Residues Supply Agreement
Description
Residues Supply Agreement document sample
Document Sample


Projects
Northwest Power and Conservation Council
POWER PLANT DEVELOPMENT ACTIVITY IN THE PACIFIC NORTHWEST 2002 - Present
10/01/10
ANewProj
Project NWPCCI EIA Plant FERC Docket Technology Primary Fuel Alternate Fuel
D Code/Unit No.
PROJECT NWPCCID EIAGC PID TECH PriFuel AltFuel
993 Hydroelectric 1681 HY WAT
Adage Mason County 1957 ST WW
Admiralty Inlet Pilot Tidal Project 1682 P-12690 TISEC Tidal current
A-Drop 1940 P-12549 Canal WAT
Agate Passage 1683 P-12691 TISEC Tidal current
Alkali 1684 WT WND
American Falls 1685 WT WND
Antelope Ridge 1869 WT WND
Applegate 1686 P-11910 HY WAT
Arrow Rock 1687 WT WND
Arrowrock 1 - 2 1688 P-4656 HY WAT
Baseline 1946 WT WND
Bear River Narrows 1691 P-12486 HY WAT
Bellevue Solar 1960 PV Solar
Big Horn II 1901 WT WND
Big Sky West Dairy Digester 1693 BGICCG AW
Page 1
Projects
Biglow Canyon Phase II 1694 WT WND
Biglow Canyon Phase III 1695 WT WND
Black Rock 1696 PS Elect.
Box Canyon Upgrade 1964 3891 2042 HY WAT
BP Cherry Point Cogeneration Project 1697 CCCG NG/RG
Bradwood 1698 CCCG NG
Burley Butte 1699 WT WND
Camp Reed 1885 WT WND
Carty Generating Station 1 1892 CC NG
Carty Generating Station 2 1893 CC NG
Cascade Pacific 1958 RBCG BL
Cascade Wind 1702 WT WND
Cassia 1871 WT WND
Cassia Gulch 1902 WT WND
CCG 500 1703 IGCC COL
Cedar Creek 1704 WT WND
Cedar Hills Landfill 1705 CC LFG
Chester Diversion 1706 P-11879 ROR WAT
China Hollow 1707 WT WND
China Mountain 1708 WT WND
Clark Canyon 1710 P-12429 HY WAT
Coastal Energy 1917 WT WND
COB Energy Facility 1713 CC NG
Collins Pine 1715 STCG WW
Columbia Ridge Landfill 1716 IC LFG
Columbia River Energy 1717 GT NG
Columbia Tidal Energy Project 1718 P-12672 TISEC Tidal current
Combine Hills II 1719 WT WND
Page 2
Projects
Connell's Prairie (White River Project) 1720 P-2494B HY WAT
Coos Bay OPT Wave Park 1721 P-12749 WEC Wave
Coos County Wave Energy Project 1722 P-12752 WEC Wave
Cotterel 1723 WT WND
County Line 1724 P-12071 HY WAT
Coyote Crest 1894 WT WND
Crump Geyser 1929 GE GST
Culbertson Generating Station 1897 GT NG
Cushman New Powerhouse 1896 HY WAT
Cut Bank 1727 WT WND
Deception Pass Tidal Energy Project 1729 P-12663 TISEC Tidal current
Desert Claim 1730 WT WND
Diamond Willow Expansion 1731 WT WND
Dorena Lake Dam 1732 P-11945 HY WAT
Double B Dairy 1935 BGICCG AW
Douglas County Wave and Tidal Energy Project 1733 P-12743 WEC Wave
Echanis 1734 WT WND
Echo Wind Farms 1680 WT WND
Emmett 1168 ST WW
Enloe 1948 P-12569 ROR R w/Div WAT
EnviroDyne 1735 IC NG/FO
Esquatzel Power 1736 P-12638 HY WAT
Farm Power Lynden 1936 BGICCG AW
Farm Power Rexville 1676 BGICCG AW
Farm Power Tillamook 1945 BGICCG AW
Fighting Creek Landfill 1922 IC LFG
Flathead County Landfill 1880 IC LFG
Page 3
Projects
Flint Creek 1947 P-12107 ROR R w/Div WAT
Frederickson Power 2 1743 CC NG
Frenchman Hill 1903 WT WND
Frenchmans Ridge 1925 WT WND
Giiwas Green 1747 BGICCG WW
Glacier Wind Energy II 1748 WT WND
Golden Hills 1749 WT WND
Golden Sunlight 1750 WT WND
Golden Valley 1751 WT WND
Goodnoe Hills West 1752 WT WND
Gordon Ridge 1753 WT WND
Goshen North (Goshen II) 1754 WT WND
Goshen South (Wolverine Canyon) 1755 WT WND
Grand View Solar PV One 1949 PV Solar
Grays Harbor Energy Facility (Satsop) (Phase II) 1895 CC NG
Great Falls Energy Center (CC Plant) 1757 CC NG
Great Falls Energy Center (Peaking Plant) 1758 Unknown NG
Greenfield 1941 P-12548 Canal WAT
Guemes Channel 1761 P-12698 TISEC Tidal current
H.W. Hill (Roosevelt Biogas) Expansion 1917 CC LFG
Harlowton 1923 WT WND
Harvest Wind 1763 WT WND
Hebgen Dam 1764 P-11882 HY WAT
Helix Wind Energy Facility 1765 WT WND
Page 4
Projects
Highwood (coal) 1766 FBST COL
Highwood Generating Station GT 2 & STG 1927 CC NG
Highwood Generating Station GT I 1767 SC NG
Highwood Wind 1768 WT WND
Hoctor Ridge 1769 WT WND
Horn Butte 1931 WT WND
Idaho Valley Energy 1772 ST COL
Imrie 1884 WT WND
Johnson 1942 P-12545 Canal WAT
Jordan Cove 1773 CCCG NG
Judith Gap Expansion 1774 WT WND
Juniper Canyon I 1954 WT WND
Juniper Canyon II 1955 WT WND
Juniper Ridge 1879 Conduit WAT
Kittitas Valley 1776 WT WND
Klamath Cogeneration (Upgrade) 1290 55103/CT1-CT2,ST1 CC NG
Klamath Falls Bioenergy 1928 ST WW
Klamath Generating Facility 1777 CC NG
Kulzer Bioenergy Park 1912 BGCG WW
Lakeview Cogeneration 1944 STCG WW
Page 5
Projects
Langley Gulch 1778 CC NG
Lava Beds 1779 WT WND
Leaning Juniper IIa 1780 WT WND
Leaning Juniper IIb 1905 WT WND
Linden Ranch 1882 WT WND
Little Wood River Ranch II 1782 P-12063 HY WAT
Longview Fibre Expansion 1919 STCG WW
LOTT WWTP 1329 ICCG WG
Lower Columbia Clean Energy Center 1783 IGCC COL
Lower Snake River Balance 1785 WT WND
Lower Snake River Phase I 1900 WT WND
Lower Turnbull Drop 1786 P-12597 Canal WAT
Lund Hill 1956 WT WND
Magic Wind 1787 WT WND
Makah Bay Wave Energy Pilot Project 1788 P-12751 WEC Wave
Martinsdale (Horizon) 1790 WT WND
Mary Taylor Drop 1793 P-12550 HY WAT
Mason Dam 1794 P-12686 HY WAT
Mill Coulee Drops 1796 P-12599 Canal WAT
Mill Creek Generating Station 1797 GT NG/FO
Miller Ranch (Northwest Wind) 1904 WT WND
Milner Dam 1798 WT WND
Page 6
Projects
Montegue 1906 WT WND
Narrows Tidal Energy Project 1800 P-12612 TISEC Tidal current
Neal Hot Springs 1801 GE GST
Nelson Creek (Lignite) 1 & 2 1803 ST LIG
Newberry Geothermal Project (Military Pass Road) 1805 GE GST
Nine Mile Rehab & Upgrade 1930 P-2545B ROR WAT
Nippon Paper Industries 1913 STCG WW
Norris Hill 1808 WT WND
Norris Hill Wind Project 1809 WT WND
Notch Butte 1810 WT WND
OIT Geoheat Center 1811 GE GST
Ontario Power Project 1812 GTCG NG
Oregon State University Energy Center 1673 GTCG NG
Oregon Trail 1813 WT WND
Outback Solar I 1907 PV Solar
Outback Solar II 1908 PV Solar
Outback Solar III 1909 PV Solar
Pacific Mountain Energy Center 1814 IGCC PC/COL/NG
Palouse 1952 WT WND
PaTu 1953 WT WND
Payne's Ferry 1886 WT WND
Pebble Springs (Leaning Juniper II North) 1427 WT WND
Pilgrim Stage Station 1815 WT WND
Pine Ridge 1924 WT WND
Page 7
Projects
Ponderosa 1841 P-13470 Conduit WAT
Pristine Springs No. 3 1817 P-12144 HY (Canal) WAT
ProLogis II 1922 PV Solar
Quin 1898 WT WND
Radar Ridge 1818 WT WND
Raft River Phase II 1819 GB GST
Rainbow Redevelopment 1821 HY WAT
Reedsport OPT Wave Park 1822 P-12713 WEC Wave
Rich Passage 1823 P-12688 TISEC Tidal current
Rickreall Cow Power 1824 BGIC AW
Rim Rock 1891 WT WND
Riverbend Landfill 1916 IC LFG
Rock Creek Dairy 1933 BGICCG AW
Rock Creek Wind Power Facility 1959 WT WND
Rockland 1962 WT WND
Roundup 1825 IGCC COL
Saddle Butte Wind Park 1889 WT WND
Saddle Mountain 1910 WT WND
Salmon Falls WT WND
Salt River 1497 P-10927 Diversion WAT
Salt River 1497 P-10927 HY WAT
San Juan Channel 1827 P-12692 TISEC Tidal current
Page 8
Projects
Sawtooth 1897 WT WND
Schwendiman 1828 WT WND
Seattle Steam 1899 GTCG NG
Senaca Sawmill 1870 STCG WW
Shepherds Flat Central (South Hulburt) 1877 WT WND
Shepherds Flat North (North Hulburt) 1830 WT WND
Shepherds Flat South (Horseshoe Bend) 1878 WT WND
Shoshone Falls Upgrade 1831 HY WAT
Simpson Tacoma Cogeneration 1513 RBSTCG BL/WW
Snoqualmie Falls Redevelopment 1963 3860 P-2493 A & B HY WAT
Spieden Channel 1832 P-12689 TISEC Tidal current
Stahlbush Island Farms 1883 BGIC AW
Star Point 1881 WT WND
Stateline 3 1836 WT WND
Stayton 1547 P-12574 HY WAT
Sumas Compressor Station 1414 GTCG NG
Sumas Energy 2 1838 CC NG
Summit Ridge 1839 WT WND
Summit/Westward 1840 CC NG
Sunergy 1932 PV Solar
Swager Farms 1934 BGICCG AW
Page 9
Projects
Swan Lake North 1950 P-13318 PS Elect.
Swanson Group Roseburg (ex Sun Studs) 1842 STCG WW
Teanaway 1890 PV Solar
Teton Ridge 1844 WT WND
Thousand Springs 1846 WT WND
Three Mile Canyon Wind Farm 1847 WT WND
Tiger Ridge 1926 WT WND
Tuana Gulch 1849 WT WND
Tuana Springs (Cassia Gulch Expansion) 1888 WT WND
Tuolumne (Windy Point, Windy Point/Windy Flats I) 1677 WT WND
Twin Buttes (Reardan) 1851 WT WND
Upper Turnbull Drop 1853 P-12598 Canal WAT
Valley County 1854 WT WND
Vansycle Wind Energy Center II 1919 WT WND
Vantage Wind Project 1855 WT WND
Wallula Energy Resource Center 1857 IGCC COL
Wanapa Energy Center 1858 CC NG
Warm Springs Upgrade & Expansion 1859 STCG WW
West Butte 1921 WT WND
Wheat Field 1640 WT WND
Whistling Ridge 1863 WT WND
Whitehall 1911 WT WND
Wibaux 1920 WT WND
Wickiup Dam 1951 P-12965 RoR WAT
Page 10
Projects
Wild Horse Expansion 1864 WT WND
Willow Creek 1655 WT WND
Windy Flats (Windy Point/Windy Flats II) 1866 WT WND
Windy Point/Windy Flats III 1918 WT WND
Withrow 1867 WT WND
Woods 1943 P-12540 Canal WAT
Yahoo Creek 1887 WT WND
Yamhill Solar 1961 PV Solar
Youngs Creek 1868 P-10359 HY WAT
Zoot Enterprises 1671 FC NG
Page 11
Projects
Included:
Projects announced or terminated within past five years.
nt Projects under construction or placed into service within the previous calendar year.
Projects with Notice of Intent or filed applications for FERC licenses or exemptions, or site certificates.
Projects with site certificates, FERC licenses or exemptions and county permits (where known).
Incremental capacity and energy shown for upgrades to existing projects.
Resource Type Installed Dependable Average Plot status Service Service Site
Capacity Capacity Energy Month Year
(MW) (MWa)
PRRES InstMW DepMW MWA PLSTAT SMO SYEAR LOC
Hydro 1.5 0.7 Terminated North Gooding Main Canal
Biomass 60.0 Proposed Shelton
Hydrokinetic 1.0 0.1 Planned 2012 Admiralty Inlet
Hydro 1.0 0.3 Proposed Greenfield Main Canal A-Drop
Hydrokinetic 52.0 16.7 Terminated Agate Passage
Wind 18.0 5.4 Terminated Glenns Ferry
Wind 81.0 Proposed American Falls
Wind 300.0 90.0 Proposed 2011 Craig Mountain
Hydro 10.0 4.3 Proposed Applegate R.
Wind 19.5 Proposed Oka
Hydro 15.0 9.3 Operating Jun 2010 Boise R.
Wind 500.0 167.0 Proposed Olex
Hydro 7.0 0.6 Proposed Bear R.
Solar 1.7 Planned Jul 2011 Bellevue
Wind 50.0 Planned Dec 2010 Bickleton
Biomass 1.5 1.1 Operating Feb 2009 Gooding
Page 12
Projects
Wind 149.5 Operating Aug 2009 Wasco
Wind 174.8 Operating Sep 2010 Wasco
Pump Storage 338.0 Proposed Black Rock Valley
Hydro 18.0 2.4 Construction Mar 2013 Pend Oreille R.
Natural gas 720.0 Proposed Blaine (Cherry Point Refinery)
Natural gas 130.0 Proposed Bradwood
Wind 10.5 Construction Sep 2010 Burley
Wind 22.5 Construction Sep 2010 Hagerman
Natural gas 450.0 Proposed Boardman
Natural gas 450.0 Proposed Boardman
Biomass 10.0 Proposed Halsey
Wind 60.0 Terminated The Dalles (vicinity)
Wind 10.5 Operating Feb 2009 Hagerman
Wind 18.9 Operating Feb 2009 Hagerman
Coal 520.0 Terminated Pocatello
Wind Proposed Firth
Biomass 26.0 Terminated Cedar Hills Regional Landfill
Hydro 3.3 1.9 Construction Apr 2011 Henry's Fork
Wind 1.5 Proposed Rufus (vicinity)
Wind 425.0 Proposed Jackpot
Hydro 3.0 0.5 Proposed Beaverhead R.
Wind 6.0 Construction Grayland
Natural gas 1150.0 1150.0 Terminated Bonanza
Biomass 13.0 Proposed Lakeview
Biomass 6.4 Operating Dec 2009 Columbia Ridge Landfill
Natural gas 42.7 Terminated Goble
Hydrokinetic 163.0 Proposed Columbia R. estuary
Wind 63.0 21.4 Operating Jan 2010 Milton Freewater (vicinity)
Page 13
Projects
Hydro 14.0 6.9 Proposed Lake Tapps flume
Hydrokinetic 100.0 35.0 Proposed Coos Bay
Hydrokinetic 100.0 20.0 Proposed Bandon
Wind 200.0 Proposed Cotterel Mountain
Hydro 1.0 0.1 Terminated N. Gooding Main Canal
Wind 120.0 Proposed Doty
Geothermal 40.0 Proposed Adel
Natural gas 91.0 Operating Aug 2010 Culbertson
Hydro 3.6 2.7 Proposed Skokomish R. N. Fk.
Wind 180.0 Proposed Cut Bank (vicinity)
Hydrokinetic 2.8 Proposed Deception Pass in Puget Sound
Wind 190.0 Proposed Reeser Ck (Ellensburg)
Wind 10.5 Operating Jun 2010 Baker
Hydro 8.3 3.8 2.0 Proposed Row R.
Biomass 2.0 0.9 Planned Dec 2012 Murtaugh
Hydrokinetic 2.0 Terminated Umpqua R.
Wind 104.0 Proposed Nov 2010 Steens Mountain
Wind 64.5 Operating Jul 2009 Echo
Biomass 17.5 Suspended Emmett
Hydro 9.0 1.1 5.1 Proposed Similkameen R.
Natural gas 13.0 Proposed Wendell
Hydro 0.9 0.1 Proposed Esquatzel Canal
Biomass 0.8 Construction 2011 Lynden
Biomass 0.8 Operating Sep 2009 Rexville
Biomass 0.8 Proposed Tillamook
Biomass 3.2 Proposed Fighting Creek Landfill
Biomass 1.6 1.0 Operating 2009 Kalispell
Page 14
Projects
Hydro 2.0 1.1 Proposed Flint Cr. @ Georgetown Lk Dam
Natural gas 280.0 Terminated Frederickson
Wind 200.0 Proposed Jordan Valley (vicinity)
Wind 145.0 Proposed Montegue vicinity
Biomass 8.0 Proposed Chiloquin vicinity
Wind 103.5 35.4 Operating Oct 2009 Cut Bank
Wind 400.0 Proposed Wasco
Wind 15.0 Proposed Whitehall
Wind 10.5 Construction Dec 2010 Burley
Wind 56.0 18.0 Terminated Goodnoe Hills
Wind 10.0 Proposed Rufus (vicinity)
Wind 90.0 Construction Oct 2010 Idaho Falls (vicinity)
Wind 450.0 Proposed Blackfoot
Solar 20.0 Planned Jan 2011 Grand View
Natural gas 650.0 Proposed Satsop
Natural gas 275.0 Proposed Great Falls
Natural gas 125.0 Proposed Great Falls
Hydro 0.6 0.2 Proposed Greenfield Main Canal Greenfield Drop
Hydrokinetic 3.5 3.3 Terminated Guemes Channel
Biomass 26.4 Proposed Roosevelt
Wind 540.0 Proposed Harlowton
Wind 100.0 Operating Dec 2009 Sundale
Hydro 6.7 5.3 Proposed Madison R.
Wind 102.0 Proposed Helix
Page 15
Projects
Coal 250.0 Terminated Salem (nr Great Falls)
Natural gas 74.0 Proposed Salem
Natural gas 46.0 Proposed Salem
Wind 6.0 Proposed Salem
Wind 60.0 Proposed Columbia Hills
Wind 78.0 Proposed Cecil
Coal 750.0 Terminated Glenns Ferry
Wind 34.0 Proposed Columbia Hills
Hydro 0.7 0.2 Proposed Greenfield Main Canal Johnson Drop
Natural gas 40.0 Proposed North Bend
Wind 52.5 Proposed Judith Gap
Wind 150.0 Proposed Bickleton
Wind 101.0 Proposed Bickleton
Hydro 3.3 1.5 Construction Oct 2010 Pilot Butte Canal
Wind 100.8 Construction Table Mountain
Natural gas 30.0 Operating Jun 2010 Klamath Falls
Biomass 39.2 35.0 Proposed Klamath Falls
Natural gas 480.0 Proposed Klamath Falls
Biomass 4.7 Proposed Valley
Biomass 24.0 Proposed Lakeview
Page 16
Projects
Natural gas 330.0 Construction Aug 2012 New Plymouth
Wind 18.0 Construction Dec 2010 Taber
Wind 90.3 Construction May 2010 Arlington
Wind 111.0 Construction Mar 2011 Arlington
Wind 50.0 Operating Sep 2010 Goldendale vicinity
Hydro 1.1 0.6 Proposed Little Wood R.
Biomass 65.0 Proposed Longview
Biomass 0.3 0.3 Operating Apr 2010 Olympia
Coal 366.0 Terminated Port Westward
Wind 907.0 Proposed
Wind 343.0 Construction Dec 2011 Pomeroy vicinity
Hydro 7.7 Planned 2011 Spring Valley Canal
Wind 60.0 Proposed Dot
Wind 12.0 Proposed Sep 2010 Buhl
Hydrokinetic 1.0 0.2 Terminated Makah Bay
Wind 52.5 Proposed Martinsdale
Hydro 0.9 0.2 Terminated Greenfield Main Canal (nr. Fairfield)
Hydro 2.7 Proposed Powder R.
Hydro 1.1 0.0 Terminated Mill Coulee Canal
Natural gas 150.0 139.5 Construction Dec 2010 Anaconda
Wind 150.0 Planned Oct 2010 Bickleton
Wind 18.0 Construction Sep 2010 Murtaugh
Page 17
Projects
Wind 404.0 135.0 Proposed Arlington
Hydrokinetic 0.8 Terminated Point Evans
Geothermal 23.0 Proposed Vale
Coal 508.0 Terminated Circle
Geothermal 140.0 127.0 Terminated Newberry Caldera
Hydro 8.8 4.4 Construction 2013 Spokane R. (Nine Mile Falls, WA))
Biomass 20.0 Proposed Port Angeles
Wind 150.0 Proposed Norris Hill
Wind 20.0 Proposed Norris vicinity
Wind 18.0 Construction Dec 2010 Shoshone
Geothermal 1.3 Proposed Klamath Falls
Natural gas 28.0 Proposed Ontario
Natural gas 5.5 Operating 2009 Corvallis
Wind 10.5 Construction Dec 2010 Hagerman
Solar 5.0 Proposed Christmas Valley
Solar 5.0 Proposed Christmas Valley
Solar 5.0 Proposed Christmas Valley
Petroleum 600.0 Terminated Kalama
Wind 100.0 Proposed Oakesdale
Wind 9.0 Construction
Wind 22.5 Construction Sep 2010 Hagerman
Wind 99.0 31.5 Operating Feb 2009 Arlington
Wind 10.5 Construction Dec 2010 Hagerman
Wind 90.0 Proposed Hardin/Billings vicinity
Page 18
Projects
Hydro 0.8 0.7 0.3 Operating May 2010 Swalley I.D. Main Canal
Hydro 0.5 0.2 Proposed Snake R.
Solar 2.4 Operating Jul 2010 Portland & vicinity
Wind Proposed Hagerman
Wind 60.0 Proposed Naselle
Geothermal 15.0 13.0 Deferred Raft River KGRA
Hydro 23.5 Planned 2011 Missouri R.
Hydrokinetic 1.5 0.7 Proposed Reedsport
Hydrokinetic 1.4 1.0 Terminated Rich Passage
Biomass 0.9 0.7 Proposed Rickreall
Wind 309.0 120.0 Proposed Dec 2010 Kevin
Biomass 4.0 Construction Jun 2010 McMinville
Biomass 4.0 1.8 Planned May 2012 Filer
Wind 550.0 Proposed Condon
Wind 79.2 24.9 Proposed American Falls (vicinity)
Coal 300.0 100.0 Terminated Roundup
Wind 564.3 Proposed Cecil vicinity
Wind 57.0 Proposed Othello
Wind 21.0 Construction Sep 2010 Hagerman
Hydro 1.1 0.8 Terminated Salt R.
Hydro 1.1 0.8 Terminated Salt R.
Hydrokinetic 5.3 3.8 Terminated San Juan Channel
Page 19
Projects
Wind 21.0 Planned Dec 2012 Glenns Ferry
Wind 20.0 Proposed Idaho Falls (vicinity)
Natural gas 50.0 Proposed Seattle
Biomass 18.8 Proposed 2010 Eugene
Wind 290.0 Planned Jan 2012 Arlington (vicinity)
Wind 265.0 Planned Jan 2012 Arlington (vicinity)
Wind 290.0 Planned Jan 2012 Arlington (vicinity)
Hydro 50.0 Proposed Snake R.
Biomass 55.0 Operating Aug 2009 Tacoma
Hydro 10.0 Construction Mar 2013 Snoqualmie R.
Hydrokinetic 8.3 3.7 Terminated Spieden Channel
Biomass 1.6 1.3 Operating Jul 2009 Corvallis
Wind 98.7 Operating Dec 2010 Moro
Wind 100.5 Proposed Touchet-Helix area
Hydro 0.6 0.1 Proposed N. Fk Santiam R.
Natural gas 5.0 Suspended 2007 Sumas
Natural gas 660.0 Terminated Sumas
Wind 200.0 Proposed Dufur
Natural gas 520.0 Terminated Port Westward
Solar 10.0 Proposed Boise
Biomass 2.0 0.9 Planned Oct 2012 Buhl
Page 20
Projects
Pump Storage 1380.0 Proposed Klamath Falls vicinity
Biomass 3.3 Proposed Roseburg
Solar 75.0 Proposed Cle Elum
Wind 37.8 Proposed Dutton (vicinity)
Wind 10.5 Construction Sep 2010 Hagerman
Wind 9.9 Operating Sep 2009
Wind 186.0 Proposed Havre vicinity
Wind 10.5 Construction Sep 2010 Hagerman
Wind 16.8 Operating Jun 2010 Hagerman
Wind 136.6 Operating May 2009 Goldendale
Wind 50.0 15.0 Deferred Reardan
Hydro 5.3 Planned 2011 Spring Valley Canal
Wind 170.0 Terminated Valley County
Wind 98.9 Operating Dec 2009 Helix
Wind 103.5 Construction Nov 2011 Vantage/Kittitas I-90 corridor
Coal 760.0 Deferred Wallula
Natural gas 1300.0 Proposed Hermiston
Biomass 15.8 Proposed Warm Springs
Wind 104.0 Proposed Crook & Deschutes Cos.
Wind 96.6 28.0 Operating Jun 2009 Arlington
Wind 75.0 Proposed Saddleback Mountain
Wind 50.0 Proposed Whitehall
Wind 20.0 Proposed
Hydro 7.2 2.4 Proposed Deschutes R.
Page 21
Projects
Wind 44.0 Operating Nov 2009 Whisky Dick Mountain
Wind 72.0 22.8 Operating Feb 2009 Arlington
Wind 262.2 Construction 2010 Goldendale
Wind 100.0 Proposed Goldendale
Wind 15.0 Proposed Withrow
Hydro 0.9 0.3 Proposed Greenfield Main Canal Woods Drop
Wind 22.5 Construction Sep 2010 Hagerman
Solar 1.2 Planned Jul 2011 Yamhill
Hydro 7.5 2.3 Construction Dec 2011 Youngs Cr.
Natural gas 0.5 Retired Bozeman
Page 22
Projects
County State Development Notes
COUNTY STATE DNOTES
Lincoln ID License issued Sep 2003; cancelled Aug 2009.
Mason WA Notice of Construction to Olympic Region Clean Air Agency Apr 2010.
Island WA Preliminary permit granted Mar 2007; expired Feb 2010; renewed Jul 2010. NOI to file
hydrokinetic pilot project license application Dec 2009. $10 MM USDOE grant Sep
2010. Planned installation 2012.
Teton MT 40-year license issued Oct 2009.
Kitsap WA Preliminary permit granted Feb 2007; surrendered Oct 2008.
Elmore ID QF contract approval by IPUC Mar 2007. Supplanted by Sawtooth.
Power ID County permits secured Nov 2004.
Union OR EFSC Intent to Apply filed Apr 2009. Planned service 2011.
Jackson OR License granted Dec 2009.
Wheatland MT IPUC approval of pwr sales contract Oct 2005.
Elmore ID License issued Mar 1989; expires Feb 2039. PSA w/Clatskanie July 2005.
Construction Oct 2008.
Gilliam OR NOI filed Jun 2010.
Franklin ID Preliminary permit granted Feb 2005. PacifiCorp request to dismiss license application
Oct 2007.
Yamhill OR 25-yr PPA announced Sep 2010. County permits secured.
Klickitat WA Planned construction Q2 2010, service Dec 2010.
Gooding ID 2008 construction for 2009 service. SPP contract approved Aug 2008.
Page 23
Projects
Sherman OR WTG order announced Apr 2008, delivery Mar 2009.
Sherman OR WTG order announced Apr 2008.
Yakima WA Feasibility study authorized by Congress in 2003; Appraisal Assessment of the Black
Rock Alternative complete Feb 2005. Feasibility Report and EIS to be complete by
end of 2008.
Pend Oreille WA New license issued Jul 2005. Upgrade underway 2009.
Whatcom WA SC application Jun 02, approved Dec 2004.
Clatsop OR Announced Dec 2005.
Cassia ID IPUC approval of QF contract Jul 2005.
Elmore ID IPUC approval of QF contract Aug 2009.
Morrow OR SC App to EFSC Dec 2009
Morrow OR SC App to EFSC Dec 2009
Lane OR BETC award, Sep 2010
Wasco OR SC application withdrawn Jan 2009.
Twin Falls ID
Twin Falls ID
Power ID Announced March 2005 for completion in 2010 or 2011. Proposal amended to polygen
concept w/no generation (Sep 2008)
Bingham ID County permits secured Aug 2008. Subj to appeal.
King WA Power generation proposal terminated. Pipeline-quality gas will be produced and
marketed to Puget Sound Energy.
Fremont ID License granted July 2008.
Sherman OR Short-listed by Oregon Energy Trust June 2006.
Twin Falls/Elko ID/NV Announced Nov 2007. EIS due 2010. Earliest construction 2012.
Beaverhead MT License granted Aug 2009.
Grays Harbor WA
Klamath OR SC approved Jan 2005. Development rights sold by People's Energy to J-Power Sep
2006. SC terminated on request of the developer May 2007.
Lake OR MOU between Collins & DG Energy 2006. Proposed service late 2008.
Gilliam OR
Columbia OR Temporary exemption granted Sep 2001. Good through Dec 2005.
OR/WA
Clatsop, Wahkiakum, Pacific Preliminary permit granted Mar 2007.
Umatilla OR Permits secured. PSA w/Clark PUD Mar 2009. Planned service Dec 2009
Page 24
Projects
King WA License granted December 1997, expires November 2047. Requires resolution of lic.
conditions.
Coos OR FERC prelim. permit issued Mar 2007; expired Feb 2010; renewal pending Apr 2010.
Coos OR FERC prelim. permit for 100 MW Apr 2007; cancelled Jun 2008.
Power ID EIS ROD & ROW grant Aug 2006.
Lincoln ID Exemption revoked Jun 2007.
Lewis/Pacific WA Announced Sep 2009
Lake OR Exploration completed. Production well drilling planned (Dec 2009). U.S. GEA Phase
III status Apr 2010.
Roosevelt MT Construction June 2009.
Mason WA U.S. DOE matching grant Nov 2009.
MT
Island/Skagit WA Preliminary permit granted Mar 2007; expired Feb 2010; reapplication May 2010.
Kittitas WA County application for permits denied Mar 2005. Resubmitted to WA EFSEC Nov
2006. Resubmitted w/ revised configuration Feb 2009. EFSEC order recommending
approval issues Nov 2009. Approved by governor Feb 2010.
Fallon MT
Lane OR License granted Oct 2008. Equipment order Jun 2010. EPUD considering sale of its
interest Sep 2010.
Cassia ID PURPA contract filed w/PUC May 2010; approved July 2010.
Dougles OR FERC prelim. permit issued Apr 2007; expired Mar 2010.
Harney OR Harney Co. CUP Apr 2007.
Morrow/Umatilla OR
Gem ID Renewable Energy of Idaho to rehab as forest residue plant. QF contract w/IPC
approved by IPUC May 2004.
Okanogan WA License application filed Sep 2008
Twin Falls ID Announced Jun 2007. Air quality permit application Mar 2007.
Franklin WA Exemption issued Jun 2008.
Whatcom WA Construction June 2010
Skagit WA PSA Apr 2008, construction Oct 2008.
Tillamook OR 1.0 MM federal stimulus funding awarded Jul 2010.
Kootenai ID Planned service 2011 - 12.
Flathead MT Construction Oct 2008 for April 2009 service.
Page 25
Projects
Granite MT Application for original license filed Aug 2008; granted Jul 2010.
Pierce WA Permitting completed mid-2003. Air operating permit expired Jan 2005.
Owyhee/Malheur ID/OR
MT
Klamath OR
Toole/Glacier MT
Sherman OR SC application complete Aug 2008. Site certificate Jun 2009.
Jefferson MT
Cassia ID IPUC approval of QF contract Jun 2005.
Klickitat WA Real estate issues prevented project from moving forward.
Sherman OR Short-listed by Oregon Energy Trust June 2006.
Bonneville ID County permits secured; interconnection agreement secured Dec 2006. Mar 2010
mobilization for planned Oct 2010 service.
Bingham ID County permits secured Apr 2008; appeal rejected Aug 2008.
Elmore ID PPA w/IPC signed Jul 2010; filed w/IPUC Jul 2010, approved Sep 2010.
Grays Harbor WA SC amendment submitted Nov 2008
Cascade MT Formerly 275 MW Montana First Megawatts. Groundbreaking 11/01. Const. susp.
June 2002 at 38% completion (expenditure basis.). Generating equipment sold.
Project purchased by Montgomery Energy Dec 2006.
Cascade MT Announced May 2008.
Teton MT 40-year license issued Aug 2009.
Skagit WA Preliminary permit granted Feb 2007; expired Jan 2010.
Klickitat WA
Wheatland MT BPA transmission reservation deposit announced Mar 2010. NWE transmission rights
secured. Proposed development 2014.
Klickitat WA Construction April 2009 for EOY 2009 service.
Gallatin MT License pending Jun 2004.
Umatilla OR EFSC SC application March 2009. SC issued July 2009. Application for SC
amendment to increase capacity to 201 MW.
Page 26
Projects
Cascade MT Preliminary enginering underway Q1 2006. Draft EIS released July 2006. Air permit
remanded to MT DEQ for separate BACT assessment of PM 2.5 (Apr 2008); reissued
Nov 2008. Site work commenced Oct 2008, termination announced Feb 2008.
Cascade MT
Cascade MT Phase I financing secured Mar 2010. Planned service June 2011.
Cascade MT Draft EIS released July 2006.
Klickitat WA Klickitat Co. energy overlay zone permit issued Sep 2006.
Gilliam OR CUP approved
Elmore ID Announced April 2004. Terminated March 2006.
Klickitat WA Final EIS issued June 2009..
Teton MT 40-year license issued Jul 2009.
Coos OR SC-NOI December 2004. FERC pre-filing Apr 2006. FERC filing Sep 2007. Coos Co.
land use permit gtd Dec 2007.
Wheatland MT
Klickitat WA County CUP February 2010, interconnection request approved May 2010, substation
expansion planned for 2010.
Klickitat WA County review expected to be complete fall 2010. Interconnection request 2006.
Deschutes OR
Kittitas WA Jan 2003 EFSEC application suspended fall 2005. Revised proposal for 65 turbine
project ranging in capacity from 95 to 195 MW recommended to the governor for
approval Mar 2007. Remanded to EFSEC. Proposed SC w/modified WTG siting
criteria approved Sep 2007. Affirmed by court Nov 2008. Amendment reducing
maximum number of WTG to 52 approved Sep 2009. Planned construction Mar 2010
for Oct 2010 service.
Klamath OR First GT upgraded June 209, second unit June 2010.
Klamath OR NOI to OR EFSC Apr 2010. SC application Sep 2010. BETC award Sep 2010.
Klamath OR SC application submitted Dec-2001; granted Nov 2005. Extension of deadline for
completing construction to Nov 2012 recommended Aug 2007.
Stevens WA Awarded participation in WA DNR Forest Biomass Initiative Jan 2010
Lake OR $1.7MM federal stimulus funding Jul 2010. Planned construction summer 2011.
Page 27
Projects
Payette ID IPUC filing Mar 2009, approved Sep 2009. Proposed EPC contract Mar 2009,
engineering Sep 2009, construction Aug 2010, commercial service Aug 2012.
Bingham ID IPUC approval of QF contract Oct 2005.
Gilliam OR SCA application filed May 2007; approved Sep 2007. Developed by Iberdrola.
Gilliam OR SCA application filed May 2007; approved Sep 2007. Developed by Iberdrola.
Klickitat WA Developed by enXco dba Northwest Wind Partners.
Lincoln ID License granted Apr 2006. Bill to extend deadline for commencement of construction
introduced to Senate May 2010.
Cowlitz WA Application for permit to DOE Jan 2010.
Thurston WA EPC contract awarded Jan 2009.
Columbia OR NOI submitted Sep-2006, superceding Summit/Westward project at same site. No
request for extension filed.
Garfield/Columbia WA
Garfield WA Site prep 2010, service Dec 2011.
Teton MT 50-yr license granted Jul 2006.
Klickitat WA
Twin Falls ID QF contract approved by IPUC Dec 2006.
Clallum WA FERC Environmental Assessment completed Oct 2006. License application filed Nov
2006. Conditional 5-yr license issued Dec 2007. License surrendered May 2009.
Wheatland MT NorthWestern OASIS filing
Teton MT Exemption Granted April 2006; revoked Feb 2009.
Baker OR $1MM CREB award Feb 2008. Prelim permit expired Dec 2009; new PP granted May
2010.
Cascade MT 50-yr license granted Jul 2006; surrendered Mar 2010.
Deer Lodge MT Application for air permits submitted Aug 2008. Application for MPUC approval
submitted Aug 2008. Construction Aug 2009.
Klickitat WA Developed by enXco.
Cassia ID IPUC approval of QF contract Oct 2005.
Page 28
Projects
Gilliam OR SCA filed May 2010.
Pierce WA Preliminary permit expired Jan 2008.
Malheur OR Successful bid for IPC July 2006 geothermal RFP. Interconnection agreement signed
Feb 2009. USDOE load guarantee announced May 2009. Wellfield development
underway . PPA w/IPC Dec 2009. Planned service Q4 2012. U.S. GEA Phase III
status Apr 2010.
McCone MT Site announced Mar 2004. Reported inactive since August 2007.
Deschutes OR 120 MW 20-yr PPC negotiated w/PG&E July 2006, subsequently terminated. EFSC
NOI filed July 2008, terminated Jul 2010.
Spokane WA Planned service 2012 and 2013.
Clallum WA Awarded participation in WA DNR Forest Biomass Initiative Jan 2010. Draft EIS July
2010. Planned service 2012.
Madison MT Land leases secured; wind monitoring underway.
Madison MT County permit secured, wind assessment underway.
Lincoln ID IPUC approval of QF contract Oct 2005.
Klamath OR Announced Nov 2006. Exploration underway April 2008. 0.28 MW binary unit
operating Aug 2009. U.S. GEA Phase III status Apr 2010.
Malheur OR Granted high-efficiency cogeneration exemption by OR EFSEC June 2005.
Benton OR Construction started Nov 2006.
Twin Falls ID IPUC approval of QF contract Apr 2005.
Lake OR Planned construction Mar 2010.
Lake OR
Lake OR
Cowlitz WA Site lease secured Oct 2005. Application for site certification filed Sep 2006. Draft EIS
released Jun 2007. SC application terminated May 2009.
Whitman WA CUP application Jul 2010.
Sherman OR Construction June 2010.
Twin Falls ID IPUC approval of QF contract Aug 2009.
Gilliam OR PPA w/LADWP, Burbank & Glendale announced Dec 2007.
Twin Falls ID IPUC approval of QF contract Apr 2005.
MT
Page 29
Projects
Deschutes OR
Jerome ID Exemption granted Apr. 2002.
Multnomah, Clackamas OR
ID
Pacific WA Grays Harbor withdraws from consortium May 2010.
Cassia ID 25 yr PPA w/EWEB for maximum of 16 MW signed March 2008, subsequently
terminated.
Cascade MT Planned construction Spring 2009 for Spring 2011 service.
Douglas OR FERC prelim. permit for 50 MW Feb 2007; license pending Mar 2010 for 1.5 MW.
$2.4 MM USDOE grant announced Sep 2010.
Kitsap WA Preliminary permit granted Feb 2007; surrendered Oct 2008.
Polk OR Anaerobic digester. Still trying to finance 1/13/06
Toole/Glacier MT PPA w/SDGE approved Dec 2009. Requires completion of MATL (scheduled for
2011). Planned construction 2010. SDG&E PUC request for equity investment Jul
2010.
Yamhill OR Construction Sep 2009 for Jun 2010 service
Twin Falls ID PURPA contract filed w/PUC May 2010; approved July 2010.
Gilliam OR NOI to EFSC Sep 2010. PGE proposal to OPUC to acquire 400 MW.
Power ID IPC request for 25yr PPA approval Sep 2010. Planned service EOY 2011.
Musselshell MT Proposed coal to liquids plant permitting proposed to be supplemental to MT DEQ air
permits issued Feb 2003 for previously proposed steam-electric plant. Air permits
reported to be revoked Sepl 2007.
Gilliam/Morrow OR NOI to Oregon EFSC Aug 2009.
Adams WA Conditional use permit announced Feb 2010.
Twin Falls ID IPUC approval of QF contract Oct 2005.
Lincoln WY Operated 1964 - 1972. Licensed Jun 1991, cancelled Sep 2006.
Lincoln WY License granted June 1991; cancelled Sep 2006.
San Juan WA Preliminary permit granted Feb 2007; surrendered Dec 2009.
Page 30
Projects
Elmore ID QF PSA w/ IPC fall 2009; approved by PUC Dec 2009.
Bonneville ID Conditional use permit 2004. IPUC app PSA Apr 2006.
King WA ARRA award for $18.75 MM Nov 2009.
Lane OR PPA approved May 2009. Planned construction Oct 2009 for 2010 service.
Gilliam/Morrow OR SC Jul 2008. PPA Aug 2008. WTG order Dec 2009. Site prep planned 2010,
operation in 2011 & 2012.
Gilliam/Morrow OR SC Jul 2008. PPA Aug 2008. WTG order Dec 2009. Site prep planned 2010,
operation in 2011 & 2012.
Gilliam/Morrow OR SC Jul 2008. PPA Aug 2008. WTG order Dec 2009. Site prep planned 2010,
operation in 2011 & 2012.
Jerome ID License amendment for reconstruction filed Aug 2006; granted Jul 2010. Extension of
deadline to complete construction to Jul 2015 granted Sep 2010.
Pierce WA AQ permit application Sep 2006, approved May 2007. Construction Jan 2008 for Aug
2009 completion.
King WA License amendment authorizing upgrades issued Jun 2009. Redevelopment
commenced Apr 2010.
San Juan WA Preliminary permit granted Feb 2007; expired Jan 2010.
Benton OR
Sherman OR Construction announced Jun 2009.
Umatilla WA/OR SC construction deadline expired. Reapplication Oct 2008 for revised configuration.
Marion OR Exemption pending Aug 2007.
Whatcom WA PSE short-list May 2004. Construction underway June 2006. Target service EOY
2007.
Whatcom WA Site certificate approved Aug 2002. Interconnection to BC Hydro rejected by NEB
March 2004. Termination announced April 2006.
Wasco OR EFSC SC Sep 2009. Planned service 2011.
Columbia OR SC approved Oct 2002. Construction start deadline extended to October 2006,
completion deadline October 2009. Request to extend two years submitted Mar 2006.
Site to be used for proposed Lower Columbie Clean Energy Center
Ada ID Announced Jun 2010 for Q4 2010 construction and 2011 operation.
Twin Falls ID PURPA contract filed w/PUC May 2010; approved July 2010.
Page 31
Projects
OR NOI to submit application for FERC license filed June 2010.
Douglas OR Negotiations w/Energy Trust terminated.
Kittitas WA Permit application to Kittitas Co. Aug 2009, approved Aug 2010.
MT
Twin Falls ID IPUC approval of QF contract Apr 2005.
Morrow OR
MT
Twin Falls ID IPUC approval of QF contract Apr 2005.
Twin Falls ID
Klickitat WA Developed by Cannon Power Corp. dba Windy Point Partners
Lincoln WA Planned service deferred from 2013 to 2014-15. (Feb 2010).
Teton MT 50-yr license granted Jul 2006.
Valley MT Project size, layout and intereconnection significantly reconfigured in Nov 2006.
Umatilla OR
Kittitas WA Application to Kittitas Co. for permits Oct 2007. Development agreement w/Kittitas Co.
signed May 2008.
Walla Walla WA Application for EFSEC Potential Site Study Oct 2006. Request withdrawn Mar 2008.
Umatilla OR Interconnection agreement and land lease permits secured. August 2005 PSD permit
effective Feb 2006.
Wasco OR Energy Trust 2005 Biopower RFP finalist.
Crook, Deschutes OR CUP March 2009. BLM DEIS Jul 2010.
Gilliam OR Eastern half of former Rattlesnake Road/Arlington CEP project.
Skamania WA EFSEC SC app filed Mar 2009.
Jefferson MT PSC ordered to set current avoided cost rates for Whitehall Wind (Jan 2010).
Wibaux MT
Deschutes OR NOI to file draft FERC license application filed Jan 2008.
Page 32
Projects
Kittitas WA Announced Apr 2008. Within existing site certificate limits. Planned service EOY
2009. Turbine order Nov 2008. TSite prep Apr 2009 for late 2009 completion.
Gilliam/Morrow OR
Klickitat WA
Klickitat WA
Douglas WA Leases being secured, feasibility studies underway, $3.8 MM CREB awarded.
Teton MT 40-year license issued Jun 2009.
Twin Falls ID IPUC approval of QF contract Aug 2009.
Yamhill OR 25-yr PPA announced Sep 2010. County permits secured.
Snohomish WA License granted June 1992; expires May 2042. Construction Feb 2010.
Gallatin MT Dismantled spring 2005 following unsatisfactory service.
Page 33
Projects
Developer/Owner Load Cogeneration Host (Application)
DEVN LOAD COGEN
American Falls Reservoir District #2 NWHS
ADAGE/Duke Energy, dba Adage Mason County
Snohomish Co. PUD Snohomish Co. PUD
Hydrodynamics, Inc.
Snohomish Co. PUD
Pacific Winds, Inc., dba as Idaho Winds Idaho Power Co. (QF)
Ridgeline Energy
Horizon Wind Energy
Symbiotics, LLC
Arrow Rock Wind, LLC QF PPA w/IPC
Boise Project Board of Control Clatskanie
First Wind Holdings dba Baseline Wind, LLC
Twin Lakes Canal Co./PacifiCorp Power sales
enXco Portland General Electric
Iberdrola Renewables M-S-R Public Power Agency (Modesto, Santa Clara, Redding)
Dean Foods Co./AgPower Partners Idaho Power (SPP through 2027) Big Sky West Dairy Digester (waste digesters)
Page 34
Projects
Portland General Electric Portland General Electric
Portland General Electric Portland General Electric
Bureau of Reclamation
Pend Oreille Co. PUD Pend Oreille Co. PUD
TransCanada BP Cherry Point Refinery
Steam and power for Cherry Point refinery, power sales
Northern Star Natural Gas Bradwood Landing LNG receiving terminal (regasification)
Idaho Wind Partners (GE Financial Services, Exergy Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Idaho Wind Partners (GE Financial Services, Exergy Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Portland General Electric Portland General Electric
Portland General Electric Portland General Electric
Cascade Pacific Pulp Cascade Pacific Pulp
UPC Wind Management
John Deere Renewables Idaho Power Co. (QF)
John Deere Renewables Idaho Power Co. (QF)
Southeastern Idaho Energy, LLC
Western Energy
Energy Developments, Inc.
Fall River REA
Sherman County
Nevada Energy Nevada Energy
Clark Canyon Hydro, LLC
Coastal Commumity Action Program Grays Harbor PUD
J-Power USA
DG Energy Fremont Sawmill (kilns)
Waste Management, Inc. Seattle City Light
Oregon Energy
Oregon Tidal Energy Co.
Eurus Energy America, Inc. Clark PUD; RECs to PG&E 2010 & 2011
Page 35
Projects
Puget Sound Energy Utility resource
Oregon Wave Energy Partners, LLC.
Finavera Renewable, Ltd., dba AquaEnergy Group, Ltd.
Windland-Shell
American Falls Reservoir Dist. #2
Everenergy
Nevada Geothermal
Basin Electric Power Cooperative Basin Electric Power Cooperative
City of Tacoma Utility resource
Invenergy
Snohomish Co. PUD
enXco
MDU Resources MDU Utilities
Symbiotics, LLC, Emerald PUD Emerald PUD
New Energy. Idaho Power (QF, firm energy) Double B Dairy (waste digesters)
Douglas Co., OR
Columbia Energy Partners SCE
John Deere Renewables PacifiCorp
Renewable Energy of Idaho See Existing Projects
Okanogan PUD Okanogan PUD
EnviroDyne Corp. Idaho Power Co. (QF, 10 MW)
Green Energy Today
Farm Power Northwest Puget Sound Energy Lynden Farm Power (waste digesters); Van Wingerden Greenhouses
Farm Power Northwest Puget Sound Energy Rexville Farm Power
Farm Power Northwest Tillamook PUD Farm Power Tillamook (waste digesters)
Kootenai Electric Cooperative Kootenai Electric Cooperative
Flathead Electric Cooperative Flathead Electric Cooperative
Page 36
Projects
Granite Co.
EPCOR dba Frederickson Power, LLC
Ridgeline Energy
Gaelectric
Klamath Tribes Giiwas Green Enterprise Park
NaturEner SDGE (15 yr PPA)
BP Alternative Energy of North America
Barrick Gold Corp.
Idaho Wind Partners (GE Financial Services, Exergy Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Windtricity Ventures, LLC & Northwest Regional Power.
Sheman Co./Local landowners/Western Wind Energy
Ridgeline Energy/BP Wind Energy SCE (20-yr PPA for 90 to 130 MW)
Ridgeline Energy
Grand View Solar PV One Idaho Power Co.
Invenergy (dba Grays Harbor Energy)
Montgomery Energy Partners
Montgomery Energy Partners
Hydrodynamics, Inc.
Snohomish Co. PUD
G2 Eenrgy, LLC
Gaelectric
Cowlitz PUD, Lakeview L&P, Peninsula Light (20%) & EWEB Cowlitz PUD (30%), Lakeview L&P (30%), Peninsula Light (20%) & EWEB (20%).
(20%).
Fall River Rural Electric Coop
Iberdrola Renewables dba Helix Wind Power Facility, LLC
Page 37
Projects
S. Montana Electric Generating & Transmission Cooperative G&T resource
S. Montana Electric Generating & Transmission Cooperative G&T resource
S. Montana Electric Generating & Transmission Cooperative G&T resource
S. Montana Electric Generating & Transmission Cooperative S. Montana Electric Generating & Transmission Cooperative
Windtricity Ventures, LLC
Invenergy
Sempra Generation
Northwest Wind Partners
Hydrodynamics, Inc.
Energy Projects Development Jordan Cove LNG receiving terminal (regasification)
Invenergy
Iberdrola Renewables dba Pacific Wind Development
Iberdrola Renewables dba Pacific Wind Development
Central Oregon Irrigation District PacifiCorp
Horizon Wind Energy
Iberdrola Renewables See Existing Projects Collins Products
Klamath Falls Bioenergy, LLC
Iberdrola Renewables
Borgford BioEnergy Kulzer Bioenergy Park (polygeneration facility)
Iberdrola Collins Lakeview Fremont mill
Page 38
Projects
Idaho Power Co. Idaho Power Co.
Idaho Wind Partners (GE Financial Services, Exergy Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
S. CA Public Power Authority LADWP (75MW), Glendale (10MW), Pasadena (5MW)
S. CA Public Power Authority S. CA Public Power Authority
S. CA Public Power Authority LADWP (45 MW); Glendale (5 MW)
B. Arkoosh
Longview Fibre Co. Longview Fibre Company
LOTT Wastewater Alliance Self-generation LOTT WWTP (waste digesters)
Summit Power Group
Puget Sound Energy
Puget Sound Energy
Turnbull Hydro NorthWestern
Lund Hill, LLC
Armand Eckert
Finavera Renewable, Ltd. Clallum Co. PUD
Horizon Wind Energy
Wade Jacobson
Baker Co., OR
Turnbull Hydro
NorthWestern Energy NorthWestern Energy
S. CA Public Power Authority LADWAP (112.5MW), Burbank (15 MW), Glendale (22.5MW)
Idaho Wind Partners (GE Financial Services, Exergy Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Page 39
Projects
Iberdrola
Tacoma Power
U.S. Geothermal Co. dba USG Oregon, LLC IPC
Great Northern Power Development/Kiewit Mining Group
Davenport Energy
Avista
Nippon Paper Industries 6 MW excess power Nippon Paper Industries
Madison Valley Renewable Energy
Sagebrush Energy
Idaho Wind Partners (GE Financial Services, Exergy Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Oregon Institute of Technology OIT
Cogentech Heinz/Or-Ida Foods (potato processing)
Oregon State University OSU OSU (Campus loads)
Idaho Wind Partners (GE Financial Services, Exergy Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Obsidian Renewables dba Outback Solar 20-yr PPA in negotiation
Obsidian Renewables dba Outback Solar
Obsidian Renewables dba Outback Solar
Energy Northwest
First Wind
O. Hilderbrand POrtland General Electric
Idaho Wind Partners (GE Financial Services, Exergy Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Iberdrola Renewables 18 yr PPAs w/option to buy w/LADWP (69 MW), Burbank (20 MW) & Glendale (10 MW).
Idaho Wind Partners (GE Financial Services, Exergy Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Gaelectric
Page 40
Projects
Swalley Irrigation District PacifiCorp
Pristine Springs, Inc.
Sunway (Portland General Electric & U.S. Bank) Portland General Electric
Pacific Winds/PowerWorks, Inc., dba as Idaho Winds
Energy Northwest Clallam, Mason 3 & Pacific Co. PUDs
U.S. Geothermal Co. EWEB
PPL Montana PPL Montana
Ocean Power Technologies
Snohomish Co. PUD
Agricultural Sustainable Energy Technologies PacifiCorp (QF) Rickreall Dairy Digester Project (digester & fiber dryer)
NaturEner SDGE (15 yr PPA)
G2 Eenrgy, LLC McMinnville Power & Light
New Energy One Idaho Power (QF, firm energy) Rock Creek Dairy (waste digester)
RES America dba Rock Creek Wind Power, LLC PGE (See Development Notes)
Ridgeline Energy Idaho Power Co.
Arch Coal, DKRW Advanced Fuels
Caithness Energy, dba Saddle Butte Wind, LLC
Horizon Wind Energy
Idaho Wind Partners (GE Financial Services, Exergy Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
Scott D. Heiner Retired
Scott D. Heiner
Snohomish Co. PUD
Page 41
Projects
Pacific Winds/PowerWorks, Inc., dba as Idaho Winds Idaho Power Co. (QF)
Schwendiman Wind, LLC PacifiCorp (QF)
Seattle Steam Co. Seattle Steam Co. (Post St.) (district heating)
EWEB Senaca Sawmill Co. (kilns)
Caithness Energy dba South Hulburt Wind SCE (20-yr PPA)
Caithness Energy dba North Hulburt Wind SCE (20-yr PPA)
Caithness Energy dba Horseshoe Bend Wind SCE (20-yr PPA)
Idaho Power Co. Idaho Power Co.
Simpson Investment Co. Simpson Tacoma Kraft Co.
Marketed through Iberdrola Renewables
Puget Sound Energy Puget Sound Energy
Snohomish Co. PUD
Stahlbush Island Farms PacifiCorp (QF) Stahlbush Island Farms (digester & product dryers)
Iberdrola Renewables Modesto Irrigation District (49.5 MW%)
NextEra Energy Resources
Santiam Water Control District
ORMAT Nevada, Inc. dba Orsumas, LLC See Existing Projects Williams Northwest Pipeline Systems (compressor GT heat recovery)
National Energy Systems Co. (dba Sumas Energy 2)
LotusWorks - Summit Ridge I
Summit Power Group
Sunergy World Idaho Power Co.
New Energy. Idaho Power (QF, firm energy) Swager Farms (waste digesers)
Page 42
Projects
Symbiotics, LLC
Swanson Group Swanson Group Roseburg mill
Teanaway Solar Reserve
Montana Windpark Solutions
Idaho Wind Partners (GE Financial Services, Exergy Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
John Deere Renewables PacifiCorp (QF)
Gaelectric
Idaho Wind Partners (GE Financial Services, Exergy Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
John Deere Renewables Idaho Power Co. (QF)
Tuolumne Wind Project Authority (Turlock Irrigation District & Turlock Irrigation District & Walnut Energy Center Authority
Walnut Energy Center Authority)
Avista Avista
Turnbull Hydro NorthWestern
GreenHunter Energy, Inc. dba as Wind Hynter, LLC
NextEra Energy Resources
Invenergy PG&E (15 yr)
Wallula Resource Recovery, LLC
Diamond Generating (dba Diamond Wanapa I, LLC)
Warm Springs Biomass, LLC Warm Springs Forest Products Industries
West Butte Wind Power, LLC
Horizon Wind Energy Snohomish PUD (20yr PPA)
Whistling Ridge Energy
Gamesa Energy d.b.a. Whitehall Wind, LLC
Crownbutte, Wind Power
Symbiotics, LLC
Page 43
Projects
Puget Sound Energy Puget Sound Energy
Invenergy LADWP
Cannon Power Corp. dba Windy Point Partners LADWAP (242MW), Glendale (20MW)
Cannon Power Corp. dba Windy Point Partners
Douglas Co. PUD Douglas Co. PUD
Hydrodynamics, Inc.
Idaho Wind Partners (GE Financial Services, Exergy Idaho Power Co. (QF)
Development Group, Atlantic Power, Reunion Power)
enXco Portland General Electric
Snohomish Co. PUD PUD Snohomish
Zoot Enterprises Zoot Enterprises (space conditioning)
Page 44
Projects
Notes Main Grid Interconnection Last Update
NOTES LOC UPDATE
Existing canal. Seasonal irrigation project. 7/8/2010
Bubbling FBC; 65 MW gross; 60 MW net. 8/16/2010
(2) 500kW 10-meter OpenHydro Open-Centre units, undersea cable and power 12kV Puget Sound Energy distribution line 7/8/2010
conditioning and control building.
Existing BuRec Sun River IP canal. Inflatable wier, intake, penstock, Existing NorthWestern 25kV line 7/8/2010
powerhouse and tailrace.
(130) TISEC units 7/9/2010
(12) GE 1.5 MW WTG 12/23/2009
1/22/2006
(164) WTG 230 kV to BPA LaGrande sub or IPC North Powder sub. 3/8/2010
(2) TGs added to existing run-of-river dam & reservoir w/diversion. PacifiCorp 9/28/2010
(13) GE 1.5 MW WTG 4/14/2006
Addition of powerhouse w/ (2) turbine-generators to existing water control 9/29/2010
structure.
BPA Diamond Butte substation (new) 7/9/2010
Undeveloped run-of-river reservoir project. 11/5/2007
Ground-mount thin-film PV 9/25/2010
RECs to PG&E through EOY 2010 BPA Rock Creek substation 5/7/2010
Gasification of cattle waste. Anaerobic digestor and (2) Guascor SFGLD 560 2/24/2010
750 kW nameplate reciprocating engines.
Page 45
Projects
(65) Siemens SWT-2.3-93 WTG. BPA John Day substation 8/21/2009
(76) Siemens SWT-2.3-93 WTG. BPA John Day substation 9/9/2010
(2) 150 MW PTG at Priest Rapids reservior intake; 23 to 38 MW powerhouse at 1/18/2007
Rosa discharge, 15 to 29.5 MW powerhouse at Sunnyside discharge. Other
configurations being studied.
High-efficiency turbines, governors, stator replacement, exciters, controls and 10/1/2010
other refurbishments.
3x1 CCCG, BPA Custer interconnect;dry cooling; no backup fuel. 1/3/2005
terminal (regasification) 12/5/2005
(7) GE 1.5 MW WTG. 8/18/2010
(15) GE 1.5 MW WTG. IPC King-Bliss 138kV line 8/18/2010
(1) CC w/duct firing, wet mech draft cooling. Configuration and model TBD. PGE Boardman - Slatt 500kV line (preferred option) 3/18/2010
(1) CC w/duct firing, wet mech draft cooling. Configuration and model TBD. PGE Boardman - Slatt 500kV line (preferred option) 3/18/2010
New 10 MW STG w/existing chemical recovery boiler. 9/24/2010
(40) GE 1.5sle WTG. BPA The Dalles - Hood R. 115kV line @ new sub. 3/30/2009
(5) Suzlon S88-2.1 MW WTG. IPC Lower Malad/ Mtn Home Jct 138kV 8/18/2010
(9) Suzlon S88-2.1 MW WTG. IPC Lower Malad- Mtn Home Jct 138kV line 8/18/2010
9/29/2008
Up to 66 WTG. 8/7/2008
(3) gas turbines, heat recovery steam generators and steam turbine-generator. 4/7/2009
(2) turbine-generators. Existing run-of-river dam w/diversion (Chester Dam). 8/4/2008
(1) GE 1.5 MW WTG 8/24/2006
(170) WTG IPC Valmy/Midpoint 345kV line. 3/18/2010
Existing dam. 12/21/2009
(4) GE 1.5 MW WTG
8/6/2007
1/11/2007
2/24/2010
(1) LM6000. 7/17/2006
50 - 150 TISEC units of 0.5 to 2.0 MW ea. 5/1/2007
(63) Mitsubishi MWT 1000-A turbines BPA 69kV Walla Walla - Pendleton line via tap 5/7/2010
Page 46
Projects
9/17/2003
(200) - (400) wave power bouys. 7/8/2010
AquabuOY heaving buoy hose pump units 7/9/2010
(81 - 98) 1.5 MW WTG 8/22/2006
Existing canal. 4/22/2008
(5) WTG. Located on Weyerhaeuser McDonald tree farm. 150 MW request for 9/22/2009
interconnection.
Est. potential 40 - 80 MW. 4/22/2010
(1) GE LMS100 GTG WAPA 8/16/2010
New powerhouse and (2) 1.8 MW Francis turbines to capture instream flow. 11/10/2009
Would interconnect w/proposed MATL transmission line for export. 1/18/2007
(4) TISEC units 7/15/2010
(95 max) 2.0 MW REpower MM92 WTG. 2/10/2009
(7) GE 1.5 MW WTG. 6/29/2010
(1) 3.8 MW horizontal Kaplan unit (low-head operation) & (1) 4.5 MW vertical PAC distribution system (15kV) 10/1/2010
Francis unit (high-head operation) at existing dam with storage.
Gasification of cattle waste. Anaerobic digestor w/engine-generators IPC Buckhorn sub 7/12/2010
(1) - (3) oscillating water column wave energy devices. 7/8/2010
(45) Siemens 2.3 WTG Harney Electric 115kV Harney - Winnamucca 3/25/2009
(10) REpower MM92 WTG; (27) 1.65 MW Vestas WTG PacifiCorp Irrigon substation 1/5/2010
Site of Boise plant idled Jul 2001. Has not been constructed, no revised service IPC Boise Cascade Emmett substation 2/11/2008
date from Idaho Power yet
Restoration of former hydro project. Existing dam and reservoir; new intake 13.2 kV Okanogan PUD line. 7/9/2010
canal, penstocks, powerhouse w/(2) 4.5 MW Kaplan hydroturbines, tailrace and
appurtenant facilities.
(6) 2.165 IC units (One in reserve). Initial operation on 99:1 NG/FO 6/8/2007
Penstock and turbine-generator at existing canal drop. 2/26/2009
Collection system, anaerobic digester and (1) 750 kW reciprocating engine. 7/20/2010
Collection system, anaerobic digester and (1) 750 kW reciprocating engine. 7/20/2010
Collection system, anaerobic digester and (1) 750 kW reciprocating engine. 7/20/2010
(2) Units 3/31/2010
(1) 1.6 MW Caterpillar 3520C IC 6/29/2009
Page 47
Projects
Existing reservoir & dam; formerly with power (FERC P-1473). New pipeline, 8/25/2010
surge tank, penstock, powerhouse w/2MW Pelton hydroturbine, tailrace and
appurtenant facilities.
7/17/2006
1/5/2010
(45) 3 MW WTG (tentative) 4/12/2010
(4) 2 MW trains. Former Crater Lake Mill site. 9/25/2008
(69) Acciona AW77/1500 WTG. Interconnection to Glacier Electric and NWA Cutbank - Conrad 115kV 8/13/2009
NorthWestern..
WTG not selected. Up to 267 WTG and 400 MW maximum buildout. BPA Klondike substation (200 MW); BPA John Day 5/5/2009
substation (100 MW)
(9) WTG 9/10/2008
(7) GE 1.5 MW WTG. IPC Milner 041 35 kV feeder 8/17/2010
6/6/2007
(5) WTG 10/18/2006
(83) GE 1.5 MW WTG PAC Goshen sub. 3/5/2010
Up to 150 WTG, 1 - 3 MW. 450 MW is max capacity. 8/6/2008
IPC Canyon Creek substation 7/27/2010
(1) 2x1 CC 11/6/2009
5/22/2008
5/22/2008
Existing BuRec Sun River IP canal. Inflatable wier, intake, penstock, Existing NorthWestern 12kV line 7/8/2010
powerhouse and tailrace.
166 TISEC units 7/8/2010
(2) 10.2 MW CTGs & (1) 6MW STG. Air-cooled 2/23/2010
(180) 3 MW WTG (tentative). Requires completion of Green Line BPA Eastern Intertie via NWE and proposed Green Line 4/12/2010
(43) Siemens 2.3 WTG. BPA Rock Creek substation 9/16/2009
Existing storage reservoir. 1/14/2005
Up to 102 MW and 68 WTG (Current SC). Up to 201 MW and 134 WTG Either PacifiCorp 230kV or BPA 500kV. 8/30/2010
(Proposed SC amendment)
Page 48
Projects
Circulating fluidized bed combustion boiler steam plant 2/3/2009
(1) GE LM6000 GT, (2) fired HRSGs and STG 9/24/2010
(1) GE LM6000 GT, gas compressor, NG pipeline lateral and interconnection. 9/24/2010
(4) 1.5 MW WTG. 7/6/2006
(30) 2MW WTG. Interconnected at Rock Creek (BPA) 10/31/2006
Gilliam Co. portion of WiIlow Creek project BPA Boardman sub via project substation 5/18/2010
3/31/2006
(17) 2MW WTG. Interconnected at Rock Creek (BPA) 7/23/2009
Existing BuRec Sun River IP canal. Inflatable wier, intake, penstock, Existing NorthWestern 69kV line 7/8/2010
powerhouse and tailrace.
nal (regasification) 6/13/2008
(33) 1.5 MW GE WTG NWE Broadview - Judith Gap 230 kV Line 2/3/2008
Up to 63 2.4 MW WTG, interconnection, access roads and O&M facility. BPA Rock Creek substation @ 115kV 8/4/2010
Up to 65 WTG. BPA Wood Creek substation (new) (Horse Heaven - 8/4/2010
Harvalum line)
2.5 mi penstock and (1) 5mw turbine-generator. PacifiCorp 69kV 9/29/2010
(48) Suzlon S88-2.1 MW WTG. BPA substation (new) on 230 kV Columbia - Covington 4/29/2010
line
(2) Siemens SGT6-5000 GT x1 STG. 9/29/2010
Fluidized bed boiler and STG 69kV PacifiCorp Collins substation. 9/28/2010
(2) GT CC w/duct-firing, steam turbine configuration undetermined PAC Meridian-Captain Jack 500kV line 8/29/2007
Polygeneration facility producing electricity, bio-oil, syngas and bio-char. Also 2/19/2010
announced at 9.4 MW.
7/20/2010
Page 49
Projects
Siemens SGT6-5000F GT w/duct firing. Evaporative cooling. IPC 230kV Ontario - Caldwell and 138 kV Caldwell- 8/9/2010
Willis.
(12) GE 1.5 MW WTG 8/17/2010
BPA Jones Canyon switching station 6/4/2010
BPA Jones Canyon switching station 6/4/2010
(25) REPower MM92 WTG BPA Harvalum substation (via KPUD Clouse substation) 9/27/2010
Diversion, (2) 550 kW francis units. 7/8/2010
New 650,000 lb boiler to replace existing power boilers. One 65 MW condensing 5/27/2010
turbine. One recovery boiler and one extraction turbine to be retained.
Gas treatment, 335kW reciprocating engine w/heat recovery and auxilliary PSE local 9/29/2010
boilers.
Plant would co-produce electricity and SNG. 10/6/2006
Balance of Dutch Flat & Kuhl Ridge sections, Tucannon & Oliphant Ridge (355) 2.0 MW WTG. 8/7/2009
sections (Columbia Co.)
(149) 2.3 MW Siemens SWT-2.3-101 WTG. BPA Central Ferry Substation (new) 5/24/2010
Existing canal drop. (1) TG 12/8/2009
BPA Wood Creek substation (new) (Horse Heaven - 8/4/2010
Harvalum line)
11/26/2007
(4) 0.25 MW AquabuOY heaving buoy hose pump units 7/9/2010
Capacity range 52.5 to 82.5 NWE Martinsdale substation 1/10/2007
Canal project. (1) turbine-generator 3/18/2009
Run-of-river, existing dam. 7/15/2010
Existing canal. 7/8/2010
(3) Pratt & Whitney SWIFTPAC 50 GTGs w/provision for additional unit. NWE Mill Creek substation 8/26/2009
BPA 1/5/2010
(12) GE 1.5 MW WTG 8/17/2010
Page 50
Projects
134 - 269 1.5 - 3 MW WTG BPA Slatt substation 5/5/2010
Pilot in-stream tidal current energy project. 3/18/2009
35 MW (gross), 23 MW (net) IPC 9/24/2010
Circulating fluidized bed combustion boiler steam plant. Transmission NWE Colstrip switchyard 9/29/2010
interconnection to WAPA.
Production and injection wells, (4) dual flash units of 35 gross, 32 (net summer); BPA LaPine 230kV (140 MW) 9/29/2010
or (3) units of 47.5 gross, 45 MW net summer. Mechanical draft cooling, 12 mi.
interconnection.
Replacement of Units 1 and 2, addition of rubber dam. 5/11/2010
Replacement HP boiler and new extraction steam turbine-generator. 9/2/2010
7/31/2008
(8) 2.5 MW WTG. Existing NorthWestern transmission at site. 7/31/2008
(12) GE 1.5 MW WTG 8/17/2010
Proposed 1 MW unit off new deep well + existing 0.25 MW binary unit off 4/22/2010
shallow wells.
7/25/2005
(1) 5.5 MW GT w/HSRG and (2) auxilliary boilers. 10/28/2008
(7) GE 1.5 MW WTG 8/18/2010
2/10/2010
2/10/2010
2/10/2010
(2) 340 MW (gross) IGCC trains. 5/14/2009
Avista 7/26/2010
(6) WTG. 8/4/2010
(14) GE 1.5 MW WTG. IPC King-Bliss 138kV line 8/17/2010
(47) Suzlon S88-2.1 MW WTG. BPA Jones Canyon switching station 4/22/2010
(7) GE 1.5 MW WTG 8/18/2010
(34) 3 MW WTG (tentative) 4/12/2010
Page 51
Projects
Headworks, 5.1 mi penstock and (1) 750 kW Francis horizontal turbine- PacifiCorp 9/29/2010
generator.
5/17/2007
Thin film PV. Seven warehouse rooftop installations. Consolidated into PGE 9/28/2010
distributed solar record in Existing Project database.
11/24/2009
(32) WTG BPA 5/24/2010
Air-cooled binary technology. 4/22/2010
Original License granted April 1956; expired November 1994. Run-of-river 2/28/2008
w/diversion. Planned redevelopment 2009-11 will replace existing units w/one
60 MW unit.
50 MW ultimate potential. OPT Power Buoy technology. 9/29/2010
62 TISEC units 7/9/2010
(1) 850kW GE/Jennbacher engine 8/8/2007
(206) WTG Montana-Alberta Tie Line (MATL) 7/21/2010
(2) Caterpillar 1.6MW reciprocating engines. 2/23/2010
Gasification of cattle waste. Anaerobic digestor w/(4) engine-generators ((1) Cat IPC Clover sub 7/12/2010
3520, (3) Cat 3412), boiler & flare.
(183) to (305) WTG (type not selected). Either proposed BPA Diamond Butte sub on existing 9/24/2010
Slatt - Buckley 500kV line or proposed PGE Cedar
Springs sub on proposed PGE Cascade Crossing
500kV line.
(44) Vestas 1.8 MW WTG 9/28/2010
Goal gasifier w/coal-to-liquids plant, 300 MW combined-cycle plant and CO2 7/24/2007
separation. Net 100MW for export.
(171 (max)) WTG, mfr & model TBD BPA Slatt substation 4/27/2010
(32) 1.8 MW WTG (tentative) Avista Benton/Tauton 115kV 2/12/2010
(14) GE 1.5 MW WTG 8/18/2010
Existing diversion. 4/22/2008
Existing water control structure. 11/17/2006
116 TISEC units 7/8/2010
Page 52
Projects
Site of terminated Alkali project. 12/23/2009
(8) 2.5 MW Clipper C-93 WTG. PAC Goshen - Rigby 69kV line 11/26/2007
ict heating) 12/11/2009
Boiler & 18.8 MW STG. 5/11/2009
(116) GE 2.5 MW WTG. BPA Slatt substation 6/4/2010
(116) GE 2.5 MW WTG. BPA Slatt substation 6/4/2010
(116) GE 2.5 MW WTG. BPA Slatt substation 6/4/2010
New 50 MW Unit 4. Units 1 and 2 to be retired. 9/28/2010
55 MW steam turbine-generator & wet cooling tower. Steam from #7 recovery 8/14/2009
boiler & #4 power boiler capacity & pressure upgrades. ~50% of energy from
black liquor, remainder from mill, forest and urban wood residues.
Refurbishment of existing 1.8 MW ea. Units 1 - 4, and replacement of 6.5 MW 115kV PSE Snoqualmie Falls substation. 9/29/2010
Unit 5 of PH 1. Rebuilt PH 2 w/refurbished 13.7 MW Unit 6 and 27 MW Unit 7.
168 TISEC units 7/8/2010
Anaerobic digestor and (1) Caterpillar reciprocating engines. 7/20/2009
(49) Suzlon S88-2.1 MW WTG. BPA John Day substation 4/22/2010
"GE" option: 67 GE WTG (100.5 MW); "Siemens" option (43) Siemens 2.3 MW PacifiCorp Wallula sub via existing Stateline 2/12/2009
WTG (98.9 MW) interconnection.
Existing diversion. 4/22/2008
ORMAT Recovered Energy Generation System (organic Rankine cycle turbine). 2/11/2008
Construction has been suspended due to environmental issues - final
determination regarding future of project is unknown
2x1 CC, 669 MW gross; 660 MW nominal, inc. 133 MW w/DB. 4/11/2006
Up to (87) 1.5 - 2.3 MW WTG BPA 230 Big Eddy - Maupin 8/25/2010
(2) 2x1 S-W V84.3a CC. Interconnected at Allston or (alternatively) new 10/6/2006
Bradbury substation.
Thin film, AC/DC rating not specified, ground and carport mount. 6/3/2010
Gasification of cattle waste. Anaerobic digestor w/engine-generators IPC Clover sub 7/12/2010
Page 53
Projects
Closed-cycle pumped-storage project consisting of upper and lower reservoirs, 345kV line to BPA Captain Jack substation. 7/14/2010
underground powerhouse w/(4) 345 MW reversible pump-turbine units.
7/18/2006
BPA Rocky Reach - Maple Valley 345kV 8/16/2010
1/18/2007
(7) GE 1.5 MW WTG 8/18/2010
(6) 1.65 MW Vestas V82 WTG 4/20/2010
(62) 3 MW WTG (tentative) 4/12/2010
(7) GE 1.5 MW WTG. 8/18/2010
(8) Suzlon S88-2.1 MW WTG. IPC Lower Malad- Mtn Home Jct 138kV line 8/18/2010
(20) REpower MM92 2 MW WTG. (42) Siemens SWT 2.3 MW WTG. 190 MW BPA Rock Creek substation 1/5/2010
permitted
Announced August 2005. Energy Northwest termination announced Feb 2008 2/18/2010
due to unpredictability of REPI. Avista acquisition announced May 2008.
Existing canal drop. (1) TG 12/8/2009
Proposal terminated Sep 2007. 9/27/2007
(42) Siemens SWT 2.3 MW WTG. 4/29/2010
(69) GE 1.5 MW WTG. 5/7/2010
915 MW (gross). Mitsubishi Heavy Industries dry gasification process. 4/1/2008
Proposed 65% CO2 separation & basalt sequestration.
(2) 2x1 F-Class CC 7/18/2006
Installation of replacement high-pressure boiler (complete), expansion of 2/24/2010
generating capacity. Fuel is forest residue.
Up to 52 WTG, access roads, project substation, O&M facility, 115kV BPA Redmond - Harney 115kV 7/26/2010
transmission interconnection.
(46) Suzlon S88-2.1 MW WTG. BPA Jones Canyon substation 4/22/2010
Up to 50 WTG 4/8/2009
2/19/2010
3/3/2010
Existing run-of-river dam & reservoir. New penstock, powerhouse w/7.15 MW Adjacent 15kV Midstate Elec. Coop distribution line 7/14/2010
Kaplan turbine-generator and tailrace.
Page 54
Projects
(22) WTG. SC application approved Jan 2009. Construction 2009. 2/24/2010
(48) GE 1.5 MW WTG. BPA interconnection request is for 180 MW. 15 yr PPA BPA Tower Rd - Alkali #1 115kV tap 5/22/2009
w/LADWP.
(114) Siemens SWT 2.3 MW WTG. BPA Rock Creek substation 1/5/2010
2/23/2010
(10) 1.5 MW WTG. 160 MW potential. 2/20/2008
Existing BuRec Sun River IP canal. Inflatable wier, intake, penstock, Existing Sun River Coop 7.2kV line 7/8/2010
powerhouse and tailrace.
(14) GE 1.5 MW WTG. IPC King-Bliss 138kV line 8/17/2010
Ground-mount thin-film PV 9/25/2010
Wier & intake w/ 3 mi diversion. (1) 7.5 MW hydro TG. 7 mi interconnection 12.5kV to SnoPUD Sultan sub 9/29/2010
(2) 250 kW molten carbonate fuel cells. 6/14/2006
Page 55
Projects
Default Calculations
Capacity Factor Capacity (MW) Capability (MW)
(%)
CCF DefMW CMWA
44% 1.5 0.7
#NAME? 60.0 #NAME?
10% 1.0 0.1
30% 1.0 0.3
32% 52.0 16.7
30% 18.0 5.4
#NAME? 81.0 #NAME?
30% 300.0 90.0
43% 10.0 4.3
#NAME? 19.5 #NAME?
62% 15.0 9.3
33% 500.0 167.0
9% 7.0 0.6
#NAME? 1.7 #NAME?
#NAME? 50.0 #NAME?
72% 1.5 1.1
Page 56
Projects
#NAME? 149.5 #NAME?
#NAME? 174.8 #NAME?
#NAME? 338.0 #NAME?
13% 18.0 2.4
#NAME? 720.0 #NAME?
#NAME? 130.0 #NAME?
#NAME? 10.5 #NAME?
#NAME? 22.5 #NAME?
#NAME? 450.0 #NAME?
#NAME? 450.0 #NAME?
#NAME? 10.0 #NAME?
#NAME? 60.0 #NAME?
#NAME? 10.5 #NAME?
#NAME? 18.9 #NAME?
#NAME? 520.0 #NAME?
#NAME? 0.0 #NAME?
#NAME? 26.0 #NAME?
58% 3.3 1.9
#NAME? 1.5 #NAME?
#NAME? 425.0 #NAME?
17% 3.0 0.5
6.0 0.0
#NAME? 1150.0 #NAME?
#NAME? 13.0 #NAME?
#NAME? 6.4 #NAME?
#NAME? 42.7 #NAME?
#NAME? 163.0 #NAME?
34% 63.0 21.4
Page 57
Projects
49% 14.0 6.9
35% 100.0 35.0
20% 100.0 20.0
#NAME? 200.0 #NAME?
9% 1.0 0.1
#NAME? 120.0 #NAME?
#NAME? 40.0 #NAME?
#NAME? 91.0 #NAME?
75% 3.6 2.7
#NAME? 180.0 #NAME?
#NAME? 2.8 #NAME?
#NAME? 190.0 #NAME?
#NAME? 10.5 #NAME?
24% 3.8 0.9
44% 2.0 0.9
#NAME? 2.0 #NAME?
104.0 0.0
#NAME? 64.5 #NAME?
#NAME? 17.5 #NAME?
1.1 0.0
#NAME? 13.0 #NAME?
11% 0.9 0.1
#NAME? 0.8 #NAME?
#NAME? 0.8 #NAME?
#NAME? 0.8 #NAME?
3.2 0.0
63% 1.6 1.0
Page 58
Projects
2.0 0.0
#NAME? 280.0 #NAME?
200.0 0.0
#NAME? 145.0 #NAME?
#NAME? 8.0 #NAME?
34% 103.5 35.4
#NAME? 400.0 #NAME?
#NAME? 15.0 #NAME?
#NAME? 10.5 #NAME?
32% 56.0 18.0
#NAME? 10.0 #NAME?
#NAME? 90.0 #NAME?
#NAME? 450.0 #NAME?
#NAME? 20.0 #NAME?
#NAME? 650.0 #NAME?
#NAME? 275.0 #NAME?
#NAME? 125.0 #NAME?
28% 0.6 0.2
93% 3.5 3.3
#NAME? 26.4 #NAME?
#NAME? 540.0 #NAME?
#NAME? 100.0 #NAME?
79% 6.7 5.3
79% 102.0 80.7
Page 59
Projects
#NAME? 250.0 #NAME?
#NAME? 74.0 #NAME?
#NAME? 46.0 #NAME?
#NAME? 6.0 #NAME?
#NAME? 60.0 #NAME?
#NAME? 78.0 #NAME?
#NAME? 750.0 #NAME?
#NAME? 34.0 #NAME?
29% 0.7 0.2
#NAME? 40.0 #NAME?
#NAME? 52.5 #NAME?
#NAME? 150.0 #NAME?
#NAME? 101.0 #NAME?
46% 3.3 1.5
#NAME? 100.8 #NAME?
30.0 0.0
#NAME? 35.0 #NAME?
#NAME? 480.0 #NAME?
#NAME? 4.7 #NAME?
#NAME? 24.0 #NAME?
Page 60
Projects
#NAME? 330.0 #NAME?
#NAME? 18.0 #NAME?
#NAME? 90.3 #NAME?
#NAME? 111.0 #NAME?
#NAME? 50.0 #NAME?
54% 1.1 0.6
#NAME? 65.0 #NAME?
80% 0.3 0.3
#NAME? 366.0 #NAME?
#NAME? 907.0 #NAME?
#NAME? 343.0 #NAME?
#NAME? 7.7 #NAME?
#NAME? 60.0 #NAME?
#NAME? 12.0 #NAME?
17% 1.0 0.2
#NAME? 52.5 #NAME?
24% 0.9 0.2
#NAME? 2.7 #NAME?
4% 1.1 0.0
#NAME? 139.5 #NAME?
#NAME? 150.0 #NAME?
#NAME? 18.0 #NAME?
Page 61
Projects
33% 404.0 135.0
#NAME? 0.8 #NAME?
#NAME? 23.0 #NAME?
#NAME? 508.0 #NAME?
#NAME? 127.0 #NAME?
50% 8.8 4.4
#NAME? 20.0 #NAME?
#NAME? 150.0 #NAME?
#NAME? 20.0 #NAME?
#NAME? 18.0 #NAME?
#NAME? 1.3 #NAME?
#NAME? 28.0 #NAME?
#NAME? 5.5 #NAME?
#NAME? 10.5 #NAME?
#NAME? 5.0 #NAME?
#NAME? 5.0 #NAME?
#NAME? 5.0 #NAME?
#NAME? 600.0 #NAME?
#NAME? 100.0 #NAME?
#NAME? 9.0 #NAME?
#NAME? 22.5 #NAME?
32% 99.0 31.5
#NAME? 10.5 #NAME?
#NAME? 90.0 #NAME?
Page 62
Projects
40% 0.7 0.3
40% 0.5 0.2
2.4 0.0
#NAME? 0.0 #NAME?
#NAME? 60.0 #NAME?
87% 15.0 13.0
#NAME? 23.5 #NAME?
47% 1.5 0.7
70% 1.4 1.0
80% 0.9 0.7
39% 309.0 120.0
#NAME? 4.0 #NAME?
44% 4.0 1.8
#NAME? 550.0 #NAME?
79.2
33% 300.0 100.0
#NAME? 564.3 #NAME?
#NAME? 57.0 #NAME?
#NAME? 21.0 #NAME?
73% 1.1 0.8
76% 1.1 0.8
72% 5.3 3.8
Page 63
Projects
#NAME? 21.0 #NAME?
#NAME? 20.0 #NAME?
#NAME? 50.0 #NAME?
#NAME? 18.8 #NAME?
#NAME? 290.0 #NAME?
#NAME? 265.0 #NAME?
#NAME? 290.0 #NAME?
#NAME? 50.0 #NAME?
#NAME? 55.0 #NAME?
#NAME? 10.0 #NAME?
45% 8.3 3.7
81% 1.6 1.3
#NAME? 98.7 #NAME?
#NAME? 100.5 #NAME?
11% 0.6 0.1
#NAME? 5.0 #NAME?
#NAME? 660.0 #NAME?
#NAME? 200.0 #NAME?
#NAME? 520.0 #NAME?
#NAME? 10.0 #NAME?
44% 2.0 0.9
Page 64
Projects
#NAME? 1380.0 #NAME?
#NAME? 3.3 #NAME?
#NAME? 75.0 #NAME?
#NAME? 37.8 #NAME?
#NAME? 10.5 #NAME?
#NAME? 9.9 #NAME?
#NAME? 186.0 #NAME?
#NAME? 10.5 #NAME?
#NAME? 16.8 #NAME?
#NAME? 136.6 #NAME?
30% 50.0 15.0
#NAME? 5.3 #NAME?
#NAME? 170.0 #NAME?
#NAME? 98.9 #NAME?
#NAME? 103.5 #NAME?
#NAME? 760.0 #NAME?
#NAME? 1300.0 #NAME?
#NAME? 15.8 #NAME?
104.0 0.0
29% 96.6 28.0
#NAME? 75.0 #NAME?
#NAME? 50.0 #NAME?
#NAME? 20.0 #NAME?
34% 7.2 2.4
Page 65
Projects
#NAME? 44.0 #NAME?
32% 72.0 22.8
#NAME? 262.2 #NAME?
#NAME? 100.0 #NAME?
#NAME? 15.0 #NAME?
33% 0.9 0.3
#NAME? 22.5 #NAME?
#NAME? 1.2 #NAME?
30% 7.5 2.3
#NAME? 0.5 #NAME?
Page 66
Northwest Power and Conservation Council
NEW POWER PROJECTS IN THE PACIFIC NORTHWEST
Update Notes (Format and formula changes, record additions or de
Date
4/21/2009
5/11/2009
5/11/2009
6/24/2009
6/27/2009
6/29/2009
7/6/2009
7/20/2009
7/20/2009
8/14/2009
8/14/2009
8/14/2009
8/19/2009
8/21/2009
9/15/2009
9/15/2009
9/22/2004
11/6/2009
11/11/2009
12/11/2009
12/14/2009
12/17/2009
1/5/2009
1/5/2009
1/5/2009
1/5/2009
2/10/2010
2/12/2010
2/19/2010
2/23/2010
2/24/2010
3/3/2010
3/9/2010
4/5/2010
4/20/2010
4/22/2010
4/22/2010
4/22/2010
4/22/2010
4/29/2010
4/29/2010
5/18/2010
5/24/2010
6/3/2010
6/28/2010
7/8/2010
7/8/2010
7/8/2010
7/8/2010
7/8/2010
7/8/2010
7/8/2010
7/8/2010
7/8/2010
7/9/2010
7/9/2010
7/9/2010
7/9/2010
7/9/2010
7/9/2010
7/9/2010
7/9/2010
7/9/2010
7/12/2010
7/14/2010
7/14/2010
7/26/2010
8/4/2010
9/24/2010
9/24/2010
9/25/2010
9/25/2010
9/28/2010
9/28/2010
9/28/2010
Northwest Power and Conservation Council
NEW POWER PROJECTS IN THE PACIFIC NORTHWEST
Update Notes (Format and formula changes, record additions or deletions onl
Item
Removed Willow Creek Geothermal (#1655)
Added Antelope Ridge
Added Senaca Sawmill
Added Summit Ridge
Added Juniper Ridge
Added Flathead Landfill WTE
Removed West Linn Paper (Inactive > 5 years)
Added Stahlbush Island Farms
Revised Neal Hot Springs Entry to reflect current structure
JK - Deleted Oregon Trail (1813), Pilgrim Stage Station (1815), Salmon Falls
(1826), Thousand Springs (1846) and Tuana Gulch (1849)
JK - Added Camp Reed (1885), Payne's Ferry (1886), Yahoo Creek (1887).
JK - Added Tuana Springs expansion.
JK - Added Saddle Butte WInd Park
JK - Added Teanaway solar
JK - Added Rim Rock
JK - Added Carty Generating Station
JK - Added Coyote Crest
JK - Added Grays Harbor Phase II
JK - Added Sawtooth wind
JK - Added Seattle Steam
JK - Added Big Horn II
JK - Added Culbertson
JK - Deleted Mountain Home (1872)
JK - Added Frenchman Hill (1903)
JK - Added Miller Ranch (1904)
JK - Added Leaning Juniper IIb (1905)
JK - Added Montegue
JK - Added Saddle Mountain
JK - Added Whitehall Wind, Borgford, Nippon Paper
JK - Added Riverbend, Finley Buttes, H.W. Hill expansion and Columbia Ridge
landfill gas energy recovery plants.
JK - Added Longview Fibre Expansion
JK - Added Wibaux
JK - Added Fighting Creek
JK - Added Coastal Energy
JK - Added Klamath Bioenergy
JK - Added Crump Geyser
JK - Deleted Fourmile Hill
JK - Deleted Liskey Farms
JK - Deleted Raft River III
JK - Added Vansycle II
JK - Deleted duplicate Columbia Ridge LFG
JK - Added Horn Butte
JK - Consolidated Lower Snake River Ph II w/ LSR balance
JK - Added Rock Creek Dairy, Swager Farms and Double B Dairy
JK - Added Farm Power Lynden
JK - Added A-Drop (#1940)
JK - Removed Cascade (#1701)
JK - Removed Greenmill (#1760)
JK - Added Greenfield (#1941)
JK - Added Johnson (#1942)
JK - Added Woods (#1943)
JK - Removed Gibson Dam (#1746)
JK - Removed Green Point Upper (#1759)
JK - Removed Deadwood (#1728)
JK - Added Lakeview Cogeneration (#1944)
JK - Added Farm Power Tillamook (#1945)
JK - Added Baseline Wind (#1946)
JK - Added Flint Creek (#1947)
JK - Added Enloe (#1948)
JK - Removed WECC, White Book and EIA capacity columns; replaced
w/Dependable capacity column
JK - Removed Cle Elum (#1711)
JK - Removed Foothills South (#1740)
JK - Removed St Laurent Land (Upper & Lower) (#1833 & 1834)
JK - Added Grand View Solar PV I
JK - Added Swan Lake North
JK - Added Wickiup Dam
JK - Added Naff Ridge
JK - Added PaTu, Juniper Canyon I & II, Lund Hill.
JK - Added Cascade Pacific Pulp
JK - Combined Cogeneration Host and Thermal Load columns
JK - Added Yamhill and Bellevue solar
JK - Converted to Excel 2007 Macro-enabled file.
JK - Added Rockland.
JK - Added Snoqualmie Falls refurbishment.
JK - Purged unused names.
Council
IC NORTHWEST
additions or deletions only)
Note
Project has not materialized
USDOE loan guarentee for 22 MW net.
Duplicate of Bennett Creek (1692) and Hot
Springs (1771)
Geothermal Energy Association Ph 3, Apr
2010
Geothermal Energy Association Ph 2, Apr
2010
Not in Geothermal Energy Association
Inventory, Apr 2010
Additional development at Raft River
deferred pending achievement of full
capacity operation of Phase I
FERC license granted
PP expired
PP expired
FERC license granted
FERC license granted
FERC license granted
PP expired
PP expired
PP expired
USDOE grant awarded
USDOE grant awarded
NOI submitted
FERC license application submitted
FERC license application submitted
White Book, WECC or EIA capacity
information generally not available.
Dependable (January) capacity will be
entered where available and noted as to
source.
Was PP only
Was PP only
Was PP only
NOI to apply for FERC license
NOI to apply for FERC license
CUP application
Under construction
BETC award
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
Northwest Power & Conservation Council
NOTES AND ABBREVIATIONS USED IN PROJECT DATABASE
15-July-2011
Status:
In-service
Construction
Planned
Proposed
Deferred
Suspended
Terminated
Retired
Abbreviations:
APS
AW
BCGE
BD
BIO
BIT
BP
BPA
CC
CFBC
CG
Chelan PUD
Clark
COL
CPUD
CUP
DEF
DEIS
Douglas PUD
PSS
EPUD
EWEB
EX
EXT
Fall River
FO
FO2
FSGE
G
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 76 5:36 PM
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
BG
GC
GE
GB
GHPD
GR
Grant
GST
GT
GTD
HY
HY Eff
IC
INA
INS
IPC
Jefferson
Klickitat
LA
Lane
LC
Lewis
LFG
LGIA
LIG
LIQ
Lower Valley
M
Mason 3
MOX
MPC
N. Wasco
NB
NG
NOI
NorthWestern
Okanogan PUD
OT
PAC
PC
PC
PG&E
PGE
PLN
PLNR
PND
PO
POT
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 77 5:36 PM
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
PP
PG
PRM
Project ID
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 78 5:36 PM
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
PS
PSE
PSPL
RAC
R&B
RB
REF
RET
RG
RL
SC
SCL
SHPD
Snohomish
SPP
ST
STY
SUB
SUB
SUS
T&D
TCL
TER
TG
Tillamook
U
UN
UNC
UR
USBR
VR
VR
WAT
WC
WCS
WDN
WEC
WG
WND
WT
WW
XG
Notes:
Capacity and energy values shown for upgrades and additions are incremental unless noted.
Average energy estimates are shown for non-thermal projects only.
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 79 5:36 PM
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
Default capacity factors for calculating energy
Code
BG
BGCG
BGGT
BGIC
BGICCG
CC
CCCG
CFBCST
FC
FCCG
GB
GE
GST
GT
GTCG
HY
IC
ICCG
IGCC
OT
NP
PS
PV
RBSTCG
ST
STCG
TISEC
UN
WEC
WT
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 80 5:36 PM
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
Northwest Power & Conservation Council
NOTES AND ABBREVIATIONS USED IN PROJECT DATABASE
15-July-2011
Project in operation.
Project under construction.
Firm date for start of construction or for completion published; construction not underway.
Project under development. Specific site, fuel, technology and capacity announced.
Development suspended.
Construction suspended.
Development or construction terminated.
Previously operating project retired.
Arizona Public Service
Agricultural waste
Binary cycle geothermal
Biodiesel
Biomass (unknown or mixed)
BItuminous coal
Buoy pump
Bonneville Power Administration
Combined-cycle combustion (gas) turbine
Circulating fluidized bed combustion (boiler)
Cogeneration
Chelan Co. PUD
Clark Co. PUD
Coal
Clatskanie People's Utility District
Conditional Use Permit
Deferred project never constructed.
Draft Environmental Impact Statement
Douglas Co. PUD
WA Energy Facility Site Eveluation Council Potential Site Study
Emerald PUD
Eugene Water & Electric Board
License exemption
Extension granted
Fall River Electric Co-op
Fuel oil
No. 2 Fuel oil
Flashed steam geothermal plant
New permanent power plant.
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 81 5:36 PM
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
Biomass gasifier
Coal gasifier
Geothermal plant
Geothermal plant - Binary
Grays Harbor PUD
Proposed retirement of existing generation
Grant Co. PUD
Geothermal fluid
Simple-cycle combustion (gas) turbine
Granted
Hydropower
Hydropower efficiency improvements (upgrades and refurbishments).
Reciprocating engine
Inactive. Not permitted or no recent evidence of development activity (10 years for hydro projects holding licenses or
exemptions).
In-service. Operating or available for service (may be on standby).
Idaho Power Company
Jefferson Co. PUD
Klickitat Co. PUD
License amendment (hydropower projects)
Lane Electric Cooperative
License or site certificate
Lewis Co. PUD
Landfill gas
Large Generator Interconnection Agreement
Lignite
Spent pulping liquor
Lower Valley Power & Light
Actions involving generic or multiple projects; may include projects listed separately.
Mason co. PUD No. 3
Mixed-oxide fuel (uranium & plutonium)
Montana Power Company (now NorthWestern Corporation)
Northern Wasco PUD
Boiling water reactor
Natural gas
Notice of intent to apply for a site certificate
NorthWestern Corporation
Okanogan Co. PUD
Other
PacifiCorp
Pulverized coal
Petroleum coke
Pacific Gas & Electric
Portland General Electric Company
Planned for construction. Permits sought
Planned retirement.
Pending (Application complete)
Project order (stipulations for a license application)
Permits secured or being secured or otherwise under consideration; construction not scheduled. Also see INA (inactive).
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 82 5:36 PM
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
FERC preliminary permit
Propane
Power Resource Managers Resource Package
Federal Energy Regulatory Commission hydropower project identification number.
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 83 5:36 PM
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
Pumped Storage Hydropower
Puget Sound Energy
Puget Sound Power & Light (Now Puget Sound Energy)
Reactivation of existing unit.
Rehabilitation and betterment
Chemical recovery boiler
Municipal solid waste
Retired from service.
Refinery gas
Relicense
Site certificate
Seattle City Light
Snohomish County PUD
Snohomish Co. PUD
Sierra Pacific Power Company
Boiler-steam turbine
Stayed
Subbituminous coal
Springfield Utility Board
Suspended partially constructed project.
Transmission & Distribution System
Tacoma Public Utilities
Terminated project prior to construction.
Temporary generation (permitted for 24 months, or less).
Tillamook PUD
Unconfirmed
Unknown
Under construction
Uranium
U.S. Bureau of Reclamation
Various
Various
Water
Waste Coal (Culm)
Water control structure (dam, canal, conduit, etc.)
Withdrawn
Wave energy converter
Wastewater treatment plant gas
Wind
Wind turbine
Woody residues
Refurbishment, expansion or retirement of existing power plant.
acity and energy values shown for upgrades and additions are incremental unless noted.
rage energy estimates are shown for non-thermal projects only.
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 84 5:36 PM
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
t capacity factors for calculating energy
Technology
Biogasification recip
Biogasification cogeneration
Digester combustion turbine
Biogasification recip
Biogasification recip w/cogeneration
Combined-cycle combustion (gas) turbine
Combined-cycle combustion (gas) turbine w/cogeneration
Circulating fluidized bed combustion
Fuel cell
Fuel cell
Geothermal binary
Geothermal
Geothermal flash steam
Simple-cycle combustion (gas) turbine
Simple-cycle combustion (gas) turbine w/cogeneration
Hydro
Reciprocating engine
Reciprocating engine cogeneration
Coal gasification combined-cycle
Other
Pressurized water reactor
Pumped Storage
Solar photovoltaic
Boiler steam electric plant w/cogeneration
Boiler steam electric plant
Boiler steam electric plant w/cogeneration
Tidal In-stream energy converters
Unknown
Wave energy conversion device
Wind turbine
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 85 5:36 PM
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 86 5:36 PM
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 87 5:36 PM
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 88 5:36 PM
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 89 5:36 PM
Northwest Power Planning Council
KEY TO ABBREVIATIONS USED IN THE PROJECT DATABASE
7/15/2011
Default Capacity
Factor Source
90%
90%
90% 5th Plan Resource Characterization
90%
90%
90% 5th Plan Resource Characterization
90% 5th Plan Resource Characterization
84%
90%
90%
92% Equivalent to Geothermal flash steam
92% 5th Plan Resource Characterization
92% 5th Plan Resource Characterization
94% 5th Plan Resource Characterization
94% 5th Plan Resource Characterization
50% Typical
91% 5th Plan Resource Characterization
91% 5th Plan Resource Characterization
83% 5th Plan Resource Characterization
90%
90%
0%
22% 5th Plan Resource Characterization
84% To match steam cogen
84% 5th Plan Resource Characterization
84% 5th Plan Resource Characterization
30% Provisional - more detail in EPRI report.
80% Assume unknowns are typically thermal units
37% 1991 Power Plan
32% Biennial review - Wind (Jun 2006)
7/15/2011 0952e578-12e0-4e33-b0e2-9e871b6b04f0.xlsKey & Lookups - Page 90 5:36 PM
Northwest Power and Conservation Council
NEW PROJECT STATUS
Generating Project Development Activity in the Generating Pro
Northwest
3000 Hydrokinetic 20000
Installed Capacity (MW)
Installed Capacity (MW)
Pumped Storage
Solar
Wind
Petroleum/Pet Coke 15000
Natural gas
2000 Hydro
Geothermal
Coal
10000
Biomass
1000
5000
0 0
Operating (2009 > Under Construction Planned
Present)
September 2010
* Jan 2002 through Feb 2007
Petroleum/Pe
Biomass Coal Geothermal Hydro Natural gas t Coke
Operating (2009 > Present) 67 16 97
Under Construction 5 43 500
Planned 8 37
Proposed 309 1174 64 109 4831
44
Susp/Deferred/Term (Jul 2006 > Present) 3454 142 7 2658 600
TECH (All)
Sum of DefMW PRRES
PLSTAT Biomass Coal Geothermal Hydro Natural gas Petroleum
Construction 5 43 470
Deferred 760 15
Planned 8 37
Suspended 18 5
Terminated 26 2694 127 7 2653 600
Proposed 309 64 109 4831
Operating 67 16 127
Grand Total 432 3454 206 212 8085 600
44
Susp/Deferred/Term (Jul 2006 > Present) 3454 142 7 2658 600
ation Council
ATUS
Generating Project Development Activity
in the Northwest
20000 Hydrokinetic
Pumped Storage
Solar
Wind
15000 Petroleum/Pet Coke
Natural gas
Hydro
Geothermal
10000 Coal
Biomass
5000
0
Proposed Susp/Deferred/Term (Jul
2006 > Present)
September 2010
Pumped
Wind Solar Storage Hydrokinetic
1302 2
1037
1066 22 1
8603 100 1718 367
354 0 0 74
Wind Solar Hydrokinetic Pump Storage Grand Total
1037 1554
50 825
1066 22 1 1133
22
304 74 6485
8603 100 367 1718 16101
1302 2 1513
12361 124 443 1718 27634
354 0 74 0 7332
Related docs
Other docs by mae16991
Get documents about "