									                                                  198 Task Material Totals for 2005
                                                                                                         TOTAL COSTS       TOTAL AMOUNT
     UCR CODE                           DESCRIPTION                            UNIT    TOTAL UNITS         CLAIMED           ALLOWED
1    T100       REPORT PREPARATION                                   HOUR OR REPORT        33,575.95 $      2,830,857.44   $   2,533,786.54
2    M0004      MID-LEVEL PROFESSIONAL                               HOUR                  15,802.35 $       987,632.47    $    846,582.61
3    M0003      PROJECT MANAGER                                      HOUR                  12,401.54 $       966,589.87    $    785,063.10
4    M0006      TECHNICIAN III                                       HOUR                  19,982.48 $       946,262.14    $    781,488.66
5    T031       MONITORING WELL SAMPLING - TWO INCH DIA              WELL                   6,789.00 $       938,881.79    $    846,417.56
6    T012       SOIL TREATMENT AT AN INCINERATION OR BIO             TON                   30,887.12 $       898,674.72    $    771,329.91
7    T001       REMOVE PRODUCT FROM TANK FOR RELEASE ABA             HOUR                   6,357.50 $       855,784.27    $    790,515.18
8    T025       MW INSTALLATION - TWO INCH DIAMETER                  LINEAR FOOT           19,100.60 $       824,645.30    $    775,157.10
9    T064       REIMBURSEMENT CLAIM PREPARATION                      PHASE                  1,441.96 $       711,657.19    $    649,721.17
10   T040       GENERAL SITE MANAGEMENT                              REIM AMT / CLM        32,531.96 $       554,609.72    $    442,243.74
11   M1368      METHOD 8015B - MODIFIED TPH-DRO IN SOLID             SAMPLE                 3,946.00 $       472,535.37    $    439,066.77
12   M1375      METHOD 8021B - BTEX/MTBE/NAPTHALENE IN W             SAMPLE                 4,223.00 $       471,105.88    $    413,110.28
13   M0618      PICKUP TRUCK                                         MILE                 968,534.97 $       442,292.01    $    384,877.83
14   T077       SOIL HAULING > 75 TONS THE FIRST 100 MIL             TON/MILE           1,418,929.29 $       441,176.61    $    346,184.48
15   T042       BACKFILLING                                          CUBIC YARD            15,965.29 $       434,341.26    $    392,033.63
16   M1371      METHOD 8021B - BTEX/MTBE IN WATER/WASTEW             SAMPLE                 5,026.00 $       424,138.87    $    386,371.40
17   M1366      METHOD 8015B - MODIFIED TPH-DRO IN WATER             SAMPLE                 3,857.00 $       423,938.10    $    379,537.70
18   M0005      JR. LEVEL PROFESSIONAL                               HOUR                   7,349.55 $       398,215.95    $    334,889.69
19   T017       FREE PRODUCT / CONTAMINATED WATER DISP               GALLON               667,193.79 $       398,046.60    $    361,911.62
20   M1365      METHOD 8015B - MODIFIED TPH-GRO IN WATER             SAMPLE                 5,124.00 $       397,094.00    $    343,260.95
21   T032       MONITORING WELL SAMPLING - FOUR-INCH                 WELL                   2,350.00 $       377,169.15    $    321,267.68
22   C1001      ELECTRICAL SERVICE                                   UTILITY                 816.47 $        306,403.68    $    256,262.35
23   M0018      LABORER [1]                                          HOUR                  10,025.40 $       299,349.68    $    261,846.36
24   T036       HEAVY EQUIPMENT MOB/DMOB                             R. TRIP / EQUIP         840.50 $        293,460.00    $    273,650.00
25   M1539      DUALPHASE EXTR.TREAT.ASSEMB.-UP TO 12GPM             HOUR                  74,043.16 $       274,414.70    $    258,511.84
26   T028       LOGGING SOIL BORINGS                                 HOUR                   3,552.85 $       263,135.23    $    246,853.56
27   M1656      OIL-SEALED DUAL PHASE EXTRACTION SYS. 50 - 500 CFM   HOUR                  46,655.50 $       241,073.34    $    227,963.18
28   M1484      TECHNICIAN III TRAVEL                                HOUR                  11,500.77 $       230,330.34    $    178,735.58
29   T030       SOIL SAMPLING                                        SAMPLE                 3,110.16 $       227,251.89    $    203,150.74
30   T079       WELL INSTALLATION USING AIR ROTARY - TWO             LINEAR FOOT            5,743.00 $       220,242.00    $    214,325.78
31   M1379      METHOD 8260B - VOLATILE ORGANICS GC/MS I             SAMPLE                 1,121.00 $       208,917.40    $    171,650.40
32   T082       WELL ABANDONMENT - TWO-INCH WELL                     LINEAR FOOT           24,842.04 $       196,413.77    $    177,853.08
33   T075       SOIL HAULING < 75 TONS THE FIRST 100 MIL             TON/MILE             384,895.59 $       189,265.63    $    176,786.54
34   M0002      SENIOR PROFESSIONAL                                  HOUR                   1,984.95 $       188,482.36    $    145,852.69
35   T006       FREE PRODUCT (LIQUID) RECOVERY FROM A MO             HOUR                   3,403.10 $       186,177.66    $    153,059.75
36   M0660      CAT 426 TYPE BACKHOE LOADER                          DAY                     416.55 $        183,771.75    $    170,719.25
37   M0007      TECHNICIAN II                                        HOUR                   4,325.40 $       175,045.14    $    136,165.08
38   M1367      METHOD 8015B/5035 - MODIFIED TPH-GRO IN              SAMPLE                 1,456.00 $       174,338.40    $    159,871.80
39   T023       DRILL RIG MOBILIZATION/DEMOBILIZATION                MOB/DMOB (RT)           445.00 $        171,046.36    $    162,288.86
40   T026       MW INSTALLATION - FOUR INCH DIAMETER                 LINEAR FOOT            2,932.00 $       166,598.16    $    148,387.55
41   T014       SITE RECONNIASSANCE / INITIAL SITE MAP               SITE                    279.85 $        122,279.50    $    109,464.50
42   M0008      TECHNICIAN I                                         HOUR                   3,099.85 $       119,856.48    $     78,061.80
43   M1482      MID-LEVEL PROFESSIONAL TRAVEL                        HOUR                   4,792.19 $       117,376.04    $    105,547.94
44   M1299      DUMP TRUCK - 8 CY CAPACITY, INCLUDES OPE             DAY                     247.25 $        109,562.50    $    102,122.50
45   M0304      PID/HNU                                              DAY                     739.00 $        108,943.45    $     90,277.45
46   T114       SMALL HEATING OIL TANK CLAIM PREP                    PER CLAIM              1,018.00 $       107,200.00    $     99,500.00
47   T113       DISPOSAL OF DRUMMED PETROLEUM CONTAM SOI             DRUM                   1,209.00 $       107,095.72    $    100,156.50
48   M1507      DUAL PHASE EXTRACTION-250-500 CFM                    HOUR                  50,043.62 $       106,691.32    $     97,062.13
49   T051       SOIL PROBE SURVEY                                    DAY                      58.13 $        104,821.52    $    100,751.02
50   M1483      JUNIOR LEVEL PROFESSIONAL TRAVEL                     HOUR                   4,690.02 $        98,244.05    $     88,206.25
51   M0298      OIL/WATER INTERFACE PROBE                            DAY                    1,806.50 $        97,553.85    $     84,547.98
52   T022       SUB. LINE LOCATION PRIOR TO DRILLING                 SURVEY                  230.75 $         95,293.46    $     84,679.14
53   M0014      SUPERVISOR/FOREMAN                                   HOUR                   1,935.75 $        91,278.71    $     77,089.95
54   T086       DOMESTIC WELL SAMPLING                               SAMPLE                 1,251.00 $        87,359.00    $     84,514.98
55   T101       SPENT CARBON CHANGEOUT                               POUND                 33,185.00 $        86,511.38    $     78,273.37

                                                                Page 1
                                                     198 Task Material Totals for 2005
                                                                                                           TOTAL COSTS      TOTAL AMOUNT
      UCR CODE                           DESCRIPTION                              UNIT   TOTAL UNITS         CLAIMED          ALLOWED
56    M1300      DUMP TRUCK - 12 CY CAPACITY, INCLUDES OP               DAY                    148.85 $         85,429.75   $    76,439.75
57    M1301      DUMP TRUCK - 16 CY CAPACITY, INCLUDES OP               DAY                    162.15 $         84,776.95   $    52,616.00
58    M1497      MINI EXCAVATOR RENTAL - DAILY                          DAILY                  231.45 $         81,777.50   $    78,062.50
59    M1382      EPA METHOD 18 BTEX/TOTAL VOLATILE PETROL               SAMPLE                 617.00 $         74,717.00   $    67,997.00
60    M0620      MEDIUM TRUCK                                           MILE                 95,962.84 $        74,699.40   $    66,277.26
61    M1376      METHOD 8021B/5035 - BTEX/MTBE/NAPTHALENE               SAMPLE                 495.00 $         71,155.01   $    66,427.51
62    T083       WELL ABANDONMENT - FOUR-INCH WELL                      LINEAR FOOT           8,377.40 $        70,088.31   $    54,713.90
63    T049       RECEPTOR SURVEY                                        SURVEY                 124.50 $         66,865.23   $    59,257.73
64    T013       SOIL DISPOSAL AT A LANDFILL                            TON                   1,538.25 $        66,276.07   $    65,338.07
65    T078       SOIL HAULING > 75 TONS OVER 100 MILES                  TON/MILE            200,782.91 $        59,646.89   $    53,820.84
66    T089       DIRECT PUSH TECHNOLOGY (DPT) DAILY COST                DAY                     42.00 $         56,618.40   $    56,550.00
67    C1003      MUNICIPAL SEWER SERVICE                                UTILITY             813,448.00 $        53,838.04   $    44,558.78
68    T033       SURVEY - MONITORING/RECOVERY WELLS                     HOUR                   710.00 $         53,519.62   $    47,632.00
69    M1481      PROJECT MANAGER TRAVEL                                 HOUR                  1,663.70 $        52,282.25   $    41,653.75
70    M1542      DUALPHSE EXTR.TREAT.ASSEMB.-UP TO 22GPM                HOUR                 12,356.00 $        47,594.24   $    31,443.84
71    M0655      VAC TRUCK > 3000 GAL.                                  DAY                     61.82 $         47,450.00   $    45,620.00
72    M0492      GRAVEL                                                 CUBIC YARD            3,349.04 $        46,606.41   $    37,911.04
73    M1485      TECHNICIAN II TRAVEL                                   HOURSS                3,203.50 $        46,505.83   $    39,558.64
74    T002       MONITOR FOR VAPOR HAZARDS                              HOUR                   681.90 $         43,817.10   $    38,821.97
75    T007       INSTALL BOOM IN SURFACE WATERS                         FOOT OF BOOM          1,736.00 $        41,664.00   $    40,224.00
76    M1323      SKID STEER LOADER BOBCAT 753 WITH BUCKET               DAY                    121.95 $         40,350.75   $    34,320.75
77    M1373      METHOD 8021B - BTEX/NAPTHALENE IN WATER/               SAMPLE                 373.00 $         40,185.00   $    35,465.00
78    T081       WELL INSTALLATION USING AIR ROTARY - SIX               LINEAR FOOT            614.00 $         39,910.00   $    39,910.00
79    T021       SITE HISTORY RESEARCH                                  SITE                    75.00 $         38,426.11   $    33,234.36
80    T053       SLUG TEST                                              HOUR                   277.75 $         38,065.73   $    36,735.73
81    M0015      ELECTRICIAN [1]                                        HOUR                   895.75 $         37,860.89   $    28,042.19
82    C1007      DIESEL FUEL                                            GALLON               17,287.77 $        36,122.44   $    33,765.01
83    T088       DIRECT PUSH TECHNOLOGY (DPT) PERMANENT W               LINEAR FOOT           2,694.83 $        35,798.70   $    35,182.59
84    M0441      PRODUCT COLLECTION TANK WITH OIL/WATER S               MONTH                   24.00 $         35,280.00   $          -
85    M1343      LOCATIONS IN VIRGINIA NOT LISTED IN M CO               DAY                    550.45 $         35,141.31   $    23,876.45
86    T047       RESEEDING < 1 ACRE                                     SQUARE FOOT         284,218.00 $        34,281.12   $    32,059.08
87    T024       SOIL BORING WITH DRILL RIG - 5 FT. SAMPL               LINEAR FOOT           2,466.40 $        31,559.52   $    28,174.52
88    M1372      METHOD 8021B/5035 - BTEX/MTBE IN SOLID W               SAMPLE                 282.00 $         31,516.15   $    27,460.15
89    M0149      METHOD 8270                                            SAMPLE                  80.00 $         30,557.00   $    23,944.00
90    M1326      SKID STEER LOADER BOBCAT 853H WITH BUCKE               DAY                     83.80 $         30,104.00   $    27,974.00
91    T035       SITE ACCESS AGREEMENT                                  AGREEMENT               80.00 $         29,966.00   $    26,011.00
92    M1204      SKIMMER PUMP - 4" INCLUDING COMPRESSOR,                PURCHASE/EACH           14.00 $         29,930.72   $    29,930.72
93    M0143      METHOD 8100                                            SAMPLE                 186.00 $         29,155.00   $    28,325.00
94    M1317      CRAWLER MOUNTED EXCAVATOR CAT 235 TYPE;                DAY                     95.00 $         29,125.00   $    24,247.50
95    M1369      METHOD 8021B - BTEX PURGEABLE AROMATICS                SAMPLE                 401.00 $         28,678.30   $    25,204.50
96    C1010      ELECTRICAL POWER DROP                                  UTILITY                  7.00 $         28,002.37   $    28,002.37
97    M1320      CRAWLER MOUNTED EXCAVATOR CAT 245 TYPE;                DAY                     31.00 $         27,400.00   $    19,700.00
98    M1293      DRUM, 55 GAL. DOT STEEL                                EACH                   560.00 $         27,100.10   $    25,342.10
99    M0001      PRINCIPAL                                              HOUR                   217.00 $         26,168.39   $    18,793.01
100   M0253      EXPLOSIMETER                                           DAY                    482.00 $         25,555.00   $    18,515.00
101   T019       BOOM REPLACEMENT                                       FT OF NEW BOOM        1,852.00 $        25,042.80   $    24,548.23
102   M0661      CAT 426 TYPE BACKHOE LOADER                            WEEK                    12.50 $         24,710.00   $    22,610.00
103   M1661      OIL/WATER SEPARATOR - 15 GPM CAPACITY                  HOUR                 20,607.40 $        24,614.34   $    22,242.13
104   M0657      CAT 416 TYPE BACKHOE LOADER                            DAY                     70.50 $         24,539.50   $    17,132.50
105   T076       SOIL HAULING < 75 TONS OVER 100 MILES                  TON/MILE             59,164.72 $        24,231.40   $    23,417.76
106   M1499      LOW PROFILE AIR STRIPPER - 15 GPM                      HOUR                 18,939.80 $        23,727.10   $    21,074.27
107   M0617      AUTO                                                   MILE                 68,286.64 $        23,387.78   $    21,204.09
108   C1002      MUNICIPAL WATER SERVICE                                UTILITY                 14.00 $         22,806.51   $    21,973.02
109   M1306      TANKER TRAILER - 10,000 GALLONS                        MONTH                    7.00 $         22,610.00   $    22,610.00
110   M0610      DRUMS (USED)                                           EACH                 11,635.00 $        22,286.00   $    19,829.00

                                                                  Page 2
                                                      198 Task Material Totals for 2005
                                                                                                            TOTAL COSTS      TOTAL AMOUNT
      UCR CODE                             DESCRIPTION                             UNIT   TOTAL UNITS         CLAIMED          ALLOWED
111   M0256      FID, OVA                                                DAY                    131.50 $         21,252.00   $    21,252.00
112   M0592      AIR ROTARY DRILLING (6" WELL) [7]                       LINEAR FOOT            495.00 $         21,037.50   $    21,037.50
113   T070       SOIL LOADING - UP TO 2,200 TONS                         TON                   8,848.36 $        20,336.47   $    10,485.69
114   M1510      DUAL PHASE EXTRACTION SYSTEM-500-850 CFM                HOUR                  5,420.00 $        20,162.40   $     8,035.20
115   T085       PUMP TEST                                               HOUR                   101.00 $         19,695.00   $    15,015.00
116   T018       BOOM INSPECTION                                         HOUR                   218.70 $         19,683.00   $    19,008.00
117   M1403      METHOD 8260B - VOLATILEORGANICS GC/MS IN                SAMPLE                  64.00 $         19,584.00   $    19,584.00
118   M0009      CLERICAL                                                HOUR                   535.60 $         18,861.44   $     9,324.67
119   M1475      OXYGEN RELEASING COMPOUND POWDER 0-1500                 POUND                 2,600.00 $        18,800.00   $    17,340.00
120   M0029      DRUMS, 55 GAL. STEEL                                    EACH                   473.00 $         18,752.83   $    17,032.89
121   M1148      SORBENT PAD 18" X 18", 100 PER BOX                      BOX                   3,474.96 $        17,907.48   $    12,507.48
122   M1370      METHOD 8021B/5035 - BTEX PURGEABLE AROMA                SAMPLE                 156.00 $         17,848.90   $    16,063.90
123   M1660      OIL/WATER SEPARATOR - 15 GPM CAPACITY                   WEEK                    30.00 $         17,400.00   $    17,400.00
124   M0658      CAT 416 TYPE BACKHOE LOADER                             WEEK                    11.00 $         17,380.00   $    17,380.00
125   M0623      DUMP TRUCK CAPACITY <=5 CY                              DAY                    113.55 $         17,190.75   $    12,696.75
126   T084       WELL ABANDONMENT - SIX-INCH WELL                        LINEAR FOOT           1,575.00 $        17,189.68   $    14,352.00
127   T038       DEBRIS DISPOSAL                                         TON                    423.86 $         16,954.40   $    14,798.40
128   M0100      TPH-CAL.LUFT METHOD - GASOLINE                          SAMPLE                 250.00 $         16,912.06   $    14,774.06
129   T069       DUAL PHASE EXTRACTION AND TREATMENT SYST                MOB/DEMOB               59.50 $         16,712.50   $    13,662.50
130   M1648      BIOLOGICAL TREATMENT                                    HOUR                 10,317.50 $        15,992.15   $    13,371.39
131   M1324      SKID STEER LOADER BOBCAT 753 WITH BUCKET                WEEK                    12.00 $         15,854.71   $     9,360.00
132   M0140      METHOD 8020                                             SAMPLE                 293.00 $         15,830.12   $    12,226.37
133   M1321      CRAWLER MOUNTED EXCAVATOR CAT 245 TYPE;                 WEEK                    15.50 $         15,699.00   $    13,230.00
134   M1316      TOPSOIL                                                 CUBIC YARD             865.10 $         15,607.00   $    13,476.70
135   M1338      SUPERVISOR/FOREMAN - OVERTIME RATE                      HOUR                   247.22 $         15,599.16   $     7,675.78
136   T094       ASPHALT PAVING                                          SQUARE FOOT           6,890.00 $        15,180.80   $    11,389.92
137   T027       RECOVERY WELL INSTALLATION = 6" DIAMETER                LINEAR FOOT            241.50 $         15,101.26   $    13,394.38
138   M1534      BLOWER - VAPOR EXTRACTION                               HOUR                 15,198.70 $        14,742.76   $    14,440.50
139   T015       UNDERGROUND STORAGE TANK (UST) TIGHTNESS                TANK                  9,990.00 $        14,450.00   $    11,450.00
140   M1486      TECHNICIAN I TRAVEL                                     HOUR                   975.10 $         14,238.40   $    12,827.40
141   M0058      POLY FILM (100' X 20') - 6 MIL                          EACH                   231.90 $         14,230.18   $    11,708.70
142   M0619      VAN                                                     MILE                 31,652.50 $        14,191.52   $    12,488.77
143   C1009      TELEPHONE SERVICE - TELEMETRY                           UTILITY                225.00 $         13,783.73   $    12,290.71
144   M0306      PID/HNU                                                 MONTH                   15.00 $         13,529.00   $    12,544.00
145   M1318      CRAWLER MOUNTED EXCAVATOR CAT 235 TYPE;                 WEEK                     7.00 $         13,095.00   $     9,540.00
146   T080       WELL INSTALLATION USING AIR ROTARY - FOU                LINEAR FOOT            285.00 $         12,768.20   $    11,400.00
147   T087       SURFACE WATER SAMPLING                                  SAMPLE                 773.75 $         12,163.25   $    11,388.00
148   T004       EMERGENCY MITIGATION OF VAP HAZ - OPERAT                DAY PER BLOWER          80.00 $         12,090.00   $     2,247.50
149   M0612      TANK WASTE [9]                                          DRUM                    69.50 $         11,942.50   $    11,767.50
150   M1011      METALS ANALYSIS: - 6000 SERIES BY ICP,                  EACH METAL             658.00 $         11,924.83   $     9,847.00
151   T092       CONCRETE PAVEMENT REMOVAL - UP TO 6" THI                SQUARE FOOT           5,233.00 $        11,825.28   $    10,421.92
152   M0079      SORBENT BOOMS                                           10-FT. LENGTH          500.00 $         11,763.50   $     9,846.50
153   M0099      SHIPPING FOR LABORATORY SAMPLES                         COOLER                 167.50 $         11,520.18   $    10,382.60
154   M0139      METHOD 8015-M (TPH)                                     SAMPLE                 116.00 $         10,665.38   $     8,401.20
155   M1545      FREEPRODUCT SKIMMER SYSTEM/4SKIMMER UNIT                HOUR                  6,240.00 $        10,545.60   $    10,545.60
156   M0431      TRASH (2")                                              WEEK                    75.00 $         10,480.40   $    10,239.60
157   M1171      DISSOLVED OXYGEN METER WITH PROBE                       DAY                    203.00 $         10,424.00   $     8,500.00
158   T072       EXCAVATING/TRENCHING                                    CUBIC YARD            2,032.06 $        10,404.13   $     7,480.61
159   T090       ASPHALT REMOVAL - UP TO 6" THICK, AREAS                 SQUARE FOOT          11,328.00 $        10,308.99   $     7,239.06
160   M0584      WELL VAULTS, LOCKING (24" X 24")                        EACH                    49.00 $         10,297.92   $     6,965.00
161   M0101      TPH-CAL.LUFT METHOD - DIESEL                            SAMPLE                 186.00 $         10,199.37   $     7,437.37
162   M1474      OXYGEN RELEASING COMPOUND POWDER 0-500                  POUND                  850.00 $         10,072.50   $     5,250.00
163   M1203      SKIMMER PUMP - 2" INCLUDING COMPRESSOR,                 PURCHASE/EACH            3.00 $          9,690.00   $     9,690.00
164   M1496      STAKE BED TRUCK - 5 TON                                 DAY                     68.50 $          9,656.83   $     8,570.00
165   M1327      SKID STEER LOADER BOBCAT 853H WITH BUCKE                WEEK                     6.00 $          9,300.00   $     7,750.00

                                                                   Page 3
                                                     198 Task Material Totals for 2005
                                                                                                            TOTAL COSTS      TOTAL AMOUNT
      UCR CODE                          DESCRIPTION                              UNIT     TOTAL UNITS         CLAIMED          ALLOWED
166   T105       250-500 CFM DUAL PHASE EXTRACTION PUMP                 MONTH                     2.00 $          9,000.00   $          -
167   M1277      NEAT CEMENT GROUT                                      90 POUND                893.50 $          8,935.00   $     8,775.00
168   M0590      AIR ROTARY DRILLING (2" WELL) [7]                      LINEAR FOOT             637.00 $          8,918.00   $     8,918.00
169   M1281      CASING - SCHEDULE 40 PVC, FLUSH THREADED               10 FOOT LENGTH          457.00 $          8,822.95   $     6,463.45
170   T058       TERRAIN CONDUCTIVITY                                   LINEAR FOOT              39.00 $          8,775.00   $     8,775.00
171   M1147      SORBENT BOOMS 8" X 10                                  EACH                    246.00 $          8,416.50   $     2,905.50
172   M1285      2" WELL SCREENS - SCHEDULE 40 PVC, FLUSH               10 FOOT LENGTH          244.00 $          8,282.75   $     6,220.25
173   M1357      NORTHERN VIRGINIA - INCLUDES CITIES OF A               DAY                      49.00 $          8,134.00   $     5,312.00
174   M0301      PH METER                                               DAY                     427.00 $          8,078.60   $     5,997.10
175   M0440      PRODUCT COLLECTION TANK WITH OIL/WATER S               WEEK                     15.60 $          7,768.80   $     7,768.80
176   M1533      BLOWER - VAPOR EXTRACTION                              HOUR                   7,746.00 $         7,513.62   $     7,309.28
177   M1150      SORBENT WICKS - 2"                                     DOZEN                    50.38 $          7,178.90   $     4,119.24
178   M0226      CONCRETE SAW, PUSH TYPE                                DAY                      44.50 $          7,037.26   $     3,240.58
179   T034       SURVEY - PROPERTY                                      HOUR                     54.00 $          6,886.61   $     3,605.00
180   M1128      ACTIVATED CARBON ADSORBER - LIQUID PHASE               UNIT                      9.00 $          6,660.00   $     6,660.00
181   M1574      GENERATOR:50 KW, 240/480, DIESEL POWERED               113-168 HR/WEEK           6.00 $          6,600.00   $     2,200.00
182   M1283      CASING - SCHEDULE 40 PVC, FLUSH THREADED               10 FOOT LENGTH           65.50 $          6,550.00   $     5,450.00
183   M0505      BENTONITE PELLETS (3/8")                               50 POUND                202.50 $          6,521.25   $     4,756.50
184   M0504      BENTONITE PELLETS (1/4")                               50 POUND                169.55 $          6,448.90   $     6,309.90
185   M1290      DISPOSAL OF PETROLEUM CONTAMINATED WATER               GALLON                11,924.00 $         6,400.66   $     6,332.46
186   M1381      EPA METHOD 18 BTEX -GC/FID                             SAMPLE                   71.00 $          6,370.00   $     5,660.00
187   M1268      GENERATOR 20 KW, 240/480, DIESEL POWERE                0-8 HR/DAY               36.00 $          6,300.00   $     2,800.00
188   M1669      ROTARY PHASE CONVERTER                                 HOUR                  21,845.00 $         6,192.42   $     5,636.18
189   T098       SILT FENCING INSTALLATION                              LINEAR FOOT            2,810.00 $         6,125.80   $     5,035.80
190   M0637      TRACTOR 6 X 4                                          DAY                       9.00 $          6,033.00   $     3,213.00
191   M1480      SENIOR PROFESSIONAL TRAVEL                             HOUR                    160.90 $          6,008.40   $     4,046.40
192   M1342      LABORER - OVERTIME RATE                                HOUR                    129.50 $          5,989.38   $     5,526.88
193   M0108      METHOD 602 - PURGEABLE AROMATICS                       SAMPLE                   71.00 $          5,976.40   $     5,885.40
194   M1127      ACTIVATED CARBON ADSORBER - LIQUID PHASE               UNIT                     12.00 $          5,952.00   $     3,968.00
195   C1008      FEDERAL / STATE / LOCAL PERMIT                         PERMIT                   42.00 $          5,944.89   $     4,498.33
196   M1649      CONTINUOUS BELT FREE PRODUCT SKIMMER                   WEEK                     16.00 $          5,856.00   $     3,294.00
197   M0157      METHOD TO3 [6]                                         SAMPLE                   21.00 $          5,823.00   $     2,853.00
198   M0305      PID/HNU                                                WEEK                     17.00 $          5,748.00   $     5,386.00
199   M0010      CAD OPERATOR                                           HOUR                    127.00 $          5,713.88   $     5,691.88
200   M1345      CHARLOTTESVILLE                                        DAY                      57.00 $          5,586.00   $     5,292.00
201   M0694      TRACKED EXCAVATOR CAT 215 TYPE                         WEEK                      3.00 $          5,430.00   $     3,620.00
202   M1305      TANKER TRAILER - 10,000 GALLONS                        WEEK                      5.00 $          5,400.00   $     3,240.00
203   M1315      SAND - BULK                                            TON                     647.90 $          5,293.67   $     4,557.22
204   M1374      METHOD 8021B/5035 - BTEX/NATTHALENE IN S               SAMPLE                   35.00 $          5,272.50   $     3,900.00
205   M1010      METHOD 601 - PURGEABLE HALOCARBONS WITH                SAMPLE                   53.00 $          5,130.00   $     5,130.00
206   M0057      PLYWOOD (4 FT X 8 FT X 0.5 IN)                         EACH                    283.00 $          5,094.00   $     3,366.00
207   M1505      DUAL PHASE EXTRACTION SYSTEM-250-500 CFM               DAY                      32.00 $          5,069.00   $     1,089.00
208   T115       SMALL UST PUMP-OUT                                     HOUR                     68.50 $          5,000.50   $     5,000.50
209   M1297      ROLL-OFF CONTAINER DELIVERY / PICK-UP                  TRIP                     40.00 $          4,988.55   $     4,352.55
210   M1581      GENERATOR:65 KW, 240/480, DIESEL POWERED               113-168 HR/WEEK           4.00 $          4,960.00   $     2,480.00
211   M0284      JACKHAMMER                                             WEEK                      8.00 $          4,960.00   $     4,340.00
212   M0038      GLOVES - NITRILE                                       PAIR                   1,144.00 $         4,956.96   $     4,612.17
213   M0594      MUD ROTARY DRILLING (6" WELL) [7]                      LINEAR FOOT             364.00 $          4,920.00   $     4,524.00
214   M1532      BLOWER - VAPOR EXTRACTION                              HOUR                  12,186.30 $         4,874.52   $     4,874.52
215   M0227      CONCRETE SAW, PUSH TYPE                                WEEK                     13.00 $          4,837.43   $     3,081.60
216   M0511      GRADED SAND                                            100 POUND               306.60 $          4,812.70   $     4,078.70
217   M1298      ROLL-OFF CONTAINER TRANSPORT FOR DISPOSA               TRIP                     27.00 $          4,800.00   $     3,772.00
218   M1597      SUBMERSIBLE 4" TOTAL FLUIDS PUMP, 1HP                  HOUR                   8,748.00 $         4,723.92   $     4,723.92
219   T073       BULK EXCAVATION                                        CUBIC YARD             2,794.98 $         4,717.74   $     3,951.07
220   T095       CONCRETE PAVING                                        SQUARE FOOT            1,330.00 $         4,577.06   $     2,829.00

                                                                  Page 4
                                                    198 Task Material Totals for 2005
                                                                                                          TOTAL COSTS      TOTAL AMOUNT
      UCR CODE                            DESCRIPTION                          UNIT     TOTAL UNITS         CLAIMED          ALLOWED
221   M1460      STANDARD METHOD 9215B - PETRO                         SAMPLE                  86.00 $          4,558.00   $     2,968.00
222   M1251      BLOWER - VAPOR EXTRACTION - REGENERATIVE              WEEK                    10.00 $          4,500.00   $     4,500.00
223   M0110      METHOD 610                                            SAMPLE                  33.00 $          4,472.89   $     4,472.89
224   M1282      CASING - SCHEDULE 40 PVC, FLUSH THREADED              10 FOOT LENGTH         102.00 $          4,363.00   $     4,179.00
225   M0693      TRACKED EXCAVATOR CAT 215 TYPE                        DAY                      9.50 $          4,341.00   $     4,303.50
226   M1239      BLOWER - VAPOR EXTRACTION - 10 HP, 190 S              WEEK                    20.00 $          4,329.00   $     3,876.00
227   M1587      PORTABLE TANK - 525 GAL. POLYETHYLENE                 EACH                    11.00 $          4,328.00   $     3,208.00
228   M1307      TRAILER - 25 TON FLATBED                              DAY                     29.00 $          4,263.00   $     3,381.00
229   M1456      METHOD 353.2 - NITRATE NITROGEN                       SAMPLE                 116.00 $          4,164.50   $     2,451.00
230   M1129      ACTIVATED CARBON ADSORBER - LIQUID PHASE              UNIT                     4.00 $          4,140.50   $     2,220.00
231   M1399      METHOD 8021B - BTEX/MTBE/NAPTHALENE IN W              SAMPLE                 200.00 $          4,067.92   $     3,722.92
232   M1509      DUAL PHASE EXTRACTION SYSTEM-500-850 CFM              WEEK                     6.00 $          4,050.00   $     2,700.00
233   M0017      WELDER [1]                                            HOUR                    20.00 $          3,966.50   $      549.50
234   M1664      PASSIVE OIL SKIMMERS - 2" < 0.25 GAL CAPACITY         EACH                     6.00 $          3,924.00   $     3,270.00
235   M0659      CAT 416 TYPE BACKHOE LOADER                           MONTH                    1.00 $          3,900.00   $          -
236   M0413      SKIMMER - FLOATING (2")                               WEEK                    13.00 $          3,900.00   $          -
237   M1446      FORK LIFT - 4,000 LB., OUTDOOR/ROUGH TER              DAY                     11.00 $          3,755.53   $     3,755.53
238   M0258      FID, OVA                                              MONTH                    3.00 $          3,630.00   $     3,630.00
239   M1329      SKID STEER LOADER BOBCAT 753 WITH HYDRAU              DAY                      8.00 $          3,624.00   $     2,718.00
240   M1584      PRODUCT COLLECTION TANK WITH OIL/WATER S              HOUR                  5,282.00 $         3,538.94   $     3,538.94
241   M0589      WELL COVERS, LOCKING (8"X5')                          EACH                    16.00 $          3,504.00   $     3,285.00
242   M0089      TEDLAR BAG                                            EACH                   140.00 $          3,494.00   $     2,874.00
243   M1257      BLOWER VENTILATION/EXHAUST - EXPLOSION P              WEEK                    24.00 $          3,480.00   $     3,480.00
244   T052       GROUND PENETRATING RADAR (GPR)                        HOUR                    12.50 $          3,440.00   $     3,440.00
245   M0152      METHOD 9020 (TOX)                                     SAMPLE                  37.00 $          3,351.00   $     3,351.00
246   M0257      FID, OVA                                              WEEK                     8.00 $          3,328.50   $     2,432.50
247   M0162      TCLP METALS                                           SAMPLE                  28.00 $          3,261.00   $     3,088.00
248   M0539      CASING - BLACK STEEL, THREADED & COUPLED              FOOT                   462.00 $          3,234.00   $     2,702.00
249   M1504      DUAL PHASE EXTRACTION SYSTEM-50-250 CFM               HOUR                  2,239.04 $         3,224.22   $     3,224.22
250   M0016      PLUMBER [1]                                           HOUR                    92.00 $          3,220.00   $     1,750.00
251   M1364      METHOD 8021B/5035 - PURGABLE HALOCARBONS              SAMPLE                  19.00 $          3,213.75   $     3,213.75
252   M0283      JACKHAMMER                                            DAY                     21.00 $          3,160.00   $     2,152.50
253   M1494      NYLON TUBING - 1/2" OD                                FOOT                  1,575.00 $         3,150.00   $     3,150.00
254   M1245      BLOWER - VAPOR EXTRACTION - REGENERATIVE              WEEK                     9.00 $          3,150.00   $     1,750.00
255   M1592      PORTABLE TANK - 1,600 GAL. POLYETHYLENE               WEEK                    21.00 $          3,066.42   $     2,813.58
256   M1654      OIL-SEALED DUAL PHASE EXTRACTION SYS. 50 - 500 CFM    DAY                     20.00 $          3,060.00   $     3,060.00
257   M0699      TRACKED LOADER CAT 931 TYPE                           DAY                     36.00 $          3,060.00   $          -
258   M1538      DUALPHASE EXTR.TREAT.ASSEMB.-UP TO 12GPM              WEEK                     5.00 $          2,980.00   $     1,788.00
259   M1349      RICHMOND, CHESTERFIELD COUNTY, HENRICO C              DAY                     27.00 $          2,944.84   $      756.00
260   M1418      METHOD 8021B/5035 - BTEX PURGEABLE AROMA              SAMPLE                  27.00 $          2,837.50   $     1,817.50
261   M1441      OXYGEN RELEASING COMPOUND - 2" SOCKS                  EACH                    56.00 $          2,833.50   $     2,833.50
262   M1137      HYDROGEN PEROXIDE                                     500 LB. DRUM            10.00 $          2,758.00   $     2,758.00
263   M1667      PASSIVE OIL SKIMMERS - 4" > 1.0 GAL CAPACITY          EACH                     3.00 $          2,718.00   $     2,718.00
264   M1008      METHOD 413.1 - OIL & GREASE                           SAMPLE                  55.00 $          2,713.89   $     1,932.89
265   M1296      ROLL-OFF CONTAINER                                    MONTH                   29.50 $          2,655.00   $     2,475.00
266   M0106      METHOD 418.1                                          SAMPLE                  70.00 $          2,640.00   $     2,040.00
267   M0123      TPH - 418.1                                           SAMPLE                  43.00 $          2,595.00   $     2,580.00
268   M0122      TPH-CAL.LUFT METHOD - DIESEL                          SAMPLE                  23.00 $          2,552.00   $     2,418.50
269   M1457      METHOD 353.2 - NITRITE NITROGEN                       SAMPLE                  97.00 $          2,532.00   $     1,742.00
270   M1347      LYNCHBURG                                             DAY                     26.00 $          2,496.00   $     2,496.00
271   M0121      TPH-CAL.LUFT METHOD - GASOLINE                        SAMPLE                  24.00 $          2,434.00   $     2,434.00
272   M1286      4" WELL SCREENS - SCHEDULE 40 PVC, FLUSH              10 FOOT LENGTH          27.50 $          2,414.00   $     2,047.00
273   M0312      PORTABLE AIR BLOWER                                   MONTH                    8.00 $          2,400.00   $     1,800.00
274   M0516      MANHOLES 8" WATERTIGHT                                EACH                    54.00 $          2,376.00   $     2,331.00
275   M1566      GENERATOR:35 KW, 240/480, DIESEL POWERED              9-16 HR/DAY              8.00 $          2,340.00   $     2,340.00

                                                                 Page 5
                                                    198 Task Material Totals for 2005
                                                                                                          TOTAL COSTS      TOTAL AMOUNT
      UCR CODE                            DESCRIPTION                          UNIT     TOTAL UNITS         CLAIMED          ALLOWED
276   M1359      TCLP VOLATILE ANALYSIS: - METHOD 8260B                SAMPLE                  10.50 $          2,268.00   $      108.00
277   M1572      GENERATOR: 50KW, 240/480 DIESEL POWERED               17-24 HR/DAY             5.00 $          2,250.00   $     2,250.00
278   M1001      WISCONSIN DNR TPH - DRO                               SAMPLE                  19.00 $          2,242.00   $     2,242.00
279   M0635      TRACTOR 6 X 2                                         DAY                      4.00 $          2,240.00   $     1,680.00
280   M1380      METHOD 8260B/5035 - VOLATILE ORGANICS GC              SAMPLE                  18.00 $          2,183.00   $     1,508.00
281   M1205      SUBMERSIBLE 2" TOTAL FLUIDS PUMP INCLUD               DAY                     14.00 $          2,142.00   $     1,989.00
282   M1395      METHOD 8021B - BTEX/MTBE IN WATER/WASTEW              SAMPLE                  54.00 $          2,141.80   $     2,003.80
283   M1289      DRILL RIG DECONTAMINATION                             DAY                     18.00 $          2,124.00   $     1,888.00
284   M1211      SUBMERSIBLE 4" TOTAL FLUIDS PUMP, 1 HP,               DAY                     14.00 $          2,100.00   $     1,200.00
285   M0472      STEAM CLEANER                                         DAY                     25.00 $          2,075.00   $     1,743.00
286   M1531      BLOWER - VAPOR EXTRACTION, 10 HP                      HOUR                  6,240.00 $         2,059.20   $     2,059.20
287   M1154      STRAW BALE                                            EACH                   532.00 $          1,988.80   $      736.00
288   M1059      METHOD 8240/8260B - VOLATILE ORGANICS GC              SAMPLE                  15.00 $          1,980.00   $     1,280.00
289   M1502      DUAL PHASE EXTRACTION SYSTEM -50-250 CFM              DAY                     17.00 $          1,972.00   $     1,972.00
290   M1537      DUALPHASE EXTR.TREAT.ASSEMB.-UP TO 12GPM              DAY                     16.00 $          1,920.00   $     1,920.00
291   T008       BOTTLED WATER WITH BOTTLED WATER DISPENS              MONTH                   69.00 $          1,915.50   $     1,915.50
292   M0711      TRENCHER - CHAIN BOOM TYPE 15 HP - WALKI              DAY                     13.26 $          1,883.00   $     1,456.92
293   T003       EMERGENCY MITIGATION OF VAP HAZ - SETUP               BLOWER                  11.00 $          1,870.00   $     1,360.00
294   M1414      METHOD 8015B - MODIFIED TPH-DRO IN WATER              SAMPLE                  35.00 $          1,855.00   $     1,495.00
295   M0518      WELL CAP - LOCKING 2"                                 EACH                   121.00 $          1,820.81   $     1,700.81
296   M1454      METHOD 350.1 - AMMONIA - NITROGEN                     SAMPLE                  66.00 $          1,815.00   $      990.00
297   M0307      PORTABLE TANK                                         DAY                     50.00 $          1,809.50   $      765.00
298   M1200      PNEUMATIC PUMP - 2" INCLUDING CONTROLLE               DAY                     12.00 $          1,800.00   $     1,800.00
299   M1101      TCLP VOLATILES ANALYSIS: - METHOD 8240 (              SAMPLE                 100.00 $          1,800.00   $          -
300   M1423      METHOD 8021B - BTEX/MTBE/NAPTHALENE IN W              SAMPLE                  32.00 $          1,780.00   $     1,380.00
301   M1184      BARRICADE - TYPE I WITH LIGHT                         DAY                    134.00 $          1,742.00   $     1,222.00
302   M0717      WHEELED LOADER CAT 910 TYPE                           DAY                      7.00 $          1,701.00   $     1,701.00
303   M1600      TELEMETRY SYSTEM & AUTODIALER                         EACH                     1.00 $          1,700.00   $     1,700.00
304   M1593      PORTABLE TANK - 1,600 GAL. POLYETHYLENE               EACH                     1.00 $          1,700.00   $     1,700.00
305   M1304      TANKER TRAILER - 10,000 GALLONS                       DAY                      7.00 $          1,692.00   $      972.00
306   M1450      METHOD 1664 - N-HEXANE EXTRACTABLE MATER              SAMPLE                  22.00 $          1,688.50   $     1,688.50
307   M1455      METHOD 351.2 - TOTAL KJELDAHL NITROGEN                SAMPLE                  43.00 $          1,676.00   $     1,676.00
308   T074       HAND EXCAVATION                                       CUBIC YARD              37.13 $          1,670.85   $      950.85
309   M1573      GENERATOR:50 KW, 240/480, DIESEL POWERED              57-112 HR/WEEK           2.00 $          1,650.00   $     1,650.00
310   M1087      METHOD 602 - PURGEABLE AROMATICS                      SAMPLE                   9.00 $          1,638.00   $     1,638.00
311   M1427      METHOD 8260B - VOLATILE ORGANICS GC/MS I              SAMPLE                   4.00 $          1,632.00   $     1,224.00
312   M1263      GENERATOR 7.5 KW, 120/240, GAS POWERED                0-56 HR/WEEK             6.00 $          1,626.00   $     1,626.00
313   M1199      SARANEX SUIT W/ HOOD                                  EACH                    54.00 $          1,593.00   $     1,593.00
314   M1259      GENERATOR 4 KW, 120/240, GAS POWERED                  0-8 HR/DAY              46.00 $          1,587.00   $     1,207.50
315   M1413      METHOD 8015B - MODIFIED TPH-GRO IN WATER              SAMPLE                  36.00 $          1,580.00   $     1,300.00
316   M0299      OIL/WATER INTERFACE PROBE                             WEEK                    10.00 $          1,580.00   $      790.00
317   M1088      METHOD 601 - PURGEABLE HALOCARBONS WITH               SAMPLE                   8.00 $          1,568.00   $     1,568.00
318   M1567      GENERATOR:35 KW, 240/480, DIESEL POWERED              17-24 HR/DAY             4.00 $          1,560.00   $     1,560.00
319   M1258      BLOWER VENTILATION/EXHAUST - EXPLOSION P              MONTH                    3.00 $          1,530.00   $     1,530.00
320   M1493      NYLON TUBING - 1/4" OD                                FOOT                  1,335.00 $         1,521.00   $     1,001.25
321   M0067      SAFETY FENCE                                          FOOT                  1,316.00 $         1,514.00   $     1,101.00
322   M1606      TRASH PUMP - 3"                                       9-16 HR/DAY             20.00 $          1,500.00   $     1,500.00
323   M0013      DRAFTSMAN                                             HOUR                    34.25 $          1,468.50   $       90.19
324   M1479      PRINCIPAL TRAVEL                                      HOUR                    31.25 $          1,453.15   $      918.38
325   M0080      SORBENT LITTER                                        BAG                     88.00 $          1,452.00   $     1,452.00
326   M1590      PORTABLE TANK - 1,000 GAL. POLYETHYLENE               EACH                     1.00 $          1,450.00   $     1,450.00
327   M1215      SUBMERSIBLE 4" TOTAL FLUIDS PUMP, 1 HP,               WEEK                     7.25 $          1,450.00   $     1,450.00
328   M1665      PASSIVE OIL SKIMMERS - 2" > 0.25 GAL CAPACITY         EACH                     2.00 $          1,430.00   $     1,430.00
329   M1302      TANKER TRAILER - 5000 GALLONS                         WEEK                     2.00 $          1,420.00   $      710.00
330   M1159      BAILER - DISPOSABLE TEFLON, .75" OD X 3,              EACH                    92.00 $          1,418.40   $      939.40

                                                                 Page 6
                                                     198 Task Material Totals for 2005
                                                                                                           TOTAL COSTS      TOTAL AMOUNT
      UCR CODE                            DESCRIPTION                           UNIT     TOTAL UNITS         CLAIMED          ALLOWED
331   M1498      MINI EXCAVATOR RENTAL - WEEKLY                         WEEKLY                   1.00 $          1,400.00   $     1,400.00
332   M0160      METHOD 8270A (TCLP - SEMIVOLATILES)                    SAMPLE                   4.00 $          1,384.00   $          -
333   M0159      METHOD 1311 (TCLP - NON-VOLATILE EXTRAC                SAMPLE                  17.00 $          1,339.00   $     1,339.00
334   M1390      METHOD 8015B - MODIFIED TPH-DRO IN WATER               SAMPLE                  23.00 $          1,290.00   $     1,290.00
335   M1358      ENCORE SAMPLE CONTAINER FOR USE WITH MET               CONTAINER              169.00 $          1,267.50   $     1,245.00
336   M1295      POLY FILM (100 X 20) - 4 MIL                           EACH                    30.50 $          1,261.00   $     1,219.50
337   M1605      TRASH PUMP - 2"                                        HOUR                  4,374.00 $         1,224.72   $     1,224.72
338   M0394      PERISTALTIC                                            DAY                     21.00 $          1,220.00   $      980.00
339   M0517      MANHOLES 12" WATERTIGHT                                EACH                    28.00 $          1,213.00   $     1,134.00
340   M1506      DUAL PHASE EXTRACTION SYSTEM-250-500 CFM               WEEK                     2.00 $          1,204.00   $      602.00
341   M1541      DUALPHASE EXTR.TREAT.ASSEMB.-UP TO 22GPM               WEEK                     2.00 $          1,196.00   $     1,196.00
342   M1525      AIR COMPRESSOR - 5 HP GAS POWERED                      HOUR                  4,374.00 $         1,180.98   $     1,180.98
343   M1351      VIRGINIA BEACH, NORFOLK, CHESAPEAKE, POR               DAY                      8.00 $          1,168.00   $     1,168.00
344   M0156      METHOD 9131                                            SAMPLE                  21.00 $          1,147.40   $      756.00
345   M1611      VENTILATION/EXHAUST BLOWER                             HOUR                  3,120.00 $         1,123.20   $     1,123.20
346   M0591      AIR ROTARY DRILLING (4" WELL) [7]                      LINEAR FOOT             80.00 $          1,120.00   $     1,120.00
347   M1360      TCLP PESTICIDE/HERBICIDE ANALYSIS:                     SAMPLE                   4.00 $          1,112.00   $          -
348   M1275      GENERATOR 50 KW, 240/480, DIESEL POWERE                0-56 HR/WEEK             2.00 $          1,100.00   $     1,100.00
349   M1126      ACTIVATED CARBON ADSORBER - LIQUID PHASE               UNIT                     2.00 $          1,090.00   $     1,090.00
350   M0309      PORTABLE TANK                                          MONTH                    3.00 $          1,071.00   $     1,071.00
351   M1348      MANASSAS, MANASSAS PARK, PRINCE WILLIAM                DAY                     14.00 $          1,057.71   $      913.00
352   M1174      MAGNETOMETER - PORTABLE                                DAY                     20.00 $          1,047.00   $     1,047.00
353   M1167      ROPE - POLYPROPYLENE 3 STRAND                          FOOT                  1,747.00 $         1,039.50   $      869.50
354   M0311      PORTABLE AIR BLOWER                                    WEEK                     9.85 $          1,034.25   $      929.25
355   M1642      SUCTION HOSE W/COUPLINGS 2"                            EACH                    12.00 $          1,020.00   $     1,020.00
356   M0486      WATER LEVEL INDICATOR                                  DAY                     36.50 $           998.75    $      916.25
357   M0595      HOLLOW STEM AUGER (2" WELL)                            LINEAR FOOT              3.00 $           990.00    $          -
358   M1487      FREE PRODUCT SKIMMER - WEEKLY                          WEEK                     6.00 $           984.00    $      984.00
359   M1288      8" WELL SCREENS - SCHEDULE 40 PVC, FLUSH               10 FOOT LENGTH           4.00 $           980.00    $          -
360   M1658      OIL-SEALED DUAL PHASE EXTRACTION SYS. 500-850 CFM      WEEK                     1.00 $           949.00    $      949.00
361   M0506      BENTONITE PELLETS (1/2")                               50 POUND                31.00 $           945.50    $      945.50
362   M1388      METHOD 8021B/5035 - PURGABLE HALOCARBONS               SAMPLE                   3.00 $           940.50    $      940.50
363   M1442      OXYGEN RELEASING COMPOUND - 4" SOCKS                   EACH                    16.00 $           933.00    $      933.00
364   M1580      GENERATOR:65 KW, 240/480, DIESEL POWERED               57-112 HR/WEEK           1.00 $           930.00    $      930.00
365   M1589      PORTABLE TANK - 1,000 GAL. POLYETHYLENE                WEEK                     8.00 $           920.00    $      345.00
366   M0430      TRASH (2")                                             DAY                     24.00 $           920.00    $      920.00
367   M1185      BARRICADE - TYPE I WITH LIGHT                          WEEK                    70.00 $           910.70    $      863.20
368   M1362      METHOD 8021B - PURGABLE HALOCARBONS AND                SAMPLE                   4.00 $           910.00    $      455.00
369   M0254      EXPLOSIMETER                                           WEEK                     5.50 $           907.50    $      907.50
370   M1459      STANDARD METHOD 9215B                                  SAMPLE                  17.00 $           901.00    $      901.00
371   M1389      METHOD 8015B - MODIFIED TPH-GRO IN WATER               SAMPLE                  21.00 $           885.00    $      885.00
372   M1387      METHOD 8021B - PURGEABLE HALOCARBONS IN                SAMPLE                   7.00 $           881.00    $      783.00
373   M1377      METHOD 8082 - PCBS                                     SAMPLE                   8.00 $           867.00    $      867.00
374   M1340      PLUMBER - OVERTIME RATE                                HOUR                    16.00 $           840.00    $      840.00
375   M0596      HOLLOW STEM AUGER (4" WELL)                            LINEAR FOOT             40.00 $           840.00    $      840.00
376   M0154      METHOD 9045 (PH)                                       SAMPLE                  77.00 $           811.50    $      797.00
377   M0488      WATER LEVEL INDICATOR                                  MONTH                    3.00 $           810.00    $      810.00
378   M1416      METHOD 8015B - MODIFIED TPH-DRO IN SOLID               SAMPLE                   4.00 $           793.00    $      793.00
379   M1104      METALS ANALYSIS: - 6000 SERIES BY ICP,                 EACH METAL               7.00 $           792.00    $      792.00
380   T096       REMOVAL OF PATIO/WALKWAY TYPE PAVEMENTS                SQUARE FOOT            359.00 $           789.80    $      789.80
381   M0308      PORTABLE TANK                                          WEEK                     8.00 $           788.00    $      788.00
382   M1012      METALS ANALYSIS: - 7000 SERIES BY FAA,                 EACH METAL              53.00 $           768.50    $      768.50
383   M1141      PORTABLE TANK - 4,000 GAL. POLYETHYLENE                WEEK                     5.00 $           765.00    $      153.00
384   M0508      BENTONITE CHIPS (3/4")                                 50 POUND               109.00 $           763.00    $      763.00
385   M1655      OIL-SEALED DUAL PHASE EXTRACTION SYS. 50 - 500 CFM     WEEK                     1.00 $           762.00    $      762.00

                                                                  Page 7
                                                    198 Task Material Totals for 2005
                                                                                                         TOTAL COSTS     TOTAL AMOUNT
      UCR CODE                         DESCRIPTION                             UNIT     TOTAL UNITS        CLAIMED         ALLOWED
386   M1666      PASSIVE OIL SKIMMERS - 4" < 1.0 GAL CAPACITY          EACH                     1.00 $          748.00   $         -
387   M0277      HAND AUGER                                            DAY                     49.50 $          742.50   $      712.50
388   M0587      WELL COVERS, LOCKING (6" X 5')                        EACH                     5.00 $          725.00   $      290.00
389   M1303      TANKER TRAILER - 5000 GALLONS                         MONTH                    1.00 $          710.00   $      710.00
390   M0062      RESPIRATOR CART - 7251 ORGANIC VAPOR                  EACH                   110.00 $          706.44   $      706.44
391   M1157      BAILER - DISPOSABLE POLYETHELENE, 1.66"               EACH                    93.00 $          697.15   $      602.45
392   M0011      SURVEYOR CREW CHIEF                                   HOUR                    18.50 $          684.50   $      499.50
393   M1169      DATA LOGGER PRESSURE TRANSDUCER                       WEEK                     3.00 $          684.00   $         -
394   M1007      METHOD 410.1 - CHEMICAL OXYGEN DEMAND                 SAMPLE                  22.00 $          660.00   $      660.00
395   M1240      BLOWER - VAPOR EXTRACTION - 10 HP, 190 S              MONTH                    1.00 $          650.00   $      650.00
396   M1168      DATA LOGGER PRESSURE TRANSDUCER                       DAY                     10.00 $          650.00   $         -
397   M0090      TYVEK SUIT                                            EACH                   181.00 $          646.17   $      517.65
398   M0515      MANHOLES 12" NON-WATERTIGHT                           EACH                    16.00 $          640.00   $      600.00
399   M1339      ELECTRICIAN - OVERTIME RATE                           HOUR                    10.00 $          635.00   $      635.00
400   M0116      METHOD 624                                            SAMPLE                   6.00 $          632.00   $      156.00
401   M1002      STANDARD METHODS 9222D - FECAL COLIFORMS              SAMPLE                  19.00 $          627.00   $      627.00
402   M1579      GENERATOR:65 KW, 240/480, DIESEL POWERED              0-56 HR/WEEK             1.00 $          620.00   $      620.00
403   M0563      PLUGS, BOTTOM, S/40 PVC, FLUSH THREADED               EACH                   117.00 $          619.50   $      591.45
404   M1003      METHOD 150.1 - PH                                     SAMPLE                  75.00 $          612.62   $      604.44
405   M1392      METHOD 8015B - MODIFIED TPH-DRO IN SOLID              SAMPLE                   4.00 $          612.50   $      612.50
406   M0229      CONDUCTIVITY METER                                    DAY                     11.00 $          605.00   $      440.00
407   M1208      SUBMERSIBLE 4" TOTAL FLUIDS PUMP, 1 HP,               DAY                      6.00 $          600.00   $      300.00
408   M0629      TANKER TRAILER CAPACITY < = 5000 GALLONS              DAY                      8.00 $          600.00   $         -
409   M0223      CHAIN SAW                                             DAY                     13.00 $          590.00   $      350.00
410   M0012      SURVEYOR ROD MAN                                      HOUR                    18.50 $          587.38   $      428.63
411   M1350      ROANOKE, ROANOKE COUNTY                               DAY                      6.00 $          577.79   $         -
412   M0519      WELL CAP - LOCKING 4"                                 EACH                    30.00 $          577.00   $      498.00
413   M1352      VIRGINIA BEACH, NORFOLK, CHESAPEAKE, POR              DAY                      5.00 $          575.00   $      460.00
414   M1266      GENERATOR 10 KW, 120/240, GAS POWERED                 0-56 HR/WEEK             2.00 $          572.00   $      572.00
415   M0247      DRAEGER PUMP                                          DAY                     19.00 $          570.00   $      570.00
416   M1181      SURVEY LEVEL WITH TRIPOD                              WEEK                     4.00 $          560.00   $      560.00
417   M1415      METHOD 8015B/5035 - MODIFIED TPH-GRO IN               SAMPLE                  19.00 $          557.50   $      557.50
418   M1543      FREEPRODUCT SKIMMER SYSTEM/1 SKIMMERUNIT              HOUR                   560.00 $          554.40   $      554.40
419   M0720      WHEELED LOADER CAT 916 TYPE                           DAY                      2.00 $          554.00   $      554.00
420   M0105      METHOD 305.1                                          SAMPLE                  27.00 $          540.00   $      539.98
421   M0331      DISCHARGE HOSE (2")                                   DAY                     77.00 $          539.00   $      455.00
422   M1260      GENERATOR 4 KW, 120/240, GAS POWERED                  0-56 HR/WEEK             4.00 $          532.68   $      157.32
423   M1218      TRASH PUMP - 3"                                       0-56 HR/DAY              3.00 $          525.00   $      525.00
424   C1011      FUEL SURCHARGES                                       LUMP SUM                 6.00 $          503.40   $       66.25
425   M1217      TRASH PUMP - 3"                                       0-8 HR/DAY              10.00 $          500.00   $      500.00
426   M0053      PAD LOCKS                                             EACH                    70.00 $          483.52   $      429.52
427   M0077      SLIPOVER RUBBER BOOTS                                 PAIR                    25.00 $          462.50   $      388.50
428   M1214      SUBMERSIBLE 4" TOTAL FLUIDS PUMP, 1 HP,               DAY                      3.00 $          459.00   $      225.00
429   M0633      TRACTOR 4 X 2                                         DAY                      1.00 $          452.00   $         -
430   M1274      GENERATOR 50 KW, 240/480, DIESEL POWERE               0-8 HR/DAY               2.00 $          450.00   $      450.00
431   M0335      DISCHARGE HOSE (3")                                   WEEK                    18.00 $          450.00   $      450.00
432   M1226      AIR COMPRESSOR - 5 HP GAS POWERED, 125 P              0-8 HR/DAY              11.00 $          440.00   $      440.00
433   M1314      RIP RAP                                               TON                     43.19 $          431.90   $      431.90
434   T065       50-250 CFM DUAL PHASE EXTRACTION PUMP AN              DAY                      1.00 $          430.00   $      430.00
435   M1653      CONTINUOUS OLEOPHILIC BELT                            FOOT                    37.00 $          407.00   $      407.00
436   M0155      METHOD 9095 [5]                                       SAMPLE                  23.00 $          402.00   $      402.00
437   M1448      FORK LIFT - 8,000 LB., OUTDOOR/ROUGH TER              DAY                      1.00 $          400.00   $      400.00
438   M0262      FLOOD LIGHTS (2,000 WATTS)                            DAY                      5.00 $          400.00   $      400.00
439   T099       LANDFILLING < 20 CUBIC YARDS OF PETROLEU              CUBIC YARD               9.09 $          386.32   $      386.32
440   M0583      WELL VAULTS, LOCKING (12" X 12")                      EACH                     4.00 $          384.00   $      384.00

                                                                 Page 8
                                                    198 Task Material Totals for 2005
                                                                                                         TOTAL COSTS     TOTAL AMOUNT
      UCR CODE                          DESCRIPTION                              UNIT   TOTAL UNITS        CLAIMED         ALLOWED
441   M1637      DISCHARGE HOSE - 2" ID X 50'                          EACH                     5.00 $          375.00   $      375.00
442   M1310      TRAILER - 20 CUBIC YARD DUMP                          DAY                      2.00 $          372.00   $      372.00
443   M1165      COOLER 60 QT.                                         EACH                     7.00 $          371.00   $      371.00
444   M1292      DRUM, 55 GAL. 17H CLOSE HEAD STEEL                    EACH                    12.00 $          370.00   $      370.00
445   M1196      ROAD SAFETY CONES                                     CONE/DAY               369.00 $          369.00   $      361.00
446   M1420      METHOD 8021B/5035 - BTEX/MTBE IN SOLID W              SAMPLE                   4.00 $          368.00   $      368.00
447   M1419      METHOD 8021B - BTEX/MTBE IN WATER/WASTEW              SAMPLE                   2.00 $          368.00   $      184.00
448   M0395      PERISTALTIC                                           WEEK                     2.00 $          366.00   $      366.00
449   M1353      WALLOPS ISLAND, ACCOMACK COUNTY; JUNE 1               DAY                      3.00 $          363.00   $         -
450   M1540      DUALPHASE EXTR.TREAT.ASSEMB.-UP TO 22GPM              DAY                      3.00 $          360.00   $      360.00
451   M1612      VENTILATION/EXHAUST FAN - 5,000 CFM                   EACH                     2.00 $          350.00   $         -
452   M1406      EPA METHOD 18 BTEX/TOTAL VOLATILE PETROL              SAMPLE                  16.00 $          348.25   $      348.25
453   M1177      MULTI-CHANNEL DATA LOGGER                             DAY                      2.00 $          345.00   $      345.00
454   M0310      PORTABLE AIR BLOWER                                   DAY                     11.00 $          343.00   $      300.00
455   M1571      GENERATOR:50 KW, 240/480, DIESEL POWERED              9-16 HR/DAY              1.00 $          337.50   $      337.50
456   M1103      TCLP METALS ANALYSIS: - METHOD 7000 SERI              SAMPLE                   3.00 $          332.00   $      332.00
457   M0125      METHOD 1010 (IGNITABILITY)                            SAMPLE                   8.00 $          331.50   $      330.50
458   M1197      ROAD SAFETY CONES                                     CONE/WEEK              113.00 $          331.00   $      226.00
459   M0094      WADERS, RUBBER                                        PAIR                     5.00 $          310.00   $      186.00
460   C1005      NATURAL GAS SERVICE                                   UTILITY                  3.00 $          308.28   $      308.28
461   M1287      6" WELL SCREENS - SCHEDULE 40 PVC, FLUS               10 FOOT LENGTH           2.00 $          308.00   $      154.00
462   T068       DUAL PHASE EXTRACTION TREATMENT ASSEMBLY              DAY                      1.00 $          300.00   $      300.00
463   M1354      WALLOPS ISLAND, ACCOMACK COUNTY; OCTOBER              DAY                      3.00 $          300.00   $      300.00
464   M1256      BLOWER VENTILATION/EXHAUST - EXPLOSION P              DAY                      4.00 $          300.00   $      225.00
465   M1172      DISSOLVED OXYGEN METER WITH PROBE                     WEEK                     2.00 $          296.00   $         -
466   M0046      LUMBER 2" X 4" X 12'                                  EACH                    56.00 $          294.00   $      294.00
467   M1186      BARRICADE - TYPE I WITH LIGHT                         MONTH                   10.00 $          290.00   $         -
468   M0084      TAPE - CAUTION                                        ROLL                    17.00 $          289.00   $      280.50
469   M0564      PLUGS, BOTTOM, S/40 PVC, FLUSH TREADED                EACH                    25.00 $          288.00   $      288.00
470   M1149      SORBENT PILLOW 24" X 18" X 2"                         EACH                    44.00 $          285.96   $      207.06
471   M1138      PASSIVE OIL SKIMMERS - 2"                             EACH                     4.00 $          285.00   $         -
472   M0359      SUCTION HOSE (6")                                     WEEK                     3.00 $          285.00   $         -
473   M0485      WATER BOTTLE (5 GALLON)                               BOTTLE                  54.00 $          283.50   $      283.50
474   M1187      BOOTS - CHEST WADERS                                  PAIR                     3.00 $          264.00   $      264.00
475   M0442      PRODUCT COLLECTION TANK WITH OIL/WATER S              DAY                     16.00 $          256.00   $      256.00
476   M1344      BLACKSBURG, HARRISONBURG, AND MONTGOMERY              DAY                      3.00 $          243.00   $      243.00
477   M1383      TCLP VOLATILES ANALYSIS: - METHOD 8260 (              SAMPLE                   3.00 $          240.00   $         -
478   M1308      TRAILER - 40 TON FLATBED                              DAY                      1.00 $          233.00   $      233.00
479   M1194      GLOVES - REUSABLE NEOPRENE                            PAIR                    54.00 $          232.04   $      144.54
480   M0158      METHOD 1311 (TCLP - ZERO HEADSPACE EXTR               SAMPLE                   2.00 $          232.00   $      232.00
481   M1164      COOLER 48 QT.                                         EACH                     9.00 $          224.50   $      220.50
482   M0104      METHOD 160.3 [3]                                      SAMPLE                  14.00 $          224.00   $      224.00
483   T041       WELL REHABILITATION                                   HOUR                     4.00 $          220.00   $      220.00
484   M0487      WATER LEVEL INDICATOR                                 WEEK                     4.00 $          217.00   $       11.34
485   M0608      DRILL RIG STAND-BY CHARGE                             HOUR                     1.50 $          211.50   $      211.50
486   M0047      LUMBER 4" X 4" X 12'                                  EACH                    20.00 $          210.00   $      168.00
487   M1158      BAILER - DISPOSABLE PVC, 1.66" OD X 3                 EACH                    18.00 $          205.50   $      125.00
488   M1583      HOUR METER - AC, NON-RESETTABLE                       EACH                     4.00 $          200.00   $      200.00
489   M1313      LOWBOY TRAILER WITH TRACTOR - UP TO 30 T              DAY                      1.00 $          200.00   $      200.00
490   M0445      RESPIRATOR - FULL FACE                                DAY                     10.00 $          200.00   $      200.00
491   M1193      GLOVES - REUSABLE BUTYL                               PAIR                     8.00 $          196.00   $      196.00
492   M1394      METHOD 8021B/5035 - BTEX PURGEABLE AROMA              SAMPLE                   1.00 $          191.75   $      191.75
493   M0109      METHOD 608                                            SAMPLE                   1.00 $          189.00   $      189.00
494   M0522      WELL PLUG - LOCKING 2"                                EACH                    15.00 $          187.50   $      175.00
495   M1166      DRAEGER TUBES - PETROLEUM HYDROCARBONS                BOX OF 10                4.00 $          186.00   $      186.00

                                                                 Page 9
                                                     198 Task Material Totals for 2005
                                                                                                          TOTAL COSTS     TOTAL AMOUNT
      UCR CODE                             DESCRIPTION                           UNIT    TOTAL UNITS        CLAIMED         ALLOWED
496   M0127      METHOD 1310 (EP TOX)                                   SAMPLE                   1.00 $          184.00   $      184.00
497   M1102      TCLP SEMIVOLATILES ANALYSIS: RATE INCLUD               SAMPLE                   1.00 $          182.00   $      182.00
498   M0490      WELDER (GAS POWERED)                                   WEEK                     1.00 $          175.00   $      175.00
499   M1417      METHOD 8021B - BTEX PURGEABLE AROMATICS                SAMPLE                   1.00 $          164.00   $      164.00
500   M1109      METHOD 8020 - BTEX PURGEABLE AROMATICS (               SAMPLE                   1.00 $          164.00   $         -
501   T097       REPLACEMENT OF PATIO/WALKWAY TYPE PAVEME               SQUARE FOOT             66.00 $          161.70   $      161.70
502   M1607      TRASH PUMP - 3"                                        17-24 HR/DAY             4.00 $          160.00   $         -
503   M0446      RESPIRATOR - FULL FACE                                 WEEK                     6.00 $          160.00   $       30.00
504   M1294      DRUM, 85 GAL. POLYETHYLENE OVERPACK DOT                EACH                     1.00 $          150.00   $      150.00
505   M1223      AIR COMPRESSOR - 175 CFM, DIESEL POWERED               0-8 HR/DAY               2.00 $          150.00   $      150.00
506   M1152      SORBENT WICKS - 4"                                     DOZEN                    2.00 $          150.00   $      150.00
507   M1133      CONTAINMENT BOOM - W/10" SKIRT                         FOOT/DAY               150.00 $          150.00   $      150.00
508   M0353      SUCTION HOSE (3")                                      WEEK                     6.00 $          150.00   $      150.00
509   M0045      ICE                                                    20 LB. BAG              50.00 $          150.00   $      150.00
510   M0036      GARBAGE BAGS                                           100 BAGS                 7.00 $          147.00   $      147.00
511   M1431      TEDLAR BAG - 5 LITER                                   EACH                     5.00 $          145.00   $      145.00
512   M1227      AIR COMPRESSOR - 5 HP GAS POWERED, 125 P               0-56 HR/WEEK             1.00 $          140.00   $      140.00
513   M0126      METHOD 1110 (CORROSIVITY)                              SAMPLE                   2.00 $          136.00   $      136.00
514   M0319      POWER AUGER                                            DAY                      3.00 $          132.00   $      132.00
515   M1013      METHOD 8020/8021B MODIFIED - BTEX/MTBE                 SAMPLE                   1.00 $          130.00   $       92.00
516   M1397      METHOD 8021B - BTEX/NAPTHALENE IN WATER/               SAMPLE                   2.00 $          120.00   $      120.00
517   M0349      SUCTION HOSE (2")                                      DAY                     20.00 $          120.00   $      120.00
518   M0278      HAND AUGER                                             WEEK                     2.00 $          120.00   $      120.00
519   M1512      AIR COMPRESSOR - 100 CFM, 100 PSIG                     17-24 HR/DAY             1.00 $          116.00   $      116.00
520   M1435      METHOD 405.1 - BOD                                     SAMPLE                   4.00 $          116.00   $       87.00
521   T093       CONCRETE PAVEMENT REMOVAL - UP TO 6" THI               SQUARE FOOT             75.00 $          115.50   $      115.50
522   M0565      PLUGS, BOTTOM, S/40 PVC, FLUSH THREADED                EACH                     3.00 $          115.50   $      115.50
523   M0460      SCBA                                                   DAY                      1.00 $          110.00   $      110.00
524   M0026      DISTILLED WATER                                        GALLON                  58.00 $          108.00   $       24.00
525   M1175      MAGNETOMETER - PORTABLE                                WEEK                     2.00 $          106.00   $      106.00
526   M1180      SURVEY LEVEL WITH TRIPOD                               DAY                      3.00 $          105.00   $      105.00
527   M1000      WISCONSIN DNR TPH - GRO                                SAMPLE                   1.00 $          105.00   $      105.00
528   M1473      OXYGEN RELEASING COMPOUND POWDER 0-60 LB               POUND                    8.00 $          103.60   $       84.00
529   M1156      BAILER - DISPOSABLE HDPE, 0.75" OD X 3                 EACH                    22.00 $          100.10   $      100.10
530   M0489      WELDER (GAS POWERED)                                   DAY                      2.00 $          100.00   $       50.00
531   M0033      FERTILIZER (10-10-10)                                  50 LB.                  19.00 $           95.00   $       95.00
532   M1009      METHOD 415.1 - TOTAL ORGANIC CARBON                    SAMPLE                   3.00 $           94.50   $       94.50
533   M1636      AIR HOSE - 1" ID X 100'                                EACH                     0.50 $           92.50   $       92.50
534   M1153      SORBENT WICKS - 4" CANISTER                            EACH                     1.00 $           91.00   $       91.00
535   M1641      SUCTION HOSE W/COUPLINGS - 1 1/4"                      EACH                     2.00 $           90.00   $       90.00
536   M1588      PORTABLE TANK - 1,000 GAL. POLYETHYLENE                DAY                      3.00 $           87.00   $       87.00
537   M1265      GENERATOR 10 KW, 120/240, GAS POWERED                  0-8 HR/DAY               1.00 $           86.00   $       86.00
538   M1189      FENCE POSTS - 4 METAL                                  EACH                    87.00 $           84.39   $       67.90
539   C1006      GASOLINE                                               GALLON                  32.53 $           80.03   $       60.20
540   M1640      SUCTION HOSE W/COUPLINGS - 1 1/4"                      WEEK                    12.00 $           72.00   $       72.00
541   M1404      METHOD 8260B/5035 - VOLATILE ORGANICS GC               SAMPLE                   4.00 $           72.00   $         -
542   M1547      GENERATOR:4 KW, 120/240, GAS POWERED                   17-24 HR/DAY             1.00 $           69.00   $         -
543   M1262      GENERATOR 7.5 KW, 120/240, GAS POWERED                 0-8 HR/DAY               1.00 $           68.00   $       68.00
544   M0523      WELL PLUG - LOCKING 4"                                 EACH                     4.00 $           67.00   $       67.00
545   M1436      METHOD 405.1 BOD CARBONACEAOUS                         SAMPLE                   2.00 $           64.00   $       64.00
546   M1488      FREE PRODUCT SKIMMER - MONTHLY                         MONTH                    4.50 $           63.00   $       63.00
547   M1425      METHOD 8082 - PCBS                                     SAMPLE                   1.00 $           63.00   $       63.00
548   M1134      CONTAINMENT BOOM CLEANING #4/#6 FUEL OIL               FOOT                    50.00 $           62.50   $       62.50
549   M1312      LOWBOY TRAILER WITH TRACTOR - UP TO 30 T               HOUR                     1.00 $           60.00   $       60.00
550   M1026      METHOD 305.1 - ACIDITY/ALKALINITY                      SAMPLE                   2.00 $           60.00   $       60.00

                                                                 Page 10
                                                     198 Task Material Totals for 2005
                                                                                                          TOTAL COSTS     TOTAL AMOUNT
      UCR CODE                         DESCRIPTION                              UNIT     TOTAL UNITS        CLAIMED         ALLOWED
551   M1195      GLOVES - REUSABLE VITON                                PAIR                    13.00 $           58.38   $       58.38
552   M0524      WELL PLUG - LOCKING 6"                                 EACH                     2.00 $           58.00   $       58.00
553   M1025      METHOD 160.4 - VOLATILE SOLIDS                         SAMPLE                   2.00 $           57.00   $       57.00
554   M1391      METHOD 8015B/5035 - MODIFIED TPH-GRO IN                SAMPLE                   1.00 $           55.00   $       55.00
555   M1105      METALS ANALYSIS: - 7000 SERIES BY FAA,                 EACH METAL               1.00 $           55.00   $         -
556   M1238      BLOWER - VAPOR EXTRACTION - 10 HP, 190 S               DAY                      1.00 $           51.00   $       51.00
557   M1458      METHOD 410.4 - CHEMICAL OXYGEN DEMAND                  SAMPLE                   2.00 $           50.00   $       50.00
558   M1005      METHOD 160.2 - SUSPENDED SOLIDS                        SAMPLE                   3.00 $           48.00   $       32.00
559   M1291      DRUM, 30 GAL. FIBER DOT                                EACH                     2.00 $           45.00   $       22.50
560   M1027      METHOD 410.1 - CHEMICAL OXYGEN DEMAND                  SAMPLE                   1.00 $           45.00   $       45.00
561   M1231      AIR COMPRESSOR - 7.5 HP GAS POWERED, 125               MONTH                   20.00 $           39.00   $         -
562   M1140      PORTABLE TANK - 4,000 GAL. POLYETHYLENE                DAY                      1.00 $           38.00   $       38.00
563   M1591      PORTABLE TANK - 1,600 GAL. POLYETHYLENE                DAY                      1.00 $           37.00   $         -
564   M1063      METHOD 9045 - PH (9040/9041/9045)                      SAMPLE                   2.00 $           35.75   $       15.75
565   M1229      AIR COMPRESSOR - 7.5 HP GAS POWERED, 125               0-8 HR/DAY               1.00 $           34.79   $         -
566   M0514      MANHOLES 8" NON-WATERTIGHT                             EACH                     1.00 $           32.50   $       32.50
567   M0032      FACE SHIELD                                            EACH                     2.00 $           29.00   $       29.00
568   M1049      METALS ANALYSIS: - 6000 SERIES BY ICP,                 SAMPLE                   1.00 $           27.00   $       27.00
569   M0075      SARANEX SUIT                                           EACH                     1.00 $           27.00   $       27.00
570   M1097      METHOD 1110 (CORROSIVITY)                              SAMPLE                   1.00 $           25.00   $       25.00
571   M1096      METHOD 1010/1020 (IGNITABILITY)                        SAMPLE                   1.00 $           25.00   $       25.00
572   M1024      METHOD 160.3 - TOTAL SOLIDS/MOISTURE                   SAMPLE                   1.00 $           24.00   $       24.00
573   M0293      MEASURING WHEEL                                        WEEK                     1.00 $           23.00   $       23.00
574   M0025      BUCKET, PLASTIC                                        EACH                     6.00 $           19.50   $       19.50
575   M1006      METHOD 160.4 - VOLATILE SOLIDS                         SAMPLE                   1.00 $           19.00   $       19.00
576   M1004      METHOD 160.1 - DISSOLVED SOLIDS                        SAMPLE                   1.00 $           16.00   $       16.00
577   M0292      MEASURING WHEEL                                        DAY                      4.00 $           16.00   $       16.00
578   M1412      METHOD 8021B/5035 - PURGABLE HALOCARBONS               SAMPLE                   1.00 $           11.25   $       11.25
579   M1021      METHOD 150.1 - PH                                      SAMPLE                   1.00 $           10.50   $       10.50
580   M1495      QUICK DISCONNECT COUPLINGS                             EACH                     2.00 $            9.00   $        9.00
581   M0085      TAPE - DUCT                                            ROLL                     2.00 $            7.80   $        7.80
582   M1639      SUCTION HOSE W/COUPLINGS - 1 1/4"                      DAY                      3.00 $            6.00   $        6.00
583   M0214      BROADCAST SPREADER                                     DAY                      1.00 $            5.00   $        5.00
584   M0088      TAPE - TEFLON                                          ROLL                     6.00 $            3.60   $        3.60




                                                                 Page 11

								
To top