scope of work template
							IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved
nor intended to serve as a standard form. The user of these documents should confer with qualified advisors with respect to its commissioning and other documentation.


         151                                                        HVAC QA ISSUES LOG                                                                                          DATE: 12/24/0

Owner's DDC System Installation Project
   ITEM           ID        Notification                                            ISSUES                                                ACTION REQUIRED                 CHECKED
                                                                                                                                             PARTY             DATE
    NO.         DATE          DATE                                                    LOG                                                   Responsible        REQ.           BY
                                           General
     5         1/12/04       1/14/04       Owner's Point naming convention has not been followed
                                           QA reviewed Cont.'s handout - more still needs to be done to follow point naming
     5                       1/21/04       convention - offered to mark it up
                                           QA to review point names on graphics and provide comment to Cont. once Cont.
     5                       3/10/04       provides document
     5                       4/14/04       QA documented point name corrections on Cont.'s spreadsheet.
     5                       6/17/04       QA edited Cont.'s point name spreadsheet, adding soft points for Main Building
                                           QA to provide the remainder of corrected hard and soft point names. Update
     5                       6/22/04       provided 7/2/7/04 based on feedback from Cont..
                                           Point name corrections are still to be completed. QA provided access to program
                                           and has began making revisions to point names and trend names in program per
     5                       8/13/04       7/27/04 spreadsheet.
                                           Met terminal box point names are still to be revised and zone controller
     5                        9/1/04       Co/HeReset% trend wires added in FBs. See 9/2/04 spreadsheet                                         Cont.          9/19/04        QA
     6                       2/19/04       Override stat location vs. isolation area needs to be worked out
     6                       3/17/04       QA provided marked up prints and description of zone blocks and requirements
     6                        6/2/04       QA provided update to Cont.'s programmer
                                           Cont. indicated programming has been completed but it is noted that warm-up and
     6                       6/22/04       overrides are not interfaced properly
                                           What is the status of schedule override blocks for MnCVRH1-3, MnVAVRH1-8,
     6          8/5/04       8/13/04       MnVAVRH2-31: are they included and where?

                                           MnCVRH1-3 is by itself but should not have override capability. QA zeroed out
     6         8/28/04                     override on time. MnVAVRH1-8 override is included as specified.

                                           MnAC2 terminal boxes do yet have their override blocks, which includes 2-31a/b,
     6         8/28/04       8/30/04       programmed as specified in QA's 8/28/04 Schedule Override Blocks.doc.                                Cont.          9/19/04        QA
     7         2/24/04       2/25/04       Cable tied to conduit needs to secure and free of sags                                                (2)
                         IT recommends that historical data be installed on the D:/ drive; its much larger than
8    3/12/04   4/23/04   C:/. Completed with the installation of V2.5                                                                 QA

18             4/27/04   Need to define location of CO2 Sensors: conference rooms and cafeteria
                         5 conference rooms in Main and 1 in Met. Cafeteria is not included because it does
18              5/5/03   not have an operable outside air damper.
                         Cont. to work with QA to draft a memo training staff on the use of the zone
24             4/28/04   thermostats                                                                                Team    5/24/04   QA
                         Zone thermostats should only indicate zone temperature and not blink outside air
25              5/3/04   temperature                                                                                Cont.             QA
                         Similar point names should use % for a PID output and V for volts/analog output.
29              6/2/04   QA 8/6/04: QA to complete revision                                                         QA                QA

82   8/28/04   8/30/04   Why do we not have archived data? Data removed from database for use in SOAP.               (2)

                        Label all wiring per spec sections 3.07.A.8. and 3.11.A. Include point name and
64             8/12/04  address.
                        Inspected w/ Cont. & Operator: Unfinished items in Main chiller room and on Met
64             10/26/04 roof remain.                                                                                Cont.   11/1/04   QA

                         Label all panels per spec section 3.11.C. This also applies to abandoned-in-place
65             8/12/04   panels used as wiring junction cans.                                                       Cont.   8/31/04

65             10/26/04 Inspected w/ Cont. & Operator: Unfinished items on Met roof remain.                         Cont.   11/1/04   QA
                        Identify all control components per spec sections 3.11.D. and 3.11.E. Provide
66              8/12/04 terminal box label at the entrance location on Tbar, if box is located above the ceiling.   Cont.   9/19/04
66   10/5/04   10/19/04 QA: Not all complete; example VAVRH1-19 in room Mn127                                                         QA

                         If the old static pressure Pitot tube sensors are no longer used, remove the
68             8/12/04   pneumatic tubing and the Pitot tubes. Plug the duct opening.                               Cont.   8/31/04   QA
69             8/12/04   MGTF Building: Correct the panel label that reads MTEng..                                  Cont.   8/31/04   QA
                         MGTF Building: Relocate the temperature room sensor to the office which is the
70             8/12/04   conditioned space.                                                                         Cont.   8/31/04   QA


72             8/12/04   Insulate all piping where sensors are installed.                                           Cont.   8/31/04   QA
                         Schedule implementation of optimal start and stop programs. Cont. to contact
73             8/13/04   Operator2 to set up a date by 10/1/04.                                                     Team    8/31/04   QA
                            MnL16CommRoom logic does not require a setpoint controller or outgoing requests.
99               10/6/04    It is just a sensor as in MGTF.                                                          Cont.      11/1/04    QA


                          Submittal #4: O&M manual - QA provided comments on Asbuilt Drawings10/23/04.
                          Eng. provided comments 10/25/04 QA needs to update spec. and return to Eng..
                          11/9/04: QA provided comment to Eng.. 11/22/04: Eng. provided as-buit spec to
                          Cont. QA 11/22/04: Spec needs to include the update for Met DDVAV and Met
                          Electric Reheat Only. 12/13/04: Cont. e-mailed updated as-built spec to QA & Eng..
                          12/14/04 QA: Provided comments to Cont.; Eng. to update and reissue. 12/15/04:
                          Cont. provided complete update of as-built docs. 12/16/04: Cont. submitted Project
                          Close Out documentation on CD, and FedExed a copy to Eng.. Cont. requests all to
                          provide comments/feedback as soon as possible so that this documentation can be
106              10/20/04 finalized, and the specified three hard copies of this information can be provided.         Eng       12/20/04

107              10/20/04 Submittal #4: Training Plan 11/9/04: Comments provided by Eng. and QA                      Cont.      11/16/04   QA
                            Formal Training by Contractor: Owner needs to schedule date and determine who
                            will attend. Cafetria 11/17 &11/19 9:00 AM to1:00 PM Operator, Operator2,
108              10/20/04   HVAC.Maint.Cont., Operator3., Operator4                                                  Cont.      11/17/04   QA
109              10/25/04   Systems Manual                                                                            QA        12/23/04   QA
                            Server needs to automatically come back up after a power outage. I've asked IT to
110              10/25/04   investigate.
                            Cont.'s service techs needs Cistrix. He has yet to fill out new forms. 10/29/04 Forms      IT          ?       QA
                            sent to Owner. Cont. to provided contact info 11/2/04. Waiting on IT. 11/8/04: IT
                            issued e-mails. IT will contact Cont.'s programmers and techs. QA 12/2/04: Cont.'s
                            service techs have their log-ins completed; Cont.'s service tech1 has the software
                            and key; Cont.'s service tech2 is waiting to receive the software and key. Cont.
                            12/15/04: Cont.'s service tech1 has left Cont.; Cont.'s service tech2 has his and its
                            working; Hiring someone to replace Cont.'s service tech1. IT 12/15/05: Cont.'s
111              10/20/04   service tech1 needs to turn his key into IT; address provided.                           Cont.      12/23/04   QA
                            Staff needs training for recovering Standards Lab after a Chilled Water or Hot Water
                            Valve sequence has enabled the "out of range breaker". Sequence will need to be
119   10/30/04   11/9/04    manually reset.                                                                         Cont. (8)   11/19/04   QA
                            As-builts: Where is the explanation of how to back up the data base to save the
                            trends? Is this automated? If not the procedure must be described. QA: #37 of
124   11/9/04    11/17/04   Training document.                                                                       Cont.      11/19/04   QA

127   11/9/04    11/17/04 Cont. needs to provide comments on project specification.                                  Cont.      12/17/04   open
                          MnAC1 & 2 terminal units were not scheduled for Nov. 11 holiday; building is
128   11/11/04   11/17/04 running; need training on use of schedules                                                 Cont.      11/19/04   QA

130   11/17/04   11/17/04 Trend sample times need to be adjusted per spec. To be completed 12/10/04                  Cont.      12/8/04    QA
                          Team needs to complete Functional Witness Testing such that failed items are
                          resolved. 11/22/04 Conducted tests; not all items are resolved. 12/3-4/04
                          Conducted additional tests. 12/10/04: Tests completed subject to memo from Cont.
131   11/17/04   11/17/04 regarding heating valves for VAV2-6 and 7 being correct. See #103 below.                  Cont.     12/10/04    QA
                          Cont. and IT need to move server to basement comm room at completion of project.
132   11/17/04   11/17/04 Cont. to schedule a date w/ IT. Cont. 12/15/04: Server moved and functional.            Cont./IT                QA

                          After the server is moved to the basement comm room, what physical access does
                          the contractor need to the comm room to fullfil the warranty requirements of the
142              12/10/04 contract? IT 12/14/04: Cont. to work with Owner if access is needed.                       QA       12/15/04    QA
                          Cont. is requested to submit a letter of successful completion of the project with a
                          warranty start date of 12/15/04, and two spaces (for Owner's project manager and
                          QA) for approval sign off. Upon receipt of this letter, Owner's project manager will
                          process the final invoice. Cont. has submitted this to the Cont. process. Owner's
144              12/15/04 project manager will be receiving this letter via email in the next day or so.            Cont.     12/23/04   open
                          Cont. is requested to turn in all access cards and keys. Cont. and programmers
                          have provided these to Owner. Cont. is still collecting the others and will submit to
145              12/15/04 Operator2 as soon as possible.                                                            Cont.     12/23/04 Operator2
                          Cont. is requested to submit unconditional waiver upon final payment from Owner.
146              12/15/04 12/16/04: Cont. concurs.                                                                  Cont.     12/23/04   open

                           Graphics
                           QA reviewed owner's other site graphics w/ Cont.; they are aware of the level of
9.1              3/24/04   quality we are looking for.
9.1              3/31/04   QA provided Cont.'s programmer a thorough review of graphics issues

9.1   4/12/04    4/13/04  QA documented graphics issues; e-mailed to Cont. & Cont.'s tech
9.1              6/24/04  Detailed comments on graphics pages provided to Cont. by QA
                          See 4/13/04 and 6/24/04 reviews by QA. QA completed markup of graphic pages
                          provided by Cont.. As of 8/13/04 not all requested changes have been made. We
46                7/30/04 need to look at this together.                                                          Cont., QA   8/31/04
46               10/19/04 QA: some minor stuff remains, but will not push it.                                                             QA
                           MnAC7 and MnAC8: where is the return duct? Needs both OA and RA, OA is fixed.
9.2   3/26/04    3/31/04   6/23/04: QA noted that this is true also for MetAC1,4,5
9.2   8/5/04     8/13/04   MnAC7 and 8 have RA, MtAC1, 4, and 5 have OA. Make all RA                                Cont.     8/31/04     QA
9.3   3/26/04              MnAC3 - why 2 discharge ducts?                                                            (2)
9.4   3/26/04    3/31/04   MnAC4 - No outside air on this unit                                                      Cont.                 QA
9.5              3/24/04   VFD's need correct point naming labels. Revised by QA 8/13/04                            Cont.                 QA
                           VFD graphic needs to include a status point indicating whether or not the VFD is in
11               4/14/04   "hand" mode                                                                            Cont.   8/31/04
11               10/4/04   VFD "Hand" graphic put on air handler graphic page - OK
                           MnAC4 HoW S R Temp sensors are located at the air handler. MnAC4 HoW Xovr                                QA
                           valves are mounted in the Mn Boiler supply and return piping to the MnAC4. MnAC4
                           HoW Xovr valves need to be added to AC4 boiler graphics and sensors located
14.1   4/23/04   4/26/04   appropriately.                                                                         Cont.             QA

14.4             8/13/04   HoWS Local and HoWR Local should be located on the local boiler side of the tees       Cont.   8/31/04   QA
14.2   4/23/04   4/26/04   MnAC4 ChW S R Temp sensors are backwards.
                           MnAC4 ChW S & R Temp sensors are still backwards. Supply should be the lower
14.2             8/4/04    one.
                           MnAC4 ChW S&R Temp sensors are located at the air handler. MnAC4 ChW Xovr              Cont.   8/31/04   QA
                           valves are mounted in the Mn Chiller supply and return piping to the MnAC4.
                           MnAC4 ChW Xovr valves need to be added to AC4 chiller graphics and sensors
14.3   4/23/04   4/26/04   located appropriately.                                                                 Cont.             QA

14.5             8/13/04   ChWS Local and ChWR Local should be located on the local chiller side of the tees      Cont.   8/31/04   QA
                           QA/Operator2: Main space color graphics needs improvements. QA to document
32     5/25/04   6/23/04   and forward to Team                                                                     QA     6/24/04
34     6/23/04   7/15/04   Need RH only graphic for units in Main Building                                        Cont.             QA
                           Location (building-room number) of thermostats needs to be provided above stat
35               6/24/04   graphic                                                                                Cont.
36     7/7/04    7/15/04   Need second floor main building graphic                                                Cont.             QA
                           Main Building Basement graphic is incorrect. L16 and electric meeter in wrong place.
37     7/7/04    7/15/04    See graphic dwgs provided by Owner                                                                      QA

37               7/30/04   Graphic is OK except meter needs moved. See 7/30 marked up pages.                      Cont.             QA

                           MnAC1 and MnAC2 Zone Condition Monitor tables: add Airflow Setpoint and Htg
                           Valve Position;data below "Status in Room" should indicate the room number
47     8/2/04    8/13/04   (Mn101). Provided marked up printout 7/30/04 and 8/28/04.
47     10/1/04   10/4/04   Mode is not functioning                                                                Cont.     ?       QA
                           MtAC3 dual duct VAV box graphics need Hot and Cold deck supply air
48     8/4/04    8/13/04   temperatures. See 7/15/04 memo and 7/30/04 marked up pages.
48               9/23/04   Delete "From Ahu XX.X"                                                                 Cont.     ?       QA
                           MtAC3 Zone Condition Monitor tables: label Damper Pos with appropriate duct; add
                           hot and cold duct supply air temps; data below "Status in Room" should indicate the
                           room number (Mt201). Note data in terminal box graphic is not same as in table. See
49     8/4/04    8/13/04   MtDD-1.
49     10/1/04             Mode is not functioning for CO boxes                                                   Cont.     ?       QA
                            MnAC5 Zone Condition Monitor tables: add Airflow Setpoint and Htg Valve Position;
50      8/4/04    8/13/04   data below "Status in Room" should indicate the room number (Mn151).
50     10/1/04              Mode is not functioning                                                                     Cont.           ?      QA
51     8/4/04     8/13/04   Provide graphic for MnCVRh3-1.                                                              Cont.        8/31/04   QA
71                8/13/04   Include CV and Rh only boxes in the AC1 zone table

71     10/1/04    10/4/04   1-3 still needs to be added                                                                 Cont.        11/1/04   QA
                            CO2 sensor level and setpoint in ppm need to be added to their respective terminal
77     8/20/04    8/20/04   box graphic                                                                                 Cont.        8/31/04   QA

79                8/20/04   MtAC1 stat is in Mt109, not Mt108. This needs to changed on the Met graphic.                Cont.        8/31/04   QA

                            Heat Source link on MnAC1, 2, 3 & 5 terminal box graphics needs to jump to MnBlr
85     8/30/04    8/30/04   not the air handler. Appropriate links have yet to be installed on Met terminal boxes.      Cont.        9/30/04   QA
                            MnBlr is showing 3 ConRP; need to confirm that there is actually two and revise
93                9/23/04   Cont.rdingly                                                                                Cont.          ?       QA
                           MGTF graphic only provides color; it needs to provide the actual temperature like
104               10/23/04 ML16 CommRoom.                                                                               Cont.        11/1/04   QA

135               11/22/04 MnCCVRH1-3: upper right hot links are not visable; coolsource link does not function         Cont.        12/3/04   QA

138               12/2/04   MtAC3 mixed air damper graphic should read "% open"                                         Cont.        12/3/04   QA

149    12/16/04             Warranty support: MtRH101 and MtRH108 graphics pages are not accessible.                    Cont.          ?

                            OAT                                                                                          (6)

                            ACs

                            MnAC1&2 needs SAF HiStcPres Alarm paged. Reviewed program with Eng. and
17.1              4/27/04   Cont.'s programmer. Not to spec. Cont.'s programmer will revise and resubmit.
                            Cont. discussed with Eng.. To implement a hard reset at the panel in the Loft but will
                            use a soft relay. Tried to locate the button. Where is the button? In cabinet near
17.1              6/23/04   AC1ChWVlv.

                            Install each duct static pressure resets per spec section 3.03.D.1.d and shall include
17.1              8/12/04   a reset button and a pilot light indicator on the face of the associated panels.            Cont.        9/19/04
17.1                        MnAC1&2: Pilot lights and reset buttons are installed                                                              QA
                            Need HiPresStatic Alarm reset procedure for each airhandler which uses it. This
17.2    8/4/04    8/13/04   would be for training and use in the systems manual                                      Cont., (5, 8)   8/31/04   QA
40                 7/7/04   Shouldn't return fan be locked out when the return damper is at 0%?
40                 9/1/04   Revise MnAC1&2 graphic to show barometric relief                                          Cont.         9/1/04    QA
                            MnAC2: zero flow to the following boxes do not read zero: VAVRh2-22, 2-24, 2-25, 2-
41     7/7/04     8/13/04   A number of Main Bldg boxes are
                            27, VAV2-6, 2-9. See QA data. not reading zero when air handlers are off. Mn1-
                            16 = -33%; Mn2-25 = -40%; Mn2-33a = +33%; Mn2-33 b= +15%; Mn5-3 = 10%
41                10/23/04                                                                                             QA                     QA
59    8/5/04       8/13/04 Why are we getting a HighStcPres Alarm on MnAC1 on start-up?                               Cont.        8/31/04
59    10/1/04              QA increase delay from 10 minutes to 20 minutes                                                                    QA
                           MnAC1 and MnAC2 fans operated Saturday morning (10/30/04) for a few minutes.
                           No zone appeared overridden. Why? Check if zone is in setback. Setback Mode is
                           not trended. The lowest zone temps on MnAC1 & 2 were down to ~55 Deg.F from
                           7:00-8:30AM. This is above Setback Mode starting setpoint of 50 to 52 Deg.F.
117   10/3/0/04    11/2/04 Cont.: Needs to be verified by team.                                                         (7)
                           MnAC3 does not need to be scheduled on. The HVCR is used infrequently and staff
                           is used to using an on timer. Can local override provide an total of 8hrs on time per
16    4/27/04      4/28/04 use and users trained? Yes.
                           MnAC3: once VAVs are operational and stat is installed, stat can be programmed for
                           2hr increments; max time for this equipment is only 224 minutes. Program my be
16                 4/28/04 forthcoming in November to change this to 8 hours.                                      Cont., (4, 5)              QA
                           MnAC3 chilled water valve is at 100%, while zone is calling for heating. Why? No
129   11/11/04    11/17/04 longer occuring.                                                                           Cont.        11/19/04   QA
 1    12/17/03    12/17/03 AC-4 valving to alternate chillers and boilers need to be automated
 1     1/14/04             Owner received quote from Cont.
                           At a minimum, we need some form of DDC indication as to the status of the position
1     1/15/04      1/16/04 of the manual valves if they are kept.
1     1/21/04              Cont. sequence is incorrect; house steam boiler is normal operation for MnAC4
                           Discuss valving requirements in meeting; Cont. proposed valving modification and
1                   2/4/04 will develop sequence

1                 2/27/04  Cont. sequence as submitted is incorrect. House boiler is primary supply for MnAC4.
1                 3/10/04  Cont. submitted new sequence; QA to review and define point names
1                 3/16/04  QA provided comments to Cont. and Taylor Engineering
1                 3/24/04  Eng. asked if all information agreed upon.
                           MnAC4Chlr ChWP Run and MnAC4Blr HoWP Run should be interlocked with Xover
1      8/6/04      8/13/04 Valves. Eng. to provide specification revision.
                           Spec revision revised again and approved by QA and Eng.. Program is yet to be
1                 10/19/04 installed. 10/21/04 - Program installed.                                                 Cont., (6)     10/19/04   QA

                            Does the MnAC4 Nortec Humidifier setpoint adjustment need to be automated? Eng.
2.1   1/15/04     1/15/04   to review; we at least need the setpoint monitored and a paged alarm                      Eng
2.1               3/24/04   Cont. to propose sequence for using the Nortec and dew point control.                     Cont.
2.1    8/4/04               No reset was implemented but Nortec status is monitored and alarms provided.                                      QA
                          QA: Rotronics dew point sensor will not be used. Cont. to provide acceptable
2.2              4/7/04   alternate.                                                                                  Cont.                    QA

                          MnAC4: Need sequence for Standards lab if Chiller 1 is required to run. Mn Chiller
 4    2/24/04    4/7/04   sequence modified 6/21/04 to maintain 42 deg.F if MnAC4 is on                            Team, (6)                   QA
19              4/27/04   MnAC4: Can TempSpAdj be eliminated? Yes                                                                              QA
                          If MnAC4 Boiler Xovr Alarm is too be used it should only indicate if valves are
26    5/21/04   5/28/04   opposite                                                                                    Cont.
26                        Alarm has been removed.
                          QA discussed with Cont.'s programmer the need to add a +/-4 deg F. hysterisis to                                     QA
                          the MnAC4 ChWVlv and HoWVlv zone temp breakers. 4 and 2 are used
30               6/2/04   respectively.                                                                               Cont.                    QA
                          MnAC4 ChWS and R sensors are grossly inaccurate. Calibrate & reinstall or replace
60               8/4/04   with better sensors.

                         Cont. indicates that theses have been recailibrated. ChWS Temp is ~ 9 deg. F
60              10/19/04 greater that chiller leaving temperature measured with a Pete's plug gauge.
                         MnAC4 ChWS and R sensors appear to be impacted by room temp. At cool bldg
                         temps (<65) the ChWST is close to the measured chiller leaving temp (37.5 ~ 38.8),
                         but as the building warms, the CHWST & RT rise, but the chiller leaving temp
                         doesn't. They need to be replaced with ones in thermal wells, preferably at the
60              10/20/04 chiller.                                                                                     Cont.         11/1/04
60              10/28/04 New sensors were installed in thermall wells at the coil.                                                             QA
                         Standards Lab panic button needs to be documented and functional tested.
123   11/9/04   11/17/04 Functional test to place 11/19/04.                                                           Cont.         11/19/04   QA

                          MnAC5 1) economizer control logic is not the same as MnAC1(spec). 2) "or"
12    4/19/04   4/21/04   statement in econ lockout logic is miss wired. 3) RADmpr% trend wire is mislabeled        Cont., (6)                 QA

                          MnAC5 4) DAT >> RAT and ChWVlv open, Fan Not Running! Why? Contractor had
                          been working around original pneumatic system downstairs, may have disturbed the
13    4/19/04   4/19/04   tubing. Unit is now cut over, but the old equipment still needs to be removed.               Cont.                   QA
                          MnAC5: Air flow is inadequate at zone boxes, SF is manual and VFD is at 15% and
39    7/7/04    8/13/04   HiPresStatic Alarm is on.
39    8/4/04    8/13/04   Need HiPresStatic Alarm reset procedure for training and systems manual.                See 17.2 above.
                          MnAC5SF is shutting down on Low Static Pressure during warm-up. Raul checked it
                          out. He thinks that the switch is defective. Will replace if it happens again. 11/21/04
126             11/9/04   MnAC1, 2 and 5 sensors are to be replaced.                                                   Cont.        12/3/04    QA

133             11/17/04 MnAC1 and MnAC2 need low pressure cutout per spec.                                           Cont.         12/8/04    QA
                         MnAC5 RADmpr is being closed during warm-up. This impacts the fans ability to
136             11/22/04 heat the space. It appears this may also be true with MnAC1 and MnAC2.                       Cont.         12/3/04    QA
 10   3/26/04            MnAC7: Temperature is rising across DX coil
                            MnAC7: This is because the system is recirculating air through the return duct, which
10     4/13/04              has been omitted from the graphic.                                                           (2)
                            MnAC7 and 8: Spec calls AC7 the unit that serves the cafeteria; the program says
                            that it is the unit that serves the kitchen. AC7 serves the kitchen. The spec needs
20                4/27/04   changed                                                                                      QA                   QA
                            MnAC7& 8: Is compressor cycling lockout part of equipment or does it need to be
21.1   4/27/04    4/28/04   installed in program? A five minute timer is in the program.                                Cont.      8/31/04    QA
                            MnAC7& 8: 2nd Stg Cooling PID range is not correct. 2nd stage cooling PID OK per
21.2   4/27/04    4/28/04   Eng.                                                                                        Cont.                 QA
                            MnAC7: why does stat display 2 numbers? Second number is for outside
22     4/27/04    5/19/04   temperature. It is now removed                                                                                    QA
                            Small AC units (MnAC7&8, Count Room AC, MetAC1,4,5 and WhAC1&2 all require
84     8/28/04    8/30/04   TempSpAdj trend wires to be added to FB                                                     Cont.      9/19/04    QA
                            Sensors currently installed in the Environmental Chambers will need to be replaced
28                5/28/04   with appropriate sensors.
                            QA reviewed spec and Vaisala products with Cont.. Vaisala 61W is not satisfactory.
                            A Vaisala 247 or similar product is specified. On 6/23/04 it was agreed to use the
28                6/22/04   Testo 650HPW.
                            Testo sensors installed, but transmitter cover is missing from the transmiter in the
28     8/12/04    8/13/04   West chamber.




28     8/19/04    8/20/04   Environmental chamber humidity and temperature sensors are still not operational.           Cont.      8/31/04    QA
                            MtAC2 OADamper does not close during unoccupied periods. See 3.03D.2 and
                            TE44 (damper is trended; but its not programmed properly) 11/21/04: Cont.'s
118    10/30/04   11/1/04   programmer says he fixed it; QA to check                                                  Cont., (6)   11/19/04   QA

                            MtAC3: RA Temp is not on original points list but is noted in the logic. Is this RAT of
63      8/6/04    8/13/04   another MAT in the heating duct? If real add to graphics in appropriate place.              Cont.      8/31/04    QA
                            MtAC3 oscillates between Cool1 and Cool2. Increasing the delay timer to 15 minutes
                            on 9/1/04 did not reduce the oscillation. Increase cycle time if possible.
90                9/2/04    Eng.10/25/2004: 15 minute cycle is OK.                                                      Cont.      9/19/04    QA
                           MtAC3 warm-up and cool-down sequences currently allow the fans to run anytime
                           after 3:00AM when the building is unoccupied and other conditions permit. This
                           allows it to run on weeQAds. It should be using a schedule as MnAC1. Also, the
                           heating PID loop is not programmed as specified. 11/21/04 QA to check results of
                           updated program. QA 11/22/04: Cooling fan does not run during warm-up but
                           spaces do not come up to temp fast enough as hot air flow falls off. Cooling air-flow
                           comes on at occupancy even without a request for cooling. Cool air from bypass
                           damper cools hot air supply. Cont.'s programmer is in the process of fixing. QA
                           12/3/04: Looks correct. Final approved sequence needs to be put into the as-built
113   10/29/04   11/1/04   spec., see #106 above.                                                                     Cont./Eng   12/3/04   QA

                          Even with the cool morning, MtAC5 needed cooling but it was locked out due to low
                          OAT. An OAT based cooling or heating lockout is not in the spec. (3.03.O.3).
                          Remember, these units do not have economizers. Remove lockout logic from
102                       It appears we have similar units.MtAC2 still to be done.
                 10/20/04 programming for all confusion over which unit is MtAC1 and MtAC5. When the                    Cont.     11/1/04   QA
                           Current Facilities Requirements doc was being developed Joe indicated to me that
                           MtAC5 provided conditioned air 24/7 to Mt109, where the SEM is located and Mt
                           108, the small room next door. MtAC1 provided conditioned air 6-6 M-F to the Met
                           lab in Room Mt106 and the darkroom adjacent to it in room Mt107. This later went
                           into the spec. Once the installation of DDC hardware was completed, Cont. techs
                           noted that this was backwards and programming and documentation was changed
                           accordingly, which includes my recent mark-up of the spec. Unfortunately, I believe
                           this may now be incorrect. Saturday, the Met color graphic indicated that the unit
                           supporting Mt106 was on not Mt109. A test of the zone overrides seemed to verify
                           this to be the case. This needs to be cleared up once and for all. Appropriate
                           changes, if necessary, will need to be made on graphic pages, point names,
                           schedules, equipment labels if need be, and in the CFR and Spec. 11/2/04:
                           Program complete but not spec. 11/9/04 QA provided comment on spec revision to
116   10/30/04   11/2/04   Eng.; Eng provided update to Cont.: See #116 above

                          Terminal Units
                          Many boxes have 78 deg.F unoccuppied setpoints, thus requesting the chiller to
43    7/19/04     7/21/04 come on over the weekend. Spec indicates this should be 90.                                   Cont.               QA
                          Met dual duct vav boxes: check for proper installation. Both hot and cold ducts are
53    8/4/04      8/12/04 reading airflow. See all boxes MtDD-1 to MtDD-8.
53    10/1/04    10/19/04 QA: OK except MtDD-8 hot deck air flow is not reading - damper is at 100%
                          QA & DM investigated MtDD-8. Determined that spec requires Heating Supply Fan
                          to turn off if not required. The program currently switches between cooling airflow
                          and heating airflow depending on zone controller ouput, staying in heating until
                          cooling > 0. It provides no flow if still in heating (0%) when the heating fan turns off.
53               10/22/04 See 3.03U.4b Damper Control. 10/29/04: Eng. to work with Cont.
                         Cont. to change program so that Cool fan is not running on Warm-up mode. Start
                         heating fan for warm-up or heating when scheduled. 11/21/04 Cooling fan still
53               11/2/04 running during warm-up.                                                                 Cont.   11/19/04   QA
                         MtDD-8: Hot damper is wide open, flow is 0; cold damper is closed, flow sp is 80,
97    10/5/04   10/19/04 flow is 30. See #53 above.
55    8/5/04     8/13/04 Delete CO2 sensors in the GEO tree of MnRh107, 108A and 109                             Cont.   8/31/04    QA
                         If a Zone controller is used in the logic program, add trends for Clg% and Htg%. For
57    8/5/04     8/13/04 example: MnVAVRh1-10                                                                    Cont.   8/31/04    QA
                         MnVAV2-8 and 2-9 thermosstats are connected to opposite boxes. This has caused
78    8/20/04    8/20/04 some confusion upstairs.                                                                Cont.   8/31/04    QA
                         Mt108 and Mt101 have additional original stats that control electric reheat. Need to
                         address this in an FB and graphics. Cont. has submited Change Order request.
                         Owner's project manager wants to CO reissued based finalized cost info. Cont.:
80               8/23/04 Official CO pending. Will proceed with installation.                                    Cont.   12/8/03    QA
                         MnVAVRH31a/b: both ducts are cooling; why is one shown as heating? Why is CO2
83    8/28/04    8/30/04 included?
                         Cont. to revise MnVAVRH31a/b FB such that the 2nd duct and its variables are
83                9/1/04 noted as a cooling duct 2 and CO2 sequence is removed.                                  Cont.   9/19/04    QA
88                9/2/04 Change termianl box setpoint controller color hysterisis to 0.3.                        Cont.   9/19/04    QA

                          Many main building VAVRH terminal boxes heating valves oscillate. This particularly
89               9/2/04   impacts the spaces served by reheat only boxes.                                        Cont.   9/19/04    QA




92              9/23/04  Noise coming from VAV box 2-8 in 2nd floor Main building                                Cont.   11/1/04    QA
                         MnAC1 and MnAC2 VAV boxes are not providing more than minimum air flow when
                         heating is required due to that fact that airflow controller Heat Mode is not enabled
                         when zone controller HTG % output is greater than 50%. 10/21/04: Numerous
                         zones are very cold; Heat Mode was enabled manually. This is a factory program; it
100             10/19/04 needs fixed ASAP.                                                                       Cont.




                         Fb's have been replaced, but logic blocks on screen are not as programmed.
100             10/22/04 10/25/04Ok after server was rebooted.                                                   Cont.   11/1/04    QA
                           MnVAVRH2-7 hot water re-heat valve is not providing heat. Cont.'s tech thinks it is
                           plugged. Note, Tstat is behind construction screen. 10/28/04: Cont. found strainer
                           plugged. This may be true elsewhere including 2-6, 2-30, 2-31a/b and 1-16.
                           11/2/04: MnVAVRH1-16 balance and shut-off valve were closed - Cont. opened
                           them. MnVAV2-30 Tstat is located behind construction partition, raised supply air
                           setpoint 5oF. MnVAV2-31a/b looks like 3-way is piped backwards - Contractor
                           adjusted the bypass, he feels that it's piped correctly. MnVAVRH2-6 may not have
                           enough capacity -- Cont. to check. 11/21/04: MnVAVRH1-9, 2-6, 2-7, 2-30 and 2-
                           31a/b boxes are not providing sufficeint heat. We need to checked the airside on all
                           of these. See witness test requirements. Cont. 11/30/04: Tuned 2-31a/b. Cont.
                           12/2/04: Confirmed airflow is within 5%. SA Temp adjusted up 5oF. Added foam
                           backing placed behind stats. Check tomorrow.        QA 12/3/04: All HoWValves are
                           controlling except for 2-6 and 2-7. Cont. needs to confirm correct valves sizes were
103              8/23/04   installed. QA 12/15/04: Cont. provided doc.                                               Cont.   12/8/04    QA
                          Reheat only terminal box MnRh1-109 in Mn109 seems starved for air. It takes a very
                          long time to warm up. 10/04: Raised SAT setpoint to 105oF. QA 12/3/04: Raised
105   10/23/04   10/25/04 SAT setpoint to 110oF.                                                                      (1)               QA

                          Operator Indicates that he's talked to Cont.'s programmer about the overrides not
                          working in the Met Building. 10/30/04: Tested MtDD8 on Saturday. Only it goes
112   10/29/04   10/30/04 active instead of the entire floor. Also, on time is 30 minutes instead of 1 hour.         Cont.       ?      QA
120               11/2/04 MnVAVRH2-9 heating PID is oscillating.                                                     Cont.   11/19/04   QA
                          Rooms Mn110 and 110A are cold. Stat does not appear to be communicating
125               11/9/04 properly with MnVAV2-20. Raul replace wiring and controller. Its working now.              Cont.   11/19/04   QA
                          MnAC1, 2 and 5 OADamper is opening to the "OADmpr Min" position druing setback
                          and warm-up. MnAC5 OADmpr is also open during the unoccupied period. They
                          should be closed at these times. 12/10/04: MnAC5 OADmpr is still open during the
137               12/2/04 unoccupied period. Cont.: Fixed. QA to check.                                              Cont.   12/8/04    QA

                           QA: When a zone goes into setback, which zones go live: only the unit that is below
                           setpoint, the block of zones used for override, or all zones served by the air handler?
                            [Eng.] The related isolation zone which is the block of zones used for override. QA
                           12/4/04: Tested setback, only zone in setback goes live. Change per Eng.'s
                           comment. Program update arriving 12/10/04, QA to test 12/11/04. 12/11/04: Unable
                           to perform test. Cont.'s programmer revision to the override programming has
                           locked the system on 24/7 in both Main and 2nd floor Met, but not in 2nd Floor Main.
140   12/3/04    12/4/04   Called Cont. to correct. 12/13/04: Corrected 12/14/04: Checked OK                         Cont.   12/10/04   QA
148              12/6/04   Cont.: CO2 sensor in contractor's room (Mn134) will be replaced                           Cont.   12/23/04
                           Warranty support:MnVAVRH1-7 is operating outside of standard schedule. Local
150   12/16/04             override is not enabled. MnAC1 is being energized to early.                               Cont.   12/23/04
                            If a local zone goes into setback, its group of zones are also suppose to come on in
151    12/18/04             setback with unoccupied setpoints. They are currently coming on with occuppied          Cont.   12/23/04

                            ChW Pumping

                            Chilled Water Plant

                            Is sequence M5 adequate to meet Standards Lab needs if AC-4 Chiller is down? Mn
 4     1/15/04     4/7/04   Chiller sequence modified 6/21/04 to maintain 42 deg.F if MnAC4 is on                   Team               QA
                            Main cooling tower: Why is Lo Status on when Lo Cmd is off and High Cmd is on
37      7/7/04    8/13/04   and Hi Status is on?                                                                    Cont.   8/31/04    QA

                            There are three sets of temperature sensors for the entering and leaving chilled
                            water temperature. The strap-on sensors are not acceptable and do not comply with
                            specification section 2.12.A.4 and should be removed from the chiller piping. One of
                            the other two sets of sensors may be used our new well sensors may be installed.
                            The immersion well sets of sensors are for the Onicon meter and for the York control
                            panel. If either of these can be communicated with they should be used. The
                            preference is to use the Onicon meter and avoid primary control of the chiller though
45                7/28/04   a gateway.                                                                              Cont.   8/31/04    QA
52      8/4/04    8/13/04   Why are there two MnChlr1 Run points? QA to fix.                                        Cont.   8/31/04    QA

                            What is the status of getting data from the York Chiller via the gateway? It does not
54      8/5/04    8/13/04   appear fully operational. New template installed. OK                                    Cont.   9/19/04    QA

                           MnChlr1 cooling tower is having trouble meeting setpoint. High fan on even though
94     9/24/04    10/19/04 delta T across the chiller is only 2-3 deg.F. Programm is OK                             Team    11/1/04    QA

                            HoW Pumping

                           Boilers
                           MnAC4 Boiler - Why is HoWRT is higher than HoWST? Sensors swapped at
15                 4/26/04 controller.                                                                                                 QA
33     5/21/04     5/28/04 MnBlr: Need status point for Condensate Return Pump (MnBlr ConRP Status)                 Cont.   8/31/04    QA
                           New MnAC4Blr and pump is running, yet MnAC4 Xovr valves are in House. My
                           understanding was that the changeover valves would lock out the pump. See 1
 86                8/30/04 above.                                                                                    (7)
134               11/21/04 New MnAC4Blr needs to run w/o 2 DO's                                                     Cont.   12/8/04    QA

                            VFD's
                            VFD data via Mod Bus is missing from this points list. This data needs to be unique
23.1              4/14/04   for each VFD.
23.1              8/13/04   QA enter point names in program.                                                                           QA
                           MnAC1, 2 & 5 and VFD graphics do not provide data for whe VFD in local "hand"
                           mode. This is an essential point for each VFD per spec. Put "VFD in Hand" alarm
                           from sequence on air handler graphic. QA: Graphic added to MnAC1,2&5; no
23.2             8/13/04   graphic added to VFD - OK                                                                     Cont., (6)   8/31/04    QA

                           Is fan status as it is currently implemented from the VFD adequate (VFD says fan is
                           on but it isn't), can it be modified to look at current level or is a current switch on the
56                7/7/04   motor needed? See 7/7/04 e-mail to Eng..

                           We continue to have occurrences when MnAC2SF VFD says that it is on and the
                           motor is not spinning. ABB says they cannot find a problem. 9/1/04: Cont. to
56     8/4/04    8/13/04   request that ABB to replace unit. 10/19/04: Was MnAC2SF VFD unit replaced? Yes                  Cont.      9/19/04    QA

                           The procedure for resetting the drive after a failure is identified (as in 56 above)
62     8/5/04    8/13/04   needs to be documented. It was decided to request that the unit be replaced instead.             (7)

81     8/23/04   8/30/04   Why are we seeing ~20% to 25% difference between VFD CmdHZ and VFD Freq?




                          VFD's are programmed by the Mfg rep with 15 Hz @ 0 input volts. This requires
                          minimum PID output to be 25%. Programming for MnAC1, MnAC2 and MnAC5 has
81               10/23/04 been corrected so that Spd Cmd, Volts out and VFD Hz are the same.

81               10/25/04 Eng.: Spec requires 10Hz minimum. Cont. to reprogram VFD and sequences.                          Cont.      11/1/04    QA
                          MnAC1, 2 & 5 VFD's: Mod Bus communication is intermittent. Data quality is poor.
95     9/30/04    10/4/04 Units reset by turn off and on - data look Ok.                                                   Cont.         ?       QA

                           MnAC1SFVFD and MnAC2SFVFD: Drive Status Bit and Fault Status Bit are not
                           consistent with themselves or with the other VFD's. Fault in on, Drive is off and the
96     9/30/04   10/4/04   fan is running? Units reset by turn off and on - data look Ok.                                  Cont.         ?       QA

122              11/9/04   VFD Mod Bus data appears to be 3 minutes earlier than ALC command data. Why?                    Cont.      11/19/04   QA

                           Electric Demand Monitoring
                           Pulse output on electric meter in basement has been installed. Connect wires too
                           terminal block in conduit box. K factor is on meter. Unfortunately, this meter is not
74               8/12/04   the primary building meter.                                                                     Cont.      8/31/04    QA
                            Load Calcs & History
                            Btu meter is reading high 300 tons. Chiller is rated 195 tons. Chiller flowmeter is
38.1              7/28/04   reading 750 gpm. Historically this flow has been around 500 gpm.
38.1              8/17/04   Pipe is 6 inch not 8 inch. Correct at BTU meter.                                         Cont.      8/31/04    QA
38.2              7/28/04   Chiller kW appears to low. Data should be somewhere between 60 and 80kW.
38.2              8/17/04   DDC output compares well with chiller panel meter.                                        (2)                  QA
                            Plant performance should read zero when chiller is off. Use flow >100 gpm as a
87                8/30/04   threshhold.                                                                              Cont.                 QA

                            Events/Alarms
                            Need means for locking out an alarm that has been acknowledged, but for which
58      8/5/04    8/13/04   maintenance is pending                                                                   Cont.      8/31/04    QA
61                7/26/04   QA provided comment on Alarm matrix.

                            Paged and e-mail critical alarms should be identical as possible conveying enough
                            information for the individual receiving them to understand what is going on. See QA
                            10/6/04 mark-up of Cont.'s spreadsheet. 11/2/04: Cont. to review; remove
61                8/12/04   standardslab template making each meassage unique as defined.                           Cont.       8/31/04    QA
64                8/13/04   Provide training in setting up alarm messaging                                         Cont., (8)   8/31/04    QA

                            Verify the system will alarm when fan is commanded on but the fan does not operate
67                8/12/04   such as when a HOA is off, a VFD does not work or a fan belt is off.                   Cont., (6)   8/31/04    QA
                            Environmental Chamber & Cooling Tower: Add condenser water pump on to
76     8/19/04    8/20/04   CondWS and R Temp overrange events. QA revised limits.                                   Cont.      9/19/04    QA


91                9/23/04   Non critical alarms need to be delayed - suggest 1 hour - Training provided            Cont., (8)   11/1/04    QA


                            Event outputs blocks have not been attached to MnAC1 and MnAC2 runtime blocks.
                            Thresholds should be set for appropriate maintenance periods for fan motors, belts
98                10/6/04   and filters.                                                                           Cont., (8)   11/1/04    QA
                            MnBlr went down @ 18:00 on Friday. The Std Lab zone temp then later went into
                            alarm. No paged alarms were sent to Facilities staff. Why? Cont.:"from" email was
114    10/30/04   11/1/04   missing in progrqm.                                                                    Cont., (6)      ?       QA
                            All alarms under the category of HVAC General are classified in alarms
                            programming as "Critical". Why? (2) Has the critical alarm matrix been
115    10/30/04   11/1/04   implemented? Cont.: Yes                                                                                        QA
                            There are now no critical alarms. This category have been removed. Why?
141               12/8/04   12/10/04 Cont.: We don't know; will fix.                                                 Cont.      12/15/04   QA
REMARKS:
(1)        EXISTING CONDITION DETERMINED TO BE ACCEPTABLE
(2)        DETERMINED NOT TO BE A QA PROBLEM
(3)        May be a problem, but out off scope
(4)        Discuss once initial installation complete
(5)        Document in Systems Manual
(6)        FT
(7)        Addressed in another item
(8)        Requires training
#          Trends & Events


Cont.      Contractor and techs
QA         Owner's QA Rep
Eng        Engineer
IT         Information Tech services staff
Operator   Owner's building mechanics
nt is neither approved



   DATE: 12/24/04




                         Cont. 10/25/04 and 11/16/04   Phone Call 2004-10-25 (GAF
              DATE                Comments                        Notes)




             10/5/04




            10/23/04
6/22/04




 6/1/04

 5/5/04

8/31/04



             Let's schedule a walk to
           confirm the completion of this   Done, needs a walkthrough
                        item                with QA.

11/21/04    Still need MetAC-2 labeling.
             Let's schedule a walk to
           confirm the completion of this   Done, needs a walkthrough
                        item                with QA.
           MET Roof, the final panels to
11/17/04     be labeled, are complete.



10/23/04
             Let's schedule a walk to
           confirm the completion of this   Done, needs a walkthrough
10/26/04                item                with QA.
 8/30/04

8/26/04
             Let's schedule a walk to
           confirm the completion of this   Done, needs a walkthrough
10/26/04                item                with QA.

 9/1/04
                                            This is just a room sensor.
                                            QA wants the logic changed
11/2/04                                     so it is just that simple.




              Cont. revising O&M per
           commentsfor review and Eng..
           Submitted from QA 11/5/04.
            Revised plan submitted for
11/16/04     review 11/15/04. 7 hard

            Schedued 11/17 and 11/19,
11/21/04      9AM - 1PM. 6 Trainees.
12/24/04

10/16/04   Complete and proven 11/2/04.




12/24/04

           Cont. to provide this training
11/21/04   during our training sessions.


11/9/04



11/17/04

12/10/04
12/15/04

12/15/04




12/15/04




12/24/04




10/19/04



10/1/04

8/13/04
8/13/04
10/19/04


8/13/04

10/1/04



8/30/04


8/13/04

10/1/04



 8/5/04



 8/2/04

8/13/04

8/13/04




10/19/04



10/5/04




10/19/04
10/19/04
 8/28/04

                               Cont. will do tomorrow with
11/21/04   Will add 10/26/04   Cont.'s programmer.

10/19/04

10/1/04


10/1/04

10/19/04

10/26/04      Complete.

12/2/04

12/3/04




8/30/04

11/17/04   Training Manual     Will merge into submittals.
10/1/04



11/21/04        Complete 11/4/04.          Cont. will look at this.

10/1/04




           Needs to be verified by team.




6/23/04

11/21/04




10/22/04                                   Done. Need to witness test.




 8/4/04
6/23/04



 8/4/04
6/23/04



 8/5/04

 8/5/04




                                       Sensor is affected by
                                       ambient and needs to be
                                       fixed. STILL OPEN. Cont.
           Well Sensors installed by   will review tomorrow and
              Cont.. Complete.         comment.
10/28/04

11/21/04


6/23/04



 8/4/04




12/4/04

12/10/04

12/2/04
 8/5/04

8/19/04

6/23/04

 6/2/04

10/1/04




           Both sensors in Cont.'s hands
12/4/04     now. Cont. will install ASAP.

              Complete. Needs to be
11/22/04         verified by team.


10/19/04


10/25/04                                    Done.
             Re-programming complete
           and downloaded. Needs to be
12/3/04           verified by team.




10/26/04            Complete.




                    Complete.



 8/4/04


                                         During startup has zero
                                         setpoint. Needs to start in
                                         heat or cooling. Heating fan
                                         is shutting down. Needs to
            DM/DJ to review QA 10/22     use cooling on startup.
              email of discoveries.      Heating fan needs to run
             Reprogamming complete
            11/17/04. Needs check by
11/21/04              team.


8/14/04

8/28/04

8/30/04


              Cont. awaiting CO18 to
12/10/04             proceed.




10/1/04
10/1/04
                                             May be a balance issue. See
           Cont./DM provided additional      Eng.'s trend log review
11/21/04           PID tuning.               comments.
                                             This is air noise in the hot
                                             water loop. This may be after
                                             boiler was replaced and air
                                             go in the system. Air may
                                             need to be vented. Not an
           Per the team, this is no longer   Cont. issue unless it is a
11/2/04               an issue.              valve problem.




                                             Completed. Now works and
                                             air flow goes up when heat is
                                             required. Heat mode
                                             graphics not showing on
                                             graphics screen. Screens
                                             need to update and they do
10/25/04                                     not.
12/15/04



12/3/04



 11/2/04   Complete.
11/21/04

11/9/04




12/14/04




12/14/04
 8/4/04

 9/1/04




8/19/04
8/19/04


10/5/04


10/15/04   Operating per sequence.




4/27/04
8/19/04



12/9/04




8/13/04
10/19/04




                       VFD has been replaced.
10/25/04               Resolved.




                       Programming issues by VFD
                       factory to have 15 Hz
                       minimum so 0 volts equals
                       15 Hz. ALC ranged 0 to 60 ,
                       not 15 to 60. Now 25%=0
                       volts and everything agrees
                       and this is true for all five
                       drives. Minimum should be
                       10 Hz. Per section 3.03D.1.c.

10/26/04   Resolved.

10/5/04




10/5/04

11/21/04




8/19/04
8/18/04

8/17/04

 9/2/04



11/21/04         Training Manual.          Cont. will get this to us.

                                           QA provided this so it is up
                                           to Cont.. Nothing will be
                                           coming from Operator and
                                           Operator2. Cont. will find this
11/21/04        Cont. to finalize.         or ask QA for it.
11/17/04     Cont. to provide training     Training will be provided.


11/2/04    Needs to be verified by team.   Witness test item.

10/19/04
                                           This is training item so
                                           Operator and Operator2 can
11/17/04     Cont. to provide training     set this up.
                                           This is a training item and
                                           the outputs need to be
                                           generated. Cont. needs to
                                           generate the run time output
11/21/04                                   for maintenance alarm.


11/2/04             Complete.


11/21/04     Cont. to verify and prove.

12/13/04
  ITEM          ID       Notification                                                   ISSUES


                                                                                         LOG
   NO.        DATE         DATE          Trended Device     Date of Trend      Time of Day

                                        MnVAVRH1-
TE-1.      10/20/2004   10/20/2004      19/General        9/19/2004/General Afternoon/General

                                        MnVAVRH1-
TE-2.      10/20/2004   10/20/2004      19/General        9/21/2004/General Morning/General
TE-3.      10/20/2004   10/20/2004      MnVAVRH1-18       9/19/2004         Afternoon




TE-4.      10/20/2004   10/20/2004      MnVAVRH1-18       9/20/2004         Morning
TE-5.      10/20/2004   10/20/2004      MnVAVRH1-17       9/19/2004         Afternoon




TE-8/10.   10/20/2004   10/20/2004      MnRH1-109         9/20/2004         Morning


TE-9.      10/20/2004   10/20/2004      MnVAVRH1-16       9/20/2004/General Morning




TE-16.     10/20/2004   10/20/2004      MnRH1-107         9/21/2004         Afternoon




TE-18.     10/20/2004   10/20/2004      MnRH1-3           9/21/2004         Morning




TE-20.     10/20/2004   10/20/2004      MnAC1SATemp       9/19/2004         2:00 PM




TE-24.     10/20/2004   10/20/2004      MnAC2SATemp       9/21/2004         10:00 AM
                                   Resets from zones
TE-27.   10/20/2004   10/20/2004   and rogue zones   General       General

TE-29.   10/20/2004   10/20/2004   MnAC1OADamper 9/21/2004         14:00

TE-30.   10/20/2004   10/20/2004   MnAC2OADamper 9/21/2004         14:00

TE-31.   10/20/2004   10/20/2004   MnAC3           9/22/2004       General
                                   MnVAV1-19
                                   Heating SA Flow
TE-35.   10/20/2004   10/20/2004   Reset/General   9/29/2004       General




                                                      9/21/2004/   4:00 PM/
TE-38.   10/24/2004   10/24/2004   MnAC4Boiler        General      General
                                   AC5 SAStatic
TE-39.   10/24/2004   10/24/2004   Pressure           General      General




                                   Environmental
TE-40.   10/24/2004   10/24/2004   Chambers           General      General
TE-43.   10/24/2004   10/24/2004   Chilled water plant General     General




TE-44.   10/24/2004   10/24/2004   MtAC2 OA Damper General         General


TE-46.   10/24/2004   10/24/2004   MtAC3              General      General

TE-47.   10/24/2004   10/24/2004   MtAC3              General      General


TE-48.   10/25/2004   10/25/2004   DD-1               9/21/2004    4:00 AM

TE-49.   10/25/2004   10/25/2004   DD                 General      General
TE-50.    10/25/2004     10/25/2004    Page 14 of 65                 As Built Drawings
TE-51.    10/25/2004     10/25/2004    Page 17 of 65                 As Built Drawings


TE-52.    10/25/2004     10/25/2004    Page 20 of 45                 As Built Drawings

TE-53.    10/25/2004     10/25/2004    Page 29 of 45                 As Built Drawings

TE-54.    10/25/2004     10/25/2004    Page 31 & 32 of 45            As Built Drawings

TE-55.    10/25/2004     10/25/2004    Page 35 & 42 of 45            As Built Drawings




Items noted with "General" means this happens in many other trends and is referenced to one trend for information.
Items noted with "General" shall be addressed on all similar points.
Were the term “General” is used it means that the same observation was found on other similar systems and all systems shoul
ISSUES                                                           ACTION REQUIRED         CHECKED


 LOG                                                           PARTY
                             Comment                          Responsible   DATE REQ.      BY        DATE
       Unit could not achieve airflow setpoint. Raised max
       duct static for MnAC1, MnAC2 and MnAC5 to 2
       inches.                                                   Cont       10/29/2004     QA      11/22/2004
       SA temperature is not maintained at 95oF setpoint.
       SA temperature setpoint and hot water valve position
       are not trended.                                          Cont       10/29/2004     QA      11/22/2004
       Unit could not achieve airflow setpoint.                  Cont       10/29/2004     QA      11/22/2004

       HW valve cycles from 0 to 50% during warm up. The
       heating SP is not trended so this cannot be
       evaluated. The cycling appears to be during warm-up
       when warm-up cycles unit on and off before the
       occupied period. QA 11/22/04: Setpoint is achieved
       at 6:00 AM with limit hot water valve cycling.            Cont       10/29/2004     QA      11/22/2004
       Unit could not achieve airflow setpoint.                  Cont       10/29/2004     QA      11/22/2004
       SA Temperature does not maintain 95oF setpoint
       and hunts 30 to 40oF every 15 minutes. QA
       11/22/04: PID response is impacted by SA Flow from
       VAVRH1-14. When the master zone is satisfied, air
       flows drop, which excites the PID (+/- 20%). Things
       stablize at higher flows.                                 Cont       10/29/2004     QA      11/22/2004

       HW valve opens 100% and SA temperature does not
       get above 72oF. 11/2/04: Valve closed                     Cont       10/29/2004     QA      11/22/2004
       SA Temperature does not maintain 95oF setpoint
       and hunts from 55 to 95oF every 10 minutes. QA
       11/22/04: This continues ot happen. QA 12/2/04:
       PID sample increased from 10 to 60 secs; now 65oF
       to 95oF every 45 min.                                     Cont       12/3/2004      QA      12/3/2004
       Not heating up and HW is cycling every 6 minutes.
       HW Valve is not trended. SA does not maintain 95oF
       setpoint. QA 12/4/04: Cont. increased PID from 10
       to 60 secs.                                               Cont       10/29/2004     QA      12/2/2004
       The supply air temperature fluctuates by up to 5oF
       every 6 minutes. QA 11/22/04: It cycles 15oF every
       35 minutes in the afternoon. QA 12/2/04: winter
       operation looks OK.                                       Cont       10/29/2004     QA      12/2/2004
       The supply air temperature fluctuates by up to 5oF
       every 6 minutes. QA 11/22/04: It cycles 15oF every
       35 minutes in the afternoon. QA 12/2/04: winter
       operation looks OK.                                       Cont       10/29/2004     QA      12/2/2004
Check for rogue zones, see Specification Section
2.04B.5.c.3. Eng.: Reports now exist and work.
Dmpr Pos (%) notation is misleading. Change to
Percent of Setpoint Flow. QA: Delete Rogue Zone
graphic - data found in VAV Zone Condition Monitor
graphic; change notation in it.                           Cont   12/3/2004    QA     12/3/2004
OA gets over 80oF and the OA damper is still open.
Explain.                                                  Cont   10/29/2004   QA     11/22/2004
OA gets over 80oF and the OA damper is still open.
Explain.                                                  Cont   10/29/2004   QA     11/22/2004
What initiates this unit? Does it normally not run?
QA: Override only.                                        Cont   10/29/2004   QA     11/22/2004

Airflow does not change with ZAT in heating. Why
not?                                                      Cont   10/29/2004   QA     12/2/2004

HSWR & HRWT go down when the OA goes up.
Why? Is it influence of ambient or is it because the
reheat load is the highest at high OA conditions? Is
the boiler too small? No, No; new boiler reaches
temp quicker than HoWVlv can react, so temps cycle
but are stable. There is no corrolation with OAT.
Unit is to be reconfigured so that ther is no direct
control of Lo/Hi fire. See 11/22/04 witness test log.     Cont   10/29/2004   QA     11/22/2004
Supply air static pressure does not track the setpoint.
Why?                                                      Cont   10/29/2004   QA     12/2/2004




                                                                   When
Run trend log with new sensors and new chambers           Cont    possible    QA     12/2/2004
Are the power units and tons correct?                     Cont   10/29/2004   QA     11/22/2004




Is the damper control working, it is not trended?         Cont   10/29/2004   QA     11/22/2004

He and Co requests don't seem correct since they
change without a pattern or not at all. Explain.          Cont   10/29/2004   QA     12/2/2004

Why do the fans operate over the weekends?                Cont   10/29/2004   QA     12/2/2004
Why is the total flow higher than the hot or cold flow
when only one is supposed to be on?                       Cont   10/29/2004   QA     12/2/2004
DD Boxes are not working per spec. Correct. QA
12/3/04: Program corrected. Eng. needs to verify.         Eng.   12/8/2004    open
             TE: Dewpoint sensor, not humidity sensor. QA:
             There is no dewpoint sensor. The inputs are
             ambient temperature and humidity. Dewpoint
             temperature is calculated by the controller.                 Cont   12/8/2004   Eng.   12/18/2004
             Boiler has high and low fire                                 Cont   12/8/2004   Eng.   12/18/2004
             Are these space sensors accurate for what is
             installed? Are these sensors included in the O&M
             information?                                                 Cont   12/8/2004   Eng.   12/18/2004
             Remove damper is the box is a CAV without a
             damper.                                                      Cont   12/8/2004   Eng.   12/18/2004

             How is slave controller wired?                               Cont   12/8/2004   Eng.   12/18/2004

             Are these units single stage cooling?                        Cont   12/8/2004   Eng.   12/18/2004




o one trend for information.

similar systems and all systems should be corrected for this situation.
      Cont Action

 Raised max DS Sp to
     2.0 from 1.5


  Modified Zone PID
  Raised max DS Sp




Modified, downloaded
  and verified FB.
 Raised max DS Sp




  Modified Zone PID

Found that circuit setter
     was closed




  Modified Zone PID




  Modified Zone PID




      Sped up PID




      Sped up PID
Rogue zone graphic is
    completed.

  Re-verify with team.

  Re-verify with team.

  Re-verify with team.

     Modified FB
     downloaded.




We shall run trend for a
 few more days and
  review as a team.

       Sped up PID.
    We plan to install
 sensors this week; we
first need to ask Becky
  if we can shut down
    units; connecting
  sensors under moist
 conditions is a hazard.
          Yes.

No. We have modified
 the programming and
 want to verify with the
team. Verified 11/22/04

Reprogrammed, need
 to verify with team.
Reprogrammed, need
 to verify with team.



Re-programmed, need
  to verify with team.
        151

PROJECT: Owner's DDC System Installation Project
 ITEM             ID        Notification


  NO.            DATE         DATE




  31                         6/17/04




  16                         4/28/04




  3             1/15/04      4/13/04



  27            5/21/04


  75            8/19/04      9/23/04

TE-42         10/24/2004   10/24/2004




 101                         10/11/04




  44                          9/1/04




 121                         11/2/04
 TE-45.     10/24/2004   10/24/2004

      139                12/3/04



      143                12/9/2004


REMARKS:
(1)                      EXISTING CONDITION DETERMINED TO BE ACCEPTABLE
(2)                      DETERMINED NOT TO BE A QA PROBLEM
(3)                      May be a problem, but out off scope
(4)                      Discuss once initial installation complete
(5)                      Document in Systems Manual
(6)                      FT
(7)                      Addressed in another item
(8)                      Still open
                     HVAC QA ISSUES LOG - Out of Scope                                                              DATE: 12/24/04

DDC System Installation Project
                                         ISSUES: Out of Scope                                   ACTION REQUIRED   Resolved

                                                 LOG                                                                By
          We had been loosing data in the trends from time to time. Controls Mfg. said
          that it could be a network configuration issue. Cont. to meet with IT to resolve.
          We need to verify this condition does not return once the server is move to the
          basement comm room.                                                                     (4, 5)            QA
          MnAC3: once VAVs are operational and stat is installed, stat can be
          programmed for 2hr override increments; note max time for this equipment is
          224 minutes. Program update my be forthcoming from Controls Mfg. in
          November to change this to 8 hours. Cont. Service Tech2 to notify us when it
          is available. We may get this under warranty. QA 12/15/04: Installed ; need to
          test.                                                                                   (4, 5)
          MnAC4: Are we going to reset the Nortec based on outside %RH? Is reset
          necessary? Eng.: Not unless dry winter conditions indicate that it is necessary.
          QA 11/21/04: It appear we are over dehumidifying in winter. Consider resetting
          coil leaving air temp based on hot water and humidifier PID > 25%. QA
          11/29/04: Tried this wihtout much success as chiller operation impacts zone
          temp stability. Need chiller with greater turndown.                                    (3, 4, 5)
          MnAC4 Chiller Setpoint is 45 deg.F. How is this physically set? It does not
          always provide low enough chilled water to meet %RH setpoint; see 5/21/04
          data. The chiller setpint is internal to the chiller. It is set at 38 deg.F leaving
          water temp. Air handler may not have enough capacity.                                  (3, 4, 5)

          MnAC4 Chiller Comp 1 & 2 Alarms do not appear functional. Are these analog
          or digital points? Per Cont. tech MnAC4Chiller Alarm outputs do not work               (3, 4, 5)
          MnAC7: Why does the SA temperature on cooling run so high? Does not get
          below 58oF. This appears to be a mechanical issue.                                     (3, 4 ,5)
          Wining noise coming from VAV box 1-19 in Room 134 Main building. After 4
          hours the noise went away and has not come back sense. 10/25/04: This may
          be a warranty issue, but Owner's staff needs to help diagnose problem if it
          happens again. Noise comes from a loose duct access cover. Operator2
          installed a piece of cardboard to quiet it.                                              (5)              QA
          York Gateway to be used to reset chiller leaving water temperature instead of
          hard wire. 10/1/04 - Chilled water reset is being sent to and being received by
          the York chiller but it does not appear to be functioning. Understand from York
          that the control board in the chiller needs updating.                                  (3, 4, 5)
          House chiller chilled water pump currently cycles on/off under low load
          conditions (currently after ~3 hours). Consider disabling the house chiller
          based on cooling request and all ChWVlvs at 0%. QA 12/15/04: Control
          program enables the chiller start sequence to run, which then turns on the
          chilled water pump. The chilled water pump should stay on as long as the start
          sequence is enabled. It is disabled once the all ChWValves are at 0%. Why
          the pump has been staying on for an extended period of time beyond this
          needs to be investigated. It also needs to be tested when MnAC4 on the house
          chiller.                                                                               (3, 4, 5)
            MtAC3: CoSAT gets down to 38oF. This is too cold. Airflow may be difficient.   (3, 4, 5)
            MtAC2: 1st stage of heating does not appear to be functioning properly. SA
            Temp is not warm up until 2nd stage operates.                                  (3, 4, 5)
            Main building heating hot water loop may need balancing. This could the
            source of MnVAV2-6 and 2-7 capacity problems. Cont. has confirmed that the
            newly installed valves were correct. HVAC.Maint.Cont. is scheduled to check
            all strainers.                                                                 (3, 4, 5)




EXISTING CONDITION DETERMINED TO BE ACCEPTABLE
DETERMINED NOT TO BE A QA PROBLEM
May be a problem, but out off scope
Discuss once initial installation complete
Document in Systems Manual

Addressed in another item
  DATE: 12/24/04



Resolved

             Date




           12/17/04




           11/22/04
Heating, Ventilating, and Air Conditioning Systems Witness Testing
         Test            Expected response           Observed response         Pass/Fail


Morning system          All rooms satisfied    Not all rooms were satisfied.   Fail
review, check out                              Not all rooms work properly
rooms not satisfied                            and achieve comfort.
and find out why




MnAC-4 Hot COV:      Graphic should            Graphic changed. Alarm          Pass
Change the hot water change, check for         received.
change over valves   alarm

MnAC-4 Cold COV:        Graphic should         Graphic changed. Alarm          Pass
Change the chilled      change, check for      received.
water change over       alarm
valves
CO2 control: Increase   Zone minimum flow      VAV box flow increases.         Pass
MnVAV1-12 CO2 PID       of zone goes to
to 50%                  increased flow
CO2 control: Increase   AH-1 minimum           OA damper minimum reset.        Pass
MnVAV1-12 CO2 PID       outside airflow goes
to 100%                 to increased flow

Confirm main chiller    Supply water           Chiller supply water setpoint   Pass
supply water reset by   temperature            reset.
closing all valves to   changes based on
no more than zone
Check rogue 50%         mostzones valve
                        Find open that         No report.                      Fail
reports for rogue       cause chilled water
zones                   reset and AH static
                        pressure reset
                      pressure reset




Check for rogue zones Find zones that        Checked manually and MnAC- Pass
                      cause chilled water    1, AC-2 & AC-5 all reset
                      reset and AH static    supply air static pressure.
                      pressure reset         Chiller reset supply water
                                             setpoint.


Put MnAC-1 return     Graphic change and VFD indicates “HAND” on             Fail
fan VFD out of        out of range alarm graphic. No alarm. Alarm
desired range by                         when power is turned off at
putting in “HAND”                        motor control center. Correct
                                         for all fans with VFD’s.

MnAC-5 create high    AH should lock out,    Failed low and high. Correct    Fail
supply air pressure   alarm and can be       and test for all VAV systems.
                      reset “are reset by
                      the reset DO point
                      or a push-button on
                      the panel face. A
                      pilot light on the
                      panel face indicates
                      static pressure
                      safety lockout is in
                      effect”
Afternoon system      All rooms satisfied    Not all rooms were satisfied.   Fail
review, check out                            Not all rooms work properly
rooms not satisfied                          and achieve comfort.
and find out why
Check trends for      Data is in history     Recent data history exists.     Pass
recent history data
Simulate server       Server comes back Rebooted.                            Pass
power outage          on line, controls
                      function normally,
                      date and time is
                      correct
Close large MnVAV     Flow reads near zero Cont. to do this in the evening   Not Done
box completely                             and confirm success.

Close small MnVAV     Flow reads near zero Cont. to do this in the evening   Not Done
box completely                             and confirm success.

Check MnAC-4 chiller Graphic reads near      Readings are more accurate      Pass
SWT & RWT            same temperatures       since sensors were changed
                                             to wells.
Cycle Mt DD-8 box to Box sequence                                           Not Done
cooling and heating    responds per
                       specifications
Mt DD-8 verify airflow Readings are                                         Not Done
readings on hot and    accurate
cold ducts




Mt DD-6 verify airflow                                                      Not Done
readings on hot and
cold ducts




Set all Met DD boxes     Last box stays in                                  Not Done
but one to cooling and   heating for minimum
put last box in          airflow and hot fan
heating, then last box   stays on
in deadband
Set all Met DD boxes     Hot fan turns off                                  Not Done
to cooling
MnAC-5 change OA         Cooling does not      Cooling does not lock-out.   Pass
temperature to 30oF      lock-out
MnAH-1 set to 10Hz       VFD runs at 10Hz      Worked.                      Pass
SA command speed
Place MnAC-1 VFD in      Alarm generated       Alarmed.                     Pass
off
MnVAVRH 2-31 a/b         Both dampers open     Only one damper opens in     Fail
full heating             to heating max and    100% heating.
                         supply air
                         temperature
                         maintained at
                         setpoint
MnVAVRH 2-31 a/b         Both dampers open     Does not work.               Fail
full cooling             to cooling max

MnVAVRH1-17 full         Damper open to full   Goes to max setpoint, flow   Pass
cooling                  cooling max           achieved.
Building pressure        Return fan and EA     Responded.                   Pass
0.15”                    damper respond

Turn chiller on,         Chiller power         QA has confirmed this.       Pass
measure power            graphic is accurate
MnAC-5 measure           Graphic is accurate    Magnehelic reading 1.4” to      Pass
static pressure                                 1.5”, graphic reading 1.46 to
                                                1.50.

MnAC-7 on cooling,       Graphic is accurate    Fluke reading 58oF, graphic     Pass
measure SA                                      reading 59oF.
temperature
MnAC-8 on cooling,       Graphic is accurate    Fluke reading 59oF, graphic     Pass
measure SA                                      reading 59oF.
temperature
Mt AC-3 on cooling,      Graphic is accurate                                    Not Done
measure SA
temperature
Verify Met heating       Requests are                                           Not Done
and cooling request      accurate
Mt DD-1 verify airflow   Graphic flow is                                        Not Done
                         accurate




MtAC-1 remove fan        Unit status changes    Unit status changed.            Pass
current switch
MtAC-5 verify supply     Check with Fluke       Fluke reading 56.7oF, graphic   Pass
air sensor calibration   meter                  reading 56.8oF.
MtAC-1 remove fan        Unit turns off         No response. Correct all DX     Fail
current switch           heating and cooling    systems’ function blocks.
                         and alarms

MtAC-1 cycle cooling     Should time out 5   Timed out 5 minutes.               Pass
                         minutes before
                         starting cooling
MtAC-2 OA damper         Damper should close Does not close                     Fail
during unoccupied
MtAC-2 Cooling           Follow spec            No interlock with cooling and   Fail
                         sequence               condenser water pump. No
                                                interlock with fan.

                         Electric heat should   Stages cycle. Removed 5         Pass
                         cycle on.              minute off timer.
WhAC-1                                          No cooling cycle time delay.    Fail
                                                Change electric heat section
                                                of function block to gas heat.
Additional               Cont. to address                2-9 needs to be tuned Fail
Observations             items

                                                       2-6 check to see flow
                                                   and valve is correct.
Observations            items




                                                       2-31a/b is valve in
                                                   backwards, why isn't it
                                                   working?




                                                       Change MtAC-3
                                                   cooling fan only operates
                                                   during occupied, setup or
                                                   cool down modes




                                                       Change MtAC-3
                                                   heating fan only operates
                                                   during occupied, setback
                                                   or warm-up modes and not
                                                   when all zones are in
                                                   cooling

                                                      Remove low limit on
                                                   economizers

                                                        DD-5, 6 & 7 when hot
                                                   is closed graphic displays
                                                   open.
                                                        Main Chiller cycles
                                                   chilled water pump when it
                                                   reaches setpoint. This is
                                                   bad for Standards Lab.
                                                   Cont. shall provide
                                                   proposal for interlock relay
                                                   to run chilled water pump
                                                   when AC-4 is running on
                                                   house chilled water.

                                                        Eliminate reset on
                                                   chilled water setpoint when
                                                   AC-4 is on building chiller.

                                                       Can the York chiller
                                                   leave the ChWP on when
                                                   the system is enabled and
                                                   not cycle the ChWP with
                                                   the chiller? Met with York
                                                   technician.


Spec Section 15900 3.16C.3.c. reads, “c. Any tests that fail to demonstrate the operation of the system shall be repeated at a l
Any tests that fail shall be remedied and all similar system types shall be similarly corrected and retested by the contractor prior
               11/22/2004                   Pass/Fail                  12/2-3/2004               Pas/Fail


AC-1 all okay.                              Fail                                                 Fail
AC-2 zones are operating properly                       AC-2 zones are operating properly
except 2-6 and 2-7 are not working on                   except 2-6 and 2-7 are not achieving
heating. They are not achieving supply                  supply air temperature of 95oF. Cont.,
air temperature of 95oF.                                please confirm that these valves are
                                                        sized properly.
Hot water controls is not working on                    Yet to be corrected
local boiler. Sensors are bad and in
wrong location. The local boiler is only
enabled by Controls, not controlled. The
control is local on the boiler for 180oF.
The Controls program only enables the
pump and boiler per spec.

MET DD zones are cold. The MtAC3 is                     Much better
bringing on cooling when no zones are
calling for cooling.




Reports now exist and work.                 Fail        QA: Delete Rogue Zone reports; data      Pass
                                                        found in existing VAV Zone Conditon
                                                        Monitor - changed notation in it.
Dmpr Pos (%) notation is misleading.
Change to Percent of Setpoint Flow.
MnAC5 SAT is not resetting properly. At           OK
55oF OA we are seeing a setpoint of
54.5oF when no zones are calling for
cooling. Check all the VAV AHU supply
air FB’s. Same DATSP on AC-2 so this
is wrong, too.




This already passed. Glenn had it noted Pass
wrong.




Not ready to test yet. They will test.     Fail                                           Pass




Not done.                                         All rooms satisfied except MnVAV-6 with Fail
                                                  the reheat valve at 100%.




Cont. Tech did this in the evening. 2-22   Pass
reading plus or minus 1.5%.

Cont. Tech did this in the evening. 2-20   Pass
reading plus or minus 5%.
Responded properly. Checked max            Pass
heat, max cooling, min heat, min cool
and changeover latch. All work.
Controls reading 80 CFM in heating with    Fail      Readings were corrected and checked   Pass
110 CFM SP; hood reading 230 CFM.
Magnehelic reading is 0.3” which is 245
CFM.
Controls reading 280 in cooling with 280
CFM SP, hood reading 152 CFM.
Magnehelic reading is 0.025” which is
143 CFM.
Controls reading 380 CFM in heating        Fail     All zones airflows were within 5% of   Pass
with 100% open; Magnehelic reading is       Need to magnehelic measurements
0.75” which is 390 CFM.                    confirm
Controls reading 210 CFM in heating        this for
with 225 CFM SP; Magnehelic reading        all
is 0.175” which is 195 CFM.                boxes.
Controls reading 230 in cooling with 240   Check
CFM SP, hood reading 120 CFM.              Mn 2-6,
Heat fan stays on.                         Pass




Heat fans turns off. Turned one zone on Pass
and the heat fan comes on.




Maintaining 95oF DAT on heating.           Pass




Both dampers open in both heat and         Pass
cool.
Return 67.5oF measured and 68.2 oF in         Pass
Controls.
57.5 measured and 55.8 in Controls.
Run when I run is still in place so there     Fail                                            Pass
are extra requests.
Measured DD-6 & 8 and both failed; so         Fail   Five in Main building were correct. All Pass
skip this and leave it to the contractor to          zones in Met were corrected - see Cont.
verify all boxes in this building and                Tech's spreadsheet. 3 were check w/
check (5) in the main building. If there             QA per above.
are three failures there, then correct
them all.




Unit is heating. Removed current              Pass
sensor. Heat cycled off.



Timed out on cycle.                           Pass


Trend shows it does close when                Pass
unoccupied.
Works except it does not shut cooling         Pass
off when the fan is not on. Tag ties to
“RUN” not “F.”
Change FB from “RUN” to “F”.


Done.                                         Pass


        2-9 is tuned (pass)                  Fail                                            Pass


        2-6 is not working. (fail) Eng.:               HoWValve is at 100%, but not
    What is flow balance at design and                  meeting setpoint-may lack capacity.
    are we getting it? Out of scope                     (pass)
                     2-31a/b is working. (pass)




                    MtAC-3 cooling fan only                          Test not feasible during winter-future
                 operates during cool down and                        (pass)
                 setup. Needs to be verified. (fail)




                       MtAC-3 During setback and                     (Pass)
                 warmup eliminate requirement for
                 cooling fan to be on in order to run
                 heating fan. Needs to be verified.
                 (fail)



                    Economizer low limit has been
                 removed. (pass)

                     DD-5, 6 & 7 graphics display
                 correctly. (pass)

                     Mn Chiller pump is staying on                   Out of scope (pass)
                 even though the chiller is cycling off
                 when AC-4 is in local chiller. We do
                 not know why. (fail)




                                                                  Completed (Pass)




                    Mn Chiller pump is staying on even           Control's program enables the chiller
              though the chiller is cycling off when AC-          control, which turns on the chilled water
              4 is in local chiller. We do not know why.          pump. The fact the pump stays on for
              (fail)                                              an extended period of time even when
                                                                  the chiller is cycled off is out of scope.
                                                                  Issue added to the out of scope list.
                                                                  (pass)

 the operation of the system shall be repeated at a later date. The EMCS Contractor shall be responsible for any
milarly corrected and retested by the contractor prior to additional witness testing by the engineer.
       12/15/2004        Pass/Fail


                         Pass
Cont. has confirmed
that these valves were
sized properly.



Working
Out of scope   Pass

						
Related docs
Other docs by gna72603
Hybridoma Technology Ppt
Views: 3232  |  Downloads: 0
Hvac Agreements
Views: 6  |  Downloads: 0
I 130 Sample Form
Views: 147  |  Downloads: 0
Hvac Invoice Form
Views: 7  |  Downloads: 0
Hypothesis in Business Research
Views: 121  |  Downloads: 0
Hvac Job Applications - DOC
Views: 43  |  Downloads: 0