									Courtice Trunk Sanitary Sewer                                                                           The Regional Municipality of Durham
                                                                                                        Works Department
                                                                                                        www.durham.ca

Class EA Study




                         Please complete the sign-in sheet and review the display materials.
                         One of our representatives will be pleased to answer your questions and address any concerns.



 Your input is much appreciated!
  November 4, 2010                                                                                                                     1
Courtice Trunk Sanitary Sewer                                                                      The Regional Municipality of Durham
                                                                                                   Works Department
                                                                                                   www.durham.ca
                                  Class EA Study



         Introduction

        The Region of Durham has determined that a new trunk sanitary sewer is necessary to
        meet wastewater servicing requirements within the Courtice Water Pollution Control
        Plant (WPCP) service area.

        A Class Environmental Assessment (EA) study will be completed to determine the
        preferred servicing alternative for the Courtice Trunk Sanitary Sewer.

        This study is classified as a “Schedule B” project under the Municipal Class EA Process.
        This process involves stakeholder consultation.

        The process will include an evaluation of all the impacts (natural, cultural, socio-
        economic and environmental) associated with each alternative and will address all
        related stakeholder concerns.




 Introduction to the Study

  November 4, 2010                                                                                                                2
Courtice Trunk Sanitary Sewer                                                                                                            The Regional Municipality of Durham
                                                                                                                                         Works Department
                                                                                                                                         www.durham.ca
                                Class EA Study


                                          In accordance with the Region of Durham’s Official Plan, future growth is planned for North Whitby (Brooklin), North
                                           Oshawa and Courtice.
                                          A new trunk sanitary sewer will be required to convey the sanitary sewage flows from existing and new development
  Why Is This Sewer Required?              areas to the Courtice Water Pollution Control Plant (WPCP).
                                          The proposed Courtice Trunk Sanitary Sewer was identified as an infrastructure requirement in the planning &
                                           construction of the Courtice WPCP.



                                          The Courtice Trunk Sanitary Sewer study area is bounded by Conlin Road, Solina Road, Harmony Road, and Lake
        Study Area Boundaries              Ontario.
                                          Boundaries were established based on wastewater conveyance needs.



                                          The Harmony Creek WPCP and Courtice WPCP currently treat sewage flows generated from Oshawa and Courtice.
                                          The Harmony Creek WPCP will ultimately be decommissioned, leaving Courtice WPCP to service all of Oshawa and
                                           Courtice.
           Servicing Strategy             The proposed Courtice Trunk Sanitary Sewer may require local sanitary sewage pumping stations to service low lying
                                           areas.
                                          In the future, sewage flows will be conveyed to the Courtice Trunk Sanitary Sewer from both the Conlin Road Sanitary
                                           Sewage Pumping Station and the future potential Thickson Road Sanitary Sewage Pumping Station.


                                            The Courtice WPCP is located east of Courtice Road and along the Lake Ontario shoreline.
                                            The Courtice WPCP was commissioned in 2007 with an existing rated capacity of 68,200 m3/d.
              Courtice WPCP                 Wastewater treatment at the Courtice WPCP is approved to service approximately 150,000 people.
                                            Presently, sanitary sewage flows are conveyed from the Harmony Creek Sanitary Sewage Pumping Station via a
                                             forcemain.




 Study Background

  November 4, 2010                                                                                                                                                      3
Courtice Trunk Sanitary Sewer                   The Regional Municipality of Durham
                                                Works Department
                                                www.durham.ca
                               Class EA Study




                 We are here




 The Municipal Class EA Process

  November 4, 2010                                                             4
Courtice Trunk Sanitary Sewer                             The Regional Municipality of Durham
                                                          Works Department
                                                          www.durham.ca
                                         Class EA Study




          Note: Figure is Not to Scale




 Courtice Sanitary Sewershed

  November 4, 2010                                                                       5
Courtice Trunk Sanitary Sewer                                            The Regional Municipality of Durham
                                                                                         Works Department
                                                                                             www.durham.ca

                                       Class EA Study



     Phase 1: Definition of Problem or Opportunity

                                    Identify Problem or Opportunity

       • The main objective of this study is to identify and evaluate servicing alternatives to
         convey sanitary sewage flows from existing developed areas and planned
         development to the Courtice WPCP.




                                        Identify of the Study Area

       • The study area is bounded by Conlin Road, Lake Ontario, Harmony Road and Solina
         Road.
       • The study area boundaries allow for several trunk sewer alternatives to be
         considered.



                   Discretionary Public Consultation to Review Problem or Opportunity

       • The Notice of Study Commencement has been published in the Oshawa This Week
         and Clarington This Week newspapers.
       • Letters have been mailed to interested members of the public, government
         offices, agencies and other stakeholders.



    Phase 2A: Identification of Alternative Solutions

                         Identify Alternative Solutions to Problem or Opportunity
        •     Seven potential alignments have been identified that were based on preliminary
              screening criteria.




                                            Select Schedule
        •     Schedule “B” was selected for this study




   What Has Been Done

November 4, 2010                                                                                               6
Courtice Trunk Sanitary Sewer                                               The Regional Municipality of Durham
                                                                                            Works Department
                                                                                                www.durham.ca

                                        Class EA Study



     Phase 2B: Evaluation of Alternative Solutions and Selection of a
     Recommended Solution

                                            Conducted Studies

         •       Several potential alignments have been evaluated based on stakeholder feedback
                 and the following studies:

                  Hydrogeological and Geotechnical Study
                  Subsurface Soil and Groundwater Field Investigation
                  Stage 1 Archaeological Assessment
                  Natural Environment Study
                  Fluvial Geomorphological Study
                  Qualitative Sustainability Assessment




                                             Evaluation Matrix
                                             Evaluation Matrix
         •       Evaluation criteria were developed and used to assess the seven potential
                 alignments in an evaluation matrix.
         •       Based on the Evaluation Matrix, a recommended alignment was identified.




                                            Preliminary Design

         •       A preliminary design of the potentially preferred alignment was developed
                 based on the conducted studies.
         •       Various potential construction methodologies of implementing the preferred
                 alignment were examined to ensure that impacts to the
                 natural, social, cultural, and economical environments are minimized.




   What Has Been Done

November 4, 2010                                                                                                  7
Courtice Trunk Sanitary Sewer                                            The Regional Municipality of Durham
                                                                                         Works Department
                                                                                             www.durham.ca

                                    Class EA Study




      The following considerations were used to determine the seven potential Courtice
      Trunk Sanitary Sewer alignments:




      • Conlin Road E & Courtice WPCP: The sanitary sewer must start at Conlin Road and
       terminate at the Courtice WPCP in order to service future growth areas.

      • Utilization of Existing Infrastructure: A key objective in determination of the potential
       alignments was the utilization of the existing sanitary sewer network such as the segments of
       existing sanitary sewer along Coldstream Drive and Townline Road North.

      • Nash Road Sanitary Sewerage Pumping Station: Consideration was given to
       decommissioning the Nash Road Sanitary Sewerage Pumping Station by conveying flows
       from its current service area to the proposed Courtice Trunk Sanitary Sewer.

      • Avoidance of Busy Streets: High traffic streets and intersections (such as King Street) were
       avoided to the extent possible to alleviate congestion during construction.

      • Avoidance of Major Creek Crossings: Potential alignments were planned to avoid major
       creek crossings to the greatest extent possible, such as the Farewell Creek on Townline
       Road and Nash Road.

      • CP Rail Crossing: In order to reach the Courtice WPCP, the sanitary sewer will have to
       cross the CP tracks. The majority of the alignments cross at a location that will minimize
       constructability issues.

      • Highway 401: In order to reach the Courtice WPCP, the sanitary sewer will have to cross
       Highway 401. Potential alignments were determined to minimize constructability issues and
       utilize existing road allowances.

      • The Greenbelt: A key consideration in the determination of the potential alignments was
       avoiding key natural features associated within the area designated as Greenbelt.




   Potential Alignment Considerations

November 4, 2010                                                                                               8
Courtice Trunk Sanitary Sewer                            The Regional Municipality of Durham
                                                                         Works Department
                                                                             www.durham.ca

                           Class EA Study



  Potential alignments were based on the following preliminary screening
  criteria:




    1. Utilize existing road            2. Minimize impact on Natural
       allowances, open space and          Environment such as
       existing utility corridors as       watercourses, green spaces
       much as possible                    and other known features




      3. Minimize impact on social          4. Ability to connect with the
         and cultural environments             existing sanitary sewer
                                               network




   Screening Criteria

November 4, 2010                                                                               9
Courtice Trunk Sanitary Sewer                                                     The Regional Municipality of Durham
                                                                                  Works Department
                                                                                  www.durham.ca
                                  Class EA Study




   Note: Figure is Not to Scale                    Note: Figure is Not to Scale




 Alternative Alignments 1 & 2

  November 4, 2010                                                                                              10
Courtice Trunk Sanitary Sewer                                                     The Regional Municipality of Durham
                                                                                  Works Department
                                                                                  www.durham.ca
                                  Class EA Study




   Note: Figure is Not to Scale                    Note: Figure is Not to Scale




 Alternative Alignments 3 & 4

  November 4, 2010                                                                                              11
Courtice Trunk Sanitary Sewer                                                     The Regional Municipality of Durham
                                                                                  Works Department
                                                                                  www.durham.ca
                                  Class EA Study




   Note: Figure is Not to Scale                    Note: Figure is Not to Scale




 Alternative Alignments 5 & 6

  November 4, 2010                                                                                              12
Alignment Alternative 7 (Recommended)
 Courtice Trunk Sanitary Sewer                          The Regional Municipality of Durham
                                                                        Works Department
                                                                            www.durham.ca

                                       Class EA Study




        Note: Figure is Not to Scale




    Alternative Alignment 7 (Recommended)

 November 4, 2010                                                                             13
Courtice Trunk Sanitary Sewer                                                                           The Regional Municipality of Durham
                                                                                                                        Works Department
                                                                                                                            www.durham.ca

                                                            Class EA Study




                                                                        Coldstream Drive




                   Conlin Road East




                                                                 The Greenbelt




                                                                                           Pebblestone Road




                                Nash Road Pumping Station




                                        King Street




                                           Farewell Creek




                                                                                                              Potential CP Rail Crossing




                                                                    Courtice WPCP                                     Highway 401

       Note: Figure is Not to Scale




   Potential Trunk Sanitary Sewer Alignments

November 4, 2010                                                                                                                              14
Courtice Trunk Sanitary Sewer                                            The Regional Municipality of Durham
                                                                                         Works Department
                                                                                             www.durham.ca

                                                  Class EA Study




                    Harmony Valley
                   Conservation Area




                                                        Second Marsh
                                                         Wildlife Area




                                        Darlington
                                      Provincial Park

       Note: Figure is Not to Scale




   Natural Features

November 4, 2010                                                                                               15
Courtice Trunk Sanitary Sewer                                                                                                             The Regional Municipality of Durham
                                                                                                                                          Works Department
                                                                                                                                          www.durham.ca
                                       Class EA Study


                                                            SOCIAL & CULTURAL ENVIRONMENT CONSIDERATIONS

                                                                 •   Heritage & Archaeological Areas
                                                                 •   Existing & Proposed Development
                                                                 •   Traffic Disruption
        NATURAL ENVIRONMENT CONSIDERATIONS                                                                           TECHNICAL CONSIDERATIONS
                                                                 •   Air and Noise Considerations
              •      Watercourse Crossings                       •   Potential for Temporary Well Interference   •   Ability to connect with existing
                                                                     due to Construction Dewatering Activity         infrastructure
              •      Fisheries
                                                                 •   Impacts on Local Schools                    •   Coordination with Proposed Road
              •      Species at Risk (COSEWIC or MNR                                                                 Projects
                     Status)
                                                                                                                 •   Ease of Construction
              •      Vegetation, Wetlands, ESA’s, ANSI’s,
                     and Locally Significant Areas                                                               •   Reliability (use of siphons, pumping
                                                                                                                     stations, and tunnels)
              •      Proximity to Valley Lands and
                     Floodplains                                 •   Estimated Capital Costs                     •   Railway Crossings

              •      Groundwater                                 •   Relative Operation and Maintenance          •   Predicted Dewatering and
                                                                     Costs                                           Depressurization Requirements
                                                                 •   Land Acquisition Requirements




                                                                        ECONOMIC CONSIDERATIONS




 Evaluation Criteria

  November 4, 2010                                                                                                                                                      16
Courtice Trunk Sanitary Sewer                                                                                                                                                                                                                                            The Regional Municipality of Durham
                                                                                                                                                                                                                                                                         Works Department
                                                                                                                                                                                                                                                                         www.durham.ca
                                                         Class EA Study


                                   Alternative 1                              Alternative 2                          Alternative 3                            Alternative 4                                Alternative 5                          Alternative 6                            Alternative 7

                                                                                                                                                                                                                                                                                        Conlin Rd./Grandview
                              Conlin Rd./Grandview                     Conlin Rd../Grandview                                                                                                                                                Conlin Rd./Grandview
  Evaluation Criteria                                                                                   Conlin Rd./Grandview Rd./Coldstream                                                    Conlin Rd../Grandview Rd./Beatrice                                                     Rd./Beatrice St./Townline
                          Rd./Coldstream Dr./Townline             Rd./Coldstream Dr./Townline Rd.                                                     Conlin Rd../Townline Rd./Nash                                                      Rd./Coldstream Dr./Townline
                                                                                                        Dr./Townline Rd./Bloor St./Prestonvale                                                  St./Townline Rd./Future Adelaide                                                      Rd./Future Adelaide Ave.
                             Rd./Future Adelaide Ave.           N./Pebblestone Rd./Trulls Rd./Future                                                    Rd./Courtice Rd./Baseline                                                     Rd./Future Adelaide Ave. Ext./Trulls
                                                                                                             Rd./Baseline Rd./Southeast to                                                          Ave. Ext./Trulls Rd./Bloor                                                    Ext./Trulls Rd./Bloor St./Courtice
                        Ext./Trulls Rd./Nash Rd./Hancock        Adelaide Ave. Ext./Courtice Rd./Nash                                                 Rd./Progress Dr./Courtice WPCP             St./Hancock Rd./Courtice WPCP          Rd./Nash Rd./Courtice Rd./Bloor
                                                                                                                   Courtice WPCP                                                                                                                                                    Rd./ Baseline Rd./ Progress
                               Rd./Courtice WPCP                 Rd./Hancock Rd./Courtice WPCP                                                                                                                                         St./Hancock Rd./Courtice WPCP
                                                                                                                                                                                                                                                                                         Dr./Courtice WPCP
                                                                                                                                 Natural Environment Considerations
                            13 creek crossings (7                 13 creek crossings (6 permanent, 6     5 creek crossings (5 permanent)         11 creek crossings (7 permanent,            11 creek crossings (7 permanent,       12 creek crossings (7 permanent,         11 creek crossings (6
     Watercourse                                                    intermittent, 1 buried)                                                          3 intermittent, 1 buried)                    3 intermittent, 1 buried)               4 intermittent, 1 buried)                 permanent, 4 intermittent, 1
                             permanent, 5 intermittent, 1
      Crossings                                                                                                                                                                                                                                                                     buried)
                             buried)
                           May impact Harmony, Farewell,          May impact Harmony, Farewell,          May impact Harmony, Farewell,           May impact Harmony, Farewell,               May impact Harmony, Farewell,          May impact Harmony, Farewell,            May impact Harmony, Farewell,
      Fisheries             Black and Tooley Creek                  Black and Tooley Creek fisheries        Robinson and Tooley Creek                Black and Tooley Creek fisheries             Black and Tooley Creek fisheries        Black and Tooley Creek fisheries          Black and Tooley Creek
                            fisheries                                                                       fisheries                                                                                                                                                               fisheries
                           3 species at risk in the vicinity      1 species at risk in the vicinity      4 species at risk in the vicinity       2 species at risk in the vicinity           3 species at risk in the vicinity      3 species at risk in the vicinity        3 species at risk in the vicinity
    Species at Risk         [Loggerhead Shrike (END),               [Loggerhead Shrike (END)]               [Loggerhead Shrike (END),                [Loggerhead Shrike (END),                    [Loggerhead Shrike (END),               [Loggerhead Shrike (END),                 [Loggerhead Shrike (END),
  (COSEWIC or MNR           Blanding’s Turtle (THR),                                                        Blanding’s Turtle (THR), Yellow          Blanding’s Turtle (THR)]                     Blanding’s Turtle (THR),                Blanding’s Turtle (THR),                  Blanding’s Turtle (THR),
       Status)              Butternut (END)                                                                 Breasted Chat (SC), Eastern                                                           Butternut (END)]                        Butternut (END)]                          Butternut (END)]
                                                                                                            Milksnake (SC)
                           3131 m of moderate constraint          5230 m of moderate constraint          1075 m of moderate constraint           1275 m of moderate constraint               3127 m of moderate constraint          6729 m of moderate constraint            1946 m of moderate constraint
                            vegetation, 2265 m of high              vegetation, 3700 m of high              vegetation, 578 m of high constraint     vegetation, 824 m of high                    vegetation, 2338 m of high              vegetation, 610 m of high                 vegetation, 1872 m of high
      Vegetation            constraint vegetation                   constraint vegetation                   vegetation                               constraint vegetation                        constraint vegetation                   constraint vegetation                     constraint vegetation

                           Crosses one moderate valley            Crosses one moderate valley            Crosses one significant valley          Crosses one moderate valley                 Crosses one moderate valley            Crosses one moderate valley              Crosses one moderate valley
   Valley Lands &
    Floodplains
                           Passes through part of                 Passes through part of Harmony-        Passes by Harmony-Farewell              Passes by Harmony-Farewell                  Passes through part of Harmony-        Passes through part of Harmony-          Passes through part of
  Wetlands/ESA’s/           Harmony-Farewell Wetland                Farewell Wetland Complex PSW            Wetland Complex PSW                      Wetland Complex PSW                          Farewell Wetland Complex PSW            Farewell Wetland Complex PSW              Harmony-Farewell Wetlands
                            Complex PSW (along Adelaide                                                                                                                                           (along Adelaide extension)              (along Adelaide extension)                Complex PSW (along Adelaide
   ANSI’s/Locally           extension)                                                                                                                                                                                                                                              extension)
  Significant Areas

                           Potential drainage of surficial        Comparable to Alternative 1.           Alignment is mainly in glacial till     Trunk sanitary sewer installation           Potential drainage of surfacial        Potential drainage of surficial          Potential drainage of surficial
                            sand deposits could have                However Alternative 2 has an even       deposits beyond wetland                  will potentially affect drainage of          sand deposits could have                sand deposits could have                  sand deposits could have
                            impacts on wetlands and                 longer distance in the wetland          boundaries. There may be great           surficial sand deposits along Nash           impacts on wetlands and creeks          impacts on wetlands and creeks            impacts on wetlands and
                            creeks in sections extending            complex.                                challenges for dewatering in the         Road and south of Black Creek.               in sections extending south of          in sections extending south of            creeks in sections extending
                            south of Pebblestone Rd., east                                                  Farewell Creek Valley because            Potential impact on environmental            Pebblestone Rd., east to                Pebblestone Rd., east to                  south of Pebblestone Rd., east
                            to Hancock Rd., and along                                                       excavation may encounter the top of      features low to moderate overall.            Hancock Rd., and along Hancock          Hancock Rd., and along Hancock            to Hancock Rd., and along
    Groundwater
                            Hancock Rd. to south of                                                         the pressurized Thorncliffe aquifer                                                   Rd. to south of Highway 2 in            Rd. to south of Highway 2 in              Hancock Rd. to south of
                            Highway 2. However, tunneling                                                   in that area. Degree of dewatering                                                    deeper sand units. Tunneling            deeper sand units. However,               Highway 2 in deeper sand
                            methods could alleviate                                                         will be dependent on the type of                                                      methods may alleviate drainage          tunneling methods could alleviate         units. Tunneling methods could
                            drainage concerns related to                                                    geological formation present and                                                      concerns related to shallow             drainage concerns related to              alleviate drainage concerns
                            shallow groundwater systems                                                     the existing groundwater levels.                                                      groundwater systems.                    shallow groundwater systems.              related to shallow groundwater
                                                                                                                                                                                                                                                                                    systems.
 Natural Environment
    Overall Rating
                                                                                                                                                       LEGEND

                                                                                                                    Most Preferred                   Less Preferred                      Least Preferred




 Evaluation of Alternative Solutions

  November 4, 2010                                                                                                                                                                                                                                                                                                 17A
Courtice Trunk Sanitary Sewer                                                                                                                                                                                                                                       The Regional Municipality of Durham
                                                                                                                                                                                                                                                                    Works Department
                                                                                                                                                                                                                                                                    www.durham.ca
                                                      Class EA Study
                                  Alternative 1                           Alternative 2                            Alternative 3                             Alternative 4                            Alternative 5                            Alternative 6                                 Alternative 7

                                                                                                                                                                                                                                                                                          Conlin Rd./Grandview
                              Conlin Rd./Grandview                    Conlin Rd../Grandview                                                                                                                                              Conlin Rd./Grandview
  Evaluation Criteria                                                                                 Conlin Rd./Grandview Rd./Coldstream                                                 Conlin Rd../Grandview Rd./Beatrice                                                            Rd./Beatrice St./Townline
                          Rd./Coldstream Dr./Townline            Rd./Coldstream Dr./Townline Rd.                                                     Conlin Rd../Townline Rd./Nash                                                    Rd./Coldstream Dr./Townline
                                                                                                      Dr./Townline Rd./Bloor St./Prestonvale                                               St./Townline Rd./Future Adelaide                                                             Rd./Future Adelaide Ave.
                             Rd./Future Adelaide Ave.          N./Pebblestone Rd./Trulls Rd./Future                                                    Rd./Courtice Rd./Baseline                                                   Rd./Future Adelaide Ave. Ext./Trulls
                                                                                                           Rd./Baseline Rd./Southeast to                                                       Ave. Ext./Trulls Rd./Bloor                                                           Ext./Trulls Rd./Bloor St./Courtice
                        Ext./Trulls Rd./Nash Rd./Hancock       Adelaide Ave. Ext./Courtice Rd./Nash                                                 Rd./Progress Dr./Courtice WPCP         St./Hancock Rd./Courtice WPCP            Rd./Nash Rd./Courtice Rd./Bloor
                                                                                                                 Courtice WPCP                                                                                                                                                        Rd./ Baseline Rd./ Progress
                               Rd./Courtice WPCP                Rd./Hancock Rd./Courtice WPCP                                                                                                                                       St./Hancock Rd./Courtice WPCP
                                                                                                                                                                                                                                                                                           Dr./Courtice WPCP
                                                                                                                        Social & Cultural Environment Considerations
                        •   21 Registered Archaeological •      20 Registered Archaeological Sites in • 18 Registered Archaeological Sites      • 23 Registered Archaeological Sites • 20 Registered Archaeological                • 21 Registered Archaeological               • 20 Registered Archaeological
      Heritage &            Sites in the vicinity               the vicinity                            in the vicinity                           in the vicinity                      Sites in the vicinity                         Sites in the vicinity                        Sites in the vicinity
 Archaeological Areas

                        • Alignment runs along western       • Alignment runs along eastern edge of   • Alignment runs along western edge       • Alignment is centralized to service     • Alignment runs along eastern           • Alignment runs along eastern               • Alignment runs along eastern
                          edge of the study area and           study area and may delay                 of the study area and may delay           majority of undeveloped lands             edge of the study area and may           edge of the study area and may               edge of the study area and may
 Existing & Proposed      may delay development of             development of lands within the          development of lands within the           within the Courtice urban area            delay development of lands               delay development of lands                   delay development of lands
                                                                                                                                                  boundary                                  within the Courtice urban area           within the Courtice urban area               within the Courtice urban area
    Development           lands within the Courtice            Courtice urban area boundary             Courtice urban area boundary
                                                                                                                                                                                            boundary                                 boundary                                     boundary
                          urban area boundary

                        • Alignment avoids busy streets • Alignment avoids busy streets               •   Alignment runs almost entirely along •     Alignment runs along Townline        •   Alignment avoids busy streets        •   Alignment avoids busy streets            •     Alignment avoids busy streets
                          including Highway 2 and the       including Highway 2 and the majority          Townline Road which will cause             Road and Nash Road which will            including Highway 2 and Nash             including Highway 2 and Nash                   including Highway 2 and Nash
  Traffic Disruption      majority of Nash Road             of Nash Road but may cause                    considerable traffic disruption            cause considerable traffic               Road but may cause                       Road but may cause                             Road
                                                            considerable traffic disruption along                                                    disruption                               considerable disruption along            considerable disruption along
                                                            Hancock Road                                                                                                                      Hancock Road                             Hancock Road
                        • Some air and noise impacts      • Some air and noise impacts on             •   Low air and noise impacts on          •    High air and noise impacts on        •   Some air and noise impacts on        •   Some air and noise impacts on        •        Low air and noise impacts on
                          on residents and motorists        residents and motorists during                residents and motorists during             residents and motorists during           residents and motorists during           residents and motorists during                residents and motorists during
    Air and Noise         during construction relative to   construction relative to the other            construction relative to the other         construction relative to the other       construction relative to the other       construction relative to the other            construction relative to the other
                          the other alternatives            alternatives                                  alternatives because most of the           alternatives because most of the         alternatives                             alternatives                                  alternatives because most of the
   Considerations
                                                                                                          sewer is located away from existing        sewer is located on existing major                                                                                              sewer is located away from
                                                                                                          major roads and areas                      roads and areas                                                                                                                 existing major roads and areas.

                        • Moderate to Significant            • Significant potential for well         • Low potential for well interference.    • Low to moderate potential for well      • Moderate potential for well            • Moderate potential for well                • Moderate potential for well
                          potential for well Interference.     interference. Alternative has the        Alternative mainly crosses serviced       interference. Alignment mainly            interference. Shallow wells north        interference. Shallow wells north            interference. Shallow wells
                          Dewatering and                       longest stretch through non-serviced     areas, except for a sparsely              crosses serviced areas, except for        of Adelaide Ave. extension may           of Adelaide Ave. extension may               north of Adelaide Ave.
                                                               areas that likely have shallow dug
                          depressurization activity may                                                 developed southern portion                the non-serviced southern portion         be affected, and possibly wells in       be affected, and possible wells in           extension may be affected, and
  Likelihood of Well                                           wells. The area of main concern is
                          affect wells in not serviced         along Pebblestone Rd. and Nash Rd.       approaching Highway 401                   from north of Bloor St. to Highway        the not serviced portion from            the non-serviced southern                    possibly wells in the not
     Interference         areas north of the Adelaide          Potential wells east of Townline Rd.                                               401                                       north of Bloor St. to Highway 401        portion from north of Bloor St. to           serviced portion from north of
                          Ave. extension. Wells along          (north of Pebblestone Rd.) and wells                                                                                                                                  Highway 401.                                 Bloor St. to Highway 401
                          Hancock Rd. south of Nash            along Hancock Rd. south of Nash Rd.
                          Road may also be affected.           may be affected, depending on
                                                               dewatering requirements.
                        • May impact College Park            • May impact College Park Elementary     • May impact College Park                 • May impact College Park               • Does not directly impact any             • May impact College Park                    • Does not directly impact any
                          Elementary School, Courtice          School due to traffic disruption and     Elementary School due to traffic          Elementary School, St. Worden           schools                                    Elementary School, Courtice                  schools
                          North Public School and              construction activity.                   disruption and construction activity.     Public School, Courtice North                                                      North Public School and Courtice
   Impacts on Local
                          Courtice Secondary School                                                                                               Public School and Courtice                                                         Secondary School due to traffic
       Schools
                          due to traffic disruption and                                                                                           Secondary School due to traffic                                                    disruption and construction
                          construction activity.                                                                                                  disruption and construction activity.                                              activity.


  Social and Cultural
    Overall Rating
                                                                                                                                                      LEGEND

                                                                                                                 Most Preferred                     Less Preferred                 Least Preferred




 Evaluation of Alternative Solutions

   November 4, 2010                                                                                                                                                                                                                                                                                               17B
Courtice Trunk Sanitary Sewer                                                                                                                                                                                                                                     The Regional Municipality of Durham
                                                                                                                                                                                                                                                                  Works Department
                                                                                                                                                                                                                                                                  www.durham.ca
                                                     Class EA Study
                                  Alternative 1                           Alternative 2                              Alternative 3                            Alternative 4                           Alternative 5                          Alternative 6                            Alternative 7

                                                                                                                                                                                                                                                                                   Conlin Rd./Grandview
                              Conlin Rd./Grandview            Conlin Rd../Grandview Rd./Coldstream                                                                                                                                      Conlin Rd./Grandview
  Evaluation Criteria                                                                                    Conlin Rd./Grandview Rd./Coldstream                                               Conlin Rd../Grandview Rd./Beatrice                                                    Rd./Beatrice St./Townline
                          Rd./Coldstream Dr./Townline           Dr./Townline Rd. N./Pebblestone                                                      Conlin Rd../Townline Rd./Nash                                                   Rd./Coldstream Dr./Townline
                                                                                                         Dr./Townline Rd./Bloor St./Prestonvale                                             St./Townline Rd./Future Adelaide                                                     Rd./Future Adelaide Ave.
                             Rd./Future Adelaide Ave.          Rd./Trulls Rd./Future Adelaide Ave.                                                     Rd./Courtice Rd./Baseline                                                  Rd./Future Adelaide Ave. Ext./Trulls
                                                                                                              Rd./Baseline Rd./Southeast to                                                     Ave. Ext./Trulls Rd./Bloor                                                   Ext./Trulls Rd./Bloor St./Courtice
                        Ext./Trulls Rd./Nash Rd./Hancock       Ext./Courtice Rd./Nash Rd./Hancock                                                   Rd./Progress Dr./Courtice WPCP          St./Hancock Rd./Courtice WPCP          Rd./Nash Rd./Courtice Rd./Bloor
                                                                                                                    Courtice WPCP                                                                                                                                              Rd./ Baseline Rd./ Progress
                               Rd./Courtice WPCP                       Rd./Courtice WPCP                                                                                                                                           St./Hancock Rd./Courtice WPCP
                                                                                                                                                                                                                                                                                    Dr./Courtice WPCP
                                                                                                                             Technical and Operational Considerations
                      • Significant dewatering potential       • Significant dewatering potential in • Moderate dewatering potential in           • Low to moderate dewatering              • Significant dewatering               • Significant dewatering              •     Significant dewatering
                        in surficial sand deposits from          surficial sand deposits from north    surficial sand deposits between              potential in surficial sand deposits      anticipated comparable to              anticipated comparable to                 anticipated comparable to
                        north of Pebblestone Road to             of Pebblestone Road to the            Pebblestone Rd. to south of Nash             between Pebblestone Rd. to south          Alternative 1, but shorter             Alternative 1, but shorter                Alternative 1, but shorter
                        the Adelaide Ave. extension,                                                   Rd. along Townline Rd. The rest of           of Nash Rd. along Townline Rd.
                                                                 Adelaide Ave. extension, along the                                                                                           construction length in the surficial   construction length in surficial          construction length in the
                        along the Adelaide Ave                                                         the route is mainly in glacial till          and between Trulls Rd .and
                        extension and Nash Road east             Adelaide Ave extension and Nash       deposits with variable groundwater           Courtice Rd. on Nash Rd. The rest         deposits compared to                   sand deposits compared to                 surficial deposits compared to
                        of the Farewell Creek, and south         Road east of the Farewell Creek,      conditions. Potential dewatering in          of the route is mainly in till deposits   Alternatives 1 and 2.                  Alternatives 1 and 2, but longer          Alternatives 1 and 2.
 Predicted Dewatering   along Hancock Road to north of           and south along Hancock Road to       the vicinity of the Farewell Creek           with variable groundwater               • Potential depressurization of the      than Alternative 3 in               •     Potential depressurization of
 and Depressurization   Bloor St.                                north of Bloor St.                    (sand lenses, lower deposits) would          conditions.                               Oak Ridges Moraine deposits in         consideration of the Trulls Road          the Oak Ridges Moraine
    Requirements      • Potential depressurization             • Potential depressurization required   be extremely problematic and               • Potential depressurization of             areas between Taunton Rd and           Section.                                  deposits in areas between
                        required for Oak Ridges Moraine                                                expensive due to the required                subsurface ORM deposits in the
                                                                 for Oak Ridges Moraine deposits                                                                                              Highway 2.                           • Potential depressurization of the         Taunton Rd and Highway 2.
                        deposits in areas between                                                      construction depth (approx. 30 m             Pebblestone Rd. area.
                                                                 in areas between Taunton Rd and                                                                                                                                     Oak Ridges Moraine deposits in
                        Taunton Rd and Highway 2.                                                      below ground surface)
                                                                 Highway 2.                          • Potential depressurization of                                                                                                 areas between Taunton Rd and
                                                                                                       subsurface ORM deposits in the                                                                                                Highway 2.
                                                                                                       Pebblestone Rd. area.

                        • Makes use of existing sewers in • Makes use of existing sewers in              • Makes use of existing sewers in the    • Makes use of existing sewer along     • Make use of existing sewers in        • Makes use of existing sewers in      • Makes use of existing sewers
  Ability to Connect      the Coldstream Drive subdivision  the Coldstream Drive subdivision                                                        Townline Rd.                                                                                                           in the Coldstream Drive
                                                                                                           Coldstream Drive subdivision and                                                 the Coldstream Drive subdivision        the Coldstream Drive subdivision
     with Existing        and along Townline Rd.            and along Townline Rd.                                                                                                                                                                                         subdivision and along Townline
                                                                                                           along Townline Rd.                                                               and along Townline Rd.                  and along Townline Rd.
    Infrastructure                                                                                                                                                                                                                                                         Rd.
                        • Makes use of future Adelaide         • Ability to coordinate with Townline     • Ability to coordinate with Townline    • Ability to coordinate with Townline   • Ability to coordinate with            • Ability to coordinate with           • Makes use of future Adelaide
  Coordination with       Ave. extension right-of-way,           Road lane widening                        Road lane widening and the               Road lane widening                      Townline Road lane widening,            Townline Road lane widening,           Ave. extension right-of-way,
   Proposed Road          ability to coordinate with                                                       Townline Road Bridge Crossing of                                                 makes use of future Adelaide            makes use of future Adelaide           ability to coordinate with
      Projects            Townline Road lane widening                                                      the Farewell Creek                                                               Ave. extension right-of-way             Ave. extension right-of-way            Townline Road lane widening

                        • Requires a deep crossing of the      • Requires a shallow crossing on          • Requires a deep crossing of the CP • Requires a shallow crossing of the        •   Requires a shallow crossing of     •   Requires an at-grade crossing of    •     Requires a deep crossing of the
  Railway Crossings       CP tracks along Courtice Road          the CP tracks in the vicinity of          tracks in the vicinity of Prestonvale CP tracks along Courtice Road                the CP tracks in the vicinity of       the CP tracks in the vicinity of          CP tracks in an open field
                                                                 Baseline Road                             Rd.                                                                                Baseline Road                          Baseline Road
                        • The majority of the sewer can be     • The majority of the sewer can be        • This sewer system requires gravity •     This sewer system requires gravity • The majority of the sewer can be         • The majority of the sewer can be     •  The majority of the sewer can
                          built using gravity sewer.             built using gravity sewer.                sewers, a pumping station and twin       sewers, a pumping station and twin   built using gravity sewer.                 built using gravity sewer.              be built using gravity sewer.
                          Tunnelling will be required under      Tunnelling will be required under         forcemains.                              forcemains.                          Tunnelling will be required under          Tunnelling will be required under       Tunnelling will be required
                          the CP railway. This                   the CP railway. This infrastructure                                                                                                                                                                        under the CP railway. This
                                                                                                                                                                                         the CP railway. This                       the CP railway. This
                          infrastructure selection will be       selection will be reliable because it                                                                                                                                                                      infrastructure selection will be
                          reliable because it will be based      will be based on gravity flow.                                                                                          infrastructure selection will be           infrastructure selection will be        reliable because it will be
      Reliability                                                                                                                                                                        reliable because it will be based          reliable because it will be based
                          on gravity flow.                                                                                                                                                                                                                                  based on gravity flow for most
                                                                                                                                                                                         on gravity flow and will not               on gravity flow and will not            of the system. A siphon is
                                                                                                                                                                                         depend on a high flow volume,              depend on a high flow volume,           required underneath the
                                                                                                                                                                                         as siphons do, or a mechanical             as siphons do, or a mechanical          Farewell Creek and this
                                                                                                                                                                                                                                                                            siphon will require a high flow
                                                                                                                                                                                         or powered system.                         or powered system.
                                                                                                                                                                                                                                                                            volume.
                        • Some dewatering and                  • Some dewatering and                     • Farewell Creek Valley crossing is a    • Moderate construction constraints     • Some construction constraints on      • Some construction constraints on     • Some dewatering and
                          depressurization challenges            depressurization challenges               physical obstacle and requires deep      on major arterial roads                 major arterial roads                    major arterial roads                   depressurization challenges
 Ease of Construction                                                                                      tunnelling                             • Some dewatering and                   • Some dewatering and                   • Some construction constraints on
                                                                                                                                                    depressurization challenges
                                                                                                                                                                                            depressurization challenges             major arterial roads

   Technical Overall
       Rating

                                                                                                                                                                                              LEGEND
 Overall Evaluation of Alternative Solutions                                                                                                             Most Preferred                   Less Preferred                   Least Preferred




   November 4, 2010                                                                                                                                                                                                                                                                                        17C
Courtice Trunk Sanitary Sewer                                                                                                                                                                                                                        The Regional Municipality of Durham
                                                                                                                                                                                                                                                     Works Department
                                                                                                                                                                                                                                                     www.durham.ca
                                                   Class EA Study
                                  Alternative 1                        Alternative 2                          Alternative 3                             Alternative 4                       Alternative 5                        Alternative 6                        Alternative 7

                                                                                                                                                                                                                                                                   Conlin Rd./Grandview
                              Conlin Rd./Grandview                Conlin Rd../Grandview                                                                                                                                     Conlin Rd./Grandview
  Evaluation Criteria                                                                             Conlin Rd./Grandview Rd./Coldstream                                            Conlin Rd../Grandview Rd./Beatrice                                              Rd./Beatrice St./Townline
                          Rd./Coldstream Dr./Townline        Rd./Coldstream Dr./Townline Rd.                                                     Conlin Rd../Townline Rd./Nash                                           Rd./Coldstream Dr./Townline
                                                                                                  Dr./Townline Rd./Bloor St./Prestonvale                                          St./Townline Rd./Future Adelaide                                               Rd./Future Adelaide Ave.
                             Rd./Future Adelaide Ave.      N./Pebblestone Rd./Trulls Rd./Future                                                    Rd./Courtice Rd./Baseline                                          Rd./Future Adelaide Ave. Ext./Trulls
                                                                                                       Rd./Baseline Rd./Southeast to                                                  Ave. Ext./Trulls Rd./Bloor                                             Ext./Trulls Rd./Bloor St./Courtice
                        Ext./Trulls Rd./Nash Rd./Hancock   Adelaide Ave. Ext./Courtice Rd./Nash                                                 Rd./Progress Dr./Courtice WPCP    St./Hancock Rd./Courtice WPCP        Rd./Nash Rd./Courtice Rd./Bloor
                                                                                                             Courtice WPCP                                                                                                                                     Rd./ Baseline Rd./ Progress
                               Rd./Courtice WPCP            Rd./Hancock Rd./Courtice WPCP                                                                                                                              St./Hancock Rd./Courtice WPCP
                                                                                                                                                                                                                                                                    Dr./Courtice WPCP
                                                                                                                              Economic Considerations
  Estimated Capital     •   $76 Million                    •   $72 Million                        •   $136 Million                          •    $123 Million                    •   $77.5 Million                    •   $73 Million                        • $60 Million
       Costs
                        • Lower Operating and              •   Lower Operating and                •   Higher operating and                  •    Higher operating and            •   Lower Operating and              •   Lower Operating and                • Low Operating and
  Relative Operation
                          Maintenance costs with               Maintenance costs with gravity         maintenance costs with a                   maintenance costs with a            Maintenance costs with               Maintenance costs with               Maintenance costs for siphon
  and Maintenance
                          gravity sewer system                 sewer system                           pumping station and twin                   pumping station and twin            gravity sewer system                 gravity sewer system                 with gravity sewer system
         Costs
                                                                                                      forcemains                                 forcemains
                        •   No land acquisitions needed    •   No land acquisitions needed        • Land will be purchased for a            •    Land will be purchased for a    •   No land acquisitions needed      •   No land acquisitions needed        • Some land acquisitions
  Land Acquisition
                                                                                                    pumping station                              pumping station                                                                                               required for permanent
   Requirements
                                                                                                                                                                                                                                                               easements
  Economic Overall
      Rating


      OVERALL
    PREFERENCE
       RATING




                                                                                                                                                LEGEND

                                                                                                             Most Preferred                Less Preferred            Least Preferred




 Overall Evaluation of Alternative Solutions

  November 4, 2010                                                                                                                                                                                                                                                                          17D
Courtice Trunk Sanitary Sewer                           The Regional Municipality of Durham
                                                        Works Department
                                                        www.durham.ca
                     Class EA Study




                                        (Preliminary)




 Plan and Profile of Recommended Alignment

  November 4, 2010                                                                    18
Courtice Trunk Sanitary Sewer                                                                                                            The Regional Municipality of Durham
                                                                                                                                         Works Department
                                                                                                                                         www.durham.ca
                     Class EA Study




                               Install typical odour control
                                  system at the sewage
                                     pumping station                                                     Install typical odour control
                                                                                                                system at outlet




                                   Potential Sewage Pumping Station Site Location   Potential Sewage Pumping Station Site Location




 Potential Baseline Road Sewage Pumping Station

  November 4, 2010                                                                                                                                                     19
Courtice Trunk Sanitary Sewer                                                                                                                                                            The Regional Municipality of Durham
                                                                                                                                                                                         Works Department
                                                                                                                                                                                         www.durham.ca
                     Class EA Study




                                      Borehole   Description
                                      MW10-1     Shallow sand deposits with high water table
                                      MW10-2     Glacial Till overlain by silty sand with high water table
                                      MW10-3     Glacial Till overlain by saturated sand, artesian groundwater presser in lower sand/silt deposit. Cold water creek discharge area
                                      MW10-4     Alternating layers of Glacial Till and sandy/silty sand deposits, high water table with artesian groundwater pressures in lower sands
                                      MW10-5     Glacial Till overlying fine grained (silt) deposits, artesian groundwater pressure in lower silts
                                      MW10-6     Glacial Till overlying saturated sand with artesian head




 General Soil Type Areas

  November 4, 2010                                                                                                                                                                                                     20
Courtice Trunk Sanitary Sewer                                                                                                                                                                                                                                                                                                   The Regional Municipality of Durham
                                                                                                                                                                                                                                                                                                                                Works Department
                                                                                                                                                                                                                                                                                                                                www.durham.ca
                                                                                                                                                   Class EA Study


                                                                            FIGURE 11: NUMBER OF DUG/BORED WELLS VS. DEPTH
                                                                                                                                                                                                                                                   FIGURE 14: NUMBER OF DRILLED WELLS VS. DEPTH

                                                            100                                                                                                                                                                                                          19




                                                                                                                                                                                                      Number of Wells within Range
                                                                                                                                                                                                                                         20                                                 18
   Number of Wells within Range




                                                                                   85                                                                                                                                                    18
                                                             80
                                                                                                                                                                                                                                         16
                                                                                                                                                                                                                                          14                                                                  12
                                                             60
                                                                                                                                                                                                                                          12
                                                                                                                                                                                                                                          10                                                                                    7
                                                             40                                                                                                                                                                                                                                                                                   5
                                                                                                            24                                                                                                                              8                                                                                                                      4
                                                                                                                                                                             1                                                              6                                                                                                                                        1
                                                              20
                                                                                                                                           1                                                                                                4
                                                                                                                                                                                                                                                   2
                                                                  0                                                                                                                                                                          2
                                                                                                                                                                                                                                             0
                                                             10                                                                                                                                                                                                                                                                                                        61-70             71-80
                                                                                                                                                                                 60-70                                                                                                                                             41-50          510-60
                                                                                                                                               20-30                                                                                                                                        21-30             31-40
                                                                                                              10-20                                                                                                                                        0-10             11-20
                                                                                    0-10
                                                                                                                  Depth (m)
                                                                                                                                                                                                                                                                                                                   Depth (m)




                                                                       FIGURE 12: NUMBER OF DUG/BORED WELLS VS.                                                                                                                                                   FIGURE 15: NUMBER OF DRILLED WELLS VS.
                                                                           RECOMMENDED PUMPING RATE (yield)                                                                                                                                                          RECOMMENDED PUMPING RATE (yield)

                                                                                                                                                                                                                                                                                    16
                             Number of Wells within Range




                                                                                                                                                                                                          Number of Wells within Range
                                                            100                                                                                                                                                                          16
                                                                                                                                                                                                                                         14
                                                              80
                                                                                                                                                                                                                                          12                                                        10
                                                              60                                                                                                                                                                          10
                                                                                                                                                                                                                                                                     8
                                                                                                       42                                                                                                                                     8                                                                6
                                                              40                                                                                                                                                                              6                                                                                4                                                         2
                                                                                                                                                                                                                                                        4                                                                                                                1
                                                                                                                                                                         1                1                                                    4                                                                                           1               1
                                                               20      17                   14                         9                               2
                                                                                                                                       2
                                                                                                                                                                                                                                               2
                                                                 0                                                                                                                                                                             0
                                                              0-5                                                                                                                             >100                                                                                                                                                                       90-100          >100
                                                                                                                                                           40-50         60-70                                                                                                                                                             50-60           60-70
                                                                                                                      20-30         30-40                                                                                                                                                                      30-40           40-50
                                                                                            6-10      11-20                                                                                                                                                                         11-20           20-30
                                                                             0-5                                                                                                                                                                        0-5          6-10

                                                                                                                 Pumping Rate (L/min)                                                                                                                                                            Pumping Rate (L/min)




                                                                       FIGURE 13: NUMBER OF DUG/BORED WELLS VS.                                                                                                                                        FIGURE 16: NUMBER OF DRILLED WELLS VS. HEIGHT OF
                                                                                HEIGHT OF WATER COLUMN                                                                                                                                                                  WATER COLUMN




                                                                                                                                                                                                        Number of Wells within Range
                                                                                                                                                                                                                                         14                                         4

                                                                                                                                                                                                                                         12                         8                               2
                           Number of Wells within Range




                                                            100                                                                                                                                                                          10                                                                        8
                                                             80                                                                                                                                                                            8
                                                                                                                                                                                                                                                       4                                                                        5          5               5
                                                                                                                                                                                                                                           6                                                                                                                                 3               3
                                                              60
                                                                                                                                                                                                                                           4
                                                              40                                                           23                                                                                                                 2
                                                                                                      16         19               13                                                           6
                                                                                                                                               7             7       1           1
                                                              20                                 12                                                                                                                                           0
                                                                                   6                                                                                                                                                                                                                                                                           40-50         50-60           60-70
                                                                                                                                                                                                                                                                                                                25-30          30-35           35-40
                                                                   0                                                                                                                                                                                                                16-20           20-25
                                                                                                                                                                         9           10         >10                                                    1-10         11-15
                                                                                                                                   6               7             8
                                                                                                                  4         5
                                                                                                 2    3
                                                                                        1

                                                                                                                                                                                                                                                                                             Height of Water Column (m)
                                                                                                                  Height of Water Column (m)




 Dug Well Cluster Within 500 m of Non-Serviced Area
  November 4, 2010                                                                                                                                                                                                                                                                                                                                                                                   21
Courtice Trunk Sanitary Sewer                                                              The Regional Municipality of Durham
                                                                                           Works Department
                                                                                           www.durham.ca
                           Class EA Study




  Open-Cut Sewer Construction on a Road Shoulder                       Typical Open-Cut Sewer Trench




                               Typical Construction Crew   Use of a Trench Box




 Typical Open-Cut Sewer Construction Practices

  November 4, 2010                                                                                                       22
Courtice Trunk Sanitary Sewer                                                                  The Regional Municipality of Durham
                                                                                               Works Department
                                                                                               www.durham.ca
                             Class EA Study




                                  Tunnel Boring Machine   Muck Carts in the Tunnel




                     Typical Tunnel Shaft                              End of Tunnel Section




 Typical Tunnelling Sewer Construction Practices

  November 4, 2010                                                                                                           23
Courtice Trunk Sanitary Sewer                                                                                                                                                                The Regional Municipality of Durham
                                                                                                                                                                                             Works Department
                                                                                                                                                                                             www.durham.ca
                                                        Class EA Study


                                                                                                                                N                      BASELINE RD.                                   N
                                                                  20 m WIDE




                                                                                                                                                                                                            MCKNIGHT RD.
                                                                 PERMANENT
                                                                  EASEMENT                                                N                                                                    N
                                                                                                                                                                              COURTICE CRT.
                                                                                                                                                                 20 m WIDE
                                                                                                                                                                PERMANENT
                                                                                                                                                                 EASEMENT        Proposed
                                                                                   Recommended Trunk Sanitary Sewer Alignment
                                                                                                                                                                                 Tunneling
                                                                                                                                                                                 Crossing
                     COURTICE RD.




                                                                                                                                    COURTICE RD.




                                                                                                                                                                                                          OSBOURNE RD.
                                          Recommended Trunk
                                            Sanitary Sewer
                                                                                      2
                                                    Working
                                              Alignment Easement for Tunneling (660 m )
                                                                                                                                                       Recommended Trunk
                                                                                                                       Proposed                          Sanitary Sewer
                                                                                                                       Tunneling                           Alignment
                                           TRULLS RD.




                                                                                                                       Crossing

                                                                                                                                                            20 m WIDE
                                                                                                                                                           PERMANENT
                                                                                                                                                            EASEMENT
                                                                                                                                                                              20 m WIDE
                                                                                                                                                                             PERMANENT
                                                                                                                                                                              EASEMENT
                                                                   20 m WIDE
                                                                  PERMANENT
                                                                   EASEMENT


                                      BASELINE RD.
                                    Location of 20 m wide easement northwest                                                                       Location of 20 m wide easement south of
                                        of Courtice Rd. and Baseline Rd.                                                                                Courtice Rd. and Baseline Rd.
                                                                                                                                                                             TRULLS ROAD



 Proposed Easement Locations

  November 4, 2010                                                                                                                                                                                                         24
Courtice Trunk Sanitary Sewer                                                                                                                            The Regional Municipality of Durham
                                                                                                                                                         Works Department
                                                                                                                                                         www.durham.ca
                                        Class EA Study



                                                                      N                                                      N
                                                                                          Recommended Trunk Sanitary Sewer
Recommended Trunk                                                                         Alignment
Sanitary Sewer Alignment
                                         COURTICE RD.                                                                                                     Recommended Trunk
                                                                                        BLOOR ST.                                                         Sanitary Sewer
                                                                                                                                                          Alignment



                                Working
                              Easement for
                               Tunneling
                                (2045 m2)
                                                                                 Working Easement for
                                                                                  Tunneling (2500 m2)
                                                         TRULLS RD.
                  BLOOR ST.




                                                                                                                                  TRULLS RD.
                                                                                                                                  TRULLS RD.
                                                                                                                                               Working Easement
                                                                                                                                                 for Tunneling
                                                                                                                                                   (660 m2)




    Temporary Working Easement at the                                     Temporary Working Easement at the                      Temporary Working Easement at
    southwest corner of Bloor Street and                                  southwest corner of Bloor Street and                     the southeast corner of King
              Courtice Road                                                         Courtice Road                                     Street and Trulls Road.




 Potential Easement Locations

    November 4, 2010                                                                                                                                                                   25
Courtice Trunk Sanitary Sewer                                                                         The Regional Municipality of Durham
                                                                                                      Works Department
                                                                                                      www.durham.ca
                     Class EA Study




                                             Phase 2: Alternative Solutions

                         Refine the preferred trunk sanitary sewer alignment based on feedback from
                                                public and stakeholder agencies


                           Finalize Preliminary Design of preferred trunk sanitary sewer alignment


                           Complete and submit Project File Report for public review and comment


                                                 Issue Notice of Completion




                                                   Phase 5: Implementation

                            Detailed Design and Construction of the Courtice Trunk Sanitary Sewer




 Next Steps

  November 4, 2010                                                                                                                  26
Courtice Trunk Sanitary Sewer                                                        The Regional Municipality of Durham
                                                                                     Works Department
                                                                                     www.durham.ca
                     Class EA Study




                                      Glen Severn, C.E.T.
                                      Project Manager
                                      The Regional Municipality of Durham
                                      605 Rossland Rd. East, Level 5, P.O. Box 623
                                      Whitby, ON L1N 6A3
                                      Phone: 1.800.372.1102 ext. 3529
                                      Fax: 905.668.2051
                                      Email: glen.severn@durham.ca




                                      Brian Barber, P. Eng.
                                      Project Manager
                                      GENIVAR
                                      600 Cochrane Dr., 5th Floor
                                      Markham, ON L3R 5K3
                                      Phone: 905.475.7270 ext. 219
                                      Fax: 905.475.5994
                                      Email: brian.barber@genivar.com




 Project Team Contacts