           Highway and Road Transportation
                (20110516-20110520)

          Project Name: Sichuan Mianyang Jiuzhaigou Expressway ................................................... 5
          Project Name: Sichuan Wenchuan highway project to Malcolm ........................................... 6
          Project Name: Shijiazhuang City Southern Ring Road project .............................................. 7
          Project Name: Huiyang district Circle East -Galaxia Dante Section Construction.................... 8
          Project Name: Dongyuan X191 line of the new back to the foot of the mountain highway
          reconstruction project dragon ........................................................................................... 9
          Project Name: Sichuan Wenchuan highway project to Jiuzhaigou .......................................10
          Project Name: Highway Project Ya'an to Kangding ............................................................11
          Project Name: S308 Gong Road, Changning County, co-construction of cross-border road ..13
          Project Name: Welcome North Section -Iron Road ~ Unicorn Road road works ...................14
          Project Name: 2011 High-tech District Changchun, a four-way road and drainage works .....14
          Project Name: Wood Yan Road -white one in the North Road ~ Yang Zhen section
          Reconstruction ................................................................................................................15
          Project Name: Ten Steps to Qu Yuan, Yueyang County, Old Rochester Road -Miluo to Qu
          Yuan above renovation project ........................................................................................16
          Project Name: G107 throughout Henan Anyang Beijing-Shenzhen line to the Hebei provincial
          boundaries, a Guo Wang Du paragraph highway reconstruction .........................................17
          Project Name: by extension of North Road East -Right Bank Road ~ Li Mu-road road works 19
          Project Name: Kan Yip Road, north of 04,012 plots of projects ..........................................19
          Project Name: Quangang Station Peak Road East -two public works projects ......................21
          Project Name: Dongsheng District of Erdos City, Ying Bin Road, Tian-Jiao Road, both sides of
          the Landscape Project .....................................................................................................21
          Project Name: Inner Mongolia Autonomous Region Zhungeer village road projects .............22
          Project Name: Peng City Investment and Development Co., Ltd. modern transport Pengzhou
          silver Road Reconstruction Project segment ......................................................................23
          Project Name: Fusong Lushuihe Town Xishan Road asphalt street reconstruction and
          extension project ............................................................................................................25

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :              +86-10-82743720
         E-Mail :           contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                                http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




          Project Name: Jianhua Road, Sinon Road West Extension Project ......................................26
          Project Name: Shaodong eighty booths to the old house Tong Road Reconstruction ...........27
          Project Name: Old City Expressway Extension Project value Tak ........................................28
          Project Name: New City Yuqiao Xilu Nan Yan -Jiukeshu Road ~ CLOUD South Avenue road
          projects ......................................................................... Error! Bookmark not defined.30
          Project Name: Wenchang Tongguling International Eco-tourism area of municipal
          engineering - old pines Road Project ................................................................................30
          Project Name: Five New City Road -Cloud Road ~ Yuqiao Xi Lunan reduced road projects ...31
          Project Name: High-tech District Changchun Road, etc. A four roads and drainage works....32
          Project Name: Changchun Road High-tech District C XI five roads and drainage works, etc. 33
          Progress stage: start construction in -EIA at the same time ...............................................33
          Project Name: Dongsheng District of Erdos City Road East, Hong fast on both sides of
          landscape works .............................................................................................................34
          Project Name: White Sujiatun Tong Road -ditch to the White Qing Tong Village New
          Construction ...................................................................................................................35
          Project Name: Auto Trade Park, the first phase of Taiwanese local road construction projects
          ......................................................................................................................................35
          Project Name: Dongfeng Rd Phase ...................................................................................36
          Project Name: Water County Road -north shore connection road construction projects .......37
          Project Name: Shengze Quo Road and planned road works ...............................................38
          Project Name: Provincial Peng Wu line -S285 Wuchuan Urban highway construction project -
          Phase II project ..............................................................................................................39
          Project Name: Tianjin Port Highway Phase II ....................................................................40
          Project Name: Highway to the Cunningham Highway Huanan three paragraphs related to the
          project of Mudanjiang .....................................................................................................41
          Project Name: Harbin to Zhaoxing Gong Road section of Tangyuan sector to Hegang ... Error!
          Bookmark not defined.44
          Project Name: Zhaoqing City area flourished Dinghu four, Insein Road construction projects
          ......................................................................................................................................43
          Project Name: Eagles may soar Shengze Lan Road, East Road and the project objectives ...43
          Project Name: New Road Project Shengze ........................................................................44
          Project Name: Lan Road Shengze Project Head ................................................................45


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :               +86-10-82743720
         E-Mail :            contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                                 http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




          Project Name: Qingyuan city along North River Road -under the profile Street - Qingyuan
          Bridge Section road construction projects .........................................................................46
          Project Name: Jin Yu slip Widening Project ...................... Error! Bookmark not defined.49
          Project Name: North Patrol line -Fangshan Section Road Project ........................................48
          Project Name: Pearl Engadabu it to Bala Ga'er Wuliyasitai to the highway section high Le ...49
          Project Name: North Road, Shengze Town section of the same .........................................50
          Project Name: Hui Yang District, Zhongshan Road -Galaxia East - Ishii Road construction
          project ...........................................................................................................................50
          Project Name: Changchun Economic and Technological Development Zone Venture Capital
          Holdings Limited thirty-seven road drainage construction projects......................................51
          Project Name: Fangchenggang City West Bay Bridge to Highway Reconstruction of Pak Sha
          Wan ...............................................................................................................................52
          Project Name: West Highway Bailian Li Bai Ma Jingli pay to pay Rebuild Project .................53
          Project Name: Dongsheng District, Ge Wang was shocked to trench to Tsing Yuan Jia ditch
          highway projects Poplar ..................................................................................................54
          Project Name: Industrial Southern Qingbaijiang all the way through five road construction
          projects such as ..............................................................................................................55
          Project Name: Shuangyashan City Waterfront North City road construction project .............56
          Project Name: Construction of Road Extension Shuangyashan City Construction Projects ....57
          Project Name: Inner Mongolia Highway Network dry white tone to the Wing Tai company
          section of the police highway projects ..............................................................................58
          Project Name: Rebuild Project in Tongling Yangtze River Highway .....................................59
          Project Name: Wuhan Han Zhuankou to the southern section of Highway Shamao a new
          project ...........................................................................................................................61
          Project Name: S211 cable channel to Danba road self-built gas Rebuild Project ..................62
          Project Name: Guiyang City, East Point Road road works ..................................................63
          Project Name: Urumqi-meter extension of the Eastern Road northbound founding of new
          construction ....................................................................................................................64
          Project Name: White to Seto Chongzuo turbulent Luo Jiangzhou District highway projects ..65
          Project Name: Shenzhen Bao'an District, Environment Park, the tiger pit road construction
          projects in the park ........................................................ Error! Bookmark not defined.69
          Project Name: Stone View Road -White Pine Road - Paddy toll stations Widening Project ....67
          Project Name: Peng Xixian Jinqiao Road, construction of industrial Kong ............................68

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :               +86-10-82743720
         E-Mail :            contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                                 http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




          Project Name: Haixiang -Fu Lin Road - East Po Tsuen Section ...........................................68
          Project Name: Highway 42 to the Pan Pan Lake County, Ge Rebuild Project .......................69
          Project Name: Highway 40 to punch back Xikou Sha Line Rebuild Project ...........................71
          Project Name: Red Star Road South Extension -Huayang Section Construction ...................72
          Project Name: High-tech Industrial Development Zone, Yangjiang Harbor Boulevard Port in
          road works .....................................................................................................................73
          Project Name: Ordos City Logistics Park Yijinhuoluo County Zha Sake Century Avenue
          municipal road projects ...................................................................................................74
          Project Name: Nanning Branch Park West Ten Road Project -Acacia Lake Road - High Seven
          Road Project ...................................................................................................................75
          Project Name: Wuxi -Chongqing to Friendship Pass -Guangxi section of highway plane
          Hongzhi Fu Lan ...............................................................................................................76
          Project Name: Guangyuan extension of the Tin Road construction projects ........................77
          Project Name: Nanning Friendship Road extension cord Extension Project ..........................78
          Project Name: Lai Tai Tong Road Drainage Project to .......................................................79
          Project Name: Chow Tai PANGXIDONG to Jindaiji Hisataka Highway ..................................81




                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :              +86-10-82743720
         E-Mail :           contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                                http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project Name: Sichuan Mianyang Jiuzhaigou Expressway


Stages of progress: survey and design

Construction period: 2012 -2014 years

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, explosion-proof blankets, non-magnetic probe, inspection wells, EOD tools vest, police
equipment, mount, intelligent transportation, electronic police, capture systems, radar guns, green facilities,
fire facilities, lighting, drainage facilities, security facilities. -For reference

Project:
   The project is located in Mianyang City, Sichuan Province, Aba territory in the northwest basin, starting
in Mianyang Youxian Zhang Jia Ping, set Terminal Interchange cotton wide high-speed connection, then
high-speed docking cotton is being built along the route through the Jiangyou City, Ping Wu County and
the Jiuzhaigou County, limited to 8 kilometers south of Jiuzhaigou County, convergence Timor nine
highway. Total length of 219 km route length, Mianyang City, Habitat 177.96318 kilometers, Aba
environment 40.54316 kilometers. Bridge and tunnel length 162,057.85 meters, accounting for the total
route length of 74.17%. Total length of 81,187.85 meters Bridge / 188, which set the bridge 14,204.5 m /
Block 13, Bridge 65729.35 m / 157, the bridge 1254 m / 18, accounting for 37.16% of the total length line;
tunnel length of 80,870 m / 38, Extra Long Tunnel 58,400 m / 14, long tunnel 16,992.5 m / 11, in the short
tunnel 5477.5 m / Block 13, accounting for the total route length of 37.01%; Interchange 14.

   Projects across the board with two-way four-lane expressway standard, the design speed of 80 km / h,
roadbed width of 24.5 meters. Auto loading bridge: road grade Ⅰ; design flood frequency: Bridge 1 / 300,
large, medium and small bridges, culverts and small drainage structures 1 / 100; bridge and roadbed width,
10.25 m wide tunnel; the other indexes by Highway Engineering Technical Standard -JTG B01-2003 of
the regulations and requirements of implementation.

  The total investment is about about 30.6 billion.


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Design:*******
Contact:*******
Phone :*******




Project Name: Sichuan Wenchuan highway project to Malcolm


Stages of progress: survey and design

Construction period: 2012 -2014 years

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, explosion-proof blankets, non-magnetic probe, inspection wells, EOD tools vest, police
equipment, mount, intelligent transportation, electronic police, capture systems, radar guns, green facilities,
fire facilities, lighting, drainage facilities, security facilities. -For reference

Project:
  The project is located within Aba in Sichuan Province, in north-western basin, from South Phoenix
pingba in Wenchuan, Wen-Ying highway access point only, based hub of high-speed exchange
connectivity Ying Wen, Wen Ma Wen-nine high-speed and high-speed, along the river upstream Zagunao ,
county manager, miyaluo, through Partridge Hill -tunnel length of 8095 meters, along the downstream ends
Suomo Malcolm Zhuo Keji.

   Total length of 173 km road length, bridge length of 49,010 meters / 109, accounting for 28.3% of route
length -including Bridge 12,460 m / 8; tunnel length of 93,900 m / 35, accounting for 54.2% of route length

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




-including length of the large 6000 meters long tunnel at 20,860 m / 3, the length of 3,000 meters to 6,000
meters long tunnel 41,890 m / 11; Bridge and Tunnel route accounted for 82.5% of total length; hub
exchange Block 1 -Wen-nine high-speed main line EK52 Wenchuan Project Interchange +305 ~ EK56
+940, B ramp, C ramp Naru Wen road, the general exchange 9.

   Projects across the board with two-way four-lane expressway standard, the design speed of 80 km / h,
roadbed width of 24.5 meters. Auto loading bridge: road grade Ⅰ; design flood frequency: Bridge 1 / 300,
large, medium and small bridges, culverts and small drainage structures 1 / 100; bridge and roadbed width,
10.25 m wide tunnel; the other indexes by Highway Engineering Technical Standard -JTG B01-2003 of
the regulations and requirements of implementation.

  The total investment is about 260 million.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Postal address:*******
Post Code:*******
Tel :*******
Fax :*******




Project Name: Shijiazhuang City Southern Ring Road project


Progress in stages: approval for the record

Construction period: December 2011 In December -2014

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, explosion-proof blankets, non-magnetic probe, inspection wells, EOD tools vest, police
equipment, mount, intelligent transportation, electronic police, capture systems, radar guns, green facilities,
fire facilities, lighting, drainage facilities, security facilities. -For reference

Project:
   Project is located in Shijiazhuang City, the starting point for the exchange of Shi-Tai high-speed
Jingxing -G5K307 1.6 km west of Jingxing cable at the cross after the stone is too high value wells along
the east line of the basic layout alignment, into the tunnel in the tomb beans in Luquan Piedmont Boulevard
west of the tunnel, Hospital Road and east across the South after the installation, with Green Bank high-
speed intersection, continue east and south by Stone Ring Road Central, Hong Kong and Macau before
heading east Beijing until the new highway to reach the end of the project.New Interchange 6, Interchange
4 conversion and building long tunnel Block 1, Block 2, Bridge, bridge nine, split Interchange 10, a service
area, a tunnel management, communications monitoring and control center of a , a conservation center, a
management office. Cable construction length 10.15 km.

  The total investment is about 10.906 billion yuan, raised 25%, 75% of domestic bank loans.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******



Project Name: Huiyang district Circle East -Galaxia Dante Section Construction


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years



                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   Project is located in Huizhou City, Huiyang District, road length of 1000 meters, 62 meters wide
planning red line, the total width of 42 meters motor vehicle lanes, two-way 8-lane, road side set the
parking zone. Sides of the road are set to 6-meter-wide sidewalks, the city main road, the starting point
coordinates: latitude 22 ° 46'47 .36 longitude 114 ° 28'42 .56, end point coordinates: latitude 22 ° 46'20 .10
longitude 114 ° 28 ' 53.10 , was from east to west, along the laying of water supply, sewerage, stormwater,
electricity, communications, lighting and other pipelines.

  The total investment is about 37,838,600 yuan.

Owner:*******
Postal address:*******
Post Code:*******
Tel :*******

Design:*******
Postal Address:*******
Tel :*******


Project Name: Dongyuan X191 line of the new back to the foot of the mountain highway reconstruction
project dragon


Progress stage: has the record

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:

                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :         +86-10-82743720
           E-Mail :      contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  Project is located in Guangdong Huilong Pui Tong Gan, starting Stake K0 +000, along the south side of
Xinfengjiang Reservoir, via New Village, Yongfeng reservoir, Ping Ling Keng, cattle Furuta, end stops
adjacent to the Huizhou City Shan Ha Tsuen, end Stake K6 +726.485, length of 6.726 kilometers. Overall
north-south route was. The project is positioned as tertiary roads, the design speed of 30km / h.

  The total investment is unknown.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******



Project Name: Sichuan Wenchuan highway project to Jiuzhaigou


Stages of progress: survey and design

Construction period: 2012 -2014 years

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, explosion-proof blankets, non-magnetic probe, inspection wells, EOD tools vest, police
equipment, mount, intelligent transportation, electronic police, capture systems, radar guns, green facilities,
fire facilities, lighting, drainage facilities, security facilities. -For reference

Project:
   The project is located within Aba in Sichuan Province, in north-western basin, from the Wen Ma
Wenchuan highway hub of exchange -Wen-nine high-speed hub Interchange main Wenchuan EK52 +305 ~
EK56 +940, B ramp, C ramp Naru Wen road, the Maoxian, Diexi, Songpan, Chuanzhusi, Goddess Lake,
Jiuzhaigou County, 8.0 km south county in Jiuzhaigou Kowloon Expressway and the sponge phase, beyond
the Sichuan and Gansu sector. Total length of route mileage of 355 kilometers, setting Bridge 47,037 m /
33, large and medium bridges 86,372 meters / 180, bridge 300 meters / 10, the bridge length of 133,709
meters / 223, accounting for 37.63% the length of the route; set long tunnel 71,650 m / 16, 52,429 meters

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




long tunnel / 27, the tunnel 5640 m / 8, short tunnel 1760 m / 5, the tunnel length, 131,479 m / 56,
accounting for 37.00% of the total length line; Bridge and Tunnel total route length of 74.64 percent;
Interchange 17, Interchange reserved hub Block 1.

   Projects across the board with two-way four-lane expressway standard, the design speed of 80 km / h,
roadbed width of 24.5 meters. Auto loading bridge: road grade Ⅰ; design flood frequency: Bridge 1 / 300,
large, medium and small bridges, culverts and small drainage structures 1 / 100; bridge and roadbed width,
10.25 m wide tunnel; the other indexes by Highway Engineering Technical Standard -JTG B01-2003 of
the regulations and requirements of implementation.

  Estimated total investment of 500 billion.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******




Project Name: Highway Project Ya'an to Kangding


Stages of progress: survey and design

Construction period: 2012 -2014 years

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, explosion-proof blankets, non-magnetic probe, inspection wells, EOD tools vest, police
equipment, mount, intelligent transportation, electronic police, capture systems, radar guns, green facilities,
fire facilities, lighting, drainage facilities, security facilities. -For reference

Project:
   The project is located Ya'an, Ganzi territory in the west of the basin, southwest of Chengdu, from the
rock in Yucheng District of the town, connected to the Xichang Yaan highway, along through the days of
the county, Luding County, Kangding county, the end Kangding vegetable garden to the east. Total length
of 134 km route length, set Bridge 10,181 m / 12, Bridge 33,545 m / 98.5, in the 2,200 meters bridges / 37,
a total of 45,926 m bridges / 147.5, total route length of 34.34%; long tunnel -Erlang Mountain Tunnel
11,148 m / 1 seat, long tunnel 23,278 m / 6, long tunnel 17,740 m / 9, in short tunnel 11,188 m / 24, the
tunnel a total of 63,354 m / 40, accounting for line length of 47.38 %; bridge and tunnel total length of
109,280 meters, accounting for 81.72% line length; 8 Interchange.

   Projects across the board with two-way four-lane expressway standard, the design speed of 80 km / h,
roadbed width of 24.5 meters. Auto loading bridge: road grade Ⅰ; design flood frequency: Bridge 1 / 300,
large, medium and small bridges, culverts and small drainage structures 1 / 100; bridge and roadbed width,
10.25 m wide tunnel; the other indexes by Highway Engineering Technical Standard -JTG B01-2003 of
the regulations and requirements of implementation.

  The total investment is about about 19.7 billion.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Contact:*******

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Tel :*******
Fax :*******




Project Name: S308 Gong Road, Changning County, co-construction of cross-border road


Stages of progress: survey and design

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only

Project:
   Project is located in Changning County, the route length of approximately 7 km, highway technical
standards, design speed of 60 km / h, subgrade width of 20 meters.

  The total investment is not detailed.

Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******



                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project Name: Welcome North Section -Iron Road ~ Unicorn Road road works


Progress stage: has the record

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only

Project:
  The project is located Laibin, line north to south, north Rail Road intersection, south to Unicorn Road
junction, road class Ⅰ and class city trunk road, the use of asphalt concrete pavement. Line length of
572.326 meters -including a cross-river Guangxi, length <100 m of the landscape bridges, the red line
width of 50 meters.

  The total investment is about 93,083,600 yuan, the owner investor and bank loans.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******




Project Name: 2011 High-tech District Changchun, a four-way road and drainage works


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years
                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Major equipment: pipes, valves, instruments, excavators, bulldozers, rollers, tamping machine, stirring hug,
pavers, lighting, pipe network -for reference

Project:
  Project is located in Changchun High-tech Industrial Development Zone, works for an urban road and
drainage along the road laying. Total roadway 211339.83m2, sidewalks and bike lanes 100180.13m2, rain
water pipe length is 6630m, the sewage pipe length 6556m.

  The total investment is 183,307,300 yuan.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design Units:*******
Postal address:*******
Contact:*******
Tel:*******


Project Name: Wood Yan Road -white one in the North Road ~ Yang Zhen section Reconstruction


Stages of progress: environmental impact assessment

Construction period: August 2011 -2012 in July

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:


                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :         +86-10-82743720
           E-Mail :      contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




   Project is located in Beijing, to communicate the Wood Yan Road, east of lumber town of Shunyi, Yang
Zhen and North Works Town, Shunyi the main road to the eastern region of north-south. After the
implementation of the project to communicate the main contact channels Shun Ping Road and White Road,
improved links with the Beijing-level high-speed access, the road network equilibrium traffic pressure on
the main road, on the Yang Zhen provided a guarantee of economic development, promoting economic
Yang Zhen development. The engineering design of wood range Yan Road Reconstruction white road
north, one south Yang Zhen Road. Corresponds to the starting point for the design of road maintenance
Stake K9 +295, design finish at K10 +824. The total length of 1.53 km section of the road. Urban sub-
distributors, the design speed of 40 km / h, the red line width of 40 meters. Status crossing bridge Block 1,
River Bridge for the Tsai family, the structure of 2X15 meters of prestressed concrete hollow slab, bridge
widening to be the status quo.

  The total investment is about 62,458,000 yuan details.

Construction:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******

Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******



Project Name: Ten Steps to Qu Yuan, Yueyang County, Old Rochester Road -Miluo to Qu Yuan above
renovation project


Stages of progress: environmental impact assessment

Construction period: July 2011 -2012 in December

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   The project is located northeast of Miluo City in Hunan Province, starting in the Miluo City and
Yueyang City intersection three Town and ending at the north of the ancient town Miluo City Rochester.
The total length 44.483km. Recommended program's main control points: the starting point of Yueyang
County Town, via Chi Feng Township, Changle Town, Beijing, Hong Kong and Macau high-speed, patio
Township, G107, Wuhan-Guangzhou high-speed railway, Hua Township, safflower Bridge, the Beijing-
Guangzhou railway, an end stop at the north end of town was the ancient Miluo Rochester, with the S307
the Cross.

  The total investment is 345,377,100 yuan.

Owner:*******
Post Code:*******
Contact:*******
Tel:*******

Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: G107 throughout Henan Anyang Beijing-Shenzhen line to the Hebei provincial boundaries,
a Guo Wang Du paragraph highway reconstruction


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   The project is located south of the village in Hebei Province Henan Linzhang Chi Hebei Province, Hebei
provincial boundaries and the planning of the G107 to the Hebei-Henan border Apricot convergence
Rebuild Project, the route south to the west by the Town of Anyang County Park, and East SU degrees
West of through the gap between degree and continue south through the North Gate area Cheung Road,
Tuen access Y040, Y040 take full advantage of the North Gate area south road corridors and the North
Ring Road, Anyang City, the Chinese road under construction, set the cross cross, and then west along the
G107 The North Central Section North Anyang City G107 Guo Wang Du ring the intersection, along the
base by Ma, Chow camp, Wat Wang Du. Route length of 13.703 km; which new 6.0 km, Old Road
Construction 7.703 km. Block 1 along the bridge to be built. The project K0 +000 ~ K8 +965.717 .. 965 km
section of 8-way six lanes recommended technical standards for highway design speed of 80 km / h,
subgrade width of 32 meters; remaining sections recommended a total of 4.738 km four-lane two-way
technical standards for highway design speed of 80 km / h, taking into account the conservation area and
reduce the removal, subgrade width of 21.5 meters used. Pavement asphalt concrete are used across the
board, bridge and culvert design load by highway - Ⅰ.

  The total investment 15272.0818 million.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project Name: by extension of North Road East -Right Bank Road ~ Li Mu-road road works


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:



  The total investment is unknown.




Designer:*******

Post Code:*******


Project Name: Kan Yip Road, north of 04,012 plots of projects


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference


                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :         +86-10-82743720
           E-Mail :      contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project:
   Project is located in the western city of Changzhou, Royal Terrace area of the west side of the water and
north of the south bank of the old canal, major projects are as follows:
1 road works: The project consists of two roads were formed. Five Star Road -labor West ~ Sanbao Street
and Sanbao Street -Five Star Road ~ Deloitte North two road length of 826.061 meters. West Star Road
south from labor, Sanbao Street north to a total length of 296.611 meters; Sanbao Street West from the Five
Star Road, west of Deloitte North Road, length of 529.450 meters; road red line width are 20 meters.
2 Green Project: This project is supporting the block west of Green Road in ground handling industry,
including Sanbao Street -Five Star Road ~ Deloitte Road north of Greenland -18,120 m2, the Royal Terrace
area of water along the east and south Green Ribbon -8290 square meters, Deloitte North -Labour West ~
Deloitte Road west of Greenland -3312 m2. The total green area of about 29,722 square meters.
3 Pipeline Project: The design includes rainwater, sewage, water, gas, communications, power supply pipes.
Pipeline and road projects with a long base. Rain water pipe: diameter d400-d800, tube length 1137 m, the
use of reinforced concrete pipe; sewage pipe: diameter DN400, tube length of 705 meters, the use of HDPE
pipe; to the pipe: diameter DN300, tube length of 925 meters, using HDPE pipe; gas pipe: laying the 160PE
medium pressure gas pipe, about 916 meters, the use of PE pipe; communication pipe: laying of 6 from the
110PE 110PE ~ 8 from the tube, single tube total length of 6554 meters; supply pipe: laying 6 the 180C-
PVC-12 in the 180C-PVC pipe, single pipe total length of 9586 meters.

  The total investment is unknown.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******

Design:*******
Postal Address:*******
Contact:*******
Tel :*******




                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project Name: Quangang Station Peak Road East -two public works projects


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   Project is located in Quanzhou Peak Road Station Quangang coastal road between East and S201, in
Quangang northeast have been built west of the eastern section of Station Peak Road, and North-South
Road level-phase, intersection design for the drainage and then extend the road east, in the K0 +432.5 to the
end at the cross-ditch plan, and coastal large channel -S201 the Cross-phase, length of 0.465905 km road
routes, the urban main road grade Ⅱ standard, roadbed width of 50 meters, two-way six-lane, driving speed
of 50 km / hour.

  The total investment is unknown.

Owner:*******
Post Code:*******
Contact:*******
Tel:*******

Designer:*******
Postal Address:*******
Contact:*******
Tel:*******


Project Name: Dongsheng District of Erdos City, Ying Bin Road, Tian-Jiao Road, both sides of the
Landscape Project


Progress in stages: approval for the record
                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Construction period: 2011 -2011

Major equipment: garden facilities, landscaping facilities, trash, drainage pipes, instruments, meters, fire
equipment, water preservation facilities, low-voltage electrical appliances, wire and cable. -For reference

Project:
  Project is located in Welcome Road -North Ring Road ~ Culture Street, Tianjiao Road -Rd 109 Old State
Road package, according to spatial distribution and control of urban design detailed planning with urban
design guidelines to determine landscape form coastline.

  The total investment is not set, the Government funds.

Owner:*******
Postal Address:*******
Tel :*******
Fax :*******




Project Name: Inner Mongolia Autonomous Region Zhungeer village road projects


Progress stage: has the record

Construction period: 2011 -2013

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   The project is located Zhungeer, village road is divided into three parts: 1, the old valley road Friday
when the communication line, the starting point for the old village of the valley, the end of five when the
ditch was a whole east-west route, the proposed 6.5 km road length , according to the standard construction

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




of four highways, the design speed of 20 km / hour, two-lane two-way requirements, the total width of
roadbed is 6.5 meters, 6.0 meters wide road. Highway bridge loading standards - Ⅱ grade; culvert and
roadbed width.

   2, Man Hon trench to the X618 line of village road starting point for the pretty Han trench, the end of
X618, was the whole east-west route, the proposed road length of 20 km, according to the standard
construction of four highways, the design speed of 20 km / h, using two-way two-lane requirements, the
total width of roadbed is 6.5 meters, 6.0 meters wide road. Highway bridge loading standards - Ⅱ grade;
culvert and roadbed width.

   3, to the Sea of Wangjiagou color line, so the starting point for the village road Wangjiagou, the end of
the sea power of color too, was the whole east-west route, the proposed road length of 2 km, according to
the standard construction of four highways, the design speed of 20 km / hour, two-lane two-way
requirements, the total width of roadbed is 6.5 meters, 6.0 meters wide road. Highway bridge loading
standards - Ⅱ grade; culvert and roadbed width.

  The total investment is not detailed.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******




Project Name: Peng City Investment and Development Co., Ltd. modern transport Pengzhou silver Road
Reconstruction Project segment


Stages of progress: environmental impact assessment -filed

Construction period: 2011 -2012 years

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   The project is located Pengzhou Longmen Town, by the white section of East Road, Temple Road,
bottom of the pot and the white stone segments. Argent Road East temple section about 500m away from
the office to change Yinqiao nine lines, using existing roads widened, K0 +206.5 at a 5 × 20m new bridge,
new bridge and the Old Bridge Old Bridge Road to separate crossover fashion, on across the old road, the
road from the station at the K1 +224 90m office is located downstream of a 5 × 20m after the bridge across
the river Baishuihe wiring at the line at K2 +000 on the terraces Ⅰ Xiao Jia Ping, wiring, finish in the ant
K3 +506.916 Locust station connected to the construction wangjiaping bridge. Full range of long
3.72971km, including the main line of long 3.48309km, regional long 0.24662km. Range of road design
features two bridges, culverts 13 and supporting along the pipeline projects, traffic engineering and green,
the total occupation of land 100.97 acres. After the river is mainly along the White Water River and its
tributaries. Rock bottom section of access road silver white road K0 +600, using the existing road widening
on the right, in the K0 +300 2 × 20m using a bridge under construction, the road construction in the K0
+788 at a 3 × 20m in the White Water River after the bridge span along the route, the route in the Park at
K1 +000 Ⅰ floor terrace results wiring, silver finish K1 +332.73 access road. Full range of long 1.336km,
road design in the use of the bridge -Silver Peak Bridge a, the new bridge in one, the new culvert 34,
matching along the pipeline projects, traffic engineering and green, the total occupation of land of 31.6
acres. After the river is mainly along the White Water River and its tributaries. The width of the road
embankment sections by 8.5m -difficult Lot 7.5m, local section 6.5m, the carriageway width 7.0m -local
section 6.0m, the road to asphalt concrete pavement, across the board with no toll booths.

  The total investment is unknown.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******


Project Name: Fusong Lushuihe Town Xishan Road asphalt street reconstruction and extension project


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
  The project is located Fusong Lushuihe town, this project is the district town Lushuihe to transform the
existing dirt roads, total length of 4.39km, transformation of the original line of the road to transformation,
only the original roads pavement reconstruction, not a long extension widened.

  The total investment is about 4.2 million yuan.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Fax :*******
Project Title: Fourth Street, Changchun High-tech District B, three roads and drainage works, etc.

Progress stage: start construction in -EIA at the same time

Construction period: 2011 -2012 years

Major equipment: pipes, valves, instruments, excavators, bulldozers, rollers, tamping machine, stirring hug,
pavers, lighting, pipe network -for reference

Project:
  Project is located in Changchun High-tech District, for a total roadway 138783.86m ², sidewalks and
bike lanes 65042.73m ², water pipe length 7574m, length of sewage pipes 7356.22m.

  The total investment is 122,216,700 yuan.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design Units:*******
Postal address:*******
Contact:*******
Tel:*******


Project Name: Jianhua Road, Sinon Road West Extension Project


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   Project is located in Yangzhou Economic Development Zone, the proposed land area 21214.56m2.
Jianhua Road Project road length of 1510.16m, west through North Road, east to Port Rd Ma, planning
road width 40m. Jianhua Road West Extension project road length of 560m, jade east River Road, west
through North, planning road width 40m.

  The total investment is about 15 million yuan.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******

Design:*******
Postal Address:*******
Tel:*******
Fax :*******



Project Name: Shaodong eighty booths to the old house Tong Road Reconstruction


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:


                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :         +86-10-82743720
           E-Mail :      contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




   Project is located in Shaodong, highway starts at the junction of Shaodong and eighty Lianyuan Pavilion,
and the phase Lianyuan City in the X023, X023 runs northward through the connection S210; end at
Shaodong Qidong County at the junction with Tong old house, and Qidong County, X088 phase, and
stretching south connection through the X023 G322, S317; route length 69.030Km. According to the basic
trend line, the main control point for the eighty booths, inexpensive bridge, stream Ze, sand, fire, factory
floor, Yangqiao, She Tin Bridge, Lingguan Hall, stone line bridge, old houses pond.

  The total investment is unknown.

Owner:*******
Postal address:*******
Post Code:*******
Contact person: has total
Tel:*******

Designer:*******
Postal Address:*******
Tel :*******
Fax :*******


Project Name: Old City Expressway Extension Project value Tak


Progress in stages: approval for the record

Construction period: 2011 -2013

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, explosion-proof blankets, non-magnetic probe, inspection wells, EOD tools vest, police
equipment, mount, intelligent transportation, electronic police, capture systems, radar guns, green facilities,
fire facilities, lighting, drainage facilities, security facilities. -For reference

Project:


                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :         +86-10-82743720
           E-Mail :      contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




   Project is located in Hengshui City, the line starting point for the town of Han Qing Diao Nanchuang
Gucheng, Hou Chuang Wei Canal between Hanoi Jilu provincial boundaries, and the proposed expressway
in Shandong Dezhou phase, and finally King County Green Township, Lan German highway intersection
with the value, the route length of 27.3km, cable a road about 11 Km, secondary road about 12 Km. Value
of the project is to use German high-speed, high-speed formation of a large wide contact capital Beijing
and Hebei, Shandong Province, southern China until a convenient high-speed access. Project design 4-lane
expressway standard with a design speed is 120Km / h, subgrade width of 28m, the carriageway width 2 ×
7.5m, width between 4.5m, hard shoulder width of 3.5m, soil shoulder width of 0.75m. Bridge and culvert
design load for the highway - Ⅰ, Bridge across the board a total of 1836m / 1 Block, Bridge 156m / 1
Block, Interchange 3, a main line station, a service area, a conservation work area, management office -
including information Management Center 1.

  The total investment is about 2.338 billion yuan, 25% owner financing, domestic bank loans 75%.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Progress stage: the construction preparation -EIA at the same time

Construction period: June 2011 -2011 in December

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   The project is located north Jiukeshu Yuqiao Xi Lunan Yan Road, south to South Street Cloud, with a
total area of 20400m2. The project extended north Jiukeshu Yuqiao Xilu Nan Road, south to Cloud South
Main Street, the road length of approximately 510m, planning for urban trunk road red line width of 40m,
driving speed 50km / h. Road type for the three road sections, the specific arrangement of the: 4.5 m -the

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




footpath +6 m -roads +2.5 m -both sides of the median +16 m -carriageway +2.5 m -both sides of the
median +6 m -roads +4.5 m -the footpath. Yuqiao Xi Lunan extension with a total of three roads intersect,
with the urban trunk road 2, an urban sub-distributors. The project includes roads, transport, water supply,
rainwater, sewage, recycled water, lighting, green, power, telecommunications, cable, gas and other
projects.

  The total investment is 291.68 million yuan.

Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Wenchang Tongguling International Eco-tourism area of municipal engineering - old pines
Road Project


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
  Project is located in Wenchang City, Long Louzhen, the project starts from the intersection of Diamond
Avenue and the beach road was cross intersection, south beyond the protective green. Pines Road standard

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




lane 26m, two-way four-lane, urban sub-distributors Ⅱ, the design speed 30km / h. Engineering design has
2 intersections, respectively, and Diamond Avenue into a T-intersection, and the beach road into a cross
intersection. Ⅱ grade of new urban roads, total road length of 654.26 meters.

  The total investment is about 25,194,700 yuan.

Owner:*******
Postal Address:*******
Contact:*******
Tel :*******

Design by: Media Asia in Hainan Eco Environmental Engineering Consulting Co., Ltd -EIA agencies
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******


Project Name: Five New City Road -Cloud Road ~ Yuqiao Xi Lunan reduced road projects


Progress stage: the construction preparation -EIA at the same time

Construction period: June 2011 -2011 in December

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   The project is located within five Nan Luxi Cloud View Road, east Yuqiao Xi Lunan Yan, a total area of
18000m2. From this project five Nan Luxi Cloud View Road, east Yuqiao Xi Lunan Yan, road about 600
meters wide, planning for the urban sub-trunk road red line width of 30m, the design speed of 40km / h.
The road is a road section type, the specific arrangement is: 4.5m -sidewalk +21 m -driveway + 4.5m -
sidewalk. A total of five and two South Road intersection, in which an urban trunk road, urban sub-arterial


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




roads 1. The construction includes roads, transport, water supply, rainwater, sewage, recycled water,
lighting, green, power, telecommunications, cable, heat and other projects.

  The total investment is 171.58 million yuan.

Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******



Project Name: High-tech District Changchun Road, etc. A four roads and drainage works


Progress stage: start construction in -EIA at the same time

Construction period: 2011 -2012 years

Major equipment: pipes, valves, instruments, excavators, bulldozers, rollers, tamping machine, stirring hug,
pavers, lighting, pipe network -for reference

Project:
   Changchun High-tech Industrial Development Zone project is located in the North, the road new
construction, Changchun High-tech Industrial Development Zone, a super of North Road, road length
1067m; C thirty Rd, road length 2207m; C thirty-six Road, road length 882m; C Eight Street, the road
length of 899m. Sewage pipeline length 3859m; water pipeline length of 5246m.


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  The total investment is unknown.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design:*******
Postal address:*******
Contact:*******
Tel :*******


Project Name: Changchun Road High-tech District C XI five roads and drainage works, etc.


Progress stage: start construction in -EIA at the same time

Construction period: 2011 -2012 years

Major equipment: pipes, valves, instruments, excavators, bulldozers, rollers, tamping machine, stirring hug,
pavers, lighting, pipe network -for reference

Project:
   Changchun High-tech Industrial Development Zone project is located in the North, the road new
construction, Changchun High-tech District C XI Road, the road length of 939.31m. MDA Sixteenth Street,
the road length of 1043m. Malonyl-eighth road, road length 1088.43m. C thirty Road, road length 862m;
planning street, road length of 932.7m. Sewage pipeline length 5600m; water pipeline length of 5871m.

  The total investment is unknown.

Owner:*******
Postal address:*******
Post Code:*******

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Contact:*******
Tel:*******

Design:*******
Postal address:*******
Contact:*******
Tel :*******


Project Name: Dongsheng District of Erdos City Road East, Hong fast on both sides of landscape works


Progress in stages: approval for the record

Construction period: 2011 -2011

Major equipment: garden facilities, landscaping facilities, trash, drainage pipes, instruments, meters, fire
equipment, water preservation facilities, low-voltage electrical appliances, wire and cable. -For reference

Project:
   Project is located in Dongsheng District 109 State Road to Rong Wu highway within 300 meters on both
sides, according to urban design space and control the layout of detailed planning with urban design
guidelines to determine landscape form coastline.

  The total investment is not set, the government investment.

Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******




                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project Name: White Sujiatun Tong Road -ditch to the White Qing Tong Village New Construction


Progress stage: project

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, explosion-proof blankets, non-magnetic probe, EOD tools vest, police equipment, mount,
intelligent transportation, E-police, capture systems, radar gun. -For reference

Project:
  Project is located in Sujiatun District of Shenyang City, the new channel to the White Qing Tong Village
Road project.

  The total investment is not detailed.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******




Project Name: Auto Trade Park, the first phase of Taiwanese local road construction projects


Progress stage: start construction in -EIA at the same time

Construction period: January 2011 in June -2012

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :            +86-10-82743720
         E-Mail :         contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project:
   Project is located in Fujian Jinfeng Development Puwei Area Xiangcheng car market, car market
Xiangcheng Xiangcheng District of Zhangzhou City is located in the north, Long Zhang and Zhang Hua
Road highway leads west of the intersection. The construction scale of the four local road construction,
technical grade Ⅰ grade slip for the city, length of 2,319.388 m, subgrade width of 18 meters. Among them,
No. 1 Road, the length of 202.14m, the red line width of 18 meters; 2nd road, the length of 897.468 meters,
18 meters wide and the red line; 3 Road, the length of 246.60 meters, 18 meters wide and the red line; 4th
Road, 973.18, red line width of 18 meters. The main construction contents include road construction and
road works, drainage pipe, road greening, street lighting, traffic management facilities, pipelines crossing
the embedded and other projects.

  The total investment is 17,087,700.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******

Design:*******
Postal Address:*******
Tel :*******
Fax :*******



Project Name: Dongfeng Rd Phase


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project:
  Project is located in Yangzhou Economic Development Zone, Dongfeng Rd road length 1614.122m, the
proposed land area 10341.74m2. West along the Grand Canal, east to cross the river South, long-term
planning road width 22m, width of 10 meters in this implementation. Total length of Phase 494m, east
Zhouzhuang River Road, west to Zhouzhuang west slip road.

  The total investment is about 26.51 million yuan.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******

Design:*******
Postal Address:*******
Tel:*******
Fax :*******


Project Name: Water County Road -north shore connection road construction projects


Progress stage: has the record

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   The project is located southwest of Yan'er Waterloo Area, starting with the status quo goldfish Ridge
Road intersection and ending with the oil road intersection, city views for the east-west roads. The four-
lane roads are two-way, three plate road, asphalt concrete pavement. Road length of 1,018.118 m, road red
line width of 24 meters, of which, motor vehicle road 16 meters wide green belt and the south side of the
sidewalk layout, green band is 3 meters, the width of the sidewalk on both sides is 5 meters. Road site

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




allocated to: 5.0m -sidewalk +3.0 m -green belt +16 m = 24m. The main construction content of the project:
road works, drainage works, greening, lighting engineering, traffic engineering, gas engineering, pipeline
network projects. The strength of electric and gas pipeline engineering considerations such integrated
trench, rain and sewage drainage system, consider a triage system.

  The total investment is unknown.

Owner:*******
Postal Address:*******
Contact:*******
Tel:*******


Project Name: Shengze Quo Road and planned road works


Progress stage: the construction preparation -EIA at the same time

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   Project is located in Shengze Town, the road works north Shun Lake Road, south to Market Road, the
road length of 645 meters, covers an area of 13,000 square meters, the full range of standard design by city
slip road, asphalt concrete pavement. The main construction content of the road 645 meters long, 18 meters
wide.

  The total investment is 9,000,000 yuan.

Owner:*******
Post Code:*******
Contact:*******


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Tel :*******

Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******


Project Name: Provincial Peng Wu line -S285 Wuchuan Urban highway construction project -Phase II
project


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   Project is located in Wuchuan City, the project starts at the north side of new paper mills, then S285
urban section of a highway reconstruction project a -K105 +000, the end of the Cross with the G325. Main
control points are: plum of existing roads, both small East River Bridge, across the Haihe River, along the
levees, sewage treatment plant, co-Temple -Temple, Mountain River Bridge, G325. Route length of
4.907km, according to the standard highway construction, driving speed 80km / h, and the implementation
of the relevant supporting municipal projects over the same period -not included in the project investment
projects, roadbed width 42.5m/46.5m, across the Haihe River Bridge -K1 +793 ~ K2 +039 by bi-directional
six-lane section of I-class urban trunk road width 33.5 m one-time implementation of the remaining
sections reserved for the main Drive forward into a bi-directional six-lane main road I-class urban
conditions. New main line bridges Block 1, length 184.5 m, the culvert 14; embankment length of 4.512
km, across the board fill 208,830 square, full line of cutting 73 806 side, protective masonry 5425 side;
cement concrete pavement 94,756 square meters; across the board were set up the Cross 10 , where the
intersection of three major levels.


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  The total investment is unknown.

Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Fax :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Tianjin Port Highway Phase II


Progress stage: the construction preparation -EIA at the same time

Construction period: In May 2011 -2013

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, explosion-proof blankets, non-magnetic probe, inspection wells, EOD tools vest, police
equipment, mount, intelligent transportation, electronic police, capture systems, radar guns, green facilities,
fire facilities, lighting, drainage facilities, safety facilities, high-speed control, high-speed electrical and
mechanical, security facilities -for reference only

Project:
   Project is located in Tianjin, recommended total length of the program line 22.31km, which contains the
Binhai New Area Link Expressway -Tianjin Han speed - Seaview Avenue project overlap length of
approximately 3.0km -Jin Han speed - Seaview Avenue Project has been approved and approved, that is,
the actual route of the project length 19.31km. Across the board this project a total of Interchange 5, Block
5, separated interchange; Channel Block 2; across the board a total of parking area, the main line toll Block
1, Block 4 ramp toll booths.

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  The total investment is about 4,436,648,500 yuan.

Construction Unit:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Design by: the Ministry of Transport of Tianjin Institute of Water Transport Engineering -EIA agencies
Postal Address:*******
Tel :*******
Fax :*******



Project Name: Highway to the Cunningham Highway Huanan three paragraphs related to the project of
Mudanjiang


Progress in stages: approval for the record

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   Project is located in Mudanjiang city, highway main starting point for three off Scenic in Mudanjiang
City, the three of a village, the village harvest, forward Village, Octopus Village to Mudanjiang Local
Taxation Ming Street and the intersection of Zhonghua Road, and eventually died. The main line of full-
length 21.95km. Extension programs in Mudanjiang City, three from off scenic, three black Po Road, the
village of Bear Park, the extension length of 1.78km, the total number of bridges along the line of Block 4,
43 culverts, junction 20. Take the form of construction of three main sections, including: K0 +000- K15
+135 section, the use of secondary roads standards; K15 +135- K18 +450 section, the use of a highway

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




standards; K18 +450- K21 +950 section, the use of City main road construction standards, and the other
related to the construction of three black bear Po Road 1.78 km Park Extension levels.

  The total investment is about 318.32 million yuan, the Ministry of subsidies and raised.

Construction unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******

Progress in stages: approval for the record

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
  The project is located Hegang length 26.836 km, technical standards for the secondary road standards.

  The total investment is about 120 million yuan.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******




                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project Name: Zhaoqing City area flourished Dinghu four, Insein Road construction projects


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   Project is located in Zhaoqing City Dinghu Wing Industrial Park District, including the thriving four and
Insein Road. Four for planning long-term prosperity of the city expressway, the main road near the park are
a total length of 1600m, road planning red line width of 50m, the recent implementation of the width of
20m, two-way four lanes, a design speed of 40km / h. Insein Road, total length of about 900m, planning red
line is 30m, two-way four lanes, a design speed of 60km / h.

  The total investment is about 30 million yuan.

Owner:*******
Postal Address:*******
Contact:*******
Tel :*******

Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Eagles may soar Shengze Lan Road, East Road and the project objectives


Progress stage: the construction preparation -EIA at the same time


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
  Project is located in Shengze Eagles may soar northbound from East Road, south to the planning of roads,
head east from the Eagles may soar Lan Road, East Road, west Yang Fan Road, the road length of 850
meters, covers an area of 27,000 square meters, across the board by city secondary roads standard design,
asphalt concrete pavement. The main construction content of the road 850 meters long, 30 meters wide.

  The total investment is about 19.5 million yuan.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******

Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******


Project Name: New Road Project Shengze


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project:
   Project is located in Shengze town, the road works north Shengze Shun Lake Road, south Lan Road,
extending to the head, total length of 1,000 meters, covers an area of 30,000 square meters, full range of
standard design by city slip road, asphalt concrete pavement . The main construction content of road length
1,000 meters, 25 meters wide, supporting the construction of bridges and culverts -Block 1 and drainage
works.

  The total investment is about 16.5 million yuan.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******

Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******



Project Name: Lan Road Shengze Project Head


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:


                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :         +86-10-82743720
           E-Mail :      contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  Project is located in Shengze City, east of the road works emerging Shengze Road, extending west to the
West Second Ring Road, total length of 1,000 meters, covers an area of 33,000 square meters, the full
range of standard design by city slip road, asphalt concrete pavement . The main construction content of
road length 1,000 meters, 30 meters wide, supporting the construction of bridges and culverts -Block 1 and
drainage works.

  The total investment is about 20 million yuan.

Owner:*******
Post Code:*******
Contact:*******
Tel :*******

Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******


Project Name: Qingyuan city along North River Road -under the profile Street - Qingyuan Bridge Section
road construction projects


Stages of progress: environmental impact assessment

Construction period: December 2011 In December -2013

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
  Project is located in Qingyuan City, North River north embankment, the new city Ⅱ grade of roads, total
road length of 1,468.026 meters.


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  The total investment is about 25.5 million yuan.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******

Stages of progress: Engineering -EIA at the same time

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   The project is located Ninghe, starting in the town of Lo Han Lutai Ninghe road, the road to consistent
with the same route to the road after the north east extension of the road and Jin Yu Lu Yu Yu along the
slip road at the intersection deflection towards the north road Lu, Yu-chun, beyond the end of highway
engineering, project length of 1.8km. After the section of road widening as: 2m pedestrian lane +3 m +12 m
+12 m carriageway central reserve +2 m sidewalk, roadbed full width 31m. The road route than the straight
line, this is still to be converted to follow the old line shape, K0 +000 ~ K1 +360 to the west section of the
road widening, K1 +360 -Yu-Lu Yu-chun, slip road and intersection ~ end northward deflection, after the
highway connecting Lu Yu, Jin Yu Road intersection with the destination. 31m wide road widening for the
full range of highway, along the Bridge Block 2, no culverts, surface intersection 2.

  The total investment is about 66,407,000 yuan.


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******

Design by: the Ministry of Transport of Tianjin Institute of Water Transport Engineering -EIA agencies
Postal Address:*******
Tel :*******
Fax :*******


Project Name: North Patrol line -Fangshan Section Road Project


Progress in stages: approval for the record

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, security facilities. -For
reference

Project:
   Project is located in Fangshan, Fangshan District Shiwo south from the town pump station, the route
north along the original route approved by the Housing Patrol South Easy Road, Nanquan River, trouble
with the original patrol south ditch line after the separation, the line goes east longitude bias Home Temple
Road, North Spring River and north to Mangniu River patrol line with the original weight and, line by Yue
San Road, the north, south ditch the red plant, red new road, tile wells river, room status and easy way long
after the local use of Zhou Zhou Road north over Okinawa branch railway, the Beijing Zhou Road,
Zhoukou Village, MA planing Sutlej, Fangshan Chengguan, Ding Jia Wa River Bridge, the local use of
consultants by Dashi eight bit line, good lump of railway, Yan Dong, Chong Qing West trunk, hedgehog
River, the Sixth Ring Road, good Tuo Road, end-to-Beijing good way. Total length of 45.8 km road. For
the secondary road project planning, design speed of 60km / h, the new bridge load standard highway - Ⅰ.
Road surface width 9m, subgrade width of 10m. Pavement with asphalt concrete pavement.

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :          +86-10-82743720
          E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  The total investment is about 1,047,792,500 yuan.

Construction:*******
Contact:*******
Tel :*******



Project Name: Pearl Engadabu it to Bala Ga'er Wuliyasitai to the highway section high Le


Stages of progress: The project proposal

Construction period: 2011 -2013

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   The project is located DONGWUZHUMUQINQI Xilin Gol League in Inner Mongolia, the territory of
the West Border Pastoral, starting DONGWUZHUMUQINQI beads Engadabu its ports, the Wuliyasitai
town, located in Sioux Chu Mu end Qin Qi town of Bala Ga'er gol. Construction standards for the four-lane
highway, the design speed of 100 km / h, the construction scale of about 187 km.

  The total investment is not detailed.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******



                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project Name: North Road, Shengze Town section of the same


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   Project is located in Shengze town, the road north from the southern section of the market works Road
West, Lan Road, head south, the northern section of the north think Yang Road, south to Shun Lake Road,
road length of 1,400 meters, covers an area of 42,000 square meters , slip by city standards across the board
design, asphalt concrete pavement. The main construction content of road length of 1400 meters, 30 meters
wide and 24 -North width 24m, the southern section of width 30m, supporting the construction of the
bridge -Block 1 and drainage works.

  The total investment is about 27.5 million yuan.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******

Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******


Project Name: Hui Yang District, Zhongshan Road -Galaxia East - Ishii Road construction project


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   The project is located Huiyang District, the project road length of 930 meters, 60 meters wide, motor
vehicle road width of 40 meters. Content with the construction of roads, water supply, sewage, water,
electricity, communications, lighting and so on.

  The total investment is about 37,838,700 yuan.

Owner:*******
Postal address:*******
Post Code:*******
Tel :*******

Design:*******
Postal Address:*******
Tel :*******


Project Name: Changchun Economic and Technological Development Zone Venture Capital Holdings
Limited thirty-seven road drainage construction projects


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: pipes, valves, instruments, excavators, bulldozers, rollers, tamping machine, stirring hug,
pavers, lighting, pipe network -for reference


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project:
   Project is located in Changchun Economic and Technological Development Zone, including 37 roads,
including road works, drainage works and greening, lighting and other auxiliary works. The total length of
roads 60988.95m, including: a trunk road, sub-distributors 17, slip 19. New roadway 796713.24m ², the
new road median area of the sidewalk 630844.92m ² 51102.40m ², an area of green belt on both sides of the
road 589567.44m ², the new total length of water pipe 60780m, total length of sewage pipes 59640m, new
street lamps 3508, new street trees 24414.

  The total investment is unknown.

Owner:*******
Post Code:*******
Tel :*******

Designer:*******
Postal Address:*******
Tel:*******



Project Name: Fangchenggang City West Bay Bridge to Highway Reconstruction of Pak Sha Wan


Progress stage: feasibility study being prepared

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only

Project:
  Project is located in Fangchenggang City West Bay Bridge to Pak Sha Wan, roads, 16 km in length, the
secondary road from the current situation for the urban sub-distributors I Extension class, with a total
investment of about 7.2 billion, Chien cost about 576 million; road red width of 33 meters, two-way four-

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




lane, asphalt concrete pavement, the design speed of 80-100 km / hour. The main construction contents are:
the West Bay Bridge III Bridge from the country at the Peninsula through the emperor emperor Ling Ling,
Moon Bay, Brownsea Beach, Pak Sha Wan and other places to change the existing highway and building
more roads into the city Ⅰ grade of roads, including the roadbed , pavement, underground drainage and
sewerage, lighting, greening and other projects and facilities.

  The total investment is about 7.2 billion bank loan of 70%, 30% of local financial support.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******

Designer:*******
Postal Address:*******
Tel :*******
Fax :*******




Project Name: West Highway Bailian Li Bai Ma Jingli pay to pay Rebuild Project


Stages of progress: survey and design

Construction period: September 2011 -2012 years

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, explosion-proof blankets, non-magnetic probe, inspection wells, EOD tools vest, police
equipment, mount, intelligent transportation, electronic police, capture systems, radar guns, green facilities,
fire facilities, lighting, drainage facilities, security facilities. -For reference

Project:

                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :         +86-10-82743720
           E-Mail :      contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  Project is located in Haikou City, according to the four-lane expressway standard alterations, length 102
km.

  The total investment is about 1,227,798,400 yuan, investment of construction funds from the government,
funded ratio of 100%.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Postal Address:*******
Tel :*******
Fax :*******




Project Name: Dongsheng District, Ge Wang was shocked to trench to Tsing Yuan Jia ditch highway
projects Poplar


Progress stage: the record

Construction period: 2011 -2013

Major equipment: drilling rig, crane, tower crane, bridge machines, hammers, generators, excavators, road
rollers, dump trucks, motor graders, pull up equipment, template, pipe fittings, fasteners, excavators,
bulldozers, cranes , rollers, tamping machine, stirring hug, pavers, protection panels, explosion-proof
blankets, non-magnetic probe, inspection wells, EOD tools vest, police equipment, mount, intelligent
transportation, electronic police, capture systems, radar speed, green facilities, fire facilities, lighting,

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




drainage facilities, safety facilities, high-speed control, high-speed electrical and mechanical, security
facilities -for reference only

Project:
   The project is located only Ge Wang Dongsheng District, shocked, shocked Ge Dongsheng District, only
to the king to the young poplar Yuanjiazao trench ditch road projects, take Highway 214 -including
government road toll station 350 meters north west through Yuan Home trench, setting the whole alfalfa
leaf exchange, and the old road connecting with the G109, the latter off the north line, beyond the blue end
of Poplar ditch way connected with planar cross-ring road K11 +870 Dongsheng District Office, the whole
line length of 11.6 km. According to the standard highway construction, design speed of 60 km / h,
subgrade width of 26 meters, 22.5 meters wide road, bridge and culvert design load for the road-I level,
bridge and roadbed width. Full clover leaf interchange type of exchange used, ramp length of 2.8 km, ramp
width of 8.5 meters, the design speed of 40 km / h, was cross the road subgrade width of 32 meters, is 4.6
km long cross-road. Cross the bridge on the roadbed width and 32 meters. Pavement with asphalt concrete
pavement.

  The total investment is about 617,537,000 yuan, sources of funds for the construction of Erdos
Dongsheng City Development and Investment Group Co., Ltd. self.

Owner:*******
Postal Address:*******
Tel:*******


Project Name: Industrial Southern Qingbaijiang all the way through five road construction projects such as


Stages of progress: survey and design

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, security facilities. -For
reference


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :          +86-10-82743720
          E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project:
   The project is located Qingbaijiang Industrial Development Zone -South Zone, including 5 new roads -
including rain water drainage system, and green, street lamps and other ancillary works. Specific path is: by
the way -about 0.5 km, the red line width of 30 meters, the Road -about 0.4 km, the red line width of 30
meters, Castle Peak Road -about 2.5 km, line width of 30 m, Dragon Tiger Boulevard -about 0.6 km, the
red line width of 40 meters, matching south of Sichuan and Shaanxi Municipal Pipeline Road -about 3.7
km, the red line width of 15.25 meters.

  The total investment is about 355.5 million yuan, construction funds from the district funds, the project is
100% funded ratio.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******




Project Name: Shuangyashan City Waterfront North City road construction project


Stages of progress: preliminary design

Construction period: June 2011 -2 012 years



                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, security facilities. -For
reference

Project:
  The project is located north of the city planning area Waterfront, Waterfront Road, construction of about
3.6km, Waterfront Road approximately 2.4km, Yan Helu about 0.8km, Academy Road, about 1.0km.

  The total investment is about about 100.2 million yuan.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design:*******
Postal Address:*******
Designer:*******
Tel :*******
Fax :*******




Project Name: Construction of Road Extension Shuangyashan City Construction Projects


Stages of progress: preliminary design

Construction period: June 2011 -2 012 years

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, security facilities. -For
reference

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :          +86-10-82743720
          E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project:
  Eagle's Nest Road in the construction of the project area, road construction is about 1.6Km -line 1.0km,
0.6km and railway interchange with an Interchange.

  The total investment is about about 310 million yuan.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design:*******
Postal Address:*******
Designer:*******
Tel :*******
Fax :*******




Project Name: Inner Mongolia Highway Network dry white tone to the Wing Tai company section of the
police highway projects


Stages of progress: survey and design

Construction period: 2011 -2013

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, explosion-proof blankets, non-magnetic probe, inspection wells, EOD tools vest, police
equipment, mount, intelligent transportation, electronic police, capture systems, radar guns, green facilities,

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




fire facilities, lighting, drainage facilities, safety facilities, high-speed control, high-speed electrical and
mechanical, security facilities. -For reference

Project:
   Project is located in Inner Mongolia Autonomous Region, starting in Wulanchabu Chahar Right Back
Banner Guangzhou Highway G55 Erlianhaote to detect dry white tone exchange hub, the end of Wing Tai
Beijing public exchange of new highway, is about 95.3 km. Across the board by four-lane expressway
standard design speed of 100 km / h, subgrade width of 26 meters. Cable length of 14.5 km, of which the
macro 10.5 kilometers long cable tray, change the extension of the original three roads as secondary roads,
the design speed of 80 km / h, roadbed width of 12.0 meters; Coble cable length of 4 km, according to two
new level road standard design, the design speed of 80 km / h, subgrade width of 12.0 meters.

  The total investment is about 4.6 billion.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******




Project Name: Rebuild Project in Tongling Yangtze River Highway


Stages of progress: survey and design

Construction period: 2011 -2013

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :          +86-10-82743720
          E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Major equipment: drilling rig, crane, tower crane, bridge machines, hammers, generators, excavators, road
rollers, dump trucks, motor graders, pull up equipment, template, pipe fittings, fasteners, excavators,
bulldozers, cranes , rollers, tamping machine, stirring hug, pavers, protection panels, explosion-proof
blankets, non-magnetic probe, inspection wells, EOD tools vest, police equipment, mount, intelligent
transportation, electronic police, capture systems, radar speed, green facilities, fire facilities, lighting,
drainage facilities, safety facilities, high-speed control, high-speed electrical and mechanical, security
facilities. -For reference

Project:
   Project is located in Tongling city, the starting point is located at the junction of Tongling City and the
pastoral house Nanling County Pavilion, starting Stake K0 +000, end at the junction with Green River
Bridge Chizhou, road total length of about 51.05km. Roads within urban areas across the board in Tongling.
Route length of 51.05 km, the design speed of 80 km / h, two-way six-lane highway standard construction.
A total of Bridge across the board, the bridge 3, the bridge 8, three bridges, culverts 124, Block 1
Interchange, the plane crossed 44, separation Interchange 3 -the main line across Block 2, on the cross rail
1 Block.

  The total investment is about approximately 13.3 billion.

Owner:*******
Postal Address:*******
Contact:*******
Tel :*******

Designer:*******
Postal Address:*******
Tel :*******
Fax :*******




                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project Name: Wuhan Han Zhuankou to the southern section of Highway Shamao a new project


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   Project is located in Wuhan City dunkou to Shamao section of the project road from the provincial
Lufthansa -Lufthansa at the intersection of Highway Stake to K3 +050, Kua Ma Ying River, west of
deviation from the original Lufthansa Highway, along the east coast of Ma Ying River forward, from the
Second Battalion of the west side of kiln bypass, turn left before the trip, after wiping the west side of kiln
brigade, and Han Hong Hannan cable high-speed intersection, move west along the Mud Lake, across
Shamao River, from Chen Han-South, between the mountains and through the last 420 meters east of the
well-being at the cross-bridge in the Han Sha Highway -intersection of Highway Stake to Lufthansa K10
+780, Hannan line across the board in the territory of miles long 7.365 km. The project 535.011 million
cubic meters of earth and stone embankment pricing; special Subgrade 6.7 km; drainage and protection
works 7640 m3; Cement Concrete Pavement 152.411 thousand square meters. Block 1 bridge, culvert 33,
flat cross 13; 439.9 acres of land acquisition, demolition of buildings 22,598 square meters, the demolition
of electric power and telecommunications pole 81, and set the necessary safety and environmental
protection facilities along the route.

  The total investment is about 1.8753 billion yuan.

Construction Unit:*******
Postal Address:*******
Tel :*******

Designer:*******
Postal address:*******
Post Code:*******

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Contact:*******
Tel :*******


Project Name: S211 cable channel to Danba road self-built gas Rebuild Project


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   Project is located in Kangding County, Danba County, the project lines from the gas line in the
provincial highway 211 Mizoguchi, by Kou Zan, Yu, cell number and other towns, Highway 303 beyond
the rainbow bridge Danba county. Of which: Gas station ditch to paragraph Huangjinping: State Road 318
from the gas at the mouth of the Cross at the Gully along the existing line along the Dadu River upstream
S211, the off campus Kangding Teachers A detachment old path wound along the foot of the new
Regardless we avoid the town, north of the town we stop at regardless of gold in the construction of the
bridge floor bridge, the route length of 7.100km. Changheba to monkey rock station segment: the starting
point of the section of the dam inundation area take a long road of rebuilding roads only points -three
hundred and fourteen forest, along the lines of the original S211 upstream along the Dadu River, perforated
Yu Heung, Kong Yu village ends east edge of town, then the monkey rock station dam road, route length of
3.546km. Monkey Rock to Danba paragraph: The paragraph beginning line of submerged rocks monkeys
received rehabilitation road only point along the Dadu River along the right line of the original S211 case
against the current, limited to the Rainbow Bridge Danba county bridge, the route length of 6.500km.
Project design for the road grade three roads in mountainous areas, the design speed of 30km / h, roadbed
width 7.5m, with asphalt concrete pavement. All the new bridge, across the board set the bridge 54m / 1
Block, the bridge 132m / 2 blocks, bridges 16m / 1 Block, the bridge a total of 202m / 4 seat, located 58
culverts.

  The total investment is unknown.


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Designer:*******
Postal Address:*******
Contact:*******
Tel:*******


Project Name: Guiyang City, East Point Road road works


Stages of progress: environmental impact assessment

Construction period: September 2011 In December -2013

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   The project is located Longdongbao Area, East Station Road, the main line and ground the whole length
of the road 11.9km; the main line of total length of about 8.1km, which bridges a long 3.8km, tunnel length
1.8km, the road long 2.5Km, bridge and tunnel more than 69%; ground road length of approximately 3.8km,
which bridges a long 0.7km, the road long 3.1Km, bridge and tunnel more than 19%. Main road grade
urban expressway, the design speed of 60km / h, using the scale of vehicle two-way six-lane roadbed width
26m.

  The total investment is unknown.

Owner:*******
Post Code:*******
Contact:*******

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Tel:*******

Design Units:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******



Project Name: Urumqi-meter extension of the Eastern Road northbound founding of new construction


Stages of progress: Feasibility Study -EIA at the same time

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   Project is located in House Road and Jianguo Road Interchange, half-way intersection with the Second
Ring Road, the end to the planning of roads, construction area of 12.3882hm2, including the demolition
area 0.1081hm2. Urumqi-meter extension of the Eastern path of the founding of the northbound road about
2029 meters and supporting infrastructure -including water, sewage, rain, heat, electricity,
telecommunications, gas, green, lighting and other projects, the total investment estimated 115.53 million
yuan, of which : project cost 68.15 million yuan, and other costs 34.37 million yuan, reserve fund of 10.25
million yuan, 2.75 million construction loan interest.

  The total investment is 115.53 million yuan.

Construction unit:*******
Postal Address:*******
Contact:*******


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Tel :*******

Design by: Chinese Academy of Geological Sciences, Institute of Hydrogeology and Environmental
Geology -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******



Project Name: White to Seto Chongzuo turbulent Luo Jiangzhou District highway projects


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   Lo Jiangzhou District project is located in the white to the Seto Chongzuo turbulent region, belong to the
old road reconstruction project. Route from the starting point K0 +000 Jiangzhou District Law in White
Township, Seto Jiangzhou District of turbulence at the end of the town, the end Stake K18 +559, line the
main control points are a starting point, BIA forest farm, the six villages in Beijing, the end. Standard
design by three roads, namely speed of 30 km / h, subgrade width of 7.5 meters, the route length of
18.559km. Renovation project includes concrete pavement, subgrade drainage and protection works,
bridges, culverts.

  The total investment is about 24.95 million yuan.

Owner:*******
Postal Address:*******
Tel:*******


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******

Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   Project is located in Bao'an District of Shenzhen City, the starting point, linking the road outside the
plant sludge treatment plant, treatment plant from the wall and between the Guangzhou-Shenzhen-Hong
Kong through the passenger line along the gravel road route status, after Luotian forest office, close to the
farm reservoirs, distribution along the small amount of plant and end at the excavation of the mountain,
Kwong Road, linking with the status quo. This item slip road for the city, two-way 2 lanes, the width of 8m,
the design speed of 30km / h.

  The total investment is unknown.

Construction:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******

Design:*******
Postal address:*******
Post Code:*******
Contact:*******

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Tel :*******
Fax :*******


Project Name: Stone View Road -White Pine Road - Paddy toll stations Widening Project


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
  Project is located in Bao'an District of Shenzhen City Shiyan in central streets of the territory, roughly
east-west, west of White Pine Road, stop at toll stations paddy fields, from west to east by the West gems,
precious stones Road, Stone View Road composition. The city secondary main road Widening will be the
construction of two-way 6 lanes, length of 4.746 km, the design speed of 50 km / h, asphalt concrete
pavement, road standards drawn in the BAA-100.

  The total investment is unknown.

Construction:*******
Postal Address:*******
Contact:*******
Tel:*******

Design:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project Name: Peng Xixian Jinqiao Road, construction of industrial Kong


Stages of progress: survey and design

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
  The project is located Pengxi Xian Golden Bridge Industrial Port, the new 1.6 km long, 16 meters wide
and municipal roads and ancillary works.

  The total investment is about 25 million yuan.

Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******




Project Name: Haixiang -Fu Lin Road - East Po Tsuen Section


Stages of progress: environmental impact assessment


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   Project is located in Haicang East Corfu town, route starting point, linking Shihcuo Interchange - the
design of the end section of Fu Lin -Stake K6 +850, end of Haicang District in Xiamen and Zhangzhou
City, the United States at the junction angle -Stake K10 +331.848, designed for urban expressway, road
length of 3.482km, design of the main road 80km / h, Des Voeux Road 40km / h, road red line width of
60m. A total of 839 acres of land requisition, housing demolition of concrete slabs 4950m2.

  The total investment is 474,165,600 yuan.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******

Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******


Project Name: Highway 42 to the Pan Pan Lake County, Ge Rebuild Project


Stages of progress: survey and design

Construction period: 2011 -2012 years



                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Major equipment: drilling rig, crane, tower crane, bridge machines, hammers, generators, excavators, road
rollers, dump trucks, motor graders, pull up equipment, template, pipe fittings, fasteners, excavators,
bulldozers, cranes , rollers, tamping machine, stirring hug, pavers, protection panels, explosion-proof
blankets, non-magnetic probe, inspection wells, EOD tools vest, police equipment, mount, intelligent
transportation, electronic police, capture systems, radar speed, green facilities, fire facilities, lighting,
drainage facilities, safety facilities, high-speed control, high-speed electrical and mechanical, security
facilities. -For reference

Project:
   Project is located in Pan County, starting from the 40 provincial highway under the Gecun Panan near,
starting Stake for the K0 +000, located on the east coast of the end of the village road, Pan Jinyun county
and community, with 42 provincial highway connecting segment Jinyun , the end of Stake to K32 +900,
route length of approximately 32.963km. In addition, cable length of 1.107km, including Office, located at
K21 +259 cable length 0.737km medicine market and the office is located at k31 +900 Pan Lake cable
length 0.370km. Project uses the Highway Engineering Technical Standard -JTGB01-2003 design, stone
line, launched in the next paragraph about Ge ~ 5km technical standards for the secondary roads, two-way
2 lanes, design speed by 60km / h, subgrade width of 10m; line launched in Stone ~ Deep Ze is a road
section of about 10km of technical standards, two-way four lanes, design speed by 60km / h, roadbed width
20m/23m; Fukasawa ~ Pan Lake section of about 17.963km technical standards for the highway, two-way
four lanes, design speed with 80km / h, roadbed width 27.5m/24.5m/21.5m, car loads are road-I level, cable
technical standards for the three roads.

  The total investment is about 1.57 billion yuan.

Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Postal Address:*******
Project Manager: Ye Jianlong

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Tel :*******




Project Name: Highway 40 to punch back Xikou Sha Line Rebuild Project


Stages of progress: survey and design

Construction period: 2011 -2012 years

Major equipment: drilling rig, crane, tower crane, bridge machines, hammers, generators, excavators, road
rollers, dump trucks, motor graders, pull up equipment, template, pipe fittings, fasteners, excavators,
bulldozers, cranes , rollers, tamping machine, stirring hug, pavers, protection panels, explosion-proof
blankets, non-magnetic probe, inspection wells, EOD tools vest, police equipment, mount, intelligent
transportation, electronic police, capture systems, radar speed, green facilities, fire facilities, lighting,
drainage facilities, safety facilities, high-speed control, high-speed electrical and mechanical, security
facilities. -For reference

Project:
   The project is located in Jinhua, Zhejiang Panan, starting with the 40 provincial Panan end of a project
phase -contact Stake set to K0 +000, and Zhu Yong expressway exchange peaks were T-shaped cross-cable.
The project is set to start next Shaxi east bridge -Stake K0 +084, 40 provincial highway along the east line
of cars by Ma Gap, after the Court established the tunnel, to the south of the village after the House and the
old phase, along the old Government of Victoria to the west of Xinxiang, Xinxiang set-dimensional tunnel,
take the old road to the south side of Victoria Xinxiang, to the River Village, located under the road tunnel
and across the North Ao pit road by the river under the old phase and the southwest side of the village. First
tower and then along the old village to leave the old road, the two pits and old across North Ao phase,
along the old road to the red end of the back -end Stake K10 +514, the main line length of 10.514 km.
Separate dimension of Xinxiang cable, length 960 meters, Stake was LK0 +000 ~ LK0 +960. Main criteria
used secondary road projects, the design speed of 60km / h, subgrade width of 10.0m, special difficulties in
road design speed 40km / h, special sections of the roadbed width 8.5m. Using three-dimensional cable
Xinxiang highway standards, design speed 40km / h, roadbed width 8.5m.


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  The total investment is about 9.1 billion.

Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Postal Address:*******
Project Manager: Zhang Chi Sun
Tel :*******




Project Name: Red Star Road South Extension -Huayang Section Construction


Stages of progress: survey and design

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, security facilities. -For
reference

Project:
  Project is located in Shuangliu County, the road from the area in Huayang and high boundary, beyond
the Fifth Ring Road -Foothills Boulevard, turn to the North Sea at about 200 meters Chang Duantou Lu.

  The total investment is not detailed.

Owner:*******
Post Code:*******

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :          +86-10-82743720
          E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Contact:*******
Tel:*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******




Project Name: High-tech Industrial Development Zone, Yangjiang Harbor Boulevard Port in road works


Stages of progress: environmental impact assessment

Construction period: October 2011 -2012 in August

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   High-tech Industrial Development Zone project is located in Yangjiang, project Shugang Avenue north
into the port road, extending south to the oil and gas / chemicals coastline terminal level for the urban sub-
trunk road, planning and line width of 40 meters, the design road length of 5,547.145 meters from the
starting point of intersection of the main road into Port Road, Yunyang high-speed connection line, the
relevant planning of roads and the wharf and out of the slip road, road planning red line width 40m, 4 lane
two-way design, build the port will be mainly responsible for collection and distribution external transport
system.

  The total investment is unknown.

Owner:*******
Postal address:*******
Post Code:*******

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Contact:*******
Tel :*******

Design:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******



Project Name: Ordos City Logistics Park Yijinhuoluo County Zha Sake Century Avenue municipal road
projects


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference

Project:
   The project is located in Erdos City Logistics Park Yijinhuoluo County Zha Sake, Century Boulevard to
the government starting from small deep-red line, full 8816.010m. The works will include roads, water,
sewage, water, water, heat, gas, electricity, telecommunications, lighting, road ancillary works. The length
of the road the red line 36m, the design speed 50km / h. Length of pipe laying to 8357m, diameter DN250 ~
DN600, PE pipe and pipe with ductile iron pipe. Rain water pipe length 17464m, with D500-D1500
reinforced concrete pipe and HDPE pipe. Sewage pipes 8434m, diameter of DN300 ~ DN800PE tube.
Water is mainly used for greening. In water -green tube length 8035m. Diameter of DN150 ~ DN250, PE
pipe for the tube. The total length of the heating pipe 4.6Km -pipe length 4.6X2Km, the maximum diameter
of heating pipe network D1220X10, the minimum diameter D820X10. Use of seamless steel tubes. 9.1 km
long gas pipeline. Diameter De200 ~ De315. As PE and steel pipes. Cable protection pipe 61688.8m,


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




opening and closing of the three, disconnect switches 18, 3 sets of complete automatic control systems.
High-density polyethylene pipe 43216.53m. High-density polyethylene Plum 18472.27m.

   The total investment is about 465,365,900 yuan -including construction and installation cost:
376,918,300 yuan, and other basic construction cost: 36,391,500 yuan -not including land acquisition and
relocation compensation fee and ground materials, subsidies, reserve funds: 41.331 million yuan, the
construction loan Interest Rate: 10.725 million yuan..

Owner:*******
Post Code:*******
Contact:*******
Tel :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******



Project Name: Nanning Branch Park West Ten Road Project -Acacia Lake Road - High Seven Road Project


Stages of progress: environmental impact assessment

Construction period: June 2011 -2011 in December

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
  The project is located Xixiangtang District of Nanning City. For new roads, built starting in the west,
Acacia Lake Road, east of the sub-arterial roads have been built seven high road, route design length of
565.574m. I-level main trunk road class, road red line width of 32m, the design speed of 50km / h, using
cement concrete pavement pavement structure. The project includes road works, drainage works, traffic

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




engineering, lighting, landscaping works. Project permanent land 3.07hm2, building demolition projects
2178m2. Number 39200 Earthwork m3.

  The total investment is about 25,782,100 yuan.

Construction unit:*******
Post Code:*******
Contact:*******
Tel:*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Wuxi -Chongqing to Friendship Pass -Guangxi section of highway plane Hongzhi Fu Lan


Stages of progress: environmental impact assessment

Construction period: 2011 -2013

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   The project is located Tiandong County, starting in the main ring road Tiandong County, Hung Ping
Village, and the ring road phase, the end is near in Tuen Tiandong County Folland, main line length
5.600km. Extension of a line starting Z1K0 +000 Napo in Tuen Tiandong County, in the main phase with
the main line at K2 +800, right along the old road, the end of Stake to Z1K1 +827, highway design;
recommend a program of the main line and the extension of a highway with a standard, the design speed is
80km / h, subgrade width of 24.5m. Main II and Extension recommended two programs designed for
secondary road, the design speed is 60km / h, subgrade width of 12m, recommended route length 12.063km

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




-including a long road 4.627km, secondary road length 7.436km. Bridge Block 1 were set long 206.04m,
prestressed concrete -after Chang hollow; No, the bridges; 70 culverts, culvert type is cover culvert. There
are an interchange along the route for the main line at K3 +200 separated interchange with the Southern
Highway, through separator for the next interchange, take full advantage of. Cross a total of five planes,
including three highway, secondary road 2. The project occupies a total area 66.45hm2, foundation
engineering, bridge engineering as a permanent covering an area of 55.12hm2; fetching area, debris field,
the temporary field bulldozers, construction access roads, temporary construction area and living area are
an area of To 11.33hm2. In accordance with the type of land use: The project occupied by paddy 9.57hm2,
dry 11.76hm2, woodland 3.26hm2, orchard 2.96hm2, bush 12.90hm2, grassland 23.86 hm2, pond water
0.65hm2, Old Road 1.02hm2, demolition sites 0.12hm2 , farm roads 0.35hm2. Demolition of houses
5070m2, with single-brick houses and brick concrete houses mainly affect the population of 101;
demolition of telecommunications lines 5.6km, power line 5.2km.

  The total investment is 464,619,000 yuan.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******



Project Name: Guangyuan extension of the Tin Road construction projects


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
   The project is located on the West Area of Guangyuan City, road length of 1750 meters, the main line of
road width 18m, separate U-groove width of roads 19m. Designed traffic speed of 40km / h. New bridge,
the overall framework of the tunnel, laying of asphalt concrete pavement; curbs, rain and sewage pipes,
underground utilities, landscaping, street lights and other municipal facilities, supporting facilities.

  The total investment is about 79 million yuan.

Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Nanning Friendship Road extension cord Extension Project


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:

                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :         +86-10-82743720
           E-Mail :      contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




   Project is located in Jiangnan District, Nanning, Nanning to the Friendship Gate along the secondary
road -State Road 322 to the outer ring expressway section of Wu Xu Zhen, Wu Xu Zhen Wu Wei
International Airport to the secondary road -County Road Extension for the city of Old Road road. Basic
route was northeast - southwest direction, the starting point of the project design, then K0 +000 Friendship
Road, Nanning, renovation and expansion project -five to extend the line as the outer ring of high-speed
road sections K4 +385.021, route extends southwest along the South Friends of the two Road, turn on the
inter-ring highway, through the good Feng Jiang area, beneath the South Central Railway, the South anti-
railway, after Wu Xu Zhen, in the K16 +211.52 cable with the airport highway grade crossing, the end near
the end of the airport highway phase, the end Stake: K18 +866.832, the old road routes to the same basic
design -construction length of 18. 866832km. The mileage is 18. 766832km -net of front-end at the starting
point of this project has been designed for road width from the transition to a secondary road 40 meters 15
meters 80 meters long transition section. The main construction contents include road works, bridge works,
drainage works, traffic engineering, green engineering, lighting engineering. This project uses the standard
level I urban trunk road design, a design speed of 60km / h, road red line width of 60m, bi-directional 8
lanes. Construction:*******
Contact:*******
Tel :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******


Project Name: Lai Tai Tong Road Drainage Project to


Stages of progress: environmental impact assessment

Construction period: 2011 -2012 years

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:

                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :         +86-10-82743720
           E-Mail :      contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




   The project is located in Nanning City Liangqing District, Jiangnan District, Chongzuo Fusui, the project
by the main and old Fusui Extension and Drainage Extension components: the main line route from the
District of Nanning City, Town, Qing Liang, and G325 National Road south secondary road connecting the
North Sea, mainly along the existing programs across the board Old Road Reconstruction, that Thomas
Chan W, Gangnam-gu that Qi, Yan Town, Fusui nine towers, mountain Xu Zhen, Xu Zhen and G322 in the
mountains, National Road Su Wei Pingxiang secondary road to the intersection, then north through Fusui
Napo, drainage there, on the canal was built near the highway from Nanning to Fusui second phase, and
then full use of the secondary road west to Fusui Lebanon section of about 15.514 km canal, end in the
drainage Li Zhennan, Quli highway from Nanning to the Friendship Gate near the exit exchange, and in the
construction of drainage Li Lu secondary roads connecting to the pack. Total length of 84.607 km mainline
routes. Which K67 +826 ~ K83 +340 section is fully utilized, the actual construction of mileage 69.093 km.
   Lebanon branch point in the drainage Fusui town west of Lebanon and in the construction of the canal to
the secondary roads connecting pack Lu, mainly along the drainage across the board city of Lebanon to
Fusui Old Road -X519 County Road reconstruction. South side at the end of that time Fusui near the
highway into the city and Fusui phase. Extension length of 15.551 km Fusui.
   Old Spur Line canal starts at the main line at K83 +340, the main full advantage of the secondary road
from Nanning to Fusui paragraph Quli Fusui to end position. Along the line of the main drainage channel to
Old Old Lebanon Road -X521 county road, X523 County Road into the southwest by the thick Walled,
Drainage swallow, near the piano in the new line of bamboo, south to avoid the drainage around the old
town, near the edge of Nanning Chong Friendship Gate Highway to the old cable channel phase at the same
time, linking Chung Seto turbulent road to the edge -X530 County Road. Old Spur Line canal length of
33.327 kilometers, about 26 km old road reconstruction, new road is about 7.327 km. Route length of
133.485 kilometers of the project, the actual construction of mileage 117.971 km. The main line of the
main control points recommended plan: Route Starting Point District of Nanning City, Town Liangqing,
that Mr Thomas Chan, Gangnam-gu that Qi, Yan Town, Fusui nine towers, mountain Xu Zhen, Napo,
drainage there, the end of drainage Lizhen Nan; Fusui Line major control points: the starting point Quli
Town, South end of Fusui; drainage Old Line major control points: the starting point Drainage Lizhen Nan,
the thick Walled, Drainage swallow, bamboo harp, the end of the old canal town of Chong edge.

  The total investment 72861.7756 million.

Owner:*******
Postal Address:*******

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Contact:*******
Tel:*******
Fax :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Chow Tai PANGXIDONG to Jindaiji Hisataka Highway


Stages of progress: environmental impact assessment

Construction period: June 2011 In June -2013

Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference

Project:
  Project is located in Jiulong town, construction contents: includes road works, drainage works and
ancillary traffic engineering, green engineering. Long route, 33.494km, construction mileage 31.393km,
with secondary road standards, the design speed of 60km / h, subgrade width of 10m.

  The total investment is 264,537,100 yuan.

Construction Unit:*******
Postal Address:*******
Contact person: WONG Wing Ming
Tel :*******

Designer:*******
Postal Address:*******

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Contact:*******
Tel :*******




                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org

								
To top