							                                                                          Bicycle and Pedestrian Grant Summary

      Sponsor                           Project Name                         Agreement No.        Cycle     Agreement Amount     Paid-to-Date    Paid-to-   Project
                                                                                                                                                  Date      Status
                                                                                                                                                    %
      AC Transit                  Bike Racks for New Buses                      A07-0003            3             $20,000.00        $0.00          0%

   Alameda County         Alameda County Pedestrian Master Plan for             A04-0019            1            $120,000.00     $120,000.00      100%
                                   Unincorporated Areas
Alameda County CMA             Countywide Bicycle Plan Update                   A05-0030            2             $30,000.00      $30,000.00      100%

Alameda County PWA          Coliseum BART to Bay Trail Connector                A05-0036            2            $100,000.00        $0.00          0%
                                    Environmental Study
                            Union Pacific (Oakland Subdivision) RR              A07-0004            3             $75,000.00        $0.00          0%
                                  Corridor Improvement Plan
       BART                 BART Station Electronic Bicycle Lockers             A05-0037            2            $174,000.00       $9,803.00       6%
      Berkeley               Aquatic Park Connection Streetscape                A07-0005            3             $65,000.00         $0.00         0%
   Redevelopment          Improvement Project - Phase 1 Bike & Ped
      Agency                             Improvements
    City of Albany            Buchanan and I-80/I-580 Intersection              A05-0035            2             $75,000.00      $75,000.00      100%
                         Alternative Bicycle/Pedestrian Connector Trail

                              Buchanan Bicycle/Pedestrian Path                  A07-0007            3            $266,000.00        $0.00          0%

   City of Alameda          City of Alameda Pedestrian Master Plan              A05-0031            2             $36,000.00      $29,169.25      81%
                         Alameda-Oakland Estuary Crossing Feasibility           A07-0006            3            $100,000.00        $0.00          0%
                                            Study
   City of Berkeley        Ashby BART Station/Ed Roberts Campus                 A07-0008            3            $136,000.00        $0.00          0%
                           Pedestrian and Bicycle Access and Safety
                                            Project
                                   Travel Choice - Berkeley                     A07-0009            3            $190,000.00        $0.00          0%
   City of Livermore       Iron Horse Trail Feasibility & Engineering           A07-0010            3             $70,000.00        $0.00          0%
                                             Study
   City of Oakland           Eastlake Streetscape and Pedestrian                A04-0016            1            $262,000.00     $262,000.00      100%
                                    Enhancement Project
                              Oakland Bicycle Master Plan Update                A04-0018            1            $134,000.00     $108,745.06      81%
                                 Market Street Bikeway Project                  A05-0034            2            $235,000.00                       0%
                              MacArthur Transit Hub Streetscape                 A07-0011            3            $215,000.00        $0.00          0%
                                     Improvement Project
  City of Pleasanton     Pleasanton Pedestrian & Bicycle Master Plan            A07-0012            3            $111,000.00        $0.00          0%

 City of San Leandro         San Leandro Bay Trail Slough Bridge                A04-0017            1            $250,000.00        $0.00          0%
                                   Bay Trail Slough Bridge                      A07-0013            3            $750,000.00        $0.00          0%
  City of Union City          11th Street Enhancement Project                   A05-0032            2            $300,000.00                       0%

East Bay Asian Youth             Bicycle Education Programs                     A06-0015            1            $121,545.16     $114,252.34      94%
       Center
  East Bay Bicycle             Bicycle Safety Education Classes                 A07-0015            3             $38,000.00        $0.00          0%
      Coalition

East Bay Regional Park                  Iron Horse Trail                        A04-0021            1            $450,000.00     $405,000.00      90%
       District

                           Alamo Canal Trail Undercrossing of I-580             A05-0033            2             $50,000.00      $44,756.68      90%
                                     Feasibility Study

                            580 Undercrossing, Alamo Canal Trail                A07-0014            3            $235,000.00        $0.00          0%



Oakland Unified School           Bicycle Education Programs                     A04-0022            1            $101,204.84     $101,204.84      100%
       District
  Transportation and        Safe Routes to School (SR2S) Alameda                A07-0016            3            $729,000.00        $0.00          0%
  Land Use Coalition                 County Partnership
    U.C. Berkeley                  UC Berkeley Bicycle Plan                     A04-0023            1             $61,250.00      $61,250.00      100%

                                                                                                                 $5,500,000.00   $1,361,181.17    25%

                                                                                                    1            $1,500,000.00   $1,172,452.24    78%

                                                                             Total by Cycles        2            $1,000,000.00   $188,728.93      19%

                                                                                                    3            $3,000,000.00      $0.00          0%
                                                     Express Bus Grant Summary

Sponsor                 Project Name                 Agreement No.     Cycle     Agreement Amount   Paid-to-Date   Paid-to-   Project
                                                                                                                    Date      Status
                                                                                                                      %
AC Transit   Express Bus Connectivity - Major Hubs     A06-0038          1         $150,000.00         $0.00         0%

             Ardenwood Express Bus Park and Ride       A06-0039          1         $1,500,000.00    $750,050.00     50%
                       Improvements
 LAVTA             LAVTA Bus Rapid Transit             A06-0040          1         $1,649,000.00    $172,296.56     10%


                                                                                   $3,299,000.00    $922,346.56     28%
                                                                          Paratransit Gap Grant Summary

       Sponsor                          Project Name                      Agreement No.       Cycle       Agreement Amount   Paid-to-Date    Paid-to-   Project
                                                                                                                                              Date      Status
                                                                                                                                                %
ACTIA/ City of Fremont                  Travel Training                      ACTIA-1            3           $140,000.00       $2,091.25        1%

ACTIA/ City of Fremont         South County Taxi Pilot Program               ACTIA-2            3           $355,700.00       $82,416.09      23%

  ACTIA/ N\N/ EMC         Countywide Mobilty Coordination Program            ACTIA-3            3           $500,000.00      $146,240.34      29%

      AC Transit                EBPC MDC/AVL Pilot Program                   A06-0030           3           $500,000.00      $125,000.00      25%

Alzheimer's Services of Special Transportation Services for Individuals      A06-0036           3           $300,000.00      $203,346.01      68%
     the East Bay                      with Dementia
        BART             East Bay Paratransit Rider Care Specialist          A06-0029           3           $126,768.00       $5,196.43        4%
 Bay Area Community       Dimond-Fruitvale Senior Shuttle and East           A06-0028           3           $102,576.00       $17,608.54      17%
       Services              Oakland Senior Shuttle Expansion

                          North Alameda County Group Trip Program            A06-0034           3           $240,454.00      $145,990.24      61%



Center for Independent Outreach and Travel Training Project of North         A06-0035           3           $239,976.00       $39,031.35      16%
        Living                      Alameda County
    City of Albany                   MRTIP - Albany                          A04-0026           1            $11,480.00       $7,098.22       62%
   City of Alameda                  MRTIP - Alameda                          A04-0027           1            $64,514.00       $26,355.07      41%

   City of Berkeley                    MRTIP - Berkeley                      A04-0028           1            $76,163.00       $35,318.76      46%



                           Ashby BART Station/Ed Roberts Campus              A06-0027           3           $141,000.00         $0.00          0%
   City of Fremont              Fremont - Various Gap Funds                  A04-0033           1           $269,823.00      $176,670.68      65%

                                      Various Programs                       A06-0044           3           $106,000.00       $72,587.28      68%

   City of Emeryville                 MRTIP - Emeryville                     A04-0029           1           $10,080.00          $0.00          0%
   City of Hayward           City of Hayward - Various Gap Funds             A04-0031           1           $378,073.00      $186,096.94      49%
                                     Hayward Ride - Today!                   A06-0032           3           $355,700.00      $134,200.60      38%

    City of Newark         Fare Assistance for AC Transit Circulator         A06-0031           3            $93,026.00         $0.00          0%
                                            Routes
   City of Oakland                MRTIP and AHIP - Oakland                   A04-0030           1           $530,546.00      $454,492.16      86%
 City of San Leandro           San Leandro - Various Gap Funds               A04-0032           1           $134,475.00      $101,965.94      76%
  Friendly Cab Co.         Pilot Program to Provide Same Day Taxi            A06-0025           3              $0.00            $0.00
       Services                      Services to Tri-Cities
        LAVTA                         LAVTA - Taxi Study                     A04-0036           1           $141,211.00       $39,925.90      28%

                            LAVTA Paratransit Customer Service               A06-0033           3           $175,000.00         $0.00          0%
                                        Software

                              Tri-Valley Travel Training Program             A06-0037           3           $123,800.00         $0.00          0%



     St. Mini Cab          Same Day South County Taxi Program -                                                $0.00            $0.00
     Corporation                    ACTIA Gap Grant



                                                                                                            $5,116,365.00    $2,001,631.80    39%


                                                                                                1           $1,616,365.00    $1,027,923.67    64%
                                                                          Total by Cycles
                                                                                                3           $3,500,000.00    $973,708.13      28%
Grant Program   Cycles   Agreement No.           Grant Name                    Sponsor               Project Status

 Bike and Ped     1        A04-0019      Alameda County Pedestrian     County of Alameda Public     Project Complete
                                                Master Plan for            Works Agency
                                            Unincorporated Areas
 Bike and Ped     1        A04-0022      Bicycle Education Programs    Cycles of Change/Oakland    Superceded by A06-
                                                                         Unified School District          0015
 Bike and Ped     1        A04-0016        Eastlake Streetscape and         City of Oakland         Project Complete
                                           Pedestrian Enhancement
                                                     Project
 Bike and Ped     1        A04-0021             Iron Horse Trail         East Bay Regional Park     Project Complete
                                                                                  District
 Bike and Ped     1        A04-0018      Oakland Bicycle Master Plan City of Oakland Public Works   Project Complete
                                                      Update                      Agency
 Bike and Ped     1        A04-0017      San Leandro Bay Trail Slough      City of San Leandro     Superceded by A07-
                                                      Bridge                                              0013
 Bike and Ped     1        A04-0023         UC Berkeley Bicycle Plan      University of California  Project Complete
                                                                                (Berkeley)                            5/7 Cycle 1 Complete
 Bike and Ped     2        A05-0032         11th Street Enhancement         City of Union City      Project Complete
                                                      Project
 Bike and Ped     2        A05-0033             Alamo Canal Trail        East Bay Regional Park     Project Complete
                                             Undercrossing of I-580               District
                                                 Feasibility Study
 Bike and Ped     2        A05-0037          BART Station Electronic      Bay Area Rapid Transit    Project Complete
                                                 Bicycle Lockers
 Bike and Ped     2        A05-0035         Buchanan and I-80/I-580           City of Albany        Project Complete
                                             Intersection Alternative
                                         Bicycle/Pedestrian Connector
                                                       Trail
 Bike and Ped     2        A05-0031        City of Alameda Pedestrian        City of Alameda        Project Complete
                                                   Master Plan
 Bike and Ped     2        A05-0036       Coliseum BART to Bay Trail Alameda County Public Works    Project Complete
                                            Connector Environmental               Agency
                                                      Study
 Bike and Ped     2        A05-0030         Countywide Bicycle Plan    Alameda County Congestion    Project Complete
                                                      Update               Mangement Agency
 Bike and Ped     2        A05-0034      Market Street Bikeway Project       City of Oakland        Project Complete                         9/15 Cycle 1 and 2
                                                                                                                      4/8 Cycle 2 Complete       Complete
 Bike and Ped     3        A07-0014       I-580 Undercrossing, Alamo     East Bay Regional Park          Active
                                                    Canal Trail                   District
 Bike and Ped     3        A07-0006        Alameda-Oakland Estuary           City of Alameda             Active
                                            Crossing Feasibility Study
Bike and Ped   3   A07-0005      Aquatic Park Connection      Berkeley Redevelopment            Active
                                 Streetscape Improvement               Agency
                              Project - Phase 1 Bike & Ped
                                       Improvements
Bike and Ped   3   A07-0008       Ashby BART Station/Ed            City of Berkeley             Active
                               Roberts Campus Pedestrian
                              and Bicycle Access and Safety
                                          Project
Bike and Ped   3   A07-0013       Bay Trail Slough Bridge       City of San Leandro             Active
Bike and Ped   3   A07-0015      Bicycle Safety Education     East Bay Bicycle Coalition        Active
                                          Classes
Bike and Ped   3   A07-0003      Bike Racks for new buses             AC Transit                Active
Bike and Ped   3   A07-0007    Buchanan Bicycle/Pedestrian          City of Albany              Active
                                            Path
Bike and Ped   3   A07-0010    Iron Horse Trail Feasibility &     City of Livermore             Active
                                     Engineering Study
Bike and Ped   3   A07-0011       MacArthur Transit Hub            City of Oakland              Active
                                 Streetscape Improvement
                                          Project
Bike and Ped   3   A07-0012      Pleasanton Pedestrian &         City of Pleasanton             Active
                                    Bicycle Master Plan
Bike and Ped   3   A07-0016   Safe Routes to School (SR2S) Transportation and Land Use          Active
                               Alameda County Partnership              Coalition

Bike and Ped   3   A07-0009     Travel Choice - Berkeley           City of Berkeley             Active
Bike and Ped   3   A07-0004      Union Pacific (Oakland      Alameda County Public Works        Active
                              Subdivision) Railroad Corridor           Agency                                      0/14 Cycle 3
                                   Improvement Plan                                                                 Complete

Express Bus    1   A06-0039   Ardenwood Express Bus Park             AC Transit                 Active
                                 and Ride Improvements
Express Bus    1   A06-0038    Express Bus Connectivity -            AC Transit                 Active
                                      Major Hubs
Express Bus    1   A06-0040     LAVTA Bus Rapid Transit               LAVTA                     Active
                                                                                                               0/3 Cycle 1 Complete

 Paratransit   1   A04-0027       Medical Return Trip             City of Alameda          Project Completed
                                 Improvement Program
                                       (MRTIP)
 Paratransit   1   A04-0026       Medical Return Trip              City of Albany          Project Completed
                                 Improvement Program
                                       (MRTIP)
Paratransit   1     A04-0028       Medical Return Trip                City of Berkeley         Project Completed
                                  Improvement Program
                                         (MRTIP)
Paratransit   1     A04-0029       Medical Return Trip                City of Emeryville       Project Completed
                                  Improvement Program
                                         (MRTIP)
Paratransit   1     A04-0030       Medical Return Trip                City of Oakland          Project Complete
                                  Improvement Program
                                         (MRTIP)
Paratransit   1     A04-0033    Paratransit Fare Assistance           City of Fremont          Project Completed
                                         Program
Paratransit   1     A04-0033      Travel Escort Program               City of Fremont          Project Completed
                                                                                                                   6/7 Cycle 1 Complete
Paratransit   1/2   A04-0030           Accessible Home                City of Oakland          Project Completed
                                  Improvement Paratransit
                                       Program (AHIPP)
Paratransit   1/2   A04-0031     Group Recreational Trips              City of Hayward         Project Completed
Paratransit   1/2   A04-0031    Joint Medical Transportation     City of Hayward and City of   Project Completed
                                       Outreach Project                  San Leandro
Paratransit   1/2   A04-0031    Pre-scheduled Non-Medical              City of Hayward         Project Completed
                                             Trips
Paratransit   1/2   A04-0031      Same Day Medical Trips              City of Hayward          Project Completed
Paratransit   1/2   A04-0032     San Leandro Out of Town            City of San Leandro        Project Completed
                                         Medical Trips
Paratransit   1/2   A04-0033           Medical Outreach               City of Fremont          Project Completed
                                   Transportation Program
                                        (South County)
Paratransit   1/2   A04-0036       Tri-Valley Taxi Study for    LAVTA/Pleasanton Paratransit        Active           7/8 Cycle 1 & 2      13/15 Cycles 1 and 2
                                    Seniors and Disabled                                                                Complete               Complete
Paratransit   3     A06-0027       Ashby BART Station/Ed               City of Berkeley             Active
                                       Roberts Campus               Ed Roberts Campus
Paratransit   3     ACTIA-3          Countywide Mobilty               Alameda County                Active
                                    Coordination Program         Transportation Improvement
                                                                           Authority
Paratransit   3     A06-0028      Dimond-Fruitvale Senior       Bay Area Community Services         Active
                                 Shuttle and East Oakland
                                 Senior Shuttle Expansion
Paratransit   3     A06-0029     East Bay Paratransit Rider        Bay Area Rapid Transit           Active
                                       Care Specialist
Paratransit   3     A06-0030    East Bay Paratransit Mobile              AC Transit                 Active
                                 Data Computer/Automatic
                               Vehicle Location Pilot Program
Paratransit   3   A06-0031   Fare Assistance for AC Transit          Newark                Active
                                   Circulator Routes

Paratransit   3   A06-0032        Hayward Ride-Today!                  Hayward             Active
Paratransit   3   A06-0033   LAVTA Paratransit Customer                 LAVTA              Active
                                    Service Software
Paratransit   3   A06-0034   North Alameda County Group Bay Area Community Services        Active
                                      Trip Program
Paratransit   3   A06-0035   Outreach and Travel Training Center for Independent Living    Active
                               Project of North Alameda                 USOAC
                                         County
Paratransit   3   ACTIA-2       South County Taxi Pilot            Alameda County          Active
                                         Project             Transportation Improvement
                                                               Authority/City of Fremont
Paratransit   3   A06-0036       Special Transportation      Alzheimer's Services of the   Active
                              Services for Individuals with       East Bay (ASEB)
                                        Dementia
Paratransit   3   ACTIA-1     Tri-City Travel Training Pilot       Alameda County          Active
                                         Project             Transportation Improvement
                                                               Authority/City of Fremont
Paratransit   3   A06-0037     Tri-Valley Travel Training               LAVTA              Active
                                        Program
Paratransit   3   A06-0044         Various Programs                City of Fremont         Active   0/15 Cycle 3
                                                                                                     Complete
                              ACTIA Program Grant Projects Summary Table
                              Bicycle and Pedestrian/Express Bus/Paratransit




                                                                                                                                                                                                                                           ACTIA
 Grant                                                                                                                                                                                                                                                                Total Project
                                   Cycle       Location                            Grant Project Sponsor                                                                     Grant Project Name                                           Measure B     Other Funds                   Project Status
Program                                                                                                                                                                                                                                                                   Cost
                                                                                                                                                                                                                                           Funds
                                                   N         City of Oakland                                                       Eastlake Streetscape and Pedestrian Enhancement Project                                                 $262,000      $2,827,600    $3,089,600        Complete
                                                   N         City of Oakland Public Works Agency                                   Oakland Bicycle Master Plan Update                                                                      $134,000       $166,440      $300,440         Complete
                                                   C         City of San Leandro                                                   San Leandro Bay Trail Slough Bridge                                                                     $250,000      $1,399,027    $1,649,027       Superceded
                                                  C, E       County of Alameda Public Works Agency                                 Alameda County Pedestrian Master Plan for Unincorporated Areas                                          $120,000       $50,000       $170,000         Complete
                                     1
                                                 N, C, S     East Bay Asian Youth Center                                           Bicycle Education Programs                                                                              $222,750       $170,000      $392,750         Complete
                                                   E         East Bay Regional Park District                                       Iron Horse Trail                                                                                        $450,000      $1,381,052    $1,831,052        Complete
                                                   N         University of California (Berkeley)                                   UC Berkeley Bicycle Plan                                                                                 $61,250         $0          $61,250          Complete
                                                                                                                                                                                                         Cycle 1 Grants (7) Subtotal       $1,500,000    $5,994,119    $7,494,119
                                                  CW         Alameda County Congestion Mangement Agency                            Countywide Bicycle Plan Update                                                                           $30,000       $20,000       $50,000          Complete
                                                   N         Alameda County Public Works Agency                                    Coliseum BART to Bay Trail Connector Environmental Study                                                $100,000       $15,000       $115,000         Complete
                                                   N         City of Alameda                                                       City of Alameda Pedestrian Master Plan                                                                   $36,000        $9,000       $45,000          Complete
                                                   N         City of Albany                                                        Buchanan and I-80/I-580 Intersection Alternative Bicycle/Pedestrian Connector Trail                      $75,000       $35,000       $110,000         Complete
                                     2             N         City of Oakland                                                       Market Street Bikeway Project                                                                           $235,000       $441,993      $676,993         Complete
                                                   S         City of Union City                                                    11th Street Enhancement Project                                                                         $300,000       $497,000      $797,000         Complete
                                                   E         East Bay Regional Park District                                       Alamo Canal Trail Undercrossing of I-580 Feasibility Study                                               $50,000       $50,000       $100,000         Complete
     Bicycle and Pedestrian




                                                  CW         San Francisco Bay Area Rapid Transit District                         BART Station Electronic Bicycle Lockers                                                                 $174,000       $58,000       $232,000         Complete
                                                                                                                                                                                                         Cycle 2 Grants (8) Subtotal       $1,000,000    $1,125,993    $2,125,993
                                                 N, C, S     Alameda County Public Works Agency                                    Union Pacific (Oakland Subdivision) Railroad Corridor Improvement Plan                                   $75,000       $75,000       $150,000          Active
                                                 N, C, S     Alameda-Contra Costa Transit District                                 Bike Racks for New Buses                                                                                 $20,000       $100,000      $120,000          Active
                                                   N         Berkeley Redevelopment Agency                                         Aquatic Park Connection Streetscape Improvement Project - Phase 1 Bike & Ped Improvements                $65,000      $1,160,000    $1,225,000         Active
                                                   N         City of Alameda                                                       Alameda-Oakland Estuary Crossing Feasibility Study                                                      $100,000       $310,797      $410,797          Active
                                                   N         City of Albany                                                        Buchanan Bicycle/Pedestrian Path                                                                        $266,000       $34,000       $300,000          Active
                                                   N         City of Berkeley                                                      Ashby BART Station/Ed Roberts Campus Pedestrian and Bicycle Access and Safety Project                   $136,000      $6,914,000    $7,050,000         Active
                                                   N         City of Berkeley                                                      Travel Choice - Berkeley                                                                                $190,000       $447,000      $637,000         Complete
                                     3             E         City of Livermore                                                     Iron Horse Trail Feasibility & Engineering Study                                                         $70,000       $98,000       $168,000        Closing Out
                                                   N         City of Oakland                                                       MacArthur Transit Hub Streetscape Improvement Project                                                   $215,000      $2,608,000    $2,823,000       Closing Out
                                                   E         City of Pleasanton                                                    Pleasanton Pedestrian & Bicycle Master Plan                                                             $111,000         $0          $111,000          Active
                                                   C         City of San Leandro                                                   Bay Trail Slough Bridge                                                                                 $750,000      $2,280,000    $3,030,000         Active
                                                  CW         East Bay Bicycle Coalition                                            Bicycle Safety Education Classes                                                                         $38,000        $3,250       $41,250         Closing Out
                                                   E         East Bay Regional Park District                                       I-580 Undercrossing, Alamo Canal Trail                                                                  $235,000       $100,000      $335,000          Active
                                                  CW         Transportation and Land Use Coalition                                 Safe Routes to School (SR2S) Alameda County Partnership                                                 $736,292       $534,188     $1,270,480       Closing Out
                                                                                                                                                                                                       Cycle 3 Grants (14) Subtotal        $3,007,292   $14,664,235    $17,671,527
                                                  CW         Alameda County Congestion Management Agency                           Alameda Countywide Bicycle Plan Update                                                                  $130,000       $35,000       $165,000          Active
                                                   N         City of Albany                                                        Albany Pedestrian Master Plan and Update to the Albany Bicycle Master Plan                              $130,000       $30,000       $160,000          Active
                                                   E         City of Dublin                                                        Alamo Canal Regional Trail Undercrossing of I-580: Construction                                         $891,000      $1,760,000    $2,651,000         Active
                                                   S         City of Fremont                                                       Irvington Area Pedestrian Improvements                                                                  $342,000       $58,000       $400,000          Active
                                                   S         City of Fremont                                                       Tri-City Senior Walk Clubs                                                                               $52,000       $15,000       $67,000           Active
                                                   S         City of Newark                                                        Newark Pedestrian and Bicycle Master Plan                                                               $119,000       $30,000       $149,000          Active
                                     4             N         City of Oakland                                                       Lakeshore/Lake Park Avenue Complete Streets Project                                                     $573,599       $633,992     $1,207,591         Active
                                                  CW         East Bay Bicycle Coalition                                            Bicycle Safety Education Program                                                                        $215,401        $4,800       $220,201          Active
                                                   E         East Bay Regional Parks District                                      Iron Horse Trail Feasibility Study - Dublin BART to Santa Rita Road                                      $25,000       $25,000       $50,000           Active
                                                  CW         TransForm                                                             Safe Routes to Schools Alameda County Partnership                                                       $820,000      $1,075,000    $1,895,000         Active
                                                  CW         TransForm                                                             TravelChoice New Residents                                                                              $175,000       $178,000      $353,000          Active
                                                  N, C       Urban Ecology                                                         East Bay Greenway Environmental Review and Implementation Strategy                                      $527,000       $403,000      $930,000          Active
                                                                                                                                                                                                       Cycle 4 Grants (12) Subtotal        $4,000,000    $4,247,792    $8,247,792
                                                                                                                                                                      41 Bicycle and Pedestrian - Cycles 1 - 4 Grants Total                $9,507,292   $26,032,139    $35,539,431
                                                   S         Alameda-Contra Costa Transit District                                 Ardenwood Express Bus Park and Ride Improvements                                                        $1,500,000    $6,700,000    $8,200,000         Active
                                     1            CW         Alameda-Contra Costa Transit District                                 Express Bus Connectivity - Major Hubs                                                                   $150,000       $16,600       $166,600          Active
                                                   E         Livermore Amador Valley Transit Authority                             LAVTA Bus Rapid Transit                                                                                 $1,649,000    $2,311,407    $3,960,407         Active
     Express Bus




                                                                                                                                                                                                         Cycle 1 Grants (3) Subtotal       $3,299,000    $9,028,007    $12,327,007
                                                  CW         Alameda-Contra Costa Transit District                                 Alameda County Countywide Express Bus Plan (from Cycle 1 funding)                                          $0          $97,500       $222,500          Active
                                     2            C, N       Alameda-Contra Costa Transit District                                 1R International Rapid Weekday and Weekend Operations                                                   $1,900,000    $1,340,000    $3,240,000         Active
                                                   E         Livermore Amador Valley Transit Authority                             LAVTA Express Bus Operating Assistance                                                                  $1,500,000     $370,000     $1,870,000         Active
                                                                                                                                                                                                         Cycle 2 Grants (3) Subtotal       $3,400,000    $1,807,500    $5,332,500

                                                                                                                                                                                       6 Express Bus - Cycles 1-2 Grants Total             $6,699,000   $10,835,507    $17,659,507

                                                   N         City of Alameda                                                       Medical Return Trip Improvement Program (MRTIP)                                                          $64,514         $0          $64,514          Complete
                                                   N         City of Albany                                                        Medical Return Trip Improvement Program (MRTIP)                                                          $11,480         $0          $11,480          Complete
                                                   N         City of Berkeley                                                      Medical Return Trip Improvement Program (MRTIP)                                                          $76,163         $0          $76,163          Complete
                                                   N         City of Emeryville                                                    Medical Return Trip Improvement Program (MRTIP)                                                          $10,080         $0          $10,080          Complete
                                                   S         City of Fremont                                                       Paratransit Fare Assistance Program                                                                      $52,388         $0          $52,388          Complete
                                                   S         City of Fremont                                                       Travel Escort Program                                                                                    $77,836         $0          $77,836          Complete
                                                   S         City of Fremont                                                       Medical Outreach Transportation Program (South County)                                                  $139,599         $0          $139,599         Complete
                                                   C         City of Hayward                                                       Pre-scheduled Non-Medical Trips                                                                          $93,700         $0          $93,700          Complete
                                   1&2             C         City of Hayward                                                       Same Day Medical Trips                                                                                  $164,650         $0          $164,650         Complete
                                                   C         City of Hayward                                                       Joint Medical Transportation Outreach Project                                                            $26,023         $0          $26,023          Complete
                                                   C         City of Hayward                                                       Group Recreational Trips                                                                                 $93,700         $0          $93,700          Complete
                                                   N         City of Oakland                                                       Medical Return Trip Improvement Program (MRTIP)                                                         $397,783         $0          $397,783         Complete
                                                   N         City of Oakland                                                       Accessible Home Improvement Paratransit Program (AHIPP)                                                 $132,763         $0          $132,763         Complete
                                                   C         City of San Leandro                                                   Joint Medical Transportation Outreach Project                                                            $7,500          $0           $7,500          Complete
                                                   C         City of San Leandro                                                   San Leandro Out of Town Medical Trips                                                                   $126,975         $0          $126,975         Complete
                                                   E         Livermore Amador Valley Transit Authority/Pleasanton Paratransit      Tri-Valley Taxi Study for Seniors and Disabled                                                          $141,211         $0          $141,211        Closing Out
                                                                                                                                                                                                Cycles 1 & 2 Grants (16) Subtotal          $1,616,365       $0         $1,616,365
                                                  CW         Alameda County Transportation Improvement Authority                   Countywide Mobilty Coordination Program                                                                 $500,000         $0          $500,000         Complete
                                                   S         Alameda County Transportation Improvement Authority/City of Fremont   South County Taxi Pilot Project                                                                         $355,700         $0          $355,700         Complete
                                                   E         Alameda County Transportation Improvement Authority/City of Fremont   Tri-City Travel Training Pilot Project                                                                  $140,000         $0          $140,000          Active
                                                  CW         Alameda-Contra Costa Transit District                                 East Bay Paratransit Mobile Data Computer/Automatic Vehicle Location Pilot Program                      $500,000       $61,645       $561,645         Complete
                                                  N, C       Alzheimer's Services of the East Bay                                  Special Transportation Services for Individuals with Dementia                                           $300,000       $348,743      $648,743         Complete
                                                   N         Bay Area Community Services                                           Dimond-Fruitvale Senior Shuttle and East Oakland Senior Shuttle Expansion                               $102,576        $5,129       $107,705          Active
                                                   N         Bay Area Community Services                                           North Alameda County Group Trip Program                                                                 $240,454       $17,447       $257,901         Complete
                                                   N         Center for Independent Living/USOAC                                   Outreach and Travel Training Project of North Alameda County                                            $239,976       $18,888       $258,864        Closing Out
                                     3             N         City of Berkeley/Ed Roberts Campus                                    Ashby BART Station/Ed Roberts Campus                                                                    $141,000       $16,000       $157,000          Active
     Paratransit




                                                   S         City of Fremont                                                       Older Driver Safety Awareness Program                                                                    $36,000         $0          $36,000          Complete
                                                   S         City of Fremont                                                       Volunteers for Independence Program                                                                      $70,000         $0          $70,000          Complete
                                                   C         City of Hayward                                                       Hayward Ride-Today!                                                                                     $355,700         $0          $355,700         Complete
                                                   S         City of Newark                                                        Fare Assistance for AC Transit Circulator Routes                                                         $93,026         $0          $93,026          Complete
                                                   E         Livermore Amador Valley Transit Authority/Pleasanton Paratransit      LAVTA Paratransit Customer Service Software                                                             $175,000       $26,000       $201,000         Complete
                                                   E         Livermore Amador Valley Transit Authority/Pleasanton Paratransit      Tri-Valley Travel Training Program                                                                      $123,800       $57,460       $181,260         Complete
                                                  CW         San Francisco Bay Area Rapid Transit District                         East Bay Paratransit Rider Care Specialist                                                              $126,768       $22,371       $149,139          Active
                                                                                                                                                                                                       Cycle 3 Grants (16) Subtotal        $3,500,000     $573,683     $4,073,683
                                                  C, S       Alameda County Transportation Improvement Authority                   Central County Taxi Program Expansion and "Guaranteed Ride Home" for Travel Training Participants        $35,000         $0          $35,000           Active
                                                  CW         Alameda County Transportation Improvement Authority                   Countywide Mobility Coordination                                                                        $374,000         $0          $374,000          Active
                                                 N, C, S     Alameda-Contra Costa Transit District                                 Interactive Voice Response (IVR)/Web-based Scheduling Software                                          $200,000         $0          $200,000          Active
                                                  CW         Alameda-Contra Costa Transit District                                 New Freedom Fund Grant Match                                                                             $36,000       $144,000      $180,000          Active
                                                 N, C, S     Alameda-Contra Costa Transit District                                 EBP Mobile Data Terminal/Automatic Vehicle Locator Project                                              $306,000       $554,000      $860,000          Active
                                                 N, C, S     Alzheimer's Services of the East Bay                                  Driving Growth through Transportation: Special Transportation Services for Individuals with Dementia    $300,000       $661,880      $961,880          Active
                                                   N         Bay Area Outreach and Recreation Program                              BORP North County Youth/Adults with Disabilities Group Trip Project                                     $266,200       $153,230      $419,430          Active
                                                  N, C       Centers for Independent Living                                        Mobility Matters!                                                                                       $300,000       $33,258       $333,258          Active
                                                   N         City of Albany                                                        Albany Senior Center Community Shuttle Bus                                                              $161,600       $30,900       $192,500          Active
                                                   N         City of Emeryville                                                    94608 Area Demand Response Shuttle Service for Seniors and/or People with Disabilities                  $232,000       $18,000       $250,000          Active
                                     4             S         City of Fremont                                                       VIP Rides Program                                                                                       $154,665         $0          $154,665          Active
                                                   C         City of Hayward                                                       Hayward Round About - Paratransit Shuttle Service                                                       $440,000         $0          $440,000          Active
                                                   N         City of Oakland                                                       GRIP - Grocery Return Improvement Program +                                                             $275,885       $50,000       $325,885          Active
                                                   N         City of Oakland - Department of Human Resources                       TAXI - UP & GO Project!                                                                                 $143,472       $260,840      $404,312          Active
                                                   E         City of Pleasanton                                                    Downtown Route                                                                                          $240,038       $75,208       $315,246          Active
                                                   E         City of Pleasanton                                                    Rider Assessment Service                                                                                 $15,000       $14,727       $29,727           Active
                                                   E         Livermore Amador Valley Transit Authority                             Paratransit Vehicle Donation Program and Dial-a-Ride Scholarship                                         $95,000        $4,813       $99,813           Active
                                                   E         Livermore Amador Valley Transit Authority                             LAVTA Livermore Senior Housing Shuttle                                                                  $175,000        $9,500       $184,500          Active
                                                  CW         San Francisco Bay Area Rapid Transit District                         Learn BART! A Picture Guide to Riding BART                                                               $43,000       $21,600       $64,600           Active
                                                   E         Senior Support Program of the Tri Valley                              Volunteers Assisting Same Day Transportation and Escorts                                                $153,140       $16,000       $169,140          Active
                                                                                                                                                                                                       Cycle 4 Grants (20) Subtotal        $3,946,000    $2,047,956    $5,993,956
                                                                                                                                                                                      52 Paratransit - Cycles 1 - 4 Grants Total           $9,062,365    $2,621,639    $11,684,004
                                                  CW         Alameda County Congestion Management Agency (ACCMA)                   Transit Oriented Development Technical Assistance Program                                               $250,000       $50,000       $300,000         Complete
                                                   N         City of Alameda                                                       Alameda Point Station Area Plan Project                                                                 $134,000       $225,585      $250,000         Complete
                                                             City of San Leandro                                                   Downtown San Leandro Bus Rapid Transit Station Area Plan Project                                                                                      Complete
 Transit Oriented




                                     1             C                                                                                                                                                                                       $250,000       $450,000      $700,000
  Development




                                                   E         City of Pleasanton                                                    Pleasanton Hacienda Business Park Station Area Plan Project                                             $120,000       $398,950      $412,175         Complete
                                                                                                                                                                                                         Cycle 1 Grants (4) Subtotal       $754,000      $1,124,535    $1,662,175
                                                   E         City of Livermore                                                     Downtown Livermore Pedestrian Transit Connections Program                                               $180,500      $1,200,000    $1,380,500         Active
                                                   S         City of Fremont                                                       Bay Street Streetscape Project                                                                          $138,000      $1,692,000    $3,400,000         Active
                                     2             N         City of Oakland                                                       West Oakland Seventh Street Transit Village Streetscape                                                 $218,500      $1,300,000    $3,418,500         Active
                                                   N         City of Berkeley                                                      Transportation Enhancements at Ashby BART Station/Ed Roberts Campus                                     $230,000     $31,770,000    $34,000,000        Active
                                                                                                                                                                                                         Cycle 2 Grants (4) Subtotal       $767,000     $35,962,000    $42,199,000
                                                                                                                                                              8 Transit Oriented Development - Cycles 1 - 2 Grants Total                   $1,521,000   $37,086,535    $43,861,175

                                                                                                                                                                                   ACTIA Program Grants Total
                                                                                                                                                                                                                                          $26,789,657   $76,575,820   $108,744,117
                                                                                                                                    (Paratransit + Bicycle and Ped + Express Bus+Transit Oriented Development)




                                                                                                                                                                                                                                                                                                       7/11/2011
                              C:\Docstoc\Working\pdf\26727f48-83d5-45d1-8488-1ebd9f5377d7.xls                                                                                                                                                                                                            1:28 PM
ACTIA Program Grants Summary - June 2008
Bicycle and Pedestrian/Express Bus/Paratransit




                                                                                               ACTIA                          Total
                                                                                                              Other
                                  Grant Programs                                              Measure B                      Project
                                                                                                              Funds
                                                                                               Funds                          Cost

                                                               7 - Cycle 1 Grants Subtotal    $1,500,000    $5,994,119     $7,494,119


                                                               8 - Cycle 2 Grants Subtotal    $1,000,000    $1,125,993     $2,125,993

 Bicycle and
                                                             14 - Cycle 3 Grants Subtotal     $3,007,292    $14,664,235   $17,671,527
 Pedestrian


                                29 Bicycle and Pedestrian - Cycles 1 - 3 Grants Total         $9,507,292    $26,032,139   $35,539,431




Express Bus                                         3 Express Bus - Cycle 1 Grants Total      $6,699,000    $10,835,507   $17,659,507



                                                        16 - Cycles 1 & 2 Grants Subtotal     $1,616,365        $0         $1,616,365


 Paratransit                                                 16 - Cycle 3 Grants Subtotal     $3,500,000     $573,683      $4,073,683


                                                             20 - Cycle 4 Grants Subtotal     $3,946,000    $2,047,956     $5,993,956



                                                 52 Paratransit - Cycles 1 - 4 Grants Total   $9,062,365    $2,621,639    $11,684,004




                                                   ACTIA Program Grants Grand Total
                                                                                              $26,789,657   $76,575,820 $108,744,117
                                        (Paratransit + Bicycle and Ped + Express Bus)




                                                                                                                          As of 7/11/2011
Plans
Bike and Ped
   Alameda        Alameda County Pedestrian     A04-0019   1   $120,000.00     $120,000.00   100%
    County              Master Plan for
                     Unincorporated Areas
U.C. Berkeley      UC Berkeley Bicycle Plan     A04-0023   1    $61,250.00     $61,250.00    100%
  Alameda          Countywide Bicycle Plan      A05-0030   2    $30,000.00     $30,000.00    100%
County CMA                  Update
  Alameda           Union Pacific (Oakland      A07-0004   3    $75,000.00        $0.00      0%
County PWA         Subdivision) RR Corridor
                      Improvement Plan
     City of    City of Alameda Pedestrian      A05-0031   2    $36,000.00     $29,169.25    81%
   Alameda              Master Plan
City of Oakland Oakland Bicycle Master Plan     A04-0018   1   $134,000.00     $108,745.06   81%
                           Update
     City of     Pleasanton Pedestrian &        A07-0012   3   $111,000.00        $0.00      0%
  Pleasanton        Bicycle Master Plan

Capital Projects
Bike and Ped
  AC Transit      Bike Racks for New Buses      A07-0003   3   $20,000.00         $0.00      0%
     BART           BART Station Electronic     A05-0037   2   $174,000.00      $9,803.00    6%
                        Bicycle Lockers
   Berkeley        Aquatic Park Connection      A07-0005   3    $65,000.00        $0.00      0%
Redevelopmen       Streetscape Improvement
   t Agency      Project - Phase 1 Bike & Ped
                         Improvements
City of Oakland    Eastlake Streetscape and     A04-0016   1   $262,000.00     $262,000.00   100%
                   Pedestrian Enhancement
                            Project
  East Bay             Iron Horse Trail         A04-0021   1   $450,000.00     $405,000.00   90%
Regional Park
   District
Express Bus
  AC Transit      Ardenwood Express Bus Park    A06-0039   1   $1,500,000.00   $750,050.00   50%
                    and Ride Improvements
    LAVTA           LAVTA Bus Rapid Transit     A06-0040   1   $1,649,000.00   $172,296.56   10%

Programs
Bike and Ped
   Oakland        Bicycle Education Programs    A04-0022   1   $101,204.84     $101,204.84   100%
Unified School
    District

East Bay Asian    Bicycle Education Programs    A06-0015   1   $121,545.16     $114,252.34   94%
 Youth Center

   East Bay        Bicycle Safety Education     A07-0015   3    $38,000.00        $0.00      0%
    Bicycle                Classes
   Coalition
Transportation Safe Routes to School (SR2S)     A07-0016   3   $729,000.00        $0.00      0%
and Land Use Alameda County Partnership
   Coalition
Paratransit
ACTIA/ City of          Travel Training         ACTIA-1    3   $140,000.00      $2,091.25    1%
 Fremont/ N\N
 Alzheimer's        Special Transportation        A06-0036   3   $300,000.00   $203,346.01   68%
Services of the   Services for Individuals with
  East Bay                 Dementia
City of Oakland   MRTIP and AHIP - Oakland        A04-0030   1   $530,546.00   $454,492.16   86%

    LAVTA            LAVTA - Taxi Study           A04-0036   1   $141,211.00    $39,925.90   28%
    City of         Hayward Ride - Today!         A06-0032   3   $355,700.00   $134,200.60   38%
   Hayward
Last Report Submitted



PR4
FR

FR




PR4




PR6




PR4



PR6




Superceded by A06-0015



PR6
Bicycle Safety Education        East Bay Bicycle        3                Course maps developed for Day 2 (on-road) Cl
          Class                     Coalition
                                                      285              Adults/Teenagers trained at all Year 1 Classes (0

                                                        60              Youth trained at Family Cycling Workshop in Y

                                                      285              Adults/Teenagers trained at all Year 2 Classes (0

                                                        17         Police departments contacted in all 14 Cities of Al
                                                                  County, plus County Sheriff, UC Berkeley, EBRPD

                                                        5              Opt-In Voluntary Police Department Citation Div
                                                                          Programs established at 5 Jurisdictions/Agenc

  Safe Routes to School        Transportation and       50                Schools offering a comprehensive SR2S progr
         (SR2S)                Land Use Coalition
                                                      17500       Students attending schools offering a comprehensiv
                                                                                            program
                                                      10%        Mode shift by families/students to bicycling and/or w
                                                                                     a result of the Project

                                                      17500                   Students who attend an assembly program

                                                      500         Students who participate in after-school activities fo
                                                                                        walking/biking
                                                        75                 Walking and bicycling community events
                                                        20                          Walkabouts conducted
                                                        20            Conceptual plans for improvements around scho

                                                        30               After-school providers who receive SR2S traini

                                                        50            Teachers who receive trainings in classroom presen

                                                        50        Schools provided with resources/assistance (outside
                                                                             targeted for comprehensive program)

                                                      100             Parents, volunteers, and community members invo
                                                                                            SR2S programs



            BART Station Electronic Bicycle Lockers
            Sponsor: BART
                                                             San Leandro          Bayfair        N. Berkeley         Du
                                                                                                                    Plea
Individual Plastic Lockers                                        0                 16                58
Individual Metal Lockers                                         28                  0                 0
Individual Plastic Lockers after Project Completion              0                   0                 0
Individual Metal Lockers after Project Completion                12                 16                 0
New Shared-Use Electronic Metal Lockers after Project
                 TOTAL NUMBER OF LOCKERS                         20                  0                34
Completion       AFTER PROJECT COMPLETION                                32                 16                 34
Individual Plastic Lockers                                             0                 16                 58
Individual Metal Lockers                                              28                 0                  0
Individual Plastic Lockers after Project Completion                   0                  0                  0
Individual Metal Lockers after Project Completion                     12                 16                 0
New Shared-Use Electronic Metal Lockers after Project
                 TOTAL NUMBER OF LOCKERS                              20                 0                  34
Completion       AFTER PROJECT COMPLETION                                   32                   16              34



           Travel Training
           Sponsor: ACTIA/ City of Fremont/ Nelson-Nygaard

Increase the personal mobility of the elderly and people with disabilities.
Project consists of the development and implementation of a transit rider oriented travel training model.



           Special Transportation Services for Individuals with Dementia
           Sponsor: Alzheimer’s Services of the East Bay

Provide transportation                 Has hired two (2) new van Total number of drivers and vans is six (6
services Monday through                drivers and put two (2)
Friday to individuals with             more vans into service (as
cognitive impairment,                  of July 31, 2007)
primarily of the Alzheimer’s
type, to and from their home
and a safe Adult Day Health
Care centers.                                                              Anticipated Action (as of July 31, 2007):
                                                                           maintain six (6) vans and six (6) drivers in
                                                                           service. Continue to tailor schedule/routes
                                                                           best serve clients.
Performance Measures (as of            There were 8806 trips                1. Individuals with Dementia will remai
July 31, 2007):                        provided during the                 home: The transportation program allows
                                       reporting period (Jan –             participants to remain at home by freeing
                                       June 2006).                         for caregivers to maintain careers or have
                                                                           respite.
                                       There were 76 people                2. Drivers will understand dementia care
                                       served during the                   drivers must pass training exams, and wil
                                       reporting period (Jan –             evaluated on an annual basis.
                                       June 2006)
                                                                           3. Passengers will be transported safely:
                                                                           are no incidents to report from this period
                                                                           4. High satisfaction with transportation
                                                                           program: 100% of clients who used ASEB
                                                                           transportation exclusively were satisfied,
                                                                           according to surveys.
                                                                           5. Van maintained in good working cond
                                                                           Vehicles are inspected daily, and kept in p
                                                                           working condition.
                                                                           6. Operate vehicles in efficient manner:
                                                                           Routes are carefully planned to minimize
                                                                           excessive driving, and vehicles are operat
                                                                           maintained within budget.
                                                                           7. Continue to improve transportation
                                                                           services: ASEB continues to seek new wa
                                                   5. Van maintained in good working cond
                                                   Vehicles are inspected daily, and kept in p
                                                   working condition.
                                                   6. Operate vehicles in efficient manner:
                                                   Routes are carefully planned to minimize
                                                   excessive driving, and vehicles are operat
                                                   maintained within budget.
                                                   7. Continue to improve transportation
                                                   services: ASEB continues to seek new wa
                                                   accommodate clients by adjusting routes,
                                                   training drivers, adding more passengers,
                                                   inviting feedback.
          Taxi Study for Seniors and Disabled
          Sponsor: LAVTA

Task 1, Feasibility Study, is
completed and has been adopted
by the Board of Directors
Task 2, Pilot Program, is being                 LAVTA has hired an extra employee
developed (?).                                  to develop the pilot program: conduct
                                                background research, met with local
                                                police departments regarding taxi
                                                permitting, researched the Tri-Valley
                                                taxi industry, identified potential
                                                clients for the pilot, and began a past
                                                trip behavior study.

          Hayward Ride – Today!
          Sponsor: City of Hayward

The Project is on track (as of July             1. Prescheduled trips for later the
31, 2007) – started providing                   same day of the request
same day rides to riders registered
with Hayward Paratransit
Program on July 3, 2006 and
continues to do so. The program
offers two service options to                   2. Demand response trips – a ride
registered riders:                              within 45 minutes from trip request.
                                                Service is limited to trips within
                                                Hayward, Castro Valley, San Leandro
                                                and San Lorenzo. Trips are offered
                                                from 8:30 to 4:30, Monday through
                                                Friday.
Spring issues of the Hayward
Paratransit newsletter were
produced and mailed to over 1000
registered riders and agencies
which serve riders and potential
riders. This includes 35 Skilled
Nursing Facilities in our service
area.
Public Presentations and
information were offered to local
community groups and resource
fairs
Decals were installed on all 8
   produced and mailed to over 1000
   registered riders and agencies
   which serve riders and potential
   riders. This includes 35 Skilled
   Nursing Facilities in our service
   area.
   Public Presentations and
   information were offered to local
   community groups and resource
   fairs
   Decals were installed on all 8
   vehicles used in the Hayward
   Paratransit service
   Additional drivers and vehicles
   were added to the fleet.
Public presentations will be offered to
senior housing complexes, Skilled
Nursing Facilities and other groups
within the service area.
Plan to respond to suggestions derived
from ACTIA’s contracted survey on
improving the Ride Today program as
appropriate.
Performance Measure:                      There were 1383 trips provided during the reporting
                                          period.
                                          Originally projected at 7083 trips per year. Funded at
                                          89%. 89%=6304 or 3152 semiannually: 1383 trips
                                          provided; under goal due to paratransit driver shortage.

                                          At least 56% of trips to be provided on lift equipped
                                          vans: 100% if trips were performed on lift equipped
                                          vans.
                                          On-time performance A) Demand response trips to be
                                          provided within 45 minutes of trip request. B) Same
                                          day reserved trips will be performed within a 20 minute
                                          window: On time performance – average of 6 months =
                                          97% for both A & B
                                          No more than 5% of trips will be no shows: 4% no
                                          shows; 0% cancels

                                          $30.25 cost per trip: With 1.23 average trips per hour at
                                          $39.73 per hour = average trip cost was $32.20.
 eveloped for Day 2 (on-road) Class

  trained at all Year 1 Classes (07/08)

 Family Cycling Workshop in Year 1

  trained at all Year 2 Classes (08/09)

  contacted in all 14 Cities of Alameda
y Sheriff, UC Berkeley, EBRPD, Others

 Police Department Citation Diversion
 blished at 5 Jurisdictions/Agencies

  g a comprehensive SR2S program

 chools offering a comprehensive SR2S
       program
 s/students to bicycling and/or walking as
  result of the Project

 ho attend an assembly program

 pate in after-school activities focused on
    walking/biking
  d bicycling community events
Walkabouts conducted
 s for improvements around schools

 oviders who receive SR2S trainings

 ve trainings in classroom presentations

 th resources/assistance (outside of those
 for comprehensive program)

 , and community members involved in
    SR2S programs




 r        N. Berkeley          Dublin/
                              Pleasanton
               58                 24
                0                  0
                0                 24
                0                  0
               34                 12
     16                  34
              58             24
              0               0
              0              24
              0              0
              34             12
    16               34




ning model.




 f drivers and vans is six (6)




tion (as of July 31, 2007): Will
) vans and six (6) drivers in daily
ue to tailor schedule/routes to
 ts.
s with Dementia will remain at
 sportation program allows
remain at home by freeing time
o maintain careers or have


 l understand dementia care: New
 ss training exams, and will be
n annual basis.

 will be transported safely: There
s to report from this period.
action with transportation
 of clients who used ASEB
 xclusively were satisfied,
rveys.
ained in good working condition:
spected daily, and kept in proper
 ion.
hicles in efficient manner:
 fully planned to minimize
ng, and vehicles are operated and
hin budget.
o improve transportation
B continues to seek new ways to
ained in good working condition:
spected daily, and kept in proper
 ion.
hicles in efficient manner:
 fully planned to minimize
ng, and vehicles are operated and
hin budget.
o improve transportation
B continues to seek new ways to
  lients by adjusting routes,
 , adding more passengers, and
 ck.




d an extra employee
ot program: conduct
 rch, met with local
 s regarding taxi
 ched the Tri-Valley
ntified potential
ot, and began a past
 y.




trips for later the
quest




 nse trips – a ride
 from trip request.
to trips within
Valley, San Leandro
Trips are offered
 Monday through
 uring the reporting

 per year. Funded at
nually: 1383 trips
ransit driver shortage.

 ed on lift equipped
 ed on lift equipped

d response trips to be
 p request. B) Same
med within a 20 minute
 average of 6 months =

 no shows: 4% no


verage trips per hour at
 st was $32.20.

						
Related docs
Other docs by xgw65822
Precipitation Worksheets
Views: 51  |  Downloads: 0
Pre Order Form, Template - Excel
Views: 35  |  Downloads: 0
Pre K Newsletter Templates - PDF - PDF
Views: 509  |  Downloads: 0
Pre Marital Certificate Application - PDF
Views: 29  |  Downloads: 0
Pre Contratual Agreement - Excel
Views: 6  |  Downloads: 0
Pre Presentation Checklist
Views: 9  |  Downloads: 0
Pre Negotiation Confidentiality Agreement
Views: 26  |  Downloads: 0
Preemployment Health Assessment
Views: 4  |  Downloads: 0
Preface of Financial Statements
Views: 1  |  Downloads: 0