                                            Northwest Power and Conservation Council
                      POWER PLANT DEVELOPMENT ACTIVITY IN THE PACIFIC NORTHWEST 2002 - Present
                                                                  10/01/10



ANewProj
                         Project        NWPCCI    EIA Plant     FERC Docket     Technology     Primary Fuel   Alternate Fuel
                                          D       Code/Unit         No.

                        PROJECT         NWPCCID    EIAGC               PID            TECH         PriFuel       AltFuel
993 Hydroelectric                          1681                               HY             WAT
Adage Mason County                         1957                               ST             WW
Admiralty Inlet Pilot Tidal Project        1682                    P-12690    TISEC          Tidal current


A-Drop                                     1940                    P-12549    Canal          WAT

Agate Passage                              1683                    P-12691    TISEC          Tidal current
Alkali                                     1684                               WT             WND
American Falls                             1685                               WT             WND
Antelope Ridge                             1869                               WT             WND

Applegate                                  1686                    P-11910    HY             WAT
Arrow Rock                                 1687                               WT             WND
Arrowrock 1 - 2                            1688                     P-4656    HY             WAT

Baseline                                   1946                               WT             WND
Bear River Narrows                         1691                    P-12486    HY             WAT

Bellevue Solar                             1960                               PV             Solar
Big Horn II                                1901                               WT             WND
Big Sky West Dairy Digester                1693                               BGICCG         AW




                                                              Page 1
                                                 Projects


Biglow Canyon Phase II                 1694                     WT      WND
Biglow Canyon Phase III                1695                     WT      WND
Black Rock                             1696                     PS      Elect.


Box Canyon Upgrade                     1964   3891      2042    HY      WAT

BP Cherry Point Cogeneration Project   1697                     CCCG    NG/RG

Bradwood                               1698                     CCCG    NG
Burley Butte                           1699                     WT      WND

Camp Reed                              1885                     WT      WND

Carty Generating Station 1             1892                     CC      NG
Carty Generating Station 2             1893                     CC      NG
Cascade Pacific                        1958                     RBCG    BL
Cascade Wind                           1702                     WT      WND
Cassia                                 1871                     WT      WND
Cassia Gulch                           1902                     WT      WND
CCG 500                                1703                     IGCC    COL

Cedar Creek                            1704                     WT      WND
Cedar Hills Landfill                   1705                     CC      LFG

Chester Diversion                      1706           P-11879   ROR     WAT
China Hollow                           1707                     WT      WND
China Mountain                         1708                     WT      WND
Clark Canyon                           1710           P-12429   HY      WAT
Coastal Energy                         1917                     WT      WND
COB Energy Facility                    1713                     CC      NG

Collins Pine                           1715                     STCG    WW
Columbia Ridge Landfill                1716                     IC      LFG
Columbia River Energy                  1717                     GT      NG
Columbia Tidal Energy Project          1718           P-12672   TISEC   Tidal current
Combine Hills II                       1719                     WT      WND



                                                 Page 2
                                                      Projects


Connell's Prairie (White River Project)        1720        P-2494B   HY            WAT

Coos Bay OPT Wave Park                         1721        P-12749   WEC           Wave

Coos County Wave Energy Project                1722        P-12752   WEC           Wave
Cotterel                                       1723                  WT            WND
County Line                                    1724        P-12071   HY            WAT
Coyote Crest                                   1894                  WT            WND

Crump Geyser                                   1929                  GE            GST

Culbertson Generating Station                  1897                  GT            NG
Cushman New Powerhouse                         1896                  HY            WAT
Cut Bank                                       1727                  WT            WND
Deception Pass Tidal Energy Project            1729        P-12663   TISEC         Tidal current
Desert Claim                                   1730                  WT            WND


Diamond Willow Expansion                       1731                  WT            WND
Dorena Lake Dam                                1732        P-11945   HY            WAT

Double B Dairy                                 1935                  BGICCG        AW
Douglas County Wave and Tidal Energy Project   1733        P-12743   WEC           Wave
Echanis                                        1734                  WT            WND
Echo Wind Farms                                1680                  WT            WND
Emmett                                         1168                  ST            WW

Enloe                                          1948        P-12569   ROR R w/Div   WAT


EnviroDyne                                     1735                  IC            NG/FO
Esquatzel Power                                1736        P-12638   HY            WAT
Farm Power Lynden                              1936                  BGICCG        AW
Farm Power Rexville                            1676                  BGICCG        AW
Farm Power Tillamook                           1945                  BGICCG        AW
Fighting Creek Landfill                        1922                  IC            LFG
Flathead County Landfill                       1880                  IC            LFG



                                                      Page 3
                                                          Projects


Flint Creek                                        1947        P-12107   ROR R w/Div   WAT


Frederickson Power 2                               1743                  CC            NG
Frenchman Hill                                     1903                  WT            WND
Frenchmans Ridge                                   1925                  WT            WND
Giiwas Green                                       1747                  BGICCG        WW
Glacier Wind Energy II                             1748                  WT            WND

Golden Hills                                       1749                  WT            WND

Golden Sunlight                                    1750                  WT            WND
Golden Valley                                      1751                  WT            WND

Goodnoe Hills West                                 1752                  WT            WND
Gordon Ridge                                       1753                  WT            WND
Goshen North (Goshen II)                           1754                  WT            WND

Goshen South (Wolverine Canyon)                    1755                  WT            WND
Grand View Solar PV One                            1949                  PV            Solar
Grays Harbor Energy Facility (Satsop) (Phase II)   1895                  CC            NG
Great Falls Energy Center (CC Plant)               1757                  CC            NG


Great Falls Energy Center (Peaking Plant)          1758                  Unknown       NG
Greenfield                                         1941        P-12548   Canal         WAT

Guemes Channel                                     1761        P-12698   TISEC         Tidal current
H.W. Hill (Roosevelt Biogas) Expansion             1917                  CC            LFG
Harlowton                                          1923                  WT            WND

Harvest Wind                                       1763                  WT            WND

Hebgen Dam                                         1764        P-11882   HY            WAT
Helix Wind Energy Facility                         1765                  WT            WND




                                                          Page 4
                                                        Projects


Highwood (coal)                          1766                          FBST      COL



Highwood Generating Station GT 2 & STG   1927                          CC        NG

Highwood Generating Station GT I         1767                          SC        NG

Highwood Wind                            1768                          WT        WND

Hoctor Ridge                             1769                          WT        WND
Horn Butte                               1931                          WT        WND
Idaho Valley Energy                      1772                          ST        COL
Imrie                                    1884                          WT        WND
Johnson                                  1942                P-12545   Canal     WAT

Jordan Cove                              1773                          CCCG      NG

Judith Gap Expansion                     1774                          WT        WND
Juniper Canyon I                         1954                          WT        WND

Juniper Canyon II                        1955                          WT        WND

Juniper Ridge                            1879                          Conduit   WAT
Kittitas Valley                          1776                          WT        WND




Klamath Cogeneration (Upgrade)           1290 55103/CT1-CT2,ST1        CC        NG
Klamath Falls Bioenergy                  1928                          ST        WW
Klamath Generating Facility              1777                          CC        NG

Kulzer Bioenergy Park                    1912                          BGCG      WW

Lakeview Cogeneration                    1944                          STCG      WW



                                                        Page 5
                                             Projects


Langley Gulch                         1778                  CC      NG

Lava Beds                             1779                  WT      WND

Leaning Juniper IIa                   1780                  WT      WND
Leaning Juniper IIb                   1905                  WT      WND
Linden Ranch                          1882                  WT      WND

Little Wood River Ranch II            1782        P-12063   HY      WAT

Longview Fibre Expansion              1919                  STCG    WW


LOTT WWTP                             1329                  ICCG    WG

Lower Columbia Clean Energy Center    1783                  IGCC    COL

Lower Snake River Balance             1785                  WT      WND

Lower Snake River Phase I             1900                  WT      WND
Lower Turnbull Drop                   1786        P-12597   Canal   WAT
Lund Hill                             1956                  WT      WND

Magic Wind                            1787                  WT      WND
Makah Bay Wave Energy Pilot Project   1788        P-12751   WEC     Wave


Martinsdale (Horizon)                 1790                  WT      WND
Mary Taylor Drop                      1793        P-12550   HY      WAT
Mason Dam                             1794        P-12686   HY      WAT

Mill Coulee Drops                     1796        P-12599   Canal   WAT
Mill Creek Generating Station         1797                  GT      NG/FO

Miller Ranch (Northwest Wind)         1904                  WT      WND
Milner Dam                            1798                  WT      WND




                                             Page 6
                                                          Projects


Montegue                                           1906                  WT      WND
Narrows Tidal Energy Project                       1800        P-12612   TISEC   Tidal current
Neal Hot Springs                                   1801                  GE      GST



Nelson Creek (Lignite) 1 & 2                       1803                  ST      LIG

Newberry Geothermal Project (Military Pass Road)   1805                  GE      GST


Nine Mile Rehab & Upgrade                          1930        P-2545B   ROR     WAT
Nippon Paper Industries                            1913                  STCG    WW

Norris Hill                                        1808                  WT      WND
Norris Hill Wind Project                           1809                  WT      WND
Notch Butte                                        1810                  WT      WND

OIT Geoheat Center                                 1811                  GE      GST

Ontario Power Project                              1812                  GTCG    NG
Oregon State University Energy Center              1673                  GTCG    NG
Oregon Trail                                       1813                  WT      WND

Outback Solar I                                    1907                  PV      Solar
Outback Solar II                                   1908                  PV      Solar
Outback Solar III                                  1909                  PV      Solar
Pacific Mountain Energy Center                     1814                  IGCC    PC/COL/NG

Palouse                                            1952                  WT      WND
PaTu                                               1953                  WT      WND
Payne's Ferry                                      1886                  WT      WND

Pebble Springs (Leaning Juniper II North)          1427                  WT      WND
Pilgrim Stage Station                              1815                  WT      WND

Pine Ridge                                         1924                  WT      WND



                                                          Page 7
                                        Projects


Ponderosa                        1841        P-13470   Conduit      WAT

Pristine Springs No. 3           1817        P-12144   HY (Canal)   WAT
ProLogis II                      1922                  PV           Solar

Quin                             1898                  WT           WND
Radar Ridge                      1818                  WT           WND
Raft River Phase II              1819                  GB           GST

Rainbow Redevelopment            1821                  HY           WAT


Reedsport OPT Wave Park          1822        P-12713   WEC          Wave

Rich Passage                     1823        P-12688   TISEC        Tidal current
Rickreall Cow Power              1824                  BGIC         AW
Rim Rock                         1891                  WT           WND


Riverbend Landfill               1916                  IC           LFG
Rock Creek Dairy                 1933                  BGICCG       AW

Rock Creek Wind Power Facility   1959                  WT           WND



Rockland                         1962                  WT           WND
Roundup                          1825                  IGCC         COL


Saddle Butte Wind Park           1889                  WT           WND
Saddle Mountain                  1910                  WT           WND
Salmon Falls                                           WT           WND

Salt River                       1497        P-10927   Diversion    WAT
Salt River                       1497        P-10927   HY           WAT
San Juan Channel                 1827        P-12692   TISEC        Tidal current



                                        Page 8
                                                   Projects


Sawtooth                                 1897                      WT       WND
Schwendiman                              1828                      WT       WND
Seattle Steam                            1899                      GTCG     NG
Senaca Sawmill                           1870                      STCG     WW
Shepherds Flat Central (South Hulburt)   1877                      WT       WND

Shepherds Flat North (North Hulburt)     1830                      WT       WND

Shepherds Flat South (Horseshoe Bend)    1878                      WT       WND

Shoshone Falls Upgrade                   1831                      HY       WAT

Simpson Tacoma Cogeneration              1513                      RBSTCG   BL/WW



Snoqualmie Falls Redevelopment           1963   3860   P-2493 A & B HY      WAT


Spieden Channel                          1832            P-12689   TISEC    Tidal current
Stahlbush Island Farms                   1883                      BGIC     AW
Star Point                               1881                      WT       WND
Stateline 3                              1836                      WT       WND

Stayton                                  1547            P-12574   HY       WAT
Sumas Compressor Station                 1414                      GTCG     NG


Sumas Energy 2                           1838                      CC       NG

Summit Ridge                             1839                      WT       WND
Summit/Westward                          1840                      CC       NG


Sunergy                                  1932                      PV       Solar
Swager Farms                             1934                      BGICCG   AW




                                                   Page 9
                                                           Projects


Swan Lake North                                     1950        P-13318   PS      Elect.


Swanson Group Roseburg (ex Sun Studs)               1842                  STCG    WW
Teanaway                                            1890                  PV      Solar
Teton Ridge                                         1844                  WT      WND
Thousand Springs                                    1846                  WT      WND

Three Mile Canyon Wind Farm                         1847                  WT      WND
Tiger Ridge                                         1926                  WT      WND
Tuana Gulch                                         1849                  WT      WND

Tuana Springs (Cassia Gulch Expansion)              1888                  WT      WND
Tuolumne (Windy Point, Windy Point/Windy Flats I)   1677                  WT      WND

Twin Buttes (Reardan)                               1851                  WT      WND


Upper Turnbull Drop                                 1853        P-12598   Canal   WAT
Valley County                                       1854                  WT      WND
Vansycle Wind Energy Center II                      1919                  WT      WND
Vantage Wind Project                                1855                  WT      WND

Wallula Energy Resource Center                      1857                  IGCC    COL

Wanapa Energy Center                                1858                  CC      NG

Warm Springs Upgrade & Expansion                    1859                  STCG    WW

West Butte                                          1921                  WT      WND

Wheat Field                                         1640                  WT      WND
Whistling Ridge                                     1863                  WT      WND
Whitehall                                           1911                  WT      WND
Wibaux                                              1920                  WT      WND
Wickiup Dam                                         1951        P-12965   RoR     WAT




                                                           Page 10
                                                  Projects


Wild Horse Expansion                       1864                  WT      WND


Willow Creek                               1655                  WT      WND

Windy Flats (Windy Point/Windy Flats II)   1866                  WT      WND
Windy Point/Windy Flats III                1918                  WT      WND
Withrow                                    1867                  WT      WND
Woods                                      1943        P-12540   Canal   WAT

Yahoo Creek                                1887                  WT      WND

Yamhill Solar                              1961                  PV      Solar
Youngs Creek                               1868        P-10359   HY      WAT
Zoot Enterprises                           1671                  FC      NG




                                                  Page 11
                                                                                   Projects


                                   Included:
                                    Projects announced or terminated within past five years.
nt                                  Projects under construction or placed into service within the previous calendar year.
                                    Projects with Notice of Intent or filed applications for FERC licenses or exemptions, or site certificates.
                                    Projects with site certificates, FERC licenses or exemptions and county permits (where known).
                                   Incremental capacity and energy shown for upgrades to existing projects.



     Resource Type   Installed      Dependable       Average       Plot status            Service     Service                         Site
                     Capacity        Capacity        Energy                               Month        Year
                       (MW)                           (MWa)
         PRRES        InstMW          DepMW            MWA          PLSTAT                 SMO        SYEAR                      LOC
     Hydro                   1.5                           0.7 Terminated                                       North Gooding Main Canal
     Biomass                60.0                               Proposed                                         Shelton
     Hydrokinetic            1.0                           0.1 Planned                                     2012 Admiralty Inlet


     Hydro                  1.0                              0.3 Proposed                                         Greenfield Main Canal A-Drop

     Hydrokinetic          52.0                             16.7 Terminated                                     Agate Passage
     Wind                  18.0                              5.4 Terminated                                     Glenns Ferry
     Wind                  81.0                                  Proposed                                       American Falls
     Wind                 300.0                             90.0 Proposed                                  2011 Craig Mountain

     Hydro                 10.0                              4.3 Proposed                                       Applegate R.
     Wind                  19.5                                  Proposed                                       Oka
     Hydro                 15.0                              9.3 Operating              Jun                2010 Boise R.

     Wind                 500.0                           167.0 Proposed                                          Olex
     Hydro                  7.0                             0.6 Proposed                                          Bear R.

     Solar                  1.7                                  Planned                Jul                2011 Bellevue
     Wind                  50.0                                  Planned                Dec                2010 Bickleton
     Biomass                1.5                              1.1 Operating              Feb                2009 Gooding




                                                                                   Page 12
                                                     Projects


Wind            149.5                 Operating          Aug    2009 Wasco
Wind            174.8                 Operating          Sep    2010 Wasco
Pump Storage    338.0                 Proposed                       Black Rock Valley


Hydro            18.0             2.4 Construction       Mar    2013 Pend Oreille R.

Natural gas     720.0                 Proposed                       Blaine (Cherry Point Refinery)

Natural gas     130.0                 Proposed                       Bradwood
Wind             10.5                 Construction       Sep    2010 Burley

Wind             22.5                 Construction       Sep    2010 Hagerman

Natural gas     450.0                 Proposed                       Boardman
Natural gas     450.0                 Proposed                       Boardman
Biomass          10.0                 Proposed                       Halsey
Wind             60.0                 Terminated                     The Dalles (vicinity)
Wind             10.5                 Operating          Feb    2009 Hagerman
Wind             18.9                 Operating          Feb    2009 Hagerman
Coal            520.0                 Terminated                     Pocatello

Wind                                  Proposed                       Firth
Biomass          26.0                 Terminated                     Cedar Hills Regional Landfill

Hydro             3.3             1.9 Construction       Apr    2011 Henry's Fork
Wind              1.5                 Proposed                       Rufus (vicinity)
Wind            425.0                 Proposed                       Jackpot
Hydro             3.0             0.5 Proposed                       Beaverhead R.
Wind              6.0                 Construction                   Grayland
Natural gas    1150.0   1150.0        Terminated                     Bonanza

Biomass          13.0                 Proposed                       Lakeview
Biomass           6.4                 Operating          Dec    2009 Columbia Ridge Landfill
Natural gas      42.7                 Terminated                     Goble
Hydrokinetic    163.0                 Proposed                       Columbia R. estuary
Wind             63.0            21.4 Operating          Jan    2010 Milton Freewater (vicinity)



                                                     Page 13
                                                 Projects


Hydro           14.0          6.9 Proposed                       Lake Tapps flume

Hydrokinetic   100.0         35.0 Proposed                       Coos Bay

Hydrokinetic   100.0         20.0 Proposed                       Bandon
Wind           200.0              Proposed                       Cotterel Mountain
Hydro            1.0          0.1 Terminated                     N. Gooding Main Canal
Wind           120.0              Proposed                       Doty

Geothermal      40.0              Proposed                       Adel

Natural gas     91.0              Operating          Aug    2010 Culbertson
Hydro            3.6          2.7 Proposed                       Skokomish R. N. Fk.
Wind           180.0              Proposed                       Cut Bank (vicinity)
Hydrokinetic     2.8              Proposed                       Deception Pass in Puget Sound
Wind           190.0              Proposed                       Reeser Ck (Ellensburg)


Wind            10.5              Operating          Jun    2010 Baker
Hydro            8.3   3.8    2.0 Proposed                       Row R.

Biomass          2.0          0.9 Planned            Dec    2012 Murtaugh
Hydrokinetic     2.0              Terminated                     Umpqua R.
Wind           104.0              Proposed           Nov    2010 Steens Mountain
Wind            64.5              Operating          Jul    2009 Echo
Biomass         17.5              Suspended                      Emmett

Hydro            9.0   1.1    5.1 Proposed                       Similkameen R.


Natural gas     13.0              Proposed                       Wendell
Hydro            0.9          0.1 Proposed                       Esquatzel Canal
Biomass          0.8              Construction              2011 Lynden
Biomass          0.8              Operating          Sep    2009 Rexville
Biomass          0.8              Proposed                       Tillamook
Biomass          3.2              Proposed                       Fighting Creek Landfill
Biomass          1.6          1.0 Operating                 2009 Kalispell



                                                 Page 14
                                           Projects


Hydro            2.0    1.1 Proposed                        Flint Cr. @ Georgetown Lk Dam


Natural gas    280.0        Terminated                     Frederickson
Wind           200.0        Proposed                       Jordan Valley (vicinity)
Wind           145.0        Proposed                       Montegue vicinity
Biomass          8.0        Proposed                       Chiloquin vicinity
Wind           103.5   35.4 Operating          Oct    2009 Cut Bank

Wind           400.0        Proposed                        Wasco

Wind            15.0        Proposed                       Whitehall
Wind            10.5        Construction       Dec    2010 Burley

Wind            56.0   18.0 Terminated                     Goodnoe Hills
Wind            10.0        Proposed                       Rufus (vicinity)
Wind            90.0        Construction       Oct    2010 Idaho Falls (vicinity)

Wind           450.0        Proposed                       Blackfoot
Solar           20.0        Planned            Jan    2011 Grand View
Natural gas    650.0        Proposed                       Satsop
Natural gas    275.0        Proposed                       Great Falls


Natural gas    125.0        Proposed                        Great Falls
Hydro            0.6    0.2 Proposed                        Greenfield Main Canal Greenfield Drop

Hydrokinetic     3.5    3.3 Terminated                      Guemes Channel
Biomass         26.4        Proposed                        Roosevelt
Wind           540.0        Proposed                        Harlowton

Wind           100.0        Operating          Dec    2009 Sundale

Hydro            6.7    5.3 Proposed                        Madison R.
Wind           102.0        Proposed                        Helix




                                           Page 15
                                                Projects


Coal          250.0              Terminated                     Salem (nr Great Falls)



Natural gas    74.0              Proposed                       Salem

Natural gas    46.0              Proposed                       Salem

Wind            6.0              Proposed                       Salem

Wind           60.0              Proposed                       Columbia Hills
Wind           78.0              Proposed                       Cecil
Coal          750.0              Terminated                     Glenns Ferry
Wind           34.0              Proposed                       Columbia Hills
Hydro           0.7          0.2 Proposed                       Greenfield Main Canal Johnson Drop

Natural gas    40.0              Proposed                       North Bend

Wind           52.5              Proposed                       Judith Gap
Wind          150.0              Proposed                       Bickleton

Wind          101.0              Proposed                       Bickleton

Hydro           3.3          1.5 Construction       Oct    2010 Pilot Butte Canal
Wind          100.8              Construction                   Table Mountain




Natural gas    30.0              Operating          Jun    2010 Klamath Falls
Biomass        39.2   35.0       Proposed                       Klamath Falls
Natural gas   480.0              Proposed                       Klamath Falls

Biomass         4.7              Proposed                       Valley

Biomass        24.0              Proposed                       Lakeview



                                                Page 16
                                                  Projects


Natural gas    330.0               Construction       Aug    2012 New Plymouth

Wind            18.0               Construction       Dec    2010 Taber

Wind            90.3               Construction       May    2010 Arlington
Wind           111.0               Construction       Mar    2011 Arlington
Wind            50.0               Operating          Sep    2010 Goldendale vicinity

Hydro            1.1           0.6 Proposed                       Little Wood R.

Biomass         65.0               Proposed                       Longview


Biomass          0.3           0.3 Operating          Apr    2010 Olympia

Coal           366.0               Terminated                     Port Westward

Wind           907.0               Proposed

Wind           343.0               Construction       Dec    2011 Pomeroy vicinity
Hydro            7.7               Planned                   2011 Spring Valley Canal
Wind            60.0               Proposed                       Dot

Wind            12.0               Proposed           Sep    2010 Buhl
Hydrokinetic     1.0           0.2 Terminated                     Makah Bay


Wind            52.5               Proposed                       Martinsdale
Hydro            0.9           0.2 Terminated                     Greenfield Main Canal (nr. Fairfield)
Hydro            2.7               Proposed                       Powder R.

Hydro            1.1           0.0 Terminated                     Mill Coulee Canal
Natural gas    150.0   139.5       Construction       Dec    2010 Anaconda

Wind           150.0               Planned            Oct    2010 Bickleton
Wind            18.0               Construction       Sep    2010 Murtaugh




                                                  Page 17
                                                    Projects


Wind           404.0           135.0 Proposed                        Arlington
Hydrokinetic     0.8                 Terminated                      Point Evans
Geothermal      23.0                 Proposed                        Vale



Coal           508.0                 Terminated                      Circle

Geothermal     140.0   127.0         Terminated                      Newberry Caldera


Hydro            8.8             4.4 Construction              2013 Spokane R. (Nine Mile Falls, WA))
Biomass         20.0                 Proposed                       Port Angeles

Wind           150.0                 Proposed                       Norris Hill
Wind            20.0                 Proposed                       Norris vicinity
Wind            18.0                 Construction       Dec    2010 Shoshone

Geothermal       1.3                 Proposed                        Klamath Falls

Natural gas     28.0                 Proposed                       Ontario
Natural gas      5.5                 Operating                 2009 Corvallis
Wind            10.5                 Construction       Dec    2010 Hagerman

Solar            5.0                 Proposed                        Christmas Valley
Solar            5.0                 Proposed                        Christmas Valley
Solar            5.0                 Proposed                        Christmas Valley
Petroleum      600.0                 Terminated                      Kalama

Wind           100.0                 Proposed                        Oakesdale
Wind             9.0                 Construction
Wind            22.5                 Construction       Sep    2010 Hagerman

Wind            99.0            31.5 Operating          Feb    2009 Arlington
Wind            10.5                 Construction       Dec    2010 Hagerman

Wind            90.0                 Proposed                        Hardin/Billings vicinity



                                                    Page 18
                                                  Projects


Hydro            0.8   0.7     0.3 Operating          May    2010 Swalley I.D. Main Canal

Hydro            0.5           0.2 Proposed                       Snake R.
Solar            2.4               Operating          Jul    2010 Portland & vicinity

Wind                               Proposed                        Hagerman
Wind            60.0               Proposed                        Naselle
Geothermal      15.0          13.0 Deferred                        Raft River KGRA

Hydro           23.5               Planned                   2011 Missouri R.


Hydrokinetic     1.5           0.7 Proposed                        Reedsport

Hydrokinetic     1.4           1.0 Terminated                     Rich Passage
Biomass          0.9           0.7 Proposed                       Rickreall
Wind           309.0         120.0 Proposed           Dec    2010 Kevin


Biomass          4.0               Construction       Jun    2010 McMinville
Biomass          4.0           1.8 Planned            May    2012 Filer

Wind           550.0               Proposed                        Condon



Wind            79.2          24.9 Proposed                        American Falls (vicinity)
Coal           300.0         100.0 Terminated                      Roundup


Wind           564.3               Proposed                       Cecil vicinity
Wind            57.0               Proposed                       Othello
Wind            21.0               Construction       Sep    2010 Hagerman

Hydro            1.1           0.8 Terminated                      Salt R.
Hydro            1.1           0.8 Terminated                      Salt R.
Hydrokinetic     5.3           3.8 Terminated                      San Juan Channel



                                                  Page 19
                                          Projects


Wind            21.0       Planned            Dec    2012 Glenns Ferry
Wind            20.0       Proposed                       Idaho Falls (vicinity)
Natural gas     50.0       Proposed                       Seattle
Biomass         18.8       Proposed                  2010 Eugene
Wind           290.0       Planned            Jan    2012 Arlington (vicinity)

Wind           265.0       Planned            Jan    2012 Arlington (vicinity)

Wind           290.0       Planned            Jan    2012 Arlington (vicinity)

Hydro           50.0       Proposed                        Snake R.

Biomass         55.0       Operating          Aug    2009 Tacoma



Hydro           10.0       Construction       Mar    2013 Snoqualmie R.


Hydrokinetic     8.3   3.7 Terminated                     Spieden Channel
Biomass          1.6   1.3 Operating          Jul    2009 Corvallis
Wind            98.7       Operating          Dec    2010 Moro
Wind           100.5       Proposed                       Touchet-Helix area

Hydro            0.6   0.1 Proposed                       N. Fk Santiam R.
Natural gas      5.0       Suspended                 2007 Sumas


Natural gas    660.0       Terminated                      Sumas

Wind           200.0       Proposed                        Dufur
Natural gas    520.0       Terminated                      Port Westward


Solar           10.0       Proposed                       Boise
Biomass          2.0   0.9 Planned            Oct    2012 Buhl




                                          Page 20
                                            Projects


Pump Storage   1380.0        Proposed                         Klamath Falls vicinity


Biomass           3.3        Proposed                       Roseburg
Solar            75.0        Proposed                       Cle Elum
Wind             37.8        Proposed                       Dutton (vicinity)
Wind             10.5        Construction       Sep    2010 Hagerman

Wind              9.9        Operating          Sep    2009
Wind            186.0        Proposed                       Havre vicinity
Wind             10.5        Construction       Sep    2010 Hagerman

Wind             16.8        Operating          Jun    2010 Hagerman
Wind            136.6        Operating          May    2009 Goldendale

Wind             50.0   15.0 Deferred                         Reardan


Hydro             5.3        Planned                   2011 Spring Valley Canal
Wind            170.0        Terminated                     Valley County
Wind             98.9        Operating          Dec    2009 Helix
Wind            103.5        Construction       Nov    2011 Vantage/Kittitas I-90 corridor

Coal            760.0        Deferred                         Wallula

Natural gas    1300.0        Proposed                         Hermiston

Biomass          15.8        Proposed                         Warm Springs

Wind            104.0        Proposed                         Crook & Deschutes Cos.

Wind             96.6   28.0 Operating          Jun    2009 Arlington
Wind             75.0        Proposed                       Saddleback Mountain
Wind             50.0        Proposed                       Whitehall
Wind             20.0        Proposed
Hydro             7.2    2.4 Proposed                         Deschutes R.




                                            Page 21
                                          Projects


Wind           44.0        Operating          Nov    2009 Whisky Dick Mountain


Wind           72.0   22.8 Operating          Feb    2009 Arlington

Wind          262.2        Construction              2010 Goldendale
Wind          100.0        Proposed                       Goldendale
Wind           15.0        Proposed                       Withrow
Hydro           0.9    0.3 Proposed                       Greenfield Main Canal Woods Drop

Wind           22.5        Construction       Sep    2010 Hagerman

Solar           1.2        Planned            Jul    2011 Yamhill
Hydro           7.5    2.3 Construction       Dec    2011 Youngs Cr.
Natural gas     0.5        Retired                        Bozeman




                                          Page 22
                                                                      Projects




         County     State                                   Development Notes


       COUNTY       STATE                                            DNOTES
Lincoln           ID        License issued Sep 2003; cancelled Aug 2009.
Mason             WA        Notice of Construction to Olympic Region Clean Air Agency Apr 2010.
Island            WA        Preliminary permit granted Mar 2007; expired Feb 2010; renewed Jul 2010. NOI to file
                            hydrokinetic pilot project license application Dec 2009. $10 MM USDOE grant Sep
                            2010. Planned installation 2012.
Teton             MT        40-year license issued Oct 2009.

Kitsap            WA        Preliminary permit granted Feb 2007; surrendered Oct 2008.
Elmore            ID        QF contract approval by IPUC Mar 2007. Supplanted by Sawtooth.
Power             ID        County permits secured Nov 2004.
Union             OR        EFSC Intent to Apply filed Apr 2009. Planned service 2011.

Jackson           OR        License granted Dec 2009.
Wheatland         MT        IPUC approval of pwr sales contract Oct 2005.
Elmore            ID        License issued Mar 1989; expires Feb 2039. PSA w/Clatskanie July 2005.
                            Construction Oct 2008.
Gilliam           OR        NOI filed Jun 2010.
Franklin          ID        Preliminary permit granted Feb 2005. PacifiCorp request to dismiss license application
                            Oct 2007.
Yamhill           OR         25-yr PPA announced Sep 2010. County permits secured.
Klickitat         WA        Planned construction Q2 2010, service Dec 2010.
Gooding           ID        2008 construction for 2009 service. SPP contract approved Aug 2008.




                                                                      Page 23
                                                                        Projects


Sherman             OR        WTG order announced Apr 2008, delivery Mar 2009.
Sherman             OR        WTG order announced Apr 2008.
Yakima              WA        Feasibility study authorized by Congress in 2003; Appraisal Assessment of the Black
                              Rock Alternative complete Feb 2005. Feasibility Report and EIS to be complete by
                              end of 2008.
Pend Oreille        WA        New license issued Jul 2005. Upgrade underway 2009.

Whatcom             WA        SC application Jun 02, approved Dec 2004.

Clatsop             OR        Announced Dec 2005.
Cassia              ID        IPUC approval of QF contract Jul 2005.

Elmore              ID        IPUC approval of QF contract Aug 2009.

Morrow              OR        SC App to EFSC Dec 2009
Morrow              OR        SC App to EFSC Dec 2009
Lane                OR        BETC award, Sep 2010
Wasco               OR        SC application withdrawn Jan 2009.
Twin Falls          ID
Twin Falls          ID
Power               ID        Announced March 2005 for completion in 2010 or 2011. Proposal amended to polygen
                              concept w/no generation (Sep 2008)
Bingham             ID        County permits secured Aug 2008. Subj to appeal.
King                WA        Power generation proposal terminated. Pipeline-quality gas will be produced and
                              marketed to Puget Sound Energy.
Fremont             ID        License granted July 2008.
Sherman             OR        Short-listed by Oregon Energy Trust June 2006.
Twin Falls/Elko     ID/NV     Announced Nov 2007. EIS due 2010. Earliest construction 2012.
Beaverhead          MT        License granted Aug 2009.
Grays Harbor        WA
Klamath             OR        SC approved Jan 2005. Development rights sold by People's Energy to J-Power Sep
                              2006. SC terminated on request of the developer May 2007.
Lake                  OR      MOU between Collins & DG Energy 2006. Proposed service late 2008.
Gilliam               OR
Columbia              OR      Temporary exemption granted Sep 2001. Good through Dec 2005.
                      OR/WA
Clatsop, Wahkiakum, Pacific   Preliminary permit granted Mar 2007.
Umatilla              OR      Permits secured. PSA w/Clark PUD Mar 2009. Planned service Dec 2009



                                                                        Page 24
                                                                Projects


King              WA   License granted December 1997, expires November 2047. Requires resolution of lic.
                       conditions.
Coos              OR   FERC prelim. permit issued Mar 2007; expired Feb 2010; renewal pending Apr 2010.

Coos              OR   FERC prelim. permit for 100 MW Apr 2007; cancelled Jun 2008.
Power             ID   EIS ROD & ROW grant Aug 2006.
Lincoln           ID   Exemption revoked Jun 2007.
Lewis/Pacific     WA   Announced Sep 2009

Lake              OR   Exploration completed. Production well drilling planned (Dec 2009). U.S. GEA Phase
                       III status Apr 2010.
Roosevelt         MT   Construction June 2009.
Mason             WA   U.S. DOE matching grant Nov 2009.
                  MT
Island/Skagit     WA   Preliminary permit granted Mar 2007; expired Feb 2010; reapplication May 2010.
Kittitas          WA   County application for permits denied Mar 2005. Resubmitted to WA EFSEC Nov
                       2006. Resubmitted w/ revised configuration Feb 2009. EFSEC order recommending
                       approval issues Nov 2009. Approved by governor Feb 2010.
Fallon            MT
Lane              OR   License granted Oct 2008. Equipment order Jun 2010. EPUD considering sale of its
                       interest Sep 2010.
Cassia            ID   PURPA contract filed w/PUC May 2010; approved July 2010.
Dougles           OR   FERC prelim. permit issued Apr 2007; expired Mar 2010.
Harney            OR   Harney Co. CUP Apr 2007.
Morrow/Umatilla   OR
Gem               ID   Renewable Energy of Idaho to rehab as forest residue plant. QF contract w/IPC
                       approved by IPUC May 2004.
Okanogan          WA   License application filed Sep 2008


Twin Falls        ID   Announced Jun 2007. Air quality permit application Mar 2007.
Franklin          WA   Exemption issued Jun 2008.
Whatcom           WA   Construction June 2010
Skagit            WA   PSA Apr 2008, construction Oct 2008.
Tillamook         OR   1.0 MM federal stimulus funding awarded Jul 2010.
Kootenai          ID   Planned service 2011 - 12.
Flathead          MT   Construction Oct 2008 for April 2009 service.



                                                                Page 25
                                                                     Projects


Granite          MT      Application for original license filed Aug 2008; granted Jul 2010.


Pierce           WA      Permitting completed mid-2003. Air operating permit expired Jan 2005.
Owyhee/Malheur   ID/OR
                 MT
Klamath          OR
Toole/Glacier    MT

Sherman          OR      SC application complete Aug 2008. Site certificate Jun 2009.

Jefferson        MT
Cassia           ID      IPUC approval of QF contract Jun 2005.

Klickitat        WA      Real estate issues prevented project from moving forward.
Sherman          OR      Short-listed by Oregon Energy Trust June 2006.
Bonneville       ID      County permits secured; interconnection agreement secured Dec 2006. Mar 2010
                         mobilization for planned Oct 2010 service.
Bingham          ID      County permits secured Apr 2008; appeal rejected Aug 2008.
Elmore           ID      PPA w/IPC signed Jul 2010; filed w/IPUC Jul 2010, approved Sep 2010.
Grays Harbor     WA      SC amendment submitted Nov 2008
Cascade          MT      Formerly 275 MW Montana First Megawatts. Groundbreaking 11/01. Const. susp.
                         June 2002 at 38% completion (expenditure basis.). Generating equipment sold.
                         Project purchased by Montgomery Energy Dec 2006.
Cascade          MT      Announced May 2008.
Teton            MT      40-year license issued Aug 2009.

Skagit           WA      Preliminary permit granted Feb 2007; expired Jan 2010.
Klickitat        WA
Wheatland        MT      BPA transmission reservation deposit announced Mar 2010. NWE transmission rights
                         secured. Proposed development 2014.
Klickitat        WA      Construction April 2009 for EOY 2009 service.

Gallatin         MT      License pending Jun 2004.
Umatilla         OR      EFSC SC application March 2009. SC issued July 2009. Application for SC
                         amendment to increase capacity to 201 MW.




                                                                     Page 26
                                                           Projects


Cascade     MT   Preliminary enginering underway Q1 2006. Draft EIS released July 2006. Air permit
                 remanded to MT DEQ for separate BACT assessment of PM 2.5 (Apr 2008); reissued
                 Nov 2008. Site work commenced Oct 2008, termination announced Feb 2008.

Cascade     MT

Cascade     MT   Phase I financing secured Mar 2010. Planned service June 2011.

Cascade     MT   Draft EIS released July 2006.

Klickitat   WA   Klickitat Co. energy overlay zone permit issued Sep 2006.
Gilliam     OR   CUP approved
Elmore      ID   Announced April 2004. Terminated March 2006.
Klickitat   WA   Final EIS issued June 2009..
Teton       MT   40-year license issued Jul 2009.

Coos        OR   SC-NOI December 2004. FERC pre-filing Apr 2006. FERC filing Sep 2007. Coos Co.
                 land use permit gtd Dec 2007.
Wheatland   MT
Klickitat   WA   County CUP February 2010, interconnection request approved May 2010, substation
                 expansion planned for 2010.
Klickitat   WA   County review expected to be complete fall 2010. Interconnection request 2006.

Deschutes   OR
Kittitas    WA   Jan 2003 EFSEC application suspended fall 2005. Revised proposal for 65 turbine
                 project ranging in capacity from 95 to 195 MW recommended to the governor for
                 approval Mar 2007. Remanded to EFSEC. Proposed SC w/modified WTG siting
                 criteria approved Sep 2007. Affirmed by court Nov 2008. Amendment reducing
                 maximum number of WTG to 52 approved Sep 2009. Planned construction Mar 2010
                 for Oct 2010 service.
Klamath     OR   First GT upgraded June 209, second unit June 2010.
Klamath     OR   NOI to OR EFSC Apr 2010. SC application Sep 2010. BETC award Sep 2010.
Klamath     OR   SC application submitted Dec-2001; granted Nov 2005. Extension of deadline for
                 completing construction to Nov 2012 recommended Aug 2007.
Stevens     WA   Awarded participation in WA DNR Forest Biomass Initiative Jan 2010

Lake        OR   $1.7MM federal stimulus funding Jul 2010. Planned construction summer 2011.



                                                           Page 27
                                                                  Projects


Payette             ID   IPUC filing Mar 2009, approved Sep 2009. Proposed EPC contract Mar 2009,
                         engineering Sep 2009, construction Aug 2010, commercial service Aug 2012.
Bingham             ID   IPUC approval of QF contract Oct 2005.

Gilliam             OR   SCA application filed May 2007; approved Sep 2007. Developed by Iberdrola.
Gilliam             OR   SCA application filed May 2007; approved Sep 2007. Developed by Iberdrola.
Klickitat           WA   Developed by enXco dba Northwest Wind Partners.

Lincoln             ID   License granted Apr 2006. Bill to extend deadline for commencement of construction
                         introduced to Senate May 2010.
Cowlitz             WA   Application for permit to DOE Jan 2010.


Thurston            WA   EPC contract awarded Jan 2009.

Columbia            OR   NOI submitted Sep-2006, superceding Summit/Westward project at same site. No
                         request for extension filed.
Garfield/Columbia   WA

Garfield            WA   Site prep 2010, service Dec 2011.
Teton               MT   50-yr license granted Jul 2006.
Klickitat           WA

Twin Falls          ID   QF contract approved by IPUC Dec 2006.
Clallum             WA   FERC Environmental Assessment completed Oct 2006. License application filed Nov
                         2006. Conditional 5-yr license issued Dec 2007. License surrendered May 2009.

Wheatland           MT   NorthWestern OASIS filing
Teton               MT   Exemption Granted April 2006; revoked Feb 2009.
Baker               OR   $1MM CREB award Feb 2008. Prelim permit expired Dec 2009; new PP granted May
                         2010.
Cascade             MT   50-yr license granted Jul 2006; surrendered Mar 2010.
Deer Lodge          MT   Application for air permits submitted Aug 2008. Application for MPUC approval
                         submitted Aug 2008. Construction Aug 2009.
Klickitat           WA   Developed by enXco.
Cassia              ID   IPUC approval of QF contract Oct 2005.




                                                                  Page 28
                                                              Projects


Gilliam      OR   SCA filed May 2010.
Pierce       WA   Preliminary permit expired Jan 2008.
Malheur      OR   Successful bid for IPC July 2006 geothermal RFP. Interconnection agreement signed
                  Feb 2009. USDOE load guarantee announced May 2009. Wellfield development
                  underway . PPA w/IPC Dec 2009. Planned service Q4 2012. U.S. GEA Phase III
                  status Apr 2010.
McCone       MT   Site announced Mar 2004. Reported inactive since August 2007.

Deschutes    OR   120 MW 20-yr PPC negotiated w/PG&E July 2006, subsequently terminated. EFSC
                  NOI filed July 2008, terminated Jul 2010.

Spokane      WA   Planned service 2012 and 2013.
Clallum      WA   Awarded participation in WA DNR Forest Biomass Initiative Jan 2010. Draft EIS July
                  2010. Planned service 2012.
Madison      MT   Land leases secured; wind monitoring underway.
Madison      MT   County permit secured, wind assessment underway.
Lincoln      ID   IPUC approval of QF contract Oct 2005.

Klamath      OR   Announced Nov 2006. Exploration underway April 2008. 0.28 MW binary unit
                  operating Aug 2009. U.S. GEA Phase III status Apr 2010.
Malheur      OR   Granted high-efficiency cogeneration exemption by OR EFSEC June 2005.
Benton       OR   Construction started Nov 2006.
Twin Falls   ID   IPUC approval of QF contract Apr 2005.

Lake         OR   Planned construction Mar 2010.
Lake         OR
Lake         OR
Cowlitz      WA   Site lease secured Oct 2005. Application for site certification filed Sep 2006. Draft EIS
                  released Jun 2007. SC application terminated May 2009.
Whitman      WA   CUP application Jul 2010.
Sherman      OR   Construction June 2010.
Twin Falls   ID   IPUC approval of QF contract Aug 2009.

Gilliam      OR   PPA w/LADWP, Burbank & Glendale announced Dec 2007.
Twin Falls   ID   IPUC approval of QF contract Apr 2005.

             MT



                                                              Page 29
                                                                    Projects


Deschutes           OR

Jerome               ID   Exemption granted Apr. 2002.
Multnomah, Clackamas OR

                    ID
Pacific             WA    Grays Harbor withdraws from consortium May 2010.
Cassia              ID    25 yr PPA w/EWEB for maximum of 16 MW signed March 2008, subsequently
                          terminated.
Cascade             MT    Planned construction Spring 2009 for Spring 2011 service.


Douglas             OR    FERC prelim. permit for 50 MW Feb 2007; license pending Mar 2010 for 1.5 MW. $2.4
                          MM USDOE grant announced Sep 2010.
Kitsap              WA    Preliminary permit granted Feb 2007; surrendered Oct 2008.
Polk                OR    Anaerobic digester. Still trying to finance 1/13/06
Toole/Glacier       MT    PPA w/SDGE approved Dec 2009. Requires completion of MATL (scheduled for 2011).
                          Planned construction 2010. SDG&E PUC request for equity investment Jul 2010.

Yamhill             OR    Construction Sep 2009 for Jun 2010 service
Twin Falls          ID    PURPA contract filed w/PUC May 2010; approved July 2010.

Gilliam             OR    NOI to EFSC Sep 2010. PGE proposal to OPUC to acquire 400 MW.



Power               ID    IPC request for 25yr PPA approval Sep 2010. Planned service EOY 2011.
Musselshell         MT    Proposed coal to liquids plant permitting proposed to be supplemental to MT DEQ air
                          permits issued Feb 2003 for previously proposed steam-electric plant. Air permits
                          reported to be revoked Sepl 2007.
Gilliam/Morrow      OR    NOI to Oregon EFSC Aug 2009.
Adams               WA    Conditional use permit announced Feb 2010.
Twin Falls          ID    IPUC approval of QF contract Oct 2005.

Lincoln             WY    Operated 1964 - 1972. Licensed Jun 1991, cancelled Sep 2006.
Lincoln             WY    License granted June 1991; cancelled Sep 2006.
San Juan            WA    Preliminary permit granted Feb 2007; surrendered Dec 2009.



                                                                    Page 30
                                                                   Projects


Elmore           ID      QF PSA w/ IPC fall 2009; approved by PUC Dec 2009.
Bonneville       ID      Conditional use permit 2004. IPUC app PSA Apr 2006.
King             WA      ARRA award for $18.75 MM Nov 2009.
Lane             OR      PPA approved May 2009. Planned construction Oct 2009 for 2010 service.
Gilliam/Morrow   OR      SC Jul 2008. PPA Aug 2008. WTG order Dec 2009. Site prep planned 2010,
                         operation in 2011 & 2012.
Gilliam/Morrow   OR      SC Jul 2008. PPA Aug 2008. WTG order Dec 2009. Site prep planned 2010,
                         operation in 2011 & 2012.
Gilliam/Morrow   OR      SC Jul 2008. PPA Aug 2008. WTG order Dec 2009. Site prep planned 2010,
                         operation in 2011 & 2012.
Jerome           ID      License amendment for reconstruction filed Aug 2006; granted Jul 2010. Extension of
                         deadline to complete construction to Jul 2015 granted Sep 2010.
Pierce           WA      AQ permit application Sep 2006, approved May 2007. Construction Jan 2008 for Aug
                         2009 completion.


King             WA      License amendment authorizing upgrades issued Jun 2009. Redevelopment
                         commenced Apr 2010.

San Juan         WA      Preliminary permit granted Feb 2007; expired Jan 2010.
Benton           OR
Sherman          OR      Construction announced Jun 2009.
Umatilla         WA/OR   SC construction deadline expired. Reapplication Oct 2008 for revised configuration.

Marion           OR      Exemption pending Aug 2007.
Whatcom          WA      PSE short-list May 2004. Construction underway June 2006. Target service EOY
                         2007.

Whatcom          WA      Site certificate approved Aug 2002. Interconnection to BC Hydro rejected by NEB
                         March 2004. Termination announced April 2006.
Wasco            OR      EFSC SC Sep 2009. Planned service 2011.
Columbia         OR      SC approved Oct 2002. Construction start deadline extended to October 2006,
                         completion deadline October 2009. Request to extend two years submitted Mar 2006.
                         Site to be used for proposed Lower Columbie Clean Energy Center
Ada              ID      Announced Jun 2010 for Q4 2010 construction and 2011 operation.
Twin Falls       ID      PURPA contract filed w/PUC May 2010; approved July 2010.




                                                                   Page 31
                                                                    Projects


                   OR   NOI to submit application for FERC license filed June 2010.


Douglas            OR   Negotiations w/Energy Trust terminated.
Kittitas           WA   Permit application to Kittitas Co. Aug 2009, approved Aug 2010.
                   MT
Twin Falls         ID   IPUC approval of QF contract Apr 2005.

Morrow             OR
                   MT
Twin Falls         ID   IPUC approval of QF contract Apr 2005.

Twin Falls         ID
Klickitat          WA   Developed by Cannon Power Corp. dba Windy Point Partners

Lincoln            WA   Planned service deferred from 2013 to 2014-15. (Feb 2010).


Teton              MT   50-yr license granted Jul 2006.
Valley             MT   Project size, layout and intereconnection significantly reconfigured in Nov 2006.
Umatilla           OR
Kittitas           WA   Application to Kittitas Co. for permits Oct 2007. Development agreement w/Kittitas Co.
                        signed May 2008.
Walla Walla        WA   Application for EFSEC Potential Site Study Oct 2006. Request withdrawn Mar 2008.

Umatilla           OR   Interconnection agreement and land lease permits secured. August 2005 PSD permit
                        effective Feb 2006.
Wasco              OR   Energy Trust 2005 Biopower RFP finalist.

Crook, Deschutes   OR   CUP March 2009. BLM DEIS Jul 2010.

Gilliam            OR   Eastern half of former Rattlesnake Road/Arlington CEP project.
Skamania           WA   EFSEC SC app filed Mar 2009.
Jefferson          MT   PSC ordered to set current avoided cost rates for Whitehall Wind (Jan 2010).
Wibaux             MT
Deschutes          OR   NOI to file draft FERC license application filed Jan 2008.




                                                                    Page 32
                                                                Projects


Kittitas         WA   Announced Apr 2008. Within existing site certificate limits. Planned service EOY 2009.
                      Turbine order Nov 2008. TSite prep Apr 2009 for late 2009 completion.

Gilliam/Morrow   OR

Klickitat        WA
Klickitat        WA
Douglas          WA   Leases being secured, feasibility studies underway, $3.8 MM CREB awarded.
Teton            MT   40-year license issued Jun 2009.

Twin Falls       ID   IPUC approval of QF contract Aug 2009.

Yamhill          OR    25-yr PPA announced Sep 2010. County permits secured.
Snohomish        WA   License granted June 1992; expires May 2042. Construction Feb 2010.
Gallatin         MT   Dismantled spring 2005 following unsatisfactory service.




                                                                Page 33
                                                            Projects




                      Developer/Owner                      Load                 Cogeneration Host (Application)


                           DEVN                            LOAD                             COGEN
American Falls Reservoir District #2         NWHS
ADAGE/Duke Energy, dba Adage Mason County
Snohomish Co. PUD                            Snohomish Co. PUD


Hydrodynamics, Inc.

Snohomish Co. PUD
Pacific Winds, Inc., dba as Idaho Winds      Idaho Power Co. (QF)
Ridgeline Energy
Horizon Wind Energy

Symbiotics, LLC
Arrow Rock Wind, LLC                         QF PPA w/IPC
Boise Project Board of Control               Clatskanie

First Wind Holdings dba Baseline Wind, LLC
Twin Lakes Canal Co./PacifiCorp              Power sales

enXco                                        Portland General Electric
Iberdrola Renewables                         M-S-R Public Power Agency (Modesto, Santa Clara, Redding)
Dean Foods Co./AgPower Partners              Idaho Power (SPP through 2027) Big Sky West Dairy Digester (waste digesters)




                                                            Page 34
                                                                     Projects


Portland General Electric                            Portland General Electric
Portland General Electric                            Portland General Electric
Bureau of Reclamation


Pend Oreille Co. PUD                                 Pend Oreille Co. PUD

TransCanada                                                                            BP Cherry Point Refinery
                                                     Steam and power for Cherry Point refinery, power sales

Northern Star Natural Gas                                                              Bradwood Landing LNG receiving terminal (regasification)
Idaho Wind Partners (GE Financial Services, Exergy   Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Idaho Wind Partners (GE Financial Services, Exergy   Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Portland General Electric                            Portland General Electric
Portland General Electric                            Portland General Electric
Cascade Pacific Pulp                                                                   Cascade Pacific Pulp
UPC Wind Management
John Deere Renewables                                Idaho Power Co. (QF)
John Deere Renewables                                Idaho Power Co. (QF)
Southeastern Idaho Energy, LLC

Western Energy
Energy Developments, Inc.

Fall River REA
Sherman County
Nevada Energy                                        Nevada Energy
Clark Canyon Hydro, LLC
Coastal Commumity Action Program                     Grays Harbor PUD
J-Power USA

DG Energy                                                                              Fremont Sawmill (kilns)
Waste Management, Inc.                               Seattle City Light
Oregon Energy
Oregon Tidal Energy Co.
Eurus Energy America, Inc.                           Clark PUD; RECs to PG&E 2010 & 2011



                                                                     Page 35
                                                                          Projects


Puget Sound Energy                                     Utility resource

Oregon Wave Energy Partners, LLC.

Finavera Renewable, Ltd., dba AquaEnergy Group, Ltd.
Windland-Shell
American Falls Reservoir Dist. #2
Everenergy

Nevada Geothermal

Basin Electric Power Cooperative                       Basin Electric Power Cooperative
City of Tacoma                                         Utility resource
Invenergy
Snohomish Co. PUD
enXco


MDU Resources                                          MDU Utilities
Symbiotics, LLC, Emerald PUD                           Emerald PUD

New Energy.                                            Idaho Power (QF, firm energy)      Double B Dairy (waste digesters)
Douglas Co., OR
Columbia Energy Partners                               SCE
John Deere Renewables                                  PacifiCorp
Renewable Energy of Idaho                              See Existing Projects

Okanogan PUD                                           Okanogan PUD


EnviroDyne Corp.                                       Idaho Power Co. (QF, 10 MW)
Green Energy Today
Farm Power Northwest                                   Puget Sound Energy                 Lynden Farm Power (waste digesters); Van Wingerden Greenhouses
Farm Power Northwest                                   Puget Sound Energy                 Rexville Farm Power
Farm Power Northwest                                   Tillamook PUD                      Farm Power Tillamook (waste digesters)
Kootenai Electric Cooperative                          Kootenai Electric Cooperative
Flathead Electric Cooperative                          Flathead Electric Cooperative



                                                                          Page 36
                                                                        Projects


Granite Co.


EPCOR dba Frederickson Power, LLC
Ridgeline Energy
Gaelectric
Klamath Tribes                                                                               Giiwas Green Enterprise Park
NaturEner                                                 SDGE (15 yr PPA)

BP Alternative Energy of North America

Barrick Gold Corp.
Idaho Wind Partners (GE Financial Services, Exergy        Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Windtricity Ventures, LLC & Northwest Regional Power.
Sheman Co./Local landowners/Western Wind Energy
Ridgeline Energy/BP Wind Energy                           SCE (20-yr PPA for 90 to 130 MW)

Ridgeline Energy
Grand View Solar PV One                                   Idaho Power Co.
Invenergy (dba Grays Harbor Energy)
Montgomery Energy Partners


Montgomery Energy Partners
Hydrodynamics, Inc.

Snohomish Co. PUD
G2 Eenrgy, LLC
Gaelectric

Cowlitz PUD, Lakeview L&P, Peninsula Light (20%) & EWEB   Cowlitz PUD (30%), Lakeview L&P (30%), Peninsula Light (20%) & EWEB (20%).
(20%).
Fall River Rural Electric Coop
Iberdrola Renewables dba Helix Wind Power Facility, LLC




                                                                        Page 37
                                                                           Projects


S. Montana Electric Generating & Transmission Cooperative   G&T resource



S. Montana Electric Generating & Transmission Cooperative   G&T resource

S. Montana Electric Generating & Transmission Cooperative   G&T resource

S. Montana Electric Generating & Transmission Cooperative   S. Montana Electric Generating & Transmission Cooperative

Windtricity Ventures, LLC
Invenergy
Sempra Generation
Northwest Wind Partners
Hydrodynamics, Inc.

Energy Projects Development                                                                  Jordan Cove LNG receiving terminal (regasification)

Invenergy
Iberdrola Renewables dba Pacific Wind Development

Iberdrola Renewables dba Pacific Wind Development

Central Oregon Irrigation District                          PacifiCorp
Horizon Wind Energy




Iberdrola Renewables                                        See Existing Projects            Collins Products
Klamath Falls Bioenergy, LLC
Iberdrola Renewables

Borgford BioEnergy                                                                           Kulzer Bioenergy Park (polygeneration facility)

Iberdrola                                                                                    Collins Lakeview Fremont mill



                                                                           Page 38
                                                                       Projects


Idaho Power Co.                                      Idaho Power Co.

Idaho Wind Partners (GE Financial Services, Exergy   Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
S. CA Public Power Authority                         LADWP (75MW), Glendale (10MW), Pasadena (5MW)
S. CA Public Power Authority                         S. CA Public Power Authority
S. CA Public Power Authority                         LADWP (45 MW); Glendale (5 MW)

B. Arkoosh

Longview Fibre Co.                                                                 Longview Fibre Company


LOTT Wastewater Alliance                             Self-generation               LOTT WWTP (waste digesters)

Summit Power Group

Puget Sound Energy

Puget Sound Energy
Turnbull Hydro                                       NorthWestern
Lund Hill, LLC

Armand Eckert
Finavera Renewable, Ltd.                             Clallum Co. PUD


Horizon Wind Energy
Wade Jacobson
Baker Co., OR

Turnbull Hydro
NorthWestern Energy                                  NorthWestern Energy

S. CA Public Power Authority                         LADWAP (112.5MW), Burbank (15 MW), Glendale (22.5MW)
Idaho Wind Partners (GE Financial Services, Exergy   Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)



                                                                       Page 39
                                                                      Projects


Iberdrola
Tacoma Power
U.S. Geothermal Co. dba USG Oregon, LLC                IPC



Great Northern Power Development/Kiewit Mining Group

Davenport Energy


Avista
Nippon Paper Industries                                6 MW excess power               Nippon Paper Industries

Madison Valley Renewable Energy
Sagebrush Energy
Idaho Wind Partners (GE Financial Services, Exergy     Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Oregon Institute of Technology                         OIT

Cogentech                                                                              Heinz/Or-Ida Foods (potato processing)
Oregon State University                                OSU                             OSU (Campus loads)
Idaho Wind Partners (GE Financial Services, Exergy     Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Obsidian Renewables dba Outback Solar                  20-yr PPA in negotiation
Obsidian Renewables dba Outback Solar
Obsidian Renewables dba Outback Solar
Energy Northwest

First Wind
O. Hilderbrand                                         POrtland General Electric
Idaho Wind Partners (GE Financial Services, Exergy     Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Iberdrola Renewables                                   18 yr PPAs w/option to buy w/LADWP (69 MW), Burbank (20 MW) & Glendale (10 MW).
Idaho Wind Partners (GE Financial Services, Exergy     Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Gaelectric



                                                                      Page 40
                                                                    Projects


Swalley Irrigation District                          PacifiCorp

Pristine Springs, Inc.
Sunway (Portland General Electric & U.S. Bank)       Portland General Electric

Pacific Winds/PowerWorks, Inc., dba as Idaho Winds
Energy Northwest                                     Clallam, Mason 3 & Pacific Co. PUDs
U.S. Geothermal Co.                                  EWEB

PPL Montana                                          PPL Montana


Ocean Power Technologies

Snohomish Co. PUD
Agricultural Sustainable Energy Technologies         PacifiCorp (QF)                  Rickreall Dairy Digester Project (digester & fiber dryer)
NaturEner                                            SDGE (15 yr PPA)


G2 Eenrgy, LLC                                       McMinnville Power & Light
New Energy One                                       Idaho Power (QF, firm energy)    Rock Creek Dairy (waste digester)

RES America dba Rock Creek Wind Power, LLC           PGE (See Development Notes)



Ridgeline Energy                                     Idaho Power Co.
Arch Coal, DKRW Advanced Fuels


Caithness Energy, dba Saddle Butte Wind, LLC
Horizon Wind Energy
Idaho Wind Partners (GE Financial Services, Exergy   Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Scott D. Heiner                                      Retired
Scott D. Heiner
Snohomish Co. PUD



                                                                    Page 41
                                                                    Projects


Pacific Winds/PowerWorks, Inc., dba as Idaho Winds   Idaho Power Co. (QF)
Schwendiman Wind, LLC                                PacifiCorp (QF)
Seattle Steam Co.                                                                       Seattle Steam Co. (Post St.) (district heating)
                                                     EWEB                               Senaca Sawmill Co. (kilns)
Caithness Energy dba South Hulburt Wind              SCE (20-yr PPA)

Caithness Energy dba North Hulburt Wind              SCE (20-yr PPA)

Caithness Energy dba Horseshoe Bend Wind             SCE (20-yr PPA)

Idaho Power Co.                                      Idaho Power Co.

Simpson Investment Co.                                                                Simpson Tacoma Kraft Co.
                                                     Marketed through Iberdrola Renewables



Puget Sound Energy                                   Puget Sound Energy


Snohomish Co. PUD
Stahlbush Island Farms                               PacifiCorp (QF)                     Stahlbush Island Farms (digester & product dryers)
Iberdrola Renewables                                 Modesto Irrigation District (49.5 MW%)
NextEra Energy Resources

Santiam Water Control District
ORMAT Nevada, Inc. dba Orsumas, LLC                  See Existing Projects              Williams Northwest Pipeline Systems (compressor GT heat recovery)


National Energy Systems Co. (dba Sumas Energy 2)

LotusWorks - Summit Ridge I
Summit Power Group


Sunergy World                                        Idaho Power Co.
New Energy.                                          Idaho Power (QF, firm energy)      Swager Farms (waste digesers)




                                                                    Page 42
                                                                                Projects


Symbiotics, LLC


Swanson Group                                                                                        Swanson Group Roseburg mill
Teanaway Solar Reserve
Montana Windpark Solutions
Idaho Wind Partners (GE Financial Services, Exergy               Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
John Deere Renewables                                            PacifiCorp (QF)
Gaelectric
Idaho Wind Partners (GE Financial Services, Exergy               Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
John Deere Renewables                                            Idaho Power Co. (QF)
Tuolumne Wind Project Authority (Turlock Irrigation District &   Turlock Irrigation District & Walnut Energy Center Authority
Walnut Energy Center Authority)
Avista                                                           Avista


Turnbull Hydro                                                   NorthWestern
GreenHunter Energy, Inc. dba as Wind Hynter, LLC
NextEra Energy Resources
Invenergy                                                        PG&E (15 yr)

Wallula Resource Recovery, LLC

Diamond Generating (dba Diamond Wanapa I, LLC)

Warm Springs Biomass, LLC                                                                            Warm Springs Forest Products Industries

West Butte Wind Power, LLC

Horizon Wind Energy                                              Snohomish PUD (20yr PPA)
Whistling Ridge Energy
Gamesa Energy d.b.a. Whitehall Wind, LLC
Crownbutte, Wind Power
Symbiotics, LLC




                                                                                Page 43
                                                                    Projects


Puget Sound Energy                                   Puget Sound Energy


Invenergy                                            LADWP

Cannon Power Corp. dba Windy Point Partners          LADWAP (242MW), Glendale (20MW)
Cannon Power Corp. dba Windy Point Partners
Douglas Co. PUD                                      Douglas Co. PUD
Hydrodynamics, Inc.

Idaho Wind Partners (GE Financial Services, Exergy   Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
enXco                                                Portland General Electric
Snohomish Co. PUD                                    PUD                         Snohomish
Zoot Enterprises                                                                 Zoot Enterprises (space conditioning)




                                                                    Page 44
                                                                             Projects




                                      Notes                                                  Main Grid Interconnection               Last Update


                                     NOTES                                                              LOC                           UPDATE
Existing canal. Seasonal irrigation project.                                                                                             7/8/2010
Bubbling FBC; 65 MW gross; 60 MW net.                                                                                                   8/16/2010
(2) 500kW 10-meter OpenHydro Open-Centre units, undersea cable and power       12kV Puget Sound Energy distribution line                 7/8/2010
conditioning and control building.

Existing BuRec Sun River IP canal. Inflatable wier, intake, penstock,          Existing NorthWestern 25kV line                            7/8/2010
powerhouse and tailrace.
(130) TISEC units                                                                                                                         7/9/2010
(12) GE 1.5 MW WTG                                                                                                                      12/23/2009
                                                                                                                                         1/22/2006
(164) WTG                                                                      230 kV to BPA LaGrande sub or IPC North Powder sub.        3/8/2010

(2) TGs added to existing run-of-river dam & reservoir w/diversion.            PacifiCorp                                                9/28/2010
(13) GE 1.5 MW WTG                                                                                                                       4/14/2006
Addition of powerhouse w/ (2) turbine-generators to existing water control                                                               9/29/2010
structure.
                                                                               BPA Diamond Butte substation (new)                         7/9/2010
Undeveloped run-of-river reservoir project.                                                                                              11/5/2007

Ground-mount thin-film PV                                                                                                                9/25/2010
RECs to PG&E through EOY 2010                                                  BPA Rock Creek substation                                  5/7/2010
Gasification of cattle waste. Anaerobic digestor and (2) Guascor SFGLD 560                                                               2/24/2010
750 kW nameplate reciprocating engines.



                                                                             Page 45
                                                                                       Projects


     (65) Siemens SWT-2.3-93 WTG.                                                        BPA John Day substation                               8/21/2009
     (76) Siemens SWT-2.3-93 WTG.                                                        BPA John Day substation                                9/9/2010
     (2) 150 MW PTG at Priest Rapids reservior intake; 23 to 38 MW powerhouse at                                                               1/18/2007
     Rosa discharge, 15 to 29.5 MW powerhouse at Sunnyside discharge. Other
     configurations being studied.
     High-efficiency turbines, governors, stator replacement, exciters, controls and                                                           10/1/2010
     other refurbishments.
     3x1 CCCG, BPA Custer interconnect;dry cooling; no backup fuel.                                                                             1/3/2005

terminal (regasification)                                                                                                                      12/5/2005
      (7) GE 1.5 MW WTG.                                                                                                                       8/18/2010

     (15) GE 1.5 MW WTG.                                                                 IPC King-Bliss 138kV line                             8/18/2010

     (1) CC w/duct firing, wet mech draft cooling. Configuration and model TBD.          PGE Boardman - Slatt 500kV line (preferred option)    3/18/2010
     (1) CC w/duct firing, wet mech draft cooling. Configuration and model TBD.          PGE Boardman - Slatt 500kV line (preferred option)    3/18/2010
     New 10 MW STG w/existing chemical recovery boiler.                                                                                        9/24/2010
     (40) GE 1.5sle WTG.                                                                 BPA The Dalles - Hood R. 115kV line @ new sub.        3/30/2009
     (5) Suzlon S88-2.1 MW WTG.                                                          IPC Lower Malad/ Mtn Home Jct 138kV                   8/18/2010
     (9) Suzlon S88-2.1 MW WTG.                                                          IPC Lower Malad- Mtn Home Jct 138kV line              8/18/2010
                                                                                                                                               9/29/2008

     Up to 66 WTG.                                                                                                                              8/7/2008
     (3) gas turbines, heat recovery steam generators and steam turbine-generator.                                                              4/7/2009

     (2) turbine-generators. Existing run-of-river dam w/diversion (Chester Dam).                                                               8/4/2008
     (1) GE 1.5 MW WTG                                                                                                                         8/24/2006
     (170) WTG                                                                           IPC Valmy/Midpoint 345kV line.                        3/18/2010
     Existing dam.                                                                                                                            12/21/2009
     (4) GE 1.5 MW WTG
                                                                                                                                                8/6/2007

                                                                                                                                               1/11/2007
                                                                                                                                               2/24/2010
     (1) LM6000.                                                                                                                               7/17/2006
     50 - 150 TISEC units of 0.5 to 2.0 MW ea.                                                                                                  5/1/2007
     (63) Mitsubishi MWT 1000-A turbines                                                 BPA 69kV Walla Walla - Pendleton line via tap          5/7/2010



                                                                                       Page 46
                                                                                   Projects


                                                                                                                                  9/17/2003

(200) - (400) wave power bouys.                                                                                                    7/8/2010

AquabuOY heaving buoy hose pump units                                                                                              7/9/2010
(81 - 98) 1.5 MW WTG                                                                                                              8/22/2006
Existing canal.                                                                                                                   4/22/2008
(5) WTG. Located on Weyerhaeuser McDonald tree farm. 150 MW request for                                                           9/22/2009
interconnection.
Est. potential 40 - 80 MW.                                                                                                        4/22/2010

(1) GE LMS100 GTG                                                                    WAPA                                         8/16/2010
New powerhouse and (2) 1.8 MW Francis turbines to capture instream flow.                                                         11/10/2009
Would interconnect w/proposed MATL transmission line for export.                                                                  1/18/2007
(4) TISEC units                                                                                                                   7/15/2010
(95 max) 2.0 MW REpower MM92 WTG.                                                                                                 2/10/2009


(7) GE 1.5 MW WTG.                                                                                                                6/29/2010
(1) 3.8 MW horizontal Kaplan unit (low-head operation) & (1) 4.5 MW vertical         PAC distribution system (15kV)               10/1/2010
Francis unit (high-head operation) at existing dam with storage.
Gasification of cattle waste. Anaerobic digestor w/engine-generators                 IPC Buckhorn sub                             7/12/2010
(1) - (3) oscillating water column wave energy devices.                                                                            7/8/2010
(45) Siemens 2.3 WTG                                                                 Harney Electric 115kV Harney - Winnamucca    3/25/2009
(10) REpower MM92 WTG; (27) 1.65 MW Vestas WTG                                       PacifiCorp Irrigon substation                 1/5/2010
Site of Boise plant idled Jul 2001. Has not been constructed, no revised service     IPC Boise Cascade Emmett substation          2/11/2008
date from Idaho Power yet
Restoration of former hydro project. Existing dam and reservoir; new intake          13.2 kV Okanogan PUD line.                    7/9/2010
canal, penstocks, powerhouse w/(2) 4.5 MW Kaplan hydroturbines, tailrace and
appurtenant facilities.
(6) 2.165 IC units (One in reserve). Initial operation on 99:1 NG/FO                                                               6/8/2007
Penstock and turbine-generator at existing canal drop.                                                                            2/26/2009
Collection system, anaerobic digester and (1) 750 kW reciprocating engine.                                                        7/20/2010
Collection system, anaerobic digester and (1) 750 kW reciprocating engine.                                                        7/20/2010
Collection system, anaerobic digester and (1) 750 kW reciprocating engine.                                                        7/20/2010
(2) Units                                                                                                                         3/31/2010
(1) 1.6 MW Caterpillar 3520C IC                                                                                                   6/29/2009



                                                                                   Page 47
                                                                             Projects


Existing reservoir & dam; formerly with power (FERC P-1473). New pipeline,                                                             8/25/2010
surge tank, penstock, powerhouse w/2MW Pelton hydroturbine, tailrace and
appurtenant facilities.
                                                                                                                                       7/17/2006
                                                                                                                                        1/5/2010
(45) 3 MW WTG (tentative)                                                                                                              4/12/2010
(4) 2 MW trains. Former Crater Lake Mill site.                                                                                         9/25/2008
(69) Acciona AW77/1500 WTG. Interconnection to Glacier Electric and            NWA Cutbank - Conrad 115kV                              8/13/2009
NorthWestern..
WTG not selected. Up to 267 WTG and 400 MW maximum buildout.                   BPA Klondike substation (200 MW); BPA John Day           5/5/2009
                                                                               substation (100 MW)
(9) WTG                                                                                                                                9/10/2008
(7) GE 1.5 MW WTG.                                                             IPC Milner 041 35 kV feeder                             8/17/2010

                                                                                                                                        6/6/2007
(5) WTG                                                                                                                               10/18/2006
(83) GE 1.5 MW WTG                                                             PAC Goshen sub.                                          3/5/2010

Up to 150 WTG, 1 - 3 MW. 450 MW is max capacity.                                                                                        8/6/2008
                                                                               IPC Canyon Creek substation                             7/27/2010
(1) 2x1 CC                                                                                                                             11/6/2009
                                                                                                                                       5/22/2008


                                                                                                                                       5/22/2008
Existing BuRec Sun River IP canal. Inflatable wier, intake, penstock,          Existing NorthWestern 12kV line                          7/8/2010
powerhouse and tailrace.
166 TISEC units                                                                                                                         7/8/2010
(2) 10.2 MW CTGs & (1) 6MW STG. Air-cooled                                                                                             2/23/2010
(180) 3 MW WTG (tentative). Requires completion of Green Line                  BPA Eastern Intertie via NWE and proposed Green Line    4/12/2010

(43) Siemens 2.3 WTG.                                                          BPA Rock Creek substation                               9/16/2009

Existing storage reservoir.                                                                                                            1/14/2005
Up to 102 MW and 68 WTG (Current SC). Up to 201 MW and 134 WTG                 Either PacifiCorp 230kV or BPA 500kV.                   8/30/2010
(Proposed SC amendment)




                                                                             Page 48
                                                                                          Projects


      Circulating fluidized bed combustion boiler steam plant                                                                                       2/3/2009



      (1) GE LM6000 GT, (2) fired HRSGs and STG                                                                                                    9/24/2010

      (1) GE LM6000 GT, gas compressor, NG pipeline lateral and interconnection.                                                                   9/24/2010

      (4) 1.5 MW WTG.                                                                                                                               7/6/2006

      (30) 2MW WTG. Interconnected at Rock Creek (BPA)                                                                                            10/31/2006
      Gilliam Co. portion of WiIlow Creek project                                           BPA Boardman sub via project substation                5/18/2010
                                                                                                                                                   3/31/2006
       (17) 2MW WTG. Interconnected at Rock Creek (BPA)                                                                                            7/23/2009
       Existing BuRec Sun River IP canal. Inflatable wier, intake, penstock,                Existing NorthWestern 69kV line                         7/8/2010
       powerhouse and tailrace.
nal (regasification)                                                                                                                               6/13/2008

      (33) 1.5 MW GE WTG                                                                    NWE Broadview - Judith Gap 230 kV Line                  2/3/2008
      Up to 63 2.4 MW WTG, interconnection, access roads and O&M facility.                  BPA Rock Creek substation @ 115kV                       8/4/2010

      Up to 65 WTG.                                                                         BPA Wood Creek substation (new) (Horse Heaven -         8/4/2010
                                                                                            Harvalum line)
      2.5 mi penstock and (1) 5mw turbine-generator.                                        PacifiCorp 69kV                                        9/29/2010
      (48) Suzlon S88-2.1 MW WTG.                                                           BPA substation (new) on 230 kV Columbia - Covington    4/29/2010
                                                                                            line




      (2) Siemens SGT6-5000 GT x1 STG.                                                                                                             9/29/2010
      Fluidized bed boiler and STG                                                          69kV PacifiCorp Collins substation.                    9/28/2010
      (2) GT CC w/duct-firing, steam turbine configuration undetermined                     PAC Meridian-Captain Jack 500kV line                   8/29/2007

      Polygeneration facility producing electricity, bio-oil, syngas and bio-char. Also                                                            2/19/2010
      announced at 9.4 MW.
                                                                                                                                                   7/20/2010



                                                                                          Page 49
                                                                            Projects


Siemens SGT6-5000F GT w/duct firing. Evaporative cooling.                       IPC 230kV Ontario - Caldwell and 138 kV Caldwell-        8/9/2010
                                                                                Willis.
(12) GE 1.5 MW WTG                                                                                                                      8/17/2010

                                                                                BPA Jones Canyon switching station                       6/4/2010
                                                                                BPA Jones Canyon switching station                       6/4/2010
(25) REPower MM92 WTG                                                           BPA Harvalum substation (via KPUD Clouse substation)    9/27/2010

Diversion, (2) 550 kW francis units.                                                                                                     7/8/2010

New 650,000 lb boiler to replace existing power boilers. One 65 MW condensing                                                           5/27/2010
turbine. One recovery boiler and one extraction turbine to be retained.

Gas treatment, 335kW reciprocating engine w/heat recovery and auxilliary        PSE local                                               9/29/2010
boilers.
Plant would co-produce electricity and SNG.                                                                                             10/6/2006

Balance of Dutch Flat & Kuhl Ridge sections, Tucannon & Oliphant Ridge          (355) 2.0 MW WTG.                                        8/7/2009
sections (Columbia Co.)
(149) 2.3 MW Siemens SWT-2.3-101 WTG.                                           BPA Central Ferry Substation (new)                      5/24/2010
Existing canal drop. (1) TG                                                                                                             12/8/2009
                                                                                BPA Wood Creek substation (new) (Horse Heaven -          8/4/2010
                                                                                Harvalum line)
                                                                                                                                       11/26/2007
(4) 0.25 MW AquabuOY heaving buoy hose pump units                                                                                        7/9/2010


Capacity range 52.5 to 82.5                                                     NWE Martinsdale substation                              1/10/2007
Canal project. (1) turbine-generator                                                                                                    3/18/2009
Run-of-river, existing dam.                                                                                                             7/15/2010

Existing canal.                                                                                                                          7/8/2010
(3) Pratt & Whitney SWIFTPAC 50 GTGs w/provision for additional unit.           NWE Mill Creek substation                               8/26/2009

                                                                                BPA                                                      1/5/2010
(12) GE 1.5 MW WTG                                                                                                                      8/17/2010




                                                                            Page 50
                                                                                 Projects


134 - 269 1.5 - 3 MW WTG                                                             BPA Slatt substation                            5/5/2010
Pilot in-stream tidal current energy project.                                                                                       3/18/2009
35 MW (gross), 23 MW (net)                                                           IPC                                            9/24/2010



Circulating fluidized bed combustion boiler steam plant. Transmission                NWE Colstrip switchyard                        9/29/2010
interconnection to WAPA.
Production and injection wells, (4) dual flash units of 35 gross, 32 (net summer);   BPA LaPine 230kV (140 MW)                      9/29/2010
or (3) units of 47.5 gross, 45 MW net summer. Mechanical draft cooling, 12 mi.
interconnection.
Replacement of Units 1 and 2, addition of rubber dam.                                                                               5/11/2010
Replacement HP boiler and new extraction steam turbine-generator.                                                                    9/2/2010

                                                                                                                                    7/31/2008
(8) 2.5 MW WTG.                                                                      Existing NorthWestern transmission at site.    7/31/2008
(12) GE 1.5 MW WTG                                                                                                                  8/17/2010

Proposed 1 MW unit off new deep well + existing 0.25 MW binary unit off shallow                                                     4/22/2010
wells.
                                                                                                                                    7/25/2005
(1) 5.5 MW GT w/HSRG and (2) auxilliary boilers.                                                                                   10/28/2008
(7) GE 1.5 MW WTG                                                                                                                   8/18/2010

                                                                                                                                    2/10/2010
                                                                                                                                    2/10/2010
                                                                                                                                    2/10/2010
(2) 340 MW (gross) IGCC trains.                                                                                                     5/14/2009

                                                                                     Avista                                         7/26/2010
(6) WTG.                                                                                                                             8/4/2010
(14) GE 1.5 MW WTG.                                                                  IPC King-Bliss 138kV line                      8/17/2010

(47) Suzlon S88-2.1 MW WTG.                                                          BPA Jones Canyon switching station             4/22/2010
(7) GE 1.5 MW WTG                                                                                                                   8/18/2010

(34) 3 MW WTG (tentative)                                                                                                           4/12/2010



                                                                                 Page 51
                                                                             Projects


Headworks, 5.1 mi penstock and (1) 750 kW Francis horizontal turbine-             PacifiCorp                                            9/29/2010
generator.
                                                                                                                                        5/17/2007
Thin film PV. Seven warehouse rooftop installations. Consolidated into PGE                                                              9/28/2010
distributed solar record in Existing Project database.
                                                                                                                                       11/24/2009
(32) WTG                                                                          BPA                                                   5/24/2010
Air-cooled binary technology.                                                                                                           4/22/2010

Original License granted April 1956; expired November 1994. Run-of-river                                                                2/28/2008
w/diversion. Planned redevelopment 2009-11 will replace existing units w/one 60
MW unit.
50 MW ultimate potential. OPT Power Buoy technology.                                                                                    9/29/2010

62 TISEC units                                                                                                                           7/9/2010
(1) 850kW GE/Jennbacher engine                                                                                                           8/8/2007
(206) WTG                                                                         Montana-Alberta Tie Line (MATL)                       7/21/2010


(2) Caterpillar 1.6MW reciprocating engines.                                                                                            2/23/2010
Gasification of cattle waste. Anaerobic digestor w/(4) engine-generators ((1) Cat IPC Clover sub                                        7/12/2010
3520, (3) Cat 3412), boiler & flare.
(183) to (305) WTG (type not selected).                                           Either proposed BPA Diamond Butte sub on existing     9/24/2010
                                                                                  Slatt - Buckley 500kV line or proposed PGE Cedar
                                                                                  Springs sub on proposed PGE Cascade Crossing 500kV
                                                                                  line.
                                                                                  (44) Vestas 1.8 MW WTG                                9/28/2010
Goal gasifier w/coal-to-liquids plant, 300 MW combined-cycle plant and CO2                                                              7/24/2007
separation. Net 100MW for export.

(171 (max)) WTG, mfr & model TBD                                                  BPA Slatt substation                                  4/27/2010
(32) 1.8 MW WTG (tentative)                                                       Avista Benton/Tauton 115kV                            2/12/2010
(14) GE 1.5 MW WTG                                                                                                                      8/18/2010

Existing diversion.                                                                                                                     4/22/2008
Existing water control structure.                                                                                                      11/17/2006
116 TISEC units                                                                                                                          7/8/2010



                                                                             Page 52
                                                                                    Projects


       Site of terminated Alkali project.                                                                                             12/23/2009
       (8) 2.5 MW Clipper C-93 WTG.                                                   PAC Goshen - Rigby 69kV line                    11/26/2007
ict heating)                                                                                                                          12/11/2009
       Boiler & 18.8 MW STG.                                                                                                           5/11/2009
       (116) GE 2.5 MW WTG.                                                           BPA Slatt substation                              6/4/2010

      (116) GE 2.5 MW WTG.                                                            BPA Slatt substation                              6/4/2010

      (116) GE 2.5 MW WTG.                                                            BPA Slatt substation                              6/4/2010

      New 50 MW Unit 4. Units 1 and 2 to be retired.                                                                                   9/28/2010

      55 MW steam turbine-generator & wet cooling tower. Steam from #7 recovery                                                        8/14/2009
      boiler & #4 power boiler capacity & pressure upgrades. ~50% of energy from
      black liquor, remainder from mill, forest and urban wood residues.

      Refurbishment of existing 1.8 MW ea. Units 1 - 4, and replacement of 6.5 MW     115kV PSE Snoqualmie Falls substation.           9/29/2010
      Unit 5 of PH 1. Rebuilt PH 2 w/refurbished 13.7 MW Unit 6 and 27 MW Unit 7.

      168 TISEC units                                                                                                                   7/8/2010
      Anaerobic digestor and (1) Caterpillar reciprocating engines.                                                                    7/20/2009
      (49) Suzlon S88-2.1 MW WTG.                                                     BPA John Day substation                          4/22/2010
      "GE" option: 67 GE WTG (100.5 MW); "Siemens" option (43) Siemens 2.3 MW         PacifiCorp Wallula sub via existing Stateline    2/12/2009
      WTG (98.9 MW)                                                                   interconnection.
      Existing diversion.                                                                                                              4/22/2008
      ORMAT Recovered Energy Generation System (organic Rankine cycle turbine).                                                        2/11/2008
      Construction has been suspended due to environmental issues - final
      determination regarding future of project is unknown
      2x1 CC, 669 MW gross; 660 MW nominal, inc. 133 MW w/DB.                                                                          4/11/2006

      Up to (87) 1.5 - 2.3 MW WTG                                                     BPA 230 Big Eddy - Maupin                        8/25/2010
      (2) 2x1 S-W V84.3a CC. Interconnected at Allston or (alternatively) new                                                          10/6/2006
      Bradbury substation.

      Thin film, AC/DC rating not specified, ground and carport mount.                                                                  6/3/2010
      Gasification of cattle waste. Anaerobic digestor w/engine-generators            IPC Clover sub                                   7/12/2010




                                                                                    Page 53
                                                                                Projects


Closed-cycle pumped-storage project consisting of upper and lower reservoirs,     345kV line to BPA Captain Jack substation.            7/14/2010
underground powerhouse w/(4) 345 MW reversible pump-turbine units.

                                                                                                                                        7/18/2006
                                                                                  BPA Rocky Reach - Maple Valley 345kV                  8/16/2010
                                                                                                                                        1/18/2007
(7) GE 1.5 MW WTG                                                                                                                       8/18/2010

(6) 1.65 MW Vestas V82 WTG                                                                                                              4/20/2010
(62) 3 MW WTG (tentative)                                                                                                               4/12/2010
(7) GE 1.5 MW WTG.                                                                                                                      8/18/2010

(8) Suzlon S88-2.1 MW WTG.                                                        IPC Lower Malad- Mtn Home Jct 138kV line              8/18/2010
(20) REpower MM92 2 MW WTG. (42) Siemens SWT 2.3 MW WTG. 190 MW                   BPA Rock Creek substation                              1/5/2010
permitted
Announced August 2005. Energy Northwest termination announced Feb 2008                                                                  2/18/2010
due to unpredictability of REPI. Avista acquisition announced May 2008.

Existing canal drop. (1) TG                                                                                                             12/8/2009
Proposal terminated Sep 2007.                                                                                                           9/27/2007
(42) Siemens SWT 2.3 MW WTG.                                                                                                            4/29/2010
(69) GE 1.5 MW WTG.                                                                                                                      5/7/2010

915 MW (gross). Mitsubishi Heavy Industries dry gasification process. Proposed                                                           4/1/2008
65% CO2 separation & basalt sequestration.
(2) 2x1 F-Class CC                                                                                                                      7/18/2006

Installation of replacement high-pressure boiler (complete), expansion of                                                               2/24/2010
generating capacity. Fuel is forest residue.
Up to 52 WTG, access roads, project substation, O&M facility, 115kV               BPA Redmond - Harney 115kV                            7/26/2010
transmission interconnection.
(46) Suzlon S88-2.1 MW WTG.                                                       BPA Jones Canyon substation                           4/22/2010
Up to 50 WTG                                                                                                                             4/8/2009
                                                                                                                                        2/19/2010
                                                                                                                                         3/3/2010
Existing run-of-river dam & reservoir. New penstock, powerhouse w/7.15 MW         Adjacent 15kV Midstate Elec. Coop distribution line   7/14/2010
Kaplan turbine-generator and tailrace.



                                                                                Page 54
                                                                             Projects


(22) WTG. SC application approved Jan 2009. Construction 2009.                                                      2/24/2010


(48) GE 1.5 MW WTG. BPA interconnection request is for 180 MW. 15 yr PPA       BPA Tower Rd - Alkali #1 115kV tap   5/22/2009
w/LADWP.
(114) Siemens SWT 2.3 MW WTG.                                                  BPA Rock Creek substation             1/5/2010
                                                                                                                    2/23/2010
(10) 1.5 MW WTG. 160 MW potential.                                                                                  2/20/2008
Existing BuRec Sun River IP canal. Inflatable wier, intake, penstock,          Existing Sun River Coop 7.2kV line    7/8/2010
powerhouse and tailrace.
(14) GE 1.5 MW WTG.                                                            IPC King-Bliss 138kV line            8/17/2010

Ground-mount thin-film PV                                                                                           9/25/2010
Wier & intake w/ 3 mi diversion. (1) 7.5 MW hydro TG. 7 mi interconnection     12.5kV to SnoPUD Sultan sub          9/29/2010
(2) 250 kW molten carbonate fuel cells.                                                                             6/14/2006




                                                                             Page 55
                                                       Projects




                  Default Calculations
Capacity Factor    Capacity (MW)     Capability (MW)
     (%)

    CCF               DefMW              CMWA
     44%                1.5               0.7
   #NAME?              60.0             #NAME?
     10%                1.0               0.1


     30%                1.0                0.3

     32%                52.0              16.7
     30%                18.0               5.4
   #NAME?               81.0            #NAME?
     30%               300.0              90.0

     43%                10.0              4.3
   #NAME?               19.5            #NAME?
     62%                15.0              9.3

     33%               500.0             167.0
      9%                7.0               0.6

   #NAME?                1.7            #NAME?
   #NAME?               50.0            #NAME?
     72%                 1.5              1.1




                                                       Page 56
                           Projects


#NAME?   149.5    #NAME?
#NAME?   174.8    #NAME?
#NAME?   338.0    #NAME?


 13%      18.0     2.4

#NAME?   720.0    #NAME?

#NAME?   130.0    #NAME?
#NAME?    10.5    #NAME?

#NAME?    22.5    #NAME?

#NAME?   450.0    #NAME?
#NAME?   450.0    #NAME?
#NAME?    10.0    #NAME?
#NAME?    60.0    #NAME?
#NAME?    10.5    #NAME?
#NAME?    18.9    #NAME?
#NAME?   520.0    #NAME?

#NAME?     0.0    #NAME?
#NAME?    26.0    #NAME?

  58%      3.3      1.9
#NAME?     1.5    #NAME?
#NAME?    425.0   #NAME?
  17%      3.0      0.5
           6.0      0.0
#NAME?   1150.0   #NAME?

#NAME?    13.0    #NAME?
#NAME?     6.4    #NAME?
#NAME?    42.7    #NAME?
#NAME?   163.0    #NAME?
  34%     63.0      21.4



                           Page 57
                          Projects


 49%     14.0     6.9

 35%     100.0    35.0

  20%    100.0     20.0
#NAME?   200.0   #NAME?
   9%     1.0       0.1
#NAME?   120.0   #NAME?

#NAME?   40.0    #NAME?

#NAME?    91.0   #NAME?
  75%      3.6     2.7
#NAME?   180.0   #NAME?
#NAME?     2.8   #NAME?
#NAME?   190.0   #NAME?


#NAME?   10.5    #NAME?
  24%     3.8      0.9

  44%      2.0     0.9
#NAME?     2.0   #NAME?
         104.0     0.0
#NAME?    64.5   #NAME?
#NAME?    17.5   #NAME?

          1.1     0.0


#NAME?   13.0    #NAME?
  11%     0.9      0.1
#NAME?    0.8    #NAME?
#NAME?    0.8    #NAME?
#NAME?    0.8    #NAME?
          3.2      0.0
 63%      1.6      1.0



                          Page 58
                          Projects


          2.0     0.0


#NAME?   280.0   #NAME?
         200.0      0.0
#NAME?   145.0   #NAME?
#NAME?    8.0    #NAME?
  34%    103.5     35.4

#NAME?   400.0   #NAME?

#NAME?   15.0    #NAME?
#NAME?   10.5    #NAME?

  32%    56.0      18.0
#NAME?   10.0    #NAME?
#NAME?   90.0    #NAME?

#NAME?   450.0   #NAME?
#NAME?    20.0   #NAME?
#NAME?   650.0   #NAME?
#NAME?   275.0   #NAME?


#NAME?   125.0   #NAME?
  28%     0.6      0.2

  93%      3.5     3.3
#NAME?    26.4   #NAME?
#NAME?   540.0   #NAME?

#NAME?   100.0   #NAME?

 79%      6.7      5.3
 79%     102.0    80.7




                          Page 59
                          Projects


#NAME?   250.0   #NAME?



#NAME?   74.0    #NAME?

#NAME?   46.0    #NAME?

#NAME?    6.0    #NAME?

#NAME?    60.0   #NAME?
#NAME?    78.0   #NAME?
#NAME?   750.0   #NAME?
#NAME?    34.0   #NAME?
  29%      0.7     0.2

#NAME?   40.0    #NAME?

#NAME?    52.5   #NAME?
#NAME?   150.0   #NAME?

#NAME?   101.0   #NAME?

  46%     3.3      1.5
#NAME?   100.8   #NAME?




          30.0     0.0
#NAME?    35.0   #NAME?
#NAME?   480.0   #NAME?

#NAME?    4.7    #NAME?

#NAME?   24.0    #NAME?



                          Page 60
                          Projects


#NAME?   330.0   #NAME?

#NAME?   18.0    #NAME?

#NAME?    90.3   #NAME?
#NAME?   111.0   #NAME?
#NAME?    50.0   #NAME?

 54%      1.1     0.6

#NAME?   65.0    #NAME?


 80%      0.3     0.3

#NAME?   366.0   #NAME?

#NAME?   907.0   #NAME?

#NAME?   343.0   #NAME?
#NAME?     7.7   #NAME?
#NAME?    60.0   #NAME?

#NAME?   12.0    #NAME?
  17%     1.0      0.2


#NAME?   52.5    #NAME?
  24%     0.9      0.2
#NAME?    2.7    #NAME?

  4%      1.1      0.0
#NAME?   139.5   #NAME?

#NAME?   150.0   #NAME?
#NAME?    18.0   #NAME?




                          Page 61
                          Projects


  33%    404.0    135.0
#NAME?     0.8   #NAME?
#NAME?    23.0   #NAME?



#NAME?   508.0   #NAME?

#NAME?   127.0   #NAME?


  50%     8.8      4.4
#NAME?   20.0    #NAME?

#NAME?   150.0   #NAME?
#NAME?    20.0   #NAME?
#NAME?    18.0   #NAME?

#NAME?    1.3    #NAME?

#NAME?   28.0    #NAME?
#NAME?    5.5    #NAME?
#NAME?   10.5    #NAME?

#NAME?    5.0    #NAME?
#NAME?    5.0    #NAME?
#NAME?    5.0    #NAME?
#NAME?   600.0   #NAME?

#NAME?   100.0   #NAME?
#NAME?     9.0   #NAME?
#NAME?    22.5   #NAME?

  32%    99.0      31.5
#NAME?   10.5    #NAME?

#NAME?   90.0    #NAME?



                          Page 62
                          Projects


 40%      0.7      0.3

 40%      0.5      0.2
          2.4      0.0

#NAME?    0.0    #NAME?
#NAME?   60.0    #NAME?
  87%    15.0      13.0

#NAME?   23.5    #NAME?


 47%      1.5      0.7

 70%      1.4      1.0
 80%      0.9      0.7
 39%     309.0    120.0


#NAME?    4.0    #NAME?
  44%     4.0      1.8

#NAME?   550.0   #NAME?



          79.2
 33%     300.0    100.0


#NAME?   564.3   #NAME?
#NAME?    57.0   #NAME?
#NAME?    21.0   #NAME?

 73%      1.1      0.8
 76%      1.1      0.8
 72%      5.3      3.8



                          Page 63
                          Projects


#NAME?    21.0   #NAME?
#NAME?    20.0   #NAME?
#NAME?    50.0   #NAME?
#NAME?    18.8   #NAME?
#NAME?   290.0   #NAME?

#NAME?   265.0   #NAME?

#NAME?   290.0   #NAME?

#NAME?   50.0    #NAME?

#NAME?   55.0    #NAME?



#NAME?   10.0    #NAME?


  45%      8.3     3.7
  81%      1.6     1.3
#NAME?    98.7   #NAME?
#NAME?   100.5   #NAME?

  11%     0.6      0.1
#NAME?    5.0    #NAME?


#NAME?   660.0   #NAME?

#NAME?   200.0   #NAME?
#NAME?   520.0   #NAME?


#NAME?   10.0    #NAME?
  44%     2.0      0.9




                          Page 64
                           Projects


#NAME?   1380.0   #NAME?


#NAME?     3.3    #NAME?
#NAME?    75.0    #NAME?
#NAME?    37.8    #NAME?
#NAME?    10.5    #NAME?

#NAME?     9.9    #NAME?
#NAME?   186.0    #NAME?
#NAME?    10.5    #NAME?

#NAME?    16.8    #NAME?
#NAME?   136.6    #NAME?

 30%      50.0     15.0


#NAME?     5.3    #NAME?
#NAME?   170.0    #NAME?
#NAME?    98.9    #NAME?
#NAME?   103.5    #NAME?

#NAME?   760.0    #NAME?

#NAME?   1300.0   #NAME?

#NAME?    15.8    #NAME?

         104.0     0.0

  29%     96.6      28.0
#NAME?    75.0    #NAME?
#NAME?    50.0    #NAME?
#NAME?    20.0    #NAME?
  34%      7.2       2.4




                           Page 65
                          Projects


#NAME?   44.0    #NAME?


 32%     72.0     22.8

#NAME?   262.2   #NAME?
#NAME?   100.0   #NAME?
#NAME?    15.0   #NAME?
  33%      0.9     0.3

#NAME?   22.5    #NAME?

#NAME?    1.2    #NAME?
  30%     7.5      2.3
#NAME?    0.5    #NAME?




                          Page 66
                                Northwest Power and Conservation Council
                        NEW POWER PROJECTS IN THE PACIFIC NORTHWEST
             Update Notes (Format and formula changes, record additions or de

  Date
 4/21/2009
 5/11/2009
 5/11/2009
 6/24/2009
 6/27/2009
 6/29/2009
  7/6/2009
 7/20/2009
 7/20/2009
 8/14/2009

 8/14/2009
 8/14/2009
 8/19/2009
 8/21/2009
 9/15/2009
 9/15/2009
 9/22/2004
 11/6/2009
11/11/2009
12/11/2009
12/14/2009
12/17/2009
  1/5/2009

  1/5/2009
  1/5/2009
  1/5/2009
 2/10/2010
 2/12/2010
 2/19/2010
 2/23/2010

 2/24/2010
  3/3/2010
  3/9/2010
  4/5/2010
4/20/2010
4/22/2010

4/22/2010

4/22/2010

4/22/2010


4/29/2010
4/29/2010
5/18/2010

5/24/2010
 6/3/2010
6/28/2010
 7/8/2010
 7/8/2010
 7/8/2010
 7/8/2010
 7/8/2010
 7/8/2010
 7/8/2010
 7/8/2010
 7/8/2010
 7/9/2010
 7/9/2010
 7/9/2010
 7/9/2010
 7/9/2010
 7/9/2010




 7/9/2010
 7/9/2010
 7/9/2010
7/12/2010
7/14/2010
7/14/2010
7/26/2010
 8/4/2010
9/24/2010
9/24/2010
9/25/2010
9/25/2010
9/28/2010
9/28/2010
9/28/2010
                                 Northwest Power and Conservation Council
                  NEW POWER PROJECTS IN THE PACIFIC NORTHWEST
       Update Notes (Format and formula changes, record additions or deletions onl

                                       Item
Removed Willow Creek Geothermal (#1655)
Added Antelope Ridge
Added Senaca Sawmill
Added Summit Ridge
Added Juniper Ridge
Added Flathead Landfill WTE
Removed West Linn Paper (Inactive > 5 years)
Added Stahlbush Island Farms
Revised Neal Hot Springs Entry to reflect current structure
JK - Deleted Oregon Trail (1813), Pilgrim Stage Station (1815), Salmon Falls
(1826), Thousand Springs (1846) and Tuana Gulch (1849)
JK - Added Camp Reed (1885), Payne's Ferry (1886), Yahoo Creek (1887).
JK - Added Tuana Springs expansion.
JK - Added Saddle Butte WInd Park
JK - Added Teanaway solar
JK - Added Rim Rock
JK - Added Carty Generating Station
JK - Added Coyote Crest
JK - Added Grays Harbor Phase II
JK - Added Sawtooth wind
JK - Added Seattle Steam
JK - Added Big Horn II
JK - Added Culbertson
JK - Deleted Mountain Home (1872)

JK - Added Frenchman Hill (1903)
JK - Added Miller Ranch (1904)
JK - Added Leaning Juniper IIb (1905)
JK - Added Montegue
JK - Added Saddle Mountain
JK - Added Whitehall Wind, Borgford, Nippon Paper
JK - Added Riverbend, Finley Buttes, H.W. Hill expansion and Columbia Ridge
landfill gas energy recovery plants.
JK - Added Longview Fibre Expansion
JK - Added Wibaux
JK - Added Fighting Creek
JK - Added Coastal Energy
JK - Added Klamath Bioenergy
JK - Added Crump Geyser

JK - Deleted Fourmile Hill

JK - Deleted Liskey Farms

JK - Deleted Raft River III


JK - Added Vansycle II
JK - Deleted duplicate Columbia Ridge LFG
JK - Added Horn Butte

JK - Consolidated Lower Snake River Ph II w/ LSR balance
JK - Added Rock Creek Dairy, Swager Farms and Double B Dairy
JK - Added Farm Power Lynden
JK - Added A-Drop (#1940)
JK - Removed Cascade (#1701)
JK - Removed Greenmill (#1760)
JK - Added Greenfield (#1941)
JK - Added Johnson (#1942)
JK - Added Woods (#1943)
JK - Removed Gibson Dam (#1746)
JK - Removed Green Point Upper (#1759)
JK - Removed Deadwood (#1728)
JK - Added Lakeview Cogeneration (#1944)
JK - Added Farm Power Tillamook (#1945)
JK - Added Baseline Wind (#1946)
JK - Added Flint Creek (#1947)
JK - Added Enloe (#1948)
JK - Removed WECC, White Book and EIA capacity columns; replaced
w/Dependable capacity column



JK - Removed Cle Elum (#1711)
JK - Removed Foothills South (#1740)
JK - Removed St Laurent Land (Upper & Lower) (#1833 & 1834)
JK - Added Grand View Solar PV I
JK - Added Swan Lake North
JK - Added Wickiup Dam
JK - Added Naff Ridge
JK - Added PaTu, Juniper Canyon I & II, Lund Hill.
JK - Added Cascade Pacific Pulp
JK - Combined Cogeneration Host and Thermal Load columns
JK - Added Yamhill and Bellevue solar
JK - Converted to Excel 2007 Macro-enabled file.
JK - Added Rockland.
JK - Added Snoqualmie Falls refurbishment.
JK - Purged unused names.
Council
IC NORTHWEST
 additions or deletions only)

                             Note
          Project has not materialized




          USDOE loan guarentee for 22 MW net.




          Duplicate of Bennett Creek (1692) and Hot
          Springs (1771)
Geothermal Energy Association Ph 3, Apr
2010
Geothermal Energy Association Ph 2, Apr
2010
Not in Geothermal Energy Association
Inventory, Apr 2010
Additional development at Raft River
deferred pending achievement of full
capacity operation of Phase I




FERC license granted
PP expired
PP expired
FERC license granted
FERC license granted
FERC license granted
PP expired
PP expired
PP expired
USDOE grant awarded
USDOE grant awarded
NOI submitted
FERC license application submitted
FERC license application submitted
White Book, WECC or EIA capacity
information generally not available.
Dependable (January) capacity will be
entered where available and noted as to
source.
Was PP only
Was PP only
Was PP only

NOI to apply for FERC license
NOI to apply for FERC license
CUP application
Under construction
BETC award
                                 Northwest Power Planning Council
          KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                             7/18/2011


                          Northwest Power & Conservation Council
            NOTES AND ABBREVIATIONS USED IN PROJECT DATABASE
                                            18-July-2011



Status:

   In-service
   Construction
   Planned
   Proposed
   Deferred
   Suspended
   Terminated
   Retired

Abbreviations:

   APS
   AW
   BCGE
   BD
   BIO
   BIT
   BP
   BPA
   CC
   CFBC
   CG
   Chelan PUD
   Clark
   COL
   CPUD
   CUP
   DEF
   DEIS
   Douglas PUD
   PSS
   EPUD
   EWEB
   EX
   EXT
   Fall River
   FO
   FO2
   FSGE
   G



7/18/2011         2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 76   5:49 PM
                                 Northwest Power Planning Council
            KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                             7/18/2011
   BG
   GC
   GE
   GB
   GHPD
   GR
   Grant
   GST
   GT
   GTD
   HY
   HY Eff
   IC

   INA
   INS
   IPC
   Jefferson
   Klickitat
   LA
   Lane
   LC
   Lewis
   LFG
   LGIA
   LIG
   LIQ
   Lower Valley
   M
   Mason 3
   MOX
   MPC
   N. Wasco
   NB
   NG
   NOI
   NorthWestern
   Okanogan PUD
   OT
   PAC
   PC
   PC
   PG&E
   PGE
   PLN
   PLNR
   PND
   PO
   POT



7/18/2011         2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 77   5:49 PM
                                Northwest Power Planning Council
           KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                            7/18/2011
   PP
   PG
   PRM
   Project ID




7/18/2011        2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 78   5:49 PM
                                     Northwest Power Planning Council
          KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                                 7/18/2011
   PS
   PSE
   PSPL
   RAC
   R&B
   RB
   REF
   RET
   RG
   RL
   SC
   SCL
   SHPD
   Snohomish
   SPP
   ST
   STY
   SUB
   SUB
   SUS
   T&D
   TCL
   TER
   TG
   Tillamook
   U
   UN
   UNC
   UR
   USBR
   VR
   VR
   WAT
   WC
   WCS
   WDN
   WEC
   WG
   WND
   WT
   WW
   XG



Notes:

   Capacity and energy values shown for upgrades and additions are incremental unless noted.
   Average energy estimates are shown for non-thermal projects only.




7/18/2011           2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 79            5:49 PM
                                 Northwest Power Planning Council
        KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                             7/18/2011
Default capacity factors for calculating energy


       Code
   BG
   BGCG
   BGGT
   BGIC
   BGICCG
   CC
   CCCG
   CFBCST
   FC
   FCCG
   GB
   GE
   GST
   GT
   GTCG
   HY
   IC
   ICCG
   IGCC
   OT
   NP
   PS
   PV
   RBSTCG
   ST
   STCG
   TISEC
   UN
   WEC
   WT




7/18/2011         2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 80   5:49 PM
                                                        Northwest Power Planning Council
                 KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                                                      7/18/2011


                  Northwest Power & Conservation Council
NOTES AND ABBREVIATIONS USED IN PROJECT DATABASE
                                              18-July-2011




    Project in operation.
    Project under construction.
    Firm date for start of construction or for completion published; construction not underway.
    Project under development. Specific site, fuel, technology and capacity announced.
    Development suspended.
    Construction suspended.
    Development or construction terminated.
    Previously operating project retired.




    Arizona Public Service
    Agricultural waste
    Binary cycle geothermal
    Biodiesel
    Biomass (unknown or mixed)
    BItuminous coal
    Buoy pump
    Bonneville Power Administration
    Combined-cycle combustion (gas) turbine
    Circulating fluidized bed combustion (boiler)
    Cogeneration
    Chelan Co. PUD
    Clark Co. PUD
    Coal
    Clatskanie People's Utility District
    Conditional Use Permit
    Deferred project never constructed.
    Draft Environmental Impact Statement
    Douglas Co. PUD
    WA Energy Facility Site Eveluation Council Potential Site Study
    Emerald PUD
    Eugene Water & Electric Board
    License exemption
    Extension granted
    Fall River Electric Co-op
    Fuel oil
    No. 2 Fuel oil
    Flashed steam geothermal plant
    New permanent power plant.



    7/18/2011                     2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 81   5:49 PM
                                                       Northwest Power Planning Council
              KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                                                        7/18/2011
Biomass gasifier
Coal gasifier
Geothermal plant
Geothermal plant - Binary
Grays Harbor PUD
Proposed retirement of existing generation
Grant Co. PUD
Geothermal fluid
Simple-cycle combustion (gas) turbine
Granted
Hydropower
Hydropower efficiency improvements (upgrades and refurbishments).
Reciprocating engine
Inactive. Not permitted or no recent evidence of development activity (10 years for hydro projects holding licenses or
exemptions).
In-service. Operating or available for service (may be on standby).
Idaho Power Company
Jefferson Co. PUD
Klickitat Co. PUD
License amendment (hydropower projects)
Lane Electric Cooperative
License or site certificate
Lewis Co. PUD
Landfill gas
Large Generator Interconnection Agreement
Lignite
Spent pulping liquor
Lower Valley Power & Light
Actions involving generic or multiple projects; may include projects listed separately.
Mason co. PUD No. 3
Mixed-oxide fuel (uranium & plutonium)
Montana Power Company (now NorthWestern Corporation)
Northern Wasco PUD
Boiling water reactor
Natural gas
Notice of intent to apply for a site certificate
NorthWestern Corporation
Okanogan Co. PUD
Other
PacifiCorp
Pulverized coal
Petroleum coke
Pacific Gas & Electric
Portland General Electric Company
Planned for construction. Permits sought
Planned retirement.
Pending (Application complete)
Project order (stipulations for a license application)
Permits secured or being secured or otherwise under consideration; construction not scheduled. Also see INA (inactive).



7/18/2011                       2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 82                           5:49 PM
                                                  Northwest Power Planning Council
            KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                                                  7/18/2011
FERC preliminary permit
Propane
Power Resource Managers Resource Package
Federal Energy Regulatory Commission hydropower project identification number.




7/18/2011                   2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 83   5:49 PM
                                                                  Northwest Power Planning Council
                          KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                                                               7/18/2011
             Pumped Storage Hydropower
             Puget Sound Energy
             Puget Sound Power & Light (Now Puget Sound Energy)
             Reactivation of existing unit.
             Rehabilitation and betterment
             Chemical recovery boiler
             Municipal solid waste
             Retired from service.
             Refinery gas
             Relicense
             Site certificate
             Seattle City Light
             Snohomish County PUD
             Snohomish Co. PUD
             Sierra Pacific Power Company
             Boiler-steam turbine
             Stayed
             Subbituminous coal
             Springfield Utility Board
             Suspended partially constructed project.
             Transmission & Distribution System
             Tacoma Public Utilities
             Terminated project prior to construction.
             Temporary generation (permitted for 24 months, or less).
             Tillamook PUD
             Unconfirmed
             Unknown
             Under construction
             Uranium
             U.S. Bureau of Reclamation
             Various
             Various
             Water
             Waste Coal (Culm)
             Water control structure (dam, canal, conduit, etc.)
             Withdrawn
             Wave energy converter
             Wastewater treatment plant gas
             Wind
             Wind turbine
             Woody residues
             Refurbishment, expansion or retirement of existing power plant.




acity and energy values shown for upgrades and additions are incremental unless noted.
rage energy estimates are shown for non-thermal projects only.




            7/18/2011                     2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 84   5:49 PM
                                                              Northwest Power Planning Council
                       KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                                                          7/18/2011
t capacity factors for calculating energy


                                                                  Technology
           Biogasification recip
           Biogasification cogeneration
           Digester combustion turbine
           Biogasification recip
           Biogasification recip w/cogeneration
           Combined-cycle combustion (gas) turbine
           Combined-cycle combustion (gas) turbine w/cogeneration
           Circulating fluidized bed combustion
           Fuel cell
           Fuel cell
           Geothermal binary
           Geothermal
           Geothermal flash steam
           Simple-cycle combustion (gas) turbine
           Simple-cycle combustion (gas) turbine w/cogeneration
           Hydro
           Reciprocating engine
           Reciprocating engine cogeneration
           Coal gasification combined-cycle
           Other
           Pressurized water reactor
           Pumped Storage
           Solar photovoltaic
           Boiler steam electric plant w/cogeneration
           Boiler steam electric plant
           Boiler steam electric plant w/cogeneration
           Tidal In-stream energy converters
           Unknown
           Wave energy conversion device
           Wind turbine




           7/18/2011                      2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 85   5:49 PM
                             Northwest Power Planning Council
        KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                         7/18/2011




7/18/2011     2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 86   5:49 PM
                             Northwest Power Planning Council
        KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                         7/18/2011




7/18/2011     2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 87   5:49 PM
                             Northwest Power Planning Council
        KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                         7/18/2011




7/18/2011     2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 88   5:49 PM
                             Northwest Power Planning Council
        KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                         7/18/2011




7/18/2011     2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 89   5:49 PM
                                     Northwest Power Planning Council
        KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
                                                 7/18/2011



  Default Capacity
      Factor                              Source
                90%
                90%
                90%    5th Plan Resource Characterization
                90%
                90%
                90%    5th Plan Resource Characterization
                90%    5th Plan Resource Characterization
                84%
                90%
                90%
                92%    Equivalent to Geothermal flash steam
                92%    5th Plan Resource Characterization
                92%    5th Plan Resource Characterization
                94%    5th Plan Resource Characterization
                94%    5th Plan Resource Characterization
                50%    Typical
                91%    5th Plan Resource Characterization
                91%    5th Plan Resource Characterization
                83%    5th Plan Resource Characterization
                90%
                90%
                  0%
                22%    5th Plan Resource Characterization
                84%    To match steam cogen
                84%    5th Plan Resource Characterization
                84%    5th Plan Resource Characterization
                30%    Provisional - more detail in EPRI report.
                80%    Assume unknowns are typically thermal units
                37%    1991 Power Plan
                32%    Biennial review - Wind (Jun 2006)




7/18/2011         2eef0716-ba5e-4aa2-a95e-01f4849aff03.xlsKey & Lookups - Page 90   5:49 PM
                                                                                 Northwest Power and Conservation Council
                                                                                            NEW PROJECT STATUS



                                 Generating Project Development Activity in the                                                                     Generating Pro
                                                  Northwest
                                 3000                                                    Hydrokinetic                                               20000
       Installed Capacity (MW)




                                                                                                                          Installed Capacity (MW)
                                                                                         Pumped Storage
                                                                                         Solar
                                                                                         Wind
                                                                                         Petroleum/Pet Coke                                         15000
                                                                                         Natural gas
                                 2000                                                    Hydro
                                                                                         Geothermal
                                                                                         Coal
                                                                                                                                                    10000
                                                                                         Biomass

                                 1000
                                                                                                                                                     5000




                                    0                                                                                                                   0
                                                Operating (2009 >   Under Construction           Planned
                                                    Present)

                                                                                     September 2010
                                                                             * Jan 2002 through Feb 2007




                                                                                                                       Petroleum/Pe
                   Biomass         Coal      Geothermal                                     Hydro       Natural gas       t Coke
Operating (2009 > Present) 67                                                                        16           97
Under Construction           5                                                                       43          500
Planned                      8                                                                       37
Proposed                  309           1174          64                                            109         4831
                           44
Susp/Deferred/Term (Jul 2006 > Present) 3454         142                                              7         2658                                  600


TECH                                    (All)

Sum of DefMW PRRES
PLSTAT       Biomass                                      Coal          Geothermal       Hydro         Natural gas     Petroleum
Construction                5                        43     470
Deferred                                760     15
Planned                     8                        37
Suspended                  18                                 5
Terminated                 26          2694    127     7   2653   600
Proposed                  309                   64   109   4831
Operating                  67                         16    127
Grand Total               432          3454    206   212   8085   600

                           44
Susp/Deferred/Term (Jul 2006 > Present) 3454   142    7    2658   600
ation Council
ATUS



    Generating Project Development Activity
               in the Northwest
    20000                                        Hydrokinetic
                                                 Pumped Storage
                                                 Solar
                                                 Wind
    15000                                        Petroleum/Pet Coke
                                                 Natural gas
                                                 Hydro
                                                 Geothermal
    10000                                        Coal
                                                 Biomass



     5000




        0
                    Proposed                 Susp/Deferred/Term (Jul
                                                2006 > Present)


                                                 September 2010




                                               Pumped
                Wind           Solar           Storage       Hydrokinetic
                    1302                2
                    1037
                    1066                22                               1
                    8603               100            1718             367
                     354                 0               0              74




            Wind           Solar             Hydrokinetic    Pump Storage Grand Total
1037                        1554
  50                         825
1066    22     1            1133
                              22
  304          74           6485
 8603   100   367   1718   16101
 1302     2                 1513
12361   124   443   1718   27634

 354     0    74       0   7332

				