									Pennsylvania Coastal Zone Management Program                               Revised:11/18/2002
FFY 2003 Grant Application                                                      July 18, 2011
October 1, 2003 To March 31, 2005
Expenses By Grant Task
Project Tasks
No Applicant CZ                             Title                            Section     Federal   Other Match    Total Cost
 1 PDR        D Master Site Plan for Hatchery/Pleasant Hill Park              306        $50,000      $50,000      $100,000
 2 DCPD       D Route 291/13 Landscaping and Signage Project                  306        $29,019      $29,019       $58,038
 3 PEC        D Kensington & Tacony Trail Signage Program                     306        $49,460      $50,429       $99,889
 4 JBA        D Bartram Dock                                                 306A        $50,000     $400,000      $450,000
 5 PDE        D SE PA Coast Day 2004                                          306        $35,788      $45,525       $81,313
 6 ISM        D R.A.D.!---River Adventure on the Delaware Program             306        $28,392      $28,392       $56,784
 7 DCPD       D Darby Creek Bridge Feasibility Study-E. Coast Greenway        306        $21,054      $21,054       $42,108
 8 RTDC       D Belk Marina Property                                         306A        $70,000      $70,000      $140,000
 9 PDE        D Advertising Campaign                                          306        $27,655      $32,086       $59,741
10 TTDC       D Acquisition of former Westinghouse Site                      306A       $400,000   $1,100,000    $1,500,000
11 PDE        D Horseshoe Crab Conservation                                   306        $33,085      $34,900       $67,985
12 PRPA       D Wetland Mitigation Analysis and Feasibility                   306        $50,000      $50,000      $100,000
13 BTBC       D Minot Avenue Flood Control                                    306        $26,500      $26,500       $53,000
14 ANS        D Student Awareness on Non-Point Source Pollution Issues        306        $21,282      $21,306       $42,588
                                                                              14        $892,235   $1,959,211    $2,851,446

15   BFCMS   E   Environmental Rediscoveries                                    306      $26,975     $36,375       $63,350
16   HCTEC   E   Shades Beach Park Off-Shore Imps. Redesign Project             306      $30,000     $30,000       $60,000
17   GTEC    E   Girard Twp. Elk Creek Access Project                           306      $23,250     $23,250       $46,500
18   MHC     E   Propagation of Native Plant Species for Habitat Restoration    306      $20,610     $20,735       $41,345
19   SVHS    E   SCUBA Do's                                                     306       $7,000      $9,360       $16,360
20   CEEC    E   Frontier Park Pathway                                         306A      $42,357     $43,335       $85,692
21   LEAEF   E   Lake Erie - Allegheny Earth Force                              306      $48,000     $92,915      $140,915
22   EWPPA   E   East Canal Basin Public Fishing Pier                          306A      $25,000     $25,000       $50,000
23   EWPPA   E   East Avenue Boat Launch Comfort Station                       306A      $50,000     $50,000      $100,000
24   GTEC    E   Girard Twp. Bluff Mapping Project                              306      $24,450     $24,450       $48,900
25   FNL     E   Education Curriculum                                           306       $5,627      $5,628       $11,255
26   EACVB   E   Seaway Trail Corridor Management Plan                          306      $37,500     $37,500       $75,000
27   EWPPA   E   Sassafras Street Pier Public Access Improvements              306A      $50,000     $50,000      $100,000
28   HCTEC   E   Shades Beach Park Pavilion Replacement Project                306A      $50,000     $50,000      $100,000
29   PSCCT   E   Rotational Grazing Initiative                               6217/310    $13,000     $13,000       $26,000
                                                                                15      $453,769    $511,548      $965,317

30   DVRPC   S   DECZone Mgmt. Admin. and Coordination                        306      $39,000             $0      $39,000
31   ECDP    S   LECZ Monitoring & Technical Assistance                       306      $55,000        $10,000      $65,000
32   CZM     S   BRSA Local Ordinance Administration                          306       $4,400         $4,400       $8,800
33   PACD    S   Implementation Compliance of CNPP                            306     $200,000        $30,000    $230,000
34   CZM     S   Coastal Zone Wetland Monitoring Update                       306      $10,000             $0      $10,000
35   CZM     S   Lake Erie Coastal Zone Monitoring Overflights                306       $9,000             $0       $9,000
36   ECDP    S   Erie County Agricultural Conservation Easement Program      306A     $101,000       $202,000    $303,000
37   SC      S   Decision Making for Implementation of NPS Measures        6217/310    $50,000       $165,512    $215,512
38   PISP    S   P. I. Center Research Equipment Grant                        306     $100,000       $171,380    $271,380
39   PF&BC   S   Hydrogeologic Study, Fairview Fish Culture Station           306      $10,000        $10,000      $20,000
40   SERO    S   Delaware Estuary Studies                                     306       $8,270        $12,150      $20,420
41   PSU     S   Introduced Flathead Catfish Res. & Outreach Program          306      $21,108        $22,132      $43,240
42   PDE     S   Stormwater Runoff Pollution Prevention Programs           6217/310    $89,202        $99,170    $188,372
43   PDE     S   Clean Water Theater                                       6217/310    $38,422        $45,000      $83,422
44   PGC     S   Roderick Wildlife Reserve -2                                306A      $39,850        $54,950      $94,800
45   CTMC    S   Tookany Ck. Streambank Stabil. and Restor. Project          306A      $50,000       $649,752    $699,752
46   DU      S   Geotextiles to Remove Pollutants from CSOs                6217/310    $50,000        $51,385    $101,385
47   PBS     S   Cultural Landscape Treatment Plan for Pennsbury Manor        306      $50,000        $50,202    $100,202
48   PACW    S   Little Tinnicum Island                                       306      $65,000       $199,193    $264,193
49   PSU     S   Presque Isle Ecosystem Minigrants Program                    306      $50,000        $62,500    $112,500
                                                                              20    $1,040,252     $1,839,726 $2,879,978
                                                                              49    $2,386,256     $4,310,485 $6,696,741
     5c916da6-7a8b-46c8-8f02-e0b87a0d7397.xls                                                              Project List
      2003 CZM Project Application                                                                                                                                                5c916da6-7a8b-46c8-8f02-e0b87a0d7397.xls

Delaware Estuary Local Projects
No.   Identifier     Project Title      County       Organization        Org. Type      ProjType       Fed       Match      Total      AreaServed                                 Summary
                                                                                                                                                    The Dept. is requesting assistance to create a master site
                   Master Site Plan                                                                                                                 plan for the fish hatchery resources, document current usage
              for              Philadelp Philadelphia                                                                                 Linden and    patterns, assess recreation needs and recommend actions to
 1 SE030030CZ Hatchery/Pleasan           Dept. of                     Government     Planning (CZM)   $50,000   $50,000    $100,000
                               hia       Recreation                                                                                   Delaware Ave. enhance the educational, recreational and coastal experience
                   t Hill Park
                                                                                                                                                    of future visitors to the site.
                                                                                                                                                       This project will begin a corridor wide graphic design program
                                                                                                                                                       for signage and banners, including individual municipal
                   Route 291/13
                                                    Delaware                                                                                           designs and recommendations; Corridor streetscape design
                                                    County                                                                            Delaware         improvement details and specific area concept plans. Site
 2 SE030047CZ Landscaping and Delaware Planning                       Government     Planning (CZM)   $29,019   $29,019    $58,038
                   Signage Project                                                                                                    County           specific design plans, ranging from a tree planting plan to an
                                                    Department
                                                                                                                                                       extensive paving, lighting, fencing, and landscaping plan are
                                                                                                                                                       to be included in the project.
                                                                                                                                                       This signage project will educate the public about the
                                                                                                                                      Delaware         Delaware Riverfront, its ecology, and make a key connection
                   Kensington &                     PA
                                                                                     Education and                                    Riverfront -     between people, the area and the coastal zone. Developing
 3 SE030017CZ      Tacony Trail         Multiple    Environmental     Non-Profit
                                                                                     Training (CZM)
                                                                                                      $49,460   $50,429    $99,889
                   Signage Program                  Council                                                                           Bridesburg-      appropriate signage will maximize the educational opportunity
                                                                                                                                      Tacony           and interaction of the public with the waterfront's history.
                                                                                                                                                       Bartram's Gardens proposes to construct a public access
                                                                                                                                                       dock to the Delaware River for recreational and educational
                                                                                                                                                       boating excursions. The proposed work will have an impact
                                        Philadelp John Bartram                       Construction                                     Lower            on approximately 400 feet along the Schuylkill River. There
 4 SE030014CZ Bartram Dock                                            Non-Profit                      $50,000   $400,000   $450,000
                                        hia       Association                        (CZM)                                            Schuylkill River will be an installation of a 30' by 5 ' floating dock with
                                                                                                                                                       associated pilings downstream from the existing seawall. The
                                                                                                                                                       floating dock will be equipped to meet the access needs of
                                                                                                                                                       the public.
                                                                                                                                      Geographic       This is an education and outreach project to enhance the
                                                    Partnership for                                                                   Area of The      public awareness efforts of the Pennsylvania Coastal Zone
                   SE PA Coast          Philadelp                                    Education and
 5 SE030038CZ Day 2004                              the Delaware      Non-Profit
                                                                                     Training (CZM)
                                                                                                      $35,788   $45,525    $81,313    Delaware         Management Program and educate the public about the
                                        hia         Estuary                                                                           Estuary          issues facing the enhancement of the Delaware Estuary.
                                                                                                                                      Coastal Zone
                                                                                                                                                       The Museum proposes to conduct a series of day long "River
                                                                                                                                                       Adventure on the Delaware" programs. They will focus on the
                                                                                                                                                       ecology of the Delaware River for students in grades four
                   R.A.D.!---River                                                                                                    R.A.D.---River   through eight. A total of thirty programs will take place during
                   Adventure on the     Philadelp Independence                       Education and                                    Adventure on     the term of the contract. Each program will consist of two
 6 SE030031CZ Delaware                            Seaport             Non-Profit
                                                                                     Training (CZM)
                                                                                                      $28,392   $28,392    $56,784
                                        hia       Museum                                                                              the Delaware     central learning components spread over an entire day. One
                   Program                                                                                                            Program          component will be a structured environmental program at the
                                                                                                                                                       museum and the other will be a sail on the schooners
                                                                                                                                                       MEERWALD or the PIONEER.

                                                                                                                                                       As a recommendation of the Route 291 Study funded by PA
                   Darby Creek                      Delaware                                                                          Route 291        CZM, the planning Dept is preparing to conduct a feasibility
                   Bridge Feasibility               County                                                                                             study to determine the selected alignment and bridge type for
 7 SE030015CZ      Study-E. Coast
                                        Delaware    Planning
                                                                      Government     Planning (CZM)   $21,054   $21,054    $42,108    over Darby
                                                                                                                                      Creek            a segment fo the East Coast Greenway over Darby Creek
                   Greenway                         Department
                                                                                                                                                       between Tinicum and Ridley Twps.
                                                                                                                                                       The Township proposes to purchase tract number 27 along
                   Belk Marina                      Township of                      Acquisition                                      563 Darby        the Darby Creek, approximately 1.75 acres. The Township
 8 SE030026CZ      Property
                                        Delaware    Ridley
                                                                      Government
                                                                                     (CZM)
                                                                                                      $70,000   $70,000    $140,000                    believes this property presents an opportunity for a public
                                                                                                                                      Road
                                                                                                                                                       access boatramp.




      7/18/2011 1:32 PM                                                                                           Page 2                                                                                      Project Information
     2003 CZM Project Application                                                                                                                                            5c916da6-7a8b-46c8-8f02-e0b87a0d7397.xls
                                                                                                                                                  The Partnership is proposing to design an educational
                                                                                                                                 Philadelphia     campaign to the general public to introduce travelers (local
                Advertising        Philadelp Partnership for                 Education and                                       International    and national) to the fact that Southeastern PA does have a
9 SE030042CZ Campaign                        the Delaware    Non-Profit
                                                                             Training (CZM)
                                                                                              $27,655     $32,086    $59,741                      coast. These educational activities will take place at the
                                   hia       Estuary                                                                             Airport 30th
                                                                                                                                 Street Station   Amtrak's 30th Street Station and the Philadelphia
                                                                                                                                                  International Airport.
                                                                                                                                                  The Township seeks to purchase the former Westinghouse
                                                                                                                                                  property to preserve open space and provide for public
                                                                                                                                                  access for recreational purposes along the Delaware River.
                Acquisition of                Tinicum
                Former                        Township,                      Acquisition                                         Tinicum          Acquisition of this tract (approximately 154 acres) will provide
10 SE030025CZ Westinghouse         Delaware Delaware            Government
                                                                             (CZM)
                                                                                              $400,000   $1,100,000 $1,500,000                    for furthering flood control, stormwater management and
                                                                                                                                 Township
                Site                          County                                                                                              nonpoint source pollution control, shoreline erosion, wetland
                                                                                                                                                  and natural resources preservation.


                                                                                                                                                  This project has two main focus areas. First, Research and
                                                                                                                                                  Development: Bait bags will be redesigned for use by New
                                                                                                                                                  England conch fisheries. A suitable bag configuration will be
                                                                                                                                                  researched and developed for eel fishery. 3000 bait bags will
                                              Partnership for                                                                    Delaware         be distributed to watermen. The second area is Education
                Horseshoe Crab                                               Combination
11 SE030041CZ Conservation         Multiple   the Delaware      Non-Profit
                                                                             (CZM)
                                                                                              $33,085     $34,900    $67,985     Estuary and      and Outreach: the research and development activites of
                                              Estuary                                                                            Beyond           Ecological Research and Development Group (ERDG) will be
                                                                                                                                                  promoted to the general public and to a targeted audience
                                                                                                                                                  through press releases, newsletter, facts sheets, websites,
                                                                                                                                                  and public events.
                                                                                                                                                  The Port Authority seeks to expand its current facilities. To
                                                                                                                                                  accommodate this expansion project, the Authority is
                Wetland
                Mitigation         Philadelp Philadelphia                    Combination
                                                                                                                                                  proposing a study to review the regulatory policies, determine
12 SE030033CZ   Analysis and
                                             Regional Port      Government
                                                                             (CZM)
                                                                                              $50,000     $50,000    $100,000    Philadelphia     possible PRPA remediation requirements, identify potential
                                   hia       Authority
                Feasibility                                                                                                                       sites, costs and recommend implementation strategies of a
                                                                                                                                                  wetland mitigation program.

                                                                                                                                                  The Township seeks assistance to help in the engineering
                Minot Avenue                  Bristol                                                                            Beverly, PA -    and design of a flood prevention facility for one of the oldest
13 SE030002CZ Flood Control        Bucks      Township
                                                                Government   Planning (CZM)   $26,500     $26,500    $53,000
                                                                                                                                 NJ Quad          neighborhoods in Bristol Township Bucks County.

                                                                                                                                                  The principal goal of this project will be to develop and teach
                A Workshop for
                                                                                                                                                  a new workshop curriculum on Nonpoint Source Pollution
                Teachers to
                                              Academy of                                                                         Delaware         (NPS).The workshop will educate high school teachers about
                Increase Student
                                   Philadelp Natural                         Education and                                                        key concepts related to NPS pollution and its effects on
14 SE030009CZ   Awareness on
                                             Sciences of
                                                                Non-Profit
                                                                             Training (CZM)
                                                                                              $21,282     $21,306    $42,588     Estuary
                Non-Point          hia                                                                                                            physical, chemical and biological processes in various aquatic
                                              Philadelphia                                                                       Coastal Zone
                Source Pollution                                                                                                                  ecosystems that comprise whole watersheds in Southeast PA.
                Issues

                                                   Total Delaware Estuary Local Projects      $892,235   $1,959,211 $2,851,446         14         Projects
Lake Erie Local Projects
                                                                                                                                                This project is a joint venture with PA Sea Grant which began
                                                                                                                                                in 2000. It has received the 2001 Governor‟s Award for
                                                                                                                                                Environmental Excellence. The program is aimed toward at
                                                                                                                                                risk, inner-city youth with the intent of teaching them about
                                              Bayfront                                                                                          the environment and proper stewardship of resources. It
                Environmental                 Center For                     Education and                                       Presque Isle   includes a hands-on sailing experience on the sloop
15 NW030043CZ Rediscoveries        Erie       Maritime
                                                                Non-Profit
                                                                             Training (CZM)
                                                                                              $26,975     $36,375    $63,350
                                                                                                                                 Bay, Lake Erie Momentum. This curriculum development module is the next
                                              Studies
                                                                                                                                                in a series to reach as many youth as possible to engender
                                                                                                                                                proper preservation/stewardship. We‟ve asked for
                                                                                                                                                clarification of the budget. The match appears to be all in-kind
                                                                                                                                                but figures are confusing.

    7/18/2011 1:32 PM                                                                                      Page 3                                                                                        Project Information
     2003 CZM Project Application                                                                                                                                  5c916da6-7a8b-46c8-8f02-e0b87a0d7397.xls
                                                                                                                                    This project will redesign a „safe harbor‟ and other off-shore
                                                                                                                                    amenities to serve Pennsylvania's eastern shorelands of Lake
                                                                                                                                    Erie at Harborcreek Twp. An earlier Initial Appraisal Study
                                                                                                                                    (IAS) was completed by the COE in 1985, which then
                                                                                                                                    concluded that the project was feasible. It was never
                                                                                                                                    implemented. A recent littoral draft study, funded by CZM in
                                                                                                                                    1997 and completed in 1998 identified a “significant obstacle”
                Shades Beach                                                                                                        in constructing the proposed improvements as earlier
                Park Off-Shore            Harborcreek                                                                  Shades Beach designed in 1985, that being water depth. Various CZM
16 NW030004CZ Improvements         Erie   Township
                                                           Government   Planning (CZM)   $30,000   $30,000   $60,000
                                                                                                                       Park         projects have been undertaken at Shades Beach throughout
                Redesign Project
                                                                                                                                    the years, (i.e. Beach Restoration and Navigational
                                                                                                                                    Improvements Study in 1989, Overall Development and On-
                                                                                                                                    shore Improvements Design and Study in 1992, A Phase I
                                                                                                                                    Archeological Study in 1993, Phase I Development (road
                                                                                                                                    paving) in 1995, Phase II Development (road and parking lot
                                                                                                                                    paving) in 1996, Phase III Development (parking lot paving) in
                                                                                                                                    1997 and the Littoral Drift Study in 1998.
                                                                                                                                        The Township wants to conduct additional site research and
                                                                                                                                        planning on this heavily-used recreational site with particular
                                                                                                                                        emphasis on developing a future „safe harbor area‟ at the
                                                                                                                                        mouth of the creek. The site currently consists of about 80
                                                                                                                                        acres of land leased from the local electric utility. Plans call
                Girard Twp. Elk                                                                                                         for a possible future donation of the land to the township.
                                          Girard                        Combination                                    Girard           The township intends to create base mapping of the entire
17 NW030012CZ Creek Access         Erie   Township
                                                           Government
                                                                        (CZM)
                                                                                         $23,250   $23,250   $46,500
                Project                                                                                                Township         site, hold public meetings to determine what the public wants
                                                                                                                                        at the site and develop an overall concept plan for the site
                                                                                                                                        and a potential “safe harbor” site at the mouth of Elk Creek.
                                                                                                                                        (Haven‟t applied recently and they have also submitted a
                                                                                                                                        companion application to map the entire coastal bluff corridor,
                                                                                                                                        about 1200 feet inland from the lakeshore).
                                                                                                                                        Funds are to assist the Biology Department to investigate and
                                                                                                                                        develop methods of propagating 20 to 30 native plant species
                                                                                                                                        that occur in the LECZ habitats (bluffs, stream banks, riparian
                                                                                                                                        zones and wetlands). The department will then evaluate the
                Propagation of
                Native Plant                                                                                           Walnut Creek     plants‟ utility for restoring the vegetative integrity of coastal
                                          Biology                                                                      & Elk Creek      locations experiencing surface erosion and soil loss. Plants
                Species for
                                          Department,
18 NW030024CZ   Habitat            Erie                    Non-Profit   Research (CZM)   $20,610   $20,735   $41,345   Watersheds &     and seeds will then be planted at several demonstration sites
                                          Mercyhurst
                Restoration                                                                                            L. Erie Shore    during Phase II of the project. These sites will be open to the
                                          College
                Projects in the                                                                                                         public to observe and learn about various species that can be
                                                                                                                       near Ohio line
                LECZ
                                                                                                                                        used for restorative plantings. Students will assist two faculty
                                                                                                                                        professors with this work. All match is „soft‟ and includes
                                                                                                                                        donated materials, equipment and services.

                                                                                                                                        Funds are to begin a SCUBA diving program among high
                                                                                                                                        school students and train them to take sedimentation
                                                                                                                                        samples from the floor of Presque Isle Bay. Students are to
                                          Strong Vincent                Combination                                    Presque Isle     be mentored by certified divers and carefully supervised.
19 NW030001CZ SCUBA Do's           Erie   High School
                                                           School
                                                                        (CZM)
                                                                                         $7,000    $9,360    $16,360
                                                                                                                       Bay              Program includes Villa Marie Academy, Sea Grant and
                                                                                                                                        Gannon University as some of the partners. Unique
                                                                                                                                        Environmental Education program!




    7/18/2011 1:32 PM                                                                               Page 4                                                                                     Project Information
     2003 CZM Project Application                                                                                                                                    5c916da6-7a8b-46c8-8f02-e0b87a0d7397.xls
                                                                                                                                         The City plans to sub-contract with LEAF (Lake Erie
                                                                                                                                         Arboretum at Frontier Park) to complete this project. Frontier
                                                                                                                                         is a 33-acre city park that has been undergoing renovations
                                                                                                                                         over the last several years. This project will connect the
                                                                                                                                         pathway linking the Bayfront Bikeway with the Seaway Trail
                 Frontier Park                                            Construction                                                   within the park. This work will help to provide a safe means
20 NW030035CZ Pathway                Erie   City of Erie     Government
                                                                          (CZM)
                                                                                           $42,357   $43,335   $85,692    Erie South, PA for pedestrians in the western portion of the city to reach the
                                                                                                                                         bayfront as well. The pathway is approximately 12,500
                                                                                                                                         square feet of surface and will be paved with asphalt. In
                                                                                                                                         addition, 50 assorted trees and turf grass will be planted
                                                                                                                                         along the pathway. Match consists of donated materials
                                                                                                                                         (asphalt) and professional services.
                                                                                                                                          This is the next in a series of environmental education efforts
                                                                                                                                          by Glinodo, and will be the seventh year. The thrust of this
                                                                                                                                          project is to continue the CAPS, GREEN and EFAS
                 Lake Erie -                Lake Erie-
                                                                          Education and                                   Lake Erie       education modules for both educators and middle school
21 NW030020CZ Allegheny Earth        Erie   Allegheny        Non-Profit
                                                                          Training (CZM)
                                                                                           $48,000   $92,915   $140,915
                 Force                      Earth Force                                                                   Watershed       students. It is anticipated that GIS will be integrated into these
                                                                                                                                          EE programs this year. A total of 75 educators and 1,200
                                                                                                                                          students are projected to be involved this year with the
                                                                                                                                          program.
                                                                                                                                          This project will establish a 1,400 square foot fishing pier in
                                                                                                                                          the East Canal Basin of the PI Bay. This pier is needed to
                                                                                                                                          replace another fishing venue being displaced by the
                 East Canal Basin           Erie-Western
                                                                          Construction                                                    expansion of the West Canal Basin marina. We‟ve asked for
22 NW030045CZ Public Fishing         Erie   Pennsylvania     Government
                                                                          (CZM)
                                                                                           $25,000   $25,000   $50,000    Erie
                 Pier                       Port Authority                                                                                additional budget information to include a breakdown of line
                                                                                                                                          items and no site or design plans were included in the
                                                                                                                                          application. Match is also a concern.

                                                                                                                                          The boat launch facility was previously renovated in 2000 by
                                                                                                                                          the Port Authority, but rest room facilities were not included.
                                                                                                                                          This project proposal is to construct a combination facility to
                                                                                                                                          include both rest rooms and a concession stand area, a
                 East Avenue                Erie-Western
                                                                          Construction                                                    drinking fountain and a pay telephone. This is a heavily used
23 NW030010CZ Boat Launch            Erie   Pennsylvania     Government
                                                                          (CZM)
                                                                                           $50,000   $50,000   $100,000   Erie County
                 Comfort Station            Port Authority                                                                                area. The application states that the Port Authority is
                                                                                                                                          applying to PAFBC for matching funds. We have asked for a
                                                                                                                                          better budget breakdown and a site/floor plan for
                                                                                                                                          construction. The application has a lump sum for a “Pre-fab”
                                                                                                                                          building only.
                                                                                                                                          The Township will hire a consulting firm to map and provide
                                                                                                                                          aerial photography for the entire coastal shoreline of the
                                                                                                                                          township to a depth of approximately 1,200 feet and a length
                 Girard Twp. Bluff          Girard                                                                        Girard          of some 5 miles. The township has adopted a Bluff Setback
24 NW030046CZ Mapping Project        Erie   Township
                                                             Government   Research (CZM)   $24,450   $24,450   $48,900                    Ordinance and requires additional, up-to-date mapping to
                                                                                                                          Township
                                                                                                                                          assist in the enforcement of this ordinance. We‟ve asked for
                                                                                                                                          a more detailed breakdown of budget items and a project site
                                                                                                                                          location map extract of the lakeshore.
                                                                                                                                          Funds are to be used to create a curriculum package for local
                                                                                                                                          educators centering around the War of 1812 in general and
                                                                                                                                          the role of the U.S. Brig Niagara in the Battle of Lake Erie in
                                                                                                                                          particular. This effort builds on earlier education modules
                 Education                  Flagship                      Education and                                   Area School
25 NW030007CZ Curriculum             Erie   Niagara League
                                                           Non-Profit
                                                                          Training (CZM)
                                                                                           $5,627    $5,628    $11,255                    focused on the War of 1812 and the maritime history of the
                                                                                                                          Districts
                                                                                                                                          entire Lake Erie Region relating to the war. Ultimately about
                                                                                                                                          350 education packets (including a video) will be produced
                                                                                                                                          and distributed to schools throughout the Erie region.



    7/18/2011 1:32 PM                                                                                 Page 5                                                                                      Project Information
     2003 CZM Project Application                                                                                                                                             5c916da6-7a8b-46c8-8f02-e0b87a0d7397.xls
                                                                                                                                                   This is a planning effort to study the currently established
                                                                                                                                                   Seaway Trail in the Lake Erie Coastal Zone. The focus of the
                                                                                                                                                   plan would be on public input to make recommendations for
                                                                                                                                                   public access, improving bike trails, creating scenic turnouts,
                                                                                                                                                   parking and improving water access and view sheds. It
                  Seaway Trail
                                                                                                                                                   would also identify streetscapes and building facades needing
                                                Erie Area                                                                                          improvement in both downtown Erie and in other lakeshore
                  Corridor
26 NW030016CZ Management             Erie       Convention &    Other            Planning (CZM)   $37,500    $37,500    $75,000    Erie County     communities. The main thrust is to develop tourism
                                                Visitors Bureau
                  Plan                                                                                                                             promotion strategies and position the Seaway Trail for
                                                                                                                                                   designation as a national scenic byway. There is a working
                                                                                                                                                   agreement between ECCVB and the state of New York,
                                                                                                                                                   dated 1996; this application is consistent with its current
                                                                                                                                                   Action Plan. Match is projected to be from DCNR C2P2
                                                                                                                                                   funding.
                                                                                                                                                   This project is for more work along the Bayfront and involves
                                                                                                                                                   construction of a 1,125-foot asphalt walkway from the
                                                                                                                                                   Bayfront Bikeway to the Sassafras Street Pier, the proposed
                  Sassafras Street
                                                Erie-Western                                                                                       site for a restaurant but currently vacant. Additional work
                  Pier Public                                                    Construction                                                      includes landscaping, benches and a bike rack. No site plan
27 NW030044CZ Access                 Erie       Pennsylvania     Government
                                                                                 (CZM)
                                                                                                  $50,000    $50,000    $100,000   Erie
                                                Port Authority                                                                                     included with application and no extract from the 1996
                  Improvements
                                                                                                                                                   “Bayfront Access Master Plan” referenced in the application.
                                                                                                                                                   Have concerns about the placement of a „for-profit‟ restaurant
                                                                                                                                                   at the terminus of this walkway.
                                                                                                                                                The township wants to replace another one of its heavily-
                                                                                                                                                used picnic pavilions. A large pavilion was replaced recently
                                                                                                                                                with the help of a DCNR Recreation Grant. (See background
                                                                                                                                                information above. Have asked for additional information on
                  Shades Beach                                                                                                                  this proposal, i.e. a breakdown of material costs and labor).
                  Park Pavilion                 Harborcreek                      Construction                                      Shades Beach Budget listed total cost of $100K as a lump sum under
28 NW030005CZ Replacement            Erie       Township
                                                                 Government
                                                                                 (CZM)
                                                                                                  $50,000    $50,000    $100,000
                                                                                                                                   Park         „Consultant/Contractor‟. Many pavilions are pre-fabricated
                  Project
                                                                                                                                                and can be emplaced with Force-Account (in-house) workers.
                                                                                                                                                Also, the Site Plan doesn‟t present any way to access this
                                                                                                                                                pavilion site (i.e. it‟s located at the extreme western side of
                                                                                                                                                the park away from the parking lot).

                                                                                                                                   Erie County     This project includes implementation of BMPs on Private
                  Rotational
                                                Penn Soil
                                                                                                                                   (Coastal        Lands (e.g. farms) and will require policy clarification from
29 NW030029CZ Grazing Initiative Erie           Conservancy      Non-Profit      CNPP (CZM)       $13,000    $13,000    $26,000                    NOAA regarding its previous 306A determination for such
                                                Charitable Trust                                                                   Watershed
                                                                                                                                   Boundary)       projects!

                                                          Total Lake Erie Local Projects          $453,769   $511,548   $965,317          15       Projects
State Agency Projects
                  Delaware                                                                                                         Delaware        DVRPC proposes to provide administration and coordination
                                                Delaware                                                                           Estuary         for the Delaware Estuary components of the PA Coastal Zone
                  Estuary Coastal
                                                Valley
                  Zone                                                                                                             Coastal Zone    Management Program.
30 SE030022CZ     Management
                                     Multiple   Regional         Government      Planning (CZM)   $39,000      $0       $39,000
                                                Planning                                                                           Management
                  Admin. and                                                                                                       Admin. and
                                                Commission
                  Coordination
                                                                                                                                   Coordination
                                                                                                                                                   ECDP proposes to conduct it‟s contracted CZM monitoring,
                  LECZ Monitoring               Erie County                                                                                        administrative, outreach and related project management
31 NW030006CZ     & Technical        Erie       Department of    Government      Planning (CZM)   $55,000    $10,000    $65,000    Erie County     activities for FY 2003 in-house and pass through projects.
                  Assistance                    Planning




    7/18/2011 1:32 PM                                                                                          Page 6                                                                                     Project Information
     2003 CZM Project Application                                                                                                                                            5c916da6-7a8b-46c8-8f02-e0b87a0d7397.xls
                                                                                                                                                This provides for administration of the bluff setback
                                                                                                                                                ordinances for each municipality including monitoring the bluff
                BRSA Local                                                                                                      Lake Erie Bluff setback distances of new structures, monitoring
                                               PA CZM                         Combination
32 NW030051CZ Ordinance             Erie       Program
                                                               Government
                                                                              (CZM)
                                                                                                $4,400     $4,400     $8,800    Recession       improvements to existing structures and maintaining a
                Administration                                                                                                  Hazard Area     variance procedure and records of all permit/non-permit
                                                                                                                                                actions within the municipalities bluff recession hazard area.

                                                                                                                                                 This project will strengthen conservation districts' ability to
                                                                                                                                Coastal NP       conduct project inspection, respond to complaints, track
                Implementation                                                                                                  Areas in
                Compliance of
                                               Conservation
                                                               Conservation   Watershed
                                                                                                                                                 programs, participate in EFP2 and provide baseline
33 MU030050CZ   Coastal Nonpoint
                                    Multiple   Districts In
                                                               Districts      Protection
                                                                                               $200,000   $30,000    $230,000   Delaware         information for CNPP implementation, and established
                                               CNPP Area                                                                        Estuary and
                Pollution Program                                                                                                                baseline information for marina and recreational boating
                                                                                                                                Lake Erie        management measure implementation.

                                                                                                                                              The project includes Delaware Estuary Coastal Zone
                Coastal Zone                                                                                                    Geographic
                Wetland                        PA CZM                         Watershed                                                       monitoring overflights for federal, state, and local permitting
34 MU030053CZ   Monitoring
                                    Multiple   Program
                                                               Government
                                                                              Protection
                                                                                               $10,000      $0       $10,000    Area of Both  agencies to obtain a birds eye view to detect possible
                Update                                                                                                          Coastal Zones violations.

                Lake Erie                                                                                                       Geographic       The project includes Erie Coastal Zone monitoring overflight
                Coastal Zone                   PA CZM                         Combination                                       Area of Lake     for federal, state, and local permitting agencies to obtain a
35 NW030054CZ Monitoring            Erie       Program
                                                               Government
                                                                              (CZM)
                                                                                                $9,000      $0        $9,000
                                                                                                                                Erie Coastal     birds eye view to detect possiple violations.
                Overflights                                                                                                     Zone
                                                                                                                                                 Funds will be used to purchase an agricultural conservation
                Erie County
                                                                                                                                                 easement for a working farm within Erie County (yet to be
                Agricultural                   Erie County
                                                                              Acquisition                                                        identified). CZM funds are to be leveraged against
36 NW030023CZ   Conservation        Erie       Department of   Government
                                                                              (CZM)
                                                                                               $101,000   $202,000   $303,000   Erie County
                Easement                       Planning                                                                                          Department of Agriculture Preservation Funds (Growing
                Program                                                                                                                          Greener) as match.
                Decision Making                                                                                                               Project proposes to apply methods of environmental
                for                                                                                                                           management science to develop a screening model to
                Implementation                                                                                                  Springfield   produce a scientifically sound listing of the top nonpoint
                of Nonpoint                    Swarthmore
37 SE030027CZ   Pollution
                                    Delaware College           Other          CNPP (CZM)       $50,000    $165,512   $215,512   Twp. Delaware pollution management measures in Delaware County.
                Measures in the                                                                                                 Co.
                Urban Coastal
                Zone Drainage
                                                                                                                                                 Funds will be used to purchase lab equipment for the
                                                                                                                                                 proposed PI Research Center, currently under construction,
                                                                                                                                                 that will include six separate laboratories. These labs will
                                                                                                                                                 support the research work of the Regional Science
                                                                                                                                                 Consortium and PA Sea Grant. Equipment includes items
                P. I. Center
                                               Presque Isle                   Combination                                       Presque Isle     such as drying oven, balances, centrifuge, incubator, water
38 NW030028CZ Research              Erie       State Park
                                                               Government
                                                                              (CZM)
                                                                                               $100,000   $171,380   $271,380
                Equipment Grant                                                                                                 State Park       bath, water chemistry, specto-photometer, autoclave,
                                                                                                                                                 freezers, refrigerators, ice machine, microscopes, audiovisual
                                                                                                                                                 equipment, field equipment, shelving, lab tables, hose reels
                                                                                                                                                 and other related equipment. List will be refined with the help
                                                                                                                                                 of consortium representatives.

                                                                                                                                               Funds are to be used to locate and test water sources (glacial
                Hydrogeologic                                                                                                   Fairview       wells and aquifers) at the Fairview fish hatchery to
                                               PA Fish and
                Study, Fairview
39 NW030018CZ   Fish Culture
                                    Erie       Boat            Government     Research (CZM)   $10,000    $10,000    $20,000    Township, Erie supplement current water supplies that are currently recycled
                                               Commission                                                                       County         for hatchery operations. Geographic imaging and mapping
                Station
                                                                                                                                               will be included in the final report.




    7/18/2011 1:32 PM                                                                                       Page 7                                                                                        Project Information
     2003 CZM Project Application                                                                                                                                             5c916da6-7a8b-46c8-8f02-e0b87a0d7397.xls

                                                                                                                                Delaware           SERO seeks fund to pruchase a 115 HP engine for a
                                                                                                                                Estuary            sampling boat. The boat is routinely used to implement tasks
                 Delaware                                                                                                       between RM         on the estuary, such as chemical sampling , chemical and
40 SE030021CZ Estuary Studies        Multiple   PA DEP SERO Government         Research (CZM)   $8,270    $12,150    $20,420                       biological sampling with cause and effect of CNPP, surface
                                                                                                                                78.0 and 133.9
                                                                                                                                including title-   water assessment monitoring for permitted discharge and
                                                                                                                                Schuylkill River   dredge spoil suspension.
                                                                                                                                                   Both this project and the pilot study are design to assess the
                 Introduced
                                                                                                                                Delaware           risk of the introduced, non-native flathead catfish to
                 Flathead Catfish
                                     Philadelp The                             Combination                                                         recreational fisheries in the Delaware and to identify
41 SE030048CZ    Research and                  Pennsylvania     Other
                                                                               (CZM)
                                                                                                $21,108   $22,132    $43,240    Estuary
                 Outreach            hia       State University                                                                                    promising alternative for biological control. A complimentary
                                                                                                                                Coastal Zone
                 Program                                                                                                                           public outreach program is included in this project.

                                                                                                                                PA Coastal         The Partnership is proposing a project that will combined
                                                                                                                                Nonpoint           storm drain marking and dog waste collection program to help
                 Stormwater                     Partnership for                                                                 Program            reduce nonpoint source pollution.
42 SE030039CZ Runoff Pollution       Multiple   the Delaware      Non-Profit   CNPP (CZM)       $89,202   $99,170    $188,372   Management
                 Prevent Programs               Estuary                                                                         Area In The
                                                                                                                                Delaware
                                                                                                                                Estuary
                                                                                                                                PA Coastal         The main focus of this project is education and outreach.
                                                                                                                                Nonpoint           PDE will coordinate 50 Clean Water Theater performances in
                                                                                                                                Program            suburban Philadelphia schools to raise the environmental
                 Clean Water         Philadelp Partnership for
43 SE030040CZ Theater                          the Delaware    Non-Profit      CNPP (CZM)       $38,422   $45,000    $83,422    Management         literacy and stewardship skills of youth across the region.
                                     hia       Estuary                                                                          Area In The        They will be empowered to become agents of change who
                                                                                                                                Delaware           will improve the quality of their local watersheds.
                                                                                                                                Estuary
                                                                                                                                                   This is a follow on project to the effort begun in 2002 to
                                                                                                                                                   create and enhance wildlife habitat in Game Lands # 314.
                                                                                                                                                   This project phase has added a public education piece.
                                                                                                                                                   Objectives for this work are to improve some 165 acres of
                                                                                                                                                   early succession critical habitat, primarily for the American
                                                                                                                                State Game         Woodcock, a shorebird species; regeneration of habitat and
                 Roderick Wildlife              PA Game                        Combination                                      Lands 314 -        nesting areas by adding nutritional soil amendments and
44 NW030003CZ Reserve -2             Erie       Commission
                                                                  Government
                                                                               (CZM)
                                                                                                $39,850   $54,950    $94,800
                                                                                                                                Springfield        planting grain and chemical and mechanical elimination of
                                                                                                                                Twp.               invasive plant species (primarily Multi flora Rose and Asian
                                                                                                                                                   honeysuckles) in selected areas. Public education includes
                                                                                                                                                   developing informative materials and displays and conducting
                                                                                                                                                   at least one public tour of the GL as part of the dedication
                                                                                                                                                   activities.
                                                                                                                                                   The proposed project will address degradation of the
                                                                                                                                Tookany            streambanks and NPS pollution problems on a watershed
                 Tookany Creek
                 Streambank                                                                                                     Creek Park,        wide basis. To help understand the impacts of the watershed,
                                                Township of                    Construction                                                        an effort for visual assessment along the entire length of the
45 SE030037CZ    Stabilization and   Multiple   Cheltenham
                                                                  Government
                                                                               (CZM)
                                                                                                $50,000   $649,752   $699,752   Cheltenham,
                 Restoration                                                                                                    Montgomery         Tookany Creek within the upper reachers of the watershed
                 Project                                                                                                                           was completed last summer by the TCWMP steering
                                                                                                                                County, PA
                                                                                                                                                   committee.
                                                                                                                                                   The overall goal of this project is to demonstrate the feasibility
                 Geotextiles to                                                                                                                    of using the porous geotextile baffle method to reduce the
                 Remove                         Drexel                                                                                             biodegradable pollutants released to the estuary from
                 Pollutants from
                                     Montgom University                                                                         Philadelphia,      dispersed locations. The intent at the Combined Sewer
46 SE030032CZ    Combined Sewer              Dept. of Civil & Other            CNPP (CZM)       $50,000   $51,385    $101,385                      Overflow site is to develop engineering design parameters to
                 Overflows to the    ery     Architectural                                                                      PA
                 Delaware River                 Engineering                                                                                        reduce both suspended and dissolved constituents, focus on
                 Estuary                                                                                                                           TSS reduction and remove soluble species to the extent
                                                                                                                                                   practical.



    7/18/2011 1:32 PM                                                                                       Page 8                                                                                         Project Information
     2003 CZM Project Application                                                                                                                                           5c916da6-7a8b-46c8-8f02-e0b87a0d7397.xls
                                                                                                                                                  The objective of this project is to produce a Cultural
                Cultural
                                           Pennsbury                                                                                              Landscape treatment plan for Pennsbury Manor. This plan
                Landscape
                                           Manor/The                                                                              Pennsbury       will build upon the strong research that the site has
47 SE030013CZ   Treatment Place   Bucks    Pennsbury
                                                            Non-Profit      Planning (CZM)    $50,000      $50,202    $100,202
                for Pennsbury                                                                                                     Manor           accomplished independently and during the CZM funded
                                           Society
                Manor                                                                                                                             "Outdoor Interpretation Plan".

                                                                                                                                                 PA Clean Ways is proposing to facilitate a two mile cleanup,
                                                                                                                                                 of the southeast side of Little Tinnicum Island, which is
                                                                                                                                                 located in the Delaware Coastal Zone in the Delaware River
                Little Tinnicum                                             Education and
48 SE030034CZ Island              Delaware PA Cleanways Non-Profit          Training (CZM)
                                                                                              $65,000     $199,193    $264,193    Delaware River near Philadelphia. This project will focus on the protection
                                                                                                                                                 and enhancement of a coastal wetland and the preservation
                                                                                                                                                 of a significant historic site.

                                                                                                                                                  This proposal is essentially to provide a „block grant‟ to the
                                                                                                                                                  Sea Grant Program of Erie to establish and administer a
                                                                                                                                                  funding source for reviewing and approving competitive
                                                                                                                                                  scientific research proposals for management of the Presque
                                                                                                                                                  Isle ecosystem from sub-applicants. Project award would not
                Presque Isle                                                                                                                      be for more than $5,000. Proposals would primarily focus on
                                           The
                Ecosystem                                                                                                         Lake Erie       fisheries management issues such as nuisance species,
49 NW030019CZ Minigrants          Erie     Pennsylvania     Other           Research (CZM)    $50,000      $62,500    $112,500
                                           State University                                                                       Coastal Zone    avian botulism-fish connection, fish consumption advisories,
                Program
                                                                                                                                                  fish toxicology and habitat. Match is projected to be $25K
                                                                                                                                                  from PSG, and the remainder from in-kind matches for the
                                                                                                                                                  various sub-projects. It‟s assumed that sub-grants would be
                                                                                                                                                  on a 50/50 basis, thus allowing for 10 to 15 sub-grants being
                                                                                                                                                  awarded from the $50K CZM share.

                                                       Total State Agency Projects           $1,040,252   $1,839,726 $2,879,978         20        Projects
                                                                            Total            $2,386,256   $4,310,485 $6,696,741         49        Total Projects




    7/18/2011 1:32 PM                                                                                       Page 9                                                                                     Project Information

								
To top