SOP by mnadeemkayani

VIEWS: 35 PAGES: 1

									   CNLC Sudan Adar Testing Operation Regulations
                         Well Testing Report


Section A: INTRODUCTION
Collect the necessary information about the tested well, basic data, testing
summary, flow rate, sampling and others
Section B: OPERATION SEQUENCE
Write down the detail operation procedure, including RIH, set the packer,
perforation, flow measurement data and flow analysis, reverse circulation,
POOH, etc
Section C: WELL TESTING DAILY REPORT
Summary information of everyday testing operation and flow rate, etc
Section D: MEMORY GAUGE REPORT
Describe the memory gauge information including the gauge specification,
program configuration, Power ON/OFF time, duration, and pressure /
temperature curve.
Section E: DOWNHOLE TOOL STRING
Downhole tools string description, OD/ID, length and RIH depth. Cushion
information and Set packer free stroke.




                                                  SUDAN ADAR TESTING
                                                   Nov. 2004




                                      1

								
To top