					                                                                              Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                    Location                                                                                                                 Projected
                                                                                                                                                                           Total Estimated ARRA
VISN


                                                                   Project Number              Project Title                       Description                Award




                 State
                                       Congressional
         City            Zip Code                       County                                                                                               (Phase 5           Project Cost
                                          District
                                                                                                                                                           Projected End
       White
       River
 1               VT 05009                At Large      Windsor   405-08-129          Upgrade Elevators                  Replace or rebuild elevators in
       Junctio
                                                                                                                        B 1, B 31, and B 39.
       n                                                                                                                                                      6/19/2009 $           1,500,000

                                                                                                                    Replace switchgear, feeders,
                                                                                                                    panels, and breakers for the
                                                                                                                    primary and secondary
                                                                                                                    electrical distribution system on
                                                                                     Replace and Upgrade Electrical station as indicated in the
 1     Bedford MA 01730                        6       Middlesex 518-05-203
                                                                                     Distribution System            Power System Study report
                                                                                                                    dated February, 2005. All work
                                                                                                                    will be performed without
                                                                                                                    interruption of normal or
                                                                                                                    emergency electrical service for
                                                                                                                                                              8/27/2009 $           4,033,000
                                                                                                                    the hospital.

                                                                                                                        This phase will renovate ward
                                                                                                                        78F space (presently OP
                                                                                                                        treatment area) into a efficient
                                                                                                                        safe and modern Psych ward.
                                                                                     Renovate Inpatient Psychiatric     All Mental Health Features
 1     Bedford MA 01730                        6       Middlesex 518-08-700
                                                                                     Wards                              required by VA regulations will
                                                                                                                        be incorporated into the area.
                                                                                                                        When 78F is completed, ward
                                                                                                                        78G will be relocated into that
                                                                                                                        space and a similar renovation
                                                                                                                        of 78G will be accomplished.
                                                                                                                                                              6/18/2009 $           7,165,000


                                                                                                                        This project will renovate the
                                                                                                                        existing NHCU on ward 2C. It
                                                                                     Renovate Nursing Home Care
                                                                                                                        will provide the new
 1     Bedford MA 01730                        6       Middlesex 518-09-707          Unit into a Community Living
                                                                                                                        Community Living Center by
                                                                                     Center
                                                                                                                        providing additional private and
                                                                                                                        semi-private bath facilities and
                                                                                                                        more home-like atmosphere.             7/6/2009 $             721,000


                                                                                                                        Replace Fire Alarm system to
       Brockto                                                                                                          include a new planned,
 1             MA 02301                        9       Plymouth 523A5-09-302         Replace Fire Alarm System
       n                                                                                                                systematic, addressable, code
                                                                                                                        compliant system throughout
                                                                                                                        the Medical Center.                   7/13/2009 $           3,525,000


                                                                                     Upgrade Supply, Processing         Upgrade Supply, Processing, &
       Northa                                          Hampshir                      and Distribution Heating,          Distribution Sterilizer, HVAC
 1               MA 01053                      2                631-07-125
       mpton                                           e                             Ventilation and Air Conditioning   System, clean and dirty room
                                                                                     & Sterilizer                       and work flow routes, and
                                                                                                                        remove lead and asbestos              8/10/2009 $           1,400,000
                                                                                                         Page 1 of 45
                                                                               Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                    Location                                                                                                                    Projected
                                                                                                                                                                              Total Estimated ARRA
VISN


                                                                    Project Number              Project Title                       Description                  Award




                 State
                                       Congressional
         City            Zip Code                        County                                                                                                 (Phase 5           Project Cost
                                          District
                                                                                                                                                              Projected End

                                                                                                                         Repair and upgrade of existing
                                                                                                                         fire protection system to meet
                                                                                                                         minimum current Life Safety
                                                                                                                         Code and VA requirements,
                                                                                                                         including fire protection water
       Northa                                          Hampshir                       Repair and Upgrade Fire            system improvements, alarm
 1               MA 01053                      2                631-08-107
       mpton                                           e                              Protection System                  and communication
                                                                                                                         improvements, fire barrier
                                                                                                                         improvements and fire
                                                                                                                         protection system activation
                                                                                                                         improvements. Project
                                                                                                                         addresses FCAs (108792,
                                                                                                                         108802,108810)                           8/6/2009 $           3,060,000

                                                                                                                         This is phase 1 of a
                                                                                                                         multiphased project to repair
                                                                                                                         electrical wiring in all buildings
                                                                                                                         of the VAMC campus by
       Provide                                         Providenc                      Repair and Upgrade Electrical      replacing existing RHW wiring
 1             RI 02908                        1                 650-07-107
       nce                                             e                              Wiring, Phase 1                    with new electrical power
                                                                                                                         wiring. Also replace panel
                                                                                                                         boards, exit lights, and quartz
                                                                                                                         lighting and repair existing
                                                                                                                         electrical/telephone closets to
                                                                                                                         comply with the NEC.                    7/23/2009 $           1,650,000

 2     Buffalo   NY 14215                      28      Erie       528-08-106          Expand Dialysis Clinic             Renovate former lab space to
                                                                                                                         expand the Dialysis Clinic              8/10/2009 $             750,000

 2     Buffalo   NY 14215                      28      Erie       528-09-121          Repair Warehouse Roof              Replace roof over warehouse
                                                                                                                         and retail store.                        8/7/2009 $             425,000

                                                                                                                         Repair loading docks at Bldg 1,
                                                                                                                         Receiving, and Bldg 2,
                                                                                      Repair Warehouse Loading           Maintenance, and improve
 2     Albany    NY 12208                      21      Albany     528A8-08-831                                           building access. Remove
                                                                                      Docks
                                                                                                                         storage building and grade
                                                                                                                         area. Provide relocatable office
                                                                                                                         building for the Projects
                                                                                                                                                                 8/27/2009 $             350,000
                                                                                                                         Section and Contracting.




                                                                                                          Page 2 of 45
                                                                               Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                    Location                                                                                                                Projected
                                                                                                                                                                          Total Estimated ARRA
VISN


                                                                    Project Number              Project Title                      Description               Award




                 State
                                       Congressional
         City            Zip Code                        County                                                                                             (Phase 5           Project Cost
                                          District
                                                                                                                                                          Projected End

                                                                                                                    This project will renovate
                                                                                                                    portions of and expand the
                                                                                                                    Post Anesthesia Care Unit on
                                                                                                                    the C Wing of the 2nd floor of
                                                                                                                    Building One. The first phase
                                                                                                                    includes improving a 1,200
                                                                                                                    square foot equipment storage
                                                                                                                    room for a temporary 6 bed
                                                                                                                    Recovery Room by adding
                                                                                                                    patient head walls (medical
                                                                                                                    gases, electricity, nurse call), a
                                                                                                                    Nurses Station and sinks to
                                                                                                                    relocate the recovery functions
                                                                                      Renovate Post Anesthesia Care into while the existing PACU is
 2     Albany    NY 12208                      21      Albany     528A8-09-802                                      being renovated in place. The
                                                                                      Unit
                                                                                                                    second phase accomplishes
                                                                                                                    selective demolition and builds
                                                                                                                    a new corridor around the
                                                                                                                    outside of what will become an
                                                                                                                    expanded PACU. The last
                                                                                                                    phase includes the Recovery
                                                                                                                    Room with Nurse’s Station,
                                                                                                                    Soiled Utility Room, Clean
                                                                                                                    Room and Storage Room.
                                                                                                                    Approximately 390 square feet
                                                                                                                    of the existing 705 square foot
                                                                                                                    Recovery Room will have aged
                                                                                                                    building components replaced
                                                                                                                    and the Recovery Room will be
                                                                                                                    expanded to approximately                6/18/2009 $             997,500


                                                                                                                         This project will give the
                                                                                      Replace and Upgrade the            Ground Floor research area the
 3     Bronx     NY 10468                      16      Bronx      526-06-103          Heating, Ventilation and Air       needed individual temperature
                                                                                      Conditioning & Controls            and humidity controls needed
                                                                                                                         to meet current standards for
                                                                                                                         animal housing.                     8/21/2009 $           1,168,000
 3     Buffalo   NY 14215                      28      Erie       528-09-122          Repair Warehouse Roof                                                  6/19/2009 $             560,000


                                                                                      Upgrade Heating, Ventilation       Project involves the
       East                                                                                                              replacement of the HVAC
 3            NJ 07018                         10      Essex      561-08-105          and Air Conditioning &
       Orange                                                                                                            system in the Prosthetics Area
                                                                                      Plumbing Systems
                                                                                                                         and the replacement of the
                                                                                                                         building water softeners.           8/13/2009 $           2,500,000




                                                                                                          Page 3 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                   Projected
                                                                                                                                                                           Total Estimated ARRA
VISN


                                                                 Project Number              Project Title                       Description                  Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                                 (Phase 5           Project Cost
                                        District
                                                                                                                                                           Projected End


                                                                                                                      Project will install an electronic
       East                                                                                                           automated access security
 3            NJ 07018                       10      Essex     561-08-106          Install Access Security System
       Orange                                                                                                         system throughout the facility
                                                                                                                      that will be controlled at the
                                                                                                                      police central dispatch center.         8/25/2009 $             850,000

                                                                                                                   Work involves renovation of
       East                                                                        Renovate and Modernize the
 3            NJ 07018                       10      Essex     561-08-107                                          the halls and walls of Building
       Orange                                                                      Inpatient Ward Halls and Floors
                                                                                                                   1 on the 13th floor for the
                                                                                                                   inpatient area.                             6/3/2009 $             500,000


                                                                                                                    This project involves upgrading
                                                                                   Upgrade Heating, Ventilation     the HVAC system in the
       East
 3            NJ 07018                       10      Essex     561-09-107          and Air Conditioning for Cardiac Cardiac Cath Lab to comply
       Orange
                                                                                   Cath Lab                         with current HVAC criteria (i.e.,
                                                                                                                    cath labs are new required to
                                                                                                                    bring in 100% outside air).               8/25/2009 $             275,000

                                                                                                                      Work includes the renovation
       East                                                                        Renovate the Ear, Nose and         of the ENT suite to include a
 3            NJ 07018                       10      Essex     561-09-119
       Orange                                                                      Throat Clinic                      modernized suite with patient
                                                                                                                      privacy and American Disability
                                                                                                                      Act compliance                          6/15/2009 $             330,000

                                                                                                                      Replace security cameras
 3     Lyons   NJ 07939                      11      Somerset 561A4-01-130         Upgrade Security Project           throughout the facility to
                                                                                                                      ensure safety of patients, staff
                                                                                                                      and visitors                            6/30/2009 $           1,200,000

                                                                                                                     Project repairs and corrects
                                                                                                                     structural deficiencies in the
                                                                                   Repair Structural Deficiencies in existing Maintenance Building.
 3     Lyons   NJ 07939                      11      Somerset 561A4-07-205
                                                                                   Building                          Additional work includes the
                                                                                                                     replacement and installation of
                                                                                                                     concrete block and the
                                                                                                                     replacement of the roof.                 8/17/2009 $             385,000

                                                                                                                      Project will repair and replace
                                                                                   Repair and Upgrade the Storm
 3     Lyons   NJ 07939                      11      Somerset 561A4-07-220                                            broken section of the
                                                                                   Water System
                                                                                                                      underground storm water
                                                                                                                      collection system                        7/9/2009 $           2,500,000

                                                                                                                      Replace the steam lines
       Montro                                        Westchest
 3            NY 10548                       19                620-08-101          Replace Steam Lines, Phase 2       throughout the campus to
       se                                            er
                                                                                                                      ensure a modern and safe
                                                                                                                      environment for staff.                  6/25/2009 $           3,450,000




                                                                                                       Page 4 of 45
                                                                             Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                 Projected
                                                                                                                                                                          Total Estimated ARRA
VISN


                                                                  Project Number              Project Title                      Description                 Award




                State
                                      Congressional
         City           Zip Code                       County                                                                                               (Phase 5           Project Cost
                                         District
                                                                                                                                                          Projected End

                                                                                                                       Renovate Building 5 for dining
       Montro                                         Westchest                     Renovate for Patient Dining
 3            NY 10548                        19                620-09-105                                             services for patients and
       se                                             er                            Area
                                                                                                                       mental health program
                                                                                                                       participants.                         7/23/2009 $           3,300,000

                                                                                                                       The contractor will perform
                                                                                                                       masonry repairs, joint tucking
                                                                                                                       and seal coat of the exterior
       Castle                                                                       Repair Exterior of Building to     masonry for buildings due to
 3              NY 12511                      19      Duchess   620A4-07-109                                           weathering and age to
       Point                                                                        Tuck-Point and Seal Masonry
                                                                                                                       eliminate leakage and seepage
                                                                                                                       of rain and melt
                                                                                                                       waters and damage to bricks,
                                                                                                                       trim and surfaces to cause
                                                                                                                                                             6/29/2009 $           1,900,000
                                                                                                                       collapse or falling pieces.
                                                                                                                       The contractor will perform
                                                                                                                       masonry repairs, joint tucking
                                                                                                                       and seal coat of the exterior
       Castle                                                                       Repair Exterior of Building to     masonry for buildings due to
 3              NY 12511                      19      Duchess   620A4-07-110                                           weathering and age to
       Point                                                                        Tuck-Point and Seal Masonry
                                                                                                                       eliminate leakage and seepage
                                                                                                                       of rain and melt
                                                                                                                       waters and damage to bricks,
                                                                                                                       trim and surfaces to cause
                                                                                                                                                             6/30/2009 $           1,900,000
                                                                                                                       collapse or falling pieces.

                                                                                                                       Contractor in first phase will
                                                                                                                       replace fan coil units in rooms
       Castle
 3              NY 12511                      19      Duchess   620A4-08-104        Replace Fan Coils, Phase 1         stacked over each other on the
       Point
                                                                                                                       first and second floors. Install
                                                                                                                       necessary valving for ready
                                                                                                                       unit maintenance.                     7/28/2009 $             850,000

                                                                                                                       Repair and upgrade boilers to
       Castle
 3              NY 12511                      19      Duchess   620A4-09-111        Repair and Upgrade Boilers         ensure optimum operation;
       Point
                                                                                                                       upgrade associate component
                                                                                                                       equipment as well.                    6/10/2009 $           1,750,000

                                                                                                                       Repair and upgrade boilers to
       Castle
 3              NY 12511                      19      Duchess   620A4-09-112        Repair and Upgrade Boilers         ensure optimum operation;
       Point
                                                                                                                       upgrade associate component
                                                                                                                       equipment as well.                    6/10/2009 $           1,750,000




                                                                                                        Page 5 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                   Projected
                                                                                                                                                                            Total Estimated ARRA
VISN


                                                                  Project Number              Project Title                       Description                  Award




                State
                                      Congressional
         City           Zip Code                       County                                                                                                 (Phase 5           Project Cost
                                         District
                                                                                                                                                            Projected End

                                                                                                                       Project is for completion of
                                                                                                                       advanced utility metering
                                                                                                                       installation so that all utilities
                                                                                                                       (Electric, Natural Gas, Steam,
                                                                                                                       Chilled Water, Chiller/Boiler
                                                                                                                       Make-up Water, Water) of each
       Castle
 3              NY 12511                      19      Duchess   620A4-09-113       Install Utility Metering            building are metered with fully
       Point
                                                                                                                       operational electronic meters
                                                                                                                       inclusive of network wiring,
                                                                                                                       web-base solution to monitor
                                                                                                                       the energy consumption,
                                                                                                                       demand of buildings and
                                                                                                                       addresses the bill auditing and
                                                                                                                       commodity analysis.                     8/11/2009 $             340,000
                                                                                                                       This project installs a of
       Castle                                                                                                          mounted 10 KW Vertical Wind
 3              NY 12511                      19      Duchess   620A4-09-116       Install Wind Turbine
       Point                                                                                                           Turbine to provide power to
                                                                                                                       building circuits.                      7/22/2009 $              80,000

                                                                                                                    Refurbish Air Handling Unit #
       New                                                                         Replace and Upgrade Heating, 11, 12, 13 housing, induction
                                                      Manhatta
 3     York     NY 10010                      14               630-08-104          Ventilation and Air Conditioning units drain piping, OR Coils,
                                                      n                                                             provide Freon leakage
       City                                                                        Equipment
                                                                                                                    detection system, chemical
                                                                                                                    treatment. Upgrade controls in
                                                                                                                    AC plant.                                   7/3/2009 $           1,623,800

                                                                                                                       Replace the existing three
                                                                                                                       emergency generators. The
                                                                                                                       new emergency generators
                                                                                                                       shall have the capability to
                                                                                                                       handle the entire demands of
                                                                                                                       the hospital in the event the
       New                                                                                                             hospital loses power. All
                                                      Manhatta
 3     York     NY 10010                      14               630-08-106          Replace Generators, Ph 2            additional loads not on
                                                      n
       City                                                                                                            emergency will be added to
                                                                                                                       emergency power such as fire
                                                                                                                       alarm panels, Supply,
                                                                                                                       Processing, & Distribution
                                                                                                                       supply/exhaust fans, 7th fl.
                                                                                                                       OPC A/C controls, utilities on
                                                                                                                       main bldg. ground to 3rd fl.,           6/30/2009 $           4,755,383
                                                                                                                       etc.
       New                                                                                                             Repair the pavement of the
                                                      Manhatta                     Repair Parking Lot and
 3     York     NY 10010                      14               630-08-109                                              parking lot, entrance to the
                                                      n                            Sidewalks
       City                                                                                                            parking lot and repair and
                                                                                                                       upgrade the loading platform.           6/29/2009 $             850,000



                                                                                                        Page 6 of 45
                                                                          Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                Projected
                                                                                                                                                                         Total Estimated ARRA
VISN


                                                                  Project Number             Project Title                      Description                 Award




                State
                                      Congressional
        City            Zip Code                       County                                                                                              (Phase 5           Project Cost
                                         District
                                                                                                                                                         Projected End

                                                                                                                    This project involves the
                                                                                                                    replacement of the existing
                                                                                                                    controls system spread
                                                                                   Replace and Upgrade Heating, throughout the campus and
       St
 3              NY 11425                      6       Queens    630A4-08-409       Ventilation and Air Conditioning consolidating it to one central
       Albans
                                                                                   Components and Controls          system. The project involves
                                                                                                                    the replacement of control
                                                                                                                    valves, dampers, motor
                                                                                                                    actuators, thermostats and
                                                                                                                                                            7/29/2009 $             650,000
                                                                                                                    motor starters.
                                                                                                                      This project involves installing
                                                                                                                      new medical air compressors
       St                                                                          Install New Medical Gas            and medical vacuum pumps in
 3              NY 11425                      6       Queens    630A4-08-410                                          Building 85/86. The project
       Albans                                                                      Systems
                                                                                                                      includes installation of new
                                                                                                                      medical gas risers, medical gas
                                                                                                                      alarm panels and new medical
                                                                                                                                                             8/4/2009 $             550,000
                                                                                                                      gas zone valves.

       St                                                                                                             This project involves removing
 3              NY 11425                      6       Queens    630A4-08-412       Replace Boiler Plant Roof
       Albans                                                                                                         and replacing the existing roof
                                                                                                                      over the boiler plant.                7/17/2009 $             400,000

       Brookly                                                                     Upgrade the Electrical             Upgrade the electrical systems
 3             NY 11209                       13      Kings     630A4-08-417
       n                                                                           Distribution System                to ensure Life Safety
                                                                                                                      compliance                            8/18/2009 $             600,000


                                                                                                                      Replace induction unit systems
                                                                                                                      in patient areas with Constant
       Brookly                                                                     Upgrade Heating, Ventilation       volume reheat system and
 3             NY 11209                       13      Kings     630A4-09-401FCA
       n                                                                           and Air Conditioning System        dedicated air handling systems.
                                                                                                                      Remove existing ductwork,
                                                                                                                      wiring, ceiling, etc Install new
                                                                                                                      system and controls.                   7/1/2009 $             395,000

                                                                                                                      This project involves installing
                                                                                                                      an additional exhaust fan to
                                                                                                                      provide ventilation to inpatient
       Brookly                                                                     Upgrade Ventilation System in
 3             NY 11209                       13      Kings     630A4-09-403FCA                                       units corridors and congregate
       n                                                                           Building 1
                                                                                                                      baths. Also the project entails
                                                                                                                      cleaning out and vacuuming
                                                                                                                      the existing exhaust duct risers
                                                                                                                      and branch duct work                  6/24/2009 $             350,000




                                                                                                       Page 7 of 45
                                                                              Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                 Projected
                                                                                                                                                                          Total Estimated ARRA
VISN


                                                                   Project Number             Project Title                       Description                Award




                State
                                      Congressional
        City            Zip Code                        County                                                                                              (Phase 5           Project Cost
                                         District
                                                                                                                                                          Projected End


                                                                                                                       This project involves replacing
                                                                                                                       the existing sprinkler heads in
                                                                                                                       Building No 4 with quick
                                                                                                                       response sprinkler heads. The
                                                                                                                       project involves installing new
       Brookly
 3             NY 11209                       13      Kings      630A4-09-404FCA     Replace Sprinkler System          sprinkler control valves and
       n
                                                                                                                       installing new tamper and flow
                                                                                                                       switches. The project involves
                                                                                                                       running new sprinkler piping in
                                                                                                                       the Building No 4 storage area
                                                                                                                       to raise sprinklers head to be
                                                                                                                       closer to the ceiling slab.
                                                                                                                                                             6/10/2009 $             155,000

                                                                                                                       Project involves dividing
                                                                                                                       existing 950 SF Radiology File
                                                                                                                       room into a patient holding
                                                                                                                       area and file room. Work
                                                                                                                       consists of new medical gas
                                                                                                                       system, electrical outlets and
                                                                                                                       light fixtures, and modification
       Brookly                                                                                                         of plumbing and HVAC system.
 3             NY 11209                       13      Kings      630A4-09-406        Renovate Radiology
       n                                                                                                               The project also consists of re-
                                                                                                                       configuring existing Radiology
                                                                                                                       administrative space. Work
                                                                                                                       consists of demolition existing
                                                                                                                       partition and replacing existing
                                                                                                                       flooring, ceiling system, and
                                                                                                                       light fixtures. Cosmetic
                                                                                                                       upgrade existing staff
                                                                                                                       bathroom.                              6/4/2009 $             657,000

                                                                                                                       Update and rebuild a 40 year
                                                                                     Renovate and Modernize            old Supply, Processing, &
       Northp
 3              NY 11768                      2       Suffolk    632-07-105ES        Supply, Processing and            Distribution space to current
       ort
                                                                                     Distribution                      VHA standards. The project will
                                                                                                                       improve utilities and
                                                                                                                       functionality of the space.           8/19/2009 $           1,800,000

                                                                                                                       Upgrade research wet labs to
                                                                                                                       current American Association
       Northp                                                                                                          for Accreditation of Laboratory
 3              NY 11768                      2       Suffolk    632-07-108          Renovate Research Wet Labs
       ort                                                                                                             Animal Care standards to
                                                                                                                       include new lab floors, walls,
                                                                                                                       ventilation systems and work
                                                                                                                       space.                                8/25/2009 $             865,000




                                                                                                        Page 8 of 45
                                                                              Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                   Projected
                                                                                                                                                                            Total Estimated ARRA
VISN


                                                                   Project Number              Project Title                       Description                 Award




                State
                                      Congressional
        City            Zip Code                        County                                                                                                (Phase 5           Project Cost
                                         District
                                                                                                                                                            Projected End

                                                                                                                        Update research admin and
       Northp                                                                                                           labs to meet current American
 3              NY 11768                      2       Suffolk    632-07-113          Renovate Research
       ort                                                                                                              Association for Accreditation of
                                                                                                                        Laboratory Animal Care
                                                                                                                        standards.                             7/10/2009 $             500,000

                                                                                                                        Replace all windows in Building
       Northp
 3              NY 11768                      2       Suffolk    632-08-111          Replace Windows                    200 with appropriate windows
       ort
                                                                                                                        to maintain a proper
                                                                                                                        environment.                            8/3/2009 $           1,500,000

                                                                                                                    This project will correct all the
                                                                                                                    Critical Electrical Deficiencies.
                                                                                                                    This project will provide for the
       Coatesv                                                                       Upgrade and Replace Electrical removal, replacement and
 4             PA 19320                       6       Chester    542-08-118
       ille                                                                          Distribution System            upgrade of the electrical
                                                                                                                    systems identified in the study
                                                                                                                    and correct all deficiencies in
                                                                                                                    accordance with all National
                                                                                                                    Electrical Codes (NEC).                    7/15/2009 $           1,750,000

                                                                                                                        This project will renovate the
                                                                                                                        20+ year old Dental Lab area.
                                                                                                                        The project will include
       Philadel                                       Philadelph                     Renovate and Modernize the         casework, equipment
 4              PA 19104                      2                  642-09-113
       phia                                           ia                             Dental Lab                         installations and planning,
                                                                                                                        laboratory benches and
                                                                                                                        associated systems and
                                                                                                                        appropriate finishes for the
                                                                                                                                                                7/7/2009 $              35,000
                                                                                                                        environment.

                                                                                                                        Upgrade boiler controls, alarms
       Philadel                                       Philadelph                     Upgrade the Boiler Plant           and piping to meet latest VHA
 4              PA 19104                      2                  642-09-505                                             criteria as outlined in report of
       phia                                           ia                             Controls
                                                                                                                        survey conducted on August
                                                                                                                        11/12, 2008 and report dated
                                                                                                                        9/10/08.                                6/3/2009 $             466,440
       Wilkes-
 4             PA 18711                       11      Luzerne    693-07-109          Renovate the Cath Lab              Prepare for the site prep of the
       Barre
                                                                                                                        new cath lab equipment.                8/28/2009 $             315,000




                                                                                                         Page 9 of 45
                                                                              Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                  Projected
                                                                                                                                                                           Total Estimated ARRA
VISN


                                                                   Project Number              Project Title                       Description                Award




                State
                                      Congressional
         City           Zip Code                        County                                                                                               (Phase 5           Project Cost
                                         District
                                                                                                                                                           Projected End

                                                                                                                        The project is to renovate
                                                                                                                        Canteen cafeteria and dining
                                                                                                                        room Approximately 7,500 SF
                                                                                                                        to include the serving food
                                                                                                                        shop area in the second floor
                                                                                                                        of building 1. The project
                                                                                                                        includes demolition,
                                                                                                                        architectural changes to
       Baltimo
 5             MD 21201                       7       Baltimore 512-06-101           Renovate Canteen Food Court        existing space, mechanical,
       re
                                                                                                                        plumbing, electrical, and HVAC
                                                                                                                        upgrade. This project will
                                                                                                                        include general construction,
                                                                                                                        modify exiting space, replace
                                                                                                                        and install new cooking
                                                                                                                        equipments, install new salad
                                                                                                                        bar, relocate serving bars and
                                                                                                                        replace the seats and tables in
                                                                                                                        the main dining area.                  8/7/2009 $             525,000

                                                                                                                        Install underground chilled
       Perry                                                                                                            water supply and return lines
 5              MD 21902                      1       Cecil      512-07-302          Replace Chilled Water Line         from the chiller plant to
       Point
                                                                                                                        building 101 across the street
                                                                                                                        to provide air conditioning to
                                                                                                                        the building.                         8/26/2009 $             150,000

                                                                                                                      The work requires select
                                                                                                                      appropriate cooling system for
                                                                                                                      the equipment, select
                                                                                                                      appropriate site to place the
       Perry                                                                         Replace and Upgrade Heating, cooling equipment,
 5              MD 21902                      1       Cecil      512-08-308
       Point                                                                         Ventilation and Air Conditioning design/upgrade power
                                                                                                                      requirements for the
                                                                                                                      equipment operations, and
                                                                                                                      design/install chilled water
                                                                                                                      piping system for the
                                                                                                                                                              8/14/2009 $             450,000
                                                                                                                      equipment/system.
                                                                                                                        The purpose of this project is
                                                                                                                        to remove Approx. 44,000 SF
                                                                                                                        of the existing roof section C &
                                                                                                                        D (Phase 2)down to the roof
       Perry                                                                                                            deck and replace with new
 5              MD 21902                      1       Cecil      512-08-312          Replace Roof
       Point                                                                                                            roof. The replacement roof will
                                                                                                                        consist of new insulation and a
                                                                                                                        single ply membrane,
                                                                                                                        mechanically attached, fully
                                                                                                                        adhered, loose laid and
                                                                                                                                                              8/21/2009 $             548,000
                                                                                                                        ballasted."

                                                                                                        Page 10 of 45
                                                                              Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                  Projected
                                                                                                                                                                           Total Estimated ARRA
VISN


                                                                   Project Number             Project Title                       Description                 Award




                State
                                      Congressional
         City           Zip Code                        County                                                                                               (Phase 5           Project Cost
                                         District
                                                                                                                                                           Projected End

                                                                                                                       This project will grind and
                                                                                                                       overlay the asphalt pavement
       Perry                                                                                                           on over 8000 linear feet of
 5              MD 21902                      1       Cecil      512-08-313          Repair Roads and Sidewalks
       Point                                                                                                           road as well as accomplish
                                                                                                                       other repairs to deteriorated
                                                                                                                       sidewalks, roads and parking
                                                                                                                       lots.                                  8/14/2009 $           1,375,000
                                                                                                                       This project will replace wet
                                                                                                                       pipe sprinkler heads in six of
                                                                                                                       the older buildings on campus,
                                                                                                                       relocate fire alarm pull stations
                                                                                                                       to code compliant locations,
                                                                                                                       provide smoke detectors within
                                                                                                                       24 inches of sprinklers in
                                                                                                                       elevator machine rooms,
                                                                                                                       provide sidewalks to connect
                                                                                                                       side and rear exits in building
                                                                                                                       364 to the public thoroughfare.
                                                                                                                       This project will also replace
                                                                                                                       the overhead doors to the fire
                                                                                                                       engine bays at the firehouse
       Perry                                                                         Upgrade and Replace Fire &        and will make other FCA
 5              MD 21902                      1       Cecil      512-08-319                                            corrections to the building
       Point                                                                         Safety Systems
                                                                                                                       envelope and interior on
                                                                                                                       Building 26 (firehouse).
                                                                                                                       Included is the construction of
                                                                                                                       an addition on the rear of the
                                                                                                                       building to house the locker
                                                                                                                       room, equipment/supply
                                                                                                                       storage room and utility room;
                                                                                                                       construction of an addition on
                                                                                                                       the northwest side of buidling
                                                                                                                       to house the rescue boat and
                                                                                                                       provide for storage of VAMHCS
                                                                                                                       disaster, decontamination and
                                                                                                                       pandemic supplies; paint
                                                                                                                       engine room and replace all
                                                                                                                       ceiling tiles; clean, repair           7/31/2009 $             475,000


                                                                                                                       This project will replace the
                                                                                                                       existing built up roof which is
       Baltimo
 5             MD 21201                       7       Baltimore 512-09-107           Repair Roofs                      22 years old and near the end
       re
                                                                                                                       of its life expectancy, with a
                                                                                                                       new cold applied built up roof
                                                                                                                       having a 30 year warranty.             8/21/2009 $             450,000




                                                                                                       Page 11 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                   Projected
                                                                                                                                                                           Total Estimated ARRA
VISN


                                                                 Project Number              Project Title                       Description                  Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                                 (Phase 5           Project Cost
                                        District
                                                                                                                                                           Projected End

                                                                                                                      The project is to pursue
                                                                                                                      correction efforts to electrical
                                                                                                                      deficiencies that have been
       Baltimo                                                                     Upgrade and Repair Electrical      identified by an extensive
 5             MD 21201                      7       Baltimore 512-09-111
       re                                                                          Distribution System                study. Study findings include
                                                                                                                      NEC code violations in device
                                                                                                                      placement, insufficient load to
                                                                                                                      support certain medical
                                                                                                                                                              8/18/2009 $             200,000
                                                                                                                      equipment operations, etc.
       Baltimo                                                                                                        All steam traps will be analyzed
 5             MD 21201                      7       Baltimore 512-09-113          Replace Steam Traps
       re                                                                                                             for failure and replaced if
                                                                                                                      needed.                                 8/21/2009 $             200,000

                                                                                                                      This project is to construct a
                                                                                                                      Vestibule/Waiting Area Shelter
                                                                                                                      in the P1 Parking Level. The
                                                                                                                      Vestibule will provide 900
                                                                                                                      square feet of temperature-
                                                                                                                      controlled space for patients,
                                                                                                                      staff, and guests who are
                                                                                                                      waiting for the elevators. It will
       Baltimo                                                                     Construct Entrance Vestibule       also house Valet Service, which
 5             MD 21201                      7       Baltimore 512-09-128
       re                                                                          Parking Garage P1                  currently operates in an
                                                                                                                      adjacent area. It will be
                                                                                                                      constructed of concrete &
                                                                                                                      storefront glass, include 2
                                                                                                                      automatic sliding doors, and be
                                                                                                                      independently heated and
                                                                                                                      cooled. The new Vestibule will
                                                                                                                      provide a more aesthetically-
                                                                                                                      pleasing and comfortable
                                                                                                                      waiting area and hospital               7/13/2009 $              90,000
                                                                                                                      entrance.




                                                                                                      Page 12 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                  Projected
                                                                                                                                                                          Total Estimated ARRA
VISN


                                                                 Project Number              Project Title                       Description                 Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                                (Phase 5           Project Cost
                                        District
                                                                                                                                                          Projected End

                                                                                                                   Provide and install storefront
                                                                                                                   door. Anchor aluminum frames
                                                                                                                   to adjoining construction at
                                                                                                                   heads, jambs and bottom and
                                                                                                                   to steel supports, and bracing.
                                                                                                                   The storefront shall be
                                                                                                                   approximately 6-inches (six)
                                                                                                                   above the acoustic tile ceiling.
                                                                                                                   Provide and install a door
                                                                                                                   bell/buzzer next to the door to
                                                                                                                   request entrance into the
                                                                                                                   PRRTP area. The unlocking
                                                                                                                   mechanism shall be located at
       Baltimo                                                                     Install Security Door 6A Mental the nurse station. The button
 5             MD 21201                      7       Baltimore 512-09-129                                          in the nurse’s station shall be
       re                                                                          Health
                                                                                                                   utilized to de-energize the
                                                                                                                   locking hardware on the
                                                                                                                   storefront door to allow for
                                                                                                                   entering the PRRTP area. The
                                                                                                                   button in the nurse’s station
                                                                                                                   shall be flush mounted and
                                                                                                                   clearly labeled for ease of use.
                                                                                                                   Provide and install all additional
                                                                                                                   components to the keyless card
                                                                                                                   reader at the entrance of the
                                                                                                                   storefront door. Integrate
                                                                                                                   keyless card reader with
                                                                                                                   existing card reader system
                                                                                                                   and software in the PRRTP
                                                                                                                   area.                                     6/30/2009 $              40,000

                                                                                                                      The purpose of this project is
                                                                                                                      to change the single zone
                                                                                                                      system currently serving the A
                                                                                                                      & MMS into a multi-zone
                                                                                                                      system. The current system is
                                                                                                                      inefficient due to the difference
                                                                                   Upgrade Acquisitions and
                                                                                                                      in thermal loads in different
       Baltimo                                                                     Materials Management Service
 5             MD 21201                      7       Baltimore 512-09-130                                             areas. The end result is
       re                                                                          Heating, Ventilation and Air
                                                                                                                      additional cost to the VAMHCS
                                                                                   Conditioning Controls
                                                                                                                      because the A & MMS area is
                                                                                                                      over conditioned. To increase
                                                                                                                      occupants comfort and reduce
                                                                                                                      the amount of energy used
                                                                                                                      there is a need for a better
                                                                                                                      control system using multiple
                                                                                                                      temperature zones.                     8/21/2009 $             250,000



                                                                                                      Page 13 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                   Projected
                                                                                                                                                                           Total Estimated ARRA
VISN


                                                                 Project Number              Project Title                       Description                  Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                                 (Phase 5           Project Cost
                                        District
                                                                                                                                                           Projected End

       Baltimo                                                                     Upgrade and Repair Electrical      This project corrects electrical
 5             MD 21201                      7       Baltimore 512-09-131
       re                                                                          Distribution System                deficiencies as identified in the
                                                                                                                      FCA report                              8/17/2009 $             750,000


       Loch                                                                                                           Replaces the existing gamewell
 5             MD 21218                      7       Baltimore 512-09-203          Replace Fire Alarm System
       Raven                                                                                                          fire alarm system with a new
                                                                                                                      addressable fire alarm system.          8/28/2009 $             300,000


                                                                                                                      The project is to construct
                                                                                                                      approximately 800 sf Low
                                                                                                                      Vision Clinic at Loch Raven in
                                                                                                                      the Outpatient Clinic. Area is to
                                                                                                                      be divided into two separate
                                                                                                                      rooms. One room is the
                                                                                                                      Therapy room and the other
                                                                                                                      the Mobility & Orientation
                                                                                                                      room. Connected to this room
       Loch
 5             MD 21218                      7       Baltimore 512-09-205          Construct a Low Vision Clinic      is an 84 sf. office. There is to
       Raven
                                                                                                                      be a combination of bright and
                                                                                                                      light color contrast to aid in the
                                                                                                                      training. Construction to consist
                                                                                                                      of new walls, doors, ducting,
                                                                                                                      and carpet. Also, the project
                                                                                                                      involves some minor demolition
                                                                                                                      and renovation. All
                                                                                                                      requirements must comply with
                                                                                                                      American Disability Act
                                                                                                                      regulations.
                                                                                                                                                              8/28/2009 $             100,000

                                                                                                                      The dock leveler at Loch Raven
                                                                                                                      needs to be replaced with new.
                                                                                                                      The contractor shall prior to
                                                                                                                      installation clean pit thoroughly
       Loch                                                                                                           and verify that all dimensions
 5             MD 21218                      7       Baltimore 512-09-207          Replace Dock Leveler
       Raven                                                                                                          are in accordance with VA
                                                                                                                      specs. The contractor shall
                                                                                                                      make a temporary electrical
                                                                                                                      hook up to allow deck to be
                                                                                                                      raised and lowered during
                                                                                                                      installation.                           8/19/2009 $              20,000




                                                                                                      Page 14 of 45
                                                                              Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                     Projected
                                                                                                                                                                              Total Estimated ARRA
VISN


                                                                   Project Number              Project Title                        Description                  Award




                State
                                      Congressional
         City           Zip Code                        County                                                                                                  (Phase 5           Project Cost
                                         District
                                                                                                                                                              Projected End

                                                                                                                        The initiative is to provide
                                                                                                                        directional bore/trench, to
                                                                                                                        place two 4” HDPE SDR 13.5
                                                                                                                        from existing manhole, to tie
                                                                                                                        conduit into manhole, and to
                                                                                                                        place conduit according to
       Loch                                                                          Relocate Campus Main               specifications required by
 5              MD 21218                      7       Baltimore 512-09-208
       Raven                                                                         Telephone Feed Bldg 4              General Service Tariff MD
                                                                                                                        P.S.C. No.203 about
                                                                                                                        Construction for Permanent
                                                                                                                        Service. Additional construction
                                                                                                                        requirements require place
                                                                                                                        three inner ducts in each
                                                                                                                        conduit and leave pull rope in
                                                                                                                        these inner ducts.                       7/22/2009 $              50,000

                                                                                                                        This project will design a new
                                                                                                                        elevator shaft and replace the
       Perry                                                                                                            existing two story elevator with
 5              MD 21902                      1       Cecil      512-09-303          Replace Elevator and Shaft
       Point                                                                                                            a new three story elevator so
                                                                                                                        all floors of the building are
                                                                                                                        American Disability Act
                                                                                                                        compliant.                               7/31/2009 $              50,000

                                                                                                                        The existing windows will be
       Perry                                                                                                            replaced with thermally
 5              MD 21902                      1       Cecil      512-09-304          Replace Windows
       Point                                                                                                            efficient double glazed
                                                                                                                        windows throughout the
                                                                                                                        building.                                8/21/2009 $             150,000

                                                                                                                        Buildings 4H and 5H have the
                                                                                                                        original stucco finish on the
                                                                                                                        exterior walls. The stucco is
       Perry                                                                         Replace Exterior for Buildings     showing signs of cracking and
 5              MD 21902                      1       Cecil      512-09-305                                             spalling. This project will install
       Point                                                                         4H and 5H
                                                                                                                        a new exterior insulation finish
                                                                                                                        system on all four buildings
                                                                                                                        which will stop the
                                                                                                                        deterioration and add
                                                                                                                                                                 8/25/2009 $           1,000,000
                                                                                                                        insulation value to all walls.

                                                                                                                        This project will replace the
                                                                                                                        entire exterior wall systems of
                                                                                                                        these buildings with an exterior
       Perry                                                                         Replace Exterior for Buildings     insulation finish system that
 5              MD 21902                      1       Cecil      512-09-308
       Point                                                                         11H, 15H and 17H                   will prevent moisture intrusion,
                                                                                                                        add thermal insulation value of
                                                                                                                        R7 to the walls and present a
                                                                                                                        much more attractive
                                                                                                                        appearance.                              8/21/2009 $           1,909,000
                                                                                                        Page 15 of 45
                                                                              Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                    Projected
                                                                                                                                                                             Total Estimated ARRA
VISN


                                                                   Project Number              Project Title                        Description                 Award




                State
                                      Congressional
         City           Zip Code                        County                                                                                                 (Phase 5           Project Cost
                                         District
                                                                                                                                                             Projected End

                                                                                                                      This project will tap into the
                                                                                                                      central chilled water system
                                                                                                                      already stubbed up inside the
                                                                                                                      buildings and use it in a new
                                                                                                                      four pipe heating and air
                                                                                                                      conditioning system for each
                                                                                     Repair and Upgrade Heating,      building. The old steam
       Perry
 5              MD 21902                      1       Cecil      512-09-309          Ventilation and Air Conditioning radiators on the exterior walls
       Point                                                                                                          of each room will be replaced
                                                                                     Systems
                                                                                                                      by dual heating and air
                                                                                                                      conditioning units that will each
                                                                                                                      draw fresh air from outside for
                                                                                                                      proper air changes. A central
                                                                                                                      hot water heat loop will be
                                                                                                                      piped using the routes of the
                                                                                                                      old steam supply and return               7/31/2009 $           1,540,000
                                                                                                                      piping.

                                                                                                                         This project will replace the old
                                                                                                                         traction elevators which date
       Perry
 5              MD 21902                      1       Cecil      512-09-313          Replace Elevators                   back to the 1940's with new
       Point
                                                                                                                         hydraulic elevators that meet
                                                                                                                         all current elevator and Life
                                                                                                                         Safety code requirements.              8/14/2009 $              90,000


       Perry                                                                         Upgrade Security for the            Provide protection of the
 5              MD 21902                      1       Cecil      512-09-335
       Point                                                                         Chemical Storage Area               chemical storage tank from the
                                                                                                                         elements and from tampering.           8/21/2009 $              25,000



       Perry                                                                                                             This project will replace a truck
 5              MD 21902                      1       Cecil      512-09-336          Replace Dock Leveler Bldg 11W
       Point                                                                                                             dock leveler for the VAMHCS
                                                                                                                         consolidated warehouse that is
                                                                                                                         not functioning.                       8/21/2009 $              20,000

                                                                                                                         This project provides secure
       Perry                                                                         Upgrade the Patient Security        locking, remote observation
 5              MD 21902                      1       Cecil      512-10-317
       Point                                                                         System                              and other building security
                                                                                                                         measures in numerous
                                                                                                                         locations on campus.                   8/24/2009 $           3,750,000

                                                                                                                    This project will upgrade and
       Perry                                                                         Upgrade and Replace Electrical replace components of the
 5              MD 21902                      1       Cecil      512A5-04-304                                       emergency electrical system at
       Point                                                                         Distribution System
                                                                                                                    Perry point as recommended in
                                                                                                                    a Planner study conducted last
                                                                                                                    year.                                       6/26/2009 $           1,870,000


                                                                                                         Page 16 of 45
                                                                             Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                  Projected
                                                                                                                                                                          Total Estimated ARRA
VISN


                                                                  Project Number             Project Title                       Description                 Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                                (Phase 5           Project Cost
                                        District
                                                                                                                                                          Projected End

                                                                                                                      Project will provide detailed
                                                                                                                      design, analysis and installation
                                                                                                                      of groundwater monitoring
                                                                                                                      wells required by WV
                                                                                                                      Department of Environmental
                                                                                                                      Protection to locate potential
                                                                                                                      sources of subsurface
       Martins                                                                      Upgrade Environmental
 5             WV 25405                      2       Berkeley   613-09-105                                            groundwater contamination.
       burg                                                                         Monitoring
                                                                                                                      Additionally, and as part of the
                                                                                                                      project, sample collection and
                                                                                                                      data analysis will be performed
                                                                                                                      on regular intervals per
                                                                                                                      direction from WV DEP. Finally,
                                                                                                                      the project will install needed
                                                                                                                      components to ensure
                                                                                                                      Environmental compliance.               6/3/2009 $           2,500,000


                                                                                                                      Project will replace the existing
                                                                                                                      nurse call system in Bldgs 500
                                                                                                                      and 501. It would also
                                                                                                                      integrate Code Blue capabilities
                                                                                                                      into a state of the art system.
       Martins                                                                      Replace Nurse Call/Code Blue      The proposed project includes
 5             WV 25405                      2       Berkeley   613-09-116
       burg                                                                         System                            installation of a new nurse call
                                                                                                                      system, including wiring at all
                                                                                                                      stations, and compliance with
                                                                                                                      licensing requirements. Project
                                                                                                                      will be completed through
                                                                                                                      procurement of services from a
                                                                                                                      GSA approved vendor.
                                                                                                                                                             7/30/2009 $             750,000




                                                                                                      Page 17 of 45
                                                                             Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                  Projected
                                                                                                                                                                          Total Estimated ARRA
VISN


                                                                  Project Number              Project Title                      Description                 Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                                (Phase 5           Project Cost
                                        District
                                                                                                                                                          Projected End

                                                                                                                       This project will convert a
                                                                                                                       portion of the existing
                                                                                                                       warehouse, B306, from storage
                                                                                                                       to a fully functional mailroom.
                                                                                                                       The required work will include
                                                                                                                       refurbishment of the existing
                                                                                                                       building heating, air
                                                                                                                       conditioning, and sprinkler
                                                                                                                       systems. The existing toilets
                                                                                                                       will have to be renovated and
                                                                                                                       fixtures updated. The existing
                                                                                                                       floor tile contains asbestos and
       Martins                                                                      Relocate the Mailroom to
 5             WV 25405                      2       Berkeley   613-09-243                                             will have to be abated. A ramp
       burg                                                                         Mitigate Security Vulnerability
                                                                                                                       will have to be installed at the
                                                                                                                       loading dock entrance to bring
                                                                                                                       carts down to the floor level.
                                                                                                                       Approximately 2000 square
                                                                                                                       feet will be renovated with new
                                                                                                                       floor covering, an acoustical
                                                                                                                       ceiling, and all required
                                                                                                                       electrical devices and lighting.
                                                                                                                       Additional equipment would
                                                                                                                       have to be installed to protect
                                                                                                                       all workers in the area as well
                                                                                                                       as increasing the security of
                                                                                                                       the room.                             8/27/2009 $             475,000

                                                                                                                     This project will replace air
                                                                                                                     handling systems for Building
                                                                                                                     501 B to meet current VA
                                                                                                                     HVAC Design Manual standards
                                                                                                                     for Nursing Home/pandemic
                                                                                    Replace Heating, Ventilation
       Martins                                                                                                       facility. Project involves
 5             WV 25405                      2       Berkeley   613-09-244          and Air Conditioning in Building
       burg                                                                                                          replacing air handling units,
                                                                                    501B
                                                                                                                     hydronic hot and chilled water
                                                                                                                     systems, exhaust fans,
                                                                                                                     controls, and ductwork. Work
                                                                                                                     will also involve asbestos
                                                                                                                     abatement, and adding rooftop
                                                                                                                     exhaust fans.                           8/27/2009 $           2,800,000

                                                                                                                       Project will accomplish
                                                                                                                       replacement of surge tank and
       Martins                                                                      Replace Heating Plant Surge        all related piping and controls
 5             WV 25405                      2       Berkeley   613-09-245                                             in the Boiler House, Building
       burg                                                                         Tank
                                                                                                                       320. There will be some
                                                                                                                       asbestos removal on piping.
                                                                                                                       The replacement tank will be
                                                                                                                                                             6/30/2009 $             200,000
                                                                                                                       stainless steel.
                                                                                                       Page 18 of 45
                                                                             Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                  Projected
                                                                                                                                                                          Total Estimated ARRA
VISN


                                                                  Project Number             Project Title                       Description                 Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                                (Phase 5           Project Cost
                                        District
                                                                                                                                                          Projected End
                                                                                                                      This project includes the
                                                                                                                      removal of existing
                                                                                                                      Wanderguard system monitors,
                                                                                                                      antennas, alarms, and
                                                                                                                      associated components located
                                                                                                                      throughout the Martinsburg
                                                                                                                      VAMC. Contractors will provide
                                                                                                                      new Roam Alert Resident
                                                                                                                      Wandering System at the
                                                                                                                      following locations: In Building
                                                                                                                      500, 5A, 5C and 4A--these are
                                                                                                                      head injury, dementia wards,
                                                                                                                      adn long term care,
                                                                                                                      respectively. In building 501A
       Martins                                                                      Replace Patient Wandering         and 501B (Nursing Home Care
 5             WV 25405                      2       Berkeley   613-09-246                                            Unit) and at the gate located at
       burg                                                                         System
                                                                                                                      the NHCU fence. New systems
                                                                                                                      shall include maglocks, tracking
                                                                                                                      receivers and patient wrist
                                                                                                                      tags, flat screen monitors and
                                                                                                                      desktop PC's located at the
                                                                                                                      nursing stations, alarms, door
                                                                                                                      controllers with surface mount
                                                                                                                      antennas, self-install server
                                                                                                                      bundles, roam alert client
                                                                                                                      licenses, central power supply
                                                                                                                      with battery backup, and portal
                                                                                                                      monitors for floor level
                                                                                                                      discrimination, patient tracking
                                                                                                                      pulse alarm. Contract will
                                                                                                                      provide all low voltage circuitry      7/30/2009 $             300,000




                                                                                                      Page 19 of 45
                                                                              Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                 Projected
                                                                                                                                                                          Total Estimated ARRA
VISN


                                                                   Project Number             Project Title                      Description                 Award




                State
                                      Congressional
         City           Zip Code                       County                                                                                               (Phase 5           Project Cost
                                         District
                                                                                                                                                          Projected End

                                                                                                                       The contractor shall provide all
                                                                                                                       labor, material, equipment and
                                                                                                                       tools required to install a new
                                                                                                                       7000 kVA transformer. The
                                                                                                                       transformer shall be a 7000
                                                                                                                       kVA, 34,500V-12470V three
                                                                                                                       phase outdoor type. The
                                                                                                                       existing 4687 kVA transformer
                                                                                                                       shall be disconnected and
                                                                                                                       removed from the concrete
                                                                                                                       pad. The new transformer shall
                                                                                                                       be installed on the existing pad
                                                                                                                       and connected to the existing
       Martins                                                                                                         primary and secondary cables
 5             WV 25405                       2       Berkeley   613-09-247          Replace Main Transformer          where practical. Provide new
       burg
                                                                                                                       cables as required. Modify
                                                                                                                       primary and secondary over
                                                                                                                       current protection for the new
                                                                                                                       transformer as required.
                                                                                                                       Provide new stress cones on
                                                                                                                       the primary and secondary
                                                                                                                       cables as required. Grounding
                                                                                                                       shall be provided per the NEC.
                                                                                                                       Provide temporary emergency
                                                                                                                       power during outages as
                                                                                                                       required. Perform a
                                                                                                                       performance test by a qualified
                                                                                                                       testing company and ensure
                                                                                                                       safe operation and submit a
                                                                                                                       written report for this project.      8/19/2009 $             750,000

                                                                                                                       Repair and upgrade boilers to
       Castle
 5              NY 12511                      19      Duchess    620A4-09-113        Repair and Upgrade Boilers        ensure optimum operation;
       Point
                                                                                                                       upgrade associate component
                                                                                                                       equipment as well.                    6/10/2009 $           1,750,000




                                                                                                       Page 20 of 45
                                                                              Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                     Projected
                                                                                                                                                                             Total Estimated ARRA
VISN


                                                                  Project Number               Project Title                       Description                  Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                                   (Phase 5           Project Cost
                                        District
                                                                                                                                                             Projected End

                                                                                                                      The Main Chiller Building
                                                                                                                      contains two 1,120 RT chillers.
                                                                                                                      The primary load for these
                                                                                                                      chillers is the Main Hospital (
                                                                                                                      Bldg. 1 ) and they also serve
                                                                                                                      as back-up chill water supplies
                                                                                                                      for the Research Building (
                                                                                                                      Bldg 4 ) and the Nursing Home
                                                                                                                      ( Bldg 6 ). The Nursing Home
       Washin                                        District of                                                      has two 110 RT chillers
 5            DC 20422                 At Large                  688-08-125          Replace Chiller in Main Hospital
       gton                                          Columbia                                                         installed and has its own
                                                                                                                      cooling tower of 300 RT.Two
                                                                                                                      1373 RT chillers are located in
                                                                                                                      MER-1 of Bldg 1. They have
                                                                                                                      been abandoned for many
                                                                                                                      years, however, all of the
                                                                                                                      necessary piping is in place
                                                                                                                      and some of it may be
                                                                                                                      reusable. The abandoned
                                                                                                                      chillers are to be removed and
                                                                                                                      a single 1500 RT chiller is to be         8/20/2009 $           2,500,000
                                                                                                                      installed.
                                                                                                                        This project reconfigures
       Washin                                        District of
 5            DC 20422                 At Large                  688-09-015          Renovate Pharmacy                  Pharmacy service located on
       gton                                          Columbia
                                                                                                                        the first floor of Building 1 into
                                                                                                                        a more functional department.            8/4/2009 $           3,000,000

                                                                                     Renovate and Expand Physical       Project will expand existing
       Durha
 6             NC 27705                      4       Durham    558-08-110            Therapy and Occupational           PT/OT area by approx. 1200
       m
                                                                                     Therapy                            sq.ft. New structure will be
                                                                                                                        built over loading dock area.           7/14/2009 $             800,000

                                                                                                                        Project will rework and provide
                                                                                                                        necessary new equipment to
                                                                                                                        break-up existing electrical
       Durha                                                                         Upgrade and Install New
 6             NC 27705                      4       Durham    558-08-120FCA                                            distribution system in Bldg. 1
       m                                                                             Electrical Distribution Systems
                                                                                                                        into the 3 branches required by
                                                                                                                        code. Project will also correct
                                                                                                                        additional critical electrical
                                                                                                                        deficiencies.                           6/12/2009 $           4,730,000
       Durha                                                                         Resurface Roads and Parking
 6             NC 27705                      4       Durham    558-09-105FCA                                            Project will resurface all roads
       m                                                                             Lots
                                                                                                                        and parking lots.                        8/5/2009 $           1,150,000

                                                                                                                        Replace water tempering
       Ashevill
 6              NC 28805                     11      Buncombe 637-08-102FCA          Repair Dom Water System            valves, water shutoff valves
       e
                                                                                                                        and damaged water piping
                                                                                                                        throughout Building 47.                  7/7/2009 $             878,000

                                                                                                        Page 21 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                   Projected
                                                                                                                                                                           Total Estimated ARRA
VISN


                                                                 Project Number              Project Title                        Description                 Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                                 (Phase 5           Project Cost
                                        District
                                                                                                                                                           Projected End

                                                                                                                       Project involves sandblasting
       Ashevill                                                                                                        stucco, cleaning brick, tuck
 6              NC 28805                     11      Buncombe 637-08-117FCA        Repair and Replace Exterior
       e                                                                                                               pointing, painting stucco and
                                                                                                                       wood trim for Buildings 11, 12,
                                                                                                                       15, 18                                  7/7/2009 $             560,000

                                                                                                                       Project involves renovating the
       Ashevill                                                                    Renovate for a Community
 6              NC 28805                     11      Buncombe 637-08-202                                               old Nursing Home Care Unit to
       e                                                                           Living Center
                                                                                                                       a new Community Living
                                                                                                                       Center.                                8/17/2009 $             420,000


                                                                                                                       Project involves renovating the
       Ashevill                                                                    Renovate Emergency                  Emergency area for better
 6              NC 28805                     11      Buncombe 637-08-203
       e                                                                           Department, Phase I                 access and the ability to see
                                                                                                                       more patients. Includes
                                                                                                                       upgrading for patient privacy.         8/17/2009 $             910,000

                                                                                                                       Green Environmental
                                                                                                                       Management Systems
                                                                                                                       Environmental corrections will
                                                                                   Renovate for Environmental          be carried out which include
 6     Salem   VA 24153                      6       Roanoke   658-08-104FCA                                           Cardboard disposal, asbestos
                                                                                   Compliance
                                                                                                                       abatement of problematic
                                                                                                                       areas, sanitary sewer/storm
                                                                                                                       sewer corrections,
                                                                                                                       Underground Storage Tank
                                                                                                                                                              8/27/2009 $             679,600
                                                                                                                       compliance work.
                                                                                                                 Steam and Condensate Return
                                                                                                                 piping and PRVs will be
 6     Salem   VA 24153                      6       Roanoke   658-08-112FCA       Replace Steam Piping, Phase 2 replaced from B/14 to B/4 to
                                                                                                                 West Circle buildings 74, 75,
                                                                                                                 76, 77 and from B/4 to B/1
                                                                                                                 onto B/17, 18, 19 & 25.                       8/5/2009 $             723,243

                                                                                                                       Project will consist of replacing
                                                                                                                       older, low efficient fluorescent
                                                                                                                       lamps with newer higher
 6     Salem   VA 24153                      6       Roanoke   658-09-103          Replace Light Fixtures              efficient ones. Install new
                                                                                                                       Passive Infra Red (PIR)
                                                                                                                       sensors in office and non-
                                                                                                                       patient areas to automatically
                                                                                                                       turn off lights when there is no
                                                                                                                                                              7/28/2009 $             487,000
                                                                                                                       one present.

                                                                                                                       This project will upgrade the
       Salisbur
 6              NC 28144                     12      Rowan     659-08-113FCA       Upgrade Elevators                   elevators in Building 3 and 4.
       y
                                                                                                                       The current FCA score for
                                                                                                                       these is D.                             7/2/2009 $           1,800,000


                                                                                                       Page 22 of 45
                                                                             Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                   Projected
                                                                                                                                                                            Total Estimated ARRA
VISN


                                                                  Project Number              Project Title                       Description                  Award




                State
                                      Congressional
         City           Zip Code                       County                                                                                                 (Phase 5           Project Cost
                                         District
                                                                                                                                                            Projected End


                                                                                    Upgrade and Replace Heating, This project will correct HVAC
       Salisbur
 6              NC 28144                      12      Rowan     659-08-401FCA       Ventilation and Air Conditioning FCA deficiencies in Building 5
       y                                                                                                             as noted in the FCA. Costs
                                                                                    System
                                                                                                                     include mark up for SEG
                                                                                                                     factors.                                  7/23/2009 $           1,873,250

                                                                                                                       This project will replace
       Salisbur                                                                                                        existing underground chilled
 6              NC 28144                      12      Rowan     659-08-404FCA       Replace Water Pipes                and domestic water lines
       y
                                                                                                                       throughout the campus. This
                                                                                                                       project will correct these FCA
                                                                                                                       identified deficiencies.                7/17/2009 $             857,250

                                                                                                                       This project will address
                                                                                                                       handicap access issues
                                                                                                                       associated with the front
                                                                                                                       entrance to bldg 100A,
       Columb                                                                                                          including, but not necessarily
 7            SC 29209                        2       Richmond 544-08-108           Renovate for Handicap Access       limited to, establishment of a
       ia
                                                                                                                       drop off point adjacent to the
                                                                                                                       existing handicap ramp,
                                                                                                                       installation of a new, more
                                                                                                                       readily accessible ramp, and
                                                                                                                       elimination of the existing entry
                                                                                                                                                               8/26/2009 $             917,605
                                                                                                                       stairs.
                                                                                                                       This project continues with a
                                                                                                                       phased replacement, re-routing
 7     Dublin   GA 31021                      8       Laurens   557-08-101          Replace Sanitary Sewer Lines       and lining of sanitary sewer
                                                                                                                       lines, manholes and
                                                                                                                       interconnections around the
                                                                                                                       campus of Carl Vinson VA
                                                                                                                       Medical Center.                         7/21/2009 $             579,480


                                                                                                                       This project will provide interior
                                                                                                                       and exterior design changes for
                                                                                                                       B-129, Nursing Home building.
                                                                                                                       Work includes: replacing corner
                                                                                                                       guards and door frame
                                                                                                                       protectors, replacing bedroom
       Montgo                                                                                                          sinks with new sinks/vanities,
 7            AL 36083                        2       Macon     619-08-118          Modernize Nursing Home
       mery                                                                                                            replacing VCT and ceiling tiles
                                                                                                                       throughout the building,
                                                                                                                       replacing corridor fluorescent
                                                                                                                       lights with cone lighting,
                                                                                                                       removing nursing station and
                                                                                                                       providing individual wing work
                                                                                                                       station, enclosing patio area,
                                                                                                                       and painting throughout.
                                                                                                                                                                6/5/2009 $           1,500,000

                                                                                                       Page 23 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                    Projected
                                                                                                                                                                            Total Estimated ARRA
VISN


                                                                 Project Number              Project Title                        Description                  Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                                  (Phase 5           Project Cost
                                        District
                                                                                                                                                            Projected End

                                                                                                                       Scope of work is replace
                                                                                                                       elevator controls, refurbish
                                                                                                                       cabs, lighting, increase
                                                                                                                       ventilation, replace safeties,
       Tuscalo                                       Tuscaloos                                                         etc. Work will involve electrical,
 7             AL 35404                      7                 679-08-114          Replace Elevators                   elevator controls, mechanical,
       osa                                           a
                                                                                                                       finishes, flooring, lighting,
                                                                                                                       demolition, etc. A/E to conduct
                                                                                                                       and provide preliminary
                                                                                                                       report/study on enlarging shaft
                                                                                                                       and replacing elevators in
                                                                                                                                                               7/17/2009 $             651,000
                                                                                                                       Building 1.
                                                                                                                       Scope of work is to remove
                                                                                                                       and replace windows in
       Tuscalo                                       Tuscaloos                                                         Buildings 2 and 3. Work will
 7             AL 35404                      7                 679-08-118          Replace Windows                     involve demolition, window
       osa                                           a
                                                                                                                       replacement,
                                                                                                                       patching/painting, caulking,
                                                                                                                       etc. necessary to provide a
                                                                                                                                                               7/17/2009 $             905,000
                                                                                                                       finish job.

                                                                                                                       This project will upgrade all
                                                                                                                       wall, ceiling and floor finishes
                                                                                                                       and replace all existing
                                                     Miami-
 8     Miami   FL 33125                      18                546-08-610          Upgrade Restrooms                   restroom fixtures (water
                                                     Dade
                                                                                                                       closets, urinals, and lavatories),
                                                                                                                       stall partitions, accessories,
                                                                                                                       etc. in 64 public restrooms
                                                                                                                       throughout the facility.                8/20/2009 $           4,214,923

                                                                                                                       All circuit breakers must be
                                                                                                                       tested for ground fault
                                                                                                                       possibilities, short circuit
                                                                                                                       problems and proper
                                                                                                                       mechanical operation. visual
                                                                                                                       inspection and manual exercise
                                                                                                                       of each breaker and the use of
                                                     Miami-                        Upgrade and Repair Electrical       a infra red scanning camera to
 8     Miami   FL 33125                      18                546-09-119
                                                     Dade                          Distribution System                 detect hot spots in the
                                                                                                                       electrical power distribution
                                                                                                                       system. Any loose, broker or
                                                                                                                       corroded connection in the
                                                                                                                       system shall be replaced with
                                                                                                                       new connectors and or
                                                                                                                       tightened with torque wrench
                                                                                                                       to meet the equipment
                                                                                                                       manufactures specifications              7/1/2009 $             330,674


                                                                                                       Page 24 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                Projected
                                                                                                                                                                        Total Estimated ARRA
VISN


                                                                 Project Number              Project Title                      Description                Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                              (Phase 5           Project Cost
                                        District
                                                                                                                                                        Projected End

                                                                                                                      Replace the existing hard wire
                                                                                                                      fire alarm system with a fully
                                                                                                                      addressable system including
                                                                                                                      voice and strobe notification.
                                                                                                                      This project will add a second
                                                                                                                      fiber optic riser in the west
                                                                                                                      tower floors, basement thru
       W.                                            Palm                                                             forth with a FACP on each
                                                                                   Replace and Upgrade Fire
 8     Palm    FL 33410                      22      Beach     548-09-124                                             floor. Each FACP will have it's
                                                                                   Alarm System
       Beach                                         County                                                           own adequate battery backup
                                                                                                                      power supply. All fire alarm
                                                                                                                      devices will be replaced and
                                                                                                                      made addressable. The voice
                                                                                                                      notification will also have
                                                                                                                      intercom capability for fire
                                                                                                                      department or emergency use
                                                                                                                      controlled from the police
                                                                                                                      security dispatch office.             8/4/2009 $           3,479,189


                                                                                                                      This project will create a new
                                                                                                                      ICU Step Down will be five
                                                                                                                      beds assigned to specialized
                                                                                                                      care of veterans requiring less
                                                                                                                      intensive nursing/medical care
       Gainesv                                                                     Construct an Intensive Care        than those in ICU but more
 8             FL 32608                      6       Alachua   573-09-103
       ille                                                                        Step Down Unit                     vigilant/intensive monitoring
                                                                                                                      than patients assigned to the
                                                                                                                      general medical ward. This
                                                                                                                      new unit provides an increased
                                                                                                                      RN to patient ratio, enhanced
                                                                                                                      monitoring, proximity to
                                                                                                                      MICU/CCU, and isolation beds.
                                                                                                                                                            6/5/2009 $             830,000

                                                                                                                      This project will replace 6
                                                                                                                      Alternative Transfer Switches
                                                                                                                      (ATS) around the medical
                                                                                                                      center. The switches function
                                                                                                                      downstream of each generator,
       Lake                                                                                                           but have additional ATS
 8             FL 32025                      4       Columbia 573A4-09-102         Replace Electrical Switches
       City                                                                                                           switches which serve our
                                                                                                                      laboratory, elevators and O.R.
                                                                                                                      Dx units. The new switches
                                                                                                                      will be reinstalled in existing
                                                                                                                      locations where possible. All
                                                                                                                      new switches will have bypass
                                                                                                                      capabilities.                        8/28/2009 $             500,000


                                                                                                      Page 25 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                Projected
                                                                                                                                                                        Total Estimated ARRA
VISN


                                                                 Project Number              Project Title                     Description                 Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                              (Phase 5           Project Cost
                                        District
                                                                                                                                                        Projected End

                                                                                                                    Remove the existing pneumatic
                                                                                                                    HVAC controls system. Design
                                                                                                                    and build a new automated
                                                                                                                    controls system that can be
                                                                                                                    controlled locally and
                                                                                                                    monitored remotely by Bldg.
                                                                                   Upgrade and Replace Heating,
                                                                                                                    502. Design will include repair
 8     Orlando FL 32803                      8       Orange    675-09-608          Ventilation and Air Conditioning
                                                                                                                    or replacement of the existing
                                                                                   Controls
                                                                                                                    electric re-heat system, volume
                                                                                                                    control dampers, installation of
                                                                                                                    VFD's on the existing Air
                                                                                                                    Handling Unit's, etc., to achieve
                                                                                                                    a complete energy efficient
                                                                                                                    controls system for the entire
                                                                                                                    building.                              8/19/2009 $             500,000


                                                                                                                 Design and install a complete
                                                                                                                 addressable fire alarm system
                                                                                                                 consistent with VA, American
                                                                                                                 Disability Act and National Fire
                                                                                                                 Protection Association
                                                                                                                 requirements. Install new
                                                                                   Repair and Upgrade Fire Alarm system parallel with existing
 8     Orlando FL 32803                      8       Orange    675-09-609
                                                                                   System                        fire alarm system. Once
                                                                                                                 activated, the old system can
                                                                                                                 be removed. New system will
                                                                                                                 be monitored by an outside
                                                                                                                 source and be warranted for
                                                                                                                 five years upon activation.
                                                                                                                 Control panels will be installed
                                                                                                                 in the VA Police Room 102.
                                                                                                                                                            6/5/2009 $             625,000




                                                                                                      Page 26 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                  Projected
                                                                                                                                                                          Total Estimated ARRA
VISN


                                                                 Project Number              Project Title                       Description                 Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                                (Phase 5           Project Cost
                                        District
                                                                                                                                                          Projected End

                                                                                                                      Design and build a new
                                                                                                                      medical gas bulk storage
                                                                                                                      building/facility. Include a new
                                                                                                                      alarm system, manifolds, a
                                                                                                                      structurally sound building, etc.
                                                                                                                      New facility must meet all
                                                                                                                      existing structural building
                                                                                   Construct New Medical Gas          codes, wind loads, National
 8     Orlando FL 32803                      8       Orange    675-09-617
                                                                                   Bldg                               Fire Protection Association, VA,
                                                                                                                      Joint Commission on
                                                                                                                      Accreditation of Healthcare
                                                                                                                      Organizations, etc.
                                                                                                                      requirements based upon the
                                                                                                                      demands of the medical center.
                                                                                                                      Existing systems must remain
                                                                                                                      operational during the building
                                                                                                                      process.                               8/31/2009 $             250,000

                                                                                                                      This project is for the
                                                                                                                      construction of an Orthotics
                                                                                                                      Lab, and rework the
                                                                                                                      Prosthetics areas for increased
                                                                                                                      personnel space. Affected
                                                                                                                      areas such as housekeeping
       Hunting                                                                     Renovate Prosthetics & Rehab
 9             WV 25704                      3       Wayne     581-07-110                                             storage will be relocated. The
       ton                                                                         Medicine
                                                                                                                      project will also provide for
                                                                                                                      improved administrative
                                                                                                                      functions, and additional
                                                                                                                      waiting areas for Prosthetics
                                                                                                                      and Rehab Medicine as well to
                                                                                                                      improve patient flow and
                                                                                                                      increase access.                        7/3/2009 $             400,000


                                                                                                                      The existing steam distribution
                                                                                                                      system is the main heating
                                                                                                                      support for the new MHC Bldg.
                                                                                                                      5, and 4 other outlying
                                                                                                                      buildings occupied by General
                                                                                                                      Counsel, Engineering, AMM,
       Hunting                                                                     Replace Steam Distribution         student quarters, and Canteen.
 9             WV 25704                      3       Wayne     581-08-112
       ton                                                                         System                             All piping will be replaced, and
                                                                                                                      manholes reworked as
                                                                                                                      required. Additional site work
                                                                                                                      improvements in the immediate
                                                                                                                      area tie in location at the MHC
                                                                                                                      B. 5 point will be made to
                                                                                                                      compliment the treatment
                                                                                                                      program for that structure.
                                                                                                                                                             8/25/2009 $           1,340,000
                                                                                                      Page 27 of 45
                                                                              Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                    Projected
                                                                                                                                                                            Total Estimated ARRA
VISN


                                                                   Project Number              Project Title                       Description                 Award




               State
                                     Congressional
        City           Zip Code                        County                                                                                                 (Phase 5           Project Cost
                                        District
                                                                                                                                                            Projected End

                                                                                                                        This project renovates Building
                                                                                                                        16, 2nd floor for Primary Care
                                                                                                                        clinic space. The project will
                                                                                                                        accomplish light renovation in
                                                                                                                        this area in order to create
                                                                                                                        clinic spaces comprised of
                                                                                                                        exam rooms, provider support
                                                                                                                        spaces, procedure rooms,
                                                                                                                        patient waiting rooms, staff
                                                                                                                        work rooms, etc. with
                                                                                                                        consideration given towards PC
                                                                                                                        provider panel size vs.
                                                                                                                        estimated patient visits vs.
       Lexingt                                                                                                          available examination and
 9             KY 40511                      6       Fayette     596-08-112          Renovate Clinics                   support spaces. The majority
       on
                                                                                                                        of space renovations will be
                                                                                                                        cosmetic division of existing
                                                                                                                        rooms into appropriately sized
                                                                                                                        primary care space with basic
                                                                                                                        room set-up (walls, doors,
                                                                                                                        support utilities) being the goal
                                                                                                                        of the project. There are also
                                                                                                                        some more intense renovations
                                                                                                                        in areas that have had corridor
                                                                                                                        walls removed, etc. due to past
                                                                                                                        functional changes. This
                                                                                                                        project renovates the second
                                                                                                                        floor (center floor, above
                                                                                                                        Ground (at grade) and below
                                                                                                                        2nd (top) floor) of Building 16,       7/17/2009 $             664,000

       Louisvill                                                                                                        Replace the horizontal sewer
 9               KY 40206                    3       Jefferson   603-08-222          Replace Sewer Lines
       e                                                                                                                lines in the Sub-Basement of
                                                                                                                        Bldg 1.                                 7/3/2009 $             250,000

       Louisvill                                                                                                        Replace the horizontal sewer
 9               KY 40206                    3       Jefferson   603-08-223          Replace Sewer Lines
       e                                                                                                                lines in the Sub-Basement of
                                                                                                                        Bldg 1.                                 7/3/2009 $             250,000


                                                                                                                        Replace street lighting.
       Louisvill                                                                     Repair and Replace Street
 9               KY 40206                    3       Jefferson   603-09-105                                             Contractor must verify voltage
       e                                                                             Lighting
                                                                                                                        available for each fixture prior
                                                                                                                        to purchase of fixtures.               6/18/2009 $             184,000




                                                                                                        Page 28 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                 Projected
                                                                                                                                                                         Total Estimated ARRA
VISN


                                                                 Project Number              Project Title                       Description                Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                               (Phase 5           Project Cost
                                        District
                                                                                                                                                         Projected End

                                                                                                                      The project will modify the
                                                                                                                      medical gas piping system for
                                                                                                                      Building 1 and 1A. Building 1:
                                                                                                                      1. Replace sections of
                                                                                                                      soldered piping 2. Add or
                                                                                                                      replace zone valves 3. Add or
                                                                                                                      replace riser valves 4. Replace
                                                                                                                      area alarm panels 5. Replace
       Memphi                                                                      Repair and Upgrade Medical         master alarm panels in the
 9            TN 38104                       9       Shelby    614-09-104
       s                                                                           Gas System                         Boiler Plant and Telephone
                                                                                                                      Operator Room 6. Add alarm
                                                                                                                      points for Code required source
                                                                                                                      equipment conditions. Building
                                                                                                                      1A: 1. Modify and replace
                                                                                                                      zone valves and piping 2.
                                                                                                                      Modify and reconnect area
                                                                                                                      alarm sensor piping 3. Add
                                                                                                                      service valves on risers
                                                                                                                                                             7/2/2009 $             668,000

       Mounta
                                                     Washingto                                                        This project will replace Nurse
 9     in     TN 37684                       1                 621-07-120          Replace Nurses Stations
                                                     n                                                                Stations in C1,E1,CG,and
       Home
                                                                                                                      ICU/PCU, in B-200.                    7/23/2009 $             313,065
       Mounta
                                                     Washingto                     Repair and Upgrade Site            This project corrects site
 9     in     TN 37684                       1                 621-07-126
                                                     n                             Lighting                           lighting deficiencies that have
       Home
                                                                                                                      an FCA score of D.                     7/7/2009 $             160,000

                                                                                                                      This project will replace the
                                                                                                                      double ended switch board,
                                                                                                                      panels, and Automatic Transfer
                                                                                                                      Switches in Building 116.
                                                                                                                      These panels and double
                                                                                                                      ended switchboard have
                                                                                                                      exceeded their life usage and
       Mounta
                                                     Washingto                                                        have been failing during testing
 9     in     TN 37684                       1                 621-09-104          Replace Switch Board
                                                     n                                                                and in desperate need of
       Home
                                                                                                                      replacement. Work includes
                                                                                                                      some minor demolition/retrofit,
                                                                                                                      new electrical installation,
                                                                                                                      wiring, and modifications to
                                                                                                                      meet code/system
                                                                                                                      requirements, any new
                                                                                                                      conduit/duct required, and any
                                                                                                                      finish work.                          8/17/2009 $             549,000




                                                                                                      Page 29 of 45
                                                                             Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                  Projected
                                                                                                                                                                           Total Estimated ARRA
VISN


                                                                  Project Number              Project Title                        Description                Award




                State
                                      Congressional
         City           Zip Code                       County                                                                                                (Phase 5           Project Cost
                                         District
                                                                                                                                                           Projected End

                                                                                                                        Project will renovate 13,500
                                                                                                                        square feet of the existing
                                                                                                                        elevator lobby, surrounding
                                                                                                                        areas, and main corridor
       Clevela                                                                      Renovate Elevator Lobby and
10             OH 44106                       11      Cuyahoga 541-08-1003                                              located in the basement and
       nd                                                                           Main Lobby
                                                                                                                        1st floor of the Wade Park
                                                                                                                        Campus. Project will provide
                                                                                                                        complete architectural finishes,
                                                                                                                        mechanical, electrical, life
                                                                                                                        safety, and HVAC systems.             7/27/2009 $           4,913,331

                                                                                                                        The project will replace the
       Battle                                                                                                           roads, curbs, gutters, &
11              MI 49015                      6       Calhoun   515-08-110          Replace Roads, Curbs, Gutter
       Creek                                                                                                            sidewalks located on the
                                                                                                                        interior of the medical centers
                                                                                                                        campus.                                7/7/2009 $           1,124,000
       Chicago
12             IL 60612                       7       Cook      537-06-151          Repair Exterior Masonry             Project will repair the exterior
       (WS)
                                                                                                                        masonry of Building 1A.               8/31/2009 $             564,200


                                                                                                                        Remove the Fire dampers that
12     Hines    IL 60156                      7       Cook      578-08-126          Reconfigure Fire Dampers            are no longer required and
                                                                                                                        reconfigure the needed ones in
                                                                                                                        all the Healthcare Buildings.          7/6/2009 $             400,000

                                                                                    Upgrade and Repair                  Upgrade and Repair Campus
12     Hines    IL 60141                      7       Cook      578-09-060
                                                                                    Condensate Return Lines             Condensate Return Lines, Bldg.
                                                                                                                        1 & 200                               8/18/2009 $             125,000

                                                                                                                        Install Boiler Flue Gas
12     Hines    IL 60141                      7       Cook      578-09-084          Install Boiler Flue Gas Analyzers
                                                                                                                        Analyzers for the Boilers in
                                                                                                                        Building 5                            6/30/2009 $             110,000
                                                                                    Install Natural Gas Emergency
12     Hines    IL 60141                      7       Cook      578-09-086                                              Install Natural Gas Emergency
                                                                                    Shutdown Valves
                                                                                                                        Shutdown Valves                       6/30/2009 $              50,000


       Iron                                                                                                             Replace existing Dietetic
                                                                                    Replace Kitchen
12     Mounta MI 49801                        1       Dickinson 585-08-103                                              Freezers and Refrigeration
                                                                                    Coolers/Freezers
       in                                                                                                               Units in main kitchen in the
                                                                                                                        basement floor of building one.        7/7/2009 $              50,000




                                                                                                       Page 30 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                   Projected
                                                                                                                                                                           Total Estimated ARRA
VISN


                                                                 Project Number              Project Title                       Description                  Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                                 (Phase 5           Project Cost
                                        District
                                                                                                                                                           Projected End

                                                                                                                      This project includes the
                                                                                                                      demolition of the existing
                                                                                                                      electrical fire pump, jockey
                                                                                                                      pump and controls for each
                                                                                                                      pump and the temporary
                                                                                                                      removal of the fire alarm
                                                                                                                      interfaces for those items. The
       Iron
                                                                                                                      construction project includes
12     Mounta MI 49801                       1       Dickinson 585-09-109          Replace Fire Pump
                                                                                                                      the installation of new jockey
       in
                                                                                                                      pump and fire pump with
                                                                                                                      controls for each pump and all
                                                                                                                      required fire alarm interface on
                                                                                                                      the Subbasement floor of
                                                                                                                      Building 1. The new
                                                                                                                      installation shall be fully
                                                                                                                      functional and certified as
                                                                                                                      required by NFPA 72, 13 and              8/7/2009 $             130,000
                                                                                                                      20.

                                                                                                                      Installation of one new chiller,
                                                                                                                      and modifications to the
                                                                                                                      controls of the existing Carrier
                                                                                                                      Chillers, including selective
                                                                                                                      demolition of existing piping
       Iron
                                                                                                                      systems and pumps. The
12     Mounta MI 49801                       1       Dickinson 585-09-111          Replace Chiller
                                                                                                                      construction includes the
       in
                                                                                                                      modification of existing
                                                                                                                      mechanical and electrical work
                                                                                                                      including commissioning of the
                                                                                                                      new equipment in the
                                                                                                                      subbasement of Building 1 and
                                                                                                                      on the south side of Building 1.
                                                                                                                                                               8/5/2009 $             350,000


                                                                                                                      Project will provide for the
                                                                                                                      power washing of the exterior,
                                                                                                                      tuck pointing damaged mortar
                                                                                                                      joints, repairing/replacing
                                                                                                                      damaged brick and stone,
                                                                                                                      installing additional drip
       Iron
                                                                                                                      edging, caulking and sealing
12     Mounta MI 49801                       1       Dickinson 585-09-114          Repair Exterior Masonry
                                                                                                                      surfaces on buildings 2 thru 6
       in
                                                                                                                      and 8 at IMVAMC. All design
                                                                                                                      and installation will be in
                                                                                                                      accordance with current VAMC
                                                                                                                      design guides and standards,
                                                                                                                      NEC, National Fire Protection
                                                                                                                      Association, state, local, and all
                                                                                                                      VA and federal codes.
                                                                                                                                                              8/10/2009 $             350,000
                                                                                                      Page 31 of 45
                                                                             Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                   Projected
                                                                                                                                                                            Total Estimated ARRA
VISN


                                                                  Project Number               Project Title                       Description                 Award




                State
                                      Congressional
        City            Zip Code                       County                                                                                                 (Phase 5           Project Cost
                                         District
                                                                                                                                                            Projected End

                                                                                                                        This project will replace the
       Madiso                                                                       Renovate and Modernize
12              WI 53705                      2       DANE      607-09-106                                              medical vacuum pump and the
       n                                                                            Flooring and Walls
                                                                                                                        medical air compressor serving
                                                                                                                        B-406.                                 7/27/2009 $             475,000

                                                                                                                        This project will construct a
                                                                                    Construct Parking Lot & Pave
12     Tomah    WI 54660                      3       Monroe    676-09-147                                              new parking lot at B-401 and
                                                                                    Gravel Lots
                                                                                                                        pave the gravel parking lots at
                                                                                                                        B-402 and B-408.                       8/31/2009 $             550,000
       Milwau
12              WI 53295                      4       Milwaukee 695-08-201          Replace Operating Room Roofs Replace roof above 2nd floor A-
       kee
                                                                                                                 wing north.                                   8/28/2009 $             120,500

       Milwau
12              WI 53295                      4       Milwaukee 695-09-129          Replace Roof                        Replace the roof over Bldg
       kee
                                                                                                                        111, C Wing, upper roof area.
                                                                                                                                                               8/28/2009 $             499,795
       Milwau
12              WI 53295                      4       Milwaukee 695-09-143          Replace Roof                        Replace roof over Bldg 111,
       kee
                                                                                                                        2nd Floor, West.                       8/28/2009 $             200,000

                                                                                                                        Upgrade of Emergency power
       Kansas                                                                       Upgrade Emergency Power             generation and distribution
15            MO 64128                        5       Jackson   589-07-130
       City                                                                         Building 1 - FCA Correction         system in building 1 at the VA
                                                                                                                        Medical Center in Kansas City
                                                                                                                        Missouri                               8/27/2009 $           3,900,000

                                                                                                                        Project will replace all original
                                                                                                                        exhaust fans and those that
       Columb                                                                       Replace Exhaust Fans - FCA          have exceeded their life
15            MO 65201                        9       Boone     589A4-09-118AO
       ia                                                                           Corrections                         expectancy. Most of these fans
                                                                                                                        are 35 years old and are in
                                                                                                                        need of new energy efficient
                                                                                                                        units.                                  6/3/2009 $           1,650,000

                                                                                                                        This project will install a new
                                                                                    Renovate Radiology
15     Topeka KS 66622                        2       Shawnee   589A5-09-105                                            intercom system and medical
                                                                                    Department - FCA Corrections
                                                                                                                        gas outlets in the radiology
                                                                                                                        department                              8/6/2009 $              90,000

       Leaven                                         Leavenwo                                                          Project will remove and replace
15              KS 66048                      2                589A6-09-121         Repair Concrete Sidewalks
       worth                                          rth                                                               2700 square feet of concrete
                                                                                                                        sidewalk.                               7/9/2009 $             100,000

                                                                                                                        This project will correct
15     Wichita KS 67218                       4       Sedgwick 589A7-08-109AO       Correct Electrical Deficiencies     electrical deficiencies, such as
                                                                                                                        fraying wires and cable run
                                                                                                                        trays.                                  6/2/2009 $           4,600,000
                                                                                    Replace Roofs on Buildings 5-7,
15     Wichita KS 67218                       4       Sedgwick 589A7-09-108                                         Replace roofs on B5, 6, 7, 10,
                                                                                    10-13, 19
                                                                                                                    11, 12, 13, 19.                            7/30/2009 $           1,000,000


                                                                                                        Page 32 of 45
                                                                              Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                 Projected
                                                                                                                                                                          Total Estimated ARRA
VISN


                                                                   Project Number              Project Title                       Description               Award




                State
                                      Congressional
         City           Zip Code                        County                                                                                              (Phase 5           Project Cost
                                         District
                                                                                                                                                          Projected End

                                                                                                                  Provide all materials, supplies,
                                                                                                                  labor expertise, and equipment
                                                                                                                  necessary for surface
                                                                                                                  preparation and application of
                                                      Williamso                      Water Tower Renovation - FCA paints and/or protective
15     Marion   IL 62959                      12                657A5-09-100
                                                      n                              Corrections                  coating materials in a safe
                                                                                                                  manner with proper handling
                                                                                                                  and removal and disposal of all
                                                                                                                  waste materials. Replace shut
                                                                                                                  off valves at the base of the
                                                                                                                  water tower as necessary.                  7/24/2009 $             148,000

                                                                                                                   Renovating approximately
                                                                                                                   1,525 gross square feet of
                                                                                                                   existing kitchen and lobby
                                                                                     Renovate Kitchen and Lobby of space into mental health
       Alexand
16             LA 71360                       5       Rapides    502-09-101D         Building 9 for Mental Health  offices and support space on
       ria
                                                                                     Program Offices               the first floor of Building 9 to
                                                                                                                   include the following: 9 Private
                                                                                                                   Offices, Waiting Room,
                                                                                                                   Secretary/Reception,
                                                                                                                                                             6/30/2009 $             324,000
                                                                                                                   Files/Storage.
                                                                                     Replace Building 5 Roof &          Replace existing roof, repair
16     Biloxi   MS 39531                      4       Harrison   520-08-110
                                                                                     Update Exterior finish             exterior trim and update
                                                                                                                        exterior finish.                     7/31/2009 $           1,120,000

                                                                                                                        Renovate and update interior
                                                                                     Renovate/Upgrade Building 17       of building including bringing
16     Biloxi   MS 39531                      4       Harrison   520-08-113          Interior for American Disability   bathrooms up to American
                                                                                     Act accessibility                  Disability Act (ADA)
                                                                                                                        requirements. Project also
                                                                                                                        includes addition of ADA
                                                                                                                        compliant elevator.                  7/15/2009 $             820,000
       Fayette                                        Washingto
16             AR 72703                       3                 564-09-116           Pave Gravel Parking Lot            Pave existing gravel lot for
       ville                                          n
                                                                                                                        approximately 45 vehicles.           8/10/2009 $              98,000


       Housto                                                                        Repair/Replace Elevator            Replace/Repair emergency
16              TX 77030                      9       Harris     580-07-303ES
       n                                                                             Controls and Motor                 motor control center EMCC6
                                                                                                                        and replace all elevator panels       7/8/2009 $             850,000
                                                                                                                     THIS PROJECT WILL CLEAN
                                                                                     Clean and Recoat portions of    AND RECOAT PORTIONS OF
16     Jackson MS 39216                       3       Hinds      586-08-115
                                                                                     Existing Roof on Building 1 & 7 EXISTING MEMBRANE ROOFS
                                                                                                                     ON Buildings 1 & 7.                      7/7/2009 $             300,000




                                                                                                        Page 33 of 45
                                                                                Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                     Location                                                                                                                 Projected
                                                                                                                                                                            Total Estimated ARRA
VISN


                                                                     Project Number              Project Title                       Description               Award




                  State
                                        Congressional
         City             Zip Code                        County                                                                                              (Phase 5           Project Cost
                                           District
                                                                                                                                                            Projected End


       North                                                                                                              This project will replace major
16     Little     AR 72114                      2       Pulaski    598-07-168          Renovate/Repair Elevators          systems such as the controller,
       Rock                                                                                                               hoist motor, leveler, door
                                                                                                                          operator, safeties, dispatcher,
                                                                                                                          etc.                                 8/14/2009 $           4,000,000

       Little                                                                          Replace air Handling               Replace 25 year old air
16                AR 72205                      2       Pulaski    598-09-120
       Rock                                                                            Equipment, Phase 2                 handling unit equipment with
                                                                                                                          more efficient equipment.            8/18/2009 $           4,000,000

                                                                                                                          Renovation of an existing
       San                                                                             Renovate for New Outpatient        building for an Outpatient
17             TX 78229                         20      Bexar      671-09-132                                             Clinic. This will relocate the
       Antonio                                                                         Clinic
                                                                                                                          South Bexar County CBOC to
                                                                                                                          this property (former DoD
                                                                                                                          BRAC property).                      6/24/2009 $           3,525,000

                                                                                                                          Remove sixteen (16) windows
                                                                                                                          and replace with pre-mulled,
                                                                                                                          intercept, low E softcoat
                                                                                                                          (prosolar), argon gas, bronze
                                                                                                                          tint, double glazed, double
                                                                                                                          strength (1/8”) full screen
                                                                                                                          fiberglass extruded screen
                                                                                                                          mold, E3 mtg rail & stile, tape
                                                                                                                          applies, two air latches, two
                                                                                                                          white logo lock, head
                                                                                                                          expander, sill extender, glass
                                                                                                                          warranty (UI=140”), DP – res,
                                                                                                                          U-factor 0.31, SHGC:28. Units
       Kerrvill                                                                        Upgrade/Repair Boiler Plant,       will qualify for energy star
17                TX 78028                      21      Kerr       671A4-09-117                                           rating in northern, north
       e                                                                               Building 19
                                                                                                                          central, south central and
                                                                                                                          southern regions.
                                                                                                                          Exterior Brick 8746 +/- sq ft,
                                                                                                                          building 19: High pressure
                                                                                                                          clean all masonry surfaces
                                                                                                                          using 300 PSI at 6-10 GPM
                                                                                                                          high pressure water cleaning
                                                                                                                          equipment. Special attention
                                                                                                                          will be taken to ensure no
                                                                                                                          more pressure than is
                                                                                                                          necessary will be used to
                                                                                                                          accomplish the desired results.
                                                                                                                          After surface has been properly
                                                                                                                          prepared, apply one heavy
                                                                                                                          floor coat (approximately 125        6/19/2009 $             756,173




                                                                                                          Page 34 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                     Location                                                                                                                Projected
                                                                                                                                                                           Total Estimated ARRA
VISN


                                                                    Project Number            Project Title                       Description                 Award




                  State
                                        Congressional
         City             Zip Code                       County                                                                                              (Phase 5           Project Cost
                                           District
                                                                                                                                                           Projected End

                                                                                                                       Building 11: Remove 24,650
                                                                                                                       sq ft of old roofing to the
                                                                                                                       concrete substrate and replace
                                                                                                                       with mechanically attached
                                                                                                                       water recovery board over
                                                                                                                       existing substrate in order to
                                                                                                                       meet local wind uplift code
                                                                                                                       requirements.

                                                                                                                       Building 18: Remove 19,070
                                                                                                                       sq ft of old roofing to the
                                                                                                                       concrete substrate and replace
                                                                                                                       with mechanically attached
       Kerrvill                                                                      Replace/Upgrade Roofs on          water recovery board over
17                TX 78028                      21      Kerr      671A4-09-118                                         existing substrate in order to
       e                                                                             Buildings 11, 18, 46 & 47
                                                                                                                       meet local wind uplift code
                                                                                                                       requirements.

                                                                                                                       Building 46: Remove 4,928 sq
                                                                                                                       ft of old roofing to the concrete
                                                                                                                       substrate and replace with
                                                                                                                       mechanically attached water
                                                                                                                       recovery board over existing
                                                                                                                       substrate in order to meet local
                                                                                                                       wind uplift code requirements.

                                                                                                                       Building 47: Remove 4,410 sq
                                                                                                                       ft of old roofing to the concrete
                                                                                                                       substrate and replace with
                                                                                                                       mechanically attached water            7/22/2009 $           1,184,000

                                                                                                                       Replace 45 air handler units
                                                                                                                       (AHU) which vary in tonnage
                                                                                                                       from 3 to 55 tons. Replace
                                                                                                                       104 reheat units in Building 96.

                                                                                                                       Remove existing pneumatic
                                                                                                                       control system and replace
                                                                                     Replace/Upgrade Air Handler
       Kerrvill                                                                                                        with DDC Central Energy
17                TX 78028                      21      Kerr      671A4-09-119       Units in various buildings
       e                                                                                                               Management System with
                                                                                     throughout the campus
                                                                                                                       single front end connections to
                                                                                                                       Building 29 and 18.

                                                                                                                       All work will be completed in
                                                                                                                       accordance with National Fire
                                                                                                                       Protection Association, NEC,
                                                                                                                       and VA HVAC Design Criteria
                                                                                                                       standards.                             7/27/2009 $           1,900,050


                                                                                                       Page 35 of 45
                                                                                 Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                    Location                                                                                                                     Projected
                                                                                                                                                                               Total Estimated ARRA
VISN


                                                                      Project Number              Project Title                       Description                 Award




                 State
                                       Congressional
         City            Zip Code                        County                                                                                                  (Phase 5           Project Cost
                                          District
                                                                                                                                                               Projected End


                                                                                                                           This project is the first of two
       Albuqu                                                                           Repair/Upgrade Steam and           phases which will consist of
18            NM 87108                         1       Bernalillo   501-09-105
       erque                                                                            Condensate systems, Phase I        repair and replacement of parts
                                                                                                                           of the steam and condensate
                                                                                                                           system existing at this facility.      8/13/2009 $             700,000
                                                                                        Replace Fuel Storage Tanks for
       Albuqu
18            NM 87108                         1       Bernalillo   501-09-205          Emergency Generators in
       erque
                                                                                        Buildings 1, 3, and 10.                                                    8/5/2009 $             325,000


                                                                                                                           This project will construct 2000
       Albuqu                                                                           Renovate 3rd Floor of Building     GSF of new office space on the
18            NM 87108                         1       Bernalillo   501-09-108
       erque                                                                            3 for Telehealth                   third floor of Building 3 for the
                                                                                                                           Non-Institutional Care and
                                                                                                                           CCHT (Telebuddy) programs.              8/5/2009 $             400,000

                                                                                                                           This project will replace the
       Albuqu
18            NM 87108                         1       Bernalillo   501-09-203          Renovate Operating Room #2         flooring in all of the surgical
       erque
                                                                                                                           operating rooms on quadrant
                                                                                                                           3C of Building 41                      8/25/2009 $             500,000

                                                                                                                       This project will remove three
                                                                                                                       existing single wall fuel tanks
                                                                                                                       associated with emergency
                                                                                        Replace Fuel Storage Tanks for
       Albuqu                                                                                                          generators at Buildings 1, 3
18            NM 87108                         1       Bernalillo   501-09-204          Emergency Generators in
       erque                                                                                                           and 10. These tanks will be
                                                                                        Buildings 1, 3, and 10.
                                                                                                                       replaced with new double wall
                                                                                                                       fiberglass fuel storage tanks to
                                                                                                                       include installation of new
                                                                                                                       piping systems.                             8/5/2009 $             640,000

                                                                                                                           This project will convert an
                                                                                                                           existing overflow parking lot
       Albuqu                                                                           Pave Overflow Patient Parking      adjacent to our main patient
18            NM 87108                         1       Bernalillo   501-09-205
       erque                                                                            Lot                                parking on the north side of
                                                                                                                           the facility into an all-weather
                                                                                                                           paved lot for the convenience
                                                                                                                           of our patients.                       7/23/2009 $             325,000

                                                                                                                           Project will replace the existing
                                                                                                                           fire alarm panels throughout
       Amarill                                                                          Replace/Upgrade Fire Alarm         the entire campus to meet
18               TX 79106                      13      Potter       504-11-104
       o                                                                                Panels                             2005 National Fire Protection
                                                                                                                           Association 101 (Life Safety
                                                                                                                           Code) for multi-alarm display
                                                                                                                           panels.                                 6/4/2009 $             560,000




                                                                                                           Page 36 of 45
                                                                              Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                              Projected
                                                                                                                                                                       Total Estimated ARRA
VISN


                                                                   Project Number             Project Title                   Description                 Award




                State
                                      Congressional
         City           Zip Code                       County                                                                                            (Phase 5           Project Cost
                                         District
                                                                                                                                                       Projected End

                                                                                                                    Project is proposed for the
                                                                                                                    removal of asbestos from areas
                                                                                                                    where immediate maintenance
                                                                                                                    or future renovation will be
                                                                                                                    slowed or cancelled do to the
                                                                                                                    presents of asbestos. Asbestos
                                                                                                                    abatement of piping insulation,
       Big
18              TX 79720                      19      Howard     519-09-300          Asbestos Abatement             floor tiling, and walls will be
       Spring
                                                                                                                    coordinated in phases to be
                                                                                                                    implemented in series with
                                                                                                                    current projects and
                                                                                                                    maintenance needs. The
                                                                                                                    removal and disposal of
                                                                                                                    asbestos will be contracted
                                                                                                                    with a Texas certified
                                                                                                                    contractor.                           8/31/2009 $             676,000

                                                                                                                    Renovate main lobby to include
                                                                                                                    minor interior renovations for
       Big                                                                           Renovate Main Entrance to      approximately 2100 square
18              TX 79720                      19      Howard     519-09-302                                         feet. Asbestos abatement will
       Spring                                                                        include asbestos abatement
                                                                                                                    be required as well as critical
                                                                                                                    planning for egress and
                                                                                                                    building access during
                                                                                                                                                          8/31/2009 $             750,000
                                                                                                                    construction.

                                                                                                                    Project will renovate sidewalks,
       Big                                                                           Ground Safety and Handicap
18              TX 79720                      19      Howard     519-09-303                                         roads and driveways as well as
       Spring                                                                        Accessibility Improvements
                                                                                                                    improve handicap accessibility
                                                                                                                    for patients and staff.               8/31/2009 $             436,000

                                                                                                                    This project will continue the
                                                                                                                    replacement of plumbing in
                                                                                                                    building one moving from the
                                                                                     Plumbing System                horizontal phase of replacing
       Big                                                                                                          all the plumbing in the
18              TX 79720                      19      Howard     519-09-306          Improvements, Building 1,
       Spring                                                                                                       basement and lower level of
                                                                                     Phase 3
                                                                                                                    floor one. The 3rd phase will
                                                                                                                    move to vertical corrections
                                                                                                                    starting on the west side of the
                                                                                                                    building moving east along the
                                                                                                                                                          8/31/2009 $             750,000
                                                                                                                    chases.
                                                                                                                   This is the second phase of a
                                                                                     Replace/Upgrade Patient Ward multi-phased project to replace
18     Phoenix AZ 85012                       4       Maricopa   644-09-104          Windows and Doors in Building old exterior windows and doors
                                                                                     1                             which have reached their
                                                                                                                   effective life. This phase will
                                                                                                                   cover the Building 1 A, B, E &
                                                                                                                   G Wings.                               8/12/2009 $             600,000
                                                                                                     Page 37 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                            Projected
                                                                                                                                                                    Total Estimated ARRA
VISN


                                                                 Project Number              Project Title                   Description               Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                          (Phase 5           Project Cost
                                        District
                                                                                                                                                    Projected End

                                                                                                                 Proposed project will address
                                                                                                                 numerous environment of care
                                                                                                                 and space deficiency issues
                                                                                                                 throughout Building 60, to
                                                                                                                 include providing additional
                                                                                                                 space for polytrauma staff and
                                                                                                                 programs. Replacement of built-
                                                                                                                 in-place air handling units that
                                                                                                                 have reached their life
                                                                                                                 expectancy. Replacement of
                                                                                                                 domestic hot water generating
                                                                                                                 and recirculating systems that
                                                                                                                 has reached their life
                                                                                   Renovate Building 60 for      expectancy, to include
18     Tucson AZ 85723                       7       Pima      678-08-111
                                                                                   Polytrauma Staff and Programs additional of appropriate zone
                                                                                                                 isolation valves. Replacement
                                                                                                                 of ceiling, floor and wall
                                                                                                                 finishes systems throughout
                                                                                                                 the public areas of building 60,
                                                                                                                 as well as all areas where
                                                                                                                 polytrauma patients are treated
                                                                                                                 Exploration of exterior
                                                                                                                 expansion to one or more
                                                                                                                 treatment spaces to meet
                                                                                                                 growing workload and
                                                                                                                 adequately treat polytrauma
                                                                                                                 patients. Exploration of
                                                                                                                 providing additional parking to
                                                                                                                 provide close to building
                                                                                                                 parking for polytrauma                 7/1/2009 $             350,000

                                                                                                                  Proposed project will providing
                                                                                   Renovate Restrooms for Patient
18     Tucson AZ 85723                       7       Pima      678-09-102                                         a private shower for each
                                                                                   Privacy in Building 60
                                                                                                                  patient restroom throughout
                                                                                                                  Building 60.                         8/25/2009 $             750,000




                                                                                                      Page 38 of 45
                                                                             Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                     Projected
                                                                                                                                                                              Total Estimated ARRA
VISN


                                                                  Project Number               Project Title                       Description                   Award




                State
                                      Congressional
         City           Zip Code                       County                                                                                                   (Phase 5           Project Cost
                                         District
                                                                                                                                                              Projected End

                                                                                                                        Proposed project will fully
                                                                                                                        sprinkler Building 3, much of
                                                                                                                        which is currently not
                                                                                                                        sprinklered. Building 3 is
                                                                                                                        approximately 36,000 GSF, and
                                                                                                                        houses the dietetics and
                                                                                                                        canteen kitchens and dining
                                                                                                                        rooms. On the first floor, the
                                                                                                                        canteen kitchen and dining
                                                                                                                        room is sprinklered while the
                                                                                                                        corresponding spaces in
                                                                                                                        dietetics are not. The
                                                                                                                        basement, which contains
                                                                                    Install Fire Sprinklers in          storage including the pharmacy
18     Tucson AZ 85723                        7       Pima      678-09-103                                              cache, locker rooms and
                                                                                    Building 3
                                                                                                                        mechanical equipment, is not
                                                                                                                        sprinklered. The dietetics
                                                                                                                        kitchen is a critical asset, and
                                                                                                                        the building should be
                                                                                                                        protected by fire sprinklers
                                                                                                                        throughout, and would be
                                                                                                                        sprinklered if constructed
                                                                                                                        today. The proposed project
                                                                                                                        will install a new fire riser on
                                                                                                                        the dietetics side, fully sprinkler
                                                                                                                        the remainder of the building
                                                                                                                        including the basement and
                                                                                                                        exterior covered walkway. The
                                                                                                                        existing sprinkler system on the
                                                                                                                        canteen side will also be                 7/3/2009 $             350,000

                                                                                                                   Project will replace the
                   83702-                                                           Replace Underground Electrical underground electrical feeders,
20     Boise    ID                            2       Ada       531-09-132
                   4598                                                             System and Generators          replace pad mount
                                                                                                                   transformers, and replace the
                                                                                                                   station generators.                           8/26/2009 $           1,820,000
       Portlan    97239-                              Multnoma
20             OR                             1                648-07-117           Renovate Lab                        This project will remodel the
       d          2964                                h
                                                                                                                        lab area.                                8/24/2009 $             465,000
       Portlan    97239-                              Multnoma                      Renovate for installation of New
20             OR                             1                648-08-124
       d          2964                                h                             SPEC CT                          Site prep for new SPEC CT.                  8/24/2009 $             100,000

                                                                                                                  The basement of Bldg. 16 has
       Portlan    97239-                              Multnoma                      Renovate Basement of Building only 1 legal exit. This project
20             OR                             1                648-08-184
       d          2964                                h                             16 for additional Exit        will create a 2nd exit. Project
                                                                                                                  will also convert some poorly
                                                                                                                  used store rooms to offices.                    8/7/2009 $             225,000




                                                                                                        Page 39 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                   Projected
                                                                                                                                                                           Total Estimated ARRA
VISN


                                                                 Project Number               Project Title                       Description                 Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                                 (Phase 5           Project Cost
                                        District
                                                                                                                                                           Projected End


                                                                                                                       This project locates a 60 ton
       Portlan    97239-                             Multnoma                      Install New Chiller for             chiller outside stair #5 and ties
20             OR                            1                648-09-125
       d          2964                               h                             Ambulatory Surgery                  it into the new ambulatory
                                                                                                                       surgery air handler located on
                                                                                                                       the 4th floor roof.                    8/24/2009 $             100,000


                                                                                                                 This project is the 2nd phase in
       Portlan    97239-                             Multnoma                      Upgrade/Repair Paging System,
20             OR                            1                648-09-127                                         correcting the Paging system in
       d          2964                               h                             Phase 2
                                                                                                                 the Medical Center that has
                                                                                                                 been graded a D in the FCA.                  8/25/2009 $             473,223

                                                                                                                       Install security upgrade to
       Rosebu    97470-                                                            Install Security Upgrades for
20            OR                             4       Douglas   653-08-207                                              surgery, such as cameras, card
       rg        6513                                                              Surgery
                                                                                                                       lock system and automatic
                                                                                                                       doors.                                  8/5/2009 $             143,000
                                                                                   Install Elevator Handrail and
       Rosebu    97470-                                                                                                B1 Elevator Tower: Install
20            OR                             4       Douglas   653-09-313          Replace Roof, Building 1
       rg        6513                                                                                                  handrails and provide roof
                                                                                   Elevator Tower
                                                                                                                       replacement.                           8/25/2009 $              55,500

                                                                                                                       Project will prepare existing
                                                                                                                       Lobby canteen food service
                       98108-                                                      Renovate existing Canteen for       area for the relocated chapel,
20     Seattle WA                            7       King      663-09-131
                       1532                                                        Chapel, Building 100                chaplains' offices and
                                                                                                                       conference room from the
                                                                                                                       basement of bldg. 100 to the
                                                                                                                       first floor of bldg. 100.              6/12/2009 $             660,000

                                                                                                                       Provide professional services
                                                                                                                       for the inspection, conducting
       Spokan    99205-                                                            Repair/Upgrade Electrical           testing of the electrical
20            WA                             5       Spokane   668-09-106                                              components and servicing of
       e         6185                                                              Distribution
                                                                                                                       the facility electrical systems,
                                                                                                                       equipment and all major
                                                                                                                       electrical distribution
                                                                                                                                                              7/20/2009 $              75,000
                                                                                                                       apparatus.

                                                                                                                       Evaluate existing electrical
       Spokan    99205-                                                            Replace/Upgrade Generators -        distribution / Generator
20            WA                             5       Spokane   668-09-110
       e         6185                                                              FCA Correction                      system. Install new generators
                                                                                                                       and required distribution
                                                                                                                       system.                                 6/2/2009 $           3,300,000


                                                                                   Replace/Upgrade Heating,         Project will replace / upgrade
       Spokan    99205-
20            WA                             5       Spokane   668-09-113          Ventilation and Air Conditioning existing HVAC systems in Bldg.
       e         6185
                                                                                   in Building 32                   32 as required to meet HVAC
                                                                                                                    Design Criteria requirements.              6/3/2009 $             158,865


                                                                                                       Page 40 of 45
                                                                             Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                 Projected
                                                                                                                                                                          Total Estimated ARRA
VISN


                                                                   Project Number             Project Title                      Description                 Award




                State
                                      Congressional
         City           Zip Code                       County                                                                                               (Phase 5           Project Cost
                                         District
                                                                                                                                                          Projected End

                                                                                                                       replace current hallway doors
       Walla            99362-                        Walla
20              WA                            5                 687-08-115          Enhance Outpatient Security        with locking doors (secure
       Walla            3975                          Walla
                                                                                                                       access), add distress buttons,
                                                                                                                       add new unisex bathroom.              6/24/2009 $             145,776

                                                                                                                       This Project is to complete a
       Walla            99362-                        Walla                         Facility Asbestos Survey to        Facility Asbestos Survey – Re-
20              WA                            5                 687-08-127                                             Inspection to insure
       Walla            3975                          Walla                         ensure Compliance
                                                                                                                       compliance with the Green
                                                                                                                       Environmental Management
                                                                                                                       Systems Program.                       7/8/2009 $              20,000

                                                                                                                       This project is to conduct a
       Walla       99362-                             Walla                         Conduct Facility Lead Paint        Facility Lead Paint Survey in
20              WA                            5                 687-08-134                                             order to be compliant with the
       Walla       3975                               Walla                         Survey to ensure compliance
                                                                                                                       Green Environmental
                                                                                                                       Management Systems
                                                                                                                       Program.                              7/29/2009 $              30,000

                                                                                                                       This project is the renovation
                                                                                                                       of the theatre restrooms on
                                                                                                                       campus which have been sited
       White                                                                                                           in various surveys; these are
20              OR 97503-3011                 2       Jackson   692-07-113          Renovate Restrooms
       City                                                                                                            most likely used for patients,
                                                                                                                       visitors, and staff. We could
                                                                                                                       probably add to the description
                                                                                                                       that they will be made ADA
                                                                                                                                                             8/25/2009 $             225,000
                                                                                                                       accessible.

                                                                                                                       This work will renovate existing
                                                                                                                       office, storage and restroom
       White                                                                                                           space and will include, but is
20              OR 97503-3011                 2       Jackson   692-08-151          Renovate Building 212
       City                                                                                                            not limited to: flooring, wall
                                                                                                                       locations, HVAC, fire
                                                                                                                       suppression and life safety
                                                                                                                       corrections.                          8/25/2009 $             495,000

                                                                                                                 Project will provide sidewalks
                                                                                    Repair/Upgrade Sidewalks and in accordance with current city
21     Fresno   CA 93703                      20      Fresno    570-09-143
                                                                                    Parking                      code, and add additional
                                                                                                                 parking spaces along the
                                                                                                                 roadway.                                    6/23/2009 $           1,900,000

       Palo                                           Santa                                                            The projects general concept
21              CA 94304                      14                640-09-244P         Demolition of Building 23
       Alto                                           Clara                                                            of scope is the demolition of
                                                                                                                       Building 23.                          8/28/2009 $             350,099

       Long                                                                         Repair/Replace Fire Pump
22              CA 90822                      46      Los Angeles600-09-213 (FCA)                                      Pump has chronic seal leakage
       Beach                                                                        System
                                                                                                                       problem and must be replaced.
                                                                                                                                                             7/28/2009 $             165,000


                                                                                                       Page 41 of 45
                                                                            Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                Projected
                                                                                                                                                                        Total Estimated ARRA
VISN


                                                                 Project Number              Project Title                      Description                Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                              (Phase 5           Project Cost
                                        District
                                                                                                                                                        Projected End
                                                     San
       Loma
22             CA 92357                      41      Bernardin 605-09-109          Renovate Laboratory                Renovate Laboratory to include
       Linda
                                                     o                                                                utilities.                            6/5/2009 $           1,300,000
                                                     San
       Loma
22             CA 92357                      41      Bernardin 605-09-133          Renovate Isolation Rooms
       Linda                                                                                                          Renovate isolation rooms.
                                                     o                                                                                                      6/5/2009 $           1,500,000

                                                                                                                      This is an on going steam
                                                                                                                      project to replace steam piping
                                                                                                                      distribution which involves the
                                                                                                                      replacement of the supply and
                                                                                                                      condensate lines, valves,
       W. Los                                        Los                           Retrofit Steam Piping, North       fittings, supports, brackets,
22             CA 90073                      30                691-07-102WL
       Angeles                                       Angeles                       Campus Phase 6                     asbestos abatement,
                                                                                                                      insulation/jacket, trap
                                                                                                                      assembly, PRV Stations,
                                                                                                                      hangers, concrete lids,
                                                                                                                      excavation, asphalt, seeding,
                                                                                                                      pavement markings and
                                                                                                                                                            6/5/2009 $           1,225,000
                                                                                                                      concrete curbs etc.

                                                                                                                  This is phase 5 of the sewer
                                                                                                                  system retrofit for Building
                                                                                                                  500, the main hospital building
                                                                                                                  for the VA Greater Los Angeles
       W. Los                                        Los                           Retrofit Sewer System for Main Healthcare System. The
22             CA 90073                      30                691-07-192WL
       Angeles                                       Angeles                       Hospital Building, Phase 5     building which was originally
                                                                                                                  built in 1976 has its sewer
                                                                                                                  system in a deterioration stage
                                                                                                                  as determined by the A/E firm
                                                                                                                  that conduct the investigation
                                                                                                                  of the system recently.                   6/5/2009 $           1,792,000

                                                                                                                  This is phase 6 of the sewer
                                                                                                                  system retrofit for Building
                                                                                                                  500, the main hospital building
                                                                                                                  for the VA Greater Los Angeles
       W. Los                                        Los                           Retrofit Sewer System for Main Healthcare System. The
22             CA 90073                      30                691-07-193WL
       Angeles                                       Angeles                       Hospital, Phase 6              building which was originally
                                                                                                                  built in 1976 has its sewer
                                                                                                                  system in a deterioration stage
                                                                                                                  as determined by the A/E firm
                                                                                                                  that conduct the investigation
                                                                                                                  of the system recently.                   6/5/2009 $           1,792,000




                                                                                                      Page 42 of 45
                                                                         Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                  Location                                                                                                                 Projected
                                                                                                                                                                         Total Estimated ARRA
VISN


                                                                 Project Number             Project Title                       Description                 Award




               State
                                     Congressional
        City           Zip Code                       County                                                                                               (Phase 5           Project Cost
                                        District
                                                                                                                                                         Projected End

                                                                                                                 Building 218 is a four story
                                                                                                                 concrete structure building and
                                                                                                                 building 507 is the wood frame
                                                                                                                 single story structure. Building
       W. Los                                        Los                          Replace Roofs Building 218 and 218 has 80% single ply roof
22             CA 90073                      30                691-08-125WL
       Angeles                                       Angeles                      Building 507                   system and the penthouse roof
                                                                                                                 with clay tile. Building 507 is a
                                                                                                                 hot mop build up roof. These
                                                                                                                 roofs are in need of
                                                                                                                 replacement and beyond patch
                                                                                                                                                             6/5/2009 $           1,050,000
                                                                                                                 work repair.

                                                                                                                     The intended purpose of this
                                                                                                                     remodel is to provide for all
                                                                                                                     utility, mechanical and space
                                                                                                                     preparation for new
                                                                                                                     equipment. The work will
                                                                                                                     include but not be limited to: a.
       W. Los                                        Los                          Renovate Radiology/Nuclear         Removal of existing supplies
22             CA 90073                      30                691-08-133WL
       Angeles                                       Angeles                      Medicine, Building 500             and equipment and disposal,
                                                                                                                     temporary staging and or
                                                                                                                     storage during construction b.
                                                                                                                     All necessary demolition c.
                                                                                                                     Design work d. Structural work
                                                                                                                     e. all related construction
                                                                                                                     documentation f. Cleanup and
                                                                                                                     activation of area.                     6/5/2009 $           1,035,390

                                                                                                                 This is phase 4 of the sewer
                                                                                                                 system retrofit for Building
                                                                                                                 500, the main hospital building.
       W. Los                                        Los                          Retrofit Sewer System for Main The building which was
22             CA 90073                      30                691-08-191WL                                      originally built in 1976 has its
       Angeles                                       Angeles                      Hospital Building, Phase 4
                                                                                                                 sewer system in a deterioration
                                                                                                                 stage as determined by the A/E
                                                                                                                 firm that conduct the
                                                                                                                 investigation of the system
                                                                                                                                                             6/5/2009 $           1,792,000
                                                                                                                 recently.

                                                                                                                     This project will repair and
                                                                                                                     resurface existing asphalt
                                                                                                                     paved roads and re-striping of
       Sepulve                                       Los                          Repair Roads and Parking,
22             CA 91343                      27                691A4-08-115SM                                        parking lots at the Sepulveda
       da                                            Angeles                      Phase 1
                                                                                                                     VA Campus. Patton Drive and
                                                                                                                     Doolittle Road ending at the
                                                                                                                     Woodley Street entrance to the
                                                                                                                     VA Campus, will be replaced.            6/5/2009 $           1,113,919



                                                                                                     Page 43 of 45
                                                                              Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                   Projected
                                                                                                                                                                            Total Estimated ARRA
VISN


                                                                   Project Number              Project Title                       Description                 Award




                State
                                      Congressional
         City           Zip Code                        County                                                                                                (Phase 5           Project Cost
                                         District
                                                                                                                                                            Projected End

                                                                                                                        This project will replace old
                                                                                     Repair/Replace Sidewalk at
23     Fargo    ND 58102                At Large      Cass       437-09-155                                             and broken concrete sidewalks
                                                                                     Medical Center
                                                                                                                        and stairs at the Medical
                                                                                                                        Center.                                7/29/2009 $             260,000

                                                                                                                        This project upgrades the
       Ft.                                                                           Upgrade Security Systems for
23              SD 57741                At Large      Meade      568-09-109                                             current security card lock and
       Meade                                                                         Medical Center
                                                                                                                        entrance monitoring system for
                                                                                                                        medical center buildings.              6/12/2009 $             460,000
                                                                                     Heating, Ventilation and Air
       Ft.                                                                                                              Design needed for repairing
23              SD 57741                At Large      Meade      568-09-120          Conditioning Repairs Building
       Meade                                                                                                            HVAC systems in Building 148
                                                                                     113 and 148
                                                                                                                        and 113                                7/30/2009 $              50,000


       Hot                                                                                                              This project will replace roads
23             SD 57747                 At Large      Fall River 568-09-209          Road Replacement, Phase 1
       Springs                                                                                                          at various locations to ensure
                                                                                                                        patient, staff and visitor safety      7/16/2009 $             400,000


                                                                                                                        This project will provide design
       Hot                                                                           Replace Hospital Steam Lines
23             SD 57747                 At Large      Fall River 568-09-211                                             services only for replacement
       Springs                                                                       and Regulators
                                                                                                                        of 80 year old steam lines and
                                                                                                                        steam regulators.                      7/28/2009 $              40,000


                                                                                                                   This project will replace 70
       Hot                                                                           Repair/Upgrade Water Line for
23             SD 57747                 At Large      Fall River 568-09-213                                        year old soft water main piping
       Springs                                                                       Quarters
                                                                                                                   that is in need of replacement
                                                                                                                   due to significant corrosion.               7/24/2009 $             110,000

                                                                                                                  Construct a new parking lot
       Minnea
23            MN 55417                        5       Hennepin 618-10-106            Parking Lot and Road Upgrade and repair existing asphalt
       polis
                                                                                                                  pavement within the Bldg 70
                                                                                                                  campus.                                       6/4/2009 $           1,100,000


       Minnea                                                                        Replace Heating, Ventilation     Replace existing coils and other
23            MN 55417                        5       Hennepin 618-10-117
       polis                                                                         and Air Conditioning Coils ph. I repairs as necessary to Air
                                                                                                                      Handling Units in Building 70.           6/24/2009 $             300,000
                                                                                     Replace Air Handlers for
23     Omaha NE 68803                         3       Hall       636-07-301ES                                           Replace air handlers
                                                                                     Laboratory Space
                                                                                                                        throughout the facility                8/28/2009 $             500,000

       Grand                                                                         Replace/Upgrade Domestic Hot Replace old Hot water heaters
23              NE 68803                      3       Hall       636-09-121
       Island                                                                        Water Heaters                with new supply on demand
                                                                                                                  hot water heaters.                           8/28/2009 $             210,000




                                                                                                        Page 44 of 45
                                                                           Planned Obligations for ARRA NRM Projects up thru 8/30/09
                                   Location                                                                                                                 Projected
                                                                                                                                                                          Total Estimated ARRA
VISN


                                                                   Project Number             Project Title                       Description                Award




                State
                                      Congressional
        City            Zip Code                        County                                                                                              (Phase 5           Project Cost
                                         District
                                                                                                                                                          Projected End


                                                                                                                       Project replaces and/or resets
       Des                                                                          Replace/Repair Steps for           the limestone steps on the
23              IA 50310                      3       Polk       636A6-09-120
       Moines                                                                       Building 3                         north entrance of Building 3,
                                                                                                                       and replaces elements of the
                                                                                                                       porch at the top of the steps.        7/17/2009 $             300,000


                                                                                    Energy Upgrades to Heating,      This project will set up the
       Iowa
23              IA 52246                      2       Johnson    636A8-09-908       Ventilation and Air Conditioning existing Air Handling Units and
       City                                                                                                          exhaust fan systems in
                                                                                    System, Building 40 & 41
                                                                                                                     Buildings 40 and 41 for energy
                                                                                                                     recovery.                               7/14/2009 $             660,000

                                                                                                                       This project will
                                                                                                                       update/renovate the interior
                                                                                                                       finishes throughout the
       Iowa                                                                         Update/Renovate Interior           common areas of one floor of
23              IA 52246                      2       Johnson    636A8-09-912                                          the main hospital building.
       City                                                                         Finishes Building 1, Phase I
                                                                                                                       Work will include, but is not
                                                                                                                       limited to, wall covering/paint,
                                                                                                                       flooring, lighting, ceilings,
                                                                                                                       reception areas and wait
                                                                                                                                                              8/3/2009 $             480,000
                                                                                                                       rooms.

                                                                                                                     This project increases the air
                                                                                    Install Heating, Ventilation and conditioning in the basement of
       St.
23              MN 56303                      6       Stearns    656-07-124ES       Air Conditioning System in       Building 29. Additional clinical
       Cloud
                                                                                    Basement Building 29             functions have been relocating
                                                                                                                     to this area and need to
                                                                                                                     provide better ventilation.             7/15/2009 $             775,000




                                                                                                       Page 45 of 45

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:8
posted:7/26/2011
language:English
pages:45
jizhen1947 jizhen1947
About Thosedocs come from internet,if you have the copyrights of one of them,tell me by mail zhenweda@163.com,and i will delete it on the first time Thank you!