NREGA and MOEF DATABASE FOR CONVERGENCE PILOTS UNDER NREGA (District Level) Name of Forest Division (District) Work/ Activity
S. No .
Total time period for convergence: Start date---
End date----
Work/ Activity
(1)
(2) Afforestation Models (a) Plantation i) Aided Natural Regeneration ii) Artificial Regeneration iii) Pasture Development iv) Bamboo Planting v) Planting of Canes vi) Mixed Plantation of trees having .MFP & medicinal value vii) Regeneration of Medicinal Herbs & Shrubs. (b) Fencing i)Dry stone
Physical Location of unit(Hectare works / Kilometre/ CD Blocks G. P. Number) (No.) (No.) (3) (4) (5)
Programme wise Physical & Financial (in lakh rupees) Database of Works taken up under Convergence NREGS NAP Other programme Total (PIA-------------------) (PIA------------------) (PIA---------------------) Physical Financial Physical Financial Physical Financial Physical Financial (6) (7) (8) (9) (10) (11) (12) (13)
1.
Ha. Ha. Ha. Ha. Ha. Ha.
Ha.
Kilometre 1
2.
3.
4.
5.
ii) Ditch cum bund ii)Barbed wire iv)Other type (c) Water conservation/ harvesting i)Contour/ Graded bunding/ Bench Terracing/ Trenching ii)Check Dams ii)Ponds iv)Any other structure v)Desilting/ Renovation of water bodies Irrigation facility in fringe area a) Well b) Field channel Land development in fringe area a)Land levelling b) Reclamation of salt affected land Flood control & protection work including drainage in water logged area Rural connectivity Total cost of convergence
Kilometre Kilometre Kilometre
Hectare
Number Number Number Number
Number Kilometre
Hectare Hectare Hectare
Kilometre
2
3