  PROJECT NAME                  PROJECT DEVELOPER /               COUNTRY    ADDRESSED               PROJECT TYPE                BRIEF DESCRIPTION
                                IMPLEMENTER                                  SECTOR


  Sector: INDUSTRY

1 Compressed air               ELYO project implementer           France     Metal Industry          Efficiency and renovation   The company is a foundry of precision specialized in the manufacture of small machine
  optimization in a metal                                                                            investment - Electricity    elements. In order to lower the use of energy the Company is going to carry out
  forming factory                                                                                                                modernization of old compressors connected with implementation of 3 compressors, a
                                                                                                                                 drier, 2 separators, the module of piloting, the electric device of counting and piping and
                                                                                                                                 sheaths of repression of hot air. This will result in emission reduction due to energy
                                                                                                                                 savings.

2 Replacement of air           UNIO SĄ/ Romanian Energy Efficiency Romania   Machine- Building       Efficiency and renovation   UNIO Satu-Mare is company of machine building industry requiring important quantities of
  compressors in Machine-      Fund (REEF)                                   Industry                investment – Electricity    compressed air. In order to lower use of energy of the manufacturing process company is
  Building Industry                                                                                                              going to replace old and energy consuming equipment with more efficient devices which
                                                                                                                                 will support sustainable energy use.


3 Increasing the energy        Malilla Company/ The Ministry of   Finland    Shipbuilding industry   Control and operations -    Malilla Ltd. is a company which manufactures metal products for the shipbuilding industry
  efficiency of compressed     Trade and Industry                                                    Electricity                 with use of compressed air. To improve the efficiency of system and achieve energy
  air system at Malilla                                                                                                          savings resulting in emission reduction the company is analyzing several measures that
  Company                                                                                                                        can be carry out e.g.: changing the control for the compressors of the compressed air
                                                                                                                                 station; lowering the pressure level; getting a timer for compressed air ejection; closing
                                                                                                                                 down parts of the network, repairing leaks, getting low pressure blast for blast cleaning;
                                                                                                                                 getting low pressure blast for blast cooling; getting a smaller compressor with a frequency
                                                                                                                                 converter.


4 Application of high          The Glass Industrial Company.      Portugal   Glass Industry          Renovation investment -     The considered Glass Industrial Company is characterized by a continuous process where
  efficiency motors in a glass                                                                       Electricity                 70% of the total electricity is consumed by electric motors. To improve energy efficiency
  industrial company versus                                                                                                      the company decided to replace of several old, oversized motors by new energy efficient
  repairing the failed motors                                                                                                    motors of the same power. Audits carried out in the company showed large potential for
                                                                                                                                 electricity savings.




                                                                                                                                                                                             0419e303-6ee1-41d2-83fa-d42dfb207ea5.xls
                                                                                                                                                                                                                         Page 2 of 8




5 Retrofit of lighting systems Industrial Company Manufacturing      Portugal   Car Manufacturing        Efficiency and renovation       The Company that is a car manufacturing industry needs to retrofit the old lighting and
  in an industrial company     Cars                                             Industry                 investment - Electricity        design the new layout of the production process. Through the involvement of the company
                                                                                                                                         with the Green Light programme coordinated by national Energy Agency, it was possible to
                                                                                                                                         carry out a detailed lighting monitoring. The main goal of these activities is to reduce the
                                                                                                                                         electricity consumption by about 4% what will result in emission reduction as well.



6 Cogeneration in a chemical Consortium made by EDP                  Portugal   Chemical Industry        Efficiency and renovation       The Company is a chemical plant that produces sodium based chemical products. The
  plant                      cogeneration and Galp Power.                                                investment – Natural Gas +      production requires use of a large amount of electric and thermal energy for electrolysis
                                                                                                         Fuel                            purposes and for steam production. To abate use of energy the plant has decided to install
                                                                                                                                         in the company a cogeneration plant. Investment, operation and maintenance of the
                                                                                                                                         cogeneration plant are assured by one consortium made by EDP cogeneration and Galp
                                                                                                                                         Power.

7 Food processing factory      FOOD PROCESSING FACTORY with          Bulgaria   Food Industry            Fuel switching and efficiency   Pobeda plc - Bourgas is a manufacturer of sugar candy, chocolate and bakery products. In
                               help of Bulgarian Energy Efficiency                                       and renovation investment –     September 2005 the company launched the implementation of an energy efficiency project
                               Fund/ Pobeda plc                                                          Fuel + Natural Gas              on its premises. On the basis of the conducted preliminary simplified energy audits the
                                                                                                                                         company is going to implement suitable measures to reduce its emission and use of
                                                                                                                                         energy.

8 Peak reduction and part      The Lexmark group                     France     Air Conditioning         Efficiency and renovation       The Lexmark Group, which is located in Orlans manufactures and commercialises toners.
  load savings in air                                                           Industry                 investment - Electricity        Once the electricity invoice was excessive, the company made an energetic audit and
  conditioning                                                                                                                           concluded that the air-conditioning system was inadequately managed as well as the
                                                                                                                                         refrigerating fluids used in the centrifugal compressor groups did not fulfill the regulation
                                                                                                                                         on the CFC's emissions. To reduce the wasted energy and to be in compliance with the
                                                                                                                                         requirements of security and environmental protection, the company decided to replace
                                                                                                                                         the chillers installed.

9 Heat recovery in a fertllizer SCAM spa/Energynet srl (ESCO).       Italy      Fertilizers Production   Efficiency investment - Gas     The Project was carried out in a fertilizer factory and it is based on hot air recovery. A new
  oven drying                                                                   Industry                                                 canal was built to pipe the hot air to the oven drying entrance, some air is burned and
                                                                                                                                         some is used to facilitate fertilizer drying as secondary air. The savings come from the
                                                                                                                                         smaller need of heat to warm the air, in fact the primary energy consumption decreases in
                                                                                                                                         spite of the same production.




                                                                                                                                                                                                     0419e303-6ee1-41d2-83fa-d42dfb207ea5.xls
                                                                                                                                                                                                                     Page 3 of 8




10 Replacement of existent     Company owner of the plant, Burner    Italy     Non- ferrous Metal     Efficiency and renovation       The project was performed in a company of the non- ferrous metal Sector. It fabricates
   burners with more efficient producer, Energia Mediterranea                  Sector                 investment - Gas                finished and semi finished products in aluminium and alloys for energy transmission and
   ones                        (ESCO), Public investors                                                                               distribution and car industry. Several of manufacturing processes are highly energy
                                                                                                                                      consuming. The energy is provided with gas burners which were replaced with more
                                                                                                                                      efficient regenerative devices. Instead of 4 burners, two new ones were installed and one
                                                                                                                                      was maintained as a reserve.


11 Energy efficiency at a       The Pharmaceutical Enterprise Orth   Austria   Pharmaceutical         Efficiency, renovation and      The Pharmaceutical Enterprise, whose core business is research and production of
   pharmaceutical enterprise    A.D. Donau                                     Industry               monitoring investment - Gas     pharmaceutical products, occupies building heated with natural gas by means of an old
                                                                                                                                      thermal oil boiler. An energy service contract was selected to finance the refurbishment of
                                                                                                                                      the facility. Measures which are going to be implemented include: realization of ventilation
                                                                                                                                      system, installation of heat recovery at the thermal boiler, renovation of the warm water
                                                                                                                                      preparation system and energy controlling system.



12 Furniture production         Bogner Energy Technologies           Austria   Furniture Production   Fuel switching and efficiency   The building that is property of Bogner Energy Technologies was refurbishment to become
   facility                                                                    Industry               and renovation investment       energy efficient. The target was not only low energy house but also the reaching of a high
                                                                                                                                      ecological standard. The following measures were taken: installation of solar panels;
                                                                                                                                      refurbishment of the oil boiler with a storage tank for the solar system; installation of low
                                                                                                                                      temperature heating system.


13 Milk Processing Industry     Obersteirische Molkerei (Upper       Austria   Milk Processing        Renovation investment -         The milk processing industry of upper Styria is among the 10 biggest milk processing
                                Styrian diary)                                 Industry               Electricity                     companies in Austria. The combustion for air ventilation has been operated so far by a
                                                                                                                                      motor with a capacity of 30 kW. In operation the ventilator consumed 152,400 kWh
                                                                                                                                      annually. To save energy a frequency reformer was installed. The frequency reformer
                                                                                                                                      reduces the revolutions per minute of the motor on demand and adapts the air stream as
                                                                                                                                      required.


14 Efficient gas burner         Energia Plus Roma s.r.l. and         Italy     Rotary press drying    Efficiency and renovation       An innovative gas burner has been installed to reduce oven gas consumption in the rotary
   installation                 Mediagraf s.p.a.                               processes     Industry investment - Gas                press drying process at Mediagraf s.p.a. (located at Noventa Padovana). The installation of
                                                                                                                                      such burner allowed lowering the oven flame level during several production processes
                                                                                                                                      reducing overall gas consumption by 30% on the average. The Related energy efficiency
                                                                                                                                      investment pay back time has been estimated in less than two years. Savings achieved
                                                                                                                                      have been monitored and the energy efficiency project has been certified by the Italian
                                                                                                                                      Authority for Electricity and Gas under the existing white certificate mechanism.



   Sector:NON RESIDENTIAL
   BUILDINGS

 1 Renovation of thermal      SIEMENS                                France    Non Residential Sector Efficiency and renovation       The Project relies on renovation of thermal equipment in a hotel of 125 rooms, where the
   equipment through energy                                                                           investment - Gas                heating of the site as well as the production of domestic hot water are dealt with by gas-
   performance contracting in                                                                                                         fired boiler of 1,5 megawatts. Hotel has also air-conditioning which is realized with use of
   one hotel                                                                                                                          cold generating chiller of a capacity of 441 kilowatts. The hotel has been approached by
                                                                                                                                      the SIEMENS company and they have helped in reducing drastically hotel energy costs.




                                                                                                                                                                                                  0419e303-6ee1-41d2-83fa-d42dfb207ea5.xls
                                                                                                                                                                                                                      Page 4 of 8




2 Heat pump installation in    JUMESCO                              Finland    Non Residential Sector Fuel switching – Electricity +   Savisaari is a garden producing vegetables and plants for the town of Kuopio. Two
  two greenhouses                                                                                     geothermal                       greenhouses of the garden were heated by electricity and it was found that electricity
                                                                                                                                       consumption could be halved by installing heat pumps. The bigger pumps collect heat
                                                                                                                                       from a nearby lake and the smaller one from a green close to the garden. This activity
                                                                                                                                       helped not only to save energy, but to reduce emission of GHG as well.


3 Wood fired boilers and       This project was 100% financed by    Bulgaria   Non Residential Sector Renewables - biomass             Kyustendil is the principal town of the Kyustendil region in South-Western Bulgaria. The
  heat insulation of an        own equity investment of the                                                                            central heating system of the building was supplied from 2 local coal fired boilers which
  educational centre           Municipality. Such investment became                                                                    were replaced with installation of 2 new pyrolysis boilers for firing of wood residues and
                               possible because the Municipality of                                                                    small sized firewood. Moreover project activity involved loft insulation, insulation of the
                               Kyustendil obtained an additional                                                                       oriels of the building, replacement of the radiators of the central heating system with fan
                               subsidy from the national budget.                                                                       convectors and individual control of the heating of each room.



4 Energy management            THE VIA CATARINA Shopping Center     Portugal   Non Residential Sector Energy Consumption               The main concern of this Company was to provide users with high comfort levels and high
  system in a shopping                                                                                Monitoring - Electricity         quality indoor conditions, minimizing the environmental impacts. The company's energy
  center                                                                                                                               policy framework is based on: rigorous definition of the standards of living, supply-side
                                                                                                                                       management policy, by choosing the best energy carriers and conversion technologies,
                                                                                                                                       demand-side management policy, by selecting the best available environmental user
                                                                                                                                       friendly energy efficient technologies.


5 Technical management of a Energie Système (ESCO)                  France     Non Residential Sector Energy Consumption               Since 1992, the engineering department of the shopping center, in collaboration with the
  large shopping center                                                                               Monitoring - Electricity         operating company had succeeded in reducing the energy invoice. The operator made a
                                                                                                                                       proposal for the installation of a BMS. The BMS consists of seven local units of monitoring
                                                                                                                                       communicating between them. It manages a complex set of equipment of heating, of
                                                                                                                                       production of chilled water, renewal of air and lighting.


6 Municipal energy efficiency Óbuda Municipality                    Hungary    Non Residential Sector Efficiency and renovation        The municipality of Óbuda consists of 108 municipal buildings. The energy consumption of
  project - Renovation of 6                                                                           investment - Gas                 buildings is extremely high because the thermal insulation characteristics of buildings and
  schools                                                                                                                              windows are poor. The windows are with a single pane and often the wooden frames are
                                                                                                                                       falling apart. The project involves: replacement of windows, windows frames/ fittings,
                                                                                                                                       insulation of front walls and insulation of roofs.

7 Awareness raising through The "syndicat" SIGEIF                   France     Non Residential Sector Awareness through                The "syndicat" SIGEIF develops its environmental policy and creates a new link with the
  monitoring in municipal                                                                             monitoring - electricity         franchising bodies. The "communes" like Rueil Malmaison decrease their consumption and
  buildings                                                                                                                            save money but also introduce a new dimension in their relationships with their staff and
                                                                                                                                       with their citizens. The campaign of “awareness through monitoring” (“sensibilisation
                                                                                                                                       instrumentée”) has been realised by a consultant in 2005 from may the 9th to may the
                                                                                                                                       14t. The typical values and good practices are shown to each worker in the building. A
                                                                                                                                       global monitoring of the progress (load curves) is realised and the results are shown later
                                                                                                                                       to renforce the behavioural change.




                                                                                                                                                                                                   0419e303-6ee1-41d2-83fa-d42dfb207ea5.xls
                                                                                                                                                                                                                       Page 5 of 8




 8 Energy efficiency in a     The joint activity between the       Bulgaria     Non Residential Sector Optimization of utilisation and The energy efficiency project in the Regional Hospital of Gabrovo was developed and
   regional hospital          Municipality of Gabrovo, Dr. Tota                                        efficiency and renovation       implemented in the framework of the Municipal Energy Efficiency Network in 2001. The
                              Venkova Regional Hospital and                                            investment – fuel + electricity measures set to be implemented included: 1) no-cost or low-cost organizational and
                              EnEffect. (The part of investment                                                                        behavioral measures (changes in the manner of utilization of the laundry, installation of a 3-
                              costs was provided by a grant,                                                                           tariff electric meter); 2) simple low-cost technical measures (repair and weather-stripping
                              through a project financed by USAID)                                                                     of windows); 3) current repair and replacement of single pieces of equipment and
                                                                                                                                       aggregates (improvements in the steam yard and combustion processes); 4) high-tech
                                                                                                                                       measures, applied for a first time in Eastern Europe (installation of a new highly efficient
                                                                                                                                       air conditioning system in the surgery ward).



 9 Biomass heating in a       The project was financed by the        Bulgaria   Non Residential Sector Fuel switching - biomass        The Project was identified in Gotse Delchev that is a municipal centre in South - West
   municipal hospital         hospital and by Senter International,                                                                    Bulgaria. A wood biomass boiler manufactured by KARERA was installed in the new boiler
                              the executive agency of The                                                                              station at the municipal hospital. Before the project, the hospital used 4 naphtha boilers
                              Netherlands Ministry of Economic                                                                         for heat generation installed in the main building. This helped to reduce municipal
                              Affairs, in the framework of the                                                                         expenses for heating and domestic hot water as well as affected on improvement of
                              Programme for Co-operation with the                                                                      microclimate.
                              Countries of Central and Eastern
                              Europe - PSO. Partners in the project
                              are the Dutch companies: Energy
                              Systems and BTG biomass
                              technology group, and from Bulgarian
                              side ERATO Holding plc and the
                              Center for Energy Efficiency EnEffect.



10 Office Building            Pichler Werke Weiz (Pichler Factory     Austria   Non Residential Sector Renovation investment and       The project was implemented at office building that demanded a thermal-energetic
                              Weiz)                                                                    renewables- Electricity         refurbishment in combination to reach a high thermal comfort and high quality indoor air.
                                                                                                                                       The following measures were undertaken: Isolation of the building, PV plant, and
                                                                                                                                       installation of new windows and shadowing systems.

11 Fashion whole sales centre Modegrosshandelscenter MGC Wien         Austria   Non Residential Sector Efficiency and renovation       The Fashion Whole Sales Centre implemented the following measures to reduce energy
                              (Fashion whole sales centre MGC                                          investment – Fuel +             costs and to simplify the facility regulation system through a central control station: Boiler
                              Vienna)                                                                  Electricity                     exchange and optimization of the heating systems; Renovation of the pipe system;
                                                                                                                                       Installation of heat recover system; Installation of electricity peak load management
                                                                                                                                       system; optimization of the air conditioning.


12 Public swimming pool       Swimming pool Simmering (owned by Austria         Non Residential Sector Optimization and Energy         The facility comprises several pools with steam baths, a sauna, a solarium, restaurant and
                              the municipality of Vienna)                                              Monitoring – gas                an experience world. Heat is supplied by the district heating; electricity is supplied by the
                                                                                                                                       municipal utility. Aim of the project was to reduce the energy costs and to have a pay back
                                                                                                                                       period of max. 10 years. The following measures were set: optimization of: central
                                                                                                                                       heating, pool water preparation; warm water preparation; ventilation system as well as
                                                                                                                                       Installation of electronic energy management system.


13 Private medical centre     Wiener Privatklinik (Viennese private   Austria   Non Residential Sector Optimization and Energy         The project which is located in a private medical centre involved the following measures:
                              medical centre)                                                          Monitoring – gas                modernization and enlargement of existing analogue regulation system, renovation and
                                                                                                                                       optimization of air conditioning, energy controlling, and optimization of demand
                                                                                                                                       management. This helped to reduce high operation and maintenance costs.

14 Micro CHP in a religious   Marianneum                              Austria   Non Residential Sector Renovation investment -         The religious centre is located on the outskirts of Vienna. The following energy systems
   centre                                                                                              Electricity + Natural Gas       are installed. For heating, domestic hot water production and electricity generation a micro
                                                                                                                                       CHP was integrated in 2003. Additionally an oil boiler with a thermal output of 116 kW is
                                                                                                                                       used to cover the thermal peak loads; furthermore two storage tanks are used for the
                                                                                                                                       same purposes. Two heat pumps provide extra heat for the winter period. For additional
                                                                                                                                       hot water production a thermal solar system with a collector is installed.


15 Micro CHP In a hotel       Schneider-Gössl                         Austria   Non Residential Sector Renovation investment -         The hotel is located on the outskirts of Vienna. The building is devided into a hotel and a
                                                                                                       Electricity + Natural Gas       restaurant. A micro CHP was installed in 2003 for heating, domestic hot water production
                                                                                                                                       and electricity generation. The micro CHP and the peak load boiler are fuelled with natural
                                                                                                                                       gas.




                                                                                                                                                                                                   0419e303-6ee1-41d2-83fa-d42dfb207ea5.xls
                                                                                                                                                                                                                              Page 6 of 8




16 Check and improve the         Ecofys                                  The Netherlands   School buildings   Renovation investment -       In three school buildings in Amsterdam Ecofys invested in new high efficient lighting and
   energy performance of                                                                                      Electricity + Natural Gas     optimization of heating system. The investments were done within an energy saving
   schools and disseminate                                                                                                                  contract. The contract has a duration of 8 years and within these years the school pays
   best practices                                                                                                                           75% of the energy savings back to Ecofys to cover the investment



   Sector: RESIDENTIAL
   BUILDINGS
 1 Cfl Promotion ( I )           Operation "10,000 bulbs for year        France            Privately owned    Efficiency investment -       ADUHME is a local energy agency which together with PHILIPS Eclairage takes place in
                                 2000" supported by ADEME, EDF,                            housing            Electricity                   promotional campaign of using of less energy consuming equipment. Also the local
                                 PHILIPS Eclairage, ADUHME                                                                                  distribution network of PHILIPS was requested to take part in this operation and a good
                                                                                                                                            number of supermarkets and resellers of do-it-yourself, in which the lamps with energy
                                                                                                                                            saving of PHILIPS mark are referred, adhered to the operation.


 2 Refurbishment of panel        The project is implemented by          Hungary            Privately owned    Efficiency investment – gas + Within the framework of Solanova project a 7-storey panel building built in the 70s in the
   flats                         Inhabitants, Local Municipality and DH                    housing            electricity                   town of Dunaújváros will be transformed into “Factor 10” building by reducing its initial
                                 company, with use of FP5 grant from                                                                        space heat demand to almost 10 %. The aim of the reconstruction is to reduce the annual
                                 the Hungarian Ministry of                                                                                  heat energy of the building to 15 - 50 kWh/m2.
                                 Environment and Water Management,

 3 Energy efficient windows      Housing Company                         Finland           Privately owned    Efficiency investment - gas   The Project corresponds to the renewal of windows in an apartment building owned by the
   by one owner through a                                                                  housing                                          owners of the apartments through shares in the housing company and managed by the
   share-based company                                                                                                                      board and the property manager.

 4 Renewal the oil heating       The project is implemented by owners Finland              Privately owned    Efficiency and renovation     The typical case is a detached house with an old heating system which needs to be
   system in one detached        of deteched houses with help of Shell                     housing            investment – fuel             renewed. As a result of the investment the house owner can expect oil consumption to
   house                         and Neste, or HPAC                                                                                         decrease which of course results in lower energy bills. Systems are much more efficient
                                                                                                                                            than old ones and renewing the system usually results in 10-30 % savings.

 5 Solar hot water system for    100% of the investment cost was         Bulgaria          Privately owned    Renewable - solar             The Old People Home is owned and administered by the Municipality of Silistra. This
   the old people home           provided by a soft loan, obtained by                      housing                                          project was identified during a local sustainable energy planning procedure, organized by
                                 the Municipality of Silistra from a                                                                        the Municipality. Before the project, domestic hot water supply of this building was based
                                 credit line in the framework of                                                                            on cost effective electricity water heaters and light fuel oil fired boilers. In order to improve
                                 Bulgarian Municipal Energy Efficiency                                                                      efficiency the solar hot water system has been implemented.
                                 Programme, administered by the US
                                 company Electrotek Concepts


 6 CFL Promotion ( I I )         EDF, the ADEME, the General Council     France            Privately owned    Renovation investment -       The objective of the operation was to diffuse 100,000 Compact Fluorescent Lamps in the
                                 and the Regional Council.                                 housing            electricity                   mountain region of France. The operation was implemented in large stores by the
                                                                                                                                            manufacturers.
 7 CFL Promotion ( I I I )       EDF and ADEME                           France            Privately owned    Renovation investment -       The major idea of this action was to promote CFLs. The objective was to sell 8,000 lamps.
                                                                                           housing            electricity                   Resulting in a partnership of EDF and ADEME with the town of Besancon, the
                                                                                                                                            hypermarkets, two FM radios and CFL manufacturers, Philips and Osram, the idea was to
                                                                                                                                            promote the product and cause a temporary drop in the prices for the households.


 8 Substitution of single        IRIS                                    Italy             Privately owned    Efficiency and renovation     IRIS (Isontina Reti Integrate e Servizi S.p.A.) is a local distributor of electricity and gas
   glasses with double                                                                     housing            investment – Gas              located in Gorizia. In the operative centre of IRIS restructuring works and operations of
   glasses and insulation of                                                                                                                improvement of the energy efficiency like envelope insulation with insulating materials and
   roof whit highly insulating                                                                                                              the substitution of single glasses with double glasses have been planned
   materials




                                                                                                                                                                                                          0419e303-6ee1-41d2-83fa-d42dfb207ea5.xls
                                                                                                                                                                                                                          Page 7 of 8




 9 Condensing boilers           Housing association - North West of   United Kingdom    Privately owned    Efficiency and renovation       In the Energy Efficiency Commitment in the UK, obligated parties can claim savings for
   installation                 England                                                 housing            investment – Gas                high efficiency boilers that are installed in domestic premises. This case study is based on
                                                                                                                                           data supplied by one of the largest social housing providers in the North West of England,
                                                                                                                                           an organisation that owns and manages over 16,000 properties.
                                                                                                                                           As part of their boiler replacement programme, this housing association (HA) claimed
                                                                                                                                           funding for A-rated condensing boilers installed in a number of their properties. The HA
                                                                                                                                           used an EEC „agent‟ to contact the different obliged parties and to see which was offering
                                                                                                                                           the best amount of funding towards the costs of the measures.

10 Average residential          The housing association and oblidged United Kingdom     Privately owned    Efficiency investment – Gas     There are nearly 25 million dwellings in Great Britain (England, Scotland and Wales) of
   package of measures          party                                                   housing                                            which nearly 17.5 million have unisolated cavity walls. A housing association in the west of
                                                                                                                                           England carried out a programme to improve the energy efficiency of a small housing
                                                                                                                                           estate between April 2004 and December 2005. This included fitting cavity wall insulation
                                                                                                                                           and loft insulation where appropriate.

11 Space For Solar:           Ecofys                                  The Netherlands   Privately owned    Renewables - solar              On an apartment complex of 80 dwellings owned by social housing association Tablis
   demonstration of large                                                               housing                                            Wonen a large collective solar thermal system for the hot tap water provision was realised.
   scale solar thermal                                                                                                                     The project took place in the framework of a large scale renovation project. In total ninety
   systems in the Netherlands                                                                                                              square meters of solar collectors have been installed. Due to the switch from individual
                                                                                                                                           kitchen tap water heaters to a collective system, the comfort of apartments have been
                                                                                                                                           improved.

12 Teli Zeeland Energy-Saving Information not available               The Netherlands   Privately owned    Campaign to reduce energy       Province Zeeland got a subsidy for an Energy-saving campaign in the grant scheme Teli. In
   Campaign for low income                                                              housing            consumption                     2004 started the Energy-saving campaign: action €nergyprofit. More than 4500 Energy-
   Households                                                                                                                              saving packages where spread in Zeeland, only at low income households. This is
                                                                                                                                           combination with a free energy-saving advice, given by employees of local reintegration
                                                                                                                                           offices. A large part of the energy-saving in this project is caused by behavioural change



13 Wonen++ The energy           Ecofys Netherlands BV and the         The Netherlands   Privately owned    Campaign to reduce energy       Campaign offering education and consulting through an independent EPA (Energy
   saving approach              Province of Groningen                                   housing            consumption                     Performance Advice) and offering installation of energy efficiency measures by a group of
   Leeuwenborg Groningen                                                                                                                   pre-selected installers and building companies. The campaign focuses on privately owned
                                                                                                                                           housing with several types of insulation, ventilation, heating solutions and sustainable
                                                                                                                                           energy generation solutions such as PV and solar boilers. The marketing of the campaign
                                                                                                                                           was done through the municipalities.

   Sector: TRANSPORTATION

 1 Ecodriving at Transpoint     Transpoint company                    Finland           Transportation     Control and operations - fuel   Transpoint Ltd. is one of the biggest transportation companies in Finland. To decrease fuel
   company                                                                                                                                 consumption and to promote energy awareness among its employees Transpoint in
                                                                                                                                           connection with the EcoDriving programme has been providing since 1999 driving
                                                                                                                                           education programme. The course is available to everyone and includes lectures on how to
                                                                                                                                           drive economically and make use of the new technology in vehicles, and two test drives
                                                                                                                                           with the instructor and a meter monitoring emissions and fuel consumption during driving.

   Sector:NETWORKS AND
   GRIDS
 1 Connection of 5 district     The Romanian Energy Efficiency Fund Romania             District Heating   Renewables - geothermal         Connection of 5 thermal substations in Oradea city to a geothermal well, replacing the use
   heating substations to       (REEF) and TRANSGEX. An emission                                                                           of fossil fuels in the CHP facility by geothermal energy. A geothermal substation will be
   geothermal Energy            reduction purchase agreement with                                                                          built next to the well, which will prepare the hot and warm water for district heating and
                                the Danish Environmental Protection                                                                        sanitary water purposes. The five thermal substations will be fully modernised by using
                                Agency (DEPA) for the project                                                                              plane heat exchangers, high efficiency pumps and automation equipment.
                                "Geothermal Energy in Oradea - Area
                                II and Beius";

 2 Pannonpower Biomass          PANNONGREEN Kft.)                     Hungary           Power Sector       Renewables - biomass            The major objectives of the Project are to produce renewable electricity and thus to reduce
   Project                                                                                                                                 GHG emissions and local pollution by switching fuel from coal to biomass for heat and
                                                                                                                                           electricity co-generation. The project is implemented on the site of an existing power
                                                                                                                                           plant. The plant belongs to Pannonpower Rt., and is located in the vicinity of Pécs, a major
                                                                                                                                           city in south-Hungary.

 3 Energy efficiency            Gabrovo HPP (later registered as      Bulgaria          District Heating   Efficiency and renovation       The project was initiated by the DH plant in order to reduce energy lost in the
   renovation of district       Toplofikatsiya Gabrovo SPSCo)                                              investment                      transportation network and to keep the number of customers. Project includes application
   heating and heating end-                                                                                                                of energy efficiency measures which will lead to emission reduction. The aim is also to
   use                                                                                                                                     create a model and incentive for other heating supply companies in Bulgaria to implement
                                                                                                                                           similar projects.
 4 Management of a district     The City of Blagnac and Dalkia, the   France            District Heating   Fuel switching –                In order to anticipate an extension of the network and new connections, Blagnac launches
   heating network and          current network operator                                                   biomass/gas/fuel                a consultation in 2001 with the intent of delegating and optimizing the management of its
   increase of geothermal                                                                                                                  service of heat distribution and reducing the costs. The main heat source is the geothermal
   contribution                                                                                                                            one. The installation generates the heat needed for the district heating and for the
                                                                                                                                           production of Domestic Hot Water. Initially the Geothermal is associated with two natural
                                                                                                                                           gas boilers (heavy fuel as back-up). After work the geothermal is associated to a gas
                                                                                                                                           condensing boiler (heavy fuel as back-up) and the two old back-up boilers. A heat pump
                                                                                                                                           has also been installed to assist the geothermal energy.




                                                                                                                                                                                                      0419e303-6ee1-41d2-83fa-d42dfb207ea5.xls
                                                                                                                                                                                                              Page 8 of 8




5 Energy efficiency retrofit of Equity capital of the Gabrovo       Bulgaria   Public Lightning   Efficiency and renovation   The Demonstration Project for Energy Efficiency Improvement of the Street Lighting in
  the street lighting system    Municipality, Global Environmental                                investment - Electricity    Gabrovo is a component of the project "Energy Efficiency Strategy to Mitigate GHG
                                FacilityGEF/UNDP, National                                                                    Emissions. The project included energy audit of the existing street lighting system,
                                Environmental Protection Fund                                                                 identifying the technical parameters of the current condition and development of a baseline
                                (NEPF), Power Distribution Company,                                                           scenario.The project implementation resulted in the installation of NVSL lighting fixtures
                                Gabrovo                                                                                       (whose power was selected according to the different categories of streets) by the local
                                                                                                                              Electricity Distribution Company.


6 Public lightning technology E.S.Co. Tuscia                        Italy      Public Lightning   Efficiency and renovation   E.S.Co. Provinciale Tuscia spa is a public company founded by Province of Viterbo that
  substitution                                                                                    investment - Electricity    carried out the Public Lighting projects based on replacement of old lighting with new
                                                                                                                              energy saving solutions. The activity was based on an Energy Service Contract in
                                                                                                                              conjunction with Third Party Financing. Investment costs were borne entirely by E.S.Co
                                                                                                                              Tuscia and are repaid through the energy savings generated during the time period
                                                                                                                              covered with the contract (about 12 years).

7 Public lightning technology City of Salzburg                      Austria    Public Lightning   Renovation investment –     The project includes energy savings in the lighting of the old part of Salzburg city. The
  substitution                                                                                    Electricity                 project activity includes two main areas: the floodlighting for the historic buildings and the
                                                                                                                              street lighting, which is primarily for ensuring the safety of road users. Energy saving
                                                                                                                              activities undertaken led to the reduction of energy and maintenance costs also increasing
                                                                                                                              road safety.