Docstoc

HDM-4

Document Sample
HDM-4 Powered By Docstoc
					         SELECT COMMITTEE
         ON PUBLIC SERVICES


            14 JUNE 2011
435423
MANDATE

    Responsible for proclaimed national roads
          Toll and Non-Toll network
    Maintain, upgrade, operate, rehabilitate and fund
     national roads
    Levy tolls to service toll roads
    Manage concessionaires
    Advise the Minister on road related matters
    Create public value
SANRAL RELATIONSHIP TO MINISTER/NDOT




                             Minister of Transport (Regulator
                             Owner)
         MOT

      Board                    Governance and Control
      Of Directors

   Chief                       Day to Day Business and
   Executive Officer           Operations Management


                       Planning, Design, Construction, Operation,
  SANRAL Staff         Management, Control, Maintenance &
                       Rehabilitation of National Roads
STRATEGIC OBJECTIVES
SANRAL has eight Strategic Objectives
  1.        Manage the national road network effectively
       •         Non-toll roads
       •         Toll Roads – ITIS, ITS
       •         Concessions
       •         Overload Control
       1.




  2.        Provide safe roads
       •         Maintenance
       •         Road Safety Management System
             •      Engineering
             •      Education
             •      Enforcement
STRATEGIC OBJECTIVES CONT’D
 3.       Carry out Government’s targeted programmes
      •    Community Development
      •    Social and Entrepreneurial Development
      •    Development of Human Capital
           •   Internal
           •   External
      •    Education
 4.       Co-operative working relationships with
          relevant Departments, Provinces, Local
          Authorities and SADC member countries
      •    Environmental relationships
      •    Reputation Management
      •    Other local efforts
      •    Co-operation between neighbouring countries
STRATEGIC OBJECTIVES
                                           CONT’D




 5.       Achieve and maintain good governance
          practice
      •     Corporate Governance
      •     Risk Management
      •     Prevention of Fraud and Corruption
      •     Internal Audit
      •     Credit Ratings
      •     Performance Agreement with the Executive
            Authority
STRATEGIC OBJECTIVES
                                                      CONT’D


 6.       Transformation
      •    External Environment
           •   Procurement Policy
           •   Developing Human Capital
           •   Community Development Programme
           •   Higher education – support tertiary institutions
           •   Technology transfer


      •    Internal Environment
           •   Employment Equity
                •   Bursaries
                •   Scholarships
                •   Internships
                •   Young Professionals Cluster
 STRATEGIC OBJECTIVES
                                                           CONT’D

7.       Achieve financial sustainability
     •         Non-toll: Treasury allocations
           •      Optimum cash flow and liquidity management
     •         Toll: Borrowings : Currently close to R29 billion
           •      DMTN Programme
           •      Export Credit Agencies
           •      Direct Foreign Investments
           •      Bank Loans
8.       Pursue research, innovation and best practice
     •         Road Infrastructure Research
     •         Performance Certification of Materials
     •         Social Sciences Research
           •      Psychology behind pedestrian behaviour
KEY PRIORITIES FOR 2011/12
   Asset Management Systems for the timely
    maintenance of national roads
   Planned increase of national road network by
    incorporation of roads as requested by Provinces
   Good co-operative relationships with relevant
    government departments, provincial and municipal
    authorities
   Toll Road development: Gauteng Freeways, N1/N2
    Winelands
   Community Development Projects (rural areas)
   Using appropriate technology
   Incident Management Systems
   Research and Development – pavement standards
                          South African Road Network Split




                                                             15,985, 2.57%
606,000, 97.40%                            16,170, 2.60%
                                                                                185, 0.03%




                  All Roads (Proclaimed)      SANRAL Other        SANRAL GFIP
                                        Annual Vehicle Kilometre Travel




        77%                                               23%                                                                      5%
                                                                                              18%




             All Roads (Estimate*)                SANRAL Other (Measured)                        SANRAL GFIP (Measured)

*Estimated based on annual fuel sales (SAPIA) and average light vehicle fuel consumption of 8.7 km/litre and heavy vehicle of 3.5 km/litre.
13
NATIONAL ROAD NETWORK (km)

Description                   Non Toll   Agency        BOT     Total
                                          Toll
Dual                               610           520    443     1 573
Carriageway


4-Lane                              11           299    240       550
Undivided


2-Lane                         12 429        1013       605    14 047
Single


Total                          13 050       1 832      1 288   16 170
% of SANRAL Network              81%         11%         8%
Total RSA Road Network Estimated at 606,000 km
                                                                                  Pavement Age Trend
                                                100%
National Road Network Length (Carriageway km)
                                                90%

                                                80%

                                                70%

                                                60%

                                                50%

                                                40%

                                                30%

                                                20%

                                                10%

                                                 0%
                                                       1998   1999   2000     2001      2002   2003   2004   2005   2006   2007   2008   2009   2010
                                                                                                      Year

                                                              >25 yrs       21-25 yrs     16-20 yrs    11-15 yrs    6-10 yrs   0-5 yrs
            ØPlease                                      Note: 72% of Network Older than Original 20 Year Design Life
                                                              Forcasted Non-Toll National Road Network Conditon
                                                                   R6bn/year Fiscus Funding for 13,050 km - NO New Toll Roads
Non-Toll National Road Network Condition (%)   100

                                                90

                                                80

                                                70

                                                60
                                                                                                                                                                                           Excellent
                                                50
                                                                                                                                                                                           Good
                                                40                                                                                                                                         Fair
                                                                                                                                                                                           Poor
                                                30
                                                                                                                                                                                           Very Poor
                                                20

                                                10

                                                 0
                                                                   2011
                                                     2009




                                                                          2012

                                                                                 2013



                                                                                               2015

                                                                                                      2016




                                                                                                                            2019




                                                                                                                                                 2022




                                                                                                                                                                      2025
                                                            2010




                                                                                        2014




                                                                                                             2017

                                                                                                                     2018



                                                                                                                                   2020

                                                                                                                                          2021



                                                                                                                                                        2023

                                                                                                                                                               2024



                                                                                                                                                                             2026

                                                                                                                                                                                    2027
                                                                                                                    Year
                                                              Forcasted Non-Toll National Road Network Conditon
                                                                   R6bn/year Fiscus Funding for 11,050* km - With New Toll Roads
Non-Toll National Road Network Condition (%)   100

                                               90

                                               80

                                               70

                                               60
                                                                                                                                                                                            Excellent
                                               50
                                                                                                                                                                                            Good
                                               40                                                                                                                                           Fair
                                                                                                                                                                                            Poor
                                               30
                                                                                                                                                                                            Very Poor
                                               20

                                               10

                                                 0
                                                                                         2014

                                                                                                2015




                                                                                                                      2018

                                                                                                                             2019




                                                                                                                                                  2022




                                                                                                                                                                       2025

                                                                                                                                                                              2026
                                                     2009

                                                            2010



                                                                           2012

                                                                                  2013




                                                                                                       2016

                                                                                                              2017




                                                                                                                                    2020

                                                                                                                                           2021



                                                                                                                                                         2023

                                                                                                                                                                2024




                                                                                                                                                                                     2027
                                                                    2011




                                                                                                                     Year
                                                                                 Average Daily Traffic Trend
                                                20000
National Road Network Length (Carriageway km)
                                                18000

                                                16000

                                                14000

                                                12000

                                                10000

                                                 8000

                                                 6000

                                                 4000

                                                 2000

                                                   0
                                                        1999    2000      2001    2002     2003   2004   2005     2006    2007    2008     2009   2010
                                                                                                     Year

                                                               0 - 5000     5000 - 10000     10000 - 20000      20000 - 50000    > 50000
                 COST OF MAINTENANCE DELAY – AGENCY

                                             Repair Cost = X / km

                 100                                       Repair Cost = 6X / km
                                                                               (Ratio 1:6)
                       Good
Road Condition




                 80

                 60    Fair
                                                                    Repair Cost = 18X / km
                       Poor            3-5 Years                                    (Ratio 1:18)
                 40

                 20    Very Poor
                                             5-8 Years
                  0
                   2008         2013         2018         2023           2028
                                             Year
                   Please Note: Typical Costs for 11.4m Wide Road in Flat Terrain
COST OF MAINTENANCE DELAY - ROAD USER (2009R)

                        R 20
                                   Good Condition            Poor Condition            Very Poor Condition
                        R 18


                        R 16
Road User Cost (R/km)




                        R 14


                        R 12
                                                                                                                  Toll Class 1
                                                                                                                  Toll Class 2
                        R 10
                                                                                                                  Toll Class 3
                                                                                                                  Toll Class 4
                         R8


                         R6


                         R4


                         R2


                         R0
                               0         2          4           6        8        10       12        14      16

                        Good                            International Roughness Index (m/km)              Poor
                                                                                                Based on HDM-4 Modeling
                                                       Index Value (Base 100 = 2000)




                                                  50
                                                          100
                                                                 150
                                                                        200
                                                                              250
                                                                                       300
                                                                                             350




                                              0
                                     Jan-01
                                     Apr-01
                                     Jul-01
                                     Oct-01
                                     Jan-02
                                     Apr-02
                                     Jul-02
                                     Oct-02
                                     Jan-03
                                     Apr-03
                                     Jul-03
                                     Oct-03
                                     Jan-04
                                     Apr-04
                                     Jul-04
                                     Oct-04




                  CPI Index
                                     Jan-05
                                     Apr-05
                                     Jul-05
                                     Oct-05
                                     Jan-06




                  PPI Index
                              Year
                                     Apr-06
                                     Jul-06
                                     Oct-06
                                     Jan-07
                                     Apr-07
                  CPA Index


                                     Jul-07
                                                                                                   Indices Comparison Trend




                                     Oct-07
                                     Jan-08
                                     Apr-08
                                     Jul-08
                                     Oct-08
                                     Jan-09
                                     Apr-09
                                     Jul-09
                                     Oct-09
                                     Jan-10
                                     Apr-10
                                     Jul-10
                                     Oct-10
                                     Jan-11
source: www.statssa.gov.za
   Strengthening/Regravel Backlog: Roads
   in Poor to Very Poor Condition

             Strengthening/Regravel Backlog: Roads in Poor to Very Poor Condition
                         Paved                       Gravel                    Total
 Authority
                 % Length Cost                 % Length Cost                Length Cost
SANRAL         11.86% 1,932 R 15,456,000,000 0.00%        0              R 0 1,932 R 15,456,000,000
Provinces - 9 22.79% 10,980 R 87,840,000,000 50.66% 69,216 R 13,843,111,157 80,196 R 101,683,111,157
Metros - 9      4.12% 2,127 R 10,635,000,000 8.48% 1,227 R 245,315,473 3,354 R 10,880,315,473
Municipalities 3.62% 1,363 R 4,089,000,000 28.54% 86,245 R 17,249,009,106 87,608 R 21,338,009,106
 Total Backlog        16,402 R 118,020,000,000      156,687 R 31,337,435,736 173,089 R 149,357,435,736
Actual numbers – Roads Infrastructure and
Fuel Levy
                         2009/10           2010/11           2011/12            2012/13

                         R             Revised estimate        Medium-term estimates (R)
                                             (R)
 Provincial           13,527,087,000   14,841,633,000     15,905,302,000     17,199,542,000

 National              5,608,086,000    6,844,501,000     8,651,596,000       9,728,055,000

 Local                10,050,262,238    6,955,989,601     8,380,816,634       1,713,432,045

 Total                29,185435,238    28,642,123,601     32,937,714,634     28,641,029,045

 Fuel Levy            28,832,536,000   34,300,000,000     35,000,000,000     38,110,000,000

 General fuel levy     6,800,000,000    7,542,000,000     8,573,000,000       9,040,000,000
 sharing
 Fuel pipeline                          1,500,000,000     1,500,000,000       1,500,000,000

 Net fuel levy        22,032,536,000   25,258,000,000     24,927,000,000     27,570,000,000

 RAF Component

 2009/10 – R12,556 billion
 2010/11 – R14,386 billion (est.)
MAINTENANCE

  • Routine Road Maintenance: all the time
     Repairing potholes within 48 hours
     Replace guardrails, sign posts etc.
     Grass cutting
     Patching
     Clearing up after accidents
     Fencing etc.
  • Periodic Maintenance ( every 7 – 8 years)
  • Special Maintenance
Community Development
Programme

 Focus on the provision of much needed
  transport infrastructure within poor
  communities
 Focus on method of infrastructure delivery
   Method  of construction (labour enhanced
    construction, maximize job creation)
   Transfer of skills
   Small contractor development
   Maximise retention of wealth in communities
CAPITAL INVESTMENT

State Toll Network Development


•   N17 East Toll Road Extension
•   N1 South and R30 Bloemfontein – Kroonstad
•   N1 Polokwane Bypass
•   N3 Mariannhill Extension

•   Gauteng Freeway Improvement Project: Tolling
    planned to commence – subject to outcome of
    further consultations led by the Ministerial
    Steering Committee
BUDGET
Total expenditure


Business        2010/11     2010/11    2011/12
area             No. of    R million   R million
R million       Projects
Non-toll            259       7 780        9 911
Network

Toll Network        148       9 582        6 388
(Excl Finance
charges)
TOTAL                        17 362       16 299
VALUE
FUNDING
   Government Grant for the non-toll network
       Cannot budget for a deficit

   Toll Revenue – to be used only on toll roads
       Borrowings from capital markets and financial institutions

   Other income (minimal) – rental income etc

   Alternate Funding Sources finalised/under discussion
       EIB
       ECA
       Foreign investors - roadshows
Ratings


    Moody’s
    Global Scale Issuer Ratings:
    (Non-guaranteed notes)
    Long-Term:        A3
    Short-Term:       P-2

    National Scale Issuer Ratings:
    (Non-guaranteed notes)
    Long-Term:         Aa2.za
    Short-Term:        P-1.za
Gauteng Freeway Improvement Project and
Open Road Tolling




                                          31
Gauteng
 Most freeways in Gauteng reached their
  capacity
 Peak hours are extending by 10 to 15 minutes
  each year
 Results in congestion and uneconomical use of
  time with increased vehicle operating costs
  and carbon emissions



                                           32
Economic Impact of Congestion &
Insufficient Maintenance
  SACCI   comments (Jan 2010) :
    Expressed concern about impact on business due to
     congestion and insufficient maintenance
    Based on conservative assumptions, cost of congestion on
     Ben Schoeman amounts to R15m/hour
    Excludes costs associated with:
       Fuel and maintenance
       Late freight deliveries

       Lost business opportunities

       Accident costs




                                                           33
Economic Impact of Congestion &
Insufficient Maintenance
  AA   conducted tests (August 2007) :
    1600cc vehicle travelling between Pretoria and
     Johannesburg
    122 Minutes additional driving per day (40 additional
     hours per month)
    Engines operating for longer times – 1,5l/hr when idling
    Additional 705 litres wasted (469 hrs idling) per annum –
     Extra R4 935 (R7 per litre)
    80 000 people – R395 m per year wasted
    Excludes working time, frustration, accidents


                                                         34
      Maintenance and Repair Cost Increases due
      to Worsening Road Conditions
*




    “The results obtained from the comparison indicate that the maintenance and repair costs of a truck increase as
    the condition of the road on which the truck is travelling deteriorates. When moving from a good condition road to
    a bad condition one, increases in vehicle maintenance and repair costs of approximately 121% can potentially
    be experienced. In addition, the increase in truck repair and maintenance costs due to deteriorating road
    conditions can potentially lead to an estimated increase of around 10% in the total logistics costs of a company.
    Other costs that can potentially be attributed to deteriorating road quality are increased vehicle operating costs,
    increased fuel consumption, increased cargo damages and ultimately increased vehicle design and manufacturing
    costs.”


                                                                                                                    35
    Maintenance and Repair Cost Increases due
    to Worsening Road Conditions


     *When comparing the average repair and maintenance costs of vehicles of
     two companies travelling on specific routes, associated to the condition ... the
     results potentially indicate that a truck (truck 1) from Company B travelling
     from Newcastle to Gauteng (300 km) has on average maintenance and
     repair costs of R627 per trip. A similar truck (truck 2) from the same company
     travelling on the N3 between Gauteng and Durban for 300 km will have on
     average maintenance and repair costs of only R270 per trip. If we assume
     that both trucks make 100 round-trips a year (200 trips in total), the total
.    maintenance and repair costs of truck 1 could potentially amount to R125
     400 per year and for truck 2 it would be R54 000. This indicates a potential
     percentage increase in maintenance and repair costs of 132% per year when
     comparing a truck travelling on a bad road with one travelling on a good road
     for company B.




                                                                                   36
Background: Economic
Impact Analysis
    SANRAL conducted an economic impact study by the Graduate
     School of Business of the UCT
    Economic impact analysis provided robust indication of project
     value to economy
    Indicators show that project is economically viable and provides
     very high benefits to the Gauteng Province and South Africa


 TABLE 12-1:       GFIP: RESULTS OF ANALYSIS OF ECONOMIC BENEFITS AND COSTS
 Benefit-Cost Ratio (BCR)                                                          8,4
 Economic Internal Rate of Return (RR)                                            37%
 Nett Present Value of Benefits minus Costs (in billions of Rand)             R209,8 billion

                                                                                               37
Background: Approval Processes
  Approached   Minister of Transport 2005 – project
   proposal
  Inter governmental (all spheres) workgroup agreed
   project principles
  DOT, SANRAL and Gauteng Government played
   leading role in compiling a document: “Gauteng
   Network Integration Process: Proposal for a
   Gauteng Freeway Improvement Scheme”
  This report was concluded in May 2006.
  Participants presented the report to political decision
   makers for acceptance
                                                       38
Background: Approval
Processes

 Severalother interactive sessions followed with
  metropolitan authorities and The Gauteng Province.
  The project was presented to the Gauteng Province
  at:
   The Gauteng Indaba (initiative of then MEC Jacobs) May
    2006
   Workshop with Gauteng Province in April 2007
   Gauteng Legislature: Transport Portfolio Committee in
    August 2007



                                                        39
Background: Approval Processes

 Cabinet  approval – mid 2007
 Intent to toll process – October 2007, indicated a tariff
  of 50c/km
    Advertised  in local and national papers
    Directly informed other authorities
    Presentations made

 Declaredas a toll road – March 2008
 Procurement of contracts commenced thereafter




                                                       40
 Road Works
 Roadconstruction :
  Civil Works
    17 Projects

    Value: R16.9 billion, including CPA, excl
     VAT




                                            41
GFIP – Improvements Made

  Widening of the freeways
  34 interchanges are significantly upgraded which will
   result in less congestion
  Median lighting has been provided on the route to
   allow for a safer journey.
GFIP – Improvements Made
 Result   of Improvements:
   Less congestion
   Time savings
   Greater production
   Safer journey
   Reduced carbon emissions
   Created 20 000 jobs during construction
 Toll Operations
Components:
 Design and Build (project implementation)
 Operations (toll collection)
   ORT roadside, back office, points of presence, systems
    maintenance and facilities – 8 Years
   Transaction clearing house (TCH) – 5 Years
   Violation processing centre (VPC) – 5 Years

 Asset   Replacement


                                                      44
Toll System
 Scope   of Works – Design & Build:
   Installationof roadside and other system hardware (tag readers,
    electronic vehicle classification, CCTV, servers, work stations,
    communications, etc);
   Development and integration of software;
   Provision and fitment of equipment and furniture for points of
    presence such as permanent kiosks, temporary kiosks, roadside
    customer service centres, mobile pay stations, etc;
   Tag packaging, logistics




                                                             45
Toll System
 Scope   of Works – Operations:
   ORT  Back Office operations - road side transactions validated
   Customer services at ”Point of Presence”
      14 Customer Service Centres

      16 Kiosks at Shopping Centres

      25 Mobile Service Centres

      20 Mobile Pay Stations




                                                           46
  Toll System (cont.)
   Call centre
   Account management
   Financial transaction settlement
   E-Tag logistics and testing
   System/equipment maintenance
   Facilities maintenance, rentals and rates
   Violation processing

 Thetoll operations of the project will provide at least
 900 permanent quality jobs (Technicians, IT, Points of
 Presence, Admin, Call Centre, etc)


                                                      47
Imports

  Specialistequipment
  Software development
  Salaries
                          ZAR 500 million




                                            48
Other Investments
 ITS and Incident Management:
    Network Monitoring
    Provides information to road users, radio stations
    Incident management (towing vehicles, medics on bikes, incident
     vehicles, etc)
    Objective to clear road as soon as possible in the event of incident, and
     assist road users
    R50 m per year

 Routine road maintenance:
   Fixing guardrails, potholes, do crack sealing, pick up litter, grass cutting,
    lighting maintenance and electricity, etc)
   R120m per year




                                                                           49
Other Investments
 Periodic   Maintenance
   Comprise  periodic maintenance actions such as rehabilitation
    and overlays.
   Scheduled to take place as follow :
      Overlays (2020/21 – 2022/23):        R2 895 million
      Rehabilitation (2030/31 –2032/33):   R8 683 million




                                                             50
 Funding
 GFIP is not funded through the central fiscus
 Funds are raised on the Capital Markets through
  SANRAL’s Domestic Medium Term Note Programme
 The user-pay principle (tolling) is used to re-pay the
  loans, as well as for future operation and maintenance of
  these roads




                                                       51
Basis for Determination of Tariffs
  Service  and repay loans to fund initial capital cost
  Interest payments during term of loans
  Asset preservation
  Routine road maintenance
  Operational costs
Considerations– Setting Tariffs


     Affordability – Since 2007, indicated tariff of
      50c/km (2007 Rand)
     Benefit to user should be greater than overall
      cost
     Project should be financially viable – must be
      able to repay debt incurred, as well as cover
      operational maintenance costs
Considerations – Heavy Vehicles

 Heavy    Vehicles:
   Have  highest impact on road pavement
   Use of the road – requirement to conduct business,
    also high value of time
   Mostly commercial vehicles – deductions for VAT
    and toll as normal business expense
 Considerations – Discounts


 Public  concern about affordability for frequent and longer
  travel distance users – Frequent User Discounts (FUD) to
  address issue
 Project principle – promotion of public transport – Public
  Transport Discounts to assist
 Motorcycles – requests for reduced tariff – toll system
  designed to classify motorcycles
  Discounts
  E-Toll    Tag users:
     Class   A1, A2, B and C – 25%
  Discounted     Tariff (per km), VAT Incl.
     Class A1         – 30c/km
     Class A2         – 49,5 c/km (42,5 /km, VAT excl)
     Class B          – R1,49 /km (R1,28 /km, VAT excl)
     Class C          – R2,97 /km (R2,55 /km, VAT excl)
  Ratio    between tariffs for class A2: B: C is:
     1:   3: 6


NB: No tag, no discount!
  Other Additional Discounts

 Public Transport Operator discounts for qualifying
  vehicles: 50%
 SAPS & SANDF exempt
 Time of Day Discounts
Time of Day Discounts
Other Additional Discounts (cont.)
  Frequent   User Discounts only for Class A1 and A2
   e-toll tag account users:
  Cumulative tolls (after all discounts) for
                                               Discount for each gantry pass in the
    the calendar month prior to current
                                                            category*
               gantry pass
                 0 – R100                                      0%
              >R100 – R200                                    2,5%
              >R200 – R380                                    7,5%
              >R380 – R550                                    15,0%
              >R550 – R700                                    25,0%
              >R700 – R830                                    37,5%
              >R830 – R940                                    45,0%
                   >R940                                      50,0%
 Payment terms

 SANRAL    is not a financial institution and
  would therefore not be able to extend credit
  without being exposed to the National Credit
  Act, hence no payment terms
 7 day grace period from date of transaction
    Impact of Toll Tariffs upon
    Financial Feasibility
    To illustrate the impact of different toll tariffs upon financial
    viability, three sets of light vehicle tariffs were considered:

                       VLN Tariff                      Tag Tariff
                                                        (-25%)
                       80c per km                     60c per km
                       66c per km*                   49,5c per km*
                       40c per km                     30c per km
*   Gazetted Tariffs

    All discounts remain the same percentages
    Monthly Tolls




   51% of all light vehicle users would pay less than R200 toll per month
   69% of all light vehicle users would pay less than R400 toll per month
   77% of all light vehicle users would pay less than R500 per month.
   A maximum of 2% of all light vehicle users is expected to pay more than
    R1000 per month toll.

*Based on 27 000 interviews
Examples of the Monthly Toll Cost of a
Passenger in a Taxi

 For  22 return trips, as described, between
  Golden Highway (south of Jhb) and Centurion
  via the N1:
   •   R472,18 per month divided amongst 16 passengers
   •   R29,51 per passenger per month
   •   R1,34 per passenger return per day



                                                    64
Examples of the Monthly Toll Cost
of a Passenger in a Taxi
 For22 return trips, as described, between
 south of Johannesburg and Centurion via the
 N1, M1 and N1 again
  •   R228,94 per month divided amongst 16 passengers
  •   R14,31 per passenger per month
  •   65c per passenger return per day




                                                   65
Examples of the Monthly Toll Cost
of a Passenger in a Taxi

 For 22 return trips, as described, between
 Golden Highway (south of Jhb) and Jhb CBD
 via the N1 and M1
  •   R45,71 per month divided amongst 16 passengers
  •   R2,86 per passenger per month
  •   13c per passenger return per day


                                                   66
Economic Study: Inflationary
Effect
 Economic   study - impact on the cost of consumer
  goods determined.
 Only considered the cost of tolling - ignoring all the
  benefits of the freeway upgrades.
 Conclusions w.r.t. “Cost of Living” increases:
    Household   incomes less than R24 365 - 0.31% increase.
     (31c for each R100 spent)
    Household incomes between R24 365 and R55 159 -
     0.29% increase (29c for each R100 spent).
 The scheme will have little impact on the cost of
  consumer goods and will not be inflationary

                                                         67
Traffic Diversion
   Issue of traffic diversion to supporting road network raised by
    local authorities during toll declaration process
   Extensive traffic modelling conducted to demonstrate impact
    during different peak and off peak periods:
       Additional GFIP capacity attracts traffic to network during peak periods
       At night and during weekends – slight increase in traffic on alternative
        “free” network – however, highway bonus not considered
       In terms of the overall alternative Provincial and Metropolitan road
        network, there should be a reduction of ±10% in travelled distance and in
        excess of 20% reduction in travel time on a daily basis as a result of the
        GFIP project.




                                                                            68
How does it work?
   Overhead gantries are fitted with electronic equipment
   When entering the toll area the electronic equipment will:
     – photograph your front and rear number plate;
     – read the E-tag on your vehicle;
     – verify that the specific tag is linked to the specific vehicle
       [number plate and class] and have an account linked to it;
     – Generate a transaction;
     – transactions are rolled up at night;
     – toll fees are deducted from your e-toll account;
     – transactions can be viewed on-line the next day




                                                                    69
SANRAL Principles for ORT


 One tag standard
 One account – may include various vehicles
 Central clearing



        Full interoperability

                                               70
Toll Point
Positions
(with
distances)




        71
ORT – Central Operations Centre




      ORT Back Office
      Transaction Clearing House (TCH)
      Violations Processing Centre (VPC)
      New ITS ops centre
Satellite
Centre
Coverage @
12 min reach


Assumptions
12 mins at ave of
80km/h = 16km
Turnaround only
possible at next
interchange
Electronic Toll Collection
  Tag linked to vehicle and number plate
  Agreements with rental companies
  Day passes will be available
  CBRTA to facilitate registration/toll collection at border posts

  Automatic Number Plate Recognition – Cameras
  Grace period of 7 days for payment, thereafter lose discounts
  Violations
       Fines will be stiff
       Applicable legislation under discussion – AARTO Act, SANRAL Act
         etc
       Will be linked to E-Natis
       Dedicated enforcement personnel – through RTMC

  Gradual country-wide roll-out
      N4 Platinum Highway e-tags to align first
      One card, one account country-wide
Account Registration/Obtaining an e-
Tag

Obtaining an e-tag and registering an e-Toll account will
 take place as follows;
    at the e-toll Customer Service website, ww.sanral.co.za;
    at an e-toll Customer Service kiosk located at a mall;
    at an e-toll Customer Services centre situated along the
     freeway network;
    contacting the e-toll Call Centre; or
    buying an e-tag at conveniently located retail outlets – set up
     account through website or contacting the Call Centre

  Interoperable with all other toll plazas in RSA
Account Registration
  Locations  of the registration points will be available on
   www.sanral.co.za once registration commences.
  The full amount of the purchase price of an e-tag is
   credited to the road user’s e-toll account upon
   registration - means the e-tag is effectively free to road
   users.
  Same account and e-tag can be used at any other plaza
   where e-toll is/will become available
Account Payment/Top-Up
 Road  users will have the option to link their e-toll
  account directly to their credit card
 If user elects to have a pre-paid account:
    Electronic fee transfer (EFT),
    Debit orders,
    At selected retailers (similar to the purchase of air-time).
    At dedicated e-toll customer service centres/kiosks.
 Monthly Tolls – Toll Calculator

 Toll calculator available to determine
  estimated monthly toll costs
 Calculator can be accessed on
  www.sanral.co.za/tollcalc




                                           78
Monthly Tolls – Toll Calculator
  Input:
    Entry/exitpoints
    Number of journeys
    Time of day when journeys are undertaken
    Vehicle class

  Output:
    Distancetravelled
    Estimated toll cost before discounts
    Estimated toll costs after discounts


                                                79
Non Payment of Toll Tariff
  The   non-payment of Toll Tariff will result in :
    levying of administrative fees,
    levying of fines and/or
    prosecution in terms of applicable legislation.

  Frequent  User Discount, e-Toll Tag Discounts and
   Public Transport Discounts will not be applicable in
   the case of the non-payment of Toll Tariffs within
   the prescribed time period




                                                       80
 Non Payment of Toll Tariff (cont.)

 Non-payers   – 7 day grace period
 Be invoiced for outstanding toll, if no registration
  takes place within grace period
 Debt collection processes will be implemented
 On road enforcement unit: physical enforcement of
  amongst others, law enforcement functions and the
  collection of outstanding tolls


                                                         81
GFIP: STATUS

  Roadworks near completion
     Bitumen shortage: surfacing slower than planned

  ETC Infrastructure will be ready in time

  Tariffs announced in early February 2011

  Public/political outcry against tariffs
      Ministerial Steering Committee and Work Groups reviewing tariffs
      Minister’s statement assures investors
      Public participation with stakeholder groups current
      Final report expected soon
      Tolling expected to start in Q3 2011
CONCLUSION
    Investing in roads
      For sustainable economic growth
      Leverage procurement to transform industry
      Make communities economically independent
      Create public value
      Core components of South Africa’s growth strategy
   Knowledge based organisation
      Right professional skills
      Support tertiary educational institutions
   Effective delivery of road infrastructure for public transport
    and movement of freight
     SANRAL: Touching Peoples Lives



THANK YOU!                     “Where a road passes,
                                development follows
                                 right on its heels”




Fraud Hotline: 0800 204 558