									                     Project Statistics                                   Project Scope                                            Project Status
18. Process Equipment Reliability Database (PERD)                                                                 The year 2011 will bring full operation of a
Chair: Open                                                                                                       production quality database, initially with relief
Staff: Dave Belonger                                                                                              valves and then expanding to instrument loops to
Contractor: Zynergy Consulting, LLC                                                                               help support “proven in use” for safety
                                                                                                                  instrumented functions and systems. Production
                                                    To develop and operate a pilot database of operating
                                                                                                                  quality software should be available by end of 2nd
                                                    company reliability data to aid in process safety and
                                                                                                                  quarter 2011 that will fully support the desired
                                                    maintenance evaluations. Once pilot database is proven,
                                                                                                                  work process for relief valves. Upon successful
                                                    expand to a full database of maintenance and reliability
                                                                                                                  startup, work will proceed to implement additional
                                                    data for equipment in the CPI and HPI.
                                                                                                                  equipment taxonomies within the software.
                                                                                                                  Future plans include a concept book titled, CCPS
                                                                                                                  Guideline for Proven in Use Data (The Gold
Standing Committee                                                                                                Standard), as well as expansion of the taxonomies
                                                                                                                  and supporting software.
Taking New Members: Yes
72. Safety and Chemical Engineering Education
(SACHE)                                             Prepare and distribute education materials to university      In 2007, a partnership to translate SACHE into
Chair: Wendy Smades, Dow                            members to assist them in incorporating safety, health, and   Chinese and Spanish was initiated. SACHE also
Staff: TBD                                          loss prevention into the chemical engineering curriculum.     incorporated into AIChE Scale-up program such
Contractor: N/A                                     Provide and industry/university/government interface for      that every US University now has free access to
                                                    process safety education and create cooperative educational   SACHE and Scale-up sponsors are committed to
Standing Committee                                  opportunities among participants.                             promote process safety to students.
Taking New Members: Yes
112. Process Safety Incident Database (PSID)
                                                                                                                  The secure web-based database with more than 700
Chair: Vacant
                                                                                                                  categorized and searchable incidents is fully
Staff: Adrian Sepeda
                                                                                                                  operational, with participants from petroleum,
Contractor: N/A                                                                                                   chemical and pharmaceutical companies
                                                    To operate an easily accessible secure database for sharing   worldwide. InfoBeans in India was the successful
                                                    incident information among members with a focus on the        bidder for reprogramming the database in a modern
                                                    lessons learned from the incident.                            language. Reprogramming will not cause an
                                                                                                                  interruption of service. Reprogramming is
                                                                                                                  necessary before identified upgrades can be made
                                                                                                                  and should be completed in the second quarter
Standing Committee
                                                                                                                  2011.
Taking New Members: Yes
                    Project Statistics                                         Project Scope                                                 Project Status
152. Process Safety Messages for Manufacturing                                                                            The Process Safety bring full operationits eighth
                                                                                                                          The year 2011 will Beacon celebrated of a
Personnel (Process Safety Beacon)                                                                                         production and has proven initially with relief
                                                                                                                          anniversaryquality database,successful in reaching
Chairs: George King, Huntsman                                                                                             well over 1then expanding to instrument loops to
                                                                                                                          valves and million operators. Feedback has been
                                                         Provide timely and informative process safety messages
Staff: Dennis Hendershot, John Herber                                                                                     excellent. In “proven in use” for language versions
                                                                                                                          help support early 2004 foreign safety
                                                         directly to manufacturing personnel to improve process           were made available. The Beacon now has over 30
Contractor: N/A                                                                                                           instrumented functions and systems. Production
                                                         To develop and operate a pilot database of operating
                                                         safety awareness.                                                translations available. CCPS continually solicits
                                                                                                                          quality software should be available by end of 2nd
                                                         company reliability data to aid in process safety and
Standing Committee
                                                                                                                          pictures2011messagesfully support the desired
                                                                                                                          quarter and that will as well as sponsorship to
                                                         maintenance evaluations. Once pilot database is proven,          help continue for relief valves. Upon successful
                                                                                                                          work process make this product available on a
Taking New Members: Yes                                  expand to a full database of maintenance and reliability         wide scale. will proceed to implement additional
                                                                                                                          startup, work
175. Reactivity Management Roundtable (RMR)              data for equipment in the CPI and HPI.                           At the November 8, 2010 meetingsoftware.
                                                                                                                          equipment taxonomies within the of the CCPS
Chair: Mark Davis, Eli Lilly                                                                                              Managing Board, theaBoard voted for the CCPS
                                                                                                                          Future plans include concept book titled,
Staff: Dan Sliva                                         A special project of CCPS, open to a broad range of              Guideline of this project on or before Gold
                                                                                                                          dissolutionfor Proven in Use Data (The November
Contractor: Unwin                                        industrial, labor, government, research, and other               7, 2011. Thiswell as expansion of the taxonomies
                                                                                                                          Standard), as will provide time to complete the
                                                         organizations. The goal is to develop and share focused          RMR tool project, and allow RMR participants to
                                                                                                                          and supporting software.
                                                         tools that companies of all sizes may use to prevent             propose potential additional reactive hazard-related
                                                         chemical reactivity accidents. The RMR supports the              projects to the TSC for the 2012 ballot. A new
                                                         OSHA alliance with CCPS and other parties.                       software contractor, Silicus, is now under contract,
Completion Date: November 2011                                                                                            starting Feb. 21, 2011 with a completion target of
Taking New Members: Peer Review Only                                                                                      June 2011.
191. GL for Pressure Relief and Effluent Handling, 2nd
ed.
Chair: Bob D’Alesandro                                   Update this book in order to update content, correct errata,
Staff: John Davenport                                    improve readability, and, if possible to correct software
                                                                                                                          Resolving peer review comments.
Contractor: DIERS volunteers                             compatibility issues with current and future MS Windows
                                                         versions
Completion Date: December 2010
Taking New Members: No
196. Independent Protection Layers
                                                         The publication will provide process automation engineers,
Chair: Wayne Chastain, Eastman Chemical                  process engineers, facility operators, and safety
Staff: John Murphy                                       professionals with the appropriate treatment and
Contractor: Process Improvement institute                requirements applicable to equipment design,                     Final draft in preparation.
                                                         administrative procedures, or other “credits” that are treated
Completion Date: Spring 2011                             as an independent protection layer from a Layer of
                                                         Protection Analysis (LOPA) perspective.
Taking New Members:no
                      Project Statistics                                     Project Scope                                              Project Status

200. External Affairs Committee—Standing Committee     Create a standing CCPS subcommittee responsible for:           The year 2011 will bring full operation of a
                                                       Evaluating requests for CCPS to participate in other           production quality database, initially with relief
Chair: N/A                                                                                                            valves and then expanding to instrument loops to
                                                       organizations’ events or projects, identifying how CCPS
Staff: Scott Berger                                    would participate, and recruiting volunteers or identifying    help support “proven in use” for safety
Contractor: N/A                                        staff to support operate a pilot                               instrumented functions and systems. Production
                                                       To develop and these activities database of operating          Subcommittee meets everyavailable by end of 2nd
                                                                                                                      quality software should be other month
                                                                              •Drafting process safety and
                                                       company reliability data to aid inor approving CCPS
                                                                                                                      quarter 2011 that will fully support the desired
                                                       messages, e.g. technical requestspilot database is proven,
                                                       maintenance evaluations. Once from regulatory agencies,
                                                       press requests database of maintenance and reliability
                                                                                                    •Proactively      work process for relief valves. Upon successful
                                                       expand to a full
                                                       seeking other organizations that can help CCPS carry out       startup, work will proceed to implement additional
Standing Committee                                     data for equipment in the CPI and HPI.
                                                       its mission                                                    equipment taxonomies within the software.
Taking New Members: Yes                                                                                               Future plans include a concept book titled, CCPS
202/231. Process Safety Boot Camp                                                                                     Guideline for Proven in Use Data (The Gold
Chair: N/A                                                                                                            Standard), as well as expansion of theconducted in
                                                                                                                      Six Process Safety Boot Camps were taxonomies
Staff: Louisa Nara                                     An intensive process safety training program for engineers     and supporting software.
                                                                                                                      2010 with 131 participants. Five have been
Contractor: N/A                                        new to process safety. Will include onsite tours and           conducted in 2011 with 127 participants with more
                                                       training as well as classroom.                                 to being scheduled. There are presently eight Boot
Standing Committee                                                                                                    Camp Instructors.
Taking New Members: N/A
207. Process Safety Culture, enhanced ed
                                                                                                                      Process Safety Culture Survey was fully completed
Chair: Shakeel Kadri
                                                                                                                      by nine (9) companies as of December 2010. Next
Staff: Greg Keeports
                                                                                                                      steps are to interpret survey results and determine
Contractor: N/A                                                                                                       next steps. The Processs Safety Culture team met in
                                                       Expand on CCPS efforts to provide resources to senior          Chicago on March 16, 2011, and the team decided
                                                       corporate officials to help them strengthen process safety     to formulate a detailed plan to meet agreed upon
                                                       culture                                                        objectives for 2011/12.      Companies who have
                                                                                                                      not done so, are asked to complete the survey to
                                                                                                                      improve our knowledge. To participate in the
                                                                                                                      survey, contact the CCPS office, Greg Keeports or
Completion date: TBD
                                                                                                                      Shakeel Kadri.
Taking New Members: No
208. Guidelines for Evaluating Process and Plant
Buildings for External Explosions and Fires, 2nd ed.   This update will incorporate recent developments related to
                                                                                                                      BakerRisk is on schedule and has issued the Peer
Chair: Wayne Garland, Eastman                          facility sitting and layout, including the newest (2009)
                                                                                                                      Review copy for comments. This project is also
Staff: Adrian Sepeda                                   version of API 752, API 753, and similar developments in
                                                                                                                      piloting a different way of issuing and collecting
                                                       the chemical industry. Project is in the Peer Review phase
Contractor: Baker Risk                                                                                                comments and resolving issues. A report will
                                                       now and contract work should be completed in the third
                                                                                                                      follow after the project is completed. Target
                                                       quarter 2011. Publication is expected in the last quarter of
Completion date: Late 2011                                                                                            publication date is still as bid—last quarter of 2011.
                                                       2011.
Taking New Members: No
                     Project Statistics                                       Project Scope                                             Project Status
209. Guidelines for Conduct of Operations                                                                             The year 2011 will bring full operation of a
Chair: Jim Klein, DuPont                                                                                              Wiley had quality database, initially with
                                                                                                                      production a few copies of the Conduct of relief
Staff: Greg Keeports                                    This project will develop new guidance and tools on           valves and then expanding to instrument loops to
                                                                                                                      Operations, Operating Discipline "concept" book
                                                        establishing, evaluating, and improving Conduct of
Contractor: ABS Consulting                                                                                            help support “proven in during March 2011.
                                                                                                                      available for the GCPS use” for safety
                                                        Operations to help organizations ensure consistent            instrumented functions and systems. Production
                                                        To develop of critical job tasks.database of operating        DuPont generously provided permission to use
                                                        completion and operate a pilot                                quality software should be availablein book.of 2nd
Completion date: Project Work Complete                  company reliability data to aid in process safety and         their Process Safety Wheel graphic by end
                                                                                                                      quarter 2011 that will fully support the desired
Taking New Members: No                                  maintenance evaluations. Once pilot database is proven,
                                                                                                                      work process for relief valves. Upon successful
                                                        expand to a full database of maintenance and reliability
210. Benchmarking Process Safety Management systems                                                                   startup, work will proceed to implement additional
                                                        data for equipment in the CPI and HPI.                        The benchmark protocol for the 6 selected Risk
                                                                                                                      equipment taxonomies within the software.
Chair: Jim Muoio                                                                                                      Based Process Safety elements has been developed
                                                        Formal, systematic benchmarking program to allow              Future plans include a concept book titled, CCPS
Staff: Jack McCavit                                                                                                   and the first round of benchmarking is complete.
                                                        participants to know the relative standing of their process   Guideline for Proven in Use Data (The Gold
                                                                                                                      Benchmarking participants actively being solicited.
Contractor: Phillip Townsend Associates                 safety programs, and for CCPS to understand the current       Standard), as well as expansion of the taxonomies
                                                                                                                      For more information, contact the CCPS office or
                                                        general state of practice.                                    and supporting software.
                                                                                                                      Phillip Townsend Associates
Standing Committee                                                                                                    (kodonnell@ptai.com).
Taking New Members: No
211. Executive Process Safety Seminars
                                                                                                                      Executive interviews have been completed.
Co-chairs: Linda Hicks, Vertellus, and Dave Cummings,
                                                                                                                      Product is in the final stages of preparation before
DuPont
                                                                                                                      peer review. Each interview has produced 20-30
Staff: Bob G. Perry
                                                                                                                      minutes of video and not all can be included as
Contractor: ioMosaic                                    Seminar targeted at improving awareness of process safety     much of it is repetitive. Although each interviewee
                                                        amongst industry executives while educating them on their     is responding to the same questions, their response
                                                        role. Companion project to 2008 project targeted at           is individual and different. The product will
                                                        Culture.                                                      represent Gary Kenney's and Don Hirsch's best
                                                                                                                      effort to fit the various interviewee responses into
                                                                                                                      the format. The video will employ a professional
                                                                                                                      "voice over" to introduce the speakers and topics.
Completion Date: Early 2011
                                                                                                                      The committee is meeting on 11/09/10.
Taking New Members: Peer Review Only
                    Project Statistics                                         Project Scope                                              Project Status
212. (Guidelines for) Likelihood of Ignition                                                                            The year 2011 will bring full operation of a
Chair: Bob Stack, Dow Chemical                                                                                          production quality database, initially with relief
                                                         Define a set of approaches for calculating the likelihood of
Staff: Adrian Sepeda                                     ignition for selected categories of scenarios, and publish a   Outline approved; first draft instrument BakerRisk
                                                                                                                        valves and then expanding toin progress. loops to
Contractor: Baker Risk                                   Guidelines or Concept series book of instructions and tools    help support “proven in use” for and interfacing
                                                                                                                        started by gathering information safety
                                                         (including a CD of calculation database of operating           instrumented functions and systems. Production
                                                         To develop and operate a pilot methodologies and structure     with the subcommittee. Mike Moosemiller is
                                                                                                                        BakerRisk’s lead. This book and technology 2nd
                                                                                                                        quality software should be available by end ofwill
                                                         for input data) to dodataIdeally, three categories and
                                                         company reliability so. to aid in process safety of
                                                         resources needed and matching precision of calculations        be the 2011 that to and complement the F&E
                                                                                                                        quartercompanionwill fully support the desired
                                                         maintenance evaluations. Once pilot database is proven,
                                                         will be to a full database of medium, and high degree of       work process for relief valves. Upon successful
                                                         expand developed (e.g. low, maintenance and reliability        book. Target publication is last quarter of 2011.
                                                                                                                        startup, work will proceed to implement additional
Completion Date: Late 2011
                                                         precision and accompanying and HPI.
                                                         data for equipment in the CPIrequired effort).
                                                                                                                        equipment taxonomies within the software.
Taking New Members: No                                                                                                  Future plans include a concept book titled, CCPS
                                                         The updated Guidelines book would provide plant design         Guideline for Proven in Use Data (The Gold
216. GL Engineering Design for Process Safety, 2nd ed.                                                                  Standard), as well as expansion of the taxonomies
                                                         engineers, facility operators, and safety professionals with
Chair: Pete Lodal, Eastman Chemicals                     key information on selected topics of interest, many of        and supporting software.
Staff: Dave Belonger                                     which are dealt with in other CCPS publications, which         Comments from the peer reviewers is due April 15.
Contractor: AON Energy Risk Engineering                  would be liberally referenced. The Guideline would also        Expect to publish by mid June
                                                         provide an extensive bibliography to related publications
                                                         and topic-specific information, as well as the key
Completion Date: Mid 2011
                                                         information on failure modes and potential design solutions
Taking New Members: Peer Review Only                     from the 1998 Design Solutions Guideline book.
218. Recognizing Incident Warming Signs
                                                         Prior to many potentially serious process incidents, warning
Co Chairs: Bobby Fischer, TOTAL
                                                         signs or problems are present, but often are not recognized
Staff: Brian D. Kelly, P. Eng.
                                                         or responded to. This project has developed improved
Contractor: AntiEntropics                                guidance documents for recognizing, characterizing and
                                                         troubleshooting warning signs to avoid process incidents
                                                         and injuries. Key areas are examined such as: Leadership,      In Peer Review.
                                                         Discipline and Organizational Culture; Training and
                                                         Competency; Process Safety Information; Procedures;
                                                         Asset Integrity; Analysis of Risk and Managing Change;
                                                         Information learned from Audits; Lessons Learned from
Completion Date: Summer 2011
                                                         Experience; and Physical Warning Signs.
Taking New Members: No
                     Project Statistics                                   Project Scope                                               Project Status
219. Process Safety Moments Presentations                                                                            The year 2011 will bring full operation of a
Chair: TBD                                         Create a library of short (1 to 4 slide) powerpoint files. This   production quality database, initially with relief
Staff: Dennis Hendershot, John Herber              will allow for easy sharing and presentation. Other media         valves and then expanding to instrument loops to
Contractor: N/A                                    such as video clips (embedded in powerpoint presentations)        help support “proven in use” for safety
                                                   or podcasts would be considered. Another potential idea is        instrumented functions and systems. Production
                                                   to develop and operate a pilot database of to provide
                                                   Tohave TSC members record the moments operating a                 Ongoing
                                                                                                                     quality software should be available by end of 2nd
                                                   personalized, reality feel. The in process safety and
                                                   company reliability data to aidmaterial topic and/or
                                                                                                                     quarter 2011 that will fully support the desired
                                                   intended audience would Once pilot database is proven,
                                                   maintenance evaluations. influence the media selection: i.e.
                                                                                                                     work process for relief valves. Upon successful
                                                   expand to a (printouts) for a maintenance and v. podcasts
                                                   powerpoint full database of toolbox meeting reliability           startup, work will proceed to implement additional
Standing Committee                                 for a business leader the CPI and HPI.
                                                   data for equipment infocused Process Safety Moment.
                                                                                                                     equipment taxonomies within the software.
Taking New Members: Yes                                                                                              Future plans include a concept book titled, CCPS
223. Process Safety in Biofuel Plants                                                                                Guideline for Proven in Use Data (The Gold
OSHA Susan Harwood Grant                                                                                             Standard), as well as expansion of the taxonomies
                                                   Develop an on-line training module to introduce process           and supporting software.
Staff: Louisa Nara                                                                                                   As of December 31, 2010, over 150 participants
                                                   safety concepts to small and start up bioethanol and
                                                                                                                     have begun the course and 33 have completed.
                                                   biodiesel manufacturers.
Completion Date: September 2011
Taking New Members: Yes @ http://aiche.learn.com
224. Hazard Identification for Operators and
Maintenance: A CCPS Training DVD                   Frequently, front line personnel are not made aware of the
Chair: TBD                                         full extent of process safety hazards present in their work
Staff: Brian D. Kelly, P. Eng.                     environments. This project will determine an optimal
                                                   format for visual training, and produce that DVD/web
                                                                                                                     Project team being formed.
                                                   training to enhance awareness and identification of process
                                                   safety hazards by front line personnel. This training would
                                                   be based on the CCPS book A Practical Approach to
Completion Date: TBD                               Hazard Identification.
Taking New Members: Yes
225. Process Safety Management for Front Line
Supervisors                                        While “Top-down” emphasis of PSM & other safety
Chair: TBD                                         programs is necessary, the daily “enforcement” is at the
Staff: John Herber                                 worker and supervisor levels. This project will increase the
                                                                                                                     Project team being formed.
                                                   understanding and buy-in for PSM at the first-line
                                                   supervisory level through better understanding of PSM, its
Completion Date: TBD                               benefits and the interactions of the various elements.
Taking New Members: Yes
                     Project Statistics                                      Project Scope                                            Project Status
227. Guidelines for Organization Change Management                                                                   The year 2011 will bring full operation of a
for Process Safety                                      Many companies continue to struggle with effective           production quality database, initially with relief
Chair: John Wincek, Croda                               implementation of Management of Organizational Change.       Reviewed 1st draft commentsinstrument loops to
                                                                                                                     valves and then expanding to March 18, 2011. 2nd
Staff: Dave Belonger                                    This project will address these issues and help companies    help support “proven in use” for safetyreview
                                                                                                                     draft due April 19. Teleconference to
                                                        bring their MOOC systems to the same degree of maturity      consolidatyed 2nd draft comments set for June 3
                                                                                                                     instrumented functions and systems. Production
                                                        To develop and operate a pilot database of operating
Completion Date: Late 2011                              as other process safety management systems.                  quality software should be available by end of 2nd
                                                        company reliability data to aid in process safety and
Taking New Members: Yes                                                                                              quarter 2011 that will fully support the desired
                                                        maintenance evaluations. Once pilot database is proven,
                                                                                                                     work process for relief valves. Upon successful
229. Conditional Modifier and Enabling Events           expand to a full database of maintenance and reliability
                                                                                                                     startup, work will proceed to implement additional
                                                        data for equipment in the CPI and HPI.
Chair: Wayne Chastain, Eastman, Co chair Stan Urbanik                                                                equipment taxonomies within the software.
                                                        A short publication providing information and                Future plans include a concept book titled, CCPS
Staff: John Murphy                                      considerations on developing and using conditional           Guideline for Proven in Use Data (The Gold
                                                                                                                     Outline developed. Contract awarded.
Contractor: Unwin                                       modifiers. It would also provide similar information on      Standard), as well as expansion of the taxonomies
                                                        apply enabling events values to hazards analysis.            and supporting software.
Completion Date: Spring 2012
Taking New Members: no
239. GL For Process Safety Knowledge and Expertise
                                                        Present the framework of process safety knowledge and
Chair: TBD
                                                        expertise versus the desired competency level in a “super-
Staff: Dave Belonger                                    matrix” format. This would be targeted at multiple
Contractor: TBD                                         audiences, ranging from front line chemical operators,
                                                        mechanics and instrument technicians through senior          Project team being formed.
                                                        management, including financial and business executives.
                                                        Gaps between existing and desired training levels can then
                                                        be identified, and potential remedies suggested.
Completion Date: TBD
                                                        Customization for specific company will be permitted.
Taking New Members: Yes

240. Guidelines for Implementing Process Safety
Management Systems, 2nd ed (Alt. title Process Safety
Management Systems: The Infrastructure for Success)     An update to the original PSM implementation guideline
                                                                                                                     The project team is in place; kickoff conference
Chair: Sara Perrin                                      which recognizes that most companies now have some form
                                                                                                                     call was held in January 2011 and a face-to-face
Staff: Dan Sliva                                        of PSM system but a number of companies, especially
                                                                                                                     meeting was held on March 14 at 9 AM at the
                                                        smaller companies, need a roadmap of how to efficiently
Contractor: TBD                                                                                                      Hyatt in Chicago.
                                                        and effectively upgrade their systems.

Completion Date: TBD
Taking New Members: Yes
                    Project Statistics                                  Project Scope                                              Project Status
241. Guidelines for Safe Automation, 2nd ed                                                                       The year 2011 will bring full operation of a
                                                  An update to the original 1993 guideline, this edition will
Chair: TBD (In Progress)                          cover state-of-the-art design and maintenance of Basic          production quality database, initially with relief
Staff: Dan Sliva                                  Process Control Systems (BPCS) and its role in overall safe     valves and team is in place; instrument loops to
                                                                                                                  The projectthen expanding tokickoff conference
Contractor: TBD                                   operation. It will also focus on the BPCS/operator              help support in January 2011. Conference call
                                                                                                                  call was held “proven in use” for safety
                                                                                                                  scheduled for February 24, systems. PM; face-to-
                                                                                                                  instrumented functions and 2011 at 2 Production
                                                  interface and will have a pilot examples of control
                                                  To develop and operateworked database of operating
                                                  schemes in combination with SIS.process safety and will be      quality software should be available by end of 2nd
                                                  company reliability data to aid in RBPS principles              face meeting tentatively targeted for May 2011.
                                                  integrated and a control strategy pilot database is proven,     quarter 2011 that will fully support the desired
Completion Date: TBD                              maintenance evaluations. Once for cyber attack “security”
                                                  will also be covered.                                           work process for relief valves. Upon successful
Taking New Members: Yes                           expand to a full database of maintenance and reliability
                                                                                                                  startup, work will proceed to implement additional
                                                  data for equipment in the CPI and HPI.
242. Student Handbook for Process Safety                                                                          equipment taxonomies within the software.
Chair: TBD                                        This project will include the development and evaluation of     Future plans include a concept book titled, CCPS
Staff: Don Abrahamson                             tools for application of process safety principles throughout   Guideline for Proven in Use Data (The Gold
Contractor: TBD                                   the standard chemical engineering curriculum in addition        Accepting as well as and forming the taxonomies
                                                                                                                  Standard), volunteersexpansion of the committee.
                                                  to, or as an alternative to, adding a new specific process      and supporting software.

Completion Date: TBD                              safety course.
Taking New Members: Yes
243. Guidelines for Mechanical Integrity
Chair: TBD
Staff: Don Abrahamson                             Update to 1st ed. which addresses gaps in guidance, such as
Contractor: TBD                                   selecting materials of construction, condition monitoring,      Accepting volunteers and forming the committee.
                                                  managed systems and MI metrics.
Completion Date: TBD
Taking New Members: Yes
Conference Projects
2012 27th CCPS International Conference
Chair: Jatin Shah
Staff: TBD                                        Part of 8th Global Congress on Process Safety                   Call for papers open through September

Completion Date: TBD
Taking New Members: Yes
3rd CCPS Latin America Conference and Expo 2011
(Buenos Aires)
Chair: TBD                                        Process Safety Expo in Latin America introducing CCPS
                                                  and its process safety resources to this audience. The          Conference theme and details are being developed,
Staff: TBD
                                                  second Latin American Conference is co-hosted by the            and negotiating conference logistics with AAIQ
                                                  Argentina Association of Chemical Engineers
Completion Date: March 13-17, 2011
Taking New Members: Yes

								