									                                                 ORANGE COUNTY PUBLIC SCHOOLS
                                                        Procurement Services
                                                           Bid Price Sheet
Bid Title: Roofing Services
  Bid #: 0903097ITB
                                                                                     Unit of     Est.
  Item #                           Description                          Unit Price   Measure   Quantity   Extended Price
            Remove existing built-up system and replace with
     1                                                                                 SF        5000              $0.00
            new 3 ply Modified Bitumen System.
            Remove and replace existing Modified Bitumen
     2
            system to match existing materials and plies.
                                                                                       SF       5000               $0.00
            Remove and replace existing shingle system with 30-
     3
            year guarantee fiberglass shingles.
                                                                                       SF       8000               $0.00

     4
            Remove and replace existing single ply system.
                                                                                       SF       4000               $0.00
            Remove existing shingle system and replace with 20
     5
            yr., 3 ply modified system.
                                                                                       SF       10000              $0.00
            Remove and replace existing rigid insulation to same
     6
            thickness.
                                                                                       BF       4000               $0.00
            Provide and install Elastomeric waterproofing with
     7
            Fiberglass mesh (Hydro-Stop preferred).
                                                                                       SF       10000              $0.00


            Remove existing gravel stop on MOD Bitumen
     8                                                                                 LF       2000               $0.00
            system. Replace with new, complete and stripped in
            to match existing material and thickness.
            Remove old built-up roofing at gravel stop and install
     9      new 2 ply Modified Bitumen edge flashing to existing                       LF       2000               $0.00
            gravel stop.
            Remove and replace existing metal eave drip at
    10      shingles to match existing 3.5 inch 24 gal. material,                      LF        600               $0.00
            thickness, and color.

            Remove damaged or deteriorated metal Fascia (10"
    11                                                                                 LF        500               $0.00
            average depth) and replace with new to match
            existing include all cleats, fasteners, and paint.
            Remove and replace shingle valley per SMACNA
    12      Figure 4.9, 5th Edition using an Ice and Water Shield                      LF        100               $0.00
            Underlayment. 0 to 100 linear feet.

            Remove and replace shingle valley per SMACNA
    13                                                                                 LF        500               $0.00
            Figure 4.9, 5th Edition using an Ice and Water
            Shield Underlayment. 101 to 500 linear feet
            Remove and replace existing metal downspout
    14      including anchors. Match existing size and                                 LF        500               $0.00
            profile; 4 inch box 24 ga. Galv.
            Remove and replace existing metal downspout
    15      including anchors. Match existing size and                                 LF        500               $0.00
            profile; 4 inch box Alum. 040
            Remove and replace existing metal downspout
    16      including anchors. Match existing size and                                 LF        500               $0.00
            profile; 4 inch box 24 ga. Stainless Steel
            Remove and replace existing VTR lead boot and
    17                                                                                 EA        100               $0.00
            related roof flashing.
            Remove and reinstall existing roof drain with new
    18      lead flashing and related roof membrane                                    EA        50                $0.00
            flashing.
            Remove and replace existing metal ridge vent
    19      system and flashing to match existing size and                             LF        200               $0.00
            profile (16" average width).
34adb64d-dceb-4545-8c42-ec039cc1f58e.xls                                                                         Page 1 of 3
            Remove and replace existing metal counter
    20                                                           LF   500       $0.00
            flashing and reglet insert per SMACNA, Figure 4-
            3b, 5th Edition, tomatch existing size, and color.

            Remove and replace existing metal pitch pocket
    21                                                           EA   250       $0.00
            system and pourable sealer to match existing
            size and profile (6" square average size).
            Top off existing pitch pans with asphalt based
    22                                                           EA   300       $0.00
            sealant.
    23      Provide and install metal cover over pitch pan.      EA   200       $0.00
            Remove and replace existing metal coping
    24      system at parpet wall to match existing profile      LF   200       $0.00
            and color (12"average width).
            Remove and replace existing metal scupper
    25      (minimum .050 aluminum with welded joints) to        EA    15       $0.00
            match existing size and profile.
    26      Install new metal or concrete splash pan.            EA   100       $0.00
            Locate leaks. Provide sufficient size water hose
            and water pressure to determine location of
    27      leaks. Provide a minimum of one man on roof          EA   400       $0.00
            and one man inside, both equipped with 2-way
            radio.
            Cut out and repair blister on built-up roofing
    28                                                           EA   250       $0.00
            system. Restore to water tight condition.
            Cut out and repair blister in Modified Bitumen
    29                                                           EA   250       $0.00
            system. Return to a water tigh condition.
            Remove existing deteriorated plywood
            underlayment and replace with new CDX
    30                                                           SF   1000      $0.00
            plywood to match existing thickness or
            conditions.
            Remove existing deteriorated wood nailer and
            replace with new pressure treated wood nailer
    31                                                           BF   1000      $0.00
            adequately anchored in place to match existing
            condition.

            Remove existing deteriorated finished wood
            (fascia, trim, etc.) and replace with new pressure
    32      treated solid wood to match existing in pattern,     BF   500       $0.00
            size, and finish. Secure with galvanized finish
            nails. Provide one prime coat and two finish
            coats of paint or stain to match existing.
            Completely remove existing sealant (caulking)
    33      and replace with new sealant appropriate for         LF   10000     $0.00
            condition used.
            Remove and replace base flashing around
    34                                                           LF   300       $0.00
            skylight.
            Remove and replace existing billows type
    35                                                           LF   400       $0.00
            expansion joint cover.
            Remove old expansion joint splice kit and install
    36                                                           EA   400       $0.00
            new to match existing.

            Inspection: Provide a total cost per hour to
            inspect roof system and provide report on a form
    37      and roof plan provided by the Orange County          HR    60       $0.00
            School Board. Inspection shall identify school
            name, building number, type of roof, condition of
            roof, condition of flashings, work needed.

34adb64d-dceb-4545-8c42-ec039cc1f58e.xls                                      Page 2 of 3
            Emergency Repair: Provide a total cost per
            hour to include cost of minimum two-man crew
    38                                                                                                                 HR           300         $0.00
            to perform emergency roof repairs. Cost should
            include overhead and profit.
            Unidentified Task: Provide a total cost per
            hour to include cost of minimum two man crew to
    39      perform related roof repair task not identified in                                                         HR           400         $0.00
            the schedule above. Cost should include
            overhead and profit.
            Material Reimbursement for Emergency
            Repair and Unidentified Tasks: Cost of
            materials other than equipment used for
    40      emergency repairs and unidentified task will be                                                            EA           300         $0.00
            paid for based on contractors actual cost
            (receipts will be required to be submitted with the
            work order invoice) plus 10%.
            Mobilization: In addition to the above unit
            cost, provide a separate unit cost that will be
            added to the cost for providing any one of/or a
            combination of several of the above tasks for
            mobilization and set-up at job site. (This is a one-
            time charge per dispatch).
    41      Contractor's raw hourly rate                                                                               HR            1          $0.00
    42      Contractor's burden rate                                                                                   BR            1          $0.00
    43      Contractor's overhead and profit                                                                           %

    44      Cost associated with payment/performance                                                                   %
            bond (if requested by Owner)
                LF= Linear Feet, SF=Square Feet , BF=Board Feet, HR=Hour, EA=Each                                           Total Bid Price     $0.00

 OCPS Terms of payment will be Net 45 days as per §218.73                          Payment
                            Discount and Terms:                                                                   % if paid in                   days
In the event an error in calculations is found, the unit price bid will be used to determine the correct extended price.
             Can you meet or exceed 30 day delivery After Receipt of Order (ARO)?                   Y or N
If No, specify number of days needed for delivery                                                     Days

Vendor Acknowledgment and Approval

I certify that this bid is made without prior understanding, agreement or connection with any corporation, firm, or person submitting a bid for
the same materials, supplies or equipment, and in all respects fair and without collusion or fraud. The following information, including an
authorized representative signature and witness, is required to be submitted with your proposal in order to be considered for evaluation and
award. The person signing below acknowledges and agrees with all proposed information as submitted and has the authorization of the said
company to enter into a contractual agreement with the School Board of Orange County for the purposes as proposed and as described herein.
Please print below unless where a signature is required.

Firm
Name                                                                          Phone No.

Authorized Representative's Signature                                                                                                 Date

Authorized Representative Name/Title
Witness Signature                                                                                                                     Date
Witness Name/Title
Vendor is to complete, sign and submit a paper copy of the Bid Price Sheet along with an electronic (MICROSOFT EXCEL) Bid Price Sheet
copy at or before the time of Bid Opening. Electronic (EXCEL) Bid Price Sheets must be submitted on a CD or DVD.
FAILURE TO SUBMIT PAPER BID PRICE SHEET WITH SIGNATURES & ELECTRONIC COPY MAY RESULT IN YOUR BID SUBMITTAL NOT BEING
ACCEPTED.
34adb64d-dceb-4545-8c42-ec039cc1f58e.xls                                                                                                      Page 3 of 3

								
To top