Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
Draft report issued, to be finalized in January. PF PF PF COASTAL REGION COASTAL REGION COASTAL REGION BRC BRC BRC BRC01GRS BRC01ARP _-A0613451 R BISHOP N VANDERKWAAK ESO PF BRC GOVERNOR REPLACEMENT STUDY BRC ASBESTOS REPLACEMENT PRGM CMS HQ BUILDING IMPROVEMENTS A C A 4123 4123 4123 1030696 1030696 1030696 A61004 A61059 A61345 A0610041 A0610591 A0613451 Y Y Y 70.0 40.0 70.8 40.0 0.0 62.4 25.2 0.0 0.0 0.0 0.0 19.1 0.0 0.0 10.6 0.3 0.0 Revised SOO approved, with new in-service date. Coils not installed by Dec 05 will become plant spares. COASTAL REGION COASTAL REGION
PF PF
BRC BRC
BRG BRG
BRC01SBC BRC01TRI
S
C4
c
2
R BISHOP R WILLIAMS
N VANDERKWAAK D MCEACHERN
ESO ESO
BRC Spare Bearing Cooling Coils BR/C TRASHRACK INSTRUMENTATION
A A
4123 4123
1030696 1030696
A61003 A61062
A0610031 A0610621
N Y
1,471.2 15.9
1,450.3 229.2
427.0 6.4
546.0 0.0
321.1 10.3
271.3 0.5 Further study work will determine if remedial work is required on the towers at BR2 and CMS
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC
BRG BRG BRG
INT01SU BRC02OAE BRC02OP
R WILLIAMS
R IREDALE B KNOKE B KNOKE
ESO PF PF
Intake Seismic Upgrade at CMS, ASH and BR2 BRC Oil Analysis Equipment BRC Oil Testing and Contamination Control
I A A
4123 4123 4123
1030696 1030696 1030696
A61127 A62024 A62025
A0611271 A0620241 A0620251
Y Y Y
280.9 47.7 27.5
280.9 47.7 27.5
224.1 47.0 41.1
0.0 0.0 0.0
94.4 47.0 100.0
37.5 7.5 EAR to be rivsed by Bknoke 33.5 Definition work proceeding based on new Blocking Policy issued late November 03.
PF
COASTAL REGION
BRC
BRG
BRG01BD
S
F3
e
2
R WILLIAMS
N VANDERKWAAK
ESO
BRG Immobilization and Blocking Devices for Water Passages
A
7159
1030722
A61856
A0618561
N
93.1
662.0
60.0
382.9
55.7
22.3 Batteries and chargers have been purchased. Delivery is Mid February
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
BRG BRG
BR1 BR1
BR103BAT _BR1-1104658
R WILLIAMS
R IREDALE
ESO
BR1 Station Battery Replacement BRC Portable Vibration Monitor
A A
7152 7152
1030697 1030697
1104039 1104658
1106068 1104827
Y Y
209.0 57.7
106.7 57.7
2.0 50.9 0.0
106.7 0.0
2.0 50.9 PF recommended to assign heat run test to staff of GTS, plan to start site work in March 2004.
PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC
BRG BRG
BR1 BR1
BRR04EXC _BR1-A0292982
R WILLIAMS
WH CHUNG G JARL
ESO PF
BR1 & BR2 Exciter Replacement BR1 VIBRATION MONITOR
A A
7152 7152
1030697 1030697
1106074 A29298
1106075 A0292982
Y Y
43.4 0.0
43.6 63.7
0.3 63.7 0.0
6.6 0.0
0.3 COMPLETE 0.0 Rick: should this be Ron Braam as PM?
PF PF
BRC BRC
BRG BRG
BR1 BR1
BR101OI _BR1-A61126
G JARL
PF PF
BR1 & BR2 OI COMPLETION BR/C HOT AIR DRYER SYSTEM
A C
7152 7152
1030697 1030697
A31126 A61126
A0311261 A0611261
Y Y
159.9 69.9
159.9 69.9
185.8 73.8
0.0 0.0
16.0 0.0
19.8 3.2 The preliminary engineering is well along, the EAR will be sent up in March for the major project work.
PF PF PF PF PF PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC BRC BRC BRC BRC BRC
BRG BRG BRG BRG BRG BRG BRG BRG BRG
BR1 BR1 BR1 BR1 BR1 BR2 BR2 BRR BRR
BR101FR _BR1-A62003 _BR1-A62071 _BR1-A62072 _BR1-A62075 _BR2-A0292986 _BR2-1106067 BRG02GFP BR103VP C C C4 C4 c c 2 2
R WILLIAMS
D DELCOURT G JARL G JARL G JARL G JARL G JARL
ESO PF PF PF PF PF
BR1 FIRE RISK REDUCTION BRG SHOP ROAD PAVING BR1 PENSTOCK FLOW METER BRC VIBRATION MONITORING EQUPT BR1 LUBE OIL FLOW METER ALARM BR2 VIBRATION MONITOR BR2 Station Battery Replacemen BR1/2 Units 1-4 & Units 7-8 Governor Oil System Filters & Sample Ports (All Units) BR1 Units 1-4 Vibration Probe Installation
A A A A A A A P P
7152 7152 7152 7152 7152 7152 7153 7152 7152
1030697 1030697 1030697 1030697 1030697 1030697 1030718
A61137 A62003 A62071 A62072 A62075 A29298 1104040
A0611371 A0620031 A0620711 A0620721 A0620751 A0292986 1106067
Y Y Y Y Y Y Y N
100.8 10.6 25.4 42.2 24.8 0.0 104.5
103.6 10.6 25.4 42.2 24.8 53.0 104.5 0.0
101.1 0.6 13.3 38.8 25.3 53.0 4.2
0.0 0.0 0.0 0.0 0.0 0.0 0.0 10.9
34.8 0.0 25.4 38.8 25.3 11.7 0.0 0.0
32.3 Close & Write-off to OMA. 0.6 COM;PLETE -0.7 COMPLETE 0.1 COMPLETE 18.7 COMPLETE 11.7 4.2
B KNOKE G JARL
PF PF
Defer to 2004-05 1030697 N 0.0 0.0 0.0 71.1 50.0 0.0 - purchase & delivery is complete - installation is 25% complete - waiting for outages to install remaining 3 coolers - expect complete by Mar 31 2004
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
BRG BRG
BRR BRR
BR103TBH BR103CWP
C
D4
c
2
N ALLINSON G JARL
PF PF
BR1 G1-G4 Turbine Oil Cooler BR1 G1-4 Cooling Water Piping Replacement
A A
7152 7152
1030697 1030697
1103704 1104267
1103982 1104395
N Y
29.5 25.0
29.5 25.0
36.1 21.1
43.8 0.0
30.0 25.0
36.1 21.1 EAR approved. Bids received, tank and dispensing system ordered. On schedule and budget
PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC
BRG
BRR
BR103DFS
G JARL
A KING
ESO
BR1 Diesel Fueling Station
A
7152
1030697
1106309
1106310
N
27.0
26.8
3.0
54.7
26.8
3.0 Project in-service and plan to close out by 31 Mar 04.
PF PF PF
BRC BRC BRC
BRG BRG BRG
BRR BRR BRR
BR100BCC BR101LLO BR100OLS C C4 c 1
G JARL B KNOKE
D EPP D EPP G JARL
ESO ESO PF
BR1 G1-4 Upper & Lower Bearing Cooling Coils BR1 Terzaghi Dam LLOG Inspection Platform BR1 Unit Oil Lift Systems
A C A
7152 7152 7152
1030697 1030697 1030697
A31028 A31106 A31119
A0310281 A0311061 A0311191
Y Y N
117.9 120.9 215.9
106.5 103.8 215.9
105.0 103.8 232.3
0.0 0.0 40.5
13.7 9.8 85.0
12.2 Complete 9.8 79.8 Eng & purch complete, await staff avail
PF PF
BRC BRC
BRG BRG
BRR BRR
BRR01PML BR101CWP
C
B4
c
1
R WILLIAMS
K CARRIERE G JARL
ESO PF
Bridge River PML Meters BR1 Unit 1-4 CW Differential Flow Switch Replacement
A A
7152 7152
1030697 1030697
A61066 A61077
A0610661 A0610771
N Y
259.3 36.6
267.8 36.6
181.2 30.2
51.4 0.0
101.8 8.0
15.2 Complete 0.0 This work is waiting to be transferred to TPD Stations C
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC
BRG BRG BRG
BRR BRR BRR
BR101TYS BR101NS2 BR101NS3
C
C4
c
2
G JARL
B MASON G JARL G JARL
ESO PF PF
BR1 Transformer Yard Spill Containment Improvements BR1 Unit 2 Needle Servomotor Refurbishment BR1 Unit 3 Needle Servomotor Refurbishment
A C C
7152 7152 7152
1030697 1030697 1030697
A61079 A61306 A61307
A0610791 A0613061 A0613071
N Y Y
10.0 132.5 132.5
11.4 132.5 132.5
6.2 135.5 132.6
98.5 0.0 0.0
1.9 116.3 114.0
1.0 Complete 116.9 Complete 114.0 COMPLETE Jan04 - Actual has exceeded aproved. Client has agreed. Dec03 - COMPLETE - Some of unit 1 invoices were charged to Unit 4.
REPOR T
PF
COASTAL REGION
BRC
BRG
BRR
BR101NS4
G JARL
T MCLAY
ESO
BR1 Unit 4 Needle Servomotor Refurbishment
C
7152
1030697
A61308
A0613081
Y
131.5
151.5
152.9
0.0
0.0
1.4
Page 1 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
DEFINITION - New scope of work proposed to client to purchase one prototype for installation early 04. New scope of work was approved by Client and accepted by Eng 14Jan04. Forecast completion is 31Jul04.
PF
COASTAL REGION
BRC
BRG
BRR
BR101NP
G JARL
G CHOW
ESO
BR1/BR2 Turbine Needle Position Indicators
A
7152
1030697
A61388
A0613881
N
56.0
74.3
26.3
164.1
64.4
16.4 - install and commission complete - spare parts purchase and small documentation to be completed - expect complete by Oct 31 2003
PF
COASTAL REGION
BRC
BRG
BRR
BRR01SEC
N ALLINSON
PF
BRG Security System Addition
C
7152
1030697
A61811
A0618111
Y
93.2
93.2
95.4
0.0
28.0
27.8 - Approved $ amount is incorrect. This was revised to $133.5 loaded - installation is about 60% complete - to be completed by Dec 31 2003
PF
COASTAL REGION
BRC
BRG
BRR
BR102TPV
C
C4
c
1
N ALLINSON
PF
BR1 G1 To G4 TIV Control Water Piping & Valves Replacement
C
7152
1030697
A61829
A0618291
N
133.5
133.5
149.2
27.4
144.0
14.0 - all work has been completed - I am waiting for final drawings to be issued and some other minor documentation to be completed. - Should be done by Dec 31 2003
PF
COASTAL REGION
BRC
BRG
BRR
BR102TDP
C
B4
c
2
N ALLINSON
PF
BR1 Tunnel Drain Piping & Valves
C
7152
1030697
A61836
A0618361
N
310.8
310.8
311.5
54.7
30.0
25.6 Revising EAR to reflect moving well and replacing pumps
PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC
BRG BRG
BRR BRR
BRG02DWL BR102SST
C
C3
c
2
J ZARIN R BISHOP
PF PF
BR1/2 Domestic Water Line Replacement BR1 & BR2 Station Service Transformers
A A
7152 7152
1030697 1030697
A61873 A61892
A0618731 A0618921
N Y
10.6 26.5
210.0 26.5
1.0 7.4
87.5 0.0
11.0 21.9
0.0 3.4 CAR Closed EARs raised for 4 plants. Costs transferred.
200
PF
BRC
BRG
BRR
BRR02SSI
C
C3
c
2
R BISHOP
PF
Bridge River Station Service Improvements
A
7152
1030697
A62029
A0620291
N
33.6
33.6
0.1
218.8
0.0
0.1 DEFINITION Dec03 - Waiting for results of the study to determine the type of modification required. Richard Whittaker assigned as PM.
PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC
BRG BRG
BRR BRR
BR103BDC BR102UPS C C4 c 2
G JARL R BISHOP
R WHITTAKER K CARRIERE
ESO ESO
BR1 Brushgear Carbon Dust Reduction System BR1 UPS System Upgrade
A A
7152 7152
1030697 1030697
A62057 A62061
A0620571 A0620611
N N
28.7 20.6
27.5 21.2
3.9 9.6
119.3 164.1
8.8 20.5
3.9 DBM issued, await decision 8.9 Station and vendor info rec'd, scope is being finalized
PF
BRC
BRG
BRR
BR102BBR
C
C4
c
2
R BISHOP
K CARRIERE
ESO
BR1 Portal Battery Bank Replacement
A
7152
1030697
A62062
A0620621
N
10.3
11.0
5.3
114.9
10.6
4.9 The site forces have had delays in the installation of the Generator Deluge rings and major components, this work may have to be rescheduled to next year. The client is scheduling and coordinating the work. The EAR for the next phase of the work will be
PF
COASTAL REGION
BRC
BRG
BRR
BR202FR
C
E7
d
2
R WILLIAMS
D DELCOURT
ESO
BR2 Fire Risk Reduction
A
7152
1030697
A62067
A0620671
N
192.1
216.6
163.0
523.0
157.2
103.6 First and second sets installed and complete. Third set to be installed in F05.
PF PF PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC BRC BRC
BRG BRG BRG BRG BRG BRG
BRR BRR BRR BRR BRR BRR
BR299T7R BR202G5R BR202TNI BR203BDC BR203CWP BR203NCR
C
C4
c
1
G JARL
A ENGLISH
ESO PF
BR2 T5/T6/T7 Transformer Replacement BR2 G5 Rehabilitation BR2 G7 & G8 Needle Refurbishment (2002/03) BR2 Brushgear Dust Collection / Humidification BR2 G5-8 Cooling Water Piping Replacement BR2 G7/8 Needle Controller Replacement
A P P P P P
7152 7153 7153 7153 7153 7153
1030719 1030718 1030718 1030718 1030718 1030718
A29058
A0290581
N Y Y Y Y Y
6,357.8 0.0 0.0 0.0 0.0 0.0
6,236.8 0.0 0.0 0.0 0.0 0.0
4,220.5 0.0 0.0 0.0 0.0 0.0
1,477.1 0.0 0.0 0.0 0.0 0.0
1,244.6 0.0 0.0 0.0 0.0 0.0
1,226.8 0.0 CANCEL 0.0 0.0 0.0 CANCEL 0.0 Implem'tion EAR submitted in Dec 03. Recent direction is to defer from 04/05 Implementation due to asbestos issues identified as more extensive than originally anticipated. Further options under review.
2067
G JARL
PF ESO
K CARRIERE G JARL
ESO PF
PF
COASTAL REGION
BRC
BRG
BRR
BR203ASB
C
E2
d
2
R WILLIAMS
D EPP
ESO
BR2 Asbestos Removal
A
7153
1030718
1104621
1104623
N
25.0
26.6
22.3
10.9
26.6
22.3 First and second sets installed and complete. Third set to be installed in F05.
PF
COASTAL REGION
BRC
BRG
BRR
BR200SAR
C
C4
c
1
G JARL
A ENGLISH
ESO
BR2 Surge Arrester Replacement
A
7153
1030718
A31063
A0310631
N
312.2
257.6
185.4
165.4
58.2
43.0 EAR approved, resources organized, site visited, estimate in progress
59
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
BRG BRG
BRR BRR
BR201CW BR203TIV
C C
C4 C4
c c
2 1
G JARL
K CARRIERE G JARL
ESO PF
BR2 G5 to G8 Cooling Water Valves/Piping/Isolating Valves Replacement BR2 TIV Control Piping Replacement
A A
7153 7153
1030718 1030718
A61098 A61858
A0610981 A0618581
N N
68.8 81.5
63.0 24.4
45.7 22.8
218.8 164.1
54.5 81.5
37.2 22.8 - purchase and delivery complete - waiting for time to install - F03/04 Plan should be $35.92 - expect complete by Dec 31 2003
PF
COASTAL REGION
BRC
BRG
BRR
BR202ACR
N ALLINSON
PF
BR2 Station Air Compressor & Dryer Replacement
A
7153
1030718
A61866
A0618661
Y
69.7
69.7
38.3
0.0
35.9
5.5
Page 2 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
PF PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC BRC
BRG BRG BRG BRG BRG
BRR BRR BRR BRR BRR
_BRR-1104177 _BRR-1106167 _BRR-1106342 BRR99SF BRR01SER C D4 d 2 T MOLSTAD J DAVIS D TUTT
PF PF PF PF ESO
BRG Shop AC Water Treatment BRR Shop Septic System Replace BRR Mechanical Shop Tools BRR Shop Facility Addition (Office Moved) Bridge River Area Reservoir Shoreline Stabilization
C A I A C
7159 7159 7159 7159 7159
1030722 1030722 1030722 1030722 1030722
1104177 1105957 1106171 A29356 A31130
1104687 1106167 1106342 A0293561 A0311301
Y Y Y Y N
11.4 52.0 30.0 25.0 1,396.1
11.4 52.0 30.0 15.0 1,186.8
11.0 8.0 3.5 15.5 828.1
0.0 0.0 0.0 0.0 257.1
0.0 0.0 0.0 2.0 392.1
11.0 8.0 3.5 Deferred 2.1 360.4 Closed L8 Project - 1 or more project has actuals or plan this Fiscal Year 2
PF PF PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC BRC BRC
BRG BRG BRG BRG BRG BRG
BRR BRT LAJ LAJ LAJ LAJ
_BRR-A0311309 _BRT-1103919 LAJ04TRR LAJ99BKR _LAJ-A61073 LAJ01RAR J ZARIN S D3 d 2 J ZARIN O' DONAGHEY G JARL A ENGLISH G JARL D BRIGHTON
ESO PF
BRR RESERVOIR SHORELINE STABIL BRT Staff House Furnishing F04 LAJ Tailwater Realtime Readout
C C P I A C
7159 7159 7154 7154 7154 7154
1030722 1030722 1030720 1030720 1030720 1030720
A31130 1103919
A0311309 1104213
Y Y Y 10.3 0.0 291.8 7.8 544.1
0.0 10.3 0.0 264.7 20.0 544.1
331.5 9.9 0.0 258.3 11.7 558.3
0.0 0.0 0.0 78.8 0.0 0.0
0.0 10.3 0.0 72.1 11.7 0.0
0.0 Complete 9.9 0.0 Complete and in service. 65.8 COMPLETE -2.4 Complete 0.0 Requests have been made of the client to schedule the completion of the Fire Alarm and P&C work, due to past outage changes. The client is reviewing a request to allow the project funding to exceed 100% but not more than 110%
ESO PF PF
Lajoie 60kV Unit Circuit Breaker Replacement (60CB1) LAJ P/H LIGHTING CONTROL SYS LAJ ROOF REPLACE & ASBESTOS RE
A29033 A61073 A61082
A0290331 A0610731 A0610821
N Y Y
PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC
BRG
LAJ
LAJ02FR
G JARL
D DELCOURT
ESO
LAJ FIRE RISK REDUCTION
A
7154
1030720
A61875
A0618751
Y
159.4
180.3
167.4
0.0
70.6
57.6 Bundle with 62090 & 61394 CMS Diesel
PF PF
BRC BRC
BRG BRG
LAJ LAJ
LAJ02SD LAJ02SSI
S
D2
c
2
B KNOKE R BISHOP
PF PF
LAJ Standby Diesel Replacement LAJOIE STATION SERVICE IMPROVE
A A
7154 7154
1030720 1030720
A62019 A62090
A0620191 A0620901
N Y
184.7 368.3
184.7 368.3
19.5 42.2
10.9 0.0
11.0 5.0
4.4 16.5 DEFINITION - Work to be split into 2 projects. Work under review by Joe Zarin. SOO to be revised. Engineering awaiting direction.
PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC
BRG BRG BRG BRG
LAJ SON SON SON
LAJ02PR _SON-A0292981 SON01OI SON03ASB S E2 d 2
J ZARIN
D PARRY G JARL
ESO PF
LAJ PENSTOCK RECOATING & SEAL SON VIBRATION MONITOR SON OI
A C P P
7154 7152 7155 7155
1030720 1030697 1030721 1030721
A62098 A29298
A0620981 A0292981
Y Y N N
26.0 0.0
26.9 25.5
16.0 25.5
0.0 0.0 158.6
23.8 0.0 0.0
11.1 COMPLETE 0.0
Deferred to 2004-05 R WILLIAMS D EPP ESO SON Asbestos Removal 0.0 16.3 0.0 16.4 0.0 0.0 PENDING - Dec03 Client has deferred this work to next fiscal. Prior to deferral work was done to locate information on similar work at other locations.
PF
COASTAL REGION
BRC
BRG
SON
SON03AVC
G JARL
A KING
ESO
SON PH Forced Air Venting/Cooling (HVAC)
P
7155
1030721
N
0.0
0.0
0.0
5.5
0.0
0.0 ON HOLD - Project placed on hold pending for the development of a standard from another project
PF PF PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC BRC BRC
BRG BRG BRG BRG BRG BRG
SON SON SON SON SON SON
SON03TRR SON04BBR SON99BKR _SON-A31116 _SON-A61083 SON00LPA S C4 c 1 S D3 d 1
G JARL
V.Cummings R BISHOP
ESO PF ESO
SON Tailwater Real Time Readout SON 48V DC Battery Bank Replacement SON 60CB1 Unit Circuit Breaker Replacement SON FOREBAY WEIR/DRAIN LINE RE
P P I C C A
7155 7155 7155 7155 7155 7155
1030721 1030721 1030721 1030721 1030721 1030721 A29034 A31116 A61083 A61090 A0290341 A0311161 A0610831 A0610901
N Y N Y Y N 0.0 291.9 9.3 24.0 57.8 0.0 274.2 9.3 24.0 57.8 0.0 269.7 0.9 25.8 23.4
21.9 0.0 136.2 0.0 0.0 14.2 0.0 94.5 0.0 25.8 20.0 0.0 Complete and in service. 90.1 0.9 COMPLETE 1.6 Install with EXC Mar 04 16.5 July 03 planned installation deferred to Jul 04 due to fish requirements
G JARL
A ENGLISH
G JARL G JARL
PF PF
SON FISH AIR COMPRESSOR REPLAC SON G1 Oil Lift System
PF
COASTAL REGION
BRC
BRG
SON
SON01FWG
S
C5
d
2
G JARL
D EPP
ESO
SON Fishwater Gates & Hoists
A
7155
1030721
A61121
A0611211
N
285.7
255.2
202.7
16.4
40.1
37.4 Gen. Deluge work overbudget. An outage must be planned with the site forces to complete the Fire Alarm and P&C work. An EAR revision and upgrade has been submitted.
PF
COASTAL REGION
BRC
BRG
SON
SON01FR
S
E6
d
2
R WILLIAMS
D DELCOURT
ESO
SON Fire Risk Reduction
A
7155
1030721
A61138
A0611381
N
203.0
281.3
272.3
339.2
143.9
134.9 Target to install during next planned outage in 2005. Project delayed due to extended time required for awarding bulk exciter procurement contract and also outage is too short in year 2004.
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
BRG BRG
SON SON
SON01EXC SON03TC
S
D4
c
1
G JARL
WH CHUNG G JARL
ESO PF
SON Exciter Replacement SON Trashrack Cleaner
A A
7155 7155
1030721 1030721
A61317 A62054
A0613171 A0620541
N N
826.8 11.5
829.9 11.5
499.8 12.5
492.4 21.9
488.3 4.0
412.9 Complete 4.2 COMPLETE Jan04 - Actual has exceeded aproved. Client has agreed. Dec03 - Project COMPLETE. Gates are in service. Completion Report delivered.
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC
BRG BRG CSG
SON SON
SON02CHG SON03SSR BRC03OSC S C3 c 2
G JARL
T MCLAY R BISHOP B KNOKE
ESO PF PF
SON Canal Headworks Gates Refurbish SON AC Station Service & MCC Replacement BRC Oil Safe Containers
I A C
7155 7155 4143
1030721 1030721 1030698
A62060 A62085 1103618
A0620601 A0620851 1103619
N N Y
249.4 745.1 12.0
255.3 30.9 12.0
255.6 38.5 9.5
43.8 27.4
239.6 85.0 12.0
239.6 ATS and diesel being 13.3 expedited To be closed 9.5
Page 3 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
Definition work proceeding based on new Blocking Policy issued late November 03. PF PF COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION BRC BRC CSG CSG CMS CSG01BD CMS02WLT S F3 e 2 R WILLIAMS N VANDERKWAAK B KNOKE ESO PF CSG Immobilization and Blocking Devices for Water Passages CMS Water Level Telemetry Upgrade A P 4143 4143 1030698 1030698 A61854 A0618541 N Y 65.8 0.0 124.8 0.0 9.3 0.0 85.7 0.0 25.1 0.0 7.6 0.0 EAR A62065, work incorporated with CMS04BLP BRC BRC CSG CSG CMS CMS CMS03BPU CMS03PBC B KNOKE PF ESO CMS Bearing Pot Upgrade CMS Powerhouse Bridge Crane Radio Remote Control P P 4143 4143 1030698 1030698 N N 0.0 0.0 0.0 27.4 27.4 Closed Governor replacement has speed switch built in PF COASTAL REGION COASTAL REGION COASTAL REGION BRC CSG CMS CMS03SS L NETTLETON PF CMS Speed Switch Replacement G1/G2 P 4143 1030698 Y 0.0 10.0 0.0 0.0 0.0 0.0 Refer to CMS04BLP. This project s/b closed. BRC BRC CSG CSG CMS CMS CMS04LP CMS03TQE S C4 c 2 B KNOKE B KNOKE D EPP PF ESO CMS Lift Pumps Cms Torque Machine and Wrench P C 4143 4143 1030698 1030698 1103306 1104581 N Y 0.0 15.5 0.0 13.8 0.0 13.8 54.7 0.0 13.8 0.0 Wrench received. Project 13.8 closed. EAR approval received in July 2003, consultant engineer focused on high priority projects in ASH, LDR & LB1 from July to Dec. Submitted revised project schedule to PF and received approval. Design work completed in Feb 2004. No local P&C technologist ava 0.0 0.0 ESO Managed
PF PF
PF PF
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
CSG CSG
CMS CMS
DSY03LTG CMS03MSU
B KNOKE
WH CHUNG B KNOKE
ESO PF
DSY Dam and Control Room Lighting Upgrade CMS Mechanic Shop Upgrade
A A
4143 4143
1030698 1030698
1103607 1103612
1103608 1103615
Y Y
33.8 23.0
29.9 23.0
1.0 21.2 0.0
29.9 23.0
1.0 To be closed 21.2 Jan04 update not available from PM Dec03 update not available from PM; Nov03 update not available from PM; DEFINITION - On time and on budget
PF
COASTAL REGION
BRC
CSG
CMS
CMS04BLP
B KNOKE
R IREDALE
ESO
CMS Thrust Bearing Lift Pump & Bearing Pot Upgrade
A
4143
1030698
1103692
1104181
Y
503.0
475.1
58.5
112.6
58.5 To be given to ESO for installation of the piping. J Adams
PF
COASTAL REGION
BRC
CSG
CMS
CMS03CWP
B KNOKE
PF
CMS Cooling Water System Replacement
A
4143
1030698
1104326
1104493
Y
25.0
25.0
0.0
0.0
0.0 Eng & purch substantially complete, site work in progress, EAR revision in progress
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
CSG CSG
CMS CMS
CMS03APR CMS03TCU
B KNOKE
K CARRIERE B KNOKE
ESO PF
CMS Alarm Panel Replacement CMS Telephone and Communication Upgrade
A A
4143 4143
1030698 1030698
1104389 1104393
1104539 1104624
Y Y
336.5 30.9
311.6 30.9
249.5 23.8
313.9 26.0
249.5 23.8 Installation of battery bank deferred until PF approve layout design of new diesel gen-set room. Forecast IDC higher than approved IDC amount.
PF
COASTAL REGION
BRC
CSG
CMS
CMS03BAT
R WILLIAMS
WH CHUNG
ESO
CMS Station Battery and Charger Addition
A
4143
1030698
1104875
1105417
Y
122.4
128.3
60.3
62.7
60.3 IN-SERVICE - Platform used for maintenance on Dec 15, 2003. Project complete. Project to be closed in March.
PF
COASTAL REGION
BRC
CSG
CMS
CMS04STP
B KNOKE
S DREXL
ESO
CMS Stator Platform
C
4143
1030698
1104892
1106071
Y
35.1
36.4
36.4
36.4
36.4 Review of costs and benefits in December showed this project is uneconomic - OEP reviewing.
PF
COASTAL REGION
BRC
CSG
CMS
CMS03SC
R WILLIAMS
N VANDERKWAAK
ESO
CMS GS Synchronous Cond.Rehab
A
4143
1030698
1105007
1105369
Y
36.5
37.3
17.2
0.0
32.8
17.2 99% complete - Field testing has been completed demonstrating a discrepancy in Ohm measurement. Investigation underway to determine problem and expected to be complete the Fyear.
PF
COASTAL REGION
BRC
CSG
CMS
CMS97GS
C WEYELL
A ENGLISH
ESO
CMS Grounding Upgrade
A
4143
1030698
A27025
A0270251
Y
463.6
412.1
389.5
0.0
78.6
56.7 1-Oct-2002 Implementation in 2002/03 R Bishop EAR replaced
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
CSG CSG
CMS CMS
CMS98SSD CMS99PCR
S
C4
c
2
R BISHOP R WILLIAMS
PF PF
CMS - Replace SS 129V DC Battery Charger CMS POWERLINE CARRIER REPLACEM
C C
4143 4143
1030698 1030698
A28058 A29019
A0280581 A0290190
N Y
31.6 295.7
11.2 295.7
11.2 196.0
43.8 0.0
0.0 0.0
0.0 Closed 3.1 Unit #2 device installed and requires repairs/modifications. Unit #1 device installation deferred to 04/05. EAR revision required.
Report
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC
CSG CSG CSG
CMS CMS CMS
CMS01MBD CMS01LLO CMS01BHS
S
F3
e
2
R WILLIAMS C WEYELL C WEYELL
D EPP D MCEACHERN J PSUTKA
ESO ESO ESO
CMS TIV Mechanical Blocking Devices CMS DAM LLO GATE STRIP & OVERC CMS BARRIER HELIPAD
A C C
4143 4143 4143
1030698 1030698 1030698
A61016 A61095 A61117
A0610161 A0610951 A0611171
N Y Y
156.6 99.6 31.8
159.6 92.9 30.0
131.9 92.9 31.4
33.9 0.0 0.0
20.7 0.1
17.3 Closed 0.1 Closed 1.4 The design is complete and the construction work is under way.
PF
COASTAL REGION
BRC
CSG
CMS
CMS01LS
R WILLIAMS
D DELCOURT
ESO
CMS FIRE RISK REDUCTION
A
4143
1030698
A61140
A0611401
Y
276.6
288.9
147.5
0.0
119.9
90.2 1-Oct-2002 PM B Knoke; 9Jan-2003 Revd fcast RBW
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
CSG CSG
CMS CMS
CMS01OI CMS01FPU
S
B4
c
2
B KNOKE B KNOKE
PF PF
CMS Operational Information (OI) Installation CMS FIRE PUMP UPGRADE
A C
4143 4143
1030698 1030698
A61311 A61381
A0613111 A0613811
N Y
47.7 23.9
47.7 23.9
40.3 25.4
36.1 0.0
39.0 1.0
16.5 To be closed 0.5
Page 4 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
Approved amount should be $81.5K Reviewed new project schedule with PF and obtained approval. Consultant engineer focused on completing high priority work in ASH, LDR & LB1 from July to Dec. Design work completed in Feb 2004. No local P&C Technologist
PF
COASTAL REGION
BRC
CSG
CMS
DSY01AVR
S
B3
b
1
C WEYELL
WH CHUNG
ESO
Daisy Station Service AVR Replacement
A
4143
1030698
A61390
A0613901
N
76.5
76.1
17.0
65.6
44.1
14.1 Dec03 update not available from PM; Nov03 update not available from PM; DEFINITION Preliminary design and estimates 100% complete.
PF
COASTAL REGION
BRC
CSG
CMS
CMS01BDC
B KNOKE
R IREDALE
ESO
CMS Brake Dust Collection System
A
4143
1030698
A61391
A0613911
N
421.1
413.7
82.5
21.9
138.2
82.5 Construction scheduled for 04/05. Tender in 03/04.
PF
COASTAL REGION
BRC
CSG
CMS
CMS03ASB
S
E2
d
2
R WILLIAMS
D EPP
ESO
CMS Powerhouse Asbestos Removal & Siding Replacement
A
4143
1030698
A61393
A0613931
N
982.0
971.4
25.4
749.5
33.7
20.5 Refer to CMS03SSU. This EAR will be closed.
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
CSG CSG
CMS CMS
CMS01BDR CMS01TIV
B KNOKE B KNOKE
PF PF
CMS BACKUP DIESEL REPLACEMNT CMS TIV Actuator Replacement
I C
4143 4143
1030698 1030698
A61394 A61809
A0613941 A0618091
Y Y
26.5 28.6
26.5 28.6
25.5 29.8
0.0 0.0
25.3 4.0
6.5 To be closed 3.7 All equipment is ordered. There continues to be project schedule risk due to late project approval.
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
CSG CSG
CMS CMS
CMS01CW CMS0224V
S
C4
c
1
B KNOKE D MCEACHERN
N VANDERKWAAK D MCEACHERN
ESO ESO
CMS Units 1&2 Cooling Water & Pumps & Strainer Replacement CMS 24 Volt DC Charger and Battery System
A A
4143 4143
1030698 1030698
A61868 A61879
A0618681 A0618791
N Y
942.9 26.5
897.1 22.0
159.5 21.9
55.8 0.0
849.7 1.1
129.3 1.5 Definition Phase funding spent. No clear recommendation
PF PF PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC BRC BRC
CSG CSG CSG CSG CSG CSG
CMS CMS CMS CMS CMS CMS
CMS02AAR CSG02TUP _CMS-A0620202 CSG02BBV CMS03SSU AC CMS03DTG S C3 c 2 S B5 c 2
B KNOKE
R IREDALE B KNOKE B KNOKE B KNOKE B KNOKE B KNOKE
ESO PF PF PF PF PF
CMS DAM AAR ASSESSMENT/REHAB CSG Timer Upgrade Project COM TIMER UPGRADE PROJECT COM.CMS Install Double Block and Bleed Valves & Filtration CMS Station Service AC Replacement CMS DRAFT TUBE GATES
A A A A A A
4143 4143 4143 4143 4143 4143
1030698 1030698 1030698 1030698 1030698 1030698
A62015 A62020 A62020 A62023 A62064 A62077
A0620151 A0620201 A0620202 A0620231 A0620641 A0620771
Y N Y Y N Y
50.0 57.2 0.0 51.9 1,386.8 118.3
50.0 39.5 19.4 51.9 21.5 118.3
42.5 20.2 19.6 42.5 269.5 81.8
0.0 10.9 0.0 0.0 218.8 0.0
15.3 18.0 0.0 15.0 700.0 110.0
7.8 CAR sent for approval 8.2 06Sep02. 3.1 13.0 269.5 57.4 Refer to CMS03SSU. This EAR will be closed. Report
PF
COASTAL REGION
BRC
CSG
CMS
CMS03SDC
B KNOKE
PF
CMS STATION SERVICE DC
I
4143
1030698
A62080
A0620801
Y
21.5
21.5
101.1
0.0
15.0
89.2 L&S have beat the recovery schedule by one week. Expected delivery date is 19 Jan 04. Other aspects of the project are on track.
PF
COASTAL REGION
BRC
CSG
CMS
CMS03GOV
R WILLIAMS
N VANDERKWAAK
ESO
CMS G1 & G2 GOVERNOR REPLACE
A
4143
1030698
A62095
A0620951
Y
3,051.9
3,076.8
713.4
0.0
1,141.0
703.9 Eng & purch substantially complete, panel installed, site wiring started
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
CSG CSG
CMS CMS
CMS03PN _CMS-A0292985
R WILLIAMS
K CARRIERE B Knoke
ESO PF
CMS G1 GENERATOR PROTECTION CMS VIBRATION MONITOR
A A
4143 7152
1030698 1030697
A62099 A29298
A0620991 A0292985
Y Y
470.5 0.0
462.8 21.1
385.2 21.1
0.0 0.0
420.1 0.0
382.0 To be deleted. 0.0 Dec03 update not available from PM; Nov03 update not available from PM; DEFINITION Preliminary design and estimates 100% complete.
PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC
CSG CSG
COM COM
COM01BDC COM01DR S C3 c 2
B KNOKE
R IREDALE B KNOKE
ESO PF
COM Brake Dust Collection System COM Airplane & Boat Dock Replacement
A P
4143 4145
1030698 1030704
A61391
A0613912
N N 0.0
26.5 0.0
25.4 0.0
16.4 10.9
26.5 0.0
25.4 EAR being raised 0.0 Under COM CW System COM03CWP
PF PF PF PF
BRC BRC BRC BRC
CSG CSG CSG CSG
COM COM COM COM
COM02CWS COM02LP COM03BC COM03PHV S C4 c 2
B KNOKE B KNOKE R BISHOP B KNOKE
PF PF PF PF
COM Cooling Water Strainer Replacement COM Lift Pumps COM Batteries & Charger COM Powerhouse Ventilation
P P P P
4145 4145 4145 4145
1030704 1030704 1030704 1030704
N Y N Y
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0
10.9 0.0 54.7 0.0
0.0 0.0 0.0 0.0
0.0 0.0 RBW Holding? 0.0 0.0 This project has never been assigned to Eng - there is no trace of it and as it is now likely too late in the year to assign it for 04 - the PM assignment should be changed to Brian Knoke until such times that it is officially transferred to Eng.
PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC
CSG
COM
COM03VT
B KNOKE
PF
COM Unit VTs
P
4145
1030704
N
0.0
0.0
0.0
21.9
0.0
0.0 remove D Boucher as contact (not Dan's)
PF PF PF PF PF PF
BRC BRC BRC BRC BRC BRC
CSG CSG CSG CSG CSG CSG
COM COM COM COM COM COM
COM04OI COM04SS COM04UPC COM03CWP _COM-1106066 COM99RCC R WILLIAMS
R WILLIAMS L NETTLETON
PF PF
COM O I COM Speed Switch Replacement G1 COM Unit Protection & Control
P P P A A C
4145 4145 4145 4145 4145 4145
1030704 1030704 1030704 1030704 1030704 1030704 1104325 1106009 A29048 1104494 1106066 A0290481
N Y Y Y Y Y
0.0 0.0
0.0 10.0
0.0 0.0
10.9 0.0 0.0
0.0 0.0 0.0 21.6
0.0 Deferred one year 0.0
G JARL
PF
COM Cooling Water System Replacement COM Airplane/Boat Dock Repl.
25.0 28.9 71.6
25.0 28.9 74.9
0.0 1.5 74.9 0.0 0.0
0.0 1.5 Complete and closed 34.3 CANCELLED - Project transferred from Dave Epp and HAD been put on hold by Coastal office; Chris Weyell agreed to close project.
0.0 34.3
K CARRIERE
ESO
COM Remote Crane Control
PF
COASTAL REGION
BRC
CSG
COM
COM00SHI
B KNOKE
A KUMAR
ESO
Clowhom Staffhouse Renovations
C
4145
1030704
A31091
A0310911
N
10.0
5.6
-0.3
10.9
-0.2
-4.5
Page 5 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
Heat run test completed in Nov by GTS staff. Target to submit Imp EAR in Jul 2004. Forecast IDC & O/H higher than approved IDC & O/H amount. COASTAL REGION COASTAL REGION COASTAL REGION
PF PF PF
BRC BRC BRC
CSG CSG CSG
COM COM COM
COM01EXC COM01WLT COM01MBD
C WEYELL
WH CHUNG B KNOKE B KNOKE
ESO PF PF
Clowhom Exciter Replacement COM Water Level Telemetry Upgrade COM Mechanical Blocking
A A A
4145 4145 4145
1030704 1030704 1030704
A61058 A61310 A61380
A0610581 A0613101 A0613801
Y Y N
25.0 101.5 167.0
28.7 101.5 167.0
12.1 20.7 5.9
0.0 0.0 109.4
16.4 5.0 0.0
0.9 To be transferred to 2.7 engineering To be transferred to 1.3 engineering Definition work underway. Construction to now be advanced to fiscal 04/05. 0.3 Definition report with cost estimate submitted to RW awaiting direction re progress to implementation EAR.Project does not show up as overspent in InfoPm investigating overun in Peoplesoft.
PF
COASTAL REGION
BRC
CSG
COM
COM03ASB
S
E2
d
2
R WILLIAMS
D EPP
ESO
COM Powerhouse Asbestos Removal
A
4145
1030704
A61398
A0613981
N
21.5
21.4
2.9
15.3
8.9
PF
COASTAL REGION
BRC
CSG
COM
COM01GSS
S
E3
d
1
C WEYELL
A ENGLISH
ESO
COM Grounding Switchgear Safety
A
4145
1030704
A61812
A0618121
N
26.5
27.1
25.3
175.1
6.2
4.4 The design is complete and the construction work is under way for this project. The deluge rings have been installed and the remainder of the work has been scheduled
PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC
CSG CSG
COM COM
COM02FR COM03EHR
S
E4
d
2
R WILLIAMS
D DELCOURT B KNOKE
ESO PF
COM Fire Risk Reduction COM Exciter Handrail
A I
4145 4145
1030704 1030704
A62036 A62078
A0620361 A0620781
N Y
203.3 17.5
189.2 17.5
183.4 23.1
153.2
177.5 24.0
173.1 To be closed 22.3 Eng & purch complete, await outage
PF
BRC
FVG
BRC01PML
S
B4
c
2
R WILLIAMS
K CARRIERE
ESO
FVG & CSG PML Meters
A
4131
1030700
A61038
A0610381
N
205.3
214.6
169.0
23.0
96.9
51.4 Definition work proceeding based on new Blocking Policy issued late November 03.
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC
FVG FVG FVG ALU ALU
FVG01BD _ALU-1103521 _ALU-1103584
R WILLIAMS
N VANDERKWAAK M LEWIS M LEWIS
ESO PF PF
FVG Immobilization and Blocking Devices for Water Passages ALU Guard Rail Installation ALU Station Service Upgrade
A A A
4131 4133 4133
1030700 1030703 1030703
A61857 1103521 1103584
A0618571 1103958 1103586
Y Y Y
26.5 20.6 25.0
135.9 20.6 25.0
3.6 3.2 18.7
0.0 0.0 0.0
20.0 4.0 25.0
2.2 3.2 18.7 Does not belong to Columbia Region - belongs to Coastal
PF PF
BRC BRC
FVG FVG
ALU ALU
_ALU -1104266 _ALU-1104454 M LEWIS PF
ALU Cooling Water System Repl. ALU Dam Road Gate Upgrade Prj.
A A
4133 4133
1030703 1030703
1104266 1104454
1104394 1104849
Y Y
25.0 10.3
0.0 10.3
0.9 9.4
0.0 0.0
0.0 10.0
0.9 9.4 IMPLEMENTATION - Jan04 update not available from PM - Dec03 update not available from PM
PF
COASTAL REGION
BRC
FVG
ALU
ALU03STR
M LEWIS
A LEONARD
ESO
ALU Surge Tower Trashrack Repl
A
4133
1030703
1106056
1106173
Y
589.5
287.9
124.4
0.0
287.9
124.4 Project transferred from DI to AE this month - status under review.
PF
COASTAL REGION
BRC
FVG
ALU
ALU99GOV
M LEWIS
A ENGLISH
ESO
ALOUETTE GOVERNOR REPLACEMENT
A
4133
1030703
A29074
A0290741
Y
232.1
398.8
93.3
10.7
3.9 This project has been closed out and slight over run charged to OMA. Needs to be closed by Glob in Peoplesoft.
PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC
FVG FVG
ALU ALU
ALU00AVR ALU02DCC
M LEWIS
A ENGLISH M LEWIS
ESO PF
ALU EXCITER REHABILITATION ALU Replace DC Contactors (MCC's)
I A
4133 4133
1030703 1030703
A31081 A61053
A0310811 A0610531
Y Y
10.0 47.0
13.3 47.0
11.8 36.0
0.0 0.0
0.4 9.0
0.4 complete 2.2 Work to be done during ALU Outage
PF
BRC
FVG
ALU
ALU02OFC
M LEWIS
PF
ALU Oil / Fuel Containment
A
4133
1030703
A61054
A0610540
Y
13.3
13.3
1.2
0.0
12.0
0.6 Implementation EAR issued, scope is being reviewed to reduce cost.
PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC
FVG
ALU
ALU01SMP
S
B4
c
2
M LEWIS
K CARRIERE
ESO
ALU Sump and Drainage System Upgrade
A
4133
1030703
A61084
A0610841
N
42.5
712.8
55.3
87.5
29.8
17.3 Work to be done during ALU Outage
PF
BRC
FVG
ALU
ALU02PHC
M LEWIS
PF
ALU Powerhouse Crane
A
4133
1030703
A61196
A0611961
Y
64.5
64.5
30.1
0.0
35.0
1.5 Work on hold pending satelite dish development
PF PF
BRC BRC
FVG FVG
ALU ALU
_ALU-A61247 ALU02TRP
M LEWIS D RILEY
PF PF
ALU SECURITY ALU Rotary Screw Trap (Fish)
A A
4133 4133
1030703 1030703
A61247 A61870
A0612471 A0618701
Y Y
15.0 48.8
15.0 39.0
11.0 39.0
0.0 0.0
6.0 1.4
1.4 complete 1.4 COMPLETE - EAR revision pending. Complete
PF PF PF
BRC BRC BRC
FVG FVG FVG
ALU ALU CQD
ALU02HWG ALU02BAR _CQD-A29365
M LEWIS
D PARRY M LEWIS
ESO PF
ALU Intake Head Works Gate Recoating ALU Brake Air Receiver CQD TUNNEL INTAKE DIESEL SHED
C A A
4133 4133 4159
1030703 1030703 1030750
A61880 A62032 A29365
A0618801 A0620321 A0293651
Y Y Y
186.5 12.7 82.2
196.4 12.7 82.2
196.4 24.5 73.3
0.0 0.0 0.0
11.6 15.0 0.0
11.6 complete 15.7 3.4 Recommendation and Implementation EAR issued, await approval
PF
COASTAL REGION
BRC
FVG
CQD
CQD02LLO
S
C3
c
2
B MISEWICH
K CARRIERE
ESO
CQD Low Level Outlet Modification
A
4160
1030709
A61891
A0618911
N
37.1
469.8
24.2
54.7
38.8
8.4 COMPLETE - Project fully delivered, ISD 28Mar03; project technologist has been told to close project
PF
COASTAL REGION
BRC
FVG
CQD
CQD02TIA
M LEWIS
A LEONARD
ESO
Coquitlam Tunnel Intakes Access Improvements
C
4160
1030709
A62028
A0620281
Y
79.5
46.1
46.1
0.0
0.1
0.1 This project was mistakenly merged with the CQD LLO fish valve study without merging budgets. This project therefore now appears over budget Ear revision required. Study near completion and expect to move into implementation phase during F05
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
FVG FVG
CQD CQD
_CQD-1103570 CQD03COM c(C4) 2m M LEWIS
M LEWIS K CARRIERE
PF ESO
CQD Low Level Outlet PLC Contr CQD Improve Phone System
A A
4160 4160
1030750 1030750
1103570 1103650
1103575 1103987
Y N
25.0 25.0
25.0 26.6
55.2 0.3
0.0 10.9
75.0 26.6
55.2 Implem in progress 0.3
Page 6 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
1-Oct-2002 Study implementation late in 2002/03 or in 2003 M Lewis; 9-Jan-2003 Revd fcast RBW Implementation now plannned for F05 (summer) COASTAL REGION COASTAL REGION
PF PF
BRC BRC
FVG FVG
CQD CQD
CQD01TCR CQD02RAD
S
B4
c
2
M LEWIS M LEWIS
PF PF
Coquitlam Tunnel Control Replacement CQD Security Radios
A C
4160 4160
1030750 1030750
A61248 A62045
A0612481 A0620451
N Y
21.2 7.0
21.2 7.0
45.9 8.7
109.4 0.0
30.0 2.0
26.1 complete 2.5 28-Nov-02 added as per RW request. NB: refer to project CQD98LGO; 9-Jan-2003 Revd fcast RBW
PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC
FVG
LB
CQD03PLC
S
C4
c
2
M LEWIS
PF
CQD Low Level Outlet PLC Control
P
4126
N
87.5
0.0 28-Nov-2002 added as per RW request (LAB)
PF PF
BRC BRC
FVG FVG
LB1 LB1
LB103DTR _LB1-1103525
S
C5
d
2
M LEWIS M LEWIS
PF PF
LB1 Draft Tube Repair study LB1 Guard Rail Installation
P A
4160 4160
1030709 1030709 1103525 1103961
N Y 20.6 20.6 8.4
27.4 0.0
25.0 0.0 8.4 9-Jan-2003 Revised forecast R Williams Project linked with bulk diesel order now needed on a priority basis due to damage to existing LB1 diesel during flood
PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC
FVG
LB1
LB103DG
S
C4
c
2
M LEWIS
PF
LB1 Replace & Relocate SB Diesel Gen
A
4160
1030709
1103561
1103563
N
25.0
25.0
10.0
10.9
50.0
10.0 Work complete some bills still coming MRL 01/04
PF PF
BRC BRC
FVG FVG
LB1 LB1
_LB1-1103587 _LB1-1103589
M LEWIS
PF
LB1 TIV Ctrl Valve Replacement LB1 Bypass Piping Replacement
A A
4160 4160
1030709 1030709
1103587 1103589
1103588 1104418
Y Y
25.0 27.7
25.0 25.0
13.4 1.1
0.0 0.0
25.0 0.0
13.4 1.1 Study EAR to inspect Drfat tube condition and recommend remedial work delayed by flood
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC
FVG FVG FVG
LB1 LB1 LB1
_LB1-1103652 _LB1-1105079 _LB1-1106352
M LEWIS M LEWIS
PF PF
LB1 Draft Tube Replacement LB1 Switchboard Panel Replacem LB1 OI Operational information
A A A
4160 4160 4160
1030709 1030709 1030709
1103652 1105079 1105973
1103963 1105110 1106352
Y Y Y
25.8 20.8 178.9
25.8 20.8 178.9
1.1 21.1 5.8
0.0 0.0 0.0
15.0 25.0 0.0
1.1 complete MRL 01/04 21.1 5.8 Approved amount should be $812.9K Project delayed due to extended time required to award the bulk purchasing contract for exciters. Forecast IDC amount higher than approved IDC amount.
PF PF PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC BRC BRC
FVG FVG FVG FVG FVG FVG
LB1 LB1 LB1 LB1 LB1 LB1
LB100EXC LB101LOP _LB1-A61131 LB101SPY _LB1-A61195 _LB1-A61245
S S
D4 C4
c c
2 1
M LEWIS M LEWIS
WH CHUNG D EPP M LEWIS M LEWIS
ESO ESO PF PF
LB1 Exciter Replacement LB1 G1 Lift Oil Pumps, Cooling Coils, Lowering Device LB1 BEARING LEVEL PROBES LB1 Lower Spillway Interim Improvements LB1 GOV UNLOADERS
A C C C A C
4160 4160 4160 4160 4160 4160
1030709 1030709 1030709 1030709 1030709 1030709
A31059 A61020 A61131 A61139 A61195 A61245
A0310591 A0610201 A0611311 A0611391 A0611951 A0612451
N N Y Y Y Y
787.9 172.3 68.3 79.5 25.4 29.7
820.0 171.0 68.3 79.5 25.4 0.0
80.5 164.9 96.5 85.9 40.4 27.2
575.5 10.9 0.0 0.0 0.0 0.0
172.4 7.1 1.0 0.0 0.0 0.0
66.6 Completion Report 1.0 outstanding. New Complete 0.3 complete 1.0 10.0 Complete 0.5 1-Oct-2002 Study implementation late in 2002/03 or in 2003 M Lewis Project is suffering delays and overruns due in part to flood and weather - further review of project needed to support EAR revision
ESO
LB1 PENSTOCK BRIDGE
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
FVG FVG
LB1 LB1
LB101GCR _LB1-A61344
S
B4
c
2
M LEWIS
PF PF
LB1 Intake Gate Control Room LB1 CONTROL ROOM HVAC
A C
4160 4160
1030709 1030709
A61341 A61344
A0613411 A0613441
N Y
188.9 26.5
188.9 26.5
143.2 25.0
43.8 0.0
190.0 0.0
125.9 0.2 1-Oct-2002 Study linked to intake control M Lewis; 9Jan-2003 Revd fcast RBW. Project is suffering delays and overruns due in part to flood and weather - further review of project needed to support EAR revision
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC
FVG FVG FVG
LB1 LB1 LB1
LB101PLR LB101ASB LB101TFW
S
B4
c
2 R WILLIAMS R WILLIAMS
M LEWIS D BRIGHTON D BRIGHTON
PF PF PF
LB1 Intake Powerline Replacement LB1 Asbestos Wall Panel Removal & Replacement LB1 Transformer Firewall & Control Room Fire Protection
A C A
4160 4160 4160
1030709 1030709 1030709
A61349 A61806 A61822
A0613491 A0618061 A0618221
N Y Y
132.1 484.7 160.9
132.1 484.7 120.0
244.9 524.3 117.0
54.7 0.0 0.0
275.0 124.0 4.0
233.3 Complete 123.7 Complete 5.0 1-Oct-2002 Parts ordered; to be done during next overhaul or forced outage M Lewis
PF
COASTAL REGION
BRC
FVG
LB1
LB102BR
S
C3
c
2
M LEWIS
PF
LB1 Bushing Replacement
A
4160
1030709
A62013
A0620131
N
58.7
58.7
46.6
31.7
75.0
25.3 Encountered unexpected logic control problems being completed in Feb 04 - MRL 01/04
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
FVG FVG
LB1 LB1
LB102CWC LB102GRD
M LEWIS M LEWIS
PF PF
LB1 Replace Cooling Water Control Valve LB1 Grounding
A C
4160 4160
1030709 1030709
A62016 A62033
A0620161 A0620331
Y Y
64.5 9.5
64.5 9.5
69.1 10.2
0.0 0.0
15.0 4.0
14.4 complete 4.2 Study EAR for Implementation in F05 will probably be combined with 129 VDC battery bank replacement
PF
COASTAL REGION
BRC
FVG
LB1
_LB1-A62034
M LEWIS
PF
LB1 24VDC BATTERY BANK CHARGER
A
4160
1030709
A62034
A0620341
Y
33.4
33.4
17.6
0.0
33.0
14.9 IN-SERVICE CBU will reallocate over-run amount to other installation.
PF
COASTAL REGION
BRC
FVG
LB1
LB102SS1
S
C3
c
2
M LEWIS
WH CHUNG
ESO
LB1 Station Service Transformer SS1 Replacement
I
4160
1030709
A62048
A0620481
N
197.3
159.1
264.7
131.3
131.5
237.2 IN-SERVICE CBU will reallocate over-run amount to other installation.
PF
COASTAL REGION
BRC
FVG
LB1
LB103CB1
S
D3
d
2
M LEWIS
WH CHUNG
ESO
LB1 Unit Circuit Breaker (60CB1)
I
4160
1030709
A62052
A0620521
N
259.3
237.8
261.6
269.2
235.1
258.9
Page 7 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
The design is complete and the construction work is under way for this project. The deluge rings installation have been installed. COASTAL REGION
PF
BRC
FVG
LB1
LB102FR
M LEWIS
D DELCOURT
ESO
LB1 FIRE RISK REDUCTION
A
4160
1030709
A62068
A0620681
Y
200.0
190.4
130.2
182.2
123.4 SOO R2 for Def. phase approved in Dec 03. EAR revision in approval process. Evaluation of Upgrade Options underway.
PF PF PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC BRC BRC
FVG FVG FVG FVG FVG FVG
LB1 LB1 LB1 RUS RUS RUS
LB103SCI _LB1-A62091 _LB1-A0292988 RUS01HOE RUS03ASB RUS03OI
M LEWIS
D EPP M LEWIS M LEWIS J DAVIS
ESO PF PF PF ESO
LB1 SPILLWAY CAPACITY IMPROVEM LB1 PARTIAL DISCHARGE MONITORI LB1 VIBRATION MONITOR Fraser Valley Head Office Expansion - Implementation RUS Control Room Asbestos Tile Removal RUS OI
A A A A P P
4160 4160 7152 4123 4131 4131
1030709 1030709 1030697 1030696 1030700 1030700
A62084 A62091 A29298 A61345
A0620841 A0620911 A0292988 A0613452
Y Y Y Y N Y
81.7 36.1
318.1 36.1 8.4
183.9 70.0 8.4 -8.6
0.0 0.0 0.0 0.0 5.5 0.0
279.6 0.0 1.1 0.0
175.6 Complete 54.3 1.1 Deferred 0.1 4
21.2
0.0
0.0 Initial meeting with client, RFS can now be initiated Oct03 - SOO drafted, will obtain approval from initiator,
PF PF PF PF PF PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC BRC BRC BRC BRC BRC
FVG FVG FVG FVG FVG FVG FVG FVG FVG
RUS RUS RUS RUS RUS RUS RUS RUS RUS
RUS03PEN RUS03SW _RUS-1103203 RUS03OSS _RUS-1103857 _RUS-1104272 _RUS-1104453 RUS99CRN RUS99GPW S E3 d 2
M LEWIS
D FRANKLIN M LEWIS M LEWIS J DAVIS M LEWIS M LEWIS
ESO PF PF PF PF PF
RUS Penstock Drain Study RUS Control Room Seismic Window Upgrades FVG Cellcorder RUS Office Soil Slopes RUS Chessel Chart Recorder RUS Cooling Water System FVG Dam Safety Weirs
P P C A A A A A A
4131 4131 4131 4131 4131 4131 4131 4131 4131
1030700 1030700 1030700 1030700 1030700 1030700 1030700 1030700 1030700 1103203 1103770 1103857 1104272 1104453 A29001 A29021 1103204 1104182 1104215 1104409 1104865 A0290011 A0290211
N N Y N Y Y Y Y N
0.0
0.0
0.0
27.4 54.7
0.0 0.0
0.0
Complete 21.0 263.3 22.7 25.0 10.0 379.9 130.0 21.0 170.0 22.7 25.0 10.0 321.2 129.4 23.4 34.8 20.6 0.9 8.8 333.8 123.3 0.0 273.5 0.0 0.0 0.0 0.0 765.9 23.0 170.0 21.0 25.0 0.0 26.1 15.8 23.4 Complete 34.8 Complete 20.6 Complete 0.9 8.8 Work complete M LEWIS B MISEWICH R IREDALE A ENGLISH ESO ESO Ruskin Crane Control Upgrade RUS Powerhouse Seismic Upgrade and Unit 3 Wall Replacement 38.6 On hold nothing planned 9.8 Estimate underway , expected to be complete by mid Feb/04.
PF PF PF PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC BRC BRC BRC
FVG FVG FVG FVG FVG FVG FVG
RUS RUS RUS RUS RUS RUS RUS
RUS99AP _RUS-A31058 RUS00OSC RUS00DTE _RUS-A61002 RUS01SWY _RUS-A61074
M LEWIS
A ENGLISH
ESO
RUSKIN ALARM SYSTEM UPGRADE RUS G1 REWIND & RECORE RFS
A A I I A A C
4131 4131 4131 4131 4131 4131 4131
1030700 1030700 1030700 1030700 1030700 1030700 1030700
A29026 A31058 A31096 A31127 A61002 A61015 A61074
A0290261 A0310581 A0310960 A0311271 A0610021 A0610151 A0610741
Y Y Y Y Y Y Y
176.6 50.0 41.2 158.6 37.1 50.0 25.4
182.0 50.0 41.4 145.0 37.1 50.0 25.4
91.3 15.9 40.8 143.1 26.2 33.6 28.2
0.0 0.0 0.0 0.0 0.0 0.0 0.0
117.9 0.0 3.1 17.4 1.0 13.7 4.0
49.4 8.2 COMPLETE 2.5 Complete 0.4 Complete 0.4 Transferred to TLOB 1.4 Complete 3.5 1-Oct-2002 Study complete; may move forward M Lewis; 9-Jan-2003 Revd fcast RBW Plan should be 1.0M
M LEWIS J DAVIS
D DELCOURT D BRIGHTON M LEWIS
ESO PF PF T PF
RUS Headcover Oil Spill Containment RUS DRAFT TUBE EXTENSION RUS SERVO MOTOR REBUILD G3 RUSKIN SWITCHYARD UPGRADE RUS UNIT #1 BRAKE DUST COLLECT
M LEWIS
R ROGERS M LEWIS
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
FVG FVG
RUS RUS
RUS01SS RUS02CD
S
C3
c
2
R BISHOP M LEWIS
PF PF
RUS AC Station Service Replacement RUS Office Genesis CDR Software
A C
4131 4131
1030700 1030700
A61249 A61339
A0612491 A0613391
N Y
40.0 10.7
40.0 10.7
41.4 7.3
54.7 0.0
6.0 2.0
5.5 complete 1.0 Jan04 update not available from PM Dec03 - PM is away at SEV; update not available ON HOLD - Deferred to 04/04 to include seismic withstand for gate; waiting for advisory board review; no milestone established
Order Install Report
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC
FVG FVG FVG
RUS RUS RUS
RUS01SGS RUS01SLR _RUS-A61830
M LEWIS B MISEWICH
D MCLELLAN D BRIGHTON M LEWIS
ESO PF PF
RUS Spillway Gates - Seal Replacement RUS PENSTOCK #1 LINING RECOAT RUS G1 EXCITER REFURBISHMENT
A I A
4131 4131 4131
1030700 1030700 1030700
A61340 A61346 A61830
A0613401 A0613461 A0618301
N Y Y
26.5 396.0 24.4
283.0 403.0 24.4
22.8 402.3 21.7
109.4 0.0 0.0
6.1 0.0 1.0
4.8 Complete 0.0 Complete 1.1 1-Oct-2002 Will extend into 2003/04 M Lewis
PF PF PF PF PF PF PF PF PF
BRC BRC BRC BRC BRC BRC BRC BRC BRC
FVG FVG FVG FVG FVG FVG FVG FVG FVG
RUS RUS RUS RUS RUS RUS RUS RUS RUS
RUS02TIV RUS02PML _RUS-A61883 RUS02FVS RUS02T1M RUS02G3B RUS02GVP _RUS-A62004 RUS02T5
S
C4
c
2
M LEWIS M LEWIS M LEWIS M Lewis M LEWIS M LEWIS
PF PF PF PF PF PF PF PF ESO
RUS TIV Limit Switches & Motors RUS PML CT's RUS RIGHT BANK ADIT VENTILATIO FVG Signage RUS T1 Oil & Flow Water Meters RUS G3 Brake Dust Collector RUS G1, G2 & G3 Vibration Probes RUS AUTOMATIC VOLTAGE REGULATR RUS TRANSFORMER 5 PAINTING
A A C C A C A A A
4131 4131 4131 4131 4131 4131 4131 4131 4131
1030700 1030700 1030700 1030700 1030700 1030700 1030700 1030700 1030700
A61877 A61881 A61883 A61888 A61896 A61897 A61898 A62004 A62005
A0618771 A0618811 A0618831 A0618881 A0618961 A0618971 A0618981 A0620041 A0620051
N Y Y Y Y Y N Y Y
21.2 26.4 21.2 14.8 12.7 52.3 26.5 26.5 58.3
21.2 26.4 21.2 14.8 12.7 52.3 26.5 26.5 58.3
6.2 40.4 18.5 13.5 2.8 52.0 70.8 3.6 54.5
10.9 0.0 0.0 0.0 0.0 0.0 27.4 0.0 0.0
16.0 15.0 2.0 0.0 12.0 12.0 68.9 1.0 3.8
1.1 complete 15.1 Complete 2.6 Complete 9.9 2.8 complete 12.0 COMPLETE 68.9 1.4 Complete 0.0 ON HOLD - Project on hold pending review of capital expenditures at RUS by PF. Engineering awaiting direction.
S
C4
c
2
G JARL M LEWIS M LEWIS R BRIGHTON
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC
FVG FVG FVG
RUS SFL SFL
RUS03PSL SFN02DWS SFN02PCS
M LEWIS
D PARRY M LEWIS M LEWIS
ESO PF PF
RUS Penstock #3 Steel Lining Interior Recoating SFN Upgrade Drinking Water System SFN P&C Shop
A A C
4131 4132 4132
1030700 1030702 1030702
A62073 A61063 A61895
A0620731 A0610631 A0618951
N Y Y
21.7 12.7 20.9
664.1 12.7 20.9
8.6 0.3 20.3
492.4 0.0 0.0
6.6 12.0 6.0
4.5 0.0 complete 6.2
Page 8 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
This project has never been assigned to Eng - there is no trace of it and as it is now likely too late in the year to assign it for 04 - the PM assignment should be changed to Mike Lewis until such times that it is officially transferred to Eng.
PF PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC BRC
FVG FVG FVG FVG FVG
WAH WAH WAH WAH WAH
WAH02CB WAH03OI _WAH-1103310 _WAH-1105915 _WAH-1103527
M LEWIS
PF
WAH 13CB1 & 13CB11 Replacement WAH OI
P P A A A
4130 4130 4130 4130 4130
1030701 1030701 1030701 1030701 1030701 1103310 1103317 1103527 1103311 1105915 1103962
Y N Y Y Y 26.8 507.1 51.2 26.8 507.1 51.2 17.2 31.4 10.3
0.0 98.5 0.0 0.0 0.0 0.0 Complete 17.0 0.0 6.0 17.2 31.4 Complete 10.3 Jan04 - Difference in forecast and approved is caused by unanticipated in O/H. Dec03 - PM is away at SEV; update not available IMPLEMENTATION - Design completed. CBU to removed gate in early Nov 03 for modifications.
M LEWIS
PF
WAH T1 On-Line Gas Monitoring WAH Station Service
M LEWIS
PF
WAH Guard Rail Replacement
PF
COASTAL REGION COASTAL REGION
BRC
FVG
WAH
WAH03IMG
M LEWIS
D MCLELLAN
ESO
WAH INMG Bypass Valve Design & Install
A
4130
1030701
1103592
1104839
N
78.4
79.7
42.4
21.9
79.7
42.4 Study EAR for Implementation in F06 or 07
PF
BRC
FVG
WAH
_WAH-1103661
M LEWIS
PF
WAH 13CB1 & 13CB11 Replacement
A
4130
1030701
1103661
1103966
Y
25.8
25.8
1.2
0.0
10.0
1.2 Design work completed in Dec 2003. Target to complete site work in next planned outage.
PF
COASTAL REGION
BRC
FVG
WAH
WAH02TOC
M LEWIS
WH CHUNG
ESO
WAH T1 Oil Containment
A
4130
1030701
1104844
1104845
N
198.0
200.1
21.1
21.9
29.3
21.1 On target for installation in May-June 04; inability to install PAM concurrently means some increased P&C design costs.
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC
FVG FVG FVG
WAH WAH WAH
WAH00GOV WAH02LP WAH01TL S C4 c 1
M LEWIS
N VANDERKWAAK M LEWIS M LEWIS
ESO PF PF
WAH GOVERNOR REPLACEMENT WAH G1 Lift Pump WAH Tunnel Lighting
A C C
4130 4130 4130
1030701 1030701 1030701
A31060 A61197 A61246
A0310601 A0611971 A0612461
Y N Y
1,981.6 53.7 188.5
1,900.3 53.7 188.5
632.3 57.1 187.6
0.0 36.1 0.0
623.6 35.0 4.0
423.1 complete 37.7 completed s/b closed 5.8 Completed schematic design & feasibility studies. Waiting for feedback from PF. Study portion complete will combine with cooling water strainer and piping replacement EAR
PF
COASTAL REGION
BRC
FVG
WAH
WAH02CWS
S
C4
c
2
M LEWIS
M LEWIS
PF
WAH Cooling Water Supply Improvements
A
4130
1030701
A61337
A0613371
Y
21.2
21.2
14.0
0.0
10.0
3.9 20 Nov 2002 CAR R3 sent to NH for approval. Pbriggs; 9Jan-2003 Revd fcast RBW
PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC
FVG
WAH
WAH01PIO
S
E3
d
2
M LEWIS
PF
WAH PIV & Intake OVDS
I
4130
1030701
A61348
A0613481
N
147.4
147.4
147.1
109.4
3.0
0.0 Completion of documentation proceeding
PF PF PF
BRC BRC BRC
FVG FVG FVG
WAH WAH WAH
WAH01ADS WAH01SSP _WAH-A62014
M LEWIS R WILLIAMS
D BAKER L NETTLETON M LEWIS
ESO PF PF
WAH ADAS Intermediate Tunnel Flume WAH Speed Switch Prototyping WAH ADAS SHEDS
A A C
4130 4130 4130
1030701 1030701 1030701
A61399 A61823 A62014
A0613991 A0618231 A0620141
Y Y Y
26.2 42.4 153.7
27.2 42.4 153.7
22.1 26.5 155.9
0.0 0.0 0.0
9.2 1.3 22.0
4.1 Closed 1.4 Complete 21.8 Misc completion items to be finished in March 2004.
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
FVG FVG
WAH WAH
WAH03ASB WAH02FR
S
E2
d
2
R WILLIAMS J DAVIS
D EPP D DELCOURT
ESO ESO
WAH Powerhouse Asbestos Wallboard Replacement WAH Fire Risk Reduction
I A
4130 4130
1030701 1030701
A62022 A62044
A0620221 A0620441
N Y
613.2 16.1
614.9 10.9
568.8 7.8
514.2 0.0
604.4 4.5
558.3 CURRENT PHASE 3.6 COMPLETE DEFINITION - Draft report issued; Engineering awaiting direction. 15.9 Complete 0.0 30-Dec-2002 3 year program; revised forecast R Williams; 9-Jan-2003 Revd fcast RBW 0.0 Eng & purch complete, await outage
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
FVG FVG
WAH WAH
WAH02IGP _WAH-A0292983
M LEWIS
D PARRY
ESO PF
Jones Lake Intake Gate Recoating WAH VIBRATION MONITOR
A C
4130 7152
1030701 1030697
A62086 A29298
A0620861 A0292983
N Y
25.8
29.2 12.6
18.3 12.6
10.9 0.0
26.8 0.0
PF
COASTAL REGION COASTAL REGION
BRC
VIG
VIG03MON
S
C4
c
2
R BISHOP
PF
VIG Bearing Level and Temp Monitoring Replacements
A
4125
1030737
1104534
1104848
N
147.8
0.0
0.0
131.3
0.0
PF
BRC
VIG
VIG01PML
S
B4
c
2
R WILLIAMS
K CARRIERE
ESO
VIG PML Meters
A
8119
1030699
A61065
A0610651
N
324.2
331.8
159.0
54.7
57.9
48.2 IMPLEMENTATION Completion anticipated to be 2005 or later; SOO to be revised and YEF readjusted accordingly
PF
COASTAL REGION
BRC
VIG
VIG01BRH
R BISHOP
R WHITTAKER
ESO
VIG Brush Holders
A
8119
1030699
A61106
A0611061
N
169.8
166.3
59.0
54.7
45.5
21.4 Definition work proceeding based on new Blocking Policy issued late November 03.
PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC
VIG
VIG01BD
S
F3
e
2
R WILLIAMS
N VANDERKWAAK
ESO
VIG Immobilization and Blocking Devices for Water Passages
A
8119
1030699
A61855
A0618551
N
87.6
645.9
57.4
96.8
28.2
6.8 1-Oct-2002 Out to tender R Bishop Complete
PF
BRC
VIG
ASH
ASH99CHA
S
C4
c
2
R BISHOP
R BISHOP
PF
ASH Charger
C
8102
1030736
A29076
A0290761
N
25.5
25.5
26.4
21.9
0.0
0.0 Implem in progress, 2003 work complete
PF
BRC
VIG
ASH
ASH00CSS
S
C3
c
1
R BISHOP
K CARRIERE
ESO
ASH Cooling Water
A
8102
1030736
A31034
A0310341
N
538.7
501.7
428.9
337.5
283.6
271.7 The final installation work will be complete by November. A SOO revision to the ISD has been approved
PF
COASTAL REGION
BRC
VIG
ASH
ASH01FPD
S
E3
d
2
R BISHOP
D DELCOURT
ESO
ASH Fire Risk Reduction
A
8102
1030736
A61099
A0610991
N
141.1
139.1
134.7
38.3
21.3
16.9
Page 9 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
PF
COASTAL REGION
IN SERVICE BRC VIG ASH ASH01EXC R BISHOP WH CHUNG ESO ASH RIVER EXCITER PROJECT I 8102 1030736 A61136 A0611361 Y 822.3 822.6 822.5 0.0 818.8 820.7 Project delayed in order to wait for decision from Water Resources & Energy Projects to confirm uprating of the unit.
PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
ASH ASH
ASH02G1R ASH01AWR
S
C3
c
2
R BISHOP A GAMAGE
WH CHUNG D BRIGHTON
ESO PF
ASH Generator Stator Winding Replacement ASH ASBESTOS WALLBOARD REPLACE
A C
8102 8102
1030736 1030736
A61198 A61838
A0611981 A0618381
N Y
26.5 443.5
27.0 405.0
27.0 402.7
27.4 0.0
1.2 15.0
1.2 Complete 12.4 IN SERVICE. Approved amount should be $230.9K
PF
BRC
VIG
ASH
ASH01DCP
S
C4
c
1
R BISHOP
WH CHUNG
ESO
ASH 125V DC Supply and Distribution Upgrade
I
8102
1030736
A61849
A0618491
N
217.9
219.3
160.1
109.4
73.9
14.7 Jan04 update not available from PM Dec03 - PM is away at SEV; update not available IN-SERVICE - Work on PRV energy dissipation chamber completed. Valve repairs deferred; in service date for valve was moved up resulting in not enough time to complete.
PF
COASTAL REGION
BRC
VIG
ASH
ASH01PRV
R BISHOP
D MCLELLAN
ESO
ASH G.S. PRV Isolating Device
A
8102
1030736
A61860
A0618601
N
265.0
264.6
217.1
142.2
162.3
114.8 Station Service upgrade installation were put into service in 2003. Design work of new diesel gen-set building in progress, target to complete before 29 Feb 2004.
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
ASH ASH
ASH02SS ASH99AC
S
C3
c
2
R BISHOP R BISHOP
WH CHUNG R BISHOP
ESO PF
ASH AC Station Service Panels ASH Air Compressor
I A
8102 8102
1030736 1030736
A61889 A61890
A0618891 A0618901
N Y
630.6 10.1
621.9 10.1
532.4 9.3
218.8 0.0
238.6 3.0
162.5 Complete….dwg to come 2.8 IN-SERVICE - On time and on budget; Dave Gill requested to put project inservice. Completion report issued to PF for sign-off.
PF PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC BRC
VIG VIG VIG VIG VIG
ASH ELS JHT JHT JHT
ASH03BR ELS02GEN JHT01TEL _JHT Adj JHT03IBW
R BISHOP R BISHOP
D PARRY R BISHOP R BISHOP
ESO PF PF
ASH Woodstave Creosoting - Bridge Crossing ELS INTAKE 10KW GENERATOR John Hart Telemark Replacements JHT Modernization Adjustment
I A A P I
8102 8102 8101 8119 8119
1030736 1030736 1030735 1030699 1030699
A62076 A62069 A61044
A0620761 A0620691 A0610442
Y Y Y Y
224.0 57.4 233.2
221.7 57.4 233.2
195.4 40.0 47.0
0.0 0.0 0.0 0.0
218.7 40.0 70.0 0.0 25.0
192.4 In Service Dec 03 35.0 PAR 1 done, PAR 2 nearing 21.2 compl.
R BISHOP
PF
JHT Intake Boom Walkway
1103235
1103236
Y
27.8
27.8
24.7
0.0
24.7 T-Ray design in progress. Design complete Nov 15.
PF PF PF PF
BRC BRC BRC BRC
VIG VIG VIG VIG
JHT JHT JHT JHT
_JHT-1103418 _JHT-1103424 _JHT-1104079 _JHT-1104885
R BISHOP
R BISHOP R BISHOP R BISHOP R BISHOP
PF PF PF PF
JHT O/I Expansion-Magnetrol JHT/JOR Snowcat Replacement VIG P&C Test Equipment JHT G1-G6 Cooling Water System
A A A A
8119 8119 8119 8119
1030699 1030699 1030699 1030699
1103418 1103424 1104079 1104885
1104842 1103596 1104419 1104911
Y Y Y Y
195.6 32.0 27.7 50.0
195.6 32.0 27.7 50.0
38.0 26.2 22.6 7.3
0.0 0.0 0.0 0.0
80.0 26.2 22.6 10.0
38.0 26.2 22.6 7.3 Reviewed new project schedule with PF and obtained approval for delaying design work by consultant. Target to submit the Implementation EAR ( Phase 2 ) in Apr 04
PF
COASTAL REGION
BRC
VIG
JHT
JHT97ICC
S
C3
c
2
R BISHOP
WH CHUNG
ESO
John Hart Comm. Cable Replacement project
I
8119
1030699
A28022
A0280221
N
380.8
308.1
303.6
109.4
8.9
4.5 temp ships container per Bmeisewich to be installed in Dec.
PF
COASTAL REGION
BRC
VIG
JHT
JHT98BC
S
C4
c
2
R BISHOP
R BISHOP
PF
JHT Intake Batteries and Chargers
A
8119
1030699
A28053
A0280531
N
146.3
146.3
68.1
43.8
25.0
4.7 COMPLETE - Approved amount shows up in JHT02SLR (JHT02SLR and JHT99POC are under same EAR)
PF
COASTAL REGION
BRC
VIG
JHT
JHT99POC
R BISHOP
D PARRY
ESO
JHT Penstock Overcoating
C
8119
1030699
A29011
A0290111
Y
0.0
722.0
722.0
3.3
3.3 IN-SERVICE - costs included in JHT99POC (JHT02SLR and JHT99POC are under same EAR)
PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
JHT JHT
JHT02SLR JHT01CT6
R BISHOP
D PARRY R BISHOP
ESO PF
JHT Intake Stop Log Recoating JHT SPARE 6 CT'S
I A
8119 8119
1030699 1030699
A29011 A61033
A0290112 A0610331
Y Y
890.3 40.0
141.7 40.0
141.8 51.1
0.0 0.0
7.0 33.0
7.1 Complete Revision req'd. 33.2 Don't know whose doing….suspect duplicate.
PF
BRC
VIG
JHT
_JHT-A61061
R BISHOP
PF
JHT EQP REL STUDY (MODERNIZTN)
I
8119
1030699
A61060
A0610601
Y
100.7
100.7
4.1
4.3
4.3 T2, T4 , T6 complete completion report submitted and approved. Project being closed to actuals.
PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC
VIG
JHT
JHT01T2R
S
C4
c
1
R WILLIAMS
A ENGLISH
ESO
JHT T2, T4 & T6 Replacement
I
8119
1030699
A61061
A0610611
N
3,318.7
2,462.2
2,471.7
1,802.0
2,235.9
2,254.1 Awaiting modernization go-nogo
PF PF
BRC BRC
VIG VIG
JHT JHT
JHT01LPS JHT01SPR A GAMAGE
R BISHOP R BISHOP
PF PF
JHT GS LIFT PUMPS JHT SUMP PUMP REPLACEMENTS
A I
8119 8119
1030699 1030699
A61105 A61113
A0611051 A0611131
Y Y
146.8 85.6
146.8 85.6
27.2 136.4
0.0 0.0
3.5 35.0
3.5 EAR Rev req'd by ROB 32.8 Phil Beeetle- is this complete? Drain holes to be done.
PF
BRC
VIG
JHT
JHT01IGS
R BISHOP
PF
JHT Intake Gallery Expansion Joint Replacements
A
8119
1030699
A61122
A0611221
Y
162.0
162.0
111.8
0.0
20.0
17.1 Project was put on hold in July 03. Current direction is to take a component approach to replacement versus total plant. Plans for FY 05 in process of being defined.
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
JHT JHT
JHT01MDN PEN01SU
D DUNLOP R WILLIAMS
D BRYSON R IREDALE
ESO ESO
John Hart G.S. Modernization Study ASH,JHT PENSTOCK SIESMIC UPGRD
A A
8119 8119
1030699 1030699
A61124 A61128
A0611241 A0611281
N Y
979.9 429.1
447.4 452.4
435.4 383.2
109.4 0.0
52.6 322.4
40.6 Work complete 250.2
Page 10 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
PF
COASTAL REGION
Implementation complete. Project to be closed in Feb.04. BRC VIG JHT JHT01IHC S C6 e 2 R BISHOP D EPP ESO JHT Intake Hydraulic Cylinders I 8119 1030699 A61243 A0612431 N 280.7 283.7 286.6 13.1 60.1 63.0 Project delayed because PF require alternative proposals to be prepared by local staff. Actuals is higher than Approved due to charges entered by local site staff; discussed with Project Initiator, will prepare EAR Implementation.
PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
JHT JHT
JHT02ISB JHT04WH
S
C3
c
2
R BISHOP
WH CHUNG R BISHOP
ESO PF
JHT Intake - Additional Building JHT Warehouse
A A
8119 8119
1030699 1030699
A61313 A61314
A0613131 A0613141
N Y
20.0 426.0
21.3 20.0
32.3 7.7
186.0 0.0
2.9 15.0
15.9 EAR approved Feb 04 4.8 Complete Should be no charges this FY??
PF
BRC
VIG
JHT
VIG01SMS
R BISHOP
PF
VIG SPOG MAGNETIC STARTER
C
8119
1030699
A61807
A0618071
Y
46.1
46.1
51.0
0.0
5.0
4.8 Complete Should be no charges this FY??
PF
BRC
VIG
JHT
JHT02DTP
R BISHOP
PF
JHT DRAFT TUBE PLATFORM
C
8119
1030699
A61808
A0618081
Y
21.2
21.2
22.6
0.0
7.2
7.2 IMPLEMENTATION - Jan04 Breaker has been delivered 11 Dec 03; manuals have been submitted; drawings needs to be provided. Nov03 - Tail end of project passed to James Leong. SOO/RFS not required; no installation involved. Breaker left factory on 8 Dec 03.
PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC
VIG VIG VIG VIG
JHT JHT JHT JHT
JHT01CB JHT02TIV JHT02FAN _JHT-A62083
R BISHOP R BISHOP
B GIN D PARRY R BISHOP
ESO ESO PF ESO
JHT Spare Unit Circuit Breaker JHT G1 PENSTOCK CORROISION JHT Welding Exhaust Fan Replacement JHT INTAKES STOP LOG STORAGE
A C A A
8119 8119 8119 8119
1030699 1030699 1030699 1030699
A61816 A62001 A62063 A62083
A0618161 A0620011 A0620631 A0620831
N Y N Y
97.2 153.7 9.3 20.6
79.7 147.6 9.3 0.0
26.2 147.6 6.8 12.8
87.5 0.0 9.8 0.0
65.5 2.1 7.0 0.0
12.0 COMPLETE in Aug 03 2.1 Complete. EAR to be closed 6.8 IN-SERVICE -0.4 Why KCL?? R bishop is not the PM.
R BISHOP
D WELLS
PF PF PF PF PF
BRC BRC BRC BRC BRC
VIG VIG VIG VIG VIG
JOR JOR JOR JOR JOR
_JOR-1103454 _JOR-1103983 JOR04TBC _JOR-1103855 _JOR-1106262 DWELLS
R BISHOP
PF
KCL Cellcorder JOR Telephone Switch Retiremen
A A A C A
8103 8103 8103 8103 8103
1030737 1030737 1030737 1030737 1030737
1103454 1103705 1103853 1103855 1106170
1104025 1103983 1103984 1104108 1106262
Y Y Y Y Y
12.0 36.1 52.2 24.2 16.2
12.0 36.1 0.0 24.2 16.2
9.5 3.8 24.2 25.2 2.0
0.0 0.0 0.0 0.0 0.0
9.5 0.0 0.0 25.0 0.0
9.5 3.8 Not ESO Project 24.2 Complete. EAR to be closed. 25.2 2.0 Plans being finalized and coordinated.Investigating Surplus KGS RTU
B KNOKE R BISHOP
PF PF PF
JOR Thrust Bearing Cooling Rep JOR G.S. Paving Jordan TIV Control Piping Repl
PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
JOR JOR
JOR99EFT JOR00LLO
R BISHOP R BISHOP
R BISHOP D PARRY
PF ESO
ELL/JOR FOREBAY REMOTE TELEMET Jordan Elliot Lower Level Outlet Gate
A C
8103 8103
1030737 1030737
A29335 A31032
A0293351 A0310321
Y N
399.9 10.0
399.9 11.6
68.4 0.0
0.0 10.9
30.0 0.0
26.1 COMPLETE 0.0 EAR Increase appr, 2003 work complete
PF
BRC
VIG
JOR
JOR00CW
S
C3
c
1
R BISHOP
K CARRIERE
ESO
JOR Powerhouse Cooling Water System Upgrade
I
8103
1030737
A31047
A0310471
N
966.3
942.8
876.2
299.8
529.5
532.4 Closed - refer to JOR02PR, EAR #A61843
PF PF
BRC BRC
VIG VIG
JOR JOR
JOR03PR JOR01LCS
S
C4
c
2
R BISHOP R BISHOP
R BISHOP R IREDALE
PF ESO
JOR 12KV POLE REPLACMENT JOR DIV/ELL RES LOWERNG CRANE
I A
8103 8103
1030737 1030737
A61028 A61040
A0610281 A0610401
Y Y
107.1 72.4
107.1 73.0
102.7 25.3
0.0 0.0
0.0 42.0
0.0 Elliot dam crane approved 11.3 In-service. Project completed within approved amount. Late adjustment of Overhead & IDC slightly increased the loaded cost.
PF
COASTAL REGION
BRC
VIG
JOR
JOR01SS
S
C3
c
2
R BISHOP
WH CHUNG
ESO
JOR AC Station Service Breaker Replacement
C
8103
1030737
A61132
A0611321
N
253.7
253.6
253.6
172.9
159.0
158.9 Awaiting Imp EAR Approval. CDN Dewatering preparing price. Feb 04 Approved and ordered. Award Contrac t Install Report COMPLETE - Completion report issued
PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC
VIG
JOR
JOR01GEN
S
D2
c
2
R BISHOP
R BISHOP
PF
JOR Diversion Emergency Generator Replacement
A
8103
1030737
A61312
A0613121
N
271.6
20.0
27.3
10.9
70.0
14.2
PF
BRC
VIG
JOR
JOR01DT
R BISHOP
D PARRY
ESO
JOR DRAFT TUBE, PRV GATE PAINT
C
8103
1030737
A61804
A0618041
Y
139.5
96.0
96.0
0.0
0.0
0.0 Jan 03 Xplan EAR submitted for $300K
PF PF
BRC BRC
VIG VIG
JOR JOR
JOR02PR JOR01PRV
S
C4
c
2
R BISHOP R BISHOP
R BISHOP B KNOKE
PF PF
JOR 12kV Pole Replacement (2002/03) JOR PRV & Governor Life Extension
I I
8103 8103
1030737 1030737
A61843 A61850
A0618431 A0618501
N N
164.0 189.0
164.0 189.0
165.2 176.2
32.8 10.9
32.0 0.0
6.8 Close ? 0.0 IMPLEMETATION - coating deferred to 2004. On budget and schedule.
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC
VIG VIG VIG
JOR JOR JOR
JOR02AMC JOR02FR ELL02EGA
R BISHOP R WILLIAMS R BISHOP
D PARRY D DELCOURT R BISHOP
ESO ESO PF
JOR PRV & TIV Asbestos Mastic Coating JOR Fire Risk Reduction Elliott Emergency Generator Addition
A A I
8103 8103 8103
1030737 1030737 1030737
A62021 A62038 A62305
A0620211 A0620381 A0623051
N Y Y
188.8 16.2 135.1
190.2 15.6 135.0
12.6 15.6 117.5
10.9 0.0 0.0
6.2 2.9 85.0
4.7 CURRENT PHASE 2.9 COMPLETE EAR REV submitted by ROB 85.6 SCA Completed. RNetzel implemented. EAR Rev req'd 162.9 Complete EAR Rev req'd by RBW.REV submitted by ROB
PF
COASTAL REGION COASTAL REGION
BRC
VIG
LDR
VIG03SP
Lnettleton
R BISHOP
PF
LDR/SCA Synchronizing Panels
A
8121
1030738
1103890
1104073
Y
39.0
39.0
162.9
0.0
163.0
PF
BRC
VIG
LDR
_LDR-1104882
R WILLIAMS
R BISHOP
PF
LDR G1 & G2 Alarm Panel Repl.
A
8121
1030738
1104882
1104891
Y
57.2
57.2
162.6
0.0
170.0
162.6 IN-SERVICE Completion report to be issued. Seal function to be assessed. On budget and schedule.
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC
VIG VIG VIG
LDR LDR LDR
LDR00STC LDR00CPT-0 LDR00CPT
T VEARY
D PARRY
ESO
Ladore Surge Tank Coating LDR FIBRE OPTIC CABLE - Other
I C C
8121 8121 8121
1030738 1030738 1030738
A29128 A31050 A31050
A0291281 A0310500 A0310501
Y Y Y
716.3
633.3 17.9
599.9 17.9 83.4
0.0 0.0 0.0
40.7 0.2 -2.2
7.3 IN SERVICE, can close out 0.2 EAR IN SERVICE, can close out 22.2 EAR
R BISHOP
WH CHUNG
ESO
LDR FIBRE OPTIC CABLE
159.2
59.0
Page 11 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
Jan04 update not available from PM Dec03 - PM is away at SEV; update not available IN-SERVICE - Project installed under budget; completion report to be issued
PF
COASTAL REGION
BRC
VIG
LDR
LDR01GSG
R BISHOP
D MCLELLAN
ESO
WOKAS REPLC GATE SEALS & GUIDE
I
8121
1030738
A61014
A0610140
Y
339.5
235.6
235.6
0.0
116.3
116.3 Complete and in service. Completion report issued for approval. Project being closed to acutals.
PF
COASTAL REGION COASTAL REGION
BRC
VIG
LDR
LDR01SCV
R BISHOP
A ENGLISH
ESO
LDR & SCA VOLTAGE XFORMER REPL
I
8121
1030738
A61027
A0610271
Y
285.8
241.7
233.0
0.0
25.0
16.3 Implement next outage. Why Dec charges?
PF
BRC
VIG
LDR
LDR01BCC
S
C4
c
2
R BISHOP
PF
LDR Bearing Cooling Coil Replacement
A
8121
1030738
A61097
A0610971
N
64.8
64.8
54.1
10.9
7.0
7.2 Report underway and issued for 3 plants,final report currently being issued.
PF
COASTAL REGION
BRC
VIG
LDR
VIG02GND
S
E3
d
2
R WILLIAMS
A ENGLISH
ESO
Vancouver Island Grounding Study Program
A
8121
1030738
A61129
A0611291
N
95.0
91.7
83.1
131.3
51.4
42.7 G1 in-service in Sep 03, G2 planned to be installed during outage in 2004. Reviewed new project schedule and obtained approval from PF.
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
LDR LDR
LDR01EXC _LDR-A61824
S
D4
c
2
R BISHOP
WH CHUNG R BISHOP
ESO PF
LDR Exciter Replacement LDR PMG LIFTING DEVICE
A A
8121 8121
1030738 1030738
A61134 A61824
A0611341 A0618214
N Y
1,624.0 31.8
1,680.6 31.8
1,310.3 6.0
711.2 0.0
481.8 6.0
474.2 DMcLennan is TM 6.0 CANCELLED - Client instructed Engineering to cancel project.
PF
COASTAL REGION
BRC
VIG
LDR
LDR02TC
R BISHOP
I WHEELER
ESO
LDR Tailrace Crane
C
8121
1030738
A61863
A0618631
N
26.5
9.1
0.0
202.4
-11.9
-21.0 Cost overruns. EAR revision to be done in February before the work continues.
PF
COASTAL REGION
BRC
VIG
LDR
LDR02FR
S
E5
d
2
R WILLIAMS
D DELCOURT
ESO
Ladore G.S. Fire Risk Reduction
A
8121
1030738
A62039
A0620391
N
251.5
305.8
306.3
158.6
267.8
268.3 Substantial amount of defects found on site in major equipments. Engineer from Cutler-Hammer spent over one month on site to rectify defects. Submitted first draft of EAR revision and wait for approval.
PF
COASTAL REGION
BRC
VIG
LDR
LDR02SS
S
C3
c
2
R BISHOP
WH CHUNG
ESO
LDR Station Service Upgrade
A
8121
1030738
A62047
A0620471
N
654.7
841.4
703.6
382.9
775.5
660.8 DEFINITION - EAR revision for Implementation is not complete - waiting on designs from SCA
PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC
VIG
LDR
LDR03TIV
B KNOKE
D CRAWFORD
ESO
LDR TIV SEAL REPLACEMENT
A
8121
1030738
A62081
A0620811
Y
21.1
8.5
4.1
0.0
4.4
4.1 DEFINITION - On budget and on schedule
PF
BRC
VIG
LDR
LDR02PIG
R BISHOP
D PARRY
ESO
LDR Painting Intake Gates
A
8121
1030738
A62087
A0620871
N
25.8
26.5
13.1
54.7
26.3
12.9 In Progresss, VFDs tendered. Awarded in Dec.
PF
BRC
VIG
LDR
LDR03SWI
R BISHOP
PF
LDR SPILLWAY GATE CONTROL ROOM
A
8121
1030738
A62094
A0620941
Y
194.4
194.4
29.2
0.0
120.0
29.2 On Order. Package recd.Install in Dec/Jan.
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC
VIG VIG VIG
LDR PUN PUN
LDR03GAC PUN01VM PUN03PHS S C4 c 1
R BISHOP R BISHOP
R BISHOP G JARL
PF PF
LDR GOVERNOR AIR COMPRESSORS Bridge River Vibration Monitor PUN Phase 2 Implementation PH Super Structure
A C P
8121 7152 8101
1030738 1030697 1030735
A62102 A29298
A0621021 A0292987
Y N Y
68.8 257.4
68.8 226.7
27.6 12.7
0.0 18.1 0.0
30.0 12.7 0.0
27.6 12.7
This project has just been transferred by D. Iredale and the status is being investigated. PF COASTAL REGION BRC VIG PUN PUN03SU1 T MOLSTAD A ENGLISH ESO PUN-Seismic: Phase 1, Non-Structural P 8101 1030735 Y 0.0 53.4 0.0 0.0 53.4 0.0 Contract has been let for the supply and installation of controls BRC BRC VIG VIG PUN PUN PUN01PBC _PUN-1103534 c(B4) 2m R BISHOP R IREDALE R BISHOP ESO PF PUN Powerhouse Crane Upgrade PUN Plant Security A A 8101 8101 1030735 1030735 1103341 1103534 1103343 1103921 N Y 371.2 11.0 369.7 11.0 21.3 4.8 10.9 0.0 28.3 5.0 21.3 What is this? 4.8 Jan04 - Difference in forecast and approved is caused by unanticipated increase in O/H. IN-SERVICE - Dec03 update not available from PM Nov03 - Seismic upgrade of roof completed 24 September. Roof replacement completed 2 October. Deficiencies completed
PF PF
COASTAL REGION COASTAL REGION
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
PUN PUN
PUN03RR _PUN-1104929
R BISHOP
A LEONARD R BISHOP
ESO PF
PUN GS Control Room Re-roofing PUN G1 Alarm Panel Replacement
A A
8101 8101
1030735 1030735
1104846 1104929
1104847 1105008
Y Y
98.8 50.0
100.6 50.0
37.6 33.1
0.0 0.0
100.6 35.0
37.6 PAM panel 33.1 IMPLEMENTATION Difference in forecast and actuals is caused by error, forcast is $31k. On schedule on budget. Wheel pins machined and passed final inspection, ready to go to site & bearings are in. Hoist specification in development on schedule and bu
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
PUN PUN
PUN03SLR PUN00FST
R BISHOP R BISHOP
D CRAWFORD WH CHUNG
ESO ESO
Comox Dam Sluiceway Gate Hoist PUN Fish Screen Trip
A I
8101 8101
1030735 1030735
1105830 A31007
1105831 A0310071
Y Y
349.1 443.0
352.8 435.9
16.9 435.9
0.0 0.0
69.3 5.9
16.9 IN SERVICE, can close out 5.9 EAR
Page 12 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
IMPLEMENTATION - This is a multi-year project.Scope has been revised and extended. On budget and schedule. PF PF COASTAL REGION COASTAL REGION BRC BRC VIG VIG PUN PUN PUN00IGR PUN00USS R BISHOP R BISHOP D PARRY T TAJIMA ESO ESO PUN Intake Steel Structure Recoating PUN Station Service Upgrade I C 8101 8101 1030735 1030735 A31022 A31033 A0310221 A0310331 N Y 310.3 300.6 324.9 298.5 324.9 87.5 0.0 92.5 0.0 90.4 Old Project - Completed 0.0 IN SERVICE. Approved amount is $126K and Actuals should be $124K PF PF COASTAL REGION COASTAL REGION BRC BRC VIG VIG PUN PUN PUN02USS PUN01LP R BISHOP R BISHOP WH CHUNG D EPP ESO ESO PUN Station Service Upgrade - Add Motor Control Centre PUNTLEDGE GS LIFT PUMP SYSTEM I A 8101 8101 1030735 1030735 A31033 A61023 A0310332 A0610231 Y Y 440.9 91.6 120.5 94.6 120.5 19.5 0.0 0.0 29.8 2.8 29.8 Defer to Fiscal 05/06 1.8 installation. ON HOLD - Work put on hold by T.Veary. No SOO/RFS set up. Project to be closed. Client decided not to implement.
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
PUN PUN
PUN01CAT _PUN-A0610441
R BISHOP
S DREXL R BISHOP
ESO PF
PUN Trashrack Catwalk PUN TELEMARK REPLACEMENT
A A
8101 8101
1030735 1030735
A61042 A61044
A0610421 A0610441
N Y
10.0 0.0
8.7 141.8
8.6 143.2
71.1 0.0
1.2 50.0
1.1 Costs split with JHT 50.0 IN SERVICE. Will monitor the trip switch and complete remaining site work before 1 May 2004.
PF
COASTAL REGION COASTAL REGION
BRC
VIG
PUN
PUN01LPT
R WILLIAMS
WH CHUNG
ESO
Puntledge Low Pressure Trip
A
8101
1030735
A61052
A0610521
Y
47.7
31.7
37.8
0.0
1.0
7.1 complete. Some dwgs outstanding from RNetzel
PF
BRC
VIG
PUN
PUN01RSR
R BISHOP
R BISHOP
PF
PUN River Siren Replacement
C
8101
1030735
A61068
A0610681
Y
96.6
96.6
88.8
0.0
50.0
42.0 S Reid / R Bishop as PM. Work complete in Dec. REV submitted for final phase.
PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
PUN PUN
PUN01UPH PUN02GAC
T VEARY R BISHOP
R BISHOP R BISHOP
PF PF
UPPER PUN HATCHERY REFURBISH PUN G1 Governor Air Compressors (2) & Air Dryer
A A
8101 8101
1030735 1030735
A61107 A61141
A0611071 A0611411
N Y
273.6 81.4
273.6 81.4
287.6 94.0
109.4 0.0
44.0 52.0
44.3 Shud be no charges in Dec?? 51.3 ? Barb to check Complete EAR closed
PF
BRC
VIG
PUN
PUN02SSA
R BISHOP
R BISHOP
PF
PUN STATION SERVICE AIR DRYER
C
8101
1030735
A61142
A0611421
Y
12.7
12.7
12.2
0.0
0.0
-9.3 IMPLEMENTATION Equipment was ready on site for installation in Sept 03 but outage was cancelled; installation tentatively rescheduled Sept04. Project completion will change to March 05
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
PUN PUN
PUN01PRV PUN01VT S B4 c 2
R BISHOP
G CHOW R BISHOP
ESO PF
Puntledge PRV Test Rig PUN Unit VT Upgrade
A A
8101 8101
1030735 1030735
A61143 A61147
A0611431 A0611471
N N
129.8 25.4
128.4 25.4
83.6 33.7
71.1 6.6
56.4 32.7
32.7 Complete. Dwgs to come. 33.7 Rev req'd This project is being bundled with PUN06TER, Design concept submitted to GLOB along with new SOO, awaiting approval. Ear will be prepared after approval rec'vd.
PF
COASTAL REGION
BRC
VIG
PUN
PUN01CBG
S
C3
c
1
R BISHOP
A ENGLISH
ESO
Puntledge Circuit Breaker & Generator Protection
A
8101
1030735
A61300
A0613001
N
318.3
314.9
251.5
142.2
139.4
76.0 This work is waiting to be transferred to TPD Stations C
PF
COASTAL REGION
BRC
VIG
PUN
PUN01SP
R BISHOP
B MASON
ESO
PUN Oil Sump & Pump Addition
A
8101
1030735
A61303
A0613031
Y
77.6
81.5
26.6
0.0
26.0
15.8 work is complete and was not assigned to ESO. Not in Infopm. 2 of 3 complete. AKumar is TM
PF
COASTAL REGION
BRC
VIG
PUN
PUN01IDB
R BISHOP
PF
PUN GS INTAKE DEBRIS BOOM
A
8101
1030735
A61818
A0618181
Y
37.1
37.1
5.7
0.0
0.0
0.2 Jan04 update not available from PM Dec03 - PM is away at SEV; update not available DEFINITION - Design of generator stand and layout of the pole lifting device completed by Kanlift Design Inc. Budget will be established according to design; site currently
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
PUN PUN
PUN01RRD PUN01UHA
R BISHOP
D MCLELLAN R BISHOP
ESO PF
PUN G.S. Rotor Removal Lifting Devices PUN UPPER HATCHERY H20 CONVEY
A A
8101 8101
1030735 1030735
A61819 A61825
A0618191 A0618251
Y Y
47.7 40.0
91.1 40.0
21.0 38.2
0.0 0.0
71.0 11.0
0.9 Close per M. Kroeker. 10.8 Coil rec'd Nov 02. Installation scheduled for F05 unit outage.
PF
COASTAL REGION
BRC
VIG
PUN
PUN02BCC
R BISHOP
N VANDERKWAAK
ESO
PUN REPLACE BEARING COOLING CO
A
8101
1030735
A61871
A0618711
Y
76.7
79.1
24.2
0.0
2.1
1.2 30-Dec-2002 Winding results will determine timing; outage difficult until 2005/06; revd fcast R Williams. SLi testing spare coil.
PF
COASTAL REGION
BRC
VIG
PUN
PUN02GR
S
C3
c
2
R BISHOP
R BISHOP
PF
PUN Generator Rewind Study
C
8101
1030735
A61876
A0618761
N
26.5
26.5
0.0
82.1
0.0
0.0 Received approval of EAR Implementation. Reviewed new project schedule with PF and obtained approval.
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
PUN PUN
PUN02RUN PUN02FR
S
C4
c
2
R BISHOP R WILLIAMS
WH CHUNG D DELCOURT
ESO ESO
Puntledge Unit Runback Replacement Study PUN FIRE RISK REDUCTION
A A
8101 8101
1030735 1030735
A62009 A62037
A0620091 A0620371
N Y
106.7 16.2
104.0 13.0
38.8 13.0
82.1 0.0
32.1 5.9
25.1 CURRENT PHASE 5.9 COMPLETE Received approval of EAR revision Reviewed new project schedule with PF and obtained approval. 40.3
PF
COASTAL REGION
BRC
VIG
PUN
PUN02BAT
R BISHOP
WH CHUNG
ESO
PUN 129v DC Battery and Charger
A
8101
1030735
A62050
A0620501
N
174.3
170.6
40.3
65.6
119.7
Page 13 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
IN-SERVICE - The project is on schedule and on budget. PF COASTAL REGION BRC VIG PUN PUN02DDB R BISHOP A KUMAR ESO COMOX DAM DEBRIS BOOM I 8101 1030735 A62074 A0620741 Y 171.5 164.4 125.8 0.0 159.9 121.2 In Service Minor charges to come.Feb 04- cpmplete. PF PF COASTAL REGION COASTAL REGION BRC BRC VIG VIG PUN PUN PUN03TEC PUN03PAP R BISHOP D WELLS R BISHOP R BISHOP PF PF PUN TELEPHONE CABLE INSTALL PUN ACCESS PLATFORMS A A 8101 8101 1030735 1030735 A62096 A62097 A0620961 A0620971 Y Y 62.4 5.0 62.4 5.0 63.5 4.6 0.0 0.0 60.0 5.0 63.5 Prlim EAR 4.6 Asbestos removed & new cladding installation completed. HVAC improvements fcast to be complete by 28 Feb '04.
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC
VIG VIG VIG
PUN PUN SCA
PUN02ASB PUN02DCS _SCA-A0292984
S
E2
d
2
R WILLIAMS R BISHOP
D EPP R BISHOP R BISHOP
ESO PF PF
PUN Powerhouse Asbestos Removal & Siding Replacement PUNTLEDGE GS INTAKE DC SUPPLY SCA VIBRATION MONITOR
I A A
8101 8101 7152
1030735 1030735 1030697
A62101 A62304 A29298
A0621011 A0623041 A0292984
N Y Y
721.1 31.8 0.0
674.7 31.8 29.6
602.2 28.9 29.6
10.9 0.0 0.0
674.1 12.0 17.6
601.6 In- service, dwgs to come. 9.3 G.Jarl project. 17.6 Complete and in service. Completion report issued for approval. Project to be closed to actuals.
PF
COASTAL REGION
BRC
VIG
SCA
SCA01LA
R BISHOP
A ENGLISH
ESO
SCA & LDR SURGE ARRESTOR REPLA
I
8121
1030738
A61019
A0610191
Y
225.6
142.2
138.1
0.0
19.3
15.2 This project has never been assigned to Eng - until such time that it is, the PM should be changed to Roy Bishop. RBW? Raised EAR??
PF PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
BRC BRC BRC BRC BRC
VIG VIG VIG VIG VIG
SCA SCA SCA SCA SCA
SCA02PU _SCA-1103173 _SCA-A0293321 SCA00LPS _SCA-A0310412 _SCA-HIGH VOLTAGE CB
R BISHOP R BISHOP
PF PF
SCA G1/G2 Protection & Control Upgrade SCA Work Platform SCA 13CB2 REPLACEMENT
P A A I I
8122 8122 8122 8122 8122 1030739 1030739 1030739 1030739 1103173 A29332 A31041 A31041 1103185 A0293321 A0310411 A0310412
Y Y Y Y Y
0.0 5.0 65.4 146.2
0.0 5.0 65.4 146.2 0.0
0.0 3.4 75.7 22.6 92.6
0.0 0.0 0.0 0.0 0.0
0.0 4.0 0.0 0.0 0.0
0.0 Prilim EAR. On hold per TAV. 3.4 17.6 Complete. EAR closed. 0.0 0.0 Transferred to TLOB
R BISHOP
PF
STRATHCONA GS LIFT PUMP SYSTEM SCA GS LIFT PUMP SYSTEM G1
PF
BRC
VIG
SCA
T
SCA HIGH VOLTAGE CIRCUIT BREAK
A
8122
1030739
A61006
A0610061
Y
25.0
25.0
30.7
0.0
0.0
1.3 COMPLETE - completion report issued; on budget and schedule
PF
COASTAL REGION COASTAL REGION
BRC
VIG
SCA
SCA01LLR
R BISHOP
D PARRY
ESO
SCA LLO Liner Coating
I
8122
1030739
A61071
A0610711
N
451.4
442.0
440.7
21.9
14.1
12.8 T1 installation deferred until F05 per client request.
PF
BRC
VIG
SCA
SCA01T1R
S
C4
c
1
R BISHOP
A ENGLISH
ESO
SCA T1 Replacement
A
8122
1030739
A61109
A0611091
N
1,659.9
1,477.0
1,127.3
1,449.7
929.6
900.5 IN SERVICE. As-built dwgs & manuals will be completed before 31 Mar 2004.
PF
COASTAL REGION COASTAL REGION
BRC
VIG
SCA
SCA01EXC
S
C4
c
1
R BISHOP
WH CHUNG
ESO
SCA G2 Exciter Replacement
I
8122
1030739
A61133
A0611331
N
1,683.0
1,672.2
1,664.4
322.8
119.9
112.1 Project cancelled. Can close the EAR.
PF
BRC
VIG
SCA
SCA01CRE
S
B3
b
2
R BISHOP
WH CHUNG
ESO
SCA Control Room Expansion
C
8122
1030739
A61318
A0613181
N
21.2
0.5
0.0
416.9
0.0
0.0 Project delayed due to substantial amount of defects in the main equipment discovered on site. Target to complete installation in Aug 04. Forecast IDC higher than approved amount.
PF
COASTAL REGION COASTAL REGION
BRC
VIG
SCA
SCA01SS
S
C3
c
2
R BISHOP
WH CHUNG
ESO
SCA AC Station Service Breaker Replacements
A
8122
1030739
A61353
A0613531
N
348.4
350.6
250.1
58.0
42.8
40.9 Bought as system spare, may use at ASH
PF
BRC
VIG
SCA
SCA01SYS
R BISHOP
PF
SCA G1 SYNCHRONIZER SPARE
A
8122
1030739
A61382
A0613821
Y
29.0
29.0
20.6
0.0
10.0
0.9 IN-SERVICE - EAR revision pending for Electrical control & P&C design and install work. Cost overrun due to electrical install costs & $17k of wrongly allocated Field service charges.
PF
COASTAL REGION
BRC
VIG
SCA
SCA01GSR
R BISHOP
D CRAWFORD
ESO
SCA Greasing System Replacement
I
8122
1030739
A61820
A0618201
N
77.1
74.0
115.8
30.6
74.0
114.0 Complete. Close EAR; PAR# A0310411-2 -33/67
PF
COASTAL REGION
BRC
VIG
SCA
SCA01BLB
D WELLS
R BISHOP
PF
SCA BUTTLE LAKE BOAT LAUNCH EX
A
8122
1030739
A61841
A0618411
Y
10.6
10.6
4.4
0.0
0.0
0.0 Complete and in service. Completion report underway. Project to be closed to actuals.
PF
COASTAL REGION COASTAL REGION
BRC
VIG
SCA
SCA02T2R
S
C4
c
1
R BISHOP
A ENGLISH
ESO
SCA T2/T3 Replacement
A
8122
1030739
A61887
A0618871
N
931.5
814.6
782.1
776.8
715.0
696.9 COMPLETE - Initiator requeted to close project.
PF
BRC
VIG
SCA
SCA02LLO
R BISHOP
D PARRY
ESO
SCA LLO DISCHARGE CHANNEL STOP
I
8122
1030739
A62002
A0620021
Y
233.2
237.3
236.9
0.0
3.5
3.1 The final installation work will be complete in Febrary. CBU is doing the work on a fixed cost basis.
PF
COASTAL REGION
BRC
VIG
SCA
SCA02FR
S
E3
d
2
R WILLIAMS
D DELCOURT
ESO
SCA Fire Risk Reduction
A
8122
1030739
A62035
A0620351
N
270.7
307.7
207.6
125.8
238.6
138.4 CB has been shipped to site for installion in 05 as agreed with GLOB
PF PF
COASTAL REGION COASTAL REGION
BRC BRC
VIG VIG
SCA SCA
SCA02NCB SCA02RRP
R BISHOP D WELLS
A ENGLISH R BISHOP
ESO PF
SCA 13CB1 REPLACEMENT SCA LDR ROOF REPLACEMENT
A A
8122 8122
1030739 1030739
A62051 A62070
A0620511 A0620701
Y Y
52.1 239.2
140.4 239.2
50.5 13.9
0.0 0.0
73.9 10.0
50.5 On hold till spring. 10.3 Tenders out for fabrication. To be combined with CMS and LDR.
PF
COASTAL REGION
BRC
VIG
SCA
SCA03SSD
R BISHOP
R BISHOP
PF
SCA STATION SERVICE DC
A
8122
1030739
A62079
A0620791
Y
219.8
219.8
5.4
0.0
60.0
5.4 DEFINITION - EAR revision for Implementation is not complete - waiting on designs. Cost overrun due to unforseen cancel of shared outage.
PF
COASTAL REGION
BRC
VIG
SCA
SCA03TIV
B KNOKE
D CRAWFORD
ESO
SCA TIV SEAL REPLACEMENT
A
8122
1030739
A62082
A0620821
Y
21.1
31.7
26.5
0.0
31.7
26.5
Page 14 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
Actual has exceeded forecast and approved DEFINITION - On schedule. Costs recorded may be high under review. PF is considering options. Engineering awaiting direction.
PF
COASTAL REGION COASTAL REGION COASTAL REGION
BRC
VIG
SCA
SCA03HEB
R BISHOP
D PARRY
ESO
SCA HEBER WOODSTAVE
A
8122
1030739
A62088
A0620881
Y
15.8
15.8
17.1
0.0
15.7
17.1 DEFINITION - On budget and on schedule
PF PF
BRC FLEET SVCS
VIG
SCA
SCA04DTG _-A0621921
R BISHOP
D PARRY
ESO
SCA DRAFT TUBE GATES FS PORTACOUNT FIT TESTER
A A
8122 3237
1030739 1030676
A62089 A62192
A0620891 A0621921
Y Y
10.5 13.8
10.6 13.8
8.0 14.2
0.0 0.0
10.5 0.0
7.9 1.0 TG Summary Tools & Equipment Plan. Actual requests made under individual EARs. Forecast detailed by individual EARs.
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
TGA TGA TGA
THE THE THE
BGS BGS BGS
BGS00EQU:C001 BGSDD BGSG3HPBJ
c(C4) e(D5)
T SOLTYS T SOLTYS
PF PF
Tools & Equipment BGS Due Diligence BGS Unit 3 turbine HP Bolting Bailey Joint Replacement
P P P
4161 4161 4161 1030710
N N Y
0.0 0.0
0.0 0.0 0.0
0.0 0.0
327.2 3,736.7 0.0
0.0 0.0 0.0
0.0 Deferred. 0.0 Project in 5 year Plan listing YTD as at Feb 11 Actual is $55K in Info-PM and $5.9K in Peoplesoft. Amounts don't agree…. EAR revised for additional $10K. Awaiting approval. Project is to be completed by the end of fiscal.
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
TGA TGA TGA
THE THE THE
BGS BGS BGS
BGSNGAS BGS03G5C BGS03SYN c(B4) d(E3) 2m 1h B4 D5
T SOLTYS C HUI C HUI
M HRAD R IREDALE R IREDALE
PF ESO ESO
BGS Natural Gas Pipeline Inter BGS - Unit 6 5 synchronous condense conversion BGS Synch Cond Start-up Pkg
A A A
4161 4161 4161
1030710 1030710 1030710
1103368 1103737 1103739
1103372 1103738 1103740
N N N
76.1 60.0 55.0
87.0 52.8 52.4
30.3 49.6 52.4
76.3 1,635.0 1,449.7
87.0 52.8 52.4
30.3 Project on hold 49.6 Project on hold 52.4 CW pipe cracking; root cause determination required. Planning stage. The project will determine repair method and detailed plan. Project name revised to "BGS - CW Pipe Evaluation & Remediation. " Investigation Report to be completed by Engineering by 20
PF
COASTAL REGION
TGA
THE
BGS
BGSCWSAMPLE
c(C3)
C HUI
PF
BGS CW pipe evaluation
A
4161
1030710
1104236
1104237
N
60.0
60.0
29.6
99.7
60.0
29.6 End-of-life replacement of equipment. Implementation in progress. Project estimated inservice date is 30May04
PF
COASTAL REGION COASTAL REGION COASTAL REGION
TGA
THE
BGS
_BGS Offshore
c(D3)
C HUI
PF
Offshore Cathodic Protection Anode Replacement
A
4161
1030710
1104238
1104239
N
391.7
391.7
29.2
163.5
215.0
29.2 completed, completion report outstanding
PF PF
TGA TGA
THE THE
BGS BGS
BGS04HSR _BGS -1104460
T SOLTYS
B DOUGLAS T SOLTYS
ESO PF
H2 Supply System HAZOP Modification BGS Instr. Dead Wgt Tester
A C
4161 4161
1030710 1030710
1104240 1104460
1104241 1104465
N Y
50.0 21.6
50.0 21.6
44.4 16.3
54.5 0.0
50.0 16.3
44.4 closed 16.3 Project planned under TG annual tools&equipment. Approved in Nov 2003. Replacement to be completed by March 31, 2004
PF PF PF PF PF PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
TGA TGA TGA TGA TGA TGA TGA TGA
THE THE THE THE THE THE THE THE
BGS BGS BGS BGS BGS BGS BGS BGS
_BGS-1106202 BGSG1PH3 BGS00TSI BGS00AMM BGS01CCI BGS01WIA BGSASBG2 BGS03SAC S WYLIE A BROTHERSTON C HUI S WYLIE T SOLTYS M STRACHAN
F. HAAG A LOW B DOUGLAS P CALDER P CALDER G VANDENBERG B DOUGLAS B DOUGLAS
PF ESO ESO ESO ESO ESO ESO ESO
BGS Manlift Replacement BGS G1 Rehabilitation TSI Upgrade - Seismic Probes BGS NH3 Ammonia System Upgrade Boiler Cycle Chemistry Improvements BGS Offshore Cooling Water Intake Access BGS Unit 2 Asbestos Removal BGS Site Security Access Upgrade
A C C I C C C A
4161 4161 4161 4161 4161 4161 4161 4161
1030710 1030710 1030710 1030710 1030710 1030710 1030710 1030710
1106201 A29083 A31151 A31152 A61158 A61172 A61173 A61178
1106202 A0290832 A0311511 A0311521 A0611581 A0611721 A0611731 A0611781
Y Y Y N Y Y Y N
0.0 14,621.7 10.0 954.2 54.7 182.4 1,725.2 198.6
172.4 14,183.3 0.0 917.9 6.0 195.4 0.0 270.5
0.0 14,183.3 6.9 921.8 6.0 195.4 0.0 181.2 0.0 0.0 302.0 0.0 0.0 0.0 174.5
172.4 55.9 0.0 495.1 0.2 86.3 0.0 250.8
0.0 55.9 cancelled 3.0 480.8 0.2 COMPLETE 86.3 cancelled 0.0 will be completed in February 161.3 completed - completion report outstanding
PF
TGA
THE
BGS
BGSASB03
S WYLIE
B DOUGLAS
ESO
02/03 BGS Asbestos Management Program
C
4161
1030710
A61186
A0611861
Y
1,402.4
1,341.8
1,368.9
0.0
392.4
422.3 completed - completion report outstanding
PF PF PF
TGA TGA TGA
THE THE THE
BGS BGS BGS
BGS02HSR BGS02G4R DRAWINGCOPIER
C HUI S WYLIE
B DOUGLAS B DOUGLAS T KOJO
ESO ESO PF
BGS Hydrogen Storage Area & Handling System Rehab Unit 4 IP Turbine Rotor Blade Replacement & Inspection TGA Document and Drawing Copier
I C C
4161 4161 4161
1030710 1030710 1030710
A61188 A61194 A62254
A0611881 A0611941 A0622541
Y Y Y
304.7 667.1 46.6
290.5 629.9 46.6
-90.3 629.9 42.5
0.0 0.0 0.0
4.0 0.3 33.4
-320.0 completed 0.3 closed 33.4 Project is in-progress. Project testing pending Unit 5 DCS availability. In-service date is March 31, 2004
PF PF PF
COASTAL REGION COASTAL REGION COASTAL REGION
TGA TGA TGA
THE THE THE
BGS BGS BGS
BGS01HD1 BGSASB04 _BGS-CA
C HUI C HUI
M HRAD B DOUGLAS T SOLTYS
PF ESO PF
BGS HP Heater Drain-piping Vibration Mitigation Implementation Phase BURRARD GS ASBESTOS MGR PROG BURRARD G.S. CHEMICAL ANALYSER
A A C
4161 4161 4161
1030710 1030710 1030710
A62256 A62258 A62259
A0622561 1102976 A0622591
Y N Y
40.2 1,475.1 114.3
40.2 1,039.7 90.3
26.4 769.0 90.3
0.0 1,527.0 0.0
40.2 648.7 90.3
18.7 on budget on schedule 769.0 closed 90.3 IN-SERVICE - Progress was accelerated due to availability of generating units.
PF PF
COASTAL REGION COASTAL REGION
TGA TGA
THE THE
BGS BGS
BGS00PDC BGSUNIT2
M STRACHAN M STRACHAN
R WHITTAKER B DOUGLAS
ESO ESO
BGS G1-G6 Partial Discharge Monitoring System (PDMS) BGS Unit 2 Generator Rotor Rewind
C C
4170 4170
1030710 1030710
A31175 A61155
A0311751 A0611551
Y Y
144.0 2,815.5
145.3 3,003.9
145.3 3,003.9
0.0 0.0
21.0 6.5
21.0 completed 6.5
Page 15 of 16
Comments to Miguel, 71871
Consolidated Capital Report - Month of January-2004
PSF Lvl 8 KBU Region Area Sub Area Facil Short Name Core Strategic Ratings Risk Matrix Priority Project Initiator Project Manager ESO PF Title Status Dept ID PSF PWPKG Level 7 Proj ID Level 8 Proj_ID Ex-Plan (Y/N)? PSF Proj Approved $k (Loaded) Input / InfoPM Proj Forecast $k (Loaded) PSF Proj Total Actuals $k (Loaded) Cap Plan FY03/04 Plan $k (Loaded) YEF Input / InfoPM Fiscal Fcast $k (Loaded) PSF Fiscal Actuals $k (Loaded YTD) Legends: Status Comments Planned: Prior Yrs EAR Submitted EAR Approved Outage In-Service White-Plan; Yellow-Forecast To update the symbols please unhide columns AW to BJ Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 FY 05
03-27-2004 6:02 PM
Complete FY 06 FY 07 FY 08
Project to be completed and closed out. Lst 3 sets of equipment will not be installed. 5 of 8 sets of equipment in-service since April 03. COASTAL REGION COASTAL REGION
PF PF
TGA TGA
THE THE
BGS BGS
BGS01TRV TGAVMANALYSER
d(E3)
1h
C5
S WYLIE
N VANDERKWAAK C HUI
ESO PF
BGS 4KV CLR/TRV Upgrade TGA Vibration Monitoring Program - Multi-channel Vibration Analyser
I C
4170 4170
1030710 1030710
A61162 A62255
A0611621 A0622551
N Y
1,237.7 81.9
1,215.6 75.8
810.6 75.8
458.4 0.0
245.6 2.3
134.6 EAR is closed 2.3 Project revised to "BGS safe shutdown diesel generator". EAR 1104497. Preliminary EAR has completed. Implementation pending review on the total request amount available alternatives. The project is managed by Engineering R. Iredale and coordinated by TG e
PF
COASTAL REGION
TGA
THE
FNG
FNGDIESELGEN
c(B4)
2m
C5
T SOLTYS
PF
FNG Black Start Diesel Unit
P
4153
N
0.0
0.0
0.0
872.5
0.0
0.0 construction nearly complete DCS and process improvements outstanding
PF
COASTAL REGION
TGA
THE
FNG
FNGINTEG
M STRACHAN
B DOUGLAS
ESO
FNG Integration into TG
A
4153
1030707
A61169
A0611691
N
3,880.8
3,856.7
3,380.4
974.0
718.0
678.2 GE turbine operating software upgrade will be installed in April ' 04
PF
COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION COASTAL REGION
TGA
THE
FNG
FNGLTSA
M STRACHAN
B DOUGLAS
ESO
Long Term Service Agreement & Spare Parts Purchase
A
4153
1030707
A61177
A0611771
N
2,104.1
2,099.3
1,614.1
412.0
113.4
44.2 completed - completion report outstanding
PF PF PF
TGA TGA TGA
THE THE THE
FNG FNG FNG
FNG02WTP _FNG-TOOLS BGS03SSD
e(D5)
G HAMILL
B DOUGLAS T SOLTYS
ESO PF ESO
FNG WTP Sediment Filter Rehabilitation FNG TOOLS AND EQUIPMENT BGS Safe Shutdown Diesel Generator Replacement
A A A
4153 4153 4161
1030707 1030707 1030710
A61193 A62257 1104497
A0611931 A0622571 1104499
N Y Y
266.8 72.0 50.0
270.2 61.5 776.8
283.8 61.5 50.3
194.3 0.0 0.0
154.3 59.4 127.8
168.0 Requested for EAR closure 59.4 EAR revised awaiting 50.3 approval SOO complete, EAR to be prepared Project is in-progress. Inservice date is March 31, 2004
C HUI
R IREDALE
PF
TGA
THE
RPG
RPGSAFEVALVES
c(D3)
2m
C5
R IREDALE
ESO
RPG Natural Gas Safety Valves/Regulatory System Replacement
P
4152
N
0.0
121.1
0.0
PF
COASTAL REGION
TGA
THE
RPG
RPG03SVR
C HUI
C HUI
PF
RPG Gas Control Valves
A
4152
1030706
1105002
1105003
Y
138.7
138.7
43.1
0.0
138.0
43.1 This work is waiting to be transferred to TPD Stations C
PF
COASTAL REGION
TGA
THE
RPG
RPG01FTC 444
1
A GEISSLER
B MASON
ESO
RPG Refueling Oil Spill Containment
A
4152
1030706
A61171
A0611711
Y
10.0 105,750.5
10.7 102,252.8
-5.5 75,038.2
0.0 34,968.8
-11.9 31,971.0
-14.9 24,643.7
Page 16 of 16
Comments to Miguel, 71871