professional documents
home
Upload
docsters
Upload
Excel Spreadsheet

Program Vehicle and Equipment Tracking Worksheets V - Voluntary Airport Low Emissions (VALE) Program center doc


rate this doc
email this doc
embed this doc
add to folder
digg reddit stumble delicious
FAA Voluntary Airport Low Emission Program PAGE 1. TRACKING FORMS - GENERAL INFORMATION Airport Name: Contact Person: Mailing Address: Email Address: 3-Letter Airport ID: Calendar Year Phone: Fax: ver. 4.0 DESCRIPTION OF TRACKING WORKSHEETS The FAA provides these VALE project tracking worksheets to help sponsors monitor the emissions performance and cost effectiveness of VALE projects. Following a calendar year of operations, the sponsor should complete these forms and keep them on file for purposes of updating reports to the State air quality agency for AERCs, facilitating FAA review, and providing information to the public upon request. PAGE 1 - General Information This sheet should be updated as needed to reflect changes in contact information. PAGE 2 - Vehicle Tracking Annual operational data and maintenance costs should be kept for each VALE-funded vehicle. Copies of PAGE 2 should be made as necessary. The annual emissions should be calculated for each VALE-funded vehicle and recorded in the lower right corner. This information, as well as supporting EDMS documentation, will need to be comunicated to the State air quality agency for AERC issuance and use. PAGE 3 - Infrastructure Tracking Annual operating data and maintenance costs should be kept for VALE-funded infrastructure. PAGE 4- Emissions Tracking Worksheet Total project emissions (vehicles + infrastructure use) should be calculated on an annual basis. Total emissions should be entered into the "project" columns. The baseline emissions should be identical or consistent with what was calculated in the initial project application. Emission reductions (ERs) for each project year are automatically calculated as the difference between "baseline" and "project." A running cumulative emissions reduction will automatically appear at the top of the page. The total number of years for the project is equal to the useful life for individual VALE vehicles and equipment or to a longer period up to the typical 20-year life of AERCs. PAGE 5 - Cost Effectiveness For each respective "Calendar Year," sponsors must record the operational & maintenance (O&M) costs for VALE-funded vehicles and infrastructure. These costs should be summed and divided by the total annual emission reductions per pollutant in the appropriate cells to the right of the cost information. This provides annual cost effectiveness for each project year. At the bottom of page 5, the sponsor should enter in the total sum of AIP requested, PFC requested, AIP matching, and other local funds from the original project application. The worksheet will automatically calculate the overall project cost effectiveness. Page 1 of 5 PAGE 2. INDIVIDUAL VEHICLE INFORMATION (Repeat the completion of this sheet for each VALE vehicle) Calendar Year: Vehicle Identification Vehicle Class Information Ground Support Equipment (GSE) nonroad, unlicensed Ground Access Vehicle (GAV) licensed for onroad use Hp: Vehicle leased to a Tenant (Y/N)? VIN or Serial Number: If yes, to whom? Alternative Fuel Type (check one) Electric CNG (compressed natural gas) LNG (liquified natural gas) LPG (liquefied petroleum gas/propane) Hybrid Technology Hydrogen (Fuel Cell) Ethanol 85 Methanol 85 Coal-derived liquid fuels Biodiesel (85-100%) Retrofit/Rebuild Other ____________________ Program ID Information Unique Airport Vehicle ID: Vehicle Airport Deployment Date: Make, Model, & Model Year: License Plate (if applicable): Vehicle Owner: Does vehicle have required VALE Program label affixed (Y/N)? Annual Vehicle Usage Avg. Useful Life (years):1 Original Vehicle Purchase Price: Airport Vehicle Type (choose only one vehicle type per worksheet) Air Conditioning Unit Baggage Tug Belt Loader Cargo Loader Cargo Tractor Catering Truck Deicer Truck Fork Lift Fuel Truck Generator Ground Power Unit Fire Truck Lavatory Truck Pushback Tractor Sweeper Sport Utility Vehicle (SUV) Passenger Car Passenger Van Service Van Pickup Truck 22' Shuttle 30-35' Bus 40' Bus Other _________________ For this calendar year, complete all that apply: Miles traveled: Hours operated: Annual Fuel Use: Fuel use units: Maintenance Records Description of Maintenance Service Date Maintenance Cost ($) Annual Emissions Summary Calculate annual emission based on the operating parameters of the vehicle(s) listed on this worksheet. Annual Emissions Pollutant (tons per year) NOx VOC CO PM10 PM2.5 SOx ver. 4.0 1 2 3 4 5 6 7 8 $ Repeat this page as needed for each VALE vehicle type. 1/ Refer to Tables 7-1 and 8-1 in the VALE program Technical Report. Page 2 of 5 PAGE 3. VALE INFRASTRUCTURE TRACKING SHEET Calendar Year: Low Emissions Infrastructure Technololgy or Equipment Units Start-up Date Estimated Operating Life (years) Description of Low Emission Infrastructure No. of Units Original Purchase Price Does equipment have required VALE label affixed ? (Y/N) Fuel Throughput (if applicable) Maintenance Description Maintenance Cost ($) 1 2 3 4 5 6 7 8 9 10 11 12 Totals: Repeat this page as needed. $0.00 0.00 $0.00 ver. 4.0 Page 3 of 5 PAGE 4. VALE EMISSION REDUCTIONS (ER) TRACKING WORKSHEET ver. 4.0 Project Cumulative Emission Reductions Summary NOx VOC CO PM10 PM2.5 SOx 0.0 All values are in tons per year Project Year #1 Baseline Project ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #6 Baseline Project NOx VOC CO PM10 PM2.5 SOx 0.0 0.0 0.0 0.0 0.0 Project Year #4 Baseline Project Project Year #5 Baseline Project Project Year #2 Baseline Project NOx VOC CO PM10 PM2.5 SOx ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #3 Baseline Project ER 0.0 0.0 0.0 0.0 0.0 0.0 ER 0.0 0.0 0.0 0.0 0.0 0.0 ER 0.0 0.0 0.0 0.0 0.0 0.0 ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #7 Baseline Project ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #8 Baseline Project ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #9 Baseline Project ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #10 Baseline Project ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #11 Baseline Project NOx VOC CO PM10 PM2.5 SOx ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #12 Baseline Project ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #13 Baseline Project ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #14 Baseline Project ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #15 Baseline Project ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #16 Baseline Project NOx VOC CO PM10 PM2.5 SOx ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #17 Baseline Project ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #18 Baseline Project ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #19 Baseline Project ER 0.0 0.0 0.0 0.0 0.0 0.0 Project Year #20 Baseline Project ER 0.0 0.0 0.0 0.0 0.0 0.0 Page 4 of 5 PAGE 5. PROJECT COST EFFECTIVENESS TRACKING WORKSHEET Annual Project Cost Effectiveness ($/ton of emissions saved) Calendar Year Project Year #1 Project Year #2 Project Year #3 Project Year #4 Project Year #5 Project Year #6 Project Year #7 Project Year #8 Project Year #9 Project Year #10 Project Year #11 Project Year #12 Project Year #13 Project Year #14 Project Year #15 Project Year #16 Project Year #17 Project Year #18 Project Year #19 Project Year #20 Totals: $ $ Cummulative Project Cost Effectiveness ($/ton of emissions saved) Initial Total Project Funds: 1/ Annual Vehicle O&M Costs ($) Annual Infrastructure O&M Costs ($) NOx VOC CO PM10 PM2.5 SOx 1 NOx VOC CO PM10 PM2.5 SOx #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! ver. 4.0 Enter in the total sum of AIP requested, PFC requested, AIP matching, and other local funds from the original project application. Page 5 of 5
flag this doc
26
0
not rated
0
6/24/2008
English
Preview

Program Application Worksheets V - Voluntary Airport Low Emissions (VALE) Program

FAA 6/24/2008 | 21 | 0 | 0 | legal
Preview

Program Vehicle and Equipment Tracking Worksheets V

FAA 6/24/2008 | 29 | 0 | 0 | legal
Preview

Inherently Low Emission Airport Vehicle (ILEAV) Pilot Program

FAA 6/24/2008 | 11 | 0 | 0 | legal
Preview

Inherently Low Emission Airport Vehicle (ILEAV) Pilot Program

FAA 6/24/2008 | 11 | 0 | 0 | legal
Preview

Inherently Low Emission Airport Vehicle (ILEAV) Pilot Program

FAA 6/24/2008 | 12 | 0 | 0 | legal
Preview

Program Application Worksheets V

FAA 6/24/2008 | 7 | 0 | 0 | legal
Preview

Aviation Emissions A Primer

FAA 6/24/2008 | 20 | 0 | 0 | legal
Preview

General Aviation Awards Program Application

FAA 6/24/2008 | 8 | 1 | 0 | legal
Preview

SOC Aviation Safety Action Program

FAA 6/24/2008 | 10 | 1 | 0 | legal
Preview

Aviation Environmental Impacts an Airport Perspective

FAA 6/24/2008 | 13 | 1 | 0 | legal
Preview

Forecasting Aviation Activity by Airport

FAA 6/24/2008 | 26 | 0 | 0 | legal
Preview

Federal Register Notice Changes to the International Aviation Safety Assesment Program

FAA 6/24/2008 | 9 | 1 | 0 | legal
Preview

Order Aviation Safety and Health Partnership Program Aviation Rulemaking Committee

FAA 6/24/2008 | 14 | 1 | 0 | legal
Preview

Global Aviation Emissions Inventories

FAA 6/24/2008 | 13 | 1 | 0 | legal
Preview

Aviation Emissions A Primer - Environmental Policies

FAA 6/24/2008 | 17 | 2 | 0 | legal
Preview

Airman Knowledge Test Question Bank

FAA 6/24/2008 | 155 | 8 | 0 | legal
Preview

Airman Knowledge Test Question Bank

FAA 6/24/2008 | 130 | 2 | 0 | legal
Preview

Airman Knowledge Test Question Bank

FAA 6/24/2008 | 69 | 0 | 0 | legal
Preview

Airman Knowledge Test Question Bank

FAA 6/24/2008 | 68 | 1 | 0 | legal
Preview

Airman Knowledge Test Question Bank

FAA 6/24/2008 | 96 | 1 | 0 | legal
Preview

Airman Knowledge Test Question Bank

FAA 6/24/2008 | 84 | 2 | 0 | legal
Preview

Airman Knowledge Test Question Bank

FAA 6/24/2008 | 131 | 0 | 0 | legal
Preview

Airman Knowledge Test Question Bank

FAA 6/24/2008 | 103 | 0 | 0 | legal
Preview

Airman Knowledge Test Question Bank

FAA 6/24/2008 | 73 | 0 | 0 | legal
Preview

Airman Knowledge Test Question Bank

FAA 6/24/2008 | 379 | 0 | 0 | legal
 
review this doc