Person Investigation Request Form Ct

W
Description

Person Investigation Request Form Ct document sample

Document Sample
scope of work template
							                                   FY 2012 NWCG Budget Request Form
                   Use the arrow buttons on your keyboard to move between cells (                              )
Project Name:                                                          Total FY 2012 Budget Request:                   $0
A. Requestor Information
1. Committee:                                                     3. Committee Priority:
2. Subgroup:                                                     4. Subgroup Priority:
5. Expenditure Lead (Who (what agency) will be expending the funds?)                        Name, agency, phone, email:

6. Project Lead (Who is in charge of the overall project?)                Name, agency, phone, email:

B. Project Description
1. Is this a single year, or a multi year project?
2. Is this an on-going project that has received NWCG funding in the previous two years?                            Yes     No

3. Describe the project. Be specific and concise: (To paste from a word document - Click inside the cell, go to formula line,
right click and paste. Use your mouse to enlarge the cell so that you can see all of your information


4. Describe the business need:

5. If this project is not funded what are the consequences?

                                                                                                  Request FY       Request FY
C. Cost Estimates                                                 Request FY 2012                    2013             2014
          Round costs to nearest $500
1. Contracts/Agreements




2. Other (Please Itemize)




                                                Total Cost                  $0                          $0             $0
3. Can this project be partially funded over a period of 2 to 3 years? If it can please list the funds needed per year to
complete the project. (The total amount of funds listed here should equal the total cost in FY 2012 column)

     FY 2012:
     FY 2013:
FY 2014:
Total Cost   $0   This field should match Total Cost for "Request FY 2012" listed above
                  FY 2012 NWCG Budget Request Form Instructions
The NWCG Budget Request Form is to be used when submitting continuing IT projects, training
requests, and project proposals.
Training budget requests are due April 4th to Mark_Koontz@nps.gov from the submitting
committee/group chair. This form is only submitted once; it does not need to be resubmitted to the
branch coordinators.
Continuing IT budget requests are due May 3 rd to the appropriate branch coordinator from the
submitting committee/group chair. This form is only submitted once; it does not need to be
resubmitted to the branch coordinators.

All remaining FY 2012 budget requests are due June 14 th to the appropriate branch coordinator. Do
not resubmit training requests or continuing IT requests submitted in April.

This form is not locked. Data can be entered in any field, so please be sure you are in the correct cell
before you enter data. All fields are set to expand as information is entered. Use the up and down
arrow keys to move between the fields, using Tab will not work.

Specific Form Field Instructions:

Project Name: Be short and concise. If this is a continuing project please use the same title that was
used in previous years. Project names and funding for FY 2009 through FY 2011 are included as a
separate worksheet.
Total Budget Request: Leave Blank. This cell will auto fill once "Section C. Cost Estimates" is filled in
for FY 2012 (Cell uses the Total Cost)
A. Requestor information. Every project must be submitted through a committee or the PMU.
Subgroups submit projects to the parent committee. The committee submits the projects to the
respective Branch Coordinator.
       1. Committee – Use drop down menu to select the committee name
       2. Subgroup – Use drop down menu to select the subgroup name
Priority ranking : 1 = highest priority, larger numbers mean decreasing priority. For example if the
committee has 8 total projects they are submitting, "1" is their highest priority and “8” is the lowest.
       3. Committee Priority – Only one number goes in this field. To be filled out by the committee
       submitting the projects. The committee prioritizes their committee projects and all subgroups
       under them. Branch Coordinators use this ranking to develop Branch priorities.
       4. Subgroup Priority – To be filled out by the subgroup submitting the project. This field lists
       the project priority in relationship to all the projects in the subgroup. Committees use this
       ranking to develop Committee priorities.
       5. Expenditure Lead – Name of the person who will be responsible for EXPENDING the funds
       for this project, this will determine what agency gets the budget funds for this project. (Select
       the appropriate person and agency that will be able to obligate the funds based on your
       project needs (contract, agreement, etc). List their contact information. Due to project funds
       being federal, the expenditure lead must be from one of these five federal agencies – BIA,
       BLM, FS, FWS, or NPS.
       6. Project Lead - Name of the person who is responsible for the project. List contact
       information. The project lead can be any member who is responsible for ensuring the project is
       completed.

                                               Page 3 of 10
                   FY 2012 NWCG Budget Request Form Instructions
B. Funding Information. Every project must have a description. This information is used to rank and
select projects for funding.
       1. Is this a single year or multi-year project? If you only request funds for one fiscal year then
       the project is a single year project. If funds are requested for more than a single year, this is a
       multi-year project.
       2. Is this an on-going project that has received NWCG funding in the previous two years?
       Select Yes or No. If you do not know if this project has been previously funded please refer to
       the Workbook Tab - "Funded Projects FY2009 to 2011"
       3. Describe the Project - Be very specific, and concise in describing what the project is and why
       it is needed by NWCG. To be considered for funding, a request for new or on-going work must
       support the FY 2012 Areas of Emphasis - which is the is the NWCG Strategic Plan
       (http://www.nwcg.gov/nwcg_admin/strategic-plan.pdf. If this is a Training or IT related
       request, include your rationale here. You can copy the information from word and paste it into
       the cell. If you type in the information free hand into excel you must use <Cntrl> <Enter> to
       start a new line or paragraph. If you use just <Enter> the curser will skip to the next cell on the
       form.
       4. Describe the business need – Why does NWCG need this project? What is the benefit?
       What problem or issue is resolved? What is the value added to NWCG? How does this project
       move NWCG forward and/or position NWCG for future success?
       5. If this project is not funded what are the consequences? - Be very specific and concise.
       What are the ramifications of not being funded? What specifically will not get done. What are
       the impacts to NWCG?

   C.     Cost Estimates – round costs to nearest $500
        1. Contracts/Agreements – List the type of agreement and the cooperator.
        When building a project it is important to determine what the appropriate instrument is for
        expending the funds, are you going to use a contract, grant or agreement. When developing
        the project, prior to submitting this request, the expenditure lead needs to talk to their local
        authority on contracting and/or grants & agreements to determine the most appropriate
        instrument to use. Based on the most appropriate tool you might need to change your
        expenditure lead (the person responsible for expending the funds).
        Example: Contract – Corporate University Enterprise, Inc
         Agreement - University of Montana
        2. Other – List other known or expected costs not identified above. See Worksheet Tab -
        Budget Items.
        3. Can this project be partially funded over a period of 2 to 3 years? If it can please list the
        funds needed per year to complete the project.? Agency budgets are declining thereby
        reducing the amount available for NWCG projects. For large budget items (over $25,000) there
        is a possibility that the full amount of the requested funds will not be available. We need to
        know if the requested amount for FY2012 is fixed, or if it can be spread over a two to three
        year period. This will not work for all projects, but if this is possible for your project please list
        the partial amounts per year in the table. The total amount of funds listed here should equal
        the total cost in FY 2012 column).

   If you need help, please contact the appropriate branch coordinator.

                                                 Page 4 of 10
                                              NWCG Funded Projects FY 2009 to FY 2011


                                                                                                   FY 2009   FY 2010   FY 2011
Com     Sub    Project                                                                              Funds     Funds    Funded
CEPC   WFISC   Completion of FI-311 Development - Test Courses                                                           X

CEPC   WFISC   Railroad Fire Investigation Course                                                                        X

CEPC           Communicators Guide                                                                                       X

CEPC           IAFC Conference Participation                                                         X

CEPC           Inciweb Redesign and Refresh                                                                              X

CEPC           P-301 Course revision                                                                           X

ETC    ISSC    Invasive Species Cleaning Techniques                                                                      X

ETC    NFES    Equipment repairs/maintenance standards                                                                   X

ETC            Class A Foam Publications                                                                       X         X

ETC            Develop/implement entrapment report                                                   X

ETC            Ground Ignition Guide                                                                 X

ETC            Publication Update - Water Handling Equipment Guide and NWCG 1998 Engine Standard                         X

FENC   FBSC    FENC External Communications                                                          X         X         X

FENC   FBSC    Field Reference Guide/Appendix B                                                      X         X         X

FENC   FBSC    Firefighter Math Website                                                              X

FENC   FBSC    Fireline Assessment train the traininer                                               X

FENC   FBSC    Regional Fire Behavior Workshops                                                      X                   X

FENC   FBSC    S-495 & Blackboard Contract - Maintenance & Delivery                                  X         X         X

FENC   FWSC    Lightning Detection Services                                                          X         X         X

FENC   FWSC    RAWS Data Archive/Applications                                                                  X         X

FENC   FWSC    RAWS Data Server Replacement                                                                              X



                                                                 Page 5 of 10
                                            NWCG Funded Projects FY 2009 to FY 2011

FENC   NPSS   collate and post fire data                                              X
FENC   NPSS   Develop communication plan                                              X

FENC   NPSS   develop standards for predictive services products                      X

FENC   NPSS   Develop tracking/performance measures                                   X
FENC   NPSS   meeting support                                                         X

FENC   NPSS   Model verification forecast                                             X

FENC   NPSS   National Fuel Moisture Database (NFMD)                                      X

FENC   NPSS   North American Regional Reanalysis Data-set (Predictive Services)               X

FENC   NPSS   On-Line Web-Based 7-Day Predictive Services Product                         X   X

FENC   NPSS   Predictive Services Web Portal                                              X   X

FENC   NPSS   ROMAN Migration to WIMS                                                     X   X

FENC   NPSS   SIT-209 Redesign                                                                X

FENC          Corporate Database                                                          X

FENC          FLAME Outreach                                                              X

FENC          Gridded 7 day Forecast                                                      X

FENC          Gridded Seasonal Wildfire Outlook Product                                   X

FENC          RAWS Standards Research                                                     X

FENC          Spatial Fire Analysis & Risk Assessment Course Delivery                 X

FENC          Spatial Fire Analysis & Risk Assessment Course Development              X

IBC           AD Pay Plan Classification                                              X   X   X

ITC    CTSP   CTSP conference                                                         X

ITC    CTSP   CTSP Training                                                           X   X

ITC    GTG    Geospatial Subcommittee Website Maintenance Support                             X



                                                                   Page 6 of 10
                                        NWCG Funded Projects FY 2009 to FY 2011

 ITC   GTG   GIS Standard Operating Procedures Update                                                X

 ITC         Incident Communication Subcommittee                                             X

 ITC         MIMIT Tasking                                                                       X

NWCG         State Travel                                                                    X   X

OWDC   LSC   L Course Curriculum Mgmt                                                        X       X

OWDC   LSC   L-580 Course Deliveries and Future L-580 Course Design & Development            X       X

OWDC   LSC   Online Leadership Toolbox Revisions & Future Integration with NWCG DL Program           X

OWDC   TDU   Distance Learning                                                               X   X   X

OWDC   TDU   Learning Content Mgmt System Maintenance                                                X

OWDC   TDU   Learning Mgmt System Support (NFA)                                              X   X   X

OWDC   TDU   NWCG Training Course Revisions                                                  X   X   X

OWDC   TDU   NWCG Training Refresher Video                                                   X   X   X

OWDC         Corporate University – Next Steps                                               X   X

OWDC         Leadership Curriculum and tools development                                         X

PMU          Access Database Development                                                             X

PMU          Contingency Funding                                                                 X   X

PMU          Enterprise archtecture                                                              X

PMU          Enterprise content management design/implementation                             X

PMU          January All Chair Room Rental                                                           X

PMU          JW PMU Move/Conference Room                                                             X

PMU          NWCG Web Domain                                                                 X   X   X

PMU          NWCG Website Governance model and Hosting                                           X   X

PMU          NWCG.gov O&M                                                                    X



                                                              Page 7 of 10
                                           NWCG Funded Projects FY 2009 to FY 2011

PMU             Trailer                                                              X   X   X

RMC     FFTG    Are You FireFit?                                                     X   X

RMC     IEMTG   Medical Advisor                                                              X

RMC     SETG    Wildland Fire Smoke Exposure                                         X       X

RMC             FFAST - WFSTAR support                                               X

RMC             IAWF Safety Summit                                                   X

RMC             meeting support                                                      X

RMC             Replace Display                                                      X

RMC             revise brochure                                                      X

RMC             Rhabdomyolysis                                                               X

RMC             Safenet Server                                                       X   X   X

RMC             Wildland Firefighter Safety and Health - MTDC                        X   X   X

SmoC            Rx 410 Smoke Guide - Phase 2                                             X   X

SmoC            Smoke Mgmt Training                                                  X   X

Smoke   SmoC    Air Quality and Smoke Mgmt Training Course                                   X




                                                                Page 8 of 10
                                    FY 2012 Budget Item List

This outline describes whether NWCG would consider financial support for various items that would be
listed in Section C. Cost Estimates in the NWCG Budget Request Form. Budget requests should be for
services, agreements or contract costs only. This is not a complete list. This is a summary of what was
requested for funding in the FY 2011 budget process.
NWCG will consider funding for:
1. Web services – if developed for the NWCG website
              a. Web content development
2. Products and Publications – NWCG may pay for these services, but we recommend you seek other
sources when possible
              a. Layout
              b. Graphics
              c. Photo layout
              d. Writer/editor
              e. Electronic edits
              f. Electronic publications
              g. Training materials
              h. Video production
3. Training costs when your group has maintenance responsibility for specific course(s)
              a. Online training development
              b. Course material development
              c. Course revisions
4. Poster/diplay development for conferences and/or committee brochures
              a. Case by Case Special consideration - see your branch coordinator and NWCG Operating
              Principles and Guidelines (PMS 900) section 10
5. Special circumstances - see your branch coordinator
              a. SME travel (not wildland fire personnel)
              b. Presenter travel - (not wildland fire personnel)

NWCG will not consider funding for:
1. Web services already being done for NWCG as part of the new web portal: Committees do not need to
request funds for these activities anymore. These services are provided by NWCG through support of the
NWCG Web Portal. By working with the Web Portal, committees can focus on the content they are
expert at rather than infrastructure
               a.    Web hosting
               b.    Web portal hosting
               c.    Web portal development
               d.    Web development hosting
2. Web services already being provided by the NWCG Web Manager
               a. Website support
               b. Website maintenance
3. Products and Publications – because they are covered already by the Publication Management System
or through the cache system
               a. Publishing, publication/printing costs



                                              Page 9 of 10
                                    FY 2012 Budget Item List
4. Training costs covered by publications
             a. Course materials (handouts/posters)
5. Travel and registration for conferences

Do not request funds for:
1. State travel for group meetings – this is determined by the branch coordinators
2. SME travel and or Evaluation team travel – for state or federal employees
              a. Federal employees need to request travel funds from their own agency
              b. State employees are covered by NASF state grant
3. Workshops – travel to a workshop or support for the workshop




                                             Page 10 of 10

						
Other docs by hci13649
Perconal Loan Agreement - PDF
Views: 6  |  Downloads: 0
Performing Arts Grants - PDF
Views: 19  |  Downloads: 0
Performing Contracts
Views: 3  |  Downloads: 0
Performance Liability
Views: 7  |  Downloads: 0
Perception Management - Excel
Views: 6  |  Downloads: 0
Performance Assessment Survey
Views: 1  |  Downloads: 0
Performance Metric Templates
Views: 6  |  Downloads: 0
Pepperdine Federal Income Taxation
Views: 7  |  Downloads: 0