Bid Guaranty and Contract Bond

Reviews
Shared by: RobParke
Stats
views:
7
rating:
not rated
reviews:
0
posted:
7/7/2009
language:
English
pages:
0
Bid Guaranty and Contract Bond OHIO HISTORICAL SOCIETY ▪ Historic Sites and Facilities Division ▪ 1982 Velma Ave. ▪ Columbus, Ohio Section153.571 Ohio Revised Code 43211–2497 KNOW ALL PERSONS BY THESE PRESENTS, that we, the undersigned as Principal and as Surety are hereby held and firmly bound unto the Ohio Historical Society as Obligee in the penal sum of the dollar amount of the bid submitted by the Principal to the Obligee on: to undertake the project known as: Type or print date of bid submittal . OHS Project number OHS Project Name The penal sum referred to herein shall be the dollar amount of the Principal’s bid to the Obligee, incorporating any additive and deductive alternate proposals made by the Principal on the date referred to above to the Obligee, which are accepted by the Obligee. In no case shall the penal sum exceed the amount of $ Type or print amount first in words, then numbers (When the line above is left blank, the penal sum will be the full amount of the Principal’s Bid including alternates. When the line above indicates an amount, the amount stated must not be less than the full amount of the Bid including alternates in dollars and cents; a percentage is not acceptable.) for the payment of the penal sum well and truly to be made, we hereby jointly and severally bind ourselves, our heirs, executors, administrators, successors, and assigns. THE CONDITION OF THE ABOVE OBLIGATION IS SUCH that whereas the above named Principal has submitted a bid on the above-referred project, NOW, THEREFORE, if the Obligee accepts the bid of the Principal and the Principal fails to enter into a proper contract in accordance with the bid, plans, details, specifications, and bills of material; and in the event the Principal pays to the Obligee the difference not to exceed ten percent of the penalty hereof between the amount specified in the bid and such larger amount for which the Obligee may in good faith contract with the next lowest bidder to perform the work covered by the bid; or in the event the Obligee does not award the contract to the next lowest bidder and resubmits the project for bidding, the Principal will pay the Obligee the difference not to exceed ten percent of the penalty hereof between the amount specified in the bid, or the costs, in advertising and printing and mailing notices to prospective bidders, whichever is less, then this obligation shall be null and void, otherwise to remain in full force and effect. If the Obligee accepts the bid of the Principal and the Principal, within ten days after the awarding of the contract, enters into a proper contract in accordance with the bid, plans, details, specifications, and bills of material, which said contract is made a part of this bond the same as though set forth herein; and NOW ALSO, if the Principal shall well and faithfully perform each and every condition of such contract; and indemnify the Obligee against all damage suffered by failure to perform such contract OHS BG&CB v20090501 Bid Guaranty and Contract Bond continued OHIO HISTORICAL SOCIETY ▪ Historic Sites and Facilities ▪ 1982 Velma Ave. ▪ Columbus, Ohio 43211–2497 OHS Project: OHS Project Name: according to the provisions thereof and in accordance with the plans, details, specifications, and bills of material therefore; and shall pay all lawful claims of subcontractors, materials suppliers, and laborers, for labor performed and materials furnished in the carrying forward, performing, or completing of said contract; we agreeing and assenting that this undertaking shall be for the benefit of any materials supplier or laborer having a just claim, as well as for the Obligee herein; then this obligation shall be void; otherwise the same shall remain in full force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall in no event exceed the penal amount of this obligation as herein stated. THE SURETY HEREBY STIPULATES AND AGREES that no modifications, omissions, or additions, in or to the terms of said contract or in or to the plans and specifications therefore shall in any wise affect the obligations of said Surety on its bond, and it does hereby waive notice of any such modifications, omissions or additions to the terms of the contract or to the work or to the specifications. BOND NUMBER: SIGNED AND SEALED this day of , 20 PRINCIPAL SURETY Type or type authorized officer or owner name and title Type or print Agent’s name and title (seal) Signature Signature (Attorney-in-Fact) (seal) Surety Company Address and Telephone: Street Surety Agent’s Address and Telephone: Street City, State, Zip City, State, Zip Telephone with Area Code Telephone with Area Code 2 Bid Guaranty and Contract Bond continued OHIO HISTORICAL SOCIETY ▪ Historic Sites and Facilities ▪ 1982 Velma Ave. ▪ Columbus, Ohio 43211–2497 OHS Project: OHS Project Name: NOTE: Failure by any party to sign Bid Guaranty and Contract Bond shall result in rejection of bid. 3

Related docs
BID GUARANTY AND CONTRACT BOND
Views: 15  |  Downloads: 0
Bid Guaranty and Contract Bond Form
Views: 0  |  Downloads: 0
Proposal Bid Bond
Views: 21  |  Downloads: 1
Multistate Guaranty for Bond Enhancement
Views: 11  |  Downloads: 0
10 Form of Bid Guaranty and Contract Bond
Views: 2  |  Downloads: 0
DT1303 Proposal Bid Bond
Views: 0  |  Downloads: 0
BID BOND
Views: 0  |  Downloads: 0
what does bid bond mean
Views: 2  |  Downloads: 0
FORM OF BID BOND
Views: 1  |  Downloads: 0
Bid Bond
Views: 120  |  Downloads: 4
Bid or Proposal Bond
Views: 67  |  Downloads: 1
Other docs by RobParke
civ050
Views: 123  |  Downloads: 0
Joy to the World
Views: 163  |  Downloads: 0
Here in this Place
Views: 261  |  Downloads: 0
dv140c
Views: 93  |  Downloads: 0
Marshall v Purolator
Views: 229  |  Downloads: 0
Marshall Lefkowitz Briefs
Views: 281  |  Downloads: 0
I Will Change Your Name
Views: 211  |  Downloads: 0
People v Conley
Views: 453  |  Downloads: 1
Howard v Kunto
Views: 511  |  Downloads: 4
cr112
Views: 113  |  Downloads: 0
Finding out the truth
Views: 629  |  Downloads: 11
at115
Views: 148  |  Downloads: 0
Shout Out Your Joy
Views: 258  |  Downloads: 1