									JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                                   BCT/1

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




BREAKDOWN COST OF TENDER

No.      Description                                                                                                  Singapore $ (SGD)
         Unloader UL-P4 to unload conventional bulk cargo vessels at Berth's J23 and J24 and transfer the
A.1      product to the wharf side conveyors.



         Design and Documentation of the Product Handling System to receive, screen and transport product
         to future facilities of Customers 7, 8 and 9, via a fully closed transport system and, to the existing six
         customers, via a linking closed transport system including modifications to the existing T1 product
B.1      handling system.

B.2      Product Handling System to the future facilities of Customer 7 and to the existing six customers.
                         Total of Base Offer (A.1 +B.1 + B.2) to be transferred to Form of Tender (FOT) 1.1a


No.      Description                                                                                                  Singapore $ (SGD)
         Design and Documentation of the Product Handling System to receive, screen and transport product
         to future facilities of Customers 7, 8 and 9, via a fully closed transport system and, to the existing six
         customers, via a linking belt conveyor transport system including modifications to the existing T1
B.3      product handling system.

B.4      Product Handling System to the future facilities of Customer 7 and to the existing six customers.
                  Total of Alternative Offer (A.1 + B.3 + B.4) to be transferred to Form of Tender (FOT) 1.1b


No.      Description                                                                                                  Singapore $ (SGD)

C.1      Unloader UL-P4 Operator's Cabin System
                                                                 To be transferred to Form of Tender (FOT) 1.2a

No.      Description                                                                                                  Singapore $ (SGD)

C.2      Unloader UL-P4 Foreign Object Detection System
                                                                 To be transferred to Form of Tender (FOT) 1.2b

No.      Description                                                                                                  Singapore $ (SGD)

D.1      Unloader UL-P5
                                                                 To be transferred to Form of Tender (FOT) 1.2c

No.      Description                                                                                                  Singapore $ (SGD)

D.2      Unloader UL-P5 Operator's Cabin System
                                                                 To be transferred to Form of Tender (FOT) 1.2d

No.      Description                                                                                                  Singapore $ (SGD)

D.3      Unloader UL-P5 Foreign Object Detection System
                                                                 To be transferred to Form of Tender (FOT) 1.2e

No.      Description                                                                                                  Singapore $ (SGD)

E.1      Product Handling System Extension to the future facilities of Customer 8 and 9
                                                               To be transferred to Form of Tender (FOT) 1.2f

No.      Description                                                                                                  Singapore $ (SGD)
         Product Handling System - UL-P3 travel range extension for operations at Berth J22 and Berth J23
F.1      (including extension at Conveyor C1 tail end)
                                                            To be transferred to Form of Tender (FOT) 1.2g
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                   BCT/2

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.       Description                                                                             Unit   Singapore $ (SGD)
          A.1 Supply of Unloader
          (Applicable to Base Offer and Alternative Offer )
          Section A.1.1 - Unloader Preliminaries
          Site establishment including provision of site offices and amenities, safety fencing,
A.1.1.1   power, communications, water and sewerage.                                              Item
A.1.1.2   Insurances as specified.                                                                Item
A.1.1.3   Other fixed overheads and statutory fees.                                               Item
A.1.1.4   Construction Management Costs including all quality assurance.                          Item
A.1.1.5   Disestablishment upon completion.                                                       Item
A.1.1.6   Any other items necessary to complete the works. (Tenderer to specify).                 Item



          Total of Section A.1.1 - Unloader Preliminaries                                                              SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                    BCT/3

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.       Description                                                                              Unit   Singapore $ (SGD)
          A.1 Supply of Unloader
          (Applicable to Base Offer and Alternative Offer )
          Section A.1.2 - Unloader Design and Documentation
          The scope of works shall include Design, preparation and submission of
          drawings and documentation to fulfil specification requirements, including load
A.1.2.1   data and drawings for a complete rail mounted ship unloader.
          Design and documentation of all mechanical and structural works of complete unloader,
A.1.2.2   including signing off by an appropriately Qualified Person.                              Item
          Design and documentation of all electrical works of complete unloader including
          electrical layout drawings, single line diagrams and schematic wiring diagrams for all
A.1.2.3   lighting and control, including signing off by an appropriately Qualified Person.        Item
A.1.2.4   Design of PLC and SCADA system                                                           Item
          Preparation of Operation and Maintenance Manuals, including draft copies and final
A.1.2.5   documents as specified.                                                                  Item
A.1.2.6   Any other items necessary to complete the works. (Tenderer to specify).                  Item



          Total of Section A.1.2 - Unloader Design and Documentation                                                    SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                       BCT/4

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                                Unit   Singapore $ (SGD)
           A.1 Supply of Unloader
           (Applicable to Base Offer and Alternative Offer )
           Section A.1.3 - Unloader UL-P4
           The scope of works shall generally include manufacture, protective treatment,
           delivery to site, unloading, storage, handling, erection, installation,
           commissioning and performance testing of a complete rail mounted ship
A.1.3.1    unloader.
           Main machine including structural items, long travel equipment, slewing equipment,
           boom luffing equipment , vertical arm and digging head equipment and mechanical
A.1.3.2    equipment associated with transport of product.                                            Item
           2C1-A Wharf conveyor loading trolley complete with discharge chute and belt lifting
           system for conveyor inlet dust sealing system. This is to discharge from the ship
A.1.3.3    unloader to 2C1 wharf conveyor                                                             Item
           2C1-B Wharf conveyor loading trolley complete with discharge chute and belt lifting
           system for conveyor dust inlet sealing system. This is to discharge from a separate
A.1.3.4    backup ship unloader to 2C1 wharf conveyor                                                 Item
           C1 Wharf conveyor loading trolley complete with discharge chute and belt lifting system
           for conveyor inlet dust sealing system. This is to discharge from ship unloader UL-P4 to
A.1.3.5    modified C1 wharf conveyor                                                                 Item
           Active dust collection system(s) and ducting to minimise air borne dust at all transfer
A.1.3.6    points                                                                                     Item
           Storm tie down system including wheel uplift and longitudinal restraints. All such
           structures shall be supplied and mounted by the Contractor to mounting points on the
A.1.3.7    wharf deck                                                                                 Item
           Long travel buffer systems to decelerate the machine in case of over travel. This
           includes supply of buffers and buffer supports which shall be mounted to the
A.1.3.8    unloader(s) by the Contractor                                                              Item
A.1.3.9    Operating control system complete with Radio Remote Control Box                            Item
           Anti-collision system for monitoring safe distances between rail mounted machines and
A.1.3.10   any other permanent wharf obstacles.                                                       Item
           Obstruction detection system for long travel assemblies and wharf conveyor loading
A.1.3.11   trolleys                                                                                   Item

A.1.3.12   Supply and installation of PLC and SCADA system into UL-P4 onboard switchroom              Item
A.1.3.13   Onboard fire protection system(s)                                                          Item
           22kV power cable reeler and trailing cable for provision of power to the machine from
A.1.3.14   the HV centre point termination box                                                        Item
           Control cable reeler and trailing cable to allow communication between the onboard
           electrical room PLC and T2 electrical room PLC over the full machine working range
A.1.3.15   from the Comms centre point termination box                                                Item
           22kV trailing cable turnover equipment at the centre of travel, near to the 22kV centre
A.1.3.16   point termination box at the wharf/transfer station connection point                       Item
           Control trailing cable turnover equipment at the centre of travel, near to the Comms
A.1.3.17   centre point termination box at the wharf/transfer station connection point                Item
A.1.3.18   On board substation and electrical room for power distribution and control systems         Item
A.1.3.19   Fully enclosed machine house for all winching equipment                                    Item
A.1.3.20   Transformers, switchgear and cabling to all drives and field sensors                       Item
           All necessary electric sensors and PLC controls to enable operation in all the operating
A.1.3.21   modes                                                                                      Item
A.1.3.22   All onboard signage                                                                        Item
A.1.3.23   Any other items necessary to complete the works. (Tenderer to specify).                    Item



           Total of Section A.1.3 - Unloader UL-P4                                                                         SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND        BCT/5

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.       Description                                                                  Unit   Singapore $ (SGD)
          A.1 Supply of Unloader
          (Applicable to Base Offer and Alternative Offer )
          Section A.1.4 - Commissioning
A.1.4.1   Pre-shipment acceptance testing and workshop testing at Contractor's site.   Item
A.1.4.2   No load testing at Jurong Port.                                              Item
A.1.4.3   Load testing for Terminal T2 to existing six customers at Terminal T1        Item
A.1.4.4   Load testing for Terminal T2                                                 Item
A.1.4.5   Performance testing for Terminal T2                                          Item
A.1.4.6   Any other items necessary to complete the works. (tenderer to specify)       Item



          Total of Section A.1.4 - Commissioning                                                            SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND        BCT/6

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.       Description                                                                 Unit   Singapore $ (SGD)
          A.1 Supply of Unloader
          (Applicable to Base Offer and Alternative Offer )
          Section A.1.5 – Unloader Training
          The scope of works shall include Preparation, Documentation, Delivery and
A.1.5.1   Presentation of training programs provided by the Contractor.               Item
A.1.5.2   Any other items necessary to complete the works. (Tenderer to specify).     Item



          Total of Section A.1.5 – Unloader Training                                                       SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                        BCT/7

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.       Description                                                                                  Unit   Singapore $ (SGD)
          B.1 Product Handling System - Design (Base offer)
          Section B.1.1 - Design and Documentation
          The scope of works shall include Design, preparation and submission of
          drawings and documentation to fulfil specification requirements, including load
B.1.1.1   data and drawings and data a complete Product Handling System.
          Design and documentation of all mechanical and structural works of complete unloader,
B.1.1.2   including signing off by an appropriately Qualified Person.                                  Item
          Design and documentation of all electrical works including electrical layout drawings,
          single line diagrams and schematic wiring diagrams for all lighting and control, including
B.1.1.3   signing off by an appropriately Qualified Person.                                            Item
B.1.1.4   Design of PLC and SCADA system                                                               Item
          Design of floor penetrations for electrical switchgear, PLC panels, etc to be supplied
B.1.1.5   and installed into the P5 Electrical Room and T2 Electrical Control Room.                    Item
          Preparation of Operation and Maintenance Manuals, including draft copies and final
B.1.1.6   documents as specified.                                                                      Item
B.1.1.7   Any other items necessary to complete the works. (Tenderer to specify).                      Item



          Total of Section B.1.1 - Design and Documentation                                                                 SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                    BCT/8

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.       Description                                                                             Unit    Singapore $ (SGD)
          B.2 Product Handling System (Base offer)
          Section B.2.1 - Preliminaries
          Site establishment including provision of site offices and amenities, safety fencing,
B.2.1.1   power, communications, water and sewerage.                                              Item
B.2.1.2   Insurances as specified.                                                                Item
B.2.1.3   Other fixed overheads and statutory fees.                                               Item
B.2.1.4   Construction Management Costs including all quality assurance.                          Item
B.2.1.5   Disestablishment upon completion.                                                       Item
B.2.1.6   Any other items necessary to complete the works. (Tenderer to specify).                 Item



          Total of Section B.2.1 - Preliminaries                                                  Total                 SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                                          BCT/9

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.       Description                                                                                  Unit   Quantity   Rate   Singapore $ (SGD)
          B.2 Product Handling System (Base offer)
          Section B.2.2 - Site Preparation
          Establishment on site of all labour, plant and equipment required for the site preparation
B.2.2.1   works.                                                                                       Item
          Supply of all materials, plant, labour and equipment for cutting and removal of existing
B.2.2.2   pavements as required for construction of the new works                                      m2
          Supply of all materials, plant, labour and equipment for reinstatement of existing
B.2.2.3   pavements adjacent new works                                                                 m2
B.2.2.4   Any other items necessary to complete the works. (Tenderer to specify).                      Item



          Total of Section B.2.2 - Site Preparation                                                                                          SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                                                      BCT/10

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                                     Unit            Quantity   Rate   Singapore $ (SGD)
           B.2 Product Handling System (Base offer)
           Section B.2.3 - Piling (Supply and Install)
           Establishment on site of all labour, plant and equipment required for the construction of
           piling for the new works, maintenance of the plant and equipment for the duration of the
B.2.3.1    works and removal on completion.                                                                Item
           Supply of all materials, plant, labour and equipment, excavate by boring in ground as
B.2.3.2    found, fix and install reinforcement and construct piles
B.2.3.3    Pile description A                                                                              Each
B.2.3.4    Pile description B                                                                              Each
B.2.3.5    Pile description C                                                                              Each
           Supply of all materials, plant, labour and equipment, by driving precast piles into ground
B.2.3.6    as found
B.2.3.7    Pile description D                                                                              Each
B.2.3.8    Pile description E                                                                              Each
B.2.3.9    Pile description F                                                                              Each
           Standby rate for piling plant for bored piles excluding all labour but including contractors
B.2.3.10   overhead costs. Rate Only. Do not include in the Contract Price.                                Day rate only
           Standby rate for piling plant for driven piles excluding all labour but including contractors
B.2.3.11   overhead costs. Rate Only. Do not include in the Contract Price.                                Day rate only
           Supply of all labour, equipment and materials as necessary to carry out pile
B.2.3.12   compression load tests for bored piles                                                          Each
           Supply of all labour, equipment and materials as necessary to carry out pile
B.2.3.13   compression load tests driven piles                                                             Each
B.2.3.14   Any other items necessary to complete the works. (Tenderer to specify).                         Item



           Total of Section B.2.3 - Piling (Supply and Install)                                                                                           SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                          BCT/11

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.       Description                                                                   Unit   Quantity   Rate   Singapore $ (SGD)
          B.2 Product Handling System (Base offer)
          Section B.2.4 - Groundworks
          Cutting off of concrete bored piles to the required level as necessary and
B.2.4.1   preparation of bored pile heads for encasement
B.2.4.2   Pile description A                                                            Each
B.2.4.3   Pile description B                                                            Each
B.2.4.4   Pile description C                                                            Each
          Cutting off of concrete driven piles to the required level as necessary and
B.2.4.5   preparation of driven pile heads for encasement
B.2.4.6   Pile description D                                                            Each
B.2.4.7   Pile description E                                                            Each
B.2.4.8   Pile description F                                                            Each
B.2.4.9   Any other items necessary to complete the works. (Tenderer to specify).       Item



          Total of Section B.2.4 - Groundworks                                                                                SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                                       BCT/12

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                               Unit   Quantity   Rate   Singapore $ (SGD)
           B.2 Product Handling System (Base offer)
           Section B.2.5 - Concrete Works (Supply and Install)

B.2.5.1    Supply, placement and compaction of compacted backfill for the following;
           Modifications at existing wharf belt conveyor C1 including foundations for trestles and
B.2.5.2    take-up system                                                                            m3
B.2.5.3    Wharf belt conveyor 2C1 including foundations for trestles and take-up system.            m3
           Foundations for pneumatic conveying arrangement that receives and transports
B.2.5.4    product from ships (berthed at Berth J24) to TS-2.                                        m3

B.2.5.5    New transfer station TS-2 foundations (and slabs if deemed required by the Designer)      m3
B.2.5.6    Trestle foundations between TS-2 and TS-JP7                                               m3
           New transfer station TS-JP7 foundations (and slabs if deemed required by the
B.2.5.7    Designer)                                                                                 m3
B.2.5.8    Trestle foundations at link between TS-JP7 and TS-3 area                                  m3
B.2.5.9    Foundation and slab modifications required at TS-3 area                                   m3

B.2.5.10   Foundations and slab modifications required between TS-3 area and existing TS-JP3/5       m3
B.2.5.11   Foundations and slab modifications required at existing TS-JP3/5                          m3
           Foundations and slab modifications required between existing TS-JP3/5 and existing
B.2.5.12   TS-JP4                                                                                    m3
B.2.5.13   Foundations and slab modifications required at existing TS-JP4                            m3
           Supply and installation of all galvanised steel cast-ins, HD bolts, gratings and
B.2.5.14   frames, formed recessed and uPVC conduits, for the following;
           Modifications at existing wharf belt conveyor C1 including foundations for trestles and
B.2.5.15   take-up system                                                                            Item
B.2.5.16   Wharf belt conveyor 2C1 including foundations for trestles and take-up system.            Item
           Foundations for pneumatic conveying arrangement that receives and transports
B.2.5.17   product from ships (berthed at Berth J24) to TS-2.                                        Item

B.2.5.18   New transfer station TS-2 foundations (and slabs if deemed required by the Designer)      Item
B.2.5.19   Trestle foundations between TS-2 and TS-JP7                                               Item
           New transfer station TS-JP7 foundations (and slabs if deemed required by the
B.2.5.20   Designer)                                                                                 Item
B.2.5.21   Trestle foundations at link between TS-JP7 and TS-3 area                                  Item
B.2.5.22   Foundation and slab modifications required at TS-3 area                                   Item

B.2.5.23   Foundations and slab modifications required between TS-3 area and existing TS-JP3/5       Item
B.2.5.24   Foundations and slab modifications required at existing TS-JP3/5                          Item
           Foundations and slab modifications required between existing TS-JP3/5 and existing
B.2.5.25   TS-JP4                                                                                    Item
B.2.5.26   Foundations and slab modifications required at existing TS-JP4                            Item
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                                          BCT/13

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                                Unit     Quantity   Rate   Singapore $ (SGD)
           Supply, bending and fixing in place of reinforcement including provision of
B.2.5.27   bending schedules, for the following.
           Modifications at existing wharf belt conveyor C1 including foundations for trestles and
B.2.5.28   take-up system                                                                             Tonnes
B.2.5.29   Wharf belt conveyor 2C1 including foundations for trestles and take-up system.             Tonnes
           Foundations for pneumatic conveying arrangement that receives and transports
B.2.5.30   product from ships (berthed at Berth J24) to TS-2.                                         Tonnes

B.2.5.31   New transfer station TS-2 foundations (and slabs if deemed required by the Designer)       Tonnes
B.2.5.32   Trestle foundations between TS-2 and TS-JP7                                                Tonnes
           New transfer station TS-JP7 foundations (and slabs if deemed required by the
B.2.5.33   Designer)                                                                                  Tonnes
B.2.5.34   Trestle foundations at link between TS-JP7 and TS-3 area                                   Tonnes
B.2.5.35   Foundation and slab modifications required at TS-3 area                                    Tonnes

B.2.5.36   Foundations and slab modifications required between TS-3 area and existing TS-JP3/5        Tonnes
B.2.5.37   Foundations and slab modifications required at existing TS-JP3/5                           Tonnes
           Foundations and slab modifications required between existing TS-JP3/5 and existing
B.2.5.38   TS-JP4                                                                                     Tonnes
B.2.5.39   Foundations and slab modifications required at existing TS-JP4                             Tonnes
           Supply, placement and compaction of concrete Grade C40 including all finishing
B.2.5.40   and curing as specified, for the following.
           Modifications at existing wharf belt conveyor C1 including foundations for trestles and
B.2.5.41   take-up system                                                                             m3
B.2.5.42   Wharf belt conveyor 2C1 including foundations for trestles and take-up system.             m3
           Foundations for pneumatic conveying arrangement that receives and transports
B.2.5.43   product from ships (berthed at Berth J24) to TS-2.                                         m3

B.2.5.44   New transfer station TS-2 foundations (and slabs if deemed required by the Designer)       m3
B.2.5.45   Trestle foundations between TS-2 and TS-JP7                                                m3
           New transfer station TS-JP7 foundations (and slabs if deemed required by the
B.2.5.46   Designer)                                                                                  m3
B.2.5.47   Trestle foundations at link between TS-JP7 and TS-3 area                                   m3
B.2.5.48   Foundation and slab modifications required at TS-3 area                                    m3

B.2.5.49   Foundations and slab modifications required between TS-3 area and existing TS-JP3/5        m3
B.2.5.50   Foundations and slab modifications required at existing TS-JP3/5                           m3
           Foundations and slab modifications required between existing TS-JP3/5 and existing
B.2.5.51   TS-JP4                                                                                     m3
B.2.5.52   Foundations and slab modifications required at existing TS-JP4                             m3
B.2.5.53   General
B.2.5.54   Supply and installation of concrete filled steel guard posts                               Each
           Excavate, supply, lay, bed, joint and backfill stormwater drainage pipes and pits
B.2.5.55   including breaking in to existing system and making good.                                  Item
           Excavate, supply, lay, bed, joint and backfill extensions to fire service pipes and pits
B.2.5.56   including breaking in to existing system and making good.                                  Item

           Excavate, supply, lay, bed, joint and cover extensions and modifications to electrical
B.2.5.57   cable trenches and pits including breaking in to existing system and making good.          Item
B.2.5.58   Any other items necessary to complete the works. (Tenderer to specify).                    Item



           Total of Section B.2.5 - Concrete Works (Supply and Install)                                                                       SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                                   BCT/14

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                         Unit     Quantity   Rate   Singapore $ (SGD)
           B.2 Product Handling System (Base offer)
           Section B.2.6 - Structural Works (Supply and Install)
           Supply, fabrication, protective treatment, delivery and erection of structural
           steelwork for the following including all fasteners, remedial painting, temporary
B.2.6.1    support as necessary
           Structural columns and beams complete with connection plates, support plates
B.2.6.2    and bracing, at the following;
B.2.6.3    Modifications at existing wharf belt conveyor C1                                    tonnes
B.2.6.4    Wharf belt conveyor 2C1                                                             tonnes
           Pneumatic conveying arrangement that receives and transports product from ships
B.2.6.5    (berthed at Berth J24) to TS-2.                                                     tonnes
B.2.6.6    New transfer station TS-2                                                           tonnes
B.2.6.7    Galleries between TS-2 and TS-JP7                                                   tonnes
B.2.6.8    Trestles between TS-2 and TS-JP7                                                    tonnes
B.2.6.9    New transfer station TS-JP7                                                         tonnes
B.2.6.10   Galleries at link between TS-JP7 and TS-3 area                                      tonnes
B.2.6.11   Trestles at link between TS-JP7 and TS-3 area                                       tonnes
B.2.6.12   New Extension to TS-3                                                               tonnes
B.2.6.13   Modifications and stiffening to existing TS-3 structure                             tonnes
B.2.6.14   Gallery Modifications between TS-3 area and existing TS-JP3/5                       tonnes
B.2.6.15   Modifications at existing TS-JP3/5                                                  tonnes
B.2.6.16   Gallery Modifications between existing TS-JP3/5 and existing TS-JP4                 tonnes
B.2.6.17   Modifications required at existing TS-JP4                                           tonnes
           Access stair and landings steel beams (excluding stair treads, handrails,
B.2.6.18   stanchions and kick plates) at the following;
B.2.6.19   Modifications at existing wharf belt conveyor C1                                    tonnes
B.2.6.20   Wharf belt conveyor 2C1                                                             tonnes
           Pneumatic conveying arrangement that receives and transports product from ships
B.2.6.21   (berthed at Berth J24) to TS-2.                                                     tonnes
B.2.6.22   New transfer station TS-2                                                           tonnes
B.2.6.23   Galleries between TS-2 and TS-JP7                                                   tonnes
B.2.6.24   Trestles between TS-2 and TS-JP7                                                    tonnes
B.2.6.25   New transfer station TS-JP7                                                         tonnes
B.2.6.26   Galleries at link between TS-JP7 and TS-3 area                                      tonnes
B.2.6.27   Trestles at link between TS-JP7 and TS-3 area                                       tonnes
B.2.6.28   Modifications at TS-3 area                                                          tonnes
B.2.6.29   Gallery Modifications between TS-3 area and existing TS-JP3/5                       tonnes
B.2.6.30   Modifications at existing TS-JP3/5                                                  tonnes
B.2.6.31   Gallery Modifications between existing TS-JP3/5 and existing TS-JP4                 tonnes
B.2.6.32   Modifications required at existing TS-JP4                                           tonnes
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                               BCT/15

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                       Unit   Quantity   Rate   Singapore $ (SGD)
B.2.6.33   Handrails, stanchions and kick plates at the following;
B.2.6.34   Modifications at existing wharf belt conveyor C1                                  m
B.2.6.35   Wharf belt conveyor 2C1                                                           m
           Pneumatic conveying arrangement that receives and transports product from ships
B.2.6.36   (berthed at Berth J24) to TS-2.                                                   m
B.2.6.37   New transfer station TS-2                                                         m
B.2.6.38   Galleries between TS-2 and TS-JP7                                                 m
B.2.6.39   Trestles between TS-2 and TS-JP7                                                  m
B.2.6.40   New transfer station TS-JP7                                                       m
B.2.6.41   Galleries at link between TS-JP7 and TS-3 area                                    m
B.2.6.42   Trestles at link between TS-JP7 and TS-3 area                                     m
B.2.6.43   Modifications at TS-3 area                                                        m
B.2.6.44   Gallery Modifications between TS-3 area and existing TS-JP3/5                     m
B.2.6.45   Modifications at existing TS-JP3/5                                                m
B.2.6.46   Gallery Modifications between existing TS-JP3/5 and existing TS-JP4               m
B.2.6.47   Modifications required at existing TS-JP4                                         m
B.2.6.48   Floor grating, including all stair treads at the following;
B.2.6.49   Modifications at existing wharf belt conveyor C1                                  m2
B.2.6.50   Wharf belt conveyor 2C1                                                           m2
           Pneumatic conveying arrangement that receives and transports product from ships
B.2.6.51   (berthed at Berth J24) to TS-2.                                                   m2
B.2.6.52   New transfer station TS-2                                                         m2
B.2.6.53   Galleries between TS-2 and TS-JP7                                                 m2
B.2.6.54   Trestles between TS-2 and TS-JP7                                                  m2
B.2.6.55   New transfer station TS-JP7                                                       m2
B.2.6.56   Galleries at link between TS-JP7 and TS-3 area                                    m2
B.2.6.57   Trestles at link between TS-JP7 and TS-3 area                                     m2
B.2.6.58   Modifications at TS-3 area                                                        m2
B.2.6.59   Gallery Modifications between TS-3 area and existing TS-JP3/5                     m2
B.2.6.60   Modifications at existing TS-JP3/5                                                m2
B.2.6.61   Gallery Modifications between existing TS-JP3/5 and existing TS-JP4               m2
B.2.6.62   Modifications required at existing TS-JP4                                         m2
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                                    BCT/16

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.         Description                                                                           Unit   Quantity   Rate   Singapore $ (SGD)
B.2.6.63    Floor plating at the following;
B.2.6.64    Modifications at existing wharf belt conveyor C1                                      m2
B.2.6.65    Wharf belt conveyor 2C1                                                               m2
            Pneumatic conveying arrangement that receives and transports product from ships
B.2.6.66    (berthed at Berth J24) to TS-2.                                                       m2
B.2.6.67    New transfer station TS-2                                                             m2
B.2.6.68    Galleries between TS-2 and TS-JP7                                                     m2
B.2.6.69    Trestles between TS-2 and TS-JP7                                                      m2
B.2.6.70    New transfer station TS-JP7                                                           m2
B.2.6.71    Galleries at link between TS-JP7 and TS-3 area                                        m2
B.2.6.72    Trestles at link between TS-JP7 and TS-3 area                                         m2
B.2.6.73    Modifications at TS-3 area                                                            m2
B.2.6.74    Gallery Modifications between TS-3 area and existing TS-JP3/5                         m2
B.2.6.75    Modifications at existing TS-JP3/5                                                    m2
B.2.6.76    Gallery Modifications between existing TS-JP3/5 and existing TS-JP4                   m2
B.2.6.77    Modifications required at existing TS-JP4                                             m2

B.2.6.78    Equipment Doors complete with associated fittings and frames at the following;
B.2.6.79    Modifications at existing wharf belt conveyor C1                                      Each
B.2.6.80    Wharf belt conveyor 2C1                                                               Each
            Pneumatic conveying arrangement that receives and transports product from ships
B.2.6.81    (berthed at Berth J24) to TS-2.                                                       Each
B.2.6.82    New transfer station TS-2                                                             Each
B.2.6.83    Galleries between TS-2 and TS-JP7                                                     Each
B.2.6.84    Trestles between TS-2 and TS-JP7                                                      Each
B.2.6.85    New transfer station TS-JP7                                                           Each
B.2.6.86    Galleries at link between TS-JP7 and TS-3 area                                        Each
B.2.6.87    Trestles at link between TS-JP7 and TS-3 area                                         Each
B.2.6.88    Modifications at TS-3 area                                                            Each
B.2.6.89    Gallery Modifications between TS-3 area and existing TS-JP3/5                         Each
B.2.6.90    Modifications at existing TS-JP3/5                                                    Each
B.2.6.91    Gallery Modifications between existing TS-JP3/5 and existing TS-JP4                   Each
B.2.6.92    Modifications required at existing TS-JP4                                             Each

B.2.6.93    Personnel Doors complete with associated fittings and frames at the following;
B.2.6.94    Modifications at existing wharf belt conveyor C1                                      Each
B.2.6.95    Wharf belt conveyor 2C1                                                               Each
            Pneumatic conveying arrangement that receives and transports product from ships
B.2.6.96    (berthed at Berth J24) to TS-2.                                                       Each
B.2.6.97    New transfer station TS-2                                                             Each
B.2.6.98    Galleries between TS-2 and TS-JP7                                                     Each
B.2.6.99    Trestles between TS-2 and TS-JP7                                                      Each
B.2.6.100   New transfer station TS-JP7                                                           Each
B.2.6.101   Galleries at link between TS-JP7 and TS-3 area                                        Each
B.2.6.102   Trestles at link between TS-JP7 and TS-3 area                                         Each
B.2.6.103   Modifications at TS-3 area                                                            Each
B.2.6.104   Gallery Modifications between TS-3 area and existing TS-JP3/5                         Each
B.2.6.105   Modifications at existing TS-JP3/5                                                    Each
B.2.6.106   Gallery Modifications between existing TS-JP3/5 and existing TS-JP4                   Each
B.2.6.107   Modifications required at existing TS-JP4                                             Each
B.2.6.108   General
            Reinstatement of surrounds of new structures, on completion of new construction, to
B.2.6.109   match existing conditions                                                             Item
B.2.6.110   Certification of all structures to Singapore Government requirements                  Item
B.2.6.111   Any other items necessary to complete the works. (Tenderer to specify).               Item



            Total of Section B.2.6 - Structural Works (Supply and Install)                                                              SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                                  BCT/17

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                          Unit   Quantity   Rate   Singapore $ (SGD)
           B.2 Product Handling System (Base offer)
           Section B.2.7 - Architectural Finish (Supply and Install)
           Supply, fabrication, protective treatment, delivery and erection of architectural
           finish for the following including all fasteners, remedial painting, temporary
B.2.7.1    support as necessary
           Wall Girts (rails) complete with connection plates and fly bracing, at the
B.2.7.2    following;
B.2.7.3    New transfer station TS-2                                                            m
B.2.7.4    New transfer station TS-JP7                                                          m
B.2.7.5    Modifications at TS-3 area                                                           m
B.2.7.6    Modifications at existing TS-JP3/5                                                   m
B.2.7.7    Modifications at existing TS-JP3/5                                                   m
B.2.7.8    Purlins complete with connection plates and fly bracing, at the following;
B.2.7.9    New transfer station TS-2                                                            m
B.2.7.10   New transfer station TS-JP7                                                          m
B.2.7.11   Modifications at TS-3 area                                                           m
B.2.7.12   Modifications at existing TS-JP3/5                                                   m
B.2.7.13   Modifications at existing TS-JP4                                                     m
B.2.7.14   Steel Sheeting complete with flashings and accessories, at the following;
B.2.7.15   New transfer station TS-2                                                            m2
B.2.7.16   New transfer station TS-JP7                                                          m2
B.2.7.17   Modifications at TS-3 area                                                           m2
B.2.7.18   Modifications at existing TS-JP3/5                                                   m2
B.2.7.19   Modifications at existing TS-JP4                                                     m2

B.2.7.20   Translucent Sheeting complete with flashings and accessories, at the following;
B.2.7.21   New transfer station TS-2                                                            m2
B.2.7.22   New transfer station TS-JP7                                                          m2
B.2.7.23   Modifications at TS-3 area                                                           m2
B.2.7.24   Modifications at existing TS-JP3/5                                                   m2
B.2.7.25   Modifications at existing TS-JP4                                                     m2
B.2.7.26   Roof Ventilators complete with flashings and accessories, at the following;
B.2.7.27   New transfer station TS-2                                                            item
B.2.7.28   New transfer station TS-JP7                                                          item
B.2.7.29   Modifications at TS-3 area                                                           item
B.2.7.30   Modifications at existing TS-JP3/5                                                   item
B.2.7.31   Modifications at existing TS-JP4                                                     item

B.2.7.32   Wall ventilation louvres complete with flashings and accessories, at the following
B.2.7.33   New transfer station TS-2                                                            item
B.2.7.34   New transfer station TS-JP7                                                          item
B.2.7.35   Modifications at TS-3 area                                                           item
B.2.7.36   Modifications at existing TS-JP3/5                                                   item
B.2.7.37   Modifications at existing TS-JP4                                                     item
B.2.7.38   General
B.2.7.39   Any other items necessary to complete the works. (Tenderer to specify).              Item



           Total of Section B.2.7 - Architectural Finish (Supply and Install)                                                         SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                       BCT/18

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                                 Unit   Singapore $ (SGD)
           B.2 Product Handling System (Base offer)
           Section B.2.8 - Mechanical Works (Supply)

           The scope of works includes the manufacture, protective treatment, workshop
           testing, preassembly, delivery to site, unloading, storage, handling, erection,
           installation, commissioning, acceptance testing, training of operations and
B.2.8.1    maintenance personnel and warranty of a complete product handling system
           Modification of existing wharf belt conveyor C1 that receives product from a ship
           unloader at J23. The modification shall enable the product to be transferred to
B.2.8.2    existing TS-1 and TS-2. This shall include;
           Conveyor enclosure complete with removable access panels for every carry and return
B.2.8.3    idler set                                                                                   Item
           Idler support stringers, support legs, head and tail pulley support frames and bend
B.2.8.4    pulley support frames                                                                       Item
           Hydraulic type, or travelling trolley type, belt tensioning equipment, including take-up
B.2.8.5    pulley frame                                                                                Item
B.2.8.6    TS-2 Head end chute, impact plate and transfer chutes at transfer point                     Item
           Drives, belts, pulleys, bearings, scrapers, idlers and any other equipment items required
B.2.8.7    for a fully operational conveyor                                                            Item
B.2.8.8    Rails for supporting and guiding the conveyor loading trolleys                              Item
           Dust sealing system including seal belt, belt restraint equipment, tensioning equipment
B.2.8.9    and any items required for a fully operation dust sealing system                            Item
           Wharf belt conveyor 2C1 that receives product from a ship unloader at J24, and
B.2.8.10   transports the product to TS-2. This shall include;
           Conveyor enclosure complete with removable access panels for every carry and return
B.2.8.11   idler set                                                                                   Item
           Idler support stringers, support legs, head and tail pulley support frames and bend
B.2.8.12   pulley support frames                                                                       Item
           Hydraulic type, or travelling trolley type, belt tensioning equipment, including take-up
B.2.8.13   pulley frame                                                                                Item
B.2.8.14   TS-2 Head end chute, impact plate and transfer chutes at transfer point                     Item
           Drives, belts, pulleys, bearings, scrapers, idlers and any other equipment items required
B.2.8.15   for a fully operational conveyor                                                            Item
B.2.8.16   Rails for supporting and guiding the conveyor loading trolleys                              Item
           Dust sealing system including seal belt, belt restraint equipment, tensioning equipment
B.2.8.17   and any items required for a fully operation dust sealing system                            Item
           Fully enclosed arrangement that receives and transports product from ships with
           onboard pneumatic self-discharging equipment (berthed at Berth J24) to TS-2. It
           is noted that product received by this method does not require screening. The
B.2.8.18   arrangement shall include;
           Two pipelines complete with flanges, concrete filled wearback bends, fittings, supports
B.2.8.19   and valving                                                                                 Item
B.2.8.20   Target box(s) at discharge end of pipelines including casing and wear protection.           Item
B.2.8.21   Collection bin                                                                              Item
B.2.8.22   Air balance valve mounted on the bin roof                                                   Item
B.2.8.23   Bin aeration to facilitate product discharge                                                Item
B.2.8.24   Pipework for bin aeration including pipe, fittings, valves and supports                     Item
B.2.8.25   High pressure blower(s) for bin aeration                                                    Item
B.2.8.26   Manual cut off gate at bin outlet                                                           Item
B.2.8.27   Flow control gate for bin outlet                                                            Item
B.2.8.28   Impact type weigher                                                                         Item
           Airslide complete with linear and turning pot segments between bin outlet and the TS-2
           transfer equipment. The airslide shall be complete with fabric, casing, supports and
B.2.8.29   fittings for connection to aeration equipment.                                              Item
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                       BCT/19

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                                Unit   Singapore $ (SGD)
           New transfer station TS-2 including fully closed equipment that screens the
B.2.8.30   product and then transfers the product to the downstream equipment
           Vibratory screens complete with drive, fully enclosed casing, screen(s), supports and
B.2.8.31   vibration isolators                                                                        Item
           Bucket elevators complete with drive, auxiliary maintenance drive, pulleys, belt with
B.2.8.32   fastened buckets, fully enclosed casing, tensioning take-up and chutework                  Item
           Airslides complete with linear and turning pot segments, fabric, casing, supports and
B.2.8.33   fittings for connection to aeration equipment                                              Item
           Airslide diverters complete with fabric, casing, supports and fittings for connection to
B.2.8.34   aeration equipment                                                                         Item
           Fully closed product transport equipment between TS-2 to TS-JP7. This shall
B.2.8.35   include
           Airslides complete with linear and turning pot segments, fabric, casing, supports and
B.2.8.36   fittings for connection to aeration equipment                                              Item
           New transfer station TS-JP7 including fully closed equipment that transfers the
           product to Customer 7’s receival system and the downstream equipment. This
B.2.8.37   shall include
           Airslides complete with linear and turning pot segments, fabric, casing, supports and
B.2.8.38   fittings for connection to aeration equipment                                              Item
           Airslide diverters complete with fabric, casing, supports and fittings for connection to
B.2.8.39   aeration equipment                                                                         Item
           Fully closed product transport equipment linking between TS-JP7 to existing TS-
B.2.8.40   3. This shall include
           Airslides complete with linear and turning pot segments, fabric, casing, supports and
B.2.8.41   fittings for connection to aeration equipment                                              Item

           Modifications to existing TS-3 including, equipment that transfers the product to
B.2.8.42   Customer 6’s receival system and the downstream equipment. This shall include

           Vertically orientated pneumatic actuated cut off slide gate at downstream end of
B.2.8.43   airslide linked from TS-JP7 complete with actuator and air-purging seal arrangement        Item
           Bucket elevator complete with drive, auxiliary maintenance drive, pulleys, belt with
B.2.8.44   fastened buckets, fully enclosed casing, tensioning take-up and chutework                  Item
           Airslides complete with linear and turning pot segments, fabric, casing, supports and
B.2.8.45   fittings for connection to aeration equipment                                              Item
           Airslide diverters complete with fabric, casing, supports and fittings for connection to
B.2.8.46   aeration equipment                                                                         Item
           Fully closed product transport equipment between TS-3 to existing TS-JP3/5,
B.2.8.47   including
           Airslides complete with linear and turning pot segments, fabric, casing, supports and
B.2.8.48   fittings for connection to aeration equipment                                              Item
           Modifications to existing TS-JP3/5 that shall include product transport to
           Customer 3’s receival system and Customer 5’s receival system and the
B.2.8.49   downstream equipment                                                                       Item
           Airslides complete with linear and turning pot segments, fabric, casing, supports and
B.2.8.50   fittings for connection to aeration equipment                                              Item
           Airslide diverters complete with fabric, casing, supports and fittings for connection to
B.2.8.51   aeration equipment                                                                         Item
B.2.8.52   Fully closed product transport system between TS-JP3/5 to existing TS-JP4
           Airslides complete with linear and turning pot segments, fabric, casing, supports and
B.2.8.53   fittings for connection to aeration equipment                                              Item
           Airslide diverters complete with fabric, casing, supports and fittings for connection to
B.2.8.54   aeration equipment                                                                         Item
           Modifications to TS-JP4 that shall include fully closed equipment that transfers
           product to Customer 4’s receival system and the downstream equipment that
           transports product to Customer 1 and Customer 2’s receival systems (i.e.
B.2.8.55   existing airslides C12 and C13 that exit TS-JP4)
           Airslides complete with linear and turning pot segments, fabric, casing, supports and
B.2.8.56   fittings for connection to aeration equipment                                              Item
           Airslide diverters complete with fabric, casing, supports and fittings for connection to
B.2.8.57   aeration equipment                                                                         Item
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                       BCT/20

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                                 Unit   Singapore $ (SGD)
B.2.8.58   General
B.2.8.59   Pipework for airslide aeration including pipe, fittings, valves and supports                Item
B.2.8.60   High pressure fans(s) for airslide aeration                                                 Item
B.2.8.61   Interconnecting chutes, discharge spouts, flexible joints and seals                         Item

B.2.8.62   Connecting chutes between ends of airslide system and customer interface locations.         Item
B.2.8.63   Dedusting equipment, including all ductwork and a dust return arrangements                  Item
B.2.8.64   Maintenance cranes and hoists for each new transfer station                                 Item
           Centralised vacuum cleaning system at TS-2 including vacuum unit, cleaning system,
           collection hopper, emptying equipment, forklift or mobile crane interface, hoses,
B.2.8.65   accessories                                                                                 Item
           Permanent vacuum ductwork at TS-2 connected to the centralised vacuum cleaning
B.2.8.66   system                                                                                      item
           Permanent vacuum ductwork at TS-JP7 and at modified transfer station TS-3 suitable
B.2.8.67   for connection to Principal supplied mobile vacuum cleaning system                          Item
           Plant compressed air system including compressor, air receiver, filters, pipework,
B.2.8.68   fittings, valves, condensate auto-drain, condensate oil separator and supports              Item
           Hydraulic equipment complete with valving, pipework, hoses, fittings, flushing fluids and
B.2.8.69   hydraulic fluids                                                                            Item
           Lubrication equipment complete with valving, pipework, hoses, fittings, oils, flushing
B.2.8.70   fluids and lubricants                                                                       Item
B.2.8.71   Cooling equipment complete with valving, pipework, hoses, fittings and fluids               Item
           Ventilation and Air Conditioning equipment for T2 electrical room at SS-P5, complete
B.2.8.72   with valving, pipework, hoses, fittings and fluids                                          Item
           Ventilation and Air Conditioning equipment for plant control system room at SS-P5,
B.2.8.73   complete with valving, pipework, hoses, fittings and fluids                                 Item
B.2.8.74   Furniture and fixtures for plant control room at SS-P5                                      Item
           Extension to fire service pipework to new transfer stations including pipework, fittings,
B.2.8.75   valves and supports                                                                         Item
B.2.8.76   Fire Protection systems as necessary                                                        Item
           Equipment supports including any brackets, stands, steelwork, fasteners and grouting
B.2.8.77   as necessary                                                                                Item
B.2.8.78   Safe guarding as necessary                                                                  Item
           Heavy duty motorised automatic retractable fence between cement unloading
B.2.8.79   operations and DLLC operations at Berth J24 that forms a sterilized security zone           Item

           Steel wire mesh fence along boundary of Terminal T2 wharf operations area at Berth
           J24 that is part of the sterilized security zone complete with lockable 5m wide access
B.2.8.80   gate for vehicles, two lockable personnel gates and connection to the heavy duty motor Item
           Modifications to the UL-P1 long travel buffering system and any other UL-P1 unloader
B.2.8.81   item as necessary for a safe unloader arrangement.                                          Item
B.2.8.82   Sound protection covers as necessary                                                        Item
B.2.8.83   Signage                                                                                     Item
B.2.8.84   Any other items necessary to complete the works. (Tenderer to specify).                     Item



           Total of Section B.2.8 - Mechanical Works (Supply)                                                               SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND    BCT/21

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.       Description                                                               Unit   Singapore $ (SGD)
          B.2 Product Handling System (Base offer)
          Section B.2.9 - Mechanical Works (Install)
          The scope of works includes the unloading, storage, handling, erection,
B.2.9.1   installation of the following;
B.2.9.2   Complete Product Handling System                                          Item
B.2.9.3   Any other items necessary to complete the works. (Tenderer to specify).   Item



          Total of Section B.2.9 - Mechanical Works (Install)                                            SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND BCT/22

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT



No.        Description                                                                     Unit   Singapore $ (SGD)
           B.2 Product Handling System (Base offer)
           Section B.2.10 - Installation of Principal Supplied Equipment
B.2.10.1   The scope of works includes the handling, installation of the following;
           Mobile vacuum system to be installed at each TS-JP7 and Modified TS3 transfer
B.2.10.2   stations                                                                        Item
B.2.10.3   Any other items necessary to complete the works. (Tenderer to specify).         Item



           Total of Section B.2.10 - Installation of Principal Supplied Equipment                               SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                          BCT/23

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.         Description                                                                                   Unit   Singapore $ (SGD)
            B.2 Product Handling System (Base offer)
            Section B.2.11 - Electrical (Supply and Install)

            The scope of works includes the manufacture, protective treatment, workshop
            testing, preassembly, delivery to site, unloading, storage, handling, erection,
            installation, commissioning, acceptance testing, training of operations and
B.2.11.1    maintenance personnel and warranty of the following;
B.2.11.2    P5 substation
            Low Voltage control assembly(ies) suitable for operation of all new electrical equipment
B.2.11.3    associated with the T2 works                                                             Item
B.2.11.4    PLC System.                                                                              Item
            SCADA System into each of the new P5 Substation Electrical Control Room and the
B.2.11.5    Operation Control Room.                                                                  Item

B.2.11.6    Power factor correction system to maintain the LV power factor between 0.85 and 0.9           Item
B.2.11.7    TS1 Electrical Room
            Modification of existing T1 PLC system to facilitate connectivity, operation and control of
B.2.11.8    the T2 PLC system                                                                             Item
            Modification of the existing T1 SCADA System to facilitate connectivity, operation and
B.2.11.9    control of the T2 SCADA system                                                                Item
            Modification of existing T1 PLC and SCADA systems to accommodate new travel limits
B.2.11.10   of existing ship unloaders UL P1 and UL P3                                                    Item
B.2.11.11   New ship unloaders UL-P4 and UL-P5
B.2.11.12   Power and Control cabling to new ship unloader UL-P4.                                         Item
B.2.11.13   Power and Control cabling to future ship unloader UL-P5.                                      Item
            Cable ladder along the conveyor 2C1 structure for the HV power supply to the new ship
B.2.11.14   unloader UL P4 and UL P5.                                                                     Item
            Cable ladder along the conveyor 2C1 structure for the HV and control reeling cables of
B.2.11.15   the new ship unloaders UL P4 and UL P5                                                        Item
            Cable ladder along the conveyor 2C1 structure for the fibre optic and Control cabling to
B.2.11.16   the new ship unloader UL P4 and UL P5.                                                        Item
B.2.11.17   HV centre point termination box for ship unloader UL P4 at transfer station TS2.              Item

B.2.11.18 Control centre point termination box for ship unloader UL P4 at transfer station TS2.           Item
          HV centre point termination box for ship unloader UL P5 at the mid point of berth J24 or
B.2.11.19 at transfer station TS2.                                                                        Item
          Control centre point termination box for ship unloader UL P5 the mid point of berth J24
B.2.11.20 or at transfer station TS2.                                                                     Item
          Anti-collision system for monitoring safe distances between rail mounted machines and
B.2.11.21 any other permanent wharf obstacles.                                                            Item
          Obstruction detection system for long travel assemblies and wharf conveyor loading
B.2.11.22 trolleys                                                                                        Item
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                     BCT/24

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.       Description                                                                                Unit   Singapore $ (SGD)
B.2.11.23 UL-P1 travel range extension for operations at Berth J23 and Berth J24
          Modification of existing PLC and SCADA software to accommodate change of travel
B.2.11.24 limits of ship unloader UL-P1.                                                             Item
B.2.11.25 Extension of existing ship unloader UL-P1 power and control cabling.                       Item
          Relocation of existing ship unloader UL-P1 HV and Control centre point termination
B.2.11.26 boxes from transfer station TS1 to transfer station TS2                                    Item
          Extension of 6.6 kV and Control cabling from TS1 Electrical Room to the relocated
B.2.11.27 centre point termination boxes                                                             Item
          Review and modification (if required) of the existing power and control cable reelers to
B.2.11.28 accommodate the extended cable lengths                                                     Item
B.2.11.29 Relocation of existing physical travel limits on the berth                                 Item
B.2.11.30 Conveyor C1
          Modification of existing conveyor C1 starter in existing substation P2 from single
B.2.11.31 direction to dual direction.                                                               Item
          Review and modify if necessary, electrical infrastructure associated with the upgraded
B.2.11.32 conveyor                                                                                   Item
B.2.11.33 Balance of plant
B.2.11.34 Weigh control equipment for each wharf-side belt conveyor                                  Item
          Telecommunications systems and equipment to suit the existing telecommunications
B.2.11.35 infrastructure at the port                                                                 Item
          Control system network communications equipment, including hubs, switches, modems,
B.2.11.36 fibre optic cable, media converters, etc                                                   Item

          Control system software, configuration and commissioning, inclusive of minimum of two
B.2.11.37 interlock signals (emergency stop and overload/silo high level) per cement customer        Item
          CCTV system for remote monitoring of plant operations from the T1 Electrical Room,
B.2.11.38 TS2 Electrical Control Room and the T2 Operation Control Room.                             Item
          All electrical ancillary equipment including motors, continuous level sensors, high/low
          level sensors, pressure switches and transducers, temperature sensors, solenoid
          valves, limit switches, underspeed sensors, flow control gate position sensors, and any
B.2.11.39 other field mounted safety and protection devices                                          Item
B.2.11.40 All power, control, fibre optic, LAN cabling, cable ladders and other accessories          Item
          Normal and emergency lighting, including along conveyor walkways, inside and outside
B.2.11.41 of transfer stations, etc                                                                  Item

            Relocate and upgrade existing lighting along air slides between TS3 and TS JP1/2 to
B.2.11.42   suit new arrangement. Design, supply and install lighting for new air slide walkways     Item
B.2.11.43   Single and three phase power points                                                      Item
B.2.11.44   Earthing system                                                                          Item
B.2.11.45   Lightning protection system                                                              Item
B.2.11.46   Any other items necessary to complete the works. (Tenderer to specify).                  Item



            Total of Section B.2.11 - Electrical (Supply and Install)                                                     SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND        BCT/25

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                  Unit   Singapore $ (SGD)
           B.2 Product Handling System (Base offer)
           Section B.2.12 - Commissioning
B.2.12.1   Pre-shipment acceptance testing and workshop testing at Contractor's site.
B.2.12.2   No load testing at Jurong Port.
B.2.12.3   Load testing for Terminal T2 to existing six customers at Terminal T1
B.2.12.4   Load testing for Terminal T2
B.2.12.5   Performance testing for Terminal T2
B.2.12.6   Any other items necessary to complete the works. (Tenderer to specify)



           Total of Section B.2.12 - Commissioning                                                           SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND       BCT/26

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                 Unit   Singapore $ (SGD)
           B.2 Product Handling System (Base offer)
           Section B.2.13 - Training
           The scope of works shall include Preparation, Documentation, Delivery and
B.2.13.1   Presentation of training programs provided by the Contractor.
B.2.13.2   Any other items necessary to complete the works. (Tenderer to specify)



           Total of Section B.2.13 - Training                                                               SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND          BCT/27

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.       Description                                                                     Unit   Singapore $ (SGD)
          B.3 Product Handling System - (Alternative offer)
          Section B.3.1 - Design and Documentation
          The scope of works is as per Section B.1.1 "Design and Documentation" however
B.3.1.1   with a Belt Conveyor linking Terminal T2 area to the existing TS-3 area         Item
B.3.1.2   Any other items necessary to complete the works. (Tenderer to specify)



          Total of Section B.3.1 - Design and Documentation                                                    SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                  BCT/28

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                            Unit   Singapore $ (SGD)
           B.4 Product Handling System (Alternative offer)
           Section B.4.1 - Product Handling System
           Scope of works is as per Section B.2.1 "Preliminaries" however with a Belt Conveyor
B.4.1.1    linking Terminal T2 area to the existing TS-3 area                                     Item                 SGD
           Scope of works is as per Section B.2.2 "Site Preparation" however with a Belt
B.4.1.2    Conveyor linking Terminal T2 area to the existing TS-3 area                            Item                 SGD
           Scope of works is as per Section B.2.3 "Piling" however with a Belt Conveyor linking
B.4.1.3    Terminal T2 area to the existing TS-3 area                                             Item                 SGD
           Scope of works is as per Section B.2.4 "Groundworks" however with a Belt Conveyor
B.4.1.4    linking Terminal T2 area to the existing TS-3 area                                     Item                 SGD
           Scope of works is as per Section B.2.5 "Concrete Works (Supply and Install)"
B.4.1.5    however with a Belt Conveyor linking Terminal T2 area to the existing TS-3 area        Item                 SGD

           Scope of works is as per Section B.2.6 "Structural Works (Supply and Install)"
B.4.1.6    however with a Belt Conveyor linking Terminal T2 area to the existing TS-3 area        Item                 SGD
           Scope of works is as per Section B.2.7 "Architectural Finish" however with a Belt
B.4.1.7    Conveyor linking Terminal T2 area to the existing TS-3 area                            Item                 SGD
           Scope of works is as per Section B.2.8 "Mechanical Works (Install)" however with a
B.4.1.8    Belt Conveyor linking Terminal T2 area to the existing TS-3 area                       Item                 SGD
           Scope of works is as per Section B.2.9 "Mechanical Works (Install)" however with a
B.4.1.9    Belt Conveyor linking Terminal T2 area to the existing TS-3 area                       Item                 SGD
           Scope of works is as per Section B.2.10 "Installation of Principal Supplied
           Equipment" however with a Belt Conveyor linking Terminal T2 area to the existing TS-
B.4.1.10   3 area                                                                                 Item                 SGD
           Scope of works is as per Section B.2.11 "Electrical (Supply and Install)" however
B.4.1.11   with a Belt Conveyor linking Terminal T2 area to the existing TS-3 area                Item                 SGD
           Scope of works is as per Section B.2.12 "Commissioning" however with a Belt
B.4.1.12   Conveyor linking Terminal T2 area to the existing TS-3 area                            Item                 SGD
           Scope of works is as per Section B.2.13 "Training" however with a Belt Conveyor
B.4.1.13   linking Terminal T2 area to the existing TS-3 area                                     Item                 SGD
B.4.1.14   Any other items necessary to complete the works. (Tenderer to specify).                Item                 SGD



           Total of Section B.4.1 - Product Handling System                                                            SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                  BCT/29

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.       Description                                                                            Unit    Singapore $ (SGD)
          C.1 Supply of Unloader (Separable Option)
          UL-P4 Operator's Cabin
          Section C.1.1 - Design, Documentation, Supply, Installation and Training
          The scope of works shall include, but not necessarily be limited to the following
          items design, manufacture, protective treatment, delivery to site, unloading,
          storage, handling, erection, installation, commissioning, performance testing and
C.1.1.1   training by the Contractor on UL-P4;
C.1.1.2   Air conditioned operator cabin and controls                                       Item
C.1.1.3   CCTV system installed in the operator’s cabin                                     Item
C.1.1.4   Any other items necessary to complete the works. (Tenderer to specify).           Item




          Total of Section C.1.1 - Design, Documentation, Supply, Installation and Training                            SGD

          C.2 Supply of Unloader (Separable Option)
          UL-P4 Foreign Object Detection
C.2.1.1   Section C.2.1 - Design, Documentation, Supply, Installation and Training
          The scope of works shall include, but not necessarily be limited to the following
          items design, manufacture, protective treatment, delivery to site, unloading,
          storage, handling, erection, installation, commissioning, performance testing and
C.2.1.2   training by the Contractor on UL-P4;
          A system of either foreign object detection or pre-screening during digging of product
          from the hold of the ship complete with machine shut-down and operator alarm. The
          system shall eliminate steel objects or large lumps from entering, damaging or blocking
C.2.1.3   the unloader’s material handling system                                                 Item
C.2.1.4   Any other items necessary to complete the works. (Tenderer to specify).                 Item




          Total of Section C.2.1 - Design, Documentation, Supply, Installation and Training                            SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                      BCT/30

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                                Unit   Singapore $ (SGD)
           D.1 Supply of Unloader (Separable Option)
           Unloader UL-P5
           Section D.1.1 - Design, Documentation, Supply, Installation and Training
           The scope of works shall generally include design, manufacture, protective
           treatment, delivery to site, unloading, storage, handling, erection, installation,
           commissioning, performance testing and training by the Contractor of a
D.1.1.1    complete rail mounted ship unloader.
           Main machine including structural items, long travel equipment, slewing equipment,
           boom luffing equipment , vertical arm and digging head equipment and mechanical
D.1.1.2    equipment associated with transport of product.                                            Item
           Active dust collection system(s) and ducting to minimise air borne dust at all transfer
D.1.1.3    points                                                                                     Item
           Storm tie down system including wheel uplift and longitudinal restraints. All such
           structures shall be supplied and mounted by the Contractor to mounting points on the
D.1.1.4    wharf deck                                                                                 Item
           Long travel buffer systems to decelerate the machine in case of over travel. This
           includes supply of buffers and buffer supports which shall be mounted to the
D.1.1.5    unloader(s) by the Contractor                                                              Item
D.1.1.6    Operating control system complete Radio Remote Control Box                                 Item
           Anti-collision system for monitoring safe distances between rail mounted machines and
D.1.1.7    any other permanent wharf obstacles.                                                       Item
           Obstruction detection system for long travel assemblies and wharf conveyor loading
D.1.1.8    trolleys                                                                                   Item
D.1.1.9    Design, supply and installation of SCADA system into UL-P5 onboard switchroom              Item
D.1.1.10   Onboard fire protection system(s)                                                          Item
           22kV power cable reeler and trailing cable for provision of power to the machine from
D.1.1.11   the HV centre point termination box                                                        Item
           Control cable reeler and trailing cable to allow communication between the onboard
           electrical room PLC and T2 electrical room PLC over the full machine working range
D.1.1.12   from the Comms centre point termination box                                                Item
           22kV trailing cable turnover equipment at the centre of travel, near to the 22kV centre
D.1.1.13   point termination box at the wharf/transfer station connection point                       Item
           Control trailing cable turnover equipment at the centre of travel, near to the Comms
D.1.1.14   centre point termination box at the wharf/transfer station connection point                Item
D.1.1.15   On board substation and electrical room for power distribution and control systems         Item
D.1.1.16   Fully enclosed machine house for all winching equipment                                    Item
D.1.1.17   Transformers, switchgear and cabling to all drives and field sensors                       Item
           All necessary electric sensors and PLC controls to enable operation in all the operating
D.1.1.18   modes                                                                                      Item
D.1.1.19   All onboard signage                                                                        Item
D.1.1.20   Any other items necessary to complete the works. (Tenderer to specify).                    Item




           Total of Section D.1.1 - Design, Documentation, Supply, Installation and Training                               SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                  BCT/31

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT



No.       Description                                                                           Unit    Singapore $ (SGD)
          D.2 Supply of Unloader (Separable Option)
D.2.1.1   UL-P5 Operator's Cabin
D.2.1.2   Section D.2.1 - Design, Documentation, Supply, Installation and Training
          The scope of works shall include, but not necessarily be limited to the following
          items design, manufacture, protective treatment, delivery to site, unloading,
          storage, handling, erection, installation, commissioning, performance testing
D.2.1.3   and training by the Contractor on UL-P5;
D.2.1.4   Air conditioned operator cabin and controls                                       Item
D.2.1.5   CCTV system installed in the operator’s cabin                                     Item
D.2.1.6   Any other items necessary to complete the works. (Tenderer to specify).           Item




          Total of Section D.2.1 - Design, Documentation, Supply, Installation and Training                            SGD

          D.3 Supply of Unloader (Separable Option UL-P5)
D.3.1.1   Foreign Object Detection
D.3.1.2   Section D.3.1 - Design, Documentation, Supply, Installation and Training
          The scope of works shall include, but not necessarily be limited to the following
          items design, manufacture, protective treatment, delivery to site, unloading,
          storage, handling, erection, installation, commissioning, performance testing
D.3.1.3   and training by the Contractor on UL-P5;
          A system of either foreign object detection or pre-screening during digging of product
          from the hold of the ship complete with machine shut-down and operator alarm. The
          system shall eliminate steel objects or large lumps from entering, damaging or
D.3.1.4   blocking                                                                               Item
D.3.1.5   Any other items necessary to complete the works. (Tenderer to specify).                Item




          Total of Section D.3.1 - Design, Documentation, Supply, Installation and Training                            SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                                                        BCT/32

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                                    Unit            Quantity   Rate   Singapore $ (SGD)
           E.1 Product Handling System Extension (Separable Option)
           Section E.1.1 - Preliminaries
           Site establishment including provision of site offices and amenities, safety fencing,
E.1.1.1    power, communications, water and sewerage.                                                     Item
E.1.1.2    Insurances as specified.                                                                       Item
E.1.1.3    Other fixed overheads and statutory fees.                                                      Item
E.1.1.4    Construction Management Costs including all quality assurance.                                 Item
E.1.1.5    Disestablishment upon completion.                                                              Item
E.1.1.6    Any other items necessary to complete the works. (Tenderer to specify).                        Item



           Total of Section E.1.1 - Preliminaries                                                                                                        SGD

           Section E.1.2 - Site Preparation
           Establishment on site of all labour, plant and equipment required for the site
E.1.2.1    preparation works.                                                                             Item
           Demolition of any existing pavements or structures complete, including breaking up of
           concrete slabs and foundations and removal off site to a suitably approved disposable
E.1.2.2    area.                                                                                          Item
E.1.2.3    Any other items necessary to complete the works. (Tenderer to specify).                        Item



           Total of Section E.1.2 - Site Preparation                                                                                                     SGD

           Section E.1.3 - Piling (Supply and Install)
           Establishment on site of all labour, plant and equipment required for the construction of
           piling for new works, maintenance of the plant and equipment for the duration of the
E.1.3.1    works and removal on completion.                                                               Item
           Supply of all materials, plant, labour and equipment, excavate by boring in ground as
E.1.3.2    found, fix and install reinforcement and construct piles
E.1.3.3    Pile description A                                                                             Each
E.1.3.4    Pile description B                                                                             Each
E.1.3.5    Pile description C                                                                             Each
           Supply of all materials, plant, labour and equipment, by driving piles into ground as
E.1.3.6    found
E.1.3.7    Pile description D                                                                             Each
E.1.3.8    Pile description E                                                                             Each
E.1.3.9    Pile description F                                                                             Each
           Standby rate for piling plant for bored piles excluding all labour but including contractors
E.1.3.10   overhead costs. Rate Only. Do not include in the Contract Price.                               Day rate only
           Standby rate for piling plant for driven piles excluding all labour but including
E.1.3.11   contractors overhead costs. Rate Only. Do not include in the Contract Price.                   Day rate only
           Supply of all labour, equipment and materials as necessary to carry out pile
E.1.3.12   compression load tests for bored piles                                                         Each
           Supply of all labour, equipment and materials as necessary to carry out pile
E.1.3.13   compression load tests driven piles                                                            Each
E.1.3.14   Any other items necessary to complete the works. (Tenderer to specify).                        Item



           Total of Section E.1.3 - Piling (Supply and Install)                                                                                          SGD

           Section E.1.4 - Groundworks
           Excavation for foundations including for working space, ground support, draining and
           pumping as necessary and placement of surplus excavated material in an approved
E.1.4.1    disposal area off site.                                                                        m3
E.1.4.2    Backfilling and compaction                                                                     m3
           Cutting off of concrete bored piles to the required level as necessary and
E.1.4.3    preparation of bored pile heads for encasement
E.1.4.4    Pile description A                                                                             Each
E.1.4.5    Pile description B                                                                             Each
E.1.4.6    Pile description C                                                                             Each
           Cutting off of concrete driven piles to the required level as necessary and
E.1.4.7    preparation of bored pile heads for encasement
E.1.4.8    Pile description D                                                                             Each
E.1.4.9    Pile description E                                                                             Each
E.1.4.10   Pile description F                                                                             Each
E.1.4.11   Any other items necessary to complete the works. (Tenderer to specify).                        Item



           Total of Section E.1.4 - Groundworks                                                                                                          SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                                                   BCT/33

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.         Description                                                                                Unit     Quantity   Rate   Singapore $ (SGD)
            E.1 Product Handling System Extension (Separable Option)
            Section E.1.5 - Concrete Works (Supply and Install)

 E.1.5.1    Supply, placement and compaction of compacted backfill for the following;
 E.1.5.2    Trestle foundations between TS-2 and TS-JP8/9                                              m3
            New transfer station TS-JP7 foundations (and slabs if deemed required by the
 E.1.5.3    Designer)                                                                                  m3
            Supply and installation of all galvanised steel cast-ins, HD bolts, gratings and
 E.1.5.4    frames, formed recessed and uPVC conduits, for the following;
 E.1.5.5    Trestle foundations between TS-2 and TS-JP8/9                                              Item
            New transfer station TS-JP7 foundations (and slabs if deemed required by the
 E.1.5.6    Designer)                                                                                  Item
            Supply, bending and fixing in place of reinforcement including provision of
 E.1.5.7    bending schedules, for the following.
            Modifications at existing wharf belt conveyor C1 including foundations for trestles and
 E.1.5.8    take-up system                                                                             Tonnes
            Supply, placement and compaction of concrete Grade C40 including all finishing
 E.1.5.9    and curing as specified, for the following.
            Modifications at existing wharf belt conveyor C1 including foundations for trestles and
 E.1.5.10   take-up system                                                                             m3
 E.1.5.11   Wharf belt conveyor 2C1 including foundations for trestles and take-up system.             m3
 E.1.5.12   General
 E.1.5.13   Supply and installation of concrete filled steel guard posts ( bollards )                  Each
            Excavate, supply, lay, bed, joint and backfill stormwater drainage pipes and pits
 E.1.5.14   including breaking in to existing system and making good.                                  m
            Excavate, supply, lay, bed, joint and backfill extensions to fire service pipes and pits
 E.1.5.15   including breaking in to existing system and making good.                                  m

            Excavate, supply, lay, bed, joint and cover extensions and modifications to electrical
 E.1.5.16   cable trenches and pits including breaking in to existing system and making good.          m
 E.1.5.17   Any other items necessary to complete the works. (Tenderer to provide details).            Item



            Total of Section E.1.5 - Concrete Works (Supply and Install)                                                                       SGD

            Section E.1.6 - Structural Works (Supply and Install)
            Supply, fabrication, protective treatment, delivery and erection of structural
            steelwork for the following including all fasteners, remedial painting, temporary
 E.1.6.1    support as necessary
            Structural columns and beams complete with connection plates, support plates
 E.1.6.2    and bracing, at the following;
 E.1.6.3    Galleries between TS-2 and TS-JP8/9                                                        tonnes
 E.1.6.4    Trestles between TS-2 and TS-JP8/9                                                         tonnes
 E.1.6.5    New transfer station TS-JP8/9                                                              tonnes
            Access stair and landings steel beams (excluding stair treads, handrails,
 E.1.6.6    stanchions and kick plates) at the following;
 E.1.6.7    Galleries between TS-2 and TS-JP8/9                                                        tonnes
 E.1.6.8    Trestles between TS-2 and TS-JP8/9                                                         tonnes
 E.1.6.9    New transfer station TS-JP8/9                                                              tonnes
 E.1.6.10   Handrails, stanchions and kick plates at the following;
 E.1.6.11   Galleries between TS-2 and TS-JP8/9                                                        m
 E.1.6.12   Trestles between TS-2 and TS-JP8/9                                                         m
 E.1.6.13   New transfer station TS-JP8/9                                                              m
 E.1.6.14   Floor grating, including all stair treads at the following;
 E.1.6.15   Galleries between TS-2 and TS-JP8/9                                                        m2
 E.1.6.16   Trestles between TS-2 and TS-JP8/9                                                         m2
 E.1.6.17   New transfer station TS-JP8/9                                                              m2
 E.1.6.18   Floor plating at the following;
 E.1.6.19   Galleries between TS-2 and TS-JP8/9                                                        m2
 E.1.6.20   Trestles between TS-2 and TS-JP8/9                                                         m2
 E.1.6.21   New transfer station TS-JP8/9                                                              m2

 E.1.6.22   Equipment Doors complete with associated fittings and frames at the following;
 E.1.6.23   Galleries between TS-2 and TS-JP8/9                                                        Each
 E.1.6.24   Trestles between TS-2 and TS-JP8/9                                                         Each
 E.1.6.25   New transfer station TS-JP8/9                                                              Each

 E.1.6.28   Personnel Doors complete with associated fittings and frames at the following;
 E.1.6.29   Galleries between TS-2 and TS-JP8/9                                                        Each
 E.1.6.30   Trestles between TS-2 and TS-JP8/9                                                         Each
 E.1.6.31   New transfer station TS-JP8/9                                                              Each
 E.1.6.32   Any other items necessary to complete the works. (Tenderer to provide details).
 E.1.6.26   General
 E.1.6.27   Any other items necessary to complete the works. (Tenderer to provide details).            Item



            Total of Section E.1.6 - Structural Works (Supply and Install)                                                                     SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                                 BCT/34

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                         Unit   Quantity   Rate   Singapore $ (SGD)
           E.1 Product Handling System Extension (Separable Option)
           Section E.1.7 - Architectural Finish (Supply and Install)
           Supply, fabrication, protective treatment, delivery and erection of architectural
           finish for the following including all fasteners, remedial painting, temporary
E.1.7.1    support as necessary
           Wall Girts (rails) complete with connection plates and fly bracing, at the
E.1.7.2    following;
E.1.7.3    New transfer station TS-JP8/9                                                       m
E.1.7.4    Purlins complete with connection plates and fly bracing, at the following;
E.1.7.5    New transfer station TS-JP8/9                                                       m
E.1.7.6    Steel Sheeting complete with flashings and accessories, at the following;
E.1.7.7    New transfer station TS-JP8/9                                                       m2

E.1.7.8    Translucent Sheeting complete with flashings and accessories, at the following;
E.1.7.9    New transfer station TS-JP8/9                                                       m2
E.1.7.10   Roof Ventilators complete with flashings and accessories, at the following;
E.1.7.11   New transfer station TS-JP8/9                                                       item

E.1.7.12   Wall ventilation louvres complete with flashings and accessories, at the following
E.1.7.13   New transfer station TS-JP8/9                                                      item
E.1.7.14   General
E.1.7.15   Any other items necessary to complete the works. (Tenderer to specify).            Item



           Total of Section E.1.7 - Architectural Finish (Supply and Install)                                                        SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                             BCT/35

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.       Description                                                                                Unit   Singapore $ (SGD)
          E.1 Product Handling System Extension (Separable Option)
         Section E.1.8 - Mechanical Works (Supply)
         The scope of works includes the manufacture, protective treatment, workshop
         testing, preassembly, delivery to site, unloading, storage, handling, erection,
         installation, commissioning, acceptance testing, documentation, training of
         operations and maintenance personnel and warranty of a extension to the
E.1.8.1  product handling system
         Fully closed product transport equipment between TS-2 to TS-JP8/9. This shall
E.1.8.2  include
         Airslide complete with linear and turning pot segments, fabric, casing, supports and
E.1.8.3  fittings for connection to aeration equipment                                               Item
         New transfer tower TS-JP8/9 including fully closed equipment that transfers the
E.1.8.4  product to Customer 8 and Customer 9’s receival systems
         Airslides complete with linear and turning pot segments, fabric, casing, supports and
E.1.8.5  fittings for connection to aeration equipment                                               Item
         Airslide diverters complete with fabric, casing, supports and fittings for connection to
E.1.8.6  aeration equipment                                                                          Item
E.1.8.7  General
E.1.8.8  Pipework for airslide aeration including pipe, fittings, valves and supports                Item
E.1.8.9  High pressure fans(s) for airslide aeration                                                 Item
E.1.8.10 Interconnecting chutes, discharge spouts, flexible joints and seals                         Item

E.1.8.11 Connecting chutes between ends of airslide system and customer interface locations.         Item
E.1.8.12 Dedusting equipment, including all ductwork and a dust return arrangements                  Item
E.1.8.13 Maintenance cranes and hoists for new transfer station TS-JP8/9                             Item
         Permanent vacuum ductwork at TS-JP8/9 suitable for connection to Principal supplied
E.1.8.14 mobile vacuum cleaning system                                                               Item
         Plant compressed air system including compressor, air receiver, filters, pipework,
E.1.8.15 fittings, valves, condensate auto-drain, condensate oil separator and supports              Item
         Hydraulic equipment complete with valving, pipework, hoses, fittings, flushing fluids
E.1.8.16 and hydraulic fluids                                                                        Item
         Lubrication equipment complete with valving, pipework, hoses, fittings, oils, flushing
E.1.8.17 fluids and lubricants                                                                       Item
E.1.8.18 Cooling equipment complete with valving, pipework, hoses, fittings and fluids               Item
         Extension to fire service pipework to new transfer stations including pipework, fittings,
E.1.8.19 valves and supports                                                                         Item
E.1.8.20 Fire Protection systems as necessary                                                        Item
         Equipment supports including any brackets, stands, steelwork, fasteners and grouting
E.1.8.21 as necessary                                                                                Item
E.1.8.22 Safe guarding as necessary                                                                  Item
E.1.8.23 Sound protection covers as necessary                                                        Item
E.1.8.24 Signage                                                                                     Item
E.1.8.25 Any other items necessary to complete the works. (Tenderer to specify).                     Item



          Total of Section E.1.8 - Mechanical Works (Supply)                                                             SGD

          Section E.1.9 - Mechanical Works (Install)
          The scope of works includes the unloading, storage, handling, erection,
E.1.9.1   installation of the following;
E.1.9.2   Complete Product Handling System Extension                                                 Item
E.1.9.3   Any other items necessary to complete the works. (Tenderer to specify).                    Item



          Total of Section E.1.9 - Mechanical Works (Install)                                                            SGD

         Section E.1.10 - Installation of Principal Supplied Equipment
E.1.10.1 The scope of works includes the handling, installation of the following;
E.1.10.2 Mobile vacuum system to be installed at each TS-JP8/9 transfer station                      Item
E.1.10.3 Any other items necessary to complete the works. (Tenderer to specify).                     Item



          Total of Section E.1.10 - Installation of Principal Supplied Equipment                                         SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                       BCT/36

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.         Description                                                                                Unit   Singapore $ (SGD)
            E.1 Product Handling System Extension (Separable Option)
            Section E.1.11 - Electrical (Supply and Install)
            The scope of works includes the manufacture, protective treatment, workshop
E.1.11.1    testing, preassembly, delivery to site and install of the following;
E.1.11.2    Balance of plant
            Supply and install telecommunications systems and equipment to suit the existing
E.1.11.3    telecommunications infrastructure at the port                                              Item
            Supply and install control system network communications equipment, including hubs,
E.1.11.4    switches, modems, fibre optic cable, media converters, etc                                 Item
            Supply and install control system software, configuration and commissioning, inclusive
            of minimum of two interlock signals (emergency stop and overload/silo high level) per
E.1.11.5    cement customer                                                                            Item
            Supply and install CCTV system for remote monitoring of plant operations from the T1
            Electrical Room, TS2 Electrical Control Room and the T2 Operation Control Room.
E.1.11.6    CCTV system shall be designed to strategically cover all transfer points                   Item

            Supply and install all electrical ancillary equipment including motors, continuous level
            sensors, high/low level sensors, pressure switches and transducers, temperature
            sensors, solenoid valves, limit switches, underspeed sensors, flow control gate position
E.1.11.7    sensors, and any other field mounted safety and protection devices                         Item
            Supply and install all power, control, fibre optic, LAN cabling, cable ladders and other
E.1.11.8    accessories                                                                                Item
            Supply and install normal and emergency lighting, including along conveyor walkways,
E.1.11.9    inside and outside of transfer station TS-JP8/9, etc                                       Item
E.1.11.10   Supply and install single and three phase power points                                     Item
E.1.11.11   Supply and install an earthing system                                                      Item
E.1.11.12   Supply and install a lightning protection system                                           Item
E.1.11.13   Any other items necessary to complete the works. (Tenderer to specify).                    Item



            Total of Section E.1.11 - Electrical (Supply and Install)                                                       SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND        BCT/37

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.        Description                                                                  Unit   Singapore $ (SGD)
           E.1 Product Handling System Extension (Separable Option)
           Section E.1.12 - Commissioning
E.1.12.1   Pre-shipment acceptance testing and workshop testing at Contractor's site.   Item
E.1.12.2   No load testing at Jurong Port.                                              Item
E.1.12.3   Load testing for Terminal T2 to existing six customers at Terminal T1        Item
E.1.12.4   Load testing for Terminal T2                                                 Item
E.1.12.5   Performance testing for Terminal T2                                          Item
E.1.12.6   Any other items necessary to complete the works. (Tenderer to specify)       Item



           Total of Section E.1.12 - Commissioning                                                           SGD

           Section E.1.13 - Training
           The scope of works shall include Preparation, Documentation, Delivery and
E.1.13.1   Presentation of training programs provided by the Contractor.                Item
E.1.13.2   Any other items necessary to complete the works. (Tenderer to specify)       Item



           Total of Section E.1.13 - Training                                                                SGD
JPPL/EE/T/01/2011 – SUPPLY, DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF CEMENT UNLOADER AND                    BCT/38

CEMENT CONVEYING SYSTEM FOR CEMENT TERMINAL 2 (T2) AT JURONG PORT




No.      Description                                                                                Unit   Singapore $ (SGD)
         F.1 Product Handling System (Separable Option)
         UL-P3 travel range extension for operations at Berth J22 and Berth
         J23 including extension at Conveyor C1 tail end
         Section F.1.1 - Electrical Works (Design, Supply and Install)

         The scope of works includes the design, manufacture, protective treatment,
F.1.1    workshop testing, preassembly, delivery to site and install of the following;
         Modification of existing PLC and SCADA software to accommodate change of travel
F.1.2    limits of ship unloader UL-P3.                                                             Item
F.1.3    Extension of existing ship unloader UL-P3 power and control cabling.                       Item
         Relocation of existing ship unloader UL-P3 HV and Control centre point termination
F.1.4    boxes                                                                                      Item
         Extension of 6.6 kV and Control cabling from TS1 Electrical Room to the relocated
F.1.5    centre point termination boxes                                                             Item
         Review and modification (if required) of the existing power and control cable reelers to
F.1.6    accommodate the extended cable lengths                                                     Item
F.1.7    Relocation of existing physical travel limits on the berth                                 Item
F.1.8    Any other items necessary to complete the works. (Tenderer to specify)



         Total of Section F.1.1 - Electrical Works (Design, Supply and Install)                                          SGD

								