					  OWNER: Environment, Safety and Health                                           BJC-EH-2010                                         REV. NO. 1011

  SUBJECT MATTER AREA: Hazard Assessment                                          PREPARER: TedNicke C. Helms,                        Page 1 of 38
                                                                                  CIHFlynn, CSP

  DOC TYPE: Procedure                                                             CONCURRENCE/DATE: Linda B. Raulston 1/12/09

  If Doc Type is Procedure, identify what type:                                                           [Approval Signature on File]
  Technical                    Emergency
  Alarm Response               Administrative

  TITLE:                                                                          APPROVED BY/DATE: Garry Suenkel 2/9/09
                        HAZARD ASSESSMENT                                                                 [Approval Signature on File]



  USQD                UCD               CAT X              EXEMPT                 EFFECTIVE DATE: 3/10/09

  USQD/UCD/CAT X No: USQD-MS-BJCEH2010-0814, R0                                   REQUIRED REVIEW DATE: 3/10/2012

  Commitment driven revision?                 No             Yes       If yes, provide number (e.g., I/CATS Issue ID): I0069746

  Exhibit L Mandatory Contractor Procedure?                                       If an Interim Procedure, Expiration Date:


                                                                        CONTENTS

PURPOSE ..................................................................................................................................................... 4
SCOPE .......................................................................................................................................................... 4
BACKGROUND .......................................................................................................................................... 5
OTHER DOCUMENTS NEEDED .............................................................................................................. 7
WHAT TO DO ............................................................................................................................................. 7
    A. Hazard Assessment Process............................................................................................................... 7
    B. Hazard Assessment Tools................................................................................................................ 11
    C. Hazard Identification and Controls (BJCF-866)..................................................................................
    C. Work Package Types....................................................................................................................... 11
    D. Minor Maintenance Work (BJCF-789, -789a, and -789b) ..................................................................
    D. Procedures in Lieu of Work Packages............................................................................................. 16
    E. Job Steps, Hazards, and Controls Incorporated Directly into the Work Package ...............................
    E. Risk Analysis Worksheet (BJCF-865) ............................................................................................ 20
    F. Activity Hazard Assessment Process (BJCF-1027).............................................................................
    F. Hazard Identification and Controls Checklist (BJCF-866) ............................................................. 22
    G. Procedures in Lieu of AHA/Job Instructions ......................................................................................
    G. Identification of Environmental Aspects and Controls Checklist (BJCF-1447) ............................. 23
    H. Identification of Environmental Aspects and Controls Checklist (BJCF-1447) .................................
    H. Job Steps, Hazards, and Controls Incorporated Directly into the Work Package or Operations
          Procedure 24
    I. Controlling Hazards.............................................................................................................................
    I. Type 2 or Type 3 Work Authorization Forms (BJCF-789)............................................................. 24
    J. Risk Analysis Worksheet (BJCF-865) ................................................................................................
    J. Activity Hazard Assessment Form (BJCF-1027) ............................................................................ 24
    K. Safety Task Analysis and Risk Reduction Talk (BJCF-856) ..............................................................
    K. Periodic Review and/or Revision to Hazard Assessments .............................................................. 26
    RECORDS
L. ................................................................ Safety Task Analysis and Risk Reduction Talk (BJCF-856)
.................................................................................................................................................................... 26
    SOURCE DOCUMENTS ..........................................................................................................................
RECORDS .................................................................................................................................................. 31
Attachment A DEFINITIONS/ACRONYMS.................................................................................................
SOURCE DOCUMENTS ........................................................................................................................... 31
Attachment B HAZARD ASSESSMENT PROCESS MAP ..........................................................................
Attachment A DEFINITIONS/ACRONYMS ......................................................................................... 32
Attachment C IMPLEMENTATION OF THE STARRT CARD PROCESS ............................................ 37


This document is approved for public
release per review by:

B. B. Marshall                         2/6/09
BJC ETTP Classification &              Date
Information Control Office
OWNER: Environment, Safety and Health                                                               BJC-EH-2010
TITLE:                                                                                              REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                                    Page 3 of 38




                                                    REVISION LOG
  Revision                                       Description of Changes                                      Pages Affected
  Number
     11        Intent changes throughout to align procedure with BJC Work Control Process (BJC-FS-1001).            All
               Updated linked forms to this procedure impacted by procedure revision.
     10        Intent changes throughout to align procedure with the Hazard Assessment Process Map.                 All
               Added environmental aspects/impacts and a new form (BJCF-1447). Also updated other
               linked forms to this procedure to reflect improvements identified from worker feedback and
               Lessons Learned.
      9        Non-intent Change.                                                                                   12
               Added clarification to STARRT Card Process, Attachment B, page 1 of 5, Section 2.0, step 2.
      8        Intent Change.

               What to do - Changed last sentence into a note.                                                      3
               A-1, bullet 2 - removed sub-bullet 1                                                                 4
               B-1 - Added Notes 1 & 2 pertaining to AHA development and Work Control Process                       5
               B-5 - Expanded to address generic AHAs                                                               5
               B-6 - Added the term “job specific and unique”                                                       6
               B-11 - Added “This is normally done during the pre-job briefing”                                     6
               B-13 – Added “either at or convenient to” and “during the pre job briefing”                          7
               B-14 - Replaced “in the AHA” with “by the work package”                                              7
               B-15 - Replaced “and” with “or”                                                                      7
               B-16 – Added “and work package are” and “(unless the revision would constitute an intent             7
               change to the work package)”.
               Made clarifications in Attachment B.                                                          Attachment B
               Removed example forms from attachments.                                                       Attachments

      7        Intent Change.
               Included form number for Activity Hazard Assessment Form.                                           2
               Removed references to Turbo Activity Hazard Assessment in Purpose; part of Note 1 and step      2, 3, 4, 9
               5 under Section B regarding Turbo AHA, and Definitions.
               Revised step B.7 to make the governing procedure and AHA development programs                        8
               consistent.
               Updated Attachment B for clarification and to bring into alignment with current process.            10-13
               Revised Attachment C to simplify the guidance, added two process flow diagrams that depict          14-17
               the STARRT process in general and for supervisors/workers.
               General clarifications throughout.                                                                   All

      6        Intent Change.
               Updated scope to apply to subcontractors as well as BJC.                                           2-6
               Attachment C - changed time frame cards are to be tracked.                                    Attachment C

      5        Non-Intent Change.                                                                                   14
               Revised text to clarify how STARRT Cards are revised Attachment-C.
OWNER: Environment, Safety and Health                                                       BJC-EH-2010
TITLE:                                                                                      REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                            Page 4 of 38




PURPOSE                    This procedure provides a process for establishment of a graded approach to
                           systematically review planned work to identify the associated hazards,
                           significant environmental aspects, and preventive measures to control those
                           hazards and aspects for protection of personnel, the public, and the
                           environment. Refer to Attachment A for the definition of “hazards”.
                           The primary means of communicating specific hazards and controls critical to
                           safe performance of work in the field is the work control process. The hazard
                           assessment process is a key function of work control and requires worker input
                           to ensure its success. Worker involvement in the hazard assessment process
                           assures that hazards are identified by workers who will perform the work, and
                           that controls to mitigate the hazards are tailored to the work at the activity level.

SCOPE                      This procedure applies to all Bechtel Jacobs Company LLC (BJC) self-
                           performed and subcontractor work activities at all tiers supporting the BJC
                           scope of work.

                           For work involving nuclear criticality/facility safety hazards and Safety Basis
                           Documentation, refer to BJC-NS-1003, Nuclear Criticality Safety Program;
                           BJC-NS-1001, Unreviewed Safety Question Determinations for Nuclear
                           Category 2 & 3 Facilities; and BJC-NS-1008, Unreviewed Change
                           Determinations for Radiological and Non-Nuclear Facilities. Work activities
                           must be in conformance with the applicable Safety Basis Documentation.
                           This procedure establishes a graded approach to systematically review planned
                           work to identify the associated hazards, significant environmental aspects, and
                           develop preventive measures to control those hazards and aspects for protection
                           of personnel, the public, and the environment. Refer to Attachment A for the
                           definition of “hazards.”

BACKGROUNDSC               A hazard assessment process must be used to identify potential hazards and
OPE                        establish controls once a Scope of Work is developed per BJC-FS-1001, Work
                           Control Process, and documented on BJCF-844, Work Request/Work Package
                           Cover Sheet. A graded approach, based on work complexity and potential
                           hazards involved, must be used. Where multiple error precursors are or
                           reasonably could be present (e.g., first time or infrequent tasks, new tools or
                           methods, etc.), consideration should be given to use of more than one hazard
                           assessment tool. Refer to Section B.1 of thisThis procedure.

                           A hazard assessment process is required for new or non-routine field applies to
                           all Bechtel Jacobs Company LLC (BJC) self-performed and subcontractor work
                           activities where:at all tiers supporting the BJC scope of work.

                           Work could involve potential for injury, illness, or property damage,
                           environmental noncompliance or environmental impact.For work involving
                           nuclear criticality/facility safety hazards and Safety Basis Documentation, refer
                           to BJC-NS-1003, Nuclear Criticality Safety Program; BJC-NS-1001,
                           Unreviewed Safety Question Determinations for Nuclear Category 2 & 3
                           Facilities; and BJC-NS-1008, Unreviewed Change Determinations for
                           Radiological and Non-Nuclear Facilities. Work activities must be in
                           compliance with the applicable Safety Basis Documentation.
                               • Work may involve new equipment, processes, or hazards not previously
                                    addressed.

                           Attachment B, Hazard Assessment Process Map, provides the necessary steps
OWNER: Environment, Safety and Health                                                      BJC-EH-2010
TITLE:                                                                                     REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                           Page 5 of 38


                           and individuals/teams involved in conducting a hazard assessment.

OTHER                      •   The hazard assessment process shall be used to identify potential hazards
DOCUMENTS                      and environmental aspects, and establish controls once a Scope of Work is
NEEDED                         developed per BJC-FS-1001, Work Control Process
BACKGROUND                 • BJCF-789, Work Authorization Form
                           • BJCF-789a, Instructions for Completing BJCF-789 Work Authorization
                               Form
                           • BJCF-789b, Minor Maintenance Work Activities for Work on Non-Safety
                               Class Structures, Systems and Components (SSC)
                           BJCF-844, and documented on BJCF-844, Work Request/Work Package Cover
                           Sheet. A graded approach, based on work complexity and potential hazards
                           involved, shall be used. Where multiple error precursors are, or reasonably
                           could be present (e.g., first time or infrequent tasks, new tools or methods, etc.),
                           consideration should be given to use of more than one hazard assessment tool.
                           Refer to Section B of this procedure.
                           • BJCF-856, Safety Task Analysis and Risk Reduction Talk (STARRT) Card
                           • BJCF-865, Risk Analysis Worksheet
                           • BJCF-866, Hazard Identification and Controls
                           • BJCF-1027, Activity Hazard Assessment
                           • BJCF-1447, Identification of Environmental Aspects and Controls
                               Checklist
OWNER: Environment, Safety and Health                                                    BJC-EH-2010
TITLE:                                                                                   REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                         Page 6 of 38




                           The hazard assessment process is required for all field work activities where:

                               •    Work could involve potential for injury, illness, or property damage,
                                    environmental noncompliance or environmental impact.
                               •    Work may involve new equipment, processes, or hazards not previously
                                    addressed.
OWNER: Environment, Safety and Health                                                    BJC-EH-2010
TITLE:                                                                                   REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                         Page 7 of 38




                           General hazards (e.g., slips, trips and falls, insect stings, protection of storm
                           drains, etc.) and controls, including general site safety requirements,
                           Environmental, Compliance and Protection (EC&P) requirements, and best
                           management practices should be documented on an Activity Hazard
                           Assessment form (BJCF-1027). Unless special emphasis is warranted based on
                           the specific job task, these need not be repeated throughout an approved work
                           package or operations procedure. Other examples of sources of general hazards
                           and controls could include a Construction Safety and Health Plan, a site-
                           specific Health and Safety Plan, the BJC Safety and Health Handbook
                           (BJC/OR-2057), and/or the EC&P Awareness Handbook (BJC/OR-2181).

OTHER                      •   BJC-FS-1001, Work Control Process
DOCUMENTS                  •   BJCF-785, Job Instructions
NEEDED                     •   BJCF-789, Type 2 or Type 3 Work Authorization Form
                           •   BJCF-844, Work Request/Work Package Cover Sheet
                           •   BJCF-856, Safety Task Analysis and Risk Reduction Talk (STARRT) Card
                           •   BJCF-865, Risk Analysis Worksheet
                           •   BJCF-866, Hazard Identification and Controls Checklist
                           •   BJCF-1027, Activity Hazard Assessment Form
                           •   BJCF-1447, Identification of Environmental Aspects and Controls
                               Checklist

WHAT TO DO                 A. Hazard Assessment Process

                           NOTE: Select a representative number of experienced workers or workers
                                 familiar with the specific steps of the planned work to participate on
                                 the Hazard ReviewWork Planning Team. Other potential participants
                                 may include a supervisor, Facility Manager, Project Environment,
                                 Safety and Health (ES&H) Representative, Engineering, Fire
                                 Protection, Nuclear Facility Safety (NFS), Quality Assurance, etc. A
                                 representative of the BJC Radiological Control Organization should
                                 be included if the work will be performed in a Radiologically posted
                                 area or may deal with radioactive material or material that may be
                                 contaminated with radioactive material. Project Environmental
                                 Compliance and Protection and Industrial Hygiene may also be
                                 members of the work planning review team.

    Work Planner/          1. Assemble a Hazard ReviewWork Planning Team to assist in the hazard
    Supervisor/               assessment process.
    Procedure Author

    Work Planning          2. IF work is going to be performed in a radiologically posted area or may
    Team                      deal with radioactive material or may deal with material that may be
                              contaminated with radioactive material, THEN
                                 include a representative of the BJC Radiological Control Organization
                                 on the team.
                           2. Review the Scope of Work for the selected activity.

    Hazard Review          3. Review the Scope of Work for the selected activity to become familiar with
    Team                      the conditions under which the activity is to be performed.
                           NOTE: Consider “mobilization” and “demobilization” activities and
                                    associated activities (e.g., preparation of laydown or work area)
OWNER: Environment, Safety and Health                                                  BJC-EH-2010
TITLE:                                                                                 REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                       Page 8 of 38


                                        during the walkdown.

                           4. Determine the appropriate hazard assessment tool(s) to be used that will
                              best address the identification of applicable work steps, hazards, and
                              establishment of controls as discussed in Section B of this procedure.
                           3. Perform a walkdown, as necessary, of the work location to evaluate
                              conditions under which the work activity is to be performed.
OWNER: Environment, Safety and Health                                                  BJC-EH-2010
TITLE:                                                                                 REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                       Page 9 of 38




                           NOTE: Consider “mobilization” and “demobilization” activities and
                                 associated activities during the walkdown.
                           NOTE: Selection of the appropriate work control documents used must be
                                 based on the type of work package and/or scope of the operations
                                 procedure(s) that will be implemented to perform the work. In
                                 accordance with BJC-FS-1001, Work Control Process, a three tiered
                                 approach for work planning, BJC work packages are Type 1, Type 2
                                 or Type 3 depending upon the hazards associated with the work, and
                                 the severity of the consequences.

    Supervisor/Task        5. Visit the work location to become familiar with the site environment.
    Lead/Work              4. Determine work control document (i.e., approved work package or
    Planner                   operations procedure) that will be used to perform the work (see Sections C
                              and D).
    Supervisor,            7. Suspend and/or stop the work activity if hazards, which have not been
    Project ES&H,             previously evaluated, are introduced or if conditions change that require
    and Facility              further evaluation.
    Manager                5. WHEN the job steps, hazards, and controls are directly incorporated into
                              the Job Instructions of the WP, THEN
                                  approval of the WP will constitute review and approval of the hazard
                                  assessment process. This includes all documented tools used (e.g.,
                                  AHA, Hazard Identification and Controls, Risk Analysis Worksheet).

    Work Planning          8. Conduct an evaluation and if necessary, revise the applicable Job
    Team                      Instructions in the Work Package (WP), separate Activity Hazard
                              Assessment (AHA) and/or Safety Task and Risk Reduction Talk
                              (STARRT), if applicable.
                           6. Determine the appropriate hazard assessment tool(s) to be used that will
                              best address the identification of applicable work steps, hazards, and
                              establishment of controls as discussed in the following sections of this
                              procedure.

                           7. Communicate to the affected workers changes made to the Job Instructions,
                              separate AHA, and/or STARRT Card, as applicable, prior to resuming
                              work.Identify hazards and controls for the job steps required to perform the
                              work. Assess location-specific hazards (e.g., elevated work, specific
                              contaminants, etc.) as part of the hazard assessment process and work scope
                              definition.
OWNER: Environment, Safety and Health                                                    BJC-EH-2010
TITLE:                                                                                   REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                         Page 10 of 38




                           B. Hazard Assessment Tools
                           8. IF a hazard involving chemicals has been identified, THEN the applicable
                              Material Safety Data Sheet(s) must be made available to the workers prior
                              to beginning work, and the workers must be trained in the appropriate use,
                              management, and response to spills or other emergencies associated with
                              the chemical(s).
                           9.
    Hazard Review          8. Conduct a hazard assessment in accordance with the functions and
    Team                      principles of Integrated Safety Management System (ISMS)/Environmental
                              Management System. Depending on the complexity and risk of the work,
                              the hazard assessment process must be performed using one or more of the
                              following assessment tools:Document any task-specific hazards, critical
                              steps, and/or environmental aspects pertaining to the job steps.
                           Hazard Identification andNOTE:          Elimination or control of a hazard must
                                    be implemented according to the following order of precedence:

                               •    Elimination of the hazard (i.e., remove the hazard).
                               •    Substitution (use less hazardous processes, equipment, chemicals, etc.).
                               •    Engineering Methods (e.g., make design changes and/or use
                                    engineering controls to eliminate or reduce the hazard).
                               •    Administrative Controls (BJCF-866)
                               •    Low Risk Minor Maintenance Work Packages (BJCF-789, 789a, 789b)
                               •    Job steps,procedures, permits, training, or other appropriate methods to
                                    control potential hazards, and controls incorporated directly into the
                                    WP).
                               •    AHA (BJCF-1027)
                               •    Procedures in lieu of AHA/Job Instructions
                               •    Identification of Environmental Aspects and Controls Checklist (BJCF-
                                    1447)
                               •    Risk Analysis Worksheet (BJCF-865)
                               •    STARRT Card (STARRT; BJCF-856)
                               •    Personal Protective Equipment (PPE). Use as a last resort to protect
                                    personnel from unmitigated hazards through the use of prescribed PPE.
OWNER: Environment, Safety and Health                                                   BJC-EH-2010
TITLE:                                                                                  REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                        Page 11 of 38




Supervisor, Project        9. When the job steps, hazards, and controls are directly incorporated into the
ES&H, and Facility            Job Instructions of the WP, approval of the WP will constitute review and
Manager                       approval of the hazard assessment process. This includes all documented
                              tools used (e.g., AHA, Hazard Identification and Controls, Risk Analysis
                              Worksheet).
                           9. Consult the Project ES&H Representative to assist in hazard identification
                              and determination of adequate controls to protect workers and the
                              environment.

                           C. Hazard Identification and Controls (BJCF-866)
                           B. Hazard Assessment Tools

    Work Planning          NOTE: Use of the BJCF-866 form is optional. It is designed to be used as a
    Team                            tool during the planning stages of work for the identification of
                                    hazards and controls associated with the Scope of Work.
                           1. Conduct a hazard assessment for the planned work activity. Depending on
                              the complexity and risk of the work, the hazard assessment process must be
                              performed, and documented using one or more of the following tools:

    Hazard Review          1. Include the appropriate workers, supervisor, Project ES&H Discipline
    Team                      Leads, Facility Manager, and other technical discipline personnel to
                              effectively identify existing and potential hazards and controls.
                              Screening Tools

                               •    Risk Analysis Worksheet (BJCF-865)
                               •    Hazard Identification and Controls Checklist (BJCF-866)
                               •    Identification of Environmental Aspects and Controls Checklist
                                    (BJCF-1447)

                               Documentation Tools

                               •    Job Instructions (BJCF-785 or a standardized Word format approved by
                                    the Project)
                               •    Type 2 or Type 3 Work Authorization (BJCF-789), Hazard Assessment
                                    (Sections 9 thru 13), Identification of Hazard and Environmental
                                    Controls (Sections 17 thru 31)
                               •    AHA Form (BJCF-1027)

                           NOTE: If the work is deemed high risk and the Risk Analysis Worksheet tool
                                  is to be used, consider completing BJCF-866 as an aid in this process.
                           C. Work Package Types

                           2. Use BJCF-866 to aid in identifying applicable requirements for inclusion in
                              contracts for subcontracted work.
                           NOTE 1: Due to the varied nature of the work, a three tiered approach is used
                                      for BJC work planning to ensure that hazards and controls are
                                      properly identified and implemented. Work planning, including the
                                      hazard assessment process, is documented in an approved work
                                      package. This document contains the job steps required to perform
                                      the work, identified hazards associated with the work, and controls
                                      to eliminate, reduce or mitigate those hazards for protection of the
                                      workers, the public, and the environment.
OWNER: Environment, Safety and Health                                                   BJC-EH-2010
TITLE:                                                                                  REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                        Page 12 of 38




                           D. Minor Maintenance Work (BJCF-789, -789a, and -789b)
                           NOTE 2: Using the three tiered approach, work package types are based on
                                   the severity of consequences due to unmitigated hazards, i.e., as the
                                   severity increases, the level of hazard control and management
                                   approval increases (see C.2, Table 1). BJC-FS-1001, Work Control
                                   Process provides a detailed description of the work planning
                                   process.

    Senior Work            For Maintenance activities in which the work is repetitive in nature, the risks
    Control Lead           are minimal, and the workers are trained in the tasks they perform, BJCF-789,
                           Work Authorization Form; BJCF-789a, Instructions for Completing BJCF-789
                           Work Authorization Form; and BJCF-789b, Minor Maintenance Work
                           Activities for Work on Non-Safety Class Structures, Systems and Components,
                           may be used in accordance with BJC-FS-1001, Work Control Process.
                           NOTE 3: Proceed to Section D if an approved operations procedure will be
                                        used to perform the work.
OWNER: Environment, Safety and Health                                                   BJC-EH-2010
TITLE:                                                                                  REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                        Page 13 of 38




    Supervisor, Work       E.   Job Steps, Hazards, and Controls Incorporated Directly into the
    Planning Team               Work Package
                           1. Identify the need for any permits (e.g., confined space entry, Radiological
                              Work Permit [RWP], hot work, excavation/penetration, lockout/tagout,
                              environmental, etc.).
 OWNER: Environment, Safety and Health                                                          BJC-EH-2010
 TITLE:                                                                                         REV. NO. 10
                                    HAZARD ASSESSMENT
                                                                                                Page 14 of 38




                            NOTE: Incorporating job steps, hazards, and controls directly into the WP is
                                     preferable to development of a separate AHA (BJCF-1027). A
                                     separate AHA is not required when the steps, hazards, and controls
                                     are already identified in the Job Instructions.
                            2. Determine work package type to be used (see Table 1).
     Hazard Review          1. Identify the individual steps of the activity as they are defined in Job
     Team                      Instructions contained in the WP. IF necessary, THEN
                                EITHER
                                   observe the actual performance of a similar activity
                                   OR
                                   discuss the activity in detail with knowledgeable personnel that will be
                                   performing the tasks.

                            2. Identify hazards associated with the work per the second function of ISMS,
                               "Analyze Hazards."

                            NOTE: General hazards and controls, including repetitive hazards and
                                  controls that are applicable to work in the facility, need not to be
                                  repeated in the Job Instructions contained in the WP.

                            3. Incorporate applicable hazards and controls directly into and align with the
                               corresponding work steps of the activity in a clear and consistent manner.


                                                      Table 1.
                                                                                                       Useful
Work Package                                                              Useful Hazard
                                   Description                                                     Documentation
   Type                                                                  Assessment Tools
                                                                                                        Tools
     Type 1      A comprehensive work package used for work          • Risk Analysis              • BJCF-785, Job
                 that is of the highest consequence, involves a         Worksheet (BJCF-865)         Instructions
                 wide variety of technical input, or may require a   • Hazard Identification      • BJCF-1027,
                 high degree of control to safely accomplish the       and Controls                  Activity
                 task. A more comprehensive hazard assessment          (BJCF-866) form.              Hazard
                 is required due to the potential consequences of    • Identification of             Assessment
                 the hazards associated with the work.                 Environmental Aspects         (AHA) Form
                                                                       and Controls Checklist
                                                                       (BJCF-1447)

     Type 2      A work package for simple work requiring extra • Hazard Identification           • BJCF-789,
                 instructions or permits to perform the work        and Controls                    Type 2 or 3
                 safely. Consequences of the hazards in this        (BJCF-866) form.                Work
                 work package are significant, but not as serious • Identification of               Authorization
                 as those of a Type 1 work Package.                 Environmental Aspects           Form
                                                                    and Controls Checklist        • BJCF-785, Job
                                                                    (BJCF-1447)                     Instructions

   Type 3        A work package for the most simple work that        • Hazard Identification      • BJCF-789,
                 is performed, and is restricted to scope that may      and Controls                  Type 2 or 3
                 be performed when the work:                            (BJCF-866) form.              Work
                                                                                                      Authorization
                 • Will not expose workers to hazards at the                                          Form
                   work location that are not associated with
                   the job.
                 • Will not require PPE beyond standard
OWNER: Environment, Safety and Health                                BJC-EH-2010
TITLE:                                                               REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                     Page 15 of 38


                    project requirements (e.g., safety glasses,
                    hard hat, gloves, safety shoes, ear plugs, and
                    high visibility vest, and non-high risk
                    radiological work PPE).
                •   Will not expose bystanders or passersby to
                    job hazards.
                •   Will not present conditions where
                    consequences require special permitting
                    [e.g., high-risk confined space; radiological
                    work permit (RWP) for high risk
                    radiological work; lockout/Tagout),
                    potentially affect a system/feature identified
                    as a configured item.
                •   Will not jeopardize compliance with nuclear
                    safety or environmental compliance
                    requirements.
                •   Will not breach the containment boundary of
                    a system.
OWNER: Environment, Safety and Health                                                   BJC-EH-2010
TITLE:                                                                                  REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                        Page 16 of 38




                           4. Document any job-specific, unique hazards and/or environmental aspects
                              pertaining to the work steps of the activity into the Job Instructions.
                           D. Procedures in Lieu of Work Packages

                           NOTE: If a new hazard or control prompts a revision to the Job Instructions,
                                 then proceed in accordance with BJC-FS-1001, Work Control
                                 Process.
                           NOTE: At no time shall the AHA form (BJCF-1027) be used as a stand-alone
                                 work control document.

    Work Planning          5. IF itan approved operations procedure is determined that a separate AHA is
    Team                      to be useddeveloped in lieu of a work package, THEN
                           1. the work procedure must adequately identify job steps, as defined in
                              hazards, and controls (refer to BJC-PQ-1107, Performance Document
                              Process) within the Job Instructions, must be reflected
                              accordinglyprocedure or document the hazards and controls on an AHA
                              form (BJCF-1027) that is used in conjunction with the AHAprocedure.
                           2.
                           F. Activity Hazard Assessment Process (BJCF-1027)

                           NOTE: At no time shall the results of an AHA process be used as a stand-
                                 alone work control document.

                           The AHA process is designed to assist the Hazard Review Team in the
                           identification, assessment, and control of hazards, including environmental
                           aspects. The process also provides a graded approach to manage the risk and
                           complexity of work. Results of the AHA process may be documented directly
                           in the Job Instructions of the WP or, in unique situations, on a separate AHA
                           form (BJCF-1027). Incorporating job steps, hazards, and controls directly into
                           the WP is preferred, and a separate AHA (BJCF-1027) is not required when the
                           job steps, hazards, and controls are already identified in the Job Instructions.
OWNER: Environment, Safety and Health                                                    BJC-EH-2010
TITLE:                                                                                   REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                         Page 17 of 38




    Hazard Review          1. Contact Project Engineering for work involving new equipment or
    Team                      processes.

                           NOTE: General hazards and controls, including general site safety
                                 requirements, Environmental, Compliance and Protection (EC&P)
                                 requirements, and best management practices need not be repeated in
                                 the AHA unless emphasis is warranted based on the specific job task.
                                 Example sources of general hazards and controls could include a
                                 general AHA, Construction Safety and Health Plan, Health and Safety
                                 Plan, BJC Safety and Health Handbook (BJC/OR-2057), and/or the
                                 EC&P Awareness Handbook (BJC/OR-2181).

    AHA Author(s)          2. IF completing an AHA (BJCF-1027), THEN
                                 ensure the form reflects the equivalent job steps provided in the Job
                                 Instructions contained in the WP.

                           3. IF possible, THEN
                              EITHER
                                 observe the actual performance of a similar activity
                                 OR
                                 discuss the activity in detail with knowledgeable workers that have or
                                 will be performing the tasks.

                           4. Assess location-specific hazards (e.g., heights, specific contaminants, etc.)
                              as part of the AHA process and work scope definition.

                           NOTE: Frequency established for the periodic review should be based on the
                                 risk and complexity of work with consideration given to more
                                 frequent reviews for higher risk activities. Refer to BJC-FS-1001 for
                                 more detailed information.

                           5. Establish and document a minimum frequency for periodic review and
                              discussion of the AHA with workers in BJCF-1027 to solicit feedback and
                              maintain accuracy.

                           6. Document any task-specific hazards, critical steps, and/or environmental
                              aspects pertaining to the job steps in the AHA.

                               a. IF a new hazard or control prompts a revision to the AHA, THEN
                                     proceed in accordance with BJC-FS-1001, Work Control Process.

    Supervisor,            7. Prior to start of work, discuss the completed AHA with the affected workers
    Project ES&H,             and revise it, as appropriate, based on these discussions. This can be
    AHA Author(s)             accomplished during the pre-job briefing.

                           8. List the worker's names on the AHA, and request they sign or initial the
                              AHA, indicating they have been briefed on its content, or have workers sign
                              an attendance sheet at the time of the pre-job briefing.
OWNER: Environment, Safety and Health                                                    BJC-EH-2010
TITLE:                                                                                   REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                         Page 18 of 38




    Subcontractors         9. Comply with BJC-FS-1001, Work Control Process, for changes involving
                              job steps, hazards, and controls that are directly incorporated into the WP
                              Job Instructions or AHA.

                           NOTE: Contractor’s Project ES&H Representative will review such
                                 documents submitted by the Subcontractor for compliance with
                                 ES&H requirements of the subcontract. This review shall not
                                 constitute a change and shall not relieve the Subcontractor of any
                                 contractual obligation.

                           10. Submit new AHAs that are not directly incorporated into the WP Job
                               Instructions to the BJC Subcontract Coordinator (SCC).

                           NOTE: BJC reserves the right to review or obtain copies of revised AHAs
                                 from the Subcontractor upon request.

                           11. Verbally notify the BJC SCC and Project ES&H Representative of
                               revisions to existing AHAs (separate from WP Job Instructions).

                           G.    Procedures in Lieu of AHA/Job Instructions

    Hazard Review          Procedures may be developed in lieu of AHAs and Job Instructions provided
    Team                   those procedures adequately identify job steps, hazards, and controls (refer to
                           BJC-FS-1001, Work Control Process, Scope Section).

                           H.    Identification of Environmental Aspects and Controls Checklist
                                 (BJCF-1447)

                           NOTE: BJCF-789 is used for Minor Maintenance WPs. BJCF-1447 is not
                                 required for Minor Maintenance WPs or AHAs where the Project
                                 EC&P Representative has determined that the work activity does not
                                 have any significant environmental aspects (e.g., when the EC&P
                                 Representative has determined that he/she does not need to be
                                 involved in the Work Planning Team in accordance with BJC-FS-
                                 1001).

    Project EC&P           12. Use BJCF-1447, Identification of Environmental Aspects and Controls
    Representative or          Checklist, to identify environmental aspects and controls that need to be
    designee                   addressed in the AHA and/or WP to reduce, mitigate, or eliminate
                               environmental impacts. Except as indicated in the NOTE above, the Project
                               EC&P Representative or designee shall complete the checklist for each
                               developed AHA or WP and provide it to the supervisor and the work
                               planner for incorporation of the environmental aspects and controls into the
                               AHA and/or WP.

    Supervisor,            13. Include all significant environmental aspects and associated controls in the
    Project ES&H,              applicable steps of the AHA or WP Job Instructions.
    AHA Author(s)
OWNER: Environment, Safety and Health                                                        BJC-EH-2010
TITLE:                                                                                       REV. NO. 10
                                     HAZARD ASSESSMENT
                                                                                             Page 19 of 38




                           I.       Controlling Hazards

                           NOTE: Elimination or control of a hazard must be implemented according to
                                 the following order of precedence:

                                •     Elimination of the hazard (i.e., remove the hazard).
                                •     Substitution (use less hazardous processes, equipment, chemicals, etc.).
                                •     Engineering Methods (e.g., make design changes and/or use
                                      engineering controls to eliminate or reduce the hazard).
                                •     Administrative Controls (procedures, permits, training, or other
                                      appropriate methods to control potential hazards).
                                •     Personal Protective Equipment (PPE). Use as a last resort to protect
                                      personnel from residual risks through the use of prescribed PPE.

    Supervisor,            3. Consult the Project ES&H Representative to assist in hazard identification
    Hazard Review             and determination of adequate controls to protect workers and the
    Team                      environment.

                           4. Identify the need for any permits (e.g., confined space entry, Radiological
                              Work Permit [RWP], hotwork, excavation/penetration, lockout/tagout,
                              environmental, etc.).

                           5. Each hazard must have a corresponding control and some hazards may have
                              more than one control. IF a hazard involving chemicals has been
                              identified, THEN
                                 the applicable Material Safety Data Sheet(s) must be made available to
                                 the workers prior to beginning work, and the workers must be trained in
                                 the appropriate use, management, and response to spills or other
                                 emergencies associated with the chemical(s).

                           6. Review and revise (as necessary) the hazard assessment and STARRT
                              Card, as required:

                                •       If the scope of work or method of accomplishment changes.
                                •       Following any accident/incident/environmental release.
                                •       If site conditions change.
                                •       If additional hazards or changes in the controls for existing hazards are
                                        identified.

                           7. Upon completion of the work activity, obtain feedback from workers and
                              communicate appropriate lessons learned during the post-job briefing. Any
                              lessons learned from the work activity shall be documented on the
                              STARRT Card for possible processing into the BJC Lessons Learned
                              Program.
OWNER: Environment, Safety and Health                                                     BJC-EH-2010
TITLE:                                                                                    REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                          Page 20 of 38




                           E. Risk Analysis Worksheet (BJCF-865)

                           NOTE: The Risk Analysis Worksheet (BJCF-865) is an optional screening
                                 tool that can be used to determine the degree to which a more in-
                                 depth assessment is needed of projects, operations, or facilities with
                                 high risk work activities that may involve unmitigated hazards or
                                 unmitigated environmental aspects/impacts. It can be used to rank
                                 hazards, identify methods to reduce the probability and severity of
                                 hazards, and to determine if a higher level of senior management
                                 involvement/approval is necessary. However,Completion of the Risk
                                 Analysis (BJCF-865) does not take the place of performing the
                                 AHAhazard assessment process., or properly documenting results of
                                 the process in work control documents.

                                        If the work is deemed high risk and the Risk Analysis Worksheet is to
                                        be used, then consider completing first the BJCF-866, Hazard
                                        Identification and Controls, form as an aid to this process.

    Hazard Review          1. Review the scope of work associated with the project, operation, or facility.
    TeamWork
    Planning Team
                           2. Review historical data to identify potential environmental compliance
                              issues, potential physical hazards, chemical and/or radiological
                              contaminants, accident or incident data, previous assessment data, and
                              lessons learned that would be applicable to the project, operation, or
                              facility.

                           3. Review existing design documents and any revised or new design
                              documents related to the facility or site.

                           NOTE: If the work is deemed high risk and the Risk Analysis Worksheet is to
                                    be used, consider completing first the BJCF-866, Hazard
                                    Identification and Controls, form as an aid to this process.
                           4. Use the Risk Analysis Worksheet (BJCF-865) to assist in screening planned
                              high risk work activities, as defined in this procedure.

                           1. Use of the Risk Analysis Worksheet (BJCF-865) to assist in screening
                              planned high risk work activities, as defined in this procedure, is
                              recommended.
                           5. Use the following steps to conduct a risk analysis of the identified hazards
                              and to develop actions/controls to eliminate or mitigate hazards.

                           2. Use the following steps to conduct a risk analysis of the identified hazards
                              and to develop actions/controls to eliminate or mitigate hazards.
                              a. List each of the identified hazards and environmental aspects on the
                                  Risk Analysis Worksheet (BJCF-865), using Table 1 of the form.

                               b. List each of the identified hazards and environmental aspects on the
                                  Risk Analysis Worksheet (BJCF-865), Table 1.
OWNER: Environment, Safety and Health                                                    BJC-EH-2010
TITLE:                                                                                   REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                         Page 21 of 38




                           NOTE: The Risk Assessment Code (RAC) is an internal code used by this
                                 procedure to facilitate determining level of senior management
                                 approval and risk acceptance. It is unrelated to facility classification
                                 categories.

                               b. Determine the initial RAC (i.e., Hazard Severity + Hazard Probability)
                                  using Tables 2 and 3 of the form (BJCF-865).

                               c. Identify mitigating actions/controls for each hazard that will eliminate,
                                  reduce, or abate the hazard.

                               d. Contact NFS personnel, as needed, for guidance on Safety Basis
                                  Documentation options and any expanded review and approval
                                  requirements.
OWNER: Environment, Safety and Health                                                   BJC-EH-2010
TITLE:                                                                                  REV. NO. 10
                                    HAZARD ASSESSMENT
                                                                                        Page 22 of 38




                               e. ForContact the Facility Manager, for work that is to be performed
                                  within a facility, contact the Facility Manager prior to performing work
                                  to determine the Safety Basis Documentation and/or ES&H
                                  requirements applicable to that facility.

                               f.   DetermineUse Table 4 of the form (BJCF-865) to determine a final
                                    RAC based on the implementation of actions to eliminate or mitigate
                                    the hazards by using Table 4 (BJCF-865).

                               g. DetermineUse Table 1 of the form (BJCF-865) to determine final level
                                  of senior management approval and risk acceptance authority using
                                  Table 1 in BJCF-865. .

                           F. Hazard Identification and Controls Checklist (BJCF-866)

                           NOTE: The BJCF-866 form is designed to be used as a screening tool during
                                 the planning stages of work for the identification of hazards and
                                 controls associated with the Scope of Work.

    Work Planning          1. Include the appropriate workers, supervisor, Project ES&H Discipline
    Team                      representatives, Facility Manager, and other technical discipline personnel
                              to effectively identify existing and potential hazards and controls.

                           2. Use BJCF-866 to aid in identifying applicable requirements for inclusion in
                              contracts for subcontracted work.
OWNER: Environment, Safety and Health                                                   BJC-EH-2010
TITLE:                                                                                  REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                        Page 23 of 38




                           G. Identification of Environmental Aspects and Controls Checklist
                              (BJCF-1447)

                           NOTE 1: The BJCF-1447 is used to document environmental aspects and
                                   controls for Type 1 work packages unless the Project EC&P
                                   Representative has determined that the work does not have any
                                   significant environmental aspects (e.g., when the EC&P
                                   Representative has determined that he/she does not need to be
                                   involved in the Work Planning Team in accordance with
                                   BJC-FS-1001).

                           NOTE 2: The BJCF-1447 is not required, but can be used for Type 2 work
                                   packages, along with BJCF-789, when the work has significant
                                   environmental aspects as determined by the EC&P Representative
                                   supporting the Work Planning Team.

                                        If a BJCF-1447 is used with a Type 2 work package on a
                                        BJCF-789, then it must be included in the WP and Sections 10 and
                                        20 of the BJCF-789 must also be completed. For example, check
                                        “Other” and reference the attached BJCF-1447 form.

                                        If a BJCF-1447 is used with a Type 2 work package on a BJCF-
                                        785, then the environmental aspects and controls must be included
                                        in the WP.

                           NOTE 3: The BJCF-1447 is not required for Type 3 work packages.

    Project EC&P           1. Use BJCF-1447, Identification of Environmental Aspects and Controls
    Representative or         Checklist, to identify environmental aspects and controls that need to be
    designee                  addressed in an approved work package or operations procedure to reduce,
                              mitigate, or eliminate environmental impacts. Except as indicated in the
                              NOTES above, the Project EC&P Representative or designee shall
                              participate in the work package development, complete the checklist, and
                              provide it to the supervisor, work planner, and/or AHA author(s) for
                              incorporation of the environmental aspects and controls into the work
                              control documents.

    Work Planner,          2. Include all significant environmental aspects and controls in the applicable
    Project EC&P              work control documents.

                           3. Ensure every identified environmental aspect has a control identified to
                              reduce, mitigate or eliminate environmental impacts.
OWNER: Environment, Safety and Health                                                   BJC-EH-2010
TITLE:                                                                                  REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                        Page 24 of 38




                           H. Job Steps, Hazards, and Controls Incorporated Directly into the Work
                              Package or Operations Procedure

    Work Planning          1. Identify the work activity job steps as they are defined in Job Instructions
    Team                      contained in the WP or operations procedure. IF necessary, THEN
                              EITHER
                                  observe the actual performance of a similar activity
                                  OR
                                  discuss the activity in detail with knowledgeable personnel that will be
                                  performing the tasks.

                           2. Use applicable hazard assessment tools to identify hazards and
                              environmental aspects associated with the work activities.

                           NOTE: Hazards and controls incorporated directly into the WP or approved
                                 operations procedure must align with the corresponding activity in a
                                 clear and consistent manner.

                           3. Document any job-specific, unique hazards and/or environmental aspects
                              pertaining to the work activity job steps into the Job Instructions (BJCF-785
                              or a standardized Word format approved by the Project) or operations
                              procedure.

                           I.   Type 2 or Type 3 Work Authorization Forms (BJCF-789)
                           NOTE: Every hazard identified must have a corresponding control. There
                                 may be more than one control for a hazard, and all applicable controls
                                 should be included.

    Work Planning          1. Perform the hazard assessment using Sections 9 thru 13 (Hazard
    Team                      Assessment) and Sections 17 thru 31 (Identification of Hazard and
                              Environmental Controls) of the Type 2 or Type 3 Work Authorization form
                              (BJCF-789).

                           2. Document the results of the hazard assessment for the work to be performed
                              using the Type 2 or Type 3 Work Authorization form (BJCF-789).

                           J. Activity Hazard Assessment Form (BJCF-1027)

                           NOTE: At no time shall the AHA form be used as a stand-alone work control
                                 document.

    Work Planning          1. Contact Project Engineering for work involving new equipment or
    Team/Project              processes.
    ES&H
                           2. Use applicable hazard assessment tools to identify hazards and
                              environmental aspects associated with the work activities.

                           3. Document any task-specific hazards, critical steps, and/or environmental
                              aspects pertaining to the work activity job steps on the AHA form.
OWNER: Environment, Safety and Health                                                    BJC-EH-2010
TITLE:                                                                                   REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                         Page 25 of 38




                           4. Conduct a step-by-step review of how the activity will be performed, which
                              hazards are involved and which controls are needed to eliminate or mitigate
                              the identified hazards.

                           5. Document the activity or task, the related hazard and type(s) of control
                              measure and/or personal protective equipment (PPE) necessary to preclude
                              or mitigate the identified hazards.

    Supervisor,            6. Prior to start of work, discuss the documented hazard assessment with the
    Project ES&H,             affected workers and revise or update it, as appropriate, based on these
                              discussions. This can be accomplished during work package, procedure or
                              pre-job briefings, as appropriate.

                           7. Obtain the workers’ names on an attendance sheet at the time of the
                              briefing, and request they sign or initial the sheet, indicating they have been
                              briefed on the work control documents including the hazard assessment.

    Subcontractors         8. Comply with BJC-FS-1001, Work Control Process, for changes involving
                              job steps, hazards, and controls that are directly incorporated into the WP or
                              a separate AHA (BJCF-1027) that is included in the WP.

                           NOTE: Contractor’s Project ES&H Representative will review such
                                 documents submitted by the Subcontractor for compliance with
                                 ES&H requirements of the subcontract. This review shall not
                                 constitute a change and shall not relieve the Subcontractor of any
                                 contractual obligation.

                           9. Submit new AHAs (BJCF-1027) that will be included in the WP to the BJC
                              Subcontract Coordinator (SCC).

                           NOTE: BJC reserves the right to review or obtain copies of revised AHAs
                                 from the Subcontractor upon request.

                           10. Verbally notify the BJC SCC and Project ES&H Representative of
                               revisions to existing AHAs.
OWNER: Environment, Safety and Health                                                   BJC-EH-2010
TITLE:                                                                                  REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                        Page 26 of 38




                           K. Periodic Review and/or Revision to Hazard Assessments

                           NOTE: Periodic review of activity hazard assessments used with work control
                                 documents (i.e., work packages or approved operations procedures)
                                 should be performed when revisions are made to the work control
                                 documents that may impact the information contained in the hazard
                                 assessment. More frequent periodic review of activity hazard
                                 assessments may be performed based on the risk and complexity of
                                 the work with consideration given to more frequent reviews for higher
                                 risk activities. Refer to BJC-FS-1001 for more detailed information.

    Supervisor/            1. Conduct periodic review and discussion of activity hazard assessments used
    Project ES&H              with work control documents (i.e., approved work packages or operations
                              procedures), with workers to solicit feedback and maintain accuracy.
                              Revise or update the applicable work control documents (e.g., job
                              instructions, hazard and controls in the approved work package or
                              procedure or separate AHA form (if used), and STARRT card, as applicable
                              in accordance with BJC-FS-1001, Work Control Process, or BJC-PQ-1107,
                              Performance Document Process.

    Supervisor/            2. Suspend and/or stop the work activity if hazards, that have not been
    Workers                   previously evaluated, are introduced or if conditions change that require
                              further evaluation.


                           3. Communicate to the affected workers changes made to all applicable work
                              control documents prior to resuming work.

                           L. Safety Task Analysis and Risk Reduction Talk (BJCF-856)

                           NOTE 1: The STARRT Card (BJCF-856) is an essential tool in the overall
                                   hazard assessment process as it represents the last review/discussion
                                   of hazards, environmental aspects, and their controls before work
                                   begins. It also is an effective tool in evaluating changed conditions
                                   in ongoing work. The color of the STARRT Card is used to track
                                   revisions. The STARRT Card may be periodically revisedupdated
                                   to reflect needed changes/improvements obtained from worker
                                   feedback and Lessons Learned.

                           NOTE 2: As is true for the AHA form (BJCF-1027), the STARRT Card
                                   augments the hazard assessment process and cannot be used as a
                                   sole hazard control document. Attachment C provides a process
                                   flow diagram of the implementation of the STARRT Card process.

    Supervisor,            1. After the initial review of the hazards and controls with the workers during
    WorkersTask               the pre-job briefing, a STARRT Card is obtained and taken to the work area
    Lead, and                 location, where feasible, when work is ready to begin. Use of the STARRT
    Subcontractor             Card is required for all BJC and Subcontractor field work activities to
    Subcontractors            augment the hazard assessment process. The STARRT Card process
                              requires a daily review for active fieldwork.
OWNER: Environment, Safety and Health                                                    BJC-EH-2010
TITLE:                                                                                   REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                         Page 27 of 38




                           NOTE: Remind workers in the briefing as to what is to be accomplished and
                                 sensitize workers as to what is to be avoided to proactively prevent
                                 injury.

    Supervisor/Task        2. Encourage workers to actively participate and maintain a questioning
    Lead                      attitude in the process, including taking a lead role when possible in the
                              STARRT Card briefing/discussion.
                           2. Obtain a STARRT card and take to the work area location when work is
                              ready to begin.

    Supervisor, Task       3. Perform a final hazard review using the STARRT Card (BJCF-856) to
    Lead, Workers             document any unidentified hazards or changed conditions.
    and
    Subcontractors         4. Encourage workers to actively participate and maintain a questioning
                              attitude in the process, including taking a lead role when possible in the
                              STARRT Card briefing/discussion.

                           5. Define clearly work suspension/stop work criteria before the task begins.

    Workers                6. Participate in the STARRT Card briefing and signs/initials/initial the
                              STARRT Card signifying their understanding and concurrence. The
                              STARRT Card must be available for review in the immediate work area
                              throughout the activity.
OWNER: Environment, Safety and Health                                                    BJC-EH-2010
TITLE:                                                                                   REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                         Page 28 of 38




                           NOTE: Changed conditions may involve revising the WP.work control
                                 documents (i.e., approved work package or operations procedure).
                                 Proceed in accordance with BJC-FS-1001, Work Control Process, or
                                 BJC-PQ-1107, Performance Document Process.

    Supervisor and         7. IF a changed condition is encountered, THEN
    Subcontractors               suspend/stop work activities until such time that the condition is
                                 evaluated, any additional hazards are identified, and controls established.

                           NOTE 1:Since STARRT Cards are considered living documents, it is
                                  acceptable to reviseupdate these cards in the field (unless the revision
                                  would constitute a change to the WP), as long as the following occurs:

                                        •   hazards are evaluated;
                                        •   appropriate controls established; and
                                        •   workers mutually agree with supervisors on the changes and
                                            are briefed on the changes. Worker involvement in this process
                                            is essential.

                           6. IFNOTE 2:             If the change does not require revising the WPwork
                               control documents or after any required changes made to the WP hashave
                               been approved, THEN
                           revisethen update the STARRT Card to reflect the new hazards and controls and
                                      discuss the changes with the workers.
OWNER: Environment, Safety and Health                                                  BJC-EH-2010
TITLE:                                                                                 REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                       Page 29 of 38




                           NOTE 3: It is unnecessary to develop a new STARRT Card each day for the
                                   same activity, unless the process for accomplishing the activity has
                                   changed (e.g., new process, new equipment, etc.), or there is a
                                   changed condition.

    Supervisor,            8. Sign/initial the revisedupdated STARRT Card signifying their
    Workers, and              understanding and concurrence.
    Subcontractors

    Supervisor             9. May use the The same STARRT Card may be used for multiple shifts,
                              provided that no changed conditions have been identified. Re-sign/initial
                              the STARRT card to document this review.

                           NOTE: The Supervisor may use another piece of paper if additional room is
                                 needed to record worker feedback.

                           10. Document worker feedback in the “Feedback and Comments” section of the
                               STARRT Card.

                           NOTE: If no worker feedback is provided on the STARRT Cards that require
                                 follow-up actions, the Card(s) may be discarded after completion of
                                 the work activities.

                           11. Collect and provide worker feedback to the Project ES&H Supervisor or
                               designee requiring follow-up action.
OWNER: Environment, Safety and Health                                                BJC-EH-2010
TITLE:                                                                               REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                     Page 30 of 38




                           NOTE: After completion of any follow-up actions, the STARRT Card(s) may
                                 be discarded.

    Project ES&H           12. Evaluate worker feedback and determine appropriate follow-up actions and
    Supervisor/                any improvements needed to the STARRT Card process.
    Designee
                           13. Review periodically the STARRT Card process for proper implementation
                               and administration.

    BJC Safety             14. Approve any exceptions or alternativeschanges to the STARRT Card
    Subject Matter             process.
    Expert
OWNER: Environment, Safety and Health                                                 BJC-EH-2010
TITLE:                                                                                REV. NO. 10
                                   HAZARD ASSESSMENT
                                                                                      Page 31 of 38




RECORDS                    The following records aremay be generated by this procedure:

                           •   Activity Hazard Assessment (BJCF-1027)
                           •   Risk Analysis Worksheet (BJCF-865)
                           •   Hazard Identification and Controls Checklist (BJCF-866)
                           •   Identification of Environmental Aspects and Controls Checklist (BJC-
                               -1447)
                           •   Activity Hazard Assessment Form (BJCF-1027)

SOURCE                     •   10 CFR Part 851, Worker Safety and Health Program
DOCUMENTS                  •   29 CFR Part 1910, Occupational Safety and Health Standards
                           •   29 CFR Part 1926, Safety and Health Regulations for Construction
                           •   DOE Order 450.1A, Environmental Protection Program
                           •   BJC-GM-1400, Integrated Safety Management System Description
                           •   BJC/OR 1745, Worker Safety and Health Program
                           •   BJC/OR-1747, Environmental Compliance and Protection Program
                               Description
                           •   BJC/OR-2057, BJC Safety and Health Handbook
                           •   BJC/OR-2181, Environmental Compliance and Protection Awareness
                               Handbook
                           •   BJC-FS-1001, Work Control Process
                           •   BJC-NS-1001, Unreviewed Safety Question Determinations for Nuclear
                               Category 2 & 3 Facilities
                           •   BJC-NS-1003, Nuclear Criticality Safety Program
                           •   BJC-NS-1008, Unreviewed Change Determinations for Radiological and
                               Non-Nuclear Facilities
                           •   BJC-PQ-1107, Performance Document Process
 OWNER: Environment, Safety and Health                                                   BJC-EH-2010
 TITLE:                                                                                  REV. NO. 10
                                    HAZARD ASSESSMENT
                                                                                         Page 32 of 38


                                              Attachment A
                                         DEFINITIONS/ACRONYMS
                                                Page 1 of 3

AHA – Activity Hazard Assessment

BJC – Bechtel Jacobs Company LLC

Critical Step(s) – A procedure step or series of steps or actions that, if performed improperly, could
cause irreversible harm to people, equipment, or the environment.

Demobilization – Demobilization shall include activities related to the removal of equipment and
supplies/materials used on the site, including the disassembly, removal and site cleanup of any offices,
buildings or other facilities assembled on the site.

EC&P – Environmental Compliance and Protection

Environmental Aspect – An element of an organization’s activities, products, or services that can
interact with the environment. Refer to BJCF-1447 for a complete list of potential environmental aspects.

Environmental Impact – Any change to the environment, whether adverse or beneficial, wholly or
partially resulting from an organization’s environmental aspects.

Environment, Safety and Health (ES&H) Representative – Ensures that hazard assessment activities
and instructions meet site ES&H procedures and controls and that appropriate hazard controls are
incorporated in the work package. This individual may be a BJC or Subcontractor employee.

Error Precursors – Existing conditions that increase error rate and may include: task demands (e.g.,
time pressure, high workload, multiple tasks, etc.); work environment (e.g., changes/departure from
routine, distractions, and interruptions); and human nature (e.g., assumptions, habit patterns, etc.).

ES&H – Environment, Safety and Health

Facility Manager – The individual responsible for ensuring that proposed work is allowable within the
facility regulatory and safety basis requirements, contains the necessary precautions and limitations to
ensure that these requirements are met, authorizes commencement of work, and coordinates permits as
defined by procedures.

Hazard – A source of danger with the potential to cause illness, injury, or death to personnel or the
public, or damage to a facility or impact the environment, without regard for the likelihood or credibility
of accident scenarios or consequence mitigation. Hazards also include environmental aspects identified
for the work activity.

Hazard Assessment Document – A document that records information about an activity that includes
steps to accomplish the activity, and the mitigating or control actions for the hazards identified.

Hazard Review Team – Team of Project Environment, Safety and Health (ES&H) Discipline Leads,
Facility Manager, and other technical discipline personnel to effectively identify existing and potential
hazards. Workers are also an essential component of these teams.
 OWNER: Environment, Safety and Health                                                    BJC-EH-2010
 TITLE:                                                                                   REV. NO. 10
                                    HAZARD ASSESSMENT
                                                                                          Page 33 of 38


                                               Attachment A
                                         DEFINITIONS/ACRONYMS
                                                Page 2 of 3

High Risk – As determined by the Hazard Assessment Process in this procedure, activities that have a
high hazard probability or high severity consequence for unmitigated hazards that could result in
significant personnel injury, illness, property damage or unmitigated environmental aspects/impacts that
correspond to a Risk Assessment Code of 1A, 1B, or 2A in Table 1 of BJCF-865.

Initial Risk – The most creditable case condition assumed to occur during an activity prior to mitigating
actions being taken.

ISMS – Integrated Safety Management System

Low Risk – Activities that have a very low potential for generating unmitigated hazards that could result
in personnel injury or illness, property damage, or unmitigated environmental aspects/impacts. Even
though an activity may be deemed low risk, the hazards shall be formally evaluated and mitigated
appropriately by engineering, administrative (e.g., permits, procedures, etc.) or personal protective
equipment.

Minor Maintenance Work – An alternative, equivalent documented method to the Activity Hazard
Assessment process which addresses low risk activities that have little or negligible potential for
generation of unmitigated hazards, the workers are trained in the tasks they perform, and the work is
repetitive in nature.

Mobilization – Mobilization shall include activities for transportation of equipment and
supplies/materials to the site, to including the establishment of offices, buildings and other necessary
facilities for operations at the site.

New activities or tasks – Work that is new to the worker(s) performing the job task that pose known or
potential hazards.

NFS – Nuclear Facility Safety

Operation – The activities and equipment associated with a specific function.

Operations Procedure – A project-level work control document containing a defined scope of work, job
steps, hazards associated with the performance of the work, and controls or mitigating actions for the
identified hazards. Clearly defined roles and responsibilities for personnel implementing the procedure
are also included.

PPE – Personal protective equipment

Project – A unique undertaking for essentially a single purpose, which is defined by scope, quality,
schedule, and cost objectives.

RAC – Risk Assessment Code

Repetitive – A specific task or activity with a fixed scope of work (e.g., changing light bulbs) that is
performed on a recurring basis (i.e., more than one time on an annual basis).

Residual Risk – Risk remaining after actions have been taken to eliminate or control the hazard.
 OWNER: Environment, Safety and Health                                                BJC-EH-2010
 TITLE:                                                                               REV. NO. 10
                                    HAZARD ASSESSMENT
                                                                                      Page 34 of 38


Risk Analysis – A formal documented process that provides a systematic hazard identification within a
given activity, operation or area, describes and evaluates the adequacy of measures taken to eliminate,
control, or mitigate the hazards, and analyzes and evaluates potential accidents and associated risks.
 OWNER: Environment, Safety and Health                                                    BJC-EH-2010
 TITLE:                                                                                   REV. NO. 10
                                    HAZARD ASSESSMENT
                                                                                          Page 35 of 38


                                               Attachment A
                                         DEFINITIONS/ACRONYMS
                                                Page 3 of 3

Risk Assessment – A method of evaluating the level of risk associated with a hazard expressed in terms
of an assigned risk category based on the risk assessment code calculated for the hazard.

RWP – Radiological Work Permit

Safety Authorization Basis – The document (or collection of documents) that formally describes and
analyzes the operations, hazards, and controls associated with a project, facility, or activity and indicates
management approval to operate in accordance with a resulting set of safety requirements and conditions
(safety envelope) that have been determined to provide an acceptable level of risk.

Safety Task Analysis and Risk Reduction Talk (STARRT) – A process that utilizes employee
participation to identify and resolve environment, safety and health hazards associated with a specific task
prior to performing the task (e.g., daily tailgate briefings).

Subcontract Coordinator (SCC) – For subcontracted work, ensures that roles assigned to the
Subcontractor are clearly defined. Coordinates between BJC and the Subcontractor Project Team
members. Serves as the primary point of communication between the Subcontractor and BJC team
members.

Work Planning Team – Team of Project Environment, Safety and Health (ES&H) Discipline Leads,
Facility Manager, and other technical discipline personnel to effectively identify existing and potential
hazards. Workers are also an essential component of these teams.

WP – Work Package
OWNER: Environment, Safety and Health                                   BJC-EH-2010
TITLE:                                                                  REV. NO. 10
                                        HAZARD ASSESSMENT
                                                                        Page 36 of 38


                                                  Attachment B
                                        HAZARD ASSESSMENT PROCESS MAP
                                                   Page 1 of 1
OWNER: Environment, Safety and Health                                                       BJC-EH-2010
TITLE:                                                                                      REV. NO. 10
                                                           HAZARD ASSESSMENT
                                                                                            Page 37 of 38




                                                               Attachment C
                                                IMPLEMENTATION OF THE STARRT CARD PROCESS
                                                                Page 1 of 2
 Supervision
 Workers
 ES&H




* Changed conditions require a more detailed assessment and may result
in revisions to the Work Package. Refer to Section K of this procedure and
BJC-FS-1001, Work Control Process.
AHA = Activity Hazard Assessment
WP = Work Package
RWP = Radiological Work Permit
                OWNER: Environment, Safety and Health
                TITLE:
                                                        HAZARD ASSESSMENT



                                               Attachment C
                                IMPLEMENTATION OF THE STARRT CARD PROCESS
                                                Page 2 of 2
Management
  Project
  Supervision
  Workers
  ES&H




                  AHA = Activity Hazard Assessment
                  RWP = Radiological Work Permit

				