					         APPLICATION OF STRUCTURE
             HEALTH MONITORING ON
                   PROAMA PROJECT

AUTHORS:
Cleber Pagliosa
Luciano Arruda
João Morais
Renato Bonadiman
PARTNERS:
Amazonas State Goverment – Infra-Structure Office
FRAUNHOFER ENAS
                         PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Project Concept:
Engineering structures aftect the human lives
economically, ecologically, curturally, socially and
ergonomically. Thus, guarantee that those structures
will work proprely is fundametal.
                               PROJECT PROPOSAL
 SHM APPLICATION ON PROAMA PROJECT
 Project Concept:
 It is known that expenses with lack of reparation in
 civil structures (bridges, viaducts, water treatment
 system, etc.) costs, in Brazil, billions of dollars.
 Moreover, bad functioning of such structures can
 cause catastrophic failures which can impact in
 environment pollution, high financial cost and also
 risk of lives.

• United States has approximately 600,000 highway bridges that
  are the lifelines of economic commerce. 25% of them are either
  structurally deficient or functionally obsolete. $17 billion
  annual investment is estimated by ASCE to be needed to improve
  current bridge conditions.
                                      PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Structural Health Monitoring
In this sense Structural Health Monitoring is the process of
identifying the presence and quantifying the extent of damage in a
system based on information extracted from the measured system
response.
There is a lack of companies in Brazil which are able to apply this
technology and de application potential is enormous.



          SHM Applications


      Pipelines                             Civil Engineering
                             Oil Platform



                                                                   Aerospace

                                                                 Eolic
                                                                Turbines
                              PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Structural Health Monitoring
(SHM):

     Module 2             Module 3               Module 5
 Data Acquisition &   Data Processing &    Structural Health Data
Transmission System    Control System      Management System




                       Structural Health
                       Monitoring System       Module 4
    Module 1                (SHMS)         Structural Health
  Sensory System
                                           Evaluation System




   Finite Element &                        Report of Monitoring
   Statistic Models                              Results
                           PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Project Concept:
One of the most important interventions of the Amazonas
Goverment if favor of the civil population is the PROAMA
project. It consists in a water treatment and
distribution system which will affect about 500K people
(first stage) with capacity to affect 1.000K people
(second stage). Such intervention is highly important to
the life quality improvement of the Amazon population and
will solve historycal issues related to wather supply in
Manaus.
                         PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
PROAMA Project IMPACT:
                 1st Stage - 500K People
                         PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
PROAMA Project IMPACT:
                2nd Stage - 1.000K People
                         PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
PROAMA - General View:
                            PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
PROAMA - Detailed View:
                      Water treatment
                          center




                                           Pipeline
                                            5,000m




                                    Water Pumping
                                       System
                              PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
PROAMA - Detailed View:
                             Distribution
                                Center




                                    Pipeline
                                     3,700m




                  Water treatment
                      center
                            PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
PROAMA - Detailed View:



                      Pipeline
                       1,250m
                                     Pipeline
                                      1,520m




                 Pipeline
                  4,650m

                                                Pipeline
                                                 2,900m
                      Distribution
                         Center
                         PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Project Objective:
In this scenario the VEXSA Engineering propose, in
partership with FRAUNHOFER ENAS, is to promote the
aplication of SHM techniques in order to monitor
the integrity of selected structures of the Amazon
Goverment PROAMA Project. This project was selected
and it is supported by the Amazonas Infrastructure
Office represented by Ms. Waldívia Ferreira Alencar.
                             PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
PROAMA Proposal Scenarios:
Possible Scenarios:



     Scenario 1       Scenario 2    Scenario 3



                    Complexity,
                    Risk, Impact
                             PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
PROAMA Proposal Scenarios:

Scenario 1:
Brigde, suspended pipeline      and   pumping   system
located on the Black River.

Criteria: Bridge extention considering the river
level variation during the year; Transport of heavy
cargo; system complexity level and interaction fuid-
structure (pipeline) and bridge.
                          PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Scenario 1:
                    Water treatment
                         center




                               Water Pumping
                                  System
                         PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Scenario 1:
Brigde, suspended pipeline     and   pumping   system
located on the Black River.
                             PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
PROAMA Proposal Scenarios:

Scenario 2:
 Brigde, suspended pipeline     and    pumping   system
located on the Black River.
and
Tancredo Neves - Distribution Center

Criteria:   Pumping    system   complexity;      system
importance as distribution center.
                         PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Scenario 2:




 Distributio
   n Center




                              Water Pumping
                                 System
                         PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Scenario 2:
Tancredo Neves - Distribution Center
                             PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
PROAMA Proposal Scenarios:

Scenario 3:
 Brigde, suspended pipeline     and    pumping   system
located on the Black River.
Tancredo Neves - Distribution Center

Pipeline 8,700m (underground)         between    Pumping
Station to Distribution Center.
Criteria: Pipelines buried along the road - risk due
to traffic vibration.
                         PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Scenario 3:




 Distributio
   n Center



         Pipelines
          8,700m
                              Water Pumping
                                  System
                           PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Benefits to the Amazonas State Goverment
• Implantation of a continuous health      monitoring
  system in the selected structures;

• Improvement in the maintenance planning and
  possible future interventions reducing expenses to
  acceptable level within the economics engineering;

• Can be applied as decision making tool to the
  government engineering team;

• Public Security embracing: hospitals water supply
  and vital government systems;
                           PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Benefits to the Amazonas State Goverment
• Improvement of the production mainentance in the
  industrial, commerce and services sectors;

• Improvement of the water distribution continuity to
  the population promoting the public health and life
  quality;

• Goverment   engineering    and  technitians   team
  qualification though trainings;

• Fixation of technology local company in the State
  of Amazonas with potential to emplyment generation;
                         PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Project General Scope
• Structural and computational analysis trhough
  Finite Elements to the selected structures in order
  to identify the critic measurement points;

• In locus vibration analysis utilizing specified
  transducer equipments. This analysis is fundamental
  in order to determine the critical points through
  the correlation with resutls obtained by FE
  analysis.

• Sesors installation in order      to monitor the
  deformations and displacements    of the selected
  structures;
                         PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Project General Scope
• Instllation of temperature sensors for monitoring
  in the pumping points;
• Intallation of signal aquisition system generated
  by the sensors;
• Goverment technical team traning (2 engineers and 1
  technitian)
• Reports to be delivered according the project plan;
                                               PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Project Schedule           - Scenario 1

    1H 2010      2H 2010          2H 2010            1H 2011           2H 2011          2H 2012

       E0           E1               E2                 E3                E4               E5

   Project       Project           Process &        Solution          Final
                                  Competence                                          Handover
    Study       Planning         Development      Development      Preparation
 • Project    • Project        •Project          •Modal Analysis   •Update FEM      •SHM Monitoring
   Proposal     Detailed        Progress          (bridge and      •Model           •SHM Report
   Summary      Schedule        Report            pipeline)         Validation      •Review Reports
              • Stakeholders   •FE Analysis      •Pre-study        •Sensors         •Governmental
                               •Competence        sensors           position         Staff Training
              • Deliverable:    development in    positioning       determination
                Project Plan                                                        •SHM Monitoring
                                the sensors      •Correlation      •Sensors          Support
                                and structure     FEM/Modal         Installation    •Lessons
                                health            Analysis         •SHM              Learned
                                monitoring       •Project          •Project         •Project Final
                                                  Progress          Progress         Report
                                                  Report            Report
                                                           PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Project Budget and Infos - Scenario 1

Budget (K US$)                                       2H2010*           1H2011*     2H2011*    1H2012*    Total*

SHM Installed Equipment                              112.85            -           -          -          112.85
HR                                                   56.33             56.33       56.33      56.33      225.33
Competence Development                               34.6              34.6        -          -          69.2
Support Equipment                                    174.61            12          -          -          186.61
Software                                             165.18            -           -          -          165.18
Consumables                                          3                 3           3          3          12
Total                                                  546.58            105.93      59.33    59.33      760.18
*Values   presented in K US$ (1000 US$) – Exgange Rate 1.76 BRL = 1.00 US$


PROJECT ORGANIZATION                                                         MAIN RISKS
VEXSA EngineeringProject Execution;                                            Low risk since technique concept
FRAUNHOFER ENAS –         Support;                                             was already validated
Amazonas Goverment        Customer                                             internationally.
                                               PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Project Schedule           - Scenario 2

    1H 2010      2H 2010          2H 2010            1H 2011           2H 2011          2H 2012

       E0           E1               E2                 E3                E4               E5

   Project       Project           Process &        Solution          Final
                                  Competence                                          Handover
    Study       Planning         Development      Development      Preparation
 • Project    • Project        •Project          •Modal Analysis   •Update FEM      •SHM Monitoring
   Proposal     Detailed        Progress          (bridge and      •Model           •SHM Report
   Summary      Schedule        Report            pipeline)         Validation      •Review Reports
              • Stakeholders   •FE Analysis      •Pre-study        •Sensors         •Governmental
                               •Competence        sensors           position         Staff Training
              • Deliverable:    development in    positioning       determination
                Project Plan                                                        •SHM Monitoring
                                the sensors      •Correlation      •Sensors          Support
                                and structure     FEM/Modal         Installation    •Lessons
                                health            Analysis         •SHM              Learned
                                monitoring       •Project          •Project         •Project Final
                                                  Progress          Progress         Report
                                                  Report            Report
                                                           PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Project Budget and Infos - Scenario 2

Budget (K US$)                                       2H2010*           1H2011*     2H2011*    1H2012*    Total*

SHM Installed Equipment                              190.5             -           -          -          190.5
HR                                                   83                83          83         83         332
Competence Development                               34.6              34.6        -          -          69.2
Support Equipment                                    174.61            12          -          -          186.61
Software                                             165.18            -           -          -          165.18
Consumables                                          3                 3           3          3          12
Total                                                650.89            132.6       86         86         955.49
*Values   presented in K US$ (1000 US$) – Exgange Rate 1.76 BRL = 1.00 US$


PROJECT ORGANIZATION                                                         MAIN RISKS
VEXSA EngineeringProject Execution;                                            Low/Medium risk - the complexity of
FRAUNHOFER ENAS –         Support;                                             the system increases – new
Amazonas Goverment        Customer                                             structures and number of sensors.
                                     PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Project Schedule       - Scenario 3

   1H 2010   2H 2010       2H 2010     1H 2011   2H 2011   2H 2012

     E0        E1            E2          E3        E4        E5
                                                            PROJECT PROPOSAL
SHM APPLICATION ON PROAMA PROJECT
Project Budget and Infos - Scenario 3

Budget (K US$)                                       2H2010*           1H2011*      2H2011*    1H2012*    Total*

SHM Installed Equipment                              219.25            40           -          -          259.25
HR                                                   109.66            109.66       109.66     109.66     426.66
Competence Development                               34.6              34.6         -          -          69.2
Support Equipment                                    174.61            12           -          -          186.61
Software                                             165.18            -            -          -          165.18
Consumables                                          3                 3            3          3          12
                                                                                                          1130.9
Total
*Values presented                                    706.31            199.26
                    in K US$ (1000 US$) – Exgange Rate 1.76 BRL = 1.00 US$
                                                                                    112.66     112.66     1

PROJECT ORGANIZATION                                                         MAIN RISKS
VEXSA EngineeringProject Execution;                                            High risk - there are lack of
FRAUNHOFER ENAS –         Support;                                             information related to the
Amazonas Goverment        Customer                                             underground pipeline, number of
                                                                               sensors needed and complexity to
                                                                               install those sensors.
Thank You

				