									Agenda Item 5 – Attachment 2
East Bay Bus Rapid Transit

presented to
Policy Steering Committee



presented by
AC Transit




May 19, 2009
                               1




                                   1
 Effect on Travel Time*
 Downtown Berkeley to Bay Fair BART


    • “Separate” has fast BRT and a slow local
      bus
           – BRT: 59 minute
           – Local: 109 min
           – Average: 76 min

    • “All-in-One” on average faster than
      Separate
           – BRT: 66 min




* Year 2025, PM peak                                                                            2
                                                                                                    2

Sources:
BRT from East Bay BRT DEIS/R, Table 3.1-11
Local developed by adjusting existing local bus travel time for projected added congestion in
mixed-flow travel lanes
Average for “Separate” is a weighted average of BRT and Local, weighted by peak period
service frequency (8 BRT per hour, 4 Local per hour)




                                                                                                        2
 Transit Ridership
 Year 2025



                                               Separate
                                    No-Build   BRT and    All-in-One
                                                Local

Corridor Transit Boardings           28,100     43,700     49,200

New Transit Trips*                              5,300       9,300

                No-
* Increase over No-Build




                                                                    3
                                                                        3

Source:
East Bay BRT DEIS/R, Table 3.1-12




                                                                            3
 Auto Travel
 Year 2025



                                                      Separate
                                                      BRT and            All-in-One
                                                       Local

      Reduction in Daily Auto Trips                      5,300               9,300

      Reduction in Daily Auto VMT*                      11,800              20,700
      * Vehicle Miles Travelled




                                                                                        4
                                                                                            4

Sources:
Reduction in Auto Trips is equal to Increase in Transit Trips from previous slide
Reduction in Auto VMT is from the East Bay BRT DEIS/R, Table 4.14-1, expressed on a daily
basis.




                                                                                                4
 Energy and Greenhouse Gases
 Year 2025



                                                         Separate
                                                         BRT and            All-in-One
                                                          Local

                                                          50,000             210,000
   Reduction in Annual Energy Usage
                                                         gallons*            gallons*

   Reduction in Annual GHGs                              120 tons**        1,900 tons**

   * Annual Gasoline and gasoline equivalents
   ** Annual CO2 and CO2 equivalents




                                                                                                5
                                                                                                    5

Source:
The above figures were estimated by Cambridge Systematics in early 2008 (after the release of
the East Bay BRT DEIS/R) using a new U.S. EPA methodology.


Daily:                       Separate      All-in-One
Reduction Energy Usage       170 gallons   690 gallons
Reduction GHGs               0.4 tons      6.3 tons




                                                                                                        5
 Capital and Operating Cost
 Service Frequency (Weekday, Minutes Between Buses)


                               Peak        Midday      Evening         Owl
               Existing
               1R                12           12
               1                 15           20           20           60
               Separate BRT and Local
               BRT              7.5           7.5          20
               1                 15           15           20           60
               All-in-One
               BRT               5             5           10           60


                                                                                             6
                                                                                                   6

Sources:
Existing from AC Transit schedules
All-in-One from AC Transit East Bay BRT FY2010 Small Starts Submittal, Operations And
Maintenance Cost Estimating Methodology And Results Report, Table 2-2.
Separate developed to provide the same bus frequency as All-in-One (e.g., 12 per hour during the
peak and midday) and have the same local bus frequency as Existing.




                                                                                                       6
     Capital and Operating Cost
     $ millions


                                                                Separate
                                             No-Build           BRT and            All-in-One
                                                                 Local

      Capital Cost                                                 $215                $235

      Annual Operating Cost*                    $21.5              $26.9              $25.6

      Annual Operating Cost
                                                $15.0              $18.2              $15.4
      Net of Fare Revenue*

       * Estimate for year 2025 costs in 2008 dollars.




                                                                                                 7
                                                                                                     7

Sources:
All-in-One Capital Cost from AC Transit East Bay BRT FY2010 Small Starts Submittal, Section 4.2,
Main Worksheet – Build Alternative.
All-in-One Operating Cost from AC Transit East Bay BRT FY2010 Small Starts Submittal, Operations
And Maintenance Cost Estimating Methodology And Results Report, Table 4-1, but converted from year
2015 to year 2025.
Separate Capital Cost developed by applying cost factor ratios by line item based on East Bay BRT
DEIS/R cost estimates to the All-in-One Capital Cost estimate.
Separate Operating Cost generated by using the three-factor operating cost model developed for All-in-
One for the AC Transit East Bay BRT FY2010 Small Starts Submittal, but with factor inputs adjusted by
applying factor ratios based on East Bay BRT DEIS/R estimates.
Operating Cost Net of Fare Revenue calculated by Cambridge Systematics by subtracting net fare
revenue from operating cost. Cambridge Systematics can provide further details, if needed.
              Oper Cost per Boarding       Subsidy per Boarding         Farebox Recovery
No Build      $2.56                        $1.78                        30%
Separate      $2.05                        $1.28                        38%
All-in-One    $1.74                        $0.97                        44%

                                                                                                         7
 Effect on Walk Distance

   • Some local bus stops removed with All-in-One

   • 80% of riders unaffected
          – They walk to the same station as today

   • 20% of riders would need to go to a different
     station
          – Some passengers have no increase in walk distance
          – Some passengers walk further but, the walk distance is
            on average one additional block



                                                                                            8
                                                                                                8

Source:
May 2009 analysis by Cambridge Systematics of current AC Transit route 1 and 1R boardings
and alighting by station.




                                                                                                    8
 Effect on Walk Distance




                                                         9
                                                             9

Source:
Map of current Route 1 and 1R boardings and alightings




                                                                 9

								