List of Active Projects - AIChE

Document Sample
List of Active Projects - AIChE Powered By Docstoc
					                     Project Statistics                                   Project Scope                                               Project Status
18. Process Equipment Reliability Database (PERD)
Chair: Open                                                                                                         The year 2011 will bring full operation of a
                                                                                                                    production quality database, initially with relief
Staff: Dave Belonger
                                                                                                                    valves and then expanding to instrument loops to
Contractor: Zynergy Consulting, LLC
                                                                                                                    help support “proven in use” for safety instrumented
                                                    To develop and operate a pilot database of operating            functions and systems. Production quality software
                                                    company reliability data to aid in process safety and           should be available by end of 2nd quarter 2011 that
                                                    maintenance evaluations. Once pilot database is proven,         will fully support the desired work process for relief
                                                    expand to a full database of maintenance and reliability data   valves. Upon successful startup, work will proceed
                                                    for equipment in the CPI and HPI.                               to implement additional equipment taxonomies
                                                                                                                    within the software. Future plans include a
                                                                                                                    concept book titled, CCPS Guideline for Proven in
                                                                                                                    Use Data (The Gold Standard), as well as expansion
Standing Committee                                                                                                  of the taxonomies and supporting software.
Taking New Members: Yes
72. Safety and Chemical Engineering Education
(SACHE)                                             Prepare and distribute education materials to university        In 2007, a partnership to translate SACHE into
Chair: Wendy Smades, Dow                            members to assist them in incorporating safety, health, and     Chinese and Spanish was initiated. SACHE also
Staff: TBD                                          loss prevention into the chemical engineering curriculum.       incorporated into AIChE Scale-up program such
Contractor: N/A                                     Provide and industry/university/government interface for        that every US University now has free access to
                                                    process safety education and create cooperative educational     SACHE and Scale-up sponsors are committed to
Standing Committee                                  opportunities among participants.                               promote process safety to students.
Taking New Members: Yes
112. Process Safety Incident Database (PSID)
Chair: Vacant                                                                                                       The secure web-based database with more than 700
Staff: Adrian Sepeda                                                                                                categorized and searchable incidents is fully
Contractor: N/A                                                                                                     operational, with participants from petroleum,
                                                                                                                    chemical and pharmaceutical companies worldwide.
                                                    To operate an easily accessible secure database for sharing
                                                                                                                    InfoBeans in India was the successful bidder for
                                                    incident information among members with a focus on the
                                                                                                                    reprogramming the database in a modern language.
                                                    lessons learned from the incident.
                                                                                                                    Reprogramming will not cause an interruption of
                                                                                                                    service. Reprogramming is necessary before
                                                                                                                    identified upgrades can be made and should be
Standing Committee                                                                                                  completed in the second quarter 2011.
Taking New Members: Yes
                    Project Statistics                                         Project Scope                                                Project Status
152. Process Safety Messages for Manufacturing                                                                           The Process Safety Beacon celebrated its eighth
Personnel (Process Safety Beacon)                                                                                        The year 2011 will bring full operationin reaching
                                                                                                                         anniversary and has proven successful of a
Chairs: George King, Huntsman                                                                                            production quality database, initially with relief
                                                                                                                         well over 1 million operators. Feedback has been
Staff: Dennis Hendershot, John Herber                    Provide timely and informative process safety messages          valves and In early 2004 foreign language versions
                                                                                                                         excellent. then expanding to instrument loops to
Contractor: N/A
                                                         directly to manufacturing personnel to improve process          help support “proven in use” for safety has over 30
                                                                                                                         were made available. The Beacon now instrumented
                                                         To develop and operate a pilot database of operating
                                                         safety awareness.                                               functions and systems.CCPS continually solicits
                                                                                                                         translations available. Production quality software
                                                         company reliability data to aid in process safety and           should be available by as well 2nd quarter 2011 that
                                                                                                                         pictures and messages end of as sponsorship to help
Standing Committee                                       maintenance evaluations. Once pilot database is proven,         will fullymake this product available on a wide
                                                                                                                         continue support the desired work process for relief
Taking New Members: Yes                                  expand to a full database of maintenance and reliability data   valves. Upon successful startup, work will proceed
                                                                                                                         scale.
175. Reactivity Management Roundtable (RMR)              for equipment in the CPI and HPI.                               At the November 8, 2010 meeting taxonomies
                                                                                                                         to implement additional equipmentof the CCPS
Chair: Mark Davis, Eli Lilly                                                                                             Managing Board, the Future plans include
                                                                                                                         within the software. Board voted for the a
Staff: Dan Sliva                                         A special project of CCPS, open to a broad range of             dissolution of this project Guideline for Proven in
                                                                                                                         concept book titled, CCPSon or before November 7,
                                                         industrial, labor, government, research, and other              2011. This will provide time to complete expansion
                                                                                                                         Use Data (The Gold Standard), as well as the RMR
Contractor: Unwin
                                                         organizations. The goal is to develop and share focused         of the taxonomies and supporting software. propose
                                                                                                                         tool project, and allow RMR participants to
                                                         tools that companies of all sizes may use to prevent            potential additional reactive hazard-related projects
                                                         chemical reactivity accidents. The RMR supports the             to the TSC for the 2012 ballot. A new software
                                                         OSHA alliance with CCPS and other parties.                      contractor, Silicus, is now under contract, starting
Completion Date: November 2011                                                                                           Feb. 21, 2011 with a completion target of June
Taking New Members: Peer Review Only                                                                                     2011.
191. GL for Pressure Relief and Effluent Handling, 2nd
ed.
Chair: Bob D’Alesandro                                   Update this book in order to update content, correct errata,
Staff: John Davenport                                    improve readability, and, if possible to correct software
                                                                                                                         Resolving peer review comments.
Contractor: DIERS volunteers                             compatibility issues with current and future MS Windows
                                                         versions
Completion Date: December 2010
Taking New Members: No
196. Independent Protection Layers
                                                         The publication will provide process automation engineers,
Chair: Wayne Chastain, Eastman Chemical                  process engineers, facility operators, and safety
Staff: John Murphy                                       professionals with the appropriate treatment and
Contractor: Process Improvement institute                requirements applicable to equipment design, administrative     Final draft in preparation.
                                                         procedures, or other “credits” that are treated as an
Completion Date: Spring 2011                             independent protection layer from a Layer of Protection
                                                         Analysis (LOPA) perspective.
Taking New Members:no
                      Project Statistics                                     Project Scope                                               Project Status

200. External Affairs Committee—Standing Committee                                                                     The year 2011 will bring full operation of a
                                                       Create a standing CCPS subcommittee responsible for:
Chair: N/A                                             Evaluating requests for CCPS to participate in other            production quality database, initially with relief
Staff: Scott Berger                                    organizations’ events or projects, identifying how CCPS         valves and then expanding to instrument loops to
                                                       would participate, and recruiting volunteers or identifying     help support “proven in use” for safety instrumented
Contractor: N/A
                                                       staff to support operate a pilot
                                                       To develop and these activities database of operating           functions and systems. Production quality software
                                                                                                                       Subcommittee meets every other month
                                                       •Drafting or approving CCPS in process safety and
                                                       company reliability data to aidmessages, e.g. technical         should be available by end of 2nd quarter 2011 that
                                                       maintenance regulatory Once pilot database is
                                                       requests fromevaluations.agencies, press requests proven,       will fully support the desired work process for relief
                                                       •Proactively seeking other organizations and reliability data
                                                       expand to a full database of maintenance that can help CCPS     valves. Upon successful startup, work will proceed
Standing Committee                                     for equipment in the CPI and HPI.
                                                       carry out its mission                                           to implement additional equipment taxonomies
Taking New Members: Yes                                                                                                within the software. Future plans include a
202/231. Process Safety Boot Camp                                                                                      concept book titled, CCPS Guideline for Proven in
                                                                                                                       Use Data (The Gold Standard), as well as expansion
Chair: N/A                                                                                                             Six Process Safetyand supporting software.
                                                                                                                       of the taxonomies Boot Camps were conducted in
Staff: Louisa Nara                                     An intensive process safety training program for engineers      2010 with 131 participants. Five have been
Contractor: N/A                                        new to process safety. Will include onsite tours and training   conducted in 2011 with 127 participants with more
                                                       as well as classroom.                                           to being scheduled. There are presently eight Boot
Standing Committee                                                                                                     Camp Instructors.
Taking New Members: N/A
207. Process Safety Culture, enhanced ed
                                                                                                                       Process Safety Culture Survey was fully completed
Chair: Shakeel Kadri
                                                                                                                       by nine (9) companies as of December 2010. Next
Staff: Greg Keeports
                                                                                                                       steps are to interpret survey results and determine
Contractor: N/A                                                                                                        next steps. The Processs Safety Culture team met in
                                                       Expand on CCPS efforts to provide resources to senior           Chicago on March 16, 2011, and the team decided
                                                       corporate officials to help them strengthen process safety      to formulate a detailed plan to meet agreed upon
                                                       culture                                                         objectives for 2011/12.      Companies who have
                                                                                                                       not done so, are asked to complete the survey to
                                                                                                                       improve our knowledge. To participate in the
                                                                                                                       survey, contact the CCPS office, Greg Keeports or
Completion date: TBD
                                                                                                                       Shakeel Kadri.
Taking New Members: No
208. Guidelines for Evaluating Process and Plant
Buildings for External Explosions and Fires, 2nd ed.   This update will incorporate recent developments related to
                                                                                                                       BakerRisk is on schedule and has issued the Peer
Chair: Wayne Garland, Eastman                          facility sitting and layout, including the newest (2009)
                                                                                                                       Review copy for comments. This project is also
Staff: Adrian Sepeda                                   version of API 752, API 753, and similar developments in
                                                                                                                       piloting a different way of issuing and collecting
                                                       the chemical industry. Project is in the Peer Review phase
Contractor: Baker Risk                                                                                                 comments and resolving issues. A report will
                                                       now and contract work should be completed in the third
                                                                                                                       follow after the project is completed. Target
                                                       quarter 2011. Publication is expected in the last quarter of
Completion date: Late 2011                                                                                             publication date is still as bid—last quarter of 2011.
                                                       2011.
Taking New Members: No
                     Project Statistics                                       Project Scope                                               Project Status
209. Guidelines for Conduct of Operations
Chair: Jim Klein, DuPont                                                                                                The year 2011 will bring full operation of a
                                                                                                                        Wiley had a few copies of the Conduct of relief
                                                                                                                        production quality database, initially with
Staff: Greg Keeports                                    This project will develop new guidance and tools on
                                                        establishing, evaluating, and improving Conduct of
                                                                                                                        Operations,then expanding to instrument loops to
                                                                                                                        valves and Operating Discipline "concept" book
Contractor: ABS Consulting                                                                                              help support the GCPS use” for safety instrumented
                                                                                                                        available for “proven in during March 2011. DuPont
                                                        Operations to help organizations ensure consistent
                                                        To develop of critical job tasks.database of operating          generously provided permission to use their Process
                                                        completion and operate a pilot                                  functions and systems. Production quality software
Completion date: Project Work Complete                  company reliability data to aid in process safety and           Safety Wheel graphic in book.2nd quarter 2011 that
                                                                                                                        should be available by end of
Taking New Members: No                                  maintenance evaluations. Once pilot database is proven,         will fully support the desired work process for relief
                                                        expand to a full database of maintenance and reliability data   valves. Upon successful startup, work will proceed
210. Benchmarking Process Safety Management systems     for equipment in the CPI and HPI.                               to implement additional equipment taxonomies
                                                                                                                        The benchmark protocol for the 6 selected Risk
Chair: Jim Muoio                                                                                                        within Process Safety elements has include a
                                                                                                                        Based the software. Future plans been developed
                                                        Formal, systematic benchmarking program to allow
Staff: Jack McCavit                                                                                                     and the book titled, CCPS Guideline for Proven
                                                                                                                        concept first round of benchmarking is complete. in
                                                        participants to know the relative standing of their process
                                                                                                                        Use Data (The Gold Standard), as well as expansion
                                                                                                                        Benchmarking participants actively being solicited.
Contractor: Phillip Townsend Associates                 safety programs, and for CCPS to understand the current
                                                                                                                        of the taxonomies and supporting software.
                                                                                                                        For more information, contact the CCPS office or
                                                        general state of practice.
                                                                                                                        Phillip Townsend Associates
Standing Committee                                                                                                      (kodonnell@ptai.com).
Taking New Members: No
211. Executive Process Safety Seminars
                                                                                                                        Executive interviews have been completed. Product
Co-chairs: Linda Hicks, Vertellus, and Dave Cummings,
                                                                                                                        is in the final stages of preparation before peer
DuPont
                                                                                                                        review. Each interview has produced 20-30 minutes
Staff: Bob G. Perry
                                                                                                                        of video and not all can be included as much of it is
Contractor: ioMosaic                                    Seminar targeted at improving awareness of process safety       repetitive. Although each interviewee is responding
                                                        amongst industry executives while educating them on their       to the same questions, their response is individual
                                                        role. Companion project to 2008 project targeted at             and different. The product will represent Gary
                                                        Culture.                                                        Kenney's and Don Hirsch's best effort to fit the
                                                                                                                        various interviewee responses into the format. The
                                                                                                                        video will employ a professional "voice over" to
                                                                                                                        introduce the speakers and topics. The committee
Completion Date: Early 2011
                                                                                                                        is meeting on 11/09/10.
Taking New Members: Peer Review Only
                    Project Statistics                                         Project Scope                                              Project Status
212. (Guidelines for) Likelihood of Ignition
Chair: Bob Stack, Dow Chemical                                                                                          The year 2011 will bring full operation of a
                                                         Define a set of approaches for calculating the likelihood of   production quality database, initially with relief
Staff: Adrian Sepeda                                     ignition for selected categories of scenarios, and publish a   Outline approved; first draft instrument BakerRisk
                                                                                                                        valves and then expanding toin progress. loops to
Contractor: Baker Risk                                   Guidelines or Concept series book of instructions and tools    help support “proven in use” for and interfacing
                                                                                                                        started by gathering information safety instrumented
                                                         To develop and operate a pilot methodologies and structure
                                                         (including a CD of calculation database of operating           with the subcommittee. Mike Moosemiller is
                                                                                                                        functions and systems. Production quality software
                                                         company reliability so. to aid in process safety of
                                                         for input data) to dodataIdeally, three categories and         should be available by book 2nd quarter 2011 that
                                                                                                                        BakerRisk’s lead. Thisend of and technology will be
                                                         resources needed and matching precision of calculations
                                                         maintenance evaluations. Once pilot database is proven,        the companion to the desired work the F&Efor relief
                                                                                                                        will fully support and complement process book.
                                                         will be to a full database of medium, and high degree of
                                                         expand developed (e.g. low, maintenance and reliability data   valves. publication is last startup, of 2011. proceed
                                                                                                                        Target Upon successful quarter work will
Completion Date: Late 2011
                                                         precision and in the CPI and HPI.
                                                         for equipmentaccompanying required effort).                    to implement additional equipment taxonomies
                                                                                                                        within the software. Future plans include a
Taking New Members: No
                                                                                                                        concept book titled, CCPS Guideline for Proven in
                                                         The updated Guidelines book would provide plant design         Use Data (The Gold Standard), as well as expansion
216. GL Engineering Design for Process Safety, 2nd ed.
                                                         engineers, facility operators, and safety professionals with   of the taxonomies and supporting software.
Chair: Pete Lodal, Eastman Chemicals                     key information on selected topics of interest, many of
Staff: Dave Belonger                                     which are dealt with in other CCPS publications, which         Comments from the peer reviewers is due April 15.
Contractor: AON Energy Risk Engineering                  would be liberally referenced. The Guideline would also        Expect to publish by mid June
                                                         provide an extensive bibliography to related publications
                                                         and topic-specific information, as well as the key
Completion Date: Mid 2011
                                                         information on failure modes and potential design solutions
Taking New Members: Peer Review Only                     from the 1998 Design Solutions Guideline book.
218. Recognizing Incident Warming Signs
                                                         Prior to many potentially serious process incidents, warning
Co Chairs: Bobby Fischer, TOTAL
                                                         signs or problems are present, but often are not recognized
Staff: Brian D. Kelly, P. Eng.
                                                         or responded to. This project has developed improved
Contractor: AntiEntropics                                guidance documents for recognizing, characterizing and
                                                         troubleshooting warning signs to avoid process incidents
                                                         and injuries. Key areas are examined such as: Leadership,      In Peer Review.
                                                         Discipline and Organizational Culture; Training and
                                                         Competency; Process Safety Information; Procedures; Asset
                                                         Integrity; Analysis of Risk and Managing Change;
                                                         Information learned from Audits; Lessons Learned from
Completion Date: Summer 2011
                                                         Experience; and Physical Warning Signs.
Taking New Members: No
                     Project Statistics                                  Project Scope                                                 Project Status
219. Process Safety Moments Presentations
Chair: TBD                                         Create a library of short (1 to 4 slide) powerpoint files. This   The year 2011 will bring full operation of a
                                                   will allow for easy sharing and presentation. Other media         production quality database, initially with relief
Staff: Dennis Hendershot, John Herber
                                                   such as video clips (embedded in powerpoint presentations)        valves and then expanding to instrument loops to
Contractor: N/A                                                                                                      help support “proven in use” for safety instrumented
                                                   or podcasts would be considered. Another potential idea is
                                                   to develop and operate a pilot database of to provide
                                                   Tohave TSC members record the moments operating a                 functions and systems. Production quality software
                                                                                                                     Ongoing
                                                   personalized, reality feel. The in process safety and
                                                   company reliability data to aidmaterial topic and/or intended     should be available by end of 2nd quarter 2011 that
                                                   audience would influence Once pilot database is proven,
                                                   maintenance evaluations. the media selection: i.e.                will fully support the desired work process for relief
                                                   expand to a (printouts) for a maintenance and v. podcasts for
                                                   powerpoint full database of toolbox meeting reliability data      valves. Upon successful startup, work will proceed
Standing Committee                                 for equipment in the CPI and HPI.Safety Moment.
                                                   a business leader focused Process                                 to implement additional equipment taxonomies
                                                                                                                     within the software. Future plans include a
Taking New Members: Yes
                                                                                                                     concept book titled, CCPS Guideline for Proven in
223. Process Safety in Biofuel Plants                                                                                Use Data (The Gold Standard), as well as expansion
OSHA Susan Harwood Grant                                                                                             of the taxonomies and supporting software.
                                                   Develop an on-line training module to introduce process
Staff: Louisa Nara                                                                                                   As of December 31, 2010, over 150 participants
                                                   safety concepts to small and start up bioethanol and
                                                                                                                     have begun the course and 33 have completed.
                                                   biodiesel manufacturers.
Completion Date: September 2011
Taking New Members: Yes @ http://aiche.learn.com
224. Hazard Identification for Operators and
Maintenance: A CCPS Training DVD                   Frequently, front line personnel are not made aware of the
Chair: TBD                                         full extent of process safety hazards present in their work
Staff: Brian D. Kelly, P. Eng.                     environments. This project will determine an optimal
                                                   format for visual training, and produce that DVD/web
                                                                                                                     Project team being formed.
                                                   training to enhance awareness and identification of process
                                                   safety hazards by front line personnel. This training would
                                                   be based on the CCPS book A Practical Approach to
Completion Date: TBD                               Hazard Identification.
Taking New Members: Yes
225. Process Safety Management for Front Line
Supervisors                                        While “Top-down” emphasis of PSM & other safety
Chair: TBD                                         programs is necessary, the daily “enforcement” is at the
Staff: John Herber                                 worker and supervisor levels. This project will increase the
                                                                                                                     Project team being formed.
                                                   understanding and buy-in for PSM at the first-line
                                                   supervisory level through better understanding of PSM, its
Completion Date: TBD                               benefits and the interactions of the various elements.
Taking New Members: Yes
                     Project Statistics                                       Project Scope                                               Project Status
227. Guidelines for Organization Change Management
for Process Safety                                                                                                      The year 2011 will bring full operation of a
                                                        Many companies continue to struggle with effective
Chair: John Wincek, Croda                                                                                               production quality database, initially with relief
                                                        implementation of Management of Organizational Change.          Reviewed 1st draft comments March 18, 2011. 2nd
Staff: Dave Belonger                                                                                                    valves and then expanding to instrument loops to
                                                        This project will address these issues and help companies       draft due April 19. Teleconference to review
                                                                                                                        help support “proven in use” for safety instrumented
                                                        bring their MOOC systems to the same degree of maturity         consolidatyed 2nd draft comments set for June 3
                                                        To develop and operate a pilot database of operating            functions and systems. Production quality software
Completion Date: Late 2011                              as other process safety management systems.
                                                        company reliability data to aid in process safety and           should be available by end of 2nd quarter 2011 that
Taking New Members: Yes                                 maintenance evaluations. Once pilot database is proven,         will fully support the desired work process for relief
229. Conditional Modifier and Enabling Events           expand to a full database of maintenance and reliability data   valves. Upon successful startup, work will proceed
                                                        for equipment in the CPI and HPI.                               to implement additional equipment taxonomies
Chair: Wayne Chastain, Eastman, Co chair Stan Urbanik
                                                        A short publication providing information and                   within the software. Future plans include a
Staff: John Murphy                                      considerations on developing and using conditional              concept book titled, CCPS Guideline for Proven in
                                                                                                                        Outline developed. Contract awarded. as expansion
                                                                                                                        Use Data (The Gold Standard), as well
Contractor: Unwin                                       modifiers. It would also provide similar information on
                                                        apply enabling events values to hazards analysis.               of the taxonomies and supporting software.
Completion Date: Spring 2012
Taking New Members: no
239. GL For Process Safety Knowledge and Expertise
                                                        Present the framework of process safety knowledge and
Chair: TBD
                                                        expertise versus the desired competency level in a “super-
Staff: Dave Belonger                                    matrix” format. This would be targeted at multiple
Contractor: TBD                                         audiences, ranging from front line chemical operators,
                                                        mechanics and instrument technicians through senior             Project team being formed.
                                                        management, including financial and business executives.
                                                        Gaps between existing and desired training levels can then
                                                        be identified, and potential remedies suggested.
Completion Date: TBD
                                                        Customization for specific company will be permitted.
Taking New Members: Yes

240. Guidelines for Implementing Process Safety
Management Systems, 2nd ed (Alt. title Process Safety
Management Systems: The Infrastructure for Success)     An update to the original PSM implementation guideline
                                                                                                                        The project team is in place; kickoff conference call
Chair: Sara Perrin                                      which recognizes that most companies now have some form
                                                                                                                        was held in January 2011 and a face-to-face meeting
Staff: Dan Sliva                                        of PSM system but a number of companies, especially
                                                                                                                        was held on March 14 at 9 AM at the Hyatt in
                                                        smaller companies, need a roadmap of how to efficiently
Contractor: TBD                                                                                                         Chicago.
                                                        and effectively upgrade their systems.

Completion Date: TBD
Taking New Members: Yes
                    Project Statistics                                  Project Scope                                               Project Status
241. Guidelines for Safe Automation, 2nd ed
                                                  An update to the original 1993 guideline, this edition will     The year 2011 will bring full operation of a
Chair: TBD (In Progress)                          cover state-of-the-art design and maintenance of Basic          production quality database, initially with relief
Staff: Dan Sliva                                  Process Control Systems (BPCS) and its role in overall safe     The projectthen expanding tokickoff conference call
                                                                                                                  valves and team is in place; instrument loops to
Contractor: TBD                                   operation. It will also focus on the BPCS/operator interface    was held in January 2011. Conference call
                                                                                                                  help support “proven in use” for safety instrumented
                                                  and will have worked examples of control operating
                                                  To develop and operate a pilot database ofschemes in            scheduled for February Production 2 PM; software
                                                                                                                  functions and systems. 24, 2011 at quality face-to-
                                                  combination with SIS. RBPS principles will be integrated
                                                  company reliability data to aid in process safety and           face meeting tentatively targeted for May 2011. that
                                                                                                                  should be available by end of 2nd quarter 2011
Completion Date: TBD                              and a control evaluations. cyber attackdatabase is proven, be
                                                  maintenance strategy for Once pilot “security” will also        will fully support the desired work process for relief
                                                  covered. a full database of maintenance and reliability data
                                                  expand to                                                       valves. Upon successful startup, work will proceed
Taking New Members: Yes
                                                  for equipment in the CPI and HPI.                               to implement additional equipment taxonomies
242. Student Handbook for Process Safety
                                                                                                                  within the software. Future plans include a
Chair: TBD                                        This project will include the development and evaluation of     concept book titled, CCPS Guideline for Proven in
Staff: Don Abrahamson                             tools for application of process safety principles throughout   Use Data (The Gold Standard), as well as expansion
Contractor: TBD                                   the standard chemical engineering curriculum in addition to,    Accepting volunteers and formingsoftware.
                                                                                                                  of the taxonomies and supporting the committee.
                                                  or as an alternative to, adding a new specific process safety
Completion Date: TBD                              course.
Taking New Members: Yes
243. Guidelines for Mechanical Integrity
Chair: TBD
Staff: Don Abrahamson                             Update to 1st ed. which addresses gaps in guidance, such as
Contractor: TBD                                   selecting materials of construction, condition monitoring,      Accepting volunteers and forming the committee.
                                                  managed systems and MI metrics.
Completion Date: TBD
Taking New Members: Yes
Conference Projects
2012 27th CCPS International Conference
Chair: Jatin Shah
Staff: TBD                                        Part of 8th Global Congress on Process Safety                   Call for papers open through September

Completion Date: TBD
Taking New Members: Yes
3rd CCPS Latin America Conference and Expo 2011
(Buenos Aires)
Chair: TBD                                        Process Safety Expo in Latin America introducing CCPS
                                                  and its process safety resources to this audience. The second   Conference theme and details are being developed,
Staff: TBD
                                                  Latin American Conference is co-hosted by the Argentina         and negotiating conference logistics with AAIQ
                                                  Association of Chemical Engineers
Completion Date: March 13-17, 2011
Taking New Members: Yes

				