					                                                 Advantages                                 lacquer and finally two top layers.
                                                                                            The result is an even, smooth and
                                                 Product stability against                  easy-care surface. Lacquer must
                                                 humidity change                            incorporate a number of proper-
                                                 Wood continually expands and               ties to enable the ready laid floor
                                                 contracts in accordance with changes       to function well; it must have a
                                                 in humidity. Many attempts have            good adherence to the wood, allow a
                                                 been made to hinder the move-              certain amount of flexibility to facili-
                                                 ment of the hardwood strips, but           tate for movement in the floor, it
                                                 none have been totally successful.         must be water repellent and have an
                                                 The thicker and wider the staves           attractive lustre. In addition, it needs
                                                 are, the greater the variation             to be "fast to light" and stop UV rays
                                                 experienced. Parquet incorporates          affecting the colour of the wood.
                                                 a top layer of hardwood which will         Neither must it contain dangerous
                                                 inevitably be affected by humidity.        gasses or combustible elements.
A wealth of experience                                                                      For a manufacturing company there
                                                 With this in mind, Boen has chosen         are also a number of hygiene, envi-
Boen Bruk AS began manufacturing mosaic
                                                 a construction that has proven to be       ronmental, mechanical and chemi-
and solid wood flooring in 1953 progressing                                                 cal factors which must be addressed.
                                                 the best with respect to sideways
to multi-layer prefinished hardwood flooring                                                Boen Protect Lacquer satisfies all of
                                                 stability and flatness under differing
in 1966. The knowledge we acquired during        humidity conditions. Comparison            these requirements. In the begin-
those many years, is drawn on today when         tests show that Boen multi layer           ning of year 2001 we are adding at
manufacturing our multi-layered hardwood         hardwood flooring has very little          the 6th roll a lacquer with improved
flooring which comes in a range of               convex and concave movement.               resistance to micro scatches.
thicknesses from 10-23mm. Boens` wood            This is due to a combination of
specialists and engineers have a vast            narrow strips, correct composition         Boen Ecoline
                                                 of the blocking layer, a very good         Boens preoiled parquet is treated
knowledge of the effect the climate has
                                                 adhesion process and continuous            with 2 coats of oil which are brushed
on wood. This important factor has played
a significant role in our choice of technology
                                                 follow-up based on Boens Quality
                                                 Control System.
                                                                                            and polished into the wood. Excess
                                                                                            oil is then removed and finally the
                                                                                                                                       2 - 01
and techniques.                                                                             oil is dried and tempered with the
                                                 All Boens multi layer hardwood             help of 6 UV lamps. The oil does not




                                                                                                                                        Advantages
                                                                                                                                                     TECHNICAL PROPERTIES
Boen have themselves developed and built         flooring products are constructed          contain dangerous gasses and satis-
many of the principal machines used in the       in such a way that they are stable         fies all the requirements for oiled
production process. Boens’ own standards         when laid and it is a matter of course     surface treatment in accordance
                                                 that our flooring can be enjoyed by        with European standards.
are on average considerably higher than
                                                 many generations to come.                  Boen Ecoline is revolutionary within
those which are generally practised in the
                                                                                            pre-oiling since it does not require
production of parquet.                                                                      additional treatment when the
                                                 ConneXProcess
                                                 Boen has developed an advanced             floor is laid in a room exposed to
                                                 method of planing that is called           normal wear.
                                                 ConneXProcess. In contrast to other
                                                 manufacturers of multi-layered             A wide range of products
                                                 hardwood flooring, we mill the             Boen can offer a wide spectre
                                                 tongue and groove after varnishing.        of wood types in several grades,
                                                 The edges of the board are then            patterns and thicknesses either with
                                                 sharp and the floor when laid does         pre-lacquered or pre-oiled surfaces.
                                                 not have any visible joins. Boen is
                                                 the first on the market with such          Patterns: Long strip, Plank, Ships
                                                 a product and is able to deliver           Plank of wide boards, Ships Plank
                                                 flooring that is top in its class in the   of narrow boards, Double Herring-
                                                 worlds parquet market.                     bone, Single Herringbone, Basket
                                                                                            Weave which can be combined with
                                                 Tongue and groove                          decorative boards and squares.
                                                 Boen has long experience as a
                                                 supplier of sports flooring. Our           Total thickness: 10, 12, 15, 21, or 23mm
                                                 patented sports floor BOFLEX has           The products with a 6mm hardwood
                                                 an unique tongue and groove                layer are: Traffic, Strongline
                                                 connection that withstands decades
                                                 of wear due to its dependency on           BOEN CARE AND
                                                 this special connection that enables       MAINTENANCE PROGRAM
                                                 it to function. Boens product develo-      The new BOEN maintenance pro-
                                                 pment department has also incor-           gram contains a complete range of
                                                 porated this know-ledge into its           products for care and maintenance
                                                 standard multi layer hardwood              of hardwood flooring. Boen Parquet
                                                 flooring products. These tiny details      lends its name with a clear con-
                                                 give a dramatic improvement for            science to this series which compris-
                                                 installation and connection between        es the best on the market today.
                                                 tongue and groove.
                                                                                            Comprehensive information
                                                 Boen Protect Lacquer                       Boen has developed a complete
                                                 Boens ready lacquer multi layer            program including display stands,
                                                 hardwood flooring has been coat-           exhibition material, brochures, vid-
                                                 ed with 6 layers, consisting firstly       eos, technical product information,
                                                 of a special layer of impregnating         installation instructions, and graphic
                                                 lacquer, followed by a foundation          material, which are available from
                                                 lacquer containing pore filler, next       dealers, on CD or via the internet
                                                 2 new layers of strong foundation          www.boen.com


                                                                                                                 www.boen.com
                                                          segde thgiarts yletelpmoC               .segde dednuor oN
                                                                   .tif esicerp a evig
                                                                                                                                 2 - 02




                                                                                                                                  Technology of milling
                                                                                                                                                          TECHNICAL PROPERTIES
All Boen multi layer hardwood flooring 10, 15
and 23mm are milled using the new edging
and milling process we call ConneXProcess.
                                                Technology of milling                    Multi layer hardwood flooring
                                                                                         produced with the usual tongue-
We have 6 years experience with this milling    "What do you in particular notice        ing and grooving procedure often
process and introduced it on all products at    when you look at a Boens multi           shows signs of frayed edges.
the end of 1999.                                layer hardwood flooring produced         Lacquer applied after profiling
                                                with the new manufacturing               follows the line of the edges. In
                                                process? Nothing at all! And that’s      addition, the lacquer runs at the
                                                what makes us happy."                    edges. As a result, lacquer pits
                                                The market is enthusiastic about         occur at the already noticable joins.
                                                the new edging process named             Since at Boen the lacquering has
                                                ConneXProcess. The precise cutting       preceeded the edging-work, the
                                                of tongue and groove guarantees          individual boards come together
                                                exact joins and edges as well as a       completely flush at the top edge.
                                                horizontal run of the varnish over       From join to join there is neither
                                                the whole width of the boards.           mis-fittings or lacquer runs.
                                                The result is a smooth and joinless
                                                surface.
                                                The name "ConneXProcess" derives
                                                from the combination of the words
                                                "connection" and "process".
                                                Using ConneXProcess, we can achieve
                                                an accurate fitting which is unique
                                                in the current market.




                                                                                                             www.boen.com
Stability of 2-strip
The following climatic test has been carried out independently to compare Boen Parkett with main competitors
manufacturing a 3-strip parquet. Width of A, B and C is about 200 mm. The test was carried out in triplicate. 15 mm thick
pre-finished laminated hardwood flooring was used for each of the 3 different climatic test.


Results:
The wider the board the larger the board-width expansion, but interesting to note, this expansion did not take place proportionally,
because of the difference in construction of sublayers. The summary on results are shown in table


                                     Immediately          DRY 20 %          Medium 50 %         Damp 70 %           Difference
         Brand:                      after removal
                                      of packing
                                                           relative
                                                          humidity
                                                                              relative
                                                                             humidity
                                                                                                  relative
                                                                                                 humidity
                                                                                                                   between dry
                                                                                                                    and damp


      BOEN PARKETT                        +3                  -7                 +6                  +7            14/100 mm           2 - 03
        Width 139 mm




                                                                                                                                        Stability of 2-strip
                                                                                                                                                               TECHNICAL PROPERTIES
      Parquet producer
    alt. A Width 200 mm                   -16                -36                 +19                +47           83/100 mm

      Parquet producer
    alt. B Width 200 mm
                                          -12                 -27                +38                +69           96/100 mm

      Parquet producer
    alt. C Width 200 mm
                                           -8                 -33                +32                +65           98/100 mm


  Measurements in 1/100 mm                               - = cupping                      + = curving


Conclusion:
Boen Parkett is in a class of its own. As can be seen from the above test results the other parquet producers have similar
standard, but this standard can not be compared with Boens. The width change leads to a lesser gap between the boards in a
dry climate and lesser strain on the adhesive joints in a damp climate. The wider parquet boards are obviously more vulnerable
to cupping / curving, when exposed to extra strain. Boen Parkett withstands the strain of dry and damper climate better.




                                                                                                                       www.boen.com
                                              Wear & tear abration test                       TESTS    Response to        Response
                                                                                                        scratching        to impact
                                              Three test specimens, with a                    BOEN         3.0 N             7N
                                              quadratic area of 100mm edge-                   TEST 1       2.0 N             7N
                                              length, are tested using suitable               TEST 2       2.5 N             4N
                                              test equipment, in this case a Taber
                                                                                              TEST 3       2.0 N             3N
                                              Abraser.
                                                                                              TEST 4       1.75 N            7N
                                              We specified type CS-17 as the
                                              friction-roller surface and 1,000 g
                                              per roller as the pressure.                 The distance between the test
                                              The abraded quantity is determined          circles must be at least 1 mm. The
                                              gravimetrically after 100, 300 and          results obtained from the smallest
                                              500 revolutions. Boen performance           weighted pressure that has made
                                              here was totally convincing, top            a continuous mark on all three test
                                              values being achieved.                      specimens are taken as the test
Testing of the Abrasion Resistance of Boen    There are controversial assertions          results. The objective of the research
                                              as to the test methods employed,            which gave rise to "protect" was
multi layer hardwood flooring abrasion test
                                              but even the "falling sand" method,         to obtain an environment-friendly
by the reputable Frauenhofer Institute in                                                 surface seal that was both UV
                                              which in our view is a more practi-
Brunswick.                                                                                resistant and still more robust.
                                              cal test, gives values that are highly
                                              recommendable.                              The result was a completely safe
                                              Please notice the appearance of             product with the advantages of
                                              the lacquered surface (uniform,             the conventional UV seal and much
                                              level, smooth appearance, with no           greater endurance.
                                              orange-peel effect).
                                                                                          1. Ecological. "Protect" is completely
                                              Test Results                                safe for man and animal alike. It
                                              (Arithmetical Average)                      is produced and applied without
                                              Wear after n Revolutions
                                              (Results in mg.)
                                                                                          the use of environment-polluting
                                                                                          waste materials or emissions. No
                                                                                                                                      2 - 04
                                                                                          solvents and no formaldehyde. And
                                               TESTS       100       300        500       with its improved pore filling of the




                                                                                                                                       Wear & tear abration test
                                                                                                                                                                   TECHNICAL PROPERTIES
                                               BOEN        5.9       19.5       33.1      board surface "protect" supports
                                               TEST 1      7.5       22.9       38.8
                                                                                          easy cleaning for a fresh living and
                                               TEST 2      5.7       21.3       36.9
                                                                                          working environment.
                                               TEST 3      9.5       27.4       37.6
                                                                                          2. Hard. Comparative tests have
                                               TEST 4      8.5       28.1       48.0
                                                                                          shown that "protect" is character-
                                                                                          ized by its greater resistance to
                                                                                          abrasion and by its endurance.
                                              Testing of Surface Properties
                                              Three test specimens are tested             3. Clear. The new clearness of this
                                              on the round plate, the general             surface coating does not falsify the
                                              conditions of implementation being          colour of the wood, but helps to
                                              observed. The test begins with a            ensure that the natural structure of
                                              pre-defined weighted pressure of 5          the hardwood remains intact. There
                                              N that is reduced, step by step, by         is no confusing it with a plastic
                                              0.5 N until 2N and by 0.1 N under 1 N.      "parquet". And when it comes to
                                              The test is finished when no further        subsequent improvement, renovation
                                              visible traces extending across the         or resealing there are no problems.
                                              entire test circle can be seen at the
                                              observation device.

                                               TESTS         Gloss 0        Gloss at           Gloss at             Gloss at
                                                             cycles         10 cycles          50 cycles            500 cycles
                                               Boen Oak,     29-32          22-25,             21-24,               14-20,
                                               old                          small scratches    scratches            scratches
                                               Boen Oak,     29-32          30-32,             30-32,               29-32,
                                               new                          no scratches       no scratches         small scratches

                                              In the beginning of year 2001 we added at the 6th. roll a lacquer with improved
                                              resistance to micro scratches on all products.
                                              Results from an internal project with an Erichsen Scrub tester with Scotch
                                              Brite (07521) and a Gloss measurer from BYK (gloss at 60 degrees) are
                                              as follows:
                                              15mm Oak has initial gloss at 29-31, we measure small scratches already at 10
                                              cycles and gloss of 22-25. New 15mm Oak has this same gloss and only small
                                              scratches after 500 cycles.
                                              A conclusion is that the gloss and surface look will stay better in areas where
                                              there is a path of traffic in domestic and especially domestic areas.




                                                                                                                     www.boen.com
                                           Sound tests


                                                    Concrete




                                                                     Measurement:       73 dB




THE NORWEGIAN TECHNOLOGICAL
BUILDING INSTITUTE

Type of building: Multi family residence
Condition/Date of construction:
Uninhabited 1994
Purpose of test: Floor partitioning
Test room: Kitchen/living room 3rd floor
Recipient room: Kitchen/living room
2rd floor
Test room volume: 80 m3                            Concrete +
Area of partitioning floor: 32,5 m2             15mm multi-layer
                                               hardwood flooring                                      2 - 05
Insulation against step sound
Projekt no: KO 24036




                                                                                                       Sound tests
                                                                                                                     TECHNICAL PROPERTIES
Test Insigator: Boen Bruk AS
Date: 30.08.94
Type of measuring equipment: NN823
                                                                     Measurement:       57 dB
                                                                     Sound Reduction
                                                                     Δ Lnpw = 57 dB
                                                                     Δ Lnpw




                                                   Concrete +
                                               Boflex Sports floor




                                                                     Measurement:       59 dB




                                                                                       www.boen.com
                                              Fire tests

                                               Observation                         1           2           3           4        Average
                                               Time taken to
                                               ignite flooring                   0:45        0:45        0:45        0:45
                                               Time taken to
                                               extinguish flame                  5:56        5:50        4:58        4:25
                                               Time taken to
                                               extinguish embers                12:40        9:34        8:37        8:00
                                               Measurement in mm
                                               of damaged flooring               300         320         260          270        288
                                               Area in mm2 of
Carried out by: SINTEF NBL
                                               damaged underboard               5600        4800        4900         7000        5575
Test Date: 08.10.93
Carried out by: Engineer Erling Stenhaug       Measurement in mm
Project No: 250010.40/93.181 B                 of damaged underboard              50          45          50          60          51
Method: NS-INSTA 414, NT FIRE 007
                                               Max. concentration of
Purpose: Endorsement /Classification           smoke the first 5 min.
Type of product: Oak Parquet                   of the test in %                    1           2           2           1           2
Name of product: 15mm oak parquet
treated with UV lacquer & Pacific 1 lacquer    Max concentration of smoke
Manufacturer: Boen Bruk AS
                                               after 5 min. of testing in %        0           1          0            0          0


                                              Description                               Single Tests 1 and 2
                                              15mm m.l.h.f made of oak treated          Lengthways along the board.
                                                                                                                                          2 - 06
                                              first with UV lacquer plus an
                                              additional coat of Pacific 1 lacquer. 4   Single Tests 3 and 4




                                                                                                                                           Fire tests
                                                                                                                                                        TECHNICAL PROPERTIES
                                              samples each of dimension 1,0 m x         Crosswise along the board. The time
                                              0,4 m netto weight approx. 8,1 kg.        is stated in minutes and seconds
                                              per m2. The samples were labelled         (min:sec) from test start time.
                                              Pacific One.                              Measurement of damaged areas on
                                                                                        both flooring and underboard are
                                              Samples                                   taken from the center of the burn
                                              Supplied by test instigator               area. Smoke is measured in the
                                                                                        degree of light absorption.
                                              Preparation of Samples
                                              Prepared by test instigator. The top      Conclusion: 15mm oak parquet, sur-
                                              layer of 3,8mm oak was glued to the       face treated with UV lacquer, and
                                              11,2 mm wooden underboard.                one coat Pacific 1 lacquer, satisfies
                                                                                        requirement for floor coverings in
                                              Conditioning of Samples                   class G as stated in the Norwegian
                                              The samples were stored at a temp-        Standard NS 3919.
                                              erature of 23ºC, with relative mois-
                                              ture at 50% until a constant weight       Comprehensive tests enclosed from
                                              was attained.                             SINTEF of University of Gent.
                                                                                        (15 mm) (10 mm Prestige)
                                              No. of Tests
                                              2 parallel lengthways and 2 crosswise
                                              of production.

                                              Test Duration
                                              15 minutes




                                                                                                               www.boen.com
                                              Environment                              Producing Hardwood floors will
                                                                                       always give some by-products:
                                              There is no more emotive "green"
                                              issue than the use of timber. But        • Minimum waste is produced
                                              here are some simple facts :             during the manufacture of our
                                                                                       floors.
                                              •Hardwoods, unlike synthetic alter-
                                              natives, come from renewable             • The manufacture of our floors
                                              resources which, in the main can be      produces no toxic by-products.
                                              regrown in a human life span.
                                                                                       • The only by-product from the man-
                                              • Boen Bruk AS have never know-          ufacture of our floors is sawdust
                                              ingly procured anything other            and wood chip. This is fully utilised
                                              than from properly managed and           in the factory kilns to produce heat
                                              sustainable sources.                     and hot water or is incorporated
Environment and life on earth urge the con-                                            into other timber based products.
tinuous search for sustainable development    • Reforestation all over the world
                                              is a major concern of Boen Bruk          • Adhesives and lacquers used in our
and necessitate national involvement and                                               production are specifically selected
                                              AS and the Johan G. Olsen Group.
commitment..... We are all involved.                                                   to ensure that no toxic gases or
                                              The Group annually contributes
                                              100 times its consumption of wood.       similar by-products are produced.
                                              Annual consumption is approxi-
                                              mately one million trees, therefore      • In maintaining/cleaning equip-
                                              the Group contributes approxi-           ment, all by-products are deposited
                                              mately 100 million new trees to          in seperate containers and trans-
                                              reforestation.                           ported to destruction units.

                                              • 3-ply construction utilise the hard-   • Boen has it own hydroelectric
                                              wood well, given the fact that only
                                              wearlayer, app. 1/3 of the product
                                                                                       plant at the Boen waterfall, that
                                                                                       produces electricity used in produc-
                                                                                                                                         2 - 07
                                              is from ”slow growing” forest. 2/3       tion.
                                              of the product is ”fast growing”




                                                                                                                                          Environment
                                                                                                                                                        TECHNICAL PROPERTIES
                                              softwood.
                                                                                       o t s ta e r h t t s e ta e r g e h t f o e n O
                                                                                       -saercni sÕnaM si tnemnorivne eht
                                                                                       htiw dna ygrene rof dnamed gni
                                                                                       ;sleuf lissof fo gninrub desaercni ti
                                                                                       -natsbus esilitu stcudorp doowdraH
                                                                                       -cafunam rieht ni ygrene ssel yllait
                                                                                            .sevitanretla citehtnys naht erut




                                                                                                                www.boen.com
                                                  General information                         The step-sound is kept within the
                                                                                              room and does not carry to
                                                  Boen's engineered hardwood flooring         apartments/ rooms below.
                                                  is industrially manufactured with
                                                  prefinished surface in accordance           It is much easier to remove the
                                                  with DIN 280 part 2 and can be              floor, should this be necessary.
                                                  installed floating, glued down or
                                                  nailed down.                                The advantage of the glue down
                                                                                              installation are as follows:
                                                  In reality all methods are generally        Craftsmanship has improved greatly
                                                  accepted by Boen for the majority of        with respect to the glue down
                                                  their 3-ply products, with the              method of installation.
                                                  exception of the Boflex P1 sports-
                                                  floor, which is made purely for             One main advantage is the total
                                                  floating installation. The other            stability under point-pressure,
To be installed floating, glued down or           exception is the 2-ply products,            e.g. very heavy furniture, heavy
                                                  Prestige and Traffic which are only         closets, pianos, etc. The function
nailed down?
                                                  made for glue down and nail down            of the tongue and groove which
                                                  installation.                               hold the boards together is of lesser
Is it a free choice or are there real arguments                                               importance. This means that a glued
for each alternative?                             Which method is to be recommended?          down hardwood floor does not
                                                  There are a large variety of 3-ply          display movement or weakness.
                                                  products on the market, based on
                                                  varying methods of construction.            The step-sound is considerably
                                                  This means that there is no simple          reduced. The sound is absorbed by
                                                  answer to this question.                    the sub-floor.
                                                                                              If sub-floor heating is installed, a
                                                   A lot can be said for the floating         glued down product will give less
                                                  installation, but at least as much
                                                  can be said for glue down installa-
                                                                                              resistance to the transfer of heat
                                                                                              compared to a floating system. It
                                                                                                                                      3 - 01
                                                  tion. While the traditional method          is however necessary to adhere
                                                  of nail down is also recommended            to certain rules where sub-floor




                                                                                                                                       General information
                                                                                                                                                             PRECONDITION & INSTALLATION
                                                  in certain circumstances.                   heating is installed.

                                                  The advantages of the floating              Relative humidity does not have the
                                                  installation are as follows:                same immediate effect on a glued
                                                  It can be used for installation on          down floor as with floating floors.
                                                  all kinds of sub-flooring, including
                                                  thin carpet, old loose concrete or          From a designers point of view,
                                                  concrete sub-flooring with a                a glue down solution is often
                                                  variable/uncertain moisture content.        recommended when installing
                                                  Prior to installation, a simple levelling   floors through narrow doorways,
                                                  of the sub floor can be done. Sub-          on stairs and in adjoining rooms
                                                  floor requirements are less critical        without the need for doorsills and
                                                  when using the floating system              other types of moulding.
                                                  than those required for glue down
                                                  installation.                               Sanding and repairs of old glued
                                                                                              down floors is simple. Replacement
                                                  Installation is easy for both crafts-       of staves is also easy when the
                                                  men and Do-It-Yourselfers alike.            boards are glued to the sub-floor.
                                                  The quantity of adhesive used
                                                  is considerably reduced as it is            A glued down floor will perform
                                                  only required for the connection            satisfactorily, because the floor is
                                                  between tongue and groove.                  fixed to the sub floor. From the
                                                                                              long life cyclops angle, it means a
                                                  The visual effect and performance           reduction in the utilisation/exploi-
                                                  of the floor is more even because           tation of hardwood and can as such
                                                  a floating floor appears as a single        be included in Boen's Environment
                                                  sheet and any expansion/contrac-            Certificate.
                                                  tion only occurs at the perimeter
                                                  of the floor.                               With regards to adhesive, there
                                                                                              are many solutions. In general the
                                                  While on the other hand a nailed            solvent based-and the polyurethane
                                                  or glued down floor can experience          adhesive areused for critical sub
                                                  individual expansion/contraction of         floor conditions. The water based
                                                  each board and in dry climates this         dispersion adhesives today are of
                                                  can lead to small gaps between              high quality, and these products
                                                  each board.                                 are being used more and more.
                                                                                              Boen has a full program of
                                                  It is absolutely essential to have an       primers and adhesives for glue
                                                  even sub floor. If the sub floor is         down installation.
                                                  uneven, it could lead to damage of
                                                  the tongue and groove connection.
                                                  This normally leads to gaps, which
                                                  expose the wood to damage from
                                                  moisture which again can cause
                                                  discoloration of the wood.




                                                                                                                  www.boen.com
                                                 Points for planners                       8.
                                                                                           Insulation of all hot pipes must
                                                 1.                                        be completed before the floor is
                                                 The concrete/screeded sub-floor           installed.
                                                 must be smooth, level and laid in
                                                 accordance with BS8204:Part 1: 1987       9.
                                                 table or alternatively DIN standard       All radiator and piping work should
                                                 183556. The deviation level is ± 2 mm     be completed and leak tested before
                                                 per 2 meter radius.                       the floor is installed.
                                                 It is inadvisable to correct deviations
                                                 with packing or latex as these can        10.
                                                 be detrimental to the performance         Provision should be made for
                                                 of a hardwood floor.                      safe, dry storage of the hardwood
                                                                                           flooring to avoid damage while
                                                 2.                                        building work is in progress.
To ensure correct installation of a hardwood     Wooden subfloors must be sound,
                                                 securely fixed, level and strong          11.
floor it is important to adhere to the follow-
                                                 enough to support a hardwood              Pre-plan the design and layout of all
ing rules.
                                                 floor.                                    ducts and access traps to be incor-
                                                                                           porated in the floor.
                                                 3.
                                                 A damp course must be incorporated        12.
                                                 beneath the concrete or screeded          Ensure that there are adequate
                                                 surface and adequate time allowed         expansions gaps for all hardwood
                                                 for the "green" concrete above the        floors. Allow 1,5mm per meter from
                                                 damp course to cure and dry out           wall to the first board.
                                                 thoroughly. A liquid surface type
                                                 damp proof membrane must be               13.
                                                 applied correctly to ensure total
                                                 water proofing.
                                                                                           Consider how different types
                                                                                           of flooring abutt each other and
                                                                                                                                   3 - 02
                                                                                           make the necessary detailed
                                                 4.                                        arrangements.




                                                                                                                                    Points for planners
                                                                                                                                                          PRECONDDITION & INSTALLATION
                                                 All wet finishes such as plaster, ter-
                                                 razzo and floor tiling should be com-     14.
                                                 pleted and dry before wood floors are     Sufficient notice should be given
                                                 installed.                                to the flooring contractor if there
                                                                                           is the likelihood of incompatibility
                                                 5.                                        of adhesives with any building
                                                 Ensure that windows are glazed            material.
                                                 and outside doors are hung before
                                                 wood floor finishes are fixed.
                                                                                           15.
                                                 6.                                        Ample provision should be given to
                                                 A new building should be adequately       the installation of barrier matting,
                                                 ventilated and heated for at least        preferably making it impossible for
                                                 10 working days prior to laying           anyone to enter a public building
                                                 commences and these conditions            without putting both feet down on
                                                 maintained during and after floor         the mat.
                                                 finishes are installed.
                                                                                           16.
                                                 7.                                        A hardwood floor should be one
                                                 Site conditions should comply with:       of the last items installed in a
                                                 • Stabilised temperature not less         building, as it can easily be damaged
                                                    than 13 0C /550F.                      by traffic during building work.
                                                 • Moisture content of walls not
                                                    more than 8%.
                                                 • Moisture content of subfloor
                                                    (for blocks or mosaics) not more
                                                    than 5%.
                                                 • Moisture content of subfloors
                                                    (others) not more than 8%.
                                                 • Relative humidity range 40 – 60%.




                                                                                                               www.boen.com
Underfloor heating system
General                                                                                           FLOATING ON
Boen Parkett flooring is an ideal floor covering                                                  CONCRETE SCREED
for placing on top of under-floor heating systems.
It looks attractive and has favourable thermal
resistance properties.                                              15mm Parquet
                                                        Moisture barrier 0,20 mm
General information
A well-functioning under-floor heating system, hot              Suitable underlay
water or electrical, results in ideal thermal distri-              Concete screed
bution throughout the area to be heated, giving              Heating tube or cable
maximum comfort. It is therefore necessary for the                      Insulation
floor- covering to have good thermal conductivity,
i.e. low resistance to heat transmission.
There are many different types of under-floor heat-
ing systems available, e.g. electric cable, hot water
pipes and low voltage foils, the majority of which

can be used together with Boen hardwood flooring.

For concrete screeded floors, Boens 15mm (for glue-down or floating) or 10mm Prestige (for glue-down only) should be used.
Pipes and cables must be covered with a min. of 30mm concrete. This process must be carried out by professionals.

Major requirements concerning concrete screed
The screed must be laid according to contractual specifications and Planning Authority requirements. When overlaying screed,
moisture must not exceed 1,5% CM or max. 90º RH when the hardwood flooring is laid. Ideally the screed will have been laid
at least 4 weeks prior to the heating system is being used. The first time the heating system is used it should be run at 2/3      3 - 03
output for at least 2 weeks so that escaping moisture can evaporate without causing damage and the screed can dry and
attain its final moisture content.




                                                                                                                                    Underfloor heating system
                                                                                                                                                                PRECONDITION & INSTALLATION
1 week before the hardwood flooring is laid the heating should be reduced to approx. 18ºC / 64ºF.

Laying Boen Parkett
If the heated under-floor is a concrete screed, this should first be covered with a layer of suitable non thermal resistant
underlay as a compensation layer and for muffling step sound. The electrical cables or waterpipes must be covered by 30mm
reinforced concrete / levelling screed.

For Sports Floors, Boflex PI special requirements apply, please contact Boen Bruk AS.

Before laying commences refer to Boens’ Laying Instructions for floating floors which provides specific details of site
requirements.

Preference should be given to fully adhering the boards
directly to the subfloor. However, the boards can be glued          Thickness        Thermal                 Thermal
continuously along the tongue and groove using a suit-                               Resistance              Conductivity
able adhesive.
                                                                    10mm             0,07 m2K/W              0,15 W(mK)
The hardwood flooring boards, which are pre-packed in
a heat-shrunk wrapper, must not be opened until                     15mm             0,10 m2K/W              0,15 W(mK)
immediately before they are laid. About two days after
the parkett has been laid, the temperature of the under-
floor heating system may be gradually raised over a
                                                                    23mm             0,18 m2K/W              0,15 W(mK)
period of one week until the desired temperature has been
obtained.                                                           Boflex           0,27 m2K/W              0,09W(mK)
The under-floor heating system must be regulated to
ensure a max. effect of 60W/m2 with a sub-floor surface temp. not exceeding 28ºC / 83ºF, with a room temp. of 20-22ºC /
68-72ºF. RH should be maintained between 40-60%. Heat must be evenly distributed under the hardwood flooring. No carpets
with insulating effect must be used on top of the floor as this accumulates heat.


FURTHER INFORMATION
Further advice and technical information is available by contacting Boen Bruk AS.




                                                                                                                    www.boen.com
                                              J AT O B A
OAK




                                                                                 ASH
14 mm Boen Clic                                                                  1.    2.

Installation Instructions for Residential Purposes

1. Lay the first board with the tongue towards the wall and the groove
facing outwards. There must be a clearance along all walls of minimum
                                                                                 3.    4.
7 mm (1 mm per meter room width). This is easily adjusted after 3 - 4
rows of boards have been fitted together. Use wooden blocks / wedges
as distance pieces.
2. The next board is positioned, slanting towards the end joint and laid in
place. Continue likewise to the end of the first row.                                                      3 - 04
                                                                                 5.
3. The second row starts with the cut-off from the first row, which must be
a minimum length of 40 cm. Place this board slanting towards the ready




                                                                                                            Boen Clic
                                                                                                                        PRECONDITION & INSTALLATION • 14MM
laid board; give it a light tap with a wooden block while pressing down
slightly, but without pressing the board down completely. This keeps it in
place when the next board is attached at the short end.
                                                                                 6.
4. Continue in the same way with the next board, which is first fitted at
the short end. Ensure that overlaps are a minimum 40 cm.
5. A gentle tap with the help of a wooden block against the lower lip of
the parquet, while pressing the board down to the sub-floor is needed to
enable the board to click into place.                                            7.
6. Adjust the distance to the wall after the first 3 - 4 rows have been fitted
together.
7. When fitting the final row against the wall, the distance between the
board and wall must be measured.
8. If it proves difficult to lay the last board at an angle, it is possible to   8.
tap the parquet together using a tapping tool. This eases the finishing
process, if for example the parquet is laid into a doorway.
9. Apertures for piping etc. must be made as spacious as possible so as to
allow for free movement of the floor. The apertures are then covered by
pipe collars.                                                                    9.
10. When laying parquet floating in corridors, we recommend installation
lengthwise.
11. Skirting should always be attached to the wall.


BoenClic can be laid from both directions according to need. The parquet         10.
can also be easily dismantled.


Other rules and regulations apply when installing/treating/maintaining
parquet in sports’ facilities, office buildings or other public places. Please
contact us for further information.                                              11.




                                                                                            www.boen.com
                                                  14 mm Boen Clic
                                                  Installation Instructions for Residential Purposes
                                                  General Information.
                                                   BoenClic is installed without the use of adhesive or other means of attachment. Our quality controllers have sorted and
                                                  graded the parquet. Should there be any doubt concerning grading and/or visual defects, it is important that claims be
                                                  made prior to the parquet being installed. Remember that the finished result is the responsibility of the installer. Wood
                                                  is a natural product with natural differences in colour and grain.

                                                  Climatic Conditions
                                                  Boen parquet is dried to 7,5 % (± 1 %) moisture content, equal to the moisture content of furniture wood. It is therefore
                                                  a matter of course that the building is heated and dry. All windows and doors must be in place and all brick-work,
                                                  rendering and concreting completed well in advance of the parquet being installed. The room must be heated to a
                                                  minimum of 15o C with relative humidity below 60 %. Ensure that the room is kept temperate after the parquet is
                                                  installed and that relative humidity remains below 60 %. Always store the parquet cartons in dry conditions and do not
                                                  open them until just before use.

                                                  Sub-flooring of chipboard, plywood and floor-boards
                                                  The sub-floor must be dry, level and self-supporting. Approved sub-floors are 22mm chipboard, 19mm plywood or 21mm
                                                  floor-boards. When using the third alternative it is important that the parquet is installed at right angles. Diagonally
                                                  installed floor-boards and cleft floor boarding must be 28mm thick. The moisture content of the sub-floor must not
                                                  exceed 12%. Any irregular sounds or faults in the sub-floor must be corrected before the parquet is installed. One layer of
                                                  builders’ paper, or other suitable underlay should be laid between the sub-floor and parquet, to avoid friction sounds.

                                                  Sub-flooring of reinforced concrete or light-weight concrete
3 - 04                                            Concrete sub-floors must be level and devoid of cement lumps etc. The tolerance limit is ± 3mm per 2 running metres.
                                                  Regarding the humidity in the sub-floor there are two methods practised internationally and two different sets of
                                                  figures: Relative humidity (RF) in the concrete has to be below 90 %. The “CM humidity” of the concrete has to be below
 Boen Clic
             PRECONDITION & INSTALLATION • 14MM




                                                  2 %. It is always necessary to lay a 0,20 mm thick plastic foil on the concrete to insulate against any remaining damp.
                                                  In addition to this, a layer of builders’ paper or other suitable underlay (2 mm PE-foam, cork, etc) must be laid between
                                                  the plastic foil and parquet.

                                                  Existing Floor Coverings
                                                  Floor coverings of linoleum, vinyl, plastic etc. do not need to be removed but a layer of builders’ paper should be laid
                                                  between them and the parquet. Thin, firm carpet e.g. needle felt, is in itself, a good underlay for parquet but for reasons
                                                  of hygiene we recommend that these be removed. All other types of carpet must be removed.
                                                  NB! Check that the sub-floor is level.

                                                  Under-Floor Heating
                                                  There are various types of under-floor heating on the market, utilising both electricity and water. We are unable to cover
                                                  individual types, but a common factor for under-floor heating is that the heating effect must not exceed 60 W/m2 and
                                                  the surface temperature of the sub-floor must not exceed 27o C. The system must be thermostatically controlled and
                                                  installed in such a way that it produces an even output over the whole surface.
                                                  NB! It is important that rugs placed on the parquet do not have rubber or other dense materials on the under side, as
                                                  this isolates the heat under the rug and can damage the parquet.

                                                  Sound Proofing
                                                  Sound is measured in decibel (db). It is necessary to differentiate between the sound made by footsteps and
                                                  reverberation. Stepping sound is the sound perceived (measured) in the room directly under the parquet. Reverberation
                                                  is the sound in the actual room. Building Authority requirements to curb stepping sounds in a building, consisting
                                                  of several apartments, is subject to special implementations. The quality, plus construction of a building along with
                                                  its’ dimensions are all important factors contributing to the final result. Consultants and architects should therefore
                                                  be consulted.

                                                  Finishing Treatment
                                                  The surface of BoenClic is pre-finished either with lacquer or matt lacquer. The AS-lacquer (anti scratch) is UV
                                                  cured, extremely scratch resistant and very durable. We do not recommend the application of an additional coat
                                                  of lacquer immediately after the parquet is installed. If however, due to special circumstances, it is necessary to
                                                  re-lacquer immediately, please contact us for instructions. The oil is also UV cured. Oiled floors require more frequent
                                                  maintenance then lacquered floors. We recommend our special cleaning and maintenance products for the various
                                                  kinds of surfaces. The most efficient method of cleaning the floor is to use a dry mop or vacuum cleaner. If it is necessary
                                                  to wash the floor, it is important to limit the use of water. Do not allow water to dry on the surface of the parquet. For
                                                  the treatment of unfinished parquet, use appropriate products.

                                                  NB: Other rules and regulations apply when treating/maintaining parquet in sports’ facilities, office buildings or other
                                                  public places. For further information please contact us.




                                                                                                                                                    www.boen.com
                                            OA K STO N E WA S H E D B R O W N
SH I PSTYLE




                                                                                ASH
15 mm Boen 2-Strip, Plank and Shipstyle                                         1.
                                                                                      60 cm
Installation Instructions for Residential Purposes

1. Place the first board against the wall with the groove facing the wall
and the tongue facing outwards. There must be a clearance along all walls,
                                                                                2.
minimum 7 mm. (1 mm per metre room width). This is easily adjusted
after 3 – 4 rows have been fitted together. Use wooden blocks or wedges
as distance pieces.
2. Ensure that the first row is straight. Use a string to check this.
3. The second row is started by using the sawn off end from the first row,                                   3 - 05
                                                                                3.
which must be a minimum length of 40 cm. Ensure that all overlaps are
a minimum 40 cm.




                                                                                                              2-Strip, Plank and Shipstyle
                                                                                                                                             PRECONDITION & INSTALLATION • BOEN 15 MM
4. When installing a floating floor the glue must be applied in the tongue
and groove. Place a bead of wood glue along the full length of the upper
edge of the groove, (towards the hardwood layer). By doing this, the glue
                                                                                4.
is pressed inwards which gives a good distribution of glue.
5. Use a tapping tool when driving the boards together. This tool should
be designed to prevent damage to the edges. When 3 rows have been
installed, make sure that all joins (including the short ends) are closed.
This also ensures that the floor is straight.
                                                                                5.
6. Apertures for piping etc. must be made as spacious as possible so as to
allow the free movement of the floor. The apertures are then covered by
pipe collars.
7. When fitting the final board against the wall, place the last board
exactly over the penultimate board. The correct width is obtained by using
                                                                                6.
a piece of parquet as a tenplate.
8. When laying parquet floating in corridors, we recommend installation
lengthways.
9. Skirtings should always be attached to the wall.

                                                                                7.
Note! 15 mm Boen Parkett can also be nailed or glued to the sub floor.
Please contact us for further information.



                                                                                8.




                                                                                9.




                                                                                              www.boen.com
                                                                          15 mm Boen 2-Strip, Plank and Shipstyle
                                                                          Installation Instructions for Residential Purposes
                                                                          General information.
                                                                          Our quality controllers have graded and sorted the parquet. Should there be any doubt concerning grading and/or visible
                                                                          defects, it is important that claims be made prior to the parquet being installed. Remember that the finished result is the
                                                                          responsibility of the installer. Wood is a natural product with natural differences in colour and grain.

                                                                          Climatic conditions
                                                                          Boen parquet is dried to 7, 5 % (± 1 %) moisture content, equal to the moisture content of furniture wood. It is therefore a mat-
                                                                          ter of course that the building is heated and dry. All windows and doors must be in place and all brick-work, rendering and
                                                                          concreting completed well in advance of the parquet being installed. The room must be heated to a minimum of 15 o C with
                                                                          relative humidity below 60 %. Ensure that the room is kept temperate after the parquet is installed and that relative humidity
                                                                          remains below 60 %. Always store the parquet cartons in dry conditions and do not open them until just before use.

                                                                          Sub-flooring of chipboard, plywood and floor-boards
                                                                          The sub-floor must be dry, level and self-supporting. Approved sub-floors are 22 mm chipboard, 19 mm plywood or 21 mm
                                                                          floor-boards. When using the third alternative it is important that the parquet is installed at right angles. Diagonally installed
                                                                          floor-boards and cleft floor boarding must be 28 mm thick. The moisture content of the sub-floor must not exceed 12 %. Any
                                                                          irregular sounds or faults in the sub-floor must be corrected before the parquet is installed. One layer of builders’ paper or
                                                                          other suitable underlay should be laid between the sub-floor and parquet, to avoid friction sounds.

                                                                          Sub-flooring of reinforced concrete or light-weight concrete
                                                                          Concrete sub-floors must be level and devoid of cement lumps etc. The tolerance limit is ± 3 mm per 2 running metres.
                                                                          Regarding the humidity of the subfloor there are two methods practised internationally and two different sets of figures:
                                                                          Relative humidity (RF) in the concrete has to be below 90 %. The “CM humidity” of the concrete has to be below 2 %.
3 - 05                                                                    It is always necessary to lay a 0, 20 mm thick plastic foil on the concrete to insulate against any remaining damp. In addition
                                                                          to this, a layer of builders’ paper or other suitable underlay (2 mm PE-foam, cork, etc) must be laid between the plastic foil
                                                                          and parquet.
 2-Strip, Plank and Shipstyle
                                PRECONDITION & INSTALLATION • BOEN 15MM




                                                                          Existing Floor Coverings
                                                                          Floor coverings of linoleum, vinyl, plastic etc. do not need to be removed but a layer of builders’ paper should be laid between
                                                                          them and the parquet. Thin, firm carpet e.g. needle felt is, in itself, a good underlay for parquet, but for reasons of hygiene we
                                                                          recommend that these be removed. All other types of carpet must be removed.
                                                                          NB! Check that the sub-floor is level.

                                                                          Under-Floor Heating
                                                                          There are various types of under-floor heating on the market, utilising both electricity and water. We are unable to cover
                                                                          individual types, but a common factor for under-floor heating is that the heating effect must not exceed 60 W/m2 and the
                                                                          surface temperature of the subfloor must not exceed 27o C. The system must be thermostatically controlled and installed in
                                                                          such a way that it produces an even output over the whole surface.
                                                                          NB! It is important that rugs placed on the parquet do not have rubber or other dense materials on the under side, as this
                                                                          isolates the heat under the rug and can damage the parquet.

                                                                          Sound Proofing
                                                                          Sound is measured in decibel (db). It is necessary to differentiate between the sound made by footsteps and reverberation.
                                                                          Stepping sound is the sound perceived (measured) in the room directly under the parquet. Reverberation is the sound in
                                                                          the actual room. Building Authority requirements to curb stepping sounds in a building, consisting of several apartments, is
                                                                          subject to special implementations. The quality, plus construction of a building along with its’ dimensions are all important
                                                                          factors contributing to the final result. Consultants and architects should therefore be consulted.

                                                                          Finishing Treatment
                                                                          The surface of Boen Parquet is pre-finished either with lacquer or oil. The AS-lacquer (anti scratch) is UV cured, extremely
                                                                          scratch resistant and very durable. We do not recommend the application of an additional coat of laquer immediately after
                                                                          the parquet is installed. If however, due to special circumstances, it is necessary to re-lacquer immediately, please contact us
                                                                          for instructions. The oil is also UV cured. Oiled floors require more frequent maintence than lacquered floors. We recommend
                                                                          our special cleaning and maintenance products for the various kinds of surfaces.
                                                                          The most efficient method of cleaning the floor is to use a dry mop or vacuum cleaner. If it is necessary to wash the floor, it is
                                                                          important to limit the use of water. Do not allow water to dry on the surface of the parquet. For the treatment of unfinished
                                                                          parquet, use appropriate products.


                                                                          NB: Other rules and regulations apply when treating/maintaining parquet in sports’ facilities, office buildings or other public
                                                                          places. For further information please contact us.




                                                                                                                                                                                www.boen.com
MAPLE




                                            OAK




                                                                              ASH
23 mm Boen 2-Strip                                                            1.    60 cm


Installation Instructions for Residential Purposes

Joists are installed at intervals of approx. 60 cm. 23 mm Boen Parquet is
installed directly on the pre-laid joists. Parquet can be randomly joined
                                                                              2.
and independent of the joists, but there must be a minimum overlap of
60 cm.


1. Put the first board against the wall with the tongue facing forward.
There must be a minimum clearance to the wall of 7 mm, (1 mm per meter                                          3 - 06
                                                                              3.
width) Use wooden blocks or wedges as distance pieces, or nail the first
row through the top of the parquet along the edge of the wall. The skirt-




                                                                                                                 2-Strip
                                                                                                                           PRECONDITION & INSTALLATION • BOEN 23 MM
ing board will cover the nails.
2. Ensure that the first row is straight. Use a string to check this.
3. Use the off-cut from the first row to begin the second row. This must be
                                                                              4.            5.
a minimum of 60 cm. Ensure that all overlaps are a minimum of 60 cm.
4. The nail/screw is placed in the tongue at an angle of approx. 50o to
the floor.
5. Use a nail punch to finish driving the nail in.
6. When knocking boards together, use a tapping block, to avoid damag-        6.
ing the edges of the parquet.
7. Cutting-out for pipes etc. must be adequate, to allow the floor free
movement. The recesses are covered by pipe-collars.
8. When installing the final row of boards; place a board exactly over the
penultimate board. To obtain the correct width, use an off-cut of parquet     7.
as a template against the wall.
9. Remember that end joins must be glued.



                                                                              8.




                                                                              9.




                                                                                                 www.boen.com
                                                      23 mm Boen 2-Strip
                                                      Installation Instructions for Residential Purposes

                                                      Generelt
                                                      Our quality controllers have graded and sorted the parquet. Any questions or claims regarding grading or visible defects
                                                      must be made prior to installation of the parquet. Remember, it is the installer of the floor who is responsible for the finished
                                                      result.


                                                      Climatic Conditions
                                                      Boen Parquet is dried to 7,5% ± 1% moisture, equal to the moisture content of furniture wood. It is therefore a precondition
                                                      of installation that the building is heated and dry. All windows and doors must be installed, all masonry work, pouring of
                                                      concrete and plastering must be completed well in advance of the parquet being installed. The room must be heated and
                                                      the relative humidity must not exceed 60 %. Temperature control must be maintained after the floor is installed, and relative
                                                      humidity must be below 60 %.


                                                      Floor Joists
                                                      Experience has shown that the joists twist slightly as the wood dries. This twisting can cause the joins at the ends of the
                                                      parquet to open. To avoid this happening, glue the end joins together in the tongue and groove. The joists are made ridged by
                                                      means of battening placed between the upper edges of the joists at a distance of approx. 150 cm.




3 - 06
 2-Strip
           PRECONDITION & INSTALLATION • BOEN 23 MM




                                                      Joining joists in a room, directly over underlying walls, must be carried out very carefully, so that deflection of the joists in
                                                      the one area does not affect the parquet in another area. This is done by trimming off the upper edges of the joists from the
                                                      middle of the wall and out to the edge. An alternative is to nail the joists together forming a totally ridged join.




                                                                   Bjelkeendene hugges            O     Momentsiv     X
                                                                                                  X     forbindelse   O
                                                                                                  O                   X




                                                      Heated Floors
                                                      We do not guarantee 23mm parquet when installed on joists with under floor heating.


                                                      Nails
                                                      For 23 mm parquet, use 2,5 x 65mm galvanised nails or 3,9 x 57 mm screws.


                                                      Post Installation Treatment
                                                      Boen Parquet is pre-finished with lacquer or oil. The lacquer is an AS-lacquer (anti-scratch), UV hardened and extremely scratch
                                                      resistant and durable. Post installation treatment is not required. If however, due to special circumstances it is necessary to
                                                      apply an extra coat of lacquer immediately, please contact us for further information. Parquet treated with oil is also UV
                                                      hardened, but oiled floors require more frequent maintenance than lacquered floors. We can recommend our cleaning and
                                                      maintenance products for the various surfaces. The best method for cleaning the floor is with a dry-mop or vacuum cleaner.
                                                      Should the floor require washing, limit the amount of water used. Do not allow water to dry on the surface of the parquet.
                                                      When maintaining untreated floors, use recommended products only.




                                                                                                                                                            www.boen.com
                                                                               J AT O B A
OAK




15 mm Boen Dutch Pattern                     OAK
                                                                               1.
                                                                                            60 cm
Installation Instructions for Residential Purposes

The flooring is laid in such a way that the transverse square in the second
row is positioned in the centre of the longitudinal strips in the first row.
                                                                               2.

1. Start by placing the first board against the wall with the groove facing
the wall and the tongue facing outwards. A 7 mm or 3/8" space should be
left between the floor and the walls. Use 7 mm or 3/8" wedges between
the walls and the flooring.                                                                                        3 - 07
                                                                               3.
2. Ensure that the first row is straight. Use a string to check this.
3. The second row is started by using the sawn off end from the first row.




                                                                                                                    Dutch Pattern
                                                                                                                                    PRECONDITION & INSTALLATION 15 MM
The length will need adjusting so that the transverse square lies in the
centre of the longitudinal strips in the first row.
4. When installing the floor using the "floating system" (i.e. not attached
                                                                               4.
to the sub-floor), place a bead of common wood adhesive along the full
length of the groove, both side and butt joints, placing the adhesive on the
full length of the upper side of the groove towards the hardwood flooring
surface. Use Boen adhesive.
5. Use the "Boen tapping tool" when driving the boards together. This tool
                                                                               5.
is specially designed to prevent damage to the edges. Wipe off excess
adhesive immediately with a damp cloth.
6. Cutting for pipes etc. must be large enough to allow the floor to move
freely. The opening should be covered with pipe-collars.
7. When using the "nail-down" method, place the nail at the base of the        6.
tongue at an angle of approx. 50o to the floor. Use a nailpunch to drive
the nails in completely.



                                                                               7.




                                                                                                    www.boen.com
                                                    15 mm Boen Dutch Pattern
                                                    Installation Instructions for Residential Purposes
                                                    Our quality controllers have graded and sorted the parquet. Should there be any doubt concerning grading and/or visible
                                                    defects, it is important that claims be made prior to the parquet being installed. Remember that the finished result is the
                                                    responsibility of the installer.

                                                    Climatic conditions.
                                                    Boen hardwood flooring is dried to 7 ± 1% moisture content, equal to the moisture content of furniture wood. It is therefore
                                                    a matter of course that the building is heated and dry. All windows and doors must be in place and all brick-work, rendering
                                                    and concreting completed well in advance of the parquet being installed. The room must be heated to a minimum of 10oC
                                                    with relative humidity below 60%. Ensure that the room is kept temperate after the parquet is installed and that relative
                                                    humidity remains below 60%.

                                                    Sub-flooring of chipboard, plywood and floor-boards.
                                                    The sub-floor must be dry, level and self-supporting. Approved sub-floors are 22mm chipboard, 19mm plywood or 21mm
                                                    floor-boards. When using the third alternative it is important that the parquet is installed at right angles. Diagonally installed
                                                    floor-boards and cleft floor boarding for use with under-floor heating systems must be 28mm thick. The moisture content of
                                                    the sub-floor must not exceed 12%. Any irregular sounds or faults in the sub-floor must be corrected before the parquet is
                                                    installed. One layer of builders’ paper or other suitable underlay should be laid between the sub-floor and parquet, to avoid
                                                    friction sounds.

                                                    Sub-flooring of reinforced concrete or light-weight concrete.
                                                    Concrete sub-floors must be level and devoid of cement lumps etc. The tolerance limit is ± 3mm per 2 running metres. The
                                                    relative humidity of the concrete must be below 90%. It is always necessary to lay a 0,20mm thick plastic foil on the concrete
                                                    to insulate against any remaining damp. In addition to this, a layer of builders’ paper or other suitable underlay should be laid
3 - 07                                              between the plastic foil and parquet.

                                                    Existing Floor Covering.
                                                    Floor coverings of linoleum, vinyl, plastic etc. do not need to be removed but a layer of builders’ paper should be laid between
 Dutch Pattern
                 PRECONDITION & INSTALLATION 15MM




                                                    them and the parquet. Thin, firm carpet e.g. needle felt is, in itself, a good underlay for parquet but for reasons of hygiene we
                                                    recommend that these be removed. All other types of carpet must be removed.
                                                    NB! Check that the sub-floor is level.

                                                    Under-Floor Heating.
                                                    There are various types of under-floor heating on the market, utilising both electricity and water. We are unable to cover indi-
                                                    vidual types, but a common factor for under-floor heating is that the heating effect must not exceed 60W/m2 and the surface
                                                    temperature of the floor must not exceed 27oC. The system must be thermostatically controlled and installed in such a way
                                                    that it produces an even output over the whole surface.
                                                    NB! It is important that rugs placed on the parquet do not have rubber or other dense materials on the under side, as this
                                                    isolates the heat under the rug and can damage the parquet.

                                                    Sound Proofing.
                                                    Sound is measured in decibel (db). It is necessary to differentiate between the sound made by footsteps and reverberation.
                                                    Stepping sound is the sound perceived (measured) in the room directly under the parquet. Reverberation is the sound in
                                                    the actual room. Building Authority requirements to curb stepping sounds in a building, consisting of several apartments, is
                                                    subject to special implementations. The quality, plus construction of a building along with its’ dimensions are all important
                                                    factors contributing to the final result. Consultants and architects should therefore be consulted.

                                                    Finishing Treatment.
                                                    The surface of Boen Parquet is pre-finished with lacquer or oil and does not require any immediate additional finishing treat-
                                                    ment. The AS-lacquer (anti scratch) is UV cured, extremely scratch resistant and very durable. The oil is also UV cured. Oiled
                                                    floors require more frequent maintence than lacquered floors. We recommend Boen maintenance products. The most effi-
                                                    cient method of cleaning the floor is to use a dry mop or vacuum cleaner. If it is necessary to wash the floor, it is important to
                                                    limit the use of water. Do not allow water to dry on the surface of the parquet.

                                                    NB: Other rules and regulations apply when treating/maintaining parquet in sports’ facilities, office buildings or other public
                                                    places. For further information please contact us.




                                                                                                                                                          www.boen.com
                                             MERBAU
BEECH




                                                                                 OAK




                                                                                                                      68 mm




                                                                                                                                      68 mm
10 mm Boen Prestige/12 mm Boen Traffic
Installation Instructions for Residential Purposes                                             476 mm                         68 mm




                                                                                                                                      68 mm
Construction.
This hardwood flooring is constructed in two layers. The top layer consists                          590 mm

of 4mm hardwood whilst the bottom layer consists of 6mm, 5-layered
plywood. The strips are prefinished with tongue and groove on all four          1. Long strip Brickbond       2. Long strip
sides.


Various methods of installation.                                                                                                              3 - 08
10mm 1-strip is available in two different lengths with the shorter length
being available in left and right hand versions for the installation of




                                                                                                                                               Prestige/Traffic
                                                                                                                                                                  PRECONDITION & INSTALLATION 10 MM/12 MM
patterned floors.
Dimensions and packaging are as follows:
1. 476mm x 68mm x 10mm – 26 left hand and 26 right hand strips per pack         3. Diagonal                   4. Herring-bone

(patterned floors)
2. 590mm x 68mm x 10mm – 52 strips per pack (long-strip floors)
3. 68mm x 68mm x 10mm decorative squares – 10 squares per pack.


These products offer a wide range of design possibilities when installing a
patterned floor. Prestige can be laid in a simple longstrip brick-bond design
as well as a chequer-board or classic herring-bone pattern. Additionally                                      6. Squares with decora-
the herring-bone pattern can be laid in a single, double or triple variation    5. Squares                    tive borders

diagonally or parallel to the wall. The decorative squares greatly increase
the scope of patterns. Further variations can be created by combining
a variety of hardwood species within the various installation patterns
available. Due to the low finished height, it can be combined with a
variety of adjoining flooring such as ceramic tiles or carpets.




                                                                                                                      www.boen.com
                                                              10 mm Boen Prestige/12 mm Boen Traffic
                                                              Installation Instructions for Residential Purposes
                                                              Installation guidelines.
                                                              Installation should be carried out in accordance with DIN standards ie: DIN 18365 "Working With Floor-coverings" and DIN
                                                              18356 "Working With Hardwood Flooring ". Tests have been carried out in conjunction with the adhesive manufacturers and
                                                              their recommendations must be followed when using proprietary, one-part waterbased or one/two-part polyurethane based
                                                              adhesives.

                                                              Sub-floor requirements.
                                                              Prestige can be adhered to any professionally installed and levelled sub-floor. This includes screed, concrete, chipboard and
                                                              plywood. The sub-floor must meet the usual requirements for the installation of any hardwood floor ie: it must be dry, level,
                                                              self supporting, clean and free from grease and dirt. After any necessary improvements have been made to the sub-floor the
                                                              hardwood flooring is ready for installation in accordance with appropriate standards and technical specification. Special care
                                                              must be given to the eveness of the sub-floor so as to avoid air pockets. For open pores in concrete sub-floors and other old
                                                              sub-floors, use BONABOND D500 or Thomsit R777. In the event of the sub-floor being uneven it should be levelled with an
                                                              appropriate levelling compound such as BONABOND H600, H620, H630 or Thomsit SL85 in accordance with the manufactur-
                                                              ers’ instructions for the use of such compounds.

                                                              Underfloor heating.
                                                              10mm prefinished hardwood flooring has a thermal conductivity of 0.07 W/m2 and is well suited for glueing to a sub-floor
                                                              containing underfloor heating. The heating effect must not exceed 60W/m2. The surface temperature of the hardwood floor-
                                                              ing should not exceed 27 0C/800F. The heating system must distribute heat evenly throughout the entire floor irrespective of
                                                              the heat setting. Carpets with backings made of insulating material must not be used on top of the hardwood floor. Concrete
                                                              sub-floors must be properly cured and dried. All the normal rules for the installation of hardwood flooring must be observed. If
                                                              in doubt please contact the manufacturer or their local representative for further information. Fluctuating air humidity can, in
3 - 08                                                        certain circumstances, cause splitting of the wood, especially where Beech and Maple are used due to the technical properties
                                                              of the species in question. Therefore it is important to ensure that an indoor temperature of between approximately 20-220C/
                                                              68-720F and a relative humidity of 55-66% are maintained.
 Prestige/Traffic
                    PRECONDITION & INSTALLATION 10 MM/12 MM




                                                              Use of adhesive.
                                                              The product must always be glued directly to the subfloor. The tongue and grooves of each board must NOT be glued. The
                                                              choice of adhesive is dependant on the type of subfloor and the conditions associated with the building’s construction. Only
                                                              adhesive that is specifically recommended for hardwood flooring should be used ie: adhesive containing a minimum of water
                                                              such as BONABOND 720, Thomsit P 618, BONABOND 770, or Thomsit P 625. Adhesive should be applied in accordance with the
                                                              manufacturers’ instructions. The area where adhesive is applied should be limited to the amount that can be worked in the
                                                              course of 10-15 minuttes.

                                                              Important installation instructions.
                                                              The strips, which are packed in polythene wrapping must be handled with care to avoid damage. During storage it is advis-
                                                              able to ensure a room temperature of approximately 180C/ 640F as large fluctuations in temperature can cause condensation
                                                              inside the packaging. Hardwood flooring is a natural, hygroscopic product and where the degree of humidity in the room is
                                                              high. This can lead to moisture being absorbed causing the hardwood to expand. For 72 hours before and after installation of
                                                              hardwood flooring the humidity level in the room must not exceed 65% and that the room temperature does not fall below 18
                                                              0C/640F. The surface temperature of the floor should be a minimum of 15 0C/ 580F. The strips, which are sealed in polythene
                                                              wrapping, should be stored in the room in which they are to be laid for at least 48 hours prior to opening. As a general rule, and
                                                              particularly in the case of a new building, the installation of the hardwood flooring should be one of the final processes. When
                                                              this is not possible, it is essential that the hardwood flooring is protected with a covering such as building paper, hardboard
                                                              or cardboard, until all work is completed.

                                                              Setting out - practical tips, expansion gaps at the walls.
                                                              The setting out of the floor must be carefully considered before beginning the
                                                              installation and this will depend on the type of pattern chosen. When choosing
                                                              the long-strip or brick-bond pattern it is an advantage to lay the strips lengthways
                                                              to take into account the angle of incidence of the main source of light. When
                                                              other patterns are chosen, installation should begin at the centre of the room; the
                                                              centre of the room should be determined by laying out guide strings from the four
                                                              corners of the room across the two diagonals of the room. It is essential that an
                                                              expansion gap of 8-10mm/ 1/3”-1/2” is left between the edge of the floor and all
                                                              walls and pillars etc. These gaps can be covered later with skirtings or mouldings
                                                              and/or filled with a flexible silicon-based seam sealer. To avoid what is known as
                                                              "curving" in larger rooms it is advisable to use a template during installation (see
                                                              diagram). To obtain a good final result it is very important to be precise in the
                                                              installation of the first row of strips. The strips are always laid into the adhesive
                                                              in front of the previous row and are pushed and rotated into place along the side
                                                              and butt of each strip.



                                                                                                                                                                                See next page




                                                                                                                                                                    www.boen.com
Installing long-strip and/or brick-bond pattern.
Using a straight-edged timber off-cut such as softwood batten or length of ply-
wood, mark off a guideline for installation, which should be a distance equivalent
to the width of 4-6 strips plus an expansion allowance of 8-10mm/1/3”-1/2”. Begin
laying along the wall with the tongue facing towards the wall whilst inserting
wedges to ensure an expansion gap of 8-10mm/ 1/3”-1/2” between the wall and
the first row of hardwood strips. Once the area between the wall and guideline
has been completed the expansion wedges should be removed. Further installa-
tion should continue only after the adhesive under this area of the floor has set
sufficiently, (refer to the adhesive manufacturer’s instructions/ recommendation).
When laying a patterned floor it is important that rows of either left or right had
strips are completed before commencing the next row. (This applies only to long-
strip patterns).

Installing brick-bond pattern diagonally.
For this type of pattern, installation must begin in the centre of the room, firstly
locate the diagonal centre of the room and screw, nail or glue a guide board along
the diagonal line. Commence installation along this board with the tongue facing
the board. Once the first half of the floor is complete remove the guide board. Once
the adhesive has set sufficiently, (refer to the adhesive manufacturer’s instructions),
commence laying of the remaining half of the room. To ensure a uniform floor
appearance when laying either lengthwise or diagonally it is advisable that the floor
is installed in a step fashion after laying the first 4-6 rows.

Installing herring-bone pattern.
Firstly fix some strips together, according to the chosen pattern – single, double or
triple herringbone, along the room’s centre line at the point close to the nearest
wall. After doing this stretch a guide string from the centre point of the room to                                              3 - 08
the apex of the pre-laid floor. This area of pre-laid floor will now act as a template
for the remainder of the installation. Once this area of the floor has adhered suf-
ficiently to the sub-floor, (refer to adhesive manufacturer’s recommendations),




                                                                                                                                 Prestige/Traffic
                                                                                                                                                    PRECONDITION & INSTALLATION 10 MM/12 MM
continue with the installation. NB: It is advisable to check the guide string occa-
sionally during installation.

Installing in square or chess-board pattern.
When installing in square/ chessboard pattern, 7 pieces of the 476mm strip will
form an exact square. To construct the next square, the strips must be rotated 90
degrees. Installation begins by setting out a guide string 476mm + 8-10mm/ 1/3”-
1/2” from the wall. Begin laying whole squares against the wall where the visual
effect is most critical. After marking a line along the floor, place guide boards as
shown, at a 900 angle. The laying starts from this corner and approx. 1,5 m2/ 5
sqft. should be laid at a time. This area of pre-laid floor will now act as a template
for the remainder of the installation. Once this area of the floor has adhered suf-
ficiently to the sub-floor, (refer to adhesive manufacturer’s recommendations),
continue with the installation.
NB: It is advisable to check the guide string occasionally during installation.

Squares incorporating decorative squares.
Installation is the same as for squares, but using the decorative squares
(68 x 68 mm) at the corners along with 476 mm strip, forming a frame around the
7-strip square.




Maintenance, cleaning and caring for your floor.
The 10mm 1-strip hardwood floor is factory finished using an environmentally friendly formaldehyde and toxin free acrylic
finish and therefore has a well protected surface. The surface is hygienic and is easy to clean by using a vacuum cleaner
and wiping with a damp cloth. The finish seals and protects the hardwood against dust and dirt. However the floor will be
exposed to wear depending on the amount of traffic to which it is subjected. Therefore it is necessary to maintain the floor
both before and during use in accordance with DIN standard 18356. Maintenance is carried out using a suitable hardwood
flooring cleaner or polish. With wood species such as: Beech or Maple or in the case of commercial installations a wax polish
is recommended eg. BonaKemi DD505, or BonaKemi Parkett Polish. Please ask your dealer for further advice on cleaning and
maintenance of your Prestige hardwood floor.




                                                                                                                www.boen.com
TRADITIONAL OAK




                                                                                H I STO R I CA L OA K
Solid Oak Plank                              ANTIQU E OAK                       1.

INSTALLATION OF PLANK ON ELASTILON®

Concrete sub-floors must be level and devoid of cement lumps etc. The
tolerance limit is ± 3 mm per 2 running metres. The relative humidity of
                                                                                2.
the concrete must be below 90 %. It is always necessary to lay a 0, 20 mm
thick plastic foil on the concrete to insulate against any remaining damp.
The ELASTILON® is then laid on top of the plastic foil.


1. Roll out the underlay crossways to the plank with the protected side up.                                            3 - 09
                                                                                3.
There must be no overlap.
2. Fold the protective plastic back approx. 50cm, so that the adhesive is




                                                                                                                        Solid Oak Plank
                                                                                                                                          PRECONDITION & INSTALLATION 20 MM
exposed.
3. Lay an extra (separate) double piece of plastic foil, covering the area of
exposed adhesive, with the fold towards the wall.
                                                                                4.
4. Lay the first rows of plank on the extra plastic foil. Remember to allow
a gap along all walls. The first 3 rows are glued in tongue and groove at
the short end. When the planks are aligned, pull the extra plastic foil
out so that the planks adhere to the self-adhesive surface of the actual
underlay.                                                                       5.
5. The next rows are laid on the original underlay of protective plastic,
which is pulled out little by little as new rows of plank are installed. If
necessary, the underlay can be straightened and stretched before the
protective plastic is pulled out and the planks adhere to the self-adhesive
underlay. This will contribute to all joins between the planks being tightly
closed.




                                                                                                        www.boen.com
                                                       Solid Oak Plank
                                                       INSTALLATION OF PLANK ON ELASTILON®
                                                       CLIMATIC CONDITIONS
                                                       Boen solid wood-flooring is dried to 7, 5 % (± 1 %) moisture content, equal to the moisture content of furniture wood. It is
                                                       therefore a matter of course that the building is heated and dry. All windows and doors must be in place and all brick-work,
                                                       rendering and concreting completed well in advance of the parquet being installed. The room must be heated to a minimum
                                                       of 15 o C with relative humidity below 60 %. Ensure that the room is kept temperate after the parquet is installed and that
                                                       relative humidity remains below 60 %.
                                                       Always store the parquet cartons in dry conditions and do not open them until just before use.

                                                       ELASTILON® is used when installing solid wood flooring on concrete sub-floors, when a floating floor is required. Solid wood
                                                       flooring can not be installed as a floating floor by gluing in the tongue and groove, but must be attached to the sub-floor. The
                                                       planks are then attached to the underlay and retain their properties as a floating floor.


                                                       SOLID WOOD PLANK
                                                       20mm plank in solid wood is manufactured in widths of 137mm, 162mm and 187mm and in 3 various types; Traditional, Antique
                                                       and Historical.

                                                       Traditional comes ready planed and filled. It must therefore be sanded and oiled after installation.

                                                       Antique comes ready filled and sanded. A dark stain has also been applied, but after installation the floor needs treating with oil.

                                                       Historical comes ready filled/plugged, sanded and dark stain applied, but must be treated with oil after installation.

                                                       When Antique and Historical are sanded, it is done in such a way that the floor takes on an “olde world look”, with a slightly
3 - 09                                                 uneven surface.

                                                       Solid wood plank must not be glued in the tongue and groove to make a “floating floor”. It must be attached to the sub-
 Solid Oak Plank
                   PRECONDITION & INSTALLATION 20 MM




                                                       floor by means of adhesive, nailing or screwing. When using nails/screws the plank must be pre-drilled to avoid the tongue
                                                       from splitting. When installing the floor floating, the solution is to use ELASTILON®, a self-adhesive underlay (see installation
                                                       instructions).




                                                                                                                                                                 www.boen.com
                                         ACCESSORIES
                                4 - 01




                                         Products




                                                                                                                              www.boen.com
     B O E N R E PA I R K I T            ADHESIVE                                    TO O LS        ”LITTLE NILSEN”
                  LAQUER                            OIL                OIL FRESHEN UP            PA R Q U E T C L E A N E R
ALUMI N I UM SKI RTI NG                     SKI RTI NG    S TA I R N O S E S & R E D U C E R S          DECOR LI N ES
                                                 Field of application                      Water vapour resistance
                                                 Cell-Aire combi-underlay is used          The water vapour resistance of
                                                 under parquet and plastic laminated       Cell-Aire combi-underlay has been
                                                 flooring in order to reduce impact        measured to 290 x 109 m2sPa/kg
                                                 sound from footstep, to prevent           by type-testing on fresh material.
                                                 unacceptable influence of moisture,       For comparison, the vapour barrier
                                                 to contribute to levelling of the         resistance through a 0,2 mm stan-
                                                 substructure, and to form a sliding       dard sheet of polyethylene (building
                                                 layer. Figure 1 illustrates the use.      quality) is 450 x 109 m2sPa/kg.

                                                                                                           Tearing strength
                                                                                                           The tearing strength,
                                                                                                           measured in accor-
                                                                                                           dance with ASTM
                                                                                                           D1938-85 on fresh
                                                                                                           material is 18 N per-
                                                                                                           pendicular and 12 N
                                                                                                           parallel to the pro-
                                                                                                           duction direction.

                                                                                                           Durability
                                                                                                           The water vapour
                                                                                                           resistance and the
                                                                                                           tearing strength
                                                                                                           have been examined
                                                                                                           after thermal age-
                                                                                                           ing at 90 oC in 24
                                                                                                           weeks according

                                                 A damp proof layer must be used
                                                                                                           to SP-method 0414
                                                                                           "Plastic-accelerated ageing in alka-
                                                                                                                                     4 - 05
                                                 between parquet or laminated plas-        line environment", 3. edition, 1992.
                                                 tic flooring and concrete floors with     This is assumed to correspond to




                                                                                                                                      Parquet underlay
                                                                                                                                                         ACCESSORIES
                                                 excessive moisture content. In floors     approx. 50 years of natural ageing.
Cell-Aire combi-underlay consists of 3 mm        where sound insulating properties         The changes in the water vapour
expanded polyethylene with density 30 kg/        are required according to the nation-     resistance and the tearing strength
m3, laminated by heat to a 0,1 mm sheet of       al building regulations of 1987 a         of a fresh product are small, and
polyethylene (PE). Cell-Aire combi-underlay is   sound-damping layer under parquet         have no practical implications.
                                                 or laminated plastic flooring must
made with a 70 mm protruding polyethylene
                                                 be used.                                  4. Special conditions of use and
film along one edge for overlap joints.                                                    installation
                                                 3. Properties                             Cell-Aire combi-underlay shall be
Cell-Aire combi-underlay is delivered in rolls   Sound insulation properties               layed with the side of the plas-
of 1 m width and 50 m length.                    A weighted reduction of impact            tic sheet downwards. Irregularities
The tolerances are 2 %.                          sound pressure level Lw = 17-19 dB        in the supporting floor levelling
                                                 has been measured in the labora-          should not exceed 2 mm over a
                                                 tory for massive concrete floors          measuring length of 1 m and 3 mm
                                                 with 7-15 mm parquet/laminated            over a measuring length of 2 m in
                                                 plastic flooring on the underlay. This    accordance with NS 3420 (tolerance
                                                 means that standard heavy floor           class 2 in table T6:a or tolerance
                                                 substructures (180mm concrete             class 1 in table Q:b), or in accordance
                                                 slabs, 265 mm hollow-core concrete        with Building Research Design
                                                 decks etc.) normally will fulfil the      Sheet 541.505. Other irregularities
                                                 requirements in the building regu-        in the supporting floor surface like
                                                 lations concerning impact sound           small toppings etc. is taken up by
                                                 insulation between dwellings (L'nw        the underlay. The supporting floor
                                                 58 dB) when parquet/laminated             shall be cleaned before installation
                                                 plastic flooring are layed on Cell-       of the underlay.
                                                 Aire combi-underlay.
                                                                                           Cell-Aire combi-underlay shall be
                                                 The top flooring causes a small           installed with overlap joints by the
                                                 reduction in the order 1 to 3 dB of the   use of the protruding polyethylene
                                                 airborne sound insulation. However,       film at the edge. For slabs on the
                                                 floors with heavy substructures as        ground substructures with a per-
                                                 described above will normally sat-        manent high moisture content it is
                                                 isfy the requirements in the build-       recommended to tape the joints. It
                                                 ing regulations concerning airborne       is also recommended that the Cell-
                                                 sound insulation between dwell-           Aire combi-underlay is folded up
                                                 ings (R'w 52dB).                          against the walls.

                                                 For light-weight floors special sound
                                                 insulation measures must be taken
                                                 in addition in order to fulfil the
                                                 requirements.




                                                                                                                www.boen.com
                                               Preparation/application
                                               Parquet Adhesive is specially
                                               formulated for gluing engineered
                                               hardwood flooring. Room temp:
                                               +180C 1. Place a bead of adhe-
                                               sive along the full length of the
                                               grooves, bott side and end groove
                                               joints tightly together. 2. Use
                                               the «Boen tapping tool» when
                                               driving the boards together.
                                               3.Adhesive squeezed up onto
                                               the flooring surface, is easily
                                               removed by a damp cloth. This
                                               has to be done immedieately
                                               after installation. Consume:
                                               20-25 m2 per bottle. Keep from
                                               freezing.

                                               Product info
                                               Consumtion 20-25 m2 per bot-
                                               tle. Shelf life/storage 2 years.
                                               Maintain good industrial hygien-
                                               ic standard. Keep from freezing.

                                               Safety
                                               The product is not classified as
                                               hazardous to health.
                                                                                                  4 - 06
                                               Contact to eyes: Rinse with
                                               water.




                                                                                                   Parquet adhesive
                                                                                                                      ACCESSORIES
                                               Skin contact: Wash with soap
Parquet Adhesive is specially formulated for
                                               and water.
gluing engineered hardwood flooring




                                                                                   www.boen.com
                                               Sealed floors
                                               -Boen Refresher
                                               Application:
                                               The floor must be free from polish,
                                               wax and other contamination prior
                                               to treatment. Apply a thin coat of
                                               Boen Refresher using a clean, soft
                                               and lint-free cloth or sponge. Boen
                                               Refresher must not be thinned with
                                               water. Let the floor dry for 30 min-
                                               utes before replacing furniture and
                                               carpets. The use of felt cushions on
                                               furniture is recommended to avoid
                                               unnecessary wear.

                                               Maintenance:
                                               Flooring treated with Boen Refresher
                                               should be kept clean by vacuum
                                               cleaning, dry mopping or mopping
                                               with a mop or cloth, well wrung
                                               in lukewarm water. Boen Cleaner
                                               or other neutral detergent may be
                                               added to the water used for clean-
                                               ing. Note that alkaline detergents
                                               may remove the Boen Refresher.

                                               In domestic use, re-apply Boen
                                               Refresher once or twice a year                        5 - 01
                                               depending on wear. Re-apply as
                                               required on flooring with higher




                                                                                                      Sealed floors
                                                                                                                      MAINTENANCE
                                               wear. Boen Refresher is also well
                                               suited to spot maintenance.
Boen Refresher is a product designed for
periodic maintenance of varnished parquet
                                               Note:
and wooden flooring. The product will fresh-
                                               Unlike flooring treated with other
en up aged and matt varnish, will protect
                                               polishes and waxes, flooring
the varnish and provide a glossy and wear
                                               treated with Boen Refresher can be
resistant finish.
                                               re-varnished. Clean the floor with
                                               Boen Cleaner, rub down lightly
                                               with grade 120 - 150 sanding paper,
                                               remove sanding dust and apply new
                                               Boen Varnish.




                                                                                      www.boen.com
                                               Sealed floors
                                               -Boen Cleaner
                                               Product description:
                                               Boen Cleaner is a cleaning agent
                                               developed for use on parquet, wood
                                               and other lacquered surfaces.

                                               Application:
                                               Wood and other lacquered flooring
                                               can be affected by water, so a well-
                                               wrung cloth/mop is recommended
                                               when cleaning. Measure: Normal
                                               daily cleaning: 25ml to 5 litres water.
                                               Badly marked floor: 50 ml to 5 litres
                                               water.

                                               Technical Specifications:
                                               pH Values: Concentrated, approx. 10
                                               working solution in water (0,5%),
                                               approx. 8. Content: Anionic and
                                               non-ionic tensides, chelating agents
                                               (complex builders), and glycoethers.
                                               Shelf life –At least 2 years from date
                                               of production, in original unopened
                                               container.


                                                                                                        5 - 02




                                                                                                         Sealed floors
                                                                                                                         MAINTENANCE
Boen Parkett Cleaner is a neutral detergent,
pH approx. 8, designed specifically for use
on sealed wooden floors and melamine
laminate floors.




                                                                                         www.boen.com
                                                  Oiled floors
                                                  -Boen Floor Soap
                                                  Range of Use:
                                                  Boen Floor Soap is used to clean oil
                                                  treated parquet and wood floors,
                                                  plus other oiled woodwork.

                                                  Cleaning:
                                                  For daily cleaning of oil treated
                                                  floors, a dry cleaning method is
                                                  recommended using a dry mop or
                                                  vacuum cleaner. If it should be nec-
                                                  essary to wash the floor, add max. 1
                                                  capful of Boen Floor Soap per. litre
                                                  water, for cleaning factory finished
                                                  ready oiled parquet (UV oil). Use a
                                                  well wrung cloth and avoid water
                                                  spillage on the floor.
                                                  Boen Floor Soap is suitable for
                                                  cleaning/maintenance of all other
                                                  types of oiled – caustic treated or
                                                  soap scrubbed floors, using a con-
                                                  centration of 1 litre of soap to 10-20
                                                  litres of warm water.

                                                  Technical Specifications:
                                                  Storage temperature must be in
                                                  excess of 5oC. Shelf-life is approx.                    5 - 03
                                                  5 years in unopened packaging. Ph.
                                                  value 9-10.




                                                                                                           Oiled floors
                                                                                                                          MAINTENANCE
Boen Floor Soap is made of light, pure veg-
etable oils and natural waxes. The soap is
effective for cleaning oiled floors. It is also
available in WHITE, with added white pig-
ments which are suitable for white oiled
floors. Boen Floor Soap is a pure and envi-
ronmentally correct product and does not
contain solvents.




                                                                                           www.boen.com
                                               Oiled floors
                                               -Boen Freshen up
                                               Range of Use:
                                               Boen Oil Freshen Up is used espe-
                                               cially for factory finished ready oiled
                                               parquet (UV oil).

                                               Instructions for Use:
                                               Shake the tin and apply a thin
                                               coat of Boen Oil Freshen Up with
                                               a sponge or cloth. After 30-60 min-
                                               utes drying time the floor is ready
                                               for use.

                                               Cleaning:
                                               The floor should be cleaned pref-
                                               erably with the use of a dry mop
                                               or vacuum cleaner. When neces-
                                               sary the floor can be washed with
                                               Boen Floor Soap. Use a well wrung
                                               cloth and avoid water spillage on
                                               the floor.

                                               Maintenance:
                                               A refresher coat can be applied
                                               when required, depending on wear
                                               and tear. It is difficult to state how
                                               often the floor should be treated,                       5 - 04
                                               but the rule of thumb is one coat
                                               annually in private homes. Areas of




                                                                                                         Oiled floors
                                                                                                                        MAINTENANCE
                                               public use should be maintained 3-
                                               5 times annually, according to need.
Boen Oil Freshen Up is based on acrylic wax
together with natural bee and palm wax.
                                               Technical Specifications:
The product does not contain solvents and
                                               Use approx. 1 litre/100m2. Shake
is also available in WHITE (white pigments),
                                               before use. Storage temperature
suitable for white oiled floors.
                                               must be in excess of 5oC. Shelf-life
Boen Oil Freshen Up gives excellent protec-
                                               is approx. 5 years in unopened pack-
tion against dirt and moisture.
                                               aging. Ph. value 8 - 9.
                                               Contents: Acrylic wax, bee and palm
                                               wax, emulsifier and water. WHITE:
                                               Acrylic wax, bee and palm wax, tita-
                                               nium dioxide, emulsifier and water.




                                                                                         www.boen.com

				