Project Management Mobilization Plan

Document Sample
Project Management Mobilization Plan Powered By Docstoc
					Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:   00-000-00(00)                                       Project:   proj name
PI No.:      000000                                              County:    county name
Prime:       firm name                                     Contract Type:   Cost Plus Fixed Fee
Date:        29-Mar-07                                      Fixed Fee %:    10%

Table of Contents
  Pages      Item
    1        Table of Contents                                Geotechnical Firm       firm name
             Cost & Hours Summary                             Contact                 contact name
             Existing Pavement Analysis Cost & Hours          Phone No.               phone
             Final Soil Survey Cost & Hours
             BFI-Bridge No. 1 Cost & Hours
             BFI-Bridge No. 2 Cost & Hours
             Wall Foundation Investigations Cost & Hours




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls Project                                                Page 1 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                              Project:     proj name
PI No.:       000000                                                                     County:      county name
Prime:        firm name                                                            Contract Type:     Cost Plus Fixed Fee
Date:         29-Mar-07                                                             Fixed Fee %:      10%
              firm name
Discipline:   Geotechnical/Pavement                            Hours & Cost Estimate for                                Summary of All Phases & Tasks
                                                                                       Total Other                          Total Labor           Direct Labor    Indirect Costs
                                                Total Hours        Total Cost          Direct Costs       Fixed Fee @          Cost                   Cost       (Overhead) @          FCCM @
Phase         Description                                                                                     10%                                                    125.00%            1.00%

                                   TOTALS ==>                  $               -   $              -   $            -    $             -       $             -     $         -      $        -

0             Public Involvement                               $               -   $              -   $            -    $             -       $             -     $         -      $        -

1             Concept Development                              $               -   $              -   $            -    $             -       $             -     $         -      $        -

2             Database Preparation                             $               -   $              -   $            -    $             -       $             -     $         -      $        -

3             Environmental Document                           $               -   $              -   $            -    $             -       $             -     $         -      $        -

4             Preliminary Plans                                $               -   $              -   $            -    $             -       $             -     $         -      $        -

5             Right of Way Plans                               $               -   $              -   $            -    $             -       $             -     $         -      $        -

6             Final Plans                                      $               -   $              -   $            -    $             -       $             -     $         -      $        -

7             Construction Services                            $               -   $              -   $            -    $             -       $             -     $         -      $        -

8             Special Studies                                  $               -   $              -   $            -    $             -       $             -     $         -      $        -



Project Level Summary - Labor
                                                               Staff Type / Project Hourly Rates / Hours                      Project Hourly Rates Include Escalation Over Current Rates of:        3.0%
                                                                                                                                               Senior
                                                                                        Project                               Project       Technician/                         CADD              Clerical           M.O.T.
                                                Total Hours        Principal            Manager       Chief Engineer         Engineer     Engineer's Aide    Technician       Technician        Administrator       Personnel
                                                                    $10.00              $10.00            $10.00              $10.00          $10.00           $10.00           $10.00            $10.00             $10.00

                              TOTAL HOURS ==>

               TOTAL DIRECT LABOR COST==> $             -      $               -   $              -   $            -    $             -       $             -     $         -      $        -   $          -    $           -


Project Level Summary - Other Direct Costs
                                                                                                                                             Other Direct Costs


                                                Total Other         Drilling            Laboratory     Miscellaneous    Specialty Drilling
                                                Direct Costs

                                   TOTALS ==> $         -      $               -   $              -   $            -    $             -       $             -     $         -      $        -   $          -    $           -




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls GeoSummary                                                                                                                                                                        Page 2 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                                Project:    proj name
PI No.:       000000                                                                       County:     county name
Prime:        firm name                                                              Contract Type:    Cost Plus Fixed Fee
Date:         29-Mar-07                                                               Fixed Fee %:     10%
              firm name
Discipline:   Geotechnical/Pavement                              Hours & Cost Estimate for                               Summary of All Phases & Tasks
                                                                 Staff Type / Project Hourly Rates / Hours                                                                 Includes Escalation of:           3.0%
                                                                                                                                                  Senior
                                                                                                                                                Technician/                             CADD               Clerical           M.O.T.
                                                  Total Hours        Principal       Project Manager    Chief Engineer   Project Engineer     Engineer's Aide       Technician        Technician         Administrator       Personnel
Phase         Description                                            $10.00              $10.00            $10.00            $10.00              $10.00              $10.00            $10.00              $10.00             $10.00

                                     TOTALS ==>

0             Public Involvement

1             Concept Development

2             Database Preparation

3             Environmental Document

4             Preliminary Plans

5             Right of Way Plans

6             Final Plans

7             Construction Services

8             Special Studies




                                                                                                                                  Other Direct Costs


                                                  Total Other         Drilling           Laboratory     Miscellaneous    Specialty Drilling
Phase         Description                         Direct Costs

                                     TOTALS ==> $         -      $               -   $            -    $           -     $             -      $          -      $            -    $            -     $              -    $           -

0             Public Involvement

1             Concept Development

2             Database Preparation

3             Environmental Document

4             Preliminary Plans                   $       -      $               -   $            -    $           -     $             -      $          -      $            -    $            -     $              -    $           -

5             Right of Way Plans

6             Final Plans                         $       -      $               -   $            -    $           -     $             -      $          -      $            -    $            -     $              -    $           -

7             Construction Services

8             Special Studies




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls GeoSummary                                                                                                                                                                                 Page 3 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                            Project:     proj name
PI No.:       000000                                                                   County:      county name
Prime:        firm name                                                          Contract Type:     Cost Plus Fixed Fee
Date:         29-Mar-07                                                           Fixed Fee %:      10%
              firm name
Discipline:   Geotechnical/Pavement                             Hours & Cost Estimate for                           Summary of All Phases & Tasks
SUMMARY BY PHASE/MAJOR TASK - TOTAL COSTS

                                                                Total Contract       Total Other                        Total Labor       Direct Labor    Indirect Costs
                                                  Total Hours        Cost            Direct Costs     Fixed Fee @          Cost               Cost       (Overhead) @        FCCM
Phase         Description                                                                                 10%                                                125.00%         1.00%
                                     TOTALS ==>                 $          -     $             -    $           -   $            -    $             -     $          -   $           -

4             Preliminary Plans - TOTALS                        $          -     $             -    $          -    $            -    $             -    $          -   $            -
              Existing Pavement Analysis                        $          -     $             -    $          -    $            -    $             -    $          -   $            -
              Final Soil Survey before PFPR                     $          -     $             -    $          -    $            -    $             -    $          -   $            -


6             Final Plans - TOTALS                              $          -     $             -    $          -    $            -    $             -    $          -   $            -
              Final Soil Survey after PFPR                      $          -     $             -    $          -    $            -    $             -    $          -   $            -
              BFI - Bridge # 1                                  $          -     $             -    $          -    $            -    $             -    $          -   $            -
              BFI - Bridge # 2                                  $          -     $             -    $          -    $            -    $             -    $          -   $            -
              BFI - Bridge # 3                                  $          -     $             -    $          -    $            -    $             -    $          -   $            -
                                                                $          -     $             -    $          -    $            -    $             -    $          -   $            -
                                                                $          -     $             -    $          -    $            -    $             -    $          -   $            -
                                                                $          -     $             -    $          -    $            -    $             -    $          -   $            -
                                                                $          -     $             -    $          -    $            -    $             -    $          -   $            -
              Wall Foundation Investigations                    $          -     $             -    $          -    $            -    $             -    $          -   $            -




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls GeoSummary                                                                                                                                 Page 4 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                               Project:    proj name
PI No.:       000000                                                                      County:     county name
Prime:        firm name                                                             Contract Type:    Cost Plus Fixed Fee
Date:         29-Mar-07                                                              Fixed Fee %:     10%
              firm name
Discipline:   Geotechnical/Pavement                             Hours & Cost Estimate for                              Summary of All Phases & Tasks
SUMMARY BY PHASE/MAJOR TASK - HOURS
                                                                Staff Type / Hourly Rates / Hours                                                                        Includes Escalation of:        3.0%
                                                                                                                                                Senior
                                                                                        Project                             Project           Technician/                             CADD           Clerical            M.O.T.
                                                  Total Hours       Principal           Manager       Chief Engineer       Engineer         Engineer's Aide       Technician        Technician     Administrator        Personnel
Phase         Description                                            $10.00              $10.00           $10.00           $10.00               $10.00             $10.00            $10.00            $10.00            $10.00
                                     TOTALS ==>

4             Preliminary Plans - TOTALS
              Existing Pavement Analysis
              Final Soil Survey before PFPR


6             Final Plans - TOTALS
              Final Soil Survey after PFPR
              BFI - Bridge # 1
              BFI - Bridge # 2
              BFI - Bridge # 3




              Wall Foundation Investigations

SUMMARY BY PHASE/MAJOR TASK - OTHER DIRECT COSTS
                                                                                                                                Other Direct Costs

                                                Total Other          Drilling           Laboratory     Miscellaneous   Specialty Drilling
Phase         Description                       Direct Costs
                                     TOTALS ==>    #REF!             #REF!                #REF!           #REF!             #REF!               #REF!               #REF!             #REF!            #REF!             #REF!

4             Preliminary Plans - TOTALS          $       -     $               -   $             -   $            -   $             -      $            -    $             -   $             -    $            -   $             -
              Existing Pavement Analysis          $       -     $               -   $             -   $            -   $             -      $            -    $             -   $             -    $            -   $             -
              Final Soil Survey before PFPR       $       -     $               -   $             -   $            -   $             -      $            -    $             -   $             -    $            -   $             -


6             Final Plans - TOTALS                $       -     $               -   $             -   $            -   $             -      $            -    $             -   $             -    $            -   $             -
              Final Soil Survey after PFPR        $       -
              BFI - Bridge # 1                    $       -     $               -   $             -   $            -   $             -      $            -    $             -   $             -    $            -   $             -
              BFI - Bridge # 2                    $       -
              BFI - Bridge # 3




              Wall Foundation Investigations      $       -     $               -   $             -   $            -   $             -      $            -    $             -   $             -    $            -   $             -




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls GeoSummary                                                                                                                                                                              Page 5 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                              Project:     proj name
PI No.:       000000                                                                     County:      county name
Prime:        firm name                                                            Contract Type:     Cost Plus Fixed Fee
Date:         29-Mar-07                                                             Fixed Fee %:      10%
              firm name
Discipline:   Geotechnical                                     Hours & Cost Estimate for                                Existing Pavement Analysis
                                                                                       Total Other                          Total Labor           Direct Labor    Indirect Costs
                                                Total Hours        Total Cost          Direct Costs       Fixed Fee @          Cost                   Cost       (Overhead) @          FCCM @
Phase         Description                                                                                     10%                                                    125.00%            1.00%

                                   TOTALS ==>                  $               -   $              -   $            -    $             -       $             -     $         -      $        -



                                                               Staff Type / Project Hourly Rates / Hours                      Project Hourly Rates Include Escalation Over Current Rates of:        3.0%
                                                                                                                                               Senior
                                                                                        Project                               Project       Technician/                         CADD              Clerical           M.O.T.
                                                Total Hours        Principal            Manager       Chief Engineer         Engineer     Engineer's Aide    Technician       Technician        Administrator       Personnel
                                                                    $10.00              $10.00            $10.00              $10.00          $10.00           $10.00           $10.00            $10.00             $10.00

                              TOTAL HOURS ==>

               TOTAL DIRECT LABOR COST==> $             -      $               -   $              -   $            -    $             -       $             -     $         -      $        -   $          -    $           -



                                                                                                                                             Other Direct Costs


                                                Total Other         Drilling            Laboratory     Miscellaneous    Specialty Drilling
                                                Direct Costs

                                   TOTALS ==> $         -      $               -   $              -   $            -




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls EPA                                                                                                                                                                               Page 6 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                            Project:    proj name
PI No.:       000000                                                                   County:     county name
Prime:        firm name                                                          Contract Type:    Cost Plus Fixed Fee
Date:         29-Mar-07                                                           Fixed Fee %:     10%
              firm name
Discipline:   Geotechnical                                         Hours & Cost Estimate for                         Existing Pavement Analysis
Existing Pavement Analysis                                                                                                                  Senior
                                                                                                                                          Technician/                    CADD         Clerical       M.O.T.
                                                     Total Hours     Principal   Project Manager    Chief Engineer   Project Engineer   Engineer's Aide   Technician   Technician   Administrator   Personnel
              Exist. Pvmnt. Analysis - Labor
              Site Visits
              Locate Utilities
              Meetings & Coordination
              Project Management
              Travel
              Pavement Evaluation
              History
              Report Preparation
              MUTCD Preparation / Permits
              Photo Cores
              Log Cores; Soil Test Data




              Exist. Pvmnt. Analysis - Other Direct Costs
                                                       ITEM                                             UNIT          NO OF UNITS        UNIT RATE         COST

              Drilling                                                                                                             Total Drilling Costs
              Mobilization                                                                               ea                                      $1.00
              Core Pavement                                                                              ea                                      $1.00
              Patch Pavement                                                                             ea                                      $1.00
              Per Diem & Lodging - Two Men                                                               day                                     $1.00
              Additional Miles > 50 miles                                                                mile                                    $1.00
              Dynamic Cone Test                                                                          ea                                      $1.00
              Collect 810.2 Samples                                                                      ea                                      $1.00


                                                       ITEM                                             UNIT          NO OF UNITS        UNIT RATE         COST

              Laboratory                                                                                                       Total Laboratory Costs
              810.01 Series Testing                                                                                                              $1.00



                                                       ITEM                                             UNIT          NO OF UNITS        UNIT RATE         COST

              Miscellaneous Other Direct Costs                                                                         Total Misc. Other Direct Costs
              Travel                                                                                     mile                                    $1.00
              Per Diem & Lodging - non-drill crew personnel                                              day                                     $1.00
              Traffic Control - Lane Closure                                                             day                                     $1.00
              Traffic Control - Shoulder Closure                                                         day                                     $1.00
              Light Plant                                                                                day                                     $1.00




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls EPA                                                                                                                                                               Page 7 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                              Project:     proj name
PI No.:       000000                                                                     County:      county name
Prime:        firm name                                                            Contract Type:     Cost Plus Fixed Fee
Date:         29-Mar-07                                                             Fixed Fee %:      10%
              firm name
Discipline:   Geotechnical                                     Hours & Cost Estimate for                                Final Soil Survey
                                                                                       Total Other                          Total Labor           Direct Labor    Indirect Costs
                                                Total Hours        Total Cost          Direct Costs       Fixed Fee @          Cost                   Cost       (Overhead) @          FCCM @
Phase         Description                                                                                     10%                                                    125.00%            1.00%

                                   TOTALS ==>                  $               -   $              -   $            -    $             -       $             -     $         -      $        -



                                                               Staff Type / Project Hourly Rates / Hours                      Project Hourly Rates Include Escalation Over Current Rates of:        3.0%
                                                                                                                                               Senior
                                                                                        Project                               Project       Technician/                         CADD              Clerical           M.O.T.
                                                Total Hours        Principal            Manager       Chief Engineer         Engineer     Engineer's Aide    Technician       Technician        Administrator       Personnel
                                                                    $10.00              $10.00            $10.00              $10.00          $10.00           $10.00           $10.00            $10.00             $10.00

                              TOTAL HOURS ==>

               TOTAL DIRECT LABOR COST==> $             -      $               -   $              -   $            -    $             -       $             -     $         -      $        -   $          -    $           -



                                                                                                                                             Other Direct Costs


                                                Total Other         Drilling            Laboratory     Miscellaneous    Specialty Drilling
                                                Direct Costs

                                   TOTALS ==> $         -      $               -   $              -   $            -    $             -




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls FSS                                                                                                                                                                               Page 8 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                              Project:    proj name
PI No.:       000000                                                                     County:     county name
Prime:        firm name                                                            Contract Type:    Cost Plus Fixed Fee
Date:         29-Mar-07                                                             Fixed Fee %:     10%
              firm name
Discipline:   Geotechnical                                           Hours & Cost Estimate for                         Final Soil Survey
Final Soil Survey                                                                                                                             Senior
                                                                                                                                            Technician/                    CADD         Clerical       M.O.T.
                                                       Total Hours     Principal   Project Manager    Chief Engineer   Project Engineer   Engineer's Aide   Technician   Technician   Administrator   Personnel
              Final Soil Survey Labor
                            General
              Site Visits
              Project Management
              Meetings & Coordination
              MUTCD Plan Prep/Permit




                         Field & Office

              Utility Locate & Gaining Site Access
              Property Owner Contact
              Boring Layout (Field)
              Soil Logging/Classification & Drill
              Crew Supervision
              Groundwater Readings
              Installation Of Erosion Control And/Or
              Limited Site Restoration
              Boring Backfill

              Travel To & From Site For Personnel
              Sample Transport To Laboratory
              (Unless Concurrent With Weekly
              Travel To & From Site)
              Laboratory Assignment & Boring Log
              Review
              Field Book Data Review & Plan
              Preparation
              Engineering Analysis & Design
              Unsuitable Materials Investigation
              Report Preparation
              Draft Report Publishing
              Report Revisions
              Compile Final Report
              QC/QA
              MOT - Flagman




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls FSS                                                                                                                                                                 Page 9 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                    Project:   proj name
PI No.:       000000                                                           County:    county name
Prime:        firm name                                                  Contract Type:   Cost Plus Fixed Fee
Date:         29-Mar-07                                                   Fixed Fee %:    10%
              firm name
Discipline:   Geotechnical                                    Hours & Cost Estimate for                 Final Soil Survey
Final Soil Survey (continued)
6.A           Final Soil Survey - Other Direct Costs
                                                       ITEM                                   UNIT       NO OF UNITS    UNIT RATE         COST

              Drilling                                                                                             Total Drilling Costs
              MOBILIZATION, PER RIG                                                           each                              $1.00
              DRILL CREW PER DIEM, TWO MAN CREW                                                day                              $1.00
              DRILL CREW PER DIEM, (ADDITIONAL PERSONS)                                        day                              $1.00
              AUGER BORINGS                                                                    foot                             $1.00
              PIEZOMETER (SLOTTED PIPE)                                                        foot                             $1.00
              CORE OR ROTARY DRILLING SETUP                                                   each                              $1.00
              NQ ROCK CORING                                                                   foot                             $1.00
              TEMPORARY CASING                                                                 foot                             $1.00
              SOIL SUPPORT SAMPLES                                                            each                              $1.00
              810.2 SERIES SAMPLES                                                            each                              $1.00
              SPT SAMPLES (SOIL SURVEY CUT SECTIONS IN CONJUNCTION W/AUGER BORINGS)           each                              $1.00
              UNDISTURBED SHELBY TUBE SAMPLES                                                 each                              $1.00
              DRILL CREW STANDBY/DELAY/SITE REHAB                                              hour                             $1.00
              SITE RESTORATION                                                                 hour                             $1.00
              DRILLING THROUGH CONCRETE, PER CORE                                             each                              $1.00
              WATER HAULING                                                                    hour                             $1.00
              PATCHING PAVEMENT AT GRADE                                                      each                              $1.00
              UNSUITABLE MATERIALS INVESTIGATION                                               foot                             $1.00
              ADDITONAL MOBILIZATION (BEYOND 50 MILE RADIUS)                                   mile                             $1.00
              SPT BORINGS                                                                      foot                             $1.00
              DRILL CREW TRAVEL (WEEKENDS TO/FROM OFFICE)                                      hour                             $1.00




      7/18/2011 5:06 PM
      2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls FSS                                                                                               Page 10 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                         Project:   proj name
PI No.:       000000                                                                County:    county name
Prime:        firm name                                                       Contract Type:   Cost Plus Fixed Fee
Date:         29-Mar-07                                                        Fixed Fee %:    10%
              firm name
Discipline:   Geotechnical                                         Hours & Cost Estimate for                    Final Soil Survey

Final Soil Survey (continued)
              Final Soil Survey - Other Direct Costs (continued)
                                                     ITEM                                           UNIT        NO OF UNITS       UNIT RATE        COST

              Laboratory                                                                                                 Total Laboratory Costs
              USCS TESTS                                                                            each                                  $1.00
              TRIAXIAL SHEAR                                                                        each                                  $1.00
              CONSOLIDATION                                                                         each                                  $1.00
              NATURAL MOISTURE CONTENT                                                              each                                  $1.00
              ORGANIC CONTENT                                                                       each                                  $1.00
              810.2 SERIES TESTING                                                                  each                                  $1.00
              CBR TESTS                                                                             each                                  $1.00
              CORROSIVITY TESTING                                                                   each                                  $1.00




                                                     ITEM                                           UNIT        NO OF UNITS       UNIT RATE        COST

              MiscellaneousOther Direct Costs                                                                     Total Misc. Other Direct Costs
              TRAVEL                                                                                 mile                                 $1.00
              DOZER FOR CLEARING TO BORING LOCATIONS                                                hour                                  $1.00
              EROSION CONTROL (Materials & Trenching Equipment)                                   lineal foot                             $1.00
              LIMITED SITE RESTORATION in CLEARED/DISTURBED AREAS                                actual costs                             $1.00
              TRAFFIC CONTROL                                                                        day                                  $1.00
              PER DIEM (NON-DRILL CREW PERSONNEL)                                                    day                                  $1.00




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls FSS                                                                                                         Page 11 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                                 Project:   proj name
PI No.:       000000                                                                        County:    county name
Prime:        firm name                                                               Contract Type:   Cost Plus Fixed Fee
Date:         29-Mar-07                                                                Fixed Fee %:    10%
              firm name
Discipline:   Geotechnical                                             Hours & Cost Estimate for                      Final Soil Survey

Final Soil Survey (continued)
              Final Soil Survey - Other Direct Costs (continued) - SPECIALTY DRILLING ITEMS

                                                                                             TOTAL SPECIALTY DRILLING ITEMS OTHER DIRECT COSTS
                                                           ITEM                                             UNIT      NO OF UNITS    UNIT RATE         COST   COMMENTS

              Drilling (Specialty Drilling Items)                                                                               Total Drilling Costs
              Mobilization of Specialty Drill, Per Rig                                                      each                                              Specify rig type (ATV, Marsh Buggy, Low Headroom, etc.)
              Mobilization of Specialty Support Equipment                                                   each                                              Specify type of equipment
              Time Rate Drilling & Setup for Confined Spaces, Over Water, Specialty In-Situ Field         crew hour                                           Specify # in Crew
              Barge (for drilling over water)                                                               hour                                              If Rental, list as direct expense
              Work Boat                                                                                     days                                              If Rental, list as direct expense
              Equipment Charge (Packers, Pressuremeter, Dilatometer, etc.)                                  hour                                              Specify Equipment (if rental, list as direct expense)
              Soil Test Borings, Below 100 Feet in Depth                                                    feet                                              Specify depth range
              HQ Rock Coring                                                                                feet
              Grouting of Bore Holes                                                                        feet
              Training of Field Personnel Due to Special Site Requirements                                  hour                                              Specify requirements and by who this is required
              Casing Advancer (drilling thru debris, rubble fill or boulders)                               feet
              Seismic Refraction Crew (Personnel only)                                                    crew hour
              Time Rate Decon for Environmental Purposes                                                    hour
              Ground Penetrating Radar (GPR)                                                                hour
              Unsuitable Materials Investigation                                                            feet
              Water Truck                                                                                   days




              UNSUITABLE MATERIALS INVESTIGATION                                                            hour




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls FSS                                                                                                                                                                     Page 12 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                          Project:   proj name
PI No.:       000000                                                                 County:    county name
Prime:        firm name                                                        Contract Type:   Cost Plus Fixed Fee
Date:         29-Mar-07                                                         Fixed Fee %:    10%
              firm name
Discipline:   Geotechnical                                         Hours & Cost Estimate for                      Final Soil Survey

Final Soil Survey (continued)
              Final Soil Survey - Other Direct Costs (continued) - SPECIALTY DRILLING ITEMS (continued)
                                                        ITEM                                         UNIT         NO OF UNITS       UNIT RATE        COST   COMMENTS

              Laboratory (Specialty Drilling Items)                                                                        Total Laboratory Costs




                                                        ITEM                                         UNIT         NO OF UNITS       UNIT RATE        COST   COMMENTS

              Miscellaneous Other Direct Costs (Specialty Drilling Items)                                           Total Misc. Other Direct Costs
              Travel                                                                                  mile                                                  Specify for whom
              Dozer or Other Equipment for Gaining Boring Access                                     hour
              Crane Rental                                                                           hour
              Decon Unit, Generator or Core Machine                                                  days                                                   Specify
              Traffic Control                                                                        days
              Per Diem (See Assumptions)                                                         per person/day
              Other Site Safety Requirements                                                         each                                                   Specify
              Permits or Bonds                                                                       each                                                   Specify
              Specialty Field Equipment                                                              days                                                   Specify Type
              Personal Protective Equipment for Environmental Drilling                               each




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls FSS                                                                                                                              Page 13 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                              Project:     proj name
PI No.:       000000                                                                     County:      county name
Prime:        firm name                                                            Contract Type:     Cost Plus Fixed Fee
Date:         29-Mar-07                                                             Fixed Fee %:      10%
              firm name
Discipline:   Geotechnical                                     Hours & Cost Estimate for                                BFI - Bridge No. 1, SR ??? Over ???
                                                                                       Total Other                          Total Labor           Direct Labor    Indirect Costs
                                                Total Hours        Total Cost          Direct Costs       Fixed Fee @          Cost                   Cost       (Overhead) @          FCCM @
Phase         Description                                                                                     10%                                                    125.00%            1.00%

                                   TOTALS ==>                  $               -   $              -   $            -    $             -       $             -     $         -      $        -



                                                               Staff Type / Project Hourly Rates / Hours                      Project Hourly Rates Include Escalation Over Current Rates of:        3.0%
                                                                                                                                               Senior
                                                                                        Project                               Project       Technician/                         CADD              Clerical           M.O.T.
                                                Total Hours        Principal            Manager       Chief Engineer         Engineer     Engineer's Aide    Technician       Technician        Administrator       Personnel
                                                                    $10.00              $10.00            $10.00              $10.00          $10.00           $10.00           $10.00            $10.00             $10.00

                              TOTAL HOURS ==>

               TOTAL DIRECT LABOR COST==> $             -      $               -   $              -   $            -    $             -       $             -     $         -      $        -   $          -    $           -



                                                                                                                                             Other Direct Costs


                                                Total Other         Drilling            Laboratory     Miscellaneous    Specialty Drilling
                                                Direct Costs

                                   TOTALS ==> $         -      $               -   $              -   $            -    $             -




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls BFI-1                                                                                                                                                                         Page 14 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                              Project:    proj name
PI No.:       000000                                                                     County:     county name
Prime:        firm name                                                            Contract Type:    Cost Plus Fixed Fee
Date:         29-Mar-07                                                             Fixed Fee %:     10%
              firm name
Discipline:   Geotechnical                                           Hours & Cost Estimate for                         BFI - Bridge No. 1, SR ??? Over ???
BFI                                                                                                                                           Senior
                                                                                                                                            Technician/                    CADD         Clerical       M.O.T.
                                                       Total Hours     Principal   Project Manager    Chief Engineer   Project Engineer   Engineer's Aide   Technician   Technician   Administrator   Personnel
              Final BFI Labor
                           General
              Site Visits
              Project Management
              Meetings & Coordination
              MUTCD Plan Prep/Permit




                         Field & Office

              Utility Locate & Gaining Site Access
              Property Owner Contact
              Boring Layout/Surveying
              Soil Logging/Classification & Drill
              Crew Supervision
              Groundwater Readings
              Installation Of Erosion Control And/Or
              Limited Site Restoration
              Boring Backfill

              Travel To & From Site For Personnel
              Sample Transport To Laboratory
              (Unless Concurrent With Weekly
              Travel To & From Site)
              Laboratory Assignment & Boring Log
              Review
              Boring Log & Plan Preparation
              Engineering Analysis & Design
              Unsuitable Materials Investigation
              Report Preparation
              Draft Report Publishing
              Report Revisions
              Compile Final Report
              QC/QA
              MOT Flagman




      7/18/2011 5:06 PM
      2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls BFI-1                                                                                                                                                          Page 15 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                 Project:   proj name
PI No.:       000000                                                        County:    county name
Prime:        firm name                                               Contract Type:   Cost Plus Fixed Fee
Date:         29-Mar-07                                                Fixed Fee %:    10%
              firm name
Discipline:   Geotechnical                                 Hours & Cost Estimate for                 BFI - Bridge No. 1, SR ??? Over ???
BFI (continued)
              Final BFI - Other Direct Costs
                                                  ITEM                                     UNIT       NO OF UNITS    UNIT RATE         COST

              Drilling                                                                                          Total Drilling Costs
              MOBILIZATION, PER RIG                                                        each                              $1.00
              DRILL CREW PER DIEM, TWO MAN CREW                                             day                              $1.00
              BRIDGE SPT BORINGS per ASTM D-1586 (0-50 FEET)                                foot                             $1.00
              BRIDGE SPT BORINGS per ASTM D-1586 (51-100 FEET)                              foot                             $1.00
              WALL SPT BORINGS per ASTM D-1586 (for Abutment Walls)                         foot                             $1.00
              PIEZOMETER/MONITORING WELL                                                    foot                             $1.00
              CORE OR ROTARY DRILLING SETUP                                                each                              $1.00
              NQ ROCK CORING                                                                foot                             $1.00
              TEMPORARY CASING                                                              foot                             $1.00
              UNDISTURBED SHELBY TUBE SAMPLES                                              each                              $1.00
              DRILL CREW STANDBY/DELAY/SITE REHAB                                           hour                             $1.00
              AUGER BORING                                                                  foot                             $1.00
              DIFFICULT MOVING                                                              hour                             $1.00
              DRILLING THROUGH CONCRETE, PER CORE                                          each                              $1.00
              WATER HAULING                                                                 hour                             $1.00
              PATCHING PAVEMENT AT GRADE                                                   each                              $1.00
              PATCHING CONCRETE BRIDGE DECK                                                each                              $1.00
              ADDITIONAL MOBILIZATION (OVER 50 MILE RADIUS)                                 mile                             $1.00
              INCREASE FOR SPT BORINGS (IN GREATER THAN 50 BPF)                             foot                             $1.00
              UNSUITABLE MATERIALS INVESTIGATION                                            foot                             $1.00




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls BFI-1                                                                                           Page 16 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                  Project:   proj name
PI No.:       000000                                                         County:    county name
Prime:        firm name                                                Contract Type:   Cost Plus Fixed Fee
Date:         29-Mar-07                                                 Fixed Fee %:    10%
              firm name
Discipline:   Geotechnical                                  Hours & Cost Estimate for                    BFI - Bridge No. 1, SR ??? Over ???
BFI (continued)
              Final BFI - Other Direct Costs (continued)
                                                     ITEM                                    UNIT        NO OF UNITS       UNIT RATE        COST

              Laboratory                                                                                          Total Laboratory Costs
              USCS TESTS                                                                     each                                  $1.00
              TRIAXIAL SHEAR (CU/PP)                                                         each                                  $1.00
              CONSOLIDATION                                                                  each                                  $1.00
              NATURAL MOISTURE CONTENT                                                       each                                  $1.00
              ORGANIC CONTENT                                                                each                                  $1.00
              CORROSIVITY SERIES                                                             each                                  $1.00



                                                     ITEM                                    UNIT        NO OF UNITS       UNIT RATE        COST

              Miscellaneous Other Direct Costs                                                             Total Misc. Other Direct Costs
              TRAVEL                                                                          mile                                 $1.00
              DOZER FOR CLEARING TO BORING LOCATIONS                                         hour                                  $1.00
              EROSION CONTROL (Materials & Trenching Equipment)                            lineal foot                             $1.00
              LIMITED SITE RESTORATION in CLEARED/DISTURBED AREAS                         actual costs                             $1.00
              TRAFFIC CONTROL                                                                each                                  $1.00
              GENERATOR & CORE MACHINE RENTAL                                                 day                                  $1.00
              SURVEY EQUIPMENT RENTAL                                                         day                                  $1.00
              PER DIEM (NON DRILL CREW PERSONNEL)                                             day                                  $1.00




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls BFI-1                                                                                                Page 17 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                                 Project:   proj name
PI No.:       000000                                                                        County:    county name
Prime:        firm name                                                               Contract Type:   Cost Plus Fixed Fee
Date:         29-Mar-07                                                                Fixed Fee %:    10%
              firm name
Discipline:   Geotechnical                                             Hours & Cost Estimate for                      BFI - Bridge No. 1, SR ??? Over ???

BFI (continued)
              Final BFI - Other Direct Costs (continued) - SPECIALTY DRILLING ITEMS

                                                                                             TOTAL SPECIALTY DRILLING ITEMS OTHER DIRECT COSTS
                                                           ITEM                                             UNIT      NO OF UNITS    UNIT RATE         COST   COMMENTS

              Drilling (Specialty Drilling Items)                                                                               Total Drilling Costs
              Mobilization of Specialty Drill, Per Rig                                                      each                                              Specify rig type (ATV, Marsh Buggy, Low Headroom, etc.)
              Mobilization of Specialty Support Equipment                                                   each                                              Specify type of equipment
              Time Rate Drilling & Setup for Confined Spaces, Over Water, Specialty In-Situ Field         crew hour                                           Specify # in Crew
              Barge (for drilling over water)                                                               hour                                              If Rental, list as direct expense
              Work Boat                                                                                     days                                              If Rental, list as direct expense
              Equipment Charge (Packers, Pressuremeter, Dilatometer, etc.)                                  hour                                              Specify Equipment (if rental, list as direct expense)
              Soil Test Borings, Below 100 Feet in Depth                                                    feet                                              Specify depth range
              HQ Rock Coring                                                                                feet
              Grouting of Bore Holes                                                                        feet
              Training of Field Personnel Due to Special Site Requirements                                  hour                                              Specify requirements and by who this is required
              Casing Advancer (drilling thru debris, rubble fill or boulders)                               feet
              Seismic Refraction Crew (Personnel only)                                                    crew hour
              Time Rate Decon for Environmental Purposes                                                    hour
              Ground Penetrating Radar (GPR)                                                                hour
              Unsuitable Materials Investigation                                                            feet
              Water Truck                                                                                   days




              UNSUITABLE MATERIALS INVESTIGATION                                                            hour




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls BFI-1                                                                                                                                                                   Page 18 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                         Project:   proj name
PI No.:       000000                                                                County:    county name
Prime:        firm name                                                       Contract Type:   Cost Plus Fixed Fee
Date:         29-Mar-07                                                        Fixed Fee %:    10%
              firm name
Discipline:   Geotechnical                                         Hours & Cost Estimate for                       BFI - Bridge No. 1, SR ??? Over ???

BFI (continued)
              Final BFI - Other Direct Costs (continued) - SPECIALTY DRILLING ITEMS (continued)
                                                        ITEM                                          UNIT         NO OF UNITS       UNIT RATE        COST   COMMENTS

              Laboratory (Specialty Drilling Items)                                                                         Total Laboratory Costs




                                                        ITEM                                          UNIT         NO OF UNITS       UNIT RATE        COST   COMMENTS

              Miscellaneous Other Direct Costs (Specialty Drilling Items)                                            Total Misc. Other Direct Costs
              Travel                                                                                   mile                                                  Specify for whom
              Dozer or Other Equipment for Gaining Boring Access                                      hour
              Crane Rental                                                                            hour
              Decon Unit, Generator or Core Machine                                                   days                                                   Specify
              Traffic Control                                                                         days
              Per Diem (See Assumptions)                                                          per person/day
              Other Site Safety Requirements                                                          each                                                   Specify
              Permits or Bonds                                                                        each                                                   Specify
              Specialty Field Equipment                                                               days                                                   Specify Type
              Personal Protective Equipment for Environmental Drilling                                each




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls BFI-1                                                                                                                             Page 19 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                              Project:     proj name
PI No.:       000000                                                                     County:      county name
Prime:        firm name                                                            Contract Type:     Cost Plus Fixed Fee
Date:         29-Mar-07                                                             Fixed Fee %:      10%
              firm name
Discipline:   Geotechnical                                     Hours & Cost Estimate for                                Wall Foundation Investigations
                                                                                       Total Other                          Total Labor           Direct Labor    Indirect Costs
                                                Total Hours        Total Cost          Direct Costs       Fixed Fee @          Cost                   Cost       (Overhead) @          FCCM @
Phase         Description                                                                                     10%                                                    125.00%            1.00%

                                   TOTALS ==>                  $               -   $              -   $            -    $             -       $             -     $         -      $        -



                                                               Staff Type / Project Hourly Rates / Hours                      Project Hourly Rates Include Escalation Over Current Rates of:        3.0%
                                                                                                                                               Senior
                                                                                        Project                               Project       Technician/                         CADD              Clerical           M.O.T.
                                                Total Hours        Principal            Manager       Chief Engineer         Engineer     Engineer's Aide    Technician       Technician        Administrator       Personnel
                                                                    $10.00              $10.00            $10.00              $10.00          $10.00           $10.00           $10.00            $10.00             $10.00

                              TOTAL HOURS ==>

               TOTAL DIRECT LABOR COST==> $             -      $               -   $              -   $            -    $             -       $             -     $         -      $        -   $          -    $           -



                                                                                                                                             Other Direct Costs


                                                Total Other         Drilling            Laboratory     Miscellaneous    Specialty Drilling
                                                Direct Costs

                                   TOTALS ==> $         -      $               -   $              -   $            -    $             -




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls WFI                                                                                                                                                                           Page 20 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                              Project:    proj name
PI No.:       000000                                                                     County:     county name
Prime:        firm name                                                            Contract Type:    Cost Plus Fixed Fee
Date:         29-Mar-07                                                             Fixed Fee %:     10%
              firm name
Discipline:   Geotechnical                                           Hours & Cost Estimate for                         Wall Foundation Investigations
WFI                                                                                                                                           Senior
                                                                                                                                            Technician/                    CADD         Clerical       M.O.T.
                                                       Total Hours     Principal   Project Manager    Chief Engineer   Project Engineer   Engineer's Aide   Technician   Technician   Administrator   Personnel
              Final BFI Labor
                           General
              Site Visits
              Project Management
              Meetings & Coordination
              MUTCD Plan Prep/Permit




                         Field & Office

              Utility Locate & Gaining Site Access
              Property Owner Contact
              Boring Layout/Surveying
              Soil Logging/Classification & Drill
              Crew Supervision
              Groundwater Readings
              Installation Of Erosion Control And/Or
              Limited Site Restoration
              Boring Backfill

              Travel To & From Site For Personnel
              Sample Transport To Laboratory
              (Unless Concurrent With Weekly
              Travel To & From Site)
              Laboratory Assignment & Boring Log
              Review
              Boring Log & Plan Preparation
              Engineering Analysis & Design
              Unsuitable Materials Investigation
              Report Preparation
              Draft Report Publishing
              Report Revisions
              Compile Final Report
              QC/QA
              MOT Flagman




      7/18/2011 5:06 PM
      2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls WFI                                                                                                                                                            Page 21 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                 Project:   proj name
PI No.:       000000                                                        County:    county name
Prime:        firm name                                               Contract Type:   Cost Plus Fixed Fee
Date:         29-Mar-07                                                Fixed Fee %:    10%
              firm name
Discipline:   Geotechnical                                 Hours & Cost Estimate for                 Wall Foundation Investigations
WFI (continued)
              Final BFI - Other Direct Costs
                                                    ITEM                                   UNIT       NO OF UNITS    UNIT RATE         COST

              Drilling                                                                                          Total Drilling Costs
              MOBILIZATION, PER RIG                                                        each                              $1.00
              DRILL CREW PER DIEM, TWO MAN CREW                                             day                              $1.00
              BRIDGE SPT BORINGS per ASTM D-1586 (0-50 FEET)                                foot                             $1.00
              BRIDGE SPT BORINGS per ASTM D-1586 (51-100 FEET)                              foot                             $1.00
              WALL SPT BORINGS per ASTM D-1586 (for Abutment Walls)                         foot                             $1.00
              PIEZOMETER/MONITORING WELL                                                    foot                             $1.00
              CORE OR ROTARY DRILLING SETUP                                                each                              $1.00
              NQ ROCK CORING                                                                foot                             $1.00
              TEMPORARY CASING                                                              foot                             $1.00
              UNDISTURBED SHELBY TUBE SAMPLES                                              each                              $1.00
              DRILL CREW STANDBY/DELAY/SITE REHAB                                           hour                             $1.00
              AUGER BORING                                                                  foot                             $1.00
              DIFFICULT MOVING                                                              hour                             $1.00
              DRILLING THROUGH CONCRETE, PER CORE                                          each                              $1.00
              WATER HAULING                                                                 hour                             $1.00
              PATCHING PAVEMENT AT GRADE                                                   each                              $1.00
              PATCHING CONCRETE BRIDGE DECK                                                each                              $1.00
              ADDITIONAL MOBILIZATION (OVER 50 MILE RADIUS)                                 mile                             $1.00
              INCREASE FOR SPT BORINGS (IN GREATER THAN 50 BPF)                             foot                             $1.00
              UNSUITABLE MATERIALS INVESTIGATION                                            foot                             $1.00




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls WFI                                                                                             Page 22 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                  Project:   proj name
PI No.:       000000                                                         County:    county name
Prime:        firm name                                                Contract Type:   Cost Plus Fixed Fee
Date:         29-Mar-07                                                 Fixed Fee %:    10%
              firm name
Discipline:   Geotechnical                                  Hours & Cost Estimate for                    Wall Foundation Investigations
WFI (continued)
              Final BFI - Other Direct Costs (continued)
                                                     ITEM                                    UNIT        NO OF UNITS       UNIT RATE        COST

              Laboratory                                                                                          Total Laboratory Costs
              USCS TESTS                                                                     each                                  $1.00
              TRIAXIAL SHEAR (CU/PP)                                                         each                                  $1.00
              CONSOLIDATION                                                                  each                                  $1.00
              NATURAL MOISTURE CONTENT                                                       each                                  $1.00
              ORGANIC CONTENT                                                                each                                  $1.00
              CORROSIVITY SERIES                                                             each                                  $1.00



                                                     ITEM                                    UNIT        NO OF UNITS       UNIT RATE        COST

              Miscellaneous Other Direct Costs                                                             Total Misc. Other Direct Costs
              TRAVEL                                                                          mile                                 $1.00
              DOZER FOR CLEARING TO BORING LOCATIONS                                         hour                                  $1.00
              EROSION CONTROL (Materials & Trenching Equipment)                            lineal foot                             $1.00
              LIMITED SITE RESTORATION in CLEARED/DISTURBED AREAS                         actual costs                             $1.00
              TRAFFIC CONTROL                                                                each                                  $1.00
              GENERATOR & CORE MACHINE RENTAL                                                 day                                  $1.00
              SURVEY EQUIPMENT RENTAL                                                         day                                  $1.00
              PER DIEM (NON DRILL CREW PERSONNEL)                                             day                                  $1.00




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls WFI                                                                                                  Page 23 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                                 Project:   proj name
PI No.:       000000                                                                        County:    county name
Prime:        firm name                                                               Contract Type:   Cost Plus Fixed Fee
Date:         29-Mar-07                                                                Fixed Fee %:    10%
              firm name
Discipline:   Geotechnical                                             Hours & Cost Estimate for                      Wall Foundation Investigations

WFI (continued)
              Final BFI - Other Direct Costs (continued) - SPECIALTY DRILLING ITEMS

                                                                                             TOTAL SPECIALTY DRILLING ITEMS OTHER DIRECT COSTS
                                                           ITEM                                             UNIT      NO OF UNITS    UNIT RATE         COST   COMMENTS

              Drilling (Specialty Drilling Items)                                                                               Total Drilling Costs
              Mobilization of Specialty Drill, Per Rig                                                      each                                              Specify rig type (ATV, Marsh Buggy, Low Headroom, etc.)
              Mobilization of Specialty Support Equipment                                                   each                                              Specify type of equipment
              Time Rate Drilling & Setup for Confined Spaces, Over Water, Specialty In-Situ Field         crew hour                                           Specify # in Crew
              Barge (for drilling over water)                                                               hour                                              If Rental, list as direct expense
              Work Boat                                                                                     days                                              If Rental, list as direct expense
              Equipment Charge (Packers, Pressuremeter, Dilatometer, etc.)                                  hour                                              Specify Equipment (if rental, list as direct expense)
              Soil Test Borings, Below 100 Feet in Depth                                                    feet                                              Specify depth range
              HQ Rock Coring                                                                                feet
              Grouting of Bore Holes                                                                        feet
              Training of Field Personnel Due to Special Site Requirements                                  hour                                              Specify requirements and by who this is required
              Casing Advancer (drilling thru debris, rubble fill or boulders)                               feet
              Seismic Refraction Crew (Personnel only)                                                    crew hour
              Time Rate Decon for Environmental Purposes                                                    hour
              Ground Penetrating Radar (GPR)                                                                hour
              Unsuitable Materials Investigation                                                            feet
              Water Truck                                                                                   days




              UNSUITABLE MATERIALS INVESTIGATION                                                            hour




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls WFI                                                                                                                                                                     Page 24 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:    00-000-00(00)                                                         Project:   proj name
PI No.:       000000                                                                County:    county name
Prime:        firm name                                                       Contract Type:   Cost Plus Fixed Fee
Date:         29-Mar-07                                                        Fixed Fee %:    10%
              firm name
Discipline:   Geotechnical                                         Hours & Cost Estimate for                       Wall Foundation Investigations

WFI (continued)
              Final BFI - Other Direct Costs (continued) - SPECIALTY DRILLING ITEMS (continued)
                                                        ITEM                                          UNIT         NO OF UNITS       UNIT RATE        COST   COMMENTS

              Laboratory (Specialty Drilling Items)                                                                         Total Laboratory Costs




                                                        ITEM                                          UNIT         NO OF UNITS       UNIT RATE        COST   COMMENTS

              Miscellaneous Other Direct Costs (Specialty Drilling Items)                                            Total Misc. Other Direct Costs
              Travel                                                                                   mile                                                  Specify for whom
              Dozer or Other Equipment for Gaining Boring Access                                      hour
              Crane Rental                                                                            hour
              Decon Unit, Generator or Core Machine                                                   days                                                   Specify
              Traffic Control                                                                         days
              Per Diem (See Assumptions)                                                          per person/day
              Other Site Safety Requirements                                                          each                                                   Specify
              Permits or Bonds                                                                        each                                                   Specify
              Specialty Field Equipment                                                               days                                                   Specify Type
              Personal Protective Equipment for Environmental Drilling                                each




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls WFI                                                                                                                               Page 25 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:       00-000-00(00)                                   Project:   proj name
PI No.:          000000                                          County:    county name
Prime:           firm name                                 Contract Type:   Cost Plus Fixed Fee
Date:            29-Mar-07                                  Fixed Fee %:    10%
                 Geotechnical Assumptions

                 Existing Pavement Analysis
             1
             2
             3
             4
             5
             6


                 Soil Survey
          1
          2
          3
          4
          6
          7
          8
          9
         10




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls Geo_Assump                                          Page 26 of 27
Georgia Department of Transportation
COST PROPOSAL - Detailed Geotechnical
Proj, No.:       00-000-00(00)                                   Project:   proj name
PI No.:          000000                                          County:    county name
Prime:           firm name                                 Contract Type:   Cost Plus Fixed Fee
Date:            29-Mar-07                                  Fixed Fee %:    10%
                 Geotechnical Assumptions

                 Bridge Foundation Investigations
          1
          2
          3
          4
          5
          6
          7
          8
          9
         10
         11
         12




                 Wall Foundation Investigations
             1
             2
             3
             4
             5
             6




     7/18/2011 5:06 PM
     2456f047-167d-4f6e-a4f7-57e6ac6b14e4.xls Geo_Assump                                          Page 27 of 27

				
DOCUMENT INFO
Description: Project Management Mobilization Plan document sample