to the               of Contents bids needed for Sitework, Concrete, and
fish ladder and spillway structure · Sluice gates for               Metals.
draining fish ladder and tailwater pool · Modifications             PLANS AT SACRAMENTO/ROSEVILLE
to the concrete dam face below v-notch on flow                      Online 08-00658
measurement weir The project also includes clean                    PLAN 058.01                               NOVATO
out of sediments accumulated in the sediment/
                                                                    BIDS 4/15/2008 AT 2:00 PM
stilling ponds that lie upstream from the weir
structure. This will require removal and transport of               NOVATO BLVD PAVEMENT REHABILITATION
the accumulated silt, soil and gravel.                              CENTRAL PH 3
PLANS AT SACRAMENTO                                                 DESCRIPTION: The work to be done includes, but is
Online 08-00754                                                     not limited to, preparation for and application of Type
                                                                    II Micro-Surfacing, including replacement marking
                                                                    and striping.
                                                                    PLANS AT SACRAMENTO
                                                                    Online 08-00696




Jobs Bidding                                                                                                 April 7, 2008
                                                           - 15 -
 Jobs Bidding                                                                                          April 7, 2008


------------------ APRIL 15 --------------------                ------------------ APRIL 15 --------------------
                                                                PLAN 171                   04-MRN, SON-101
PLAN 074.01                        PLACER CO.
BIDS 4/15/2008 AT 3:30 PM                                                              MARIN & SONOMA CO.
                                                                BIDS 4/15/2008 AT 2:00 PM
BARTON ROAD BRIDGE REPLACEMENT AT
MINERS RAVINE                                                   DOT 04-0E8004 TREAT BRIDGE DECK WITH
DESCRIPTION: The scope of work, in genera,                      METHACRYLATE RESIN-REPAIR JOINT SEALS
includes constructing a new bridge and road                     DESCRIPTION: This project consists of treat bridge
approaches, removing an existing bridge, grading,               deck with methacrylate resin and repair joint seals.
paving, rock slope protection, signing and striping,            PLANS AT SACRAMENTO
applying erosion control, providing traffic control,            Online 08-00621
water main and gas line relocations, and other items            PLAN 171        01-MEN-101 MENDOCINO CO.
and details, not mentioned that are required.
                                                                BIDS 4/15/2008 AT 2:00 PM
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00487                                                 DOT 01-458204 REPLACE CONCRETE
                                                                PAVEMENT
PLAN 107.09                              YREKA                  DESCRIPTION: This project consists of replace
BIDS 4/15/2008 AT 2:00 PM                                       concrete pavement.
RURAL HEALTH SCIENCES INSTITUTE BUILDING                        PLANS AT SACRAMENTO
CONST. AT COLLEGE OF THE SISKIYOUS                              Online 08-00717
DESCRIPTION: This project consists of the                       PLAN 171          01-HUM-96 HUMBOLDT CO.
construction of the Rural Health Sciences Institute
                                                                BIDS 4/15/2008 AT 2:00 PM
Building. No description given. Per the Table of
Contents bids needed from all trades EXCEPT Div                 DOT 01-477404 BRIDGE PAINTING
02-Sitework; Div-013 Special Construction; Div-14               DESCRIPTION: This project consists of bridge
Conveying Systems; and Div-27 Communications.                   painting.
PLANS AT SACRAMENTO/ROSEVILLE                                   PLANS AT SACRAMENTO
Online 08-00514                                                 Online 08-00718

PLAN 171               02-SIS-5 SISKIYOU CO.                    PLAN 171               02-PLU-70 PLUMAS CO.
BIDS 4/15/2008 AT 2:00 PM                                       BIDS 4/15/2008 AT 2:00 PM
DOT 02-0C3304 REHABILITATE TRUCK                                DOT 02-4C5604 SHOULDER SUPERELEVATION
INSPECTION FACILITY                                             CORRECTION
DESCRIPTION: This project consists of rehabilitate              DESCRIPTION: This project consists of shoulder
truck inspection facility near Mount Shasta at the              superelevation correction.
Dunsmuir Truck Inspection Facility.                             PLANS AT SACRAMENTO
PLANS AT SACRAMENTO                                             Online 08-00721
Online 08-00405                                                 PLAN 171                02-SHA-5 SHASTA CO.
PLAN 171                 03-SAC, PLA-80                         BIDS 4/15/2008 AT 2:00 PM
               SACRAMENTO & PLACER CO.                          DOT 02-2C2104 CHANNEL REPAIRS-
BIDS 4/15/2008 AT 2:00 PM                                       IMPROVEMENTS TO BE PERFORMED USING
DOT 03-367824 CONSTRUCT HOV LANES                               RSP
DESCRIPTION: This project consists of construct                 DESCRIPTION: This project consists of channel
HOV lanes.                                                      repairs and improvements to be performed using
PLANS AT SACRAMENTO                                             PLANS AT SACRAMENTO
Online 08-00415                                                 Online 08-00723




Jobs Bidding                                                                                          April 7, 2008
                                                       - 16 -
 Jobs Bidding                                                                                             April 7, 2008


------------------ APRIL 15 --------------------                 ------------------ APRIL 15 --------------------
                                                                 PLAN 190.02                      HUMBOLDT CO.
PLAN 171              03-NEV-80 NEVADA CO.
                                                                 BIDS 4/15/2008 AT 2:00 PM
BIDS 4/15/2008 AT 2:00 PM
                                                                 CONST. OF SHOULDER AND BRIDGE WIDENING
DOT 03-2E2804 REPAIR CULVERT WITH
                                                                 ON MYRTLE AVE BETWEEN HALL AVE AND
PIPELINER-REPLACE DOWNDRAIN-ROCK SLOPE
                                                                 MITCHELL RD
DESCRIPTION: This project consists of repair culvert
                                                                 DESCRIPTION: The road work to be done consists
with pipeliner, replace downdrain, rock slope.
                                                                 of, in general, of removing bridge concrete and railing
PLANS AT SACRAMENTO
                                                                 including salvaging water main, widening the
Online 08-00734
                                                                 concrete slab bridge, cleaning and treating bridge
PLAN 171                    01-LAK, MEN-1                        deck, placing rock slope protection and constructing
                    LAKE & MENDOCINO CO.                         metal tube bridge railing and metal beam approach
                                                                 guard railing.
BIDS 4/15/2008 AT 2:00 PM
                                                                 PLANS AT SACRAMENTO/ROSEVILLE
DOT 01-481204 RECONSTRUCT FENCE                                  Online 08-00268
DESCRIPTION: This project consists of reconstruct
fence.                                                           PLAN 228.01                      HUMBOLDT CO.
PLANS AT SACRAMENTO                                              BIDS 4/15/2008 AT 12:00 PM
Online 08-00784                                                  CONSTRUCTION OF STORM DAMAGE REPAIRS
PLAN 171                03-BUT, COL, SUT-5                       ON BUTLER VALLEY ROAD
                                                                 DESCRIPTION: The work to be done consists, in
               BUTTE, COLUSA, SUTTER CO.                         general, of traffic control, clearing, earthwork for
BIDS 4/15/2008 AT 2:00 PM                                        construction of earth retaining structures (wire wall),
DOT 03-3E7804 INSTALL RUMBLE STRIPS                              installing drainage facilities and restoring roadway
DESCRIPTION: This project consists of install                    surfacing with aggregate base and asphalt concrete
rumble strip.                                                    at two storm damage sites on Butler Valley Road.
PLANS AT SACRAMENTO                                              PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00787                                                  Online 08-00705
PLAN 172.03                 ORANGE COUNTY                        PLAN 236.01                             FREMONT
BIDS 4/15/2008 AT 2:00 PM                                        BIDS 4/15/2008 AT 2:00 PM
CHINO HILLS STATE PARK VISITOR CENTER                            PEDESTRIAN SIGNAL UPGRADE PHASE 2
DESCRIPTION: This project consists of construct a                DESCRIPTION: This project consists of upgrade to
new visitor center, parking area, widen highway,                 existing pedestrian pushbuttons to Accessible
relocate/underground utilities, site improvements and            Pedestrian Pushbutton (APS) Systems in various
landscaping.                                                     intersections near the California School for the Blind
PLANS AT SACRAMENTO                                              and Fremont BART Station.
Online 08-00464                                                  PLANS AT SACRAMENTO
                                                                 Online 08-00583
PLAN 186.07                          BAY AREA
BIDS 4/15/2008 AT 2:00 PM
ELECTRICAL WORK ON AUTOMATIC FARE
EQUIPMENT IN DESIGNATED DISTRICT
STATIONS
DESCRIPTION: This project consists of, but not
limited to, installation/replacement/relocation of
Automatic Fare Collection (AFC) equipment; relo-
cation of old equipment to a temporary staging area;
electrical outlet installation/modifications, and
removal of old AFC equipment & associated material.
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00683

Jobs Bidding                                                                                             April 7, 2008
                                                        - 17 -
  Jobs Bidding                                                                                              April 7, 2008


------------------ APRIL 15 --------------------                    ------------------ APRIL 15 --------------------
                                                                    PLAN 379.03                              FRESNO
PLAN 241.01              AUBURN, PLACER CO.
                                                                    BIDS 4/15/2008 AT 2:00 PM
BIDS 4/15/2008 AT 2:00 PM
                                                                    HISTORIC OLD ADMINISTRATION BUILDING PH 1
GAYLE-SUNSHINE WATER PIPELINE
                                                                    AND 2 AT FRESNO CITY COLLEGE
DESCRIPTION: This project consists of the
                                                                    DESCRIPTION: This project will be bid as multiple
installation of approx. 11,660 LF of water pipeline of
                                                                    prime contracts with 15 separate bid packages as
varying diameter and pressure class as well as
                                                                    follows: 03-Earthwork and Paving; 04-Landscape
appurtenances including, but not necessarily limited
                                                                    and Irrigation; 05-Site Concrete, Building Concrete,
to, pressure relief valves, isolation valves, blow-off
                                                                    Reinforcing Steel, Rough Carpentry, and Structural
valves, hydrants, curb stop and valve/meter boxes.
                                                                    Demolition; 06-Masonry; 07-Structural Steel/Misc.
The work shall include survey control, saw-cutting,
                                                                    Iron; 08-Finish Carpentry; 09-Roofing; 10-Metal
excavation, trenching, tree trimming/removal, traffic
                                                                    Framing/Drywall/Plaster/Insulation; 11-Acoustical
control, paving and any other construction activities
                                                                    Ceilings/Wall Panels/FRP; 12-Painting; 13-General
required.
                                                                    Specialties, Flooring, Elevator and Lifts, Glass and
PLANS AT SACRAMENTO
                                                                     Glazing, Doors and Hardware; 14-Fire Protection;
Online 08-00603
                                                                    15-Plumbing/Site Utilities; 16-HVAC/Sheet Metal;
PLAN 246.02                           SAN PABLO                     17-Electrical/Lighting/Fire Alarm/
BIDS 4/15/2008 AT 2:00 PM                                           Telecommunications/Low Voltage.
                                                                    PLANS AT SACRAMENTO
PAVING REHABILITATION AT CONTRA COSTA                               Online 08-00590
COLLEGE-SAN PABLO
DESCRIPTION: In general, the work consists of re-                   PLAN 383.03                          ROSEVILLE
pavement and rehabilitation of existing roads located               BIDS 4/15/2008 AT 2:00 PM
within the perimeters of the campus. Work will
                                                                    WEST PLACER MIDDLE SCHOOL PHASE 3 INC 2
include rehabilitation of speed bumps, cut outs, utility
                                                                    - 15 BID DIVISION PACKAGES
covers, curb demolition, pavement reinforcement,
                                                                    DESCRIPTION: This project will be constructed
striping, asphalt overlay and planning.
                                                                    using separate Multi-prime contractors (Trade
PLANS AT SACRAMENTO/ROSEVILLE
                                                                    Contractors) with 15 Bid Division Packages as
Online 08-00437
                                                                    follows: 10-site work; 11-landscape and irrigation, 12-
PLAN 257.02                               MERCED                    concrete work, 13-wood framing, 15-metals, 16-metal
BIDS 4/15/2008 AT 2:00 PM                                           roofing, 20-drywall package, 22-painting, 24-flooring,
                                                                    26-plumbing, 27-HVAC, 28-electrical, 30-casework,
COTTONWOOD CREEK COMMUTER BIKE PATH                                 32-fire protection, and 36-misc. trade
DESCRIPTION: This project includes, but not limited                 PLANS AT SACRAMENTO/ROSEVILLE
to, the installation of Class I concrete bike path from             Online 08-00764
G Street to Tanager Court.
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00715
PLAN 272.08                     WALNUT CREEK
BIDS 4/15/2008 AT 2:00 PM
WALNUT CREEK SEWER RENOVATION PHASE 6
DESCRIPTION: The work generally consists of
renovation and/or replacement of approx. 9,800 LF of
6- and 8-inch sewer located in Walnut Creek. The
work includes, but is not limited to, trenching,
shoring, replacing sections of sewer pipe, installing
manholes and paving.
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00741



Jobs Bidding                                                                                               April 7, 2008
                                                           - 18 -
  Jobs Bidding                                                                                               April 7, 2008


------------------ APRIL 15 --------------------                   ------------------ APRIL 16 --------------------
                                                                   PLAN 048.07                        SACRAMENTO
PLAN 450.05                         SANTA CRUZ
                                                                   BIDS 4/16/2008 AT 2:00 PM
BIDS 4/15/2008 AT 3:00 PM
                                                                   SOUTH NATOMAS COMMUNITY CENTER
COWELL COLLEGE COMMONS RENOVATION -
                                                                   CONCESSION
ONLINE ONLY
                                                                   DESCRIPTION: The work will involve, but be limited
DESCRIPTION: The scope of this project includes
                                                                   to, demolition, modification, construction of an
the renovation of the original dining hall, servery,
                                                                   approx. 350 SF food concession operation tenant
kitchen and food preparation areas to accommodate
                                                                   improvements development in an existing open and
an increased and expanding student population on
                                                                   operating community center serving the general
campus. This project will also correct structural
                                                                   public.
seismic deficiencies in the dining hall and commons
                                                                   PLANS AT SACRAMENTO/ROSEVILLE
on the 1st floor and office areas in the basement,
                                                                   Online 08-00599
including accessibility and fire protection upgrades to
meet code compliance's. The project area is approx.                PLAN 050.02                        SACRAMENTO
22,000 SF and primarily constructed of cast-in-place               BIDS 4/16/2008 AT 2:00 PM
reinforced concrete with concrete walls and moment
frames.                                                            SLUICE FLOOD GATE REPLACEMENT AT BLUE
PLANS AT ONLINE                                                    DIAMOND ALMOND GROWERS
Online 08-00666                                                    DESCRIPTION: The work to be performed consists
                                                                   of removing two sluice gates and replacing with two
PLAN 459.05                       SACRAMENTO                       new wall mounted sluice gates, applications of a
BIDS 4/15/2008 AT 1:00 PM                                          rehabilitation liner, and partial demolitions of concrete
                                                                   structure, and associated work.
CENTRAL PLANT UTILITIES EXTENSION URBAN
                                                                   PLANS AT SACRAMENTO
WILDLIFE PRESERVE - ONLINE ONLY
                                                                   Online 08-00782
DESCRIPTION: The UC Davis Medical Center's
Urban Wildlife Preserve was originally built in 1997.              PLAN 140.03                        WEAVERVILLE
The ongoing Central Plant Utilities Expansion project              BIDS 4/16/2008 AT 1:00 PM
caused major demolition throughout the preserve,
and now the site needs to be restored. Work in the                 SHASTA COLLEGE - WEAVERVILLE CENTER
Urban Wildlife Preserve includes repairs from the                  DESCRIPTION: This project consists of, but not
construction impact, and restoration of the site's                 limited to, clear the site of all vegetation, paving,
original amenities.                                                rubble and other existing site improvements; install
PLANS AT ONLINE                                                    barricades, fences and other protective devices;
Online 08-00766                                                    perform all excavation, fill, backfill, shoring, bracing
                                                                   and other incidental work required to complete the
------------------ APRIL 16 --------------------                   construction; extend utilities as shown or required;
                                                                   construct new building structures complete, as
PLAN 009.03                       SACRAMENTO                       shown and specified; construct new on-site improve-
BIDS 4/16/2008 AT 2:00 PM                                          ments; and perform all other misc. work as shown
                                                                   PLANS AT SACRAMENTO/ROSEVILLE
11TH STREET SEWER REPLACEMENT - O-P                                Online 08-00664
ALLEY TO R STREET
DESCRIPTION: This project consists of constructing
or replacing 8-inch, 10-inch, and 12-inch combined
sewer pipeline, manholes, drains, sewer services,
and associated work.
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00779




Jobs Bidding                                                                                                April 7, 2008
                                                          - 19 -
 Jobs Bidding                                                                                        April 7, 2008


------------------ APRIL 16 --------------------               ------------------ APRIL 16 --------------------
                                                               PLAN 171           04-ALA-680 ALAMEDA CO.
PLAN 160.01                        RED BLUFF
                                                               BIDS 4/16/2008 AT 2:00 PM
BIDS 4/16/2008 AT 2:00 PM
                                                               DOT 04-0E6604 REPLACE CONCRETE
TEHAMA COLLEGE CENTER INCREMENT NO 1
                                                               PAVEMENT
AND 2
                                                               DESCRIPTION: This project consists of replace
DESCRIPTION: No description given. Per the Table
                                                               concrete pavement.
of Contents - Increment 1 consists of selective
                                                               PLANS AT SACRAMENTO
demolition, site clearing, earth moving, dewatering
                                                               Online 08-00724
and storm utility drainage piping. Increment 2
consists of the construction of the building bids              PLAN 171        04-SCI-85 SANTA CLARA CO.
needed from all trades EXCEPT Div-11 Equipment;                BIDS 4/16/2008 AT 2:00 PM
Div-24, Div-25, Div-29, Div-30, Div-34 through 49.
PLANS AT SACRAMENTO/ROSEVILLE                                  DOT 02-0E1204 REPLACE JOINT SEAL
Online 08-00678                                                ASSEMBLIES
                                                               DESCRIPTION: This project consists of replace joint
PLAN 171              03-PLA-65 PLACER CO.                     seal assemblies.
BIDS 4/16/2008 AT 2:00 PM                                      PLANS AT SACRAMENTO
                                                               Online 08-00725
DOT 03-2M9104 PLACE HMA-BONDED WEARING
COURSE-GAP GRADED, ETC.                                        PLAN 171                03-BUT-70 BUTTE CO.
DESCRIPTION: This project consists of place HMA                BIDS 4/16/2008 AT 2:00 PM
(Bonded Waring Course-Gap Graded); rumble strip
and striping.                                                  DOT 03-4C7304 PLACE RSP-MINOR CONC-
PLANS AT SACRAMENTO                                            CHANNEL LINING TO EXISTING DRAINAGE
Online 08-00611                                                CHANNEL
                                                               DESCRIPTION: This project consists of place RSP
PLAN 171        04-CC-680 CONTRA COSTA CO.                     and Minor Conc (channel lining) to exist drainage
BIDS 4/16/2008 AT 2:00 PM                                      channel.
                                                               PLANS AT SACRAMENTO
DOT 04-2A7204 TREAT BRIDGE DECK WITH
                                                               Online 08-00731
METHACRYLATE RESIN-REPLACE JOINT SEALS
DESCRIPTION: This project consists of treat bridge             PLAN 171                03-BUT-32 BUTTE CO.
deck with methacrylate resin and replace joint                 BIDS 4/16/2008 AT 2:00 PM
PLANS AT SACRAMENTO
Online 08-00619                                                DOT 03-2M8604 RECONSTRUCT SIDEWALKS-
                                                               CURB-GUTTER AND DRIVEWAYS
PLAN 171        01-MEN-101 MENDOCINO CO.`                      DESCRIPTION: This project consists of reconstruct
BIDS 4/16/2008 AT 2:00 PM                                      sidewalks, curb and gutter, and driveways.
                                                               PLANS AT SACRAMENTO
DOT 01-481304 OPEN GRADED FRICTION
                                                               Online 08-00732
COURSE
DESCRIPTION: This project consists of open graded              PLAN 171                   03-PLA, NEV-80
friction course.                                                                    PLACER & NEVADA CO.
PLANS AT SACRAMENTO
                                                               BIDS 4/16/2008 AT 2:00 PM
Online 08-00719
                                                               DOT 03-2E9804 INSTALL GROUND-IN RUMBLE
PLAN 171            02-SHA-299 SHASTA CO.                      STRIPS IN PCC PAVEMENT
BIDS 4/16/2008 AT 2:00 PM                                      DESCRIPTION: This project consists of install
DOT 02-397904 REALIGN CURVE AND IMPROVE                        ground-in rumble strips in PCC pavement.
DRAINAGE SYSTEM                                                PLANS AT SACRAMENTO
DESCRIPTION: This project consists of realign curve            Online 08-00733
and improve drainage system.
PLANS AT SACRAMENTO
Online 08-00722


Jobs Bidding                                                                                        April 7, 2008
                                                      - 20 -
  Jobs Bidding                                                                                                April 7, 2008


------------------ APRIL 16 --------------------                    ------------------ APRIL 16 --------------------
                                                                    PLAN 233.01                             BAY AREA
PLAN 171             03-ED-50 EL DORADO CO.
                                                                    BIDS 4/16/2008 AT 1:30 PM
BIDS 4/16/2008 AT 2:00 PM
                                                                    UPPER SAN LEANDRO DAM SPILLWAY AND
DOT 03-3M2604 PLACE RUBBERIZED HMA-
                                                                    CHANNEL RESTORATION
BONDED WEARING COURSE-GAP GRADED-
                                                                    DESCRIPTION: Work covers excavating soil and
DESCRIPTION: This project consists of place
                                                                    hauling it off-site; finishing cut slopes and protecting
rubberized HMA (bonded wearing course-gap
                                                                    slopes with geotextile material; demolishing approx.
graded) and striping.
                                                                    194 LF of the top of an existing concrete box culvert
PLANS AT SACRAMENTO
                                                                    along Miller Creek; constructing a new access
Online 08-00786
                                                                    roadway to the dam and the blow-off valve; and
PLAN 171             03-ED-50 EL DORADO CO.                         performing related required work as shown on the
BIDS 4/16/2008 AT 2:00 PM                                           drawings and as specified. Additionally work covers
                                                                    excavating and removing the sediment down to an
DOT 03-2M7804 RECONSTRUCT CHANGEABLE                                elevation of 287 feet in the areas downstream of the
MESSAGE SIGN                                                        outlet of the box culvert and within the clearing and
DESCRIPTION: This project consists of reconstruct                   grubbing area shown on Drawing No. 523.17-C-002,
changeable message sign.                                            and disposing the excess sediment at a Class II
PLANS AT SACRAMENTO                                                 Disposal Site.
Online 08-00788                                                     PLANS AT SACRAMENTO/ROSEVILLE
PLAN 206.05                       SACRAMENTO                        Online 08-00575
BIDS 4/16/2008 AT 2:00 PM                                           PLAN 239.04                           LOS GATOS
2008 SEAL COAT PROJECT                                              BIDS 4/16/2008 AT 2:00 PM
DESCRIPTION: This project consists of mixing                        RINCONADA WATER TREATMENT PLANT
asphaltic emulsion aggregate, set-control additives,                VALVES REPLACEMENT
water, and spreading the mixture on properly                        DESCRIPTION: This project consists of, but not
prepared surfacing and any other work involves in                   limited to: 1. Replace 49 butterfly valves with sizes
construction or placing material. This work shall also              ranging from 16- to 42-inches, actuators, and
include the removal of traffic stripes and the re-                  associated equipment; 2. Install two 16-inch, four 30-
striping of streets including the installation of raised            inch, and one 60-inch butterfly valves, actuators, and
pavement markers.                                                   associated equipment; 3. Install one buried 72-inch
PLANS AT SACRAMENTO/ROSEVILLE                                       butterfly valve, manual control only including
Online 08-00762                                                     excavation, backfilling, grading, corrosion protection,
                                                                    and misc. 4. Install six 30-inch magnetic flow meters
                                                                    and associated control and electrical equipment.
                                                                     5. Install control system and instrumentation
                                                                    improvements necessary to operate valves.
                                                                    6. Improve the existing plant air system that is used
                                                                    to operate pneumatic actuators. 7. Provide
                                                                    dewatering,
                                                                    PLANS AT SACRAMENTO
                                                                    Online 08-00595




Jobs Bidding                                                                                                 April 7, 2008
                                                           - 21 -
 Jobs Bidding                                                                                                April 7, 2008


------------------ APRIL 16 --------------------                   ------------------ APRIL 17 --------------------
                                                                   PLAN 040.03                                AUBURN
PLAN 265.04                            OROVILLE
                                                                   BIDS 4/17/2008 AT 3:30 PM
BIDS 4/16/2008 AT 2:00 PM
                                                                   100 RAMP REMODEL ASBESTOS ABATEMENT
PRE-QUALIFICATION FORMS FOR
                                                                   11414 - 11464 B AVE
MONTGOMERY ST-WASHINGTON AVE
                                                                   DESCRIPTION: This project consists of abatement
ROUNDABOUT
                                                                   and disposal of asbestos containing materials
DESCRIPTION: This is a Prequalification package
                                                                   including Linoleum, spray-on acoustic ceiling,
only for the construction of a roundabout at
                                                                   drywall, floor tile, mastic, roofing, pipe insulation and
Montgomery Street and Washington Avenue.
                                                                   other related materials. Additionally work will remove
PLANS AT SACRAMENTO
                                                                   and dispose of fluorescent lamps, ballasts containing
Online 08-00646
                                                                   PCB's and flaking lead paint. Work includes the
PLAN 282.01           MAXWELL, COLUSA CO.                          demolition and removal of carpet, drywall and
BIDS 4/16/2008 AT 10:00 AM                                         standard construction materials.
                                                                   PLANS AT SACRAMENTO/ROSEVILLE
MAXWELL ROAD ROAD REHABILITATION                                   Online 08-00698
DESCRIPTION: This project consists of place an
asphalt concrete overlay with reinforcing fabric on top            PLAN 136.01                   SACRAMENTO CO.
of a leveling course throughout the limits of the                  BIDS 4/17/2008 AT 2:00 PM
project. Shoulder backing and traffic markings are
                                                                   BRADSHAW ROAD WIDENING CALVINE ROAD
also to be performed.
                                                                   TO FLORIN ROAD
PLANS AT SACRAMENTO/ROSEVILLE
                                                                   DESCRIPTION: This project consists of constructing
Online 08-00673
                                                                   pavement widening on both sides of Bradshaw
PLAN 283.01          ARBUCKLE, COLUSA CO.                          Road and construction of a raised concrete median,
BIDS 4/16/2008 AT 10:30 AM                                         construction of bridges at Laguna Creek and
                                                                   Gerber Creek, construction of retaining walls,
OLD HIGHWAY 99W ROAD REHABILITATION                                construction of roadside ditches, underground drain
DESCRIPTION: This project consists of place an                     lines and culverts, 48-inch water transmission main,
asphalt concrete overlay with reinforcing fabric on top            traffic signal modifications, traffic signal interconnect
of a leveling course throughout the limits of the                  system, roadway striping and signing, asphalt
project. Shoulder backing and traffic markings are                 concrete pedestrian walk, driveways and fences,
also to be performed.                                              landscaping and placing of irrigation systems, and
PLANS AT SACRAMENTO/ROSEVILLE                                      other incidental work.
Online 08-00674                                                    PLANS AT SACRAMENTO/ROSEVILLE
PLAN 446.05                            TRUCKEE                     Online 08-00602
BIDS 4/16/2008 AT 2:00 PM                                          PLAN 141.05                         JOSHUA TREE
TRUCKEE COMMUNITY RECREATION CENTER                                BIDS 4/17/2008 AT 2:00 PM
PHASE 1A AND 1B - ONLINE ONLY                                      MULTI-USE SPORTS COMPLEX AT COPPER
DESCRIPTION: Demolition of certain existing                        MOUNTAIN COLLEGE
improvements. Construction of Phase 1A                             DESCRIPTION: This project consists of the
Gymnasium. Construction of Phase 1B                                construction of a new gymnasium and related site
Administrative Offices, Community Rooms and                        work at Copper Mountain College.
Classrooms.                                                        PLANS AT SACRAMENTO/ROSEVILLE
PLANS AT ONLINE                                                    Online 08-00601
Online 08-00641




Jobs Bidding                                                                                                April 7, 2008
                                                          - 22 -
  Jobs Bidding                                                                                               April 7, 2008


------------------ APRIL 17 --------------------                      ------------------ APRIL 17 --------------------
                                                                      PLAN 278.01                       SONOMA CO.
PLAN 142.01                      TUOLUMNE CITY
                                                                      BIDS 4/17/2008 AT 2:00 PM
BIDS 4/17/2008 AT 2:00 PM
                                                                      GEYSERVILLE VISITORS PLAZA-PARK AND RIDE
WASTEWATER TREATMENT PLANT
                                                                      DESCRIPTION: This project proposes the removal of
IMPROVEMENTS PHASE 1 AND 2
                                                                      existing facilities and building a new parking lot and
DESCRIPTION: This project consists of the
                                                                      related amenities. The project consists of grading,
construction and installation of the following as the
                                                                      the supply and installation of water main, curb and
Base Bid: A headworks structure with mechanical
                                                                      gutter, sidewalk, concrete flatwork, vase rock,
screen and screenings washer; aeration basin and
                                                                      paving, lighting and landscaping.
integral clarifier; blower building; modifications to
                                                                      PLANS AT SACRAMENTO/ROSEVILLE
existing aerated lagoons; specified pumps, blowers,
                                                                      Online 08-00671
generators, valves, vaults and additional necessary
mechanical and structural equipment; specified site                   PLAN 381.03                          STOCKTON
work; coordination with other contractors working on                  BIDS 4/17/2008 AT 2:00 PM
and within the existing treatment facility; the
coordination and integrating of these facilities with                 SAN JOAQUIN COUNTY ADMINISTRATION
the existing treatment facility and all piping, electrical            BUILDING BP 4 - 20 BID PACKAGES
and appurtenances necessary to operate the                            DESCRIPTION: The purpose of this Bid Package 4
constructed facilities in accordance with the                         is to select the Subcontractors -Vendors for this
performance specifications. Additive bid items                        project. There are 20 Subsystem Packages as
include, in ascending numerical sequence for bid                      follows: 4.01-Water Features; 4.02 Interior and Site
comparison: 1. Multi-Use Building; 3. Sludge Lagoon                   Stone; 4.03 Millwork/Casework; 4.04 Ceramic Tile;
Center Wall/Liner; and 3. Sludge Dewatering                           4.05 Carpet/Resilient Flooring; 4.06 Painting; 4.07
PLANS AT SACRAMENTO                                                   Vault Doors; 4.08 Main Specialties; 4.09 Toilet
Online 08-00676                                                       Partitions; 4.10 Wall/Corner Guards; 4.11 Access
                                                                      Flooring; 4.12 Metal Lockers; 4.13 Fire
PLAN 227.02                    SAN JOAQUIN CO.                        Extinguishers; 4.14 Folding Partitions; 4.15 Toilet
BIDS 4/17/2008 AT 1:30 PM                                             and Bath Accessories; 4.16 Parking Control
                                                                      Equipment; 4.17 Entrance Mats and Frames; 4.18
BRANDT ROAD AND MORSE COLONY
                                                                      Window Blinds/Shades; 4.19 Fixed Seating; and 4.20
IMPROVEMENTS
                                                                      Handicap Lift. The project consists of a new 6-story
DESCRIPTION: The work, in general, consists of
                                                                      (302,000 SF) office building with one level of below
resurfacing 0.43 miles of Brandt Road, and 1.51
                                                                      grade parking. The project includes the completion
miles of Morse Colony (Golfview Road and Morse
                                                                      of the tenant spaces. Construction of this project
Road), with 0.50 ft thick asphalt concrete on Brandt
                                                                      began August 1, 2007 with a 22 month
Road and 0.25 ft on all remaining segments, with
                                                                      PLANS AT SACRAMENTO
reinforcing fabric (traveled lanes only). Brandt Road
                                                                      Online 08-00652
will also be widened from 24 ft to 32 ft to allow for
two 12 ft standard lanes and with 4 ft paved
shoulders on each side. Four-foot gravel shoulders
will be placed on each side adjacent to the edge
PLANS AT SACRAMENTO
Online 08-00771




Jobs Bidding                                                                                                 April 7, 2008
                                                             - 23 -
  Jobs Bidding                                                                                               April 7, 2008


------------------ APRIL 17 --------------------                     ------------------ APRIL 17 --------------------
                                                                     PLAN 454.05                            MANTECA
PLAN 382.03                             FAIRFIELD
                                                                     BIDS 4/17/2008 AT 2:00 PM
BIDS 4/17/2008 AT 4:00 PM
                                                                     PARKS CORPORATION YARD STORM DRAIN
NEW PUBLIC HEALTH CLINIC-PUBLIC HEALTH-
                                                                     BASIN PUMP STATION - ONLINE ONLY
FORENSIC LAB FACILITIES
                                                                     DESCRIPTION: The project involves furnishing and
DESCRIPTION: NOTE: Only Prequalified General
                                                                     installing a 80 gpm package storm drain pump
Contractors may submit a bid for this project. This
                                                                     station, approx. 60' of 3" force main, storm drain
project consists of the new construction of a 2-story,
                                                                     pipes, 130' of 4" sanitary sewer line, a catch basin,
30,000 GSF building at the corner of Courage Drive
                                                                     two 36" storm drain basin inlet/outlet structure.
and Watney Way in Fairfield. The 1st floor will be
                                                                     PLANS AT SACRAMENTO
utilized as a County Public Health Clinic with fully
                                                                     Online 08-00688
equipped exam rooms, offices and an X-ray lab. The
2nd floor use will be divided between the County                     PLAN 082.03               WEST SACRAMENTO
Health Laboratory and District Attorney's Forensic                   BIDS 4/18/2008 AT 2:00 PM
Laboratory. These labs will have at a minimum,
negative pressure air systems, cabinetry, fume                       MAIN DRAIN PUMP STATION
hoods, piped gases, piped water sterilizers, piped                   DESCRIPTION: This project consists of furnishing
deionized water, and integrated security systems.                    and installing all mechanical, structural, civil,
Utility tie-ins will connect directly to City connections            architectural, electrical, instrumentation, and other
points. Contractor will need to provide intranet                     items necessary including site improvement and
connectivity to the County buildings located at 275                  utility piping to construct the Main Drain Pump
Beck and cable connection to 375 Beck. This will be                  Station including four 144 cfs vertical wet pit pumps,
a steel frame structure with exterior cement plaster,                two diesel fuel engines, two natural gas engines,
metal panels and glass/aluminum windows. Scope                       right angle gears, fuel oil storage tank, pump
also includes site and landscape improvements with                   building, pump discharge steel pipes, pump station
lamp posts along the perimeter of the project.                       forebay, wetwell, discharge outfall structure,
PLANS AT SACRAMENTO                                                  demolition of existing pump station and associated
Online 08-00748                                                      structural, equipment, piping, paving, repair and
                                                                     reconstruction of existing improvements affected by
PLAN 452.05                        SACRAMENTO                        the Work, provide temporary pumping system during
BIDS 4/17/2008 AT 2:00 PM                                            construction and all incidentals fro complete and
                                                                     usable facility.
SHRADER CIRCLE SINGLE FAMILY REHABS AT
                                                                     PLANS AT SACRAMENTO/ROSEVILLE
7840-7836-7826-7832 - ONLINE ONLY
                                                                     Online 08-00669
DESCRIPTION: This project consists of the
renovation of four (4) four-bedroom single-family                    ------------------ APRIL 18 --------------------
homes. This project will be divided into two stages:
First completing the three vacant units, then                        PLAN 084.07                           CONCORD
relocating the tenant from the occupied unit into one                BIDS 4/18/2008 AT 2:00 PM
of the newly renovated units, to renovate the fourth
unit.                                                                STANDBY POWER FACILITY IMPROVEMENTS
PLANS AT ONLINE                                                      DESCRIPTION: The work generally consists of
Online 08-00686                                                      removal and replacement of existing generators with
                                                                     two new 2-MW generators, building and seismic
                                                                     modifications, and electrical work.
                                                                     PLANS AT SACRAMENTO/ROSEVILLE
                                                                     Online 08-00670




Jobs Bidding                                                                                                April 7, 2008
                                                            - 24 -
  Jobs Bidding                                                                                           April 7, 2008


------------------ APRIL 22 --------------------                 ------------------ APRIL 22 --------------------
                                                                 PLAN 171              06-FRE-198 FRESNO CO.
PLAN 004.03                           YUBA CITY
                                                                 BIDS 4/22/2008 AT 2:00 PM
BIDS 4/22/2008 AT 10:00 AM
                                                                 DOT 06-0G7304 INSTALL SOLAR FLASHING
WALTON AVENUE AND CAMINO DE FLORES
                                                                 BEACONS AND WIDENING SHOULDERS
SIGNAL PROJECT
                                                                 DESCRIPTION: This project consists of install solar
DESCRIPTION: This project consists of the
                                                                 flashing beacons and widening shoulders.
installation of traffic signal and handicap ramps.
                                                                 PLANS AT SACRAMENTO
PLANS AT SACRAMENTO/ROSEVILLE
                                                                 Online 08-00727
Online 08-00765
                                                                 PLAN 171            06-MAD-145 MADERA CO.
PLAN 005.01                           YUBA CITY
                                                                 BIDS 4/22/2008 AT 2:00 PM
BIDS 4/22/2008 AT 3:00 PM
                                                                 DOT 06-0G6004 REPAIR FAILED AREAS AND
LINCOLN-JONES IMPROVEMENTS
                                                                 OVERLAY PAVEMENT
DESCRIPTION: This project involves constructing
                                                                 DESCRIPTION: This project consists of repair failed
curb, gutter, and sidewalk on the southwest corner of
                                                                 areas and overlay pavement.
the Lincoln Road and Jones Road intersection.
                                                                 PLANS AT SACRAMENTO
PLANS AT SACRAMENTO/ROSEVILLE
                                                                 Online 08-00728
Online 08-00773
                                                                 PLAN 171                 06-KER-166 KERN CO.
PLAN 015.02                            MODESTO
                                                                 BIDS 4/22/2008 AT 2:00 PM
BIDS 4/22/2008 AT 11:00 AM
                                                                 DOT 6-0E5004 REPLACE CULVERT-CONSTRUCT
2008 STREETS PREVENTIVE MAINTENANCE
                                                                 WINGWALLS-WIDENING SHOULDERS
DESCRIPTION: This project consists of preventive
                                                                 DESCRIPTION: This project consists of replace
maintenance by cape seal and rejuvenating seal.
                                                                 culvert, construct wingwalls and widening shoulders.
PLANS AT SACRAMENTO/ROSEVILLE
                                                                 PLANS AT SACRAMENTO
Online 08-00501
                                                                 Online 08-00730
PLAN 093.01                               BENICIA                PLAN 171            04-SON-101 SONOMA CO.
BIDS 4/22/2008 AT 2:00 PM
                                                                 BIDS 4/22/2008 AT 2:00 PM
THE BENICIA COMMANDANTS REHABILITATION
                                                                 DOT 04-3A0304 GRIND AND REPLACE PCC
PROJECT
                                                                 PAVEMENT
DESCRIPTION: This project consists of seismic
                                                                 DESCRIPTION: This project consists of grind and
retrofitting, and all other rehabilitation equipment
                                                                 replace PCC pavement.
required to complete the project.
                                                                 PLANS AT SACRAMENTO
PLANS AT SACRAMENTO
                                                                 Online 08-00791
Online 08-00707
                                                                 PLAN 201.01                         LOS GATOS
PLAN 171                    06-KER-5 KERN CO.
                                                                 BIDS 4/22/2008 AT 11:00 AM
BIDS 4/22/2008 AT 2:00 PM
                                                                 DMV PARKING LOT SEAL AND STRIPE 07-421
DOT 06-489804 RESURFACE EXISTING
                                                                 DESCRIPTION: This project consists of repairs to
PAVEMENT WITH RUBBERIZED HOT MIX
                                                                 the asphalt surface, apply two seal coats, stripe the
ASPHALT
                                                                 parking lot, remove existing handicapped ramping,
DESCRIPTION: This project consists of resurface
                                                                 install new ADA compliant ramping and install
existing pavement with rubberized hot mix asphalt.
                                                                 bollards. The Contractor shall also remove a raised
PLANS AT SACRAMENTO
                                                                 concrete slab parking space and install asphalt per
Online 08-00726
                                                                 the specs. All parking lot storm drain basins and
                                                                 drain pipe must be cleaned and power flushed
                                                                 PLANS AT SACRAMENTO
                                                                 Online 08-00548



Jobs Bidding                                                                                            April 7, 2008
                                                        - 25 -
  Jobs Bidding                                                                                             April 7, 2008


------------------ APRIL 22 --------------------                   ------------------ APRIL 22 --------------------
                                                                   PLAN 281.01                               DUBLIN
PLAN 213.04                          WOODLAND
                                                                   BIDS 4/22/2008 AT 2:00 PM
BIDS 4/22/2008 AT 2:00 PM
                                                                   PUMP STATION IMPROVEMENTS IN PRESSURE
CONSTRUCTION OF WATER WELL 25 -
                                                                   ZONES 2 AND 3
MONITORING WELL NO 1
                                                                   DESCRIPTION: This project consists of the
DESCRIPTION: This project consists of construct a
                                                                   upgrading of six potable water booster pump stations
groundwater monitoring well in the City of
                                                                   with appurtenances and auxiliary systems.
Woodland consists of all work as indicated on the Bid
                                                                   PLANS AT SACRAMENTO
Schedule and Technical Specs.
                                                                   Online 08-00742
PLANS AT SACRAMENTO
Online 08-00697                                                    PLAN 119.01                          ELK GROVE
PLAN 216.02                             VALLEJO                    BIDS 4/23/2008 AT 3:00 PM
BIDS 4/22/2008 AT 1:30 PM                                          THE COMMONS AT ELK GROVE - ASSISTED
                                                                   LIVING FAC. 49 BID PACKAGES
VALLEJO HIGH SCHOOL BASKETBALL BACK
                                                                   DESCRIPTION: This project consists of an
BOARD SUPPORT
                                                                   Alzheimer's Facility, Assisted Living Facility (2-
DESCRIPTION: Note: Complete Prequalification of
                                                                   stories, 1-Bedroom and 2-Bedroom) and Parking
Bidders Questionnaires are to be submitted by 4/4 at
                                                                   area. There are 49 Separate Bid Packages as
2 p.m. in order to bid this project. This project
                                                                   follows: 1-site survey and staking; 2-site work and
consists of removing existing basketball back boards
                                                                   utilities; 3-paving and striping; 4-site concrete;
and supports, including demolition of existing wall
                                                                   5-landscape and irrigation; 6-concrete; 7-water-
and ceiling finishes; install new blocking, framing for
                                                                   proofing; 8-gypcrete underlayment; 9-masonry and
basketball back boards; install and replace interiors
                                                                   stone work; 10-metals; 11-framing lumber;
materials; install basketball back boards furnished by
                                                                   12-framing labor; 13-trusses; 14-finish carpentry;
the Owner; and painting and patching new and
                                                                   15-cabinets and countertops; 16-plastic laminate;
existing finishes.
                                                                   17-insulation; 18-roofing; 19-siding; 20-sheet metal;
PLANS AT SACRAMENTO/ROSEVILLE
                                                                   21-doors and hardware; 22-automatic sliding doors;
Online 08-00700
                                                                   23-vinyl windows; 24-drywall and steel stud framing;
PLAN 232.05                            MARTINEZ                    25-suspended ceiling; 26-tile; 27-resilient flooring;
BIDS 4/22/2008 AT 2:00 PM                                          28-carpet; 29-fiberglass reinforced panels;
                                                                   30-painting; 31-wall coverings; 32-corner guards;
WET WEATHER BYPASS IMPROVEMENTS - PRE-                             33-fireplaces; 34-flagpoles; 35-metal lockers; 36-fire
LOAD PHASE                                                         extinguishers; 37-mailboxes; 38-toilet and bath
DESCRIPTION: The work generally consists of                        accessories; 39-shelving; 40-commercial kitchen
construction of a "pre-load" fill over the footprint of            equipment; 41-appliances; 42-horizontal louver
the future site of the West Weather Overflow                       blinds; 43-interior PVC shutters; 44-elevators;
Structure and twin box culverts and installation of a              45-plumbing; 46-HVAC; 47-fire sprinklers;
wick drain system.                                                 48-electrical; and 49-emergency call system.
PLANS AT SACRAMENTO/ROSEVILLE                                      PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00712                                                    Online 08-00752
PLAN 248.01                     REDWOOD CITY
BIDS 4/22/2008 AT 11:00 AM
REDWOOD CITY DMV HVAC UNIT
REPLACEMENT-DUCT CLEANING
DESCRIPTION: This project consists of remove and
replace the existing HVAC system with new like
kind HVAC system per the specifications.
PLANS AT SACRAMENTO
Online 08-00604



Jobs Bidding                                                                                              April 7, 2008
                                                          - 26 -
 Jobs Bidding                                                                                           April 7, 2008


------------------ APRIL 23 --------------------               ------------------ APRIL 23 --------------------
                                                               PLAN 171           04-SM-101 SAN MATEO CO.
PLAN 126.01                    GRASS VALLEY
                                                               BIDS 4/23/2008 AT 2:00 PM
BIDS 4/23/2008 AT 2:00 PM
                                                               DOT 04-1E0704 HOT MIXED ASPHALT
WOLF CREEK LODGE
                                                               SURFACING
DESCRIPTION: The construction includes a 31,981
                                                               DESCRIPTION: This project consists of hot mixed
SF residential building (including 3,493 SF of club
                                                               asphalt surfacing.
rooms) with an additional 5,890 SF basement
                                                               PLANS AT SACRAMENTO
garage. The construction includes related site
                                                               Online 08-00792
improvements, off-site improvements, garage
buildings, trash enclosure and spa.                            PLAN 226.01                            YUBA CITY
PLANS AT SACRAMENTO                                            BIDS 4/23/2008 AT 3:00 PM
Online 08-00780
                                                               SECURITY GATE UPGRADES AT WATER AND
PLAN 171             06-FRE-168 FRESNO CO.                     WASTEWATER TREATMENT FACILITIES
BIDS 4/23/2008 AT 2:00 PM                                      DESCRIPTION: The project entails installation of
                                                               new entry gates and fencing at the Yuba City
DOT 06-0F9904 REPAIR DAMAGED SLOPE AND
                                                               Wastewater and Water Treatment Facilities. At the
INSTALL UNDERDRAINS
                                                               Wastewater facility the work is at the main entry
DESCRIPTION: This project consists of repair
                                                               location and includes: new pavement section, curb,
damaged slope and install underdrains.
                                                               gutter, sidewalk, rolling gates, fencing, removal and
PLANS AT SACRAMENTO
                                                               disposal of the old fencing, electrical conduit and pull
Online 08-00729
                                                               boxes. At the Water facility the work is at the two
PLAN 171         10-STA-99 STANISLAUS CO.                      entry gates on Northgate Drive and includes: new
BIDS 4/23/2008 AT 2:00 PM                                      rolling gates, fencing including the entire Northgate
                                                               Drive frontage, removal and disposal of the old
DOT 10-0M8104 INSTALL CHAIN LINK FENCE                         fencing, electrical conduit, and pull boxes. The City
DESCRIPTION: This project consists of install chain            is already under contract with Ingersoll Rand to
link fence.                                                    install security cameras, proximity card readers,
PLANS AT SACRAMENTO                                            monitors and other items at both facilities that will
Online 08-00736                                                work with the new gate operators and use the
PLAN 171               02-SIS-5 SISKIYOU CO.                   conduits and pull boxes installed with this project.
                                                               PLANS AT SACRAMENTO/ROSEVILLE
BIDS 4/23/2008 AT 2:00 PM
                                                               Online 08-00704
DOT 02-0E4804 PLACE HOT MIX ASPHALT
OVERLAY-ADJUST METAL BEAM GUARD                                PLAN 457.05                               LINCOLN
DESCRIPTION: This project consists of place hot                BIDS 4/23/2008 AT 3:00 PM
mix asphalt overlay and adjust metal beam guard.               SANTA CLARA MEMORIAL PARK - ONLINE ONLY
PLANS AT SACRAMENTO                                            DESCRIPTION: Demolition of certain existing
Online 08-00785                                                improvements. Construction of cemetery Reception
PLAN 171                03-SIE-49 SIERRA CO.                   and Conference building and associated site work
                                                               and improvements.
BIDS 4/23/2008 AT 2:00 PM
                                                               PLANS AT ONLINE
DOT 03-0E2004 REPLACE METAL BEAM                               Online 08-00755
GUARDRAIL
DESCRIPTION: This project consists of replace
metal beam guardrail.
PLANS AT SACRAMENTO
Online 08-00790




Jobs Bidding                                                                                           April 7, 2008
                                                      - 27 -
 Jobs Bidding                                                                                              April 7, 2008


------------------ APRIL 24 --------------------                  ------------------ APRIL 24 --------------------
                                                                  PLAN 146.01                 LAMONT, KERN CO.
PLAN 002.02                              MERCED
                                                                  BIDS 4/24/2008 AT 2:00 PM
BIDS 4/24/2008 AT 2:00 PM
                                                                  LAMONT VILLAGE - 44 UNIT APARTMENTS
GARDNER ROAD WIDENING
                                                                  DESCRIPTION: NOTE: OWNER WILL NOT BE
DESCRIPTION: The work to be done consists, in
                                                                  ACCEPTING BIDS. THE TWO GENERAL
general, of replacing an existing culvert in
                                                                  CONTRACTORS: BROWN CONSTRUCTION, INC.
Cottonwood Creek and widening Gardner Road
                                                                  & WALLACE AND SMITH GENERAL
within the City of Merced.
                                                                  CONTRACTORS WILL BE ACCEPTING THE BIDS.
PLANS AT SACRAMENTO/ROSEVILLE
                                                                  The 44-unit rental housing project will be constructed
Online 08-00716
                                                                  on a 6.71 acre site. In addition to the 44 rental units,
PLAN 077.04                                  GALT                 the project will consists of a Community Center
BIDS 4/24/2008 AT 2:00 PM                                         building and fully improved site including play
                                                                  equipment, picnic facilities, covered parking and
GALT HIGH SCHOOL RESTROOM                                         uncovered parking facilities.
MODERNIZATION                                                     PLANS AT SACRAMENTO/ROSEVILLE
DESCRIPTION: Note: This project does not contain                  Online 08-00579
addendum's 1 and 2, which were used as part of the
first phase of the project done in Summer of 2007.                PLAN 161.03            PLANADA, MERCED CO.
Addendum's 1 and 2 do not related to the scope of                 BIDS 4/24/2008 AT 2:00 PM
work in this project, thus the first addendum for this
                                                                  FELIX TORRES FARM WORKER HOUSING SITE
project begins with Addendum 3. This project
                                                                  DESCRIPTION: The work will consist of civil
consists of restroom modernization.
                                                                  construction and building construction, residential
PLANS AT SACRAMENTO
                                                                  and commercial. Attention is called to the need for
Online 08-00758
                                                                  sub-bidders to provide a deductive alternate bid
PLAN 143.02                   CASTRO VALLEY                       along with their base bid. The scope of the deductive
BIDS 4/24/2008 AT 3:00 PM                                         alternate is as following: Seasonal Facility - 6
                                                                  buildings (4 each Type 1 and 2 each Type 2)
REDWOOD CONTINUATION HIGH SCHOOL -                                consisting of 12 units. Year-Round Facility - 2
NEW CAMPUS                                                        buildings (1 each Type 8 and Type 10) consisting of
DESCRIPTION: No description given. Per the Table                  4 units. The deductive alternate include all work from
of Content bids needed from the following bid                     the slab foundation to the roof.
divisions: Div-02 Sitework, Div-03 concrete; Div-05               PLANS AT SACRAMENTO
Metals; Div-06 Wood and Plastic; Div-07 Thermal                   Online 07-03041
and Moisture control; Div-09 Finishes; Div-10
Specialties; and Div-16 Electrical.                               PLAN 229.04                          WOODLAND
PLANS AT SACRAMENTO                                               BIDS 4/24/2008 AT 2:00 PM
Online 08-00743
                                                                  LIBRARY MAINTENANCE PROJECT
                                                                  DESCRIPTION: This project consists of maintenance
                                                                  of the Historical Library in the City of Woodland.
                                                                  Includes stucco repair, repair of windows - replacing
                                                                  broken panes and damaged wood frames, painting
                                                                  the entire building, replacement and repair of roof
                                                                  tiles, while maintaining the historical structure and
                                                                  significance of the building.
                                                                  PLANS AT SACRAMENTO
                                                                  Online 08-00710




Jobs Bidding                                                                                              April 7, 2008
                                                         - 28 -
  Jobs Bidding                                                                                          April 7, 2008


------------------ APRIL 24 --------------------                   -------------------- MAY 5 ----------------------
                                                                   PLAN 006.01                    SACRAMENTO
PLAN 261.02          NORTHERN CALIFORNIA
                                                                   BIDS 5/5/2008 AT 2:00 PM
BIDS 4/24/2008 AT 3:00 PM
                                                                   AUSLENDER PLUMBING PHASE II
DATA CABLING AND ELECTRICAL SERVICES 07-
                                                                   DESCRIPTION: This project consists of plumbing
374
                                                                   improvements to 1500 15th Street.
DESCRIPTION: This project consists of on an "As
                                                                   PLANS AT SACRAMENTO/ROSEVILLE
Needed" basis perform telecommunications, data
                                                                   Online 08-00778
cabling and related electrical services at several
northern California field offices.                                 -------------------- MAY 6 ----------------------
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00643                                                    PLAN 171               02-TEH-5 TEHAMA CO.
PLAN 460.05                       SACRAMENTO                       BIDS 5/6/2008 AT 2:00 PM
BIDS 4/24/2008 AT 2:00 PM                                          DOT 02-0C9704 EXISTING BRIDGE TO BE
COSGROVE WAY SINGLE FAMILY REHABS 2008                             REPLACED
- ONLINE ONLY                                                      DESCRIPTION: This project consists of an existing
DESCRIPTION: This project consists of the                          bridge to be replaced.
renovation of four (4) four-bedroom single family                  PLANS AT SACRAMENTO
homes at 7434, 7458, 7462 and 7466 Cosgrove                        Online 08-00720
Way. This project will be divided into two stages: fist            PLAN 171                 01-LAK-20 LAKE CO.
completing the three vacant units, then relocating the             BIDS 5/6/2008 AT 2:00 PM
tenant from the occupied unit into one of the newly
renovated units, to renovate the fourth unit.                      DOT 01-432604 WIDEN SHOULDERS-UPGRADE
PLANS AT ONLINE                                                    ROAD APPROACHES-DIGOUTS-OVERLAY
Online 08-00768                                                    DESCRIPTION: This project consists of widen
                                                                   shoulders, upgrade road approaches, digouts, and
------------------ APRIL 29 --------------------                   PLANS AT SACRAMENTO
                                                                   Online 08-00783
PLAN 171               04-SOL-80 SOLANO CO.
                                                                   PLAN 244.01                    SACRAMENTO
BIDS 4/29/2008 AT 2:00 PM
                                                                   BIDS 5/6/2008 AT 2:00 PM
DOT 04-0A5314 WIDEN FREEWAY AND
STRUCTURES                                                         BIELE ROOF REPLACEMENT
DESCRIPTION: This project consists of widen                        DESCRIPTION: This project consists of roof
freeway and structures.                                            replacement at 1421 15th Street.
PLANS AT SACRAMENTO                                                PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00622                                                    Online 08-00777

------------------ APRIL 30 --------------------                   -------------------- MAY 7 ----------------------
PLAN 171               03-NEV-80 NEVADA CO.                        PLAN 171         10-STA-99 STANISLAUS CO.
BIDS 4/30/2008 AT 2:00 PM                                          BIDS 5/7/2008 AT 2:00 PM
DOT 03-2E0504 BRIDGE DECK REPLACEMENT                              DOT 10-2A7704 RECONSTRUCT INTERCHANGE
DESCRIPTION: This project consists of bridge deck                  DESCRIPTION: This project consists of reconstruct
replacement.                                                       interchange.
PLANS AT SACRAMENTO                                                PLANS AT SACRAMENTO
Online 08-00789                                                    Online 08-00737




Jobs Bidding                                                                                           April 7, 2008
                                                          - 29 -
 Jobs Bidding                                                                                           April 7, 2008


-------------------- MAY 7 ----------------------               ------------------- MAY 13 ---------------------
                                                                PLAN 230.04                       COSTA MESA
PLAN 212.04                 LOS ANGELES CO.
                                                                BIDS 5/13/2008 AT 1:30 PM
BIDS 5/7/2008 AT 2:00 PM
                                                                REPLACE ROOF AT THE COSTA MESA DMV 07-
FURNISH SPARE COILS AND MATERIALS AT
                                                                454
OSO PUMPING PLANT
                                                                DESCRIPTION: This project consists of replacing the
DESCRIPTION: This project consists of furnish spare
                                                                roof at the Costa Mesa DMV building.
coils and materials at the OSO Pumping Plant.
                                                                PLANS AT SACRAMENTO/ROSEVILLE
PLANS AT SACRAMENTO/ROSEVILLE
                                                                Online 08-00711
Online 08-00770
                                                                PLAN 412.05                    ROHNERT PARK
-------------------- MAY 8 ----------------------               BIDS 5/13/2008 AT 2:00 PM
PLAN 016.07           SACRAMENTO COUNTY                         SCHULZ HEATING SYSTEM REPAIRS AT
BIDS 5/8/2008 AT 2:00 PM                                        SONOMA STATE UNIVERSITY - ONLINE ONLY
                                                                DESCRIPTION: This project consists of abandon the
METRO AIR PARK - MAP - OFFSITE WATER                            existing pipe in place and capping off at the tunnel
TRANSMISSION MAIN                                               and construction of approx. 150 SF concrete block
DESCRIPTION: The installation of 3,400' of 24" DIP              building next to the Schulz Information Center that
water transmission main, bore and jack a 42" steel              will house the hot water boilers and pumps, also
casing under I-5, flushing water amd sanitizing the             included is the installation of the equipment and tie
Metro Air Park in site water system, construction of            into the infrastructure in the mechanical space.
a 15' wide paved access road, miscellaneous grading             PLANS AT ONLINE
and storm drain improvements.                                   Online 08-00358
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00298                                                 ------------------- MAY 14 ---------------------
PLAN 188.06                      PLEASANTON
                                                                PLAN 171           04-ALA-880 ALAMEDA CO.
BIDS 5/8/2008 AT 3:00 PM
                                                                BIDS 5/14/2008 AT 2:00 PM
PAINTING INTERIOR-EXTERIOR AT
                                                                DOT 04-1706U4 REPLACE EXISTING BRIDGE
PLEASANTON DMV 07-420
                                                                WITH PRESTRESSED CONCRETE-WIDEN
DESCRIPTION: This project consists of patch, prep
                                                                FREEWAY
and paint the interior and exterior of the building.
                                                                DESCRIPTION: This project consists of replace
PLANS AT SACRAMENTO
                                                                existing bridge with prestressed concrete and widen
Online 08-00684
                                                                freeway.
------------------- MAY 13 ---------------------                PLANS AT SACRAMENTO
                                                                Online 07-02942
PLAN 171               03-PLA-28 PLACER CO.
                                                                ------------------- MAY 21 ---------------------
BIDS 5/13/2008 AT 2:00 PM
DOT 03-2A9404 DRAINAGE FACILITIES TO BE                         PLAN 171               03-PLA-65 PLACER CO.
RECONSTRUCTED AND AC PAVING                                     BIDS 5/21/2008 AT 2:00 PM
DESCRIPTION: This project consists of drainage
                                                                DOT 03-3338U4 CONSTRUCT NEW FREEWAY
facilities to be reconstructed and AC paving.
                                                                PAVED WITH AC-17 BRIDGES-SOUND WALLS -
PLANS AT SACRAMENTO
                                                                LINCOLN BYPASS
Online 08-00735
                                                                DESCRIPTION: This project consists of construct
                                                                new freeway paved with AC, 17bridges and sound
                                                                walls. This project is near Lincoln from 0.6 km north
                                                                of Twelve Bridges overcrossing to 1.3 km south of
                                                                Bear River.
                                                                PLANS AT SACRAMENTO
                                                                Online 08-00629


Jobs Bidding                                                                                           April 7, 2008
                                                       - 30 -
 Jobs Bidding                                                     April 7, 2008

------------------ JUNE 11 ---------------------
PLAN 158.01                          PITTSBURG
BIDS 6/11/2008 AT 2:00 PM
FIRE STATION 85
DESCRIPTION: This project consists of the
construction of a new wood framed stucco clad two
bay fire station of approx. 7,377 SF, to be located on
and approx. one (1) acre of land. The scope of work
includes Battalion Chief quarters, incombustible roof,
pavements, landscaping, lighting, fencing, utility
connections and the furnishing of all other products,
materials, and construction of all other improvement
work necessary for a complete project.
PLANS AT SACRAMENTO/ROSEVILLE
Online 08-00490