Key Performance Index for Administrative Officer - Excel by neq18905

VIEWS: 86 PAGES: 8

Key Performance Index for Administrative Officer document sample

More Info
									                             Team Tunner Acronyms List
                   Current as of: 16 May 2005

                   For updates or information, please contact Clarke Winkle (SEI) at cwinkle@seistl.com or Donna Carbon(Warner
                   Robins) at Donna.Carbon@robins.af.mil

ACRONYM                  DESCRIPTION

ABES                Amended Budget Estimate Submission (part of AF budgeting process)
ABIDES              Automated Budget Interactive Data Environment System (part of AF budgeting process)
ABL                 Allocated Baseline (configuration management)
ACAT                Acquisition Category
ACMS                Automated Configuration Management System (used by SPO to track ECP submissions)
ACO                 Administrative Contracting Officer (function of DCM, St. Louis)
ACWP                Actual Cost of Work Performed (EVMS)
ADMS                Automated Data Management System (used by SPO to track data submissions)
AETC                Air Educational Training Command
AFDR                Award Fee Determination Report
AFI                 Air Force Instruction
AFM - or - AFMAN Air Force Manual
AFMC                Air Force Materiel Command
AFOTEC              Air Force Operational Test and Evaluation Center
AFRB                Award Fee Review Board
AFSC                Air Force Safety Center -also - Air Force Specialty Code
AID                 Altered Item Drawing
AMC                 Air Mobility Command
ANSI                American National Standards Institute
Ao                  Operational Availability
APB                 Acquisition Program Baseline
APOM                Amended Program Objective Memorandum (part of AF budgeting process)
APCAM               After Production Corrosion Abatement Modification
APS                 Aerial Port Squadron
AQMS                Advanced Quality Manufacturing System
ASC                 Aeronautical System Center - also - Accredited Standards Committee
ASCII               American Standard Code for Information Interchange
ATP                 Acceptance Test Procedure
ATR                 Acceptance Test Report
BAC                 Budget at Completion (EVMS)
BCR                 Baseline Cost Report - also - Budget Change Request (EVMS)
BCWP                Budgeted Cost of Work Performed (EVMS)
BCWR                Budgeted Cost of Work Remaining (EVMS)
BCWS                Budget Cost of Work Scheduled (EVMS)
BDRSK               Battle Damage Repair Spared Kit
BES                 Budget Estimate Submission
BMWG                Business Management Working Group
BOE                 Basis of Estimate
BPAC                Budget Program Activity Code (part of AF budgeting process)
BPAT                Business Process Action Team
BRAC                Base Realignment And Closure
C/L                 Checklist
C/SCSC              Cost/Schedule Control Systems Criteria (EVMS)
C/SSR               Cost/Schedule Status Report
CA                  Critical Action - also - Corrective Action
CAAS                Contract Advisory and Assistance Support
CAC                 Cost at Complete
CAD                 Computer Aided Design
    PNA-LE;3fccdf3c-47ba-4fc1-80a9-98d1a8468f65.xlsConsolidation6/30/2011
CAIV               Cost as Independent Variable
CAM                Cost Account Manager
CAO                Contract Administration Office (function of DCM, St. Louis)
CAP                Control Account Plan (EVMS) - also - Corrective Action Plan
CAR                Corrective Action Report       - also - Configuration Audit review
CARS               Consolidated Analysis and Reporting System (AF system for reporting vehicle maint.)
CAS                Contract Administration Services (DCM st Louis) - also - Cost Accounting Standards
CCA                Corrosion Control and Abatement - also - Circuit Card Assembliy
CCB                Change Control Board       - also - Configuration Control Board
CCN                Contract Change Notice -also- Configuration Change Notice
CCP                Contract Change Proposal
CDM                Configuration Data Management
CDR                Critical Design Review
CDRL               Contract Data Requirements List (reports required by contract)
CER                Cost Estimating Relationship
CFE                Contractor Furnished Equipment
CFSR               Contract Funds Status Report
CI                 Configuration Item (configuration management)
CID                Commercial Item Description
CIDS               Critical Item Development Specification (configuration management)
CLIN               Contact Line Item Number
CLS                Contractor Logistics Support
CMP                Configuration Management Plan
CMS                Contract Management System (SEI's contracting system)
CND                Cannot Duplicate
CO                 Change Order
COEA               Cost and Operational Effectiveness Analysis
COM                Cost of Money
CONOPS             Concept of Operations
CONTR              Contractor
CONUS              Continental United States
CPAF               Cost Plus Award Fee (type of contract)
CPAR               Contractor Performance Assessment Report
CPC                Corrosion Prevention Compounds
CPDT               Critical Pin Durability Test
CPI                Cost Performance Index [BCWP/ACWP] - also - Continuous Productivity Improvement
Cpk                Capability index (part of DMS)
CPR                Cost Performance Report
CR                 Change Request
CRAF               Civil Reserve Air Fleet
CRB                Configuration Review Board
CRC                Contractor Request for Change
CREP               Contract Repair Enhancement Program
CRI                Cost Reduction Initiative
CSR                Contract Summary Report
CV                 Cost Variance (EVMS)
CWBS               Contract Work Breakdown Structure
DAC                Designated Acquisition Commander
DAL                Data Acquisition List (lists contractor data available to Gov't)
DCAA               Defense Contract Audit Agency
DCAS               Defense Contract Administration Service
DCM St Louis       Defense Contract Management St. Louis
DCMA               Defense Contract Management Agency
DCN                Design Change Notice
DCP                Design Change Proposal - also - Data Change Proposal
DED                Diesel Engine Driven
DEM/VAL            Demonstration / Validation
   PNA-LE;3fccdf3c-47ba-4fc1-80a9-98d1a8468f65.xlsConsolidation6/30/2011
DFARS              Defense Federal Acquisition Regulation Supplement
DFMA               Design for Manufacturing Assembly
DID                Data Item Description (specifies req'mts & format for data submittals)
DLA                Defense Logistics Agency
DMS                Dimensional Management System
DMSMS              Diminishing Manufacturing Sources and Material Shortage
DoD                Department of Defense
DODD               Department of Defense Directive
DODI               Department of Defense Instruction
DR                 Deficiency Report - also - Disposition Report
DREP               Depot Repair Enhancement Program
DRR                Design Readiness Review
DSMC               Defense Systems Management College
DSN                Digital Switched Network (AF system for long distance)
DT                 Developmental Test
DT&E               Developmental Test and Evaluation
DTB                Dayton T. Brown
DTC                Design to Cost
DTLCC              Design to Life Cycle Cost
DTOSC              Design to Operational and Support Cost
DTS                Defense Transportation System
DTUPC              Design to Unit Production Cost
DVT                Design Verification Test
EAC                Estimate at Complete (EVMS)
ECF                Engineering Change Form
ECN                Engineering Change Notice
ECO                Engineering Change Order
ECP                Engineering Change Proposal
ECR                Engineering Change Request - also - Estimated Change Request
EIRT               Executive Integrated Review Team - also - Extended IRT
ELWA               Engineering Lab Work Authorization
EMD                Engineering Manufacturing Development [Phase]
EMI                Electromagnetic Interference
EPA                Economic Price Adjustment
EPC                Estimated Price at Completion
ESSA               Enhanced Supply Support Agreement
ESSI               Engineered Support Systems Inc.
ETC                Estimate to Compete (EVMS)
ETI                Elapsed Time Indicator (Hobbs meter- shows total engine hours)
ETO                Enhanced Technical Order
E-Vault            Electronic Vault
EVMS               Earned Value Management System
F3I                Form, Fit, Function, and Interface
FAI                First Article Inspection
FAR                Federal Acquisition Regulation
FAT                First Article Test
FBL                Functional Baseline (configuration management)
FCA                Functional Configuration Audit (demonstrates system meets requirements)
FEA                Finite Element Analysis
FEDR               Field Engineering Discrepancy Report
FEF                Fix Effectiveness Factor
FER                Finite Element Report
FIR                Field Incident Report
FIT                Fault Isolation Tree
FM                 Field Manual
FMECA              Failure Modes, Effects, and Criticality Analysis
FOC                Full Operational Capability
   PNA-LE;3fccdf3c-47ba-4fc1-80a9-98d1a8468f65.xlsConsolidation6/30/2011
FOD               Foreign Object Debris - also - Falling Object Damage
FOL               Forward Operating Location
FOT&E             Follow-on Test and Evaluation
FPRA              Forward Pricing Rate Agreement
FPT               First Production Test
FRACAS            Failure Reporting, Analysis and Corrective Action System
FRB               Failure Review Board
FRPRR             Full Rate Production Readiness Review
FSB               Field Service Bulletin
FSD               Full Scale Development
FSE               Field Service Engineer
FSP               Forward Supply Point
FY                Fiscal Year
G&A               General and Administrative
GFE               Government Furnished Equipment
GFP               Government Furnished Property
GSI               Government Source Inspection
HAC               House Appropriation Committee
HASC              House Armed Services Committee
HWCI              Hardware Configuration Item (configuration management)
HWTRR             Hardware Test Readiness Review
IBR               Integrated Baseline Review (EVMS)
IC                Improvement Candidate
ICD               Interface Control Drawing - also - Interface Control Document
ICS               Interim Contractor Support
ID/IQ             Indefinite Delivery / Indefinite Quantity (type of open ended contract)
ILS               Integrated Logistics Support
ILSM              Integrated Logistics Support Management
ILSP              Integrated Logistics Support Plan
IMP               Integrated Master Plan
IMS               Integrated Master Schedule
IOC               Initial Operational Capability
IOR               Improvement Opportunity Request
IOT&E             Initial Operational Test and Evaluation
IP                Improvement Project - also - Initial Problem
IPB               Illustrated Parts Breakdown
IPD               Integrated Product Data
IPPD              Integrated Product and Process Development
IPR               In-Process Review
IPT               Integrated Product Team
ISO               International Organization Standard            [Quality standard - ISO 9000] not an acronym
ISP               Integrated Support Plan
ISSL              Initial Spares Support List
ITDP              Integrated Technical Data Package
IWA               Internal Work Authorization
J&A               Justification and Approval
JCS               Joint Chief of Staff
JRMET             Joint Reliability and Maintainability Evaluation Team
KO                Contracting Officer
KPC               Key Product Characteristic
KPP               Key Performance Parameter (part of DMS)
LCC               Life Cycle Cost
LD3               Lower Deck containers (3 refers to the series)
LEL               Loader System Program Office
LIMS              Logistics Information Management System [database at SEI]
LIP               Large Item Parts
LLDT              Lift Link Durability Test
  PNA-LE;3fccdf3c-47ba-4fc1-80a9-98d1a8468f65.xlsConsolidation6/30/2011
LMS                Load Management Systems
LRE                Latest Revised Estimate (EVMS)
LRIP               Low Rate Initial Production
LRU                Line Replaceable Unit
LSA                Logistics Support Analysis
LTS                Long Term Support --also-- Long Term Storage
MA                 Maintenance Action          - also -   Maintenance Availability
MCSP               Mission Completion Success Probability
MDT                Mean Down Time
MFR - or - MR      Memorandum for Record
MHE                Material Handling Equipment
MHS                Material Handling Systems
MIL-HDBK           Military Handbook
MIL-STD            Military Standard(s)
MIPS               Master Integrated Program Schedule - also - Manufacturing Integrated Program Structure
MIS                Manufacturing Instruction Set - also - Management Information System
MM                 Material Management
MOA                Memorandum of Agreement
MOE                Measure of Effectiveness
MOP                Measure of Performance
MR                 Management Reserve - also - Memorandum for Record
MRB                Material Review Board
MRP                Manufacturing Resource Planning - also - Material Review Panel
MRPS               Material Requirements Planning System [master schedule]
MRSP               Mobility Readiness Spares Package
MRT                Mean Repair Time
MS                 Milestone      [MSIII = Milestone III]
MTBCF              Mean Time Between Critical Failure
MTBF               Mean Time Between Failure
MTBM               Mean Time Between Maintenance
MTBMi              Mean Time Between Maintenance -inherent [characteristic of the vehicle]
MTD                Maintenance Time Down
MTMC               Military Traffic Management Command
MTW                Multi-Theatre Wars /or/ Warfare
NCR                Non-Conformance Report
NDI                Non-Development Item - also - Non-Destructive Inspection
NGSL               Next Generation Small Loader
NSA                Nuclear Safety Assessment
O&S                Operations and Support
OA                 Operational Assessment (less formal than OT&E)
OBS                Organizational Breakdown Structure
OCC                Other Contract Costs
OCONUS             Outside the Continental United States
OCR                Office of Collateral Responsibility
ODC                Other Direct Costs
OH                 Overhead
OI                 Operating Instruction
OLVIMS             On-Line Vehicle Interactive Management System (AF system for reporting vehicle maint.)
OPR                Office of Primary Responsibility
ORD                Operational Requirements Document
OSD                Office Secretary of Defense
OSHA               Occupational Safety and Health Administration
OSS&E              Operational Safety, Suitability and Effectiveness
OT&E               Operational Test and Evaluation
P3                 Primevera Project Planner
P3I                Pre-Planned Product Improvement
PAT                Process Action Team           - also - Production Acceptance Test
   PNA-LE;3fccdf3c-47ba-4fc1-80a9-98d1a8468f65.xlsConsolidation6/30/2011
PB                 President's Budget [Basis for Congressional deliberation; Auth&Appr Process]
PBD                Program Budget Decision [[translates SecDef Decisions to Serv Sec; results in PB]
PBL                Production Baseline (configuration management)
PCA                Physical Configuration Audit (ensures hardware matches drawing)
PCO                Procuring Contracting Officer (usually located at SPO)
PCOL               Procuring Contracting Officer Letter
PE                 Program Element (part of AF budgeting process) - also -                      Project Engineer
PEO                Program Executive Officer
PES                Program Engineering Support
PFIS               PIOS Financial Information System
PFR                Program Financial Review
PI                 Program Integrator (function of DCM, St. Louis)
PIDS               Prime Item Development Specification
PIOS               Production and Inventory Optimization System
PM                 Program Manager
PMB                Performance Measurement Baseline
PMD                Program Management Directive
PMR                Program Management Review
PO                 Program Office - also - Purchase Order
POD                Program Office Directive
POM                Program Objective Memorandum (part of AF budgeting process)
POP                Period of Performance
PPBS               Planning, Programming and Budgeting System [Long Term, Mid Term, Near Term]
PPDT               Power Pack Durability Test
PPSL               Preliminary/Program Parts Selection List - also - Program Parts Section List
PPL                Provisioning Parts List
PR                 Purchase Request
PRR                Production Readiness Review
PS                 Program Support --also-- Performance Specification
PSR                Program Status Report
PWO                Production Work Order
QA                 Quality Assurance
R&M                Reliability and Maintainability
RAB                Repairable Assembly Baseline
RAM                Responsibility Assignment Matrix - also - Random Access Memory
RDW                Request for Deviation or Waiver
REA                Request for Equitable Adjustment
RFD/W              Request for Deviation/Waiver
RFP                Request for Proposal
RFQ                Request for Quotation
RGT                Reliability Growth Test
RLA                Repair Level Analysis
RM&A -also- RMA    Reliability, Maintainability, and Availability
RMS                Risk Mitigation Study
ROI                Return on Investment
ROM                Rough Order of Magnitude - also - Read Only Memory
SAF/AQQM           Office of Assistant Secretary of AF (Acquisition), Directorate of Global Reach
SAMP               Single Acquisition Management Plan
SAR                Safety Assessment Report-also-System Anomaly Report-also-Subsequent Application Review
SASC               Senate Armed Services Committee
SCAR               Supplier Corrective Action Report
SCD                Source Control Document
SCN                Specification Change Notice - also - Software Change Notice
SEI                Systems & Electronics Inc.
SEP                Standard Engineering Procedure
SERD               Support Equipment Requirements Document
SIC                Standard Industrial Classification
   PNA-LE;3fccdf3c-47ba-4fc1-80a9-98d1a8468f65.xlsConsolidation6/30/2011
SLEP              Service Life Extension Program
SMC               Space and Missile Systems Center [AF]
SMM               System Maturity Matrix
SOA               Service Order Authorization
SOF               Special Operations Forces
SON               Statement of Need (followed by ORD)
SOP               Standard Operating Procedure - also - Standing Operating Procedure
SORAP             Source of Repair Acquisition Plan
SORD              System Operational Requirements Document (new name-ORD)
SOW               Statement of Work
SP                Standard Procedure
SP&A              Schedule, Performance and Actual -- (cost) [charts at SEI reviews]
SPC               Statistical Process Control
SPD               System Program Director
SPI               Schedule Performance Index [BCWP/BCWS] - also - Special Packaging Instructions - also - Special Process Initiative
SPO               System Program Office - also - System Project Office -also- Specific Procurement Office
SR                Status Report
SRP               Standard Repair Procedures - also - Supportability & Reliability Program
SRU               Shop Replaceable Unit - also - Subassembly Repairable Unit
SSA               Supply Support Agreement - also - Software Support Agency
SSDT              Steering System Durability Test
ST                Special Tooling
STE               Special Test Equipment
SV                Schedule Variance (EVMS)
SWO               Service Work Order - also - Surface Work Order
T&E               Test and Evaluation
T.O.              Technical Order - also - Technical Operations (Tech Manuals)
TAAF              Test, Analyze, and Fix
TAB               Total Allocated Budget
TACOM             Tank Automotive Command - also - Tank Armaments Command
TC                To Complete (EVMS)
TCPI-BAC          To Complete Performance Index to BAC (EVMS)
TCPI-LRE          To Complete Performance Index to LRE (EVMS)
TD                Technical Data - also - Test Director - also - Technical Director
TDP               Technical Data Package - also - Test Discrepancy Report - also - Test Design Plan
TDR               Test Discrepancy Report
TE                Test Equipment
TEMP              Test and Evaluation Master Plan
TIM               Technical Interchange Meeting
TIR               Total Item Record       - also - Test Incident Report
TIWG              Test Integration Working Group
TMCR              Technical Manual Contract Report/Requirement
TMSK              Temporary Mission Support Kits
TP                Test Plan
TPM               Technical Performance Measurement
TPWG              Test Plan Working Group
TQM               Total Quality Management
TRANS             Transportation Squadron
TRR               Test Readiness Review
TRSP              Tunner Reliability and Supportability Plan
TSPR              Total System Performance Responsibility
TSSA              Tunner System Sustainment Availability
TUS               Tunner Unique System [SEI data system]
UB                Undistributed Budget (EVMS)
UCA               Undefinitized Contract Action
ULD               Unit Load Device
ULO               Unliquidated Obligation
  PNA-LE;3fccdf3c-47ba-4fc1-80a9-98d1a8468f65.xlsConsolidation6/30/2011
UPC               Unit Production Cost
UPCC              Unit Price Commitment Curve
UUT               Unit Under Test
VAC               Variance at Complete (EVMS)
VAR               Variance Analysis Report (EVMS)
VCR               Validation Completion Report
VDP               Vehicle Deadlined for Parts
VECP              Value Engineering Change Proposal
VIC               Vehicle in Commission
VMR               Variation Measurement and Reduction 9 (part of DMS)
VOC               Vehicle out of Commission
VpCI              Vapor Phase Corrosion Inhibitor
VSA               Variation Simulation Analysis (part of DMS)
W/O               Work Order
WBEL              Wide Body Elevator Loaders
WBS               Work Breakdown Structure
WBSE              Work Breakdown Structure Element
WI                Work Instruction
WR-ALC            Warner Robins-Air Logistics Center
WRM               War Readiness Material
WRSK              War Readiness Spares Kit




  PNA-LE;3fccdf3c-47ba-4fc1-80a9-98d1a8468f65.xlsConsolidation6/30/2011

								
To top