Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
On Dam Rd., between Lake St. Widen, reconstruct, restripe and add bike
5427(018) 01 Clearlake RURAL Lake COG and the Dam Rd. Ext. lanes. I $ 311,530 $ 311,530 2 2/9/09 $ 25,000 $ - R V
Install crosswalks, curb ramps, bulb-outs,
Near Fort Bragg MS, Dana Gray sidewalks, signs, and new
5088(019) 01 Fort Bragg RURAL Mendocino COG ES, and Redwood ES. bicycle/pedestrian trails. I $ 225,300 $ 214,000 2 10/30/09 $ 24,160 $ - R R
Along portions of Hwy. 20 in Construct sidewalks, bulb-outs, and
5914(057) 01 Lake County RURAL Lake COG Clearlake Oaks. crosswalks. I $ 1,484,056 $ 474,480 2 9/3/09 $ 135,000 $ - R R
Shasta County
Regional New sidewalk, curb and gutter, ADA ramps,
Transportation widening for a bike lane, pavement
5321(012) 02 Anderson SCRTPA Planning Agency Bruce St, Emily Dr and Pinion Ave. markings and a pedestrian path. I $695,050 $695,050 1 8/21/07 6/23/09 $ 692,050 9/15/09 $ 109,339 R R
Construct/install new sidewalk, ADA ramps,
curb, gutter, bike lanes, radar speed
displays, drainage facilities, driveways,
street lighting, raised crosswalk & school
West Street from Carmichael zone pavement markings, and curb radius
5290(009) 02 Portola RURAL Plumas CTC School Driveway to Joy Way. returns. I $562,023 $562,023 1 1/27/09 $ 51,800 7/30/09 $ 6,368 R R
Shasta County
Regional On the South side of Mistletoe Ln.
Transportation from Mistletoe ES to West of Construct curb, gutter, sidewalk, and bike
5068(027) 02 Redding SCRTPA Planning Agency Shady Ln. on Mistletoe Ln. lanes. I $ 623,205 $ 623,210 2 4/17/09 $ 61,986 $ - R V
Shasta County Shasta County Hire a full-time SRTS Coordinator to serve
Regional Regional Shasta City Schools and establish a SRTS
Transportation Transportation In the cities of Anderson, Redding, Task Force. Coordinator will work primarily
6093(028) 02 Planning Agency SCRTPA Planning Agency and Shasta Lake. with four target schools. NI $ 300,000 $ 300,000 2 5/8/09 $ 300,000 $ - R V
Shasta County
Regional
Transportation Montana Street from Vallecito
5474(012) 02 Shasta Lake SCRTPA Planning Agency Street to Shasta Dam Boulevard. New sidewalk, curb and gutter. I $773,209 $773,209 1 1/7/08 3/17/09 $ 250,000 1/6/10 $ 170,617 V R
Installation of sidewalks, class II bike lane
and road improvements along Palm
Avenue between Nevada Street and State
Palm Avenue between Nevada Highway 49. Flashing beacons to be
5077(013) 03 Auburn SACOG Placer LTC Street and State Highway 49. installed on either side of school. I $696,955 $696,955 1 3/27/08 $ 65,000 $ - R V
Install curb, gutter, sidewalk, access ramps,
tie-in pavement, school crossings and
drainage improvements along Monte Vista
Avenue between Lower Wyandotte Road
Monte Vista Avenue between and Autrey Lane to enhance student safety
Lower Wyandotte Road and Autrey to reach Golden Hills & Helen Wilcox
03 Butte County BCAG BCAG Lane Elementary Schools I $290,576 $290,576 1 V
Sacramento Area Conduct four walkability/bikability audits per
Council of At 11 schools within the city of year within the San Juan Unified School
03 Citrus Heights SACOG Governments Citrus Heights. District. NI $ 496,670 $ 496,670 2 V
Along and adjacent to the Fremont
St. corridor, which connects SR-20
(10th St.) to SR-20/45 (Bridge St.),
within a 1/4-mi of Egling MS and
03 Colusa RURAL Colusa CTC Birchfield P.S. Install sidewalks and curb ramps. I $ 307,500 $ 274,500 2 V
Page 1 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
K-8 Street Smarts is a public-private traffic
safety educational program to provide
collaborative efforts with the school district,
law enforcement, businesses, UCD and
Sacramento Area community based organizations, using
Council of 1000 hours of a temporary part-time
5238(045) 03 Davis SACOG Governments City of Davis. Coordinator. NI $333,740 $333,740 1 4/18/08 $ 333,740 12/1/09 $ 151,541 R R
Construct concrete sidewalk approximately
2,520 linear feet on the south side of Green
South side of Green Valley Road Valley Road west toward Pleasant Grove
west toward Pleasant Grove Middle Middle School; Construct asphalt concrete
School; North side of Green Valley sidewalk approx. 650 feet in length on the
Rd from future signalized Silver north side of Green Valley Rd from future
Springs Parkway east to existing signalized Silver Springs Parkway east to
5925(057) 03 El Dorado County SACOG El Dorado CTC asphalt walkway. existing asphalt walkway. I $435,300 $435,300 1 12/17/07 5/21/08 $ 435,300 7/28/09 $ 435,300 R R
Along the North side of SR-193
from the intersection at SR-49 to
American River Trail at the Auburn
Lake Trails subdivision, within Construct the first phase of a Class I bike
5925(070) 03 El Dorado County SACOG El Dorado CTC community of Cool. path. I $ 999,500 $ 999,500 2 8/6/09 $ 125,000 $ - R R
Conduct site visits at all 53 schools in
western El Dorado County, complete a
El Dorado County bike/walkability checklist, assess potential
Transportation all 53 schools in western El Dorado improvements and develop improvement
6157(032) 03 Commission SACOG El Dorado CTC County needs. NI $35,000 $35,000 1 6/30/08 $ 35,000 8/11/09 $ 35,000 R R
Install two pedestrian crosswalks, including
flashing lights, raised crosswalk markings,
iridescent markings, wider width, and
Nevada City School Zion St. at Doane Rd and at Brock audible sounds; Create and mark a right
5018(007) 03 District RURAL Nevada CTC Rd. hand turn lane on a designated street. I $172,910 $172,910 1 6/20/08 $ 15,000 12/15/09 $ 9,319 R R
Install two pedestrian crosswalks, including
flashing lights, raised crosswalk markings,
iridescent markings, wider width, and
Nevada City School Zion St. at Doane Rd and at Brock audible sounds; Create and mark a right
5018(007) 03 District RURAL Nevada CTC Rd. hand turn lane on a designated street. I 1 6/20/08 $ 8,000 12/15/09 $ 4,969 R R
The Education component will include a
Bicycle Rodeo and Walkable/Bikeable
Community workshop; The Encouragement
component addresses the marketing
All schools within the Town of program; The Enforcement component will
03 Paradise BCAG BCAG Paradise. fund a Community Service Officer. NI $66,000 $66,000 1 V
At Sheridan ES, all improvements
are within one block of the South Construct multipurpose path and curb
5919(085) 03 Placer County SACOG Placer LTC East frontage of the school. ramps; install two four-way stops. I $ 329,794 $ 329,800 2 6/2/09 $ 74,250 12/16/09 $ 12,397 R R
School zones of Markam Middle
School and Schnell Elementary Install four radar speed feedback signs and
5015(016) 03 Placerville SACOG El Dorado CTC School. two in-road crosswalk lighting systems. I $167,211 $167,211 1 11/24/09 $ 167,211 $ - R R
Proposes a SRTS pilot program within the
Dry Creek School District. Hire a consultant
to develop a "SRTS Tool Box" including
strategies for education, encouragement,
5182(044) 03 Roseville SACOG Placer LTC Dry Creek School District. enforcement, engineering and evaluation. NI $215,000 $215,000 1 5/12/09 $ 215,000 $ - R V
Page 2 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Installation of new curbs, gutters and
sidewalks in the vicinity of Robla
Sacramento Area Elementary School; Street crossing
Council of Vicinity of Robla Elementary enhancements to facilitate access to the
5002(131) 03 Sacramento SACOG Governments School. existing bike trail that leads to the school. I $650,000 $650,000 1 10/31/08 $ 100,000 9/23/09 $ 17,477 R R
At Bannon Creek ES along
Bannon Cr. Dr. at Azevedo Dr. and
also at Millcreek Dr.; at Jefferson
ES along Pebblewood Dr. at and
between Azevedo Dr. and Bannon
Cr. Parkway; and at Natomas Park Reconstruct eight intersections by installing
ES along Crest Dr. at Ives Ave., curb extensions, curb ramps and high-
Sacramento Area Fenmore Ave., and North Bend visibility crosswalks; widen sidewalks,
Council of Dr., and at the intersection of North construct speed tables, and install
5002(143) 03 Sacramento SACOG Governments Bend Dr./Gateway Park Circle. medians. I $ 1,958,000 $ 996,000 2 12/3/09 $ 121,000 $ - R R
Sacramento Area In the counties of Sutter, Yuba, Create tools, programs, and materials that
Council of Yolo, Sacramento, Placer, and El promote safe walking and bicycling;
03 Governments SACOG Unknown Dorado. conduct outreach and educate partners. NI $ 240,000 $ 180,000 2 V
Pacific Elementary School
(intersection of 41st Street and traffic calming, curb extensions, drainage
Sacramento Area 43rd Avenue in urbanized improvments, traffic ciculation
Council of unincorporated Sacramento improvements, and other upgrades for
5924(147) 03 Sacramento County SACOG Governments County.) student pedestrians and bicyclists. I $825,000 $825,000 1 1/30/08 $ 80,000 11/19/09 $ 80,000 R R
Construct 8-foot Class I pedestrian/bike
path connecting Donner Pass Rd to Alder
Creek Middle School and the Frishman
Hollow Affordable Housing Project. The
project would also connect to Alder Drive
north of the school site. This project would
SW corner of SR 89N and Alder relocate school pedestrian traffic off the
5473(008) 03 Truckee RURAL Nevada CTC Drive high-traffic and high-speed State Route 89. I $229,350 $229,350 1 V
Prepare Safe Routes to School maps and
conduct training; apply selective traffic
enforcement; develop traffic safety
awareness and education/training program;
Imperial Valley enhance existing school crossing guard
Association of program; initiate an incentive/recognition
5278(007) 03 Westmorland SCAG Governments In the city of Westmorland. program for walking/bicycling to school. NI $ 180,000 $ 180,000 2 5/8/09 $ 180,000 $ - R V
Close sidewalk gaps along Maud Avenue
Vicinity of Fairview Elementary between D Street and Kelly Street,
School; Maud Avenue between D construct bulbouts at the intersection of
Street and Kelly Street; Maud Avenue and Romagnolo Street, and
Intersection of Maud Avenue and install high visibility yellow crosswalks at
5933(090) 04 Alameda County MTC MTC Romagnolo Street. the school. I $585,310 $585,310 1 1/29/09 $ 77,310 $ - R V
Close sidewalks gaps, install ADA
pedestrian ramps at crosswalks and
intersections, install high visibility
Vicinity of Marshall Elementary crosswalks, and install one in-roadway
04 Alameda County MTC MTC School. lighted crosswalk on Omega Avenue. I $499,596 $499,596 1 V
Page 3 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
The Partnership is a countywide
collaboration between Public Health
Department, the Transportation and Land
Coalition, Cycles of Change and many
other partners. 1) Lead comprehensive
SRTS efforts in Oakland, Berkeley and the
unincorporated areas of Alameda County;
Alameda County 2) Make available tailored trainings,
Public Health curriculum support and technical support to
5933(091) 04 Department MTC MTC All Alameda County schools. all county schools. NI $498,001 $498,001 1 5/24/08 $ 498,000 $ - R V
Reconfigure the Central School road
entrance to improve the visibility.
Improvements include narrowing the
entrance and bringing the sw/crosswalk
04 Belmont MTC MTC Central School road entrance further out. I $28,600 $28,600 1 V
Install traffic calming and traffic control
devices at three locations in the vicinity of
Vicinities of Brisbane Elementary Brisbane Elementary School and Lipman
5376(007) 04 Brisbane MTC MTC School and Lipman Middle School. Middle School. I $193,170 $193,170 1 5/10/08 $ 193,171 6/3/09 $ 186,001 R V
Pollard Rd. between Winchester Install bike lane, signs, stripes and radar
Blvd. and Quito Rd.; intersection of speed feedback signs; construct curb,
5306(017) 04 Campbell MTC MTC Pollard Rd./York Ave. gutter, sidewalk and curb ramps. I $ 255,000 $ 255,000 2 7/23/09 $ 49,300 $ - R V
Project to close sidewalk gap between
Pacheco Boulevard between Camino Del Sol and Windhover Way on
Contra Costa Camino Del Sol and Windhover Pacheco Boulevard in the Vine Hill area of
5928(086) 04 County MTC MTC Way. unincorporated Contra Costa County. I $311,000 $311,000 1 2/24/08 $ 65,000 1/12/09 $ 64,373 R V
Along the south side of Willow Lake Road
from Discovery Bay Boulevard to Discovery
Bay Elementary School, install a 920-foot
long, 5-foot wide concrete sidewalk, install
Willow Lake Road from Discovery or modify eight pedestrian curb ramps, and
Contra Costa Bay Boulevard to Discovery Bay install crosswalk striping at Discovery Bay
5928(087) 04 County MTC MTC Elementary School. intersection. I $186,000 $186,000 1 2/24/08 3/24/09 $ 186,000 5/14/09 $ 53,000 R V
Hire experts to conduct one or two-day
training seminars at each school site and to
develop and coordinate age appropriate
Cotati-Rohnert Park classroom curriculum. Periodic
Unified School Cotati-Rohnert Park Unified School measurement of student participation will
04 District MTC MTC District be recorded. NI $83,084 $83,084 1 V
Construct 3,760 linear feet of sidewalks and
12 new ADA curb ramps establishing a
continuous walking path along the
suggested route to Garden Gate Elem.
School; Install 8 ADA buttons, 8 pedestrian
countdown devices and protected left turn
Vicinity of Garden Gate Elem. lanes; Increase the pedestrian timing at the
School; Intersection of Green Leaf intersection of Green Leaf Dr. and Sterling
5318(024) 04 Cupertino MTC MTC Dr. and Sterling Rd. Rd. I $393,788 $393,788 1 5/8/09 $ 393,788 $ - R V
Throughout the San Ramon Valley,
in the communities of Alamo,
Blackhawk, Danville, Diablo, San Sustain and expand the Street Smarts
Ramon, and a small portion of Program's existing traffic safety education
Walnut Creek within the San efforts; encourage bicycling and walking to
Ramon Valley Unified School school as a safe, healthy, convenient and
5434(017) 04 Danville MTC MTC District boundaries. cost-effective mode of transportation. NI $ 392,000 $ 290,000 2 3/27/09 $ 290,000 10/8/09 $ 8,890 R R
Page 4 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Install curb bulb-outs, in-pavement lighted
crosswalks, LED-enhanced signs and
On Arlington Dr. at its intersection upgraded/interconnected advanced
with both Madera Dr. and Brewster flashing beacons and signs for crosswalk;
04 El Cerrito MTC MTC Dr., near Madera ES. conduct public outreach via city website. I $ 230,464 $ 230,470 2 V
Hire a program manager to facilitate the
efforts to increase walking and biking to
school:
- Plan events;
- Coordinate assemblies;
- Organize trips for children;
- Oversee crossing guard program;
- Develop and oversee Walking School Bus
routes;
- Coordinate with Kaiser Permanente for
HEAL program;
- Coordinate forums for parent education;
- Oversee the Healthy Promotions after
school club;
- Coordinate PAWS project volunteer force;
Sacramento Area - Complete a yearly evaluation report;
Council of - Assist with replication efforts in
5288(021) 04 Folsom SACOG Governments Natoma Station Elementary School conjunction with FCUSD. NI $91,480 $91,480 1 9/18/08 9/18/08 $ 91,480 1/0/00 $ - R V
Develop and implement an Education and
Encouragement Program, an adult crossing
guard training and recruitment program,
and a School Zone Traffic Enforcement
Gilroy Unified School District in Program; purchase and circulate two
5034(021) 04 Gilroy MTC MTC Santa Clara County. mobile radar speed feedback trailers. NI $ 301,500 $ 301,500 2 9/8/09 $ 301,500 1/0/00 $ - R R
Provide sidewalk improvements along
Marin Avenue, the primary walking route to
and from school; Reconstruction/widen
existing narrow sidewalk near the school
Vicinity of Tamalpais Valley School entrance; Install ADA compliant ramps and
5927(061) 04 Marin County MTC MTC (Marin Avenue) high visibility crosswalks. I $715,390 $715,390 1 2/24/08 $ 95,055 12/22/09 $ 82,845 R R
Install in-pavement lighted crosswalks at
three intersections on Santa Cruz Avenue
in the vicinity of Hillview Middle School and
Santa Cruz Avenue in the vicinity install a new striped crosswalk with
5273(017) 04 Menlo Park MTC MTC of Hillview Middle School. landing/ramp. I $143,000 $143,000 1 10/30/07 $ 15,400 7/22/09 $ 15,400 V V
Near Laurel School on Ringwood Install in-pavement lighted crosswalks,
Ave. from Coleman Ave. to Colby electronic speed feedback signs,
Ave., including in intersection with pedestrian countdown heads, safety
Edge Rd. at the South corner of lighting, signs, stripes and pavement
the school, and on Bay Rd. where markings; remove on-street parking;
in intersects with Ringwood Ave. construct asphalt concrete pathways and
04 Menlo Park MTC MTC and Greenwood Dr. asphalt curbs. I $ 441,100 $ 441,100 2 V
Install traffic calming features by extending
East side of Camino Alto; curbs, narrowing the intersection, and
04 Mill Valley MTC MTC intersection of Miller Ave./Almonte. installing a pedestrian crossing signal. I $ 718,986 $ 565,290 2 V
Page 5 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Create a comprehensive traffic safety
program to educate students about safety,
increase awareness and improve choices,
including Suggested Routes to School and
promoting events. The City will create and
coordinate a computerized carpool
program. The Silicon Valley Bicycle
Coalition (SVBC) will be responsible for
administering the "Drive Your Bike" school
5314(005) 04 Milpitas MTC MTC City of Milpitas. curriculum. NI $375,000 $375,000 1 5/5/08 $ 375,000 7/14/09 $ 11,636 R V
Consist primarily of workshops for students
(over 200 workshops over a 3-year period).
Other project components are School
Traffic Safety Rodeos, School/Family
Safety Rodeos and Safe Routes to School
5124(026) 04 Mountain View MTC MTC City of Mountain View. Passport. NI $300,000 $300,000 1 3/2/08 $ 300,000 9/15/09 $ 129,762 R R
Build on the success of California and
Marin County's SRTS projects through a 3-
year program of education, encouragement,
enforcement and evaluation to create a
significant, lasting change in the way
Napa County Office children get to and from school in Napa
6446(001) 04 of Education MTC MTC Napa County. County. NI $498,719 $498,719 1 10/28/08 $ 498,719 9/22/09 $ 25,295 R R
Frick Middle School (Foothill at
62nd Ave and 63rd Ave); Hoover
Elementary (San Pablo
Ave/Brockhurst St); Franklin
Elementary (E. 15th St/9th Ave);
Peralta Elementary (Telegraph
Ave/63rd St); Lakeview Elementary
(Grand Ave/MacArthur Ave); and Construct sidewalk bulb-outs at
Lafayette Elemenary (Market intersections serving five elementary
5012(089) 04 Oakland MTC MTC St/18th St). schools and one middle school. I $700,425 $700,425 1 3/2/08 $ 62,725 3/10/09 $ 62,725 R V
Along major routes leading to Bret Construct pedestrian bulb-outs, sidewalk
Harte MS, Manzanita ES, Paralta gap closures, and curb ramps; install
ES, Pacific Boychoir, and La pedestrian countdown signal heads,
5012(102) 04 Oakland MTC MTC Escuela Internacional schools. crosswalk striping and new bicycle lane. I $ 920,300 $ 920,300 2 V
Construct 250 feet of 4-foot wide concrete
sidewalk along the north side of Lisa Lane
Lisa Lane between Marcia Drive between Marcia Drive and Iron Horse
and Iron Horse Regional Trail (Fair Regional Trail, right in front of Fair Oaks
5375(019) 04 Pleasant Hill MTC MTC Oaks Elementary School). Elementary School. I $344,150 $344,150 1 1/14/09 $ 37,000 $ - R V
Implement engineering changes to
Vicinities of Ford Elementary pedestrian routes at four elementary
School, Grant Elementary School, schools in the city of Richmond, increasing
King Elementary School and the safety of students walking to and from
04 Richmond MTC MTC Lincoln Elementary School. these schools. I $412,167 $412,167 1 V
Adjacent to the following five Construct raised medians, sidewalks and
schools: Coronado ES, Highland bicycle paths; install lighted crosswalks and
ES, Nystrom ES, Washington ES, pavement markings; conduct education and
04 Richmond MTC MTC and Wilson ES. enforcement outreach programs. I $ 712,000 $ 477,000 2 V
Page 6 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Provide sidewalks, curb ramps, and high
visibility school crosswalks along the key
routes serving both schools; Modify an
irregularly-shaped intersection in front of St.
Anselm's School to slow vehicular travel
Vicinities of St. Anselm's School speeds, calm traffic, and shorten school
5159(013) 04 San Anselmo MTC MTC and Wade Thomas School. crosswalks. I $342,375 $342,375 1 5/19/08 $ 20,000 11/17/08 $ 2,100 R V
Three schools bordered by Improve the connectivity among three
Sacramento Street (south), schools and to the larger neighborhood by
Jackson Street (north), Powell installing two Medlock crosswalks, a traffic
Street (west) and Stockton Street signal and upgrade the existing signs and
6328(019) 04 San Francisco MTC MTC (east). pavement markings. I $830,390 $830,390 1 3/31/08 $ 144,000 12/15/09 $ 16,091 R R
Key intersections in the vicinity of Install several sidewalk bulbouts at key
6328(020) 04 San Francisco MTC MTC Jefferson Elementary School. intersections. I $608,200 $608,200 1 3/9/09 $ 122,000 $ - R V
Implement an integrated set of services
and supports at 15 target elementary
schools across the San Francisco Unified
School District (SFUSD). Put in place an
interagency system for assessing and
prioritizing school needs in addition to
San Francisco implementing the Education,
Department of San Francisco Unified School Encouragement, Enforcement, Evaluation
6447(001) 04 Public Health MTC MTC District (SFUSD). and Engineering (five Es). NI $880,469 $500,000 1 3/27/09 $ 500,000 $ - R V
Near Alamo ES and Kittredge ES,
San Francisco between 21st and 25th Ave.
Municipal (inclusive) and between Clement Construct bus bulb-outs, pedestrian refuge
Transportation and Lake St.; and on 22nd and islands, speed humps; install pedestrian
04 Agency MTC MTC 23rd Ave., adjacent to the schools. countdown signals and bicycle racks. I $ 941,512 $ 825,200 2 V
Citywide improvements of school crosswalk
5005(091) 04 San Jose MTC MTC San Jose Citywide warning signs. I $790,000 $790,000 1 4/27/08 4/27/08 $ 770,366 10/8/09 $ 137,130 R R
On Minidoka Ave. adjacent to Construct curb, gutter, sidewalk, and curb
Russo Academy, McEntee ramps; install crosswalks and safety
5005(097) 04 San Jose MTC MTC Academy, and Pala MS. lighting. I $ 976,000 $ 746,000 2 7/16/09 ###### $ 125,000 12/30/09 $ 12,427 R R
Construct sidewalk facilities on the east
side of Happy Lane, on the segment of
Happy Lane, adjacent to Sun roadway adjacent to Sun Valley Elementary
5043(028) 04 San Rafael MTC MTC Valley Elementary School. School. I $362,179 $362,179 1 4/26/08 $ 49,000 12/30/09 $ 45,791 R R
Provide selected pilot schools a foundation
to create ongoing changes in walking/biking
behaviors. A SRTS Coordinator will assist
schools in conducting assessments. In
Santa Clara County addition, Traffic Safe Communities Network
Public Health Representative schools across will provide at least one workshop for
5937(119) 04 Department MTC MTC Santa Clara County. school site representatives. NI $500,000 $500,000 1 3/8/08 3/8/08 $ 500,000 9/3/09 $ 189,566 R R
Develop a 2-year pilot SRTS program,
utilizing and built upon the techniques and
successes of federally recognized SRTS
program. Include events such as walk and
5028(047) 04 Santa Rosa MTC MTC City of Santa Rosa. bike to school days. Establish a task force. NI $250,000 $250,000 1 5/2/08 $ 250,000 7/16/09 $ 56,545 R V
Construct and widen sidewalks; install all-
Intersection of Tokay St./Amethyst way stop controls and flashing beacons
04 Santa Rosa MTC MTC Way and along Bellevue Ave. with high-visibility crosswalks. I $ 611,695 $ 611,700 2 V
Page 7 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Establish a formal and ongoing SRTS
Park Side School, Pine Crest Program for the 4 elementary schools in the
School, Brook Haven School and Sebastopol Union School District,
the Sebastopol Independent addressing the five E's, based on the
Charter School in the City of national model program in neighboring
5123(011) 04 Sebastopol MTC MTC Sebastopol. Marin County. NI $250,000 $250,000 1 4/6/08 $ 250,000 8/18/09 $ 55,596 R R
Construct approx 260 feet of new sidewalk
to close a gap fronting the Sebastopol
Union School District office located at 7601
Sebastopol Union School District Huntley Street; Install a new high-visibility
5123(012) 04 Sebastopol MTC MTC office (7601 Huntley Street). crosswalk and signage I $76,769 $76,769 1 3/31/08 7/25/08 $ 76,769 10/26/09 $ 76,769 R R
Roseland and Bellevue School Develop a comprehensive SRTS program
5920(114) 04 Sonoma County MTC MTC District neighborhoods. in eight schools. NI $ 500,000 $ 500,000 2 6/3/09 $ 500,000 1/0/00 $ - R V
1. Educate students and families; 2.
Incorporate all aspects of safety; 3.
Inplement components of "Street Smarts";
4. Create brochures; 5. Hold Safety
Fairfield-Suisun Unified School Assemblies; 6. Set up School Safe Traffic
5032(021) 04 Suisun City MTC MTC District. Zone. NI $150,000 $150,000 1 9/17/08 $ 150,000 $ - R V
Install pedestrian countdown signals for 39
intersections, 3 in-roadway crosswalk lights
and 4 vehicle speed feedback signs, at
locations on walking routes to schools
5213(027) 04 Sunnyvale MTC MTC Sunnyvale citywide throughout the City of Sunnyvale. I $295,600 $295,600 1 6/27/08 $ 295,600 8/27/09 $ 188,505 R R
Upgrade/enhance 18 crosswalks, install
approximately 22 ADA compliant
sidewalks/ramps, and install 1 traffic control
5388(006) 04 Tiburon MTC MTC Vicinity of Del Mar Middle School device. I $352,165 $352,165 1 1/22/08 8/14/09 $ 352,165 1/6/10 $ 74,227 R R
Conduct nine walkability audits/walkability
workshops, seven focus groups, 35
meetings with teacher and parent groups,
five assemblies, 75 outreach contracts, 35
West Contra Costa on-site technical assistance with local
Transportation In the cities of Richmond, San bicycle/pedestrian champions, and 120
Advisory Pablo, El Cerrito, Pinole, Hercules classroom pedestrian educational
5928(090) 04 Committee MTC MTC and El Sobrante. presentations. NI $ 561,740 $ 500,000 2 4/29/09 $ 500,000 $ - R V
San Luis Obispo
Council of Various locations surrounding Construct sidewalk gap closures with curb,
05 Arroyo Grande SLOCOG Governments Ocean View ES. gutter, and curb ramps. I $ 259,000 $ 259,000 2 V
Santa Cruz
County Regional Conduct study to identify the barriers that
Transportation In the Soquel Union Elementary currently prevent children from
5304(006) 05 Capitola AMBAG Commission School District. walking/biking to school. NI $ 49,000 $ 46,000 2 9/3/09 $ 46,000 1/0/00 $ - R R
Santa Barbara
County
Association of Various locations along school
05 Lompoc SBCAG Governments routes within the city of Lompoc. Construct sidewalk and curb ramps. I $ 378,775 $ 378,780 2 V
Transportation Implement the "Street Smarts" program to
Agency For In the cities of Soledad and King two cities in Monterey Co, targeting children
5944(093) 05 Monterey County AMBAG Monterey County City. in grades K-8 and their parents. NI $ 316,635 $ 316,640 2 3/31/09 $ 316,635 $ - R V
Page 8 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Hire a SRTS Coordinator as a liaison with
staff and parents to facilitate development
of programs, encourage participation of all
district schools, coordinate development of
Natomas Unified Sacramento Area pedestrian and bicycle safety training and
School District Council of development maps. Also provide Cross
6456(001) 05 (NUSD) SACOG Governments Natomas Unified School District Guard Training and Bike Safety Education. NI $499,700 $499,700 1 6/2/09 $ 499,700 1/0/00 $ - R V
San Luis Obispo Pathway connecting Oceanaire
Council of Drive and Vista Lago across Bicycle/Pedestrian bridge (minimum 180 ft.
5016(044) 05 San Luis Obispo SLOCOG Governments Perfumo Creek. long x 8 ft. wide) across Perfumo Creek. I $798,600 $798,600 1 6/26/08 $ 75,000 $ - R V
Conduct two Safe Routes to School
workshops and deliver on-going SRTS
San Luis Obispo San Luis Obispo programs throughout the County; hire
Council of Council of 60 schools throughout San Luis SRTS Coordinator to work directly with
6096(046) 05 Governments SLOCOG Governments Obispo Co. schools. NI $ 160,730 $ 134,730 2 11/2/09 $ 134,730 1/0/00 $ - R R
Construct sidewalk, curb and gutter on the
San Luis Obispo south side of Price Street, install bulbouts,
San Luis Obispo Council of Price Street in the vicinity of flashing crosswalk system signs, and
05 County SLOCOG Governments Nipomo Elementary School. pedestrian bridge segments. I $605,000 $605,000 1 V
Santa Barbara
County Construct an off-street multipurpose
Association of pathway separated from the roadway for
5007(042) 05 Santa Barbara SBCAG Governments Jake Boysel Multipurpose Pathway exclusive use by bicyclists and pedestrians. I $901,700 $901,700 1 5/7/08 9/8/09 $ 93,000 9/25/09 $ 61,276 R R
Santa Barbara
County Along the West side of San Ysidro
Santa Barbara Association of Rd., from just South of Montecito Construct pedestrian pathway and curb
5951(121) 05 County SBCAG Governments Union School (MUS) to Hwy. 101. ramps. I $ 392,746 $ 392,750 2 4/10/09 $ 80,000 $ - R V
Santa Cruz Improvements that will change the route
County Regional that children currently use to walk and bike
Transportation to school (Mission Hill MS and Bay View
5025(044) 05 Santa Cruz AMBAG Commission SR1/Mission St. ES). I $ 172,326 $ 172,330 2 2/27/09 9/3/09 $ 172,330 $ - R R
The Coe Avenue Enforcement and
Education Program is a follow-on to the
Office of Traffic Safety project specifically
designed for Fitch Middle School. Help to
Transportation reduce pedestrian accidents with a
Agency For combination of enforcement, education and
5316(005) 05 Seaside AMBAG Monterey County Coe Avenue community involvement. NI $36,000 $36,000 1 11/5/08 $ 36,000 1/6/10 $ 22,116 R R
Santa Cruz
County Regional Various locations near elementary Install driver feedback signs and count-
Transportation schools in residentail down pedestrian signals at various
5031(016) 05 Watsonville AMBAG Commission neighborhoods locations near schools. I $297,000 $297,000 1 3/26/09 $ 297,000 $ - R V
Intersection of 7th Ave. and Install in-pavement lighted crosswalk;
06 Avenal KCAG KCAG Orange St. and along Union Ave. construct sidewalk gap closure. I $ 53,425 $ 53,430 2 V
Install zebra-stripe and raised crosswalks,
Adjacent to the following six signs, bulb-outs, curb extensions, crossing
schools: Cecil Ave. MS, Terrace islands, pedestrian-activated LED flashing
ES, Princeton St. School, beacons, curb ramps, countdown signals,
Morningside ES, Harvest ES, and audio signals, and bicycle parking; relocate
5227(037) 06 Delano KCOG KCOG La Vina MS one in-pavement lighted crosswalk. I $ 398,310 $ 398,310 2 9/11/09 $ 50,000 $ - R R
Page 9 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Provide education and encouragement
services; furnish students with
bicycle/pedestrian safety education; equip
community members with
bicycle/pedestrian safety training through a
"train-the-trainer" program; provide 5 SRTS
Various schools in the city of workshops to parent groups and school
06 Delano KCOG KCOG Delano. officials. NI $ 90,000 $ 90,000 2 V
Along P St. near A.E. Mills IS. and
along O St. between A.E. Mills MS
and Firebaugh MS and near Hazel Construct sidewalks and curb ramps; re-
5224(012) 06 Firebaugh COFCG COFCG M. Bailey ES. stripe crosswalks. I $ 393,000 $ 393,000 2 3/17/09 $ 35,000 $ - R V
The intersection of Belmont Install traffic signal light at the intersection
5060(150) 06 Fresno COFCG COFCG Avenue and Mariposa Avenue of Belmont Avenue and Mariposa Avenue. I $388,058 $388,058 1 1/7/08 10/28/08 $ 388,058 12/30/09 $ 66,300 R R
Implement an educational program on
bicycle and pedestrian safety to students
through the services of the Volunteer
Center of Fresno, including: a) High
Visibility School Based on Events for
"Keeping Kids Safe Day"; b) School
assembly and classroom activities. c).
06 Fresno COFCG COFCG Tehipite Middle School School-Parent safety meetings. NI $23,500 $23,500 1 V
Along Pinedale, Spruce, Locust,
Fir, Beechwood, Maroa, and Construct sidewalk gap closures and curb
06 Fresno COFCG COFCG College Avenues. ramps. I $ 348,600 $ 348,600 2 V
Implement a School Safety Education Day;
conduct safety activities for safe travel to
and from school; provide educational
06 Fresno COFCG COFCG Pinedale ES. materials and safety helmets. NI $ 8,500 $ 8,500 2 V
Qunice Ave. from Tahoe Ave. to
5942(179) 06 Fresno County COFCG COFCG East of Sandy Ave. Construct asphalt sidewalks. I $ 61,220 $ 61,220 2 5/26/09 $ 10,678 $ - R V
5942(180) 06 Fresno County COFCG COFCG On Maple Ave. near Weldon Ave. Install flashing yellow beacons. I $ 119,760 $ 119,760 2 6/2/09 $ 19,700 $ - R V
North side of Clarkson Ave. from
Santa Clara Ave. to 0.3 miles west
5942(181) 06 Fresno County COFCG COFCG of San Mateo Ave. Construct asphalt walkway. I $ 56,720 $ 56,720 2 6/2/09 $ 9,946 $ - R V
Construct curb, gutter, sidewalk, drive
Stine Road at Bianchi Way and approaches, wheelchair ramps and AC tie-
Wood Lane (Curran Middle School ins along Stine Road at Bianchi Way and
5950(285) 06 Kern County KCOG KCOG & Munsey Elem. School). Wood Lane. I $243,000 $243,000 1 6/14/08 6/20/08 $ 243,000 $ - R V
Conduct safe routes to school education for
Kern County parents, children, school officials, and the
Council of 47 School Districts located community at large through workshops, site
6087(028) 06 Governments KCOG KCOG throughout Kern County. assessments, and outreach. NI $ 220,641 $ 190,570 2 8/25/09 $ 190,570 1/0/00 $ - R R
Cinnamon and Meadow Lane Implement a Walking School Bus Program;
06 Lemoore KCAG KCAG Elementary Schools. implement a safety education program. NI $ 102,419 $ 102,420 2 V
Tulare County In the Page-Moore Tract subdivision,
Association of Alameda St., Lafavette Ave., construct approximately one mile of new
06 Lindsay TCAG Governments Sierra View St. and Stanford Ave sidewalks over a ten-block area. I $810,304 $810,304 1 V
Tulare County In the Page-Moore Tract subdivision,
Lindsay Unified Association of Alameda St., Laurel Ave. and construct approximately 1.2 miles of new
06 School District TCAG Governments Sycamore Ave sidewalks over a seven-block area. I $833,756 $833,756 1 V
Page 10 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Install curbs, gutters, sidewalks, and street
lights along Lake St. (from Clark to Ellis);
Clark St. and Kennedy St. (from Lake to
Tulare), and Adel St. (from Lake to
Merced). Construct pedestrian crossing at
Lake St. (from Clark to Ellis); Clark the intersections of Lake St. & Clark St. and
St. and Kennedy St. (from Lake to Lake St. & Adel St. The Lake-Clark
Tulare), and Adel St. (from Lake to crossing will include two solar powered LED
5157(068) 06 Madera MCTC Madera CTC Merced). pedestrian activated crosswalk beacons. I $709,000 $709,000 1 V
Along the South side of Martin St.
from school complex to Rd. 26;
along the West side of North D St.
from school complex to Adell St.;
along Ellis St. between North D St.
06 Madera County MCTC Madera CTC and North Lake St. Construct pedestrian/bicycle paths. I $ 290,605 $ 290,610 2 V
Along Perkins Ave., Browning
06 McFarland KCOG KCOG Ave., and Kern Ave. Construct sidewalk and curb ramps. I $ 286,750 $ 286,750 2 V
Along the North side of E. Parlier
Ave. between Milton Ave. and
06 Parlier COFCG COFCG Mendocino Ave. Construct curb, gutter, and sidewalk. I $ 378,200 $ 205,000 2 V
Along the East side of Frankwood Construct sidewalk and curb ramps; install
06 Reedley COFCG COFCG Ave. in-pavement crosswalk lights. I $ 93,650 $ 93,650 2 V
1. Conduct 5 walkability/bikability audits per
year at K-8 schools; 2. Annually invite
schools to initiate school site
walking/bicycling events and programs; 3.
Hold an annual summit or conference to
promote walking and biking at school and
district level; 4. Initiate a SRTS Resource
Sacramento Area All school districts that have K-8 Advisory Committee; 5. Prepare and
Council of schools located within the present an annual report to the County
5924(146) 06 Sacramento County SACOG Governments unincorporated County. Board of Supervisors. NI $500,000 $500,000 1 6/30/08 $ 500,000 12/23/09 $ 110,256 R R
Tulare County
Association of
06 Tulare TCAG Governments Laspina St. at Kohn ES. Install in-pavement lighted crosswalk. I $ 80,000 $ 78,000 2 V
Tulare County Purchase ultra high-visibility, hand-held
Association of Seven schools in the city of Tulare LED stop signs for all school crossing
06 Tulare TCAG Governments where crossing guards are utilized. guards. NI $ 4,500 $ 4,500 2 V
In the City of Strathmore along the
West side of Rd. 230 between
Ave. 198 and Ave. 196, and along
Tulare County the North side of Ave. 196 between
Association of Balfour and Rd. 230; also at the Construct sidewalks; install two solar-
06 Tulare County TCAG Governments intersection of Rd. 230/Ave. 196. powered overhead flashing beacons. I $ 308,700 $ 308,700 2 V
Tulare County Along the North side of Tulare Ave.
Association of between Santa Fe St. and
06 Visalia TCAG Governments Pinkham ES. Construct sidewalk and curb ramps. I $ 318,909 $ 318,910 2 V
Intersection of Filburn/Griffith Ave.
and Fifth/Broadway St., near
Teresa Burke ES and Karl
06 Wasco KCOG KCOG Clemons ES. Install in-pavement lighted crosswalk. I $ 249,664 $ 249,670 2 V
Install six in-pavement lighted crosswalk,
Tulare County four mast arm lights, and seventy-six high
Association of Routes to the City of Woodlake's visibility school crossing signs on routes to
5284(005) 06 Woodlake TCAG Governments five major schools. the City's five major schools. I $489,020 $489,020 1 9/17/08 $ 489,000 $ - R V
Page 11 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Construct improvements such as curb bulb-
outs, automated bollards, high visibility
signs, pedestrian count -down signals,
embedded flashing LED lighted crosswalks
and 24-hour call boxes at the intersection
Intersections of Alhambra Rd & of Alhambra Rd and 2nd St and the
2nd St and Commonwealth Ave & intersection of Commonwealth Ave and
5130(017) 07 Alhambra SCAG LAMTA Curtis Ave Curtis Ave I $270,189 $270,189 1 12/4/09 $ 264,258 $ - R R
Prepare Safe Routes to School maps and
conduct training sessions for both students
and their parents on bicycle/pedestrian
07 Artesia SCAG LAMTA In the city of Artesia. safety. NI $ 230,000 $ 230,000 2 V
Include new education and public outreach
components in the school curriculum to
inform students of bicycle/pedestrian safety
and the benefits of walking/bicycling to
07 Avalon SCAG LAMTA In the city of Avalon. school. NI $ 107,600 $ 100,000 2 V
Re-stripe crosswalks; install stop bars,
At 12 schools within the city of pavement markings, curb ramps, and
5112(011) 07 Azusa SCAG LAMTA Azusa. school area warning signs. I $ 102,720 $ 102,720 2 V
Vicinities of Bell Gardens, Cesar Install/construct school area warning signs,
Chavez and Suva Elementary pavement repainting, pedestrian countdown
Schools and Bell gardens signals, radar speed signs and in pavement
5373(010) 07 Bell Gardens SCAG LAMTA Intermediate School. crosswalks with flashing lights. I $337,280 $337,280 1 V
Construct bulb-outs at John Muir, Luther
Burbank Middle school & Bret Harte
Elementary School; Install bicycle &
pedestrian detection at 12 intersections;
John Muir, Luther Burbank Middle Install countdown pedestrian signal heads,
school & Bret Harte Elementary bicycle loop detection or video camera
School; various intersections and surveillance at various intersections;
5200(026) 07 Burbank SCAG LAMTA various locations. Construct sidewalks at various locations. I $887,600 $887,600 1 4/18/08 $ 30,000 $ - R V
Implement a SRTS program by conducting
eight Parent Faculty Association meetings,
eight bicycle rodeos, and three "Bike to
07 Claremont SCAG LAMTA In the city of Claremont. School with a Police Officer" events. NI $ 356,430 $ 356,430 2 V
Install traffic signal, pedestrian stop signals
with median beacons, and flashing stop
Within the city limits of El Monte at signs; construct sidewalks, bulb-outs and
07 El Monte SCAG LAMTA 11 locations near 11 schools. curb ramps. I $ 1,000,000 $ 611,000 2 V
Install traffic school signs, pavement
legends, crosswalks, bulb-outs, overhead
Near Fedde MS, Ferguson ES, and pedestrian signals, and radar speed
07 Hawaiian Gardens SCAG LAMTA Hawaiian ES. feedback signs. I $ 817,272 $ 611,000 2 V
Sidewalk Gap Closure for George W.
George W. Crozier Middle School Crozier Middle School and Inglewood High
and Inglewood High School; Daniel School; Traffic calming measures or other
Freeman, Highland, Oak Street improvements for Daniel Freeman,
and Clyde Woodworth Elementary Highland, Oak Street and Clyde Woodworth
07 Inglewood SCAG LAMTA Schools. Elementary Schools. I $239,470 $239,470 1 V
In the vicinity of La Verne Heights
ES, Oak Mesa ES, and Marion
07 La Verne SCAG LAMTA Roynon ES. Install pedestrian countdown signals. I $ 44,120 $ 44,120 2 V
Page 12 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Phase I: Collect traffic counts, conduct
walking audits, evaluate crime data, vehicle
accident data, along with parent survey and
student tally sheets; Phase II: Distribute
school-specific suggested safe routes to
school maps and educate students school
staff, parents and stakeholders on
bicycle/pedestrian safety; Phase III: Assess
07 Lawndale SCAG LAMTA In the city of Lawndale. the SRTS Program. NI $ 298,000 $ 298,000 2 V
Educate students and parents about
pedestrian/bicycle safety with workshops,
At Elementary and Middle schools student participation in demonstrations,
within Long Beach Unified School safety rodeos, and certificates of
07 Long Beach SCAG LAMTA District. commendation for commitment. NI $ 500,000 $ 500,000 2 V
Watch the Road educational outreach
program will educate the children and the
community about the unsafe conditions
around schools as well as determining the
skills and awareness. The long-term goal is
to create safe and long lasting habits that
5006(531) 07 Los Angeles SCAG LAMTA West Los Angeles and the Valley young children will carry into adulthood. NI $499,003 $499,003 1 3/8/08 3/8/08 $ 499,003 7/16/09 $ 129,685 R V
Develop a traffic safety education program
25 schools within the Los Angeles and adopt the successful "Watch the Road"
5006(645) 07 Los Angeles SCAG LAMTA Unified School District. traffic safety campaign. NI $ 500,000 $ 251,000 2 V
Along San Pedro St. and Martin
07 Los Angeles SCAG LAMTA Luther King Jr. Blvd. Construct sidewalks and crosswalks. I $ 910,000 $ 910,000 2 V
In the Westchester area of Los Construct sidewalks, bulb-out, and bicycle
Angeles on Sepulveda Bl. Between facilities; install radar speed feedback
07 Los Angeles SCAG LAMTA 80th and 83rd St. signs. I $ 888,000 $ 625,460 2 V
Near Wilbur ES and Portola MS at
the intersection of Wilbur
Ave./Crebs Ave. and along the Install crosswalk enhancements, radar
North side of Canasta St. between speed feedback signs, and sidewalk
07 Los Angeles SCAG LAMTA Mecca Ave. and Veloz Ave. improvements. I $ 435,000 $ 435,000 2 V
Develop an
education/encouragement/enforcement
program that promotes safety for children
Eleven Elementary Schools within who walk/bicycle to school, parents, the
07 Los Angeles SCAG LAMTA the community of Watts. schools, and community members. NI $ 450,000 $ 250,000 2 V
In Venice near Westminister ES,
along Main St. from Santa Monica
city limit to Grand Blvd., also at
Westminister Ave./Main St.
intersection, and on Abbot Kinney Install bulb-outs, bike lanes and radar
Blvd. were it intersects with speed feedback signs; enhance
07 Los Angeles SCAG LAMTA Broadway and Westminister Ave. crosswalks. I $ 622,000 $ 622,000 2 V
45 Elementary Schools in the Los Conduct workshops and add interactive
07 Los Angeles SCAG LAMTA Angeles Unified School District. lesson plans to school curriculums. NI $ 500,000 $ 500,000 2 V
Enhance safety and encourage children
Encompasses the entire and their parents to walk/bicycle to school
Los Angeles unincorporated area of Los by developing suggested safe routes to
5953(559) 07 County SCAG LAMTA Angeles County. school. NI $ 500,000 $ 500,000 2 9/1/09 $ 500,000 1/0/00 $ - R R
Page 13 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Los Angeles Intersection of Broadway Ave. and Install traffic signal, safety lighting, curb
07 County SCAG LAMTA Reichling Ln. ramps and crosswalks. I $ 350,700 $ 315,700 2 V
Update signage, construct new sidewalk,
curb & gutter, in-pavement flashers,
Vicinity of Loma Vista Elementary thermoplastic crosswalks and striping, in
(Slauson & 58th St to the south, the vicinity of Loma Vista Elementary,
Loma Vista Ave to the east, including Slauson & 58th St to the south,
Everett Ave to the west and 57th Loma Vista Ave to the east, Everett Ave to
St. to the north) the west and 57th St. to the north.
07 Maywood SCAG LAMTA I $226,380 $226,380 1 V
Install nine bulb-outs, 13 thermoplastic
crosswalks and legends, 15 new signs, two
raised crosswalks, five mobile speed
Along E. Lemon Ave. near feedback signs, eight new pedestrian
Bradoaks ES and along Duarte Rd. countdown heads, two overhead pedestrian
07 Monrovia SCAG LAMTA near Sante Fe MS. signals, and one median fence. I $ 731,150 $ 731,150 2 V
Updating traffic signage, thermoplastic
striping, and theromplastic crosswalks;
repainting pavement legends; installing in-
pavement flashers; and replacing damaged
Vicinities of Greenwood and sidewalk for Greenwood and Washington
Washington Elementary schools. Elementary schools.
5247(013) 07 Montebello SCAG LAMTA I $362,923 $362,923 1 7/30/09 $ 362,923 $ - R R
Install pedestrian signal, traffic school
signs, pavement markings, raised
crosswalks, bulb-outs, pedestrian
On Bradshaw St., South of Beverly countdown heads and radar speed
07 Montebello SCAG LAMTA Blvd. feedback signs. I $ 388,640 $ 321,420 2 V
Ventura County Construct sidewalk, curb ramps, bulb-outs,
Transportation At five locations near seven and in-pavement lighted crosswalk;
07 Oxnard SCAG Commission schools in city of Oxnard. upgrade striping and signage. I $ 518,120 $ 518,120 2 V
Cleveland, Don Benito, Eugene Improve safety in school zones by
Field, Hamilton, Jefferson, modifying behavior of both pedestrians and
Longfellow, Madison, and Marshall motorists through a comprehensive multi-
Fundamental Elementary Schools school education, encouragement, and
07 Pasadena SCAG LAMTA and Blair International. enforcement program. NI $ 600,000 $ 250,000 2 V
Promote walking to school with a joint
effort between the City and the Palos
Verdes Peninsula Unified School District
(PVPUSD). Develop tools to encourage
Rancho Palos Palos Verdes Peninsula Unified walking to school through education and
07 Verdes SCAG LAMTA School District (PVPUSD). incentives. NI $30,000 $30,000 1 V
On Amelia Ave. between 5th and
Gladstone Streets, near Shull ES Construct sidewalk and retaining wall;
07 San Dimas SCAG LAMTA and Ekstrand ES. replace guardrailing. I $ 635,745 $ 483,290 2 V
Construct improvements, such as bulb-
Vicinities of Morningside Elem. outs, crosswalks, curb ramps, stop bars,
School, O'Melveny Elem. School, countdown signals, pedestrian refuge
San Fernando Elem. School and islands, for four K-8 public schools within
5202(013) 07 San Fernando SCAG LAMTA San Fernando Middle School. it's jurisdiction. I $994,126 $994,126 1 V
Page 14 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
In the city of San Fernando at 18
intersections adjacent to the
following five public schools:
Gridley ES, Morningside ES,
O'Melveny ES, San Fernando ES,
and San Fernando MS (also Construct bulb-outs with perpendicular curb
07 San Fernando SCAG LAMTA adjacent to six private schools). ramps. I $ 999,850 $ 999,850 2 V
Hold two community workshops; hire a
consultant to coordinate administration,
education, outreach and evaluation tasks;
establish 16 core teams of key
stakeholders that will develop and execute
07 San Marino SCAG LAMTA In the city of San Marino. individualized SRTS plans. NI $ 310,000 $ 310,000 2 V
In vicinity of Santa Clarita, Newhall and
Cedar Creek Elementary Schools, perfrom
crossing improvements; Install oversized
fluorescent yellow-green school signs,
speed feedback signs and pedestrian
Vicinity of Santa Clarita, Newhall countdown signals; Restrip existing
and Cedar Creek Elementary transverse crosswalks with ladder style;
5450(034) 07 Santa Clarita SCAG LAMTA Schools. And construct bulbouts. I $586,476 $586,476 1 1/8/08 7/10/08 $ 586,470 11/25/09 $ 586,470 R R
Near Peachland ES, Mitchell ES, Install bulb-outs, signage, and pedestrian
5450(046) 07 Santa Clarita SCAG LAMTA and Rosedell ES neighborhoods. countdown heads; widen sidewalk. I $ 637,270 $ 637,270 2 7/1/09 $ 89,000 $ - R V
The Santa Cruz County Health Services
Santa Cruz Agency and the Santa Cruz Area
Santa Cruz County County Regional Transportation Management Association
Health Services Transportation Santa Cruz County and cities in are collaborating to motivate more students
6448(001) 07 Agency AMBAG Commission the County to safely walk and bike to school. NI $410,550 $410,550 1 8/12/08 $ 410,550 7/28/09 $ 54,663 R R
Procure the services of a consultant to
coordinate education, outreach, evaluation
and documentation of pedestrian and
bicycle programs to be held at the City's 2
middle schools and 2 of the 8 elementary
07 Santa Monica SCAG LAMTA City of Santa Monica. schools. NI $197,000 $197,000 1 V
Install 122 countdown pedestrian signal
heads, 12 driver speed awareness signs, 2
new flashing beacons, and 6000 sq. ft.
widened sidewalk throughout the city as
identified by comprehensive pedestrian
safety review and multi-agency evaluation.
5257(020) 07 South Gate SCAG LAMTA Locations citywide I $905,000 $905,000 1 2/18/09 $ 90,000 $ - R V
Hold two community workshops; hire a
consultant to coordinate administration,
education, outreach and evaluation tasks;
establish 16 core teams of key
stakeholders that will develop and execute
07 South Gate SCAG LAMTA In the city of South Gate. individualized SRTS plans. NI $ 400,000 $ 200,000 2 V
Provide Illuminated In-Road Crosswalk
system adjacent to Maple Elementary.
System includes flashing yellow LED lights
Ventura County embedded in pavement along 2 marked
Transportation Kimber Dr (adjacent to Maple crosswalks on Kimber Dr and LED
07 Thousand Oaks SCAG Commission Elementary). pedetrain warning signs. I $113,000 $113,000 1 V
Page 15 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Conduct education campaign promoting
safety and focusing on crosswalk use;
Ventura County Conduct a "safety day" which will include
Transportation staff from the City's Public Works
07 Thousand Oaks SCAG Commission At Aspen ES near Oberlin Ave. Department and Police Department. NI $ 12,000 $ 12,000 2 V
Ventura County
Transportation Intersection of Oberlin Ave. and
07 Thousand Oaks SCAG Commission Queenbury St. Construct raised crosswalks with bulb-outs. I $ 49,000 $ 49,000 2 V
Assign two crossing guards to the
Ventura County intersection of Gainsborough Rd. at
Transportation Glenwood ES, Acacia ES, and Windsor Dr. and Gainsborough Rd. at
07 Thousand Oaks SCAG Commission Redwood MS. Dover Ave. NI $ 35,000 $ 35,000 2 V
Install in-pavement lighted crosswalk and
flashing beacon, bulb-outs, signage,
Ventura County On Gainsborough Rd. on the way striping, and bicycle racks; In addition, a
Transportation to Glenwood and Acacia ES and number of non-infrastructure features will
07 Thousand Oaks SCAG Commission Redwood MS. be incorporated into the project. I $ 367,000 $ 367,000 2 V
Riverside County Purchase pole-mounted radar speed
Transportation feedback signs and a mobile radar trailer;
08 Blythe SCAG Commission In the city of Blythe. train and equip crossing guards at all sites. NI $ 486,650 $ 486,650 2 V
Install sidewalk on 5 streets; Construct 28
ADA ramps; Construct retaining wall;
Perform misc. tree and vegetation removal;
Relocate mailboxes; Construct curb and
San Bernardino gutter; Install 51 street lights; Install bicycle
Associated racks, secured fencing and gates for Los
5467(006) 08 Chino Hills SCAG Governments Locations citywide Serranos Elementary School. I $995,000 $995,000 1 3/28/08 $ 75,000 $ - R V
Along Country Club Dr. near Los
San Bernardino Serranos ES and near Chaparral
Associated ES on: Williams Ave., Ethel St.,
08 Chino Hills SCAG Governments Esther St., and Cecelia St. Construct sidewalks. I $ 856,130 $ 856,130 2 V
Install zebra-stripe crosswalks, advanced
In the vicinity of Cesar Chavez ES, stop-yield bar, signs, bulb-outs, crossing
Coral Mountain Academy, Palm islands, tapered curb extensions, overhead
Riverside County View ES, Peter Pendleton ES, crosswalk lighting, pedestrian-activated
Transportation Valley View ES, and Bobby Duke flashing beacons, pedestrian countdown
08 Coachella SCAG Commission MS. signal, and sidewalk. I $ 482,500 $ 482,500 2 V
Coachella Valley Riverside County At schools within the cities of Deliver a comprehensive bicycle/pedestrian
Association of Transportation Desert Hot Springs, Palm Springs safety education and encouragement
08 Governments SCAG Commission and Coachella. program. NI $ 447,420 $ 447,420 2 V
Install missing sidewalks and handicap
San Bernardino ramps on designated school routes serving
Associated Vicinities of US Grant Elementary US Grant Elementary School and Colton
5065(013) 08 Colton SCAG Governments School and Colton Middle School. Middle School. I $446,274 $446,274 1 7/25/08 $ 44,000 $ - R V
Riverside County Within two mile radius of three ES
Transportation and one MS, within the city of Install pedestrian safety improvements and
08 Desert Hot Springs SCAG Commission Desert Hot Springs. bikeways along school routes. I $ 497,140 $ 497,140 2 V
San Bernardino Intersection of Alder Ave & Install school pedestrian crossing traffic
Associated Wabash Ave (for Alder Middle signal at the intersection of Alder Ave &
5307(015) 08 Fontana SCAG Governments School). Wabash Ave for Alder Middle School. I $324,040 $324,040 1 V
Page 16 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
In the vicinity of Cahuilla ES, Cielo
Riverside County Vista ES, Katherine Finchy ES,
Transportation Vista del Monte ES, and Raymond Install pedestrian safety improvements and
08 Palm Springs SCAG Commission Cree MS. bikeways along school routes. I $ 382,500 $ 382,500 2 V
Along the East side of the Deer
Creek Channel near its intersection Upgrade maintenance access road to a
San Bernardino with The Pacific Electric Trail, Class I Bike Trail and provide a connection
Rancho Associated halfway between Baseline Rd. and at its intersection with the Pacific Electric
08 Cucamonga SCAG Governments Highland Ave. Trail. I $ 274,984 $ 225,990 2 V
Launch a pilot program to educate children
San Bernardino and their parents about the benefits of
Rancho Associated Five schools within the city of utilizing the Pacific Electric Trail as a safe
08 Cucamonga SCAG Governments Rancho Cucamonga. route for walking and bicycling to school. NI $ 123,800 $ 114,800 2 V
San Bernardino Install in-pavement lighted crosswalks,
Associated At 14 Elementary and three Middle signage, and other infrastructure
5083(010) 08 Redlands SCAG Governments Schools in the city of Redlands. improvements. I $ 1,000,000 $ 1,000,000 2 1/14/09 $ 61,272 1/0/00 $ - R V
San Bernardino Intersections of Eucalyptus
Associated Ave./McKinley St. and Willow Construct curb ramps with in-pavement
5205(014) 08 Rialto SCAG Governments Ave./Holladay Pl. warning signal. I $ 476,000 $ 476,000 2 8/28/09 $ 75,000 $ - R R
Deliver a comprehensive bicycle/pedestrian
safety education and encouragement
Riverside County program in schools with a focus on
Transportation education, encouragement, evaluation, and
08 Riverside County SCAG Commission In the city of Riverside. capacity-building activities. NI $ 349,520 $ 349,520 2 V
Riverside County Department of Public
Heath's (DOPH) Injury Preventive Services
(IPS) and its partners will develop a 2-year
comprehensive SRTS Education and
Riverside County Riverside County Encourage program for Alvord and
Department of Transportation Alvord and Riverside Unified Riverside Unified School Districts, in the
5956(176) 08 Public Health SCAG Commission School Districts, City of Riverside. City of Riverside. NI $491,580 $491,580 1 3/28/08 3/28/08 $ 491,580 9/25/09 $ 200,077 R R
San Bernardino
San Bernardino Associated On the East side of Almond Ave. Construct curb, gutter and sidewalk gap
08 County SCAG Governments near Almond ES. closure. I $ 296,680 $ 296,680 2 V
Ridgecrest Rd. from Pah Ute Ave.
San Bernardino to Pebble Beach Dr.; Pah Ute Ave.
San Bernardino Associated from Ridgecrest Rd. to Tamarisk
08 County SCAG Governments Rd. Construct sidewalk. I $ 287,200 $ 287,200 2 V
Launch a program to provide safety
San Bernardino At schools in the cities of education as well as information and
San Bernardino Associated Victorville, Apple Valley, Hesperia, encouragement to initiate Safe Routes to
08 County SCAG Governments Adelanto, and Barstow. School Programs in 12 K-8 schools. NI $ 316,080 $ 316,080 2 V
San Bernardino On Grandview Rd. between the
San Bernardino Associated entrance to Grandview ES and
08 County SCAG Governments Walnut Dr. Construct sidewalk with asphalt berm. I $ 105,540 $ 105,540 2 V
A countywide effort to provide safety
San Bernardino San Bernardino education, information and encouragement
County Public Associated to initiate SRTS programs in all major
5954(109) 08 Health Department SCAG Governments County-wide. districts in the County. NI $473,218 $473,218 1 3/28/08 $ 473,218 11/25/09 $ 112,484 R R
Page 17 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Serve as a comprehensive program
covering all five E's and reaching out to all
of the City's 26 elementary schools. It
includes developing a SRTS Toolkit,
holding a Citywide Workshop and
conducting individual SRTS walking audits
at each of the 26 elementary schools.
All of the City's elementary schools Expected to complete in 2 years, 13
5450(037) 08 Santa Clarita SCAG LAMTA (26). schools a year. NI $295,000 $295,000 1 9/18/08 $ 295,000 11/2/09 $ 69,756 R R
Installation of a new traffic signal,
construction of infill portions of sidewalk,
curb and gutter, curb ramps, pavement
San Bernardino markers, existing traffic signal
Associated Oak Glen Road from 5th Street to modifications and the installation of bike
5457(016) 08 Yucaipa SCAG Governments Sunnyside Drive lanes, crosswalks and traffic signs. I $390,000 $390,000 1 9/10/09 $ 390,000 $ - R R
Initiate School Safety Program to identify
and correct traffic safety issues related to
children getting to and from schools,
San Bernardino addressing the areas of education,
Associated encouragement, enforcement and
08 Yucca Valley SCAG Governments In the town of Yucca Valley. engineering. NI $ 125,000 $ 125,000 2 V
Within the boundary of Mammoth Phase I: Construct sidewalk gap closure;
Lakes Unified School District, just widen shoulders to and add bike lanes;
to the West of Mammoth ES and Phase II: Construct sidewalk gap closure;
5439(022) 09 Mammoth Lakes RURAL Mono CTC MS. install school zone flashing beacons. I $ 1,049,500 $ 749,000 2 V
Construct sidewalk and curb ramps;
At the intersection adjacent to reconstruct alley ramp and drainage
09 Tehachapi KCOG KCOG Jacobsen MS. swales; relocate safety lighting standard. I $ 250,000 $ 250,000 2 V
Installation of new sidewalks, curbs,
gutters, and driveways including gap
Intersection of Elm Avenue and closures and repairs; ADA compliant
California Street (crossing into handicap ramps; and at grade lighted
5254(011) 10 Atwater MCAG MCAG Shaffer Elementary School). crosswalks. I $445,500 $445,500 1 6/5/09 $ 445,500 $ - R V
Implement a 2-year SRTS project (2 pilot
schools in year 1 and expanded to 15
additional schools in year 2). Strategies
include: a) Establish SRTS Taskforces; b)
Conduct parent and community outreach; c)
Implement an incentive program; d)
Establish Parent Safety Patrols or crossing
guard programs; e) Use expert assistance;
f) Conduct an advertising campaign; g)
Meet with city engineers and law
Chula Vista San Diego enforcement; h) Organize a steering
Elementary School Association of Chula Vista Elementary School committee; i) Evaluate objectives to make
6445(002) 10 District SANDAG Governments District program modifications. NI $499,025 $499,025 1 7/24/08 $ 499,025 1/0/00 $ - R V
Near Selma Herndon ES and
5256(008) 10 Livingston MCAG MCAG Campus ES. Construct sidewalks. I $ 871,000 $ 871,000 2 5/7/09 $ 86,000 $ - R V
Intersection of 7th St./K St.; near
seven schools within the city of Install in-pavement lighted crosswalk;
10 Los Banos MCAG MCAG Los Banos. install 14 radar speed feedback signs. I $ 262,350 $ 262,350 2 V
San Joaquin
Council of On Eighth St. and Farmington Rd.
5008(088) 10 Stockton SJCOG Governments near Montezuma ES. Construct sidewalk gap closures. I $ 427,740 $ 427,740 2 8/25/09 $ 52,800 $ - R R
Page 18 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
10 schools within the four public
San Joaquin School Districts of Lincoln Unified,
Council of Lodi Unified, Manteca Unified, and Hire a SRTS Program Coordinator to
5008(089) 10 Stockton SJCOG Governments Stockton Unified. organize and implement a SRTS Program. NI $ 500,000 $ 500,000 2 8/20/09 $ 500,000 1/0/00 $ - R R
1. Prepare SRTS maps; 2. Apply Selective
Traffic Enforcement; 3. Develop Traffic
Southern Safety Awareness and Education Programs
California for students and residents of Brawley; 4.
Association of Initiate School Crossing Guard Training
5167(021) 11 Brawley RURAL Governments City of Brawley. Programs. NI $180,000 $180,000 1 7/10/08 $ 180,000 12/22/09 $ 79,600 R R
Construct/install an offset median, bulb
outs, setback limit lines and other
enhanced striping, prominent crosswalk
zebra striping, ADA-compliant pedestrian
San Diego ramps, non-slip sidewalk grating, flashing
Association of Vicinities of Rice Elementary and yellow beacons, and "school zone" warning
5203(024) 11 Chula Vista SANDAG Governments Otay Elementary Schools signs. I $621,115 $621,115 1 10/24/07 $ 63,000 $ - V V
Intersection of Montgomery Ave.
and Westminster Dr.; West side of
San Diego Westminster Dr. and Summit Ave.
Association of from Montgomery Ave. to Verdi Reconfigure intersection with speed
5446(013) 11 Encinitas SANDAG Governments Ave. table/crosswalk; construct walkway. I $ 723,762 $ 651,390 2 3/9/09 $ 94,400 $ - R V
Southern
California Construct sidewalk, curb and gutter and in-
Association of Pedestrian routes near Grace fill paving on pedestrian routes near Grace
5958(051) 11 Imperial County SCAG Governments Smith Elementary School. Smith Elementary School. I $412,000 $412,000 1 4/24/08 8/6/09 $ 412,000 $ - R R
At La Mesa Dale ES, Lemon Ave.
ES, Maryland Ave. ES, Murray Implement a four year SRTS program
San Diego Manor ES, Northmont ES, Rolando consisting of education, encouragement,
Association of ES, La Mesa MS, and Parkway enforcement, engineering and evaluation
5207(029) 11 La Mesa SANDAG Governments MS. components in six ES and two MS. NI $ 453,090 $ 453,090 2 4/29/09 $ 453,090 12/16/09 $ 2,171 R R
San Diego Along Glen St. near Lemon Ave. Construct curb, gutter, sidewalks, and
Association of ES from the school to just past the pedestrian refuge islands; modify roadway
5207(030) 11 La Mesa SANDAG Governments intersection of Glen St./Alpine St. signing, striping, and markings. I $ 522,300 $ 522,300 2 3/31/09 $ 72,800 $ - R V
Construct curb, gutter, sidewalks, curb
San Diego ramps; install in-pavement lighted
Association of On Palm St. at the intersections of crosswalks and in-pavement lighted
5418(017) 11 Lemon Grove SANDAG Governments Golden Ave. and School Ln. centerline markers. I $ 929,754 $ 743,510 2 9/2/09 $ 85,766 $ - R R
San Diego Install sidewalks, curb ramps, bulb-outs,
Association of crosswalks, and signing and striping
11 National City SANDAG Governments On Coolidge Ave. near Kimball ES. enhancements. I $ 830,000 $ 730,000 2 V
Install traffic control devices and calming
San Diego measures including pop-outs, a center
Association of Along California St. near Lincoln median, and two radar speed feedback
11 Oceanside SANDAG Governments MS and Palmquist ES. signs. I $ 63,320 $ 63,320 2 V
1. Create a SRTS Community Coalition for
political District 4 of San Diego; 2. Promote
Walk to School Week events and
collaborate a community wide Walk to the
Rady Children's Moon Campaign for the 27 elementary
Hospital, Center for San Diego schools; 3. Facilitate school-based
Healthier Association of education; 4. Select six schools as
5004(178) 11 Communities SANDAG Governments Southeastern San Diego. "Comprehensive Program" schools. NI $499,816 $499,816 1 7/25/08 $ 499,816 1/0/00 $ - R V
San Diego Sidewalk and bike trail along one block of a
Association of busy boulevard for students on their way to
5957(077) 11 San Diego County SANDAG Governments Winter Gardens Boulevard and from school. I $517,000 $517,000 1 10/19/07 8/28/08 $ 487,788 4/13/09 $ 52,000 R V
Page 19 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Replace citywide school signs from
San Diego obsolete dull yellow signs to more visible
Association of fluorescent yellow-green signs at various
5381(026) 11 San Marcos SANDAG Governments Locations citywide. school locations. I $44,000 $44,000 1 5/7/09 $ 44,000 $ - R V
Construction of 1600 lineal feet of sidewalk,
curb and gutter improvements on both
sides of Rock Springs Road froom
San Diego Rock Springs Road froom Woodland Parkway to Richland Road near
Association of Woodland Parkway to Richland an elementary school, a middle school and
5381(028) 11 San Marcos SANDAG Governments Road a high school. I $990,000 $990,000 1 5/21/09 $ 990,000 $ - R V
Near Prospect Ave. School, East
along Prospect Ave. for one block
to Atlas View Dr., on Atlas Dr. from
Prospect Ave. to Slope St., to
San Diego Rhone Road, and on Pryor from
Association of Atlas View Dr. to its dead end past
5429(016) 11 Santee SANDAG Governments Rhone Road. Install sidewalks. I $ 228,800 $ 228,800 2 3/11/09 $ 18,000 $ - R V
Install signals and push-buttons; Improve
Orange County Baker/Mendoza intersection crosswalks; Install safety lighting; Construct
Transportation (adjacent to St. John the Baptist ADA ramps; And improve traffic signal
5312(068) 12 Costa Mesa SCAG Authority Elementary School). display. I $167,200 $167,200 1 7/25/08 $ 167,200 $ - R V
Provide a new mid-block pedestrian
actuated signal crossing Irvine Ave at
Mariners Elementary School, including
Orange County pedestrian and bicycle signal hardware, a
Transportation Irvine Ave at Mariners Elementary new crosswalk and safety lighting, and
5312(069) 12 Costa Mesa SCAG Authority School. constructing ADA handicap ramps. I $175,065 $175,065 1 7/25/08 $ 175,065 6/3/09 $ 96,438 R V
Orange County On Broadway between Fullerton
Transportation Ave. and Tustin Ave. and between Construct curb ramps and chokers;
12 Costa Mesa SCAG Authority Fullerton Ave. and Irvine Ave. landscape within the chokers. I $ 999,600 $ 999,600 2 V
In the vicinity of Victoria ES, along
Victoria St. at its intersections with
National Ave., Canyon Dr., and Construct enhanced crosswalks, sidewalks,
Hatley Rd. Also along State Ave. and curb ramps; install pedestrian
and National Ave. between countdown signal heads and bike racks;
Orange County Congress St. and Governor St., stripe roadway and enhance signage;
Transportation and along Presidential Pl., conduct education, encouragement, and
12 Costa Mesa SCAG Authority Republic Ave., and Union Ave. enforcement outreach. I $ 449,250 $ 449,250 2 V
Develop and distribute a Bicycle Safety
Orange County Guide and Map that provides key
Transportation At 14 Elementary Schools and one information on bicycle regulations and
12 Costa Mesa SCAG Authority MS in the city of Cost Mesa. safety tips; upgrade bicycle racks. NI $ 80,000 $ 80,000 2 V
Provide a comprehensive, district-wide
Orange County Bicycle/Walking Safety Educational
Transportation program; develop a sustainable walking
5410(070) 12 Irvine SCAG Authority In the city of Irvine. program for youth in grades K-8. NI $ 500,000 $ 500,000 2 7/1/09 $ 500,000 1/0/00 $ - R V
Orange County At 19 Elementary Schools in Develop individualized pedestrian safety
Transportation Saddleback Valley and Capistrano and circulation plans for all of the City's
12 Mission Viejo SCAG Authority Unified School Districts. schools. NI $ 492,000 $ 492,000 2 V
Orange County South side of Fletcher Ave.
Transportation between Glassell St. and Batavia Construct curb, gutter, curb ramps and
5073(063) 12 Orange SCAG Authority St. sidewalk gap closure. I $ 334,200 $ 299,200 2 6/3/09 $ 42,000 $ - R V
Orange County
San Juan Transportation On the North side of Via Positiva Construct sidewalk and install in-pavement
12 Capistrano SCAG Authority located West of Alipaz. lighted crosswalk. I $ 253,400 $ 253,400 2 V
Page 20 of 21 Printed On: 6/30/2011
Safe Route To School (SRTS)
Project List - Sorted by District and Agency
Data as of 1/7/2010
General Project Information Baseline information Actual Project Delivery information Tracking of Project Delivery Milestones
Project District Agency MPO RTPA Project Location Description of Work Project Type Current Total Current Cycle PE Auth ROW Constructi Closed Obligated Last Invoice Expended For Projects with For Projects in For Projects in All Projects:
Number I=Infrastructure Project Cost Programmed Date Auth on Auth out Date Federal Amt Payment Federal Amt no authorization: PE Phase: CON Phase: Have less than 6
NI=Non- Estimate Federal Funds Date Date ($) Date ($) Have less than 6 Have less than 2 Have less than 2 months elapsed
Infrastructure ($) ($) months elapsed years elapsed years elapsed since last 'paid'
since FTIP since PE since CON invoice or
Approval? Authorization? Authorization? Authorization?
Orange County
Transportation Intersection of Willits and Sullivan Install a traffic signal and new wheelchair
5063(120) 12 Santa Ana SCAG Authority Street. ramps. I $434,637 $434,637 1 2/6/08 12/14/09 $ 434,637 12/23/08 $ 13,730 R R
Orange County Addition of left turn signal with
Transportation intersection of McFadden Ave at protected/permissive phasing for east-
5063(121) 12 Santa Ana SCAG Authority Newhope St. bound and west-bound traffic I $253,550 $253,550 1 2/6/08 9/9/09 $ 253,550 1/6/09 $ 6,897 R R
Orange County Installation of a traffic signal and new
Transportation Intersection of Hazard Ave and wheelchair ramps at the intersection of
5063(122) 12 Santa Ana SCAG Authority Rosita Street. Hazard Ave and Rosita Street. I $426,376 $426,376 1 2/6/08 9/3/09 $ 426,376 12/23/08 $ 19,602 R R
Orange County Installation of a Traffic Signal at Hazard
Transportation Intersection of Hazard Avenue at Avenue east of Gates Street and sidewalk
5063(123) 12 Santa Ana SCAG Authority Gates Street. improvements. I $418,126 $418,126 1 2/6/08 9/3/09 $ 418,126 12/23/08 $ 11,844 R R
Orange County Installation of a traffic signal and sidewalk
Transportation Intersection of Raitt Street and improvements at Raitt Street and Glenwood
5063(124) 12 Santa Ana SCAG Authority Glenwood Place. Place I $456,060 $456,060 1 2/6/08 $ 33,000 12/29/08 $ 12,578 R V
Build and support local NI projects;
Conduct activities that complement
infrastructure projects; Increase the number
University of of children and youth that walk and bike;
California at San And establish STARC to provide State level
6342(004) 12 Francisco RURAL Statewide State-wide. and local level supports. NI Statewide $3,882,076 $3,882,076 1 6/17/09 $ 3,882,076 $ - R V
Orange County On the West side of Lemon St.
Transportation between Villa Park Rd. and Construct curb, gutter, pedestrian walkway,
12 Villa Park SCAG Authority Santiago Blvd. AC pavement and bicycle lane. I $ 399,531 $ 189,630 2 V
El Cajon Trail and On Casa Loma
Orange County Ave. from its intersection with the
Transportation Imperial Hwy. to El Cajon Trail
5402(027) 12 Yorba Linda SCAG Authority crosswalk, near Yorba Linda MS. Relocate existing mid-block crosswalk. I $ 196,690 $ 196,690 2 6/3/09 $ 35,000 $ - R V
Page 21 of 21 Printed On: 6/30/2011