					O/o GM BSNL Satara                                                        TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                                      IN SATARA TELECOM DISTRICT. 2009-10.

                                   BHARAT SANCHAR NIGAM LIMITED
                                    (A GOVT. OF INDIA ENTERPRISE)
                            OFFICE OF GENERAL MANAGER TELECOM SATARA
                           OLD LIC BUILDING, PALACE STREET, SATARA-415 002.
                                                *** TENDER FORM ****
TENDER FORM NUMBER: -

TENDER FORM FOR : TENDER FOR “ ERECTION & MAINTENANCE OF TOWERS OF ANY TYPE, MAKE &
                             ASSOCIATED WORKS AS PER BSNL STANDARDS, AT ANY PLACE IN SATARA
                             TELECOM DISTRICT”

NO. OF PAGES: -           30.

COST OF TENDER FORM: - Rs.1125/- IN CASH, (NON-REFUNDABLE), PAYABLE AT CASH COUNTER, O/o
                       G. M. TELECOM, BSNL, SATARA-2. (COST INCL. OF 12.50 % S.TAX) IN CASE
                                   THE         FORM            DOWNLOADED
                                                                IS            FROM    THE    WEBSITE:
                                   http://maharashtra.bsnl.co.in/Tender OF SATARA TELECOM, TENDERER
                                   SHOULD ATTACH A DD OF Rs.1125/-, PAYABLE AT SATARA ONLY, TOWARDS
                                   COST OF TENDER FORM.

TENDER FORM ISSUED BY: -



PERIOD FOR ISSUEING THE TENDER FORMS: - DURING 11:00 TO 15:00 Hrs OF
                                                                     14/08/2009 TO   03/09/2009 ( EXCEPT HOLIDAYS)
DATE OF ISSUE: -

TENDER FORM ISSUED TO: -



EARNEST MONEY DEPOSIT: - Rs. 2,04,250 /- (RUPEES TWO LAKHS FOUR THOUSAND
                                          TWO HUNDRED FIFTY ONLY)

MODE OF PAYMENT: -
  1. DD SHOULD BE IN FAVOUR OF A.O. CASH BSNL, SATARA FROM NATIONALISED
     / SCHEDULE BANK ONLY OR BANK GUARANTEE VALID FOR 270 DAYS FORM
     NATIONALISED OR SCHEDULED BANK AS PER PROFORMA ON PAGE NO. 23 & 24
     OF TENDER DOCUMENT ONLY .
  2. DD SHOULD BE PAYABLE AT SATARA ONLY.
TENDERS WITH OUTSTATION PAYABLE D.D. FOR EMD WILL BE STRICTLY REJECTED

LAST DATE AND TIME FOR RECEIVING : -                                        04/09/2009, 15:00 Hrs.
COMPLETED TENDER FORMS

DATE AND TIME OF OPENING OF TENDER: -                                      04/09/2009, AT 15:30 Hrs.

             In case of difference ABOUT interpretation, English text will be considered authentic

In Case of any dispute, the original English Document                 1                   Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                             Name and Seal.
O/o GM BSNL Satara                                                    TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                                  IN SATARA TELECOM DISTRICT. 2009-10.
                                           BHARAT SANCHAR NIGAM LIMITED
                                            (A GOVT. OF INDIA ENTERPRISE)
                                   OFFICE OF GENERAL MANAGER TELECOM SATARA
                                   OLD LIC BUILDING, PALACE STREET, SATARA-415 002.

                                                  **** TENDER NOTICE ****
No. T- 73/Tender– Tower Erection & Mtce /2009-10/ 05 Dated at Satara the                   13/08/2009.
        Wax sealed / packing by PVC tape sealed tenders are invited by the General Manager Telecom, BSNL,
Satara, on behalf of BSNL, for “ERECTION AND MAINTENANCE OF TOWERS OF ANY TYPE, MAKE &
ASSOCIATED WORKS AS PER BSNL STANDARDS, AT ANY PLACE IN SATARA TELECOM DISTRICT
”, from the experienced tenderers, as per the specifications, which can be had from the SDE (Tender-1), O/o
G.M.Telecom, BSNL, Satara or can be downloaded from web site http://Maharashtra.bsnl.co.in/Tender of
Mh.circle. The details are as under:
1. Cost of each tender form (non-refundable).        : Rs.1125/- in cash, including sales tax @ 12.50 %.
2. Period during which the forms will be supplied, : Between 11:00 to 15:00 Hrs of          14/08/2009 to 03/09/2009
   to the tenderers.                                    ( EXCEPT HOLIDAYS )
3. Name of the officer from whom tender forms.        : SDE (Tender-1), O/o G.M.Telecom, BSNL, Satara - 2.
    can be obtained
4. Last date for receipt of completed tender forms. :        04/09/2009, upto 15:00 Hrs.
5. Date and time of opening of tender.               :       04/09/2009, at 15:30 Hrs.
6. EMD to be deposited along with the tender form : Rs 2,04,250/- Only by D.D. in favour of A.O. Cash BSNL Satara OR
                                                       Bank guarantee valid for 270 days from the date of tender opening
                                                       as per proforma on page No. 23 & 24, form ANY NATIONALISED OR
                                                        SCHEDULE BANK ONLY. D.D. SHOULD BE PAYABLE AT SATARA ONLY.
7. Particulars of work                                  : As mentioned below.
8. Experience                                           : Experience in erection 40m or more height towers & allied works for
                                                          not less than Rs.20 lakh OR 20 Nos of 40 mtr or more height towers
                                                         in DoT/ BSNL/ MTNL/ Private Telecom Service Providers irrespective
                                                          of Technology used there of since April 2004 on wards. Experience
                                                          certificate issued by DE or above rank officer in the name of the
                                                          tendering firm should be submitted. In case of private telecom service
                                                          providers experience certificate should be from competent authority
                                                          with his name , designation telephone /Mobile No. & seal should be
                                                          submitted
  Tenders with out-station payable DD for EMD will be strictly rejected. Tender forms will be issued to contractors on written
                                                    request on official letterhead.
           Completed tender document (along with original DD as mentioned above) in wax sealed / PVC tape sealed cover
super scribed as “ERECTION & MAINTENANCE OF TOWERS OF ANY TYPE, MAKE & ASSOCIATED WORKS AS
PER BSNL STANDARDS, AT ANY PLACE IN SATARA TELECOM DISTRICT ” should be sent to the A.G.M. (PLG),
O/o G.M.Telecom, Satara, by registered post/speed post/courier, or may be dropped in tender box kept in O/O A.G.M.
(Plg), 2nd floor, O/o GM BSNL Satara on or before 15:00 Hrs of 04/09/2009. Tenders received late will not be
accepted.
           If within the validity period of the tender (within 240 days after opening of the tenders), any tenderer withdraws his
tender or makes any modifications in rates / terms & conditions which are not acceptable to GMT, BSNL – Satara, then the
GMT, BSNL – Satara shall without prejudice to any other right or remedy, be at liberty to forfeit the EMD absolutely.
           The right to accept the whole tender or part thereof or to reject any tender, without assigning any reason whatsoever
is reserved by the G.M.Telecom, BSNL, Satara.
           Tender forms will not be sent by post. No tender will be accepted from any person, directly or indirectly connected
with the Govt./BSNL Service.
PARTICULARS OF WORK:
Name of work                                              Approx.           Approx.          Security         Period
                                                          Qty                Cost            Deposit          of tender
Erection and maintenance of towers of any type,                                                 10% of
make & associated maintenance Works as per BSNL Eerection                                     Cost of work
standards at any place in Satara Telecom District.       40 M = 66Nos Rs.81.70 Lakhs             award         1 Year
                                                                            Asstt. General Manager (Plg.)
                                                                          O/o G. M. Telecom, BSNL, Satara-2
      IN CASE OF DIFFERENCE ABOUT INTERPRETATION, ENGLISH TEXT WILL BE CONSIDERED AUTHENTIC
In Case of any dispute, the original English Document           2                           Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                               Name and Seal.
O/o GM BSNL Satara                                                   TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                                 IN SATARA TELECOM DISTRICT. 2009-10.
FORM NO.                                                  **** TENDER FORM ****

FROM:                                                                       TO,
                                                                             The General Manager Telecom,
                                                                             BSNL, Satara-2.
-------------------------------------------------------------------------------------------------------------------------------
Subject:- Erection and Maintenance of towers of any type, make & associated works as per BSNL
            standards, at any place in Satara Telecom District.
Sir,
              With reference to your tender notice no. T-73/Tender - Tower Erection & Mtce./2009-2010/05
dated at Satara the 13/08/2009, regarding calling for tender on the above mentioned subject, I/We offer
my/our tender on the terms and conditions & specifications given and at the rates quoted in Annexure-
finance bid.
              The rates are including transportation, all the taxes & duties except service tax. I/We have
fully understood the terms and conditions of the tender & offer to execute the work, at the rates mentioned
above.
              I/We agree to abide by this bid for a period of 240 days from the date fixed for bid opening
and it shall remain binding upon us and may be accepted at any time before the expiring of that period
until a formal agreement is prepared and executed, this bid together with your written acceptance thereof
in your notification to award shall constitute a binding contract on us.
              If within the validity period of the tender (240 days from the date of opening of tender), I/we
withdraw the tender or make any modifications in rates / terms & conditions which are not acceptable to
GMT, BSNL – Satara, then the GMT, BSNL – Satara shall, without prejudice to any other right or
remedy, be at liberty to forfeit our EMD absolutely.
              Should this tender be accepted either fully or in parts, I/We hereby agree to abide by and fulfill
all the terms and conditions of the contract hereafter as applicable or in default thereof, forfeit to and pay
to the BSNL, the sum of money mentioned in the said conditions without prejudice.
              The DD No / B.G. NO. dated ___/___/2009 , from the Bank _______________________
____________________________________________ for Rs.2,04,250 Lakhs only (Rupees Two Lakhs
four thousand two hundred fifty only) is enclosed towards EMD & DD No.__________, dated
___/___/2009 for form fee. I/We also agree to pay the Security Deposit as and when called for within 15
days from the date of receipt of such type of notice.
              If I / We fail to pay the Security Deposit within 15 days of receipt of approval of tender, the
entire amount of EMD may be forfeited without prejudice to any other right or remedies of the BSNL.
              If I/We fail to carry out the work according to the specifications given, the entire money
(Earnest and Security Deposit) may be forfeited without prejudice to any other right or remedies of the
BSNL or their successor in office. I/ we also declare that I/we are not directly or indirectly related
with Government / BSNL Service.
              Thanking you,
                                                                       Yours faithfully,
Place:                       Sign. Of tenderer with rubber seal:
Date:                                                         Name:
                                                           Address:
                    Contact Tele. No.(Office) & (Residence):-
                                          Email :_
                                          Mobile :-
Witness if any, Sign.:
                   Name:
                Address:
   IN CASE OF DIFFERENCE ABOUT INTERPRETATION, ENGLISH TEXT WILL BE CONSIDERED AUTHENTIC
In Case of any dispute, the original English Document 3           Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                             Name and Seal.
O/o GM BSNL Satara                                                               TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                                             IN SATARA TELECOM DISTRICT. 2009-10.
                                                  TENDERER’S PROFILE

                                                                                                                     Passport size
General :                                                                                                            Photograph of
1. Name of the tenderer / firm _______________________________________                                               the tenderer /
                                                                                                                     authorised
2. Name of the person submitting the tender whose Photograph is affixed                                              signatory holding
  Shri/Smt.____________________________________________________                                                      power of Attorney

[The tender has to be signed by Proprietor/Partner/authorised SIGNATORY ONLY, In case of
Proprietary/Partnership/Ltd firms, if person other than tenderer has signed tender document then original
power of attorney on Rs. 100/- non judicial stamp paper (Notarised / before special executive Magistrate)
should be submitted along with the bid.]

3. Address of the firm: ------------------------------------------------------------------------------------------
  --------------------------------------------------------------------------------------------------------------------
  --------------------------------------------------------------------------------------------------------------------
4. Telegraphic Address ……………………………………………………………


5. Tel no. (with STD code) (O) …………………….(Fax)………………………..(R)……………………..
6. Registration & incorporation particulars of the firm:
        i) Proprietorship
        ii) Partnership
        iii) Private Limited
        iv) Public Limited
        v) Individual.
 (Please attach attested copies of documents of registration/ incorporation of your firm with the competent
authority as required by business law)
7. Name of Proprietor/Partners/Directors ……………………………………………………………
……………………………………………………………………………………………………….
8. . Tenderer‟s bank, its address & : ______________________________________________
     his current account number from a bank ________________________________________________________
    having ECS facility if any.    ______________________________________________
10. Permanent Income Tax number : _______________________________
     Income Tax circle : _________________________________________
     (Please attach a copy of last income tax return filed)
11. Service Tax Registration . if any :-
     ( Please attach attested Xerox copy of registration certificate)
12. EPF Registration, if any :-
     ( Please attach attested Xerox copy of registration certificate)
13. Labour Licence, if any :-
     ( Please attach attested Xerox copy of Licence / registration certificate) Contd. On next page..

In Case of any dispute, the original English Document      4                                                         Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                                                        Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.


14. Whether the firm / company is registered under M.S.M.E.D. Act 2006, if Yes please attach
     attested copy of registration certificate. :-     ______________________.
         Micro /    Small /      Medium ( please tick as applicable.)
15. Infrastructural capabilities:
    a. Number of labors under command of the firm
         That can be simultaneously engaged and time
         Required for mobilizing that much no. of labors & the max.
         No. of labors that can be mobilized with in a period of fortnight ………………………
         From the date of the work order.
    b. Any other constructional equipment available,
         Suitable for this work, with the tenderer.        …………………………………………
   c.    Particulars of vehicles available with the tenderer:
         Type of Vehicle(s) ……………………………                          Registration number……………….



    16. Details of Technical and supervisory Staff:




I / We here by declare that , I/We have not been black listed by any other Govt./MTNL/BSNL department
any where in India during the current period, if at any latter stage it is noticed that the said declaration is
false then GM BSNL Satara shall with out prejudice to any other right or remedy ,be at liberty to forfeit
entire amount of EMD / Security deposit and termination of contract.
I/We hereby declare that the information furnished above is true and correct.
Place:
Date:                           Signature of tenderer/Authorised signatory ……………………
                                                       Name of the tenderer ………………………..
                                                       Seal of the tenderer.




                                                                           Continued on next page …..



In Case of any dispute, the original English Document      5                             Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                            Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.


                   **** CERTIFICATE ABOUT THE NEAR RELATIVES OF THE TENDERER ****




This is to certify that,

I ________________________________________, son of ________________________________ r/o
______________________________________________________________________ hereby certify that
none of my relative (s) as defined below:

    i)       Members of a Hindu Undivided family.
    ii)       They are related as husband and wife.
    iii)     The one is related to the other in manner as father, mother, son(s), & Son‟s wife (daughter –in-
             law), Daughter (s) & daughter‟s husband (son-in-law), brother(s) & brother‟s wife, sister(s) &
             sister‟s husband (brother-in-law).

is /are employed in any BSNL/ Govt. unit. In case at any stage, it is found that the information given by
me is false/ incorrect, BSNL shall have the absolute right to take any action as deemed fit/ without any
prior intimation to me.



    Signature of the tenderer with Seal,
    Name:
    Address :
    Date :-




    Contact Tele. No.:-




    Note :
    Government of India/ Financial Institutions nominees and independent non-official part-time
    Directors appointed by Govt. of India or the Governor of the State are excluded from the purview of
    submission of above certificate in regard to employment of near relatives working in the BSNL while
    submitting tenders by the limited companies.




In Case of any dispute, the original English Document      6                          Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                         Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.
                    GENERAL TERMS AND CONDITIONS AND INSTRUCTIONS:

1. The tender documents will be issued by SDE (Tender-1), O/o G.M.Telecom, BSNL - Satara, on
    written request, submitted on official letterhead of the contractor.
2. The tender should be written in Hindi or English.
3. No responsibility for postal delay will be accepted & for that, no extension of time will be granted.
4. Attested Xerox copies of following documents are to be enclosed:
   a) In case of Partnership/Proprietorship/ Ltd company, the relevant documents regarding the -firm
        partnership / proprietorship / Ltd company.
   b) Firm registration certificate BST / CST/ VAT.
   c) Solvency Certificate, issued after 1-04-2009, for at least Rs.10 Lakh, from any Nationalised /
        Scheduled Bank, on the name & address of the tendering firm as per proforma enclosed.
   d) Experience certificate issued by an officer not below the rank of Divisional Engineer, for erection
        & allied works for 40m or more height towers, carried out in DoT/BSNL/MTNL/ private Telecom
        Service providers irrespective of technology used there of since April 2004 onwards for not less
        than Rs20 Lakh or 20Nos of 40 M or more height towers & associated works in the name of
        tendering firm. In case of private Telecom service providers certificate from competent authority
        with name, Designation , Telephone / Mobile No. & seal should be submitted.
   e) Attested copy of Latest Income tax return filed for the assessment year 2007-08 0r 2008-09 and
        attested copy of PAN card.
   f) Certificate about no relatives of the tenderer as per Proforma on page No.6 of tender document
        duly filled & signed OR on separate letter head of the tenderer in prescribed proforma.
5. The tender papers submitted without payment of EMD or without any of the documents mentioned in
    clause 4 or without the name & authority of the person signing the tender form will not be considered.
6. After acceptance of tender, work will be allotted as and when required, during the validity period of
    the tender, which is one year from the date of signing the agreement. The validity period of the tender
    can be extended for further one more year by G.M. BSNL Satara on same rates, terms & conditions.
7. Service tax should be charged by the Contractor (if applicable) at prevailing rates from time to time
    and the TR – 6 Challan, evidencing payment of Service Tax to the concerned authorities should be
    submitted to the AO (Cash) & SDE (Estimate) for effecting regular payments.
8. The rates should be quoted clearly in words & in figures, without any correction. If there is any
    ambiguity in rates, the rates quoted in words will be taken as correct and final. Also Sales Tax or any
    other chargeable duty must be specifically mentioned separately, failing which no such tax or duty
    will be paid or allowed later on.
9. The work should be completed within a period specified (depending on urgency of work), in the work
    order issued by D.E. Transmission Satara. The work must be carried out during daytime only.
10. If the work is not completed within the period given in the work order, the tenderer has to pay the
    penalty. For penalty, period will be calculated from the date of completions as given in the work
    order. Any fraction of week will be rounded off to next higher week. The rate of penalty will be 1.0 %
    of the bill amount per week for delay up to 1st four weeks. For delay exceeding 4 weeks, 1.5 % of bill
    amount per week for delay up to next four weeks. If delay exceeds 8 weeks, contract will be
    terminated by giving one months registered notice for unsatisfactory / undue slow work or the
    contractor will be allowed at higher rate of penalty on mutual agreement between work order issuing
    authority and the contractor. In this case decision of GM BSNL Satara will be final.
11. Prices quoted & the tender bid should be firm & valid for acceptance within 240 days from the date of
    tender opening. If within this validity period, any tenderer withdraws his tender / makes any
    modifications in rates / terms, conditions which are not acceptable to GMT, BSNL – Satara, then the
    GMT, BSNL – Satara shall, without prejudice to any other right or remedy, be at liberty to forfeit of
    the EMD absolutely. Also if the successful tenderer fails to accept the work order or commence the

In Case of any dispute, the original English Document      7                         Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                        Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.
    work or to carry out the work according to the specifications given, the entire money (whole EMD and
    Security Deposit) may be forfeited without prejudice to any other right or remedies.
12. Tenderer should attest all the corrections in the tender to avoid rejection.
13. Separate deposit of EMD and or Security Deposit are necessary for every tender and every section. No
    adjustment of previous deposit is acceptable.
14. Completed tender document (all the pages of tender form) should be returned, duly signed along with
    the name of the signatory on EACH AND EVERY PAGE, by the tenderer (proprietor/ all the
    partner‟s or authorized signatory or consent letter of all the partner‟s , in case of partnership firm) with
    company-seal, indicating the name of the tenderer/firm, partner/proprietor/ authorized signatory, full
     address for correspondence & contact telephone number, etc., at the right side bottom corner, as a
     token of acceptance of all the terms and conditions mentioned in the tender document. Signature
     should be accompanied with the name of the proprietor/partner who has signed the form. Otherwise
     the form will not be considered.
15. The wax sealed/ Packing by PVC tape sealed envelope, containing the completed tender document as
    mentioned in clause 14 above and in tender notice, along with the DD / Bank guarantee towards EMD
    payment (The DD should be in favour of A.O. Cash, BSNL, Satara & payable at Satara.) & DD for
    form fee or ACG-67 receipt (copy) if form is purchased from this office, super scribed as “
    ERECTION AND MAINTENANCE OF TOWERS OF ANY TYPE AND MAKE AND
    ASSOCIATED WORKS (AS PER BSNL STANDARDS), ANYWHARE IN SATARA
    TELECOM DISTRICT ” should be sent to the A.G.M. (PLG) , O/o G.M.Telecom Satara, by
    registered post/speed post/courier, or may be droped in tender box kept in O/o A.G.M. (Plg)
    O/o GM BSNL Satara (2nd Floor), Old LIC Building , Palace street, Near City Post Satara on or
    before 15:00 Hrs of 04/09/2009.
16. The completed tender document as mentioned above, shall be received upto 15:00 Hrs of
    04/09/2009 & will be opened on the same day, in the presence of those tenderers/ their authorized
    representatives whomsoever may be present, at 15:30 Hrs.
17. Any provision of clause in the tender for instance “subject to market fluctuations” which might effect
    the price of articles, will result in tender being rejected.
18. The General Manager Telecom, BSNL, Satara reserves the right to reject any or all the tenders
    without assigning any reason whatsoever. Also he is not bound to accept the lowest tender.
19. The General Manager Telecom, BSNL, Satara reserves the right to award the ENTIRE WORK OR
    PART OF THE WORK TO ONE OR MORE THAN ONE CONTRACTOR, WHO MAY NOT BE
    LOWEST TENDERER.
20. Any tender not according to the specifications, terms and conditions mentioned in the tender
    document or conditional or not to the point, are liable to be rejected without any further notice.
21. Tender should be submitted in two well sealed envelopes ( Packing by PVC tape / Wax seal) enclosed
in a outer properly sealed envelope & addressed to A.G.M. (Plg) Satara ( Packing by PVC tape / Wax
seal) as follows (tenders which are not properly sealed will not be opened):
   a) The first envelope marked as “Technical Bid” for Erection and Maintenance of towers in Satara
       SSA, should contain 1) DD‟s / Bank guarantee valid for 270 days towards EMD 2) Cost of tender
       form – if the form is downloaded then DD for form fee should be attahed/ACG-67 receipt (copy),
       if the form is purchased from this office. 3) Tender document with all pages duly filled & signed
       EXCEPT finance bid page No.26 to 30 of tender document and documents as per clause 4 &14.
   b) The second envelope marked as “Finance Bid” , should contain only rates quoted ( finance bid
       pages, page No.26 to 30 of document) for Erection and maintenance of towers duly filled and
       signed by the tenderer. This will be opened on later date after technical scrutiny of documents.
   c) Finance bid will be opened on later date after scrutiny of technical bid and date of opening of
       finance bids will be intimated to the qualified bidders only. If DD/any document as mentioned in
       clause 4 are not enclosed & tenderer is not exempted, the bid will not be considered.
22. Tenderer has to produce all original documents as and when required for verification.
In Case of any dispute, the original English Document      8                            Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                           Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.
23. Security deposit should be paid within stipulated time by the approved tenderer; otherwise the EMD
will be forfeited.
24. No person, directly or indirectly connected with Govt/BSNL Service, should submit the Tender for
   above-mentioned subject. If at a later date, it is noticed that any of the successful tenderer/tenderer(s)
   is / are directly or indirectly connected with the Govt/BSNL Service, the contract of such tenderer(s)
   shall be terminated without any further notice & the EMD and/or Security Deposit paid will be
   forfeited. In this case, the decision of the General Manager Telecom, BSNL, Satara will be the final.
25. The Contractor shall keep an account of work done from time to time and shall intimate to this
    office whenever the approximate work mentioned in tender has completed.
26. Evaluation of tender will be as follows –
     Part A and Part B will be evaluated Separately & will be evaluated as a composite bid. Quantity given
     for evaluation mentioned in annexure is approximate.
27. When number of contractors / suppliers finalized are more than one, the tentative distribution of order
    shall be made according to the formula given below.

       Sl.No. Number of bidders on whom the Proposed quantity of distribution of work.
              order id proposed to be placed.
       1      2                               L-1 would get 70 % & L-2 would get 30%.
       2      3                               L-1 would get 50%, L-2 would get 30% & L-3
                                              would get 20% work.


28. The successful tenderer shall be required to deposit Security Deposit of 10% of the cost of work
awarded either by Cash / DD (Nationalized or Scheduled Bank) or in the form of Bank Guarantee valid
for One & half years, from any Nationalized or Scheduled Bank, in 15 days from the receipt of Letter of
Approval cum notice for payment, otherwise EMD will be forfeited. Also if more than one contractor‟s
are selected as per annexure wise work, Security Deposit will be reduced proportionately. The EMD
submitted in the form of DD shall be converted in to security deposit. In case EMD is submitted in the
form of bank guarantee, then the approved tenderer has to pay the security deposit in the form of D.D. or
Bank guarantee of full amount should be submitted . Conversion of EMD in to security deposit shall not
be applicable for EMD submitted in the form of bank guarantee. The EMD submitted in the form of bank
guarantee will be released after submission of required full amount of security deposit in the form of DD
or in the form of bank guarantee. There is no any interest payable on the EMD or security deposit amount.
29. Security deposit will be returned to the contractor after completion of 3 months from the date of
termination of tender, after realizing any sums of money payable by the Contractor to the G.M.T. BSNL,
Satara & on written request from him after production of no objection certificate from field units.
Production of no objection certificate is the tenderers responsibility.
30. After depositing the Security Deposit to this office, tenderer has to sign an agreement on Rs.100/-
non-judicial stamp paper. Then only this office will issue the final letter of approval for starting the
works. Based on this approval, as per the requirement, work orders will be issued by the AGM / DE after
ascertaining the validity of labour license. After issuing of the allotment letter, for doing the work,
approved tenderer should register himself with the Asstt. Labour Commissioner, Pune to obtain the valid
labour license (if required so for doing the work) under Contract Labour Regulation and Abolition Act-
1970. Otherwise obtain NOC from him or L.E.O. – Solapur . The labour license/NOC such obtained
should be valid for the entire period of the contract.
31. Based on this approval, if required for doing the work, the approved tenderer should apply–
                    i. For Service Tax registration, to Central Excise Authorities concerned.
                   ii. For EPF registration, to concerned EPF Authorities.
     The labour license, the EPF registration, Service tax registration so obtained should be valid for the
     entire period of the contract.
In Case of any dispute, the original English Document      9                          Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                         Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.
32. The approved Contractor shall in no circumstance sublet the contract. If found so S/D will be
forfeited. Also in case of insolvent suppliers S/D will be forfeited, by giving registered notice.
33. The successful tenderer shall be responsible for arranging and obtaining all necessary materials / tools,
easements, permits and licenses for transportation of material/tools/equipment‟s/persons etc. required for
execution of work or all material supplied by BSNL / material recovered at or from local stores depot to
work site and vice versa. The cost for all this will be entirely borne by the tenderer & no claim of any type
for this work will be entertained.
34. The work consists of transportation of tower material from SDE (MM), MIDC – Satara & erection of
tower, painting of erected tower, hoisting of antenna, antenna orientation, ring earthing of towers erected
and other allied necessary works as described in Annexure, to be done as per requirement, anywhere in
Satara Telecom District, as per the specification given. Also maintenance works of any type / height tower
in Satara SSA. The work not carried out as per specifications should be replaced within 7 days, at no any
extra cost. Otherwise penalty as per clause 10 will be charged. The work has to be offered for T & D wing
or officer nominated by GM BSNL Satara for acceptance testing.
35. Work per each work order or part thereof will be treated as separate work, covered by separate work
order. Conditions and specifications will be the same for all works.
36. BSNLSatara will not be responsible for payment of compensation / damages etc. to the successful
tenderer, if the work is stopped in between due to non-availability of stores or for any other unavoidable
circumstances / reasons.
37. The Contractor shall be responsible for any losses, damages, accidents etc. that may have occurred
during the execution of the work. All damages caused to the private property, during execution of work
should be promptly attended to, at no any extra cost. Also the Contractor shall pay compensation to the
BSNL, Satara / any other agency or his workmen, payable under Insurance Cover to all workmen working
under this Contract & Workmen Compensation Act – 1923 V (iii), for injuries caused to workmen. If such
compensation is paid by the G.M.T.BSNL, Satara as a Principal Employer under the Sub Section (1) of
Section 12 of the same Act on behalf of the Contractor, it will be recovered by the G.M.T.BSNL, Satara
from the Contractor, under Section (ii) of the said Section from the S/D or any dues payable by the
G.M.T.BSNL, Satara to the Contractor on any accounts.
38. The Contractor will be responsible for all damages caused in the course of all the above said work. If
the Contractor or his working people or labours/servents damage any water pipe, drains, electric or
telephone cables or Departmental/Subscriber‟s properties, during the course of execution of work or if
any defects appeared in the work after completion of work or within three months after a certificate final
have been given by the concerned field In-Charge SDE/JTO, the Contractor shall upon a receipt of notice
in writing in that behalf, make the same good at his own cost, or in default, if the In – Charge of the said
work (SDE/JTO) have made the same good from other workmen, then such amount will be deducted from
the S/D or from any sums that may then or at any time there after become due to the contractor. The
security deposit of the Contractor shall not be refunded before the expiry of three months after the issue of
the certificate final or otherwise of completion of work or till the final bill has been prepared and passed,
NOC obtained from concerned field SDE, whichever is later
39. The successful tenderer shall be responsible for arranging and obtaining all necessary materials/tools,
easements, permits and licenses for transportation of material / tools / equipment‟s /persons etc. required
for execution of work or all material supplied by BSNL / material recovered at or from local stores depot
to work site and vice versa. The cost for all this will be entirely borne by the tenderer & no claim of any
type for this work will be entertained. The contractor shall be able to execute the works at 4 to 5 or more
locations simultaneously by keeping sufficient number of suitable staff/workmen under efficient
supervision (for speedy & timely execution of the ordered work) and should follow all the
rules/regulations under Contract Labour Regulation And Abolition – (a) Act 1970 and (b) Rules 1971.
The Contractor should fulfill / comply all the terms & conditions & provisions of EPF & Misc. Provisions
Act 1952 and EPF Scheme 1962, in respect of labourers/employees engaged for performing / execution of
the said work.
In Case of any dispute, the original English Document     10                          Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                         Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.
40. It is the sole responsibility of the tenderer that all the labours engaged under this work under
the said contract are insured for safety, by the successful tenderer. GMT, BSNL, Satara will not be
responsible for any compensation on account of any accidental injury to the workers working
under the tenderer.
41. The EMD of unsuccessful bidder will be refunded after finalization of tender. EMD of successful
bidder will be converted in to security deposit, if EMD paid in Demand draft. If EMD is submitted in the
form of bank guarantee then EMD will be refunded after submission of security deposit if full amount as
required ( In the form of Demand Draft or in the form of bank guarantee ) by the successful bidder.
42. No escalation in rates will be entertained during or after approval of the tender, till the completion of
the entire contract period. Any hike in the cost of material / labour rates etc. will be at the risk and cost of
the tenderer only. Also the quantity given in the tender notice is approximate and may vary (can be
increased or decreased). The GM BSNL Satara at the time of award of work under the contract, reserves
the right to decrease or increase the work by up to 25 % of the total quantum of work specified in the
schedule of requirements without any change in the rates or other terms and conditions The rates should
be quoted while taking these facts into account.
43. NO TENDERER SHALL TRY TO INFLUENCE THE BSNL ON ANY MATTER RELATING TO THIS BID, FROM THE
TIME OF BID OPENING TILL THE CONTRACT IS AWARDED. ANY SUCH EFFORT TO MODIFY BID/INFLUENCE THE
TENDER EVALUATION, COMPARISON OR CONTRACT AWARDING DECISIONS, SHALL RESULT IN THE REJECTION
OF THE SAID TENDER/BID.
44. If the successful Tenderer fails to accept the ordered work or if in the opinion of the General Manager
Telecom, BSNL, Satara, the work carried out is not satisfactory or the work is not being carried out at
sufficient rate or the material supplied is of substandard quality or the tenderer violates any of the
conditions of the tender / contract, the contract will be terminated by giving one month‟s notice & the
work will be carried out from other agencies at the risk and responsibility & cost of the defaulting
tenderer & the Security Deposit will be forfeited. However, the tenderer will be paid for the work he has
carried out satisfactorily. The decision of the General Manager Telecom, BSNL, Satara will be final in
this respect.
45. All the work carried out in respect of this tender by the Contractor shall be offered for Acceptance
testing to T & D A.T. or the representatives nominated by the G.M.T. BSNL – Satara. Approved
contractor or his representative should be present at the time of A.T.
46. Any dispute arising out of contract shall be referred to C.G.M.T., BSNL, Mumbai for arbitration as
per arbitration clause given below and his award shall be binding to both the parties.
47. I/Tax & all other taxes and duties such as Works Contract Tax etc., as applicable from time to time,
will be deducted at source, from the bills submitted. Service tax should be charged by the Contractor (if
applicable) at prevailing rates from time to time and the TR – 6 Challan, evidencing payment of Service
Tax to the concerned authorities should be submitted to the AO (Cash) & SDE (Estimate) for effecting
regular payments.
48. The machine numbered bills should be submitted within 15 days of completion of work, after
acceptance testing. Late bills (beyond 3 months after date of acceptance testing) will be paid only after
vigilance clearance.
49. The bills submitted should be:
      a) In duplicate, one copy marked as “Original” & other “Duplicate”.
      b) The bill should be in printed form and machine numbered and imprinted with Sales Tax, Service
           Tax , Income Tax No. etc. particulars.
      c) Along with the details of work carried out, copy of work order issued, total number of work
           orders issued till the said bill & work order, progressive total of bills submitted, dates of
           commencement and completion of work, acceptance testing report along with satisfactory work
           certificate issued by concerned SDE.
      d) By the contractor, along with the statement of details of –
          List of labourers/employees engaged for the said work & duration of engagement.

In Case of any dispute, the original English Document     11                            Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                           Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.
            Amount of wages paid to labourers/employees engaged during the said period.
          Amount of EPF contribution paid to the EPF authorities along with documents.
          Undertaking as mentioned in clause 30 & 31 of terms & conditions of tender.
      e) Copy of TR-6 Chelan paid for evidencing payment of service tax to the concerned authorities .
      F ) Maximum No. of labours engaged , days worked , mendays etc.work on each work order along
      with bill.
      g) A.T. Report.
50. FORMATION OF RINGS FOR QUOTING CARTEL RATE: If one or more groups of bidders are found
to have rings for bidding Cartel Rates with intension to restrict competition and to boost up rates of tender
items to the detriment of the BSNL, the GMT BSNL, Satara reserves the right to ignore their offers. If the
offers are taken into consideration for some reasons and other, group or groups forming the cartel shall be
treated as one offer and quantity distribution shall be made accordingly. If all the bidders form one cartel
rate, the GMT BSNL, Satara reserves the right to limit the number of firms. In such a situation a limited
number of offers would be drawn from all the offers on random basis from eligible bidders after opening
the bids.
51. LABOUR LAWS: The contractor shall be responsible for any losses/damages etc. that may have occurred
during execution of work and shall pay compensation to his workman payable under workmen
compensation Act 1923 (VII) for injuries caused to the workmen. If such compensation is paid by Govt.
as a Principal Employer under sub section (I) of section 12 of the same Act on behalf of the contractor, it
shall be recovered by the Govt. from the contractor under section (ii) from security deposit or any other
dues payable by the Govt. to the contractor on any account. If required for carrying out the work, the
contractor shall obtain a valid license under the Contract Labour (R&A) Act 1970 and the Contract
Labour (Regulation and Abolition) Central Rules 1971 before the commencement of work, and continue
hold the said license till completion of the contract. The contractor shall comply with the provisions of the
payment of wages Act, 1936, Minimum Wages Act-1948, Employees liability Act 1938, Workmen‟s
Compensation Act 1932, Employees Provident Fund Act 1952-EPF Scheme 1962,, Building &
Construction Act, Equal Remuneration Act, Contract Labour (Regulation and Abolition) Act 1970 or the
modification thereof or any other law relating thereto and the rules made there under from time to time.
He shall also indemnify the BSNL against any payments to be made for due observance of the said laws.
No minor labour (below the age of eighteen years) shall be employed on the work.
52. ARBITRATION: In the event of any question, dispute or difference arising under the tender/ agreement
for this tender or in connection there-with except as to matter the decision of which is specifically
provided under the agreement for this tender, the same shall be referred to sole arbitration of the Chief
General Manager, Maharashtra Circle BSNL, Mumbai or in case his designation changed or his office is
abolished then in such case to sole arbitration or the officer for the time being is entrusted whether in
addition to the functions of the Chief General Manager, Maharashtra Circle BSNL, Mumbai or whatever
designation such officers may be called hereinafter referred to as the said officer) and if the Chief General
Manager, Maharashtra Circle BSNL, Mumbai or the said officer is unable or unwilling to act as such to
the sole arbitration or some other person appointed by the Chief General Manager, Maharashtra Circle
BSNL, Mumbai or the said officer. The agreement to appoint an arbitrator will be in accordance with the
Arbitration and Conciliation ACT 1996. There will be no objection to any such appointment that the
arbitrator is Government Servant or that he has to deal with the matter to which the agreement relates or
that in the course of his duties as Government Servant he has expressed views on all or any of the matter
under dispute. The award of the arbitrator shall be final and binding on the parties. In the event of such
arbitrator to whom the matte is originally referred, being transferred or vacating his office or being unable
to act for any reasons whatsoever such Chief General Manager, Maharashtra Circle BSNL, Mumbai or
the said officer shall appoint another persons to act as arbitrator in accordance with terms of the
agreement and the person so appointed shall be entitled to proceed from the stage at which it was left out
by his predecessors. The arbitrator may from time to time with the consent of parties enlarge the time for
making and publishing the award. Subject to aforesaid Indian Arbitration and Conciliation Act 1996 and
In Case of any dispute, the original English Document     12                          Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                         Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.
the Rules made there under, any modification thereof for the time being in force shall be deemed to apply
to the arbitration proceeding under this clause.
53. SET OFF: Any sum of money due and payable to the contractor (including security deposit refundable
to him) under this contract may be appropriated by the BSNL, SATARA or any other person or persons
contracting through the BSNL, SATARA and set off the same against any claim of the BSNL, SATARA or
such other person or persons for payment of a sum of money arising out of this contract made by the
Contractor with BSNL, SATARA or such other person or persons contracting through BSNL, SATARA.
54. FORCE MAJEURE: Neither the BSNL nor the Contractor shall be liable to the other for any delay in or
failure of performance of their respective obligations under the agreement caused by occurrences beyond
the control of the BSNL or the Contractor (as the case may be) including but not limited to fire (including
failure or reductions), acts of God acts of public enemy, wars, insurrections, riots, strikes, lock-outs,
sabotage, any law, status or ordinance, thereof or any other local authority or any compliance therewith or
any other causes, contingencies or circumstances similar to the above. Either party shall promptly but not
later than twenty days thereafter notify the other of the commencement and cessation of such contingency
and if such contingency continues beyond three months, both parties agree upon the equitable solution for
termination of this agreement or otherwise decide the course of action to be adopted.
55. CONTINGENCIES:- If during execution of work, certain additional activities are required to be
carried out for completion of the work and which are not covered in the scope of work or schedule of
rates, the rates for such contingency words will be fixed by the G.M. Telecom, Satara considering the
prevailing market rates. Similarly G. M. Telecom Satara reserves the right to add, delete or alter any item
of work or tender documents in the interest of the BSNL. The quantity of work mentioned in the tender is
approximate.
56. G.M. BSNL Satara reserves the right to call minor clarifications from the bidders.
57. During the entire tender period / evaluation process, if it is observer that, the downloaded
document / purchased document is exactly not as per the original tender document and / or it is
tampered / changed /altered / modified in any way, the tendered bid will be rejected.


                                             FOR AND ON BEHALF OF THE BSNL




                                              Asstt. General Manager (Plg.)
                                             O/o G.M.Telecom, BSNL, Satara-2.




Encl.: SPECIFICATION FOR ERECTION OF TELEPHONE TOWERS AND
       ASSOCIATED WORKS IN SATARA TELECOM DISTRICT.




In Case of any dispute, the original English Document     13                         Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                        Name and Seal.
O/o GM BSNL Satara                                                TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                              IN SATARA TELECOM DISTRICT. 2009-10.
                                           BRIEF DESCRIPTION OF WORK


        The work consists of erection / maintenance of telephone towers of various sizes & heights on
land , 15 mtrs. to 100 mtr single / coupled masts / Tower on land or roof top and the associated works like
erecting platforms, hoisting / dehoisting of antennas, feeder cable / wave guide Cable, earthing of the
tower, earthing of lightening spike, fixing of aviation lamps, erection of wave-guide rack and its
protection etc.

       The contractor has to carry out all works mentioned in this tender document as well as in work
order with his own tools and machinery. The tower/mast material (viz. lightening spike, Antenna, wave
guide & related accessories etc) will be supplied by BSNL Satara. The contractor will have to arrange all
other material such as that for fabricating antenna fixtures or coupling angles for 15 mtrs / 100 mtrs.
Single/coupled masts / tower. All the material should be of good / standard quality and deeply galvanized
iron.

       The work also includes the maintenance of existing towers and masts. Maintenance of tower/masts
includes periodic checkup, tightening of nut and bolts of tower/masts, minor work (viz. Removal of bends
to tower material, wave guide, runways etc) replacement of aviation lamp, Painting of tower, earthing of
tower, Minor Repair work of base foundation of tower, Cleaning of base foundation tower area &
surrounding area, Painting of base foundation of tower with water proof cement paint etc. & all other its
associated works as mentioned in work order by the Divisional Engineer In charge of work.

        The approved contractor shall in no circumstances award the work to a subcontractor without
written permission of this office.

       No water or light will be provided by the BSNL Satara for the work and contractor will have to
make his own arrangement for the same. He will also arrange for warehouse, accommodation for
labourers etc. On completion of work he shall remove these temporary erections and clear the site.

       While erection of tower / mast and maintenance of mast/tower contractor should not make any
damage to BSNL property other wise it will be recovered from the contractor. Again if any damage
occoured to other than BSNL property while erection / maintenance of tower / mast work, BSNL will not
be responsible for such cases, contractor has to settle the case at his own.




                                                                   Asstt. General Manager (Plg.)
                                                                O/o G. M. Telecom, BSNL, Satara-2




In Case of any dispute, the original English Document     14                               Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                              Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.
         SPECIFICATION FOR ERECTION OF TELEPHONE TOWERS AND
            ASSOCIATED WORKS IN SATARA TELECOM DISTRICT.
         A) SCOPE OF WORK
         The work consists of erection and maintenance of 15 mtrs to 100 mtrs. Telecom towers/mast on
the land, 15 mtrs./ 21 mtrs. Single mast on ground or the roof top for the purpose of provision of
UHF/MW/Mobile /WLL transmission systems between two exchanges and carrying out other associated
works like dismantling of towers including coupled towers, earthing of lightening spike, ring earth,
erecting antenna fixtures, platforms, wave-guide rack, wave-guide protection and hoisting / dehoisting of
antenna, wave-guide and feeder cable, or their dismantlement, earthing of the tower, fixing of aviation
lamps, orientation of antenna & allied works. The approximate numbers of towers to be erected are given
in the tender notice. However the quantity may vary depending upon availability of material.

        B) TECHNICAL TERMS AND CONDITIONS AND SPECIFICATION

        1) ERECTION OF TOWER:- All galvanised components, nuts and bolts supplied by the
Department should be arranged component wise for each tower erection and quantity checked before
commencing the work. The tower should be erected on the tower foundation at the site as per structural
diagrams. components required to be bent to shape or straightened as per requirement should be done.
        The tower should be erected perfectly vertical without any twist and all nuts and bolts should be
fully tightened, after modifying any mismatched holes within the permissible limits or changing such
component if modifications weaken it significantly. The contractor should widen or elongate or align the
holes for proper fitness. Proper size and proper number of bolts and components should be used for fitting
as per erection diagram and if any fabrication work required to be carried out for erection of tower.
        The inner fittings with horizontal cross-bracings between adjacent and opposite sides of tower
should be properly fitted at each designed level. Bolts of horizontal level should be inserted from inside
and nuts fitted outside the tower. Bolts of vertical level should be inserted from beneath and nuts fitted
from upside of the tower.
        The contractor should aquiatant himself to the structural diagrams and interpret them correctly.
      The contractor should also clean, degrease or touch up with red oxide paint/zinc rich primer for the
components if required.
2) TIGHTENING OF NUTS & BOLTS:- In the first place, the first and second sections of the tower
   should be tightened tentatively. First section should be tightened only after confirming that the third
   section is accurately assembled. This procedure should be followed at all subsequent stages of
   erection. All the sections should be tightened properly. On completion of erection, tightening of nuts
   and bolts should be checked thoroughly once again. No forceful fitting and hammering through
   bolts will be allowed.
       3)      Work should be carried out only between 6 am to 6 pm subject to adequacy of natural light
and provided there is no rain and the erected tower components are not wet.
       4)      During installation of mast, arrangement should be made by the contractor for providing
temporary obstruction light, as required under Aviation Regulation when the tower height reaches 150 ft
and beyond.
       5)       The antenna fixtures are required to be mounted at the towers at various heights for
mounting the antennae ranging from 1.2 m diameter to 3 m diameter. The types of antennae to be
mounted are:
          1) Standard parabolic antenna.
          2) Parabolic grid type antenna.
          3) Sectorial vertical type antenna
          4) Any other type of antenna

In Case of any dispute, the original English Document     15                              Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                             Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.
The antenna used for CDMA WLL are sector antenna (i.e. sectorial vertical type antenna) of height
around 2-3 mtrs. But the antennas used for CORdect WLL are three types –

a) Omini Direction Antenna - These antenna are light weight, about 1mtr. in height, the size of antenna
   is like a cricket stump & are mainly used at BSDs(Base Station Distribution) and RBS(Relay Base
   Station).

b) Patch Pannel Antenna - These antenna are light weight, about 1mtr. in height , the size of antenna is
   like a cricket stump & are mainly used at BSDs(Base Station Distribution) and CBS (Compact Base
   Station).

c) RBS directional antenna - having 2feet height and one feet width is used for RBS. For each CBS
     either 2 omini direction antennas or 2 patch panel antennas are required. In each BSD total 4 CBS are
     installed and at DIU site total 8 CBS are required to be installed. I.e. One CORdect system total 20
     CBS are required to be installed. (i.e. total 40 antenna) and 3 RBS or maximum as per requirement. At
     present six RBS per CORdect are used.
For CORdect system – CBS and antennas are required to be mounted on single structure and connected to
each after by jumper cable. From CBS to MDF(DIU) three cable pairs are required to provide
supply/signals to CBS from DIU. For this local cable of 10/20 pair capacity is required to be erected from
CBS to DIU i.e. Feeder cable/waive guide is not required for CORdect system. The cable shall be
properly secured by clamps at intervals specified by SDE(WLL) or Officer In charge of work.
Also for RBS site solar panel of size about (3‟ X 10‟) is required to be installed at each RBS site.
                 The material required for antenna fixtures will be hot dip galvanized and will be suitable to
carry the load of antenna.
         6)      Platforms are required to be constructed on the towers for movement of working staff at
various heights. All the material should be hot dip galvanized iron. Plates used or the platform should be
MS sheets of 6 mm thickness with hot dip galvanised. The exact size of the platform will depend upon the
height at which it is to be erected and will also differ from tower to tower, details of which are given in
the quotation.
         7)      Guard rings are to be provided on the ladder at an interval of 1 mtr and are vertically
connected with each other through MS Flats. Size of the flats used for the work will be 20x3 mm. All the
material will be hot dip galvanized.
         8)      Wave-guide racks are required to be provided between tower and building with
intermediate supports wherever required with the help of G.I. Pipe of 80mm size. Size of the rack will be
12” / 18” /24” wide. Material used for these racks will be angle irons of 50 x 50 x 5 and flats 25 x 5 mm.
The material should be hot dip galvanised. These racks will also be provided with semi-circular cover of
24 guage G.I.sheet supported by G.I.Plates welded or bolted at every two feet for protection. Earth
resistance shall be less than one ohm.
         9)      Earthing of Tower & Earthing of lighting spike - Contractor shall provide proper earthing
of. lighting spike on the top of the tower & he should ensure proper earthing, by way of ring earthing, of
tower at the foundation level of tower, from all sides of tower to the satisfaction of concerned D.E.
(Ring earthing is to be done as per E.I. number PROTECTION EARTHING I-001, DTD. 24/09/1998, issued by T&D
CIRCLE
         10)   DISMANTLING OF TOWERS:- Besides erection, the work also involves dismantling of
towers / masts including coupled towers and the accessories erected on the towers. The contractor will
follow all the Engineering instructions during erection and dismantling of towers. The dismantled towers
will be transported to the new site and erection at new site as per the instructions of the concerned
D.E.(Tx). Tn case of 15 mtr mast/coupled mast solar panel and its accessories, wave guide cable, clamps
should be hand over to concerned S.D.E. / JTO under clear receipt.

In Case of any dispute, the original English Document     16                           Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                          Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.
                    SPECIFICATION FOR PROVISION OF RING EARTH
(A) Laying of ring earth around Telecom Building :

i)       The ring earth around the Telecom building and tower should be as per E. I. No.
         PROTECTION EARTHING I – 001 Dated 24/09/1998, issued by T&D Circle.
         A trench 30 cms wide and normally 150 cms deep is dug. The depth should not be less than 60
cms. In any case. G. I. (Galvanized Iron) strip of 50x5mm. is laid in the trench. The trench should be
minimum one meter away from the tower. In the case of black cotton soil, the trench should be
sufficiently deep to avoid cracking of soil in summer. In case of rocky or hard murum soil, the depth
may be 60 to 90 cms. In case of rocky, hard murum and black cotton soil, the trench should not be filled
by the excavated material and instead foreign good earth, i.e. yellow soil or ash, which are fine and
cohesive in nature should be used.. While filling the trench, the earth may be rammed in layers, so as to
give cohesiveness and compactness to the soil.

ii) The G. I. Strips are to be connected with each other. The joints are to be properly wrapped and
sealed by water proof tape to avoid any ingress of moisture at the joint, while Laying the G. I. Strips for
ring earth, it should not be bent sharply at right angles but should be laid in a smooth curve of not less
than one meter radius.

(B) Connection of Tower and the Antenna subsystem to the ring earth:

        Each leg of the tower should be separately connected by 50x5mm. G. I. Strips above the ground
level of each leg and other end is connected to the ring earth. The connection of G. I. Strip to the tower
leg is done by tower bolts & for nuts with lead sheaths in between. The sheath of the cable for warning
light on tower, if armoured, should be separately connected to the tower at the top end, and to the ring
earth at the bottom end by GI strips.

( C ) Measurement of earth resistance and it’s limit:

      THE EARTH RESISTANCE SHOULD BE LESS THAN OR EQUAL TO 0.5 ohm IN ANY
CONDITION.

( D ) Material used in earthling:

  i) G. I. Strips of size 50x5 mm are laid in a ring trench and connected to tower legs, earth bar in power
room and engine room etc. All joints inside the earth should be made waterproof.

ii) Tower and other connection:
            Each leg is connected to ring earth by means of G. I. Strip. All connections are made by GI
nuts & bolts for GI to GI ( with a lead strip of 1 to 3mm thick as a washer in between, for ensuring proper
surface contact) viz.
    a) GI strip to …………………………….. by GI nuts and bolts with lead strip 1 to 3
       GI strip                                    mm GI strip thick in between.

     b) GI strip to …………………………….. connected by brass nuts & bolts or lug and
        Copper strip             converted to make it moisture proof.

     c ) Copper to …………………………… with insulation tape & should be water
         copper strip or lugs. Tight outside the building.
In Case of any dispute, the original English Document     17                          Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                         Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.
     d) Connections ………………………… 9mm x 1mm copper strip is used.
        Inside the building.

               SPECIFICATION FOR SUPPLY OF AVIATION OBSTRUCTION LAMP

A) AVIATION OBSTRUCTION LAMP:
  i)   It should be LED based Aviation Obstruction Lamp with inbuilt photo switch to switch
       ON/OFF automatically at dusk / dawn. ( Power consumption up to 15 W ).
  ii)  It should be of international Red Colour with thick & clear glass cover (weather proof).
  iii) It should have total 360 degree integrated luminous intensity.
  iv)  It should work on -50 V D.C. with inbuilt photo sensor / switch.

B) POWER CABLE :
i )  It should be 2.5 sq. mm Copper cable,twin cable Teflon coated PVC cable.
ii)  This power cable should carry-50 V D.C. & the length should be from Aviation Lamp (Top) up
     to equipment room.
iii) This power cable should be drawn through ¾” PVC pipe, along the
     tower/runway. Clamping should be done by the tenderers. All the material &
     labour required would be supplied by the tenderer.

C) AVIATION OBSTRUCTION LAMP POSITION.
           i)      For 100 M MTR TOWER –
   a) at 100 M height – one lamp.
   b) At 60 M height- Two lamp in diagonal position.
   c) At 40 M height –Two lamps in opposite diagonal position.
           ii)     For 60 Mtr Tower – a) at 60 m height – one lamp.
                                       b)At 40 m height- Two lamps in diagonal position.
           iii) For 40 mtr Tower –     one lamp at top.
           iv) For 30 Mtr tower – One lamp at top.



                                                                 Asstt. General Manager ( Plg )
                                                                O/o G.M. BSNL Satara-415002




In Case of any dispute, the original English Document     18                                Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                               Name and Seal.
O/o GM BSNL Satara                                               TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                             IN SATARA TELECOM DISTRICT. 2009-10.
SPECIFICATION OF WORK INVOLVED IN MAINTENANCE / ERECTION OF TOWER


1)       Supply & erection of antenna fixture for two type antenna. Antenna fixture made up of hot dip galvanized
         iron material of approx. weight 150 kg. each fixture. Typical distance between two antenna 2 to 3 mtr. as
         approved by competent authority.
2)       Hoisting & De-hoisting of GSM antenna ( One type antenna & Two type antenna)/CDMA /CORDECT
3)       Hoisting, De-hoisting of waive guide – Hoisting the waive guide with clamping to tower Fixing of
         connectors, jumpers, earthing kit & weather proofing kit to waiveguide.
        De-hoisting the waive guide by de-clamping it from tower. Removal of connectors, jumpers and weather
        proofing kit if required.
4)       Fixing of lightning spike (copper spike), continuity check of lightening spike of tower(on top) to ring earth
         on ground.
5)       Tightening of nut bolts of all types of RTT/GBT
6)       Painting of all types of RTT/GBT
7)       Orientation of one/two type antenna fixture, orientation of one/two type antenna with tilt for any number of
         operations in a day.
8)       Fixing of aviation lamp on tower top, laying the cable from lamp to electricity point through PVC
         conduit/flexible pipe with clamping (using plastic tie) to tower. Replacement of faulty aviation
         lamp/sensor/voltage stabilizer , taking out the faulty LED from the holder and putting the new filament.
9)       Waive guide related maintenance work – removing & putting weather proofing kit, removing and fixing
         connectors, jumper cable.
10)      Erection of waive guide rack of 12”/18”/24” width
11)      Waive guide rack protection of 12”/18”/24” width
12)      Earthing as per technical specification and re-ear thing of tower (ring earth) with measurement details.
13)      Fixing of lightening arrestor / lightening spike.
14)      Checking of verticality of tower.




                                                                 Asstt. General Manager ( Plg )
                                                                O/o G.M. BSNL Satara-415002.




In Case of any dispute, the original English Document     19                                 Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                                Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.
     SPECIFICATION FOR PAINTING OF OLD AND NEW TOWERS IN SATARA TELECOM
                       DISTRICT.(LABOUR WITH MATERIAL).

   A) SCOPE OF WORK
   The work consists of supply and painting of unpainted new towers as well as painting of old towers
which have been painted five years earlier or whose paint has been pealed of and the tower shows signs of
rusting at many places. Old towers will have to be painted after carrying out routine maintenance work &
tightening of all nuts and bolts.

B) TECHNICAL TERMS AND CONDITIONS AND SPECIFICATION

1) The painting of towers is intended to give `Day warning' to flying Aircrafts as per Civil Aviation
Specification and also to give protection against corrosion thereby prolong the life of the towers wherever
erected in Satara Telecom District.
2) The new towers which have not been painted hitherto, will be first applied a coat of Zinc rich metal
primer of ISI mark, after thoroughly cleaning the surface of the metal with sand paper or soft wire brushes
to remove dust, dirt, soil, greases etc.
3) After this coat of primer has dried up, two coats of Brilliant White Synthetic and International Orange
Epoxy/Polyurethane paints of standard colour code of reputed companies (Standard make) will be applied
as per the standard required for the towers.
4) The Civil Aviation Specifications requires that the colour of International Brilliant white and orange
be applied in alternate bands. The top of the structure is started with International deep orange and bottom
of the structure also is finished with International deep orange. The height of the structure is to be
conveniently divided into a number of bands to achieve this.
5) In case of old towers which have been painted three years earlier or those towers whose paint has
pealed off due to heavy rains and wind within three years, should also be painted after consulting the
concerned field officer. Such towers should first be thoroughly cleaned off all the earlier paint/rust with
sand paper or soft metal brush.
6) All the nut and bolts of the tower should be tightened. Pre monsoon precautions like tightening of all
connectors, jumper cables waive guide connectors will have to be done by the contractor.
7) After cleaning as above, they will be first applied the Zinc rich metal primer and then the two coats of
white synthetic enamel and international deep orange as per (3) & (4) above.
8) Tower includes antenna fixture assembly, waveguide rack, waveguide supporters, ladder, rings,
platform, or any other fixtures to the tower.
9) Cement painting of base foundation of any type of tower. Cement paint snowcem make as per field
requirement
10) Miscellaneous minor repair works.
                            a) repair work of base foundation. Such as warn out / damage / cracks etc of
                                any type of tower with cement plastering before painting of base foundation
                            b) Cleaning of base foundation tower area and tower surrounding area of any
                                type of tower.


                                                                Asstt. General Manager ( Plg )
                                                                O/o G.M. BSNL Satara-415002




In Case of any dispute, the original English Document     20                               Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                              Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.
                                                   AGREEMENT

         This Agreement made on this__________day of________2009, between M/s …………………………
…………………………….……………………………………………………………………………………………
herein after called „The Contractor‟ (which expression shall unless excluded by or repugnant to the context, include
its successors, heir, executors, administrative representative and assignee) of the one part & the General Manager
Telecom, Bharat Sanchar Nigam Limited, Satara hereafter referred to as BSNL of other part.
         Where as the contractor has offered to enter into contract with the BSNL for the execution of the work of
ERECTION AND MAINTENANCE OF TOWERS OF ANY TYPE, MAKE & ASSOCIATED WORKS AS PER BSNL
STANDARDS, AT ANY PLACE IN SATARA TELECOM DISTRICT FOR PART --- - - , on terms & conditions herein
contained and the rates approved by the BSNL, (copy of rates enclosed) have been duly accepted and where as the
security deposit have been paid in cash or inform of bank Guarantee of Rs. ________ and whereas no interest will
be claimed on security deposit.
Now these presents witness and it is hereby agreed and declared by and between the parties to these presents as
follows:
    1) The contractor shall, during the period of this contract that is to say from ___________ to _____________
         for completion of work for Rs._____ lakh or the above period whichever is earlier or until this contract
         shall be determined by such notice as is hereinafter mentioned, safely carryout, by means of labours
         employed at his own expenses and by means of tools, implements and equipment etc. to be supplied by
         him to his labour at his own expenses, for above said work, which is to be completed within period
         specified in work order, as described in tender documents ( annexed to the agreement), when the BSNL or
         any other persons authorized by GMT BSNL, Satara in that behalf require. It is understood by the
         contractor that the quantity of work mentioned on the schedule is likely to change as per actual
         requirements as demanded by exigencies of service.
    2) The NIT (notice inviting tender), Bid documents (Technical and Financial), letter of intent, approved rates,
         annexed hereto and such other additional particulars, instructions, drawing, work orders as may be found
         requisite to be given during execution of the work shall be deemed and taken to be an integral part of the
         contract and shall also be deemed to be included in the expression” The Agreement” or “The Contract”
         wherever herein used.
    3) The contractor shall also supply the requisite number of workmen with means & material as well as tools,
         appliances, machines, implements etc. required for proper execution of work within the time prescribed in
         the work order.
    4) The contractor hereby declares that nobody connected with or in the employment of the Department of
         Telecommunications / BSNL/ MTNL is not / shall not ever be admitted as partner in the contract.
    5) The contractor shall abide by the terms and conditions, guidelines, construction practices, safety
         precaution etc. stipulated in the tender document including any correspondence between the contractor and
         the BSNL having bearing on execution of work and payments of work to be done under the contract.
    6) The contractor shall comply / abide all labour laws, EPF , minimum wages act during the execution of the
         work.
    7) Contractor will submit the bills after successful completion of acceptance testing by T & D Circle/ Officer
         nominated by G.M. BSNL, Satara.
    In witness whereof the party‟s presents have here into set their respective hands and seals the day and year in
    ………………………
    Above written:
                                                Signed sealed & delivered by the above
    Witness:                                   named Contractor in the person of
    1.

    2.
                                                Signed & delivered on behalf of
    Witness:                                   the BSNL by the

    1.
    2.
In Case of any dispute, the original English Document     21                               Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                              Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.



                               PROFORMA OF SOLVENCY CERTIFICATE

                                        SOLVENCY CERTIFICATE

                 This is to certify that to the best of our knowledge and information that Shri/ M/s

______________________________________________, having their office at ____________________

____________________________________________ is customer of our bank, is respectable and can be

treated as good for any engagement upto a limit of Rs. ____________ (Rupees_____________________

________________________ only).

               This certificate is issued without any guarantee or responsibility on the bank or any of the
officers.



                                               Signature with seal
                                               of Bank Authority :
                                                            Name :
                                                 Address of Bank :

                                                          DATE :-


                                               Contact Tele. No. :




In Case of any dispute, the original English Document     22                         Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                        Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.

                PROFORMA FOR BANK GUARANTEE FOR BID SECURITY ( EMD)

             (TO BE SUBMITTED ON NON JUDIIAL STAMP PAPER Rs.100/- )

Tender NO. _______________________________________ Date ______________

Bid guarantee No. __________________________________Date________________

This deed of guarantee is executed by Bank office address _____________________ having head office
_______________________________________ herein after referred to as „The Bank‟ which term shall
include the said bank and its successors in favour of BSNL ( Government of India Enterprises) office
address, Office of The General Manager Telecom, BSNL Satara .
Where as BSNL has invited bids for Erection and Maintenance of Towers in Satara Telecom District
Closing date _________ & M/s __________________________________ having their registered / Head
office at _________________________________ there after referred to as „Bidder‟ wish to participate in
the said tender. An irrevocable bank guarantee against bid guarantee/earnest money for an amount of Rs.
___________________________ (in words) hereinafter referred to as Born amount is required to be
submitted by the bidder as a condition precedent for participation in the said bid which amount is to be
forfeited on the happening of any contingencies mentioned in the tender documents.
Now at the request on and behalf of the Bidder,
         „The Bank‟ here by undertake and promise to pay the BSNL on demand of any amount or sum of
money which the Bidder may become or be liable to pay under the said tender reason, the said Bidder‟s
failure to enter into an agreement of contract on intimation of acceptance of their bid and /or to commence
the supply of said items and or failure to deposit with in the stipulated period as per the terms and
conditions relating to the contract as specified in the tender documents, but not exceeding „Bond
Amount‟.
And it hereby expressly agreed and declared as under
    1. This guarantee shall remain in force up to _________________ i.e. hereafter referred as „Expiry
         Date‟ for the period of nine months from the opening date of the tender (state in Para „2‟ above).
    2. „The Bank‟ hereby undertake to pay immediately merely on demand by BSNL not exceeding
         Bond Amount without any reservation, protest, demur and any such demand BSNL shall be
         conclusive as regards the amount due and binding on the bank irrespective of any dispute or
         differences raised by the Bidder.
    3. „The Bank‟ also agreed to pay the claims up to the Bond Amount not withstanding any dispute
         raised by the Bidder in any suit or proceedings pending before any court or tribunal relating there
         to our liability under this present tenability of the claim of The General manager Telecom, BSNL
         Satara for forfeiting the bid Money/Earnest Money Bank Guarantee.
    4. „The Bank‟ further agrees with the BSNL that the latter shall have the fullest liberty without its
         consent and without affecting its obligations in any manner to vary any of the terms and
         conditions of the tender documents or extend the time of validity offer and of the powers
         exercisable by BSNL against the said Bidder and to forbear or enforce any of the terms and
         conditions of the tender documents and The Bank shall not relieved from the liability hereunder by
         reason of any such variation or extension being granted to the said Bidder.
    5. This guarantee will not be discharged due to the change in constitution of the Bank or that of the
         Bidder.

                                                                                Continued on next page..


In Case of any dispute, the original English Document     23                         Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                        Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.

    6. The Bank lastly undertake not to revoke this guarantee during its currency except with the
        previous consent of the BSNL in writing.
    Notwithstanding anything contained hereinbefore the Bank liability under this guarantee is restricted
    to Rs. _____________ and shall remain inforce till _______________ The Bank shall be relieved or
    discharged of all liabilities under this guarantee either on its discharge (of the bank guarantee) by
    BSNL OR if no claim or demand under this guarantee is made by The General Manager Telecom
    BSNL Satara, The bank in writing on or before its expiry date.
    In witness thereof the bank through its authorized officer, has set its hand and stamp on this
    ___________ day of _____________ 2009 at (Place) __________

    Witness :

    1. Signature                                       Signature
       Name                                             Name

Office Address                                  ( Designation with Bank Stamp)




                                                  Telephone no. :-




In Case of any dispute, the original English Document     24                         Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                        Name and Seal.
O/o GM BSNL Satara                                              TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                            IN SATARA TELECOM DISTRICT. 2009-10.

                                                   CHECK LIST
                                                                                          Remark
    Sr.
               Technical Bid envelop should contain following Documents              Mark tick for the
    No.
                                                                                     documents enclosed
     1      Bid Security in the form of Demand draft or in the form of Bank
            guarantee valid for 270 days from the date of tender opening, from
            any Nationalized Bank / schedule bank for an amount as given in
            NIT.
     2      Form fee in the form of DD of Nationalized / Schedule Bank incase
            of BID is down-loaded from the web-site OR Original ACG-67
            Receipt for form fee.
     3      Tender document(s), in original, duly filled in and signed by tenderer
            or his authorized representative along with seal on each page.
            Copy of Latest Income Tax Return filed (for assessment year 2007-
     4
            08 or 08-09 whichever is latest) and Attested copy of PAN Card.
            Partnership/Proprietorship Firm/Company, the relevant documents
            like partnership deed (registered with registrar of Companies),
     5
            memorandum of articles of association, proprietorship affidavit etc
            duly attested copy.
            Solvency certificate for Rs.10 Lakhs, issued in the name of the
     6      tendering firm from any Nationalised/Schedule Bank issued after
            01/04/2009
            Experience certificate for the said work; issued by the competent
     7      authority as mentioned in NIT duly attested by a gazetted officer OR
            SDE/AO and above officer of BSNL.
            Certificate about tenderers near relatives as per proforma on Page
     8
            No. 6 of tender document or on official letterhead.
     9      Tender form, dully filled on page No 3 of tender document.
            Information about the tenderer (on page No.4) duly filled in the
    10
            tender document.
            Original “Power of Attorney” in case person other than the tenderer
    11
            has signed the tender documents.
            List of qualified experienced personnel, who are working for the
    12
            tenderer, who will be deployed for the work.
    13      All other document(s) as required by BID thereof.
    14      Firm registrations – BST/CST/VAT
    15      Service Tax registration certificate if any.
    16      EPF registration Certificate if any.
    17      Labour Licence if any.

                                                                                          Remark
    Sr.
               Financial Bid envelope should contain following Documents             Mark tick for the
    No.
                                                                                     documents enclosed
            Rates duly quoted by the tenderer in the prescribed format. (Finance
     1
            Bid Page No 26 to 30 of Tender documents.



In Case of any dispute, the original English Document     25                          Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                         Name and Seal.
O/o GM BSNL Satara                                                          TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                                        IN SATARA TELECOM DISTRICT. 2009-10.
                                                                PART A
                                                             FINANCE BID
     ERECTION OF 40 MTR TOWER AS PER SPECIFICATIONS & REQUIREMENT,AT ANY PLACE
                            IN SATARA TELECOM DISTRICT
Sl    Description of work                        Unit.        Qty for     Rate to be   Rate to be quoted in words per unit inclusive of
No                                                           Evaluation   quoted in     all taxes , duties, etc. except service tax in Rs.
                                                                             Rs.
1     ERECTION OF TOWER
      I) Eerection of 40 Mtr tower including     Per Ton      660 ton
      any type of fabrication work ( cutting ,
      drilling, sharpening, gas welding / gas
      cutting, carriage & handling with
      labour charge etc.) required if any for
      erection of tower work.
2     A) ERECTION OF WAVE GUIDE
      RACK (Verticle & Horizontal) (
      50x50x5 mm) per mtr.( Labour with
      material) Please refer specifications on
      page No.16, point no.8 of tender
      document.
      i) 12” width                               Per Mtr      462 mtr
3     SUPPLY AND FIXING OF
      AVIATION OBSTRUCTION LAMP
      AND ITS ACCESSORIES.
      i)Aviation Obstruction Lamp with           .Each        66 nos
      inbuilt photo switch unit,         -
      50VDC operated
      ii)power cable with conduit PVC pipe       Per MTR     3300 mtr
      iii) MCB with its accessories.             Each         66 nos
4     EARTHING OF TOWER – Ring
      Earth- PER MTR ,
      a)Ring Earth                               Per Mtr     1914 mtr
      ( Labour with Material )
5      PAINTING OF TOWERS - NEW
      TOWER - ( LUMP SUM)( LABOUR
      WITH – MATERIAL)
      i) 40 MTR                                  Each        66 nos
6     A) SORTING OF TOWER                        Per Ton.    660 ton
      MATERIAL
      B) Transportation of tower                 Per Ton./   660 ton
                                                 KM
      material from store to site &
      from site to store depot, of
      recovered material.
      C) Loading and Unloading                   Per Ton.    660 ton

Note : The rates for all items given in quotation/ finance bid (Part A and Part B) pages should be quoted
by each firm/tenderer, without which tender will not considered as valid. It shall be noted that evaluation
of tender will be done part wise. Part A & Part B will be evaluated separately & will be evaluated as
composite bid. Rates are to be quoted inclusive of all taxes & duties except service tax.
        For claiming Service tax separately, tenderer should obtain Service Tax registration from Excise
Authorities and imprint the same on the face of the bill & should submit the copy of registration to this
office. Also the tenderer should submit TR-6 challan copies evidencing payment of Service tax to Govt.
of India, along with every bill claimed for payment against the said tender

PLACE                                                                   SIGNATURE OF TENDERER
                                                                         WITH SEAL
DATE                                                                     NAME
                                                                        ADDRESS WITH
                                                                        CONTACT TELE. NO.

In Case of any dispute, the original English Document     26                                                Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                                               Name and Seal.
O/o GM BSNL Satara                                                           TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                                         IN SATARA TELECOM DISTRICT. 2009-10.

                                                                  PART B
                                                               FINANCE BID
 Sl    Description of work                        Unit.          Qty for     Rate to be   Rate to be quoted in words per unit inclusive of
 No                                                             Evaluation   quoted in     all taxes , duties, etc. except service tax in Rs.
                                                                                Rs.
  1    ERECTION OF TOWER
       I) 30 Mtr tower ( Dismentaled tower )      Per ton           7


  2    DISMANTALING OF TOWER
       i)30 MTR light weight                      Per ton           7
       ii) 15 MTR coupled mast                    LumpSum           2
       iii) 15 MTR MARR                           LumpSum          10
  3    Provision of orientation plat form on      Per Sq.mtr       10
       tower including railing with labour &
       material.
  4    A) ANTENNA FIXURE ERECTION
       WITH ACCESSORY - LUMP SUM .
       (Labour with material)
       i) UHF / MW Up to 50 MTR                   Each              1
       ii) CDMA / CORDECT /GSM up to 50           Each             10
       mtr height.
       iii) UHF / MW above 50 mtr to 100          Each              1
       MTR
       iv) CDMA / CORDECT /GSM above              Each              1
       50 mtr to100 mtr height.
       B ) ANTENNA FIXURE                         Each              2
       DISMANTALING ( Only Labour
       )WITH IT‟S Accessory.
  5    A) ERECTION OF WAVE GUIDE
       RACK (Verticle & Horizontal) (
       50x50x5 mm) per mtr.( Labour with
       material) Please refer specifications on
       page No.16, point No.8 of tender
       document.
       i) 12” width                               Per Mtr          10
       ii) 18” width                              Per Mtr          10
       iii) 24” width                             Per Mtr          10
       B)DISMANTALING OF WAVE
       GUIDE RACK ( Only Labour ) per
       mtr.
       i) 12” width                               Per Mtr          10
       ii) 18” width                              Per Mtr          10
       iii) 24” width                             Per Mtr          10
  6    A) WAVE GUIDE PROTECTION
       ERECTION - For Horizontal W.G.
       Rack only ( Labour with material )
       Please refer specifications on page
       No.16, point No.8 of tender document.
       i) 12” width                               Per Mtr          10
       ii) 18” width                              Per Mtr          10
       iii) 24” width                             Per Mtr          10
       B) WAVE GUIDE PROTECTION
       DISMENTALING ( Labour )
       i) 12” width                               Per Mtr           5
       ii) 18” width                              Per Mtr           5
       iii) 24” width                             Per Mtr           5

In Case of any dispute, the original English Document     27                                                  Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                                                 Name and Seal.
O/o GM BSNL Satara                                                  TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                                IN SATARA TELECOM DISTRICT. 2009-10.




 Sl   Description of work               Unit.    Qty for        Rate to be   Rate to be quoted in words per unit inclusive of all
 No                                             Evaluation      quoted in        taxes , duties, etc. except service tax in Rs.
                                                                   Rs.
 7    A ) WAVE GUIDE HOISTING
      ANY TYPE ( Lump Sum..)
      i) Up to 50 Mtr                   Lump       10
                                        sum
      ii ) above 50 to 100 Mtr          Lump       10
                                        sum
      B ) WAVE GUIDE DEHOISTING
      ANY TYPE ( Lump Sum..)
      i) Up to 50 Mtr                   Lump       10
                                        sum
      ii ) above 50 to 100 Mtr          Lump       10
                                        sum
 8    A) ANTENNA HOISTING ( Lump
      sum..) up to 50 MTR
      i) Parabolic                      Lump        1
                                        sum
      ii) Grid parabolic                Lump        2
                                        sum
      iii) Grid semi parabolic          Lump        1
                                        sum
      iv) GSM /CDMA/ CORDECT            Lump       10
                                        sum
      B) ANTENNA HOISTING ( Lump
      sum..) above 50 to 100 MTR
      i) Parabolic                      Lump        1
                                        sum
      ii) Grid parabolic                Lump        1
                                        sum
      iii) Grid semi parabolic          Lump        1
                                        sum
      iv) GSM /CDMA/ CORDECT            Lump        1
                                        sum
      C) ANTENNA DEHOISTING (
      Lump sum..) up to 50 MTR
      i) Parabolic                      Lump        1
                                        sum
      ii) Grid parabolic                Lump       10
                                        sum
      iii) Grid semi parabolic          Lump        1
                                        sum
      iv) GSM /CDMA/ CORDECT            Lump        5
                                        sum
      D) ANTENNA DEHOISTING (
      Lump sum..) above 50 to 100 MTR
      i) Parabolic                      Lump        1
                                        sum
      ii) Grid parabolic                Lump       10
                                        sum
      iii) Grid semi parabolic          Lump        1
                                        sum
      iv) GSM /CDMA/ CORDECT            Lump        1
                                        sum




In Case of any dispute, the original English Document     28                                       Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                                      Name and Seal.
O/o GM BSNL Satara                                                          TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                                        IN SATARA TELECOM DISTRICT. 2009-10.




 Sl   Description of work                     Unit.          Qty for     Rate to be   Rate to be quoted in words per unit inclusive of all
 No                                                         Evaluation   quoted in        taxes , duties, etc. except service tax in Rs.
                                                                            Rs.
 9    SELF SUPPORTING MAST
      FOUNDATION AND ERECTION
      A) 15 mtr Mast / Tower                  LumpSum          10
      B) 15 mtr Coupled Mast                  LumpSum           1
      BSNL will supply only 15 mtr mast /
      Tower. The contractor will supply
      coupling of 50x50x5 mm ( labour
      with material for foundation and
      erection of tower / Mast.)
 10   ANTENNA ORIENTATION ( ANY
      TYPE )
      i) Upto 40 MTR                          Per Antenna      20
      ii) Above 40 MTR                        Per Antenna       1
 11   Provision of Antenna Horizontal         Per Antenna       5
      Support ( Labour with material )
 12   Wiring and Fixing of Aviation           Per Set           5
      Obstruction Lamp & its accessories (
      labour only)
 13   SUPPLY AND FIXING OF
      AVIATION OBSTRUCTION
      LAMP AND ITS ACCESSORIES.
      i)Aviation Obstruction Lamp with        .Each            10
      inbuilt photo switch unit,          -
      50VDC operated
      ii)power cable with conduit PVC pipe    Per MTR         400
      iii) MCB with its accessories.          Each             10
 14   EARTHING OF TOWER – Ring
      Earth- PER MTR , Pit Earth –
      Lumpsum.
      a)Ring Earth                            Per Mtr          20
      ( Labour with Material )
      b) Earthing of tower for 15 MTR         Lump Sum         10
      Mast / Coupled tower. Pit earth
 15   EARTHING OF LIGHTNING                   Per MTR.          5
      SPIKE (Labour with material)
 16   Maintenance of tower work.
      a) Replacement of aviation lamp         Per set          10
      b) Replacement of wiring                Per set          10
      c) Nut bolt fittings / tightening
          15 MTR                              Per Tower         1
          40 MTR                              Per Tower        10
          60 MTR                              Per Tower         4
         100 MTR                              Per Tower         2
 17    PAINTING OF TOWERS -OLD
      TOWER - ( LUMP SUM)( LABOUR
      WITH – MATERIAL)
      i) 100 MTR Special heavy weight,        Each              1
      135 M.T. weight.
      ii) 60 MTR                              Each              2

In Case of any dispute, the original English Document     29                                                Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                                               Name and Seal.
O/o GM BSNL Satara                                                             TENDER FOR ERECTION & MTCE. OF TOWERS
Old LIC Bldg. Palace Street-Satara-2                                           IN SATARA TELECOM DISTRICT. 2009-10.




 Sl    Description of work                        Unit.            Qty for     Rate to be   Rate to be quoted in words per unit
 No                                                               Evaluation   quoted in     inclusive of all taxes , duties, etc.
                                                                                  Rs.                except service tax.
       iii) 40 MTR                                Each               10
       iv) 30 Mtr                                 Each                1
 18    A) SORTING OF TOWER                        Per M.T.            1
       MATERIAL
       B) Transportation of tower                 Per M.T./           1
                                                  KM
       material from store to site &
       from site to store depot, of
       recovered material.
             C) Loading and Unloading             Per M.T.           7
 19    Supply of G.I. Short material / Nut        Per Kg.           100
       Bolts
 20    Wave Guide related mtce. Work ( only       lumpsum             1
       Labour) ( removing & Putting weather
          proofing kit, removing and fixing
       connectors, clamps jumper cable etc. )
 21    Hoisting / Dehoisting 10 Pr/20pr Cable     Per MTR           100
                  from CBS to DIU
 22    Installation of solar Pannel ( size 3‟ x   Per site/ Per       1
         10‟ ) with material of iron frame &      set of 4
         accessories, minimum 3mm thick.          panel of
                                                  RBS
 23    Minor repair work of base                  Per tower           5
       foundation of tower (any type) with        lumpsum
       material & labour
 24    Clening of base foundation tower           Per tower          13
       area & surrounding area (any type)         lumpsum
       with labour & tools
 25    Cement painting of base foundtion          Per tower
       of towerwith material & labour             lumpsum
                                                                      1
       100 mtr
                                                                      2
       60 mtr
                                                                     10
       40 mtr

NOTE :- Rates for all items given in finance bid (Part A & Part B) pages should be quoted by each firm /
tenderer, without which tender will not be considered as valid. It shall be noted that evaluation of tender
will be done part wise. Part A & Part B will be evaluated separately & will be evaluated as composite bid.
Rates are to be quoted inclusive of all taxes & duties except service tax.
        For claiming Service tax separately, tenderer should obtain Service Tax registration from Excise
Authorities and imprint the same on the face of the bill & should submit the copy of registration to this office. Also
the tenderer should submit TR-6 challan copies evidencing payment of Service tax to Govt. of India, along with
every bill claimed for payment against the said tender.


PLACE                                                                     SIGNATURE OF TENDERER
                                                                          WITH SEAL


DATE                                                                      NAME
                                                                          ADDRESS WITH
                                                                          CONTACT TELE. NO.



In Case of any dispute, the original English Document     30                                                  Tenderers signature with
Available in O/o GM BSNL-Satara will be considered authentic.                                                 Name and Seal.

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:39
posted:7/8/2011
language:English
pages:30