PROJECT OBJECTIVES AND BACKGROUND                                                         1

PROJECT SCOPE AND FRAMEWORK                                                               2

APPROACH                                                                                  3

PROJECT TIMING                                                                            6

PARTICIPANTS AND INVOLVEMENT                                                              7

PLANNED PROJECT OUTCOMES AND NEXT STEPS                                                  14

COORDINATION WITH OTHER PLANNING INITIATIVES                                             14

PROJECT ADMINISTRATION                                                                   14

RELATED DOCUMENTS                    ERROR! BOOKMARK NOT DEFINED.13

DOCUMENT REVISION HISTORY                                                                15




                                                 Page i                                 7/21/2011
                                                          cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                           U n i v e r s i t y o f W a s hi n g t o n
              R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                            P r o j e c t P l a n a n d C h ar t e r

Project Objectives and Background
The objective of the University of Washington Strategic Roadmap for Information
Management and Administrative Systems (the “Roadmap”) project is to define a vision of
the future of information management and administrative systems (IM/AS) at the
University of Washington, aligned with the institution’s business goals and priorities, and to
develop an action plan for achieving this vision. The Roadmap will be the University’s
plan for information management and administrative systems designed by business owners
in collaboration with the Office of Information Management (OIM) and its constituent
stakeholders. OIM will implement and maintain the plan, under the oversight of the
Information Management Advisory Committee (I-MAC).
The Roadmap is being developed in response to the IS Futures Taskforce and feedback
from I-MAC. Although foundation work had been performed in the Systems Strategy
initiative and outlined in the Strategic Choices document, the IS Futures Taskforce
determined that the University did not have a clear and integrated long term plan for
information systems or a vision of where the University needs to be in five or ten years. As
a result, I-MAC had no context for the prioritization of project requests and no framework
within which to determine how individual requests would fit into a longer term vision. The
Office of Information Management was created to ensure the long term integration of
systems, planning and resources supporting information management and administrative
systems across campus.
In the winter of 2006-07, immediately following the creation of the OIM, a discovery
process was initiated involving meetings with key stakeholders to identify critical issues
and concerns. Several recurring themes were identified as a result of the discovery
process which will help guide the focus of the Roadmap. These themes include:
     Users need broader and more timely access to data
     Core systems are not meeting current needs
     There is a need for integration across systems and data, and consistency across
      business practices
     There are many opportunities for business process improvements
     There is a need for improved OIM/user partnerships and collaboration to achieve
      the business goals
     The University needs to fund compliance and utility projects and not have these
      compete with new development and innovation

Following is a link to the Emerging Themes web page for additional background:
http://www.washington.edu/provost/oim/reports/EmergingThemes_May2007.pdf




                                                     Page 1                                  7/21/2011
                                                               cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                            U n i v e r s i t y o f W a s hi n g t o n
               R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                             P r o j e c t P l a n a n d C h ar t e r

Project Scope and Framework
The scope of the Roadmap project will encompass institution-wide information
management and administrative systems organized into the following three key areas,
identified as priorities during the preliminary discovery process:

      Roadmap for Administrative Systems                                              Scope and Framework
      and Information Management


       Information Management                                Business Processes and
       § Enterprise data warehouse; data                     Information Systems
           management                                        § Finance; Procurement; and Budget
       §   Tools                                             § HR/Payroll
       §   Common portal to access                           § Student and academic
           information.                                          administrative systems; course
       §   Distributed development                               management; financial aid; fiscal
           environment with access to                            services
           common central services and                       §   Research (pre-award, post award)
           enabling local solutions for                      §   Facilities/Space; housing & food
           specialized needs                                     services; hazardous materials;
       §   Security                                              equipment inventory
       §   Integration                                       §   Alumni/Development



                        Strategy, Policy and Partnership
                        § Leadership and alignment; strategic partnerships;
                            governance; project prioritization
                        §   Information sharing culture; collaborative environment.
                        §   Portfolio management
                        §   An on-going, repeatable process for tuning the
                            strategic plan




The scope of the Roadmap project does not include technical infrastructure, security
middleware, desktop tools, academic teaching tools, digital libraries, and collaboration
tools. These areas will be coordinated with the C&C strategic planning initiatives, along
with overlapping areas such as the MyUW/portal.
The OIM Roadmap scope also does not include applications specific to the individual
departments such as medical center billing and clinical systems, athletic ticketing systems,
enterprise risk, etc.
The scope will address the current state relating to IM/AS funding but will not cover
funding solutions. Funding solutions will be handled separately at the executive level.




                                                             Page 2                                   7/21/2011
                                                                        cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                         U n i v e r s i t y o f W a s hi n g t o n
            R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                          P r o j e c t P l a n a n d C h ar t e r

Approach
The diagram below provides a high level overview of the proposed approach and work
plan. A more detailed work plan is available in Excel.
     WINTER            SPRING              SUMMER                 FALL              WINTER               SPRING
      2007              2007                 2007                 2007               2008                 2008
                            Project Planning


       Perform Discovery


                                       Assess Current State



                                          Research Trends



                                                                    Define the Vision



                                                                            Analyze the Gap



                                                                                             Develop Action Plan




PROJECT PLANNING

    Develop project approach, structure, communication plan, team members,
     issue resolution structure and meeting plans.
    Design template deliverables.

PERFORM DISCOVERY

    Conduct interviews
    Document and organize results; identify broad themes
    Identify and document institutional business goals and priorities

DOCUMENT CURRENT STATE

    Clarify scope of each area (which applications are covered, which
     functions, business processes and organizational groups)
    Review and summarize inventory of current systems (technology used,
     number of users, age, stability assessment)
    Review and summarize projects in progress


                                                   Page 3                                  7/21/2011
                                                             cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                         U n i v e r s i t y o f W a s hi n g t o n
            R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                          P r o j e c t P l a n a n d C h ar t e r

    Identify resources required to support the current environment
    Identify high level business processes and cross reference to high level
     data defined by the Data Management Committee (DMC)
    Summarize relevant data from Discovery/Assessment Meetings, the IS
     Futures Task Force findings and other relevant recent studies and
     documents (22 committee assessment, I-MAC presentations, Choices,
     Information System Services table, I-MAC interviews)
    Conduct additional interviews, work sessions or surveys as needed
    Summarize how well the current systems and process support UW goals
     and priorities; identify major risks and compliance issues

CONDUCT RESEARCH

    Summarize previous UW research, plans and studies
    Research what other comparable institutions and the State of Washington
     are doing in areas such as:
         o Information management
         o Administrative systems
         o Governance
         o Guiding principles
    Research technical trends and the state of the application software
     industry for higher education
    Research best practices and examples from research organizations:
         o Gartner
         o Forrester
         o Educause
         o IT Governance Institute
    Summarize analysis of trends and research

DEFINE THE VISION

    Develop Guiding Principles
    Work in task groups to define vision for individual areas.; coordinate
     across teams for consistency of vision; engage task group sponsors, deans
     and other advisory groups in vision
    Document the Vision

PERFORM FIT-GAP ANALYSIS

    Compare current state to desired state
    Document the Gap Analysis

DEVELOP ACTION PLAN

    Identify solutions, resources, timelines, trade-offs
    Define long term priorities mapped to broad themes and institutional
     objectives
    Define sequencing based on priorities, dependencies, readiness, budget
     and risk


                                                   Page 4                                  7/21/2011
                                                             cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                     U n i v e r s i t y o f W a s hi n g t o n
        R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                      P r o j e c t P l a n a n d C h ar t e r

 Define short term solutions for each area based on overall calendar and
  sequencing
 Develop sequenced roadmap to achieve the vision
 Define governance and responsibility model
 Develop ongoing repeatable planning process




                                               Page 5                                  7/21/2011
                                                         cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                          U n i v e r s i t y o f W a s hi n g t o n
             R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                           P r o j e c t P l a n a n d C h ar t e r

Project Timing
The current plan is to complete the OIM Roadmap by Spring 2008.
Project work will be scheduled around the availability of project team members and
advisory team members.
Project deliverables will be timed for I-MAC review coordinated with I-MAC meetings and
retreats.
     September 26, 2007 I-MAC Retreat: A half-day I-MAC retreat to discuss
      Guiding Principles. A handbook will be developed for I-MAC committee members
      covering: strategic plan information, an update on the Roadmap planning process,
      and examples of guiding principles.
     Fall I-MAC Meeting, December 10, 2007: Planned Roadmap deliverables for this
      meeting will include:
           o Current State Assessment Update (including Trends and Risk Assessment)
           o Guiding Principles
     Winter I-MAC Meeting, March 6, 2008: Planned Roadmap deliverables for this
      meeting will include:
           o Vision
           o Gap Analysis
           o Preliminary Roadmap Action Plan
     Spring I-MAC Meeting, May 14, 2008: Planned Roadmap deliverables for this
      meeting will include:
           o Final Roadmap Action Plan




                                                    Page 6                                  7/21/2011
                                                              cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                              U n i v e r s i t y o f W a s hi n g t o n
                 R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                               P r o j e c t P l a n a n d C h ar t e r

Participants and Involvement
The following chart provides a high level overview of project governance and participant
groups:
                                           Executive Sponsors
                                               Executive Sponsor:
                                        Phyllis Wise/Ron Johnson



              IM/AS                             Project
        Technology Advisory
                Technical                         Project                   Steering Committee
                                              Management                        Steering
              Group                                                               (I-MAC)
                                                Team
                                                  Team



                                                Roadmap
                                               Roadmap Team
                                               Working Team




     Administrative Systems Task Groups              Information Management Task Groups        Governance Task Group

   FACILITIES/                      RESEARCH             DECISION         INTEGRATION/
                    HR/PAYROLL                                                                      GOVERNANCE
     SPACE                            ADMIN              SUPPORT        INFRASTRUCTURE


   FINANCE/
                     STUDENT         ALUMNI/
   BUDGET/
                      ADMIN        DEVELOPMNT
 PROCUREMENT




ROLES AND RESPONSIBILITIES OF SPONSORS AND ADVISORY GROUPS

     Executive Sponsors                             • Champion the project; communicate key introductory
                                                      messages to project participants and define the overall
     Ron Johnson
                                                      priority of the project
     Phyllis Wise
                                                    • Give advice
                                                    • Resolve high-level issues and remove organizational
                                                      barriers
                                                    • Provide executive vision
                                                    • Support the project and the project manager
                                                    • Fund the project
                                                    • Identify risks
                                                    • Assign resources to the project

     Project Sponsor                                As project sponsor:
     Sponsor: Sara Gomez                            • Champion the project
                                                    • Monitor progress



                                                        Page 7                                    7/21/2011
                                                                    cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                     U n i v e r s i t y o f W a s hi n g t o n
        R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                      P r o j e c t P l a n a n d C h ar t e r
                                           • Communicate with Executive Sponsors
                                           • Review and validate all deliverables
                                           • Give advice
                                           • Resolve high-level issues
                                           • Provide executive vision
                                           • Support the project and the project manager
                                           • Fund the project
                                           • Identify risks
                                           • Assign resources to the project
                                           As CIO:
                                           • Provide direction and input on technical issues
                                           • Facilitate Technical Advisory Group (in role as CIO)
                                           • Provide high-level liaison with C&C

Steering Committee                         • Act as high-level advisors to the project
I-MAC                                      • Approve guiding principles
V’Ella Warren, Chair                       • Validate the vision - strategic direction and priorities
                                           • Approve initiatives and action plan

IM/AS Technology Advisory                  • Evaluate Roadmap issues against technical constraints – provide
Group                                        input to Steering Committee and Working Team
                                           • Identify cross UW technical issues and challenges (infrastructure,
                                             database, application, web)
                                           • Provide input into guiding principles and vision
                                           • Identify technical gaps between current environment and
                                             defined vision – report back to roadmap working team




                                               Page 8                                  7/21/2011
                                                         cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                       U n i v e r s i t y o f W a s hi n g t o n
          R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                        P r o j e c t P l a n a n d C h ar t e r

Other Advisory Groups                        • Act as advisors to the project
Deans                                        • Help define guiding principles
Faculty                                      • Recommend initiatives and priorities
The Advisory Group for the                   • Identify key business representatives for participation
Governance & Partnership task
groups will include Ron Johnson,
Mike Eisenberg, V’Ella Warren,
Matt O’Donnell, Nancy Woods,
Pam Stewart, Gary Quarfoth, and
Jim Fine (for IM/AS overlap with
UW Medicine).
Other
Note: Look at existing committees and
groups to see if any of these could serve
as an advisory group

Data Management Committee                    • Provide input and advice
Represented by Mike Eisenberg
(Chair), Jeanne Marie Isola, and
Bill Yock




                                                 Page 9                                  7/21/2011
                                                           cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                         U n i v e r s i t y o f W a s hi n g t o n
            R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                          P r o j e c t P l a n a n d C h ar t e r
ORGANIZATION OF PROJECT MANAGEMENT, ROADMAP WORKING TEAM AND TASK
GROUPS

The following table presents an overview of the task group roles, the Roadmap Working
team, and the project management team. Each task group will include Sponsors, Leads,
Facilitators, Task Group Members and Staff. Detailed team lists are included in the
separate supporting document – Team Members.xls. Note: All proposed team members
are subject to approval of their sponsors based on other commitments.


           Roles                                       Responsibilities

Roadmap Internal Project                • Coordinate with Consulting Project Manager on
Manager                                   development of Project Plan, Charter, and Work Plan
                                          documents
Jeanne Marie Isola
                                        • Assign tasks, track dependencies, track task and
                                          deliverable completion
                                        • Concur on project logistics
                                        • Manage project communications with key internal and
                                          external stakeholders
                                        • Review and approve all deliverables
                                        • Present findings to Sponsors and Steering Committee
                                        • Track project risks and take mitigating action when
                                          required
                                        • Complete project wrap up document, including
                                          assessment of original objectives, final timeline and
                                          costs, lessons learned, and next steps
                                        • Facilitate project meetings
                                        • Review and approve project status reports and public
                                          website content


Consulting Project Manager              • Develop and maintain Project Plan, Charter, and Work
                                          Plan documents
Jackie Bardsley
                                        • Design project logistics including deliverable templates,
                                          standards for electronic documents formats, document
                                          naming standards
                                        • Develop and distribute meeting agendas
                                        • Facilitate project meetings
                                        • Develop and distribute project status reports and
                                          content for website
                                        • Maintain the project work plan. In coordination with
                                          Internal Project Manager, assign tasks, track
                                          dependencies, track task and deliverable completion


                                                  Page 10                                  7/21/2011
                                                             cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                           U n i v e r s i t y o f W a s hi n g t o n
              R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                            P r o j e c t P l a n a n d C h ar t e r
                                          • Oversee completion of all project tasks including
                                            meetings, interviews, work sessions, research, analysis,
                                            documentation, presentation materials, and
                                            presentations. Keep Internal Project Manager informed
                                            of issues.
                                          • Track project risks in coordination with Internal Project
                                            Manager
                                          • Assist in project wrap up activities and summarization


Core Planning Team                        • Develop and document a communication plan including
                                            internal communication with project team members,
Jeanne Marie Isola, Jackie
                                            sponsors, advisory committees, user groups, external
Bardsley, Nancy Rauhauser, Mary
                                            constituents and other stakeholders
Syre, Pat Bonner, Gary Prohaska
                                          • Maintain internal communication with core project team
                                            members.
                                          • Manage project SharePoint site, document repository
                                            and version control
                                          • Track issues and ensure timely resolution of issues.
                                            Escalate when necessary.
                                          • Develop deliverable templates, examples, and meeting
                                            plans, jointly with the project managers.
                                          • Ensure all project documentation is archived.

Roadmap Design Team                       • Provide high level design direction
Jeanne Marie Isola, Jackie                • Review and approve deliverables
Bardsley, Bill Shirey, Bill Yock, Jim
                                          • Support formal and informal communications
Loter, Sara Gomez, Cindy Brown
                                          • Coordinate with Core Planning team liaison
                                          • Understand and concur with task group meeting plans
                                            and deliverables

Project Logistics Team                    • Develop calendar of recurring meetings, including
                                            dates, times, attendees and location.
Kristina Powers, Kimberley
Jaehne, Mary Friedmar, Stephen            • Attend meetings, take notes and provide draft minutes
Want                                        for the meeting facilitator.
                                          • Record discussions, decisions and follow up items from
                                            meetings.

Task Group Sponsors                       • Identify business needs and priorities
                                          • Assign subject matter experts to task groups
                                          • Provide vision for the task groups
                                          • Determine area readiness for major systems projects

Task Group Leads and Team                 • Assess current state

                                                    Page 11                                  7/21/2011
                                                               cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                           U n i v e r s i t y o f W a s hi n g t o n
              R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                            P r o j e c t P l a n a n d C h ar t e r
Members                                   • Define vision
                                          • Identify gaps between current state and desired state
                                          • Brainstorm ways to achieve the vision
                                          • Provide the content for all task group deliverables
                                          • Present results to other task group leads, sponsors and I-
                                            MAC as appropriate (leads)


Task Group Facilitators                   • Act as project coordinators of the task group
                                          • Act as support to task group leads
                                          • Coordinate and facilitate task group working sessions
                                          • Manage the current environment and research
                                            documentation
                                          • Complete the required task group documentation in
                                            consistent format


Task Group Staff                          • Act as support to task group leads and facilitators
                                          • Perform the research on trends and current environment
                                          • Maintain documentation in working sessions


Administrative Systems Area               • Oversee and guide the work of the administrative
Team Leads                                  systems task groups
Jeanne Marie Isola                        • Define and review all deliverables
Bill Shirey

Information Management Team               • Develop all deliverables
Leads
                                          • Coordinate collaboration with team to assess current
Bill Yock                                   state, define the vision and develop the action plan
Gary Prohaska

Governance & Partnership Team             • Oversee and guide the work of the Governance and
Leads                                       Partnership task group
Cindy Brown                               • Define and review all deliverables
Jim Loter

Roadmap Working Team                      • Integrate Roadmap across functional silos/resolve cross
                                            functional issues
                                          • Provide cross UW business representation of major
                                            business areas


                                                    Page 12                                  7/21/2011
                                                               cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                             U n i v e r s i t y o f W a s hi n g t o n
R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                              P r o j e c t P l a n a n d C h ar t e r
                            • Major team for defining the gap and action plan,
                              setting priorities and sequencing




                                      Page 13                                  7/21/2011
                                                 cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                          U n i v e r s i t y o f W a s hi n g t o n
             R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                           P r o j e c t P l a n a n d C h ar t e r

Planned Project Outcomes and Next Steps
The outcomes of the Roadmap project will include:
     Current State Assessment – including an inventory of systems, projects, resources
      and governance, and an assessment of how well they support the University’s
      goals and priorities; risk assessment, trends and best practices
     Guiding Principles
     Vision – an outline of the desired future state
     Gap Analysis
     Recommended Action Plan to achieve the vision
     Executive summary and presentation materials

Following the completion of the Roadmap, the next steps will be to develop feasibility
studies or research projects for longer term priorities and to develop project charters and
investment plans for shorter term priorities.


Coordination with Other Planning Initiatives
The Roadmap team is aware that we are working in a dynamic environment and that
several other strategic and tactical planning projects are underway. Some examples –
     C&C is conducting a planning process involving an assessment of the current state
         of systems, and a definition of a vision and role for C&C to support the
         University’s strategic goals. The OIM Roadmap is being developed in parallel
         with the C&C plan and the two plans will dovetail in certain areas such as
         architecture decisions. The two planning teams will coordinate outreach efforts to
         avoid duplication and confusion in the user community. C&C is a service provider
         to OIM so in several areas the C&C plans will need to support the OIM
         requirements for applications.
     Re-assessment of the role of the University’s I-MAC committee.
     Financial Systems Scoping Study. This study will be coordinated with the task
         group work for Finance, Budget and Procurement.
     UW Medicine has recently developed an ITS strategic plan and is in process of
         developing new project quality and governance structures.
Earlier planning documents by C&C covering business applications will be considered and
updated where appropriate. These will include:
     The “Rainbow” chart http://www.washington.edu/computing/directions/iss.html
     The UW strategic plan slide deck
      http://depts.washington.edu/cac/cchome/splan.finalrpt.pdf
     The Strategic Choices document
      http://depts.washington.edu/cac/cchome/choices/

Project Administration
Project team email list: oim-roadmap
Project website:          Under development – for external communication. Periodic email
                          updates will be sent to stakeholders linking back to the website


                                                   Page 14                                  7/21/2011
                                                              cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                           U n i v e r s i t y o f W a s hi n g t o n
              R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                            P r o j e c t P l a n a n d C h ar t e r
                           for news, status and updates. This site will be linked from the
                           OIM website.
Team SharePoint:
                                    https://share.u.washington.edu/sites/OIM/Roadmap/de
                           fault.aspx.


                           The project team SharePoint site will be used for storing team
                           documents and templates and for tracking team news, calendar,
                           status and discussions
Document formats:          All project deliverables will be created using the following tools:
                           Microsoft Word, Excel, PowerPoint. Documents created using any
                           other tools, including Microsoft Project and Visio, will be imported
                           into Word or PowerPoint documents or will be saved and
                           distributed as PDF documents to ensure accessibility.
Document naming:           Document names will be created in the following format:
                           Roadmap – [Doc Name] – Draft/Final]
                           Example: Roadmap – Team Meeting Minutes 05-25-2007– Draft
                           All project documents will be stored on the SharePoint site Shared
                           Documents, with version control/check in/check out so it will not
                           be necessary to include a version number or revision date in the
                           document name
Document layout:           Standard templates for each deliverable will be used where
                           possible. At a minimum, all documents will include the following:
                           Header: Document title
                           Footer: Left: logo, center: page number; right: date and file name
                           Table of contents for all documents over 10 pages in length
                           Revision history at the end of each document for all documents
                           that are subject to revision over time
Issue tracking:            Issues and tasks will be tracked in SharePoint
Project standards:         All meetings will have an agenda (distributed in advance of the
                           meeting), a designated facilitator and note-taker, and minutes on
                           a timely basis following the meeting. Minutes will include
                           assigned follow-up items which will be discussed in the following
                           meeting.


Document Revision History
Date              Changed By            Summary

5/24/2007         Jackie Bardsley       Created first draft of document for discussion

6/1/2007          Jackie Bardsley       Updated sections on Participants based on feedback in
                                        meetings on May 31.


                                                    Page 15                                  7/21/2011
                                                               cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                         U n i v e r s i t y o f W a s hi n g t o n
            R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                          P r o j e c t P l a n a n d C h ar t e r

Date          Changed By              Summary

6/1/2007      Jackie Bardsley         Updated based on feedback from Sara in email dated
                                      6/1/2007.

6/7/2007      Jackie Bardsley         Updated participants based on feedback from Bill Shirey.

6/13/2007     Jackie Bardsley         Updated scope to exclude ticketing.

6/19/2007     Jackie Bardsley         Edited list of Governance Advisory team members based
                                      on discussions in Roadmap team meeting.
                                      Clarified scope as AS/IM, not IS/IM.
                                      Clarified application scope renaming Facilities/Services to
                                      Facilities/Space; moving Housing under the Student area.
                                      Added a comment on Project Scope to clarify that funding
                                      solutions are out of scope.
                                      Updated the team member diagram to be consistent in
                                      terminology and content with the team spreadsheet.
                                      Clarified roles and responsibilities.

6/22/2007     Jackie Bardsley         Changed document header and other references to refer to
                                      Information Management and Administrative Systems, or
                                      IM/AS.
                                      Added dates of scheduled I-MAC meetings.
                                      Added V’Ella Warren as co-sponsor of the Student task
                                      group.
                                      In the section on coordination with other planning initiatives,
                                      added comment that “Kuali Scoping Study for financial
                                      systems. This study will be coordinated with the task group
                                      work for Finance, Budget and Procurement.” (later
                                      changed to Financial Systems Scoping Study.

7/19/07       Jackie Bardsley         In the Approach section, underlined tasks relating to key
                                      deliverables from each phase.
                                      In Timing section, changed I-MAC subcommittee session from
                                      July/August to August since it will not be possible to
                                      schedule in July.
                                      In the Participants and Involvement section, added a
                                      Technical Advisory committee.
                                      Changed terminology throughout the document to refer to
                                      Task Groups rather than Subteams.




                                                  Page 16                                  7/21/2011
                                                             cf9ea385-03d5-4558-a1c2-88b166c9267d.doc
                                                                       U n i v e r s i t y o f W a s hi n g t o n
          R o a d m a p f o r I n f o r m at i o n M a n a g e m e n t & A d m i n i s t r a t i v e S y st e m s
                                                                        P r o j e c t P l a n a n d C h ar t e r

Date        Changed By              Summary

8/7/07      Jackie Bardsley         Added URL link to Emerging Themes.
                                    Removed “service delivery” from the scope list for Strategy,
                                    Policy and Partnership (based on meeting with Cindy Brown
                                    and Mary Syre).
                                    Updated the high level timeline document to agree with
                                    most recent plans regarding kick off and timing. Added a
                                    Project Planning activity.
                                    Removed reference to August 2007 I-MAC subcommittee as
                                    this session will not be held.
                                    Added new project structure to the Participants and
                                    Involvement section.
                                    Add task group sponsors with a responsibility to provide
                                    vision for their assigned task groups.
                                    Added URL to SharePoint site.
                                    Removed related documents since all documents will be on
                                    SharePoint.
                                    Made minor editing clarifications.

8/7/07      Jackie Bardsley         Changed “Kuali Scoping Study” to “Financial Systems
                                    Scoping Study”.
                                    Changed additional instances of “sub team” to “task
                                    group”.

8/30/07     Jackie Bardsley         Updated roles and responsibilities for Executive Sponsor,
                                    Project Sponsor, Internal Project Manager based on
                                    PowerPoint deck from Jeanne Marie. Added placeholders
                                    for Core Planning Team, Logistics Team, Design Team and
                                    Roadmap Working Team.

9/26/07     Jackie Bardsley         Remove references to Technology Future Days. Updated
                                    with the latest version of the Project Structure chart and
                                    removed the old bubble chart. Replaced Technical
                                    Advisory Group with IM/AS Technology Advisory Group.




                                                Page 17                                  7/21/2011
                                                           cf9ea385-03d5-4558-a1c2-88b166c9267d.doc

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:143
posted:7/22/2011
language:English
pages:18
Description: Roadmap Technology Diagram document sample