Docstoc

cv-hur

Document Sample
cv-hur Powered By Docstoc
					                                                                                         CV D.HURPAUL
                                                                                         Project Director


                                     CURRICULUM VITAE

 1.       Family name: HURPAUL
 2.        First names: Devindranathsing (Dev)
 3.        Date of birth: 29 March 1949
 4.        Nationality: Luxembourg
 5.        Education:
Institution                                   Degree(s) or Diploma(s) obtained:
(Date from - Date to)
University of Manchester – England            Bachelor of Science (BSc. Hons. Civil Engineering)
September 1969 – July 1972                    – 1972
Institute of Civil Engineers – London 1976    MICE- Member of Institute of Civil Engineers
The Council of Engineering Institutions       Chartered Engineer (CEng) – 1977

6.      Language skills: Indicate competence on a scale of 1 to 5 (1 - excellent; 5 - basic)
              Language               Reading          Speaking             Writing
               English                  1                 1                    1
                French                  1                 1                    1
               German                   3                 4                    4

7.      Membership of professional bodies:
           Member of the Institute of Civil Engineers, London.
           Member of Ordre des Architectes et Ingénieurs, Luxembourg.
           Member of Institution of Engineers, Mauritius.
8.      Other skills: (e.g. Computer literacy, etc.): office application (word, excel)
9.      Present position: Director of LUXCONSULT S.A, Head of Overseas Transport and
        Infrastructure Department.
10.     Years within the firm: 30
11.      Key qualifications: (Relevant to the project)
Over 38 years of professional experience of which more than 15 years were gained in SubSaharan
part of Africa for feasibility studies, preliminary design, detailed design, preparation of tender
dossier, evaluation of tenders, supervision, claims assessment of various civil engineering works in
Europe, Africa and Caribbean connected with roads, motorway, railways, bridges, drainage system,
water supply. Has long experience and is familiar with EDF, EU, World Bank and ADB financed
project as well as FIDIC / EDF contract procedures, logical framework (project cycle management),
preparation of project dossiers/financing proposal. Has acted as Project Director for various road
and Infrastructure projects as well as for Technical Assistance Support to Road Authorities
financed by EIB and EDF.
12.     Specific experience in the region:
       Country           Date from - Date to               Country             Date from - Date to
  Tunisia             2010 – on-going                 Mauritius              1994 – to date
  Comoros             2010 – ongoing                  Madagascar             Jan 2003 – March 2004
  Turkey              2006 – on-going                 Ethiopia               Oct 2003 – Jan 2004
  Vanuatu             2006 – 2007                     Surinam                March 1989
  Mali                2002 – 2007                     Sudan                  Jan 1986 – Jan 1987
  Benin               2005 – 2007                     Botswana               Sep 1986 – Jan 1987
  Rwanda              2006 – on-going                 Zaire                  March 1982 – Dec 1984
  Cameroon            Oct 2005




                                                                                                      Page 1 / 4
                                                                                                                                                                      CV D.HURPAUL
                                                                                                                                                                      Project Director
          13.          Professional experience
  Date     Location             Company            Position                                                             Description
 from -
Date to
 2010-     TUNISIA            LUXCONSULT     Project Director/   TECHNICAL ASSISTANCE TO THE PROJECT IMPLEMENTATION UNIT (STA) FOR THE CONSTRUCTION OF 155
  2014                            S.A.        Backstopping       KM OF TOLL MOTORWAY BETWEEN SFAX AND GABES, TUNISIA. - EIB Funded The specific objectives are to
ongoing                                                          enhance PMU’s capacity to plan, manage and monitor projects activities; Specifically assist the PMU in the timely
                                                                 planning, implementation and monitoring of the activities in order to ensure completion of works within time and budget
                                                                 and to the required quality
 2010-     COMOROS            LUXCONSULT     Project Director/   REHABILITATION OF OUALLAH- MIRINGONI ROAD- 10 KM-MOHELI, COMOROS- EDF Financed
Ongoing                           S.A         Backstopping       Technical Feasibility Study, Detailed Design,and Preparation of Bid Documents
 2010-    MAURITIUS           LUXCONSULT     Project Director/   UPGRADING OF QUARTIER MILITAIRE B6 ROAD- MAURITIUS 12km; B28 ROAD 36 KM – FEASIBILITY AND
ongoing                           S.A.        Backstopping       DETAILED STUDY Economic feasibility study and report, EIA Study and report, preliminary design, , detailed design,
                                                                 pavement and drainage design, tender documentation (FIDIC 4th Edition), quantities, cost estimate, engineering reports
 2006-     TURKEY                JV GTZ/     Project Director    PROJECT IMPLEMENTATION UNIT TO THE BOSPHORUS TUNNEL PROJECT (EIB, JBIC and Government of
 2011 -                       LUXCONSULT/    for Luxconsult/     Turkey Funding)
ongoing                         KARDEN        Backstopping       The objective is to provide qualified and experienced support to enable the Project Implementation Unit (PIU) to handle the
                                                                 following service areas: Overall quality control, Administration, Financial accounting and control, Public relations.
 Oct.      CONGO              LUXCONSULT     Project Director/   FEASIBILITY STUDY OF KINKALA- MINDOULI RN1 ROAD (60 KM) – CONGO (Brazzaville)- EDF Financed
2009-                             S.A.        Backstopping       Technical and socio economic feasibility study and report, Environmental Impact Assessment Study and report,
 June                                                            preliminary design+ report with cost estimates; TOR for detailed design, Project Dossier and Financing Proposal to be
 2010                                                            submitted to EDF Committee for funding (FIP, FA)
March      FRANCE                 JV ISL           Project       HIGH SPEED TRAIN PROJECT- Paris- Strasbourg(TGV)
1999 –                         (INGEROP,         Coordinator /   Preliminary, detailed design, tender , tender evaluationand supervision of civil works for 56 km of railway line assigned to
 2007                          SOGELERG,         Team Leader     in the region of Reims; Cost of works 300 Million Euro
                              LUXCONSULT
 Oct.     VANUATU             LUXCONSULT     Project Director/   TECHNICAL ASSISTANCE TO THE PUBLIC WORKS DEPARTMENT - VANUATU
2006-                              S.A.       Backstopping       EDF Project No. 9.ACP VA 02 – PWD Maintenance Training Programme. Specific objectives are to: Improve PMU’s
 Jan.                                                            capacity to plan, manage and monitor projects activities through the “MAINTENANCE TRAINING PROGRAMME”(on-the-
 2008                                                            job-training and demonstration work
 May            MALI          LUXCONSULT     Project Director/   TECHNICAL ASSISTANCE TO THE PMU OF THE NATIONAL DEPARTMENT OF
2002-                             S.A.        Backstopping       PUBLIC WORKS (DNTP) (EDF Funding).
August                                                           Technical Assistance to reinforce the PMU of the DNTP (Département National des Travaux Publics) for the
                                                                                                                                         th,             th
 2008                                                            implementation of the transport sector programme financed under the 8 , 9th and 10 .EDF and follow up of the EDF
                                                                 financed contracts.
 2006     RWANDA              LUXCONSULT     Project Director    NYAMATA- RURUHA Road (20KM)
 2008                             S.A.                           Preliminary, detailed design, EIA study, Traffic study, tender and supervision of civil works
 2000-    MAURITIUS           LUXCONSULT     Project Director    COASTAL BYPASS ROAD FOR NTZ (Northern Touristic Zone) (13km):
 2005                             S.A.       / Team Leader       Preliminary, EIA study, Traffic study, Economic study, detailed design, tender dossier (FIDIC). Client: Road Development
                                                                 Authority-




                                                                                                                                                                                   Page 2 / 4
                                                                                                                                                               CV D.HURPAUL
                                                                                                                                                               Project Director



 2001-     MAURITIUS   LUXCONSULT   Project Director/   REHABILITATION OF WOOTON- QUARTIER MILITAIRE B6 ROAD (13km + 6 km of bypass)
 2005                      S.A.      Team Leader        Preliminary, EIA study, Traffic study, Economic study, detailed design, tender dossier.(FIDIC) Client: Road Development
                                                        Authority-
                                                                                                                             th
January   MADAGASCAR   LUXCONSULT   Project Director/   IDENTIFICATION OF ROD PROJECTS FINANCABLE UNDER 9 EDFP – TOLIARA AND FIANARANTSOA REGIONS
 2003-                     S.A.      Backstopping       Prefeasibility study including preliminary design, EIA study, Traffic study, Economic study, cost estimates. Identification of
 March                                                  a road programme under the 9th EDF allocated budget (using the elements of the logical framework cycle); preparation of
  2004                                                  project dossier, elements for financial proposal and TOR for detailed engineering study. Cost of works 80 Million Euro
  July     MAURITIUS   LUXCONSULT   Project Director    PHOENIX- NOUVELLE FRANCE SECOND CARRIAGEWAY (16 km). EDF Funded
 1999 –                   S.A. S    / Team Leader       Preliminary, detailed design, EIA study, Traffic study, project dossier / financing proposal based on logical framework,
  2003                                                  tender, tender evaluation, and supervision of civil works including assessment of claims Client: Ministry of Public
                                                        Infrastructure
1996 –     MAURITIUS   LUXCONSULT   Project Director/   INFRASTRUCTURAL DEVELOPMENT OF FREEPORT ZONES AND PORT AT MER ROUGE
 2000                      S.A.     Contract Expert     Feasibility study, masterplan, design, tender (FIDIC), tender evaluation, Supervision of Works for development of Freeport
                                                        zone on a 45 ha plots of land within the port area. Financed by World Bank /Luxembourg Government. Project includes 15
                                                        000 m2 of metallic sheds with handling and storage equipment, 5 km of port roads. Client: Mauritius Freeport Authority
 1992-     MAURITIUS   LUXCONSULT        Project        CRAWLER LANE TO M1 MOTORWAY- PAILLES- REDUIT (8km)
 1995                      S.A.      Director/Team       Feasibility study and detailed engineering study, tender, tender evaluation (FIDIC) and supervision of works for the
                                         Leader         construction of a crawler lane with an emergency lane for an 8 km stretch of the ascending section of M1 Motorway,
                                                        assessment of claims Client: Ministry of Works
 July     LUXEMBOURG   LUXCONSULT      Project          LUXEMBOURG CITY URBAN RING ROAD MOTORWAY- 20 KM
1987 –                     S.A.     Manager/Team        Main Project Features: for an Urban Motorway Ring Road between Gasperich- Cents and Kirchberg with 3 major grade
 1992                                  Leader           separated interchanges and 2 grade separated roundabout (feasibility study, detailed design, tender dossier, assistance in
                                                        supervision of works). Client: Administration des Ponts et Chaussées
 1986-      SUDAN      LUXCONSULT      Project           REHABILITATION AND REVIVAL PLAN FOR DROUGHT STRICKEN AREAS IN AFRICA-
 1987                      S.A.     Manager/ Team       Identification and programming missions to Sudan on behalf of the Commission for various road and rail road projects to
                                       Leader           be financed by the EU Commission in the framework of the Rehabilitation and Revival Plan (RER).Main projects handled:
                                                        Hamadi road bridge, Sonjokaya railway bridge, Kadugli airstrip, and Emergency Bailey bridges. Client: European
                                                        Commission Assessment of Claims for Hamadi Bridge Project
Septemb   BOTSWANA     LUXCONSULT      Project          REHABILITATION AND REVIVAL PLAN FOR DROUGHT STRICKEN AREAS INAFRICA-
er 1986                    S.A.     Manager/ Team       Fact finding mission to identify suitable components eligible to be funded from EDF resources involving. Preparation of
 – June                                Leader           tender dossiers for supplies, invitation to tender, attendance for tender opening session at Gaborone, evaluation of
  1987                                                  tenders, preparation of award contracts. Client: EU Commission
 1985 -   LUXEMBOURG   LUXCONSULT      Project          SOUTHERN MOTORWAY BASCHARAGE- EHLERANGE (13 KM)
  1988                     S.A.      Coordinator/       Feasibility, detailed study, preparation of tender dossier and assistance in supervision of works for the Southern Motorway
                                     Team Leader        – 13 km long with 4 grade separated interchange and two cut and fill tunnels. Client: Administration des Ponts et
                                                        Chaussées




                                                                                                                                                                            Page 3 / 4
                                                                                                                                                                      CV D.HURPAUL
                                                                                                                                                                      Project Director



      1980 -   LUXEMBOURG        LUXCONSULT          Project      EXTENSION OF RUNWAY AND TAXIWAY OF LUXEMBOURG INTERNATIONAL AIRPORT
       1984                          S.A.          Coordinator/   Preliminary and detailed design; supervision of works for extension of 60 m wide runway and 23 m wide taxiway by 1.3 km,
                                                   Team Leader    Apron., 100m length bridge to cover motorway in the radio altimeter operating area before the threshold; runway/taxiway
                                                                  lights, runway threshold and end lights, ILS, PAPI wing bars etc.. Client: Administration de l’Aéroport/ Ponts et Chaussées
14.      Other relevant information (e.g., Publications)




                                                                                                                                                                                   Page 4 / 4

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:173
posted:7/15/2011
language:Turkish
pages:4