                  Financial Security for Landfills in Alberta

This Excel file provides a template for calculating closure/ post-closure costs for Class I,
Class II or Class III Landfills.
The requirement for financial security for landfills is described in the Alberta Environmental
Protection and Enhancement Act (EPEA) and the Waste Control Regulation (WCR)
Under s. 28 of the WCR, security is to be in an amount determined by the Director and be sufficient
to ensure completion of conservation and reclamation based on:


registration holder,



soils, geology, hydrology and revegetation, and


The financial security must cover the closure/ post-closure costs of the facility.
The WCR outlines circumstances where the Director can increase or decrease the amount of
security (s. 29), and the approval or registration holder remains liable for the costs of conservation
and reclamation (s. 33(6)).
In an application for a waste management facility, the applicant is required to provide information
regarding closure of the facility as outlined in the AENV document Application Form: All Waste
Management and Hazardous Recyclable Facilities (June 1999) . Included in the information the
applicant must provide are an estimate of the cost of closure and post-closure monitoring or site
maintenance, and the financial assurance instruments the applicant can demonstrate to cover the
cost of facility closure and post-closure care.
The Standards and Guidelines for Landfills in Alberta, "Public and Stakeholder Draft for
Discussion" (S&G) dated June 2001 and the Code of Practice for Landfills (COP) issued by
Alberta Environment outline the closure/ post-closure requirements in terms of final cover, final
design slopes, reclamation, maintenance, operations, monitoring, and reporting.

The following templates are based on the following conditions:




Background                                               1 of 13            b798493d-b3a8-4445-8591-b6c2c9d9193c.xls
                                                                                                                                         7/1/2011
                                   Financial Security for Landfills in Alberta

This Excel file provides a template for calculating closure/ post-closure costs for Class I,
Class II or Class III Landfills.
There are five sheets associated with the file. The names of the sheets are shown at the bottom
of the screen.
The first sheet is called "Background". It references the pertinent legislation regarding financial
security.


The second sheet is called "Instructions". It provides instructions on how to use this template.

The third sheet is called "Data". In this spreadsheet, the landfill type, size, and number of
groundwater and gas monitoring wells is input. This data is linked to the following spreadsheets
to perform the calculations.
On this sheet, insert the following data:
a) The landfill type (ie Class 1, 2 or 3. ) Simply enter the number in the box.
                                                             2       2     2
b) The landfill cell size. Enter the size in hectares, acres, ft , miles or m . The area is calculated
automatically as shown in the green shaded box, in m 2.
c) The average waste thickness. Enter the average waste thickness in m.
d) The estimated total capacity is automatically calculated as shown in the shaded green box, in
m3


d) Engineering. Enter the percentage of cost for engineering involved in the closure of the landfill.
e) The number of groundwater monitoring wells and the number of monitoring events per year
f) The number of gas monitoring wells and the number of monitoring events per year
g) Estimated time to closure. Enter the estimated time to closure for the landfill in years.

h) Closure time period. Enter in the estimated closure time period in years. The Alberta Landfill
Code of Practice suggests monitoring a minimum of twenty five years after the closure of a landfill.
i) Contingency. Enter the contingency percentage in the box. It is recommended that a
contingency of 10 to 20 % be incorperated into the landfill costs.
j) Inflation rate. Enter the average inflation rate in the box.
k) Interest rate. Enter the annual interest rate that the security will earn in the box.


The fourth sheet is called "closure & post-closure costs". In this spreadsheet, the assumptions
regarding the various elements, quantities and products must be input to perform the calculations.
On this sheet, insert the following data:
a) the various components of Closure Costs are shown first. Depending on the Class of Landfill
that you have, input your costs in Column D, E or F for a Class I, Class II or Class III Landfill,
respectively.
The items are shown as Required if the item is required based on the legislation. A range of unit
costs and the assumptions associated with the costs are provided as a reference. An estimated
cost for the item can be based on the estimated unit cost and the surface area from the Data
sheet.
Based on site specific requirements/ conditions, other elements may be included.

b) the various components of Post Closure Costs are shown next.

It is noted that the Annual monitoring costs and Total Post-Closure monitoring costs are
calculated automatically based on the input on the fifth sheet "Monitor cost".
The Total closure / post closure costs in row 49 is calculated automatically based on the input
in the rows above.
c) Lines 53 to 97 include other miscellaneous closure and post closure costs. Depending on
the Class of Landfill that you have, input your costs in Column D, E or F for a Class I, Class II or
Class III Landfill, respectively.
The Grand Total (closure / post closure costs) in row 98 is calculated automatically based on
the input in the rows above.
The fifth sheet is called "Monitor cost". In this spreadsheet, the unit costs for the various
analytical tests need to be input.
The number of monitoring wells and the number of monitoring events per year will link directly
from the "Data" sheet. If required, the number of wells or number of events shown can be
overridden by manually inputting more or less as required.



Instructions                                                              2 of 13                        b798493d-b3a8-4445-8591-b6c2c9d9193c.xls
                                                                                                                  7/1/2011
                 Financial Security for Landfills in Alberta



Landfill Closure Costs

Landfill Type (Class 1, 2 or 3)

Landfill Cell Size                               ha                 acre           ft2              mi2               m2

                                                 2
                                               0m

Estimated surface area based
                                                 2
on a maximum grade of 30%                      0m

Average waste thickness                          m

                                                 3
Estimated total capacity                       0m

Engineering

Groundwater
# of gw monitoring wells
# of monitoring events / year

Gas
# of monitoring wells
# of monitoring events / year

Time Frame
Estimated time to closure                        years
Closure time period1                             years

Financial Considerations
Contingency
Inflation Rates
Interest Rates

1. The Alberta Landfill Code of Practice suggests monitoring a minimum of twenty five years after the closure of a landfill.




Data                                                      3 of 13          b798493d-b3a8-4445-8591-b6c2c9d9193c.xls
                                                                                                       Insert   the name of your landfill here                                                                                                                 7/1/2011
Financial Security for Landfills in Alberta
                                                                  Based on:                                                                         Assumptions                                            Class I      Class II      Class III
CLOSURE COSTS
Reporting                                closure and reclamation plan                                           $5,000 to $10,000
Final Cover
mob/ demob (earthworks contractor)       varies depending on location of contractor relative to site            $5,000 to $15,000
stripping topsoil                        varies depending on location of borrow pit                             $1 to $4.5/ m3
excavation of borrow material            varies depending on location of borrow pit                             $5.5 to $7/ m3
Clay cover - S&I                         0.6 to 1 m thick, compacted to 95% Standard Proctor                    $4 to $9/ m3 if available on site                                                          Required      Required     Required
                                         maximum dry density (SPMDD)                                            $9 to $17/ m3 if not available on site
QA/ QC (clay)                            inspection and testing, includes technician, truck and                 $700 to $1,000/ day                                                                                                   Required
                                         equipment, does not include room and board
                                         additional laboratory testing                                          $0.10 to $0.80/ m2 (lower unit cost for larger site, higher unit cost for smaller site)

Subsoil                                  0.35 m thick, or 0.8 m thick                                           $4 to $8/ m3 if available on site                                                          Required      Required     Required
                                                                                                                $8 to $12/ m3 if not available on site
Topsoil                                  0.2 m thick                                                            $4 to $8 / m3 if available on site                                                         Required      Required     Required
                                                                                                                $8 to $12 / m3 if not available on site
Vegetation                               Vegetation - re-seeding, replanting and refertilization as                                                                                                        Required      Required     Required
                                         required
- Seed                                                                                                          $20 to $30/ kg for natural mixes, $4 to $6 / kg for agronomic mixes, $1,500 for
                                                                                                                seeding
- Tree planting                          dependent on final use of site
- Fertilizer                                                                                                    $0.01 m2 and $1,000 to $2,000 to broadcast
                                         vegetation costs dependent on final use and size of site (lower        $0.20 to $1/ m2
                                         unit cost for larger site)
Synthetic Cover
Bedding sand                             imported cover to protect synthetic liner                              $25/ m3
Cover Options
    i. HDPE, 80 mil, textured            S&I, including mob/demob for sites within 3 hours drive of             $8 to $12/ m2
                                         supplier                                                                                                                                                          Typically      May be
    ii. PVC , 30 mil                     S&I, including mob/demob for sites within 3 hours drive of                         2                                                                             required as   required as   Usually not
                                                                                                                $5 to $6 /m
                                         supplier                                                                                                                                                           part of       part of      required
    iii. GCL (Geocomposite Clay Liner)   S&I, including mob/demob for sites within 3 hours drive of             $8 to $10 / m2                                                                             approval      approval
                                         supplier
Geomat (textile)                         S&I, including mob/demob for sites within 3 hours drive of                         2
                                                                                                                $2 to $5/ m
                                         supplier
Geocomposite Drainage layer              S&I, including mob/demob for sites within 3 hours drive of             $5 to $9 / m2
                                         supplier
Sand Drainage layer                      Variability in price due to availability of product on site                            2
                                                                                                                $4 to $10 / m
                                                                                                                                                                               Subtotal Closure Costs:
                                                                                                                                                                                          Engineering:
                                                                                                                                                                                       Contingency %:
                                                                                                                                                                              Total Closure Costs:




closure & post closure costs                                                                                                        4 of 13                                                                                     b798493d-b3a8-4445-8591-b6c2c9d9193c.xls
                                                                                                               Insert   the name of your landfill here                                                                                                         7/1/2011
Financial Security for Landfills in Alberta
                                                                        Based on:                                                                         Assumptions                                           Class I   Class II    Class III
CLOSURE COSTS
Miscellaneous Activities
Removal of:
- storage tanks                                dismantling/ removal of any buildings/ slabs, etc., disposal             dependent on contents of tanks, and contamination of materials
                                               costs are based upon "on-site" disposal, conducting soil
                                               monitoring program as required
- site buildings (office/ warehouse)           dismantling/ removal of any buildings/ slabs, etc., disposal             demolition: $1,000 to $2,000 for small office type building, $4,000 to $5,000 for 3
                                               costs are based upon "on-site" disposal, conducting soil                                                                                            2
                                                                                                                        bay maintenance shop, excluding removal of materials; or $35 to $79/ m for
                                               monitoring program as required                                           buildings. Some contractors may remove salvageable buildings for little or no cost
                                                                                                                        (ie they would take the materials).
- site infrastructure                          dismantling/ removal of any buildings/ slabs, etc., disposal             $35 to $79/ m2 for removal of asphalt or gravel roads
                                               costs are based upon "on-site" disposal, conducting soil
                                               monitoring program as required
Reclamation of waste transfer station          Minor site works consisting of removal of gravel roads, site             $25,000 to $75,000
                                               grading with on-site clay and topsoil to satisfy agricultural
                                               requirements
Reclamation of:
- Pesticide storage area                       dismantling/ removal of any buildings/ slabs, etc., conducting           demolition: $1,000 to $2,000 for smaller area, $4,000 to $5,000 for larger area,
                                               soil monitoring program as required                                      excluding removal of materials; or $25/ m2 for buildings. Subject to contamination of
                                                                                                                        materials.
- HHW storage area                             dismantling/ removal of any buildings/ slabs, etc., conducting           demolition: $1,000 to $2,000 for smaller area, $4,000 to $5,000 for larger area,
                                               soil monitoring program as required                                      excluding removal of materials; or $25/ m2 for buildings. Subject to contamination of
                                                                                                                        materials.
- Used oil building and site                   dismantling/ removal of any buildings/ slabs, etc., conducting           demolition: $1,000 to $2,000 for smaller area, $4,000 to $5,000 for larger area,
                                               soil monitoring program as required                                      excluding removal of materials; or $25/ m2 for buildings. Subject to contamination of
                                                                                                                        materials.
- Solvent washing of contaminated surfaces swabbing of equipment/buildings with a dissolving solvent;                   $44/m2 including labour
                                           conducting solvent washing program as required
- Soil monitoring, as required             soil monitoring program will typically consist of a number of 1              Soil analytical program will be a function of groundwater impact detected and site
                                           m deep boreholes and analytical program.                                     observations. Estimate $2,000 for one day field program, analytical costs extra.

                                                                                                                                                           Other Miscellaneous Closure Costs (subtotal):
                                                                                                                                                                                          Engineering:
                                                                                                                                                                                        Contingency %:
                                                                                                                                                              Total Miscellaneous Closure Costs:




closure & post closure costs                                                                                                            5 of 13                                                                                 b798493d-b3a8-4445-8591-b6c2c9d9193c.xls
                                                                                                      Insert   the name of your landfill here                                                                                                             7/1/2011
Financial Security for Landfills in Alberta
                                            Based on:                                                                                               Assumptions                                            Class I   Class II    Class III
COSTS FOR NEGOTIATING REQUIREMENTS FOR LANDFILL APPROVALS
Landfill Gas Management System          This will be dependent on what is already installed, more              based on requirements to protect adjacent landowners from LIF gas migration
                                        recent landfills have this installed when the cell is constructed
Venting Layer                           Includes installation                                                  $4 to $16 / m3
Extraction Wells                        Well spacing, 30 to 90 m between wells, and depth, 15 to 30            $250 to $500 / m of well installed
                                        m in depth, are dependent on waste characteristics
Passive Well Head                                                                                              $750 to $1,500 / well
Active Well Head                                                                                               $7,500 to $11,000 / well
Compressors/Blowers                                                                                            $3,700 to $37,680 / compressor
Laterals / Headers                      80 to 300 m/ ha depending on well spacing                              $120 / m
Active Candle Flare Set-up              This is installed at the same time as the final cover                  $22,000 to $150,000 / flare
Active Enclosure Flare Set-up           This is installed at the same time as the final cover                  $150,000 to $754,000 / flare
Leachate Management System              This will be dependent on what is already installed, more
                                        recent landfills have this installed when the cell is constructed
Wells                                   Well spacing, 30 to 90 m between wells, and depth, 15 to 30            $3,700 to $15,000 / well
                                        m in depth, are dependent on waste characteristics
Recirculation Trenches                                                                                         $120 to $375 / m
Pumps / Controllers                                                                                            $750 to $7,535 / pump
Laterals/headers                        80 to 300 m/ ha depending on well spacing                              $120 / m
Forcemain                               Geology of area and system design dictate price                        $120 to $380 / m
Tanks                                                                                                          $0.20 to $0.54 / Litre of tank volume
Pretreatment/Treatment Plan (on site)                                                                          $150,700 to $754,000 / facility setup
Run-on/Run-off Control System           This will be dependent on what is already in place for run-off
                                        control
Down chutes / Perimeter Ditches                                                                                $50 to $250 / m
Sedimentation Ponds                     Installed with liner                                                   $150,000 to $155,000 / pond
Grading                                 general grading for surface water management                           $10 to $25 / m
QA/ QC (total)                          soils and synthetic liners                                             $1.50 to $2.00 / m2 (lower unit cost for larger site, higher unit cost for smaller site).

                                                                                                                                               Subtotal Additional Miscellaneous (Closure Costs):
                                                                                                                                                                                     Engineering:
                                                                                                                                                                                  Contingency %:
                                                                                                                                          Total Additional Miscellaneous Closure Costs:




closure & post closure costs                                                                                                    6 of 13                                                                                    b798493d-b3a8-4445-8591-b6c2c9d9193c.xls
                                                                                                     Insert   the name of your landfill here                                                                                                              7/1/2011
Financial Security for Landfills in Alberta
                                                                 Based on:                                                                        Assumptions                                              Class I   Class II    Class III
POST CLOSURE COSTS
Annual maintenance                      twice / year inspection of cover, surface drainage,                 Assume 8 days / year - $50/ hr x 10 hrs/ trip x 8 trips = $4,000
                                        benchmarks, site security by company personnel
                                        Need to consider long term land use and lease agreement in terms of who would responsible for ongoing maintenance such as lawn mowing,
                                        snow clearing, etc. In most cases it is anticipated that the leasee would be responsible for this, thus it would not be part of the post-closure
                                        costs

                                        Vegetation - re-seeding, replanting and refertilization as            reseeding - $0 to $1,000 per event in the second or third year, replanting, as
                                        required                                                              required in the second or third year, re-fertilization, as required in the second or third
                                                                                                              year

                                        Vegetation - mowing/ spraying, as required                                              2                                  2
                                                                                                              $0.03 to $0.05/ m for mowing, $0.05 to $0.15/ m for spreading (vegetation
                                                                                                              maintenance may not be required depending on the site use, and lease agreement)


                                        Reporting - reclamation report on vegetation                          $2,000 to $5,000 (as required)



                                        landscape maintenance (reseeding, mowing, etc), if required           Assume 4 days/ year @$25/ hr x 8 to 10 hr/ day +$100/ day disb, additional costs of
                                                                                                              grading/ excavation equipment required = $1,200 to $1,250

Annual monitoring                       groundwater monitoring                                                 # of monitoring wells with # of monitoring events / year
                                        gas monitoring                                                        # of monitoring wells with # of monitoring events / year
Annual reporting
Leachate collection, disposal and       disposal costs of the leachate vary with leachate generation,         $0.004 to $0.07 / L or $0.025 to $0.05 / m2 / year
monitoring                              complexity of system, size of landfill, cover type and                $3.00 / m3 (assume close proximity)
                                        disposal/treatment method
                                        twice/ year monitoring leachate head/ or monthly if a max             included in the bi-annual inspection, if monthly include additional 10 visits for 4
                                        leachate head restriction applies                                     hours per trip
                                        laboratory analysis as per Table 3.4.2 in Draft Standards and         $335/ sample for analytical costs, plus field tech and disb = $500
                                        Guidelines for Landfills in Alberta
                                        System Maintenance - repairs and preventative maintenance                         2
                                                                                                              $0.0375 / m / year
                                                                                                                         2
                                                                                                              $0.0125 / m
Gas management system                   System Maintenance - repairs and preventative maintenance             $0.0375 to $0.19 / m2 / year

Surface water monitoring, as required   System management                                                     $0.18 - $0.38 / m2
                                                                                                                         2
                                                                                                              $0.125 / m
                                        laboratory analysis as per Table 3.4.2 in Draft Standards and         $335/ sample for analytical costs, plus field tech and disb = $500
                                        Guidelines for Landfills in Alberta
                                                                                                                                 2
Utilities                               gas and/or electricity to run collection and monitoring systems       $0.37 to $0.42 / m / year
Annual Subtotal post closure costs
Subtotal post closure costs                                                                                                                                              Subtotal post closure costs
                                                                                                                                                                                        Engineering:
                                                                                                                                                                                     Contingency %:
                                                                                                                                                                       Total Post Closure Costs:
Based on 2002 rates
Costs supplied by: Envirotest Laboratories, Layfield Geosynthetics and Industrial Fabrics Ltd., North American Construction Ltd.,
demolition contractors, vegetation suppliers, as-builts for SHTC, AENV




closure & post closure costs                                                                                                   7 of 13                                                                                     b798493d-b3a8-4445-8591-b6c2c9d9193c.xls
                                                                                                            Insert   the name of your landfill here                                                                                                7/1/2011
Financial Security for Landfills in Alberta
                                                                      Based on:                                                                   Assumptions                                       Class I   Class II    Class III
POST CLOSURE COSTS
Unplanned Closure Costs
Such as in the event of a liner leak,
corrective action
Leak                                         locate leak in cell using "electrical Leak Detection Method"            $4,000
Placement of 10% of total volume of a cell
and placement into an adjacent cell                                                                                  $10 / m3
Repair                                                                                                               $6,000
Re-capping                                                                                                           $9 / m2
Removal of liquid inventories                assume all liquids are deep well disposed by a third party
                                             Leachate in holding tanks                                               $128 m3
                                             Leachate in open cell                                                   2,400 m3
                                             Drainage in control pond                                                2,100 m3
                                                                                                                                          Subtotal Additional Miscellaneous (Post Closure Costs):
                                                                                                                                                                                     Engineering:
                                                                                                                                                                                  Contingency %:
                                                                                                                                 Total Additional Miscellaneous Post Closure Costs:




closure & post closure costs                                                                                                    8 of 13                                                                             b798493d-b3a8-4445-8591-b6c2c9d9193c.xls
                                                              Insert   the name of your landfill here                                                                                                          7/1/2011
Financial Security for Landfills in Alberta
                                                  Based on:                                               Assumptions                                           Class I   Class II    Class III

CLOSURE COSTS
Subtotal Closure Costs:
Engineering:
Contingency %:
Total Closure Costs:

Subtotal Other Miscellaneous Closure
Costs:
Engineering:
Contingency %:
Total Miscellaneous Closure Costs:

Subtotal Additional Miscellaneous (Closure
Costs):
Engineering:
Contingency %:
Total Additional Miscellaneous Closure
Costs:

GRAND TOTAL (CLOSURE COSTS)

                               If Closure is in                        years

                      To cover Closure Costs                                   are required to be put in the bank annually based on an interest rate of
                                                                                                                                     and an inflation rate of




POST CLOSURE COSTS

Subtotal post closure costs
Engineering:
Contingency %:
Total Post Closure Costs:

Subtotal Unplanned Post Closure Costs:
Engineering:
Contingency %:
Total Additional Miscellaneous Post Closure
Costs:

GRAND TOTAL (POST CLOSURE COSTS)

                      If Post Closure starts in                        years
                     and Post Closure is over                          years

To cover Closure and Post Closure Costs                                         are required to be put in the bank each annually based on an interest rate of
                                                                                                                                     and an inflation rate of




closure & post closure costs                                                            9 of 13                                                                                 b798493d-b3a8-4445-8591-b6c2c9d9193c.xls
                                                                                                        7/1/2011
               Financial Security for Landfills in Alberta
Post Closure Monitoring Cost

                  Assumes: All groundwater monitors and landfill gas monitors are in place
                           2002 Analytical Costs - Enviro-test Laboratories
                           5% inflation rate per year
                           Average Wastes for Landfill - No site specific Analytical Costs

                               To allow manual entry of data, click on Tools in the menu, click on
                               Protection in the submenu, and then click on Unprotect Sheet

                               Class I Landfill groundwater analysis on             12       monitors
                               Class II Landfill groundwater analysis on                     monitors
                               Class III Landfill groundwater analysis on                    monitors
                               Groundwater Monitoring Frequency per Year             2       events

                               Class I Landfill gas analysis on                      6       monitors
                               Class II Landfill gas analysis on                             monitors
                               Class III Landfill has no LFG concerns
                               Gas Monitoring Frequency per Year                     2       events




Monitor cost                                        10 of 13            b798493d-b3a8-4445-8591-b6c2c9d9193c.xls
                                                                                                      7/1/2011
                Financial Security for Landfills in Alberta
                                                                  Monitoring
                                                                  Frequency
                                     Unit Rate           Units     per Year                         ETL Section
Class I Landfill

Analytical - Groundwater
                      Major ions                  110         0            0             0          2.6.1
                Dissolved Metals                   90         0            0             0          2.5.2.1
                       Ammonia                     20         0            0             0          2.7.1
                           DOC                     35         0            0             0          2.7.3
                           COD                     45         0            0             0          2.7.4
                           TKN                     35         0            0             0          2.7.1

 Benzene, 1,4 Dichlorobenzene,
       Toluene, Vinyl Chloride                   127.5        0            0             0




                      Sub Total                  462.5                               $0.00

Analytical - Landfill Gas
              Sulphur Compound                    200         0            0             0
    Carbon Dioxide, O2, N, CH4                    105         0            0             0
                       Tedlar Bags                 25         0            0             0
                        Sub Total                                                    $0.00

Field Personnel & Disbursements
                     Field Tech                    60       30             0             0
                          Truck                   100        2             0             0
                             Cell                  20        2             0             0
                Water level tape                   25        2             0             0
                     PID meters                   150        2             0             0
                        Gastech                    50        2             0             0
                           Misc.                  100        1             0             0
                     Sub Total                                                       $0.00


Annual Report                                    6500         1            0         $0.00

Total Cost                                                                           $0.00




Monitor cost                                       11 of 13           b798493d-b3a8-4445-8591-b6c2c9d9193c.xls
                                                                                                      7/1/2011
                Financial Security for Landfills in Alberta
                                                                  Monitoring
                                                                  Frequency
                                     Unit Rate           Units     per Year                         ETL Section
Class II Landfill

Analytical - Groundwater
                      Major ions                  110         0            0             0          2.6.1
                Dissolved Metals                   90         0            0             0          2.5.2.1
                       Ammonia                     20         0            0             0          2.7.1
                           DOC                     35         0            0             0          2.7.3
                           COD                     45         0            0             0          2.7.4
                           TKN                     35         0            0             0          2.7.1

 Benzene, 1,4 Dichlorobenzene,
       Toluene, Vinyl Chloride                   127.5        0            0             0




                      Sub Total                  462.5                               $0.00

Analytical - Landfill Gas
              Sulphur Compound                    200         0            0             0
    Carbon Dioxide, O2, N, CH4                    105         0            0             0
                       Tedlar Bags                 25         0            0             0
                        Sub Total                                                    $0.00

Field Personnel & Disbursements
                     Field Tech                    60       24             0             0
                          Truck                   100        2             0             0
                             Cell                  20        2             0             0
                Water level tape                   25        2             0             0
                     PID meters                   150        2             0             0
                        Gastech                    50        2             0             0
                           Misc.                  100        1             0             0
                     Sub Total                                                       $0.00


Annual Report                                    6500         1            0         $0.00

Total Cost                                                                           $0.00




Monitor cost                                       12 of 13           b798493d-b3a8-4445-8591-b6c2c9d9193c.xls
                                                                                                       7/1/2011
                Financial Security for Landfills in Alberta
                                                                   Monitoring
                                                                   Frequency
                                      Unit Rate          Units      per Year                         ETL Section
Class III Landfill

Analytical - Groundwater
                      Major ions                  110          0            0             0          2.6.1
                Dissolved Metals                   90          0            0             0          2.5.2.1
                       Ammonia                     20          0            0             0          2.7.1
                           DOC                     35          0            0             0          2.7.3
                           COD                     45          0            0             0          2.7.4
                           TKN                     35          0            0             0          2.7.1
                      Sub Total                   335                                 $0.00

Analytical - Landfill Gas
                       Not required


                       Sub Total                                                      $0.00

Field Personnel & Disbursements
                     Field Tech                    60       24              0             0
                          Truck                   100        2              0             0
                             Cell                  20        2              0             0
                Water level tape                   25        2              0             0
                     PID meters                   150        0              0             0
                        Gastech                    50        2              0             0
                           Misc.                  100        1              0             0
                     Sub Total                                                        $0.00


Annual Report                                     4000         1            0         $0.00

Total Cost                                                                            $0.00




Monitor cost                                        13 of 13           b798493d-b3a8-4445-8591-b6c2c9d9193c.xls

								
To top