major_projects
Document Sample


D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
ENO Name Qualifier
260149 Abbott Point - expansion Infrastructure - coal
453678 Abydos Mining project - iron ore
448599 Agate Creek Mining project - gold
460570 Alpha Mining project - coal
44805 Argyle - underground Mining project - diamonds
364193 Aurukun Mining project - bauxite
42072 Austar - stage 3 Mining project - coal
460576 Awaba East Mining project - coal
443407 Baal Gammon Mining project - Copper Tin Silver Indium
41952 Balla Balla Mining project - vanadium
428786 Balmoral Southern - magnetite Mining project - iron ore
529735 Barnes Hill Mining project - nickel
364203 Barrambie Mining project - vanadium
41954 Batchelor - Mg Mineral processing facilities
42080 Bell Bay - Mg Mineral processing facilities
512982 Bellamel Mining project - gold
361151 Belvedere Mining project - coal
512975 Bickham Mining project - coal
460649 Bigrlyi Mining project - uranium
529738 Bill Hill Mining project - tungsten
41957 Bowdens Mining project - lead silver zinc
41958 Boyne Island - Expansion Mineral processing facilities
436539 Brockman 4 Mining project - iron ore
529730 Bundarra Mining project - gold
46740 CML 7 - Rasp Mine Mining project - lead zinc silver
44815 Cadia East Mining project - copper gold
460580 Camberwell Mining project - coal
512974 Cameby Downs Mining project - coal
448424 Canegrass Mining project - nickel cobalt
361150 Cape Lambert - magnetite Mining project - iron ore
351690 Capel - Pig Iron Mineral processing facilities
460577 Caval Ridge Mining project - coal
460571 China First Mining project - coal
45255 Cloncurry Mining project - copper
529950 Cobbora Mining project - coal
46724 Coburn Mining project - mineral sands
460569 Colton Mining project - coal
444270 Copper Hill Mining project - copper gold
47577 Cosmos - Expansion Mining project - nickel
444264 Crocker Well Mining project - uranium
460578 Daunia Mining project - coal
444271 Deflector Mining project - copper gold silver
444420 Diggers South Mining project - nickel
356005 Donald Mining project - mineral sands
46758 Dongara Mining project - mineral sands
529745 Drake Mining project - coal
41982 Dugald River Mining project - lead zinc silver
46478 Duketon Mining project - gold
453690 Eagle Downs Mining project - coal
443499 Einasleigh Mining project - Copper Gold Silver
453692 Ellensfield Mining project - coal
1 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
260121 Eneabba Mining project - coal
260105 Ensham - Expansion Mining project - coal
448641 Ernest Henry - underground Mining project - copper
41986 Exmouth - Limestone Mining project - limestone
42197 Extension Hill - hematite Mining project - iron ore
42236 Extension Hill - magnetite Mining project - iron ore
453616 Four Mile Mining project - uranium
46972 Gladstone - Ferrochrome Mineral processing facilities
356002 Gladstone - Nickel Mineral processing facilities
47374 Gladstone - Steel Mineral processing facilities
42008 Gladstone - billets Mineral processing facilities
46730 Goongarrie - KNP Mining project - nickel cobalt
47711 Gormandale Mining project - coal
42044 Gove - Expansion Mineral processing facilities
47418 Grosvenor Mining project - coal
356004 Harts Range Mining project - garnet
42002 Hawks Nest - magnetite Mining project - iron ore
42003 Hazelwood - Mg Mineral processing facilities
529744 Hellyer - Fossey Mining project - lead silver zinc
260087 Hera Mining project - gold silver
42005 Honeymoon Mining project - uranium
46760 Honeymoon Well Mining project - nickel
42006 Hope Downs Mining project - iron ore
512976 Hunter Valley Operations Mining project - coal
42009 Jabiluka Mining project - uranium
260129 Jack Hills Mining project - iron ore
42010 Jangardup South Mining project - mineral sands
260078 Kalkaroo Mining project - copper gold molybdenum
361133 Kanmantoo Mining project - copper
260141 Karara - iron ore Mining project - iron ore
42011 Kemerton - Expansion Mineral processing facilities
460564 Kestrel Mining project - coal
356003 Keysbrook Mining project - mineral sands
43826 King Island - Scheelite Mining project - tungsten
529740 Kingsgate Mining project - molybdenum bismuth
453687 Kingston Mining project - coal
46786 Kintyre Mining project - uranium
260135 Koolanooka - magnetite Mining project - iron ore
529733 Koongie Mining project - zinc copper
453694 Kunioon Mining project -coal
42013 Kurri Kurri - Expansion Mineral processing facilities
42015 Kwinana - TiO2 Mineral processing facilities
42018 Lady Loretta Mining project - lead zinc silver
460650 Lake Maitland Mining project - uranium
444263 Lake Way-Centipede Mining project - uranium
512993 Leonora Mining project - gold
361132 Lucky Break Mining project - nickel cobalt
512994 Majors Creek Mining Project - gold
260113 Mangoola Mining project - coal
46788 Manyingee Mining project - uranium
448507 Marillana Mining project - iron ore
42025 Marlborough Mining project - nickel cobalt
2 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
42026 Maroochydore Mining project - copper
444272 Maud Creek Mining project - gold
42028 Maules Creek Mining project - coal
460582 Metropolitan Mining project - coal
453689 Middlemount Mining project - coal
428932 Mindy Mindy Mining project - iron ore
364119 Molyhil Mining project - molybdenum tungsten
512978 Monto Mining project - coal
260117 Moolarben Mining project - coal
512979 Moranbah South Mining project - coal
47382 Morwell - Mg Mineral processing facilities
453695 Mount Arthur - MAC20 Mining project -coal
529739 Mt Carbine Mining project - tungsten
512997 Mt Carlton Mining project - gold
41964 Mt Cattlin Mining project - tantalum lithium
529736 Mt Garnet Mining project - tin
444265 Mt Gee Mining project - uranium
42038 Mt Keith - Expansion Mining project - nickel
529737 Mt Lindsay Mining project - tin tungsten magnetite
42039 Mt Margaret Mining project - nickel
529743 Mt Marion Mining project - lithium
428785 Mt Mason Mining project - iron ore
435969 Mt Morgan Mining project - gold
42040 Mt Pleasant Mining project - coal
364210 Mungada - hematite Mining project - iron ore
529729 Mungana - gold Mining project - gold
42042 Munni Munni PGM Mining project - platinum palladium
529728 Murchison Mining project - gold
512981 Mutooroo Mining project - copper cobalt
457841 Narngulu Mining project - mineral sands
448418 Narrabri North Mining project - coal
47704 Narracan Mining project - coal
428782 Nelson Bay River - magnetite Mining project - iron ore
260147 Nelson Point - RGP1,2,3,4,5&6 Infrastructure- iron ore
444422 New Morning Mining project - nickel
453691 New Saraji Mining project - coal
260159 Newcastle - NCIG Infrastructure - coal
443582 NiWest Mining project - nickel cobalt
436528 Nolans Bore Mining project - rare earths uranium phosphate
46728 Nornico Mining project - nickel cobalt
512998 Norseman Mining project - gold
435972 Northparkes - E48 Mining project - copper gold
512961 Nullagine Mining project - iron ore
364126 Nullagine-Golden Gate Mining Project - gold
428788 Oakajee Infrastructure - iron ore
444418 Oakajee - YIL Mining project - infrastructure
361153 Olive Downs Mining project - coal
42052 Olympic Dam - Expansion Mining project - copper gold uranium silver
460556 Osborne - magnetite Mining project - magnetite
45237 Panorama Mining project - zinc copper
529731 Parker Range Mining project - iron ore
428779 Peculiar Knob Mining project - iron ore
3 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
46715 Phillips River Mining project - gold
453684 Phils Creek Mining project - iron ore
42118 Portland - Expansion Mineral processing facilities
428933 Prairie Downs Mining project - lead zinc
512972 Railway Mining project - iron ore
460563 Randalls Mining project - gold
529742 Ravensthorpe - FQM Mining project - nickel cobalt
529741 Ravensworth North Mining project - coal
260093 Rentails Mining project - tin
260143 Ridges Mining project - iron ore
512968 Ridley - magnetite Mining project - iron ore
453685 Robertson Range Mining project - iron ore
448640 Rocklands Mining project - copper
45332 Roseby Mining project - copper
512970 Roy Hill Mining project - iron ore
47525 Saddlers Creek Mining project - coal
453688 Salmon Gums Mining Project - coal
47414 Sherlock Bay Mining project - nickel
41987 Sino Iron Project - magnetite Mining project - iron ore
529732 Solomon Hub Mining project - iron ore
529734 Sorby Hills Mining project - lead silver
512999 South Laverton Mining project - gold
42209 Southdown - magnetite Mining project - iron ore
46790 Speewah Mining project - fluorspar
260082 Spinifex Ridge Mining project - molybdenum copper
512980 Spinifex Ridge - iron ore Mining project - iron ore
260103 Stanwell - Coke Coking Plant
42083 Togara North Mining project - coal
46794 Tomago - Expansion Mineral processing facilities
45242 Tomingley Mining project - gold
46717 Toongi - Rare Earths Mining project - zirconia rare earths
46742 Trilogy Mining project - copper lead zinc silver gold
443398 Tropicana Mining project - gold
46752 Tunkillia Mining project - gold
444266 Valhalla Mining project - uranium
42085 Wagerup - Unit 3 Mineral processing facilities
443399 Walhalla Mining project - gold
47438 Wallarah 2 Mining project - coal
42086 Wandoan Mining project - coal
45451 Wateranga Mining project - ilmenite feldspar mica apatite corundum
443550 Watershed Mining project - tungsten
460555 Weipa - expansion Mining project - bauxite
260137 Weld Range Mining project - iron ore
453683 West Pilbara Mining project - iron ore
512969 Western Turner Syncline Mining project - iron ore
444267 Westmoreland Mining project - uranium
43829 Westonia Mining project - gold
364225 Wiggins Island Infrastructure - coal
453686 Wilcherry Hill - magnetite Mining project - iron ore
428781 Wilgerup Mining project - iron ore
428784 Wiluna West Mining project - iron ore
435951 Wingellina Mining project - nickel cobalt
4 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
453617 Wonarah Mining project - phosphate
436535 Wonbindi Mining project - coal
435953 Woodlawn Mining project - lead zinc
460579 Woori Mining Project - coal
351718 Worsley - Expansion 2 Mineral processing facilities
46762 Yakabindie Mining project - nickel
428783 Yalgoo - magnetite Mining project - iron ore
351717 Yannarie Solar Mining project - salt
443555 Yarwun - expansion Bauxite Refinery
512983 Yeelirie Mining project - uranium
444421 Yerilla Mining project - nickel cobalt
512971 Yilgarn Project Mining project - iron ore
5 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
State Commodity
Queensland Black Coal
Western Australia Iron Ore
Queensland Gold
Queensland Black Coal - thermal
Western Australia Diamonds
Queensland Bauxite, Alumina
New South Wales Black Coal - coking
New South Wales Black Coal - coking/thermal
Queensland Copper Tin Silver Indium
Western Australia Vanadium Titanomagnetite
Western Australia Iron Ore
Tasmania Nickel
Western Australia Vanadium
Northern Territory Magnesium
Tasmania Magnesium
Western Australia Gold
Queensland Black Coal - coking
New South Wales Coal
Northern Territory Uranium
Western Australia Tungsten
New South Wales lead-zinc-silver
Queensland Aluminium
Western Australia Iron Ore
Western Australia Gold
New South Wales Lead Zinc Silver
New South Wales Copper-Gold
New South Wales Black Coal - coking/thermal
Queensland Coal
Western Australia Nickel Cobalt
Western Australia Iron Ore
Western Australia Iron
Queensland Black Coal - coking
Queensland Black Coal - thermal
Queensland Copper Gold
New South Wales Black Coal
Western Australia Mineral Sands
Queensland Black Coal - coking
New South Wales Copper Gold
Western Australia Nickel
South Australia Uranium
Queensland Black Coal - coking PCI
Western Australia Copper Gold Silver
Western Australia Nickel
Victoria Zircon
Western Australia Mineral Sands
Queensland Black Coal
Queensland lead-zinc-silver
Western Australia Gold
Queensland Coal
Queensland Copper Gold Silver
Queensland Coal
6 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Western Australia Black Coal - Thermal
Queensland Black coal - thermal
Queensland Copper
Western Australia Limestone-Quicklime
Western Australia Iron Ore
Western Australia Iron Ore
South Australia Uranium
Queensland Ferrochrome
Queensland Nickel, coabalt
Queensland Steel
Queensland Steel
Western Australia Nickel-Cobalt
Victoria Brown Coal - Thermal
Northern Territory Aluminium
Queensland Black Coal - Coking
Western Australia Garnet
South Australia Iron ore - magnetite
Victoria Magnesium
Tasmania Silver Lead Zinc
New South Wales Gold, Silver
South Australia Uranium
Western Australia Nickel
Western Australia Iron ore
New South Wales Coal
Northern Territory Uranium
Western Australia Iron Ore
Western Australia Mineral sands
South Australia Copper, Gold, Molybdenum
South Australia Copper, Gold
Western Australia Iron Ore
Western Australia Titanium minerals
Queensland Black Coal - coking
Western Australia Ilmenite, leucoxene, zircon
Tasmania Tungsten
New South Wales Molybdenum Bismuth
South Australia Coal
Western Australia Uranium
Western Australia Iron Ore
Western Australia Zinc Copper
Queensland Coal
New South Wales Aluminium
Western Australia Titanium minerals
Queensland Lead, Zinc, Silver
Western Australia Uranium
Western Australia Uranium
Western Australia Gold
Queensland Nickel, Cobalt
New South Wales Gold
New South Wales Black Coal - Thermal
Western Australia Uranium
Western Australia Iron Ore
Queensland Nickel Cobalt
7 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Western Australia Copper
Northern Territory Gold
New South Wales Black Coal - Thermal
New South Wales Black Coal - coking
Queensland Coal
Western Australia Iron Ore
Northern Territory Molybdenum, Tungsten
Queensland Coal
New South Wales Black Coal - Thermal
Queensland Coal
Victoria Magnesium
New South Wales Coal
Queensland Tungsten
Queensland Gold Silver Copper
Western Australia Tantalum Lithium
Queensland Tin
South Australia Uranium
Western Australia Nickel
Tasmania Tin Tungsten Magnetite
Western Australia Nickel
Western Australia Lithium
Western Australia Iron Ore
Queensland Gold
New South Wales Black Coal - thermal
Western Australia Iron Ore
Queensland Gold Copper
Western Australia PGM
Western Australia Gold
South Australia Copper Cobalt
Western Australia Minerals Sands
New South Wales Black Coal
Victoria Brown Coal - Thermal
Tasmania Iron Ore
Western Australia Iron Ore
Western Australia Nickel
Queensland Black Coal - coking
New South Wales Black Coal
Western Australia Nickel Cobalt
Northern Territory Rare Earths Uranium Phosphate
Queensland Nickel-Cobalt
Western Australia Gold
New South Wales Copper Gold
Western Australia Iron Ore
Western Australia Gold
Western Australia Iron Ore
Western Australia Iron Ore
Queensland Coal - Coke/PCI
South Australia Copper, uranium, gold and silver
Queensland Iron
Western Australia Zinc Copper
Western Australia Iron Ore
South Australia Iron Ore
8 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Western Australia Gold
Western Australia Iron Ore
Victoria Aluminium
Western Australia Lead, Zinc
Western Australia Iron Ore
Western Australia Gold
Western Australia Nickel Cobalt
New South Wales Black Coal
Tasmania Tin
Western Australia Iron Ore
Western Australia Iron Ore
Western Australia Iron ore
Queensland Copper
Queensland Copper
Western Australia Iron Ore
New South Wales Black Coal - Thermal
Western Australia Coal
Western Australia Nickel
Western Australia Iron Ore
Western Australia Iron Ore
Western Australia Lead Silver
Western Australia Gold
Western Australia Iron Ore
Western Australia Fluorspar
Western Australia Molybdenum, Copper
Western Australia Iron Ore
Queensland Coke
Queensland Black Coal - thermal
New South Wales Aluminium
New South Wales Gold
New South Wales Zirconia Yttria Niobium
Western Australia Copper Lead Zinc Silver Gold
Western Australia Gold
South Australia Gold
Queensland Uranium
Western Australia Aluminium
Victoria Gold
New South Wales Black Coal - Thermal
Queensland Black Coal - Thermal
Queensland Ilmenite Feldspar Mica Apatite Corundum Zircon Rutile Scandium
Queensland Tungsten
Queensland Bauxite
Western Australia Iron Ore
Western Australia Iron Ore
Western Australia Iron Ore
Queensland Uranium
Western Australia Gold
Queensland Black Coal
South Australia Iron Ore
South Australia Iron Ore
Western Australia Iron Ore
Western Australia Nickel - Cobalt
9 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Northern Territory Phosphate
Queensland Black Coal - PCI Thermal
New South Wales Lead Zinc
Queensland Black Coal - thermal
Western Australia Aluminium
Western Australia Nickel
Western Australia Iron Ore
Western Australia Salt
Queensland Alumina
Western Australia Uranium
Western Australia Nickel Cobalt
Western Australia Iron Ore
10 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Project_type
Infrastructure
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Minerals processing facilities
Minerals processing facilities
Mining project - minerals
Mining project - energy
Mining project - energy
Mining project - energy
Mining project - minerals
Mining project - minerals
Minerals processing facilities
Mining project - minerals
Mining project - gold
Mining project - minerals
Mining project -minerals
Mining project - energy
Mining project - energy
Mining project - minerals
Mining project - minerals
Mineral processing facilities
Mining project - energy
Mining project - energy
Mining project - minerals
Mining project - energy
Mining project - minerals
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project- minerals
Mining project - minerals
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - minerals
Mining project - energy
11 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Mining project - Energy
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mineral processing facilities
Mineral processing facilities
Minerals processing facilities
Mining project - minerals
Mining project - energy
Minerals processing facilities
Mining project - energy
Mining project - minerals
Mining project - minerals
Minerals processing facilities
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project, minerals
Mining project - minerals
Mining project - energy
Mining project - energy
Mining project - mining
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Minerals processing facilities
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - energy
Minerals processing facilities
Minerals processing facilities
Mining project - minerals
Mining project - energy
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - minerals
12 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - energy
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - mining
Mining project - energy
Mineral processing facilities
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - minerals
Mining Project - gold
Mining project - minerals
Minerals project - gold
Mining project - minerals
Mining project - minerals
Mining project - coal
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - infrastructure
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - infrastructure
Mining project - infrastructure
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - iron ore
Mining project - minerals
13 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Mining project - minerals
Mining project - minerals
Mineral processing facilities
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - iron ore
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - energy
Mineral processing facilities
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - energy
Minerals processing facilities
Mining project - minerals
Mining project - energy
Mining project - energy
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - energy
Mining project - minerals
Mining project - infrastructure
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - minerals
14 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mining project - energy
Mineral processing facilities
Mining project - minerals
Mining project - minerals
Mining project - minerals
Mineral processing facility
Mining project - minerals
Mining project - minerals
Mining project - minerals
15 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Principal_company
Ports Corporation of Queensland
Atlas Iron Ltd
Renison Consolidated Mines NL
Hancock Prospecting
Rio Tinto
Chinese Aluminium Company (CHALCO)
Yancoal Australia Pty Ltd
Centennial Coal
North Queensland Metals Ltd
Aurox Resources Ltd
Australasian Resources
Proto Resources & Investment Metals Finance Ltd
Reed Resources
Mount Grace Resources/ MINTEX/ Anglo American
Bass Resources/ Pacific Magnesium Corporation
Norton Fold Fields
Aquila Resources Ltd
Winsian Investments
Energy Metals/Paladin Energy
Hazelwood Resources
Silver Standard Australia
Comalco
Hamersley Iron
Terrain Minerals
CBH Resources
Newcrest Mining
Integra Coal
Syntech Resources
Nickelore Ltd
China Metallurgical Group Corporation
Iluka Resources
BMA Coal
Waratah Coal
Exco Resources NL
Cobbora Unicorporated Joint Venture
Gunson Resources
Northern Energy Corporation
Golden Cross Resources
Jubilee Mines
Pepinnini Minerals
BMA Coal
ATW Gold Corporation
Western Areas
Astron Ltd
Tiwest JV
QCoal
OZ Minerals
Regis Resources NL
Aquila Resources and Vale
Copper Strike Ltd
Vale
16 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Aviva Corporation
Ensham Resources
Xstrata
Exmouth Limestone
Mount Gibson Iron Ltd
Asia Iron Pty Ltd
Alliance Resources(25%) and Quasar Resources(75% - Heathgate Resources affiliate)
Tata Iron and Steel Co
Yieh Loong (Taiwan)
Boulder Group
Heron Resources(40%)/CVRD-Inco(60%)
Loy Yang Power
Rio Tinto (previously Alcan)
Anglo Coal Australia
Olympia Resources Ltd
Western Plains Gold Ltd
Latrobe Magnesium Ltd (100%)
Bass Metals
YTC Resources
SXR Uranium One
LionOre(80%)/Norilsk Nickel(20%)
Hancock Prospecting(50%) & Rio Tinto(50%)
Rio Tinto (Coal and Allied)
ERA (Rio Tinto)
Murchison Metals Ltd
Bemax Cable Sands (WA) Pty Ltd
Havilah Resources NL
Hillgrove Resources
Gindalbie Metals Ltd
Millennium Inorganic Chemicals
Rio Tinto Coal Australia
Olympia Resources Ltd
King Island Scheelite Ltd
Auzex Resources
Hybrid Energy
CAMECO (70%)/Mitsubishi Developments (30%)
Midwest Corporation
Anglo Australian Resources
Tarong Energy
VAW (Hydro Aluminium)
Tiwest JV
Lady Loretta JV (Xstrata/Mineral Securities)
Mega Uranium
Toro Energy Ltd
Navigator Resources
Metallica Minerals Ltd and Metals Finance Corporation
Cortona Resources
Xstrata
Paladin Resources
Brockman Resources Ltd
Gladstone Pacific Nickel Ltd
17 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Aditya Birla Minerals(50%)/Murchison United NL(50%)
GBS Gold International
Aston Resources
Peabody Pacific
Macarthur Coal Ltd
Consolidated Minerals Ltd
Thor Mining PLC
Macarthur Coal
Felix Resources
Anglo Coal Australia and Exxaro
Hazelwood Power/Europacific Corp
BHP Billiton
Icon Resources
Conquest Mining
Galaxy Resources Ltd
Consolidated Tin Mines
Marathon Resources
BHPBilliton
Venture Minerals
Minara Resources
Reed Resources & Minerals Resources Ltd
Jupiter Mines Ltd
Norton Gold Fields Ltd
Coal and Allied (Rio Tinto)
Gindalbie Metals
Mungana Gold Mines
Helix Resources/ Lonmin
Silver Lake Resources
Havilah Resources
Iluka Resources Ltd
Whitehaven Coal Ltd
HRL Developments Pty Ltd
Zelos Resources NL
BHPBilliton Iron Ore
Western Areas
BMA Coal
Newcastle Coal Infrastructure Group (NCIG)
GME Resources Ltd
Arafura Resources Ltd
Metallica Minerals (International Mineral Resources - 50%)
Matsa Resources
Rio Tinto plc (80%) and Sumitomo (20%)
BC Iron Ltd
Millenium Minerals
Geraldton Iron Ore Alliance
Yilgarn Infrastructure Ltd
Macarthur Coal Ltd
BHPBilliton
Barrick Gold Corporation
CBH Resources Ltd
Cazaly Resources
Western Plains Resources Ltd
18 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Tectonic Resources
Iron Ore Holdings Ltd
Prairie Downs Metal Ltd
United Minerals Corporation
Integra Mining
First Quantum Minerals
Xstrata
Metals X Ltd
Kimberley Metals Group
Atlas Iron Ltd
FerrAus Ltd
Cudeco Ltd
Universal Resources Ltd(100%)
Hancock Prospecting
Anglo Coal Australia
Spitfire Oil Ltd
Australasian Resources Ltd
CITIC Pacific Ltd
Fortescue Metals Group
Kimberley Metals Group
Saracen Mineral Holdings
Grange Resources
Mineral Securities Ltd
Moly Mines Ltd
Moly Mines Ltd
Macarthur Coal
Xstrata Coal
Tomago Aluminium Company
Alkane Exploration
Australian Zirconia (Alkane Exploration)
Tectonic Resources
AngloGold Ashanti and Independence Group NL
Helix Resources (49%)/Minotaur Exploration Ltd (51%)
Summit Resources/Paladin Resources
Alcoa of Australia
Orion Gold NL
Kores (Korean Resources)82.25%
Xstrata Coal
Queensland Industrial Minerals Pty Ltd
Vital Metals Ltd
Rio Tinto
Midwest Corporation
Australian Premium Iron Ore
Rio Tinto
Laramide Resources
Westonia Mines
Central Queensland Port Authority
Ironclad Mining Ltd
Centrex Metals Ltd
Golden West Resources Ltd
Metals X
19 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Minemakers Ltd
Cockatoo Coal Ltd
Tri Origin Minerals Ltd
Cockatoo Coal Ltd
BHP Billiton
BHP Billiton
Ferrowest Ltd
Straits Salt Pty Ltd
Rio Tinto
BHP Billiton
Heron Resources
Polaris Metals NL
20 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Capacity
21 to 50 Mtpa
3 Mtpa DSO
100,000oz per ann Au
30 Mtpa
20 million carats per annum
7.5 Mtpa of Bauxite; 2.1 Mtpa of Alumina
2 Mtpa
4.0 Mtpa raw
500,000 tpa
6.0 Mtpa vanadium rich titanomagnetite concentrate
42 Mtpa ore
2,200 tpa Ni
2.0 Mtpa for 9.0 ktpa of Vanadium
12.5 kt magnesium metal (stage 1)
80 ktpa magnesium metal
40,000 oz per ann Gold
7.0 Mtpa
2.0 Mtpa
0.6 ktpa U3O8; 0.55 ktpa V2O5
2.3 Mtpa tungsten concentrates
4.5Moz Ag, 4750t Pb, 4500t Zn in concentrate
170 kt
22 Mtpa
91,500 oz over life of the project
0.75 Mtpa for 65ktpa Zn conc (50%Zn); 35ktpa Pb conc(70%Pb); 800,000oz Ag
Increase ore production from 24 to 27 Mtpa
up to 3 Mtpa
Stage 1: 1.4 Mtpa; Stage 2: up to 20 Mtpa
20,000 tpa Ni heap leach
7 Mtpa concentrate
300,000 tpa of Pig Iron
5.5 Mtpa
25 Mtpa
2.0 Mtpa ore for 80,000 tpa of concentrate
30 Mtpa Raw Coal
60 ktpa Zircon, 120 ktpa Ilmenite, 30 ktpa HiTi
0.2 Mtpa
25,000 tpa Cu; 40,000 oz per annum Au
12 ktpa Ni in concentrate
5.7 Mtpa for 585 tpa of U3O8
4.0 Mtpa
450,000tpa for 65,000oz of Au, 3,400tpa Cu and 65,000oz Ag
5,000 tpa Ni
86 ktpa Zircon; 106 ktpa ilmenite; 73 ktpa leucoxene
200 ktpa ilmenite; 30 ktpa rutile; 30 ktpa zircon
6 Mtpa
1.8 Mtpa ore
111,000 oz per annum of gold
up to 7 Mtpa coking coal
12 to 15 ktpa Copper
5.5 Mtpa ROM
21 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
2.5 Mtpa
Increase from 12 to 20 Mtpa
75 ktpa Cu concentrate
1 Mtpa limestone; 200 ktpa quicklime
3.0 Mtpa of hematite
5.0 Mtpa of magnetite concentrate
1,360 tpa U3O8
120ktpa Stage 1
30 ktpa Nickel & 1.4 ktpa Cobalt
Unknown
2.1 Mtpa billets
4 Mtpa, 50 ktpa Ni
Up to 10 Mtpa
Increasing capacity from 2.1 to 3.8 Mtpa
5 Mtpa
Stage 1 80 ktpa of abrasives
6 Mtpa concentrate
5,000 tpa magnesium metal
850 ktpa ore for 167 ktpa concentrates
39,000oz/ann Au; 77,000oz/ann Ag
300 tpa of yellow cake
40ktpa Ni concentrate
Stage1: 22 Mtpa; Stage2: 30 Mtpa
add 3.6 Mtpa capacity
1 kt U3O8
Stage 1: 1.5 Mtpa; Stage 2: 25 Mtpa
250 kt mineral sands concentrates
6.5 Mtpa for 31 ktpa Cu, 95,000 oz per annum, 82 tpa Mo
2.0 Mtpa for minimum 14 ktpa Cu and 3,000 ozpa Au in Concentrates
Stage1: 2 Mtpa DSO; Stage 2: 8.0 Mtpa concentrate
95 kt TiO2 pigment
increase from 4 Mtpa to 5.7 Mtpa
Ilmenite 36ktpa; Leucoxene 42 ktpa, Zircon 15 ktpa
600 ktpa scheelite ore
800 tpa Mo; 260 tpa Bi
1.2 to 2.4 Mtpa
1.2ktpa Uranium Oxide
4.5 Mtpa
20ktpa Zn; 10ktpa Cu
10 Mtpa
140 ktpa
Increase capacity from 100 to 150 kt TiO2 pigment
1.0 Mtpa for 125 ktpa Zn; 50 ktpa Pb; 850,000 oz Ag
0.75 ktpa U3O8
1.5 to 2 Mtpa ore for 1.4-1.5 mlb of U3O8 per annum
53,000 oz per annum of gold
Stage1:0.25 Mtpa for 1600tpa of Nickel in concentrate; Stage2: 1.5Mtpa for 10,000tpa Nickel in concentrate
60,000 oz per annum of gold
10.5 Mtpa ROM
Unknown
15 to 25 Mtpa
3.7 Mtpa ore for 25 kt Ni; 2 kt Co
22 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
60 kt Cu cathode
100,000 oz per ann
13 Mtpa
increase to 3.0 Mtpa
1.8 Mtpa
5.0 Mtpa
400,000 tpa
Stage 1: 1.0 Mtpa
4.0 Mtpa Open-cut; 3.0 Mtpa Underground
6.5 Mtpa
100 ktpa
4.5 Mtpa
2,400 tpa tungsten cons
135,000 oz per ann Gold
1.0 Mtpa ore for 116ktpa spodumene and 364 tantalumand
5,000 tpa Sn
1,000 tpa of U3O8
Expansion from 11 to 14.2 Mtpa throughput
8,000 tpa Tin; 7,000 tpa Tungsten; 7,000 tpa Magnetite
64 ktpa Ni; 3.6 ktpa Co
200 ktpa spodumene
1.0 Mtpa Direct Shipping Ore
35,000 oz Gold; 1 ktpa Copper; 200 kt Sulphur
8.5 Mtpa
Stage 1: 3 Mtpa Direct Shipping Ore
140,000 oz/ann Ag; 12,000 t/ann Cu
100,000 ozpa PGM's and gold 5 ktpa Cu and Ni
100,000 oz/ann
10 ktpa Copper; 1.2 ktpa Cobalt
up to 600,000 tpa
Stage 1: 1.5Mtpa; Stage 2: 4.5Mtpa
Up to 8 Mtpa
0.1 Mtpa magnetite
RGP1: 100 to 110 Mtpa; RGP2: 110 to 118 Mtpa; RGP3: 129 Mtpa; RGP4: 155 Mtpa; RGP5: 200 Mtpa; RGP6: 240 Mtpa
5,000 tpa Ni
5 Mtpa coking coal
Stage 1: 30 Mtpa; further Stages to 60Mtpa
1.5 Mtpa for 13,100 tpa Ni and 630 Co
750 ktpa for 20 ktpa REO, 150tpa U3O8
10 ktpa Ni; 0.435 ktpa Co
100,000 oz per annum of Gold
6.0 Mtpa
3.0 Mtpa
1.0 Mtpa for 70,000oz/ann
Port 100 Mtpa; Rail 140 Mtpa
60 Mtpa
1.0 Mtpa Coke/PCI
Increase production from 230ktpa to 350-500ktpa
770,000 tpa of magnetite concentrate
1.5 Mtpa for 80,000tpa Cu and 90,000tpa Zn
4 Mtpa
3.0 Mtpa
23 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
500,000 tpa
1.5 Mtpa DSO
Expansion to raise capacity from 360ktpa to 500ktpa
Stage 1: 250,000 tpa; Stage 2: 500,000 tpa
10 Mtpa
120,000 oz per annum
39,000 tpa Ni
9.9 Mtpa
1.5 to 2.0 Mtpa
1.5 to 2.0 Mtpa direct shipping ore
15 Mtpa concentrate
6 Mtpa DSO
3 Mtpa expandable to 5 Mtpa
Initially 5Mtpa Sulphides then 8Mtpa Oxides for 34 ktpa Cu
55 Mtpa
4.5 Mtpa
3.5 Mtpa
2 Mtpa for 8.85 ktpa of contained Ni
70 Mtpa ore
50 Mtpa
20 ktpa Pb; 1 Moz/ann Ag
100,000 oz per annum of Gold
6.5 Mtpa of magnetite concentrate (69%Fe)
100ktpa
20 Mtpa for 11 ktpa of Mo and 12 ktpa of Cu in Concentrates
1.0 Mtpa
Unknown (300MW Cogeneration)
4.0 - 5.0 Mtpa
Expansion to 600ktpa
1.0 Mtpa for 70,000oz/ann
3.65ktpa Zirconia, 1.13ktpa yttria, 0.6ktpa Tantalum-Niobium
0.8 Mtpa
300,000 oz/ann
1.25 Mtpa
2,700 tpa U3O8
1100 ktpa alumina
150,000 tpa plant
4 to 5 Mtpa
20 Mtpa Raw
4.5 Mtpa
2.0Mtpa for 4,000 tpa concentrate of contained WO3
increase capcity from 18 to 35 Mtpa
15 to 20 Mtpa
25 Mtpa
29 Mtpa
1,400 tpa of U3O8
75,000 ozpa
Phase 1: 20Mtpa; Ulimate 70Mtpa
2 Mtpa magnetite concentrate
1.0 Mtpa
Stage 1: 1.0 Mtpa; Stage 2: 12 Mtpa
4.34 Mtpa for up to 40,000 tpa Ni and 3,000 tpa Co
24 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
3 Mtpa
4.0 Mtpa PCI and thermal coal
440,000 tpa for 80 ktpa concentrate
Stage 1: 3.0 Mtpa; Stage 2: 5.0 Mtpa
Increase Alumina production from 3.5 to 4.6 Mtpa
3ktpa Ni expanding to 18ktpa
0.77 Mtpa magnetite concentrate
3 Mtpa
Expansion from 1.4 to 3.4 Mtpa of Alumina output
5.0 kpa U3O8
3.2 Mtpa ore for 21,000 tpa Ni and 1,400 tpa Co
Stage 1: 2.5 Mtpa
25 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Status
Under Construction
Proposed
Proposed
Proposed
Under Construction
Proposed
Under construction
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
New project, feasibility study
New project, prefeasibility study underway
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Expansion, pre-feasibility study underway
Under Construction
Proposed
Proposed
Under Construction
Proposed
Operating
Proposed
Proposed
Proposed
Under Construction
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Committed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Under Construction
Proposed
Proposed
Proposed
26 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Proposed
Proposed
Under Construction
New project, on hold
Under Construction
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Under Construction
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Under Construction
Proposed
Operating
Proposed
New project, on hold
Operating
New project, EIS and feasibility study underway
Proposed
Under Construction
Under Construction
Expansion, on hold
Under Construction
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Expansion, feasibility study underway
Under Construction
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Under Construction
Proposed
Proposed
New project, feasibility completed. On hold
27 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Feasibility study underway
Proposed
Proposed
Under Construction
Under Construction
Proposed
Proposed
Proposed
Under Construction
Proposed
Proposed
Under Construction
Proposed
Proposed
Under Construction
Proposed
Proposed
Expansion, feasibility study underway
Proposed
Expansion, feasibility study underway
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
New project, feasibility study underway
Proposed
Proposed
Proposed
Under Construction
Proposed
Proposed
RGP1: Operating; RGP2: Operating; RGP3: Operating; RGP4: Operating ; RGP5: Under Construction; RGP6: Proposed
Proposed
Proposed
Operating
Proposed
Proposed
Proposed
Proposed
Under Construction
Under Construction
Proposed
Proposed
Proposed
Proposed
Proposed Expansion
Proposed
Proposed
Proposed
Proposed
28 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Proposed
Proposed
Proposed
Proposed
Proposed
Under Construction
Care and Maintenance
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Under Construction
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Under Construction
On Hold
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Expansion, feasibility study completed. On Hold
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Under Construction
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
29 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Proposed
Proposed
Proposed
Proposed
Under Construction
Proposed
Proposed
Proposed
Under Construction
Proposed
Proposed
Proposed
30 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Comments
Upgrade of the Abbott Point coal terminal. The upgrade includes the construction of 70km of rail line costing $600M to link the m
Proposed Direct Shipping Ore project that would truck ore to Port Hedland for export
A Feasibility Study is currently being undertaken
Proposed open-cut thermal coal mine in the Galilee Basin. $2.5B rail, $2B port & $3B mine. 80Mtpa capacity. Construction to s
Open-pit mining to cease 2008. Underground production from 2007 to 2018
CHALCO need to spend $4M to complete a prefeasibility study by end May 2006. An alumina refinery is to be built on the east
Stage 3 Austar Longwall Top Caving (LTCC) mine extension
Proposed underground longwall mine producing semi-soft coking and thermal coals
Proposed open pit mine 11km east of the Jumma Mill. Plan to produce a copper concentrate with Ag and In credits plus a tin co
Bankable Feasibility Study completed July 2007. Mine Life minimum 20 years at 5 Mtpa years. Concentrate transported by 100
Plan to produce exports of 5.2 Mtpa of concentrate, 4.9 Mtpa pellets, 1.45 Mtpa HBI briquettes
Proposed nickel mine near Launceston
12 year mine life. Bankaable Feasibility Study due to be completed early 2007
Tasmanian magnesium project
Prefeasibility study completed
Vale has an option to acquire a 51% interest. Proposed multi-longwall operation producing 7 Mtpa over a 40 year mine life
Proposed thermal coal mine in the Upper Hunter Valley
Prefeasibility study underway
Proposed scheelite mine
Feasibility study underway
Smelter expansion
Construction started Dec 2007. Will use Brockman 2 infrastructure via a 35 km rail spur
Proposed gold mining project near Leonora
Includes old South Mine. Redevelopment on hold
Feasibility study completed. Ridgeway underground mine to cease in Jan 2010 and Cadia Hill open-pit to cease in 2013
Proposed $65 million mine expansion to extend the underground and open-cut operations
Construction began in mid-2009. Stage 1 exports via Brisbane. The Stage 2 project is dependent on Wiggins Island Port faciliti
Proposed heap leach operation on 140,000t of contained nickel
The project has a favourable location close to infrastructure. Plan to produce 7 Mtpa of concentrate over 20 years
Iluka is undertaking a feasibility study into building pig iron plants fed with iron oxide waste (50-65% Fe) from its mineral sands
Proposed Peak Downs expansion project with mine life at least 30 years. Includes a new coal handling and preparation plant. C
Also called North Alpha or Waratah Galilee. Proposed open-cut thermal coal mine in Galilee Basin. 500 km rail line to coast
Positive prefeasibility study announced 8/7/08. Initial 11 year mine life. Commenced a Bankable Feasibility Study
Planned 20 Mtpa open-cut thermal coal mine supplying up to 7 power stations
Feasibility underway for a 2010 start. Proposed 12 year mine life
Proposed open-cut coking coal mine near Maryborough. Initial 5 year mine life
On hold
Plans announced for expansion of Cosmos nickel mine
Includes Mt Victoria deposit. Prefeasibility study underway
Proposed open-cut coking and PCI coal mine. Mine life 21 years. Construction to commence in 2009 and includes a coal handl
Part of Gullewa Project. Bankable Feasibility Study underway
Prefeasibility study underway. Part of Forrestania Nickel Project
Was WIM250. First stage to be brought into production in 2010. Concentrates shipped to China
Feasibility study underway
Proposed coal mines near Collinsville including Cows (2010), Jax (2011), Drake (2012) & Byerwen (2012)
Mine life of 17 years. On hold
Consists of 8 gold deposits including Moolart Well and Rosemont deposits. Feasibility study completed. Mining leases granted
Proposed longwall project. Undertaking a definitive feasibility study
Inlcudes Kaiser Bill deposit. Plans for 1.5Mtpa in 2010
Planned to commence in late 2009 with a mine life of at least 20 years. Plan to produce both coking and thermal coal
31 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
The Central West Project proposes to supply coal to a 400MW mine mouth power station
Investigating the development of a 8 Mtpa underground longwall mine
Development of a decline 400m below the final Stage 7 of the open-pit
Transport to Geraldton by road (85km) then rail (240km)
Bankable Feasibility Study completed
In-situ leaching is expected to commence in early 2010. Plan to process the leachate at the nearby Beverley plant
On hold
The company has an estimated 188.5 Mt nickel and cobalt resource at Malborough near Rockhampton. The project includes a
Integrated steel plant. Evaluating alternatives in Taiwan or Western Australia. Taiwan most likely
Proposal for a billet plant in Gladstone
Kalgoorlie Nickel Project (KNP). Pilot plant 2007. Resource drilling and engineeting design by 2009. Bankable Feasibility Study
Proposed brown coal mine to supply fuel for a 1000MW clean coal technology power station. Near the current Loy Yang mine
Alcan announced its decision to proceed with increasing the refinery's capacity from 2.1 to 3.8Mtpa. Construction started late 2
EIS underway
Plan to start construction in 2nd half of 2007
Possible concentrate, pellet or pig iron production. Mine life 50 years
Proposal to process fly ash from the Hazelwood Power Station to produce magnesium
proposed Fossey mine development at the Hellyer Project
Feasibility study in progress
Project life of 6-7 years
Bankable Feasibility Study due 2nd Quarter 2007
Project consisted of constructing a mine and rail spur. Construction commenced May 2006
Approval received for expansion
Stage 1 commenced in late-2006. Direct shipping grade ore is trucked 540km by road trains to the Port of Geraldton for export.
As at Sept06 feasibility and environmental studies were well advanced
Low waste ore ratio of 1.4:1 (waste to ore). Proposed 11 year mine life. A $14M feasibility study underway
Prefeasibility Study completed Oct06. Initial mine life 6.5 years. Definitive Feasibility Study completed Dec07
DSO shipped through Geraldton. The concentrate would be transported to Geraldton via a 260km rail line. Initial mine life of 25
Kemerton TiO2 pigment plant. A decision to proceed is dependent on market factors
Extends mine life to 2031. Contruction commenced in 2008 and first coal is expected in 2012
A Bankable Feasibility Study has been completed that indicates an 8 year mine life. Environmental approval process underway
Feasibility study completed Oct 06. Initial 10 year mine life
Proposed mining project in northern NSW
FuturGas Project. Hybrid Energy to undertake a two year feasibility study into mining the Kingston Brown Coal deposit to fuel a
Feasibility study and EIS on hold. Sold to Cameco & Mitsubishi for US$495M in July 2008
Proposed $540M iron ore pellet project producing 4.5Mtpa. A scoping study was completed in February 2006
Proposed zinc and copper project near Halls Creek
The Meandu mine is now planned to be mined beyond 2012. The replacement Kunioon mine is expected to be operational som
Expansion - fourth potline
TiO2 pigment plant expansion construction is due to commence during 2008
Feasibility Study underway
Scoping study completed
Feasibility to commence mid-2009 on a calcrete type uranium deposit. Mine life 10-12 years
Feasibility Study underway. Previously called Mertondale
A feasibility study was completed in mid-2007. Also known as NORNICO Project. Mine life 4 years
Pre-feasibility underway
Previously known as Anvil Hill. Construction strated Aug08. Mine life 18 years
Project on hold
A "free digging" detritals project with some DSO. A pre-feasibility study to be completed by mid-2009
EIS released April 2007. Definitive Feasibility Study due 3rd Quarter 2007.
32 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Feasibility study underway. Plan to use GEOCOAT technology to process ore
Proposed open-cut mine in the Gunnedah Basin
A $50M expansion to extend the mine's life until 2034
In 2007 a bulk sample was taken. Commercial open-cut mining is expected to start in late 2009
The deposit lies within 15 km of BHP Billiton's rail line
Completed a Definitive Feasibility Study in Dec 2006 - Molyhil is economically viable. Considering a 5 year initial mine life
Proposed open-cut thermal coal mine
Construction commenced in late 2008
Proposed underground longwall mine producing coking coal
Prefeasibility study underway. Propose to use flyash from the Hazelwood Power Station
MAC20 is planned to raise open-cut production from 11.5 to 15 Mtpa from 2011
Proposed tungsten project in NQ
Also called Silver Hill. Proposed 6 year mine life. Feasibility study underway
Bankable Feasibility Study commenced in January 2008 and is due for completion in Sept08
Proposed tin mine in North Queensland
Scoping study completed. Bankable feasibility due in 2009
BHPBilliton to spend up to $650M revamping processing facilities to lift output by 25,000 tpa by installing a low pressure acid le
Proposed mining project near Burnie
Plan to commence production in March 2011 subject to approvals
Called the Central Yilgarn Iron Ore Project. Plan to truck ore 110 km to Menzies then rail to Esperance
Plan to produce about 35,000 oz/ann. Plan to relocate the 750ktpa Kundana CIP plant
Proposed open-cut thermal coal mine in the Hunter Valley
Proposal to truck ore 85km to Morawa rail siding then railed 200 km to Geraldton. Planned six year mine life
Proposed mining project in North Queensland
Platinum-Palladium Project
Proposed 1.2Mtpa gold ore project in Murchison District which includes the Tuckabianna deposit
Proposed mine near Broken Hill
proposed upgrade of the Narngulu processing facility to treat heavy mineral concentrate from Jacinth-Ambrosia project in South
Initially a Contiuous Miner operation followed by a Longwall operation
Proposed brown coal mine to supply fuel to an 800MW integrated drying gasification combined cycle power station. HRL propo
A desktop study found that an open-pit mine could produce 0.1 Mtpa for 10 years for coal washeries
Rapid Growth Project 1 (RGP1) included increasing capacity at Mining Area C from 15 to 23 Mtpa. RGP2 included developemt
Includes Daybreak deposit. Prefeasibility study underway
Proposed longwall mine
In January 2008 construction commenced on the NCIG coal terminal which is due for completion in 2010
Includes Mt Kilkenny, Hepi and Eucalyptus deposits. Prefeasibility Study completed May 2007. Bankable Feasibility Study due i
Undertaking a $24M feasibility study. Construction to commence in 2009 and operations start 2010 with a plus 20 year mine lif
Scoping study completed in August 2006. Planned 20 year mine life
Feasibility study underway
New underground block cave on the E48 Orebody. Construction commenced late 2006. Mine life 6 years.
A Channel Iron Deposit project with an initial life of 8 years. A Pisolite fines product to be exported via Fortescue Metals Group
Initial production from the Golden Gate open-cut. Plans for 6 pits
The Geraldton Iron Ore Alliance is proposing to develop a port and rail network for proposed mines in the Mid-West region of W
Includes port facilities and a 465km rail line to Mt Weld iron project
Proposed open-cut mine with a life of about 10 years
A $50 million two year study underway. A 4 year prestrip would create a waste stockpile 6kmx6km and 130m high. 350ktpa und
A tailings retreatment project using a magnetic separation plant. Exports via Townsville
Seeking government approvals. Mine life of 8 years
Proposed iron ore project near Marvel Loch
Direct Shipping Ore project with a mine life of 7 years
33 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Feasibility study completed. Trilogy and Kundip orebodies to be mined over 4 years
Proposed direct shipping ore project near Yandi
The proposed expansion is contingent of Alocoa finding a cheap source of electricity
To produce 20,000 tpa zinc and 3,000 tpa lead. Scoping Study completed May 2007. Bankable Feasibility Study due in April 20
Proposed Marra mamba mine
Mine life 5 years at a cash operating cost of $504 per oz
Plan to reopen the open-cut mixed nickel-cobalt hydroxide operation previously owned by BHP Billiton
Proposed coal mine in the Hunter Valley
10 year mine life with a breakeven of $US1.80 to 2.00 per pound. Feasibility Study due in early 2008
Direct shipping ore can be trucked 170km to Wyndham for export
Proposed magnetite mine near the Pardoo mine
Also known as East Pilbara Project and inclides Davidson Creek. Proposed direct shipping ore project that would truck ore to th
Definitive Feasibility Study due July 2008. Initial 10 year mine life
Feasibility study completed Sept06. Planned 8.5 year mine life
A Marra Mamba mine is due to commence in 2011
Replacement for Drayton pits. Environmental and preliminary feasibility studies underway
Proposed open-pit mine and brown coal to liquids processing plant (270 million litres of oil per annum)
Bankable feasibility study completed.
Also called Balmoral Central. Plan to export 27.6 Mtpa of concentrate and pellets over 25 years
Proposed iron ore project includes rail line
Proposed lead silver mine near Kunnunurra
Feasibility study completed
A $13M Bankable Feasibility Study was completed in early 2006. The concentrate would be transported to Albany in a slurry pip
Prefeasibility study undertaken
Bankable Feasibility Study completed. Construction to commence in April 2008. July 2009 start-up. Initial 10 year mine life
Proposed iron ore mine with an initial 5 year life. Ore trucked 170 km to Port Hedland for export
Conducting a feasibility into a coking facilities
4th potline investment decision expected in 2005
Includes Wyoming and Caloma Deposits. A prefeasibility study indicated a 4 year 70,000oz/ann project. Bankable Feasibility St
Feasibility study completed. Planning a demonstration plant
Feasibility study underway
Construction to start in 2010. High costs due to remoteness. Initial mine life 10 years
Feasibility study underway
Prefeasibility underway
Wagerup bauxite refinery expansion - Unit 3 - 2.6 to 4.7 Mtpa. WA Gov't granted approval for the expansion in Sept06
Gold recovered by both gravity and froth flotation methods. Feasibility study for Eureka Project due for completion in late 2007
Environmental and mine feasibility studies are being prepared
14 Mtpa washed coal per annum. Decision to proceed expected in 2009. Requires development of Southern Missing Rail Link
Involves the construction of a separation plant onsite and the mining of a multi-mineral eluvial resource
The project is at the feasibility stage. BFS due Sept 2008. Mine life about 10 years
Expansion could go as high as 50 Mtpa. Rio is seeking approval to build a new harbour that could ship 63 Mtpa
Plan to rail hematite 390km to the Port of Oakjee
Proposed pisolite project based on three deposits located near Pannawonica
US$149M feasibility study using Tom Price infrastructure. Brockman ore type
Scoping study completed
2.2 Mtpa processing plant. Seven year mine life. Cash cost $555/oz
Preliminary engineering work has begun for the proposed coal terminal
Proposed magnetite mine. Feasibility Study due to be completed end 2008
Hematite resource being evaluated for Direct Shipping Ore operation
Stage 1 plan to truck ore to Leonora and then rail to Esperance; Stage 2 a 300 km rail line to either Oakajee or Esperance
A feasibility study was completed in Sept08 for an initial 39 year mine life
34 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Proposed open pit phosphate mine. Plan to truck beneficiated ore 230km west to Tennant Creek then rail to Darwin
Located about 30 km north of Moura rail line near Baralaba
Prefeasibility study determined an 8 year underground mine life. Feasibility study to precede development in 2011
Previously known as Guluguba. A planned two stage development in the Surat Basin
Construction started May 2008. Expansion of mining operations, additional refinery capacity and upgraded port facilities
Prefeasibility study underway for a potential 2008 start-up
A 2.4 Mtpa Yogi mine would produce 0.5 Mtpa of +96% iron ingots for export
Straits Salt Pty Ltd is currently investigating the feasibility of producing up to 10 Mtpa of salt in the eastern Exmouth Gulf area. P
The Yarwun Alumina Refinery expansion commenced in 3rd Quarter 2007 and is due for completion in 2nd half of 2011
Construction is expected to start in 2011. The deposit is 9km long by 1.5 km wide
Includes Jump-up Dam. The Sept 08 Scoping Study identified an 18 year mine life
Proposed hematite mine with ore trucked to Trans Australia rail line siding
35 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Employment
osting $600M to link the mines of Central Queensland to Abbott Point. Plans exist for the X80 expansion to 80 Mtpa
Construction: up to 2500; Operations: up to 1600
780 Operating (1500 during construction)
3,800 construction; 600 operating
and In credits plus a tin concentrate. Feasibility Study completed May08. Mine life 7 years
Unknown
Construction: 100; Operations: 40
150 Operational phase, 66 Operational phase
Unknown
Operating: 500
Construction: 60; Operation: 100
120 Construction phase, 80 Operational phase
Unknown
Construction: 50; Operation: 90
Construction: 1500; Operation: 800
Stage 1-Construction: 100; Operation: 100
Unknown
Unknown
340
Construction: 2200; Operation: 760
Unknown
Construction: 625
Construction: 200; Operation: 120
Unknown
100
350
65
Construction: 100; Operation: 65
Unknown
Construction: 350; Operation: 385
Unknown
nd thermal coal
36 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
150 Construction phase, 40 Operational phase
Unknown
Construction: 400; Operating: 300
Unknown
Construction: 700; Operating 350
Unknown
Operations: 600
Unknown
Unknown
1700 Construction phase, 120 Operational phase
Construction: 800; Operation: 300
Unknown
Construction: 120; Operation: 60
Unknown
1000 Construction phase, 300 Operational phase
110 Operational phase
rt of Geraldton for export. Stage2: 25 Mtpa operation and includes the construction of a 380 km railway and port infrastructure
100 Construction phase, 50 Operational phase
150 operations and 300 construction jobs
line. Initial mine life of 25 years
500 Construction phase, 200 Operational phase
Operation: 30
150 Construction; 100 Operations
wn Coal deposit to fuel a 150 to 300 MW power station
Unknown
Construction: 220; Operation: 260
Unknown
200 Construction phase, 65 Operational phase
Unknown
Unknown
1000 Construction phase, 300 Operational phase
37 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Unknown
Construction: 250; Operations: 175
400 Operational phase
year initial mine life
Construction: 1200
Unknown
Unknown
Operations: 49
Unknown
Unknown
Operations: 160
2529 Construction phase, na Operational phase
Construction: 80; Operation: 40
Construction: 700; Operation: 340
Unknown
Unknown
Ambrosia project in South Australia
Unknown
GP2 included developemt of Orebody 18. RGP3 involves increasing AreaC production to 42 Mtpa. RGP4 raised total production to 155 Mtpa
65
ble Feasibility Study due in June 2008. Minimum mine life 20 years. Mixed sulphide product
60
Unknown
Construction: 40; Operations: 144
the Mid-West region of WA
Unknown
Unknown
Construction: 45; Operations: 25
Construction: 176; Operation: 150
Unknown
38 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Unknown
Unknown
bility Study due in April 2008.
Operations: 600
Operations: 500
t that would truck ore to the Jimblebar mine then rail to Port Hedland
Unknown
Unknown
Unknown
ed to Albany in a slurry pipeline. Includes a pellet plant in Malaysia
Unknown
tial 10 year mine life
200 Operational phase
Unknown
Operating: 70
Unknown
Unknown
Unknown
1500 Construction phase, 260 Operational phase
completion in late 2007
Operation: 300
Construction: 1375; Operation: 844
Unknown
Unknown
akajee or Esperance
Unknown
39 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
rail to Darwin
Construction: 150; Operation: 250
2700 Construction Jobs
Unknown
tern Exmouth Gulf area. Plan to produce 3 Mtpa. Approvals expected in 2007
n 2nd half of 2011
Construction: 700; Operation: 300
40 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Location
Near Bowen, Qld
100 km south of Port Hedland
50km west of Kidston, Qld
55km NW of Alpha, Qld
120km SW of Kununurra, WA
Cape York Penisula, North Queensland
Hunter Valley
30 km SW of Newcastle, NSW
7km west of Herberton
100 km SW of Port Hedland, WA
30 km from Cape Preston and 80km SW of Dampier, WA
4km west of Beaconsfield
80km north of Sandstone, WA
85 km S of Darwin, NT
Bell Bay, Tas
10 km SW of Kalgoorlie
Near Moura, Qld
20 km north of Scone
329 km NW of Alice Springs, NT
220km NW of Newman
20 km SE of Mudgee, NSW
Gladstone, Qld
Pilbara, WA
60km N of Leonora
Broken Hill, NSW
SSW of Orange, NSW
10 km NW Singleton, NSW
Between Miles and Chinchilla
20km NW of Ora Band, WA
10km from the port of Cape Lambert, WA
Capel
20 km SW of Moranbah, Qld
Near Alpha, Qld
40km NE of Cloncurry
60km east of Dubbo
Near Shark Bay, 250km N of Geraldton
Near Maryborough, Qld
5km North of Molong, NSW
50km N of Leinster, WA
154km West of Broken Hill, SA
25 km SE of Moranbah
200km East of Geraldton, WA
100km South of Southern Cross, WA
66 km NW of Horsham
SE of Geraldton, WA
Near Collinsville in NQ
85 km NE of Mount Isa, QLD
60km N of Laverton
East of the Peak Downs mine
70km SE of Georgetown
175km west of Mackay
41 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
8km North of Eneabba, WA
40km East of Emerald, Central Queensland
115km east of Mt Isa, Qld
Cape Range, near Exmouth, WA
350km NNE of Perth
350km NNE of Perth
Near the Beverley mine, South Australia
Gladstone, Qld
Gladstone, Qld
Gladstone, Qld
Gladstone, Queensland
85km N of Kalgoorlie, WA
La Trobe Valley, Vic
Gove, NT
8 km north of Moranbah, Qld
130km north east of Alice Springs
115 km south of Coober Pedy
150 km E of Melbourne, Vic
Near Burnie in NW Tasmania
Near Nymagee, NSW
420 km NE of Adelaide, SA
60km SSE of Wiluna, WA
Pilbara, WA
24 km north of Singleton
230 km E of Darwin, NT
380 km NE of Geraldton, WA
Jangardup South, WA
NW of Broken Hill, SA
Mt Lofty Ranges, SA
260km East of Geraldton, WA
Kemerton, WA
40 km NE of Emerald, Qld
70km South of Perth
Near Grassy
20km east of Glen Innes
250km south east of Adelaide
400km ESE of Port Hedland
120km SE of Geraldton, WA
20km SW of Halls Creek
Kingaroy
Kurri Kurri, NSW
Kwinana, WA
140 km NW of Mt Isa, Qld
130 km SE of Wiluna, WA
17km SE of Wiluna, WA
30 km NE of Leonora
140km by road from Townsville, Qld
12 km south of Braidwood
Near Muswellbrook, NSW
450km SW of Port Hedland, WA
100km NW of Newman, WA
70 km NW of Rockhampton, Qld
42 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Pilbara region 100km SE of Nifty mine, WA
25km East of Katherine, NT
20 km NE of Boggabri
Near Wollongong
10km north east of the German Creek mine
60 km NW of Newman, WA
230km north east of Alice Springs, NT
120km south of Gladstone
30km North of Mudgee
4km south of Moranbah
Near Morwell, Vic
Near Muswellbrook
120km NW of Cairns
45 km NW of Collinsville
5km east of Ravensthorpe
Near Mt Garnet
94km NE of Leigh Creek, SA
S of Wiluna, WA
100km SSW Burnie
100 km NW of Murrin Murrin, WA
40km SW of Kalgoorlie
112 km NW of Menzies, WA
38km SW of Rockhampton
5 km W of Muswellbrook
260km East of Geraldton, WA
16km NW of Chillagoe
Near Karratha
600km NE of Perth
60 km SW of Broken Hill
Near Geraldton, WA
Near Boggabri, NSW
La Trobe Valley, Vic
NW Tasmania
Pilbara Region, WA
130km South of Southern Cross, WA
East of the Saraji mine
Newcastle, NSW
35km SSE of Murrin Murrin
135 km north west of Alice Springs
Near Greenvale, Qld
20 km south of Norseman
27km north of Parkes, New South Wales
140 km north of Newman
185 km NE of Newman, WA
23 km North of Geraldton, WA
20km North of Geraldton, WA
30 km south of Coppabella
Roxby Downs, SA
150km south of Cloncurry, Qld
100km SE of Port Hedland, WA
300km east of perth
90 km SE of Coober Pedy, SA
43 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
170km W of Esperance, WA
10km east of Yandi mine
Point Danger
60 km SW of Newman, WA
280 km south of Port Hedland
Near Kalgoorlie, WA
Near Ravensthorpe in WA
18 km NW of Singleton
Zeehan, Tas
120km South of Wyndham
75 km east of Port Hedland
50 km east of Jimblebar mine
15km wnw of Cloncurry, Qld
60km NW of Cloncurry, Qld
Pilbara Region
15km SW of Muswellbrook, NSW
100km north of Esperance
Near Karratha, WA
Fortescue 80 km SW of Karratha WA
Pilbara Region
50km north of Kunnunarra
110 km NE of Kalgoorlie
80km NE of Albany
110km S of Wyndham
50km NE of Marble Bar in Pilbara Region, WA
170 km east of Port Hedland
Near Rockhampton, Central Qld
45 km SW of Blackwater
Near Newcastle, NSW
North of Parkes, NSW
Near Dubbo
Near Ravensthorpe, WA
400km NE of Kalgoorlie
NE of Ceduna, SA
25km North of Mt Isa
Darling Ranges, WA
180km east of Melbourne
NW of Wyong
60 km north of Miles
70km SW of Bundaberg
140km NW of Cairns
Weipa, north Queensland
50km NW of Cue, WA
50km south west of Pannawonica
near Tom Price
156km NW of Burketown, Qld
50km W of Southern Cross, WA
Gladstone, Qld
90km west north west of Whyalla
30 km SE of Lock, SA
40 km west of Wiluna, WA
Near WA, SA and NT border in Western Australia
44 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
230km east of Tennant Creek, Northern Territory
Near Moura, Central Queensland
Near Goulbourn, New South Wales
300 km NW of Brisbane, Qld
Near Bunbury, WA
75km SSE of Wiluna, WA
230 km ENE of Geraldton, WA
80km south of Onslow, WA
10km NW of Gladstone
400 km north of Kalgoorlie
150km NE of Kalgoorlie, WA WA
60 km north of Koolyanobbing
45 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Reference
Media Releases
Atlas iron website
ASX Announcement (30/8/07); ABARE project list (4/09)
www.longwalls.com (29/10/08); www.abc.net.au (27/10/08)
Underground Equipment and Technology (July 2004); Rio Tinto Press Release (8/12/05); WA Prospect Magazine (March 2006
News Release by Premier Beattie (2/3/06); Courier Mail (4/3/06)
AIMR2010
Centennial Coal Annual Report 2008
Queensland Mining and Petroleum Industries 2006 (Dept of Mines and Water); Media Release (9/5/08)
Quarterly Report (Dec05); Quarterly Report (March 2007); ASX Announcement (18/7/07)
ASX Release (7/8/06); www.austresources.com.au (2/12/08)
ABARE Project List (4/10)
www.miningnews.net (13/2/06)
ABARE project list (4/09)
ASX Announcement (20/7/05); www.longwalls.com (25/8/08)
ABARE project list (Oct 2010)
www.abare.gov.au (11/08)
ABARE Project List (4/10)
www.abare.gov.au list of major project (April 07)
Unknown
Media (2006); Rio Tinto website
ABARE Project List (4/10)
Investment Monitor - Access Economics (June 2004); Australian (31/7/06); ASX Announcement (6/8/07); ABARE project list (4
Underground Equipment and Technology (July 2004); www.miningnews.net (13/12/04); ABARE project list (4/09)
www.abc.net.au (6/6/08)
www.thechronicle.com.au (12/6/09)
Media Release (26/9/07); ASX Announcement (6/3/08)
Findlay & Co Stockbrokers Ltd (16/1/06); www.capelam.com.au (27/11/08)
The Australian (19/8/05)
BMA Coal Fact Sheet (11/08)
www.longwalls.com (29/10/08); ABARE project list (4/09)
Dept of NRM - Queensland Mineral Projects (2004 & 2006); www.miningnews.net (22/3/04 & 12/10/04); ASX Announcement (2
www.dailyliberal.com.au (11/5/10)
Investment Monitor - Access Economics (June 2004); ASX Release (13/12/04); ASX Announcement (26/3/07); ABARE project
ASX Release www.northernenergy.com.au (4/12/08)
ABARE project list (4/07 & 4/09)
Investment Monitor (Access Economics (August 2004); ASX Announcement (5/9/06)
www.abare.gov.au list of major project (April 07)
BMA Coal Fact Sheet (11/08)
ABARE project list (4/07 & 4/09)
www.abare.gov.au list of major projects (April 07)
Astron Ltd Announcement (25/8/05); ABARE project list (4/09)
Investment Monitor - Access Economics (June 2004); ABARE project list (4/09)
ABARE Project List (4/10)
Dept NRM - Queensland Mineral Projects (2004); Australian Mining Monthly (8/06); The Australian (19/12/06); ABARE project l
Regiser of Ausralian Mining 2004/05; www.regisresources.com.au (4/9/07); ABARE project list (4/09)
Aquila Resources website; www.longwalls.com (3/11/08)
Queensland Mining and Petroleum Industries 2006 (Dept of Mines and water); ABARE project list (4/09)
Final Report - Initial Advice Statement (August 2007)
46 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
June Quarterly Report 2004; AGM (29/11/04); Australian Mining Monthly (Nov07); Media Release (21/11/07)
News Release; AIMR2010
www.miningnewspremium.net (6/12/07)
Mt Gibson Iron website (6/7/09); Quarterly Report (June 2006)
Resource Stocks magazine (April/May 2004); Quarterly Report (June 2006); ABARE project list (4/09)
www.miningnewspremium.net (28/4/08); Australian (26/9/08); ABARE project list (4/09)
Investment Monitor - Access Economics (June 2004)
The Australian (6/10/05)
Investment Monitor - Access Economics (June 2004)
ABARE Project List (4/10)
Investment Monitor - Access Economics (June 2004); Australian Financial Review (8/7/04); www.miningnews.net (19/10/05)
Loy Yang Power Media Release (17/7/02)
Register of Australian Mining 2004/05; www.minmet.com.au (10/9/04); Media Release (10/9/04)
Australian Mining Monthly (June 2004); ABARE project list (4/09)
ASX Release (12 September 2005); Presentation (13/11/06)
www.minebox.com (28/8/06); AIMR2008; ABARE project list (4/09)
Register of Australian Mining 2004/05; ASX Announcement (29/11/07)
www.miningnewspremium.net (19/1/10)
ASX Announcement (13/4/05); March Quarterly Report 2006
News Release (1 Nov 2004);News Release (29/8/06); ABARE project list (4/09)
Investment Monitor - Access Economics (June 2004); www.lionore.com (3/9/07)
Media Release (27/4/06); Rio Tinto and Hancock Prospecting websites
ABARE project list (4/09)
www.theajmonline.com (13/12/04); Murchison Metals website; ASX Release (20/3/06); www.miningnews.net (26/6/06); Murchu
Prospect (June-August 2004)
ASX Announcement (15/2/05); www.miningnews.net (16/2/06); ABARE project list (4/09)
Adelaide Advertiser (20/10/05); ASX Announcement (18/10/06); ASX Announcement (18/12/07)
Gindalbie website and Media Releases; ASX Announcement (5/7/06); ABARE project list (4/09)
Prospect (June-August 2004)
AIMR2008
ASX Release (15 September 2005); Presentation (13/11/06); ABARE project list (4/09)
www.miningnews.net (6/08/2004 & 17/1/05); ASX Announcement (6/10/05 & 10/2/06)
ABARE Project List (4/10)
Strike Oil ASX Announcement (17/10/07)
Investment Monitor - Access Economics (June 2004); www.news.com.au (11/7/08)
Midwest website and Media Releases
ABARE Project List (4/10)
Tarong Energy website; ABARE project list (4/09); Tarong News Release (21/4/09)
Unknown
www.minebox.com (31/3/08)
Investment Monitor _Access Economics (June 2004); www.miningnews.net (1/2/06); ABARE project list (4/09)
www.abare.gov.au (11/08)
www.abare.gov.au list of major projects (April 07); ASX Release (23/9/08)
ABARE project list (4/09)
ASX Announcement (29/9/05); www.miningnews.net (9/3/06); ASX Announcement (5/7/07)
ABARE project list (4/09)
September 2004 Quarterly Report; Media Releases (2007)
Investment Monitor - Access Economics (June 2004)
Presentation at AGM (15/11/07); Company website; ABARE project list (4/09)
www.intierra.com (3/9/07)
47 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Investment Monitor - Access Economics (June 2004); www.intierra.com (4/9/07)
www.abare.gov.au (April 07)
www.longwalls.com (13/7/10)
www.abc.net.au (26/11/08 & 3/12/08)
Macarthur Coal website (2/7/09)
Media Release (12/5/06); Open Briefing (6/3/06)
www.minebox.com (6/4/06); Media Release (Oct07)
ABARE project list (4/09)
Felix Resources website (2005 and 23/11/06); www.abc.net.au (26/11/08)
ABARE project list (4/09)
Investment Monitor - Access Economics (June 2004)
BHP Billiton website; ABARE project list (4/09)
ABARE Project List (4/10)
ABARE project list (4/09); Conquest Mining website (15/7/09)
ASX Announcement (13/12/07)&(4/3/08)
ABARE Project List (4/10)
ABARE project list (4/07); ABARE project list (4/09)
Prospect (June-August 2004); The West Australian (7/12/04); The Australian (7/12/04)
ABARE Project List (4/10)
www.reedresources.com (20/8/10)
www.miningnews.net (7/9/06)
The Australian (8/1/07); Media Release (28/11/07); ABARE project list (4/09)
ABARE project list (4/09)
Gindalbie Gold website
ABARE Project List (4/10)
ABARE Project List (4/10)
ABARE project list (4/09)
WA Prospect magazine (Sept-Nov 08)
Whitehaven Coal Ltd website (3/12/07)
Media Release by Dept of Energy and Resources (17/7/02)
ASX Release (15/5/06)
BHPBilliton website and Media Releases (RPG3&4 - 20/10/05); News Release (25/7/06); BHPBilliton website
www.abare.gov.au list of major projects (April 07)
Interim Report 31st January 2008; Quarterly Activities Report (31/10/08)
Media Releases
ASX Announcement (14/5/07)
Presentation by Alistar Stephens (MD)(February 2007); www.abc.net.au (16/4/08)
Investment Monitor - Access Economics (June 2004); ASX Announcement (23/8/06)
ABARE project list (4/09)
Weekend Australian (17-18/2/07); ABARE project list (4/09)
ASX Announcement (3/7/09)
Australian Financial Review (3/4/06); www.miningnews.net (18/8/10)
Australian Mining Monthly (July 2006); www.miningnews.net (26/6/06)
www.abare.gov.au list of major projects (April 07)
Quarterly Report (Dec05); www.macarthurcoal.com.au (3/12/08)
Australian Mining Monthly (July 2004)
www.dip.qld.gov.au (1/12/08)
Underground Equipment and Technology (July 2004); www.cbhresources.com.au (24/8/07)
ABARE Project List (4/10)
www.minebox.com (28/8/06); AIMR2008); ABARE project list (4/09)
48 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Investment Monitor - Access Economics; www.miningnews.net (22/11/05)
Company website
www.miningnews.net (5/8/2004)
www.miningnews.net (11/7/06); ASX Announcement (31/5/07); ASX Announcement (4/10/07)
Company website (2009)
www.miningnewspremium.net (1/8/08)
WA Prospect Magazine (June-August 2010)
ABARE Project List (4/10)
Bluestone Tin website (March 2005); http://metalsx.com.au (4/9/07)
Company website and Media Releases; EPBC Referral (25/510)
ABARE project list (4/09)
Company website
Courier Mail (4/12/07)
Register of Australian Mining 2004/05; Media Release - Universal Resources (9/9/04); www.miningnews.net (10/2/04); ASX An
ABARE project list (4/09)
Investment Monitor - Access Economics (June 2004)
Spitfire Oil website
www.minmet.com.au (16/9/04)
The West Australian (3/4/06); Canberra Times (4/4/06);(www.miningnews.net (7/7/06); www.citicpacificmining.com (30/4/08)
ABARE Project List (4/10)
ABARE Project List (4/10)
ABARE project list (4/09)
Grange Resources websites and Media Releases
Investment Monitor - Access Economics (June 2004); www.intierra.com (5/9/07)
www.minebox.com (15/3/05); www.miningnews.net (20/2/06); ASX Announcement (2/8/07); ASX Announcement (25/9/07)
ASX Announcement (4/6/09)
ASX Release (16/12/04); Australian Financial Review (17/12/04)
Investment Monitor - Access Economics (June 2004)
Underground Equipment and Technology (July 2004); www.miningnews.net (4/5/06); www.alkane.com.au (5/9/07)
Investment Monitor - Access Economics (June 2004)
Investment Monitor - Access Economics (June 2004)
www.smh.com.au (8/8/07)
Investment Monitor - Access Economics (June 2004); www.miningnews.net (23/6/04); Helix website (5/9/07)
www.abare.gov.au list of major projects (April 07)
Media Release (3/8/07)
Investment Monitor - Access Economics (June 2004); project website (2007); ABARE project list (4/09)
Australian Financial Review (30/4/07)
Dept NRM - Queensland Mineral Projects (2004)
Queensland Mining and Petroleum Industries 2006 (Dept of Mines and Water); March 08 Quarterly Report
The Australian (10/9/08)
Midwest website and Media Releases
Company websites
ABARE project list (4/09)
www.abare.gov.au list of major projects (April 07)
www.miningnews.net (13/08/2004 and 14/4/04); Media Release (21/7/06)
www.longwalls.com (4/5/06)
Company website
Media Release (28/7/06)
www.miningnews.net (17/8/06)
www.miningnewspremium.net (13/4/07); Press Release (12/9/08)
49 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Australian Mining Monthly (Mrach 2008)
Cockatoo Coal website (2006); ABARE project list (4/09)
Media Release (2/4/07)
ASX Announcement (4/12/08)
West Australian (24/5/05); BHP Billition News Release (16/08)(1/5/08)
Investment Monitor - Access Economics (June 2004)
www.miningnews.net (1/8/06)
WA Prospect Magazine (June-August 2005); Euroz Coneference (3/07)
Rio Tinto News Release (3/7/07)
Australian (22/5/09)
www.abare.gov.au list of major projects (April 07); Heron website (23/8/07); ASX Release (12/9/08)
ABARE project list (4/09)
50 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Capital_expenditure
$770 million
$38.5 million
$60 million
$7.5 billion
A$1013 million plus $200 million on open-pit "cut-back"
$3.0 billion
$80 million
Unknown
$47 million
$1,000 million
US$2.6 billion
$90 million
$256 million
$127 million
$800 million
$23 million
$1.0 billion
$50 to $100 million
$70 million
$111.6 million
$50 million
$1 billion
US$1,521 million
$25M
$110 million
$2.0 billion
$65 million
Stage 1: $250 million
$865 million
$600 million
$200 to $250M
Unknown
$5.3 billion
$209 million
$1.3 billion
$100 million
$35 million
$330 million
$130 million
$160 million
Unknown
$30 million
$40 million
$125 million
$50 million
Unknown
$500 million
$125 million
$892 million
$122 million
Unknown
51 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
$1.0 billion (includes power plant)
Unknown
$26 million
$45 million
$100 million
$820 million
$90 million
$200 million Stage 1, $100 million Stage 2
$1.3 billion
$2.8 billion
$1.0 billion
$1.4 billion
Up to $5 billion
$1.5 billion
$1.0 million
$4 million
$720 million
$30 million
$26 million
$43.6M
$118 million
$400 million
US$1.0 billion
$130 million
$70 million
Stage 1: $41M; Stage 2: 1.5 billion
$40 million
$250 milion
$130 million
Stage 1: $108 million Stage 2: $1.7 billion
$470 million
US$991 million
$20 million
$95 million
$81 million
Unknown
$120 million
$540M
$60-$80 million
$500 million
$850 million
$100 million
$200 million
US$85 million
$196-247 million
$45 million
$20 million
$50 million
$1.1 billion
$30 million
Unknown
$688 million
52 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
$200 million
$25 million
Unknown
$50 million
$70 million
$50 million
$60 million
$35 million
$80M Open-cut; $150M underground
$1.43 billion
$800 million
US$260 million
$50 million
$118 million
$40 million
Unknown
$400 million
$650 million
$255 million
$2.0 billion
Unknown
$31 million
$30 million
$1.3 billion
Stage 1: $94 million
$275M
$71 million
Unknown
$75 million
$60 million
Stage 1: $140M; Stage 2: $90M
Up to $4 billion
$20 million
RGP1: US$111M; RGP2: US$575M; RGP3: US1.3 billion; RGP4: US$1.4 billion; RGP5: US$1.094 billion; RGP6: $2.2 billion
$40 million
Unknown
Stage 1: $1 billion
$455 million
$75 million
$278 million
$75 million
$200 million
$43 million
$78 million
$1.6 billion
$2 to 3 billion
$50 million
$2 to 4 billion
$74 million
$213 million
$104 million
$110 million
53 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
$35 million
Unknown
$1 billion
Stage 1: $55 million
unknown
$85 million
$150 million
$900 million
$25 to $35M includes fuming
$50 million
$1.6 billion
$650 million
Unknown
$338million
unknown
$128 million
Unknown
$35 million
$5.2 billion
$2.1 billion
$100 million
$29 million
US$1.2 billion
$20 million
$1,071 million
$12 million
$1 billion
$300 million
$1.2 billion
$40 million
$90 million
$40 million
$500M to $1,000M
$20 million
$400 million
$1 billion
Unknown
$550 million
$1 billion
$41 million
$69 million
$1.0 billion
$800 million
$2 billion
unknown
$317 million
$65 million
Phase 1: $400 million
$296 million
Unknown
Unknown
$2.2 billion
54 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
$93 million
Unknown
$150 million
Unknown
US$1.9 billion
$40 million Stage 1, $650 million Stages 2&3
$437 million
Unknown
US$1.8 billion
unknown
$1.2 billion
$120 million
55 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Technology
Open-pit
Open-pit and Carbon-In-Pulp
Open-cut
Underground block caving operation
Open-pit and Refinery
Underground Longwall
Longwall
Open-pit
Open-pit, concentrator & DRI
Unknown
Open-pit
Open-pit
Underground Longwall
Open-cut
Unknown
Unknown
Smelter
Open-pit
Open-pit
Underground
Underground operation
Open-cut and underground
Open-cut
Open-pit and Heap leach
Open-pit & Concentrator
Unknown
Open-cut
Open-cut
Open-pit
Open-cut
Open-pit bucket wheel excavator and mineral separation plant
Open-cut and wash plant
Open-pit
Unknown
Open-pit
Open-cut
Open-pit and underground plus concentrator and CIL
Open-pit
Open-pit
Open-cut
Underground operation
Open-pit
Longwall
Open-pit and underground
Longwall
56 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Open-cut
Longwall and Bord & Pillar
Underground mining
Open-pit
Open-pit and magnetic concentrator
In-situ leaching (ISL)
Unknown
Refinery
Unknown
Unknown
Open-pit
Open-cut and Coal Gasification
Alumina refining
Underground longwall
Open-pit
Thermal Reduction Process
Underground
Unknown
In-Situ Leaching (ISL)
Open-pit
Open-pit
Open-cut
Open-pit
Open-pit
Open-pit
Open-pit and concentrator
Open-pit and magnetic separators
Unknown
Longwall
Open pit mining and wet processing
Initial open-pit to 180m
Unknown
Open-pit and Gasification
Open-pit
Open-pit
Unklnown
Open cut
Smelter
TRONOX patented chloride process
Underground mine
Unknown
Open-pit
Open-pit
Open-pit then Heap and Vat Leach
Open-pit
Open-cut
In-Situ Leaching
Open-pit
Open-pit & high pressure acid leach
57 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Open-pit
Underground and GEOCOAT
Open-cut
Longwall
Open-cut
Open-pit
Open-pit
Open-cut
Open-cut and Longwall
Underground longwall
Smelter
Open-cut
Unknown
Open-pit
Open-pit
Open-pit
Unknown
Open-pit
Unknown
Open-pit
Open-pit
Tailings retreatment and CIP
Open-cut
Open-pit
Unknown
Open-pit
Underground Mining
Open-cut and Coal Gasification
Open-pit and concentrator
Open-pit
Longwall
Nickel Heap Leach
Open-pit and processing plant
Open-pit and Heap Leach
Underground Block Caving Mine
Open-pit
Open-cut and Carbon-In-Pulp
Open-cut
Open-pit in Southern Orebody versus Underground
Dredge and magnetic separators
Open-pit and Concentrator
Open-pit
Open-pit
58 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Open-pit
Open-pit
Smelter
Top Down Long Hole Open Stoping
Open-pit
Open-pit & Carbon-In-Pulp
Open-cut
Unknown
Reprocessing tailings
Open-pit
Open-pit and magnetic separators
Open-pit
Flotation
Open-pit
Open-pit
Open-cut and Underground
Open-pit and coal-to-liquids
Open-pit
Open-pit and magnetite concentrator
Open-pit
Unknown
Open-pit and magnetic separators
Open-pit
Open-pit
Open-pit
Coke Ovens
Underground Longwall
Smelter
Open-pit and Underground with Carbon-In-Leach Plant
Unknown
Unknown
Open-pit and CIP
Unknown
Open-pit
Underground
Underground longwall
Open-cut
Open-pit
Open-pit
Open-pit
Open-pit
Open-pit
Open-pit
Open-pit & Acid Leach
Open-pit
Open-pit and concentrator
Open-pit
Open-pit
High pressure acid leach process
59 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Open pit
Open-cut
Underground mine and surface processing plant
Open-cut
Open-pit
Open-pit, concentrator and DRI
Refinery
Open-pit
Open-pit & Atmospheric Leaching
Open-pit
60 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Commencement
2010
2010
2011
2013
2007
2011
2012
2012
2009
2010
2010
2011
Unknown
Unknown
Unknown
2011
2014
2011
2012
2012
Unknown
Unknown
2010
2010
unknown
2012
Unknown
Stage 1: 2010; Stage 2: 2013
2011
2010
2007
2011
2012
2010
2013
2010
2010
2015
2006/07
2010
2010
2011
2009
2010
2011
2012
2011
2011
2012
2011
2009
61 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
2012
2012
2011
Unknown
2010
2011
2010
Unknown
2009
Unknown
2013
2012
2007 to 2016
2007
2012
2008
2011
Unknown
2011
2011
2010
Unknown
Stage 1: 2008; Stage 2: 2009
2011
Unknown
Stage 1: 2006; Stage 2: 2013
Unknown
2010
2011
Stage 1: 2010; Stage 2: 2011
Unknown
2012
2010
2008
Unknown
2015
Unknown
Unknown
2011
2012
Unknown
2010
2011
2011
2012-13
2010
Stage1: 2008; Stage2: 2009
2011
2012
Unknown
2012
2010
62 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Unknown
2009
2011
2011
2010
Unknown
2009
unknown
2009 Open-cut; 2012 Underground
2014
Unknown
2011
2013
2011
2010
2012
2013
2008-09
2013
Unknown
2011
2007
2009
2013
2009
2014
Unknown
2012
unknown
2010
2009
2007 to 2010
Unknown
RGP1: end 2004; RGP2: late 2006; RGP3: late 2007; RGP4: 2010; RGP5: 2011; RGP6: 2013
2011
1012
2010
Unknown
2011
Unknown
2011
2010
2010
2011
2010
2011
2009
2013
2009
2009
2011
2009
63 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
Unknown
2010
Unknown
2009
2011
2010
2011
2013
2008
Unknown
unknown
2013
2010
unknown
2011
Unknown
Unknown
Unknown
2010
Unknown
2015
2010
2010
Unknown
2009
2010
2007
Unknown
Unknown
2011
Unknown
Unknown
2013
Unknown
2012
2010
2009
2011
2011
Unknown
2010
2013
2011
2011
2010
Unknown
Unknown
2009
2010
2008
Stage 1: 2008; Stage 2: Unknown
Unknown
64 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
2010
2011
2011
2012
2011
2008
2012
2008
2011
2014
2009
2011
65 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
GDA94long GDA94lat ACCURACY EXPIRY_DATE DESCRIPTION1
148.08 -19.88 10000 Ports Corporation of Queensland
119.031 -21.452 999
143.549 -18.994 999 Renison Consolidated Mines
146.423 -23.219 999 Hancock Prospecting Pty Ltd
128.3839 -16.71445 10000 Rio Tinto
141.832 -13.365 2000
151.319134 -32.950422 0 Yanzhou Coal Mining
151.048 -33.028 999 Centennial Coal Co Ltd
145.3247531 -17.380495 2000
117.775711 -20.766037 0
116.123 -21.1442 999
146.768 -41.196 999
119.133 -27.43 1000 Reed Resources Ltd
131.05 -13.05 0 New World Alloys
146.863 -41.133 0 Bass Resources
121.388 -30.819 999
149.9360789 -24.48577611 500 Aquila Resources Ltd
150.918 -31.844 999
131.029 -22.219 999 Paladin Resources Ltd
120.463 -21.656 999
149.869295 -32.633705 0
151.3383 -23.9242 0 Comalco Ltd
117.174 -22.611 999 Rio Tinto
121.203 -28.301 999
141.4513 -31.969 10000
148.9991 -33.4582 10000 Newcrest Mining Ltd
151.144 -32.485 999
150.286 -26.58 999
120.9661 -30.22766 999
117.0778 -20.7095 0
115.561 -33.58 10000 Iluka Resources
148.145 -22.213 999 BMA
146.47 -22.76 999
140.1992 -20.5835 10000 Exco Resources
149.2507 -32.2203 999 Delta Electricity
114.1265 -26.7038 10000 Gunson Resources
152.652 -25.427 999
148.867 -33.05 999
120.576 -27.599 10000 Jubilee Mines NL
138.813 -32.02 999
148.287 -22.046 999 BMA
116.366 -28.67 999
119.811 -32.72 999 Western Areas
142.7667 -36.5137 10000
114.931 -29.251 10000 Tiwest JV
147.86 -20.42 999
140.155169 -20.253527 0
122.2733 -27.8482 10000 Regis Resources
148.1905 -22.1928 999 Aquila Resources Ltd
144.0989069 -18.50588194 250
148.254 -21.762 999
66 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
115.2265 -29.92362 1000 Aviva Corporation Ltd
148.4974811 -23.45756111 1000 Ensham Resources
140.702 -20.441 999 Xstrata
114.116666 -21.976528 0
117.1883 -29.598 0 Mt Gibson Iron Ltd
117.188 -29.56 0 Mt Gibson Iron Ltd
139.5 -30.15 10000 Heathgate Resources
151.247 -23.84 10000 Tata Iron and Steel
151.24 -23.83 10000
151.247 -23.81 10000
151.11 -23.61 999
121.1476 -30.0111 10000 Heron Resources Ltd
146.69 -38.29 10000 Loy Yang Power
136.833 -12.25 0 Alcan Gove Pty Limited
147.993 -21.876 10000 Anglo Coal Australia Pty Ltd
134.917 -23.1 10000
135.151394 -30.010875 0
146.4 -38.28 0 LaTrobe Magnesium
145.72 -41.57 999
146.3258061 -32.11111 1000
140.07129 -31.728528 0
120.379 -26.923 10000 LionOre Australia Pty Ltd
119.112161 -22.948392 0 Hancock Prospecting Pty Ltd
150.992 -32.51 999 Rio Tinto
132.896897 -12.500592 0 Rio Tinto
117.153 -26.13 10000 Murchison Metals Ltd
115.628731 -34.361925 0 Cable Sands
140.512 -31.752 1000 Havilah Resources NL
138.9959539 -34.08534806 2000
116.80051 -29.16018 1000 Gindalbie Gold
115.63 -33.33 0 Millennium Chemicals
148.3703 -23.242 999
115.9265 -32.4315 10000
144.065 -40.053 10000
151.965 -29.826 999
139.99 -36.66 999
122.0722 -23.3401 10000
116.2 -29.18 10000 Midwest Corporation
127.538 -18.321 999 Anglo Australian Resources NL
151.842 -26.711 999 Tarong Energy
151.487 -32.812 0 Hydro Aluminium
115.758 -32.248 0 Tiwest JV
139.070178 -19.771536 0 Xstrata
121.098 -27.137 999
120.358 -26.698 999
121.571 -28.688 999
145.6907461 -19.47962 100 Metallica Minerals
149.827 -35.672 999
150.67 -32.3 10000 Xstrata
115.183 -22.412 10000 Paladin Resources Ltd
119.2096 -22.5875 999
149.831057 -22.948454 0
67 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
122.31544 -22.200462 0
132.451 -14.442 999
150.177513 -30.526211 0
150.995 -34.186 999
148.63 -22.84 999 Macarthur Coal Ltd
119.4255 -22.9745 999 Consolidated Minerals Ltd
135.748 -22.759 100
151.133 -24.963 999 Macarthur Coal
149.785 -32.29 10000 Felix Resources
148.039 -22.058 999 Anglo Coal Australia
146.411 -38.235 10000 Hazelwood Power Corporation
150.85 -32.35 999 BHP Billiton
145.131 -16.62 999
147.565 -20.276 999
120.0345 -33.565763 999
145.453 -17.696 999
139.333 -30.217 999
120.546104 -27.230106 0 BHPBilliton
145.321 -41.701 999
120.983 -28.3 0 Minara Resources Ltd
121.446 -31.065 999 Reed Resources Ltd
120.3656 -29.11841 999
150.374 -23.637 999
150.84 -32.24 0 Rio Tinto
116.9025 -29.1288 1000 Gindalbie Gold
144.404 -17.12 999
116.851351 -21.1187 0 Helix Resources Ltd
118.186 -27.394 999
140.935 -32.251 999 Havilah Resources NL
114.692 -28.817 999 Iluka Resources
149.85 -30.52 999
146.23 -38.23 10000 HRL Developments
144.74 -41.17 999
118.583 -20.321 10000 BHPBilliton Iron Ore
119.679 -32.452 999 Western Areas
146.368 -22.458 999 BMA
151.785 -32.92 1000 Newcastle Port Corporation
121.806 -29.042 999
133.239 -22.594 999 Arafura Resources
145.121 -18.926 10000 Metallica Minerals
121.783 -32.413 999
148.031 -32.918 999 Rio Tinto Limited
119.8358 -22.0928 999
120.417 -21.808 100
114.64 -28.602 999
114.634 -28.566 999
148.3630661 -22.15545694 0 Macarthur Coal
136.889312 -30.440357 0 BHP Billiton
140.58 -22.093 999 Barrick Gold Corporation
119.205 -21.1497 10000
119.554 -31.619 999 Cazaly Resources
135.381 -29.588 999
68 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
120.1932 -33.6546 10000 Tectonic Resources NL
119.1866 -22.7349 999
141.5813631 -38.35441826 0 Alcoa World Alumina Australia
119.275 -23.707 999
118.692 -22.892 999
122.21 -31.043 999 Integra Mining
120.36 -33.54 999
151.039 -32.458 999 Xstrata
145.434 -41.85 10000
128.2731569 -16.60190806 1000
119.118 -20.2 999
136.436 -32.751 999
140.363 -20.678 999
140.1452 -20.1425 10000 Universal Resources
120.056 -22.564 999 Hancock Prospecting Pty Ltd
150.83 -32.43 10000 Anglo Coal Australia Pty Ltd
121.42 -32.84 999
117.541 -20.814 10000
116.146 -21.08089 999
117.522 -22.176 999 Fortescue Metals Group Ltd
128.981 -15.451 999
122.36 -30.142 999
118.502 -34.539 0 Grange Resources
127.978 -16.407 10000
120.1118 -20.88752 1000 Moly Mines Ltd
120.1118 -20.83 999 Moly Mines Ltd
150.267 -23.483 10000 Macarthur Coal
148.514973 -23.840126 0 Xstrata plc
151.715 -32.81 10000 Tomago Aluminium Co Pty Ltd
148.2167 -32.5967 10000 Alkane Exploration
148.6182 -32.4484 10000 Alkane Exploration
120.129 -33.605 10000 Tectonic Resources NL
124.5401 -29.26336 999 Independence Group
134.7598 -31.229 10000 Helix Resources Ltd
139.367 -20.387 999 Paladin Resources Ltd
115.917005 -32.918806 0 Alcoa World Alumina Australia
146.4630119 -37.91475806 999
151.381 -33.238 10000
149.906083 -26.096442 0 Xstrata plc
151.83 -25.382 10000
144.8807969 -16.33759306 250
141.872 -12.665 999 Rio Tinto
117.70141 -26.83203111 1000 Midwest Corporation
116.262 -22.199 999
117.586 -22.662 999 Rio Tinto
138.082 -17.515 999
118.699 -31.291 10000 Westonia Mines
151.217 -23.817 10000 Gladstone Port Authority
136.436 -32.751 999
135.879 -33.729 999
119.9417 -26.79891 999
128.963 -26.061 999
69 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
136.3288 -19.8985 999
149.622 -24.022 999
149.5705 -35.0629 999 Tri Origin Minerals
150.026 -26.244 999
115.99 -33.28 1000 BHP Billiton
120.5775 -27.4581 10000 BHP Billiton
116.8186 -28.34171 999
114.567 -22.183 999 Straits Resources Limited
151.143 -23.8104 999 Rio Tinto
119.903 -27.181 999 BHP Billiton
122.051 -29.714 999 Heron Resources Ltd
119.999 -30.456 999
70 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
URL1 DESCRIPTION2
http://www.pcq.com.au
http://www.rcm.com.au
http://www.hancockprospecting.com.au/
http://www.riotinto.com
http://www.yanzhoucoal.com.cn
http://www.centennialcoal.com.au
http://www.reedresources.com
http://www.newworldalloys.com
http://www.bassresources.com.au
http://www.aquilaresources.com.au
http://www.paladinresources.com.au
http://www.comalco.com
http://www.riotinto.com
http://www.newcrest.com.au
http://www.iluka.com
http://www.bmacoal.com
http://www.excoresources.com.au
http://www.de.com.au Eraring Energy
http://www.gunson.com.au
http://www.jubileemines.com.au/
http://www.bmacoal.com
http://www.westernareas.com.au
http://www.tiwest.com.au
http://www.regisresources.com/
http://www.aquilaresources.com.au
71 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
http://www.avivacorp.com.au
http://www.ensham.com.au/
http://www.xstrata.com
http://www.mtgibsoniron.com.au/
http://www.mtgibsoniron.com.au/
http://www.heathgateresources.com.au
http://www.tatasteel.com
http://www.heronresources.com.au
http://www.loyyangpower.com.au
http://www.alcangove.com.au/ Rio Tinto
http://www.anglocoal.com.au/
http://www.latrobemagnesium.com
http://www.lionore.com
http://www.hancockprospecting.com.au/ WA Dept of Industry and Resources
http://www.riotinto.com/index.asp Coal and Allied
http://www.riotinto.com Energy Resources of Australia Ltd
http://www.mml.net.au
http://www.cablesands.com.au
http://www.havilah-resources.com.au
http://www.gindalbie.com.au
http://www.millenniumchem.com
http://www.midwestcorp.com.au
http://www.anglo.com.au
http://www.tarongenergy.com.au
http://www.hydro.com
http://www.tiwest.com.au
http://www.xstrata.com
http://www.metallicaminerals.com.au
http://www.xstrata.com
http://www.paladinresources.com.au
72 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
http://www.macarthurcoal.com.au
http://www.consminerals.com.au
http://www.macarthurcoal.com.au
http://www.felixresources.com.au
http://www.anglocoal.com.au
http://www.hazelwoodpower.com.au
http://www.bhpbilliton.com
http://www.bhpbilliton.com WMC Resources Ltd
http://www.minararesources.com.au
http://www.reedresources.com
http://www.riotinto.com Coal and Allied
http://www.gindalbie.com.au
http://helix.net.au
http://www.havilah-resources.com.au
http://www.iluka.com
http://www.hrl.com.au
http://ironore.bhpbilliton.com BHP Billiton
http://www.westernareas.com.au
http://www.bmacoal.com
http://www.newportcorp.com.au
http://www.arafuraresources.com.au/
http://www.metallicaminerals.com.au
http://www.riotinto.com
http://www.macarthurcoal.com.au
http://ironore.bhpbilliton.com/developments/index.asp WMC Resources Ltd
http://www.barrick.com
http://www.cazalyresources.com.au
73 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
http://www.tectonicres.com.au
http://www.alcoa.com
http://www.integramining.com.au
http://www.xstrata.com
http://www.universalresources.com.au
http://www.hancockprospecting.com.au/
http://www.anglocoal.com.au/
http://www.fmgl.com.au
http://www.grangeresources.com.au
http://www.molymines.com
http://www.molymines.com
http://www.macarthurcoal.com.au
http://www.xstrata.com/
http://www.tomago.com.au
http://www.alkane.com.au/
http://www.alkane.com.au/
http://www.tectonicres.com.au
http://www.independencegroup.com.au
http://helix.net.au
http://www.paladinresources.com.au Summit Resources Ltd
http://www.alcoa.com Alumina Ltd
http://www.xstrata.com/
http://www.riotinto.com
http://www.midwestcorp.com.au
http://www.riotinto.com
http://www.westoniamines.com.au
http://www.gpa.org.au
74 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
http://www.trioriginminerals.com.au/
http://www.bhpbilliton.com Worsley Alumina
http://www.bhpbilliton.com
http://www.straits.com.au
http://www.riotinto.com Australian Aluminium Council
http://www.bhpbilliton.com
http://www.heronresources.com.au
75 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
URL2 DESCRIPTION3 URL3
http://www.eraring-energy.com.au Macquarie Generation http://www.macgen.com.au
76 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
http://www.riotinto.com
http://www.doir.wa.gov.au
http://www.coalandallied.com.au/
http://www.energyres.com.au
77 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
http://www.wmc.com
http://www.coalandallied.com.au/
http://www.bhpbilliton.com
http://www.wmc.com
78 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
http://www.summitresources.com.au
http://www.aluminalimited.com
79 of 80 6/22/2011 6:23 PM
D:\Docstoc\Working\pdf\161685df-09d6-4acf-8d26-3b6274b8c915.xls as at February 2010
http://worsley.geo.net.au
http://www.aluminium.org.au
80 of 80 6/22/2011 6:23 PM
Get documents about "