EXISTING FLOOR PLAN by neolledivine

VIEWS: 63 PAGES: 11

									Specialised Programs and Community Endeavours has established itself in the Kenmore
South Scout hall. The building was originally constructed to accommodate the activities of
the Scouts, and has not been designed to facilitate equitable access.

The existing toilet facilities and septic system needs repair and the current layout makes
it difficult for use by a person in a wheelchair. The deck is small and it difficult to use as a
breakout space.

Currently the hall can only be used for a single activity at any one time.




                                                                                  EXISTING FLOOR PLAN
                                                                                                   17 June 2009
STAGE 1
The existing sanitary facilities will be reconfigured to accommodate an equitable access
facility and the septic system will be upgraded.
New floors will be laid over the existing floor to create a level surface for recreation
activities.
The base shell of the session rooms will be erected ready for fitout.



                                   STAGE 1 - TOILETS AND SESSION ROOMS
                                                                                           17 June 2009
Four session rooms will be added within the structure, and the rooms will open out onto
private reflection gardens, with the retained rock face as the backdrop. The rooms are
designed to facilitate the “Clinic”.




                                                   STAGE 2 - SESSION ROOM FITOUT
                                                                                          17 June 2009
STAGE 3
The existing kitchen will be relocated to function as a servery and an area where cooking
classes can be undertaken. The kitchen will be designed to be wheelchair accessible.
New bifold doors will be installed out onto the existing deck to take advantage of the views
to the creek




                                     STAGE 3 - KITCHEN AND BI FOLD DOORS
                                                                                               17 June 2009
STAGE 4
A reception and waiting area, and covered deck will be added to the existing building.
This stage will require Development Approval from Council.




                                         STAGE 4 - NEW DECK AND RECEPTION
                                                                                         17 June 2009
STAGE 1                                                            STAGE 2
The existing sanitary facilities will be reconfigured to           Four session rooms will be added within the structure,
accommodate an equitable access facility and the septic            and the rooms will open out onto private reflection
system will be upgraded.                                           gardens, with the retained rock face as the backdrop.
New floors will be laid over the existing floor to create a        The rooms are designed to facilitate the “Clinic”.
level surface for recreation activities.
The base shell of the session rooms will be erected ready
for fitout.




STAGE 3
The existing kitchen will be relocated to function as
a servery and an area where cooking classes can
be undertaken. The kitchen will be designed to be                  STAGE 4
wheelchair accessible.                                             A reception and waiting area, and covered deck will
New bifold doors will be installed out onto the existing           be added to the existing building. This stage will
deck to take advantage of the views to the creek                   require Development Approval from Council.


                                                       PROPOSED STAGING OF MAJOR WORKS
                                                                                                               17 June 2009
BRANTON STREET (SOUTH) ELEVATION




CREEK (WEST) ELEVATION




                                   PROPOSED ELEVATIONS
                                                  17 June 2009
REAR (NORTH) ELEVATION




SIDE (EAST) ELEVATION




                         PROPOSED ELEVATIONS
                                        17 June 2009
SITE PLAN
     17 June 2009
CONCEPT SKETCH OF COMPLETED PREMISES
                                17 June 2009
CONCEPTUAL VIEW OF COMPLETED PREMISES
                                 17 June 2009

								