Base IQ

Document Sample
Base IQ Powered By Docstoc
					                                                                                                                                                        RFP N40084-10-R-8709

                                                           ATTACHMENT J-0200000-07
                                                          EXHIBIT LINE ITEM NUMBERS
                                                   SOLICITATION/CONTRACT #N40084-10-R-8709
                                                             EXHIBIT A - CLIN 0001

Line Item 0001   Base Period - Indefinite Delivery Indefinite Quantity Work

PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A706

NAME OF OFFEROR OR CONTRACTOR:
          SHORT                                                                                                                   EST        UNIT OF   UNIT      TOTAL
ELIN      DESCRIPTION      FULL DESCRIPTION                                                                                       QTY        ISSUE     PRICE ¥   AMOUNT ¥
A700      Change of Occpancy Maintenance (COM)
A700AA    COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                     10      UN
          Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
          Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
          (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
          Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                                work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                                to the Government immediately. In such case, applicable IDIQ work item or another
                                contract will be issued.
                                The Contractor shall ensure that FH unit is fully functional with all equipments and
                                fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                                smudges, streaks and foreign matter, and debris.
A700AB    COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                     30      UN
          Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
          Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
          (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
          2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                                work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                                to the Government immediately. In such case, applicable IDIQ work item or another
                                contract will be issued.
                                The Contractor shall ensure that FH unit is fully functional with all equipments and
                                fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                                smudges, streaks and foreign matter, and debris.

                                                                                J-0200000-07 Page 1
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
A700AC   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   35    UN
         Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

A700AD   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    8   UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

A700AE   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   10   UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                               J-0200000-07 Page 2
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
A700AF   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   32    UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

A700AG   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    3   UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

A700AH   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                    4   UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                               J-0200000-07 Page 3
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
A700AJ   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   13    UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


A700AK   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   15   UN
         rise, 2-Bedroom       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied Less   including all equipments, fixtures and interior conditions, and shall perform the COM work
         Than 1 Year)          items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


A700AL   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   35   UN
         rise, 2-Bedroom       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied 1      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Year to 2 Years)      items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


                                                                               J-0200000-07 Page 4
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
A700AM   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt more than 2 year period. The              70    UN
         rise, 2-Bedroom       Contractor shall participate in deficiency inspection and inspect FH unit including all
         Unit (Occupied        equipments, fixtures and interior conditions, and shall perform the COM work items listed
         More Than 2 Years)    in Attachment J-1401000-04. When the Contractor found the work item need to be
                               adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work
                               item list, or which exceeds specified Quantitly LImitation, the Contractor shall report to
                               the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

A700AN   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   15   UN
         rise, 3-Bedroom       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied Less   including all equipments, fixtures and interior conditions, and shall perform the COM work
         Than 1 Year)          items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

A700AP   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   15   UN
         rise, 3-Bedroom       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied 1      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Year to 2 Years)      items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                               J-0200000-07 Page 5
                                                                                                                                                    RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                EST      UNIT OF   UNIT        TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥     AMOUNT ¥
A700AQ   COM, Atsugi, High-   This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   50    UN
         rise, 3-Bedroom      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied       including all equipments, fixtures and interior conditions, and shall perform the COM work
         More Than 2 Years)   items listed in Attachment J-1401000-04. When the Contractor found the work item need
                              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.


A700AR   COM, Atsugi, High- (Note: At the time of contract award, this item is reserved for future use. Amount                       (Max Amount)                 21,000,000
         rise, 4-Bedroom    indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         Unit               determined later by contract modification.) The Contractor shall inspect FH unit including
                            all equipments, fixtures and interior conditions, and shall perform the COM work items
                            listed in Attachment J-1401000-07 (ATSUGI/KAMISEYA). When the Contractor found
                            the work item need to be adjusted, maintained, repaired and/or replaced, and which is
                            not listed in the COM work item list, the Contractor shall report to the Government
                            immediately. In such case, applicable IDIQ work item or another contract will be issued.
                            The Contractor shall ensure that FH unit is fully functional with all equipments and
                            fixtures, and is in quality conditions.


A700AS   COM, Atsugi, SOQ     This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    2   UN
         (Occupied Less       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Than 1 Year)         including all equipments, fixtures and interior conditions, and shall perform the COM work
                              items listed in Attachment J-1401000-04. When the Contractor found the work item need
                              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.


                                                                              J-0200000-07 Page 6
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥   AMOUNT ¥
A700AT   COM, Atsugi, SOQ      This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         (Occupied 1 Year to   period. The Contractor shall participate in deficiency inspection and inspect FH unit
         2 Year)               including all equipments, fixtures and interior conditions, and shall perform the COM work
                               items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

A700AU   COM, Atsugi, SOQ      This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   2   UN
         (Occupied More        period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Than 2 Years)         including all equipments, fixtures and interior conditions, and shall perform the COM work
                               items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


A700AV   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied Less   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


                                                                               J-0200000-07 Page 7
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥   AMOUNT ¥
A700AW   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied 1      items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Year to 2 Years)      to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

A700AX   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         More Than 2 Years)    to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


A700AY   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied Less   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


                                                                               J-0200000-07 Page 8
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                EST     UNIT OF   UNIT         TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥      AMOUNT ¥
A700AZ   COM, Atsugi,         This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         Townhouse in SOQ     period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied 1     items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Year to 2 Years)     to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.

A700BA   COM, Atsugi,         This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   3    UN
         Townhouse in SOQ     period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied       items listed in Attachment J-1401000-04. When the Contractor found the work item need
         More Than 2 Years)   to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.



                                                                                                                        Sub Total, A700 (A700AA - A700BA):

                                                                              J-0200000-07 Page 9
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                             QTY         ISSUE     PRICE ¥   AMOUNT ¥
A701     Whole Unit Painting
A701AA   Whole Unit         The Contractor shall prepare and repaint all interior surfaces of FH unit, including                60      UN
         Painting, Atsugi,  concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 2-      materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit       surrounding area. Natural finish coating for wood surface is not included in this line item.
                            The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                            uniformly.

A701AB   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              50      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 3-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.
A701AC   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              20      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 4-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.
A701AD   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including             100      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         High-rise, 2-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.

A701AE   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              80      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         High-rise, 3-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.

                                                                            J-0200000-07 Page 10
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                          EST       UNIT OF UNIT            TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                           QTY       ISSUE     PRICE ¥       AMOUNT ¥
A701AF   Whole Unit          (Note: At the time of contract award, this item is reserved for future use. Amount                  (Max Amount)                 14,000,000
         Painting, Atsugi,   indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         High-rise, 4-       determined later by contract modification.) The Contractor shall prepare and repaint all
         Bedroom Unit        interior surfaces of FH unit, including concrete, mortar, board, wood, metal, steel and
                             other painted surfaces, with proper materials in proper number of coat(s). New paints
                             shall match color and gloss of surrounding area. Natural finish coating for wood surface
                             is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.
A701AG   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                2    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         SOQ                 materials in proper number of coat(s). New paints shall match color and gloss of
                             surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.

A701AH   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                2    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse in SOQ,   materials in proper number of coat(s). New paints shall match color and gloss of
         3-Bedroom           surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.

A701AJ   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                4    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse in SOQ,   materials in proper number of coat(s). New paints shall match color and gloss of
         4-Bedroom           surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.


                                                                                                                     Sub Total, A701 (A701AA - A701AJ):


                                                                           J-0200000-07 Page 11
                                                                                                                                                         RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                    EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                                      QTY         ISSUE     PRICE ¥   AMOUNT ¥
A702     Architectural work
A702AA   Paint Interior     The Contractor shall prepare and paint interior surfaces, including concrete, mortar,                   30,000      SM
         surfaces           board, wood, metal, steel or other surfaces designated by the Government, with proper
                            materials in proper number of coat(s).
                            New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                            chosen by the Government.


A702AB   Paint Interior wood      The Contractor shall prepare and paint interior wooden natural varnish finish surfaces,            1,000      SM
         natural varnish          including wooden frame, trims, moldings and wooden floor, with proper materials in
         finish surfaces          proper number of coat(s). New paints shall match color and gloss of surrounding area.
                                  New painted surfaces shall be smooth, evenly and uniformly.

A702AC   Paint Exterior           The Contractor shall prepare and paint exterior surfaces up to 2.5 meters height from             20,000      SM
         surfaces                 ground (including concrete, mortar, board, wood, metal, steel or other surfaces
         (scaffolding or other    designated by the Government) or height/location that does not require fall protection
         fall protection is not   (such as scaffolding) specified in EM 385-1-1, with proper materials in proper number of
         required)                coat(s). This item includes textured pattern and the Contractor shall make textured
                                  pattern by spraying base material on exterior concrete or mortar surfaces, including
                                  application of sealer. Line item shall include scaffolding installation and removal for
                                  exterior painting.
                                  New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                                  chosen by the Government.

A702AD   Paint Exterior           The Contractor shall prepare and paint exterior surfaces over 2.5 meters height up to 9            2,000      SM
         surfaces                 meters height from ground (including concrete, mortar, board, wood, metal, steel or other
         (scaffolding or other    surfaces designated by the Government) or height/location that requires fall protection
         fall protection is       (such as scaffolding) in accordance with EM 385-1-1, with proper materials in proper
         required)                number of coat(s). This item includes textured pattern and the Contractor shall make
                                  textured pattern by spraying base material on exterior concrete or mortar surfaces,
                                  including application of sealer. Line item shall include scaffolding installation and removal
                                  for exterior painting.
                                  New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                                  chosen by the Government.

A702AE   Paint house ID           The Contractor shall prepare and paint house ID number on building or parking space.                  100      EA
         number                   Line item shall include background painting if required. The same paint shall be used.
                                                                                J-0200000-07 Page 12
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                           QTY       ISSUE     PRICE ¥   AMOUNT ¥
A702AF   Replace vinyl floor    The Contractor shall remove existing vinyl floor tiles/vinyl simulated wood floor tile,        1,200    SM
         tile/vinyl simulated   prepare surfaces to make smooth and even floor, and provide new vinyl floor tiles/vinyl
         wood floor tile        simulated wood floor tiles. New floor tile shall be same material and color as existing.
                                Line item shall include wax new vinyl floor unless otherwise directed by KO or HSG
                                Officer.
A702AG   Re-adhesive loose      The Contractor shall re-adhesive loose vinyl floor tile.                                        100    SM
         vinyl floor tile.

A702AH   Replace vinyl floor The Contractor shall remove existing vinyl floor sheets, prepare surfaces to make smooth           500    SM
         sheet (including slip- and even floor, and provide new vinyl floor sheets or slip-retardant vinyl floor sheets.
         retardant)             New vinyl floor sheet shall be same material and color as existing. Line item shall
                                include wax new vinyl floor sheets if necessary.

A702AJ   Sand wooden            The Contractor shall prepare and sand wooden flooring to remove existing paint and              500    SM
         flooring               make smooth and even floor.
A702AK   Replace hardwood       The Contractor shall remove existing hardwood flooring, sub sheeting baord and proof            300    SM
         flooring               sheet, prepare surfaces to make smooth and even floor, and provide new hardwood
                                flooring, sub sheeting board and proof sheet. Hardwood flooring: tongue and grooved,
                                thickness: up to 15mm. New hardwood flooring system shall match existing if replaced
                                flooring is adjacent to another hardwood floor.

A702AL   Repair loose, holes The Contractor shall repair loose, holes or cracks of hardwood flooring (refasten loose             50    SM
         or cracks of        hardwood flooring and/or fill hole, cracks with wooden piece and putty, and sand it to
         hardwood flooring make smooth and even surface)

A702AM   Install or replace   The Contractor shall provide new floor metal molding or replace floor metal molding with          200    LM
         floor metal molding. new one. New metal molding shall be same material and color as existing.

A702AN   Replace wooden       The Contractor shall remove existing and provide new wooden step board with riser                  20    EA
         step                 board on stairway. New step shall be same material and color as exiting. Stair width: up
                              to 1,500 mm/(EA), Unit: No. of step.
A702AP   Replace stair non- The Contractor shall remove existing and provide new stair non-slip nosing on edge of               100    LM
         slip nosing          step, Stainless steel, brass or aluminum with or without rubber strip. New stair non-slip
                              nosing shall be same material and color as existing.
A702AQ   Replace floor carpet The Contractor shall remove existing carpet with underlayer padding, prepare surfaces to        3,000    SM
                              make smooth and even floor, and provide new carpet with underlayer padding. New floor
                              carpet shall be same material and color as existing.

                                                                              J-0200000-07 Page 13
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                             QTY       ISSUE     PRICE ¥   AMOUNT ¥
A702AR   Replace wooden         The Contractor shall remove existing and provide new wooden baseboard, Size: up to                 300    LM
         baseboard              25x200mm
A702AS   Replace wooden         The Contractor shall remove existing and provide new wooden quarter round                          100   LM
         quarter round          ("TAMABUCHI"), Size: up to 3/4"
         ("TAMABUCHI")
A702AT   Replace                The Contractor shall remove existing and provide new interior/exterior ceramic, terrazzo,          400   SM
         interior/exterior      melamine resin laminated, quarry or mosaic floor tiles, and provide new interior/exterior
         ceramic, terrazzo,     ceramic, terrazzo, melamine resin laminated, quarry or mosaic floor tile, including mortar
         melamine resin         bed and joint cement. New floor tile shall be same material and color as exiting.
         laminated, quarry or
         mosaic floor tile
A702AU   Replace exterior       The Contractor shall remove existing and provide new exterior stair nosing tile, including         100   LM
         stair nosing tile      mortar bed and joint cement. New stair nosing tile shall be same material and color as
                                existing
A702AV   Replace wooden         The Contractor shall remove existing and provide new wooden floor joist, Size: up to                50   SM
         floor joist            105/2x105mm, @300~455mm, Unit: floor area having damaged floor joist.
A702AW   Replace wooden         The Contractor shall remove existing and provide new wooden sleeper hold ("Oobiki"),                30   LM
         sleeper hold           Size: up to 120x120mm, including wooden sleeper hold support ("Tsuka") @455~910mm
         ("Oobiki")
A702AX   Replace wooden         The Contractor shall remove existing and provide new wooden diagonal sheathing or                  100   SM
         sheathing or water     plywood sheathing or water proof sheathing, Thickness: up to 19mm
         proof sheeting
A702AY   Replace wall or        The Contractor shall remove existing and provide new gypsum boards, non-asbestos                    30   SM
         ceiling board          cement boards, plywood or acoustical tile baord on wall or ceiling.
A702AZ   Replace wall corner    The Contractor shall remove existing and provide new wall corner cover, metal or plastic.           50   LM
         cover (Metal or
         Plastic)
A702BA   Replace wall           The Contractor shall remove existing wall covering, prepare surfaces and provide new               150   SM
         covering               wall covering ("KABEGAMI" or "VINYL CLOTH"). New wall covering shall be same
         ("KABEGAMI" or         material and color as existing.
         "VINYL CLOTH")
A702BB   Replace wood           The Contractor shall remove existing and provide new wood batten strip ("OSHIBUCHI")               100   LM
         batten strip           on wall or ceiling
         ("OSHIBUCHI")
                                                                             J-0200000-07 Page 14
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                          QTY       ISSUE     PRICE ¥   AMOUNT ¥
A702BC   Replace ceramic        The Contractor shall remove existing and provide new ceramic wall tiles with mortar bed         400    SM
         wall tile              and joint cement. New wall tile shall be same material and color as existing.
A702BD   Replace plaster        The Contractor shall remove existing plaster, prepare surfaces and provide new plaster          500   SM
                                on wall or ceiling
A702BE   Replace wooden         The Contractor shall remove existing and provide new wooden wall stud, Size: up to               50   SM
         wall stud              105/2x105mm, @300~455mm, Unit: wall area having damaged wall stud
A702BF   Replace wooden         The Contractor shall remove existing and provide new wooden frame for wall or ceiling            50   SM
         frame for wall or      boards, Unit: Damaged wall or ceiling area.
         ceiling board
A702BG   Replace batten strip   The Contractor shall remove existing and provide new batten strip or molding on wall or         100   LM
         or molding on wall     ceiling
         or ceiling
A702BH   Replace wooden         The Contractor shall remove existing and provide new swinging or sliding wooden flush            20   EA
         door                   door (plywood facing or printed plywood facing) with/without glass and/or louver,
                                including hardware. New door shall be same material and color as existing.
                                Door size: up to 2.0m²/(EA)
A702BJ   Replace aluminum       The Contractor shall remove existing and provide new swinging aluminum flush door                50   EA
         door                   with/without glass, built-in screen window and/or louver, including hardware, aluminum
                                door frame, wooden trims and restoration of wall and floor around door. New door shall
                                be same material and color as existing.
                                Door size: up to 2.0m²/(EA)
A702BK   Replace aluminum       The Contractor shall remove exiting and provide new aluminum framed screen door with             30   EA
         screen door            insect screen mesh and hardware. New screen door shall be same material and color as
                                existing.
                                Screen door size: up to 2.0m²/(EA)
A702BL   Replace aluminum       The Contractor shall remove existing and provide new sliding, double hung or fixed type          30   EA
         window                 aluminum window with hardware, glass, aluminum window frame, wooden trims and
                                restoration of wall and floor around window, New window shall be same material and
                                color as existing. Window size: up to 2.0m²/(EA)
A702BM   Replace aluminum       The Contractor shall remove exiting and provide new aluminum framed screen window                50   EA
         screen window          with insect screen mesh and hardware. New screen window shall be same material and
                                color as exiting.
                                Screen window size: up to 2.0m²/(EA)
                                                                            J-0200000-07 Page 15
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                              QTY       ISSUE     PRICE ¥   AMOUNT ¥
A702BN   Adjust and refit door The Contractor shall adjust and refit door lock, knob, hinge or latch, including retighten or     1,000    EA
                               replace missing screws. Unit: No. of door (including accordion door)
A702BP   Replace door face       The Contractor shall remove existing and provide new plywood or printed plywood door           100     SH
         sheet on one side of    face sheet on one side of door. New printed plywood door face sheet shall be same
         door                    material and color as existing. Door size: up to 2.0m²/(SH)
A702BQ   Replace threshold       The Contractor shall remove existing and provide new wood or metal threshold of door.           20     LM
         of door                 New threshold shall be same material and color as existing.
A702BR   Replace wooden          The Contractor shall remove existing and provide new wooden door frame, including               30     LM
         door frame              wooden trims and restoration of wall and floor around door frame
A702BS   Replace wooden          The Contractor shall remove existing and provide new wooden trim on door or window              80     LM
         trim on door or         frame
         window frame
A702BT   Repair wooden door      The Contractor shall repair wooden door frame with wooden piece and putty                       30     LM
         frame
A702BU   Install weather strip   The Contractor shall prepare surfaces and provide new weather strip around door or             200     LM
         around door or          window. New weather strip shall be same material and color as others.
         window
A702BV   Replace aluminum        The Contractor shall remove existing and provide new aluminum weather strip for bottom          20     EA
         weather strip for       of door. New weather strip shall be same material and color as existing.
         bottom of door.
A702BW   Replace insect          The Contractor shall remove existing and provide new insect screen mesh with new             1,500     SM
         screen mesh             gaskets of screen door or window. New insect screen mesh shall be same material and
                                 color as existing.
A702BX   Replace glass pane The Contractor shall remove existing and provide new float, figured, wired or safety glass           50     SM
                            pane, including gasket or caulking around glass. New glass pane shall be same material
                            and color as existing.
A702BY   Replace safety          The Contractor shall remove existing and provide new safety double glass pane,                  20     SM
         double glass pane       including inner film or dry air between glass panes, and gasket or caulking around glass.
                                 New glass pane shall be same material and color as existing.
A702BZ   Replace door lock       The Contractor shall remove existing and provide new door lock with door knob, interior         10     EA
                                 or exterior, cylinder or mortise lock type or "sora-joh" type. New door lock shall be same
                                 material and color as existing.
                                                                              J-0200000-07 Page 16
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                           QTY       ISSUE     PRICE ¥   AMOUNT ¥
A702CA   Replace door lock     The Contractor shall remove existing door lock and provide new privacy door lock with             10    EA
         with privacy door     door knob, which has release system by using pin from outside for emergency, like a
         lock                  door lock for bathroom use, in Master bed room. Line item shall include repair of door for
                               new door lock, replacement of strike and repair of door frame for new strike. New door
                               lock shall be same material and color as others.
A702CB   Replace door knob The Contractor shall remove existing and provide new door knob or handle on closet                   100   EA
         or handle on closet door. New door knob and handle shall be same material and color as existing
         door
A702CC   Replace pull handle The Contractor shall remove existing and provide new pull handle for screen door. New               10   EA
         for screen door.    pull handle shall be same material and color as existing.
A702CD   Replace latch on      The Contractor shall remove existing and provide new latch on screen door. New latch              20   EA
         screen door           shall be same material and color as existing.

A702CE   Replace window or     The Contractor shall remove existing and provide new window or sliding door latch,               100   EA
         sliding door latch,   Crescent, screw-in or dead bolt type. New latch shall be same material and color as
         Crescent, screw-in    existing.
         or dead bolt type

A702CF   Replace door          The Contractor shall remove existing and provide new door stopper, Floor mount,                   50   EA
         stopper               baseboard mount or door top mount type. New door stopper shall be same material and
                               color as existing.
A702CG   Replace floor type    The Contractor shall remove existing and provide new floor type stopper for heavy duty            30   EA
         stopper for hevy      door type. New door stopper shall be same material and color as existing.
         duty door type.
A702CH   Replace sheave        The Contractor shall remove existing and provide new sheave ("TOGURUMA") of sliding              100   EA
         ("TOGURUMA") of       door or window. New sheave shall be same material and color as existing.
         sliding door or
         window
A702CJ   Replace door hinge The Contractor shall remove existing and provide new door hinge, Stainless steel or                  10   EA
                            brass. New door hinge shall be same material and color as existing.
A702CK   Replace door hinge, The Contractor shall remove existing and provide new door hinge, single or double acting            10   EA
         single or double    spring hinge. New door hinge shall be same material and color as existing.
         acting spring hinge

                                                                           J-0200000-07 Page 17
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY       ISSUE     PRICE ¥   AMOUNT ¥
A702CL   Replace door hinge The Contractor shall remove existing and provide new door hinge on folding door or                   100    EA
         on folding door or closet door. New door hinge shall be same material and color as existing.
         closet door

A702CM   Replace top or        The Contractor shall remove existing and provide new top or bottom guide rail for double           20   EA
         bottom guide rail for folding door. New rail shall be same material and color as existing. Rail size (L): up to
         double folding door 1,800 mm/(EA).

A702CN   Replace top or       The Contractor shall remove existing and provide new top or bottom guide pin for double             30   EA
         bottom guide pin for folding door. New guide pin shall be same material and color as existing.
         double folding door.

A702CP   Replace round     The Contractor shall remove existing and provide new round plastic vent on closet door.                50   EA
         plastic vent on   New round plastic vent shall be same material and color as existing. Size: up to 40mm
         closet door       Dia.
A702CQ   Replace wooden    The Contractor shall remove existing and provide new wooden louver in wooden door.                      5   EA
         louver in wooden  New louver shall be same material and color as existing. Louver size: up to (W) 600 x
         door              (H) 250 mm.
A702CR                     The Contractor shall remove existing and provide new door closer. New door closer shall
         Replace door closer                                                                                                      20   EA
                           be same material and color as existing.
A702CS   Replace pneumatic The Contractor shall remove existing and provide new pneumatic door closer of screen                   10   EA
         hydraulic door    door. New door closer shall be same material and color as existing.
         closer of screen
         door
A702CT   Replace chain and      The Contractor shall remove existing and provide new chain and its lock set on door,              20   EA
         its lock set on door   Stainless steel. New chain and lock set shall be same material and color as existing.
A702CU   Replace swing latch    The Contractor shall remove existing and provide new swing latch for door. New latch              20   EA
         for door.              shall be same material and color as existing.
A702CV   Replace peephole       The Contractor shall remove existing and provide new peephole in entrance door. New               10   EA
         in entrance door       peephole shall be same material and color as existing.

A702CW   Replace venetian       The Contractor shall remove existing and provide new venetian blind. One-side                      5   EA
         blind, 6.0m²/(EA)      operation, Aluminum slat: (W)25mm, curbed, color: white.
                                Window opening size: over 4.0m² and up to 6.0m²/(EA)
                                                                            J-0200000-07 Page 18
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                            QTY       ISSUE     PRICE ¥   AMOUNT ¥
A702CX   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                     500    EA
         blind, 4.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: over 2.0m² and up to 4.0m²/(EA)
A702CY   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                     300    EA
         blind, 2.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: over 1.0m² and up to 2.0m²/(EA)
A702CZ   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                      50    EA
         blind, 1.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: up to 1.0m²/(EA)
A702DA   Replace loose or      The Contractor shall remove existing loose or broken parts (cord, slat, pully, ladder tape      3,500    EA
         broken parts of       and other parts) of venetian blind, and provide new one. New parts shall be same
         venetian blind.       material and color as existing.
A702DB   Replace vertical      The Contractor shall remove existing and provide new vertical blind. Aluminum slat:               100    EA
         blind                 (W)50mm or 100mm, color: white.
                               Window opening size: up to 6.0m²/(EA)
A702DC   Replace loose or      The Contractor shall remove existing loose or broken parts (cords, slat, pully, drawstrings     2,000    EA
         broken parts of       and other parts) of vertical venetian blind, and provide new one. New cord and
         vertical venetian     drawstring shall be same material and color as existing.
         blind.
A702DD   Replace twisted       The Contractor shall remove twisted shaft of vertical blind, and provide new one. New            5      EA
         shaft of vertical     shaft shall be same material and color as existing. Size: up to (L)4,000mm/(EA).
         blind
A702DE   Replace curtain or    The Contractor shall remove existing and provide new curtain or clothes hanging rod,            15      ST
         clothes hanging rod   including brackets and/or rings, Stainless steel. New rod shall be same material and
                               color as existing. Size: up to 40mm Dia.
A702DF   Install/Replace       The Contractor shall remove existing and provide new curtain rail with hung brackets,           20      ST
         curtain rail          unit: Length for curtain rail. New rail shall be same material and color as existing. This
                               item may not include removal of existing.
A702DG   Adjust and refit      The Contractor shall adjust and refit curtain rod/rail or handrail or cloth hanging rod,        15      ST
         curtain rod/rail or   including retighten or replacement of loose or missing screws.
         handrail or cloth
         hanging rod
                                                                              J-0200000-07 Page 19
                                                                                                                                         RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                        EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                        QTY     ISSUE     PRICE ¥   AMOUNT ¥
A702DH   Replace accordion    The Contractor shall remove existing and provide new accordion curtain door with rails,      30    EA
         curtain door         door handle, door catch and hardware. Fire-retardant vinyl facing. New curtain door
                              shall be same material and color as existing.
                              Size: up to 5.0 m²/(EA),
A702DJ   Replace facing       The Contractor shall remove existing facing sheet from counter top or cabinet, prepare      200    SM
         sheet of counter top surfaces and provide new facing sheet of melamine decorative sheet, printed plywood or
         or cabinet           stainless steel sheet. New facing sheet shall be same material and color as existing.

A702DK   Replace kitchen or  The Contractor shall remove existing and provide new kitchen wall hung cabinet,             20     EA
         laundry wall hung   including restoration of ceiling and wall around cabinet. New cabinet shall be same
         cabinet             material and color as existing.
                             Cabinet size: up to (W)2000 x (H)1000 x (D)450mm
A702DL   Replace kitchen     The Contractor shall remove existing and provide new kitchen base cabinet with counter      20     EA
         base cabinet        top, including restoration of floor and wall around cabinet. New cabinet shall be same
                             material and color as existing.
                             Cabinet size: up to (W)2000 x (H)1000 x (D)650mm
A702DM   Replace lavatory    The Contractor shall remove existing and provide new lavatory sink cabinet with related     20     EA
         sink cabinet        accessories, including reinstallation of existing wash basin. New cabinet shall be same
                             material and color as existing.
                             Cabinet size: up to 1450mm wide
A702DN   Replace mirror      The Contractor shall remove existing and provide new mirror. New mirror shall be same       10     EA
                             material and color as existing. Mirror size: up to 2.0m²/(EA). This item may be used for
                             new provision (size up to 2.0m²/(EA))
A702DP   Replace shelf board The Contractor shall remove existing and provide new shelf board of cabinet. New shelf      30     EA
         of cabinet          board shall be same material and color as existing. Size: up to 0.5m²/(EA)

A702DQ   Replace bracket or   The Contractor shall remove existing and provide new bracket or pin of shelf board. New    50     EA
         pin of shelf board   bracket shall be same material and color as existing.

A702DR   Replace cabinet     The Contractor shall remove existing and provide new cabinet door, including hardware.      20     EA
         door                New cabinet door shall be same material and color as existing. Door size: up to
                             1.0m²/(EA)
A702DS   Replace closet door The Contractor shall remove existing and provide new closet door, including hardware.       50     EA
                             New closet door shall be same material and color as existing. Door size: up to
                             2.0m²/(EA)
A702DT   Replace cabinet     The Contractor shall remove existing and provide new cabinet door hinge. New door           20     EA
         door hinge          hinge shall be same material and color as existing.
                                                                          J-0200000-07 Page 20
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION             FULL DESCRIPTION                                                                        QTY       ISSUE     PRICE ¥   AMOUNT ¥
A702DU   Replace cabinet         The Contractor shall remove existing and provide new cabinet drawer, including                 20    EA
         drawer                  hardware. New drawer shall be same material and color as existing. Unit: No, of drawer.
A702DV   Replace door knob The Contractor shall remove existing and provide new door knob or handle on cabinet                  30   EA
         or handle on        door/drawer. New door knob and handle shall be same material and color as existing.
         cabinet door/drawer


A702DW   Replace magnet or The Contractor shall remove existing and provide new magnet or roller catcher. New                   50   EA
         roller catcher    magnet and roller catch shall be same material and color as existing.

A702DX   Replace corrugated      The Contractor shall remove existing and provide new corrugated FRP terrace roofing,          100   SM
         FRP terrace roofing,    carport acrylic panel and backyard polycarbonate panel. New material shall be same
         carport acrylic panel   material and color as existing. Line item shall include scaffolding installation and
         and backyard            removal.
         ploycarbonate
         panel.


A702DY   Replace wood,        The Contractor shall remove existing and provide new wood, stainless steel, brass or              20   LM
         stainless steel,     vinyl handrail of stairway, including brackets. New handrail shall be same material and
         brass or vinyl       color as existing.
         handrail of stairway

A702DZ   Repair spall, crack     The Contractor shall repair spall, crack or broken concrete or mortar surfaces                 40   SM
         or broken concrete
         or mortar surfaces
A702EA   Replace PVC gutter The Contractor shall remove existing and provide new PVC gutter, including brackets.               100   LM
                            New gutter shall be same material and color as existing. Line item shall include
                            scaffolding installation and removal.
A702EB   Replace downspout The Contractor shall remove existing and provide new PVC downspout or                               200   LM
                            carport/backyard terrace downspout, including brackets. New downspout shall be same
                            material and color as existing. Line item shall include scaffolding installation and
                            removal.
A702EC   Repair/refit gutter,    The Contractor shall repair/refit gutter, downspout and accessories. Line item shall          100   LM
         downspout and           include scaffolding installation and removal.
         accessories
                                                                              J-0200000-07 Page 21
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                             QTY      ISSUE     PRICE ¥   AMOUNT ¥
A702ED   Replace chain-link The Contractor shall remove existing and provide new chain-link or steel mesh fence                 40    LM
         or steel mesh fence including concrete foundation and restoration of surrounding area. New fence shall be
                             same structure, material and color as existing. Fence height: up to 1.5m
A702EE   Replace panel of     The Contractor shall remove existing steel or aluminum "MEKAKUSHI" fence and provide              40   LM
         "MEKAKUSHI"          new same material fence (Up to 1,800mmH). New panel shall be same material and
         fence                color as existing.
A702EF   Replace door of      The Contractor shall remove existing and provide new single door of aluminum or steel              5   EA
         MEKAKUSHI" or        "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New door shall be same material
         steel mesh fence     and color as existing.
A702EG   Replace latch,       The Contractor shall remove existing and provide new latch, hinge, knob or stopper of             20   EA
         hinge, knob or       aluminum or steel "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New latch,
         stopper of           knob and stopper shall be same material and color as existing.
         "MEKAKUSHI" or
         steel mesh fence

A702EH   Replace cap or joint The Contractor shall remove existing and provide new cap or joint of aluminum or steel            20   EA
         of "MEKAKUSHI" "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New cap and joint shall be same
         or steel mesh fence material and color as existing.


A702EJ   Replace cap or joint The Contractor shall remove existing and provide new cap or joint for carport or backyard         50   EA
         for carport or       terrace. New cap and joint shall be same material and color as existing. Line item shall
         backyard terrace     include scaffolding installation and removal.
A702EK   Replace vent cap or The Contractor shall remove existing and provide new vent cap or natural vent screen on            10   EA
         air vent screen     exterior wall. New vent shall be same material and color as existing. Vent size: up to
                             0.5m²/(EA) Height less than 6 meters.
A702EL   Adjust and refit    The Contractor shall adjust and refit metal storage shed, including roof, wall, doors,             20   EA
         metal storage shed brackets, handle/lock, guide rail, floor, hardware, shelves, and retighten or replacement
                             of loose or missing fasteners, Unit: No. of metal storage shed
                                                                          J-0200000-07 Page 22
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST     UNIT OF    UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                          QTY     ISSUE      PRICE ¥   AMOUNT ¥
A702EM   Replace FRP water-     The Contractor shall remove existing and provide new FRP water-proof coating of fish          200    SM
         proof coating,         pond and highrise balcony (Bldg. 3101 and 3102) and apply finish coatings. Line item
         mortar or concrete     shall include temporary relocation and keeping of fishes during repair work of fish pond,
                                and return of them with proper treatment after completion of work and necessary curing
                                time. This item shall also include; chip out and remove damaged portions, prepare
                                surfaces and apply adhesive, and provide new water-proof mortar or concrete under FRP
                                coating of fish pond and balcony. Pond/balcony area: up to 100m²/(EA)

A702EN   Replace bird           The Contractor shall remove existing and provide new bird protection net with fasteners          50    EA
         protection net         and main rope, at balcony of Hi-rise. New bird protection net shall be same material and
                                color as existing. Opening area: up to 14.0m²/(EA) New provision (without removal) may
                                be ordered.
A702EP   Refinish bathtub       The Contractor shall remove all scratches and scores, and refinish bathtub in accordance         50    SM
         coating                with manufacturer's recommended method.
A702EQ   Repair surface of      The Contractor shall repair surfaces of artificial polyester or acrylic type counter in          50    SM
         polyester or acrylic   accordance with Attachment J-1502000-03.
         counter
A702ER   Replace kitchen        The Contractor shall remove existing and provide new kitchen counter. The counter shall           3    Set
         counter stainless,     be same material as existing.
         marble, polyester
A702ES   Replace inspection     The Contractor shall remove existing and provide new inspection panel for bathtub. New           10    EA
         panel for bathtub.     inspection panel shall be same material and color as existing.

A702ET   Repair, adjust and     The Contractor shall repair, adjust and refit cabinet door or drawersr, so the cabinet door    4,000   EA
         refit cabinet door     and drawer can open and close smoothly as originally intended. (1 door or 1 drawer is
         and drawers            counted as 1 EA.)
A702EU   Repair nail holes on The Contractor shall repair surfaces of wall or door that has been damged by nail. The           3,000   EA
         wall or door         nail holes shall become imvisible, and the the wall or door surface shall look smooth. (1
                              door or 1 SM wall is counted as 1 EA.)
A702EV   Adjust and refit       The Contractor shall adjust and refit hardwre on wall, floor and door (loose screws, outlet,   3,000   EA
         hardware on wall,      door stopper, plumbing fixture, faucets, etc.) (1 door or 1 SM wall/floor is counted as 1
         floor and door         EA.)
A702EW   Replace caulking or    The Contractor shall replace existing caulking or cement for joint with new.                   1,000   LM
         cement for joint
                                                                               J-0200000-07 Page 23
                                                                                                                                                    RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST     UNIT OF        UNIT         TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                            QTY     ISSUE          PRICE ¥      AMOUNT ¥
A702EX   Replace house         The Contractor shall remove existing house number plate and shall provide new number            100    EA
         number plate          plate (metal or plastic), same size, color and material as existing, with number printed on
                               the plate. The number shall bear severe weather condition.
A702EY   Replace towel ring    The Contractor shall replace existing towel ring or bar with new, same or similar model in       20    EA
         or bar                bathroom.

                                                                                                                          Sub Total, A702 (A702AA - A702EY):

A703     Electrical work
A703AA   Replace light         The Contractor shall replace existing light fixture with same or similar model,                      200    EA
         fixture               Typical light fixtures are as follows:
                               Waterproof or indoor use, ceiling, wall, flush, or pendant mount type with
                               globe/cover/diffuser, incandescent or fluorescent light, and typical lamp size, and voltage
                               as indicated Attachment J-1502000-03 or reference drawings.
A703AB   Replace ceiling        The Contractor shall replace existing ceiling fan/light fixture with new type of the ceiling         50    EA
         fan/light fixture with fan/light fixture in accordance with Attachment J-1502000-03. New ceiling fan/light fixture
         new material           shall be same or similar model as others.
A703AC   Replace exit light    The Contractor shall replace existing exit light and fixture with same or similar model.              20    EA
         and fixture           Typical exit lights are as follows:
                               Waterproof or indoor use, ceiling or wall mount type with acrylic direction cover and
                               battery, fluorescent light 1-10W or 1-20W.

A703AD   Replace               The Contractor shall replace existing globe/diffuser of light fixture. The replacement                50    EA
         globe/diffuser of     globe/diffuser shall be same type and compatible with existing light fixture.
         light fixture
A703AE   Replace fluorescent The Contractor shall replace existing fluorescent light bulb includes starter lamp.                    600    EA
         light bulb includes
         starter lamp

A703AF   Replace pull switch The Contractor shall replace pull switch and cord of light fixture with same or similar                 50    EA
         and cord of light    model.
         fixture
A703AG   Replace cover plate The Contractor shall replace cover plate for outlet or switch with same or similar model.              200    EA
         for outlet or switch
         or CATV

                                                                             J-0200000-07 Page 24
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY       ISSUE     PRICE ¥   AMOUNT ¥
A703AH   Replace tumbler or The Contractor shall replace tumbler or dimmer switch or bathroom timer switch with                   50    EA
         dimmer switch      same or similar model.
A703AJ   Replace electrical   The Contractor shall replace electrical outlet with same or similar model.                          50   EA
         outlet
A703AK   Replace chime,       The Contractor shall replace chime, buzzer, or push button with same or similar model.              10   EA
         buzzer, or push
         button
A703AL   Replace ballast of   The Contractor shall replace ballast of fluorscent light with new one.                              50   EA
         fluorscent light
A703AM   Replace home type The Contractor shall replace home type smoke detector (house-wired or battery-                         30   EA
         smoke detector    powered) with same or similar model. New battery shall also be provided for battery-
                           powered type.
A703AN   Replace CATV/FM      The Contractor shall replace CATV/FM outlet and outlet cover with same or similar                   50   EA
         outlet               model.
A703AP   Replace              The Contractor shall remove existing incandescent light bulb and provide new compact               200   EA
         incandescent light   fluorescent light.
         bulb to compact
         fluorescent light
A703AQ   Replace batteries    The Contractor shall replace battery for smoke detector with new, 9V.                              200   EA
         for GFM smoke
         detector
A703AR   Replace toggle       The Contractor shall replace toggle switch including plates with same or similar model.            100   EA
         switch


                                                                                                                    Sub Total, A703 (A703AA - A703AR):

A704     Mechanical work
A704AA   Replace washbasin The Contractor shall replace washbasin or slope sink or lavatory sink including pipe                   30   EA
         or lavatory sink  fittings with same or similar model.


A704AB   Replace commode      The Contractor shall replace commode (water closet), including seat, lid and fittings with          20   EA
                              same or similar model.
A704AC   Replace seat of      The Contractor shall replace toilet seat and lid of commode with same or similar model.            100   EA
         commode
                                                                            J-0200000-07 Page 25
                                                                                                                                                 RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
A704AD   Replace low tank of The Contractor shall replace low tank, including lid and fittings, with same or similar                5    EA
         commode             model.
A704AE   Replace lid of low    The Contractor shall replace low tank lid and fittings with same or similar model.                   5   EA
         tank
A704AF   Replace low tank      The Contractor shall replace flush valve for low tank with same or similar model.                    5   EA
         valve
A704AG   Replace paper         The Contractor shall replace toilet paper holder with same or similar model.                        20   EA
         holder
A704AH   Replace plastic bar   The Contractor shall replace plastic bar of toilet paper holder.                                    30   EA
         of paper holder

A704AJ   Replace lavatory      The Contractor shall replace lavatory with base cabinet unit, including pipe fittings with          30   EA
         with cabinet          same or similar model.
A704AK   Replace plug and      The Contractor shall replace plug and chain for lavatory sink with same or similar model.           30   EA
         chain for lavatory
         sink
A704AL   Replace medicine      The Contractor shall replace medicine cabinet (single, double or three mirror type),                50   EA
         cabinet               including restoration of wall to fit new cabinet, necessary wiring to light fixture mounted
                               on the new cabinet and furnishing of light/bulb, and remove old wall mounted fixture, with
                               same or similar model.
A704AM   Replace mirror of     The Contractor shall replace mirror of medicine cabinet with same or similar model.                 10   EA
         medicine cabinet
A704AN   Repair medicine       The Contractor shall repair medicine cabinet, including light fixture cover, door and               50   EA
         cabinet               accessories.
A704AP   Replace bathtub       The Contractor shall replace bathtub, including hardware, with same or similar model.               10   EA

A704AQ   Replace bathtub       The Contractor shall replace bathtub drain pipe with direct flow (in-line) type fitting,            10   EA
         drain pipe            including dismount/remount bathtub.
A704AR   Replace shower        The Contractor shall replace shower head with same or similar model.                                20   EA
         head
A704AS   Replace hand          The Contractor shall replace shower head and hose with same or similar model.                       50   EA
         shower head and
         hose
A704AT   Repair or adjust      The Contractor shall repair or adjust shower/faucet mixing valve.                                   50   EA
         shower/faucet
         mixing valve.
                                                                              J-0200000-07 Page 26
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                             QTY       ISSUE     PRICE ¥   AMOUNT ¥
A704AU   Replace hose of    The Contractor shall replace hose of hand shower with same or similar model.                        30    EA
         hand shower
A704AV   Replace bar type   The Contractor shall replace bar type shower head holder with same or similar model.                10   EA
         shower head holder

A704AW   Replace robe hook     The Contractor shall replace robe hook with same or similar model.                               10   EA

A704AX   Replace grip bar for The Contractor shall replace grip bar for bathtub with same or similar model.                     10   EA
         bathtub
A704AY   Replace towel rack The Contractor shall replace towel rack with same or similar model.                                 10   EA

A704AZ   Replace soap dish     The Contractor shall replace soap dish with same or similar model.                                5   EA

A704BA   Replace faucet        The Contractor shall replace hose faucet, garden faucet, bath faucet, mixing faucet or           20   EA
                               mixing valve, including handles or lever, with same or similar model.
A704BB   Replace handle of     The Contractor shall replace handle or lever of faucet with same or similar model.               20   EA
         mixing faucet
A704BC   Replace packing for The Contractor shall replace packing for faucet or valve.                                         500   EA
         faucet or valve
A704BD   Replace             The Contractor shall replace combination stopper of washbasin, lavatory or bathtub with            10   EA
         combination stopper same or similar model.

A704BE   Replace mixing        The Contractor shall replace mixing faucet for kitchen sink (individual handles,                 20   EA
         faucet for kitchen    combination type) with same or similar model.
         sink
A704BF   Check and repair as   The Contractor shall check and repair as necessary all plumbing works (hot & cold water         100   LM
         necessary all         supply, drainage, faucet and shower).
         plumbing works
A704BG   Remove foreign        The Contractor shall remove foreign matter and repair clogged drain pipe connected to            50   EA
         matter and repair     either commode, lavatory, bathtub or kitchen sink.
         clogged drain pipe

A704BH   Replace non-        The Contractor shall replace non-asbestos insulation on water/heater pipe with new                100   LM
         asbestos insulation similar material.
         on pipe
A704BJ   Repair sink faucet The Contractor shall repair sink faucet assembly.                                                   30   EA
         assembly
                                                                            J-0200000-07 Page 27
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT         TOTAL
ELIN     DESCRIPTION             FULL DESCRIPTION                                                                            QTY       ISSUE     PRICE ¥      AMOUNT ¥
A704BK   Replace kitchen         The Contractor shall replace kitchen sink with same or similar model.                               3    EA
         double sink
A704BL   Repair piping under     The Contractor shall repair piping under kitchen sink or washbasin with similar material.          20    EA
         kitchen sink or
         washbasin
A704BM   Replace kitchen         The Contractor shall replace kitchen ventilation hood in kitchen with same or similar              10    EA
         ventilation hood        model.
A704BN   Replace exhaust         The Contractor shall replace exhaust fan, ceiling or wall mounted type, with same or               20    EA
         fan                     similar model.
A704BP   Replace grease          The Contractor shall replace grease filter of range hood fan with same or similar model.          100    EA
         filter of range hood
         fan
A704BQ   Replace screen          The Contractor shall replace screen filter of exhaust fan with same or similar model.              10    EA
         filter of exhaust fan

A704BR   Replace vent cover The Contractor shall replace vent cover with grille for dryer's exhaust pipe.                           10    EA
         with grill for dryer

A704BS   Replace heat-pump       The Contractor shall replace heat-pump type air conditioner (both indoor and outdoor               50    EA
         type A/C                unit) with same or similar model.
A704BT   Replace pipe            The Contractor shall replace pipe insulation cover for heat pump AC with new same or               30    ST
         insulation cover for    similar material to ensure proper and energy efficient operation and function of AC. (All
         heat pump AC            pipe insulation cover for one heat pump AC unit is counted as 1 ST.)



                                                                                                                         Sub Total, A704 (A704AA - A704BT):

                                                                              J-0200000-07 Page 28
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY         ISSUE     PRICE ¥   AMOUNT ¥
A705     Whole Unit Cleaning
A705AA   Whole Unit         The Contractor shall perform whole unit cleaning.                                                     60      UN
         Cleaning, Atsugi,  The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 2-
         Bedroom Unit
A705AB   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   50      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 3-
         Bedroom Unit
A705AC   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   20      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 4-
         Bedroom Unit
A705AD   Whole Unit           The Contractor shall perform whole unit cleaning.                                                  120      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         High-rise, 2-
         Bedroom Unit
A705AE   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   80      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         High-rise, 3-
         Bedroom Unit
A705AF   Whole Unit           (Note: At the time of contract award, this item is reserved for future use. Amount                   (Max Amount)                  4,736,000
         Cleaning, Atsugi,    indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         High-rise, 4-        determined later by contract modification.) The Contractor shall perform whole unit
         Bedroom Unit         cleaning. The Contractor shall ensure that FH unit is clean, sanitary and sightly.
A705AG   Whole Unit           The Contractor shall perform whole unit cleaning.                                                    2      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         SOQ
A705AH   Whole Unit           The Contractor shall perform whole unit cleaning.                                                    2      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse in SOQ
         Area, 3-Bedroom
A705AJ   Whole Unit        The Contractor shall perform whole unit cleaning.                                                       3      UN
         Cleaning, Atsugi, The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse in SOQ
         Area, 4-Bedroom
                                                                                                                    Sub Total, A705 (A705AA - A705AJ):
                                                                            J-0200000-07 Page 29
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                              EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                               QTY         ISSUE     PRICE ¥   AMOUNT ¥
A706     Cleaning work
A706AA   Clean and wax floor The Contractor shall clean and wax floor to ensure clean, sanitary and sightly condition.         2,000      SM

A706AB   Deep clean carpet     The Contractor shall deep clean carpet and rug to ensure clean, sanitary and sightly            1,000      SM
         and rug               condition. The Government may direct cleaning method such as sampooing, steam
                               cleaning, dry cleaning or other similar deep cleaning processes.
A706AC   Clean concrete and    The Contractor shall clean concrete and tiled floor to ensure clean, sanitary and sightly       1,000      SM
         tiled floor           condition.
A706AD   Clean tile and        The Contractor shall clean tile and washable wall to ensure clean, sanitary and sightly            500     SM
         washable wall         condition.
A706AE   Clean exterior wall   The Contractor shall clean exterior wall surfaces to ensure clean, sanitary and sightly            500     SM
                               condition.
A706AF   Clean stainless       The Contractor shall clean and polish stainless steel sink and counter to ensure clean,             30      EA
         steel sink and        sanitary and sightly condition..
         counter
A706AG   Clean dryer vent      The Contractor shall clean dryer vent line with fan to ensure clean, sanitary and sightly          200      EA
         line with fan         condition and propler operation and function of dryer. The Contractor shall clean from
                               dryer to duct connection (if vertical duct exhaust fan system is used) or to exterior wall
                               hood.
A706AH   Clean gutter and      The Contractor shall clean gutter and downspout to ensure clean, sanitary and sightly              700      LM
         downspout             condition and proper original intended function of gutter and downspount. All the foreign
                               materials shall be removed. Line item shall include scaffolding installation and removal.

A706AJ   Clean canopy          The Contractor shall clean canopy including gutter and downspout to ensure clean,                  600     SM
                               sanitary and sightly condition. Above A706AH shall also be applied for gutter and
                               downspout. Line item shall include scaffolding installation and removal.
A706AK   Mini cleaning         The Contractor shall perform Mini cleaning to ensure clean, sanitary and sightly                    30      UN
                               condition.

A706AL   Grass cutting         The Contractor shall cut grass (including but not limited to turf, weed, vines, and other      10,000      SM
                               unwanted vegetations) to uniform height of 2 inches to maintain grass healthy condition
                               and appearance.
                                                                            J-0200000-07 Page 30
                                                                                                                                       RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                    EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION    FULL DESCRIPTION                                                                          QTY       ISSUE     PRICE ¥   AMOUNT ¥
A706AM   Sodding        The Contractor shall provide sod, Anti Weeds Type Sod (Saint Augustine Grass II or            3,000    SM
                        Modified Centipede Grass) species unless otherwise specified. It shall be dense,
                        uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid
                        on properly prepared topsoil. Sod joints shall be staggered and butted together. On
                        slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed
                        installation shall be smooth and uniform in appearance. The Contractor shall water and
                        provide continuing care for sodded areas as necessary to firmly establish new grass
                        growth and development. The Contactor shall replace all grass that dies or fails to
                        develop noticeable growth within 90 days of sodding at no additional cost to the
                        Government.


                                                                                                           Sub Total, A706 (A706AA - A706AM):



                                                                                            TOTAL OF BASE PERIOD, A700 THROUGH A706AM:




                                                                    J-0200000-07 Page 31
                                                                                                                                                        RFP N40084-10-R-8709

                                                           ATTACHMENT J-0200000-07
                                                          EXHIBIT LINE ITEM NUMBERS
                                                   SOLICITATION/CONTRACT #N40084-10-R-8709
                                                             EXHIBIT B - CLIN 0002

Line Item 0002   First Option Period - Indefinite Delivery Indefinite Quantity Work

PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B700 through B706

NAME OF OFFEROR OR CONTRACTOR:
          SHORT                                                                                                                   EST        UNIT OF   UNIT      TOTAL
ELIN      DESCRIPTION      FULL DESCRIPTION                                                                                       QTY        ISSUE     PRICE ¥   AMOUNT ¥
B700      Change of Occpancy Maintenance (COM)
B700AA    COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                     10      UN
          Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
          Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
          (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
          Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                                work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                                to the Government immediately. In such case, applicable IDIQ work item or another
                                contract will be issued.
                                The Contractor shall ensure that FH unit is fully functional with all equipments and
                                fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                                smudges, streaks and foreign matter, and debris.
B700AB    COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                     30      UN
          Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
          Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
          (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
          2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                                work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                                to the Government immediately. In such case, applicable IDIQ work item or another
                                contract will be issued.
                                The Contractor shall ensure that FH unit is fully functional with all equipments and
                                fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                                smudges, streaks and foreign matter, and debris.

                                                                               J-0200000-07 Page 32
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
B700AC   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   35    UN
         Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

B700AD   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    8   UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

B700AE   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   10   UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                              J-0200000-07 Page 33
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
B700AF   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   32    UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

B700AG   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    3   UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

B700AH   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                    4   UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                              J-0200000-07 Page 34
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
B700AJ   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   13    UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


B700AK   COM, Atsugi, High- This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                      15   UN
         rise, 2-Bedroom    period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied Lessincluding all equipments, fixtures and interior conditions, and shall perform the COM work
         Than 1 Year)       items listed in Attachment J-1401000-04. When the Contractor found the work item need
                            to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
B700AL                      This item applies to the FH unit in which Quantitly LImitation, the less than 1 year
         COM, Atsugi, High- work ELIN list, or which exceeds specifiedthe last occuapnt stayed Contractor shall report               35   UN
         rise, 2-Bedroom    period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied 1   including all equipments, fixtures and interior conditions, and shall perform the COM work
         Year to 2 Years)   items listed in Attachment J-1401000-04. When the Contractor found the work item need
                            to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                            work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                            to the Government immediately. In such case, applicable IDIQ work item or another
                            contract will be issued.
                            The Contractor shall ensure that FH unit is fully functional with all equipments and
                            fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                            smudges, streaks and foreign matter, and debris.


                                                                             J-0200000-07 Page 35
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
B700AM   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt more than 2 year period. The              70    UN
         rise, 2-Bedroom       Contractor shall participate in deficiency inspection and inspect FH unit including all
         Unit (Occupied        equipments, fixtures and interior conditions, and shall perform the COM work items listed
         More Than 2 Years)    in Attachment J-1401000-04. When the Contractor found the work item need to be
                               adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work
                               item list, or which exceeds specified Quantitly LImitation, the Contractor shall report to
                               the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

B700AN   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   15   UN
         rise, 3-Bedroom       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied Less   including all equipments, fixtures and interior conditions, and shall perform the COM work
         Than 1 Year)          items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

B700AP   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   15   UN
         rise, 3-Bedroom       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied 1      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Year to 2 Years)      items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                              J-0200000-07 Page 36
                                                                                                                                                    RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                EST      UNIT OF   UNIT        TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥     AMOUNT ¥
B700AQ   COM, Atsugi, High-   This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   50    UN
         rise, 3-Bedroom      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied       including all equipments, fixtures and interior conditions, and shall perform the COM work
         More Than 2 Years)   items listed in Attachment J-1401000-04. When the Contractor found the work item need
                              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.


B700AR   COM, Atsugi, High- (Note: At the time of contract award, this item is reserved for future use. Amount                       (Max Amount)                 21,000,000
         rise, 4-Bedroom    indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         Unit               determined later by contract modification.) The Contractor shall inspect FH unit including
                            all equipments, fixtures and interior conditions, and shall perform the COM work items
                            listed in Attachment J-1401000-07 (ATSUGI/KAMISEYA). When the Contractor found
                            the work item need to be adjusted, maintained, repaired and/or replaced, and which is
                            not listed in the COM work item list, the Contractor shall report to the Government
                            immediately. In such case, applicable IDIQ work item or another contract will be issued.
                            The Contractor shall ensure that FH unit is fully functional with all equipments and
                            fixtures, and is in quality conditions.


B700AS   COM, Atsugi, SOQ     This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    2   UN
         (Occupied Less       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Than 1 Year)         including all equipments, fixtures and interior conditions, and shall perform the COM work
                              items listed in Attachment J-1401000-04. When the Contractor found the work item need
                              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.


                                                                             J-0200000-07 Page 37
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥   AMOUNT ¥
B700AT   COM, Atsugi, SOQ      This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         (Occupied 1 Year to   period. The Contractor shall participate in deficiency inspection and inspect FH unit
         2 Year)               including all equipments, fixtures and interior conditions, and shall perform the COM work
                               items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

B700AU   COM, Atsugi, SOQ      This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   2   UN
         (Occupied More        period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Than 2 Years)         including all equipments, fixtures and interior conditions, and shall perform the COM work
                               items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


B700AV   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied Less   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


                                                                              J-0200000-07 Page 38
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥   AMOUNT ¥
B700AW   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied 1      items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Year to 2 Years)      to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

B700AX   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         More Than 2 Years)    to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


B700AY   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied Less   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


                                                                              J-0200000-07 Page 39
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                EST     UNIT OF   UNIT         TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥      AMOUNT ¥
B700AZ   COM, Atsugi,         This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         Townhouse in SOQ     period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied 1     items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Year to 2 Years)     to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.

B700BA   COM, Atsugi,         This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   3    UN
         Townhouse in SOQ     period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied       items listed in Attachment J-1401000-04. When the Contractor found the work item need
         More Than 2 Years)   to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.



                                                                                                                        Sub Total, B700 (B700AA - B700BA):

                                                                             J-0200000-07 Page 40
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                             QTY         ISSUE     PRICE ¥   AMOUNT ¥
B701     Whole Unit Painting
B701AA   Whole Unit         The Contractor shall prepare and repaint all interior surfaces of FH unit, including                60      UN
         Painting, Atsugi,  concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 2-      materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit       surrounding area. Natural finish coating for wood surface is not included in this line item.
                            The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                            uniformly.

B701AB   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              50      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 3-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.
B701AC   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              20      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 4-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.
B701AD   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including             100      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         High-rise, 2-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.

B701AE   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              80      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         High-rise, 3-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.

                                                                            J-0200000-07 Page 41
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                          EST        UNIT OF UNIT           TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                           QTY        ISSUE     PRICE ¥      AMOUNT ¥
B701AF   Whole Unit          (Note: At the time of contract award, this item is reserved for future use. Amount                   (Max Amount)                14,000,000
         Painting, Atsugi,   indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         High-rise, 4-       determined later by contract modification.) The Contractor shall prepare and repaint all
         Bedroom Unit        interior surfaces of FH unit, including concrete, mortar, board, wood, metal, steel and
                             other painted surfaces, with proper materials in proper number of coat(s). New paints
                             shall match color and gloss of surrounding area. Natural finish coating for wood surface
                             is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.
B701AG   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                2    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         SOQ                 materials in proper number of coat(s). New paints shall match color and gloss of
                             surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.

B701AH   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                2    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse in SOQ,   materials in proper number of coat(s). New paints shall match color and gloss of
         3-Bedroom           surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.

B701AJ   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                4    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse in SOQ,   materials in proper number of coat(s). New paints shall match color and gloss of
         4-Bedroom           surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.


                                                                                                                     Sub Total, B701 (B701AA - B701AJ):


                                                                           J-0200000-07 Page 42
                                                                                                                                                 RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                          EST      UNIT OF        UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                            QTY      ISSUE          PRICE ¥   AMOUNT ¥
B702     Architectural work
B702AA   Paint Interior     The Contractor shall prepare and paint interior surfaces, including concrete, mortar,         30,000    SM
         surfaces           board, wood, metal, steel or other surfaces designated by the Government, with proper
                            materials in proper number of coat(s). This line item does not cover natural finish coating
                            for wood surface.
                            New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                            chosen by the Government.

B702AB   Paint Interior wood      The Contractor shall prepare and paint interior wooden natural varnish finish surfaces,          1,000   SM
         natural varnish          including wooden frame, trims, moldings and wooden floor, with proper materials in
         finish surfaces          proper number of coat(s). New paints shall match color and gloss of surrounding area.
                                  New painted surfaces shall be smooth, evenly and uniformly.

B702AC   Paint Exterior           The Contractor shall prepare and paint exterior surfaces up to 2.5 meters height from           20,000   SM
         surfaces                 ground (including concrete, mortar, board, wood, metal, steel or other surfaces
         (scaffolding or other    designated by the Government) or height/location that does not require fall protection
         fall protection is not   (such as scaffolding) specified in EM 385-1-1, with proper materials in proper number of
         required)                coat(s). This item includes textured pattern and the Contractor shall make textured
                                  pattern by spraying base material on exterior concrete or mortar surfaces, including
                                  application of sealer. Line item shall include scaffolding installation and removal for
                                  exterior painting.
                                  New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                                  chosen by the Government.

B702AD   Paint Exterior           The Contractor shall prepare and paint exterior surfaces over 2.5 meters height up to 9          2,000   SM
         surfaces                 meters height from ground (including concrete, mortar, board, wood, metal, steel or other
         (scaffolding or other    surfaces designated by the Government) or height/location that requires fall protection
         fall protection is       (such as scaffolding) in accordance with EM 385-1-1, with proper materials in proper
         required)                number of coat(s). This item includes textured pattern and the Contractor shall make
                                  textured pattern by spraying base material on exterior concrete or mortar surfaces,
                                  including application of sealer. Line item shall include scaffolding installation and removal
                                  for exterior painting.
                                  New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                                  chosen by the Government.

B702AE   Paint house ID           The Contractor shall prepare and paint house ID number on building or parking space.              100    EA
         number                   Line item shall include background painting if required. The same paint shall be used.
                                                                                J-0200000-07 Page 43
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                           QTY       ISSUE     PRICE ¥   AMOUNT ¥
B702AF   Replace vinyl floor    The Contractor shall remove existing vinyl floor tiles/vinyl simulated wood floor tile,        1,200    SM
         tile/vinyl simulated   prepare surfaces to make smooth and even floor, and provide new vinyl floor tiles/vinyl
         wood floor tile        simulated wood floor tiles. New floor tile shall be same material and color as existing.
                                Line item shall include wax new vinyl floor unless otherwise directed by KO or HSG
                                Officer.
B702AG   Re-adhesive loose      The Contractor shall re-adhesive loose vinyl floor tile.                                        100    SM
         vinyl floor tile.

B702AH   Replace vinyl floor The Contractor shall remove existing vinyl floor sheets, prepare surfaces to make smooth           500    SM
         sheet (including slip- and even floor, and provide new vinyl floor sheets or slip-retardant vinyl floor sheets.
         retardant)             New vinyl floor sheet shall be same material and color as existing. Line item shall
                                include wax new vinyl floor sheets if necessary.

B702AJ   Sand wooden            The Contractor shall prepare and sand wooden flooring to remove existing paint and              500    SM
         flooring               make smooth and even floor.
B702AK   Replace hardwood       The Contractor shall remove existing hardwood flooring, sub sheeting baord and proof            300    SM
         flooring               sheet, prepare surfaces to make smooth and even floor, and provide new hardwood
                                flooring, sub sheeting board and proof sheet. Hardwood flooring: tongue and grooved,
                                thickness: up to 15mm. New hardwood flooring system shall match existing if replaced
                                flooring is adjacent to another hardwood floor.

B702AL   Repair loose, holes The Contractor shall repair loose, holes or cracks of hardwood flooring (refasten loose             50    SM
         or cracks of        hardwood flooring and/or fill hole, cracks with wooden piece and putty, and sand it to
         hardwood flooring make smooth and even surface)

B702AM   Install or replace   The Contractor shall provide new floor metal molding or replace floor metal molding with          200    LM
         floor metal molding. new one. New metal molding shall be same material and color as existing.

B702AN   Replace wooden       The Contractor shall remove existing and provide new wooden step board with riser                  20    EA
         step                 board on stairway. New step shall be same material and color as exiting. Stair width: up
                              to 1,500 mm/(EA), Unit: No. of step.
B702AP   Replace stair non- The Contractor shall remove existing and provide new stair non-slip nosing on edge of               100    LM
         slip nosing          step, Stainless steel, brass or aluminum with or without rubber strip. New stair non-slip
                              nosing shall be same material and color as existing.
B702AQ   Replace floor carpet The Contractor shall remove existing carpet with underlayer padding, prepare surfaces to        3,000    SM
                              make smooth and even floor, and provide new carpet with underlayer padding. New floor
                              carpet shall be same material and color as existing.
                                                                              J-0200000-07 Page 44
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                             QTY       ISSUE     PRICE ¥   AMOUNT ¥
B702AR   Replace wooden         The Contractor shall remove existing and provide new wooden baseboard, Size: up to                 300    LM
         baseboard              25x200mm
B702AS   Replace wooden         The Contractor shall remove existing and provide new wooden quarter round                          100   LM
         quarter round          ("TAMABUCHI"), Size: up to 3/4"
         ("TAMABUCHI")
B702AT   Replace                The Contractor shall remove existing and provide new interior/exterior ceramic, terrazzo,          400   SM
         interior/exterior      melamine resin laminated, quarry or mosaic floor tiles, and provide new interior/exterior
         ceramic, terrazzo,     ceramic, terrazzo, melamine resin laminated, quarry or mosaic floor tile, including mortar
         melamine resin         bed and joint cement. New floor tile shall be same material and color as exiting.
         laminated, quarry or
         mosaic floor tile
B702AU   Replace exterior       The Contractor shall remove existing and provide new exterior stair nosing tile, including         100   LM
         stair nosing tile      mortar bed and joint cement. New stair nosing tile shall be same material and color as
                                existing
B702AV   Replace wooden         The Contractor shall remove existing and provide new wooden floor joist, Size: up to                50   SM
         floor joist            105/2x105mm, @300~455mm, Unit: floor area having damaged floor joist.
B702AW   Replace wooden         The Contractor shall remove existing and provide new wooden sleeper hold ("Oobiki"),                30   LM
         sleeper hold           Size: up to 120x120mm, including wooden sleeper hold support ("Tsuka") @455~910mm
         ("Oobiki")
B702AX   Replace wooden         The Contractor shall remove existing and provide new wooden diagonal sheathing or                  100   SM
         sheathing or water     plywood sheathing or water proof sheathing, Thickness: up to 19mm
         proof sheeting
B702AY   Replace wall or        The Contractor shall remove existing and provide new gypsum boards, non-asbestos                    30   SM
         ceiling board          cement boards, plywood or acoustical tile baord on wall or ceiling.
B702AZ   Replace wall corner    The Contractor shall remove existing and provide new wall corner cover, metal or plastic.           50   LM
         cover (Metal or
         Plastic)
B702BA   Replace wall           The Contractor shall remove existing wall covering, prepare surfaces and provide new               150   SM
         covering               wall covering ("KABEGAMI" or "VINYL CLOTH"). New wall covering shall be same
         ("KABEGAMI" or         material and color as existing.
         "VINYL CLOTH")
B702BB   Replace wood           The Contractor shall remove existing and provide new wood batten strip ("OSHIBUCHI")               100   LM
         batten strip           on wall or ceiling
         ("OSHIBUCHI")
                                                                             J-0200000-07 Page 45
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                          QTY       ISSUE     PRICE ¥   AMOUNT ¥
B702BC   Replace ceramic        The Contractor shall remove existing and provide new ceramic wall tiles with mortar bed         400    SM
         wall tile              and joint cement. New wall tile shall be same material and color as existing.
B702BD   Replace plaster        The Contractor shall remove existing plaster, prepare surfaces and provide new plaster          500   SM
                                on wall or ceiling
B702BE   Replace wooden         The Contractor shall remove existing and provide new wooden wall stud, Size: up to               50   SM
         wall stud              105/2x105mm, @300~455mm, Unit: wall area having damaged wall stud
B702BF   Replace wooden         The Contractor shall remove existing and provide new wooden frame for wall or ceiling            50   SM
         frame for wall or      boards, Unit: Damaged wall or ceiling area.
         ceiling board
B702BG   Replace batten strip   The Contractor shall remove existing and provide new batten strip or molding on wall or         100   LM
         or molding on wall     ceiling
         or ceiling
B702BH   Replace wooden         The Contractor shall remove existing and provide new swinging or sliding wooden flush            20   EA
         door                   door (plywood facing or printed plywood facing) with/without glass and/or louver,
                                including hardware. New door shall be same material and color as existing.
                                Door size: up to 2.0m²/(EA)
B702BJ   Replace aluminum       The Contractor shall remove existing and provide new swinging aluminum flush door                50   EA
         door                   with/without glass, built-in screen window and/or louver, including hardware, aluminum
                                door frame, wooden trims and restoration of wall and floor around door. New door shall
                                be same material and color as existing.
                                Door size: up to 2.0m²/(EA)
B702BK   Replace aluminum       The Contractor shall remove exiting and provide new aluminum framed screen door with             30   EA
         screen door            insect screen mesh and hardware. New screen door shall be same material and color as
                                existing.
                                Screen door size: up to 2.0m²/(EA)
B702BL   Replace aluminum       The Contractor shall remove existing and provide new sliding, double hung or fixed type          30   EA
         window                 aluminum window with hardware, glass, aluminum window frame, wooden trims and
                                restoration of wall and floor around window, New window shall be same material and
                                color as existing. Window size: up to 2.0m²/(EA)
B702BM   Replace aluminum       The Contractor shall remove exiting and provide new aluminum framed screen window                50   EA
         screen window          with insect screen mesh and hardware. New screen window shall be same material and
                                color as exiting.
                                Screen window size: up to 2.0m²/(EA)
                                                                            J-0200000-07 Page 46
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                              QTY       ISSUE     PRICE ¥   AMOUNT ¥
B702BN   Adjust and refit door The Contractor shall adjust and refit door lock, knob, hinge or latch, including retighten or     1,000    EA
                               replace missing screws. Unit: No. of door (including accordion door)
B702BP   Replace door face       The Contractor shall remove existing and provide new plywood or printed plywood door           100     SH
         sheet on one side of    face sheet on one side of door. New printed plywood door face sheet shall be same
         door                    material and color as existing. Door size: up to 2.0m²/(SH)
B702BQ   Replace threshold       The Contractor shall remove existing and provide new wood or metal threshold of door.           20     LM
         of door                 New threshold shall be same material and color as existing.
B702BR   Replace wooden          The Contractor shall remove existing and provide new wooden door frame, including               30     LM
         door frame              wooden trims and restoration of wall and floor around door frame
B702BS   Replace wooden          The Contractor shall remove existing and provide new wooden trim on door or window              80     LM
         trim on door or         frame
         window frame
B702BT   Repair wooden door      The Contractor shall repair wooden door frame with wooden piece and putty                       30     LM
         frame
B702BU   Install weather strip   The Contractor shall prepare surfaces and provide new weather strip around door or             200     LM
         around door or          window. New weather strip shall be same material and color as others.
         window
B702BV   Replace aluminum        The Contractor shall remove existing and provide new aluminum weather strip for bottom          20     EA
         weather strip for       of door. New weather strip shall be same material and color as existing.
         bottom of door.
B702BW   Replace insect          The Contractor shall remove existing and provide new insect screen mesh with new             1,500     SM
         screen mesh             gaskets of screen door or window. New insect screen mesh shall be same material and
                                 color as existing.
B702BX   Replace glass pane The Contractor shall remove existing and provide new float, figured, wired or safety glass           50     SM
                            pane, including gasket or caulking around glass. New glass pane shall be same material
                            and color as existing.
B702BY   Replace safety          The Contractor shall remove existing and provide new safety double glass pane,                  20     SM
         double glass pane       including inner film or dry air between glass panes, and gasket or caulking around glass.
                                 New glass pane shall be same material and color as existing.
B702BZ   Replace door lock       The Contractor shall remove existing and provide new door lock with door knob, interior         10     EA
                                 or exterior, cylinder or mortise lock type or "sora-joh" type. New door lock shall be same
                                 material and color as existing.
                                                                              J-0200000-07 Page 47
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                           QTY       ISSUE     PRICE ¥   AMOUNT ¥
B702CA   Replace door lock     The Contractor shall remove existing door lock and provide new privacy door lock with             10    EA
         with privacy door     door knob, which has release system by using pin from outside for emergency, like a
         lock                  door lock for bathroom use, in Master bed room. Line item shall include repair of door for
                               new door lock, replacement of strike and repair of door frame for new strike. New door
                               lock shall be same material and color as others.
B702CB   Replace door knob     The Contractor shall remove existing and provide new door knob or handle on closet               100   EA
         or handle on closet   door. New door knob and handle shall be same material and color as existing
         door
B702CC   Replace pull handle   The Contractor shall remove existing and provide new pull handle for screen door. New             10   EA
         for screen door.      pull handle shall be same material and color as existing.
B702CD   Replace latch on      The Contractor shall remove existing and provide new latch on screen door. New latch              20   EA
         screen door           shall be same material and color as existing.

B702CE   Replace window or     The Contractor shall remove existing and provide new window or sliding door latch,               100   EA
         sliding door latch,   Crescent, screw-in or dead bolt type. New latch shall be same material and color as
         Crescent, screw-in    existing.
         or dead bolt type

B702CF   Replace door          The Contractor shall remove existing and provide new door stopper, Floor mount,                   50   EA
         stopper               baseboard mount or door top mount type. New door stopper shall be same material and
                               color as existing.
B702CG   Replace floor type    The Contractor shall remove existing and provide new floor type stopper for heavy duty            30   EA
         stopper for hevy      door type. New door stopper shall be same material and color as existing.
         duty door type.
B702CH   Replace sheave        The Contractor shall remove existing and provide new sheave ("TOGURUMA") of sliding              100   EA
         ("TOGURUMA") of       door or window. New sheave shall be same material and color as existing.
         sliding door or
         window
B702CJ   Replace door hinge The Contractor shall remove existing and provide new door hinge, Stainless steel or                  10   EA
                            brass. New door hinge shall be same material and color as existing.
B702CK   Replace door hinge, The Contractor shall remove existing and provide new door hinge, single or double acting            10   EA
         single or double    spring hinge. New door hinge shall be same material and color as existing.
         acting spring hinge

                                                                           J-0200000-07 Page 48
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY       ISSUE     PRICE ¥   AMOUNT ¥
B702CL   Replace door hinge The Contractor shall remove existing and provide new door hinge on folding door or                   100    EA
         on folding door or closet door. New door hinge shall be same material and color as existing.
         closet door

B702CM   Replace top or        The Contractor shall remove existing and provide new top or bottom guide rail for double           20   EA
         bottom guide rail for folding door. New rail shall be same material and color as existing. Rail size (L): up to
         double folding door 1,800 mm/(EA).

B702CN   Replace top or       The Contractor shall remove existing and provide new top or bottom guide pin for double             30   EA
         bottom guide pin for folding door. New guide pin shall be same material and color as existing.
         double folding door.

B702CP   Replace round     The Contractor shall remove existing and provide new round plastic vent on closet door.                50   EA
         plastic vent on   New round plastic vent shall be same material and color as existing. Size: up to 40mm
         closet door       Dia.
B702CQ   Replace wooden    The Contractor shall remove existing and provide new wooden louver in wooden door.                      5   EA
         louver in wooden  New louver shall be same material and color as existing. Louver size: up to (W) 600 x
         door              (H) 250 mm.
B702CR                     The Contractor shall remove existing and provide new door closer. New door closer shall
         Replace door closer                                                                                                      20   EA
                           be same material and color as existing.
B702CS   Replace pneumatic The Contractor shall remove existing and provide new pneumatic door closer of screen                   10   EA
         hydraulic door    door. New door closer shall be same material and color as existing.
         closer of screen
         door
B702CT   Replace chain and      The Contractor shall remove existing and provide new chain and its lock set on door,              20   EA
         its lock set on door   Stainless steel. New chain and lock set shall be same material and color as existing.
B702CU   Replace swing latch    The Contractor shall remove existing and provide new swing latch for door. New latch              20   EA
         for door.              shall be same material and color as existing.
B702CV   Replace peephole       The Contractor shall remove existing and provide new peephole in entrance door. New               10   EA
         in entrance door       peephole shall be same material and color as existing.

B702CW   Replace venetian       The Contractor shall remove existing and provide new venetian blind. One-side                      5   EA
         blind, 6.0m²/(EA)      operation, Aluminum slat: (W)25mm, curbed, color: white.
                                Window opening size: over 4.0m² and up to 6.0m²/(EA)
                                                                            J-0200000-07 Page 49
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                            QTY       ISSUE     PRICE ¥   AMOUNT ¥
B702CX   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                     500    EA
         blind, 4.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: over 2.0m² and up to 4.0m²/(EA)
B702CY   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                     300    EA
         blind, 2.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: over 1.0m² and up to 2.0m²/(EA)
B702CZ   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                      50    EA
         blind, 1.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: up to 1.0m²/(EA)
B702DA   Replace loose or      The Contractor shall remove existing loose or broken parts (cord, slat, pully, ladder tape      3,500    EA
         broken parts of       and other parts) of venetian blind, and provide new one. New parts shall be same
         venetian blind.       material and color as existing.
B702DB   Replace vertical      The Contractor shall remove existing and provide new vertical blind. Aluminum slat:               100    EA
         blind                 (W)50mm or 100mm, color: white.
                               Window opening size: up to 6.0m²/(EA)
B702DC   Replace loose or      The Contractor shall remove existing loose or broken parts (cords, slat, pully, drawstrings     2,000    EA
         broken parts of       and other parts) of vertical venetian blind, and provide new one. New cord and
         vertical venetian     drawstring shall be same material and color as existing.
         blind.
B702DD   Replace twisted       The Contractor shall remove twisted shaft of vertical blind, and provide new one. New            5      EA
         shaft of vertical     shaft shall be same material and color as existing. Size: up to (L)4,000mm/(EA).
         blind
B702DE   Replace curtain or    The Contractor shall remove existing and provide new curtain or clothes hanging rod,            15      ST
         clothes hanging rod   including brackets and/or rings, Stainless steel. New rod shall be same material and
                               color as existing. Size: up to 40mm Dia.
B702DF   Install/Replace       The Contractor shall remove existing and provide new curtain rail with hung brackets,           20      ST
         curtain rail          unit: Length for curtain rail. New rail shall be same material and color as existing. This
                               item may not include removal of existing.
B702DG   Adjust and refit      The Contractor shall adjust and refit curtain rod/rail or handrail or cloth hanging rod,        15      ST
         curtain rod/rail or   including retighten or replacement of loose or missing screws.
         handrail or cloth
         hanging rod
                                                                             J-0200000-07 Page 50
                                                                                                                                         RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                        EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                        QTY     ISSUE     PRICE ¥   AMOUNT ¥
B702DH   Replace accordion    The Contractor shall remove existing and provide new accordion curtain door with rails,      30    EA
         curtain door         door handle, door catch and hardware. Fire-retardant vinyl facing. New curtain door
                              shall be same material and color as existing.
                              Size: up to 5.0 m²/(EA),
B702DJ   Replace facing       The Contractor shall remove existing facing sheet from counter top or cabinet, prepare      200    SM
         sheet of counter top surfaces and provide new facing sheet of melamine decorative sheet, printed plywood or
         or cabinet           stainless steel sheet. New facing sheet shall be same material and color as existing.

B702DK   Replace kitchen or  The Contractor shall remove existing and provide new kitchen wall hung cabinet,             20     EA
         laundry wall hung   including restoration of ceiling and wall around cabinet. New cabinet shall be same
         cabinet             material and color as existing.
                             Cabinet size: up to (W)2000 x (H)1000 x (D)450mm
B702DL   Replace kitchen     The Contractor shall remove existing and provide new kitchen base cabinet with counter      20     EA
         base cabinet        top, including restoration of floor and wall around cabinet. New cabinet shall be same
                             material and color as existing.
                             Cabinet size: up to (W)2000 x (H)1000 x (D)650mm
B702DM   Replace lavatory    The Contractor shall remove existing and provide new lavatory sink cabinet with related     20     EA
         sink cabinet        accessories, including reinstallation of existing wash basin. New cabinet shall be same
                             material and color as existing.
                             Cabinet size: up to 1450mm wide
B702DN   Replace mirror      The Contractor shall remove existing and provide new mirror. New mirror shall be same       10     EA
                             material and color as existing. Mirror size: up to 2.0m²/(EA). This item may be used for
                             new provision (size up to 2.0m²/(EA))
B702DP   Replace shelf board The Contractor shall remove existing and provide new shelf board of cabinet. New shelf      30     EA
         of cabinet          board shall be same material and color as existing. Size: up to 0.5m²/(EA)

B702DQ   Replace bracket or   The Contractor shall remove existing and provide new bracket or pin of shelf board. New    50     EA
         pin of shelf board   bracket shall be same material and color as existing.

B702DR   Replace cabinet     The Contractor shall remove existing and provide new cabinet door, including hardware.      20     EA
         door                New cabinet door shall be same material and color as existing. Door size: up to
                             1.0m²/(EA)
B702DS   Replace closet door The Contractor shall remove existing and provide new closet door, including hardware.       50     EA
                             New closet door shall be same material and color as existing. Door size: up to
                             2.0m²/(EA)
B702DT   Replace cabinet     The Contractor shall remove existing and provide new cabinet door hinge. New door           20     EA
         door hinge          hinge shall be same material and color as existing.
                                                                          J-0200000-07 Page 51
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION             FULL DESCRIPTION                                                                        QTY       ISSUE     PRICE ¥   AMOUNT ¥
B702DU   Replace cabinet         The Contractor shall remove existing and provide new cabinet drawer, including                 20    EA
         drawer                  hardware. New drawer shall be same material and color as existing. Unit: No, of drawer.

B702DV   Replace door knob The Contractor shall remove existing and provide new door knob or handle on cabinet                  30   EA
         or handle on        door/drawer. New door knob and handle shall be same material and color as existing.
         cabinet door/drawer


B702DW   Replace magnet or The Contractor shall remove existing and provide new magnet or roller catcher. New                   50   EA
         roller catcher    magnet and roller catch shall be same material and color as existing.

B702DX   Replace corrugated      The Contractor shall remove existing and provide new corrugated FRP terrace roofing,          100   SM
         FRP terrace roofing,    carport acrylic panel and backyard polycarbonate panel. New material shall be same
         carport acrylic panel   material and color as existing. Line item shall include scaffolding installation and
         and backyard            removal.
         ploycarbonate
         panel.


B702DY   Replace wood,        The Contractor shall remove existing and provide new wood, stainless steel, brass or              20   LM
         stainless steel,     vinyl handrail of stairway, including brackets. New handrail shall be same material and
         brass or vinyl       color as existing.
         handrail of stairway

B702DZ   Repair spall, crack     The Contractor shall repair spall, crack or broken concrete or mortar surfaces                 40   SM
         or broken concrete
         or mortar surfaces
B702EA   Replace PVC gutter The Contractor shall remove existing and provide new PVC gutter, including brackets.               100   LM
                            New gutter shall be same material and color as existing. Line item shall include
                            scaffolding installation and removal.
B702EB   Replace downspout The Contractor shall remove existing and provide new PVC downspout or                               200   LM
                            carport/backyard terrace downspout, including brackets. New downspout shall be same
                            material and color as existing. Line item shall include scaffolding installation and
                            removal.
B702EC   Repair/refit gutter,    The Contractor shall repair/refit gutter, downspout and accessories. Line item shall          100   LM
         downspout and           include scaffolding installation and removal.
         accessories
                                                                              J-0200000-07 Page 52
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                             QTY      ISSUE     PRICE ¥   AMOUNT ¥
B702ED   Replace chain-link The Contractor shall remove existing and provide new chain-link or steel mesh fence                 40    LM
         or steel mesh fence including concrete foundation and restoration of surrounding area. New fence shall be
                             same structure, material and color as existing. Fence height: up to 1.5m
B702EE   Replace panel of     The Contractor shall remove existing steel or aluminum "MEKAKUSHI" fence and provide              40   LM
         "MEKAKUSHI"          new same material fence (Up to 1,800mmH). New panel shall be same material and
         fence                color as existing.
B702EF   Replace door of      The Contractor shall remove existing and provide new single door of aluminum or steel              5   EA
         MEKAKUSHI" or        "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New door shall be same material
         steel mesh fence     and color as existing.
B702EG   Replace latch,       The Contractor shall remove existing and provide new latch, hinge, knob or stopper of             20   EA
         hinge, knob or       aluminum or steel "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New latch,
         stopper of           knob and stopper shall be same material and color as existing.
         "MEKAKUSHI" or
         steel mesh fence

B702EH   Replace cap or joint The Contractor shall remove existing and provide new cap or joint of aluminum or steel            20   EA
         of "MEKAKUSHI" "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New cap and joint shall be same
         or steel mesh fence material and color as existing.


B702EJ   Replace cap or joint The Contractor shall remove existing and provide new cap or joint for carport or backyard         50   EA
         for carport or       terrace. New cap and joint shall be same material and color as existing. Line item shall
         backyard terrace     include scaffolding installation and removal.
B702EK   Replace vent cap or The Contractor shall remove existing and provide new vent cap or natural vent screen on            10   EA
         air vent screen     exterior wall. New vent shall be same material and color as existing. Vent size: up to
                             0.5m²/(EA) Height less than 6 meters.
B702EL   Adjust and refit    The Contractor shall adjust and refit metal storage shed, including roof, wall, doors,             20   EA
         metal storage shed brackets, handle/lock, guide rail, floor, hardware, shelves, and retighten or replacement
                             of loose or missing fasteners, Unit: No. of metal storage shed
                                                                          J-0200000-07 Page 53
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST     UNIT OF    UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                          QTY     ISSUE      PRICE ¥   AMOUNT ¥
B702EM   Replace FRP water-     The Contractor shall remove existing and provide new FRP water-proof coating of fish          200    SM
         proof coating,         pond and highrise balcony (Bldg. 3101 and 3102) and apply finish coatings. Line item
         mortar or concrete     shall include temporary relocation and keeping of fishes during repair work of fish pond,
                                and return of them with proper treatment after completion of work and necessary curing
                                time. This item shall also include; chip out and remove damaged portions, prepare
                                surfaces and apply adhesive, and provide new water-proof mortar or concrete under FRP
                                coating of fish pond and balcony. Pond/balcony area: up to 100m²/(EA)

B702EN   Replace bird           The Contractor shall remove existing and provide new bird protection net with fasteners          50    EA
         protection net         and main rope, at balcony of Hi-rise. New bird protection net shall be same material and
                                color as existing. Opening area: up to 14.0m²/(EA) New provision (without removal) may
                                be ordered.
B702EP   Refinish bathtub       The Contractor shall remove all scratches and scores, and refinish bathtub in accordance         50    SM
         coating                with manufacturer's recommended method.
B702EQ   Repair surface of      The Contractor shall repair surfaces of artificial polyester or acrylic type counter in          50    SM
         polyester or acrylic   accordance with Attachment J-1502000-03.
         counter
B702ER   Replace kitchen        The Contractor shall remove existing and provide new kitchen counter. The counter shall           3    Set
         counter stainless,     be same material as existing.
         marble, polyester
B702ES   Replace inspection     The Contractor shall remove existing and provide new inspection panel for bathtub. New           10    EA
         panel for bathtub.     inspection panel shall be same material and color as existing.

B702ET   Repair, adjust and     The Contractor shall repair, adjust and refit cabinet door or drawersr, so the cabinet door    4,000   EA
         refit cabinet door     and drawer can open and close smoothly as originally intended. (1 door or 1 drawer is
         and drawers            counted as 1 EA.)
B702EU   Repair nail holes on The Contractor shall repair surfaces of wall or door that has been damged by nail. The           3,000   EA
         wall or door         nail holes shall become imvisible, and the the wall or door surface shall look smooth. (1
                              door or 1 SM wall is counted as 1 EA.)
B702EV   Adjust and refit       The Contractor shall adjust and refit hardwre on wall, floor and door (loose screws, outlet,   3,000   EA
         hardware on wall,      door stopper, plumbing fixture, faucets, etc.) (1 door or 1 SM wall/floor is counted as 1
         floor and door         EA.)
B702EW   Replace caulking or    The Contractor shall replace existing caulking or cement for joint with new.                   1,000   LM
         cement for joint
                                                                               J-0200000-07 Page 54
                                                                                                                                                    RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST     UNIT OF        UNIT         TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                            QTY     ISSUE          PRICE ¥      AMOUNT ¥
B702EX   Replace house         The Contractor shall remove existing house number plate and shall provide new number            100    EA
         number plate          plate (metal or plastic), same size, color and material as existing, with number printed on
                               the plate. The number shall bear severe weather condition.
B702EY   Replace towel ring    The Contractor shall replace existing towel ring or bar with new, same or similar model in       20    EA
         or bar                bathroom.

                                                                                                                          Sub Total, B702 (B702AA - B702EY):

B703     Electrical work
B703AA   Replace light         The Contractor shall replace existing light fixture with same or similar model,                      200    EA
         fixture               Typical light fixtures are as follows:
                               Waterproof or indoor use, ceiling, wall, flush, or pendant mount type with
                               globe/cover/diffuser, incandescent or fluorescent light, and typical lamp size, and voltage
                               as indicated Attachment J-1502000-03 or reference drawings.
B703AB   Replace ceiling        The Contractor shall replace existing ceiling fan/light fixture with new type of the ceiling         50    EA
         fan/light fixture with fan/light fixture in accordance with Attachment J-1502000-03. New ceiling fan/light fixture
         new material           shall be same or similar model as others.
B703AC   Replace exit light    The Contractor shall replace existing exit light and fixture with same or similar model.              20    EA
         and fixture           Typical exit lights are as follows:
                               Waterproof or indoor use, ceiling or wall mount type with acrylic direction cover and
                               battery, fluorescent light 1-10W or 1-20W.

B703AD   Replace               The Contractor shall replace existing globe/diffuser of light fixture. The replacement                50    EA
         globe/diffuser of     globe/diffuser shall be same type and compatible with existing light fixture.
         light fixture
B703AE   Replace fluorescent The Contractor shall replace existing fluorescent light bulb includes starter lamp.                    600    EA
         light bulb includes
         starter lamp

B703AF   Replace pull switch The Contractor shall replace pull switch and cord of light fixture with same or similar                 50    EA
         and cord of light    model.
         fixture
B703AG   Replace cover plate The Contractor shall replace cover plate for outlet or switch with same or similar model.              200    EA
         for outlet or switch
         or CATV

                                                                             J-0200000-07 Page 55
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY       ISSUE     PRICE ¥   AMOUNT ¥
B703AH   Replace tumbler or The Contractor shall replace tumbler or dimmer switch or bathroom timer switch with                   50    EA
         dimmer switch      same or similar model.
B703AJ   Replace electrical   The Contractor shall replace electrical outlet with same or similar model.                          50   EA
         outlet
B703AK   Replace chime,       The Contractor shall replace chime, buzzer, or push button with same or similar model.              10   EA
         buzzer, or push
         button
B703AL   Replace ballast of   The Contractor shall replace ballast of fluorscent light with new one.                              50   EA
         fluorscent light
B703AM   Replace home type The Contractor shall replace home type smoke detector (house-wired or battery-                         30   EA
         smoke detector    powered) with same or similar model. New battery shall also be provided for battery-
                           powered type.
B703AN   Replace CATV/FM      The Contractor shall replace CATV/FM outlet and outlet cover with same or similar                   50   EA
         outlet               model.
B703AP   Replace              The Contractor shall remove existing incandescent light bulb and provide new compact               200   EA
         incandescent light   fluorescent light.
         bulb to compact
         fluorescent light
B703AQ   Replace batteries    The Contractor shall replace battery for smoke detector with new, 9V.                              200   EA
         for GFM smoke
         detector
B703AR   Replace toggle       The Contractor shall replace toggle switch including plates with same or similar model.            100   EA
         switch


                                                                                                                    Sub Total, B703 (B703AA - B703AR):

B704     Mechanical work
B704AA   Replace washbasin The Contractor shall replace washbasin or slope sink or lavatory sink including pipe                   30   EA
         or lavatory sink  fittings with same or similar model.


B704AB   Replace commode      The Contractor shall replace commode (water closet), including seat, lid and fittings with          20   EA
                              same or similar model.
B704AC   Replace seat of      The Contractor shall replace toilet seat and lid of commode with same or similar model.            100   EA
         commode
                                                                            J-0200000-07 Page 56
                                                                                                                                                 RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
B704AD   Replace low tank of The Contractor shall replace low tank, including lid and fittings, with same or similar                5    EA
         commode             model.
B704AE   Replace lid of low    The Contractor shall replace low tank lid and fittings with same or similar model.                   5   EA
         tank
B704AF   Replace low tank      The Contractor shall replace flush valve for low tank with same or similar model.                    5   EA
         valve
B704AG   Replace paper         The Contractor shall replace toilet paper holder with same or similar model.                        20   EA
         holder
B704AH   Replace plastic bar   The Contractor shall replace plastic bar of toilet paper holder.                                    30   EA
         of paper holder

B704AJ   Replace lavatory      The Contractor shall replace lavatory with base cabinet unit, including pipe fittings with          30   EA
         with cabinet          same or similar model.
B704AK   Replace plug and      The Contractor shall replace plug and chain for lavatory sink with same or similar model.           30   EA
         chain for lavatory
         sink
B704AL   Replace medicine      The Contractor shall replace medicine cabinet (single, double or three mirror type),                50   EA
         cabinet               including restoration of wall to fit new cabinet, necessary wiring to light fixture mounted
                               on the new cabinet and furnishing of light/bulb, and remove old wall mounted fixture, with
                               same or similar model.
B704AM   Replace mirror of     The Contractor shall replace mirror of medicine cabinet with same or similar model.                 10   EA
         medicine cabinet
B704AN   Repair medicine       The Contractor shall repair medicine cabinet, including light fixture cover, door and               50   EA
         cabinet               accessories.
B704AP   Replace bathtub       The Contractor shall replace bathtub, including hardware, with same or similar model.               10   EA

B704AQ   Replace bathtub       The Contractor shall replace bathtub drain pipe with direct flow (in-line) type fitting,            10   EA
         drain pipe            including dismount/remount bathtub.
B704AR   Replace shower        The Contractor shall replace shower head with same or similar model.                                20   EA
         head
B704AS   Replace hand          The Contractor shall replace shower head and hose with same or similar model.                       50   EA
         shower head and
         hose
B704AT   Repair or adjust      The Contractor shall repair or adjust shower/faucet mixing valve.                                   50   EA
         shower/faucet
         mixing valve.
                                                                              J-0200000-07 Page 57
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                             QTY       ISSUE     PRICE ¥   AMOUNT ¥
B704AU   Replace hose of    The Contractor shall replace hose of hand shower with same or similar model.                        30    EA
         hand shower
B704AV   Replace bar type   The Contractor shall replace bar type shower head holder with same or similar model.                10   EA
         shower head holder

B704AW   Replace robe hook     The Contractor shall replace robe hook with same or similar model.                               10   EA

B704AX   Replace grip bar for The Contractor shall replace grip bar for bathtub with same or similar model.                     10   EA
         bathtub
B704AY   Replace towel rack The Contractor shall replace towel rack with same or similar model.                                 10   EA

B704AZ   Replace soap dish     The Contractor shall replace soap dish with same or similar model.                                5   EA

B704BA   Replace faucet        The Contractor shall replace hose faucet, garden faucet, bath faucet, mixing faucet or           20   EA
                               mixing valve, including handles or lever, with same or similar model.
B704BB   Replace handle of     The Contractor shall replace handle or lever of faucet with same or similar model.               20   EA
         mixing faucet
B704BC   Replace packing for The Contractor shall replace packing for faucet or valve.                                         500   EA
         faucet or valve
B704BD   Replace             The Contractor shall replace combination stopper of washbasin, lavatory or bathtub with            10   EA
         combination stopper same or similar model.

B704BE   Replace mixing        The Contractor shall replace mixing faucet for kitchen sink (individual handles,                 20   EA
         faucet for kitchen    combination type) with same or similar model.
         sink
B704BF   Check and repair as   The Contractor shall check and repair as necessary all plumbing works (hot & cold water         100   LM
         necessary all         supply, drainage, faucet and shower).
         plumbing works
B704BG   Remove foreign        The Contractor shall remove foreign matter and repair clogged drain pipe connected to            50   EA
         matter and repair     either commode, lavatory, bathtub or kitchen sink.
         clogged drain pipe

B704BH   Replace non-        The Contractor shall replace non-asbestos insulation on water/heater pipe with new                100   LM
         asbestos insulation similar material.
         on pipe
B704BJ   Repair sink faucet The Contractor shall repair sink faucet assembly.                                                   30   EA
         assembly
                                                                            J-0200000-07 Page 58
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT         TOTAL
ELIN     DESCRIPTION             FULL DESCRIPTION                                                                            QTY       ISSUE     PRICE ¥      AMOUNT ¥
B704BK   Replace kitchen         The Contractor shall replace kitchen sink with same or similar model.                               3    EA
         double sink
B704BL   Repair piping under     The Contractor shall repair piping under kitchen sink or washbasin with similar material.          20    EA
         kitchen sink or
         washbasin
B704BM   Replace kitchen         The Contractor shall replace kitchen ventilation hood in kitchen with same or similar              10    EA
         ventilation hood        model.
B704BN   Replace exhaust         The Contractor shall replace exhaust fan, ceiling or wall mounted type, with same or               20    EA
         fan                     similar model.
B704BP   Replace grease          The Contractor shall replace grease filter of range hood fan with same or similar model.          100    EA
         filter of range hood
         fan
B704BQ   Replace screen          The Contractor shall replace screen filter of exhaust fan with same or similar model.              10    EA
         filter of exhaust fan

B704BR   Replace vent cover The Contractor shall replace vent cover with grille for dryer's exhaust pipe.                           10    EA
         with grill for dryer

B704BS   Replace heat-pump       The Contractor shall replace heat-pump type air conditioner (both indoor and outdoor               50    EA
         type A/C                unit) with same or similar model.
B704BT   Replace pipe            The Contractor shall replace pipe insulation cover for heat pump AC with new same or               30    ST
         insulation cover for    similar material to ensure proper and energy efficient operation and function of AC. (All
         heat pump AC            pipe insulation cover for one heat pump AC unit is counted as 1 ST.)



                                                                                                                         Sub Total, B704 (B704AA - B704BT):

                                                                              J-0200000-07 Page 59
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY         ISSUE     PRICE ¥   AMOUNT ¥
B705     Whole Unit Cleaning
B705AA   Whole Unit         The Contractor shall perform whole unit cleaning.                                                     60      UN
         Cleaning, Atsugi,  The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 2-
         Bedroom Unit
B705AB   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   50      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 3-
         Bedroom Unit
B705AC   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   20      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 4-
         Bedroom Unit
B705AD   Whole Unit           The Contractor shall perform whole unit cleaning.                                                  120      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         High-rise, 2-
         Bedroom Unit
B705AE   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   80      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         High-rise, 3-
         Bedroom Unit
B705AF   Whole Unit           (Note: At the time of contract award, this item is reserved for future use. Amount                   (Max Amount)                  4,736,000
         Cleaning, Atsugi,    indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         High-rise, 4-        determined later by contract modification.) The Contractor shall perform whole unit
         Bedroom Unit         cleaning. The Contractor shall ensure that FH unit is clean, sanitary and sightly.
B705AG   Whole Unit           The Contractor shall perform whole unit cleaning.                                                    2      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         SOQ
B705AH   Whole Unit           The Contractor shall perform whole unit cleaning.                                                    2      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse in SOQ
         Area, 3-Bedroom

B705AJ   Whole Unit        The Contractor shall perform whole unit cleaning.                                                       3      UN
         Cleaning, Atsugi, The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse in SOQ
         Area, 4-Bedroom
                                                                                                                    Sub Total, B705 (B705AA - B705AJ):
                                                                            J-0200000-07 Page 60
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                              EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                               QTY         ISSUE     PRICE ¥   AMOUNT ¥
B706     Cleaning work
B706AA   Clean and wax floor The Contractor shall clean and wax floor to ensure clean, sanitary and sightly condition.         2,000      SM

B706AB   Deep clean carpet     The Contractor shall deep clean carpet and rug to ensure clean, sanitary and sightly            1,000      SM
         and rug               condition. The Government may direct cleaning method such as sampooing, steam
                               cleaning, dry cleaning or other similar deep cleaning processes.
B706AC   Clean concrete and    The Contractor shall clean concrete and tiled floor to ensure clean, sanitary and sightly       1,000      SM
         tiled floor           condition.
B706AD   Clean tile and        The Contractor shall clean tile and washable wall to ensure clean, sanitary and sightly            500     SM
         washable wall         condition.
B706AE   Clean exterior wall   The Contractor shall clean exterior wall surfaces to ensure clean, sanitary and sightly            500     SM
                               condition.
B706AF   Clean stainless       The Contractor shall clean and polish stainless steel sink and counter to ensure clean,             30      EA
         steel sink and        sanitary and sightly condition..
         counter
B706AG   Clean dryer vent      The Contractor shall clean dryer vent line with fan to ensure clean, sanitary and sightly          200      EA
         line with fan         condition and propler operation and function of dryer. The Contractor shall clean from
                               dryer to duct connection (if vertical duct exhaust fan system is used) or to exterior wall
                               hood.
B706AH   Clean gutter and      The Contractor shall clean gutter and downspout to ensure clean, sanitary and sightly              700      LM
         downspout             condition and proper original intended function of gutter and downspount. All the foreign
                               materials shall be removed. Line item shall include scaffolding installation and removal.

B706AJ   Clean canopy          The Contractor shall clean canopy including gutter and downspout to ensure clean,                  600     SM
                               sanitary and sightly condition. Above B706AH shall also be applied for gutter and
                               downspout. Line item shall include scaffolding installation and removal.
B706AK   Mini cleaning         The Contractor shall perform Mini cleaning to ensure clean, sanitary and sightly                    30      UN
                               condition.

B706AL   Grass cutting         The Contractor shall cut grass (including but not limited to turf, weed, vines, and other      10,000      SM
                               unwanted vegetations) to uniform height of 2 inches to maintain grass healthy condition
                               and appearance.
                                                                            J-0200000-07 Page 61
                                                                                                                                       RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                    EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION    FULL DESCRIPTION                                                                          QTY       ISSUE     PRICE ¥   AMOUNT ¥
B706AM   Sodding        The Contractor shall provide sod, Anti Weeds Type Sod (Saint Augustine Grass II or            3,000    SM
                        Modified Centipede Grass) species unless otherwise specified. It shall be dense,
                        uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid
                        on properly prepared topsoil. Sod joints shall be staggered and butted together. On
                        slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed
                        installation shall be smooth and uniform in appearance. The Contractor shall water and
                        provide continuing care for sodded areas as necessary to firmly establish new grass
                        growth and development. The Contactor shall replace all grass that dies or fails to
                        develop noticeable growth within 90 days of sodding at no additional cost to the
                        Government.


                                                                                                           Sub Total, B706 (B706AA - B706AM):



                                                                                   TOTAL OF FIRST OPTION PERIOD, B700 THROUGH B706AM:




                                                                    J-0200000-07 Page 62
                                                                                                                                                        RFP N40084-10-R-8709

                                                           ATTACHMENT J-0200000-07
                                                          EXHIBIT LINE ITEM NUMBERS
                                                   SOLICITATION/CONTRACT #N40084-10-R-8709
                                                             EXHIBIT C - CLIN 0003

Line Item 0003   Second Option Period - Indefinite Delivery Indefinite Quantity Work

PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs C700 through C706

NAME OF OFFEROR OR CONTRACTOR:
          SHORT                                                                                                                   EST        UNIT OF   UNIT      TOTAL
ELIN      DESCRIPTION      FULL DESCRIPTION                                                                                       QTY        ISSUE     PRICE ¥   AMOUNT ¥
C700      Change of Occpancy Maintenance (COM)
C700AA    COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                     10      UN
          Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
          Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
          (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
          Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                                work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                                to the Government immediately. In such case, applicable IDIQ work item or another
                                contract will be issued.
                                The Contractor shall ensure that FH unit is fully functional with all equipments and
                                fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                                smudges, streaks and foreign matter, and debris.
C700AB    COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                     30      UN
          Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
          Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
          (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
          2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                                work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                                to the Government immediately. In such case, applicable IDIQ work item or another
                                contract will be issued.
                                The Contractor shall ensure that FH unit is fully functional with all equipments and
                                fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                                smudges, streaks and foreign matter, and debris.

                                                                               J-0200000-07 Page 63
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
C700AC   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   35    UN
         Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

C700AD   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    8   UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

C700AE   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   10   UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                              J-0200000-07 Page 64
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
C700AF   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   32    UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

C700AG   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    3   UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

C700AH   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                    4   UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                              J-0200000-07 Page 65
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
C700AJ   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   13    UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


C700AK   COM, Atsugi, High- This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                      15   UN
         rise, 2-Bedroom    period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied Lessincluding all equipments, fixtures and interior conditions, and shall perform the COM work
         Than 1 Year)       items listed in Attachment J-1401000-04. When the Contractor found the work item need
                            to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
C700AL                      This item applies to the FH unit in which Quantitly LImitation, the less than 1 year
         COM, Atsugi, High- work ELIN list, or which exceeds specifiedthe last occuapnt stayed Contractor shall report               35   UN
         rise, 2-Bedroom    period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied 1   including all equipments, fixtures and interior conditions, and shall perform the COM work
         Year to 2 Years)   items listed in Attachment J-1401000-04. When the Contractor found the work item need
                            to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                            work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                            to the Government immediately. In such case, applicable IDIQ work item or another
                            contract will be issued.
                            The Contractor shall ensure that FH unit is fully functional with all equipments and
                            fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                            smudges, streaks and foreign matter, and debris.


                                                                             J-0200000-07 Page 66
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
C700AM   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt more than 2 year period. The              70    UN
         rise, 2-Bedroom       Contractor shall participate in deficiency inspection and inspect FH unit including all
         Unit (Occupied        equipments, fixtures and interior conditions, and shall perform the COM work items listed
         More Than 2 Years)    in Attachment J-1401000-04. When the Contractor found the work item need to be
                               adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work
                               item list, or which exceeds specified Quantitly LImitation, the Contractor shall report to
                               the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

C700AN   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   15   UN
         rise, 3-Bedroom       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied Less   including all equipments, fixtures and interior conditions, and shall perform the COM work
         Than 1 Year)          items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

C700AP   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   15   UN
         rise, 3-Bedroom       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied 1      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Year to 2 Years)      items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                              J-0200000-07 Page 67
                                                                                                                                                    RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                EST      UNIT OF   UNIT        TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥     AMOUNT ¥
C700AQ   COM, Atsugi, High-   This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   50    UN
         rise, 3-Bedroom      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied       including all equipments, fixtures and interior conditions, and shall perform the COM work
         More Than 2 Years)   items listed in Attachment J-1401000-04. When the Contractor found the work item need
                              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.


C700AR   COM, Atsugi, High- (Note: At the time of contract award, this item is reserved for future use. Amount                       (Max Amount)                 21,000,000
         rise, 4-Bedroom    indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         Unit               determined later by contract modification.) The Contractor shall inspect FH unit including
                            all equipments, fixtures and interior conditions, and shall perform the COM work items
                            listed in Attachment J-1401000-07 (ATSUGI/KAMISEYA). When the Contractor found
                            the work item need to be adjusted, maintained, repaired and/or replaced, and which is
                            not listed in the COM work item list, the Contractor shall report to the Government
                            immediately. In such case, applicable IDIQ work item or another contract will be issued.
                            The Contractor shall ensure that FH unit is fully functional with all equipments and
                            fixtures, and is in quality conditions.


C700AS   COM, Atsugi, SOQ     This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    2   UN
         (Occupied Less       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Than 1 Year)         including all equipments, fixtures and interior conditions, and shall perform the COM work
                              items listed in Attachment J-1401000-04. When the Contractor found the work item need
                              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.


                                                                             J-0200000-07 Page 68
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥   AMOUNT ¥
C700AT   COM, Atsugi, SOQ      This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         (Occupied 1 Year to   period. The Contractor shall participate in deficiency inspection and inspect FH unit
         2 Year)               including all equipments, fixtures and interior conditions, and shall perform the COM work
                               items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

C700AU   COM, Atsugi, SOQ      This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   2   UN
         (Occupied More        period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Than 2 Years)         including all equipments, fixtures and interior conditions, and shall perform the COM work
                               items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


C700AV   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied Less   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


                                                                              J-0200000-07 Page 69
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥   AMOUNT ¥
C700AW   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied 1      items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Year to 2 Years)      to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

C700AX   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         More Than 2 Years)    to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


C700AY   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied Less   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


                                                                              J-0200000-07 Page 70
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                EST     UNIT OF   UNIT         TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥      AMOUNT ¥
C700AZ   COM, Atsugi,         This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         Townhouse in SOQ     period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied 1     items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Year to 2 Years)     to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.

C700BA   COM, Atsugi,         This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   3    UN
         Townhouse in SOQ     period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied       items listed in Attachment J-1401000-04. When the Contractor found the work item need
         More Than 2 Years)   to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.



                                                                                                                        Sub Total, C700 (C700AA - C700BA):

                                                                             J-0200000-07 Page 71
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                             QTY         ISSUE     PRICE ¥   AMOUNT ¥
C701     Whole Unit Painting
C701AA   Whole Unit         The Contractor shall prepare and repaint all interior surfaces of FH unit, including                60      UN
         Painting, Atsugi,  concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 2-      materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit       surrounding area. Natural finish coating for wood surface is not included in this line item.
                            The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                            uniformly.

C701AB   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              50      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 3-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.
C701AC   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              20      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 4-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.
C701AD   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including             100      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         High-rise, 2-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.

C701AE   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              80      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         High-rise, 3-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.

                                                                            J-0200000-07 Page 72
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                          EST        UNIT OF UNIT           TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                           QTY        ISSUE     PRICE ¥      AMOUNT ¥
C701AF   Whole Unit          (Note: At the time of contract award, this item is reserved for future use. Amount                   (Max Amount)                14,000,000
         Painting, Atsugi,   indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         High-rise, 4-       determined later by contract modification.) The Contractor shall prepare and repaint all
         Bedroom Unit        interior surfaces of FH unit, including concrete, mortar, board, wood, metal, steel and
                             other painted surfaces, with proper materials in proper number of coat(s). New paints
                             shall match color and gloss of surrounding area. Natural finish coating for wood surface
                             is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.
C701AG   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                2    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         SOQ                 materials in proper number of coat(s). New paints shall match color and gloss of
                             surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.

C701AH   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                2    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse in SOQ,   materials in proper number of coat(s). New paints shall match color and gloss of
         3-Bedroom           surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.

C701AJ   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                4    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse in SOQ,   materials in proper number of coat(s). New paints shall match color and gloss of
         4-Bedroom           surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.


                                                                                                                     Sub Total, C701 (C701AA - C701AJ):


                                                                           J-0200000-07 Page 73
                                                                                                                                                 RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                          EST      UNIT OF        UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                            QTY      ISSUE          PRICE ¥   AMOUNT ¥
C702     Architectural work
C702AA   Paint Interior     The Contractor shall prepare and paint interior surfaces, including concrete, mortar,         30,000    SM
         surfaces           board, wood, metal, steel or other surfaces designated by the Government, with proper
                            materials in proper number of coat(s). This line item does not cover natural finish coating
                            for wood surface.
                            New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                            chosen by the Government.

C702AB   Paint Interior wood      The Contractor shall prepare and paint interior wooden natural varnish finish surfaces,          1,000   SM
         natural varnish          including wooden frame, trims, moldings and wooden floor, with proper materials in
         finish surfaces          proper number of coat(s). New paints shall match color and gloss of surrounding area.
                                  New painted surfaces shall be smooth, evenly and uniformly.

C702AC   Paint Exterior           The Contractor shall prepare and paint exterior surfaces up to 2.5 meters height from           20,000   SM
         surfaces                 ground (including concrete, mortar, board, wood, metal, steel or other surfaces
         (scaffolding or other    designated by the Government) or height/location that does not require fall protection
         fall protection is not   (such as scaffolding) specified in EM 385-1-1, with proper materials in proper number of
         required)                coat(s). This item includes textured pattern and the Contractor shall make textured
                                  pattern by spraying base material on exterior concrete or mortar surfaces, including
                                  application of sealer. Line item shall include scaffolding installation and removal for
                                  exterior painting.
                                  New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                                  chosen by the Government.

C702AD   Paint Exterior           The Contractor shall prepare and paint exterior surfaces over 2.5 meters height up to 9          2,000   SM
         surfaces                 meters height from ground (including concrete, mortar, board, wood, metal, steel or other
         (scaffolding or other    surfaces designated by the Government) or height/location that requires fall protection
         fall protection is       (such as scaffolding) in accordance with EM 385-1-1, with proper materials in proper
         required)                number of coat(s). This item includes textured pattern and the Contractor shall make
                                  textured pattern by spraying base material on exterior concrete or mortar surfaces,
                                  including application of sealer. Line item shall include scaffolding installation and removal
                                  for exterior painting.
                                  New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                                  chosen by the Government.

C702AE   Paint house ID           The Contractor shall prepare and paint house ID number on building or parking space.              100    EA
         number                   Line item shall include background painting if required. The same paint shall be used.
                                                                                J-0200000-07 Page 74
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                           QTY       ISSUE     PRICE ¥   AMOUNT ¥
C702AF   Replace vinyl floor    The Contractor shall remove existing vinyl floor tiles/vinyl simulated wood floor tile,        1,200    SM
         tile/vinyl simulated   prepare surfaces to make smooth and even floor, and provide new vinyl floor tiles/vinyl
         wood floor tile        simulated wood floor tiles. New floor tile shall be same material and color as existing.
                                Line item shall include wax new vinyl floor unless otherwise directed by KO or HSG
                                Officer.
C702AG   Re-adhesive loose      The Contractor shall re-adhesive loose vinyl floor tile.                                        100    SM
         vinyl floor tile.

C702AH   Replace vinyl floor The Contractor shall remove existing vinyl floor sheets, prepare surfaces to make smooth           500    SM
         sheet (including slip- and even floor, and provide new vinyl floor sheets or slip-retardant vinyl floor sheets.
         retardant)             New vinyl floor sheet shall be same material and color as existing. Line item shall
                                include wax new vinyl floor sheets if necessary.

C702AJ   Sand wooden            The Contractor shall prepare and sand wooden flooring to remove existing paint and              500    SM
         flooring               make smooth and even floor.
C702AK   Replace hardwood       The Contractor shall remove existing hardwood flooring, sub sheeting baord and proof            300    SM
         flooring               sheet, prepare surfaces to make smooth and even floor, and provide new hardwood
                                flooring, sub sheeting board and proof sheet. Hardwood flooring: tongue and grooved,
                                thickness: up to 15mm. New hardwood flooring system shall match existing if replaced
                                flooring is adjacent to another hardwood floor.

C702AL   Repair loose, holes The Contractor shall repair loose, holes or cracks of hardwood flooring (refasten loose             50    SM
         or cracks of        hardwood flooring and/or fill hole, cracks with wooden piece and putty, and sand it to
         hardwood flooring make smooth and even surface)

C702AM   Install or replace   The Contractor shall provide new floor metal molding or replace floor metal molding with          200    LM
         floor metal molding. new one. New metal molding shall be same material and color as existing.

C702AN   Replace wooden       The Contractor shall remove existing and provide new wooden step board with riser                  20    EA
         step                 board on stairway. New step shall be same material and color as exiting. Stair width: up
                              to 1,500 mm/(EA), Unit: No. of step.
C702AP   Replace stair non- The Contractor shall remove existing and provide new stair non-slip nosing on edge of               100    LM
         slip nosing          step, Stainless steel, brass or aluminum with or without rubber strip. New stair non-slip
                              nosing shall be same material and color as existing.
C702AQ   Replace floor carpet The Contractor shall remove existing carpet with underlayer padding, prepare surfaces to        3,000    SM
                              make smooth and even floor, and provide new carpet with underlayer padding. New floor
                              carpet shall be same material and color as existing.
                                                                              J-0200000-07 Page 75
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                             QTY       ISSUE     PRICE ¥   AMOUNT ¥
C702AR   Replace wooden         The Contractor shall remove existing and provide new wooden baseboard, Size: up to                 300    LM
         baseboard              25x200mm
C702AS   Replace wooden         The Contractor shall remove existing and provide new wooden quarter round                          100   LM
         quarter round          ("TAMABUCHI"), Size: up to 3/4"
         ("TAMABUCHI")
C702AT   Replace                The Contractor shall remove existing and provide new interior/exterior ceramic, terrazzo,          400   SM
         interior/exterior      melamine resin laminated, quarry or mosaic floor tiles, and provide new interior/exterior
         ceramic, terrazzo,     ceramic, terrazzo, melamine resin laminated, quarry or mosaic floor tile, including mortar
         melamine resin         bed and joint cement. New floor tile shall be same material and color as exiting.
         laminated, quarry or
         mosaic floor tile
C702AU   Replace exterior       The Contractor shall remove existing and provide new exterior stair nosing tile, including         100   LM
         stair nosing tile      mortar bed and joint cement. New stair nosing tile shall be same material and color as
                                existing
C702AV   Replace wooden         The Contractor shall remove existing and provide new wooden floor joist, Size: up to                50   SM
         floor joist            105/2x105mm, @300~455mm, Unit: floor area having damaged floor joist.
C702AW   Replace wooden         The Contractor shall remove existing and provide new wooden sleeper hold ("Oobiki"),                30   LM
         sleeper hold           Size: up to 120x120mm, including wooden sleeper hold support ("Tsuka") @455~910mm
         ("Oobiki")
C702AX   Replace wooden         The Contractor shall remove existing and provide new wooden diagonal sheathing or                  100   SM
         sheathing or water     plywood sheathing or water proof sheathing, Thickness: up to 19mm
         proof sheeting
C702AY   Replace wall or        The Contractor shall remove existing and provide new gypsum boards, non-asbestos                    30   SM
         ceiling board          cement boards, plywood or acoustical tile baord on wall or ceiling.
C702AZ   Replace wall corner    The Contractor shall remove existing and provide new wall corner cover, metal or plastic.           50   LM
         cover (Metal or
         Plastic)
C702BA   Replace wall           The Contractor shall remove existing wall covering, prepare surfaces and provide new               150   SM
         covering               wall covering ("KABEGAMI" or "VINYL CLOTH"). New wall covering shall be same
         ("KABEGAMI" or         material and color as existing.
         "VINYL CLOTH")
C702BB   Replace wood           The Contractor shall remove existing and provide new wood batten strip ("OSHIBUCHI")               100   LM
         batten strip           on wall or ceiling
         ("OSHIBUCHI")
                                                                             J-0200000-07 Page 76
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                          QTY       ISSUE     PRICE ¥   AMOUNT ¥
C702BC   Replace ceramic        The Contractor shall remove existing and provide new ceramic wall tiles with mortar bed         400    SM
         wall tile              and joint cement. New wall tile shall be same material and color as existing.
C702BD   Replace plaster        The Contractor shall remove existing plaster, prepare surfaces and provide new plaster          500   SM
                                on wall or ceiling
C702BE   Replace wooden         The Contractor shall remove existing and provide new wooden wall stud, Size: up to               50   SM
         wall stud              105/2x105mm, @300~455mm, Unit: wall area having damaged wall stud
C702BF   Replace wooden         The Contractor shall remove existing and provide new wooden frame for wall or ceiling            50   SM
         frame for wall or      boards, Unit: Damaged wall or ceiling area.
         ceiling board
C702BG   Replace batten strip   The Contractor shall remove existing and provide new batten strip or molding on wall or         100   LM
         or molding on wall     ceiling
         or ceiling
C702BH   Replace wooden         The Contractor shall remove existing and provide new swinging or sliding wooden flush            20   EA
         door                   door (plywood facing or printed plywood facing) with/without glass and/or louver,
                                including hardware. New door shall be same material and color as existing.
                                Door size: up to 2.0m²/(EA)
C702BJ   Replace aluminum       The Contractor shall remove existing and provide new swinging aluminum flush door                50   EA
         door                   with/without glass, built-in screen window and/or louver, including hardware, aluminum
                                door frame, wooden trims and restoration of wall and floor around door. New door shall
                                be same material and color as existing.
                                Door size: up to 2.0m²/(EA)
C702BK   Replace aluminum       The Contractor shall remove exiting and provide new aluminum framed screen door with             30   EA
         screen door            insect screen mesh and hardware. New screen door shall be same material and color as
                                existing.
                                Screen door size: up to 2.0m²/(EA)
C702BL   Replace aluminum       The Contractor shall remove existing and provide new sliding, double hung or fixed type          30   EA
         window                 aluminum window with hardware, glass, aluminum window frame, wooden trims and
                                restoration of wall and floor around window, New window shall be same material and
                                color as existing. Window size: up to 2.0m²/(EA)
C702BM   Replace aluminum       The Contractor shall remove exiting and provide new aluminum framed screen window                50   EA
         screen window          with insect screen mesh and hardware. New screen window shall be same material and
                                color as exiting.
                                Screen window size: up to 2.0m²/(EA)
                                                                            J-0200000-07 Page 77
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                              QTY       ISSUE     PRICE ¥   AMOUNT ¥
C702BN   Adjust and refit door The Contractor shall adjust and refit door lock, knob, hinge or latch, including retighten or     1,000    EA
                               replace missing screws. Unit: No. of door (including accordion door)
C702BP   Replace door face       The Contractor shall remove existing and provide new plywood or printed plywood door           100     SH
         sheet on one side of    face sheet on one side of door. New printed plywood door face sheet shall be same
         door                    material and color as existing. Door size: up to 2.0m²/(SH)
C702BQ   Replace threshold       The Contractor shall remove existing and provide new wood or metal threshold of door.           20     LM
         of door                 New threshold shall be same material and color as existing.
C702BR   Replace wooden          The Contractor shall remove existing and provide new wooden door frame, including               30     LM
         door frame              wooden trims and restoration of wall and floor around door frame
C702BS   Replace wooden          The Contractor shall remove existing and provide new wooden trim on door or window              80     LM
         trim on door or         frame
         window frame
C702BT   Repair wooden door      The Contractor shall repair wooden door frame with wooden piece and putty                       30     LM
         frame
C702BU   Install weather strip   The Contractor shall prepare surfaces and provide new weather strip around door or             200     LM
         around door or          window. New weather strip shall be same material and color as others.
         window
C702BV   Replace aluminum        The Contractor shall remove existing and provide new aluminum weather strip for bottom          20     EA
         weather strip for       of door. New weather strip shall be same material and color as existing.
         bottom of door.
C702BW   Replace insect          The Contractor shall remove existing and provide new insect screen mesh with new             1,500     SM
         screen mesh             gaskets of screen door or window. New insect screen mesh shall be same material and
                                 color as existing.
C702BX   Replace glass pane The Contractor shall remove existing and provide new float, figured, wired or safety glass           50     SM
                            pane, including gasket or caulking around glass. New glass pane shall be same material
                            and color as existing.
C702BY   Replace safety          The Contractor shall remove existing and provide new safety double glass pane,                  20     SM
         double glass pane       including inner film or dry air between glass panes, and gasket or caulking around glass.
                                 New glass pane shall be same material and color as existing.
C702BZ   Replace door lock       The Contractor shall remove existing and provide new door lock with door knob, interior         10     EA
                                 or exterior, cylinder or mortise lock type or "sora-joh" type. New door lock shall be same
                                 material and color as existing.
                                                                              J-0200000-07 Page 78
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                           QTY       ISSUE     PRICE ¥   AMOUNT ¥
C702CA   Replace door lock     The Contractor shall remove existing door lock and provide new privacy door lock with             10    EA
         with privacy door     door knob, which has release system by using pin from outside for emergency, like a
         lock                  door lock for bathroom use, in Master bed room. Line item shall include repair of door for
                               new door lock, replacement of strike and repair of door frame for new strike. New door
                               lock shall be same material and color as others.
C702CB   Replace door knob     The Contractor shall remove existing and provide new door knob or handle on closet               100   EA
         or handle on closet   door. New door knob and handle shall be same material and color as existing
         door
C702CC   Replace pull handle   The Contractor shall remove existing and provide new pull handle for screen door. New             10   EA
         for screen door.      pull handle shall be same material and color as existing.
C702CD   Replace latch on      The Contractor shall remove existing and provide new latch on screen door. New latch              20   EA
         screen door           shall be same material and color as existing.

C702CE   Replace window or     The Contractor shall remove existing and provide new window or sliding door latch,               100   EA
         sliding door latch,   Crescent, screw-in or dead bolt type. New latch shall be same material and color as
         Crescent, screw-in    existing.
         or dead bolt type

C702CF   Replace door          The Contractor shall remove existing and provide new door stopper, Floor mount,                   50   EA
         stopper               baseboard mount or door top mount type. New door stopper shall be same material and
                               color as existing.
C702CG   Replace floor type    The Contractor shall remove existing and provide new floor type stopper for heavy duty            30   EA
         stopper for hevy      door type. New door stopper shall be same material and color as existing.
         duty door type.
C702CH   Replace sheave     The Contractor shall remove existing and provide new sheave ("TOGURUMA") of sliding                 100   EA
         ("TOGURUMA") of door or window. New sheave shall be same material and color as existing.
         sliding door or
         window
C702CJ   Replace door hinge The Contractor shall remove existing and provide new door hinge, Stainless steel or                  10   EA
                            brass. New door hinge shall be same material and color as existing.
C702CK   Replace door hinge, The Contractor shall remove existing and provide new door hinge, single or double acting            10   EA
         single or double    spring hinge. New door hinge shall be same material and color as existing.
         acting spring hinge

                                                                           J-0200000-07 Page 79
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY       ISSUE     PRICE ¥   AMOUNT ¥
C702CL   Replace door hinge The Contractor shall remove existing and provide new door hinge on folding door or                   100    EA
         on folding door or closet door. New door hinge shall be same material and color as existing.
         closet door

C702CM   Replace top or        The Contractor shall remove existing and provide new top or bottom guide rail for double           20   EA
         bottom guide rail for folding door. New rail shall be same material and color as existing. Rail size (L): up to
         double folding door 1,800 mm/(EA).

C702CN   Replace top or       The Contractor shall remove existing and provide new top or bottom guide pin for double             30   EA
         bottom guide pin for folding door. New guide pin shall be same material and color as existing.
         double folding door.

C702CP   Replace round     The Contractor shall remove existing and provide new round plastic vent on closet door.                50   EA
         plastic vent on   New round plastic vent shall be same material and color as existing. Size: up to 40mm
         closet door       Dia.
C702CQ   Replace wooden    The Contractor shall remove existing and provide new wooden louver in wooden door.                      5   EA
         louver in wooden  New louver shall be same material and color as existing. Louver size: up to (W) 600 x
         door              (H) 250 mm.
C702CR                     The Contractor shall remove existing and provide new door closer. New door closer shall
         Replace door closer                                                                                                      20   EA
                           be same material and color as existing.
C702CS   Replace pneumatic The Contractor shall remove existing and provide new pneumatic door closer of screen                   10   EA
         hydraulic door    door. New door closer shall be same material and color as existing.
         closer of screen
         door
C702CT   Replace chain and      The Contractor shall remove existing and provide new chain and its lock set on door,              20   EA
         its lock set on door   Stainless steel. New chain and lock set shall be same material and color as existing.
C702CU   Replace swing latch    The Contractor shall remove existing and provide new swing latch for door. New latch              20   EA
         for door.              shall be same material and color as existing.
C702CV   Replace peephole       The Contractor shall remove existing and provide new peephole in entrance door. New               10   EA
         in entrance door       peephole shall be same material and color as existing.

C702CW   Replace venetian       The Contractor shall remove existing and provide new venetian blind. One-side                      5   EA
         blind, 6.0m²/(EA)      operation, Aluminum slat: (W)25mm, curbed, color: white.
                                Window opening size: over 4.0m² and up to 6.0m²/(EA)
                                                                            J-0200000-07 Page 80
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                            QTY       ISSUE     PRICE ¥   AMOUNT ¥
C702CX   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                     500    EA
         blind, 4.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: over 2.0m² and up to 4.0m²/(EA)
C702CY   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                     300    EA
         blind, 2.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: over 1.0m² and up to 2.0m²/(EA)
C702CZ   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                      50    EA
         blind, 1.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: up to 1.0m²/(EA)
C702DA   Replace loose or      The Contractor shall remove existing loose or broken parts (cord, slat, pully, ladder tape      3,500    EA
         broken parts of       and other parts) of venetian blind, and provide new one. New parts shall be same
         venetian blind.       material and color as existing.
C702DB   Replace vertical      The Contractor shall remove existing and provide new vertical blind. Aluminum slat:               100    EA
         blind                 (W)50mm or 100mm, color: white.
                               Window opening size: up to 6.0m²/(EA)
C702DC   Replace loose or      The Contractor shall remove existing loose or broken parts (cords, slat, pully, drawstrings     2,000    EA
         broken parts of       and other parts) of vertical venetian blind, and provide new one. New cord and
         vertical venetian     drawstring shall be same material and color as existing.
         blind.
C702DD   Replace twisted       The Contractor shall remove twisted shaft of vertical blind, and provide new one. New            5      EA
         shaft of vertical     shaft shall be same material and color as existing. Size: up to (L)4,000mm/(EA).
         blind
C702DE   Replace curtain or    The Contractor shall remove existing and provide new curtain or clothes hanging rod,            15      ST
         clothes hanging rod   including brackets and/or rings, Stainless steel. New rod shall be same material and
                               color as existing. Size: up to 40mm Dia.
C702DF   Install/Replace       The Contractor shall remove existing and provide new curtain rail with hung brackets,           20      ST
         curtain rail          unit: Length for curtain rail. New rail shall be same material and color as existing. This
                               item may not include removal of existing.
C702DG   Adjust and refit      The Contractor shall adjust and refit curtain rod/rail or handrail or cloth hanging rod,        15      ST
         curtain rod/rail or   including retighten or replacement of loose or missing screws.
         handrail or cloth
         hanging rod
                                                                             J-0200000-07 Page 81
                                                                                                                                         RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                        EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                        QTY     ISSUE     PRICE ¥   AMOUNT ¥
C702DH   Replace accordion    The Contractor shall remove existing and provide new accordion curtain door with rails,      30    EA
         curtain door         door handle, door catch and hardware. Fire-retardant vinyl facing. New curtain door
                              shall be same material and color as existing.
                              Size: up to 5.0 m²/(EA),
C702DJ   Replace facing       The Contractor shall remove existing facing sheet from counter top or cabinet, prepare      200    SM
         sheet of counter top surfaces and provide new facing sheet of melamine decorative sheet, printed plywood or
         or cabinet           stainless steel sheet. New facing sheet shall be same material and color as existing.

C702DK   Replace kitchen or  The Contractor shall remove existing and provide new kitchen wall hung cabinet,             20     EA
         laundry wall hung   including restoration of ceiling and wall around cabinet. New cabinet shall be same
         cabinet             material and color as existing.
                             Cabinet size: up to (W)2000 x (H)1000 x (D)450mm
C702DL   Replace kitchen     The Contractor shall remove existing and provide new kitchen base cabinet with counter      20     EA
         base cabinet        top, including restoration of floor and wall around cabinet. New cabinet shall be same
                             material and color as existing.
                             Cabinet size: up to (W)2000 x (H)1000 x (D)650mm
C702DM   Replace lavatory    The Contractor shall remove existing and provide new lavatory sink cabinet with related     20     EA
         sink cabinet        accessories, including reinstallation of existing wash basin. New cabinet shall be same
                             material and color as existing.
                             Cabinet size: up to 1450mm wide
C702DN   Replace mirror      The Contractor shall remove existing and provide new mirror. New mirror shall be same       10     EA
                             material and color as existing. Mirror size: up to 2.0m²/(EA). This item may be used for
                             new provision (size up to 2.0m²/(EA))
C702DP   Replace shelf board The Contractor shall remove existing and provide new shelf board of cabinet. New shelf      30     EA
         of cabinet          board shall be same material and color as existing. Size: up to 0.5m²/(EA)

C702DQ   Replace bracket or   The Contractor shall remove existing and provide new bracket or pin of shelf board. New    50     EA
         pin of shelf board   bracket shall be same material and color as existing.

C702DR   Replace cabinet     The Contractor shall remove existing and provide new cabinet door, including hardware.      20     EA
         door                New cabinet door shall be same material and color as existing. Door size: up to
                             1.0m²/(EA)
C702DS   Replace closet door The Contractor shall remove existing and provide new closet door, including hardware.       50     EA
                             New closet door shall be same material and color as existing. Door size: up to
                             2.0m²/(EA)
C702DT   Replace cabinet     The Contractor shall remove existing and provide new cabinet door hinge. New door           20     EA
         door hinge          hinge shall be same material and color as existing.
                                                                          J-0200000-07 Page 82
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION             FULL DESCRIPTION                                                                        QTY       ISSUE     PRICE ¥   AMOUNT ¥
C702DU   Replace cabinet         The Contractor shall remove existing and provide new cabinet drawer, including                 20    EA
         drawer                  hardware. New drawer shall be same material and color as existing. Unit: No, of drawer.

C702DV   Replace door knob The Contractor shall remove existing and provide new door knob or handle on cabinet                  30   EA
         or handle on        door/drawer. New door knob and handle shall be same material and color as existing.
         cabinet door/drawer


C702DW   Replace magnet or The Contractor shall remove existing and provide new magnet or roller catcher. New                   50   EA
         roller catcher    magnet and roller catch shall be same material and color as existing.

C702DX   Replace corrugated      The Contractor shall remove existing and provide new corrugated FRP terrace roofing,          100   SM
         FRP terrace roofing,    carport acrylic panel and backyard polycarbonate panel. New material shall be same
         carport acrylic panel   material and color as existing. Line item shall include scaffolding installation and
         and backyard            removal.
         ploycarbonate
         panel.


C702DY   Replace wood,        The Contractor shall remove existing and provide new wood, stainless steel, brass or              20   LM
         stainless steel,     vinyl handrail of stairway, including brackets. New handrail shall be same material and
         brass or vinyl       color as existing.
         handrail of stairway

C702DZ   Repair spall, crack     The Contractor shall repair spall, crack or broken concrete or mortar surfaces                 40   SM
         or broken concrete
         or mortar surfaces
C702EA   Replace PVC gutter The Contractor shall remove existing and provide new PVC gutter, including brackets.               100   LM
                            New gutter shall be same material and color as existing. Line item shall include
                            scaffolding installation and removal.
C702EB   Replace downspout The Contractor shall remove existing and provide new PVC downspout or                               200   LM
                            carport/backyard terrace downspout, including brackets. New downspout shall be same
                            material and color as existing. Line item shall include scaffolding installation and
                            removal.
C702EC   Repair/refit gutter,    The Contractor shall repair/refit gutter, downspout and accessories. Line item shall          100   LM
         downspout and           include scaffolding installation and removal.
         accessories
                                                                              J-0200000-07 Page 83
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                             QTY      ISSUE     PRICE ¥   AMOUNT ¥
C702ED   Replace chain-link The Contractor shall remove existing and provide new chain-link or steel mesh fence                 40    LM
         or steel mesh fence including concrete foundation and restoration of surrounding area. New fence shall be
                             same structure, material and color as existing. Fence height: up to 1.5m
C702EE   Replace panel of     The Contractor shall remove existing steel or aluminum "MEKAKUSHI" fence and provide              40   LM
         "MEKAKUSHI"          new same material fence (Up to 1,800mmH). New panel shall be same material and
         fence                color as existing.
C702EF   Replace door of      The Contractor shall remove existing and provide new single door of aluminum or steel              5   EA
         MEKAKUSHI" or        "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New door shall be same material
         steel mesh fence     and color as existing.
C702EG   Replace latch,       The Contractor shall remove existing and provide new latch, hinge, knob or stopper of             20   EA
         hinge, knob or       aluminum or steel "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New latch,
         stopper of           knob and stopper shall be same material and color as existing.
         "MEKAKUSHI" or
         steel mesh fence

C702EH   Replace cap or joint The Contractor shall remove existing and provide new cap or joint of aluminum or steel            20   EA
         of "MEKAKUSHI" "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New cap and joint shall be same
         or steel mesh fence material and color as existing.


C702EJ   Replace cap or joint The Contractor shall remove existing and provide new cap or joint for carport or backyard         50   EA
         for carport or       terrace. New cap and joint shall be same material and color as existing. Line item shall
         backyard terrace     include scaffolding installation and removal.
C702EK   Replace vent cap or The Contractor shall remove existing and provide new vent cap or natural vent screen on            10   EA
         air vent screen     exterior wall. New vent shall be same material and color as existing. Vent size: up to
                             0.5m²/(EA) Height less than 6 meters.
C702EL   Adjust and refit    The Contractor shall adjust and refit metal storage shed, including roof, wall, doors,             20   EA
         metal storage shed brackets, handle/lock, guide rail, floor, hardware, shelves, and retighten or replacement
                             of loose or missing fasteners, Unit: No. of metal storage shed
                                                                          J-0200000-07 Page 84
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST     UNIT OF    UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                          QTY     ISSUE      PRICE ¥   AMOUNT ¥
C702EM   Replace FRP water-     The Contractor shall remove existing and provide new FRP water-proof coating of fish          200    SM
         proof coating,         pond and highrise balcony (Bldg. 3101 and 3102) and apply finish coatings. Line item
         mortar or concrete     shall include temporary relocation and keeping of fishes during repair work of fish pond,
                                and return of them with proper treatment after completion of work and necessary curing
                                time. This item shall also include; chip out and remove damaged portions, prepare
                                surfaces and apply adhesive, and provide new water-proof mortar or concrete under FRP
                                coating of fish pond and balcony. Pond/balcony area: up to 100m²/(EA)

C702EN   Replace bird           The Contractor shall remove existing and provide new bird protection net with fasteners          50    EA
         protection net         and main rope, at balcony of Hi-rise. New bird protection net shall be same material and
                                color as existing. Opening area: up to 14.0m²/(EA) New provision (without removal) may
                                be ordered.
C702EP   Refinish bathtub       The Contractor shall remove all scratches and scores, and refinish bathtub in accordance         50    SM
         coating                with manufacturer's recommended method.
C702EQ   Repair surface of      The Contractor shall repair surfaces of artificial polyester or acrylic type counter in          50    SM
         polyester or acrylic   accordance with Attachment J-1502000-03.
         counter
C702ER   Replace kitchen        The Contractor shall remove existing and provide new kitchen counter. The counter shall           3    Set
         counter stainless,     be same material as existing.
         marble, polyester
C702ES   Replace inspection     The Contractor shall remove existing and provide new inspection panel for bathtub. New           10    EA
         panel for bathtub.     inspection panel shall be same material and color as existing.

C702ET   Repair, adjust and     The Contractor shall repair, adjust and refit cabinet door or drawersr, so the cabinet door    4,000   EA
         refit cabinet door     and drawer can open and close smoothly as originally intended. (1 door or 1 drawer is
         and drawers            counted as 1 EA.)
C702EU   Repair nail holes on The Contractor shall repair surfaces of wall or door that has been damged by nail. The           3,000   EA
         wall or door         nail holes shall become imvisible, and the the wall or door surface shall look smooth. (1
                              door or 1 SM wall is counted as 1 EA.)
C702EV   Adjust and refit       The Contractor shall adjust and refit hardwre on wall, floor and door (loose screws, outlet,   3,000   EA
         hardware on wall,      door stopper, plumbing fixture, faucets, etc.) (1 door or 1 SM wall/floor is counted as 1
         floor and door         EA.)
C702EW   Replace caulking or    The Contractor shall replace existing caulking or cement for joint with new.                   1,000   LM
         cement for joint
                                                                               J-0200000-07 Page 85
                                                                                                                                                    RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST     UNIT OF        UNIT         TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                            QTY     ISSUE          PRICE ¥      AMOUNT ¥
C702EX   Replace house         The Contractor shall remove existing house number plate and shall provide new number            100    EA
         number plate          plate (metal or plastic), same size, color and material as existing, with number printed on
                               the plate. The number shall bear severe weather condition.
C702EY   Replace towel ring    The Contractor shall replace existing towel ring or bar with new, same or similar model in       20    EA
         or bar                bathroom.

                                                                                                                          Sub Total, C702 (C702AA - C702EY):

C703     Electrical work
C703AA   Replace light         The Contractor shall replace existing light fixture with same or similar model,                      200    EA
         fixture               Typical light fixtures are as follows:
                               Waterproof or indoor use, ceiling, wall, flush, or pendant mount type with
                               globe/cover/diffuser, incandescent or fluorescent light, and typical lamp size, and voltage
                               as indicated Attachment J-1502000-03 or reference drawings.
C703AB   Replace ceiling        The Contractor shall replace existing ceiling fan/light fixture with new type of the ceiling         50    EA
         fan/light fixture with fan/light fixture in accordance with Attachment J-1502000-03. New ceiling fan/light fixture
         new material           shall be same or similar model as others.
C703AC   Replace exit light    The Contractor shall replace existing exit light and fixture with same or similar model.              20    EA
         and fixture           Typical exit lights are as follows:
                               Waterproof or indoor use, ceiling or wall mount type with acrylic direction cover and
                               battery, fluorescent light 1-10W or 1-20W.

C703AD   Replace               The Contractor shall replace existing globe/diffuser of light fixture. The replacement                50    EA
         globe/diffuser of     globe/diffuser shall be same type and compatible with existing light fixture.
         light fixture
C703AE   Replace fluorescent The Contractor shall replace existing fluorescent light bulb includes starter lamp.                    600    EA
         light bulb includes
         starter lamp

C703AF   Replace pull switch The Contractor shall replace pull switch and cord of light fixture with same or similar                 50    EA
         and cord of light    model.
         fixture
C703AG   Replace cover plate The Contractor shall replace cover plate for outlet or switch with same or similar model.              200    EA
         for outlet or switch
         or CATV

                                                                             J-0200000-07 Page 86
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY       ISSUE     PRICE ¥   AMOUNT ¥
C703AH   Replace tumbler or The Contractor shall replace tumbler or dimmer switch or bathroom timer switch with                   50    EA
         dimmer switch      same or similar model.
C703AJ   Replace electrical   The Contractor shall replace electrical outlet with same or similar model.                          50   EA
         outlet
C703AK   Replace chime,       The Contractor shall replace chime, buzzer, or push button with same or similar model.              10   EA
         buzzer, or push
         button
C703AL   Replace ballast of   The Contractor shall replace ballast of fluorscent light with new one.                              50   EA
         fluorscent light
C703AM   Replace home type The Contractor shall replace home type smoke detector (house-wired or battery-                         30   EA
         smoke detector    powered) with same or similar model. New battery shall also be provided for battery-
                           powered type.
C703AN   Replace CATV/FM      The Contractor shall replace CATV/FM outlet and outlet cover with same or similar                   50   EA
         outlet               model.
C703AP   Replace              The Contractor shall remove existing incandescent light bulb and provide new compact               200   EA
         incandescent light   fluorescent light.
         bulb to compact
         fluorescent light
C703AQ   Replace batteries    The Contractor shall replace battery for smoke detector with new, 9V.                              200   EA
         for GFM smoke
         detector
C703AR   Replace toggle       The Contractor shall replace toggle switch including plates with same or similar model.            100   EA
         switch


                                                                                                                    Sub Total, C703 (C703AA - C703AR):

C704     Mechanical work
C704AA   Replace washbasin The Contractor shall replace washbasin or slope sink or lavatory sink including pipe                   30   EA
         or lavatory sink  fittings with same or similar model.


C704AB   Replace commode      The Contractor shall replace commode (water closet), including seat, lid and fittings with          20   EA
                              same or similar model.
C704AC   Replace seat of      The Contractor shall replace toilet seat and lid of commode with same or similar model.            100   EA
         commode
                                                                            J-0200000-07 Page 87
                                                                                                                                                 RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
C704AD   Replace low tank of The Contractor shall replace low tank, including lid and fittings, with same or similar                5    EA
         commode             model.
C704AE   Replace lid of low    The Contractor shall replace low tank lid and fittings with same or similar model.                   5   EA
         tank
C704AF   Replace low tank      The Contractor shall replace flush valve for low tank with same or similar model.                    5   EA
         valve
C704AG   Replace paper         The Contractor shall replace toilet paper holder with same or similar model.                        20   EA
         holder
C704AH   Replace plastic bar   The Contractor shall replace plastic bar of toilet paper holder.                                    30   EA
         of paper holder

C704AJ   Replace lavatory      The Contractor shall replace lavatory with base cabinet unit, including pipe fittings with          30   EA
         with cabinet          same or similar model.
C704AK   Replace plug and      The Contractor shall replace plug and chain for lavatory sink with same or similar model.           30   EA
         chain for lavatory
         sink
C704AL   Replace medicine      The Contractor shall replace medicine cabinet (single, double or three mirror type),                50   EA
         cabinet               including restoration of wall to fit new cabinet, necessary wiring to light fixture mounted
                               on the new cabinet and furnishing of light/bulb, and remove old wall mounted fixture, with
                               same or similar model.
C704AM   Replace mirror of     The Contractor shall replace mirror of medicine cabinet with same or similar model.                 10   EA
         medicine cabinet
C704AN   Repair medicine       The Contractor shall repair medicine cabinet, including light fixture cover, door and               50   EA
         cabinet               accessories.
C704AP   Replace bathtub       The Contractor shall replace bathtub, including hardware, with same or similar model.               10   EA

C704AQ   Replace bathtub       The Contractor shall replace bathtub drain pipe with direct flow (in-line) type fitting,            10   EA
         drain pipe            including dismount/remount bathtub.
C704AR   Replace shower        The Contractor shall replace shower head with same or similar model.                                20   EA
         head
C704AS   Replace hand          The Contractor shall replace shower head and hose with same or similar model.                       50   EA
         shower head and
         hose
C704AT   Repair or adjust      The Contractor shall repair or adjust shower/faucet mixing valve.                                   50   EA
         shower/faucet
         mixing valve.
                                                                              J-0200000-07 Page 88
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                             QTY       ISSUE     PRICE ¥   AMOUNT ¥
C704AU   Replace hose of    The Contractor shall replace hose of hand shower with same or similar model.                        30    EA
         hand shower
C704AV   Replace bar type   The Contractor shall replace bar type shower head holder with same or similar model.                10   EA
         shower head holder

C704AW   Replace robe hook     The Contractor shall replace robe hook with same or similar model.                               10   EA

C704AX   Replace grip bar for The Contractor shall replace grip bar for bathtub with same or similar model.                     10   EA
         bathtub
C704AY   Replace towel rack The Contractor shall replace towel rack with same or similar model.                                 10   EA

C704AZ   Replace soap dish     The Contractor shall replace soap dish with same or similar model.                                5   EA

C704BA   Replace faucet        The Contractor shall replace hose faucet, garden faucet, bath faucet, mixing faucet or           20   EA
                               mixing valve, including handles or lever, with same or similar model.
C704BB   Replace handle of     The Contractor shall replace handle or lever of faucet with same or similar model.               20   EA
         mixing faucet
C704BC   Replace packing for The Contractor shall replace packing for faucet or valve.                                         500   EA
         faucet or valve
C704BD   Replace             The Contractor shall replace combination stopper of washbasin, lavatory or bathtub with            10   EA
         combination stopper same or similar model.

C704BE   Replace mixing        The Contractor shall replace mixing faucet for kitchen sink (individual handles,                 20   EA
         faucet for kitchen    combination type) with same or similar model.
         sink
C704BF   Check and repair as   The Contractor shall check and repair as necessary all plumbing works (hot & cold water         100   LM
         necessary all         supply, drainage, faucet and shower).
         plumbing works
C704BG   Remove foreign        The Contractor shall remove foreign matter and repair clogged drain pipe connected to            50   EA
         matter and repair     either commode, lavatory, bathtub or kitchen sink.
         clogged drain pipe

C704BH   Replace non-        The Contractor shall replace non-asbestos insulation on water/heater pipe with new                100   LM
         asbestos insulation similar material.
         on pipe
C704BJ   Repair sink faucet The Contractor shall repair sink faucet assembly.                                                   30   EA
         assembly
                                                                            J-0200000-07 Page 89
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT         TOTAL
ELIN     DESCRIPTION             FULL DESCRIPTION                                                                            QTY       ISSUE     PRICE ¥      AMOUNT ¥
C704BK   Replace kitchen         The Contractor shall replace kitchen sink with same or similar model.                               3    EA
         double sink
C704BL   Repair piping under     The Contractor shall repair piping under kitchen sink or washbasin with similar material.          20    EA
         kitchen sink or
         washbasin
C704BM   Replace kitchen         The Contractor shall replace kitchen ventilation hood in kitchen with same or similar              10    EA
         ventilation hood        model.
C704BN   Replace exhaust         The Contractor shall replace exhaust fan, ceiling or wall mounted type, with same or               20    EA
         fan                     similar model.
C704BP   Replace grease          The Contractor shall replace grease filter of range hood fan with same or similar model.          100    EA
         filter of range hood
         fan
C704BQ   Replace screen          The Contractor shall replace screen filter of exhaust fan with same or similar model.              10    EA
         filter of exhaust fan

C704BR   Replace vent cover The Contractor shall replace vent cover with grille for dryer's exhaust pipe.                           10    EA
         with grill for dryer

C704BS   Replace heat-pump       The Contractor shall replace heat-pump type air conditioner (both indoor and outdoor               50    EA
         type A/C                unit) with same or similar model.
C704BT   Replace pipe            The Contractor shall replace pipe insulation cover for heat pump AC with new same or               30    ST
         insulation cover for    similar material to ensure proper and energy efficient operation and function of AC. (All
         heat pump AC            pipe insulation cover for one heat pump AC unit is counted as 1 ST.)



                                                                                                                         Sub Total, C704 (C704AA - C704BT):

                                                                              J-0200000-07 Page 90
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY         ISSUE     PRICE ¥   AMOUNT ¥
C705     Whole Unit Cleaning
C705AA   Whole Unit         The Contractor shall perform whole unit cleaning.                                                     60      UN
         Cleaning, Atsugi,  The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 2-
         Bedroom Unit
C705AB   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   50      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 3-
         Bedroom Unit
C705AC   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   20      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 4-
         Bedroom Unit
C705AD   Whole Unit           The Contractor shall perform whole unit cleaning.                                                  120      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         High-rise, 2-
         Bedroom Unit
C705AE   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   80      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         High-rise, 3-
         Bedroom Unit
C705AF   Whole Unit           (Note: At the time of contract award, this item is reserved for future use. Amount                   (Max Amount)                  4,736,000
         Cleaning, Atsugi,    indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         High-rise, 4-        determined later by contract modification.) The Contractor shall perform whole unit
         Bedroom Unit         cleaning. The Contractor shall ensure that FH unit is clean, sanitary and sightly.
C705AG   Whole Unit           The Contractor shall perform whole unit cleaning.                                                    2      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         SOQ
C705AH   Whole Unit           The Contractor shall perform whole unit cleaning.                                                    2      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse in SOQ
         Area, 3-Bedroom
C705AJ   Whole Unit        The Contractor shall perform whole unit cleaning.                                                       3      UN
         Cleaning, Atsugi, The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse in SOQ
         Area, 4-Bedroom

                                                                                                                    Sub Total, C705 (C705AA - C705AJ):
                                                                            J-0200000-07 Page 91
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                              EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                               QTY         ISSUE     PRICE ¥   AMOUNT ¥
C706     Cleaning work
C706AA   Clean and wax floor The Contractor shall clean and wax floor to ensure clean, sanitary and sightly condition.         2,000      SM

C706AB   Deep clean carpet     The Contractor shall deep clean carpet and rug to ensure clean, sanitary and sightly            1,000      SM
         and rug               condition. The Government may direct cleaning method such as sampooing, steam
                               cleaning, dry cleaning or other similar deep cleaning processes.
C706AC   Clean concrete and    The Contractor shall clean concrete and tiled floor to ensure clean, sanitary and sightly       1,000      SM
         tiled floor           condition.
C706AD   Clean tile and        The Contractor shall clean tile and washable wall to ensure clean, sanitary and sightly            500     SM
         washable wall         condition.
C706AE   Clean exterior wall   The Contractor shall clean exterior wall surfaces to ensure clean, sanitary and sightly            500     SM
                               condition.
C706AF   Clean stainless       The Contractor shall clean and polish stainless steel sink and counter to ensure clean,             30      EA
         steel sink and        sanitary and sightly condition..
         counter
C706AG   Clean dryer vent      The Contractor shall clean dryer vent line with fan to ensure clean, sanitary and sightly          200      EA
         line with fan         condition and propler operation and function of dryer. The Contractor shall clean from
                               dryer to duct connection (if vertical duct exhaust fan system is used) or to exterior wall
                               hood.
C706AH   Clean gutter and      The Contractor shall clean gutter and downspout to ensure clean, sanitary and sightly              700      LM
         downspout             condition and proper original intended function of gutter and downspount. All the foreign
                               materials shall be removed. Line item shall include scaffolding installation and removal.

C706AJ   Clean canopy          The Contractor shall clean canopy including gutter and downspout to ensure clean,                  600     SM
                               sanitary and sightly condition. Above C706AH shall also be applied for gutter and
                               downspout. Line item shall include scaffolding installation and removal.
C706AK   Mini cleaning         The Contractor shall perform Mini cleaning to ensure clean, sanitary and sightly                    30      UN
                               condition.

C706AL   Grass cutting         The Contractor shall cut grass (including but not limited to turf, weed, vines, and other      10,000      SM
                               unwanted vegetations) to uniform height of 2 inches to maintain grass healthy condition
                               and appearance.
                                                                            J-0200000-07 Page 92
                                                                                                                                       RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                    EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION    FULL DESCRIPTION                                                                          QTY       ISSUE     PRICE ¥   AMOUNT ¥
C706AM   Sodding        The Contractor shall provide sod, Anti Weeds Type Sod (Saint Augustine Grass II or            3,000    SM
                        Modified Centipede Grass) species unless otherwise specified. It shall be dense,
                        uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid
                        on properly prepared topsoil. Sod joints shall be staggered and butted together. On
                        slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed
                        installation shall be smooth and uniform in appearance. The Contractor shall water and
                        provide continuing care for sodded areas as necessary to firmly establish new grass
                        growth and development. The Contactor shall replace all grass that dies or fails to
                        develop noticeable growth within 90 days of sodding at no additional cost to the
                        Government.


                                                                                                           Sub Total, C706 (C706AA - C706AM):



                                                                                TOTAL OF SECOND OPTION PERIOD, C700 THROUGH C706AM:




                                                                    J-0200000-07 Page 93
                                                                                                                                                        RFP N40084-10-R-8709

                                                           ATTACHMENT J-0200000-07
                                                          EXHIBIT LINE ITEM NUMBERS
                                                   SOLICITATION/CONTRACT #N40084-10-R-8709
                                                             EXHIBIT D - CLIN 0004

Line Item 0004   Third Option Period - Indefinite Delivery Indefinite Quantity Work

PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs D700 through D706

NAME OF OFFEROR OR CONTRACTOR:
          SHORT                                                                                                                   EST        UNIT OF   UNIT      TOTAL
ELIN      DESCRIPTION      FULL DESCRIPTION                                                                                       QTY        ISSUE     PRICE ¥   AMOUNT ¥
D700      Change of Occpancy Maintenance (COM)
D700AA    COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                     10      UN
          Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
          Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
          (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
          Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                                work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                                to the Government immediately. In such case, applicable IDIQ work item or another
                                contract will be issued.
                                The Contractor shall ensure that FH unit is fully functional with all equipments and
                                fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                                smudges, streaks and foreign matter, and debris.
D700AB    COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                     30      UN
          Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
          Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
          (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
          2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                                work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                                to the Government immediately. In such case, applicable IDIQ work item or another
                                contract will be issued.
                                The Contractor shall ensure that FH unit is fully functional with all equipments and
                                fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                                smudges, streaks and foreign matter, and debris.

                                                                               J-0200000-07 Page 94
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
D700AC   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   35    UN
         Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

D700AD   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    8   UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

D700AE   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   10   UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                              J-0200000-07 Page 95
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
D700AF   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   32    UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

D700AG   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    3   UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

D700AH   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                    4   UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                              J-0200000-07 Page 96
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
D700AJ   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   13    UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


D700AK   COM, Atsugi, High- This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                      15   UN
         rise, 2-Bedroom    period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied Lessincluding all equipments, fixtures and interior conditions, and shall perform the COM work
         Than 1 Year)       items listed in Attachment J-1401000-04. When the Contractor found the work item need
                            to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
D700AL                      This item applies to the FH unit in which Quantitly LImitation, the less than 1 year
         COM, Atsugi, High- work ELIN list, or which exceeds specifiedthe last occuapnt stayed Contractor shall report               35   UN
         rise, 2-Bedroom    period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied 1   including all equipments, fixtures and interior conditions, and shall perform the COM work
         Year to 2 Years)   items listed in Attachment J-1401000-04. When the Contractor found the work item need
                            to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                            work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                            to the Government immediately. In such case, applicable IDIQ work item or another
                            contract will be issued.
                            The Contractor shall ensure that FH unit is fully functional with all equipments and
                            fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                            smudges, streaks and foreign matter, and debris.


                                                                             J-0200000-07 Page 97
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
D700AM   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt more than 2 year period. The              70    UN
         rise, 2-Bedroom       Contractor shall participate in deficiency inspection and inspect FH unit including all
         Unit (Occupied        equipments, fixtures and interior conditions, and shall perform the COM work items listed
         More Than 2 Years)    in Attachment J-1401000-04. When the Contractor found the work item need to be
                               adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work
                               item list, or which exceeds specified Quantitly LImitation, the Contractor shall report to
                               the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

D700AN   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   15   UN
         rise, 3-Bedroom       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied Less   including all equipments, fixtures and interior conditions, and shall perform the COM work
         Than 1 Year)          items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

D700AP   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   15   UN
         rise, 3-Bedroom       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied 1      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Year to 2 Years)      items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                              J-0200000-07 Page 98
                                                                                                                                                    RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                EST      UNIT OF   UNIT        TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥     AMOUNT ¥
D700AQ   COM, Atsugi, High-   This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   50    UN
         rise, 3-Bedroom      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied       including all equipments, fixtures and interior conditions, and shall perform the COM work
         More Than 2 Years)   items listed in Attachment J-1401000-04. When the Contractor found the work item need
                              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.


D700AR   COM, Atsugi, High- (Note: At the time of contract award, this item is reserved for future use. Amount                       (Max Amount)                 21,000,000
         rise, 4-Bedroom    indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         Unit               determined later by contract modification.) The Contractor shall inspect FH unit including
                            all equipments, fixtures and interior conditions, and shall perform the COM work items
                            listed in Attachment J-1401000-07 (ATSUGI/KAMISEYA). When the Contractor found
                            the work item need to be adjusted, maintained, repaired and/or replaced, and which is
                            not listed in the COM work item list, the Contractor shall report to the Government
                            immediately. In such case, applicable IDIQ work item or another contract will be issued.
                            The Contractor shall ensure that FH unit is fully functional with all equipments and
                            fixtures, and is in quality conditions.


D700AS   COM, Atsugi, SOQ     This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    2   UN
         (Occupied Less       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Than 1 Year)         including all equipments, fixtures and interior conditions, and shall perform the COM work
                              items listed in Attachment J-1401000-04. When the Contractor found the work item need
                              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.


                                                                             J-0200000-07 Page 99
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥   AMOUNT ¥
D700AT   COM, Atsugi, SOQ      This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         (Occupied 1 Year to   period. The Contractor shall participate in deficiency inspection and inspect FH unit
         2 Year)               including all equipments, fixtures and interior conditions, and shall perform the COM work
                               items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

D700AU   COM, Atsugi, SOQ      This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   2   UN
         (Occupied More        period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Than 2 Years)         including all equipments, fixtures and interior conditions, and shall perform the COM work
                               items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


D700AV   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied Less   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


                                                                             J-0200000-07 Page 100
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥   AMOUNT ¥
D700AW   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied 1      items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Year to 2 Years)      to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

D700AX   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         More Than 2 Years)    to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


D700AY   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied Less   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


                                                                             J-0200000-07 Page 101
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                EST     UNIT OF   UNIT         TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥      AMOUNT ¥
D700AZ   COM, Atsugi,         This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         Townhouse in SOQ     period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied 1     items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Year to 2 Years)     to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.

D700BA   COM, Atsugi,         This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   3    UN
         Townhouse in SOQ     period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied       items listed in Attachment J-1401000-04. When the Contractor found the work item need
         More Than 2 Years)   to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.



                                                                                                                        Sub Total, D700 (D700AA - D700BA):

                                                                            J-0200000-07 Page 102
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                             QTY         ISSUE     PRICE ¥   AMOUNT ¥
D701     Whole Unit Painting
D701AA   Whole Unit         The Contractor shall prepare and repaint all interior surfaces of FH unit, including                60      UN
         Painting, Atsugi,  concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 2-      materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit       surrounding area. Natural finish coating for wood surface is not included in this line item.
                            The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                            uniformly.

D701AB   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              50      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 3-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.
D701AC   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              20      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 4-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.
D701AD   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including             100      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         High-rise, 2-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.

D701AE   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              80      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         High-rise, 3-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.

                                                                           J-0200000-07 Page 103
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                          EST        UNIT OF UNIT           TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                           QTY        ISSUE     PRICE ¥      AMOUNT ¥
D701AF   Whole Unit          (Note: At the time of contract award, this item is reserved for future use. Amount                   (Max Amount)                14,000,000
         Painting, Atsugi,   indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         High-rise, 4-       determined later by contract modification.) The Contractor shall prepare and repaint all
         Bedroom Unit        interior surfaces of FH unit, including concrete, mortar, board, wood, metal, steel and
                             other painted surfaces, with proper materials in proper number of coat(s). New paints
                             shall match color and gloss of surrounding area. Natural finish coating for wood surface
                             is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.
D701AG   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                2    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         SOQ                 materials in proper number of coat(s). New paints shall match color and gloss of
                             surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.


D701AH   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                2    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse in SOQ,   materials in proper number of coat(s). New paints shall match color and gloss of
         3-Bedroom           surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.


D701AJ   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                4    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse in SOQ,   materials in proper number of coat(s). New paints shall match color and gloss of
         4-Bedroom           surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.



                                                                                                                     Sub Total, D701 (D701AA - D701AJ):


                                                                          J-0200000-07 Page 104
                                                                                                                                                 RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                          EST      UNIT OF        UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                            QTY      ISSUE          PRICE ¥   AMOUNT ¥
D702     Architectural work
D702AA   Paint Interior     The Contractor shall prepare and paint interior surfaces, including concrete, mortar,         30,000    SM
         surfaces           board, wood, metal, steel or other surfaces designated by the Government, with proper
                            materials in proper number of coat(s). This line item does not cover natural finish coating
                            for wood surface.
                            New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                            chosen by the Government.

D702AB   Paint Interior wood      The Contractor shall prepare and paint interior wooden natural varnish finish surfaces,          1,000   SM
         natural varnish          including wooden frame, trims, moldings and wooden floor, with proper materials in
         finish surfaces          proper number of coat(s). New paints shall match color and gloss of surrounding area.
                                  New painted surfaces shall be smooth, evenly and uniformly.

D702AC   Paint Exterior           The Contractor shall prepare and paint exterior surfaces up to 2.5 meters height from           20,000   SM
         surfaces                 ground (including concrete, mortar, board, wood, metal, steel or other surfaces
         (scaffolding or other    designated by the Government) or height/location that does not require fall protection
         fall protection is not   (such as scaffolding) specified in EM 385-1-1, with proper materials in proper number of
         required)                coat(s). This item includes textured pattern and the Contractor shall make textured
                                  pattern by spraying base material on exterior concrete or mortar surfaces, including
                                  application of sealer. Line item shall include scaffolding installation and removal for
                                  exterior painting.
                                  New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                                  chosen by the Government.

D702AD   Paint Exterior           The Contractor shall prepare and paint exterior surfaces over 2.5 meters height up to 9          2,000   SM
         surfaces                 meters height from ground (including concrete, mortar, board, wood, metal, steel or other
         (scaffolding or other    surfaces designated by the Government) or height/location that requires fall protection
         fall protection is       (such as scaffolding) in accordance with EM 385-1-1, with proper materials in proper
         required)                number of coat(s). This item includes textured pattern and the Contractor shall make
                                  textured pattern by spraying base material on exterior concrete or mortar surfaces,
                                  including application of sealer. Line item shall include scaffolding installation and removal
                                  for exterior painting.
                                  New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                                  chosen by the Government.

D702AE   Paint house ID           The Contractor shall prepare and paint house ID number on building or parking space.              100    EA
         number                   Line item shall include background painting if required. The same paint shall be used.
                                                                               J-0200000-07 Page 105
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                           QTY       ISSUE     PRICE ¥   AMOUNT ¥
D702AF   Replace vinyl floor    The Contractor shall remove existing vinyl floor tiles/vinyl simulated wood floor tile,        1,200    SM
         tile/vinyl simulated   prepare surfaces to make smooth and even floor, and provide new vinyl floor tiles/vinyl
         wood floor tile        simulated wood floor tiles. New floor tile shall be same material and color as existing.
                                Line item shall include wax new vinyl floor unless otherwise directed by KO or HSG
                                Officer.
D702AG   Re-adhesive loose      The Contractor shall re-adhesive loose vinyl floor tile.                                        100    SM
         vinyl floor tile.

D702AH   Replace vinyl floor The Contractor shall remove existing vinyl floor sheets, prepare surfaces to make smooth           500    SM
         sheet (including slip- and even floor, and provide new vinyl floor sheets or slip-retardant vinyl floor sheets.
         retardant)             New vinyl floor sheet shall be same material and color as existing. Line item shall
                                include wax new vinyl floor sheets if necessary.

D702AJ   Sand wooden            The Contractor shall prepare and sand wooden flooring to remove existing paint and              500    SM
         flooring               make smooth and even floor.
D702AK   Replace hardwood       The Contractor shall remove existing hardwood flooring, sub sheeting baord and proof            300    SM
         flooring               sheet, prepare surfaces to make smooth and even floor, and provide new hardwood
                                flooring, sub sheeting board and proof sheet. Hardwood flooring: tongue and grooved,
                                thickness: up to 15mm. New hardwood flooring system shall match existing if replaced
                                flooring is adjacent to another hardwood floor.

D702AL   Repair loose, holes The Contractor shall repair loose, holes or cracks of hardwood flooring (refasten loose             50    SM
         or cracks of        hardwood flooring and/or fill hole, cracks with wooden piece and putty, and sand it to
         hardwood flooring make smooth and even surface)

D702AM   Install or replace   The Contractor shall provide new floor metal molding or replace floor metal molding with          200    LM
         floor metal molding. new one. New metal molding shall be same material and color as existing.

D702AN   Replace wooden       The Contractor shall remove existing and provide new wooden step board with riser                  20    EA
         step                 board on stairway. New step shall be same material and color as exiting. Stair width: up
                              to 1,500 mm/(EA), Unit: No. of step.
D702AP   Replace stair non- The Contractor shall remove existing and provide new stair non-slip nosing on edge of               100    LM
         slip nosing          step, Stainless steel, brass or aluminum with or without rubber strip. New stair non-slip
                              nosing shall be same material and color as existing.
D702AQ   Replace floor carpet The Contractor shall remove existing carpet with underlayer padding, prepare surfaces to        3,000    SM
                              make smooth and even floor, and provide new carpet with underlayer padding. New floor
                              carpet shall be same material and color as existing.
                                                                              J-0200000-07 Page 106
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                             QTY       ISSUE     PRICE ¥   AMOUNT ¥
D702AR   Replace wooden         The Contractor shall remove existing and provide new wooden baseboard, Size: up to                 300    LM
         baseboard              25x200mm
D702AS   Replace wooden         The Contractor shall remove existing and provide new wooden quarter round                          100   LM
         quarter round          ("TAMABUCHI"), Size: up to 3/4"
         ("TAMABUCHI")
D702AT   Replace                The Contractor shall remove existing and provide new interior/exterior ceramic, terrazzo,          400   SM
         interior/exterior      melamine resin laminated, quarry or mosaic floor tiles, and provide new interior/exterior
         ceramic, terrazzo,     ceramic, terrazzo, melamine resin laminated, quarry or mosaic floor tile, including mortar
         melamine resin         bed and joint cement. New floor tile shall be same material and color as exiting.
         laminated, quarry or
         mosaic floor tile
D702AU   Replace exterior       The Contractor shall remove existing and provide new exterior stair nosing tile, including         100   LM
         stair nosing tile      mortar bed and joint cement. New stair nosing tile shall be same material and color as
                                existing
D702AV   Replace wooden         The Contractor shall remove existing and provide new wooden floor joist, Size: up to                50   SM
         floor joist            105/2x105mm, @300~455mm, Unit: floor area having damaged floor joist.
D702AW   Replace wooden         The Contractor shall remove existing and provide new wooden sleeper hold ("Oobiki"),                30   LM
         sleeper hold           Size: up to 120x120mm, including wooden sleeper hold support ("Tsuka") @455~910mm
         ("Oobiki")
D702AX   Replace wooden         The Contractor shall remove existing and provide new wooden diagonal sheathing or                  100   SM
         sheathing or water     plywood sheathing or water proof sheathing, Thickness: up to 19mm
         proof sheeting
D702AY   Replace wall or        The Contractor shall remove existing and provide new gypsum boards, non-asbestos                    30   SM
         ceiling board          cement boards, plywood or acoustical tile baord on wall or ceiling.
D702AZ   Replace wall corner    The Contractor shall remove existing and provide new wall corner cover, metal or plastic.           50   LM
         cover (Metal or
         Plastic)
D702BA   Replace wall           The Contractor shall remove existing wall covering, prepare surfaces and provide new               150   SM
         covering               wall covering ("KABEGAMI" or "VINYL CLOTH"). New wall covering shall be same
         ("KABEGAMI" or         material and color as existing.
         "VINYL CLOTH")
D702BB   Replace wood           The Contractor shall remove existing and provide new wood batten strip ("OSHIBUCHI")               100   LM
         batten strip           on wall or ceiling
         ("OSHIBUCHI")
                                                                             J-0200000-07 Page 107
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                          QTY       ISSUE     PRICE ¥   AMOUNT ¥
D702BC   Replace ceramic        The Contractor shall remove existing and provide new ceramic wall tiles with mortar bed         400    SM
         wall tile              and joint cement. New wall tile shall be same material and color as existing.
D702BD   Replace plaster        The Contractor shall remove existing plaster, prepare surfaces and provide new plaster          500   SM
                                on wall or ceiling
D702BE   Replace wooden         The Contractor shall remove existing and provide new wooden wall stud, Size: up to               50   SM
         wall stud              105/2x105mm, @300~455mm, Unit: wall area having damaged wall stud
D702BF   Replace wooden         The Contractor shall remove existing and provide new wooden frame for wall or ceiling            50   SM
         frame for wall or      boards, Unit: Damaged wall or ceiling area.
         ceiling board
D702BG   Replace batten strip   The Contractor shall remove existing and provide new batten strip or molding on wall or         100   LM
         or molding on wall     ceiling
         or ceiling
D702BH   Replace wooden         The Contractor shall remove existing and provide new swinging or sliding wooden flush            20   EA
         door                   door (plywood facing or printed plywood facing) with/without glass and/or louver,
                                including hardware. New door shall be same material and color as existing.
                                Door size: up to 2.0m²/(EA)
D702BJ   Replace aluminum       The Contractor shall remove existing and provide new swinging aluminum flush door                50   EA
         door                   with/without glass, built-in screen window and/or louver, including hardware, aluminum
                                door frame, wooden trims and restoration of wall and floor around door. New door shall
                                be same material and color as existing.
                                Door size: up to 2.0m²/(EA)
D702BK   Replace aluminum       The Contractor shall remove exiting and provide new aluminum framed screen door with             30   EA
         screen door            insect screen mesh and hardware. New screen door shall be same material and color as
                                existing.
                                Screen door size: up to 2.0m²/(EA)
D702BL   Replace aluminum       The Contractor shall remove existing and provide new sliding, double hung or fixed type          30   EA
         window                 aluminum window with hardware, glass, aluminum window frame, wooden trims and
                                restoration of wall and floor around window, New window shall be same material and
                                color as existing. Window size: up to 2.0m²/(EA)
D702BM   Replace aluminum       The Contractor shall remove exiting and provide new aluminum framed screen window                50   EA
         screen window          with insect screen mesh and hardware. New screen window shall be same material and
                                color as exiting.
                                Screen window size: up to 2.0m²/(EA)
                                                                           J-0200000-07 Page 108
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                              QTY       ISSUE     PRICE ¥   AMOUNT ¥
D702BN   Adjust and refit door The Contractor shall adjust and refit door lock, knob, hinge or latch, including retighten or     1,000    EA
                               replace missing screws. Unit: No. of door (including accordion door)
D702BP   Replace door face       The Contractor shall remove existing and provide new plywood or printed plywood door           100     SH
         sheet on one side of    face sheet on one side of door. New printed plywood door face sheet shall be same
         door                    material and color as existing. Door size: up to 2.0m²/(SH)
D702BQ   Replace threshold       The Contractor shall remove existing and provide new wood or metal threshold of door.           20     LM
         of door                 New threshold shall be same material and color as existing.
D702BR   Replace wooden          The Contractor shall remove existing and provide new wooden door frame, including               30     LM
         door frame              wooden trims and restoration of wall and floor around door frame
D702BS   Replace wooden          The Contractor shall remove existing and provide new wooden trim on door or window              80     LM
         trim on door or         frame
         window frame
D702BT   Repair wooden door      The Contractor shall repair wooden door frame with wooden piece and putty                       30     LM
         frame
D702BU   Install weather strip   The Contractor shall prepare surfaces and provide new weather strip around door or             200     LM
         around door or          window. New weather strip shall be same material and color as others.
         window
D702BV   Replace aluminum        The Contractor shall remove existing and provide new aluminum weather strip for bottom          20     EA
         weather strip for       of door. New weather strip shall be same material and color as existing.
         bottom of door.
D702BW   Replace insect          The Contractor shall remove existing and provide new insect screen mesh with new             1,500     SM
         screen mesh             gaskets of screen door or window. New insect screen mesh shall be same material and
                                 color as existing.
D702BX   Replace glass pane The Contractor shall remove existing and provide new float, figured, wired or safety glass           50     SM
                            pane, including gasket or caulking around glass. New glass pane shall be same material
                            and color as existing.
D702BY   Replace safety          The Contractor shall remove existing and provide new safety double glass pane,                  20     SM
         double glass pane       including inner film or dry air between glass panes, and gasket or caulking around glass.
                                 New glass pane shall be same material and color as existing.
D702BZ   Replace door lock       The Contractor shall remove existing and provide new door lock with door knob, interior         10     EA
                                 or exterior, cylinder or mortise lock type or "sora-joh" type. New door lock shall be same
                                 material and color as existing.
                                                                             J-0200000-07 Page 109
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                           QTY       ISSUE     PRICE ¥   AMOUNT ¥
D702CA   Replace door lock     The Contractor shall remove existing door lock and provide new privacy door lock with             10    EA
         with privacy door     door knob, which has release system by using pin from outside for emergency, like a
         lock                  door lock for bathroom use, in Master bed room. Line item shall include repair of door for
                               new door lock, replacement of strike and repair of door frame for new strike. New door
                               lock shall be same material and color as others.
D702CB   Replace door knob     The Contractor shall remove existing and provide new door knob or handle on closet               100   EA
         or handle on closet   door. New door knob and handle shall be same material and color as existing
         door
D702CC   Replace pull handle   The Contractor shall remove existing and provide new pull handle for screen door. New             10   EA
         for screen door.      pull handle shall be same material and color as existing.
D702CD   Replace latch on      The Contractor shall remove existing and provide new latch on screen door. New latch              20   EA
         screen door           shall be same material and color as existing.

D702CE   Replace window or     The Contractor shall remove existing and provide new window or sliding door latch,               100   EA
         sliding door latch,   Crescent, screw-in or dead bolt type. New latch shall be same material and color as
         Crescent, screw-in    existing.
         or dead bolt type

D702CF   Replace door          The Contractor shall remove existing and provide new door stopper, Floor mount,                   50   EA
         stopper               baseboard mount or door top mount type. New door stopper shall be same material and
                               color as existing.
D702CG   Replace floor type    The Contractor shall remove existing and provide new floor type stopper for heavy duty            30   EA
         stopper for hevy      door type. New door stopper shall be same material and color as existing.
         duty door type.
D702CH   Replace sheave     The Contractor shall remove existing and provide new sheave ("TOGURUMA") of sliding                 100   EA
         ("TOGURUMA") of door or window. New sheave shall be same material and color as existing.
         sliding door or
         window
D702CJ   Replace door hinge The Contractor shall remove existing and provide new door hinge, Stainless steel or                  10   EA
                            brass. New door hinge shall be same material and color as existing.
D702CK   Replace door hinge, The Contractor shall remove existing and provide new door hinge, single or double acting            10   EA
         single or double    spring hinge. New door hinge shall be same material and color as existing.
         acting spring hinge

                                                                          J-0200000-07 Page 110
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY       ISSUE     PRICE ¥   AMOUNT ¥
D702CL   Replace door hinge The Contractor shall remove existing and provide new door hinge on folding door or                   100    EA
         on folding door or closet door. New door hinge shall be same material and color as existing.
         closet door

D702CM   Replace top or        The Contractor shall remove existing and provide new top or bottom guide rail for double           20   EA
         bottom guide rail for folding door. New rail shall be same material and color as existing. Rail size (L): up to
         double folding door 1,800 mm/(EA).

D702CN   Replace top or       The Contractor shall remove existing and provide new top or bottom guide pin for double             30   EA
         bottom guide pin for folding door. New guide pin shall be same material and color as existing.
         double folding door.

D702CP   Replace round     The Contractor shall remove existing and provide new round plastic vent on closet door.                50   EA
         plastic vent on   New round plastic vent shall be same material and color as existing. Size: up to 40mm
         closet door       Dia.
D702CQ   Replace wooden    The Contractor shall remove existing and provide new wooden louver in wooden door.                      5   EA
         louver in wooden  New louver shall be same material and color as existing. Louver size: up to (W) 600 x
         door              (H) 250 mm.
D702CR                     The Contractor shall remove existing and provide new door closer. New door closer shall
         Replace door closer                                                                                                      20   EA
                           be same material and color as existing.
D702CS   Replace pneumatic The Contractor shall remove existing and provide new pneumatic door closer of screen                   10   EA
         hydraulic door    door. New door closer shall be same material and color as existing.
         closer of screen
         door
D702CT   Replace chain and      The Contractor shall remove existing and provide new chain and its lock set on door,              20   EA
         its lock set on door   Stainless steel. New chain and lock set shall be same material and color as existing.
D702CU   Replace swing latch    The Contractor shall remove existing and provide new swing latch for door. New latch              20   EA
         for door.              shall be same material and color as existing.
D702CV   Replace peephole       The Contractor shall remove existing and provide new peephole in entrance door. New               10   EA
         in entrance door       peephole shall be same material and color as existing.

D702CW   Replace venetian       The Contractor shall remove existing and provide new venetian blind. One-side                      5   EA
         blind, 6.0m²/(EA)      operation, Aluminum slat: (W)25mm, curbed, color: white.
                                Window opening size: over 4.0m² and up to 6.0m²/(EA)
                                                                            J-0200000-07 Page 111
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                            QTY       ISSUE     PRICE ¥   AMOUNT ¥
D702CX   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                     500    EA
         blind, 4.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: over 2.0m² and up to 4.0m²/(EA)
D702CY   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                     300    EA
         blind, 2.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: over 1.0m² and up to 2.0m²/(EA)
D702CZ   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                      50    EA
         blind, 1.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: up to 1.0m²/(EA)
D702DA   Replace loose or      The Contractor shall remove existing loose or broken parts (cord, slat, pully, ladder tape      3,500    EA
         broken parts of       and other parts) of venetian blind, and provide new one. New parts shall be same
         venetian blind.       material and color as existing.
D702DB   Replace vertical      The Contractor shall remove existing and provide new vertical blind. Aluminum slat:               100    EA
         blind                 (W)50mm or 100mm, color: white.
                               Window opening size: up to 6.0m²/(EA)
D702DC   Replace loose or      The Contractor shall remove existing loose or broken parts (cords, slat, pully, drawstrings     2,000    EA
         broken parts of       and other parts) of vertical venetian blind, and provide new one. New cord and
         vertical venetian     drawstring shall be same material and color as existing.
         blind.
D702DD   Replace twisted       The Contractor shall remove twisted shaft of vertical blind, and provide new one. New            5      EA
         shaft of vertical     shaft shall be same material and color as existing. Size: up to (L)4,000mm/(EA).
         blind
D702DE   Replace curtain or    The Contractor shall remove existing and provide new curtain or clothes hanging rod,            15      ST
         clothes hanging rod   including brackets and/or rings, Stainless steel. New rod shall be same material and
                               color as existing. Size: up to 40mm Dia.
D702DF   Install/Replace       The Contractor shall remove existing and provide new curtain rail with hung brackets,           20      ST
         curtain rail          unit: Length for curtain rail. New rail shall be same material and color as existing. This
                               item may not include removal of existing.
D702DG   Adjust and refit      The Contractor shall adjust and refit curtain rod/rail or handrail or cloth hanging rod,        15      ST
         curtain rod/rail or   including retighten or replacement of loose or missing screws.
         handrail or cloth
         hanging rod
                                                                            J-0200000-07 Page 112
                                                                                                                                         RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                        EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                        QTY     ISSUE     PRICE ¥   AMOUNT ¥
D702DH   Replace accordion    The Contractor shall remove existing and provide new accordion curtain door with rails,      30    EA
         curtain door         door handle, door catch and hardware. Fire-retardant vinyl facing. New curtain door
                              shall be same material and color as existing.
                              Size: up to 5.0 m²/(EA),
D702DJ   Replace facing       The Contractor shall remove existing facing sheet from counter top or cabinet, prepare      200    SM
         sheet of counter top surfaces and provide new facing sheet of melamine decorative sheet, printed plywood or
         or cabinet           stainless steel sheet. New facing sheet shall be same material and color as existing.

D702DK   Replace kitchen or  The Contractor shall remove existing and provide new kitchen wall hung cabinet,             20     EA
         laundry wall hung   including restoration of ceiling and wall around cabinet. New cabinet shall be same
         cabinet             material and color as existing.
                             Cabinet size: up to (W)2000 x (H)1000 x (D)450mm
D702DL   Replace kitchen     The Contractor shall remove existing and provide new kitchen base cabinet with counter      20     EA
         base cabinet        top, including restoration of floor and wall around cabinet. New cabinet shall be same
                             material and color as existing.
                             Cabinet size: up to (W)2000 x (H)1000 x (D)650mm
D702DM   Replace lavatory    The Contractor shall remove existing and provide new lavatory sink cabinet with related     20     EA
         sink cabinet        accessories, including reinstallation of existing wash basin. New cabinet shall be same
                             material and color as existing.
                             Cabinet size: up to 1450mm wide
D702DN   Replace mirror      The Contractor shall remove existing and provide new mirror. New mirror shall be same       10     EA
                             material and color as existing. Mirror size: up to 2.0m²/(EA). This item may be used for
                             new provision (size up to 2.0m²/(EA))
D702DP   Replace shelf board The Contractor shall remove existing and provide new shelf board of cabinet. New shelf      30     EA
         of cabinet          board shall be same material and color as existing. Size: up to 0.5m²/(EA)

D702DQ   Replace bracket or   The Contractor shall remove existing and provide new bracket or pin of shelf board. New    50     EA
         pin of shelf board   bracket shall be same material and color as existing.

D702DR   Replace cabinet     The Contractor shall remove existing and provide new cabinet door, including hardware.      20     EA
         door                New cabinet door shall be same material and color as existing. Door size: up to
                             1.0m²/(EA)
D702DS   Replace closet door The Contractor shall remove existing and provide new closet door, including hardware.       50     EA
                             New closet door shall be same material and color as existing. Door size: up to
                             2.0m²/(EA)
D702DT   Replace cabinet     The Contractor shall remove existing and provide new cabinet door hinge. New door           20     EA
         door hinge          hinge shall be same material and color as existing.
                                                                         J-0200000-07 Page 113
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION             FULL DESCRIPTION                                                                        QTY       ISSUE     PRICE ¥   AMOUNT ¥
D702DU   Replace cabinet         The Contractor shall remove existing and provide new cabinet drawer, including                 20    EA
         drawer                  hardware. New drawer shall be same material and color as existing. Unit: No, of drawer.

D702DV   Replace door knob The Contractor shall remove existing and provide new door knob or handle on cabinet                  30   EA
         or handle on        door/drawer. New door knob and handle shall be same material and color as existing.
         cabinet door/drawer


D702DW   Replace magnet or The Contractor shall remove existing and provide new magnet or roller catcher. New                   50   EA
         roller catcher    magnet and roller catch shall be same material and color as existing.

D702DX   Replace corrugated      The Contractor shall remove existing and provide new corrugated FRP terrace roofing,          100   SM
         FRP terrace roofing,    carport acrylic panel and backyard polycarbonate panel. New material shall be same
         carport acrylic panel   material and color as existing. Line item shall include scaffolding installation and
         and backyard            removal.
         ploycarbonate
         panel.


D702DY   Replace wood,        The Contractor shall remove existing and provide new wood, stainless steel, brass or              20   LM
         stainless steel,     vinyl handrail of stairway, including brackets. New handrail shall be same material and
         brass or vinyl       color as existing.
         handrail of stairway

D702DZ   Repair spall, crack     The Contractor shall repair spall, crack or broken concrete or mortar surfaces                 40   SM
         or broken concrete
         or mortar surfaces
D702EA   Replace PVC gutter The Contractor shall remove existing and provide new PVC gutter, including brackets.               100   LM
                            New gutter shall be same material and color as existing. Line item shall include
                            scaffolding installation and removal.
D702EB   Replace downspout The Contractor shall remove existing and provide new PVC downspout or                               200   LM
                            carport/backyard terrace downspout, including brackets. New downspout shall be same
                            material and color as existing. Line item shall include scaffolding installation and
                            removal.
D702EC   Repair/refit gutter,    The Contractor shall repair/refit gutter, downspout and accessories. Line item shall          100   LM
         downspout and           include scaffolding installation and removal.
         accessories
                                                                             J-0200000-07 Page 114
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                             QTY      ISSUE     PRICE ¥   AMOUNT ¥
D702ED   Replace chain-link The Contractor shall remove existing and provide new chain-link or steel mesh fence                 40    LM
         or steel mesh fence including concrete foundation and restoration of surrounding area. New fence shall be
                             same structure, material and color as existing. Fence height: up to 1.5m
D702EE   Replace panel of     The Contractor shall remove existing steel or aluminum "MEKAKUSHI" fence and provide              40   LM
         "MEKAKUSHI"          new same material fence (Up to 1,800mmH). New panel shall be same material and
         fence                color as existing.
D702EF   Replace door of      The Contractor shall remove existing and provide new single door of aluminum or steel              5   EA
         MEKAKUSHI" or        "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New door shall be same material
         steel mesh fence     and color as existing.
D702EG   Replace latch,       The Contractor shall remove existing and provide new latch, hinge, knob or stopper of             20   EA
         hinge, knob or       aluminum or steel "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New latch,
         stopper of           knob and stopper shall be same material and color as existing.
         "MEKAKUSHI" or
         steel mesh fence

D702EH   Replace cap or joint The Contractor shall remove existing and provide new cap or joint of aluminum or steel            20   EA
         of "MEKAKUSHI" "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New cap and joint shall be same
         or steel mesh fence material and color as existing.


D702EJ   Replace cap or joint The Contractor shall remove existing and provide new cap or joint for carport or backyard         50   EA
         for carport or       terrace. New cap and joint shall be same material and color as existing. Line item shall
         backyard terrace     include scaffolding installation and removal.
D702EK   Replace vent cap or The Contractor shall remove existing and provide new vent cap or natural vent screen on            10   EA
         air vent screen     exterior wall. New vent shall be same material and color as existing. Vent size: up to
                             0.5m²/(EA) Height less than 6 meters.
D702EL   Adjust and refit    The Contractor shall adjust and refit metal storage shed, including roof, wall, doors,             20   EA
         metal storage shed brackets, handle/lock, guide rail, floor, hardware, shelves, and retighten or replacement
                             of loose or missing fasteners, Unit: No. of metal storage shed
                                                                          J-0200000-07 Page 115
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST     UNIT OF    UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                          QTY     ISSUE      PRICE ¥   AMOUNT ¥
D702EM   Replace FRP water-     The Contractor shall remove existing and provide new FRP water-proof coating of fish          200    SM
         proof coating,         pond and highrise balcony (Bldg. 3101 and 3102) and apply finish coatings. Line item
         mortar or concrete     shall include temporary relocation and keeping of fishes during repair work of fish pond,
                                and return of them with proper treatment after completion of work and necessary curing
                                time. This item shall also include; chip out and remove damaged portions, prepare
                                surfaces and apply adhesive, and provide new water-proof mortar or concrete under FRP
                                coating of fish pond and balcony. Pond/balcony area: up to 100m²/(EA)

D702EN   Replace bird           The Contractor shall remove existing and provide new bird protection net with fasteners          50    EA
         protection net         and main rope, at balcony of Hi-rise. New bird protection net shall be same material and
                                color as existing. Opening area: up to 14.0m²/(EA) New provision (without removal) may
                                be ordered.
D702EP   Refinish bathtub       The Contractor shall remove all scratches and scores, and refinish bathtub in accordance         50    SM
         coating                with manufacturer's recommended method.
D702EQ   Repair surface of      The Contractor shall repair surfaces of artificial polyester or acrylic type counter in          50    SM
         polyester or acrylic   accordance with Attachment J-1502000-03.
         counter
D702ER   Replace kitchen        The Contractor shall remove existing and provide new kitchen counter. The counter shall           3    Set
         counter stainless,     be same material as existing.
         marble, polyester
D702ES   Replace inspection     The Contractor shall remove existing and provide new inspection panel for bathtub. New           10    EA
         panel for bathtub.     inspection panel shall be same material and color as existing.

D702ET   Repair, adjust and     The Contractor shall repair, adjust and refit cabinet door or drawersr, so the cabinet door    4,000   EA
         refit cabinet door     and drawer can open and close smoothly as originally intended. (1 door or 1 drawer is
         and drawers            counted as 1 EA.)
D702EU   Repair nail holes on The Contractor shall repair surfaces of wall or door that has been damged by nail. The           3,000   EA
         wall or door         nail holes shall become imvisible, and the the wall or door surface shall look smooth. (1
                              door or 1 SM wall is counted as 1 EA.)
D702EV   Adjust and refit       The Contractor shall adjust and refit hardwre on wall, floor and door (loose screws, outlet,   3,000   EA
         hardware on wall,      door stopper, plumbing fixture, faucets, etc.) (1 door or 1 SM wall/floor is counted as 1
         floor and door         EA.)
D702EW   Replace caulking or    The Contractor shall replace existing caulking or cement for joint with new.                   1,000   LM
         cement for joint
                                                                              J-0200000-07 Page 116
                                                                                                                                                    RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST     UNIT OF        UNIT         TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                            QTY     ISSUE          PRICE ¥      AMOUNT ¥
D702EX   Replace house         The Contractor shall remove existing house number plate and shall provide new number            100    EA
         number plate          plate (metal or plastic), same size, color and material as existing, with number printed on
                               the plate. The number shall bear severe weather condition.
D702EY   Replace towel ring    The Contractor shall replace existing towel ring or bar with new, same or similar model in       20    EA
         or bar                bathroom.

                                                                                                                          Sub Total, D702 (D702AA - D702EY):

D703     Electrical work
D703AA   Replace light         The Contractor shall replace existing light fixture with same or similar model,                      200    EA
         fixture               Typical light fixtures are as follows:
                               Waterproof or indoor use, ceiling, wall, flush, or pendant mount type with
                               globe/cover/diffuser, incandescent or fluorescent light, and typical lamp size, and voltage
                               as indicated Attachment J-1502000-03 or reference drawings.
D703AB   Replace ceiling        The Contractor shall replace existing ceiling fan/light fixture with new type of the ceiling         50    EA
         fan/light fixture with fan/light fixture in accordance with Attachment J-1502000-03. New ceiling fan/light fixture
         new material           shall be same or similar model as others.
D703AC   Replace exit light    The Contractor shall replace existing exit light and fixture with same or similar model.              20    EA
         and fixture           Typical exit lights are as follows:
                               Waterproof or indoor use, ceiling or wall mount type with acrylic direction cover and
                               battery, fluorescent light 1-10W or 1-20W.

D703AD   Replace               The Contractor shall replace existing globe/diffuser of light fixture. The replacement                50    EA
         globe/diffuser of     globe/diffuser shall be same type and compatible with existing light fixture.
         light fixture
D703AE   Replace fluorescent The Contractor shall replace existing fluorescent light bulb includes starter lamp.                    600    EA
         light bulb includes
         starter lamp

D703AF   Replace pull switch The Contractor shall replace pull switch and cord of light fixture with same or similar                 50    EA
         and cord of light    model.
         fixture
D703AG   Replace cover plate The Contractor shall replace cover plate for outlet or switch with same or similar model.              200    EA
         for outlet or switch
         or CATV

                                                                            J-0200000-07 Page 117
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY       ISSUE     PRICE ¥   AMOUNT ¥
D703AH   Replace tumbler or The Contractor shall replace tumbler or dimmer switch or bathroom timer switch with                   50    EA
         dimmer switch      same or similar model.
D703AJ   Replace electrical   The Contractor shall replace electrical outlet with same or similar model.                          50   EA
         outlet
D703AK   Replace chime,       The Contractor shall replace chime, buzzer, or push button with same or similar model.              10   EA
         buzzer, or push
         button
D703AL   Replace ballast of   The Contractor shall replace ballast of fluorscent light with new one.                              50   EA
         fluorscent light
D703AM   Replace home type The Contractor shall replace home type smoke detector (house-wired or battery-                         30   EA
         smoke detector    powered) with same or similar model. New battery shall also be provided for battery-
                           powered type.
D703AN   Replace CATV/FM      The Contractor shall replace CATV/FM outlet and outlet cover with same or similar                   50   EA
         outlet               model.
D703AP   Replace              The Contractor shall remove existing incandescent light bulb and provide new compact               200   EA
         incandescent light   fluorescent light.
         bulb to compact
         fluorescent light
D703AQ   Replace batteries    The Contractor shall replace battery for smoke detector with new, 9V.                              200   EA
         for GFM smoke
         detector
D703AR   Replace toggle       The Contractor shall replace toggle switch including plates with same or similar model.            100   EA
         switch


                                                                                                                    Sub Total, D703 (D703AA - D703AR):

D704     Mechanical work
D704AA   Replace washbasin The Contractor shall replace washbasin or slope sink or lavatory sink including pipe                   30   EA
         or lavatory sink  fittings with same or similar model.


D704AB   Replace commode      The Contractor shall replace commode (water closet), including seat, lid and fittings with          20   EA
                              same or similar model.
D704AC   Replace seat of      The Contractor shall replace toilet seat and lid of commode with same or similar model.            100   EA
         commode
                                                                           J-0200000-07 Page 118
                                                                                                                                                 RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
D704AD   Replace low tank of The Contractor shall replace low tank, including lid and fittings, with same or similar                5    EA
         commode             model.
D704AE   Replace lid of low    The Contractor shall replace low tank lid and fittings with same or similar model.                   5   EA
         tank
D704AF   Replace low tank      The Contractor shall replace flush valve for low tank with same or similar model.                    5   EA
         valve
D704AG   Replace paper         The Contractor shall replace toilet paper holder with same or similar model.                        20   EA
         holder
D704AH   Replace plastic bar   The Contractor shall replace plastic bar of toilet paper holder.                                    30   EA
         of paper holder

D704AJ   Replace lavatory      The Contractor shall replace lavatory with base cabinet unit, including pipe fittings with          30   EA
         with cabinet          same or similar model.
D704AK   Replace plug and      The Contractor shall replace plug and chain for lavatory sink with same or similar model.           30   EA
         chain for lavatory
         sink
D704AL   Replace medicine      The Contractor shall replace medicine cabinet (single, double or three mirror type),                50   EA
         cabinet               including restoration of wall to fit new cabinet, necessary wiring to light fixture mounted
                               on the new cabinet and furnishing of light/bulb, and remove old wall mounted fixture, with
                               same or similar model.
D704AM   Replace mirror of     The Contractor shall replace mirror of medicine cabinet with same or similar model.                 10   EA
         medicine cabinet
D704AN   Repair medicine       The Contractor shall repair medicine cabinet, including light fixture cover, door and               50   EA
         cabinet               accessories.
D704AP   Replace bathtub       The Contractor shall replace bathtub, including hardware, with same or similar model.               10   EA

D704AQ   Replace bathtub       The Contractor shall replace bathtub drain pipe with direct flow (in-line) type fitting,            10   EA
         drain pipe            including dismount/remount bathtub.
D704AR   Replace shower        The Contractor shall replace shower head with same or similar model.                                20   EA
         head
D704AS   Replace hand          The Contractor shall replace shower head and hose with same or similar model.                       50   EA
         shower head and
         hose
D704AT   Repair or adjust      The Contractor shall repair or adjust shower/faucet mixing valve.                                   50   EA
         shower/faucet
         mixing valve.
                                                                              J-0200000-07 Page 119
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                             QTY       ISSUE     PRICE ¥   AMOUNT ¥
D704AU   Replace hose of    The Contractor shall replace hose of hand shower with same or similar model.                        30    EA
         hand shower
D704AV   Replace bar type   The Contractor shall replace bar type shower head holder with same or similar model.                10   EA
         shower head holder

D704AW   Replace robe hook     The Contractor shall replace robe hook with same or similar model.                               10   EA

D704AX   Replace grip bar for The Contractor shall replace grip bar for bathtub with same or similar model.                     10   EA
         bathtub
D704AY   Replace towel rack The Contractor shall replace towel rack with same or similar model.                                 10   EA

D704AZ   Replace soap dish     The Contractor shall replace soap dish with same or similar model.                                5   EA

D704BA   Replace faucet        The Contractor shall replace hose faucet, garden faucet, bath faucet, mixing faucet or           20   EA
                               mixing valve, including handles or lever, with same or similar model.
D704BB   Replace handle of     The Contractor shall replace handle or lever of faucet with same or similar model.               20   EA
         mixing faucet
D704BC   Replace packing for The Contractor shall replace packing for faucet or valve.                                         500   EA
         faucet or valve
D704BD   Replace             The Contractor shall replace combination stopper of washbasin, lavatory or bathtub with            10   EA
         combination stopper same or similar model.

D704BE   Replace mixing        The Contractor shall replace mixing faucet for kitchen sink (individual handles,                 20   EA
         faucet for kitchen    combination type) with same or similar model.
         sink
D704BF   Check and repair as   The Contractor shall check and repair as necessary all plumbing works (hot & cold water         100   LM
         necessary all         supply, drainage, faucet and shower).
         plumbing works
D704BG   Remove foreign        The Contractor shall remove foreign matter and repair clogged drain pipe connected to            50   EA
         matter and repair     either commode, lavatory, bathtub or kitchen sink.
         clogged drain pipe

D704BH   Replace non-        The Contractor shall replace non-asbestos insulation on water/heater pipe with new                100   LM
         asbestos insulation similar material.
         on pipe
D704BJ   Repair sink faucet The Contractor shall repair sink faucet assembly.                                                   30   EA
         assembly
                                                                            J-0200000-07 Page 120
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT         TOTAL
ELIN     DESCRIPTION             FULL DESCRIPTION                                                                            QTY       ISSUE     PRICE ¥      AMOUNT ¥
D704BK   Replace kitchen         The Contractor shall replace kitchen sink with same or similar model.                               3    EA
         double sink
D704BL   Repair piping under     The Contractor shall repair piping under kitchen sink or washbasin with similar material.          20    EA
         kitchen sink or
         washbasin
D704BM   Replace kitchen         The Contractor shall replace kitchen ventilation hood in kitchen with same or similar              10    EA
         ventilation hood        model.
D704BN   Replace exhaust         The Contractor shall replace exhaust fan, ceiling or wall mounted type, with same or               20    EA
         fan                     similar model.
D704BP   Replace grease          The Contractor shall replace grease filter of range hood fan with same or similar model.          100    EA
         filter of range hood
         fan
D704BQ   Replace screen          The Contractor shall replace screen filter of exhaust fan with same or similar model.              10    EA
         filter of exhaust fan

D704BR   Replace vent cover The Contractor shall replace vent cover with grille for dryer's exhaust pipe.                           10    EA
         with grill for dryer

D704BS   Replace heat-pump       The Contractor shall replace heat-pump type air conditioner (both indoor and outdoor               50    EA
         type A/C                unit) with same or similar model.
D704BT   Replace pipe            The Contractor shall replace pipe insulation cover for heat pump AC with new same or               30    ST
         insulation cover for    similar material to ensure proper and energy efficient operation and function of AC. (All
         heat pump AC            pipe insulation cover for one heat pump AC unit is counted as 1 ST.)



                                                                                                                         Sub Total, D704 (D704AA - D704BT):

                                                                             J-0200000-07 Page 121
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY         ISSUE     PRICE ¥   AMOUNT ¥
D705     Whole Unit Cleaning
D705AA   Whole Unit         The Contractor shall perform whole unit cleaning.                                                     60      UN
         Cleaning, Atsugi,  The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 2-
         Bedroom Unit
D705AB   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   50      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 3-
         Bedroom Unit
D705AC   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   20      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 4-
         Bedroom Unit
D705AD   Whole Unit           The Contractor shall perform whole unit cleaning.                                                  120      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         High-rise, 2-
         Bedroom Unit
D705AE   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   80      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         High-rise, 3-
         Bedroom Unit
D705AF   Whole Unit           (Note: At the time of contract award, this item is reserved for future use. Amount                   (Max Amount)                  4,736,000
         Cleaning, Atsugi,    indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         High-rise, 4-        determined later by contract modification.) The Contractor shall perform whole unit
         Bedroom Unit         cleaning. The Contractor shall ensure that FH unit is clean, sanitary and sightly.
D705AG   Whole Unit           The Contractor shall perform whole unit cleaning.                                                    2      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         SOQ
D705AH   Whole Unit           The Contractor shall perform whole unit cleaning.                                                    2      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse in SOQ
         Area, 3-Bedroom
D705AJ   Whole Unit        The Contractor shall perform whole unit cleaning.                                                       3      UN
         Cleaning, Atsugi, The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse in SOQ
         Area, 4-Bedroom
                                                                                                                    Sub Total, D705 (D705AA - D705AJ):
                                                                           J-0200000-07 Page 122
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                              EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                               QTY         ISSUE     PRICE ¥   AMOUNT ¥
D706     Cleaning work
D706AA   Clean and wax floor The Contractor shall clean and wax floor to ensure clean, sanitary and sightly condition.         2,000      SM

D706AB   Deep clean carpet     The Contractor shall deep clean carpet and rug to ensure clean, sanitary and sightly            1,000      SM
         and rug               condition. The Government may direct cleaning method such as sampooing, steam
                               cleaning, dry cleaning or other similar deep cleaning processes.
D706AC   Clean concrete and    The Contractor shall clean concrete and tiled floor to ensure clean, sanitary and sightly       1,000      SM
         tiled floor           condition.
D706AD   Clean tile and        The Contractor shall clean tile and washable wall to ensure clean, sanitary and sightly            500     SM
         washable wall         condition.
D706AE   Clean exterior wall   The Contractor shall clean exterior wall surfaces to ensure clean, sanitary and sightly            500     SM
                               condition.
D706AF   Clean stainless       The Contractor shall clean and polish stainless steel sink and counter to ensure clean,             30      EA
         steel sink and        sanitary and sightly condition..
         counter
D706AG   Clean dryer vent      The Contractor shall clean dryer vent line with fan to ensure clean, sanitary and sightly          200      EA
         line with fan         condition and propler operation and function of dryer. The Contractor shall clean from
                               dryer to duct connection (if vertical duct exhaust fan system is used) or to exterior wall
                               hood.
D706AH   Clean gutter and      The Contractor shall clean gutter and downspout to ensure clean, sanitary and sightly              700      LM
         downspout             condition and proper original intended function of gutter and downspount. All the foreign
                               materials shall be removed. Line item shall include scaffolding installation and removal.

D706AJ   Clean canopy          The Contractor shall clean canopy including gutter and downspout to ensure clean,                  600     SM
                               sanitary and sightly condition. Above D706AH shall also be applied for gutter and
                               downspout. Line item shall include scaffolding installation and removal.
D706AK   Mini cleaning         The Contractor shall perform Mini cleaning to ensure clean, sanitary and sightly                    30      UN
                               condition.

D706AL   Grass cutting         The Contractor shall cut grass (including but not limited to turf, weed, vines, and other      10,000      SM
                               unwanted vegetations) to uniform height of 2 inches to maintain grass healthy condition
                               and appearance.
                                                                            J-0200000-07 Page 123
                                                                                                                                       RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                    EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION    FULL DESCRIPTION                                                                          QTY       ISSUE     PRICE ¥   AMOUNT ¥
D706AM   Sodding        The Contractor shall provide sod, Anti Weeds Type Sod (Saint Augustine Grass II or            3,000    SM
                        Modified Centipede Grass) species unless otherwise specified. It shall be dense,
                        uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid
                        on properly prepared topsoil. Sod joints shall be staggered and butted together. On
                        slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed
                        installation shall be smooth and uniform in appearance. The Contractor shall water and
                        provide continuing care for sodded areas as necessary to firmly establish new grass
                        growth and development. The Contactor shall replace all grass that dies or fails to
                        develop noticeable growth within 90 days of sodding at no additional cost to the
                        Government.


                                                                                                           Sub Total, D706 (D706AA - D706AM):



                                                                                   TOTAL OF THIRD OPTION PERIOD, D700 THROUGH D706AM:




                                                                   J-0200000-07 Page 124
                                                                                                                                                        RFP N40084-10-R-8709

                                                           ATTACHMENT J-0200000-07
                                                          EXHIBIT LINE ITEM NUMBERS
                                                   SOLICITATION/CONTRACT #N40084-10-R-8709
                                                             EXHIBIT E - CLIN 0005

Line Item 0005   Fourth Option Period - Indefinite Delivery Indefinite Quantity Work

PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs E700 through E706

NAME OF OFFEROR OR CONTRACTOR:
          SHORT                                                                                                                   EST        UNIT OF   UNIT      TOTAL
ELIN      DESCRIPTION      FULL DESCRIPTION                                                                                       QTY        ISSUE     PRICE ¥   AMOUNT ¥
E700      Change of Occpancy Maintenance (COM)
E700AA    COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                     10      UN
          Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
          Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
          (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
          Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                                work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                                to the Government immediately. In such case, applicable IDIQ work item or another
                                contract will be issued.
                                The Contractor shall ensure that FH unit is fully functional with all equipments and
                                fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                                smudges, streaks and foreign matter, and debris.
E700AB    COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                     30      UN
          Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
          Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
          (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
          2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                                work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                                to the Government immediately. In such case, applicable IDIQ work item or another
                                contract will be issued.
                                The Contractor shall ensure that FH unit is fully functional with all equipments and
                                fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                                smudges, streaks and foreign matter, and debris.

                                                                              J-0200000-07 Page 125
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
E700AC   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   35    UN
         Townhouse, 2-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

E700AD   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    8   UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

E700AE   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   10   UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                             J-0200000-07 Page 126
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
E700AF   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   32    UN
         Townhouse, 3-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

E700AG   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    3   UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied Less        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

E700AH   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                    4   UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied 1 Year to   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         2 Years)              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                             J-0200000-07 Page 127
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
E700AJ   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   13    UN
         Townhouse, 4-         period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Bedroom Unit          including all equipments, fixtures and interior conditions, and shall perform the COM work
         (Occupied More        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 2 Years)         to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


E700AK   COM, Atsugi, High- This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                      15   UN
         rise, 2-Bedroom    period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied Lessincluding all equipments, fixtures and interior conditions, and shall perform the COM work
         Than 1 Year)       items listed in Attachment J-1401000-04. When the Contractor found the work item need
                            to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
E700AL                      This item applies to the FH unit in which Quantitly LImitation, the less than 1 year
         COM, Atsugi, High- work ELIN list, or which exceeds specifiedthe last occuapnt stayed Contractor shall report               35   UN
         rise, 2-Bedroom    period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied 1   including all equipments, fixtures and interior conditions, and shall perform the COM work
         Year to 2 Years)   items listed in Attachment J-1401000-04. When the Contractor found the work item need
                            to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                            work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                            to the Government immediately. In such case, applicable IDIQ work item or another
                            contract will be issued.
                            The Contractor shall ensure that FH unit is fully functional with all equipments and
                            fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                            smudges, streaks and foreign matter, and debris.


                                                                            J-0200000-07 Page 128
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
E700AM   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt more than 2 year period. The              70    UN
         rise, 2-Bedroom       Contractor shall participate in deficiency inspection and inspect FH unit including all
         Unit (Occupied        equipments, fixtures and interior conditions, and shall perform the COM work items listed
         More Than 2 Years)    in Attachment J-1401000-04. When the Contractor found the work item need to be
                               adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work
                               item list, or which exceeds specified Quantitly LImitation, the Contractor shall report to
                               the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

E700AN   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   15   UN
         rise, 3-Bedroom       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied Less   including all equipments, fixtures and interior conditions, and shall perform the COM work
         Than 1 Year)          items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

E700AP   COM, Atsugi, High-    This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   15   UN
         rise, 3-Bedroom       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied 1      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Year to 2 Years)      items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

                                                                             J-0200000-07 Page 129
                                                                                                                                                    RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                EST      UNIT OF   UNIT        TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥     AMOUNT ¥
E700AQ   COM, Atsugi, High-   This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   50    UN
         rise, 3-Bedroom      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Unit (Occupied       including all equipments, fixtures and interior conditions, and shall perform the COM work
         More Than 2 Years)   items listed in Attachment J-1401000-04. When the Contractor found the work item need
                              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.


E700AR   COM, Atsugi, High- (Note: At the time of contract award, this item is reserved for future use. Amount                       (Max Amount)                 21,000,000
         rise, 4-Bedroom    indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         Unit               determined later by contract modification.) The Contractor shall inspect FH unit including
                            all equipments, fixtures and interior conditions, and shall perform the COM work items
                            listed in Attachment J-1401000-07 (ATSUGI/KAMISEYA). When the Contractor found
                            the work item need to be adjusted, maintained, repaired and/or replaced, and which is
                            not listed in the COM work item list, the Contractor shall report to the Government
                            immediately. In such case, applicable IDIQ work item or another contract will be issued.
                            The Contractor shall ensure that FH unit is fully functional with all equipments and
                            fixtures, and is in quality conditions.


E700AS   COM, Atsugi, SOQ     This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                    2   UN
         (Occupied Less       period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Than 1 Year)         including all equipments, fixtures and interior conditions, and shall perform the COM work
                              items listed in Attachment J-1401000-04. When the Contractor found the work item need
                              to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.


                                                                            J-0200000-07 Page 130
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥   AMOUNT ¥
E700AT   COM, Atsugi, SOQ      This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         (Occupied 1 Year to   period. The Contractor shall participate in deficiency inspection and inspect FH unit
         2 Year)               including all equipments, fixtures and interior conditions, and shall perform the COM work
                               items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

E700AU   COM, Atsugi, SOQ      This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   2   UN
         (Occupied More        period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Than 2 Years)         including all equipments, fixtures and interior conditions, and shall perform the COM work
                               items listed in Attachment J-1401000-04. When the Contractor found the work item need
                               to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


E700AV   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied Less   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


                                                                             J-0200000-07 Page 131
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                 EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥   AMOUNT ¥
E700AW   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied 1      items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Year to 2 Years)      to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.

E700AX   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 3-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied        items listed in Attachment J-1401000-04. When the Contractor found the work item need
         More Than 2 Years)    to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


E700AY   COM, Atsugi,          This ELIN applies to the FH unit in which the last occuapnt stayed less than 1 year                   2   UN
         Townhouse in SOQ      period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom       including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied Less   items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Than 1 Year)          to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                               work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                               to the Government immediately. In such case, applicable IDIQ work item or another
                               contract will be issued.
                               The Contractor shall ensure that FH unit is fully functional with all equipments and
                               fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                               smudges, streaks and foreign matter, and debris.


                                                                             J-0200000-07 Page 132
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                                EST     UNIT OF   UNIT         TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                                QTY     ISSUE     PRICE ¥      AMOUNT ¥
E700AZ   COM, Atsugi,         This ELIN applies to the FH unit in which the last occuapnt stayed 1 year to 2 year                   2    UN
         Townhouse in SOQ     period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied 1     items listed in Attachment J-1401000-04. When the Contractor found the work item need
         Year to 2 Years)     to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.

E700BA   COM, Atsugi,         This ELIN applies to the FH unit in which the last occuapnt stayed more than 2 year                   3    UN
         Townhouse in SOQ     period. The Contractor shall participate in deficiency inspection and inspect FH unit
         Area, 4-Bedroom      including all equipments, fixtures and interior conditions, and shall perform the COM work
         Unit (Occupied       items listed in Attachment J-1401000-04. When the Contractor found the work item need
         More Than 2 Years)   to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM
                              work item list, or which exceeds specified Quantitly LImitation, the Contractor shall report
                              to the Government immediately. In such case, applicable IDIQ work item or another
                              contract will be issued.
                              The Contractor shall ensure that FH unit is fully functional with all equipments and
                              fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears,
                              smudges, streaks and foreign matter, and debris.



                                                                                                                        Sub Total, E700 (E700AA - E700BA):

                                                                            J-0200000-07 Page 133
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                             QTY         ISSUE     PRICE ¥   AMOUNT ¥
E701     Whole Unit Painting
E701AA   Whole Unit         The Contractor shall prepare and repaint all interior surfaces of FH unit, including                60      UN
         Painting, Atsugi,  concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 2-      materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit       surrounding area. Natural finish coating for wood surface is not included in this line item.
                            The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                            uniformly.

E701AB   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              50      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 3-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.
E701AC   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              20      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse, 4-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.
E701AD   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including             100      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         High-rise, 2-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.

E701AE   Whole Unit           The Contractor shall prepare and repaint all interior surfaces of FH unit, including              80      UN
         Painting, Atsugi,    concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         High-rise, 3-        materials in proper number of coat(s). New paints shall match color and gloss of
         Bedroom Unit         surrounding area. Natural finish coating for wood surface is not included in this line item.
                              The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                              uniformly.

                                                                           J-0200000-07 Page 134
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                          EST       UNIT OF UNIT            TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                           QTY       ISSUE     PRICE ¥       AMOUNT ¥
E701AF   Whole Unit          (Note: At the time of contract award, this item is reserved for future use. Amount                  (Max Amount)                 14,000,000
         Painting, Atsugi,   indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         High-rise, 4-       determined later by contract modification.) The Contractor shall prepare and repaint all
         Bedroom Unit        interior surfaces of FH unit, including concrete, mortar, board, wood, metal, steel and
                             other painted surfaces, with proper materials in proper number of coat(s). New paints
                             shall match color and gloss of surrounding area. Natural finish coating for wood surface
                             is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.
E701AG   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                2    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         SOQ                 materials in proper number of coat(s). New paints shall match color and gloss of
                             surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.

E701AH   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                2    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse in SOQ,   materials in proper number of coat(s). New paints shall match color and gloss of
         3-Bedroom           surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.

E701AJ   Whole Unit          The Contractor shall prepare and repaint all interior surfaces of FH unit, including                4    UN
         Painting, Atsugi,   concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper
         Townhouse in SOQ,   materials in proper number of coat(s). New paints shall match color and gloss of
         4-Bedroom           surrounding area. Natural finish coating for wood surface is not included in this line item.
                             The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and
                             uniformly.


                                                                                                                     Sub Total, E701 (E701AA - E701AJ):


                                                                          J-0200000-07 Page 135
                                                                                                                                                 RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                          EST      UNIT OF        UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                            QTY      ISSUE          PRICE ¥   AMOUNT ¥
E702     Architectural work
E702AA   Paint Interior     The Contractor shall prepare and paint interior surfaces, including concrete, mortar,         30,000    SM
         surfaces           board, wood, metal, steel or other surfaces designated by the Government, with proper
                            materials in proper number of coat(s). This line item does not cover natural finish coating
                            for wood surface.
                            New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                            chosen by the Government.

E702AB   Paint Interior wood      The Contractor shall prepare and paint interior wooden natural varnish finish surfaces,          1,000   SM
         natural varnish          including wooden frame, trims, moldings and wooden floor, with proper materials in
         finish surfaces          proper number of coat(s). New paints shall match color and gloss of surrounding area.
                                  New painted surfaces shall be smooth, evenly and uniformly.

E702AC   Paint Exterior           The Contractor shall prepare and paint exterior surfaces up to 2.5 meters height from           20,000   SM
         surfaces                 ground (including concrete, mortar, board, wood, metal, steel or other surfaces
         (scaffolding or other    designated by the Government) or height/location that does not require fall protection
         fall protection is not   (such as scaffolding) specified in EM 385-1-1, with proper materials in proper number of
         required)                coat(s). This item includes textured pattern and the Contractor shall make textured
                                  pattern by spraying base material on exterior concrete or mortar surfaces, including
                                  application of sealer. Line item shall include scaffolding installation and removal for
                                  exterior painting.
                                  New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                                  chosen by the Government.

E702AD   Paint Exterior           The Contractor shall prepare and paint exterior surfaces over 2.5 meters height up to 9          2,000   SM
         surfaces                 meters height from ground (including concrete, mortar, board, wood, metal, steel or other
         (scaffolding or other    surfaces designated by the Government) or height/location that requires fall protection
         fall protection is       (such as scaffolding) in accordance with EM 385-1-1, with proper materials in proper
         required)                number of coat(s). This item includes textured pattern and the Contractor shall make
                                  textured pattern by spraying base material on exterior concrete or mortar surfaces,
                                  including application of sealer. Line item shall include scaffolding installation and removal
                                  for exterior painting.
                                  New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be
                                  chosen by the Government.

E702AE   Paint house ID           The Contractor shall prepare and paint house ID number on building or parking space.              100    EA
         number                   Line item shall include background painting if required. The same paint shall be used.
                                                                               J-0200000-07 Page 136
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                           QTY       ISSUE     PRICE ¥   AMOUNT ¥
E702AF   Replace vinyl floor    The Contractor shall remove existing vinyl floor tiles/vinyl simulated wood floor tile,        1,200    SM
         tile/vinyl simulated   prepare surfaces to make smooth and even floor, and provide new vinyl floor tiles/vinyl
         wood floor tile        simulated wood floor tiles. New floor tile shall be same material and color as existing.
                                Line item shall include wax new vinyl floor unless otherwise directed by KO or HSG
                                Officer.
E702AG   Re-adhesive loose      The Contractor shall re-adhesive loose vinyl floor tile.                                        100    SM
         vinyl floor tile.

E702AH   Replace vinyl floor The Contractor shall remove existing vinyl floor sheets, prepare surfaces to make smooth           500    SM
         sheet (including slip- and even floor, and provide new vinyl floor sheets or slip-retardant vinyl floor sheets.
         retardant)             New vinyl floor sheet shall be same material and color as existing. Line item shall
                                include wax new vinyl floor sheets if necessary.

E702AJ   Sand wooden            The Contractor shall prepare and sand wooden flooring to remove existing paint and              500    SM
         flooring               make smooth and even floor.
E702AK   Replace hardwood       The Contractor shall remove existing hardwood flooring, sub sheeting baord and proof            300    SM
         flooring               sheet, prepare surfaces to make smooth and even floor, and provide new hardwood
                                flooring, sub sheeting board and proof sheet. Hardwood flooring: tongue and grooved,
                                thickness: up to 15mm. New hardwood flooring system shall match existing if replaced
                                flooring is adjacent to another hardwood floor.

E702AL   Repair loose, holes The Contractor shall repair loose, holes or cracks of hardwood flooring (refasten loose             50    SM
         or cracks of        hardwood flooring and/or fill hole, cracks with wooden piece and putty, and sand it to
         hardwood flooring make smooth and even surface)

E702AM   Install or replace   The Contractor shall provide new floor metal molding or replace floor metal molding with          200    LM
         floor metal molding. new one. New metal molding shall be same material and color as existing.

E702AN   Replace wooden       The Contractor shall remove existing and provide new wooden step board with riser                  20    EA
         step                 board on stairway. New step shall be same material and color as exiting. Stair width: up
                              to 1,500 mm/(EA), Unit: No. of step.
E702AP   Replace stair non- The Contractor shall remove existing and provide new stair non-slip nosing on edge of               100    LM
         slip nosing          step, Stainless steel, brass or aluminum with or without rubber strip. New stair non-slip
                              nosing shall be same material and color as existing.
E702AQ   Replace floor carpet The Contractor shall remove existing carpet with underlayer padding, prepare surfaces to        3,000    SM
                              make smooth and even floor, and provide new carpet with underlayer padding. New floor
                              carpet shall be same material and color as existing.
                                                                              J-0200000-07 Page 137
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                             QTY       ISSUE     PRICE ¥   AMOUNT ¥
E702AR   Replace wooden         The Contractor shall remove existing and provide new wooden baseboard, Size: up to                 300    LM
         baseboard              25x200mm
E702AS   Replace wooden         The Contractor shall remove existing and provide new wooden quarter round                          100   LM
         quarter round          ("TAMABUCHI"), Size: up to 3/4"
         ("TAMABUCHI")
E702AT   Replace                The Contractor shall remove existing and provide new interior/exterior ceramic, terrazzo,          400   SM
         interior/exterior      melamine resin laminated, quarry or mosaic floor tiles, and provide new interior/exterior
         ceramic, terrazzo,     ceramic, terrazzo, melamine resin laminated, quarry or mosaic floor tile, including mortar
         melamine resin         bed and joint cement. New floor tile shall be same material and color as exiting.
         laminated, quarry or
         mosaic floor tile
E702AU   Replace exterior       The Contractor shall remove existing and provide new exterior stair nosing tile, including         100   LM
         stair nosing tile      mortar bed and joint cement. New stair nosing tile shall be same material and color as
                                existing
E702AV   Replace wooden         The Contractor shall remove existing and provide new wooden floor joist, Size: up to                50   SM
         floor joist            105/2x105mm, @300~455mm, Unit: floor area having damaged floor joist.
E702AW   Replace wooden         The Contractor shall remove existing and provide new wooden sleeper hold ("Oobiki"),                30   LM
         sleeper hold           Size: up to 120x120mm, including wooden sleeper hold support ("Tsuka") @455~910mm
         ("Oobiki")
E702AX   Replace wooden         The Contractor shall remove existing and provide new wooden diagonal sheathing or                  100   SM
         sheathing or water     plywood sheathing or water proof sheathing, Thickness: up to 19mm
         proof sheeting
E702AY   Replace wall or        The Contractor shall remove existing and provide new gypsum boards, non-asbestos                    30   SM
         ceiling board          cement boards, plywood or acoustical tile baord on wall or ceiling.
E702AZ   Replace wall corner    The Contractor shall remove existing and provide new wall corner cover, metal or plastic.           50   LM
         cover (Metal or
         Plastic)
E702BA   Replace wall           The Contractor shall remove existing wall covering, prepare surfaces and provide new               150   SM
         covering               wall covering ("KABEGAMI" or "VINYL CLOTH"). New wall covering shall be same
         ("KABEGAMI" or         material and color as existing.
         "VINYL CLOTH")
E702BB   Replace wood           The Contractor shall remove existing and provide new wood batten strip ("OSHIBUCHI")               100   LM
         batten strip           on wall or ceiling
         ("OSHIBUCHI")
                                                                             J-0200000-07 Page 138
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                          QTY       ISSUE     PRICE ¥   AMOUNT ¥
E702BC   Replace ceramic        The Contractor shall remove existing and provide new ceramic wall tiles with mortar bed         400    SM
         wall tile              and joint cement. New wall tile shall be same material and color as existing.
E702BD   Replace plaster        The Contractor shall remove existing plaster, prepare surfaces and provide new plaster          500   SM
                                on wall or ceiling
E702BE   Replace wooden         The Contractor shall remove existing and provide new wooden wall stud, Size: up to               50   SM
         wall stud              105/2x105mm, @300~455mm, Unit: wall area having damaged wall stud
E702BF   Replace wooden         The Contractor shall remove existing and provide new wooden frame for wall or ceiling            50   SM
         frame for wall or      boards, Unit: Damaged wall or ceiling area.
         ceiling board
E702BG   Replace batten strip   The Contractor shall remove existing and provide new batten strip or molding on wall or         100   LM
         or molding on wall     ceiling
         or ceiling
E702BH   Replace wooden         The Contractor shall remove existing and provide new swinging or sliding wooden flush            20   EA
         door                   door (plywood facing or printed plywood facing) with/without glass and/or louver,
                                including hardware. New door shall be same material and color as existing.
                                Door size: up to 2.0m²/(EA)
E702BJ   Replace aluminum       The Contractor shall remove existing and provide new swinging aluminum flush door                50   EA
         door                   with/without glass, built-in screen window and/or louver, including hardware, aluminum
                                door frame, wooden trims and restoration of wall and floor around door. New door shall
                                be same material and color as existing.
                                Door size: up to 2.0m²/(EA)
E702BK   Replace aluminum       The Contractor shall remove exiting and provide new aluminum framed screen door with             30   EA
         screen door            insect screen mesh and hardware. New screen door shall be same material and color as
                                existing.
                                Screen door size: up to 2.0m²/(EA)
E702BL   Replace aluminum       The Contractor shall remove existing and provide new sliding, double hung or fixed type          30   EA
         window                 aluminum window with hardware, glass, aluminum window frame, wooden trims and
                                restoration of wall and floor around window, New window shall be same material and
                                color as existing. Window size: up to 2.0m²/(EA)
E702BM   Replace aluminum       The Contractor shall remove exiting and provide new aluminum framed screen window                50   EA
         screen window          with insect screen mesh and hardware. New screen window shall be same material and
                                color as exiting.
                                Screen window size: up to 2.0m²/(EA)
                                                                           J-0200000-07 Page 139
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                              QTY       ISSUE     PRICE ¥   AMOUNT ¥
E702BN   Adjust and refit door The Contractor shall adjust and refit door lock, knob, hinge or latch, including retighten or     1,000    EA
                               replace missing screws. Unit: No. of door (including accordion door)
E702BP   Replace door face       The Contractor shall remove existing and provide new plywood or printed plywood door           100     SH
         sheet on one side of    face sheet on one side of door. New printed plywood door face sheet shall be same
         door                    material and color as existing. Door size: up to 2.0m²/(SH)
E702BQ   Replace threshold       The Contractor shall remove existing and provide new wood or metal threshold of door.           20     LM
         of door                 New threshold shall be same material and color as existing.
E702BR   Replace wooden          The Contractor shall remove existing and provide new wooden door frame, including               30     LM
         door frame              wooden trims and restoration of wall and floor around door frame
E702BS   Replace wooden          The Contractor shall remove existing and provide new wooden trim on door or window              80     LM
         trim on door or         frame
         window frame
E702BT   Repair wooden door      The Contractor shall repair wooden door frame with wooden piece and putty                       30     LM
         frame
E702BU   Install weather strip   The Contractor shall prepare surfaces and provide new weather strip around door or             200     LM
         around door or          window. New weather strip shall be same material and color as others.
         window
E702BV   Replace aluminum        The Contractor shall remove existing and provide new aluminum weather strip for bottom          20     EA
         weather strip for       of door. New weather strip shall be same material and color as existing.
         bottom of door.
E702BW   Replace insect          The Contractor shall remove existing and provide new insect screen mesh with new             1,500     SM
         screen mesh             gaskets of screen door or window. New insect screen mesh shall be same material and
                                 color as existing.
E702BX   Replace glass pane The Contractor shall remove existing and provide new float, figured, wired or safety glass           50     SM
                            pane, including gasket or caulking around glass. New glass pane shall be same material
                            and color as existing.
E702BY   Replace safety          The Contractor shall remove existing and provide new safety double glass pane,                  20     SM
         double glass pane       including inner film or dry air between glass panes, and gasket or caulking around glass.
                                 New glass pane shall be same material and color as existing.
E702BZ   Replace door lock       The Contractor shall remove existing and provide new door lock with door knob, interior         10     EA
                                 or exterior, cylinder or mortise lock type or "sora-joh" type. New door lock shall be same
                                 material and color as existing.
                                                                             J-0200000-07 Page 140
                                                                                                                                               RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                           QTY       ISSUE     PRICE ¥   AMOUNT ¥
E702CA   Replace door lock     The Contractor shall remove existing door lock and provide new privacy door lock with             10    EA
         with privacy door     door knob, which has release system by using pin from outside for emergency, like a
         lock                  door lock for bathroom use, in Master bed room. Line item shall include repair of door for
                               new door lock, replacement of strike and repair of door frame for new strike. New door
                               lock shall be same material and color as others.
E702CB   Replace door knob     The Contractor shall remove existing and provide new door knob or handle on closet               100   EA
         or handle on closet   door. New door knob and handle shall be same material and color as existing
         door
E702CC   Replace pull handle   The Contractor shall remove existing and provide new pull handle for screen door. New             10   EA
         for screen door.      pull handle shall be same material and color as existing.
E702CD   Replace latch on      The Contractor shall remove existing and provide new latch on screen door. New latch              20   EA
         screen door           shall be same material and color as existing.

E702CE   Replace window or     The Contractor shall remove existing and provide new window or sliding door latch,               100   EA
         sliding door latch,   Crescent, screw-in or dead bolt type. New latch shall be same material and color as
         Crescent, screw-in    existing.
         or dead bolt type

E702CF   Replace door          The Contractor shall remove existing and provide new door stopper, Floor mount,                   50   EA
         stopper               baseboard mount or door top mount type. New door stopper shall be same material and
                               color as existing.
E702CG   Replace floor type    The Contractor shall remove existing and provide new floor type stopper for heavy duty            30   EA
         stopper for hevy      door type. New door stopper shall be same material and color as existing.
         duty door type.
E702CH   Replace sheave     The Contractor shall remove existing and provide new sheave ("TOGURUMA") of sliding                 100   EA
         ("TOGURUMA") of door or window. New sheave shall be same material and color as existing.
         sliding door or
         window
E702CJ   Replace door hinge The Contractor shall remove existing and provide new door hinge, Stainless steel or                  10   EA
                            brass. New door hinge shall be same material and color as existing.
E702CK   Replace door hinge, The Contractor shall remove existing and provide new door hinge, single or double acting            10   EA
         single or double    spring hinge. New door hinge shall be same material and color as existing.
         acting spring hinge

                                                                          J-0200000-07 Page 141
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY       ISSUE     PRICE ¥   AMOUNT ¥
E702CL   Replace door hinge The Contractor shall remove existing and provide new door hinge on folding door or                   100    EA
         on folding door or closet door. New door hinge shall be same material and color as existing.
         closet door

E702CM   Replace top or        The Contractor shall remove existing and provide new top or bottom guide rail for double           20   EA
         bottom guide rail for folding door. New rail shall be same material and color as existing. Rail size (L): up to
         double folding door 1,800 mm/(EA).

E702CN   Replace top or       The Contractor shall remove existing and provide new top or bottom guide pin for double             30   EA
         bottom guide pin for folding door. New guide pin shall be same material and color as existing.
         double folding door.

E702CP   Replace round     The Contractor shall remove existing and provide new round plastic vent on closet door.                50   EA
         plastic vent on   New round plastic vent shall be same material and color as existing. Size: up to 40mm
         closet door       Dia.
E702CQ   Replace wooden    The Contractor shall remove existing and provide new wooden louver in wooden door.                      5   EA
         louver in wooden  New louver shall be same material and color as existing. Louver size: up to (W) 600 x
         door              (H) 250 mm.
E702CR                     The Contractor shall remove existing and provide new door closer. New door closer shall
         Replace door closer                                                                                                      20   EA
                           be same material and color as existing.
E702CS   Replace pneumatic The Contractor shall remove existing and provide new pneumatic door closer of screen                   10   EA
         hydraulic door    door. New door closer shall be same material and color as existing.
         closer of screen
         door
E702CT   Replace chain and      The Contractor shall remove existing and provide new chain and its lock set on door,              20   EA
         its lock set on door   Stainless steel. New chain and lock set shall be same material and color as existing.
E702CU   Replace swing latch    The Contractor shall remove existing and provide new swing latch for door. New latch              20   EA
         for door.              shall be same material and color as existing.
E702CV   Replace peephole       The Contractor shall remove existing and provide new peephole in entrance door. New               10   EA
         in entrance door       peephole shall be same material and color as existing.

E702CW   Replace venetian       The Contractor shall remove existing and provide new venetian blind. One-side                      5   EA
         blind, 6.0m²/(EA)      operation, Aluminum slat: (W)25mm, curbed, color: white.
                                Window opening size: over 4.0m² and up to 6.0m²/(EA)
                                                                            J-0200000-07 Page 142
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                            QTY       ISSUE     PRICE ¥   AMOUNT ¥
E702CX   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                     500    EA
         blind, 4.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: over 2.0m² and up to 4.0m²/(EA)
E702CY   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                     300    EA
         blind, 2.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: over 1.0m² and up to 2.0m²/(EA)
E702CZ   Replace venetian      The Contractor shall remove existing and provide new venetian blind. One-side                      50    EA
         blind, 1.0m²/(EA)     operation, Aluminum slat: (W)25mm, curbed, color: white.
                               Window opening size: up to 1.0m²/(EA)
E702DA   Replace loose or      The Contractor shall remove existing loose or broken parts (cord, slat, pully, ladder tape      3,500    EA
         broken parts of       and other parts) of venetian blind, and provide new one. New parts shall be same
         venetian blind.       material and color as existing.
E702DB   Replace vertical      The Contractor shall remove existing and provide new vertical blind. Aluminum slat:               100    EA
         blind                 (W)50mm or 100mm, color: white.
                               Window opening size: up to 6.0m²/(EA)
E702DC   Replace loose or      The Contractor shall remove existing loose or broken parts (cords, slat, pully, drawstrings     2,000    EA
         broken parts of       and other parts) of vertical venetian blind, and provide new one. New cord and
         vertical venetian     drawstring shall be same material and color as existing.
         blind.
E702DD   Replace twisted       The Contractor shall remove twisted shaft of vertical blind, and provide new one. New            5      EA
         shaft of vertical     shaft shall be same material and color as existing. Size: up to (L)4,000mm/(EA).
         blind
E702DE   Replace curtain or    The Contractor shall remove existing and provide new curtain or clothes hanging rod,            15      ST
         clothes hanging rod   including brackets and/or rings, Stainless steel. New rod shall be same material and
                               color as existing. Size: up to 40mm Dia.
E702DF   Install/Replace       The Contractor shall remove existing and provide new curtain rail with hung brackets,           20      ST
         curtain rail          unit: Length for curtain rail. New rail shall be same material and color as existing. This
                               item may not include removal of existing.
E702DG   Adjust and refit      The Contractor shall adjust and refit curtain rod/rail or handrail or cloth hanging rod,        15      ST
         curtain rod/rail or   including retighten or replacement of loose or missing screws.
         handrail or cloth
         hanging rod
                                                                            J-0200000-07 Page 143
                                                                                                                                         RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                        EST     UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION          FULL DESCRIPTION                                                                        QTY     ISSUE     PRICE ¥   AMOUNT ¥
E702DH   Replace accordion    The Contractor shall remove existing and provide new accordion curtain door with rails,      30    EA
         curtain door         door handle, door catch and hardware. Fire-retardant vinyl facing. New curtain door
                              shall be same material and color as existing.
                              Size: up to 5.0 m²/(EA),
E702DJ   Replace facing       The Contractor shall remove existing facing sheet from counter top or cabinet, prepare      200    SM
         sheet of counter top surfaces and provide new facing sheet of melamine decorative sheet, printed plywood or
         or cabinet           stainless steel sheet. New facing sheet shall be same material and color as existing.

E702DK   Replace kitchen or  The Contractor shall remove existing and provide new kitchen wall hung cabinet,             20     EA
         laundry wall hung   including restoration of ceiling and wall around cabinet. New cabinet shall be same
         cabinet             material and color as existing.
                             Cabinet size: up to (W)2000 x (H)1000 x (D)450mm
E702DL   Replace kitchen     The Contractor shall remove existing and provide new kitchen base cabinet with counter      20     EA
         base cabinet        top, including restoration of floor and wall around cabinet. New cabinet shall be same
                             material and color as existing.
                             Cabinet size: up to (W)2000 x (H)1000 x (D)650mm
E702DM   Replace lavatory    The Contractor shall remove existing and provide new lavatory sink cabinet with related     20     EA
         sink cabinet        accessories, including reinstallation of existing wash basin. New cabinet shall be same
                             material and color as existing.
                             Cabinet size: up to 1450mm wide
E702DN   Replace mirror      The Contractor shall remove existing and provide new mirror. New mirror shall be same       10     EA
                             material and color as existing. Mirror size: up to 2.0m²/(EA). This item may be used for
                             new provision (size up to 2.0m²/(EA))
E702DP   Replace shelf board The Contractor shall remove existing and provide new shelf board of cabinet. New shelf      30     EA
         of cabinet          board shall be same material and color as existing. Size: up to 0.5m²/(EA)

E702DQ   Replace bracket or   The Contractor shall remove existing and provide new bracket or pin of shelf board. New    50     EA
         pin of shelf board   bracket shall be same material and color as existing.

E702DR   Replace cabinet     The Contractor shall remove existing and provide new cabinet door, including hardware.      20     EA
         door                New cabinet door shall be same material and color as existing. Door size: up to
                             1.0m²/(EA)
E702DS   Replace closet door The Contractor shall remove existing and provide new closet door, including hardware.       50     EA
                             New closet door shall be same material and color as existing. Door size: up to
                             2.0m²/(EA)
E702DT   Replace cabinet     The Contractor shall remove existing and provide new cabinet door hinge. New door           20     EA
         door hinge          hinge shall be same material and color as existing.
                                                                         J-0200000-07 Page 144
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION             FULL DESCRIPTION                                                                        QTY       ISSUE     PRICE ¥   AMOUNT ¥
E702DU   Replace cabinet         The Contractor shall remove existing and provide new cabinet drawer, including                 20    EA
         drawer                  hardware. New drawer shall be same material and color as existing. Unit: No, of drawer.

E702DV   Replace door knob The Contractor shall remove existing and provide new door knob or handle on cabinet                  30   EA
         or handle on        door/drawer. New door knob and handle shall be same material and color as existing.
         cabinet door/drawer


E702DW   Replace magnet or The Contractor shall remove existing and provide new magnet or roller catcher. New                   50   EA
         roller catcher    magnet and roller catch shall be same material and color as existing.

E702DX   Replace corrugated      The Contractor shall remove existing and provide new corrugated FRP terrace roofing,          100   SM
         FRP terrace roofing,    carport acrylic panel and backyard polycarbonate panel. New material shall be same
         carport acrylic panel   material and color as existing. Line item shall include scaffolding installation and
         and backyard            removal.
         ploycarbonate
         panel.


E702DY   Replace wood,        The Contractor shall remove existing and provide new wood, stainless steel, brass or              20   LM
         stainless steel,     vinyl handrail of stairway, including brackets. New handrail shall be same material and
         brass or vinyl       color as existing.
         handrail of stairway

E702DZ   Repair spall, crack     The Contractor shall repair spall, crack or broken concrete or mortar surfaces                 40   SM
         or broken concrete
         or mortar surfaces
E702EA   Replace PVC gutter The Contractor shall remove existing and provide new PVC gutter, including brackets.               100   LM
                            New gutter shall be same material and color as existing. Line item shall include
                            scaffolding installation and removal.
E702EB   Replace downspout The Contractor shall remove existing and provide new PVC downspout or                               200   LM
                            carport/backyard terrace downspout, including brackets. New downspout shall be same
                            material and color as existing. Line item shall include scaffolding installation and
                            removal.
E702EC   Repair/refit gutter,    The Contractor shall repair/refit gutter, downspout and accessories. Line item shall          100   LM
         downspout and           include scaffolding installation and removal.
         accessories
                                                                             J-0200000-07 Page 145
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                             QTY      ISSUE     PRICE ¥   AMOUNT ¥
E702ED   Replace chain-link The Contractor shall remove existing and provide new chain-link or steel mesh fence                 40    LM
         or steel mesh fence including concrete foundation and restoration of surrounding area. New fence shall be
                             same structure, material and color as existing. Fence height: up to 1.5m
E702EE   Replace panel of     The Contractor shall remove existing steel or aluminum "MEKAKUSHI" fence and provide              40   LM
         "MEKAKUSHI"          new same material fence (Up to 1,800mmH). New panel shall be same material and
         fence                color as existing.
E702EF   Replace door of      The Contractor shall remove existing and provide new single door of aluminum or steel              5   EA
         MEKAKUSHI" or        "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New door shall be same material
         steel mesh fence     and color as existing.
E702EG   Replace latch,       The Contractor shall remove existing and provide new latch, hinge, knob or stopper of             20   EA
         hinge, knob or       aluminum or steel "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New latch,
         stopper of           knob and stopper shall be same material and color as existing.
         "MEKAKUSHI" or
         steel mesh fence

E702EH   Replace cap or joint The Contractor shall remove existing and provide new cap or joint of aluminum or steel            20   EA
         of "MEKAKUSHI" "MEKAKUSHI" or steel mesh fence (Up to 1,800mmH). New cap and joint shall be same
         or steel mesh fence material and color as existing.


E702EJ   Replace cap or joint The Contractor shall remove existing and provide new cap or joint for carport or backyard         50   EA
         for carport or       terrace. New cap and joint shall be same material and color as existing. Line item shall
         backyard terrace     include scaffolding installation and removal.
E702EK   Replace vent cap or The Contractor shall remove existing and provide new vent cap or natural vent screen on            10   EA
         air vent screen     exterior wall. New vent shall be same material and color as existing. Vent size: up to
                             0.5m²/(EA) Height less than 6 meters.
E702EL   Adjust and refit    The Contractor shall adjust and refit metal storage shed, including roof, wall, doors,             20   EA
         metal storage shed brackets, handle/lock, guide rail, floor, hardware, shelves, and retighten or replacement
                             of loose or missing fasteners, Unit: No. of metal storage shed
                                                                          J-0200000-07 Page 146
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                            EST     UNIT OF    UNIT      TOTAL
ELIN     DESCRIPTION            FULL DESCRIPTION                                                                          QTY     ISSUE      PRICE ¥   AMOUNT ¥
E702EM   Replace FRP water-     The Contractor shall remove existing and provide new FRP water-proof coating of fish          200    SM
         proof coating,         pond and highrise balcony (Bldg. 3101 and 3102) and apply finish coatings. Line item
         mortar or concrete     shall include temporary relocation and keeping of fishes during repair work of fish pond,
                                and return of them with proper treatment after completion of work and necessary curing
                                time. This item shall also include; chip out and remove damaged portions, prepare
                                surfaces and apply adhesive, and provide new water-proof mortar or concrete under FRP
                                coating of fish pond and balcony. Pond/balcony area: up to 100m²/(EA)

E702EN   Replace bird           The Contractor shall remove existing and provide new bird protection net with fasteners          50    EA
         protection net         and main rope, at balcony of Hi-rise. New bird protection net shall be same material and
                                color as existing. Opening area: up to 14.0m²/(EA) New provision (without removal) may
                                be ordered.
E702EP   Refinish bathtub       The Contractor shall remove all scratches and scores, and refinish bathtub in accordance         50    SM
         coating                with manufacturer's recommended method.
E702EQ   Repair surface of      The Contractor shall repair surfaces of artificial polyester or acrylic type counter in          50    SM
         polyester or acrylic   accordance with Attachment J-1502000-03.
         counter
E702ER   Replace kitchen        The Contractor shall remove existing and provide new kitchen counter. The counter shall           3    Set
         counter stainless,     be same material as existing.
         marble, polyester
E702ES   Replace inspection     The Contractor shall remove existing and provide new inspection panel for bathtub. New           10    EA
         panel for bathtub.     inspection panel shall be same material and color as existing.

E702ET   Repair, adjust and     The Contractor shall repair, adjust and refit cabinet door or drawersr, so the cabinet door    4,000   EA
         refit cabinet door     and drawer can open and close smoothly as originally intended. (1 door or 1 drawer is
         and drawers            counted as 1 EA.)
E702EU   Repair nail holes on The Contractor shall repair surfaces of wall or door that has been damged by nail. The           3,000   EA
         wall or door         nail holes shall become imvisible, and the the wall or door surface shall look smooth. (1
                              door or 1 SM wall is counted as 1 EA.)
E702EV   Adjust and refit       The Contractor shall adjust and refit hardwre on wall, floor and door (loose screws, outlet,   3,000   EA
         hardware on wall,      door stopper, plumbing fixture, faucets, etc.) (1 door or 1 SM wall/floor is counted as 1
         floor and door         EA.)
E702EW   Replace caulking or    The Contractor shall replace existing caulking or cement for joint with new.                   1,000   LM
         cement for joint
                                                                              J-0200000-07 Page 147
                                                                                                                                                    RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST     UNIT OF        UNIT         TOTAL
ELIN     DESCRIPTION           FULL DESCRIPTION                                                                            QTY     ISSUE          PRICE ¥      AMOUNT ¥
E702EX   Replace house         The Contractor shall remove existing house number plate and shall provide new number            100    EA
         number plate          plate (metal or plastic), same size, color and material as existing, with number printed on
                               the plate. The number shall bear severe weather condition.
E702EY   Replace towel ring    The Contractor shall replace existing towel ring or bar with new, same or similar model in       20    EA
         or bar                bathroom.

                                                                                                                          Sub Total, E702 (E702AA - E702EY):

E703     Electrical work
E703AA   Replace light         The Contractor shall replace existing light fixture with same or similar model,                      200    EA
         fixture               Typical light fixtures are as follows:
                               Waterproof or indoor use, ceiling, wall, flush, or pendant mount type with
                               globe/cover/diffuser, incandescent or fluorescent light, and typical lamp size, and voltage
                               as indicated Attachment J-1502000-03 or reference drawings.
E703AB   Replace ceiling        The Contractor shall replace existing ceiling fan/light fixture with new type of the ceiling         50    EA
         fan/light fixture with fan/light fixture in accordance with Attachment J-1502000-03. New ceiling fan/light fixture
         new material           shall be same or similar model as others.
E703AC   Replace exit light    The Contractor shall replace existing exit light and fixture with same or similar model.              20    EA
         and fixture           Typical exit lights are as follows:
                               Waterproof or indoor use, ceiling or wall mount type with acrylic direction cover and
                               battery, fluorescent light 1-10W or 1-20W.

E703AD   Replace               The Contractor shall replace existing globe/diffuser of light fixture. The replacement                50    EA
         globe/diffuser of     globe/diffuser shall be same type and compatible with existing light fixture.
         light fixture
E703AE   Replace fluorescent The Contractor shall replace existing fluorescent light bulb includes starter lamp.                    600    EA
         light bulb includes
         starter lamp

E703AF   Replace pull switch The Contractor shall replace pull switch and cord of light fixture with same or similar                 50    EA
         and cord of light    model.
         fixture
E703AG   Replace cover plate The Contractor shall replace cover plate for outlet or switch with same or similar model.              200    EA
         for outlet or switch
         or CATV

                                                                            J-0200000-07 Page 148
                                                                                                                                                RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST       UNIT OF   UNIT       TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY       ISSUE     PRICE ¥    AMOUNT ¥
E703AH   Replace tumbler or The Contractor shall replace tumbler or dimmer switch or bathroom timer switch with                   50    EA
         dimmer switch      same or similar model.
E703AJ   Replace electrical   The Contractor shall replace electrical outlet with same or similar model.                          50   EA
         outlet
E703AK   Replace chime,       The Contractor shall replace chime, buzzer, or push button with same or similar model.              10   EA
         buzzer, or push
         button
E703AL   Replace ballast of   The Contractor shall replace ballast of fluorscent light with new one.                              50   EA
         fluorscent light
E703AM   Replace home type The Contractor shall replace home type smoke detector (house-wired or battery-                         30   EA
         smoke detector    powered) with same or similar model. New battery shall also be provided for battery-
                           powered type.
E703AN   Replace CATV/FM      The Contractor shall replace CATV/FM outlet and outlet cover with same or similar                   50   EA
         outlet               model.
E703AP   Replace              The Contractor shall remove existing incandescent light bulb and provide new compact               200   EA
         incandescent light   fluorescent light.
         bulb to compact
         fluorescent light
E703AQ   Replace batteries    The Contractor shall replace battery for smoke detector with new, 9V.                              200   EA
         for GFM smoke
         detector
E703AR   Replace toggle       The Contractor shall replace toggle switch including plates with same or similar model.            100   EA
         switch


                                                                                                                     Sub Total, E703 (E703AA - E703AR):

E704     Mechanical work
E704AA   Replace washbasin The Contractor shall replace washbasin or slope sink or lavatory sink including pipe                   30   EA
         or lavatory sink  fittings with same or similar model.


E704AB   Replace commode      The Contractor shall replace commode (water closet), including seat, lid and fittings with          20   EA
                              same or similar model.
E704AC   Replace seat of      The Contractor shall replace toilet seat and lid of commode with same or similar model.            100   EA
         commode
                                                                           J-0200000-07 Page 149
                                                                                                                                                 RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST      UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                                QTY      ISSUE     PRICE ¥   AMOUNT ¥
E704AD   Replace low tank of The Contractor shall replace low tank, including lid and fittings, with same or similar                5    EA
         commode             model.
E704AE   Replace lid of low    The Contractor shall replace low tank lid and fittings with same or similar model.                   5   EA
         tank
E704AF   Replace low tank      The Contractor shall replace flush valve for low tank with same or similar model.                    5   EA
         valve
E704AG   Replace paper         The Contractor shall replace toilet paper holder with same or similar model.                        20   EA
         holder
E704AH   Replace plastic bar   The Contractor shall replace plastic bar of toilet paper holder.                                    30   EA
         of paper holder

E704AJ   Replace lavatory      The Contractor shall replace lavatory with base cabinet unit, including pipe fittings with          30   EA
         with cabinet          same or similar model.
E704AK   Replace plug and      The Contractor shall replace plug and chain for lavatory sink with same or similar model.           30   EA
         chain for lavatory
         sink
E704AL   Replace medicine      The Contractor shall replace medicine cabinet (single, double or three mirror type),                50   EA
         cabinet               including restoration of wall to fit new cabinet, necessary wiring to light fixture mounted
                               on the new cabinet and furnishing of light/bulb, and remove old wall mounted fixture, with
                               same or similar model.
E704AM   Replace mirror of     The Contractor shall replace mirror of medicine cabinet with same or similar model.                 10   EA
         medicine cabinet
E704AN   Repair medicine       The Contractor shall repair medicine cabinet, including light fixture cover, door and               50   EA
         cabinet               accessories.
E704AP   Replace bathtub       The Contractor shall replace bathtub, including hardware, with same or similar model.               10   EA

E704AQ   Replace bathtub       The Contractor shall replace bathtub drain pipe with direct flow (in-line) type fitting,            10   EA
         drain pipe            including dismount/remount bathtub.
E704AR   Replace shower        The Contractor shall replace shower head with same or similar model.                                20   EA
         head
E704AS   Replace hand          The Contractor shall replace shower head and hose with same or similar model.                       50   EA
         shower head and
         hose
E704AT   Repair or adjust      The Contractor shall repair or adjust shower/faucet mixing valve.                                   50   EA
         shower/faucet
         mixing valve.
                                                                              J-0200000-07 Page 150
                                                                                                                                              RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                           EST       UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                             QTY       ISSUE     PRICE ¥   AMOUNT ¥
E704AU   Replace hose of    The Contractor shall replace hose of hand shower with same or similar model.                        30    EA
         hand shower
E704AV   Replace bar type   The Contractor shall replace bar type shower head holder with same or similar model.                10   EA
         shower head holder

E704AW   Replace robe hook     The Contractor shall replace robe hook with same or similar model.                               10   EA

E704AX   Replace grip bar for The Contractor shall replace grip bar for bathtub with same or similar model.                     10   EA
         bathtub
E704AY   Replace towel rack The Contractor shall replace towel rack with same or similar model.                                 10   EA

E704AZ   Replace soap dish     The Contractor shall replace soap dish with same or similar model.                                5   EA

E704BA   Replace faucet        The Contractor shall replace hose faucet, garden faucet, bath faucet, mixing faucet or           20   EA
                               mixing valve, including handles or lever, with same or similar model.
E704BB   Replace handle of     The Contractor shall replace handle or lever of faucet with same or similar model.               20   EA
         mixing faucet
E704BC   Replace packing for The Contractor shall replace packing for faucet or valve.                                         500   EA
         faucet or valve
E704BD   Replace             The Contractor shall replace combination stopper of washbasin, lavatory or bathtub with            10   EA
         combination stopper same or similar model.

E704BE   Replace mixing        The Contractor shall replace mixing faucet for kitchen sink (individual handles,                 20   EA
         faucet for kitchen    combination type) with same or similar model.
         sink
E704BF   Check and repair as   The Contractor shall check and repair as necessary all plumbing works (hot & cold water         100   LM
         necessary all         supply, drainage, faucet and shower).
         plumbing works
E704BG   Remove foreign        The Contractor shall remove foreign matter and repair clogged drain pipe connected to            50   EA
         matter and repair     either commode, lavatory, bathtub or kitchen sink.
         clogged drain pipe

E704BH   Replace non-        The Contractor shall replace non-asbestos insulation on water/heater pipe with new                100   LM
         asbestos insulation similar material.
         on pipe
E704BJ   Repair sink faucet The Contractor shall repair sink faucet assembly.                                                   30   EA
         assembly
                                                                            J-0200000-07 Page 151
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                               EST       UNIT OF   UNIT         TOTAL
ELIN     DESCRIPTION             FULL DESCRIPTION                                                                            QTY       ISSUE     PRICE ¥      AMOUNT ¥
E704BK   Replace kitchen         The Contractor shall replace kitchen sink with same or similar model.                               3    EA
         double sink
E704BL   Repair piping under     The Contractor shall repair piping under kitchen sink or washbasin with similar material.          20    EA
         kitchen sink or
         washbasin
E704BM   Replace kitchen         The Contractor shall replace kitchen ventilation hood in kitchen with same or similar              10    EA
         ventilation hood        model.
E704BN   Replace exhaust         The Contractor shall replace exhaust fan, ceiling or wall mounted type, with same or               20    EA
         fan                     similar model.
E704BP   Replace grease          The Contractor shall replace grease filter of range hood fan with same or similar model.          100    EA
         filter of range hood
         fan
E704BQ   Replace screen          The Contractor shall replace screen filter of exhaust fan with same or similar model.              10    EA
         filter of exhaust fan

E704BR   Replace vent cover The Contractor shall replace vent cover with grille for dryer's exhaust pipe.                           10    EA
         with grill for dryer

E704BS   Replace heat-pump       The Contractor shall replace heat-pump type air conditioner (both indoor and outdoor               50    EA
         type A/C                unit) with same or similar model.
E704BT   Replace pipe            The Contractor shall replace pipe insulation cover for heat pump AC with new same or               30    ST
         insulation cover for    similar material to ensure proper and energy efficient operation and function of AC. (All
         heat pump AC            pipe insulation cover for one heat pump AC unit is counted as 1 ST.)



                                                                                                                         Sub Total, E704 (E704AA - E704BT):

                                                                             J-0200000-07 Page 152
                                                                                                                                                  RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                             EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION        FULL DESCRIPTION                                                                               QTY         ISSUE     PRICE ¥   AMOUNT ¥
E705     Whole Unit Cleaning
E705AA   Whole Unit         The Contractor shall perform whole unit cleaning.                                                     60      UN
         Cleaning, Atsugi,  The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 2-
         Bedroom Unit
E705AB   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   50      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 3-
         Bedroom Unit
E705AC   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   20      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse, 4-
         Bedroom Unit
E705AD   Whole Unit           The Contractor shall perform whole unit cleaning.                                                  120      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         High-rise, 2-
         Bedroom Unit
E705AE   Whole Unit           The Contractor shall perform whole unit cleaning.                                                   80      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         High-rise, 3-
         Bedroom Unit
E705AF   Whole Unit           (Note: At the time of contract award, this item is reserved for future use. Amount                   (Max Amount)                  4,736,000
         Cleaning, Atsugi,    indicated is approximate maximum for this item. Therefore, quantity and unit price will be
         High-rise, 4-        determined later by contract modification.) The Contractor shall perform whole unit
         Bedroom Unit         cleaning. The Contractor shall ensure that FH unit is clean, sanitary and sightly.
E705AG   Whole Unit           The Contractor shall perform whole unit cleaning.                                                    2      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         SOQ
E705AH   Whole Unit           The Contractor shall perform whole unit cleaning.                                                    2      UN
         Cleaning, Atsugi,    The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse in SOQ
         Area, 3-Bedroom

E705AJ   Whole Unit        The Contractor shall perform whole unit cleaning.                                                       3      UN
         Cleaning, Atsugi, The Contractor shall ensure that FH unit is clean, sanitary and sightly.
         Townhouse in SOQ
         Area, 4-Bedroom
                                                                                                                     Sub Total, E705 (E705AA - E705AJ):
                                                                           J-0200000-07 Page 153
                                                                                                                                                   RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                              EST         UNIT OF   UNIT      TOTAL
ELIN     DESCRIPTION         FULL DESCRIPTION                                                                               QTY         ISSUE     PRICE ¥   AMOUNT ¥
E706     Cleaning work
E706AA   Clean and wax floor The Contractor shall clean and wax floor to ensure clean, sanitary and sightly condition.         2,000      SM

E706AB   Deep clean carpet     The Contractor shall deep clean carpet and rug to ensure clean, sanitary and sightly            1,000      SM
         and rug               condition. The Government may direct cleaning method such as sampooing, steam
                               cleaning, dry cleaning or other similar deep cleaning processes.
E706AC   Clean concrete and    The Contractor shall clean concrete and tiled floor to ensure clean, sanitary and sightly       1,000      SM
         tiled floor           condition.
E706AD   Clean tile and        The Contractor shall clean tile and washable wall to ensure clean, sanitary and sightly            500     SM
         washable wall         condition.
E706AE   Clean exterior wall   The Contractor shall clean exterior wall surfaces to ensure clean, sanitary and sightly            500     SM
                               condition.
E706AF   Clean stainless       The Contractor shall clean and polish stainless steel sink and counter to ensure clean,             30      EA
         steel sink and        sanitary and sightly condition..
         counter
E706AG   Clean dryer vent      The Contractor shall clean dryer vent line with fan to ensure clean, sanitary and sightly          200      EA
         line with fan         condition and propler operation and function of dryer. The Contractor shall clean from
                               dryer to duct connection (if vertical duct exhaust fan system is used) or to exterior wall
                               hood.
E706AH   Clean gutter and      The Contractor shall clean gutter and downspout to ensure clean, sanitary and sightly              700      LM
         downspout             condition and proper original intended function of gutter and downspount. All the foreign
                               materials shall be removed. Line item shall include scaffolding installation and removal.

E706AJ   Clean canopy          The Contractor shall clean canopy including gutter and downspout to ensure clean,                  600     SM
                               sanitary and sightly condition. Above E706AH shall also be applied for gutter and
                               downspout. Line item shall include scaffolding installation and removal.
E706AK   Mini cleaning         The Contractor shall perform Mini cleaning to ensure clean, sanitary and sightly                    30      UN
                               condition.

E706AL   Grass cutting         The Contractor shall cut grass (including but not limited to turf, weed, vines, and other      10,000      SM
                               unwanted vegetations) to uniform height of 2 inches to maintain grass healthy condition
                               and appearance.
                                                                            J-0200000-07 Page 154
                                                                                                                                       RFP N40084-10-R-8709

NAME OF OFFEROR OR CONTRACTOR:
         SHORT                                                                                                    EST       UNIT OF   UNIT       TOTAL
ELIN     DESCRIPTION    FULL DESCRIPTION                                                                          QTY       ISSUE     PRICE ¥    AMOUNT ¥
E706AM   Sodding        The Contractor shall provide sod, Anti Weeds Type Sod (Saint Augustine Grass II or            3,000    SM
                        Modified Centipede Grass) species unless otherwise specified. It shall be dense,
                        uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid
                        on properly prepared topsoil. Sod joints shall be staggered and butted together. On
                        slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed
                        installation shall be smooth and uniform in appearance. The Contractor shall water and
                        provide continuing care for sodded areas as necessary to firmly establish new grass
                        growth and development. The Contactor shall replace all grass that dies or fails to
                        develop noticeable growth within 90 days of sodding at no additional cost to the
                        Government.


                                                                                                            Sub Total, E706 (E706AA - E706AM):



                                                                                TOTAL OF FOURTH OPTION PERIOD, E700 THROUGH E706AM:




                                                                   J-0200000-07 Page 155

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:8
posted:6/29/2011
language: