World Bank ument

Document Sample
World Bank ument Powered By Docstoc
					Public Disclosure Authorized




                                        China            E294 Vol. 2



                               Sustainable Coastal Resources Development Project
Public Disclosure Authorized




                                                   (Loan 4322)



                                                Project Restructuring

                                    Environmental and Social Impact Assessment


                                                   12 March 2004
Public Disclosure Authorized




                                       Foreign Economic Cooperation Center
                                              Ministry of Agriculture
                                        Beijing, People’s Republic of China
Public Disclosure Authorized
                                     Table of Contents



1.   Consolidated Environmental Evaluation Report

2.   Tangshan, Hebei Province
       a. Tangshang Fishery Supervision and Inspection Center
       b. Construction Project of Shoal Shellfish Seedlings Aquaculture [Clam and jellyfish
           hatchery]

3.   Penglai, Yantai, Shandong Province
       a. Penglai Coastal Belt Administration Center
       b. Penglai Jinglu Fishery Company, Ltd. [High value fish processing]
       c. Penglai Beiguo Town Industry Comprehensive Effluent Treatment Project
       d. Penglai Chaoshui Chaoshui Town Comprehensive Effluent Treatment Project

4.   Xiangshan, Ningbo, Zhejiang Province
        a. Xiangshan County Coastal Belt Administration Center
        b. Construction Items of establishing Jiushan Islands Ocean Ecologic Conservation
           Zone
        c. Ningbo Chaoxiang Marine Life Product Company. Ltd. [Marine algae processing]
        d. Xiangshan Huayi Seafood Co. Ltd. [Seafood processing]
        e. Ningbo Feiri MarineIndustrial Co., Ltd. [Seafood Processing]
        f. Ningbo Xianglong Aquatic Food Company, Ltd. [Seafood Processing
        g. Xiangshan Fishing Trade and Development Co., Ltd. [Seafood wholesale market]
        h. Shipu Seafood Industrial Park [Planned waste treatment facility not financed by the
           project and will serve all components in Shipu area]

5.   Fangchenggang, Guangxi Autonomous Region
       a. Coastal Fishery Resources and Environmental Monitoring Management Center
       b. Jiaye Aquaculture Synthetically Exploiture Ltd. [Marine fish hatchery]
              i. Annex 1. Monitoring Report of Environmental Monitoring Station of
                 Fangchenggang for Fish Hatchery
       c. Yuanyi Integrated Agricultural Co., Ltd. [Marine fish cage culture]
       d. Yuanyi Integrated Agricultural Co., Ltd. [Seafood freezing]




                                             2
  CONSOLIDATED REPORT ON ENVIRONMENT EVALUATION




CHINA COASTAL RESOURCE SUSTAINABLE DEVELOPMENT

                                         PROJECT
                         (NEW SUB-PROJECTS)

   The China Coastal Resource Sustainable Development Project (CHA-4322 ) became effective
in December, 1998. The project was originally spread in the coastal provinces including Liaoning,
Shandong, Jiangsu and Fujian and its Xiamen Municipality. During MTR in 2002, some endusers
applied for a cut of their borrowing from the Bank, including U.S.$ 13 million from Fujian, U.S.$
7.69 million from Jiangsu and US$ 5.84 million to be reallocated in Shandong, totaling at US$
26.53 million. With consensus among MOF, MOA and the Bank, it has been agreed that the
withdrawn borrowing will be reallocated to new borrowers for the same purpose of the project,
with emphasis on coastal zone management and aquatic product processing while taking into
consideration small sized aquiculture. In accordance with the SAR and legal agreement of the
project, the Bank has mobilized specialists to conduct the pre-appraisal and appraisal together with
local experts on the newly proposed sub-projects in Zhejiang, Guangxi, Hebei and Shandong in the
respect of socio-eco environment, processing, institutional strengthening and finance. Now all the
newly proposed sub-projects have finished their financial guarantee, feasibility study and
environment evaluation.
 A. Briefing on new sub-project area
  1. Xiangshan County, Zhejiang Province
      Xiangshan County is located at the center of China’s east coast with a land territory of 1,175
    square Kms and a coastal area of 5,335 square Kms. Its total population is 534,000. The county
    has a coastal line of 800 Kms. and 600 islands. Major produces from the sea include
    Hexagram’s Lagocephalus, hairtails, butterfish and cuttlefish, while aquiculture largely raises
    shrimps, oysters, kelp, laver and razor clam. The county is one of China’ important fishery
    producers. The volcanic rocks of the Jurassic system dominate Land formation in this county.
    Pines, shrubs, bushes and grasses cover mountains and hills. The county has a mild and humid
    climate due to the sub-tropical monsoon influence, with 4 distinct seasons and plenty rainfall.
    Natural calamities include frost and typhoon. Due to over-catching by the increasing number
    of fishing boats, the coastal fishery resources are diminishing sharply in recent years. The
    governments have thus encouraged the fishermen to resettle at the coast for aquiculture and
    aquatic processing since 1998. Since 2000, the governments have allocated earmarked funds to
    support the resettlement program every year. To supplement the government effort, the Bank
    has agreed that the county participates the China Costal Resource Sustainable Development



                                                 3
  Project. It is expected that such participation will create 1,200 job opportunities with 80 % for
  women.
      The proposed sub-projects, namely, the aquatic processing projects and the aquatic
    wholesale market are to be located in the industrial development zone of Shipu Town.
    According to the government rule for sewage discharging, each individual aquatic processing
    plant and wholesale enterprise has built up its independent sewage treatment facility. The
    development zone is now building a new sewage treatment plant. It is expected to complete
    the civil construction by July and to be put into operation by the end of October this year.
    The newly built plant has a daily capacity of 5,000 tons. The total cost of RMB.9.95 million
    yuan is entirely borne by the local government Shipu Town is a large fishing port. The town
    is 36 Km.s away from the county seat. It has a population of 70,000, of whom 40,000 are
    engaged in fishery production. Of its annual gross output value of RMB. 3.3 billion yuan, the
    fishery accounts for 1.2 billion yuan. It is also important in terms of trading and fishing boat
    visit by Taiwan. The town has passenger boats linking with Shanghai, Ningbo and Wenzhou.
    Its development zone has good access to transportation, communication, post and
    telecommunication, power and water supply, sewage piping network and living quarter
    communities. The town has an annual averaged rainfall of 1,392 mm, sunshine of 2,025
    hours, frost-free period of 296 days, with the relative humidity of 80% and wind velocity of
    5.5 m/sec.. Typhoon is the most dangerous calamity. However, the risk of the town by
    typhoon is effectively relieved due to the windbreak effect of its 600 islands.
1.1 Coastal Zone Management Center
       This sub-project is aimed at the coastal ecologic protection. By completion of the project,
it is possible to detect the changes of the coastal fishery resources at the East China Sea with the
county itself in particular, for the purpose of fishing programming and protection and
management of the fishery resources. It is also possible to monitor and evaluate the nearby
inshore and offshore ecologic environment quality, for the purpose of marine environment
protection. In addition, emergence of fish diseases will also be monitored to help aquatic
product quality and safety control. The training program will also help enhancement of the
research and management capability of the staff and participation into environment protection
by both the local government and people.
       The center is to be built at the county seat proper with a total area of 8,907 square m.s, of
which the building space accounts for 4,906 m2. The main building is a 6-stored structure. The
floor space will be allocated to the marine environment advisory section, aquatic disease control
center, aquatic quality testing center, environment protection training center, supervision center
for marine environment protection communication network, and laboratories. The center is also
to be equipped with a patrol and inspection boat. The project is to be implemented by the
Marine and Fishery Bureau of the County Government at the cost of the county government.
1.2 Marine Ecologic Natural Reserve at the Jiushan Island
       This sub-project is aimed at protection of the marine ecologic environment. Jiushan Island
is formed by 76 reefs with a total area of 7.3 square Km.s, with the main island of 4 square
Km.s. Very few people is living there. Thanks to the warm current from Taiwan and the coastal
water systems, the marine area around the island has abundant feeding organisms. Thus it
becomes a favorable ground for many marine living beings. The survey reveals that within the

                                                4
   reserve of the island there exist 54 species of fishes, 25 species of shellfishes and 7 species of
   mollusca. In addition, there also exist a great number of precious species of plants, flowers, tea
   trees and medicinal herbs and 8 species of birds within the national and provincial protection
   category. To protect from destruction by human activities, it is of urgent need to establish the
   proposed reserve. Within the reserve area, it is planned to foster 2 publicity boards, 20 floating
   posters, 20 warning boards and an observatory platform with fencing. A small dock is to be built
   for the patrol boat. A management station is also to be built with necessary communication and
   warning equipment. The project is to be implemented by the Marine and Fishery Bureau of the
   County Government at the cost of the county government.
   1.3 Huayi Aquatic Food Processing Co. Ltd
         The company, founded in 1996, has gone through HACCP accreditation and has an AA
   creditability. Its annual sales in 2002 was RMB. 100 million with an export value of US$ 11
   million. The proposed aquatic processing plant is to be built in the industrial development zone
   set by the county government at the side of the county seat proper. The project covers a total
   area of 20,000 square m.s with a building space of 13,991 square m.s ( of which the cold storage
   accounts for 5,200 square m.s, processing workshop for 2,500 square m.s, pre-treatment
   workshop for 2,000 square m.s, and office building including laboratories and storage for 4,291
   square m.s.), Within the project campus, 2,500 square m.s of green coverage will be set. Its
   annual capacity is 1,930 tons, of which 1,560 tons will be exported to overseas market (
   including 800 tons of perch slides, 400 tons of perch pieces, 200 tons of fried perch and 80 tons
   of dried perch) and 370 tons be sold at domestic market. Due to the diminishing of the marine
   fishery resources, more and more fishermen have shifted from fishing to cage aquiculture. The
   current production from aquiculture has reached to 90,000 tons, which provide adequate supply
   of raw fishes for processing.
   1.4 Feiri Aquatic Industrial Co. Ltd
      The company was founded in 1996 and mainly engaged in aquatic food processing for export
to Japan, South Korea, U.S., Europe and Southeast Asia. The company has 2 processing plants
with 11 processing workshops covering a total floor space of 8,200 square m.s. Its annual
production is 5,500 tons with an export value of US$ 7.5 million. The proposed project is to
occupy an area of 39,960 square m.s in the industrial development zone, of which the building
space accounts for 14,900 square m.s and the green coverage accounts for 11,988 square m.s. Of
the building space, the processing workshops account for 5,000 square m.s, cold storage for 2,000
square m.s, office building with laboratories for 3,000 square m.s, dormitories and canteen for
2,000 square m.s, boiler room for 300 m.s, machine and switch rooms for 800 m.s, warehouses for
1,000 m.s and sewage treatment for 800 m.s. Its annual capacity is expected to be 1,396 tons, of
which 1,150 tons is exported to overseas markets and 246 tons sold at domestic market
   1.5 Xianglong Aquatic Food Co. Ltd
       The company was founded in 1997 and mainly engaged in aquatic food processing for
export to Japan, South Korea, U.S., Europe and Southeast Asia. The proposed project is planed to
build a floor space of 10,972 square m.s in the industrial development zone, of which the
processing workshops and auxiliary facilities account for 9,332 square m.s and the cold storage for
1,640 square m.s. The green coverage of 2000 square m.s and roads of 3,237 square m.s will be



                                                  5
built. The project is designed to have an annual capacity of processing 980 tons of fishes and 620
tons of headless shrimps.
  1.6 Chaoxing Marine Bio-product Co. Ltd
      The company is located at Shipu Town. The proposed project is to be built in the industrial
development zone of the town to produce kelp meal, iodine reinforced soy sauce and kelp fillet,
with the cultured kelp as the raw materials. The annual production includes 3,000 tons of kelp
meal, 1,000 tons of iodine-reinforced soy sauce and 2,000 tons of kelp fillet. The project is to build
a floor space of 12,541 square m.s ( of which processing workshops accounts for 5,280 square m.s,
cold storage for 5,412 square m.s, office building with laboratories for 960 square m.s, and
dormitories for 889 square m.s), a green coverage of 11,954 square m.s and roads of 8055 square
m.s. Xiangshan County has 330,000 hectares of shallow beaches with a depth of less than 20 m.s
which favor aquiculture with kelp in particular. The county has a history of kelp culture for more
than 30 years and the local people are quite good at it. With financial support by the Bank, the
project is able to absorb a great number of fishermen who are willing to withdraw from fishing to
aquiculture.
     1.7 Zhejiang Aquatic Shopping Center ( Wholesale Market )
Xiangshan County now has a total aquiculture area of 16,000 hectares, which produce about
90,000 to 100,000 tons at a value of RMB. 1.1 billion yuan per annum. More than 50 varieties of
products are yielded from aquiculture including laver, hexagrammos lagocelphalus, perch, crabs,
eel, grouper and tilapia. 6 culture bases have been established by cage culture, pond culture with
marine water and laver culture. Some 20,000 people are engaged in aquiculture. Trading volume
by wholesale in 2002 amounted to 290,000 tons at a value of RMB. 1.3 billion yuan. The proposed
wholesale market is to be built in the Taiwan Oriented Trading Zone at Shipu Town. The market
will occupy 92,000 square m.s with a building space of 42,5000 square m.s ( including the general
trading hall of 7,000 square m.s, the open type trading hall of 10,5000 square m.s, the living and
perishable product trading zone of 11,000 square m.s, negotiation rooms of 7,000 square m.s,
parking ground of 2,000 square m.s, 4 trading wharves with a capacity of 1,000 tons each, and 7
boats). The newly proposed market is able to hold 60 boats for simultaneous trading. The project is
a complex for trading, boat holding, cold storage, logistics and commercial exchanges. Its annual
turnover is designed to be 46,000 tons at a value of RMB.911 million yuan. In addition, the project
has an ice making capacity of 30,000 tons per annum.
2. Penglai Municipality of Shandong Province
  Shandong is one of the original provinces that participated the project at the very beginning. At
the SAR stage, the sub-project in this province was designated to be located in Weihai
Municipality. Due to some reasons, the provincial Department of Finance, Department of Marine
and Fisheries and Commission of Planning have subsequently decided to enlend the Bank loan to
Penglai Municipality instead.
  The municipality has 34 fishery villages with more than 50,000 permanent fishery workers. It
has cultured 20,000 hectares of shallow sea and 333 hectares around the reefs. Aquiculture under
confinement reaches to 60,000 square m.s. The municipality has 1,500 fishing boats with more
than 80,000 h.p. in total, of which the majority are small boats which are just able for inshore
fishing. The Penglai Fishing Harbor is a large harbor in North China where fishing boats from
South Korea, Japan, Taiwan, Hong Kong and Southeast Asia are often seen. Penglai is also an

                                                  6
important trading zone with South Korea and Taiwan. Due to over fishing, the municipality is also
facing the problem of diminishing fishery resources which need to be protected. Moreover,
contamination by the industrial, agricultural and domestic sources needs to be controlled; the
monitoring and evaluation system needs to be established; and training and education of protection
on marine resources and eco-environment need to be strengthened.
 2.1 Coastal Zone Management Center
       Marine resource diminishing by over fishing and human destructive activities has drawn
serious attention of the municipal government. In order to develop and utilize the fishery resources
in a rational way, and provide an effective protection on the marine resources and environment to
ensure the sustainable development of fishery industry, it is decided to set up a management center
for resource protection and environment monitoring with the Band fund. The coastal zone
management center has the main tasks as to carry out monitoring , survey and evaluation on
coastal fishery resources; to make plans and programs for fishing and aquiculture in a scientific
way; and to conduct training and education on resource and environment protection in a planned
way. The project is to be built close to the fishing harbor at Beigou Town, about 7 Km.s away
from or 5 minutes drive to the city proper. The center is to have a floor space of 2,900 square m.s
and a garage of 600 square m.s. The building will be divided into the exhibition hall for protection
on marine living beings, laboratories, monitoring rooms, offices and training classrooms. The
center will be equipped with marine water testing instruments and communication facilities.
Potential pollutants include domestic sewage, solid refuses and discharged water from laboratories.
  2.2 Jinglu Fishery Co. Ltd
        The company is the largest aquatic processing enterprise in the municipality. It has gone
through HACCP accreditation. At present, 90 % of its products are exported to South Korea,
Taiwan, Japan, Europe and U.S.. The proposed project is to build 9,504 square m.s, of which 4,500
square m.s for processing workshops, 1,734 square m.s for cold storage, 1,110 square m.s for
sewage treatment and 2,160 square m.s for warehouse. The project is to process 1,500 tons of
aquatic products per annum, of which flavoring shells account for 1,000 tons and oyster for 500
tons.
   2.3 Sewage Treatment Plant at Beigou Town
         The plant is about 10 Km.s from Penglai city, located at Beigou which administrate 80
villages with a total population of 60,000 and a total territory of 190 square Km.s. The proposed
project is a small sewage treatment plant with an annual capacity of 10,000 tons. The town does
not have a sewage treatment plant yet although it has 200 medium and small sized enterprises at
the side close to the Penglai city proper. Expanding of aquiculture results in an increasing number
of processing plants. Businessmen from Japan and South Korea import the finished products from
the cultured raw materials which are largely processed by small sized plants, who, in order to
make remarkable profits, always build the processing facilities without sewage treatment. It has
become aware that pollution has affected the environment, the tourist attraction and the
aquiculture. The Penglai Municipal Government has made up its mind to control pollution by the
processing industry. It is then decided to build a sewage treatment plant for the proposed project
and the adjacent processing plants with the Bank fund. More sewage plants will be set up
following this example. The plant, with an annual capacity of 10,000 tons, is to occupy 9,900
square m.s and have a green coverage of 3,500 square m.s.

                                                 7
   2.4 Sewage Treatment Plant at Chaoshui Town
      Chaoshui Town administrates 53 villages with a total population of 32,000, a total territory of
90 square Km.s and a coastal line of 17 Km.s. Situation of aquatic processing and sewage
treatment is similar with Beigou Town. The town is 32 Km.s from Penglai city. It has 120 medium
and small sized enterprises dominated by aquatic processing. The proposed project is a small
sewage treatment plant with an annual capacity of 10,000 tons. The plant is to occupy 20,000
square m.s and have 3,500 square m.s of green coverage.
3. Fangchenggang Municipality of Guangxi
   Fangchenggang Municipality is located at China’s southwest coastal end. It is facing the North
Bay and neighbors with Vietnam. Its total population is 780,000 and total territory of 6,181 square
Km.s with a city proper of 17 square Km.s. Guangxi is a large agricultural producer and its
southern part is particularly important for sugar cane, fruit trees and paddy rice. The North Bay is a
traditional fishing ground. Due to the signing of the fishing agreement between Chinese and
Vietnamese governments, the Chinese fishermen have to retreat from a part of the bay where they
used to fish. To offset the affection on the fishermen’s livelihood, the Chinese government has set
up a resettlement program for those fishermen who are to shift from fishing to aquiculture. The
proposed sub-projects are a part of the mentioned efforts. MOA and local government will provide
financial support to the participating fishermen.
  3.1 Coastal Zone Management Center
         The center is aimed at protection on marine resources and environment. Fangchenggang
has a coastal line of 584 Km.s, which need to be monitored and protected. The government has
decided to set up a center to monitor the coastal resources, protect the environment and control the
fish diseases with the Bank fund. The project is to be implemented by the municipal government
with joint participation of the fishery bureau and the marine administration that are both involved
in marine resource monitoring and environment protection. The center is to be built at the newly
established city proper with a total area of 6,000 square m.s including 2,000 square m.s of green
coverage. The main building will be used for fish disease control center, marine planning section,
offices and technical training rooms.
  3.2 Yuanyi Aquatic Product Processing Plant
         No existing processing plant conforms to HACCP or European standards. The proposed
project aims at the largest processing plant with HACCP standard in the municipality. The plant is
to be built in the municipal industrial and economic development zone. It is to occupy 30,000
square m.s with a green coverage of 4,200 square m.s. It has an annual processing capacity of
6,500 tons and an ice making capacity of 9,000 tons. The project is to employ more than 200
fishermen retired from banned fishing. At the busy season, the total employment will exceed 1,000
workers. 80 % of the job opportunities will be offered to women due to the labor-intensive nature
of the process. Guangxi is the ethnic concentration region although Fangchenggang has few ethnic
groups. The proposed project has made the plan to employ ethnic people of the Zhuang Nationality
in first priority. Part of the processed products will be exported to Hong Kong, South Korea, Japan
and Southeast Asia but the majority is to be supplied to the domestic markets such as Guizhou,
Guangzhou, Nanning and Shanghai. The plant management believes there is no much difference
between export and domestic sales in terms of profitability and market access.
  3.3 Marine Fish Hatchery

                                                  8
         The hatchery is to be built at Qisha Town, about 31 Km.s away from Fangchenggang city
proper. It is surrounded by the sea at 3 sides, with a total area of 167,000 square m.s including a
green coverage of 3,000 square m.s. The hatchery is to produce quality figurines including
800,000 heads of groupers and 7.7 million heads of snappers per annum. Qisha is the second
largest fishing harbor in Guangxi. Its annual trading turnover amounts to 170,000 tons. Aquatic
trading and processing forms the pillar of the local economy. Qisha harbor has close linkage with
Vietnamese fishing boats. About 60% of the fishing boats trading in the harbor is from Vietnam
while a few is from Taiwan and Indonesia.
   3.4 Marine Cage Culture
       Fangchenggang is facing at the North Bay. With few industrial operations, the natural
environment is well preserved. At present, there is no deep marine cage culture yet. The proposed
project is to be located at the coastal side of Tiantangpo Township by building 20 cages to be laid
at the depth of 10 –15 m.s. Each cage has a diameter of 13 – 15 m.s with a depth of 6 – 8 m.s. The
site has the sub-tropical marine water features with an annual averaged temperature of 20 degrees
centigrade. Tide current is of the normal whole day type with a fluctuation of 2.2 m.s. Water
quality is in conformity of Grade I of the National Standard.
4. Tangshan Municipality of Hebei Province
      Tangshan Municipality, located at the northern part of the Bohai Sea, is Hebei’s important
fishery producer. It has a coastal line of 210 Km.s. Tangshan is also an important port for shipment
of coal, iron and steel. In tradition, Tangshan is an important shells supplier to South Korea and
Japan. In recent years, Tangshan has become the pioneer in culture of shrimps combined with
jellyfish.
  4.1 Shells Hatchery
         The proposed project is to be built in Ruannan County, about 30 Km.s from the Tangshan
city proper. The county located at the northern part of the Bohai Sea is an important fishery
producer of Hebei Province. It has highways linking with both Beijing and Tianjing. With a
coastal line of 80 Km.s, the county administrates 21 fishing villages with a total population of
50,000 including a total labor force of 15,000 to operate more than 1,000 fishing boats. The county
is a traditional shells producer and exporter. The hatchery is to be built at the coastal beaches about
3 Km.s away from the Bohai Sea.
   4.2 Coastal Zone Management Center
      The center is to be built in Kaiping District of the municipality, which administrates 6
townships with a total population of 260,000 including 120,000 engaged in agriculture. Along the
210 Km.s coastal line, there exist operations of shipbuilding, iron and steel making, chemical
industry, coal shipment and tourism. The municipal marine and fishery bureau has done a great
deal on marine environment protection and executes quite rigid and strict rule when endorsing use
of marine waters. However, following the regional economic development, much more serious
attention must be paid to the protection on marine environment and coastal resources.
 B. Environmental Impact by the Sub-Projects and Measures for Alleviation
     1. Xiangshan County of Zhejiang Province
         1.1 Coastal Zone Management Center
           Of the total cost of RMB. 23.946 million yuan, the Bank funding accounts for U.S.$
1.79 million and cost for environment protection for 300,000 yuan. The project may cause slight

                                                   9
affection on environment. Potential pollutants include 1) sewage water: domestic sewage and
water discharged by the laboratories; 2) waste air: displacement by the laboratories; 3) noises:
from air conditioning and standby power generator; 4) solid refuses: domestic garbage from
offices; 5) petrol oil and refuses from the patrol and inspection boat; and 6) dust and noises during
construction of the civil works.
  Measures to be undertaken: Sewage water is to be filtered through grids, go through anaerobic
treatment and sedimentation before release to the sewage treatment plant of the industrial
development zone; Waste air is to be displaced through higher discharging pipes; Noise is to be
prevented by setting noise making machines like power generators in isolated housing farther
away from living quarters; solid refuses are to be handled by sanitation departments in an unified
way; Waste fuel, water and solid refuses of the patrol inspection boats are to be handled by
sanitation departments when returning back to the harbor after the mission; Dust and noise during
construction of civil works are to be alleviated by ground watering, coverage of dust making
sources and prohibition on working operations in late evenings.
          1.2 Marine Ecologic Natural Reserve on Jiushan Island
          Of total cost of RMB. 6.03 million yuan, the Bank funding accounts for U.S.$ 414,000.
The project itself does not cause negative affection on environment since it requires very few
people stationing on the island. The small observatory station and dock may produce some
domestic garbage and solid refuse when human activities exist. Aseptic tank is to be built to collect
sewage water. Solid refuse is to be wrapped and shipped back for unified disposal by sanitation
departments. Waste fuel, water and solid refuse by the patrol boat are also to be collected and
shipped back for unified disposal by the sanitation departments. For design and construction of the
small observatory station and dock, adequate attention is to be paid to proper conservation of the
surrounding environment.
          1.3 Huayi Aquatic Food Processing Co. Ltd
           Among total cost of RMB.33.994 million yuan, the Bank funding accounts for U.S.$ 1.024 million
and cost on environment protection for RMB.820,000 yuan. Potential pollutants include: 1) Waste air, mainly
smoke from processing; 2) Waste water from processing, washing and rinsing and domestic sewage; 3) Solid
refuses such as fish heads and bones; 4) noises from refrigerators, generators and machines working in various
workshops; and 5) dust and noise during construction of civil works.
 Measures to be undertaken: An independent waste water treatment facility is to be installed. Waste water
discharged from processing and domestic sewage are to be treated through filtration, anaerobic treatment and
sedimentation before release to the unified treatment plant; Solid refuses are to be collected for fish meal
production; Mud fro sedimentation is to be dried for brick making; Refrigerating agent (liquid ammonia ) and
fuel oil are to be stored and handled in accordance with the national rules on use, transportation and storage of
dangerous articles.
     1.4 Feiri Aquatic Industrial Co. Ltd
              Of its total cost of RMB. 44.94 million yuan, the Bank funding accounts for U.S.$
2.865 million and cost on environment protection for RMB.1.94 million yuan. Major potential
pollutants include: 1) Waste water from processing operations and domestic sewage; 2) Waste air,
mainly smoke from boilers and processing operations; 3) Solid refuses, mainly 2,000 tons of shells
and mud from sewage treatment; 4) Mechanical noises from refrigerators and operational
machines in the workshops.

                                                       10
  Measures to be undertaken: A sewage treatment facility is to be installed as a part of the project
to be constructed. Waste water is to be treated by the facility through filtration, anaerobic
treatment and sedimentation before release. Shells are to be made into shell meal. Viscera from
shell fish are to be collected and used as raw material for fish meal making. Mud from
sedimentation of sewage treatment is to be used for brick making. Other domestic solid refuses are
to be collected for unified disposal by sanitation departments. Noise and dust prevention during
construction period is to be subject to national rules on noise and dust prevention for urban civil
construction.
          1.4 Xianglong Aquatic Food Co. Ltd
          Of its total cost of RMB.32.56 million yuan, the Bank funding accounts for U.S.$1.625
million and cost on environment protection for RMB. 600,000 Yuan. Major potential pollutants
are: 1) Waste water from processing and domestic sewage; 2) Waste air, mainly smoke from
processing; 3) solid refuses, including 800 tons of fish viscera and shrimp heads, mud from
sedimentation and domestic garbage; 4) Mechanical noise from operation of the machines; and 5)
Dust and noise during construction of civil works.
  Measures to be undertaken: Waste water and sewage are to be pre-treated by its own facility
through grid filtration, anaerobic treatment and sedimentation before release to the unified
treatment plant at the industrial development zone. Odor from processing is to be controlled up to
the national standard GB14554-93 ( odor pollutant release standard ) and smoke from processing
controlled up to the national standard GWPB5-2000 ( smoke release standard for catering
business). Solid refuses such as fish head, viscera, shrimp head and fish bone are to be collected
for fish meal making. Domestic solid refuses are to be collected for unified disposal by sanitation
departments. Mud from sedimentation is collected for brick making and some residue is to be
buried by sanitation departments.
       1.5 Chaoxing Marine Biological Products Co. Ltd
                Of its total cost of RMB.37.37 million yuan, the Bank funding accounts for U.S.$
2.238 million and cost on environment protection for RMB.600,000 yuan. Major potential
pollutants are: 1) Waste water from processing operations at annual consumption of 220,000 tons;
2) Smoke from the 4 ton capacity coal boiler and 360 ton of coal residue per annum; 3) 230 tons of
solid refuses from kelp processing per annum; 4) Domestic garbage; and 5) Mechanical noises.
     Measures to be undertaken: The boiler is to employ anthracite coal as the fuel. Smoke is to go
through water membrane for dust and sulfide removal before release into atmosphere. Odor from
processing is to be alleviated by acid and alkaline spraying before release. Waste water is to be
pre-treated by filtration, anaerobic and chemical treatment and sedimentation before release to the
sewage treatment plant at the industrial development zone. Coal residue and mud are to be
collected for brick making. Residue from kelp processing is to be collected for animal feed. Boiler
and grounders are to be isolated to prevent noise pollution.
       1.6 Zhejiang Aquatic Shopping Center ( Wholesale Market )
                Of its total cost of RMB.63.88 million yuan, the Bank funding accounts for
U.S.$2.617 million and cost on environment protection for RMB. 1.3 million yuan. Major
potential pollutants are: 1) Rejected fish from trading transactions; 2) Odor produced from trading
halls; 3) Waste water from ground cleaning; 4) Noises from ice making, power generating and



                                                 11
trading transactions; 5) Domestic garbage and sewage water; and 6) Dust and noise during
construction of civil works.
     Measures to be undertaken: Rejected fishes are to be collected in time for fish meal making;
Domestic garbage and other solid refuses are collected for unified disposal by sanitation
departments; waste water at the daily production of 600 tons is to be treated by a newly built
sewage treatment facility at the cost of the project according to the national standard GB8978-
1996 (standard on aggregated release of waste water ); During construction, dust proof and noise
prevention measures are to be undertaken according to national standard on sanitation requirement
for urban construction of civil works.
      2. Penglai Municipality of Shandong Province
        2.1 Costal Zone Management Center
                  Of its total cost of RMB.13.12 million yuan, the Bank funding accounts for U.S.$
817,000. The project itself is aimed at environment protection, which does not cause pollution,
except a few amount of waste water, waste air, domestic garbage and sewage need to be properly
disposed. It is to install higher displacement outlets for laboratories. Domestic garbage and solid
refuses are to be collected for unified disposal by sanitation departments. The center is to be built
within the tourism zone with a number of scenic spots. It is planned to build an exhibition hall on
the ground floor to introduce marine living beings and environment. It is recommended that the
exhibition also covers protection on marine living beings and impact by human activities on
marine environment. The center has 40% of area under green coverage, which helps conserve the
surrounding environment.
         2.2 Jinglu Fishery Co. Ltd
            Of its total cost of RMB.29.97 million yuan, the Bank funding accounts for U.S.$ 1.89
million and cost on environment protection for RMB. 2.54 million yaun. Major potential pollutants
are: 1) Waste water from processing operations and domestic sewage; 2) Refuses from oyster
processing including viscera and 3,600 tons of shells; and 3) Noise from refrigerators. The
company now has 2 large processing workshops, which produce commodities for export to Japan,
South Korea, U.S. and others. However, no waster water treatment facility is installed.
  Measures to be undertaken: The company has pledged and planned to build an independent
waste water treatment station when the Bank funded project is constructed. The station is to have a
full capacity to treat all the waste water from both the existing and newly built processing
facilities. In this connection, 9% of the total cost is to be allocated for construction of the station,
which will meet the requirement of national standard GB8978-1996 ( standard on aggregated
release of waste water ). After treatment, 10% of the waste water will be recycled for use. Oyster
viscera are to be collected for fish meal making while the shells are buried at the designated site.
Mechanical noise from ice making and other operations is to be prevented by isolate walls.
       2.3 Waste Water Treatment Plant at Beigou Town
                 The project is to cost RMB.20.91 million yuan in total, of which the Bank funding
accounts for U.S.$ 1.5 million. This is a very small waste water treatment plant, with a daily
capacity of 10,000 tons. The waste water is to be treated according to the national standard
GB8978-1996 ( standard on aggregated release of waste water ). Potential pollutants are: 1) Waste
air with bad odor from ammonia and hydrogen sulfide; 2) Solid refuse, mainly mud; 3) Smoke
from boilers; 4) Noise.

                                                   12
     Measures to be undertaken: Waste air is to be treated up to the national standard GB14554-93
( standard on release of odor pollutants ); Smoke from boilers is to be controlled to the national
standard GB13271-2001 ( standard on release of atmospheric pollutants by boilers ); Water
treatment produces 3.7 tons of mud daily, which will be dehydrated to the standard GB4284-84
(standard on control of mud pollutants for farming ); Noise is to be controlled by installation of
sound isolation facilities surrounding the noise making equipment.
      2.4 Waste Water Treatment Plant at Chaoshui Town
                          The project is to cost RMB.24.9 million yuan, of which the Bank funding
accounts for U.S.$ 1.5 million. This is another small waste water treatment plant similar to the
plant to be built at Beigou Town., with a daily capacity of 10,000 tons. The waste water is to be
treated according to the national standard GB8978-1996 ( standard on aggregated release of waste
water ). Potential pollutants are: 1) Waste air with bad odor from ammonia and hydrogen sulfide;
2) Solid refuse, mainly mud; 3) Smoke from boilers; 4) Noise.
     Measures to be undertaken: Waste air is to be treated up to the national standard GB14554-93
( standard on release of odor pollutants ); Smoke from boilers is to be controlled to the national
standard GB13271-2001 ( standard on release of atmospheric pollutants by boilers ); Water
treatment produces 3.7 tons of mud daily, which will be dehydrated to the standard GB4284-84
(standard on control of mud pollutants for farming ); Noise is to be controlled by installation of
sound isolation facilities surrounding the noise making equipment.
      3. Fangchenggang Municipality of Guangxi Zhuang Autonomous Region
           3.1 Costal Zone Management Center
     Of its total cost of RMB.16.33 million yuan, the Bank funding accounts for U.S.$ 980,000 and
cost on environment for RMB.360,000 yuan. The project itself is aimed at environment protection,
which does not cause pollution, except a few amount of waste water, waste air, domestic garbage
and sewage need to be properly disposed. It is to install higher displacement outlets for
laboratories. Domestic garbage and solid refuses are to be collected for unified disposal by
sanitation departments. The center is to be built in the newly established city proper, which is quite
close to the potential coastal tourism zone with a number of scenic spots. It is planned to build an
exhibition hall on the ground floor to introduce marine living beings and environment. It is
recommended that the exhibition also covers protection on marine living beings and impact by
human activities on marine environment.
       3.2 Yuanyi Aquatic Freezing Processing Plant
           Of its total cost of RMB.53.37 million yuan, the Bank funding accounts for U.S.$ 3.06
million and cost on environment protection for RMB. 990,000 yuan. Major potential pollutants
are: 1) Waste water from processing and domestic sewage; 2) Bad odor mainly from processing; 3)
solid refuses of processing residues such as shells, fish viscera and shrimp heads, mud from
sedimentation and domestic garbage; 4) Mechanical noise from refrigerators and operational
machines; and 5) Dust and noise during construction of civil works.
  Measures to be undertaken: Waste water and sewage are to be treated by its own facility through
grid filtration, anaerobic treatment and sedimentation up to the national standard GB8978-1966
before discharging. Odor from processing is to be controlled up to the national standard GB14554-
93 ( odor pollutant release standard ) and smoke from processing controlled up to the national
standard GWPB5-2000 ( smoke release standard for catering business). Solid refuses such as fish

                                                  13
head, viscera, shrimp head and fish bone are to be collected for fish meal making. Domestic solid
refuses are to be collected for unified disposal by sanitation departments. Mud from sedimentation
is collected for brick making and some residue is to be buried at the designated site. Refrigerating
agent ( liquid ammonia ) is a dangerous chemical, which is to be shipped and stored subject to the
national rule on control of shipment and storage of dangerous chemicals. There exists mangrove at
the nearby coast. Study by the Guangxi Mangrove Research Institute has proven that mangrove
contributes to control of water and soil contamination. Discharged waste water up to the national
standard is not harmful but provides nutrients such as N and P to mangrove. However, attention
will be paid to monitoring the growth situation of mangrove in accordance with experts’ advice.
      3.3 Marine Fish Hatchery
               Of its total cost of RMB.16.23 million yuan, the Bank funding accounts for U.S.$
748,000 and cost on environment protection for RMB.660,000 yuan. Major potential pollutants
are: dust and noise during construction of civil works; during normal operation, there is water with
organic nitrogen an organic phosphate discharged from the hatchery, together with feed residue,
fish manure and contaminated mud; water pumps and boilers make noises and displace waste air
and coal residue; and in addition, it also produces domestic garbage.
     Measures to be undertaken: Noise and dust are to be controlled during construction according
to pertinent national rules and ground be promptly paved or green covered. Domestic solid refuses
are to be collected for unified disposal by sanitation departments. Boilers are to consume
anthracite coals and smoke is displaced through high chimney after dust removal. Drugs and
chemicals are to be subject to strict control to minimize figurine and water contamination. Waste
water is discharged in batches after sedimentation, degradation and sterilization in aseptic ponds.
Mud from sedimentation is to be dehydrated and used for brick making or road building. Low
noise making mechanical equipment is to be employed or silencers are to be installed.
        3.4 Marine Cage Culture
                 The project cost RMB.6.97 million yuan in total of which the Bank funding
accounts for US$ 393,000. In line with the national rules, application of nation-wide forbidden
drugs is strictly prohibited at any time during operation. It is to exercise a regular test and
inspection system on marine water and fishes. Feeds are to be analyzed by sampling to prevent
contamination by poor quality feeds. The site sees fast tide current at a velocity of 80 Cm./sec.
Under normal situation, water can be dispersed to 25 Km.s away in 10 hours. Therefore it is hard
to cause contamination to surrounding marine environment by feed residue or fish manure.
However, it is recommended by aquatic experts that cages should be moved from time to time and
foreign attachments on cages be cleared when possible.
      4. Tangshan Municipality of Hebei Province
           4.1 Costal Zone Management Center
            Of its total cost of RMB.25 million yuan, the Bank funding accounts for U.S.$ 1.12
million and cost on environment for RMB.200,000 yuan. The project itself is aimed at
environment protection which brings forth little impact on surrounding environment, except a few
amount of waste water, waste air, domestic garbage and sewage and dust and noise during
construction need to be properly disposed. It is to install higher displacement outlets for
laboratories. Domestic garbage and solid refuses are to be collected for unified disposal by
sanitation departments. Dust and noises are to controlled according to national rules on urban

                                                 14
construction of civil works. It is also recommended by specialists that a pre-warning and pre-
forecasting system should be set up to encounter emergent accidents by the center together with
pertinent departments such as the port administration, ocean shipment, fuel tanks, wharfs, cargo
shipment and coal shipment, etc. since Tangshan is rather developed along the coast.
                 4.2 Shell Fish Hatchery
             Of its total cost of RMB.19.92 million yuan, the Bank funding accounts for US$ 1.538
million and cost on environment protection for RMB.1.6 million yuan. The hatchery is located 3
Km.s away from the coast. Perfect inlet and outlet canal system is available. The hatchery is
largely to use underground water for hatching operation, which is recycled after sedimentation,
biological treatment and ozonic sterilization. Shell fishers have the effect on water purification.
Scientific culture of shell fishes helps protect marine environment. So the hatching process does
not pollute environment. The hatchery has a small boiler to operate 20 days a year when small
hatching ponds need to be heated. It is recommended to use anthracite coals to alleviate pollution.
It has been noticed that the hatchery is to be built within the Bohai Oil Field Development Zone.
Oil harvesting machines are spread in this area. Under normal situation, the machines are well
maintained and the oil piping lines are well sealed. However, it is recommended by experts that
joint efforts need to be made to protect against oil leakage accidents together with the oil field
administration.
 C. Monitoring on the Project Environment
     1. Necessary Monitoring System to Be Established on Project Environment
       The project is designed to aim at promotion of sustainable development of coastal resources.
On one hand, the project helps build a number of coastal zone management centers to strengthen
the technical and administrative capabilities on monitoring and evaluation of coastal resources. On
the other hand, the project helps set up aquiculture and processing subprojects to create more job
opportunities for the fishermen who are willing to shift from fishing to land stationed activities,
thus to help alleviate heavy burdens on natural environment and resources. Therefore, the sub-
projects, with the coastal zone management centers in particular, are requested, with the Bank’s
financial and technical assistance, to make great efforts for the purpose. When the sub-projects are
implemented, their impact on the surrounding environment must be minimized by every means,
while monitoring and evaluation systems and procedures are formulated to ensure that human
activities are always subject to careful and rigid inspection and they would not cause destructive
affection on marine waters, coastal zones and offshore islands. It is also requested that reports on
environment monitoring and evaluation must be prepared and submitted to both MOA and The
Bank on regular basis.
     2. Environmental Monitoring on Coastal Zone Management Centers
       Construction of a number of the centers is a very important component of the project. Cost
of the centers as a whole accounts for 16% of the total cost of the project. China is the pioneer to
carry out coastal zone management with the Bank loan.
  The center itself does not imply negative impact on environment. Dust and noises during
construction will disappear automatically when the construction of civil works is completed. All
the centers are to be built in cities where there is well built sewage discharging networks and
garbage disposal means. Local governments always appropriate funds through their annual budget
to sufficiently support the sanitation departments to handle these matters. In addition, the

                                                 15
departments also charge on the amount they have disposed for the users according to agreements
between the users and the departments that clearly specify the annual discharging volume by each
particular user.
     3. Environmental Monitoring on Aquatic Processing Plants
       6 aquatic processing plants are newly proposed plus 1 wholesale market. These sub-projects
are to produce a large quantity of waste water, waste air and solid refuses. They are requested to
operate under strict control of pertinent national rules and regulations. However, Experts have
recommended that MOA and local governments should undertake measures to further monitor
their surrounding environment as follows:
          a. In design scheme, the sub-projects should have technological flow for waste water
              treatment, which need to be endorsed by the local environment protection agencies.
              Cost of the waste water treatment facilities must be incorporated in budgets of the
              total costs. Solid garbage must be collected for unified disposal by the sanitation
              departments and fees should be budgeted into the operational cost;
          b. Processing and environment protection facilities must be built simultaneously;
          c. Reimbursement is only effected when it is proven that the waste water treatment
              facilities are completed and put into normal operation;
          d. During normal operation, reports on running of waste water treatment facilities
              together with analyzed results of the discharged water must be submitted twice a year
              to the CPMO, MOA, by June 30 and December 31 respectively in both Chinese and
              English. Storage and use of the refrigerating agent ( liquid ammonia ) and measures
              to protect against emergent accident must be specified in the reports. A condensed
              consolidated report will be prepared by CPMO and submitted to the Bank and local
              environment protection agencies.
          e. Cost for discharging water after treatment, disposal of solid refuses, laboratory test
              and analysis, training on environment protection and procurement of environment
              protection facilities must be planned and budgeted in a consolidated scheme.
     4. Environmental Monitoring on Hatcheries, Cages and Mangrove
          Marine water and soil at the adjacent and surrounding area must be tested and analyzed
       on regular basis to assess the pollution and contamination potential by the project. Necessary
       measures must be taken when problems are identified.
          a. Water quality, both of marine water where the cages are located and of water in
              hatcheries must be tested twice a year and corrective actions be taken when necessary
              in accordance with national rules. The reports must be submitted to CPMO by June
              30 and December 31 respectively, both in Chinese and English. Drugs if any, feeds
              used and diseases identified and their impact on environment must also be specified.
              CPMO will prepare a condensed report and submit to the Bank and local environment
              protection agencies.
          b. According to experts’ recommendations, cages should be removed at a certain area
              every 1-2 years.
          c. Though Ruannan County in Hebei Province is exporting shellfishes to Japan and
              South Korea, its proposed hatchery is to be built in an area with many petrol oil
              harvesting machines. It has been noticed that the machines are well maintained and

                                                 16
      protected and the oil piping lines are well sealed. However, it is recommended by
      experts that there exists oil leakage risks, which may contaminate ground water and
      soils. Therefore, it is required, on one hand, the hatchery keeps close contact and
      takes joint efforts with the oil field to protect against emergent accident, and on the
      other hand, the hatchery analyzes the ground water and soils regularly. It is requested
      that the hatchery submits the result reports twice a year to CPMO, the Bank and the
      local environment protection agencies. It is recommended by MOA that the Bank
      may entrust a research institution at the national level to monitor the hatchery for 3
      successive years and submit reports twice a year to MOA, the Bank and local
      environment protection agencies, just similar to the practice by Yingkou on marine
      water test. The cost is estimated at US$ 30,000 and hopefully to be budgeted into the
      Bank loan.
   d. Yuanyi aquatic processing plant in Fangchenggang Municipality is to be built close to
      the coast where there exists a mangrove plantation. It has been noted that the plant is
      to build its own waste water treatment facility and the water discharged will conform
      to the national standard. However, it is recommended by experts that attention must
      be paid to the quality variance of the marine water at the discharging outlet. It is
      required that the processing plant should entrust the local environment protection
      bureau to carry out evaluation on marine water and mangrove twice a year. The
      reports should be submitted to CPMO and the Bank. The plant should make budget
      for this action accordingly.
5. Applicable National Standards
      Environmental Atmospheric Quality Standard (GB3097-1996)
      Marine Water Quality Standard (GB3097-1997)
      Environmental Noise Standard for Urban Area (GB3096-93)
      Aggregate Release Standard for Waste Water (GB8978-1996)
      Odor Pollutants Release Standard (GB14554-93)
      Atmospheric Pollutants Release Standard for Boilers (GB13271-2001)
      Mud Pollutants Control Standard for Farming Purpose (GB4284-84)
      Noise Control Standard for Industrial Enterprises (GB12348-90)




                                           17
                              Tangshan, Hebei Province




Tangshang Fishery Supervision and Inspection Center

Construction Project of Shoal Shellfish Seedlings Aquaculture [Clam and jellyfish hatchery]




                                             18
Environmental Influence Report of the Construction Project




Project Name: Tangshan Fishery Supervision and Inspection Center



Construction Unit: China Tangshan City Animal Husbandry and Fishery

               Bureau




                D.    Date: march 4, 2004

E.
Authorized by the General Bureau of National Environment Protection




                                    19
   Qualification Certificate for Environmental Influence Appraisement




Assessment Unit: Altocumulus Research Institute of Hebei Province
Project Representative Director: Fan Yinqi
                        Description of the assessment personnel

Name               Speciality       Title             Certificate      Responsibility
                   Majored                            Number

Fin Yin-qi         Environment      Senior            No.              Report charges
                   assessment       Engineer          B12190005

Fan Hui-xin        Environment      Engineer                           Report making
                   assessment

Han Zhi-cheng      Environment      Vice-director                      Report
                   assessment                                          auditing




Basic Description of the Construction Project
 Project Name             Tangshan Fishery Supervision and Inspection Center

 nstruction Unit          Tangshan City Animal Husbandry and Fishery Bureau



                                                 20
Ficticious Person   Yan Sheng-Hua              Linkman Yan Sheng-
                                                          Hua
Address             Tang Gu Road ,Kai Ping district Tangshan city, Hebei
                    Province

Telephone           0315_23150       Fax    0315_2315042     Post   06300
                    42                                       Code   0

Construction Area   Tang Gu Road ,Kai Ping district Tangshan city, Hebei
                    Province

Examination&Appro                                 Approva
val Department of                                 l
the Project                                       Docume
Establishment                                     nt
                                                  Number

Construction Type   Reconstruction                Industry
                                                  Sort &
                                                  Code
                                                  Number

Total Area (m2)     27000            Virescence   500
                                     Area (m2)

Total Investment    2500.5           Environme    20         Proportion
(million yuan)                       nt
                                     Protection
                                     investment
                                     (million
                                     yuan)

Assessment Cost                      Predicted Put-into-     March, 2005
(million yuan)                       Production Date




                                            21
Project Content and Scale:
      I. Civil works
   The planned project is going to use the disused office building of the
breeding chicken farm, which is belonged to Tangshan City Animal
Husbandry and Fishery Bureau, to carry on the reconstruction. No civil works.
                    II. Main equipments
  The responsible necessary equipments are: .gas chromatograph, atomic
absorption spectrometer, fluorescence spectrometer, multifunctional
instrument for the quality of water, high-power biological microscope,
electronic analytical balance, constant-temperature incubator, low-temperature
fridge and other necessary instruments.
                III. Main Energy Resource Consumption
1.       Total water consumption: 2t/d, tonnage: 2t/d;
2.       Total Electric Power: 10 kw/h;
3.       Fuel consumption: the project needs no fuel in the daily grind, the
     warming in winter adopts centralized supply.
The original pollution and main environmental problem:
 The project construction is located in the disused farm of Tangshan City
Animal Husbandry and Fishery Bureau, there is no original pollution and
environmental problem.




                                                 22
 Natural and social environmental conditions of the construction site

  Natural conditions (landform, physiognomy, geology, climate, weather, hydrology, vegetation,
  biology variety etc):

            The construction is located in Tang Gu Road ,Kai Ping district ,Tangshan city, at the foot of
    Yanshan Mountain, with a zone of hills slanting connect plain, and northeast high, southwest low
 hypsography. The landform is flat. The geology of this area belongs to Ordovician stratum . the climate
  here is temperate , belongs to continental climate, four seasons distinctly. it is cold and arid in winter ,
 windy and dry in spring, hot , moist and rainy in summer, cool and moist in autumn. The ESE wind is
  prevailing in this district, the frequency is 11.89%, the annual average wind speed is of 2.52 m/s, the
annual average temperature is 12 .The water system belongs to Dou River. There are no industrial and
                                           residential areas nearby.




Social environmental conditions ( social and economic structures, education, culture, cultural relic
protection etc) :
         Kaiping district governs 6 towns, 132 villages, 6 street agencies. The gross area is 252
square kilometers , the population is 260,449. of which 117,383 are engaged in agriculture,
143,066 are not agricultural population.the population density is 1034 / square kilometers.
      In 1999, the gross products is 3,208,540,000 Yuan, the agricultural products is 195,180,000
Yuan, the industrial products is 1,907,820,000 Yuan and the third industry is 1,105,540,000 Yuan.
The proportion of them is 6.08%, 59.46% and 34.46% respectively.
      Crops have mainly: Wheat, corn, grain, potato, beans, vegetable and industrial crop etc.




Description of the quality of environment
The environmental quality and its major problems of the construction site (environmental
air, surface water, ground water, sound environment, ecological environment etc)
    1.Analysis of the atmosphere quality
   The average daily intensity of SO2 of this area is 0.016 ~ 0.028 mgs/ m3, the average intensity
an hour is 0.011-0.042mgs/ m3. The average value of a day and an hour surpass the standard. ( the
standard value is 0.15mg/m3). The average daily intensity of TSP is 0.103 ~ 0.799mg/m3, its

                                                     23
average daily value exceeds the standard value by 76.7%.
    According to the said atmospheric environmental quality, it is found that the TSP pollution is
serious. There are many pollutive sources, especially the structural pollution is serious, the
contaminant is discharged heavily, the emission of part pollutive sources can not reach the
standard stably, besides, the construction places and stock fields and bare ground can cause dust by
the wind, and the transportation can cause dust as well. All the said pollutive sources cause a high
TSP density in atmosphere.
    2. Analysis of the surface water quality
    There are Dou river and pomegranate river in the district. The average water quality of the
urban areas belongs to 5th class of bad water quality. The major contaminant is COD and NH3-N,
come from the industrial effluent and sewage. Though, the sewage treatment plants have been
established in north suburb and east suburb, partial industrial effluents and sewage directly emit
into Dou river without any treatment because the city pipe net system has not been completed.
    The front part of the pomegranate river has a better water quality, but after the industrial
effluent and sewage being poured into it, the water quality gets worse. Before the pomegranate
river enter the Dou river, an inspection of this section shows that the density of CODcr and BOD5
is 43.82 mg/L and 9.93 mg/L respectively.
      3. Analysis of noise environment
   North to the construction is Tang Gu highway, therefore the environmental noises are mainly
caused by the traffic..
      4. Analysis of the biological environment
  Since the coal mining causes ground sinking, the ground buildings are destroied , the land using
function reduces, a lot of industrial solid junks piled in farmland such as coal stone, slag and coal
ash pollute the environment.

The main environment protection targets ( list the targets and its protection grades)
  1)The resident and farmland are listed as the main protection targets.
 2) Atmosphere: Carry out the secondary standard of the air quality, GB3095 — 96
  3)Water: Carry out the standard of the surface water environmental quality, GB3838 — 2002
  4)Noise: Carry out the fourth regional standard of the city environmental noise. GB3096 — 93.



Criteria of Appraisement
                                1.Environmental atmosphere quality criterion is
Environmental     Quality       conformed to the Grade Two Criterion of the
Criterion                       Environmental Atmosphere Quality Criterion(
                                GB3095 – 1996)
                                         2.the surface water quality is conformed to the V
                                         class     of   “the    surface    water    quality
                                         criterion”,GB3838-2002.
                                3.Noise environmental quality should be conformed
                                to the fourth Class Criterion of City Noise
                                Environment Criterion( GB3096 – 93).




Contamination    Emission            (1) Wastewater emission control regulations
Criterion                                should be conformed to the second grade
                                         Criterion of the Waste Water Emission

                                                 24
                                Criterion (GB8978- 96).
                    (2) Noise emission should be conformed to the IV Class
                       of the Industrial Corporation Noise Criterion( GB12348
                       – 90).




Gross       Control the emission amount of effluent : 730 t/a
Criterion




                                        25
Engineering Analysis of the construction Project
Technical process




Main Pollution process:
   In the process of examining the samples, some waste water with chemical reagents
will be emitted.




The main source of pollutants and its predicted emission
               Emission        Name           Consistency     Consistency
     Conten    source                         and             and
               (with serial)                  production      production
                                              Before          After
  type

                                               26
                                                   processing       processing


Air pollutant

Water           1                 Waste water      730t/a           730t/a
pollutant

Solid waste     2                 Solid waste      3.6t/a           3.6t/a


Noise               The noise in the project mainly comes from the
                    concerning equipments at the wind pumping station. The
                    source of the noise is graded 70 Db( A).



Others


The main influences on the environment
 At first, the project is carrying on at the disused building, there will be some
decoration works during the reconstruction, so it has little affection to the
ecological environment. . second, the project does not belong to productive
project, therefore, it has little affection to the ecological environment as well
during the running period .




Analysis of Environment Influence

    Brief Analysis of Environment Influence During Construction
  The project is carrying on at the disused building of the farm, there will be some
decoration during the reconstruction of the building, the construction scale is small.
Therefore, no flying dust be made by the construction. In the course of reconstruction,
some noises will be produced, but there are no resident around 300m, so, it will not
disturb the people nearby; it can leave a part of building rubbish, but can not affect the
surroundings, if these building rubbishes are placed in designated place according to
the requirement of the department of city building.

                                                   27
Analysis of the environment influence during the running of the
project:
    1. polluted air
      the power is electricity during the running of the project ,there is no fuel such as
coal etc. that can cause air pollution. warm offered in winter adopts central air-
conditioner, it can not cause air pollution as well.
      2.waste water:
      the annual water consumption is 730 t, displacement is 730 t , the waste water
contains some chemical reagents, it will cause certain influence to the water
environment if it is not handled. The Project will adopt a special treatment system and
drainage system to pure the waste water so that it will not affect the environment.
      3. Noise :
      The noise in the project mainly comes from the fans and other concerning
equipments in the air pumping system. The source noise grade is 70dB( A). muffles
are used in wind pipes to decrease the emission of noise. The noise grade will be
reduced to below 55 dB ( A ).
      4. Solid junk :
      some solid waste such as the packing of chemical reagents etc. and some
chemical reagents will be produced in the running course , these solid junks can
pollute environment if being thrown without any treatment. so, they must be placed at
designated place, especially, the waste reagents must be handled according to the
State Criteria.




Planned prevention and treatment measures and anticipated effects
        Conte   Resource         Name of          Prevention       Anticipated
 type                            pollution        Measures         effects


Air pollution

Water           1                Waste water      Special          Reach the
pollution                                         treatment and    state Criteria
                                                  drainage
                                                  system will
                                                  be adopted
Solid waste     2                Rubbish and      Treatment        No influence
                                 waste            according to     on the
                                 reagents         the request      environment
                                                  and placed at
                                                  designated
                                                  place

                                                  28
Noise            The wind pump station will make use of low noisy pump,
                 Noise emission should be conformed to the IV Class of the
                 Industrial Corporation Noise Criterion( GB12348 – 90).
Others



The methods of the environment protection and the anticipated effect




        None




Conclusion and suggestions:
Conclusion
  I. Construction purpose
     1. To supervise and inspect the fishery water, try to guarantee its accordance
with the national standard;
     2.To supervise and inspect aquaculture medicine and feed,try to guarantee
fishing medicine and feed accord with the quality requirement and the standard of
environmental protection;
     3.To develop disease quarantine detection of aquatic animal and forecast
disastrous disease, offer reliable guarantee for the aquaculture disease of
prevention and cure;
     4.To develop the quality detection of aquatic product, provide assistance for
the establishment and enforcement of aquatic product market qualification system,
ensure the quality of aquatic product reaches the national quality standard, so that
people can enjoy excellent aquatic product;
     5.To carry out the planned fishery technical training to improve the
comprehensive quality and the production ability of the aquaculture breeders;
   6.To offer accurate and reliable data for the administrative departments in
order to provide them with the scientific basis to establish and carry out the
reasonable laws and regulations.
   On the whole, the project is necessary.

II. Site
   The project is located in the disused farm of Tangshan city animal
husbandry and fishery burea, in the south of Kaiping district, north to it is
Tang Gu Road, east and south are farmland, 300m west to it is residence
area(fig.1). nearby, there are no river, water source, natural protective area,
cultural relic, sight and other environmental sensitive place, the site is

                                                    29
reasonable.

III. Construction content and scale
   The total investment is estimated for 25,000,000. The project is planned
to carry out in Tangshan city urban area, covering the area of 26670m2 with
the construction area of 5,000m2. The responsible necessary equipments are:
.gas chromatograph, atomic absorption spectrometer, fluorescence
spectrometer, multifunctional instrument for the quality of water, high-power
biological microscope, electronic analytical balance, constant-temperature
incubator, low-temperature fridge and other necessary instruments. Total
water consumption: 2t/d, tonnage: 2t/d; Total Electric Power: 10 kw/h;
     IV. the pollutant treatment
   1.the polluted air
     The power is electricity during the running of the project ,there is no fuel
such as coal etc. that can cause air pollution. warm offered in winter adopts
central air-conditioner, it can not cause air pollution as well.
       2.waste water:
     The annual water consumption is 730 t, displacement is 730 t , the waste
water contains some chemical reagents, it will cause certain influence to the
water environment if it is not handled. The Project will adopt a special
treatment system and drainage system to pure the waste water so that it will
not affect the environment.
       3. noise :
       The noise in the project mainly comes from the fans and other
concerning equipments in the air pumping system. The source noise grade is
70dB( A). muffles are used in wind pipes to decrease the emission of noise.
The noise intensity will be reduced to below 55 dB ( A ).
       4. Solid junk :
     Some solid waste such as the packing of chemical reagents etc. and some
chemical reagents will be produced in the running course, these solid junks
can pollute environment if being thrown away without any treatment. so, they
must be placed at designated place, especially, the waste reagents must be
handled according to the State Criteria.
     On the whole, the project is feasible in the environmental protection.
     V. suggestions
   1.to set up the environmental protection establishment, comply to the said
requirements strictly.
   2 especially to guarantee the construction of the treatment and drainage
system of sewage. To establish strict and effective regulations, determine the
processing technique and methods for the sewage according to the quantity
and category of chemical reagents used in daily work, be sure that the sewage
drainage reaches the State Criteria;
   3 the waste chemical reagents should be treated strictly according to the
relevant requirement, after properly treatment , put at designated place;
      4 strictly safekeeping the poisonous goods;
   5.to place the work of environmental protection into the overall agenda
schedule of the project, provide and carry out the head responsible system.
Every one should take the responsibility to implement his task respectively,
inspect regularly. Assign special environment protecters in charge of the
daily protection work, take a good care of the protecting implements and keep
the administering effect.
                                                  30
Preliminary Examination Opinion:




                                   Seal
Sign:                              Date:

Examination Opinion From the Junior Environmental
Protection Department:




                                   Seal
Sign:                               Date:


                                            31
Examination and Approval Opinion:




                                Seal
Sign:                             Date:


            The approval table of environment protection of construction project
Serial number                              sign


                                            32
 Project name                           Tangshan city fishery supervision                                             Construct                 Kaiping
                                                                                                                      ion site
                                                   and inspection center                                                                   district
Constructing unit                            Tangsgan city animal                                        Post         063000            phon 2315042
                                                                                                         code                           e
                                             husbandry and fishery
                                                             beurea
 Enterprise                                                         Construc
                                                            inspection             reconstruction
category                                                            tion
                                                                    character
scale                                Occupy an area of 27000m    2  Report          Report table
                                                                    category
 Instauration                                                       Doc                 time
department                                                          ume
                                                                    nt
                                                                    num
                                                                    ber
Control                             Approval                        Doc                 time
area                                department of                   ume
                                    the report                      nt
                                                                    num
                                                                    ber
  Total investment                  25,005 thousand yuan                     200thousand proportion
                                                         Environment yuan
                                                         protection
                                                         investment
 Report compiler
                                                                                                 Environment
                                                                                                 appraisement
                                                                                                 costs
                                   actuality of                                    Criteria of             Criteria of emission
                                   environment                                     environment quality    enforcement
                                   quality
                                                                               GB3095—96,second
atmosphere
                                                                                             grade
  Surface                                                                       GB3838—2002,                                GB8978 96,second
  water
                                                                                             class                                        grade

groundwate
r
  Yawp                                                                         GB3096—93,fourth                                    GB12348 90
                                                                                             class                                        class
                             Pollution control index
Control item      The         emission of      Reduced          Reduced          Increase      Total       Approval     Regional      Density    Forecast   Approva
               beginning          new         quantity of      quantity of      and reduce    emission     emission     reduced        before    emitting       l
               quantity of    construction     treatment      new instead of                     y            z         quantity     treatmen     density   emitting
                emission           u                v              old              x                                      {              t         }        density
                  t                                                 w                                                                   |                      ~




                               0.073                                            0.073         0.073        0.073
Wast

                                                                                    33
e
water
 Hg
 Cr
 Pb
 S
COD
oil
waste
gas
 SO²

Powd
er
dust
 soot
 Solid   0.0004          0.0004   0.0004   0.0004

waste

lamp
black




                  east




                            34
             field

                     the site of the project

         propagation
         inspection station




                              Disused breeding chicken farm
TangGu




                      Employee dormitory

Road
          300m       field




                 Residence building


          attached figure the site of the project




                                               35
     Environmental Influence Report of the Construction Project




Project Name: Construction Project of Shoal Shellfish Seedlings

            Aquaculture

Construction Unit: General Corporation of Aquatic Product Development and

Aquaculture of Luannan County




                  F.    Date: August 1, 2003

G.
Authorized by the General Bureau of National Environment Protection



                                       36
Assessment Unit: Tangshasn Environment Protection Research Institute
Project Representative Director: Zhu Meng
                     Description of the assessment personnel

Name            Speciality          Title            Certificate      Responsibility
                Majored                              Number

Li Chun-yan     Environment         Senior           No.              Report making
                assessment          Engineer         B12190005

Wei Fei         Environment         Engineer                          Report making
                assessment

Li Shu-min      Environment         Vice-director                     Report
                assessment                                            auditing




Basic Description of the Construction Project
                             Shoal Seashell Seedlings Aquiculture Construction
Project Name                 Project


Construction Unit            General Corporation of Aquatic Product Development
                             and Aquaculture of Luannan County


Ficticious Person            Li Bao-zhong                  Linkman     Li Bao-
                                                                       zhong




                                                37
Address                 Liuzhan Town, Luannan County, Hebei Province


Telephone               4509315        Fax          4505315    Post Code      063505
                        13803329787
Construction Area       Coastal Land of Liuzhan Town, Luannan County


Examination&Approval                                 Approval
Department of the                                    Document
Project Establishment                                Number

Construction Type       New Construction             Industry   Sea Water
                                                     Sort &     Aquiculture
                                                     Code
                                                     Number

Total Area (m2)         40000         Virescence     400
                                      Area (m2)

Total Investment        19.92         Environment 1.6           Proportion    8%
(million yuan)                        Protection
                                      investment
                                      (million
                                      yuan)

Assessment Cost                       Predicted Put-into-       March,
(million yuan)                        Production Date           2005




                                           38
Project Content and Scale:
     I. Construction Content and Scale
   The planned project is going to use the coastal land of Liuzhan Town, Luanna
County, to construct an aquiculture base with annual breeding of 13 thousand
kilogram of various shellfish seedlings, 10000 pieces per kg being the spec, and
the total area covering 40000m2. The construction includes: (1)3 workshop
buildings for breeding shoal shellfish seedlings, with 60000m3; (2)2.5m3/s of
water pumping-up station; (3)35000m3 of water deposit and sterilization pool; (4)
25000m3 of sand filtration pool; (5) 3500m3 of temperature control and water
purification pool; (6) two wells of high and low temperature (7) 500mu of
interval temporary breeding pool; (8) 500m2 for dormitory and working office;
(9) for other production facilities.
                   II. Construction Site
  The project construction is located in Luannan County situated in the north
coast of Bohai gulf. It is near highways along the sea, 120 kilometers from
Tianjin, 240 kilometers from Beijing and 90 kilometers from Qinhuandao. With
the Jing-Tang express way across Luannan County, the construction site enjoys
good transportation and convenient communication. It has a shallow-sea
aquaculture area of more than 2 million mu, a shoal aquaculture area of 640
thousand mu and a long coastal line of 90 kilometers.
                III. Main Energy Resource Consumption
4.      Natural Gas: 75000m3 per year;
     2. Total Electric Power: 1 million kw.h/a;
     IV. Main Raw and Supplement Material Consumption
     Seashell origins, drugs and baits




                                                  39
V. Planned Work Force and Working Schedule
50 persons as work force, 24 hours as working period with 3 shifts, and 150 days
within a year.


VI. Main Facilities and Equipments
                        names           quantity            specifications
Purpose of facilities

Electric power supply   transformer     1                   200KW


                        generators      2                   75KW

                        Electrical      3000m
                        wires
                        Electric        1
                        distribution
                        room
                        cables          1000m
Control of water        Oxygen          2                   20 x 4M3
giving and draining     producing
                        machine
                        boiler          3                   2T one on and other
                                                            in support
                        Drainage        5000m               Different spec
                        tube
                        Electric        2                   2m3/s
                        pump
Water quality control   Micro-filter    2                   1000m3
                        Biological      2                   1000m3
                        treatment
                        facilities
                        Ozone           2                   1000m3
                        emitters
                        Ultraviolet     2                   1000m3
                        radiation
                        disinfection
Indoors temperature     Floor air       3
control equipment       conditioner
                        Pollution       1
                        absorbing
                        pump in
                        reproduction
                        Water           3
                        quality auto-
                           i
                        Ray control     3
Lab facilities          Gas             1


                                                40
                        Spectrometer 1
                        Water pump 2
                        machine
                        Cultivation
Transportation          Special lorry 2                        Freeze, keep
vehicles                                                       temperature
                        Truck           1                      Nissan

                        Watching        1                      80 horse power
                        boat

Any original pollution or chief environmental problems concerning the project:

  This is a new constructed project for the purpose of aquaculture by using
shoal land, thus no original pollution or environment problems exits.




Natural and social environmental conditions of the construction site

 Natural conditions (landform, physiognomy, geology, climate, weather, hydrology, vegetation,
 biology variety etc):

    1. The geological location
          The breeding plant of the seashells is located in the Liuzan Town, Luannan County. The
         geographical coordinate is east longitude 118o 37’ 9”, northern latitudes 39o 11’ 21”

                                                41
     2. Landform and physiognomy

      The construction site lies in the east bank of Shuo river, its geological structure is mud and it is flat. There
are no industrial and residential areas nearby.

    3. Geology

    The geology of this area belongs to a kind of muddy structure and the shallow sea is muddy
and sandy while in the deep sea it is sandy. In the nearby sea the grade of the undersea coast is flat
and the tide current is facile.

       4. Hydrology

    The tide of this area belongs to the irregular half-day kind. The different scale between tides is
0.74 – 2.25 m. The average different scale between tides is 1.7m and the highest tide is 2.25m, the
lowest one is 0.74m. The tide frequency is 9%.

   5. Climate

     (1) Air temperature

    The average yearly air temperature is 11.8 oC, the highest 36.3 oC, the lowest – 14.8 oC. The
average Jan air temperature is – 8.5 C to – 9.3 C. The highest average temperature in July is 27
o
 C~ 29 oC.

       (2) Rainfall

     The average yearly rainfall in this area is 621.5 mm, mainly in July and Aug. The rainfall in
the two months reaches as much as 50% of the whole year. There is little rain in the spring and
winter.

       (3) Wind

     The average yearly wind speed is 4.5~5m per second. The dominate wind is SW.

     (4) Fog

     There are about 21 foggy days on the average in a year and they are mostly in winter.

       (5) Freezing

     It often begins to freeze from middle Nov. or the beginning of Dec. and the ice melts in the
beginning of Mar. The freezing period is about 3~3.5 months. The period between mid Dec. and
Jan. is strongly frozen.

       6. Earthquake

     The earthquake intensity of this area is 8.




                                                         42
Social environmental conditions ( social and economic structures, education, culture, cultural relic
protection etc) :

   Luannan county lies in the north of the Bohai Gulf and is a key fishing county in Hebei
province. The total coast line is 80km. There are 21 fishing villages in the county and the fishing
population is 50,000. The fishing workforce is 15,000. There are 1,294 fishing ships with the total
power 45,000 HP.




Description of the quality of environment
The environmental quality and its major problems of the construction site (environmental
air, surface water, ground water, sound environment, ecological environment etc)

    1.Analysis of the atmosphere quality
   The average daily intensity of SO2 of this area in non- heating period is 0.010 ~ 0.039 mgs/ m3,
and the pollution index is 0.09 ~ 0.26. The average daily value doesn't surpass the standard. ( the
standard value is 0.15mg/m3). The average daily intensity of TSP is 0.25 ~ 0.72mg/m3, the
pollution index is 0.85 ~ 2.4, its average daily value exceeds the standard value by 38%. In the
heating period SO2 is 0.085 ~ 0.136mg/m3, the pollution index is 0.56 ~ 0.91, the average daily
value doesn't exceed the standard value. TSP: 0.31-0.74mg/m3, the pollution index is 1.0 ~ 2.5, the
average daily exceeding rate is 50%.
    2. Analysis of the seawater quality
      The nearby sea area: the sea area in this part is small. Physical and chemical index is: the
color of the seawater is lightly green with its transparence 30 ~ 50cm, PH 7.8 ~ 8.6, DO 5.4 ~ 7.5
mg/ L, CODmn 0.60 ~ 0.90 mg/ L, dissolved oxygen above 5mg/L, active phosphate 0.3 ~ 0.5

                                                 43
µmolP/l, ammonia salt 0.14~ 0.4915µmoln/L, salt degree 20‰ ~ 30‰, phosphine no more than
0.01mg/L..
      The above indexes is conformed to the standards of the Second Standard of The Quality of
Seawater( GB3097-1997).
      3. Analysis of noise environment
       The noise condition in this area in daytime is 45.9~ 60.0 dB( A), at night 43.1~ 55.0 dB(
A).
      The sound environment in this area is good enough.
      4. Analysis of the biological environment
       The biological environment in this area is mainly for the breeding of seashells. There are
large pieces of beaches. The natural vegetation includes bulrushes and red willows. The agrplants
include rice and various kinds of vegetables.


The main environment protection targets ( list the targets and its protection grades)

   In this area there are no important cultural relics. Therefore the nearby sea and the sea breeding
parts are listed as the main protection targets.




Criteria of Assessment
                               Environmental atmosphere quality criterion is
Environmental     Quality      conformed to the Grade Two Criterion( Fig.1) of the
Criterion                      Environmental Atmosphere Quality Criterion(
                               GB3095 – 1996)
                                (1) SO2: 0.15mg/m3 TPS: 0.30mg/m3
                               Noise environmental quality should be conformed to
                               the Second Class Criterion of City Noise Environment
                               Criterion( GB3096 – 93).
                          Day: 60dB(A)       Night: 50 dB (A)
                          (3) Sea water quality should be conformed to the Second
                             Class Criterion of the Sea Water Quality Criterion(
                             GB3097 – 1997).


Contamination                        (2) Wastewater emission control regulations
Emission Criterion                       should be conformed to the Grade One
                                         Criterion of the Waste Water Emission
                                         Criterion (GB8979- 96).
                            (2) Noise emission should be conformed to the II Class of
                               the Industrial Corporation Noise Criterion( GB12348 –
                               90).
                               Day: 60 dB(A) Night:50 dB(A)
                            (3) Polluted air emission should be conformed to the II
                               phase criterion ( Fig. 1 – 4) of the Boiler Polluted Air

                                                 44
                               Emission Criterion( GB13271- 2001).
                                Soot: 50mg/m3         SO2: 100mg/m3
                               Smoke: Grade One
                            (4) Effluvium emission criterion should be conformed to
                                the new criterion of the Second Class (Fig. 1) of the
                                Effluvium Pollution Emission Criterion( GB14554 –
                                93).
                            (5) Polluted soil should be conformed to the Agriculture
                                Polluted Soil Control Regulations( GB4284 – 84).

Gross Control Criterion      This project is to breed seedlings in seawater. It pumps
                            and drains water by electric power. Then it would be
                            deposited, filtrated and biologically cleansed. The
                            seawater can be recycled. The boiler uses natural gas, a
                            kind of clean fuel.




Engineering Analysis of the construction Project
Technical process

                    Boiler steaming
                     ↓
water pumping→water storage → sand filtering →temperature control →
breeding pool → circulation pool→ micro-filtering →living organism filtering →
ozone disinfection → breeding pool



Main Pollution process:
     1.waste water
     The project adopts biological treatment of water in the shellfish breeding, and uses
     sea water by circulation.

5.       Noise
     The noise is mainly produced from the various pumps when the pumping station
     is working, with 90 ~110dB (A).

6.       Polluted air
     The project uses clean energy source—natural gas as fuel provided by Jidong Old
     Fields. The annual quantity used is 75 thousand m3, producing a small amount of
     smoke. During ozone disinfection, no iffluvium is emitted.

7.      Mug
     During the biological treatment of water, the project produces a small amount of
     mud.


                                                  45
The main source of pollutants and its predicted emission
                 Emission        Name           Consistency    Consistency
        Conten   source                         and            and
                 (with serial)                  production     production
                                                Before         After
  type                                          processing     processing


Air pollutant    Boiler

                 Technological H2S              0.06mg/m3      0.06mg/m3
                 process       NH3              1.5mg/m3       1.5mg/m3
                                                (Freely)       (Freely)


Water
pollutant

Solid waste      Biological      Polluted mud
                 process


Noise                The noise in the project mainly comes from the pumps and
                     other concerning equipments at the pumping station. The
                     source of the noise is graded 90 – 110 Db( A).



Others




                                                46
The main influences on the environment

This project is to breed shellfishes on the sands beside water, which has no
influence to the environment.




Analysis of Environment Influence

    Brief Analysis of Environment Influence During Construction
                 1. Influence of dust during construction
     (1) the project construction, digging, heaping, back filling and cleaning of earth
     will cause dust. (2) Various vehicles during the construction will cause dust.
     (3)The heaping and cleaning up of garbage will cause dust.
     2. Influence of noise during construction
     Noise during the construction mainly comes from various machine and vehicles,
     such as bulldozers and grabs as well as cement mixer etc during preliminary
     period.
    3. Influence to vegetation and transportation during construction
     The construction is carries on in the coastal land, so there will be almost no
     influence to vegetation or transportation.
     4.Environment protection measures during construction
      (1) About dust: Covers or covering agent should be used while digging and
heaping earth or piling materials.
      (2) About noise: The construction will be carried on far-reached shoal land
during autumn and winter, and there are no residents nearby, so noise influence to
surroundings should be comparatively small.
      (3) About concrete wastes: mainly referring to non-back filling earths and other
construction garbage. Under strict administration, all the non-back filling earths and
other construction garbage should be timely cleaned up and moved to the restricted
area or used to fill pits or for the repairing of roads. Any lumbering and leaving about
are strictly prohibited.
      Noise and the influence to atmosphere will disappear with the construction
coming to the end.


Analysis of the environment influence during the running of the
project:
   1. Waste water:
    This project of cultivating shellfish stirp adopts the biological and qualified-water
processing techniques. It can recycle water and doesn' t emit the wastewater into the
environment.
    2. Noise:

                                                  47
     The noise in the project mainly comes from the pumps and other concerning
equipments at the water pumping station. The source noise grade is 90 – 110 dB( A).
Cushions are used in the pumps with to reduce vibration, and muffles used in wind
pipes to decrease the emission of noise.
    3. Polluted air
  The boiler used in this project is provided by Jidong Oil Field, which uses natural
gas as energy source, producing little smog, having almost no influence to the
atmosphere environment. Ozone emission will be conformed to the standard in Chart
1(GB14554-93).
     4. Mud
     As the mud contains organic contents, which can be used as fertilizer to be
     synthetically used.




                                                48
Planned prevention and treatment measures and anticipated effects
        Conte   Resource        Name of        Prevention      Anticipated
 type                           pollution      Measures        effects


Air pollution   Boiler                         Use natural
                                               gas
                Treatment of    H2S                            In conformity
                technological   NH3                            with the new
                process                                        criterion of
                                                               the Second
                                                               Class (Fig. 1)
                                                               of the
                                                               Effluvium
                                                               Pollution
                                                               Emission
                                                               Criterion
                                                               (GB14554 –
                                                               93).

Water
pollution
Solid waste     Biology          Polluted soil
                process
Noise           The pump station will produce noises at the grade of
                90~110dB(A). In order to reduce noises, it adopts these
                methods of adding the damping underlay to the pumps and
                installing silencers.
Others

The methods of the environment protection and the anticipated effect




        None




Conclusion and suggestions:
Conclusion
1. Industrial Policies
   According to the policies issued by National Agriculture Department,

                                               49
     “steering the policies correctly, quickening the industrial construct
     change, and strictly controlling the intension of fishing, so as to enhance
     the fishery resources and environment protection”, Luannan County, in
     consideration of the local situation, established a steering policies in
     fishery industry, that is, “changing fishing and catching into breeding”.
     This project , making use of the unique aquaculture resource, has
     established industrized aquaculture production system. Therefore, it has
     set a foundation for a continuous development of aquaculture in Luannan
     County, which is confirmed to the industrial policies.
2. Choice of the Construction Sites
     The planned project construction is located in Liuzan Town of Luannan
     County, with over 2million mu of shallow sea aquaculture area, a shoal
     aquaculture area of 640 thousand mu and a long coastal line of 90
     kilometers. It is near highways along the sea, 120 kilometers from
     Tianjin, 240 kilometers from Beijing and 90 kilometers from Qinhuandao.
     With the Jing-Tang express way across Luannan County, the construction
     site enjoys good transportation and convenient communication.
3. The environment Analyses during the period of processes
    1). Waste water:
      This project of cultivating shellfish stirp adopts the biological and
qualified-water processing techniques. It can recycle water and doesn' t emit
the wastewater into the environment.
      2). Noise:
      The noise in the project mainly comes from the pumps and other
concerning equipments at the water pumping station. The source noise grade
is 90 – 110 dB( A). Cushions are used in the pumps with to reduce vibration,
and muffles used in wind pipes to decrease the emission of noise.
    3). polluted air
   The boiler used in this project is provided by Jidong Oil Field, which uses
natural gas as energy source, producing little smog, having almost no
influence to the atmosphere environment. Ozone emission will be conformed
to the standard in Chart 1(GB14554-93).
    4. mud
     As the mud contains organic contents, which can be used as fertilizer to
be synthetically used.
      In short, the project is feasible concerning the environment protection
      Suggestions:
      1) Enhance the administration and maintenance of the water quality
          control system during the project running.
      2) Regularly monitor the consistency of H2S, NH3 in stench at water
          quality control system pumping station.




                                                 50
Preliminary Examination Opinion:




                       Seal
Sign:                   Date:

Examination Opinion From the Junior Environmental
Protection Department:




                      Seal
Sign:                  Date:



Examination and Approval Opinion:




                                51
        Seal
Sign:     Date:




                  52
                   Environmental Inspection and Assessment

   Consigned by the General Corporation of Aquatic Product Development and Aquiculture of
Luannan County, the Lunnan Environmental Inspection Station has made a spot inspection on
scheduled water quality and the breeding condition of the shellfish and jellyfish breeding area on
July, 2003.
   The conclusions are as follows:
     I.      By sampling examination, the seawater level of this area is fully in accordance with
             the standards of seawater breeding foods of non-social effects of pollution, which is
             regulated by Department of Agriculture, People’s Republic of China.
     II.     The distance between seedling breeding area and sea area is 0.5 kilometers,
             channels which water comes in are wide and flowing, and the source is ensured.
     III.    There is no pollution outside the residential or industrial area from within a 3-
             kilometer radius.
     IV.     Seedling breeding is engaged in ponds indoor, which is a closely inside circulation
             and there is no self-pollution during the time of production.
     V.      The construction area is near to two big salt fields--- Daqing River and Nanpu,
             which salt animalcule and its eggs are abundant, and it can provide large amount of
             natural bait for breeding young jellyfish.
     VI.     The construction area is close to Jidong oil field, as a result, it is suggested that the
             sluice pool should be broadened to reserve water source in case of oil transportation
             pipe leaking.




                                              Environmental Inspection Station of Luannan County




                                                                                           July, 2003




                                                 53
                           Inspection Report
              (Seawater) Environment Inspection Serial (2003-09)




 Inspection Unit              Environment Inspection Station of Luannan County



Inspected Unit             General Corporation of Aquatic Product   Development

                        and Aquiculture of Luannan County




  Environment Inspection Station of Luannan
                             County (Seal)
Issue Date July, 2003




                                        54
   Sample Test of Water Quality in Factorial Social-
          Pollution-Free Aquatic Breeding
          Testing Items                 Testing Methods            Testing Results
1 color, smell, sapor            Colorimetry; sense of feeling    No strange smell or
                                                                  color
2 Coliform                       Fermentation                     298 per L

3 Feces and Intestine Bacteria   Fermentation                     80 per L

4 mercury                        Low-temperature atom absorbing   0.0002 mg/L
                                 spectrophotometry
5 cadmium                        Dithizone spectrophotometry      0.0005mg/L

6 lead                           Dithizone spectrophotometry      0.005mg/L

7 hexad chromium                 Diphenylcarbazide                0.002mg/L
                                 pectrophtometry
8 all chromium                   Diphenylcarbazide                0.002mg/L
                                 pectrophtometry
9 arsenic                        Silver diethyl dithiocarbamate   0.0035mg/L
                                 pectrophtometry
10 copper                        Sodium ammonium diethyl          0.005mg/L
                                 dithiocarbamate
11 zinc                          Dithizone spectrophotometry      0.0025mg/L

12 Selenium                      Fluorescence spectrophotometry   0.00003mg/L

13 cyanide                       Isonicotinacid-soduim farmate    0.002mg/L
                                 diethylamino-disulfingl
                                 spectrophotometry
14 volatilizing hydroxybenzene   Distilled 4-aminophenazone       0.001mg/L
                                 spectrophotometry
15 petroleum                     Ultraviolet spectrophotometry    0.025mg/L

16 benzene hexachloride (BHC)    Gas-chromatography               0.0000005

17 dichlorodiphenyltrichoroethane Gas-chromatography              0.0000029
(DDT)
18 malathion                      Gas-chromatography              0.00001

19 parathion-methyl              Gas-chromatography               0.000002

20 Rogor                         Gas-chromatography               0.00028

21 polychlorinated               Gas-chromatography               0.000005



                                           55
Testing Time: July 29, 2003                          Sample Source: Gathered
Monitor person: Cui Jiangli, Fan Yuting, Shi Suyan   Auditor: Zhang Yutian
Monitor Principal: Zhang Yutian                      Technology Principal: Yao Xiuhhuan




                                               56
                         Penglai, Yantai, Shandong Province




Penglai Coastal Belt Administration Center

Penglai Jinglu Fishery Company, Ltd. [High value fish processing]

Penglai Beiguo Town Industry Comprehensive Effluent Treatment Project

Penglai Chaoshui Chaoshui Town Comprehensive Effluent Treatment Project




                                             57
Report about the Influence of Construction Items on Environment




                     Project: Penglai Coastal Belt Administration Center

   Undertaker: (seal) Penglai Ocean and Fishery Bureau




Date of Report Making: February 11, 2004
  Produced by: National Bureau of Environmental Protection


    Edition Explanation to Report about the Influence of Construction Items on
                                        Environment


 Report about the Influence of Construction Items on Environment is edited by qualified
units, which are engaged in evaluating environment influence.
1. Item name— the given name when the project is reported for approval, it should be no
more than 30 Chinese characters (two English word sections is as one Chinese
character).
2. Construction site— the detailed address of the project, the beginning and ending spots
of the highway and railway should also be marked if necessary.
3. Trade classification— to fill according to national standard.
4. Total investment— the total investment amount of the project.


                                              58
5. Major targets of environment protection— in a certain range surrounding the project,
the concentrated residential area, schools, hospitals, preserved cultural relics, places of
interest, water sources and ecological sensitive spots should be noted as the protected
targets, and their characters, scales and distances from the project border should also be
noted as clearly as possible.
6. Conclusion and suggestion— to reach the analysis conclusion about the clean
production, qualified discharge and general control, to make sure of the effectiveness of
antipollution measures, to explain the influence that this project has upon environment, to
reach a definite conclusion about the environmental feasibility of the project and to put
forward other suggestions to reduce the influence on environment.
7. Preliminary opinion— the trade responsible institution fills in the reply opinion, if there
is no responsible institution, it can be blank.
8. Opinion of examination and approval— it should be answered by administrative
responsible institution of environmental protection.




                                                       1/3




Evaluation Unit: Yantai Scientific Research Institute of
Environmental Protection (seal)
Principal of the Project: Chen Chang’an

                                                  59
                          Information of Evaluators
                              Technical   Post certificate
   Name          Profession                                          Responsibility
                                title        number
             Scientific
  Chen      research of                   Environment evaluation
                         Engineer
Chang’an environmental                      post No. B2419007
             evaluation
             Scientific
            research of                   Environment evaluation
Qu Shaofei               Engineer
           environmental                   post No. B24190010
             evaluation




                         Basic Information of the Project

Project name                  Penglai Coastal Belt Administrative Center
Undertaker                        Penglai Ocean and Fishery Bureau
     Legal                                       Person to
                       Wang Jianwei                                        Mr. Zhou
representative                                    contact
 Communicati
                                 Gangli village, Beigou town Penglai
  on address
      Tel           5604258        Fax            5652766          P. C.          265600
 Construction
                                 Gangli village, Beigou town Penglai
      site
                    Penglai Development & Authorization
  Authorized by                                             Peng Reply No. [2002] 68
                    Planning Bureau              No.
                   Newly built√repair and       Trade
Construction
                     enlarge□technical      classification
 character
                        modification          and code
  Occupied                                   Plantation
                           20000                                        8000
  area (m2)                                   area (m2)
                                                               Ratio of
                              Investment in                investment in
    Total
                              environmental                environmental
 investment         1312
                                protection                   protection/
(RMB 10,000)
                              (RMB 10,000)                      total
                                                             investment




                                            60
    Capital
   needed
                               Expected date of
 according to
                                  operation
evaluation R
MB 10,000
                          Content and Scale of the Project
   Penglai is gifted with superior coastal natural conditions and rich fishing resources,
it is a good place to develop ocean fishery. The exploitation of coastal fishing
resources has become an important factor in developing fishery economy, but at the
same time, brought new problems: some offshore commercial fishing resources are
shrinking, stringent monitoring and protecting measures should be urgently adopted;
pollution is threatening some sea areas; exploitation is exhausting the resources in
some parts of the sea. The present situation is that we are short of facilities,
equipment and personnel to monitor and manage dishing resources and ocean
environment, we are struggling to raise the public’s awareness of protecting fishing
resources and ocean environment to ensure the rational exploitation of resources.
Regarding this, Penglai has decided to set up coastal belt administrative center to
provide better service for the sustainable development of local and surrounding
offshore resources.
  1. Work of the project: it includes three parts, one is monitoring and management of
fishing resources, second is monitoring and management of ocean environment, the
third is personnel training and technology communication.
  2. Water consumed by the project: it includes three parts, one is staff’s daily life
consumption, the quantity is 1,000m3/year; second is dining hall consumption, the
quantity is 500m3/year; the third is lab consumption, the quantity is 100m3/year.
  3. Heat supply of the project: heat will be supplied by Beigou heat and power plant
and no boiler will be built.




                                            61
Original pollution that is related to this project and the major environmental problems:
                                     There is no.




                                          62
Introduction to the Natural and Social Environment of the Project

    Natural Environment (landscape, ground feature, geology, climate, meteorology,
    hydrology, vegetation, diversity of biology, etc.)
  Inside Penglai, the ground feature is low mountains and hills, the general terrain is
 high south and low north. Penglai borders Yellow Sea and Bohai in the north. The
 project site is comparatively flat and it is on typical alluvial accumulative ground unit.
 The geology nearby the factory, influenced by the fluctuation of bed rocks, the
 formation structures change greatly, it has remarkable character of marine and land
 mixed deposit, made up of mild clay, gravel and bed rock. The bed rocks are mainly
 basalt and scattered glimmerite, granite, etc.
  It has distinct seasons, with the annual average temperature of 11.9 . The hottest
 month is July, with the average temperature of 25.7 , the coldest month is January,
 with the average temperature of -3.9 .
  The annual average rainfall is 620mm, mainly concentrated in July and August,
 which takes up 47% of the whole year’s rainfall. The maximum daily rainfall is
 208.1mm(on August 25, 1982), the largest rainfall lasted nine days(in July, 1970), with
 the accumulated rainfall of 160.9mm.
  Hydrology: the tide is regular semidiurnal tide in Penglai Port. The usual wave
 direction is NNE, with the frequency of 7.4%, the second usual wave direction is NE,
 ENE and NW, with the respective frequency of 3.9%, 3.2% and 3.3%, strong wave
 direction is NNE, with the frequency of 5.4%, the biggest wave height is 4.1m. The
 ocean current is irregular semidiurnal tidal flow. The motion style of tidal current is
 mainly reciprocating current and its main current direction is NE-SW. The highest west
 current speed is 0.55m/s out of the port voyage, with the direction of 214°, the highest
 eastern current speed is 0.45m/s, with the direction of 59°.




                                               63
   Social Environment (structure of social economy, education, preservation of cultural
   relics, etc.)
  The project is located in Gangli Village, Beigou Town Penglai. In 2002, the GNP of
this town reached RMB13million, the national income reached RMB 19.96million, with
the average increase of 15.6%, the gross output value of industry and agriculture
reached RMB 18.22million, with the average increase of 9.58%, of which, the gross
output value of industry increased 16.8%.
  There are no protected cultural relics inside the project area.




Environment Quality State

  Environment quality state of the project site and main environmental problems
  (atmospheric environment, ground water, underground water, sound environment,
  ecological environment, etc.)
  According to the statistics in 2003 from Penglai Environment Monitoring Station, the
 environment quality in this area is as follows:
  Atmospheric environment: in this area, the hour index of SO2 density varies from
0.006 to 0.053mg/Nm3, the hour index of NO2 density varies from 0.005 to
0.066mg/Nm3, the average daily index of TSP density varies from 0.032 to
0.270mg/Nm3. The atmosphere in this area satisfies the second level of the GB3097-
1996 Standards for Environmental Air Quality.
  Sound environment: noise monitoring index (Leq) is 50.8dB(A) in daylight and
43.6dB(A) at night, which conforms to second level of GB3096-93 Standards for
Environmental Noise in Cities and Towns.
  Offshore area: in 2003, at the monitoring spot in Penglai Port, the monitor result was
as follows: PH is 8.03, DO is 7.72mg/l, CODMn is 2.27mg/l, inorganic phosphorus is
0.020mg/l, inorganic nitrogen is 0.134mg/l, oil category is 0.025mg/l, which all conform
to the four levels of GB3097-1997 Standards for Sea Water Quality. Outside the Port, at


                                             64
the monitoring spots inside the aquatic farm, the result was as follows: PH is 8.13, DO
is 7.74mg/l, CODMn is 2.09mg/l, inorganic phosphorus is 0.010mg/l, inorganic nitrogen
is 0.132mg/l, oil category is 0.025mg/l, which all satisfies the second level ofGB3097-
1997 Standards for Sea Water Quality.




Major Environmental Protection Targets (list the items and their protection grades)
  There are no important cultural relics inside the evaluated area, so the aquatic farm
and nearby residential areas will be treated as environmental sensitive spots. The water
in aquatic farm should satisfy the second of Standards for Sea Water Quality, sound
environment should satisfy the second level of Standards for Environmental Noise in
Cities and Towns.




                                            65
                            Evaluation Standards



                Second level of GB3095—1996 Standards for Environmental Air
Standards for   Quality.
                Second level of GB3096-93 Standards for Environmental Noise in
 Environment
                Cities and Towns
   Quality      Second level of GB3097-1997 Standards for Sea Water Quality




                Second level of GB8978-1996 Standards for Sewage Comprehensive
Standards for   Discharge

  Pollutant

  Discharge




  General
Control Index




                                        66
                          Construction Items Analysis


Introduction to Technology Process (see maps)

  Through the monitoring and management of fishing resources and ocean
environment and through technical training, this project is to carry out monitor,
investigation and evaluation over fishing resources along the coast and ocean
environment, to plan in scientific way the exploitation of panland and shallow sea
and development of offshore fishing. At the same time, this project will provide
training to law-enforcement personnel and fishermen to raise completely the
supervision team’s quality, strengthen the fishermen’ awareness of resource and
environmental protection to make sure of the sustainable development of offshore
resources.




                                          67
 Major Pollution Procedures
 1. Life sewage produced by ding hall is 500m3/year and the main pollutants are COD,
animal and plant oil.
 2. Life sewage produced by staff is 1,000 m3/year and the main pollutant is COD.
 3. Sewage produced by lab is 100 m3/year, and the main pollutants are COD, waste
acid and alkali.




              Production of Major Pollutants and Planned Discharge
                                           68
 Content     Discharge        Name of       Density and quantity     Processed density and
            source (No.)      Pollutant     before disposal (unit)       quantity (unit)
  Type
Atmosph
  eric          No               No                    No                     No
pollutant
                           1. COD,
                          animal and
           1. From dining                    1. 600mg/l 0.3t/y        1. 600mg/l 0.3t/y
                           plant oil
  Water          hall                         50mg/l 0.025t/y          50mg/l 0.025t/y
                            2. COD
 pollutant 2. From dorms                     2. 350mg/l 0.35t/y       2. 350mg/l 0.35t/y
                           3. Waste
            3. From labs                          3. A little              3. A little
                           acid and
                             alkali

  Solid
          Staff’ daily
                             Life rubbish          50tons/year            50tons/year
pollutant     life




  Noise                                               No




 Others                                              No


Major Ecological Influence
 The project site was original farmland, with good ecological environment. During the
construction of this project, part ecological environment will be destroyed. When this
project completes, the plantation area is 40%, which can effectively recover some
environment.




Analysis of Environment Influence


                                              69
   H. Environment Influence in Construction Period
   This project covers an area of 20,000m2, with the construction area of 3,500m2.
  The construction scale is small, the powder dust and noise, produced in the
  construction will have a certain effect on surroundings. It is suggested that
  undertaker should strictly obey to the construction system, close off the construction
  site and spray water regularly to reduce powder dust. It is forbidden to work at night
  to make sure that the environment pollution will be reduced to the lowest degree.




  Analysis of Environment Influence in Operation Period
   The discharged sewage of the project mainly come from dining hall and staff’ life.
  Sewage from dining hall is 500m3/year and the main pollutant is COD, with the
  density of 600mg/l, quantity of 0.3ton/year and animal and plant oil, with the density
  of 50mg/l, quantity of 0.025ton/year. Sewage from staff’ life is 1,000m3/year and the
  main pollutant is COD, with the density of 350mg/l and quantity of 0.35ton/year.
   The sewage from life and dining hall and a little lab effluent, discharged by the
  project, will enter through pipes into Beigou sewage processing plant and will be
  released after disposal. So it will not produce pollution to surrounding environment.




Planned Treatment Measures and Expected Treatment Result

                                             70
   content Discharge            Name of                                      Expected
                                                    Treatment measures
Type      source (No.)          Pollutant                                 treatment result

Atmospheri         No              No                      No                    No
c pollutant
           1. From          1. COD, animal                                 Discharge
           dining hall      and plant oil   Sent to Beigou sewage
  Water                                                                   according to
           2. From          2. COD         processing plant through
 pollutant
           dorms            3. Waste acid     pipes for disposal
           3. From labs     and alkali
                                                                            standard


   Solid
                                                Sent to be disposed in
              Staff’ daily life Life rubbish
pollutant                                      rubbish processing plant




   Noise                                              No




  Others                                              No




Ecological Protection Measures and Expected Result
 The project site was original farmland, with good ecological environment. During the
construction of this project, part ecological environment will be destroyed. When this
project completes, the plantation area is 40%, which can effectively recover some
environment




                                               71
                          Conclusion and Suggestion
 I. Conclusion
 Environment influence of the project includes two periods: construction period and
operation period.
  1. Construction period
 This project covers an area of 20,000m2, with the construction area of 3,500m2. The
construction scale is small, the powder dust and noise, produced in the construction
will have a certain effect on surroundings. It is suggested that undertaker should
strictly obey to the construction system, close off the construction site and spray water
regularly to reduce powder dust. It is forbidden to work at night to make sure that the
environment pollution will be reduced to the lowest degree
  2. Operation period
 The discharged sewage of the project mainly come from dining hall and staff’ life.
Sewage from dining hall is 500m3/year and the main pollutant is COD, with the
density of 600mg/l, quantity of 0.3ton/year and animal and plant oil, with the density of
50mg/l, quantity of 0.025ton/year. Sewage from staff’ life is 1,000m3/year and the
main pollutant is COD, with the density of 350mg/l and quantity of 0.35ton/year.
 The sewage from life and dining hall and a little lab effluent, discharged by the
project, will enter through pipes into Beigou sewage processing plant and will be
released after disposal. So it will not produce pollution to surrounding environment.
 The evaluation result is that from environmental protection angle, this project is
feasible.




                                           72
 Preliminary Opinion




                       Official Seal
Person handling:               Time




                                       73
Examination opinion from next level administrative responsible institution of
environmental protection:




                                   Agree to transmit




                                Official Seal
Person handling: Zhang Chunguang                     Feb. 22, 2004


 J. Opinions of Examination and Approval
  1. Penglai Coastal Belt Administrative Center, built by Penglai Ocean and
Fishery Bureau by loans from World Bank to strengthen the monitoring and
management of fishing resources and ocean environment, has produced a little
“three wastes” during its operation and has little influence on surroundings,
so we agree to set up this center.
 2. The sewage from life, produced by the project, can be dispatched to the planned
Beigou sewage processing plant for treatment.
 3. The validity of this examination and approval is 5 years. During this period, if there
are great changes in production scale or project site, it should be separately report to
environmental protection department for new examination and approval.




                         Official Seal

                                                74
Person handling: Guo Xintai   Feb. 23, 2004




                                  75
Opinions of Examination and Approval




                           Official Seal
Person handling:                Time




                                           76
                                         Note
  This report should be attached with the following appendix and figures:
Appendix 1 document reporting for approval
Appendix 2 other administrative documents that are related with environment
evaluation
Figure 1 geographical location map of the project (administrative division and water
system should be shown, waste entrance and ground feature should be marked)
Figure 2 layout of the project
  If this report can’t explain the pollution and the influence that this project has on
environment, specialized evaluation should be held. According to the characteristics
of the project and local environment, the following one or two items can be chosen
for specialized evaluation.
1. Specialized evaluation of atmospheric environment influence
2. Specialized evaluation of water environment influence
3. Specialized evaluation of ecological influence
4. Specialized evaluation of sound influence
5. Specialized evaluation of soil influence
6. Specialized evaluation of solid waste influence
 If not included in above specialized evaluations, it can be separately evaluated.
The special evaluation can be carried out according to the requirements of
Technical Guidance to Evaluation of Environment Influence.




  Reprint by Environmental Protection Bureau of Shandong Province




                                           77
              Environmen Influence Report




  Project Name: Penglai jinglu packinghouse

  Construction units: Penglai Jinglu Fishery CO.,LTD.




Date of Draw up: 23/4/2003

  Draw up by:State Environmental Protection Administration Ion Of
                             China




                                   78
 K. Account for report
This report is drawn up by the units who get the qualification and
undertake the job of environmet evaluation


1. name of the project—is the name which been confirmed,cannot excess 60 words

2. place of the construction—detailed address, calzada and railway must should be
   wrote where is the begining and where is th end



3. trade category--fill in according to the national standard



4. total investment—is the total investment of the project



5. the objective of environment protection—is the place, such sa
   uptown school hospital cultural relic beauty spot riverhead and hypersensitive
   zoology point ,surround the project construction



6. conclusion and suggestion—sum up the analyse of uncontaminative production drain
   sewage has been reached the standard total constral.Make sure the step is
   useful.Explain the project can make how much pollution to the entironment.Draw
   up the clear conclusion that the project can work accroing to the standard .Give the
   suggestiong to shut down the pollution.



7. prejudication ideas—filled by the dept. in charge



8. examine and approve ideas—the dept.who charge the entironment protection give
   the offical




The situation of construction
        Project name                    Penglai Jinglu packinghouse

                                            79
  Constrction                        Penglai Jinglu Fishery CO.,LIT.
     units
   Artificial             Wanghong             Linkman             Haoshiqiang
    person
Communicatio                Economic Developing area Penglai Shandong Pro.
   n address
Project confirm        Penglai Development Planning           Confirm
     dept.                         Bureau                       No.
 Construction                New               Industry        Food process industry
   porperty                                    type No.               03130
 Bulit-up area             151645                  Virescence area            54592
    (sq.m.)                                            (sq.m.)
     Total         19706000 environment 2541600             Entironment        1.29%
  investment            0        investment               investment/total
     (rmb)                                                   investment
Project contents and scal:
    Penglai Jinglu Fishery CO.,LIT.set up in 1990,the company stay in economic
development area of Penglai,panning to build a new packinghouse
  Project contents:packinghouse,built-up area 99966 sq.m.Therein packinghouse
42000 sq.m.; Sewage treatment plant1110.25sq.m.;Cold storage 26000sq.m.;traning
center hostel dinning room and others buliding 31386sq.m..
 This project can offer at best 4600 job
 Mail meterial and energy cost:
       sleeve-fish:7500t/a
       tunny:1250t/a
       chub mackerel:3000t/a
       oyster:1000t/a
       scallop:1000t/a
       octopus:2000t/a
       spanish mackerel:3000t/a
       red fish :1000t/a
       electric:2800000kw./h
       water:720000 stere/a


Inhere pulltion situation and main enrionment question(connceting with the project)
1. Sewage:Main sewage is from wash meterial and process water ,living
   sewage.Total sewage displlacement is about 2000 stere/d. Sewage contents
   COD:1500-2000 mg/l,SS:800mg/l. Factory wanna to use biology to make the
   sewage clean.Main emission concentration:COD:150M/L SS 150m/l .Total
   emission is COD108t/ss108t per year.
2. West: Factory products 1000t wast per year
3. Noice pollution:This project make a little noice,and surround the factory doesn`t
   have impressionable noice point,can reach <industry corporation noice standard>




                                          80
     Envrionment brief instruction(landform, physiognomy,geology,clime,weather,
     hydrography,vegetation, biology diversity etc.)

          This factory`s now construction project lies in shanghahi road of penglai
     economic development area ,north of 206 national highway.
          This area belongs to temperate zone,East Asia monsoon climate .Continental
     climate.Average temperature is 11.6 centigrade.Average rainfall is 628.7mm..Average
     humidity is 69.6% The main wind direction is S all over the year.Average wind speed
     is 4.5m/s.
          And its physiognomy is denudation hill.The land where wanna to bulit the factory
     used to be a farm. South is higher than north.From southeast to northwest,the land
     inclines.Neture level is between 18.33m to 15.01m.The most altitudinal difference
     is3.32m.The most intensity of earthquake is seven
     Social envrionment brife instruction:(economic configuration of
     society,education,culture,culture relic etc.)
          Penglai economic developing area lies to the east of penglai city,by the yellow
     sea,and it borders Nanwang town south,borders Magezhuang east,borders new port of
     penglai north.So the position can supply a very good developed transportation.
          In the area there are more than 30 industry company.Fishery and aquaculture are
     very flourishing.In the area,agriculture is mostly fruit tree.

     The situation of envrionment quality:
      The project`s locus`s main envrionment qualty problem
     (air,water,groundwater,sound envrionment,biology envrionment etc.)
      This project lies in the economic developing area .Depending on the report
     submitted by the envrionment measurement station,the air quality of this area is
     second level of the national air standard.The quality of groundwater is better,sound
     envrioment and biology envrioment is also better.
          The aim of main envrioment protection (list the list and level of protection)
          None but the village surround the factory.

         The village is the only protective aim.




The standard
    of the     <City Area Envrionment Noice Srandard>(GB3096-93)2 type
quality        standard

                                               81
envrionment




              <Sewage Synthesis Drainage Standard>(gb8978-1996) first level
Contaminatio standard
n    drainage
srandard

                    <Industry Corporation Noice Standard>(GB12348-90) 2 type
                    standard




                    This project drains contamination is COD (108T/A).

     Total
   quantity
    control         The factory should apply for the total quantity quota.
   standard




Main contamination production and intending drainage situation
 content             Drainage          Contamination    The consistency of       Drainage
                     headstream        name             production and turnout   consistency and
type                 (serial number)                    before disposal          drainage quantity


Air contamination    None              None             None                     None


                                                                                 Drainage quantity:
                                                        Drainage quantity:       720000m3/a


                                                       82
Water                 Washing and       CODcr    720000m3/a          CODcr:150mg/l
contamination         thawing working   SS                           108t/a
                      procedure                  SS:800mg/l,576t/a   ss:150mg/l
                                                                     108t/a


Solid                 Process           Offal    1000t/a             None
contamination



Nosie                 Process noise .


Else                  None

Main biology evrionmet influence

None




Envrionment influence analyse
Envrionment brief influence analyse during the construction:
  Main influence is the noise and dust during the construction,and there is
also so noise when the equipment is going to be set up.And it is supposed
to adopt some steps to do not let the dust and noise out to let the influence
down.
Working influence analyse
When the construction has been completed,the influence include the
water envrionment and the noise envrionment.
1. water envrionment:The sewage of this project will be disposed depend
    on the standard of the national,and mail drainage consisitence is
    COD:150MG/L,SS:150MG/L,SS:150MG/L.Total drainage is
    COD108t,SS108t.Drainage quality is accord to the standard of
    <Sewage disposed standard>2 level standard
2. noise environment:This project makes low noise .Around the factory
    there is no noise hypersensitive point.So when the project has been
    finished,there will have a little influence to the environment.
3. Fh offal and others waste producted by this project will be used to
    make fishmeal.so it cannot pollute the environment.



Main contamination process and drainage situation

                                                83
  content        Drainage          Name of            Prevention and   Intending
                 headstream
                                   contamination      cure step        management
                                                                       effect
type
Air              None              None               None             None
contamination
Water            Washing and     DODcr                Biology          Drained when
contamination    thawing         SS                   dispose          achieve the
                 working                                               standar
                 procendure etc.
Solid            Process         Offal                Sell             None
contamination
Noise            Noise is very low .It is can reach the standard
Else             None
Zoology protection step and effect

None




Engineering analysis of the construction item
1. Brief description of squid flow:
Material ice-out----Headed, eared, gutted----Clean----Peel off the skin with barker---Clean and
dress----Grade and weigh----Cut----Frozen----Cut into piece----Grade and put in plate----Frozen---
-Grade again----Pack in plastic bag----Metal detection----Pack in carton box----Print production
date----Refrigerate
2. Breaded oyster technological process as follows:
Clean material----Spit sand----Shuck off the shell----Clean----X detection----Soak in ice----Grade
and put in plates----Frozen----Put off the model----Sprinkle with flour----Singly frozen----X
detection----Put into bag----Metal detection----Pack in carton box----Store
Technological process as follows:
Material----Clean----Impurity out----Grade----Clean----Season----Pack in plastic bag----Steam----
Cool----Frozen----Metal detection----Pack in carton box----Store
Main infectant working procedure as follows:
                             Fine strainer
                       Pump1↑           ↓

                                                 84
Waste water→Grille sedimentation pool→Water collection well→Hydrolyze acidification pool→

    Blast
  ↓ Pump2 ↓
Regulation pool→SBR→Drain
         ↓
    Mud concentration pool
      Pump↓
      Mud drier bed
         ↓
     Move the mud




Conclusion and suggestion
We can reach the following conclusion through the above analysis of engineering and environment
influence:
1. There’ll be powder dust and noise during the period of construction. So some measurement
    must be adopted to prevent dust and noise during construction.
2. Business period of item
Water environment: The waste water will be treated. The drain water conforms to grade standard
of the document “Sewage drain standard” (GB8978-96)
Noise environment: The noise in the factory can conform to the standard of the document
“Industrial enterprise noise standard” (GB12348-90).
All the solid waste will be used to produce fish powder. So they can’t bring about influence to the
environment.
All the infectant resource can meet the requirement of the relevant rule and won’t produce
pollution to the environment after the item completed. So it’s feasible from the point of the
environment protection.

                                                85
In order to prevent environment pollution, the suggestion is raised as follows:
The maintenance of waste water treatment facilities should be strengthened during daily running.




Examination opinion:




Clerk:                            Company:
Examination opinion issued by junior administration department of environment protection as
follows:
In this item, sea products are cleaned, ice-out, processed, frozen and then refrigerated. The waste
water produced will be treated as follows: Waste water→Grille net—Regulation well—Oxygen
pool—Oxygenlike pool-Sedimentation pool—Sand strainer pool—Drain into urban sewage pipe
Waste dregs—Partial sale, partially processed fish powder.
After careful investigation, we agree the item is forwarded to superior department. During the
period of production and construction, the management rules should be obeyed to ensure the drain
conforms to the standard.



                                                 86
Clerk:                      Company:




Examination opinion:
  The item is to process and refrigerated all kinds of sea products. The waste water produced has
less influence to the environment after adopting some measurement. So the construction is agreed
to proceed.
  . The item should obey the relevant rules. All the drain should conform to the standard.
  . Waste water produced should be treated properly. It may be drained directly to the urban drain
pipe network and enter the urban sewage treatment field after treated properly according to the
national standard.
  . The fish guts produced should be treated properly.
  . The item should be put into production after checked and accepted by the department of
environment protection.
  .




                                                87
Clerk:                          Company:
                                     April 24th, 2003




Note
  . The report should attach the following documents and drawings:
Attachment1: Item approvement document
Attachment2: Other relevant administration management documents
Attached drawing1: Geographical position drawing including administrative division, water
system, waste collection position and topography and landforms, etc.
Attached drawing2: Plan arrangement drawing
  . If the report can’t show the pollution and influence to the environment, special commence
should be proceeded. According to the features of the item and local environment, the following
one or two special commence should be proceeded.
1. Special commence about atmosphere environment influence
2. Special commence about water environment influence (including surface water and
     underground water)
3. Special commence about environment influence
4. Special commence about noise influence

                                                 88
5. Special commence about soil influence
6. Special commence about solid waste influence
The commence not listed above should be proceeded individually. The special commence should
be proceeded according to the rule of environment influence technology.
            Printed by environment protection bureau of Shandong province




                                             89
       Construction Project Environment Influence Report




  Project Name: Penglai Beigou Town Industry Comprehensive

  Effluent Treatment Project

  Construction Unit (seal): People's Government of Beigou Town




        Compiling Date: September 26, 2003

  Made by General Bureau of National Environment Protection




L. Compiling Explanation to the Environment Affected Report List of Construction

                                      90
     Project
  Report List of Construction Project on Environment Effect is compiled by the units, which have
estimation certificate on environment effect..
1. Project name—the name of the project when it waits for approval, it should be no more than
    thirty Chinese words(two English phases is regarded as one Chinese word).
2. Construction site --the detailed geographical location of the project, highways and railways
should be pointed out the beginning and terminal.
3. Trade type -- list according to national standard.
4. Total investment ~ the amount of investment.
5. Main environment protection target- the dense resident areas,schools, hospitals, protected relic,
place of interest, water source and ecological smart area that are in certain scale surrounding the
project
should be marked in the aspect of protected targets, character, scale and distance from the project
border.
6. Conclusion and suggestion----the analysis conclusion about the clear production, standard
discharge and amount control of the project should be given to make out the effectiveness of the
anti-pollution measures, to explain the effect of the project on environment, thus to draw a definite
conclusion on the environment feasibility of the project. Other suggestions about how to reduce
the environment should also be given.
7. Pre-exam suggestion-----replying suggestions filled in by career department in charge. If there is
no department in charge, it cannot be filled in.
8.Exam suggestion-----Examined by the environment protection administrative department in
charge of examining the project.




                                                 91
Construction Item Environment Influence Comment Qualification Certificate
Unit Name: Yantai Environment Protection Science Research Office
Commenting Organization: Appraisal Office
Certificate grade: 2aa Grade
Certificate No.: Guo Huan Ping Zheng YI Zi No. 2419
Business scope: Earth surface water, water underground, gas, sound and solid waste, ecology,
water and earth holding, social economy, human body health***** Chemistry industry, petroleum
Chemistry and medicine; Transportation, mining; light industry, textile, chemical fiber;
Machinery, Electronics;
Metallurgy and pressing & extending process*****.
Valid Date: From January 1, 2000 to December 31, 2004
The State Environment Protection Bureau
                                         December 25, 199



Appraisal unit:Yantai Science Institute of Environment Protection(seal)
Person in charge: Zhou Dexing '



                                       Estimation Staff
 Name               Major              Title                Certificate No.   Responsibility
 Zhou Dexing        Scientific study   Senior engineer      Lu-05281
                    And
                    environment
                    estimation
 Liu Yanqing        Scientific study   Engineer             Lu-05336
                    And
                    environment
                    estimation




Basic Introduction about the Construction Project



                                                      92
  Project name      Penglai Beigou Town Industry Comprehensive Effluent Treatment
                                               Project
   Construction                  People’s Government of Beigou Town
       unit
      Legal                          Wang Yi                     Contact         You
  representative                                                                Xiqiang
     Address                            Penglai, Shandong Province
        Tel         5912457           Fax          5912657        P.C         265601
Construction site             North of Gangli Village of Beigou Town, Penglai
Examination and                                   Approval
     approval                                        code
   department
   Construction          Newly built              Trade type     Public facility service
    character                                      and code         industry 11750
    Occupied                  9900                Plantation             3500
     area( )                                        area( )
       Total        2091.78      Investment in     2019.78      Proportion     100%
investment(RMB                    environment                        of
     10,000)                       protection                  environment
                                 (RMB10,000)                     protection
                                    included                    investment
                                                                  to total
                                                                investment
Estimation cost                    Planed date for practice        In December 2003
(RMB10,000)




                                                 93
Project Content and Scale                                        ,
   1. Construction scale: the planed scale of comprehensive sewage disposal project is 10,000m3'/d,
including the industrial sewage of 9,000m3'/d, living sewage of 1,000m3'/d. The general changing index is
1.3, the largest volume of sewage in an hour is 542m3'/h.
   2. Technique choice: touch oxidation technique (see page 9)
   3. Construction Content
   Inside the sewage disposal plant, the buildings and structures are divided into four functional areas
according to their functions.
   Area before the factory: consists of comprehensive office building, lab and central control area
   Effluent Treatment Area: consists of water input pump room, grill house, touch oxidation basin, blower
house, second deposit basin, etc.
     Sludge Treatment Area: consists of sludge, condensation basin and sludge de-hydration machine house,
etc. There is a side door for transportation and it is strictly isolated with area before the factory.
   Water Recycling Area: consists of elevating pump house, chloride adding room, reservoir, chloride
adding touch basin, etc. Among them, the water supply pump house, fire fighting pump house and elevating
pump house are set up together. The chloride adding room is far away from the area before factory.
   4. Road arrangement: the main roads inside the p!ant are connected with the outside roads in two Places,
one is in the east of the plant, which is the main passage for the plant, the other is arranged in the west of
the plant, mainly for the transport of grille rubbish and dehydration mud.
   5. Main pipe arrangement: the diameter of the sewage pipe into the plant is ~ 500mm. It connects with
the adjusting basin. The sewage disposal structures inside the plant are all connected with each other by cast
iron pipe. In case of the accident, the main disposal structures are all equipped with transcendental pipes.
Inside the plant, rain pipe and sewage pipe are laid for the collection and discharge of rain, living or
production sewage. Rain inside the plant is discharge to the outside
directly.
   6. Electricity Supply: two 10KV are transported from the substation, one is for work and the other is for
reserve. Under normal conditions, 1 # supplies electricity, otherwise the spare electricity source will be put
into use. The electricity volume of the plant is 75,000Kwh/a (real electrical energy) and the lost electrical
energy is 32,000Kwh/a.
   7. Heat Supply: oil hot water boiler of WNS-0.7/0.4/95/70 is used for the winter heating consumption of
diesel oil is 100 tons.
      8. Production organization and staff number: three-shift working system is practiced and the annual
working days are 365. The fixed staff is 20 persons, including 16 operation staff, 2 subsidiary production
staff and 2 management technique.
      The original pollution related with the project and the main environment pollution:

     None.




                                                           94
Briefings on natural and social environment of the area where the project locates.
Natural environment (terrain, landform, geological condition, climate, metrology, hydrology,
 vegetation, biodiversity and so on)
   1. Geological position
    The effluent treatment project is located in beigou Town, the economically strong town
of Penglai City, which is about 10Km east of Penglai down town area, 40Km west of Longkou
city and faces the sea on its north. Its coordinate is 120o34,---- 121o9, east longitude and
17o46'----38o26'.
    2. Terrain and Landform
    The geological condition of the area belongs to the shield of Eastern Shandong and the
northeastern section of the rising part of Jiaodong. The planned project is located in the north
of Gangli Village, Beigou Town, Penglai City, which belongs to terrain area of low hill.
   3. Geological Condition
    The geological condition of the area belongs to the shield of Eastern Shandong and the
northeastern section of the rising part of Jiaodong. And there is no bad structure growth. The
bedrock of tide part in the land and coastline is exposed. The natures of rocks are basalt and
taff. And the rocks incline to the sea.
    4. Hydrology
   The main river of this town is Weiyang River, of which the resource is Xujiaji Town
combining the Huangshui River into Bohai Sea. This river is seasonal river, and there is water
in the rain seasons and dry in the dry seasons.

     The tide in this sea area is formal semi-diurnal tide, and the average flood tide is 6 hour:
and 5 minutes, the average falling tide period is 6 hours and 19 minutes. The average sea
surface (the base level is average Huanghai Sea surface) is 0.08m. The average tidal range all
these years is 1.03m, and the highest sea level all these years is 2.02m. The ocean current is
influenced by the Miaodao strait tide, so the ocean current of flood tide in the sea area is to the
east a little toward south, and the falling tide is to the west a little toward south. The flood tide
is bigger falling tide. The waves in this sea area are mainly stormy waves; the average,
frequency is 86.1%. Common wave direction is to the north, and the frequency 9%, the,
sub-wave direction is northwest, and the frequency is 5%. The strong wave direction is
northwest and sub-strong wave direction is to the north. This sea area is not frozen.
    5. Meteorology
     (1) Temperature
    The average temperature all these years is 11.9 ~C. The highest temperature appears in
July, and the average temperature in this month is 24.6~C. The lowest temperature appears in
January, and the average temperature in this month is -2.4~C. The highest temperature all these
years is 38.4~C (July 5, 1972), and the lowest temperature all these years is -14.9~C (February
1979).




                                                   95
    (2) Precipitation
    The average precipitation all these years is 657.7mm. The rainfall in the whole
year
mainly concentrates in July, August and September. Among these, the rainfall in July
and
August mainly covers the 47% of the total rainfall in each year. The largest rainfall
one day is
208.lmm(August 25, 1982), and the longest raining period lasted 9 days. (July 1970)
   (3) Wind regime
    For many years, the average wind speed is 4.2m/s. The leading wind direction is
SSW and
The frequency is 15%. The whole year strong wind directions are N, NW, the
maximum wind
speed is 28m/s, instant maximum wind speed is 40.0m/s(June 5, 1963), the sub-strong
wind
direction is NNE, the fastest wind speed is 27m/s..
    SW wind prevails in spring; there appears storm and cyclone alternatively to the
south
And north in summer. The average appearance days of 8-degree wind are 39.4 days
for these
years.There appears average 2 or 3 times' typhoon in the harbor.
      The average appearance days of heavy fog (the visibility is under 1 km) are 6
days.
      6. Earthquake
      The average intensity of the earthquake is 7 degree.




                                                96
Social environment briefing (social economy structure, education, culture, historic
relics protection and so on):
     Penglai City Beigou Town is the important development zone in Penglai City,
which governs 80 towns and natural villages. By the end of 2001, the County has the
population of 620,000, and covers 190 km2, and the population density is 329
persons/km2 .The GDP of town in 2001 reached 5.4 billion yuan, and the industrial
product value is 3.1 billion. With the development of the economy in Penglai City, the
construction of Beigou Town got obvious progress. The framework of the main road
in the county has formed fundamentally, and piping equipment improved greatly. At
present the number of enterprises is 210. And they can be divided into 6 types
according to the careers: aquatic food processing, dyeing, carpet, wine, chemical
industry, and dock and so on.
     Shandong Weiyang Group Company in this county is the leading industrial
enterprise in PenglIai City. This company is the large-scale group company in which
the hi-tech biological engineering is leading, and the construction and textile are flank
and combines technology, industry, trade together. The company has fixed assets of
0.14 billion yuan, and 2,800 staffs. The company is powerful and realized the product
value of 0.28 billion yuan, and 14.06 million yuan's profit. The company has 15
enterprises and facilities, among which the cement production ability reached 0.7
million tons/year.
     This county has advanced industry and agriculture with abundant resources of
agriculture, forest, fruit, fishing, mining, in which the construction materials are
outstanding. The water and ground transportations are convenient and fast, so there
are many businessmen from overseas.




                                                  97
Environment Quality Condition
Environment Quality Conditions and Main Problems Where the Project is Located
(environmental air, ground water, underground water, sound environment, ecological
                     2nd grade of ENVIRONMENTAL AIR QUALITY STANDARE
environment, etc.) (GB3097-1996)
                     annual average day SO2 concentration range is from 0.006-
Environmental Air: 2ndgrade of SEA WATER QUALITY STANDARD(GB3097-
Environment           annual
0.053mg/Nm3, NO21997) average hour concentration range is from 0.032-
Quality Stand
0.27mg/Nm3, which nd grade of URBAN DISTRICT ENVIRONMENT NOISE
                     2are all in accordance with the second level standard of
Environmental Air Quality Standard (GB3097-1996).
                     STANDARD
Environmental Noise:By monitoring the noises of environment, the Leg in the day time
                     (GB3096-93)
is 45.0Db(A) and in the night time it is 44.1dB(A),which are all in accordance with the
2nd level standard of City Area Environment Noise Standard(GB3096-93).
Coast Sea Area: In August 2001, the supervision results of the special dock for base oil
of Weiyang Luanjiakou Harbor of Shandong Province indicates that all the standards are
                     1st 2nd standard of SEAWATER WATER QUALITY STANDARD
in accordance with the grade of WASTE WATER COMPREHENSIVE DISCHAGE
                     STANDARD(GB8978-1996);                                                     Comme
(GB3097-1997),in which the PH IS 8.04-8.19, DO is 6.40-6.80mg/L, CODMn is 0.72-
                      is 0.005-0.022mg/L, DISCHARGE STANDARD(GB14554-93)
0.96mg/L,active PHODOR POLLUTANTInorganic N is 0.014-0.193mg/L, SS is 2-4 the                        nting
                                ATMOSPHERE POLLUTANT DISCHARGE
                     BOILERnot checked out and the salinity is 31.568‰-32.844‰. All             suitable
mg/L, Hg
Pollutant and petroleum are
                     STANDARD(GB13271-2001);
the standard
Discharge indexes of all pollutant are under 1.0, and are in accordance with the                standar
                     2nd standard of INDUSTRIAL ENTERPRISES NOISE
relevant
Standardrequests of PENGLAI CITY COAST SEA AREA FUNCTION DIVIDENCE,                             ds
                     STANDARD (GB12348-90).
and the water quality in this sea area is quite good.
                     AGRICULTURAL SLUDGE POLLUTANT CONTROL
                     STANDARD
                     (GB4284-84);




Main Environment Protection Objects (Name list and Protection Level):
There is no important historic relic for protection within the appraised area.Therefore,
                     This project is an environment protection objects.
the near sea and villages are the main environment protection project, after operation
Total Amount
                     the project construction can decrease the total COD discharge
Control Standard
                     amount by 1,600 tons each year.
                                                                                                Constr
                                                                                                 uction
                                                                                                Project
                                                                                                Analysi
                                                                                           s


Techniques Flowing Chart
Touch Oxidation Techniques Flowing Chart



                                                                                      Touch
Comprehensi                  Machiner       Adjusting            Pre-
                                                                                      Oxidatio
ve Effluent                  y              Basin                deposit
                             G ill


                                    Dehydratio               Sludge                   Second
   Shipping out for2 treatment                   98
                                    n                        Concentratio             Deposit
                                    M hi                     n                        Basin
Main Pollution Working Procedures:
1. Piping effluent treated
2. Waste gas smell from the open operating buildings
3. Waste gas from boilers
4. Noises of blowers, pumps, etc.
5. Sludge from de-hydration machine




Project’s main occurred pollutants and expected discharge conditions




                                               99
       Content                                            Occurred
                                                            density
                   Discharge        Name of                              Discharge density and
                                                         And amount
                    Source          Pollutants                               amount(Unit)
Type                                                        before
                                                       treatment(Unit)
Air Pollutants                                                               Plant Area:
                                                                            H2S 0.013-
                   Technical
                                                                            0.043mg/m3
                   waste gas,       H2S NH3              450mg/m3
                                                                          NH3 not decided-
                  boiler waster        SO2                0.585t/a
                                                                                0.070
                       gas
                                                                               Mg/m3
                                                                         450mg/m3 0.580 t/a
  Water            Production
                                                       500mg/L 5t/d
 Pollutants       waste water,                                             60mg/L 0.6t/d
                                       COD               330mg/L
                  Living waste                                            60mg/L 0.18Kg/d
                                                          1Kg/d
                     water
Solid Wastes         Sludge                                3.75t/d              3.75t/d

                 The equivalent sound level of noises from water pumps, sludge pumps and
                 blowers are about 90dB (A). Isolated by pump house and machine house
                 and flagged by distance, the sound level can be reduced to 31dB (A). The
                 environmental noise monitoring levels of this area are~45.0 dB (A) in the
                 daytime and 44.1 dB (A) at night. After adding the influence value and
                 environment current value, the noises within the plant area are 45.4 dB (A)
    Noise        in the daytime and 44.9 dB (A), which are in accordance with II Standard
                 of Industrial Enterprise Plant Area Noise Standard (GB 12348-90).




    Other                                              None




                                                 100
Environmental Influence Analysis




                                   101
Brief analysis to environmental influence during construction period:
    During the construction period, the project will cause construction noise and small amount
of
construction powder. But because it is field work, so there is a little influence to environment
and the
influence will disappear with the end of construction.
Environmental Influence Analysis During Operating Period:
Environmental influence during the project's operating period is embodied in the following
aspects.
   1, Waste Water-
  ( 1 ) Under normal conditions, the discharged waste water is almost 10 thousand m3/d,
CODcr 0.6 t/d.
The discharged effluent can reach the 1st grade requirement of Effluent Comprehensive
Discharge
Standard (GB8978-1996). After the effluent is discharged into sea through special pipes, it
can be
confirmed through comparison and investigation to relevant items that: except that COD in
mixing area
0.01 Km2 (15 m) way from estuary overreaches the standard, the water quality of other areas
are all in
accordance with the 2na Grade Standard of Seawater Quality Standard (GB3097-1997);
  (2) But under accidents when the effluent treatment system does not work and the untreated
effluent is
directly discharged into the sea, COD in mixing area overreaches the standard 2.75 Km2 and
the influence
to surrounding sea is serious.
    2. Waste Gas
Waste gas discharged from buildings working openly contains many kinds of badly odor
materials. Their
main contents are sulfured hydrogen, thiol, thio ether and other sulfides, ammonia, amine,
alcohol, fat
acid, indole, etc. among which the most is sulfured hydrogen and ammonia. According to the
analysis to
odor influence information of Yantai Laishan Effluent Treatment Factory by Qingdao Ocean
University
Environment Protection Research Center, it-can be confirmed that within the factory area,
H2S
0.013-0.043 mg/m3, NH3 not decided-0.070 mg/m3, which are in accordance with the 2nd
Standard of
Odor Pollutant Discharge Standard (GB14554-93). Usually the odor is not that obvious 200
meters way
from the factory border, but in summer the odor can influence a range of 300 meters; boiler
discharged
SO2450 mg/m3 and 0.585 t/a, through 10 meters longchimney, can reach 2"d Class Area II
2nd Time Zone requirement of Boiler Atmosphere Pollutant Discharge. Standard (GB13271-
2001). Due to the boiler discharged pollutants are very few, they will not have obvious
influence to surrounding air.
    3. Sludge:
Discharged sludge amount is 3.75 t/d. After the sludge is stabilized and then dehydrated,
water content is
less than 80% and reach the requirement of Farm Sludge Pollutant Control Standard
(GB4284-84) and
can be shipped out and used in the field and will not cause pollution.
    4. Noise:
The equivalent sound level of noises from water pumps, sludge pumps and blowers are about
90dB (A) .
Isolated by pump house and machine house and flagged by distance, the sound level can be
                                                  102
reduced to
31 dB (A). The environmental noise monitoring levels of this area are 45.0 dB (A) in the
daytime and 44.1
dB (A) at night. After adding the influence value and environment current value, the noises
Intended Prevention Actions and Expected Treatment Results




                           103
 Conclusions:
 During the construction period, there will be construction noises and small amount of
 construction
 powder. But for it is fieldwork, there is little influence to environment and the influence
 will disappear with the end of construction.
 Environmental influence during the project's operating period is embodied in the following
 aspects:
    1, Waste Water:
 (1) Under normal conditions, the discharged waste water is almost 10 thousand m3/d,
     Content
 CODcr 0.6           Discharging Pollutant         Prevention Actions         Expected Treatment
                     Source
TypeThe discharged effluent can reach the 1st grade requirement of Effluent
 t/d.                                                                         Results
 Comprehensive Industrial
Atmosphere                          H2 S           None                       In accordance with
                     waste          NH
Pollutant Standard (GB8978-1996).2 After theNone
 Discharge                                          effluent is discharged into Odor
                                                                                sea through
 special pipes,      gas,           SO2                                       Pollutant Discharge
                     boiler                                                     Standard
 it can be confirmed through comparison and investigation to relevant items that: except
 that COD in         waste gas                                                (GB14554-93); in
                                                                               accordance
 mixing area 0.01 Km2 (15 m) way from estuary overreaches the standard, the water quality
 of other                                                                     with Boiler
 areas are all in accordance with the 2nd Grade Standard of Seawater Quality     Atmosphere
 Standard(GB3097-1997);                                                       Pollutant Discharge
 (2) But under accidents when the effluent treatment system does not workStandardand the
 untreated effluent                                                           (GB13271-2001)
                     Pollutant      COD            Touch       Oxidation      In accordance with
Waterdirectly discharged into the sea, COD in mixing area overreaches the standard 2.75
    is
Production
 Km2 and             Effluent,      COD            Techniques                 Effluent
       the influence to surrounding sea is serious.Touch        Oxidation     Comprehensive Discharge
 2. Waste Gas        Living                        Techniques                 Standard (GB8978-1996)
 Waste gas discharged from buildings working openly contains many kinds accordance with
                     Effluent                                                 In of badly odor
 materials.                                                                   Effluent
                                                                              Comprehensive
 Their main contents are sulfured hydrogen, thiol, thio ether and other sulfides, ammonia, Discharge
 amine,                                                                       Standard (GB8978-1996)
                     Sludge                         most is sulfured hydrogenIn accordance with
Solid Waste acid, indole, etc. among which theTreated according to
 alcohol, fat                                                                   and ammonia.
 According                                         Urban Effluent               Urban Effluent
 to the analysis to odor influence information ofTreatment                      Treatment Factory
                                                     Yantai Laishan Effluent Treatment Factory
 by                                                Factory Effluent &         Effluent & Sludge
                                                   Sludge Discharge           Discharge
 Qingdao Ocean University Environment Protection Research Center, it can be confirmed
 that within                                       Standard (CJ3025-93)       Standard (CJ3025-93)
 the factory area, H2S 0.013-0.043sound level of noises from water pumps, sludge pumps and
Noise                The equivalent mg/m3, NH3 not decided-0.070 mg/m3, which are in
 accordance          blowers are
                     about 90dB Pollutant Discharge Standard (GB14554-93). Usually the
 with the 2nd Standard of Odor(A) . Isolated by pump house and machine house and flagged by
 odor is not         distance, the
                     sound way can the factory border, (A). summer the odor can influence
 that obvious 200 meters levelfrombe reduced to 31 dBbut inThe environmental noise monitoring
 a range             levels of this
                     area are 45.0 dB (A) in mg/m3 and 0.585 t/a, through night. After adding the
 of 300 meters; boiler discharged SO2 450the daytime and 44.1 dB (A) at 10 meters long
 chimney, can        influence
                     value 2na Time Zone requirement of the noises within the plant area
 reach 2nd Class Area II and environment current value, Boiler Atmosphere Pollutant are 45.4 dB
 Discharge           (A) in the
                     daytime and 44.9 dB (A), which are in accordance with II Standard will
 Standard (GB13271-2001). Due to the boiler discharged pollutants are very few, they of Industrial
 not have            Enterprise
 obvious influence Plant Area Noise Standard (GB 12348-90).
                      to surrounding air.
 3. Sludge:
Others               None
       Ecological protection is 3.75 t/d. After the sludge
 Discharged sludge amountactions and expected results is stabilized and then dehydrated,
 water
 content is less than 80% and reach the requirement of Farm Sludge Pollutant Control
 Standard
 (GB4284-84) and can be shipped out and used in the field and will not cause pollution.
 4. Noise:
 The equivalent sound level of noises from water pumps, sludge pumps and blowers are
 about 90dB                                           104
  (A) . Isolated by pump house and machine house and flagged by distance, the sound level
 can be
 reduced to 31dB (A). The environmental noise monitoring levels of this area are 45.0 dB
                                   Conclusions & Suggestions
Suggestions:
1. In order to alleviate the influent of odors to surrounding environment, we suggest to
strengthen
greening between main buildings and walls, forming an over 10 meters wide greening area to
attract
and isolate odor materials and make the environment beautiful as well. Greening shall
choose tree
seedlings that have strong attractive ability to odor materials (such as ammonia, sulfured
hydrogen,
etc.) When accidents happen in summer, place fragrant materials over grill houses and
deposit
basins to cover the odor.
2. The factory border of Effluent Treatment Factory shall not less than 300 meters away
from
residential villages.
3. The floating rubbish in the effluent can be stopped by grills. But the sporadic oil in the
effluent
still will flow into the sea. In order to prevent from oil film, we suggest adding effluent
floating oil
isolation facility.
4. When effluent treatment system does not work and cannot treat the effluent, the factory
shall
adopt effective actions to avoid a large amount of untreated effluent directly being
discharged into
the sea, preventing from serious pollution to surrounding sea area.
5. After the sludge is stabilized and then dehydrated, water content is less than 80% and
reach the
requirement of Farm Sludge Pollutant Control Standard (GB4284-84) and can be used in the
field.
6. We suggest that after in-depth treatment of part of effluent, they can be re-used in
greening and
agricultural irrigation, etc. to alleviate the pollution to sea water.




                                               105
Pre-exam suggestions:




Undertaker:                     Seal:
                        Day     Month        Year

The exam suggestion by the sub-administrative department in charge of environment
protection:




Undertaker:                    Seal:
                                       Day      Month      Year




  Examined suggestions:




                                                    106
    Undertaker:                  Seal:
                                         Day       Month     Year




                                         Notes

1.This report should have the following annexes and charts
Annex 1. Setting-up Approval document
Annex 2. The other administrative management document connected with environment
comments

                                                 107
      Chart 1. Project geographical position chart (It should reflect administrative divide, water series,
     pollutant sinker position signature and geographical conditions and so on.)
      Chart 2. Project flat position chart
     2.If this report form cannot explain the pollution made by the project and influence on the
     environment,
     it should be commented professionally. According to the characteristic of the construction
     project and
     local environment, one or two of the following should be chosen.
     1) Special comment about the atmosphere environment influence.
     2) Special comment about the water environment (includes surface water and underground
     water)
     3) Special comment about the ecological influence
     4) Special comment about the sound influence
     5) Special comment about the earth influence
     6) Special comment about the solid waste.


      The listed special comments that are not included in the above special comments can be carded
     out
     according to the requirement in THE ENVIRONMENT INFLUENCE COMMENT
     TECHNOLOGY
     GUIDE.




                          Photocopied by Shandong Province Environment Protection Bureau




Construction          Beigou Town Comprehensive             Constructio    North of Gangli Village,Beigou
Project name          Effluent Treatment Project            n              Town, Penglai City

Construction          Beigou Town            Post code      265601         Tel         0535-5912457
unit                  People’s
                      Government
Career type           Public equipment       Project        Newly-built Enlarging the project Technology
                      service                nature         Reform

                                                           108
Construction                   Effluent treatment              Report              Report Report from Registration
scale                          Ability 10000T/d                type
Project setting-up                                             File No.                               Time
department
Control scope                  SO2            ReportYantai      File No.            Tim
                                              Exam  City                            e
                                                    Environme
                                              departme
                                              nt    nt
                                                    Protection
                                                    Bureau
Total                          20,917,800yuan       Environme Ten thousand yuan            Ratio
investment                                          nt
                                                    Protection
                                                    Investment
Report                         Yantai City Environment          Commenting fee             Ten thousand yuan
Compiling unit                 Protection Science Research
                               Center
                               Environment          Environment quality standard           Discharge standard
                               quality at present
Atmosphere                     Reach the standard 2nd grade of GB3095-       GB13271-2001 2nd district
                                                    1996                     standard
                                                                             GB14554-93
Surface water                                                                1st grade of GB8978-1996
Underground
water
Noise                          Reach the standard            2nd grade of GB3093-93 2nd Standard of GB 12348-90
Sea water                      Reach the standard            2nd grade of GB3097-
                                                             1997
                                                        Pollution Control Standard
Control   Former      Amount of     Newly-built   New to       Discharge     Total       Permitting   District     Potency       Predicted   Discharge
item      discharge   Newly-built   processing    Old          increasing    Discharge   Discharge    Decreasing   Before        Discharg    Potency(11)
          Amount(     part(2)       decreasing    Decreasing   &decreasing   Amount(6)   Amount(7)    Amount(8)    Treatment(9   e
          1)                        amount(3)     Amount(4)    amount(5)                                           )             Potency(
                                                                                                                                 10)




Waste                 365                                      365           365
water
Hg
Cadmi
um
Cadmi
um
Pb
As
6+Chr
omium
Hydrid
e
COD                   1825          1606                       209           219                      500          60            60
Petrole
um
Type
                                                                                   109
Waste         130                          130       130
gas
SO2           0.585                        0.585     0.585              450       450      500
Powde
r
Smoke
Solid         1369                         1369      1369
waste


        Unit: Waste gas amount: XlO4 standard meter 3/year; waste water, solid waste amount:
        ten thousand tons/year; other items are all tons/year. Waste water potency: mg/1; waste

        Notice: This form is filled in by commenting units, and is attached at the end of the report
        book (form). The last blank of the form is the characteristic pollutant of this item.

        Among: (5)=(2)-(3)-(4);(6)=(2)-(3)+(1)-(4)




                                                           110
                  Monitor item             Monitor        Monitor unit    Monitor
                                           content                        interval

 Construction     Analyze and monitor      BOD5,COD,T   Monitor           Monitor every
period of the     the influence of the     N,TP,TK,     group of          two months
Effluent          construction on the      Heavy Metal, Penglai
treatment plant   environment along        etc.         Environment
                  the seaside                           Protection
                                                        Bureau
Attempt           The quality of inlet,    BOD5,COD,T Monitor            Monitor
operating         outlet piping entrance   N,TP,TK,     group of        group of
period of the     and water quality        Heavy Metal, Penglai         effluent
effluent          near the piping outlet   etc.         Environment     Treatment
Treatment         as well as water                      Protection      Plant
Plant             quality change along                  Bureau and      monitors inlet
                  the seaside                           monitor group   and outlet
                                                        of the effluent water quality
                                                        Treatment       everyday.
                                                        Plant           monitors
                                                                        outlet of
                                                                        drainage and
                                                                        the water
                                                                        quality of
                                                                        water region
                                                                        along coast
                                                                        every three
                                                                        days. And
                                                                        Penglai
                                                                        Environment
                                                                        Protection
                                                                        Bureau does it
                                                                        every week
Operation         Monitor the outlet       BOD5,COD,T Monitor           Monitor
period of the     whether accord with      N,TP,TK,     group of        group of
effluent          the design, and          Heavy Metal, Penglai         Wastewater
Treatment         whether accord with      etc.         Environment     Treatment
Plant             the discharge                         Protection      Plant
                  standard and the                      Bureau and      monitors inlet
                  change in water area                  monitor group and outlet
                  along coast                           of the effluent water quality,
                                                        Treatment       monitors
                                                        Plant           outlet of
                                                                        drainage and
                                                                        the water
                                                                        quality of
                                                                        water area
                                                                        along coast
                                                                        every week.
                                                                        And Penglai
                                                                        Environment
                                                                        Protection
                                                                        Bureau
                                                                        checks outlet
                                                                        water quality
                                                                        every month,
                                                                        and monitors
                                                                        the change in
                                                111
                                                                        water area
                                                                        along coast
                                                                        indefinite
                                                                        period.
    Construction Project Environment Influence
                      Report




Project Name Penglai Chaoshui Town Comprehensive Effluent Treatment Project

Construction Unit (seal) Chaoshui Town People’s Government




                        Compiling Date August 6, 2003
         Made by General Bureau of National Environment Protection




                                         112
  Compiling Explanation to the Environment Affected Report List of Construction Project


  Report List of Construction Project on Environment Effect is compiled by the units, which have
estimation certificate on environment effect.
  1. Project name — the name of the project when it waits for approval, it should be no more than
thirty Chinese words (two English phases is regarded as one Chinese word).
  2. Construction site — the detailed geographical location of the project, highways and railways
should be pointed out the beginning and terminal.
  3. Trade type — list according to national standard.
  4. Total investment — the amount of investment.
  5. Main environment protection target — the dense resident areas, schools, hospitals, protected
relic, place of interest, water source and ecological smart area that are in certain scale surrounding
the project should be marked in the aspect of protected targets, character, scale and distance from
the project border.
6. Conclusion and suggestion — the analysis conclusion about the clear production, standard
discharge and amount control of the project should be given to make out the effectiveness of the
anti-pollution measures, to explain the effect of the project on environment, thus to draw a definite
conclusion on the environment feasibility of the project. Other suggestions on how to reduce the
effect to the environment should also be given.
              7. Pre-exam suggestion--------- replying suggestions filled in by career department in charge. If
              there is no department in charge, it cannot be filled in.
      8.      Exam suggestion------------Examined by the environment protection administrative

           department in charge of examining the project.




                                                        113
     Construction Item Environment Influence Comment Qualification

                                            Certificate


Unit Name: Yantai Environment Protection Science Research Institute
Commenting Organization: Appraisal Office
Certificate grade: 2nd Grade
Certificate No.: Guo Huan Ping Zheng YI Zi No. 2419
Business scope: Earth surface water, water underground, gas, sound and solid waste, ecology,
water and earth holding, social economy, human body health***** Chemistry industry, petroleum
Chemistry and medicine; Transportation, mining; light industry, textile, chemical fiber;
Machinery, Electronics; Metallurgy and pressing & extending process*****.
Valid Date: From January 1, 2000 to December 31, 2004
The State Environment Protection Bureau
                                    December 25, 1999




Appraisal unit: Yantai Environment Protection Science Research Institute (seal)
Person in charge   Zhou Dexing

                                           Estimation Staff

      Name          Major          Title         Certificate No.        Responsibility
              Scientific study
                                                Huan Ping Gang
      Zhou          and         Senior
                                                   Zheng Zi        Environment estimation
     Dexing    environment     engineer
                                                No.B24190005
                estimation
              Scientific study
                                                Huan Ping Gang
                    and
   Li Weihua                   Engineer            Zheng Zi        Environment estimation
               environment
                                                No.B24190003
                estimation
              Scientific study
                                                Huan Ping Gang
                    and
  Liu Yanqing                  Engineer            Zheng Zi        Environment estimation
               environment
                                                No.B241900059
                estimation




                                                 114
                          Basic Introduction about the Construction Project


Project name             Penglai Chaoshui Town Comprehensive Effluent Treatment Project
 Construction
                                      Chaoshui Town People’s Government
     unit
    Legal
               Si Weifang                         Contact                 Zhang Zhenming
representative
   Address                                   Penglai, Shandong Province
     Tel        5816882                Fax               5816882          P. C.            265601
Construction
                                  East of Yaqian Village, Chaoshui Town, Penglai
     site
Examination and
                 Penglai Municipal Development and
    approval                                          Approval code     Peng Ji Fa [2003] No. 67
   department    Planning Bureau
Construction                                          Trade type and Public facility service industry
                            Newly built
  character                                                code                   11750
Occupied area                                         Plantation area
                               20000                                               7185
    (m2)                                                   (m2)
                                                                      Proportion of
                                                                       environment
     Total                   Investment in environment
  investment       2490       protection (RMB 10,000)      2490
                                                                         protection         100%
(RMB 10,000)                           included                       investment to
                                                                            total
                                                                        investment
Estimation cost
                               Planed date for practice                   August 2004
(RMB10,000)




                                                 115
Project Content and Scale
      1. Construction scale: the planed scale of comprehensive effluent disposal project is 10,000m3./d,
including the industrial effluent of 8500m3./d living effluent of 1500m3./d. The general changing index is
1.3; the largest volume of effluent in an hour is 542m3/h.
   2. Technique choice: Biolak technique (see page 9)
      3. Construction Content
   Inside the effluent disposal plant, the buildings and structures are divided into 4 functional areas
 according to their functions.
      Area before the plant: consists of comprehensive office & lab building and dinning room. It is
separated from producing area by green area. The residential area is arranged around the four corners of the
plant and it is separated from area before the plant by the green area between them.
      Effluent Treatment Area: it is located at the central part of the plant with roads and area before the
plant at its opposite. It consists of bar rack, water input pump room, grill house, touch oxidation basin, fan
house, deposit basin, stabilization basin, etc.
      Sludge Treatment Area: it is an independent area located at the northeast of the plant, which
consists of sludge condensation basin, sludge store basin and sludge de-hydration machine house, etc.
There is a side door for transportation and it is strictly isolated with area before the plant.
      Water Recycling Area: consists of elevating pump house, chloride adding room, reservoir, chloride
adding touch basin, etc. Among them, the water supply pump house, fire fighting pump house and
elevating pump house are set up together. The chloride adding room is far away from the area before plant.
      4. Road arrangement: the main roads inside the plant are connected with the outside roads in two
places, one is in the southwest of the plant, which is the main passage for the plant, and the other is
arranged in the east of the plant, mainly for the transport of grille rubbish and dehydration mud. The
sidewalk adopts the snake connection.
    5. Main pipe arrangement: the diameter of the effluent pipe into the plant is Ö800mm. It connects
with the adjusting basin. The effluent disposal structures inside the plant are all connected with each other
by cast iron pipe in diameter of Ö500-Ö800; The sludge pipe adopts theÖ500-Ö800 cast iron pipe. In case of
the accident, the main disposal structures are all equipped with transcendental pipes. Inside the plant, rain
pipe and effluent pipe are laid for the collection and discharge of rain, living or production effluent. The
effluent is discharged to the collector well in the pump house.
    6. Electricity Supply: the two 5KV of the plant are transported from the transformer substation in the
northwest, which is directly layed to the transformer substation high voltage side, one is for work and the
other is for reserve. Under normal conditions, 1# supplies electricity, otherwise the spare electricity source
will be put into use. The electricity volume of the plant is 363,000Kwh/a (real electrical energy)
    7. Heat Supply: oil hot water boiler of WNS-0.7/0.4/95/70 is used for the winter heating. The annual
                                                        116
consumption of diesel oil is 100 tons.
    8. Production organization and staff number: three-shift working system is practiced and the annual
working days are 365. The fixed staff is 22 persons, including 12 operation staff, 4 subsidiary production
staff, 3 management techniques and 3 service staff.




The original pollution related with the project and the main environment pollution:




None.




                                                      117
         Briefings on natural and social environment of the area where the project locates:

Natural environment (terrain, landform, geological condition, climate, metrology, hydrology,
vegetation, biodiversity and so on)
   1. Geological position
       The effluent treatment project is located in Penglai Chaoshui Town The town is located
at the east part of famous fairy land - Penglai Pavilion, which is 40 km from Yantai Municiapal
Government with Yantai ETDZ at its east, the Yellow Sea at its north, borders on Daxindian
Town in the west and joins Daliuhang Town in the south.
      2. Terrain and Landform
  Chaoshui Town belongs to low hill highland, there formed a flat stream area flatland in the
central north of the town, which covers 60% total area of the town. The landform of Chaoshui
is high in the southwest and low in the northeast. The altitude of Nuwang Mountain in the
southwest is 230.5 meters and 176.7 meters of the Bailian Mountain in the northwest. The
planned effluent treatment project is located at the east of Yaqian Village, Chaoshui Town,
Penglai, the area belongs to coastal flat.
   3. Geological Condition
       The geological condition of the area belongs to the shield of Eastern Shandong. The
northeastern section of the rising part of Jiaodong is located at the northern border of the rising
part of Jiaobei as from Jiaodong. And there is no bad structure growth. The bedrock of tide part
in the land and coastline is exposed. The natures of rocks are basalt and tuff. And the rocks
incline to the sea.
    4 Hydrology
   The main river of this town is Beifengshan River, Pingchang River and Chunyu River which
all belong to seasonal river. Among them, Pingchang River is the 2nd largest river in Penglai
originated from the south foot of Pengban Mountain that connected with Pengqi. It enters
Penglai from the south of Daduogou Village and finally enters the Yellow Sea in Pingchang
Weijia from south to north. The river inside town length of is 19.6 kilometers covering an area
of 223.1 square meters.
      The tide in this sea area is formal semi-diurnal tide, and the average flood tide is 6 hours
and 5 minutes, the average falling tide period is 6 hours and 19 minutes. The average sea
surface (the base level is average Huanghai Sea surface) is 0.08m. The average tidal range all
these years is 1.03m, and the highest sea level all these years is 2.02m. The ocean current is
influenced by the Miaodao strait tide, so the ocean current of flood tide in the sea area is to the
east by south, and the falling tide is to the west by south. The flood tide is bigger falling tide.
The waves in this sea area are mainly stormy waves; the average frequency is 86.1%. Common
wave direction is north and the frequency 9%, the sub-wave direction is northwest, and the
frequency is 5%. The strong wave direction is northwest and sub-strong wave direction is to
the north. This sea area is not frozen.


                                                  118
   5    Meteorology
        1    Temperature
      The average temperature all these years is 11.9 . The highest temperature appears in
July, and the average temperature in this month is 24.6 . The lowest temperature appears in
January, and the average temperature in this month is –2.4 . The highest temperature all these
years is 38.4 (July 5, 1972), and the lowest temperature all these years is –14.9 (February 2,
1979).


        2    Precipitation
       The average precipitation all these years is 657.7mm. The rainfall in the whole year
mainly concentrates in July, August and September. Among these, the rainfall in July and
August mainly covers the 47% of the total rainfall in each year. The largest rainfall one day
was 208.1mm (August 25, 1982), and the longest raining period lasted 9 days. (July 1970)
        3     Wind regime
  For many years, the average wind speed is 4.2m/s. The leading wind direction is SSW and the
frequency is 15%. The whole year strong wind directions are N NW, the maximum wind
speed is 28m/s, instant maximum wind speed is 40.0m/s(June 5, 1963), the sub-strong wind
direction is NNE, the fastest wind speed is 27m/s.
      SW wind prevails in spring; there appears storm and cyclone alternatively to the south
and north in summer. The average appearance days of 8-degree wind are 39.4 days for these
years. There appear average 2 or 3 times’ typhoon in the harbor.
      The average appearance days of heavy fog (the visibility is less than 1km) are 6 days.
      6 Earthquake
     The average intensity of the earthquake is 6 degree.




                                                 119
   Social environment briefing (social economy structure, education, culture, historic relics
   protection and so on):


Penglai Chaoshui Town has 53 villages and natural villages under its management. The total
population of the town has reached 32000 with an area about 90 square kilometers by the end
of 2001. The gross value of social products of the entire town was 1.6 billion Yuan and the
industrial output was 1.1 billion Yuan in 2001.Chaoshui Town can develop in high speed for
its strong industrial foundation. Over 120 enterprises enter the town and initially formed 6
industries including lock making, chemical industry, food, printing, lamps and solar energy.
Town furniture and lock factory, Zhaoyun Seafood Co., Ltd and Huasheng Food Factory has
been noted as “Yantai Star Enterprise”. Chaoshui Town has tens of enterprises engaging in
various seafood processing with an annual processing volume of over 2000 tons, among which
the total investment of 8 projects as Ludao Food Co., Ltd., Yantai Qunfu Food Co., Ltd., etc. is
about 100 million Yuan. Their products include 3 series as seashell, fish and alga over 40
varieties. The town coastline is 17 kilometers long with 15 marine parks founded there; the
main cultivating varieties include kelp, wakame, abalone, sea cucumber, scallop and mussel.
The gross sea food production of the town in 2002 reaches 70000 tons, which has been the
highest in history. Chaoshui town is convenient in transportation and advanced in position. The
third industry has a vigorous development. The 3 farm product markets as Chaoshui Farm
Product Market, Chunyu Farm Product Market and Yaqian Farm Product Market are mainly
engaged in agricultural and sideline products with a gross daily production of 0.185 billion
Yuan, which have become the new growth point of Chaoshui. Chaoshui Town has been
carrying the agriculture industrial structure modulation in recent years and has established the
new developing thoughts of mainly engaged in seafood, farming and fruit and has initially
formed industry and scale superiority. In developing the high efficient forest and fruit industry,
the whole town has established four high quality planting area as pear, peach, cherry and grape.
Meanwhile, the area ratio of economic products as apple, pear and peach and the farming land
has been adjusted to 7:3. There are 45 villages of the town have become the fruit planting
specialized villages and 8 villages have become the vegetable planting specialized villages.
The 0.12 billion Yuan annual income cover 6% of the total economic income. The town breeds
over 2300 cattle and over 0.5 million pigs. There are 40 newly built chicken cotes, among
which there are over 10 can hold chickens more than 10000 and over 20 can hold more than
5000.

                                                 120
Environment Quality Condition


Environment Quality Conditions and Main Problems Where the Project is Located
(environmental air, ground water, underground water, sound environment, ecological
environment, etc.)

Environmental Air: annual average day SO2 concentration range is from 0.006-0.053mg/Nm3,
NO2 annual average hour concentration range is from 0.005-0.066mg/Nm3, and TSP annual
average day concentration range is from 0.032-0.270mg/Nm3, which are all in accordance with
the second level standard of Environmental Air Quality Standard (GB3097-1996).

Environmental Noise: By monitoring the noises of environment, the Leq in the day time is
45.0dB (A) and in the night time it is 44.1dB (A), which are all in accordance with the 2nd
level standard of City Area Environment Noise Standard (GB3096-93).

Coastal Area: In August 2001, the supervision results indicate that the costal area seawater
quality of this area are in accordance with the 2nd standard of SEAWATER WATER
QUALITY STANDARD (GB3097-1997), in which the PH IS 8.04-8.19, DO is 6.40-
6.80mg/L, CODMn is 0.72-0.96mg.L, active PH is 0.005-0.022mg/L, Inorganic N is 0.014-
0.193mg/L, SS is 2-4 mg/L, Hg and petroleum are not checked out and the salinity is
31.568‰-32.844‰. All the standard indexes of all pollutant are under 1.0, and are in
accordance with the relevant requests of PENGLAI CITY COAST SEA AREA FUNCTION
DIVIDENCE, and the seawater quality in this area is quite good.




Main Environment Protection Objects (Name List and Protection Level):
There is no important historic relic for protection within the appraised area. Therefore, the near
sea and villages are the main environment protection objects.




                                                121
 Commenting suitable standards



                      2nd grade of ENVIRONMENTAL AIR QUALITY STANDARD (GB3097-
Environment           1996)
Quality Standard      2nd grade of SEA WATER QUALITY STANDARD (GB3097-1997)
                      2nd grade of URBAN DISTRICT ENVIRONMENT NOISE STANDARD
                      (GB3096-93)




                      1st grade of WASTE WATER COMPREHENSIVE DISCHAGE
                      STANDARD (GB8978-1996);
                      ODOR POLLUTANT DISCHARGE STANDARD(GB14554-93)
Pollutant Discharge   BOILER ATMOSPHERE POLLUTANT DISCHARGE
Standard              STANDARD(GB13271-2001);
                      AGRICULTURAL SLUDGE POLLUTANT CONTROL STANDARD
                      (GB4284-84);
                      2nd standard of INDUSTRIAL ENTERPRISES NOISE STANDARD
                      (GB12348-90).




Total Amount          This project is an environment protection project, after operation the project
Control Standard      construction can decrease the total COD discharge amount by 1971 tons
                      each year.




                                                122
123
                                    Construction Project Analysis

  Techniques Flowing Chart
 Touch Oxidation Techniques Flowing Chart


                                                       Pump

                                                                                               Touch
 Comprehensive         Machiner          Adjusting                  Pre-                      Oxidation
 Effluent               y Grill           Basin                     deposit                    Basin
                                                                    Basin




                   Aeratio             Second                   Sterilization
                   n basin             Deposit                     Room
                       Remaine          Basin
                       d sludge
                                                                              Discharging or Recycling




                                      Sludge                  Dehydrati
                                      Concentr                on
                                      ation                   Machine
                                                                   Shipping out the
                                      Basin
                                                                         sludge cake




Main Pollution Working Procedures:
1. Piping effluent treated
2. Waste gas smell from the open operating buildings
3. Waste gas from boilers
4. Noises of fans, pumps, etc.
5. Sludge from de-hydration machine




                                                 124
Project’s main occurred pollutants and expected discharge conditions


   Content Discharge
                                             Occurred density
                             Names of                                    Discharge density and
            Source           Pollutants     and amount before               amount (Unit)
Type                                         treatment (Unit)
                                                                    1. Plant Area
  Air 1. Technical 1. H2S NH3                                        H2S 0.013–0.043mg/m3
          waste gas                                                  NH3 not decided–0.070
Pollutant 2. boiler waste                    2. 450 mg/m3 0.585 t/a
                                                                    mg/m3
    s                     2. SO2
          gas                                                       2. 450 mg/m3 0.585 t/a


 Water                          COD              600mg/L 6t/d               60mg/L 0.6 t/d
          Production
Pollutant waste water            SS             350mg/L 3.5t/d              20mg/L 0.2 t/d
    s                          NH3-N             40 mg/L 0.4t/d             15mg/L 0.15t/d



  Solid
        Sludge                                       3.75t/d                     3.75t/d
 Wastes

           The equivalent sound level of noises from water pumps, sludge pumps and fans are
           about 90dB A . Isolated by pump house and machine house and flagged by distance,
           the sound level can be reduced to 31dB (A). The environmental noise monitoring
           levels (Leq) of this area are 45.0 dB (A) in the daytime and 44.1 dB (A) at night. After
  Noise    adding the influence value and environment current value, the noises within the plant
           area are 45.4 dB (A) in the daytime and 44.9 dB (A) at night, which are in accordance
           with II Standard of Industrial Enterprise Plant Area Noise Standard (GB 12348-90).




  Others                                             None


Main ecological impact (more pages are needed when not enough)

None




                                               125
       Environmental Influence Analysis


        Brief analysis to environmental influence during construction period:


       During the construction period, the project will cause construction noise and small amount of construction
powder. But because it is field work, so there is a little influence to environment and the influence will disappear with the
end of construction.

   Environmental Influence Analysis During Operating Period:

  Environmental influence during the project’s operating period is embodied in the following aspects
   1 Waste Water
  1 Under normal conditions: the discharged waste water is almost 10 thousand m3/d, CODcr 0.6 t/d.
The discharged effluent can reach the 1st grade requirement of Effluent Comprehensive Discharge
Standard (GB8978-1996). After the effluent is discharged into sea through special pipes, it can be
confirmed through comparison and investigation to relevant items that: except that COD in mixing area
0.01 Km2 (15 Mu) way from estuary overreaches the standard, the water quality of other areas are all in
accordance with the 2nd Grade Standard of Seawater Quality Standard (GB3097-1997);
(2) But under accidents: when the effluent treatment system does not work and the untreated effluent is
    directly discharged into the sea, COD in mixing area overreaches the standard 2.75 Km2 and the
    influence to surrounding sea is serious.

2. Waste Gas
Waste gas discharged from buildings working openly contains many kinds of badly odor materials. Their
main contents are sulfured hydrogen, thiol, thio ether and other sulfides, ammonia, amine, alcohol, fat
acid, indole, etc. among which the most is sulfured hydrogen and ammonia. According to the analysis to
odor influence information of Yantai Laishan Effluent Treatment Plant by Qingdao Ocean University
Environment Protection Research Center, it can be confirmed that within the plant area, H2S 0.013-0.043
mg/m3, NH3 not decided-0.070 mg/m3 , which are in accordance with the 2nd Standard of Odor Pollutant
Discharge Standard (GB14554-93). Usually the odor is not that obvious 200 meters way from the plant
border, but in summer the odor can influence a range of 300 meters; boiler discharged SO2 450 mg/m3
and 0.585 t/a, through 10 meters long chimney, can reach 2nd Class Area II 2nd Time Zone requirement of
Boiler Atmosphere Pollutant Discharge Standard (GB13271-2001). Due to the boiler discharged
pollutants are very few, they will not have obvious influence to surrounding air.

3. Sludge:
Discharged sludge amount is 3.75 t/d. After the sludge is stabilized and then dehydrated, water content is
less than 80% and reach the requirement of Farm Sludge Pollutant Control Standard (GB4284-84) and
can be shipped out and used in the field and will not cause pollution.

4. Noise:
The equivalent sound level of noises from water pumps, sludge pumps and fans are about 90dB A .
Isolated by pump house and machine house and flagged by distance, the sound level can be reduced to
31dB (A). The environmental noise monitoring levels of this area are 45.0 dB (A) in the daytime and 44.1
dB (A) at night. After adding the influence value and environment current value, the noises within the
plant area are 45.4 dB (A) in the daytime and 44.9 dB (A) at night, which are in accordance with II

                                                            126
Standard of Industrial Enterprise Plant Area Noise Standard (GB 12348-90).




                 Intended Prevention Actions and Expected Treatment

   Results

       Content     Discharging     Pollutant     Prevention Actions    Expected Treatment

                                                  127
Type          Source                                          Results
Atmosphere    1. Industrial   1. H2S   None                             1. In accordance
Pollutant     waste gas,      NH3      None                               with Odor
              2. boiler       2. SO2                                      Pollutant
              waste gas                                                   Discharge
                                                                          Standard
                                                                          (GB14554-
                                                                          93);
                                                                        2. In accordance
                                                                          with Boiler
                                                                          Atmosphere
                                                                          Pollutant
                                                                          Discharge
                                                                          Standard
                                                                          (GB13271-
                                                                          2001)
Water         Production      COD      Biolak technique       In accordance with
Pollutant     Effluent                 treatment              Effluent Comprehensive
                              SS       Biolak technique       Discharge Standard
                                       treatment              (GB8978-1996)
                              NH3-N    Biolak technique       In accordance with
                                       treatment              Effluent Comprehensive
                                                              Discharge Standard
                                                              (GB8978-1996)
Solid Waste   Sludge                   Treated according to   In accordance with Urban
                                       Urban Effluent         Effluent Treatment Plant
                                       Treatment Plant        Effluent & Sludge
                                       Effluent & Sludge      Discharge Standard
                                       Discharge Standard     (CJ3025-93)
                                       (CJ3025-93)




                                        128
Noise          The equivalent sound level of noises from water pumps, sludge pumps and fans
               are about 90dB A . Isolated by pump house and machine house and flagged
               by distance, the sound level can be reduced to 31dB (A). The environmental
               noise monitoring levels of this area are 45.0 dB (A) in the daytime and 44.1 dB
               (A) at night. After adding the influence value and environment current value,
               the noises within the plant area are 45.4 dB (A) in the daytime and 44.9 dB (A)
               at night, which are in accordance with II Standard of Industrial Enterprise Plant
               Area Noise Standard (GB 12348-90).
Others         None
Ecological protection measure and intended effect
Non




                                              129
Conclusions & Suggestions
Conclusions:
During the construction period, there will be construction noises and small amount of construction
powder. But for it is fieldwork, there is little influence to environment and the influence will
disappear with the end of construction.

Environmental influence during the project’s operating period is embodied in the following
aspects
   1 Waste Water
(1) Under normal conditions, the discharged waste water is about 10000 m3/d, in which the COD
0.6 t/d, SS0.2t/d and NH3-N0.15t/d is contained. The discharged effluent can reach requirement of
Effluent Comprehensive Discharge Standard (GB8978-1996). Part of the effluent is recycled and
the rest is discharged into sea through streams. Counted on all the effluent is discharged into the sea
that only the COD in mixing area 0.01 Km2 (15 m) way from estuary overreaches the standard, the
water quality of other areas are all in accordance with the 2nd Grade Standard of Seawater Quality
Standard (GB3097-1997);
(2) Under accidents when the effluent treatment system does not work and the untreated effluent is
   directly discharged into the sea, COD in mixing area overreaches the standard 2.75 Km2 and the
   influence to surrounding sea is serious.

2. Waste Gas
Waste gas discharged from buildings working openly contains many kinds of badly odor materials.
Their main contents are sulfured hydrogen, thiol, thio ether and other sulfides, ammonia, amine,
alcohol, fat acid, indole, etc. among which the most is sulfured hydrogen and ammonia. According
to the analysis to odor influence information of Yantai Laishan Effluent Treatment Plant by
Qingdao Ocean University Environment Protection Research Center, it can be confirmed that within
the plant area, H2S 0.013-0.043 mg/m3, NH3 not decided-0.070 mg/m3 , which are in accordance
with the 2nd Standard of Odor Pollutant Discharge Standard (GB14554-93). Usually the odor is not
that obvious 200 meters way from the plant border, but in summer the odor can influence a range of
300 meters; boiler discharged SO2 450 mg/m3 and 0.585 t/a, through 10 meters long chimney, can
reach 2nd Class Area II 2nd Time Zone requirement of Boiler Atmosphere Pollutant Discharge
Standard (GB13271-2001). Due to the boiler discharged pollutants are very few; they will not have
obvious influence to surrounding air.

3. Sludge:
Discharged sludge amount is 3.75 t/d. After the sludge is stabilized and then dehydrated, water
content is less than 80% and reach the requirement of Farm Sludge Pollutant Control Standard
(GB4284-84) and can be shipped out and used in the field and will not cause pollution.

4. Noise:
The equivalent sound level of noises from water pumps, sludge pumps and fans are about
90dB A . Isolated by pump house and machine house and flagged by distance, the sound level
can be reduced to 31dB (A). The environmental noise monitoring levels of this area are 45.0 dB (A)
in the daytime and 44.1 dB (A) at night. After adding the influence value and environment current
value, the noises within the plant area are 45.4 dB (A) in the daytime and 44.9 dB (A), which are in
accordance with II Standard of Industrial Enterprise Plant Area Noise Standard (GB 12348-90).

Through the above analysis, we think during the normal running of the project, if the proposed
actions can be executed, the project is feasible from the angle of environment protection.

                                                  130
Suggestions:
1. In order to alleviate the influent of odors to surrounding environment, we suggest to strengthen
greening between main buildings and walls, forming an over 10 meters wide green area to attract
and isolate odor materials and make the environment beautiful as well. Greening shall choose tree
seedlings that have strong attractive ability to odor materials (such as ammonia, sulfured hydrogen,
etc.) When accidents happen in summer, place fragrant materials over grill houses and deposit
basins to cover the odor.
2. The plant border of Effluent Treatment Plant shall not less than 300 meters away from residential
villages.
3. The floating rubbish in the effluent can be stopped by grills. But the sporadic oil in the effluent
still will flow into the sea. In order to prevent from oil film, we suggest adding effluent floating oil
isolation facility.
4. When effluent treatment system does not work and cannot treat the effluent, the plant shall adopt
effective actions to avoid a large amount of untreated effluent directly being discharged into the sea,
preventing from serious pollution to surrounding sea area.
5. After the sludge is stabilized and then dehydrated, water content is less than 80% and reaches the
requirement of Farm Sludge Pollutant Control Standard (GB4284-84) and can be used in the field.
6. We suggest that after in-depth treatment of part of effluent, they can be re-used in greening and
agricultural irrigation, etc. to alleviate the pollution to sea water.




                                                  131
Pre-exam suggestions:




Undertaker:                       Seal:
                          Day     Month     Year



The exam suggestions by the sub-administrative department in charge of environment protection:




Undertaker:                        Seal:
                           Day     Month    Year




                                              132
Examined suggestions:




Undertaker:                   Seal:
                        Day     Month   Year




                                           133
                                              M. Notes
  1. This report should have the following annexes and charts
   Annex 1. Setting-up Approval document
 Annex 2. The other administrative management document connected with environment
comments
  Chart 1. Project geographical position chart (It should reflect administrative divide, water series,
 pollutant sinker position signature and geographical conditions and so on.)
  Chart 2. Project flat position chart

  2. If this report form cannot explain the pollution made by the project and influence on the
     environment, it should be commented professionally. According to the characteristic of the
     construction project and local environment, one or two of the following should be chosen.
  1) Special comment about the atmosphere environment influence.
  2) Special comment about the water environment (includes surface water and underground
     water)
  3) Special comment about the ecological influence
  4) Special comment about the sound influence
  5) Special comment about the earth influence
  6) Special comment about the solid waste.



   The listed special comments that are not included in the above special comments can be carried
out according to the requirement in THE ENVIRONMENT INFLUENCE COMMENT
TECHNOLOGY GUIDE.




                               Photocopied by Shandong Province Environment Protection Bureau


                                                 134
                         Xiangshan, Ningbo, Zhejiang Province

Xiangshan County Coastal Belt Administration Center

Construction Items of establishing Jiushan Islands Ocean
   Ecologic Conservation Zone

Ningbo Chaoxiang Marine Life Product Company. Ltd. [Marine algae processing]

Xiangshan Huayi Seafood Co. Ltd. [Seafood processing]

Ningbo Feiri MarineIndustrial Co., Ltd. [Seafood Processing]

Ningbo Xianglong Aquatic Food Company, Ltd. [Seafood Processing

Xiangshan Fishing Trade and Development Co., Ltd. [Seafood wholesale market]

Shipu Seafood Industrial Park [Planned waste treatment facility not financed by the
       project and will serve all components in Shipu area]




                                               135
Evaluation of the Influences of Construction Items on the
                        Environment




  Project: Xiangshan County Coastal Belt Administration Center



    Undertaker: (seal) Xiangshan Ocean and Fishery Bureau




              Date of Report Making: July 29, 2003

      Produced by: National Bureau of Environment Protection




                               136
                                  Responsibility Arrangement



            Evaluation Unit: Xiangshan Environment Supervision Station

          Principal of Evaluation Unit: Shi Yaqin

          Principal of Project: Ni Jianzhong




                                   Information of Evaluators

      Name        speciality    Technical      Post Number       Responsibility   Signature
                                  title
                                              Environment                         Wan Yong
     Wan        Environment     Assistant                            Report
                                             Evaluation Post
     Yong       Engineering     Engineer                           Production
                                             No. C20150004
                                              Environment                         Shi Yaqing
      Shi       Environment
                                Engineer     Evaluation Post        Verifier
     Yaqing     Engineering
                                             No. C20150001




Evaluation is based upon:
                                                137
1. Law of Environment Protection OF P.R. China
2. Law of Ocean Environment Protection OF P.R. China
3. Ordinance on Environment Protection Involved in Construction of P.R. China
4. Documents of Xiangshan Development and Planning Bureau: Xiangshan Investment
   Planning No. [2003]22 Notification on Establishing Coastal Belt Administration Center In
   Xiangshan County
5. Feasibility Report on Establishing Coastal Belt Administration Center In Xiangshan County
6. Bulletin on GB3838-2002 Standards For Surface Water Environment issued by China
   Environment Protection Bureau
7. GB3095-1996 Quality Standards for Environmental Air issued by China Environment
    Protection Bureau
8. National Standards Of P.R. China: GB3096-93 Standards for City Environment Noise




Basic Information of the Project:

                                              138
  Project Name         Coastal Belt Administration Center, Xiangshan County



   Undertaker      Xiangshan Ocean and Fishery Bureau




Principal               Huang Cailin                Contact                  Fang Yue


 Correspondence
                Xiangshan Ocean and Fishery Bureau
    Address


       Tel:        13003705705      Fax       0574-65982242            Postal Code 315731



 Construction site Tian’an Road, Dancheng, Xiangshan County

                                                                  Xiangshan Development
                   Xiangshan Development                          & Planning Bureau
  Authorized by                                 Authorization No.
                   and Planning Bureau                            Investment Section Reply
                                                                  No. [2003]22

   Character of
                              New              Trade classification
   Construction


    Area to be                                        Forestation
    occupied                13.36 Mu                      M2

                              Investment in                         Ratio of
                               environment                      investment in
 Total investment
                  2394.59       protection            30         environment           1.25%
   10,000 yuan
                                (included)                     protection/total
                               10,000 yuan                        investment
  Capital needed
   according to                                     Expected date of
                                                                                  Dec.2004
    evaluation                                         operation
  (10,000 yuan)




                                              139
1 Reasons For The Project
   Xiangshan county. is in the middle region along the east sea coast of Zhejiang provinces.
With three sides facing the sea, the county enjoys the richness of coastal natural resources,
and development advantages of ocean fishery and economy. In the county’s Two-Wing
economy system, ocean fishery plays a significant role in its strategic development. The
exploitation of the fishing resources along the coast, the adjustment of the production
structure and the upgrading of the production standards have consequently quickened the
area’s development pace and led to the economic increase of the county’s fishery. Yet new
problems arise: ocean fishing resources, particularly the off-shore commercial fishing
resources are shrinking. Stringent monitoring and protecting measures should be adopted to
ease off the overexploitation burden on the resources. Pollution is threatening some sea areas.
Exploitation is exhausting the resources in some parts of the sea. Aquatic species diseases are
on the rise and quickly spreading in aquatic breeding and, aquatic product is beset with
quality safety problems. The county is struggling with the problems of raising the public’s
awareness of the protection of fishing resources and ocean environment, of consolidating
measures to protect the natural resources of the coastal area and to ensure the rational
exploitation of resources, and of strengthening aquatic product quality safeguarding, but it is
in great need of facilities and equipment, and management personnel. Considering these
problems, and in order to provide better services for the sustainable development of the
regional economy, the county government has decided to carry out this construction project of
the coastal regions administration center.

2. Scale and Content of the Project Construction
    The Center Site, with an occupation of 8,907 square meters, will be located on Tian’an
Road, Dancheng, Xiangshan County. Among the 8,907, namely 13.36 Mu (a tradition
Chinese unit), 3,975 square meters (approximately 6 Mu) will be used to build city roads.
That is to say, 4.932 square meters (7.36 Mu or so) land is for the practical use. The main
building is a six-storey mansion, occupying 4,906 square meters. Among the six storeys, the
first storey of 1,070 square meters serves as a hall for running papers for the convenience of
people and information consulting. The second one is used for the location of Fishery
Resources and Ocean Environment Inspection and Administration Center, occupying 1,111
square meters. The third floor taking up 592 square meters is functioning as Aquatic Animals’
Disease Prevention and Cure Center. Aquatic Product Quality and Safety Control Center is on
the fourth floor, taking up 592 square meters. On the fifth floor, the Central Office is
inhabited, with a range of 592 square meters also. The sixth storey enjoys the function as
Training Center, also occupying 592 square meters. Half-basement with an area of 317 square
meters is used as a garage. The area of the staircase roof is 40 square meters.Other,
Equipment mainly is classified into four categories. Inspection Apparatus, Office Necessities,
Training Equipment and Information Network Communication Commanding System
Equipment. mong all the facilities, relevant scheme and layout of the 1,470 KW fishery-
policy inspecting ship will be attached.
    The project needs total fund amassment of 23.9459 million RMB, with the equivalent of
2.892 million US dollars. Sources of Fund: Loan from World Bank is 1.8 million US dollars,
with the equivalent of 14.904 RMB; local financial rationing fund is 9.0419 million RMB.




                                              140
                                  North




                                                                          Road
                                                   Tian’an              Road




                                                                                  141
                                                                          Danhe
                                          The Site of Our Project:
Map of Location (See appendix):




                                          Coastal Belt Administration
                                          Center
Brief Introduction to the                                  natural         and         social
environment of the project
 Natural environment(landform, physiognomy, geology, climate, hydrology, vegetation,
 diversity of biology, etc.)
 Xiangshan County is located in the middle of the coastal areas of Zhejiang Province, between
 Xiangshan Port and Sanmen bay. The land area of the county is made up of the eastern part of
 Xiangshan Peninsular and other islands off the coast, bordering the Pacific on the east,
 Cathead Ocean on the south, and Ninghai County on the west. The county is 90 km south to
 north, and 70 km east to west, with the land slanting to the southeast, belonging to low
 highlands. At the South end lies Shipu Port, a famous fishery port in China. In climate,
 Xiangshan is at the margin of subtropical area, enjoying typical subtropical monsoon climate,
 warm, humid, with four distinct seasons. In winter, it stays cold and fine controlled by cold
 air; in spring, with cold air alternating with less high pressures, weather is now rainy, now
 fine; in early summer, with pressure increasing, the weather is stable with occasional local
 thunderstorms bringing in typhoon and big tides and other disastrous weathers; in autumn,
 pressure decreases, resulting in constant rainy-day weather. Generally speaking, the weather
 is characteristic of the following elements as recorded over the years:
   The average temperature: 16.20 C°; the lowest temperature: -7.5 C° (as recorded of Jan.16,
1961); the average wind speed: 5.5M/S; the biggest rainfall: April,1956; the smallest rainfall:
770.6mm; the average rainfall 1308mm; the average relative humidity: 80%; frostless period of
the whole year: 235 days




                                               142
Brief introduction to social environment (structure of social economy, education, culture,
projection of cultural relics)
    Xiangshan County has land area of 1,175 km2 and sea area of 5,335 km2 with 18
townships and neighborhood committees. The population is numbered at 534,000. The vast sea
area is typical of extensive shallow foreshore and long coastal line, which, measured at 800
kilometers in total, accounts for 1/6 of the coastal line of the whole province. Since the Reform
and Opening-Door practice, Xiangshan have been basing its development on its traditional
trades and rich resources, insisting on the “one body and two wings” development strategy, that
is, having industrial economy as main body and marine economy and construction economy as
wrings. Guided by this strategy, it has made great efforts to develop agriculture, enhance its
industry and create characteristic economies. As a result, the whole county has been developing
steadily in a healthy and rapid way. In 1994, it was listed as one of the 400 counties strongest in
rural economy; in 1996, it was listed among the “Well-off Counties” of Zhejiang Province. In
2002, its gross internal product hit 9,2 billions, and the whole county is flourishing in
agriculture and striding in industry, arising suddenly in construction and rigorously developing
in third industry.
    Its agricultural structure is mainly composed of rice, wheat, bean, cole and cotton. Thanks
to its long coastal line and extensive water area with rich marine lives, it is a productive fishery
area, producing quantitative hairtails, yellow-fin-fish, pomfrets, and blackfish. The aquatic
breeding is mainly prawns, clams, oysters, seaweeds and purple vegetable. Its industry, though
started late, develops rapidly in textile, mechanism, electronics, food, and construction material.
Its transportation system is convenient with two sea port, Shipu Sea Port and Hepu Sea Port. In
recent years, electronic industry develops rapidly and tourist industry is on the rise, especially
in Songlan Mountain which attracts large numbers of visitors from home and abroad.




Status Quo of environment quality




                                                 143
The Status Quo of environment quality and major environmental problems of the project
area (environmental air, ground water, underground water, sound environment, entironment,
etc.)
1.Water environment
        Wastewater from the site of our project flows into Nanda river which belongs to the
Nanda River Water System and has its water as the third-class functionally. Xiangshan
Environment Protection Supervision Station has set up a supervision spot at the Lijia
Bridge. Statistics of years’ survey indicate that the quality of water at this section is
beyond the fifth-class, whose dominating pollutants are oxygen-dependent stuff and
ammonia-nitrogen(NH 3-N).
2.Atmospheric environment
   The air of the project area satisfies the second level of the GB3095-1996 Quality Standards
for Environmental Air
   The following table records the atmospheric statistics of June 2-4, 2003.
                                                            Unit: mg/m3
                                  S02                  NO2                 TSP
            June 2              <0.003                 0.034              0.173
            June 3              <0.003                 0.015              0.157
            June 4              <0.003                 0.032                /
           average               0.002                 0.027              0.165
3.Sound environment
   Sound environment satisfies the first level of Standards for Environment Noise In Cities and
Towns.
  Major environmental problems of the Site: Surface water exceeding the standard of Function
Zones, namely, losing the ability to admit more pollutants; acid rain increasing by the year.




Major targets of environment protection (list the items and their respective protection
level)




                                     Evaluation Standards

                                                144
                                         1.     Surface Water:
                                               Based on the third level of GB3838-2002 Standards for Surface Water
                                               Environment Quality. Some specifications are as follows:

                                                                    Index of                                D          N
                                          Parameter         PH                      BOD5mg/L
                                                                  KMnO+4 mg/L                      O mg/L       H3-N mg/L
Quality Specification for Environment




                                          Standards         6-9        ≤6               ≤4           ≥5           ≤1.0


                                        2. Atmospheric Air
                                           Control of atmospheric air of the project area is administered based on the second
                                           level of GB3095-1996 Standards for Environmental Air Quality. Here are some
                                           of its specifications:
                                                          Second Level of Standards for Environmental Air Quality
                                                                     Unit: mg/ m3 at standard state
                                                Pollutant            N. TSP               O. SO2                P. NO2
                                              Yearly average          0.20                 0.06                 0.08
                                              Daily average           0.30                 0.15                 0.12

                                        3. Sound environment:
                                           This project is sited at an empty plot to the west of Tian’an Road and to the north
                                           of Danhe Road. Noise control is administered referring to the first class of
                                           GB3096—93 Standards for Environmental Noise in Cities and Towns, namely
                                           daytime: 55dB nighttime 45dB.




                                                                             145
                                                          1 Waste Water
                                                              Waste Water discharge is based on the first level of GB8978-1996 Standards for
                                                          Waste Water Comprehensive Discharge. Some specifications are as follows: (Unit:
                                                          mg/L (except PH))
                                                                                                         anion-surface
                                                               Parameter         PH       CODCr                                 NH3-N
                                                                                                            activator
      Standards for Waste Water Comprehensive Discharge




                                                                Standards        6-9        100                5.0               15
                                                              2. Noise: During the construction, noise control is administered according to
                                                              GB12523-90 Noise Limitation On Construction site. Here are some of its
                                                              Specifications:
                                                                    Noise Limitation On Construction site
                                                                          Noise Equivalent to Leq[dB(A)]
                                                                      During                                               Noise limitation
                                                                                        Major noise sources
                                                                  construction                                         Daytime          Nighttim
                                                                    Earth and        Bulldozer, grab, loading&
                                                                                                                         75                55
                                                                       rocks          unloading machine, etc
                                                                                                                                          Not
                                                                      Piling                Pile drivers                 85          allowed to
                                                                                                                                         work
                                                                                      Concrete mixer, shaking
                                                                     Structure                                           70                55
                                                                                        tamper, electric saw
                                                                    Decoration          Crane, lift trucker, etc           65            55
                                                            During the construction, noise control is exercised referring to the first level of
                                                          GB12348-90 Noise Standards for Environment Around Industry and Enterprises, i.e,
                                                          daytime 55dB, nighttime 45dB. The fourth level will be used for the construction sites
                                                          on the sides of the main road, namely, daytime 70dB, nighttime 55dB.
Specifications of general
         control




                                                                                                146
Construction Items Analysis
Profile of the Project (See Maps)
  The project will be constructed and undertaken by Xiangshan Ocean and Fishery
Administration Department. By the time of its completion, the project will be transferred to the
Coastal Regions Administration Center for duty operation. The Coastal Regions Administration
Center is to execute the following tasks Performing the monitoring, investigation, evaluation
and administration of the fishery resources along the county’s coast line, proposing the
orientation, approaches, measures and work plans of rational exploitation of the fishery
resources, and making suggestions concerning the policy-making of the fishery development.
Performing the monitoring function of the ocean ecological conditions of the county’s coast
regions, Responsible to the breeding enterprises for the prevention, examination and
elimination of the aquatic species diseases, Checking and measuring the safety of the county’s
aquatic product quality Providing training and educational programs to the law-enforcement
personnel of the fishery resources and ocean environment, the fishery scientific workers and the
fishing population.
Coastal Belt Administration Center is shown in the table below:

                        Xiangshan County Coastal Belt Administration
                        C
                   Office


                             V.W.




                                            F.R.O.E.I.A.




                                                                               A.P.Q.S.C.C



                                                                                             TRAINING
                                                                 A.A.D.P.C.C




                                                                                              CENTER
                                    L.E.D




ONLY INTIAL LETTERS OF THE SEVEN DEMPARTMENTS ARE GIVEN AND MORE BRANCHES OF OFFICE AND
VOCATIONAL WORK DEPARTMENT ARE EXPLAINED IN THE FOLLOWING TWO PARAGRAPHS.




                                                           147
 Major pollution sources:
 1    Waste Water
      Mainly from life sewage and laboratory sewage, 1500 tons yearly, 500 tons coming from
      life,100 tons coming from labs and 900 tons from other sources.
 2    Exhaust Gas
      Mainly from the analytic processes in the lab such as the utilization of ventilators.
 3    Noise
       Mainly from the outside machine of air-conditioners and the gasoline generator while the
       electricity supply is suspended, approximately 65-75dB
 4. Solid waste
       Mainly from life garbage, about 19.2 tons per person, if calculated at one kilogram per
       working day and 300 working days per year.




Major pollutant formation and their discharge
     content                                             Concentration before       Concentration
                discharging source    Pollutant
type                                                         processed and         when discharged
                      (No.)             name
                                                            quantity (unit)       and quantity (unit)
                                                         1500 tons or so of
                                                         waste water will be
                       Life sewage          CODcr                                The discharging
                                                         produced, according
                                            anionic                                 output is about
                                                         to experience,
                                            surface                                 1500ton
      Water                                              containing
                                             active                              CODcr≤100
                                                         ammonia-nitrogen
     pollutant                               agent,                              mg/L
                                                         (NH 3-N) 30, anionic
                                           ammonia-                                 anion-surface
                       Lab sewage                        surface active agent
                                           nitrogen(                              activator≤5 mg/L
                                                         20
                                            NH3-N)                                NH3-N≤15 mg/L
                                                         mg/L,CODcr400mg/
                                                         L
 Atmospheric                                Peculiar
                           lab                                   ------                  ------
  pollutants                                 smell
                   the outside machine
                    of air-conditioners
                                             Noise
                     and the gasoline
      Noise                                  From              65-75dB                 65-75dB
                   generator while the
                                           equipment
                   electricity supply is
                        suspended

                                                  148
                                         Life and
                                                         About 19.2 tons      About 19.2 tons
  Garbage              Office             office
                                                         yearly               yearly
                                         garbage

   Others
Major Influences on Ecology
 The Site of the Project was originally an agricultural field. After the construction, the ecology
will be irreversibly changed. In order to improve the regional ecological surroundings, green
belts will be set up to update the office environment.
The overall implementation of our project.
     First, we can grasp the current state and change of the chief economic fishery resources in
coastal areas of Xiangshan County and East Sea areas. By doing so, we can provide accurate
and detailed gist to guide fishery production activities and to protect and manage fishery
resources, and then we can take some relevant effective measures. Second, we are able to know
about the state and trend of ocean environmental quality in Xiangshan coastal belt and its
neighborhood. This is of critical importance to make a macro policy of Sea environment
protection and administration. Third, we can at our earliest time get the aquatic products’
morbid state and state of diseases in aquatic breeding regions. So, we can provide a powerful
backing for the healthy development of aquatic production breeding industry. Fourth, With it, a
sound and strong guarantee can be found on the way to promoting standard production and
putting environment-protection aquatic products (green aquatic products) into markets. Thus,
we can practically and effectively implement fishery resource cultivation and protection, ocean
ecology protection and the healthy development strategy of fishery industry. Meanwhile,
management staff, sci-tech staff and fishermen will be trained and educated systematically to
improve their practicing qualities and raise their awareness of protecting the ocean ecology.
Also, the project will lead the public awareness of environment—protecting the sea and
protecting our surroundings—to its maximum.




                                                149
Analyses of influences on environment
Influences of construction on environment
   During the construction period, engineering mainly concerns earth and rocks, piling,
structures, wall building, decoration, transportation and pipe laying. The major pollutants are
construction wastes and noises made by mechanic operation. The rainwater running through
construction site will affect the ground water environment. The granulated stone and cement,
loading and unloading of lime , casting of construction materials, laying up the houses and the
construction site will stir up dust. During the construction period, the construction site should
be sprayed every day, more frequently during the monsoon season, reducing the negative
effects on environment. Because the construction is to last 16 months, In addition to following
routine stipulation, the construction should have a noon break during the summer time. The
construction workers should be educated to carry out civilized operation, not making noise,
keeping construction site clean, heaping at given places, clearing life garbage timely, not
throwing randomly, Reducing the disturbance to the neighboring residents to its minimum.
    If there is need for noisy operation at night, application forms should be filled out and
submitted to the environment authority for approval beforehand. Only with Permission to Work
at Night, can there be night operation, and it should be carried out according to the
requirements in the permission, reducing noise to the minimum.




                                                150
 Influences on environment when it begin to operate
    1    Effects of waste water on environment
         After the project is constructed, wastewater comes mainly from life, labs and other waste
   water, with a yearly total of 1500 tons, waste water from life being mainly pollutant factors
   CODcr, anionic surface active agent, ammonia-nitrogen(NH3-N), etc.. Sewage from labs
   has mixed components, containing a lot of organic and inorganic matters. Nanda River can
   no longer permit any pollutant. All the wastewater must be treated to reach the standards for
   disposal. The detailed measures are as in the following table.
 2. Influence of waste gas
         Lab analysis will turn out some peculiar smells, mainly from the slight volatilization of
    reagents. Because it is of low concentration, most of them disperse quickly, having no harm
    to the environment. However, some highly-concentrated fumes need ventilators to remove.
    With the aid of those ventilators, they will not be harmful to the environment.
 3. Influence of Noise
    Noise mainly comes from the outside machine of air-conditioners and the gasoline generator
    while electricity supply is suspended, about 65-75dB. Sound insulation and distance will
    make it attenuate to no harm to the environment.
 4. Solid Waste
   Solid waste is mainly from daily consumption and office operation and will be collected and
   transferred, frequently as possible, to Environment Sanitation Service for disposal.
 5. Supervision Boats will also produce solid waste and wastewater, impairing the environment.
    Substantial measures are as follows:




Preventive measures to be adopted by the project and their target effects
   Contents       Discharging sources
 Types                                     Pollutants      Preventive measures       Target effects
                         (No.)



                                                  151
                                                   After being sifted by the
                                                   case bar, it will be
                                                   collected and deposited
                                         CODcr     followed by the                Satisfying the
                                         anionic   treatment using
                                         surface   facultative anaerobe and        requirements
                                          active   aerobe till it reaches the           for
                  Life sewage
                                          agent,   standards to be                 environment
                                       ammonia- discharged. All the                  protection
                                        nitrogen sewage water will be
                                        (NH3-N) introduced to a sewage            enacted by the
  Water
                                                   processing factory to be           relative
 pollutant
                                                   constructed as part of the         national
                                                   project.                          authority
                                                   Cool it directly in the
                                                   lab, and use it for              having little
                                       Quantitativ                                 influence on
                                                   forestation. Quantitative
                                           e of
                                                   waste water will be                  the
                                         organic
                Sewage from lab                    collected in barrels and        environment
                                           and
                                                   sent to waste water
                                       inorganic
                                                   disposal factory or a
                                         matter
                                                   proper factory to be
                                                   processed and drained.
                                                                                  Having little
 Pollutants                                          Let into high sky
                                        Peculiar                                  influence on
  harming              Lab                           through natural aeration
                                         smells                                   the
atmosphere                                           and pipe ventilation
                                                                                  environment
                                                                                   Satisfying the
                                                                                    requirements
                                                     The outside machine of              for
                                                     air-conditioners requires      environment
                                                       maintenance. For the           protection
               The outside machine                      very noisy ones, we
              of air-conditioners &    Noise from    offer the timely repair to    enacted by the
  Noise       the gasoline generator      the          reduce the noise; The           relative
                 while electricity     equipment      chamber generator will           national
               supply is suspended                       be set away from             authority,
                                                     roadside and residential
                                                        areas with effective         having little
                                                         sound insulators.          influence on
                                                                                         the
                                                                                    environment
                                                                                      Have little
                                                     Collected and treated by
                                        Garbage                                     influence on
 Garbage                                                  Department of
                     Offices            from life
                                                         Environmental                   the
                                       and offices
                                                            Sanitation              environment



                                              152
                                                                                   Satisfying the
                                                                                   requirements
                                                      Life garbage is collected           for
                                                            and treated by         environment
                                                           Department of              protection
                                         Garbage           Environmental           stipulated by
  Others          Supervision Boats     from life,      Sanitation; sewage is        the relative
                                        wastewater    disposed by grease water         national
                                                      separator, making sure it       authority,
                                                      satisfy the requirements      having little
                                                           before drainage          influence on
                                                                                         the
                                                                                   environment
Measures for Ecology Protection and Target Effects:
  The Site of the construction was originally an agricultural field. After the construction, the
ecology will be irreversibly changed. Green belts will be built up around and inside the Site.
Plants consuming less water or trees in favor of the local climate will be preferable. Meanwhile,
all the bare plots will be transformed into green belt. Chambers will be spotted with some
decoration and ornamental plants or flowers to formulate a favorable and enjoyable office
surroundings.




                                                153
Conclusions and Suggestions
   This Project is entitled Xiangshan County Coastal Belts Administration Center. After its
construction, administration on the coastal areas will step on to a new stage. Law enforcement
will be enhanced by the increase of transportation and communication tools. Fishery Resources
and Ocean Environment Supervision and Administration Center will be equipped with
specialized supervision boats and more advanced analysis apparatus, providing more accurate
and more extensive monitoring, and thus will be able to provide better serve for the massive
aquatic product breeders and the enforcement department. Aquatic Animals’ Disease
Prevention and Cure Center will also have an unprecedented development. With the addition of
many necessary machinery and equipments and exclusive labs, the Center can carry on a
systematic study on disease prevention and treatment, uncover the causes of some previous
aquatic animals diseases and can offer sound technical support for the aquatic breeding industry
of Xiangshan County. Also, Aquatic Products Quality Control Center will be updated with
advanced apparatuses and equipment to enhance the quality control, provide safe technical
support, and promote a standardized development of Xiangshan aquatic industry. Thus, the
quality of the aquatic products will be raised to meet the market demand home and abroad and
to boost domestic markets and export output as well. Meanwhile, the Training Center will
devote space and equipment for all kinds of trainings for the management staff, sci-tech staff,
fishermen and others who are concerned about the protection of the ocean environment. All in
all, by exerting the Administration Center to its utmost, ocean ecology will be under protection,
reasonable ocean exploitation will be guided to ensure the sustainable development of ocean
and industry.
   Currently, quality of atmospheric and acoustic environment in the construction areas of the
project is nice enough to meet the requirements of different functions in different parts.
1. Wastewater is mainly from people’s daily consumption, labs and other sources. After being
 sifted by the case bar, it will be collected and deposited followed by treatment with
 facultative anaerobe and aerobe and then be discharged. All the sewage water will be
 conducted to a sewage-processing factory to be processed. The cooled water in the lab can be
 directly released; however, quantities of waste liquid must be stored in special barrels to be
 dispatched to relevant enterprises or sewage factory before being dumped.
2. Exhaust gas is mainly from labs. It will be sent off to the sky through the ventilating pipes,
 causing no damage to the surroundings nearby.
3. Noise of 65-75dB is mainly from the outside machine of the air-conditioners and the gasoline
 generators while electricity is cut off. Noise insulation measures will be adopted; distance will

                                                154
also reduce it to some degree.
4. Solid waste is mainly from life and offices and will be collected and treated by
  Department of Environmental Sanitation.
5. Garbage from supervision boats collected and treated by Department of Environmental
      Sanitation; sewage is disposed by grease water separator, to make it satisfi the
      requirements before drainage and have no harm to the environment.


   As long as all the laws and standards are strictly implemented and all environment-
 protection measures are put into effect, ocean ecology will be safely protected and
 sustainable development of fishery industry will be promoted. Meanwhile, improving staff
 member’s awareness of environment-protection will also contribute greatly to shaping
 Xiangshan County into an economically developed county with an excellent ecology.




                                              155
Examination and Supervision Comments:

      The report of Evaluation of Influences of Construction Items on the Environment
  written by supervision station of Xiangshan County Bureau of Environment Protection
  has been carefully studied. We thereby agree with the conclusion and suggestions.
      The construction undertaker must administer “three meanwhiles” system, putting
  into effect all the measures of environment protection, seeing to it that life sewage is
  recycled for forestation and lab sewage is not let out.

     We hereby authorize the project.




                    (Seal) Xiangshan County Bureau of Environment Protection
                                                   Date: August 13,2003




                                             156
                                                                                                    Application for Environment Protection Plan for

                                 Project Construction
                               Apply unit seal                             Form writer signature                 committed by signature
                                                    Xiangshan County Coastal Belts                                                   North of Danhe Road, West of Tian’an Road, Dancheng,
                       Project name                                                          Location of construction
                                                         Administration Center                                                                        Xiangshan County
                                                 Construct a 4906-floor-area complex of
                       Scale and content
                                                 Administrative Station and install it with  character of construction                                      new
                       of the construction
                                                          necessary equipment
                                                                                             Administrative classification of
                       trade                                                                                                               Production of the application form
                                                                                             Environment protection
                       Total
                                                                                                Investment in environment                                        Percentage of
                       investment 10,000                         2394.59                                                                         30                                 1.25%
                                                                                                protection 10,000 yuan                                         investment %
                       yuan
                                                                                                                                       Xiangshan




   Construction item
                                                 Xiangshan Bureau of Development and                                                   Investment Planning     Construction         March
                       Applicant Unit                                                           Approval No.
                                                              Planning                                                                 Section Reply No.       starting date        2003
                                                                                                                                       [2003]22
                       Unit examining
                       and approving the     Xiangshan Bureau of Environment Protection         Approval No.                                                   Approval time
                       item
                                               Xiangshan                                                                               Xiangshan
                                                                  Contact
                       Unit name             Bureau of Ocean                    13003705705                         Unit               Environment             Contact phone      65718706
                                                                  phone
                                               and Fishery                                                                             Supervision Station
                                                                                                Evaluation Unit
                                               Xiangshan
                                                                  Postal




 undertaker
                       Address               Bureau of Ocean                       315731                           Address             191 Xinhuan Road       Postal No.           315700




Construction
                                                                  coast
                                               and Fishery
                       Legal person           Huang Cailin        Contact         Fang Yue                          Certificate No.                            Evaluation fee
                                                        Level of
                                                                               Environmental Air GB 3095-1996 surface water Level 2 Environmental noise GB 3096-93 Type 1 see water GB 3097-1997
                                                        environment
                                                                               soil     others
                                                        quality

                                                                                     Protected drinking water sources        Natural conservation area         places of interest      forest parks     Protected farmland




               project area
                                                        Environmentally              protected areas of ecological functions
                                                        Sensitive items               area liable to loss of water and earth    ecologically sensitive and fragile area       densely-populated area protected cultural relics




    status quo of Environment of the
                                                                                     three rivers, two lakes, two controlled areas     three gorges reservoirs
                                                                               construction completed
                                                                                                                                                                                                                                                                       Total construction engineering
                                                                                      and under                                                                                                                   Planned construct
                                                                                                                                                                                                                                                                       finished + in process + planned
                                                                                    construction

                                                        Pollutants
                                                                                                                                                                                                                                                                         ”new-for-                 Verified




                                                                                                         allowed
                                                                                                                               quantity
                                                                                                                                                        quantity
                                                                                                                                                                                   pollutant
                                                                                                                                                                                                                                     Self-        Total




                                                                                                                                                                                   Expect3ed
                                                                                                                                                                                                        Allowed                                                             old                       total
                                                                                                                                                                                                                      quantity    diminishing   expected
                                                                                                                                                                                                                                                                  tit
                                                                                                                                                                                                                                                                                         tit
                                                                                                                                                                                                                                                                                                                     tit




                                                                                                                                                                                                      concentration                                                     diminishing                discharge




                                                                               discharged water
                                                                                                                                                                                                                                                                                                                              Local equilibration




                                                                                                                                                                                   concentration of
                                                                                                                                                                                                                                    quantity    quantity
                                                                                                                                                                                                                                                            discharge
                                                                                                                                                                                                                                                                                    discharge
                                                                                                                                                                                                                                                                                                               Discharge
                                                                                                                                                                                                                                                                                                                             replacing diminishing

                                                                                                                                                                                                                                                                                                               fluctuation




                                                                                                         Discharged quantity
                                                                                                                                                                                                                                                                          quantity                  quantity
                                                                                                                                                                                                                                                           Verified total
                                                                                                                                                                                                                                                                                  Expected total




                                                                                                                               Practically discharged




                                                                               Quantity of practically
                                                                                                                                                        Verified total discharge
                                                          Wastewater              ——                       ——                                                                           ——                 ——          0.15                      0.15
                                                        Chemically needed
                                                                                                                                                                                    ≤400                  ≤100          0.6           0.45       0.15
                                                        oxygen




                   items details
                                                        ammonia-
                                                        nitrogen                                                                                                                      ≤30                 ≤15         0.045        0.0225       0.0225
                                                        (NH 3-N)
                                                        Anion surface active
                                                        agent
                                                                                                                                                                                      ≤20                  ≤5          0.03        0.2925       0.0075
                                                        Waste gas                 ——                       ——                                                                          ——                  ——
                                                        Sulphur dioxide*
                                                        looting*
                                                        Industrial powder*




Pollutant discharge t control industrial construction
                                                        Nitrogen oxide



                                                                                                                                                                                                                              2
  Industrial solid
                          ——    ——               ——         ——
  waste*




other



project
pollutant
related to the
             Notes     1. * pollutant controlled by the country in quantity during the “tenth -five” years
                 2.. discharge quantity increase and decrease      + increase - decrease
               3 ure units Waste water discharge quantity——10,000tons/year Waste gas discharge——10,000 m3 (Cubic
                   Tons10,000biaoM3/year Industrial garbage——10,000tons/year Concentration of pollutant in sewage ——mg/liter Concentration
                   of pollutant discharged into the air——mg/m3 Quantity of waste water——ton/year Pollutants into the air——ton/year




                                                                           3
       Xiangshan County Coastal Belts                                              North of Danhe Road, West of Tian’an Road, Dancheng,
            Administration Center                                                                   Xiangshan County
    Construct a 4906-floor-area complex of
    Administrative Station and install it with
             necessary equipment

                        2394.59                                                              30                         %        1.25%
                                                                                            [2003]22                            2003 3

                                           130037057
                                                                                                                                65718706
                                               05
                                                                                              191                                 315700

         GB 3095-1996        GB3838-2002              GB 3096-93 1



                    +                                                                                  +   +
                                                                                        “       ”

    ——       ——                       ——        ——        0.15             0.15
*                                    ≤400      ≤100       0.6     0.45     0.15
*                                    ≤30       ≤15       0.045   0.0225   0.0225
                                     ≤20        ≤5        0.03   0.2925   0.0075
    ——       ——                       ——        ——
*
*
*

*   ——       ——                       ——        ——



                                                          4
    1 * “   ”
2               +        -
3                   ——   /   ——   /   ——   /       ——   /   ——   /   —— /   ——




                                               5
Evaluation of Influences of Construction Items on the
Environment




     Project: Construction Items of Establishing Jiushan

                Islands Ocean Ecologic Conservation Zone

        Undertaker: (seal) Xiangshan Ocean and Fishery Bureau




                      Completed on July 31, 2003
             Made by National Bureau of Environment Protection
                                Responsibility Arrangement



Evaluation Unit: Xiangshan Environment Supervision Station
           Principal of Evaluation Unit: Shi Yaqin

           Principal of Project: Ni Jianzhong




                                     Information of Evaluators

        Name       speciality    Technical       Post Number     Responsibility   Signature
                                   title
                                                Environment                       Wan Yong
        Wan       Environment     Assistant                         Report
                                               Evaluation Post
        Yong      Engineering     Engineer                        Production
                                               No. C20150004
                                                Environment                       Shi Yaqin
        Shi       Environment
                                  Engineer     Evaluation Post      Verifier
       Yaqin      Engineering
                                               No. C20150001




                                                  2
Evaluation is based upon:

 3.   Law of Environment Protection OF P.R. China
 4.   Law of Ocean Environment Protection OF P.R. China
 5.   Ordinance on Environment Protection Involved in Construction of P.R. China
 6.   Documents of Xiangshan Development and Planning Bureau: Xiangshan Investment
      Planning No. [2003]51 Decision on Establishing Jiushan Islands Ocean Ecologic
      Conservation Zone In Xiangshan County
 7.   Feasibility Report on Establishing Jiushan Islands Ocean Ecologic Conservation Zone In
      Xiangshan County
 8.   Document issued by Zhejiang Province (Zhejiang Gov. Document No. [2003]60):
      Zhejiang Gov. Decision on Establishing Jiushan Islands Ocean Ecologic Conservation
      Zone In Xiangshan County at Provincial Level
 9.   National Standards Of P.R. China: GB3097-1997 Standards for Sea Water Quality
 10. Document of Ningbo Environment Protection Bureau: Ningbo Environment Section No.
      [1999]070: Notice on Implementing Zhejiang Gov. Notice on Alongshore Ocean
      Environmental Function planning (Adjusted)
 11. GB3095-1996 Standards for Environmental Air issued by China Environment Protection
      Bureau
 12. National Standards Of P.R. China: GB3096-93 Noise Limitation for City Environment
      and GB12523-90 Noise Limitation for Construction




                                                3
                                Basic Information of the Project

                   Construction Items of Establishing Jiushan Islands Ocean Ecologic
    Project
                   Conservation Zone

  Undertaker       Xiangshan Ocean and Fishery Bureau

   Principal             Huang Cailin                Contact                 Fang Yue

Correspondence
               Xiangshan Ocean and Fishery Bureau
   Address

      Tel:         13003705705      Fax        0574-65982242           Postal Code 315731

Construction site Jiushan Islands Conservation Zone and Songlan Mountain

                                                                          Xiangshan
                                                                          Development &
                   Xiangshan Development
 Authorized by                                   Authorization No.        Planning Bureau
                   and Planning Bureau
                                                                          Investment Section
                                                                          Reply No. [2003]51
 Character of
                                                Trade classification
 Construction                 New
   Area to be        3 mu for Administrative          Forestation
   occupied                  Station                      M2
                              Investment in                         Ratio of
                               environment                      investment in
Total investment   603.25       protection            60         environment           9.95%
  10,000 yuan                   (included)                     protection/total
                               10,000 yuan                        investment
Capital needed
                                                Expected date of
 according to
                                                                                  Dec.2004
  evaluation                                    operation
(10,000 yuan)




                                                 4
1. Reasons for the Project
     Jiushan Islands, Xiangshan, located at the southernmost end of Zhoushan Islands, is a
  famous archipelago made up of 76 small islands, 7,300 square meters in area, the main
  island of being 4,080 Km2. The Islands and its neighboring area enjoy an advantageously
  unique location: it is at the junctures of Zhoushan fishery site, Damuyang fishery site,
  Fishing Mountain fishery site, and Fishery sites of Eastern Sea east of Southern Zhejiang,
  favored by the warm current from Taiwan and water system along the coast. It is a
  productive sea area abundant in bait creatures, an ideal habitat and breeding place for
  numerous sea creatures. According to the investigation made on the islands resources, the
  major island itself boasts of 54 species of fish, including 25 kinds of carapace fishes, 7
  kinds of molusc, in addition to big yellow-fin-tuna, small shaol, Man needless cuttlefish,
  hairtail, and small yellow-fin-tuna. As a result of its richness in organic food and biological
  resources, and small shaol and cuttlefish which are the major food of cow fish---- the
  second-class national protected animals----the area and its neighboring sea areas abound in
  cowfish.
       In addition to the favorable natural conditions for marine animals as mentioned above,
   the reservation zone enjoys favorable climate, varied physiognomy with rich vegetation,
   attracting many flying creatures to inhabit and breed, including one kind of the second -
   class nationally protected bird, and seven kinds of provincially protected birds. The
   vegetation is varied and flourishing, with wild phoenix tree as the major type, the
   nationally rare plants including Putuo Mountain camphor and various herbs and ornamental
   plants such as honeysuckle, South Sky Star, lilies, and Shanhuangjing camellia.
       The ecologic environment of the area is, on the whole, well-maintained. However,
   with the development of economy and the improvement of exploitation capacity, the
   natural resources on the islands are being randomly exploited and damaged, the plants and
   animals are being more and more immoderately picked and captured. So it is imperative to
   strengthen the conservation and protection of the resources in the area and exercise
   sustainable utilization, and it should not be delayed in doing it.




                                                   5
2. Scale and contents of the project
     The conservation zone Jishan Islands are located at the south end of Zhoushan Islands, 18.5
  kilometers off Changzuitou, Juexi Town, the closest land area. They are divided into nuclear
  zone, 5884 hectares, buffer area, 1,1375 hectare, and experiment area, 97,691 hectare,
  respectively accounting for 6.6%, 10.8 and 82.6% of the total. The contents of the project
  include: a. setting up twelve suspended signs, twenty buoys and can buoys; twenty-nine
  prohibition signs, as well as some wire fences, stakes, pickets, and platforms for
  administration observation b. building up a administrative station and a small accessory dock
  for trafficking. The main building is 1,500 m2 in floor area with three floors, the first floor to
  be used as display hall for sea samples and exhibition hall for ocean knowledge, the second
  floor to be used as monitoring and analysis center, third floor functions as offices; c.
  equipping the area and Administration Station with necessary facilities and office equipment.
     The project plans to apply for ten positions of civil servants and raise 6,032,500 yuan RMB
  as total investment, 6,032,500 yuan of which from the World Bank, 268,000 yuan from the
  local government. Administration outlay is also to be financed by the local Financial Bureau.




                                                    6
Map of location (see appendix)




                                     east




                                 7
Brief Introduction to the natural and social environment of the project
 Natural environment(landform, physiognomy, geology, climate, hydrology, vegetation,
 diversity of biology, etc.)
 Xiangshan County is located in the middle of the coastal areas of Zhejiang Province, between
 Xiangshan Port and Sanmen bay. The land area of the county is made up of the eastern part of
 Xiangshan Peninsular and other islands off the coast, bordering the Pacific on the east,
 Cathead Ocean on the south, and Ninghai County on the west. The county is 90 km south to
 north, and 70 km east to west, with the land slanting to the southeast, belonging to low
 highlands. At the South end lies Shipu Port, a famous fishery port in China. The
 Administrative Station is sited in Songlan Mountain overlooking Damu Ocean to the
 southeast of central town of Xiangshan, belonging administratively to Dandong and Juexi.
 Songlan Mountain is a famous coastal resort with sea area of 40.12 km2,of which 23 km2 is
 water area and 2 km2 is islands and islets.
 It has an easy access to the town center and South Jiushan, the former being 4 km off and the
 latter being 20 km off. The sea area of Jiushan Islands is an ideal habitat and breading place
 for sea creatures, boasting of rich resources of seedlings of big yellow-fin-tuna, needless Man
 cuttlefish, baits and their seedling. It also has reef biogeocenose ecosystem, suitable for
 cowfish and black-tailed seagulls. In climate, Xiangshan is at the margin of subtropical area,
 enjoying typical subtropical monsoon climate, warm, humid, with four distinct seasons. In
 winter, it stays cold and fine controlled by cold air; in spring, with cold air alternating with
 less high pressures, weather is now rainy, now fine; in early summer, with pressure
 increasing, the weather is stable with occasional local thunderstorms bringing in typhoon and
 big tides and other disastrous weathers; in autumn, pressure decreases, resulting in constant
 rainy-day weather. Generally speaking, the weather is characteristic of the following elements
 as recorded over the years:
   The average temperature: 16.20 C°; the lowest temperature: -7.5 C° (as recorded of Jan.16,
1961); the average wind speed: 5.5M/S; the biggest rainfall: April,1956; the smallest rainfall:
770.6mm; the average rainfall 1308mm; the average relative humidity: 80%; frostless period of
the whole year: 235 days




                                                 8
Brief introduction to social environment (structure of social economy, education, culture,
projection of cultural relics)
    Xiangshan County has land area of 1,175 km2 and sea area of 5,335 km2 with 18
townships and neighborhood committees. The population is numbered at 534,000. The vast sea
area is typical of extensive shallow foreshore and long coastal line, which, measured at 800
kilometers in total, accounts for 1/6 of the coastal line of the whole province. Since the Reform
and Opening-Door practice, Xiangshan have been basing its development on its traditional
trades and rich resources, insisting on the “one body and two wings” development strategy, that
is, having industrial economy as main body and marine economy and construction economy as
wrings. Guided by this strategy, it has made great efforts to develop agriculture, enhance its
industry and create characteristic economies. As a result, the whole county has been developing
steadily in a healthy and rapid way. In 1994, it was listed as one of the 400 counties strongest in
rural economy; in 1996, it was listed among the “Well-off Counties” of Zhejiang Province. In
2002, its gross internal product hit 9,2 billions, and the whole county is flourishing in
agriculture and striding in industry, arising suddenly in construction and rigorously developing
in third industry.
    Its agricultural structure is mainly composed of rice, wheat, bean, cole and cotton. Thanks
to its long coastal line and extensive water area with rich marine lives, it is a productive fishery
area, producing quantitative hairtails, yellow-fin-fish, pomfrets, and blackfish. The aquatic
breeding is mainly prawns, clams, oysters, seaweeds and purple vegetable. Its industry, though
started late, develops rapidly in textile, mechanism, electronics, food, and construction material.
Its transportation system is convenient with two sea port, Shipu Sea Port and Hepu Sea Port. In
recent years, electronic industry develops rapidly and tourist industry is on the rise, especially
in Songlan Mountain which attracts large numbers of visitors from home and abroad.




Status Quo of environment quality




                                                   9
The Status Quo of environment quality and major environmental problems of the project
area (environmental air, ground water, underground water, sound environment, entironment,
etc.)
1. Water environment
        The location of the project borders on Atlantic; the seawater functions as the first-class. In
        recent years, the water quality is worsened, some index exceeding the standards. But with
        the setting up of one after another land sewage disposing factories, sea water alongshore
        will improve fundamentally.
2   Atmospheric environment
        The air of the project area satisfies the second level of the GB3095-1996 Quality
        Standards for Environmental Air
        The following table records the atmospheric statistics of June 2-4, 2003. Unit: mg/m3
                                        S02                  NO2                     TSP
           June 2                     <0.003                 0.034                  0.173
           June 3                     <0.003                 0.015                  0.157
           June 4                     <0.003                 0.032                    /
          average                      0.002                 0.027                  0.165
3. Sound environment
    Sound environment satisfies the first level of Standards for Environment Noise In Cities
    and Towns.
    Major problems with the environment: The quality of the sea waters have been worsened
    somewhat, some index exceeding the Standards for Functional Sea areas, and acid rain
    increasing by the year.




Major targets of environment protection (list the items and their respective protection
level)
    1 Jiushan Islands Ocean Ecologic Conservation Zone at provincial level
        2   Songlanshan seashore holiday resort,




                                                      10
Evaluation is based on the following standards

                                          1     Sea water
                                               Quality control of sea water is administered referring to the first level of GB3097-
                                                1997Standards for Sea Water Quality. The following are some of its
                                                specifications:

                                                                  Chemically                                             Non-
                                              parameter   PH        needed       BOD5mg/L                   DO
                                                                                                                 ionic ammonia
                                                                 oxygen mg/L                        mg/L
                                                                                                                      mg/L
  Quality Specification for Environment




                                                          7.8-
                                              standards               ≤2                 ≤1             6               ≤1.0
                                                          8.5

                                          2. Atmospheric Air
                                             Control of atmospheric air of the project area is administered based on the second
                                             level of GB3095-1996 Standards for Environmental Air Quality. Here are some
                                             of its specifications:
                                                            Second Level of Standards for Environmental Air Quality
                                                                       Unit: mg/ m3 at standard state
                                                   Pollutant               Q. TSP              R. SO2               S. NO2
                                              Yearly average             0.20                 0.06                 0.08
                                              Daily average              0.30                 0.15                 0.12
                                          3. Acoustic environment
                                             Although this project is sited in Songlan Mountain (the former hydrometric
                                             station) and Jiushan Islands, noise control is administered referring to the first level
                                             of GB3096—93 Standards for Environmental Noise in Cities and Towns, namely
                                             daytime: 55dB nighttime 45dB




                                                                                    11
                                          1. Waste water
                                              The project is close to Dama Ocean which is suitable for fishery. Waste water is
                                              not allowed to let.
                                          2. Noise
                                              During the construction, noise control is administered according to GB12523-90
                                              Noise Limitation On Construction site. Here are some of its Specifications:
      Standards for pollutant discharge




                                                     Noise Limitation On Construction site
                                                                         Noise Equivalent to Leq[dB(A)]
                                                      During                                               Noise limitation
                                                                         Major noise sources
                                                   construction                                        Daytime         Nighttime
                                                     Earth and        Bulldozer, grab, loading&
                                                                                                         75                55
                                                       rocks           unloading machine, etc.
                                                                                                                          Not
                                                      Piling                 Pile drivers                85          allowed to
                                                                                                                         work
                                                                       Concrete mixer, shaking
                                                     Structure                                           70                55
                                                                         tamper, electric saw
                                                    Decoration          Crane, lift trucker, etc.        65            55
                                            When operation begins, noise control is administered according to the first type of
                                          GB12348—90 Noise Limitation for Industrial Factories       namely, daytime:
                                          55dB nighttime: 45dB.
Specifications of general
         control




                                                                                  12
Construction items analyses
 Brief introduction to the construction engineering (see maps)
      Xiangshan Ocean and Fishery Bureau undertake the project. After its construction, the
 Administrative Station will be staffed with 10 personnel performing administrative duties. The
 ratio of technical personnel to administrators and managers is 4 4 2. It will be installed with
 advanced equipment, including speedboats and transportation vehicles for inspection and
 supervision and office equipment. Those infrastructure serve to ensure better monitoring and
 management and enhance the protection of and research into various biological resources, reef
 resources, cultural resources, natural resources and so on. Various endangered and rare
 biological populations will be restored; benign circulation of ecosystem guaranteed; diversified
 biology maintained, resulting in the formation of species resource bank. After that, it will apply
 for provincial ecologic conservation zone.


 Process of Establishing Conservation Zone and its Operation Diagram:

       Apply for                     Set up                         Set up suspension
       the                           Administrativ                  boards, buoys and
       establishme                   e Station of                   can buoys
       nt of ocean                   the                            prohibition
                                     Conservation                   boards, and
                                                                    platform for
                                                                    inspection and



             Publicize                 carry out                    Realize the
             relative laws             routine                      protection and
             and                       research and                 restoration of
             knowledge                 administration               ecology in the
                                                                    zone




                                                   13
 Major pollution sources
 1. Waste water
        mainly from life liquid waste and laboratory sewage, 250 tons yearly, 100 tons coming
        from life, 50 tons coming from labs and 50 tons from other sources.
 2. Exhaust gas
    mainly from slight volatilization of reagents during the chemical analyses in the lab
 3. Noise
        mainly from the outside machine of air-conditioners, about 65-75dB
 4. Solid waste
        mainly from life garbage, about 3 tons per person, if calculated at one kilogram per
        working day and 300 working days per year.


Major pollutant formation and their discharge

        content                                                                            Concentration
                  discharging                              Concentration before            when
 type                             Pollutant name
                  source (No.)                             processed and quantity (unit)   discharged and
                                                                                           quantity (unit)


                   Life sewage
                                                   250 tons or so of waste water
                                                   will be produced, according to
                                   CODcr anionic
    Water                                          experience, containing                  Not allowed to
                                    surface active
                                                   ammonia-nitrogen (NH3 -N)                     let
   pollutant                      agent, ammonia-
                                                   30, anionic surface active
                                  nitrogen(NH3-N)
                   Lab sewage                      agent 20
                                                   mg/L,CODcr400mg/L



 Atmospheric
                        lab         Peculiar smell                     ------                   ------
  pollutants
                     Outside
                    machine of        Noise From
    Noise                                                             65-75dB                  65-75dB
                       air-           equipment
                   conditioners
                                    Life and office                                         About 3 tons
   Garbage            Office                                    About 3 tons yearly
                                       garbage                                                yearly



                                                      14
   others

Major influence on ecology
    The administrative station is sited at location of the former hydrometric station. Its construction
will make great change to the appearance of the place. Proper trees should be planted in all clearing
space to improve office environment and the local ecology. The construction of the small dock will
cause irreversible changes to the original coastal line and view, therefore we suggest using the
original dock. If a new one has to be constructed, it should be scientifically designed and
constructed and its location should be well selected, causing as little damage as possible to the
original rock coastal line, so that the harmonious scenes in Songlan Mountain can be maintained.
 After the construction, the station will be staffed with professional technical, administrative,
management personnel, who will administer unprecedented perennial monitoring, analyses and
researches of the ecologic environment, set up historical files of resources and environment of the
zone, research into the technology of the breeding and reproducing of rare animal and endangered
sea animals. Random and excessive capture and felling, capture of parent fish, capture by bombing,
electrify and other illegal practices will all be punished and prohibited.
 The station will also carry out propaganda work to publicize the relative laws and stipulations to
enhance public’s sense of environment protection, making every person in the area an environment
protector. In nuclear area, all human activities will be prohibited; in buffer zone and experimental
zone, proper development activities can be carried out, such as ecologic travels, popular science
educations, researches and other activities intended as self-supporting, untill the realization of the
ocean ecologic protection and its ecologic balance.




Analyses of influences on environment




                                                   15
Influences of construction on environment
     During the construction period, engineering mainly concerns earth and rocks,
piling, structures, wall building, decoration, transportation and pipe laying. The
major pollutants are construction wastes and noises made by mechanic operation.
The rainwater running through construction site will affect the ground water
environment. The granulated stone and cement, loading and unloading of lime ,
casting of construction materials, laying up the houses and the construction site
will stir up dust. During the construction period, the construction site should be
sprayed every day, more frequently during the monsoon season, reducing the
negative effects on environment. In addition to following routine stipulation, the
construction should have a noon break during the summer time. The construction
workers should be educated to carry out civilized operation, not making noise,
keeping construction site clean, heaping at given places, clearing life garbage
timely, not throwing randomly, reducing the negative effects on the tour area
around it to the greatest extent.
     If there is need for noisy operation at night, application forms should be filled out and
submitted to the environment authority for approval beforehand. Only with Permission to Work
at Night, can there be night operation, and it should be carried out according to the
requirements in the permission, reducing noise to the minimum.




                                                16
Influences on environment when it begin to operate
1. Effects of waste water on environment
   After the project is constructed, wastewater comes mainly from life, labs and other waste
   water, with a yearly total of 300 tons, waste water from life being mainly pollutant factors
   CODcr, anionic surface active agent, ammonia-nitrogen(NH3 -N), etc.. Sewage from labs
   has mixed components, containing a lot of organic and inorganic matters. All the
   wastewater must be treated to reach the standards for disposal. The detailed measures are as
   in the following table.
2. Influence of waste gas
   Lab analysis will produce some peculiar smells, mainly from slight volatilization of
   reagents. Because it is low concentration, most of them disperse quickly, having no harm to
   the environment.
3. Influence of Noise
    Noise mainly comes from the outside machine of air-conditioners, about 65-75dB. Sound
    insulation and distance will make it attenuate to no harm to the environment.




                                                 17
Preventive measures to be adopted by the project and their target effects
   Contents
                Discharging
                                 Pollutants         Preventive measures       Target effects
 Types            sources
                   (No.)
                                               First, deposit them in a case
                              CODcr anionic
                                               bar pool, then treat them
                              surface active
                                               with facultative anaerobe
                                  agent,                                           Satisfying the
                Life sewage                    and aerobe. The processed
                               ammonia-                                          requirements for
                                               sewage water can be used
                                nitrogen
                                               for forestation. Random let          environment
                                (NH3 -N)
   Water                                       is not allowed.               protection enacted by
                                               Cool it directly in the lab,
  pollutant                                                                    the relative national
                                               and use it for forestation.
                              Quantitative of Quantitative waste water       authority having little
               Sewage from      organic and    will be collected in barrels       influence on the
                   lab            inorganic    and sent to waste water              environment
                                    matter     disposal factory or a proper
                                               factory to be processed and
                                               drained.
  Pollutants                                   Let into high sky through     Having little
   harming          Lab       Peculiar smells natural aeration and pipe      influence on the
 atmosphere                                    ventilation                   environment
                                                                                   Satisfying the
                                               Keep maintenance of the           requirements for
                                               outside machine of air
                                                                                    environment
                The outside                    conditioners. Those with
                machine of       Noise from    heave noise will be fixed        protection enacted
    Noise
                   air-          equipment     and quickly and properly to     by relative national
                conditioner                    reduce the noise. Effective       authority, having
                                               sound insulation measures
                                                                              little influence on the
                                               will also be adopted
                                                                                    environment
                                                 Collected and treated by      Have little influence
   Garbage                     Garbage from
                  Offices                              Department of
                              life and offices                                 on the environment
                                                Environmental Sanitation




                                               18
                                                       Life garbage is collected       Satisfying the
                                                      and treated by Department       requirements for
                                                           of Environmental             environment
                     Speed        Garbage from
                                                         Sanitation; sewage is      protection stipulated
    Others       boat for               life,
                                                       disposed by grease water        by the relative
                 supervision        wastewater
                                                       separator, making sure it     national authority,
                                                       satisfy the requirements    having little influence
                                                            before drainage         on the environment
                          Measures for ecologic protection and target effects
    The administrative station is sited at the location of the former hydrometric station. Its
 construction will make great change to the original view of the place. Green belt is planned to be set
 up around the area and the inside the station, choosing proper plants fitting the environment and
 consuming less water. Grass and flour will be grown in all clearing space, and pot flowers and plants
 will be grown inside the buildings. At the same time, try to bring the Administrative Station into
 normal operation as early as possible. With all those measures, a pleasant green environment will be
 created, the ecologic environment will be protected to the greatest degree and diversity of creatures
 will be resumed in the area.




Conclusions and suggestions



                                                   19
    Intended to establish Jiushan Islands ocean ecologic conservation zone in Xiangshan
County, the project will result in effective protection of the area as spawning place and/or
resources of big yellow-fin fish and needless Man cuttlefish, bait and larva bait and also as
habitat for cowfish and as reproduction place for black tailed gulls and other birds. The reef
ecology system will also be effectively protected.
     As for the workers and equipment, professional personnel and advanced equipment will be
staffed and installed, who will exercise over-all researches into its administration, law-
execution and supervision and propaganda, prevent and stop all illegal practices and behaviors
that will impair the ecologic environment, mobilize the public to participate in the protection
work, till the restoration of biologic resources and entironment, which will promote coordinated
development of the local economy.
     At present, the atmospheric environment and acoustic environment are good enough in
quality to satisfy requirements for various functional areas.
1. The wastewater, mainly from life sewage and lab sewage as well as other sources as
     mentioned above, will go through case-bar treatment and depositing treatment and aerobe
     and anaerobe treatment to be made suitable as irrigation water for forestation. No
     wastewater will be allowed to let without proper treatment. Quantitative wastewater will
     be collected in barrels and sent to waste water disposal factory or a proper factory to be
     processed and drained.
2. The major exhaust gas comes from labs, which will be let into high sky through air-
     exhausting pipes and ventilation, causing no consequence to the surroundings.
3. Noise mainly comes from the outside machine of air-conditioners, about 65-75dB. Sound
     insulation and distance will make it attenuate to no harm to the environment.
4. Garbage, mainly from life and offices, will be collected and then disposed by sanitation
     service.
5. The construction of the small dock will impair the original coastal line and view, we suggest
     using the original dock. If a new one has to be constructed, it should be scientifically
     designed and constructed and its location should be well selected, causing as little damage
     as possible to the original rock coastal line, so that harmonious travel scenes in Songlan
     Mountain can be maintained.
6. Suggestions: Since administrative Station will be built in tour area, with the first floor as
     displaying hall for ocean biological samplers and exhibition place for ocean knowledge, its
     content should be constantly enriched to involve various aspects of ocean and halobios,
                                                 20
     especially of the ecologic phenomena and biological species unique to Xiangshan.
     Exhibition should be open to tourists and made into a window for Chinese and foreign
21
Examination conclusion


      The report of Evaluation of Influences of Construction Items on the Environment
  written by supervision station of Xiangshan County Bureau of Environment Protection
  has been carefully studied. We thereby agree with the conclusion and suggestions.
      The construction undertaker mush administer “three meanwhiles” system, putting
  into effect all the measures of environment protection, seeing to it that life sewage is
  recycled for forestation and lab sewage is not let out.

    We hereby authorize the project.




               (Seal) Xiangshan County Bureau of Environment Protection

                Date: August 13,2003




                                               22
                               Application for Environment Protection Plan for Project Construction
                               Apply unit seal                                     Form writer signature                 committed by signature
                                          Constructions Items of Jiushan Islands Ocean
                     Project name                                                          Location of construction               Jiushan Islands and Songlan Mountain, Xiangsha
                                                   Ecologic Conservation Zone
                                          Construct a 1500-meter-floor-area complex of
                     Scale and content       Administrative Station and install it with
                                                                                           character of construction                                     new
                     of the construction      necessary equipment; set up protection
                                                    establishments in the area
                                                                                           Administrative classification of
                     trade                                                                                                                Production of the application form
                                                                                           Environment protection
                     Total
                                                                                           Investment in environment                                      Percentage of
                     investment 10,000                        603.25                                                                      60                                 9.95
                                                                                           protection 10,000 yuan                                       investment %
                     yuan
                                                                                                                                 Xiangshan
                                             Xiangshan Bureau of Development and                                                 Investment Planning C o n s t r u c t i o n Marc
                     Applicant Unit                                                        Approval No.
                                                             Planning                                                            Section Reply No.      starting date         2003
                                                                                                                                 [2003]51
                     Unit examining
                     and approving the    Xiangshan Bureau of Environment Protection Approval No.                                                       Approval time
                     item
                                            Xiangshan                                                                           Xiangshan
                                                             Contact
                     Unit name            Bureau of Ocean                  13003705705                       Unit               Environment            Contact phone      657187
                                                             phone
                                            and Fishery                                                                         Supervision Station
                                                                                          Evaluation Unit
                                            Xiangshan
                                                             Postal
                     Address              Bureau of Ocean                                                    Address              191 Xinhuan Road     Postal No.          31570




Construction
                                                             coast
                                            and Fishery
                     Legal person          Huang Cailin      Contact         Fang Yue                        Certificate No.                           Evaluation fee

                     Level of
                                          Environmental Air GB 3095-1996 surface water Level 2 Environmental noise GB 3096-93 Type 1 see water GB 3097-1997
                     environment
                                          soil     others
                     quality




     status quo of
                                 Protected drinking water sources        Natural conservation area         places of interest      forest parks     Protected farmland
   Environmentally               protected areas of ecological functions
   Sensitive items                area liable to loss of water and earth    ecologically sensitive and fragile area       densely-populated area protected cultural relics
                                 three rivers, two lakes, two controlled areas     three gorges reservoirs
                          construction completed
                                                                                                                                                                                                                 Total construction engineering
                                 and under                                                                                                                   Planned construct
                                                                                                                                                                                                                 finished + in process + planned
                               construction

   Pollutants
                                                                                                                                                                                                                   ”new-for-                  Verified




                                                    allowed
                                                                          quantity
                                                                                                   quantity
                                                                                                                              pollutant
                                                                                                                                                                               Self-        Total




                                                                                                                              Expect3ed
                                                                                                                                                   Allowed                                                            old                       total
                                                                                                                                                                 quantity   diminishing   expected


                                                                                                                                                                                                            tit
                                                                                                                                                                                                                                   tit
                                                                                                                                                                                                                                                               tit




                                                                                                                                                 concentration                                                    diminishing                discharge




                          discharged water
                                                                                                                                                                                                                                                                         Local equilibration




                                                                                                                              concentration of
                                                                                                                                                                              quantity    quantity
                                                                                                                                                                                                      discharge
                                                                                                                                                                                                                              discharge
                                                                                                                                                                                                                                                         Discharge
                                                                                                                                                                                                                                                                       replacing diminishing

                                                                                                                                                                                                                                                         fluctuation




                                                    Discharged quantity
                                                                                                                                                                                                                    quantity                  quantity
                                                                                                                                                                                                     Verified total
                                                                                                                                                                                                                            Expected total




                                                                          Practically discharged




                          Quantity of practically
                                                                                                   Verified total discharge
     Wastewater              ——                       ——                                                                           ——                 ——         0.025           0.025      ----
   Chemically needed
                                                                                                                               ≤400                  -----         0.1            0.1       ----
   oxygen
   ammonia-
   nitrogen                                                                                                                      ≤30                 -----       0.0075      0.0075         ----
   (NH3 -N)
   Anion surface active
   agent
                                                                                                                                 ≤20                 -----       0.005           0.005      ----
   Waste gas                 ——                       ——                                                                          ——                  ——
   Sulphur dioxide*
   looting*
   Industrial powder*
   Nitrogen oxide

   Industrial solid
                             ——                       ——                                                                          ——                  ——
   waste*




other



    j t
pollutant
related to the
                                                                                                                                                                      24
Notes     1. * pollutant controlled by the country in quantity during the “tenth -five” years
    2.. * discharge quantity increase and decrease      + increase - decrease
1 Measure units Waste water discharge quantity——10,000tons/year Waste gas discharge——10,000 m3 (Cubic
   Tons10,000biaoM3/year Industrial garbage——10,000tons/year Concentration of pollutant in sewage ——
   mg/liter Concentration of pollutant discharged into the air——mg/m3 Quantity of waste water——ton/year Pollutants into the
   air——ton/year




                                                              25
                    Jiushan Islands Marine natural reserve area project

                                    Social Evaluation report

   Jiushan Islands marine natural reserve area project is a long term social and environmental project
based on Xiangshan county and even Zhejiang province’s actual marine situation and necessity to
protect marine and fishery resource. This project is given full consideration to Jiushan islands.

     .Respond to local economy development’s requirement
   Though influence on fishing production of Xiangshan to some extend, viewing from long term
interest, establishment of Jiushan islands marine natural reserve area will contribute to continuous
development of Xiangshan marine economy :
   1.It will offer safe reproduction and living surrounding for main economical fish type as large
yellow croaker , octopus and porpoise ,black tail seagull within reserve area. Compared with present
small and low valued fish, fishing resource after protection will have more economy value. Establish
reserve area is to protect and utilize marine resource more scientifically and reasonably. If we control
marine resource under scientific evaluation and make sure that fishing production is within resource
reproduction capacity’s acceptance, fishing production will on the way of positive circulation and
continuous development.
   2.After establish reserve area, the situation that disorder and unlimited use resource of shellfish and
alga on island and reef, bird and vegetation in reserve area will be quickly changed. Resource of bird,
shellfish,alga and vegetation will rehabilitate, and surrounding environment will be well protected.
   3.Marine environment within reserve area will be essentially improved. Given the advantage of
peaceful harbor, numerous islands, beautiful scene, abundant fishes and bird resource, this reserve
area is suitable for developing recreation tourist industry, integrate with Songlanshan and Shipu spot,
to develop program as sea fishing, bird island and island tour, seafood taste and sea scene view. With
the development of tour industry, it will not only accelerate development of relevant industry,
increase tour income, but also play an important role in creating more job opportunity.
   4.with the establishment of reserve area, popularity of Ningbo and Xiangshan will be enhanced
which will lead us to attract more attention from oversea and domestic businessman and bring more
invest and economy corporation opportunity.
   5.After establishment of reserve area, it will become R&D and education center for marine
knowledge, strengthen environmental protection concept of common people especially for primary
and middle school students. Combine class knowledge and practice, it will educate them to love sea
and love territory, strengthen their sea territory consciousness and resource continuous development
consciousness, voluntarily join in team to protect marine environment.

     . Respond to necessity to integrate with national and world relevant law
Chapter 3 The 22nd of Marine Environmental Protection Law of People’s Republic China stipulate
requirement to establish marine reserve area, which symbolize china’s reserve area construction step
to formality and legalization. Jiushan islands is reproduction area and transport center of main coastal
economy fishes and birds, in accordance with the requirement of marine reserve area establishment.
Construct such kind of surrounding into marine natural reserve area is significant presentation of
china’s marine resource step toward legalization and standardzation.
     . Respond to shortness of marine reserve area of Zhejiang province Since we begin to set up
natural reserve area from 1956, we had built 22 different level natural reserve area up to 1997 and
reach 116409h square meters. But there is only 1 reserve area for wild animal, plant and forest
protection, named Nanji islands reserve area., far behind the requirement to protect zhejiang’s
diversity animal and plant.Establishment of Jiushan islands natural reserve area will adjust Zhejiang
reserve area’s situation, fasten development of reserve area.All in all , marine resource and
environmental surrounding of Jiushan islands and nearby area had been destroyed heavily , if
protection is not applied, the situation will be worse .Marine resource in this area will continue
recession and is unable to continuous utilization , and more and more vital species will disappear,
Jiushan islands will turn into a stagnant water. abundant marine resource will become memory to
Jiushan islands and nearby area. Lesson from large yellow croaker and octopus is deeply impressed to
us, owing to over catching and lack of protection lead to severe resource recession. If protection is not
applied, it will not only influence health and continuous development of Xiangshan economy and
effect development of relevant industry, but also destroy some fisherman’s living situation and cause
uncertainty of social stability. Therefore, we must pay full attention to relationship between develop
marine resource and protect marine resource ,focus on maintain marine natural environment, well plan
and design development of marine resource according to nature development objective law. Though it
will bring negative influence to Xiangshan marine industry to some extent at present, however, from
long term view, it will play an profound important role in effective protect marine resource
,reasonable develop marine resource and ensure sustain utilization of marine resource , promote
healthy development of Xianshan marine industry.

     Owing to shortness of macro control and overall plan, and lack of
consciousness to protect marine resource , traditional marine industry mode are not basically changed.
Few knowledge about continuous development of marine resource and given priority to current
interest, lack of science plan and rough management when utilize marine resource, we do destroy and
waste marine resource and marine environment




                                                   27
Consulting Plan Related to the Key Interested Parties of the Jiushan Islands Marine Ecological
Reserve and


        Propaganda Plan of the Reserve

      Set up by World Bank Loan “China Coastal Area Sustainable

              Development Project” Xiangshan County Project


   This project is based on the actual situation of marine and fishery in Xiangshan
County and even Zhejiang Province, and in accordance the demands for protection of
marine and fishery resources, and to establish an marine and fishery ecological natural
reserve in the Jiushan Islands, which is 18.5 km from the continent and in the ocean
within the eastern side of Xiangshan County. The construction content and program of
the project cover establishing boundary plates, buoys and floating marks, bulletin
boards on prohibition, iron wire fences and piles and management observation
platform, constructing management station for the reserve and the facilitating simple
dock in Songlan Mountain, and providing instruments and equipments, office devices,
supervision administration yacht and supervision vehicles. Through construction of
infrastructural facilities and equipments, after the operation of the project, it will carry
out systematical supervision and evaluation on the project, adopt counter-measures,

promote the protection of the objects of Jiushan Islands and the surrounding ocean
areas and of ecological environment, maintain the healthy circulation of marine
ecological system, accomplish the restoration of biological resources and ecological
environment, and promote the sustainable and healthy development of social economy.



                                              28
Part 1: Geological location
   Jiushan Islands is located the utmost south of Zhoushan Islands, and is a renowned

location of islands in the middle coastal areas of Zhejiang. It is 18.5km away from the
Changzuitou of Juexi Town, which is the nearest point from the islands. The islands are
composed of 76 islands and reefs in different sizes, with a total area of 7.3 square
kilometers. Its mother island, the South Jiushan Islands, has a total area of 4.08 square
kilometers. The islands and its surrounding areas have unique geological location,
which is the juncture area of Zhoushan Fishery, Damuyang Fishery, Yushan Fishery
and Zhejiang East Sea Fishery, and influenced by the Taiwan Warm Current and the
coastal river systems, the area becomes a sea area with high productivity, and with
fruitful baiter creatures, becomes an excellent multiplying and roosting place for

various marine biological resources. The geological coordinate of the reserve is
A 29°32.4N 122°3.3E B 29°32.4N 122°29.2E C 29°16.2N 122°3.3E D 29
°16.2N 122°23.5E. The reserve has a total area of 1149.5 square meters, and is
divided into 3 districts including central zone, buffing zone and experimental zone
according to their functions.
Part 2: Analysis on benefits
   After establishment of the reserve, the fishery in part of the Xiangshan County will
be affected, as in the neighboring sea areas of Jiushan Islands, some small amount of
fishermen are engaged in seasonal fishery, and the fishing boats they use are mostly
small wooden boats, and additionally, the fruitful seashells and the herb medicines on
the islands also bring certain amount of economic benefits to the neighboring
fishermen. As statistics shows, the quantity of small boats used in the fishery of the sea

                                            29
area is 80 and more, and the labor force is beyond 300 persons, with an annual income
of 20-30 thousand Yuan. Although after the establishment of the reserve, the economic

benefits of that type of fishermen will be impacted inevitably, in long run, the
establishment of Jiushan Islands marine Ecological Natural Reserve is not only
favorable to the sustainable development of marine economy of the county, but also
helpful to the later development of the area. On the basis that the current fishery
production of 800 tons in the area equals to 10 million Yuan, after the construction of
the reserve, the fishery resources protected in that area will go up to about 20 thousand
tons, and the production value will also increase sharply, leading to substantial
economic benefits.
   1. Through the implementation of the project, the protection and research on the

various biological resources, island and reef resources, and human and natural views in
the reserve will be enhanced, the population of many kinds of endangered rare
creatures, such as the national grade II protection animal river dolphin, is expected to
resume, and the healthy circulation of ecological system in the reserve will be
maintained. The reserve will protect effectively the important ecological system, rare
and precious species and the diversity of marine creatures, such as the island and reef
ecological system and the protected animals like big yellow croaker, cuttlefish and
black-tailed gull, establish the way of utilization of marine creature resources in
accordance with the principle of sustainable utilization, and maintain the healthy
circulation of marine ecological system.
   2. The implementation of the project will protect the marine ecological resources in
the area of Jiushan Islands, promote the resumption and reproduction of various

                                            30
important economic biological resources in the reserve, and further establish the
conservation of quality resources, which is one of the key actions of sustainable

strategy.
   3. The implementation of the project will promote the harmonious development of
local economy and natural protection, thus is a social public affair that benefits both the
contemporary and the future generations, and also the need of local economy
development. The project will also change the rapacious exploitation and extensive
operation of Jiushan Islands and the neighboring sea area, reduce the occurrence of
marine pollution and harm cases, such as contamination and red tide, and enable better
protection and resumption of the current resources in the Jiushan Islands area, which
produces social and ecological benefits beyond calculation. The fishery resources

resumed in the reserve will be far beyond the current small scale and low value fishery
in economic value, and the excellent ecological environment created in the reserve will
improve the life quality of the people dramatically. In the mean time, the improvement
of marine ecological environment will play a decisive role in promoting the intensive
efficient ecological breeding mode and the proliferation drainage control in the coastal
area of Xiangshan County, and in carrying out the marine blue project of agricultural
and animal raising, and impact the teaching, scientific research and sustainable
utilization profoundly.
   4. The implementation of the project is the need of joining the related marine laws
and regulations of our country with that of the world. The article 22 of chapter 3 of the
Marine Environmental Protection Law of P.R.C specifies the condition of establishing



                                            31
marine natural reserve, which is a mark that the construction of reserve in our country
is stepping toward normalization and legalization.

     5. The implementation of the project will be a significant example in the Zhejiang Province and even the whole

country, bridge the gap of marine ecological type of reserve in Zhejiang Province, thus adjust the current

unreasonable layout of marine natural reserves in Zhejiang Province, and promote the development of marine

ecological natural reserves in this province.

Part 3: Consulting plan of related interested personnel
     1. Organizing the learning and training of related personnel regularly

     The neighboring sea area of Jiushan Islands has long been the fishery area of the wide range of fishermen. The

establishment of marine ecological reserve this time will provide protection to this area, and consequently the related

benefits of part of the fishermen in the area will be impacted. Therefore, the significance of propaganda, consulting

and training aimed at that part of population is self-evident. How to popularize the significance and necessity of

establishing that reserve as much as possible, and how to guide them to transfer from the mode of rapacious

exploitation and extensive operation to the road of sustainable development, are the key subjects of the current

publicity and education. The training plan of the recent period is as follows:


     Phase 1 Time of training: December 2003 Persons trained: 200


         Content of training: General description of the reserve and the necessity of establishing the reserve.


     Phase 2 Time of training: March 2004 Persons trained: 100


         Content of training: Related national laws and regulations and related acts of the reserve.


     Phase 3 Time of training: June 2004 Persons trained: 100


                                                           32
       Content of training: The development prospect of the reserve.

  2. Making strong efforts in publicizing the related laws, regulations and acts of

Jiushan Islands marine ecological natural reserve and related scientific knowledge,
enhancing the consciousness of the people on marine ecological science, and promoting
the active participation of the people in the construction of Jiushan Islands marine

ecological natural reserve. The detailed schedule is as follows:
    (1) During the construction of the project, widely publicizing the meaning of
conduction the construction of Jiushan Islands marine ecological natural reserve by
adopting various media, such as Xiangshan News, Xiangshan TV, Ningbo Daily, and
improve the consciousness of the public on protection of resources, to create the
favorable atmosphere of protecting resources and utilizing the resources reasonably.
   (2) Establishing the propaganda plates and prohibition board at Juexi, Songlan
Mountain or South Jiushan mother island, joining with the towns and streets that are
close to the Jiushan Islands and the neighboring sea area, to carry out publicity and
education on Jiushan Islands natural reserve to the related agricultural and fishery
villages, to enable them to understand the significance of establishing the reserve.
   (3) Carrying out the publicity and education on the related laws and regulations of

marine ecological protection regularly, publicizing the significance and necessity of
establishing the Jiushan Islands marine ecological natural reserve to the public, to
enable them to understand that the formulation and implementation of related laws and

regulations and the conduct of marine ecological protection are in the end to uphold the
current and future self-interests of the wide workers.



                                                      33
   3. Setting up the windows for publicizing and consulting by defining special persons
and posts, which focus on related matters of the reserve, and offering explanation to the

other questions of the related interested persons.




                                            34
Report on the Environmental Effect of the Construction Project




  Project Process of marine alga

  Constructed by Ningbo Chaoxing Marine Life Product Co. Ltd. (stamp)




                                          35
Made by National Environmental Protection General Administration

                                        On July 30, 2003




        Responsibilities Form




Appraised by    Environmental Protection Supervision & Test Station of Xiangshan County



Person in Charge of the Appraising Institute Shi Yaqin



Person in Charge of the Project Shi Yaqin




T. About Appraiser

                         Professional
   Name        Profession                  Certificate No.   Responsibilities   Signature
                           Position
Ni Jianzhong Environmenta Engineer        Huan-Ping-Gang-    Examined and
                                               36
              l supervise &                Zheng-Zi No.      approved by
                   Test                     C20150002
              Environmenta
                            Assistant    Huan-Ping-Gang-
  Wu wu       l supervise &                                   Made by
                            Engineer    Zheng-Zi C20150003
                   Test




In light of




                                              37
1. State Council of PRC [1998] No.253 “Rules on Environmental Protection &
   Administration of Construction Project”
2. National Environmental Protection General Administration “ Technical Guide for
   Appraisal of Environmental Affect” HJ/T2.1-2.3-93 HJ/T2.4-95
3. [1996] No. 91 “Approval on the Project of Functional Division of Ground Water
   Environment in Zhejiang Province” issued by People’s Government of Zhejiang
   Province
4. [1997] No.67” Approval on the Project of Functional Division of Environmental Air
   Quality in Ningbo City” issued by People’s Government of Ningbo City
5. “Feasibility Report on the Process Project of Marine Alga” make by Ningbo
   Chaoxing Marine Life Product Co. Ltd.
6. Xiang-Ji-Ton-Fu [2003]No.53 ”Approval on the Construction Project of Marine
   Alga Process of Ningbo Chaoxing Co., Ltd.




                                               38
    About the construction Project


    Project         Process of marine alga
Constructed by      Ningbo Chaoxing Marine Life Product Co. Ltd.
    Legal                                     Contact
Representative            Ye Zaifu             Person                             Li Feng
   Address                 Aquatic Product Industrial Park, Shipu Town, Xiangshan County
    Mobile         13566538578        Fax      0574-65982687            P.C.                315731
Constructed at    Aquatic Product Industrial Park, Shipu Town, Xiangshan County
                     Development & Plan            Approval
Examined and      Administration of Xiangshan                    Xiang-Ji-Tou-Fu[2003] No.53
 approved by                County                   No.
  Quality of      Newly Constructed, Rebuilt or Industry &
 Construction       expand Technical reform
                                                   Code
     Area               55 mu                       Green Land m2                      11954
                      there into Investment
     Total                                                      Percentage of
investment ten 3801.12 in environmental               60        Investment in               1.6%
                             protection
  thousand                                                      Environment
                           ten thousand
                                                               Date to put into
Appraisal Funds                                                                         In May, 2005
                                                                 production
Scale & Content

Background
With total ocean area of 5335 square kilometers, the county of Xiangshan is abundant in ocean
resources. There is 300,000 mu shawl as well as 4.96 million mu interior ocean of 20-meter-long, in
which interior ocean within the harbor is 450,000 mu. The coastline is 800 kilometer long. All the
alone is favorable to develop ocean aquaculture. Recently, abnormal fishing has resulted in the
reduction of ocean resources, which consequently forces fishers to turn to aquaculture, especially in
fishes, seashell, alga, etc. Alga aquaculture as a household industry, has a history of over 30 years in
Xiangshan. However, due to few processing enterprises, narrow market, such industry has been
limited. By establishing a comprehensive alga processing plant, it is able to increase the fisher’s
income, promote the local economy and enhance the development of alga aquaculture.

Contents
 1 Scale of production Select fresh kelp to produce kelp powder, iodine sauce, kelp threads, with
    annual turnout of 300-ton kelp powder, low-ton iodine sauce and 2000-tone kelp thread.
                                                        39
 2   Civil engineering Covers and area of 55 mu, building area of 12,541 square meters, with
     5280-square-meter workshop, 5412-square-meter cold storage, 960-square-meter office
     building, 889-square-meter dormitory, green land of 11954 square meters and roads of 8055
     square meters.
Original pollutants and main environmental issues related to this project




                  About the natural and social environment where the project is constructed

      Natural environment (such as topography, landforms, geology, climate, atmosphere, hydrology,
      vegetation, biological variability, etc.)
      1 Geographic location The second-phase project of the aquatic city is located at Shipu
           Industrial Park (refer to the appendix in details). Next to the road, the project enjoys
           convenient transportation and favor environment, close to the east coast, Shipu Town is one of
           famous ports, connected with Dongchen, Dingtang, Xiaotang to the north, next to Sanmen
           Bay to the west, opposite to Hepu, Gaotang to the south and linked to Damuyang,
           Maotouyang to the east.
      2 Geology Landforms Shipu Town is at costal hilly country, 70% areas of low hilly country or
           island hilly country. In the old part of the city, and the buildings are along the brooks while
           streets and harbors winds beside the stairsteps. The height above sea level is between 20-28
           meters in the city, only 3-4 meters around the harbor. The highest location is Dajinshan, 394
           meters to the est. The basic roads on both sides of the harbor are mainly composed of gray
           and dark gray mountain rock. Geological structure is of northeast, west-east, southwest crack.
           Around the harbor is coastal stairstep land and plain. The depth of the basic rock varies from
           10 meters to 20 meters. Around No. 2 Harbor, the basic rock is generally 4-7 meter deep. So
           far no earthquake above 5 Scale has happened in Shipu.
      3 Climate At subtropical monsoon belt, warm and moist, of clear four seasons and rich rainfall.
       In winter, controlled by cold air mass, it is often sunny and cold; in spring, it is sometimes sunny
       and sometimes cloudy; in early summer, it is rainy due to sub-high pressure; in summer,
       controlled by high pressure, it is sunny and hot, few rain, with typhoon, torrential rain and flood
       at the same time. There is southeast wind in spring and northeast wind in winter. Disasters
       include frost, low temperature, storm, ice, drought, typhoon, torrential rain, cold wave, etc.
       especially typhoon, torrential rain, drought, low temperature.
      4 Atmosphere annual average temperature 16.2                average temperature in January
         5.4      average temperature in July 5.4        the lowest temperature in the past -7.5     Jan. 16,
       1961       the highest in the past 38.8      Aug.20, 1971 .
       Average rainfall 1392mm about 23 days the max daily rainfall 281.6 mm successive for as
       long as 23 days the max annual rainfall 1756.2mm in 1976                the min annual
       rainfall 770.6 in 1967 .
       annual average relative humidity 80% The sunshine time 2025.8 hours non-frost

                                                       40
   period 296.7 days. Wind direction North wind in winter and southwest wind in summer.
   Average wind speed 5.5m/s Max instant wind speed58 m/s Average highest water
   temperature30       lowest water temperature 8
  5 Hydrology tides Shipu port is the body to absorb the pollutants as for the appraised project.
   The northwest port of Shipu port is land. On the east side, from the northwest to the southwest is
   Shanban Touzui, Northeast Island, Duimanshan, Nantian Island, Gaotang Island in line, as a
   natural shade. On the west side, close to Sanmen Bay, composed of Venus shore and five water
   courts: Tongwamen, Dongmen, Xiawanmen, Linmen, Sanmen. The port extends from the month
   to the south, winds from the west to the south, lake a crescent moon, with the middle line of 18
   km, width of 0.4-3mm, water area of 27 km and water depth of 4-33m.
   Tides and Shipu are regular half-day tides. Average high tide is 2.14mlow tide is -1.4m average
   tide margin is 3.54m. the rising tide enter from the southeast to the east and ebb from the
   opposite direction to the east, generally in counter-clockwise. The max flow speed is about five
   hours later than tide. The rising tide is of small speed, 0.55m/s for 7 hours and 7 minutes and
   0.37m/s below for 6 hours and 24 minutes. The ebb is of large speed, 0.75m/s on the surface for
   6 hours and 15 minutes, and 0.96m/s for 6 hours and 5 minutes. The aftertide is from the north to
   the east at 0.1-0.2m/s. Waves in Shipu port is mixed wave. Tide height is less than 0.8m. During
   typhoon, the highest wave is about 1.5m.
About Social Environment social economic structure, education, culture, relics
protection etc.                                                                                          About
                                                                                                          the
  Xiangshan is situated between Xiangshan Port and Sanmen Bay: at east longitude of 131°34′-
                                                                                                        current
      122°20′,and north latitude of 28°45′-29°41′.The county is composed of the east part of
      Xiangshan peninsula and 608 reef rocks along the ocean, with land area of 1.75 square             environ
    kilometers and ocean area of nearly 5000 square kilometers. The population is 528,000. the          mental
     county people’s government is at Dencheng Town. Xiangshen is one of key fishing area in
                                                                                                        quality
  Zhejiang Province, rich in hairtail, yellow-fin tuna, pomfret, cuttle, etc. Ocean aquaculture is
mainly in prawn, clam, oyster, kelp, etc. There are Shipu port, Hepu port, with convenient ocean
 transportation. It is only 36 km between Shipu Town and Dencheng Town. With an area of 83.6
  square kilometers, there are 70 administrative villages and 20 residence quarters in Shipu. In
2000, total population is 70429 among which 26772 is non-agriculture population. Shipu is the
   key port appointed by the country and the province for the reception and trade with Taiwan.
   Various aquatic products are produced there. It was recorded that, in 2000, total value is 3.3
     billion with industrial value of 2.1 billion, agricultural and aquatic value of 1.2 billion. Its
industry includes aquatic process and building ships. Transportation is convenient, up to Dalian
  in the north, down to Hainan and Guangdong in the south and to Shashi by water in the west.
Besides, passenger steam ship pass several ports including Shanghai, Jiaojiang, Shenjiamen, etc.
The ocean area is 27 square kilometers, calm, capable of ten thousands of fishing steamers. 500-
 ton steamer can pass the port. Shipu boasts various industries, especially in aquatic process. At
     present, there are over 200 cold storages with capability of 30000 tons, the daily freezing
   capability of which is 2000 tons. Education develops at the same time. Now there is a aquatic
  school, a adult technical school, the middle schools, tow junior middle schools and 31 primary
                         schools. Compulsory education rate is above 99%.




                                                        41
Current environmental quality and main environmental problems air, surface water,
ground water, sound environment, ecological environment, etc.
   1.Ocean water environment in 2001regular supervision and test was carried out at
    Shipu port by Ningbo Environment Supervision & Test Center According to
    GB3097-1997 “Ocean Water Quality Standards” index of inorganic nitrogen beyond
    the standard for Class IV water quality, the other indexes are all in accordance with
    the standards for Class III water quality stipulated in Project of Functional Division
    of Off sea Environment in Zhejiang Province 11
   2. Air of good quality, up to Standard II of GB3095-1996 “Environment Quality”
14
   3. Noise supervised and tested by Xiangshen Environmental Supervision and Test Station,
          noise up to Standard III of GB3095-1996” Urban Environment Noise Standard”


Main Environmental Protection Objectives: Name and Grade
1 Environment air, GB3095-1996Standard II of “Environment Quality”
2 According to Project of Functional Division of Off sea Environment in Zhejiang
    Province, Class IV functional zone. Water quality, Class III GB9097-1997”Ocean
    Water Quality Standards”
3 Environment noise: Standard III of GB3095-1996” Urban Environment Noise
    Standard”




                                 Applicable standards for appraisal




                                                  42
                               1    Environmental quality GB3095-1996Standard II of “Environment Quality”
                                                                             unit mg/m3

                                                                 Annual average          Daily average       Hourly average
                                                 SO2                  0.06                    0.15                  0.50
                                                 NO2                  0.05                    0.10                  0.15
                                                 TSP                  0.2                     0.3                    /



                               2. water environment According to Project of Functional Division of Off Sea Environment
                                   in Zhejiang Province, Class IV functional zone.
Environment Quality Standard




                                                                                  unit mg/L


                                                                                                         Inorgani        Active
                                        Item            PH            DO       CODMN          BOD5           c       phosphat
                                                                                                         Nitrogen          e
                                      Standard
                                                       6.8-8.8          3          ≤5m          ≤5         ≤0.5          ≤0.045
                                        value




                               3. Environmental noise Standard III of GB3095-1996” Urban Environment Noise
                                     Standard”
                                   Leq [dB (A)]

                                                         Types                 In the day                At night

                                                             3                      65                     55




                                                                                         43
                                 1      waste gas as for boiler smoke, according to Standards for No. 2 Zone and period II GB13271-2001”
                                        Discharge Standard for Boiler Gas Pollu8tant”. Some standards are as follows
                                                                  Unit mg/L
                                                  Project                discharge              smoke darkness            SO2 discharge
                                         Standard value              density mg/m3                 darkness             density mg/m3
                                              Other boilers                 200                        1                       900

                                     As for dining-room smoke, according to GWPB5-2000 “Catering Smoke Discharge Standards (Trial)”, refer to
                                     the following form:

                                                      Scale                      Small                    Medium                    Large
                                         Standard stove number                  ≥1 < 3                    ≥3 < 6                     ≥6
                                         Corresponding stove
                                                                               1.67,< 5.00               ≥5.00,< 10                  ≥10
                                         power 108J/h
                                         corresponding projection area
                                                                               ≥1.1,< 3.3                ≥3.3,< 6.6                  ≥6.6
                                         of the discharge cover m2
                                         max possible discharge
                                                                                                            2.0
                                         density mg/m3
                                         min removal rate of cleaning
                                                                                   60                        75                       85
                                         feasibilities %
  Pollutant discharge standard




                                     As for stench, according to GB14554-93 “Stenchy Pollutant Discharge Standard” form 1
                                     density within the factory 20.
                                 2      Waste water Adopting GB8978-1996 Standard III of “ Sewage Disposal Standard”, but wastewater in the
                                        park is through collective disposal by the industrial park committee. All enterprises are allowed to carry out
                                        and issue standards for wastewater. Relevant indexes are as follows:
                                                                               unit mg/L
                                                                                                                                  Animal and
                                            Project           PH          CODcr        BOD5           SS          NH3-N
                                                                                                                                  vegetable oil
                                        Standard
                                                              6-9          2000         1200          400          150                 1.0
                                        value mg/l

                                     As for waste water in the park, GB8978-1996 Standard II of “ Sewage Disposal Standard” some standards are
                                     as follows:                                 unit mg/L
                                                                                                                          Animal and
                                             Project         PH       CODcr      BOD5            SS       NH3-N
                                                                                                                          vegetable oil
                                         Standard
                                                             6-9       150         30            150         25               1.0
                                         value mg/l

                                 3     noise Noise in the factory according to GB12348-90 Standard III of “Industrial Enterprise Noise Standard”
                                      Voice Class Leq[dB(A)]
                                                     Type                       In the daytime                  At night
                                                       3                              65                           55

                                      Noise at construction site according to “ Noise Limit at Construction Site”.
                                                          Noise Limit at Construction Site Voice class Led[dB(A)]
                                            During                                                                       Noise Limit
                                          construction                    Main noise source
                                                                                                             in the daytime         at night
                                            Earthwork               bulldozer digger loader, etc.                  75                  55
                                                                                                                                 Construction
                                               Piling                       Piling machine                         85
                                                                                                                                  prohibition
                                             Structure          concrete miner vibrator electric saw               70                  55
                                            Decoration                     crane lifter, etc.                      65                  55
                                     Refer to “Environmental Effect Report for the first-phase development Zone of Xiangshan Shipu Aquatic
                                     Products Industrial Park” designed by sewage disposal plant daily disposal volume of 5000 tons
                                                                                  unit mg/L
  Sum                                         Item          PH       CODcr         BOD5           SS        NH3-N
                                                                                                                             Animal and
                                                                                                                            vegetable oil
control                                 Standard
 index                                   value mg/l         6-9       2000          1200          400         150                100


                                     Waste water in the park according to GB8978-1996”Waste Water Discharge Standards”

                                                                                              44
       Engineering Analysis of the Construction Project
                               Brief introduction of the technical flow
1. process of kelp powder

                                                      Waste water solid waste

         Fresh kelp                                 Drying                     Dip in                     Cleanout

                   noise           waste gas                 waste gas


           steam                   grind                                                 sprayed powder              pack

                                                             off the
                                           Dryin                           grind noise
                                                              t h




 After purchasing the fresh kelp, dry the kelp or not depending on the quantity. In case of small quantity,
 the fresh kelp can be directly cleaned by the industrial cleaner to remove off the impurity before steamed
 under high temperature and pressure. Then for smashed powder, it is simple to dry, smash and pack; but
 for sprayed powder, necessary to be further grinded, off the stench and then packed in vacuum.


2 Process of iodine sauce


                             waste water solid waste waste gas                    noise

      Fresh kelp           Deepfreeze               dip in             Cleanout           steam            grind




       Select      Proportioning           filter
                                                               sterilization            vacuumize              deposited




 First carry out physical and chemical index test on the material to ensure them up to edible standards,
 cleaned, steamed under high temperature and pressure, grinded, filtered, and colored. Then in crease the
 content of amino acid and iodine; promote the luster through filter, concentrated in vacuum after
 sterilization.




                                                                         45
46
Brief introduction
    3 Process of kelp threads
                 waste water solid waste             Kelp ends noise

         Fresh kelp               cleaned             Select                       c      sterilization



               vacuumize                Deepfreeze




    First clean the fresh kelp to remove the impurity. Select the good which is cut into threads, sterilized by
    microwave to keep the original taste and then packed in vacuum.


 Raw material and energy
1  Raw material fresh kelp 3000-ton kelp powder needs 18,000 ton fresh kelp and sauce needs 1670
   tons fresh kelp; 2000-ton kelp thread needs 3330-ton fresh kelp, 23000 ton fresh kelp in total
2 energy as for this project, annually consume water of 250000 tons, electricity of 2 million degree and
  cost of 1200 tons.

   Main pollution procedure and discharge
   1 waste waster
        < production waste water It is mainly the wastewater generated due to cleaning fresh kelp, and
            annual discharge is about 220000 tons.
        = life waste water production days are 300 days in a year. There are 106 employees. If everyone
            discharge 0.1-ton waste water a day, 3180-ton waste water is produced every year.
   2 waste gas
   < boiler smoke there is one 4-ton boiler, consuming 1200 ton coal every year and producing 12.48
       million square meters waste gas
   = Dining-room smoke waste gas discharge is 4000mg/m3.
   > stench much stench is produced
   3 solid waste
<     Sands and impurities while cleaning the fresh kelp, and waste kelp while cutting the kelp into
    thread, about 230 tons every year.
= coal cinder consuming 1200 ton coal and producing 360 ton coal cinder
> Life waste: if everyone produces 0.5 kg waste every day, 15.9-ton life waste is produced every year.

    Main production equipments
    2 sets of driers, 2 sets of cleaners, 2 sets of grinders, 2 sets of steamers, 1 sets of blending machine, 1
    sets of microwave drying sterilizer, 1 set of mixer, 1 set of micro smasher, 1 set of sterilizer, 2 sets of
    vacuum packing machine, 1 set of pouring equipment, 2 sets of soaking machines, 2 sets of cutter, 1 set
    of filter and 1 4-ton boiler.


                                                               47
    Main Pollutants and discharge


        Contents                                     Pre-density & annual      Discharge density &
                     Sources       Pollutant
Types                                                   discharge (unit)       annual volume (unit)

                                                   Waste gas 12.48 million Waste gas 12.48 million

                      Boiler      SO2 smoke        square meters SO2 28.8      square meters SO2

                                                    tons smoke 51.5 tons     11.2tons smoke 2.5tons

 Air pollutant                                            Waste gas                 Waste gas

                   Dining-room      Smoke             volume 4000m3/h          volume 4000m3/h

                                                     smoke 14-20mg/m3          smoke 14-20mg/m3

                    Fresh kelp      Stench                        /                     /

                                                  Waste water 220,000tons     Waste water 223,180
                    Cleaning      CODcr SS,
                                                      CODcr 500mg/L           tons CODcr 500mg/L
                      water           etc.
                                                         SS 300mg/L               SS 300mg/L
Water pollutant
                                                   Waste water 3180 tons
                    Life waste    CODcr SS,
                                                      CODcr 400mg/L
                      water           etc.
                                                         SS 150mg/L

                      Boiler      Coal cinder                 360 tons              360 tons

                    Process of   Sand and waste     Sands 115 tons waste      sands 115 tons waste
 Solid waste
                      kelp            kelp              kelp 115 tons            kelp 115 tons

                    Life waste         /                      15.9 tons             15.9 tons

    Noise                                         Grinder, smasher, cutter

                                                         48
     Others



     Main ecological effects. Upon the accomplishment of this project, all agricultural fields and ponds will have
turned into industri8al sites. The-effects and changes on ecological environment is permanent.




                                           Analysis of environmental effects




                                                             49
     Brief analysis of environmental effects during construction:



     Including piling, structure, building up decoration, transporting and paving. Main pollutants are

     noise and building waste and rain waster at the construction site. Besides, dust affects the

     surrounding environment.



1           Air environment prevention, to build up walls around the construction fields and safety

    net around the building to prevent the broken stones from the surrounding environment. Mine and

    pile the earth and move away the building waste in time. Regularly water the road and building

    material against dust.

2           Water environment prevention: Rainwater sewage, slurry sewage and deposited water on

    the site should be collected and then treated in settlement tank. Then the upper clean liquid is

    drained into rivers through draining ditches. Well dispose life waste water. Set up temporary

    living facilities, oil separation at kitchen, toilet, drain off the life waste after disposal.

3      Noise prevention: during construction, adopt advanced machines and technics to make the

    noise up to the standards at construction site. If necessary, construction at night shall be reported

    to environmental protection administration for approval with “Night Operation License”




                                                       50
 Analysis of Environmental effects during operation

         1 Waste gas disposal and analysis of environmental effects
         < boiler smoke make the discharge of smoke and SO2 up to standards to reduce the
            effects on the surrounding environment.
         = dining-room smoke through smoke filter up to GWPB5-2000 “Catering Smoke
            Discharge Standards (Trial)”, discharged in air to reduce the effects on the
            surrounding environment.
         > stench absorb collectively and discharged in air after spray, affecting the
            surrounding environment to some extent.
         2 waste water disposal and analysis of environmental effects
<          production waste water mainly cleaning water, first up to standards of the waste
   water disposal plant in the park after sediment, physical and chemical disposal. Then up to
   standards II of GB8978-1996 “Waste Water Discharge Standard” before drained off to Shipu
   Port.
=          life waste water first to the sewage network in the park, then drained off after
   disposed by waste water disposal plant
         3 solid waste disposal and analysis of environmental effects
   <       coal cinder used to pave the road or as raw materials for bricks, not affecting the
      surrounding environment
   =       sands in the waste cleaning water can be used to pave the road, to dispose the
      impurities together with the life waste, the waste kelp can be as the raw material for kelp
      powder, hardly affecting the surrounding environment.
     4 Noise control and analysis of environmental effects: noise is mainly produced by
      smasher and other production equipments. Try not to trouble the around residents by
      separating the noise and adjusting the distance.
     5 Analysis of environmental risks: small the raw material is fresh kelp, there shall be
      aquatic base. Delay in the collection of fresh kelp may destroy the ocean environment.




                                                    51
                                                           Prevention & Results

           Type
                             Sources (No.)                    Pollutants                   Prevention                 Results
 Content
                                                                                                              Up to standards, little
                                 Boiler                      SO2 smoke                         Dusting
                                                                                                                       effect
                                                                                                              Up to standards, little
                             Dining-room                        Smoke                          Dusting
   Air pollutant                                                                                                       effect
                                                                                                                   Affecting the
                              Fresh kelp                        Stench                          Spray          environment to some
                                                                                                                       extent
                            Cleaning water                 CODcr SS, etc.                                       Up to standards of
 Water pollutant                                                                               Sediment       waste water plant, little
                           Life waste water                CODcr SS, etc.
                                                                                                                       effect
                                                                                     To pave road or be raw
                                 Boiler                       Coal cinder                                          As resources
                                                                                       materials for bricks
                                                                                    Coal cinder to pave the
    Solid waste                                                                      roads waste kelp Be
                            Process of kelp            Coal cinder waste kelp                                      As resources
                                                                                     raw materials for kelp
                                                                                               products
                               Life waste                                              To cleaning system            Harmless
      Noise                                                   Up to standards, little effect
      Others
Ecological prevention and results: man shall cut the kelp in time to prevent the corrupted kelp from destroying the off Sea
environment.


      Conclusions and Suggestions




                                                                           52
Conclusions
The establishment of this project can be beneficial to the development of kelp aquaculture, better
help in the fishers to shift the industry.


Suggestions:
Carry out cleaning production, increase the green area, and beautify the environment. Enhance
the consciousness and management in environment protection. While developing economy,
responsible to protect the environment, purchase the fresh kelp from time to time against
corrupted kelp, which may destroy the off sea environment.




                                                     53
Ratification opinion:

      In principle, we agree with Xiangshan Environment-protection Monitoring-station’s environment-

evaluation suggestions on the alga water-products manufacture project of Ningbo Chaoxing Marine Life

Product Co. Ltd. This project belongs to newly-established projects, its establishment will benefit the

development of our county’s alga cultivation industry and improve the continuous development of ocean

fishing.

      The construction unit must strictly execute the “three simultaneities” system and carry out all the

environment-protection measures required in environment-evaluation. During the implementation process of

this project, the following aspects must be performed.

      1. Fully generalize cleanness craftwork, reduce water-using volume from the beginning, reuse the

treated wastes-water as possible, cut down the total volume of drain-sewage.

  2. Make rain-sewage separately flow inside the factory district, reduce the treating volume of waste-water.

The production sewage, employee life-using water should be treated under the second grade, only when it

has reached to GB8978-1996 “ Sewage General Drain-out Standard” second grade, can it be drained out or

reused.

      3. Solid wastes must be piled at fixed point, the cinder can be used to fill roads or act as raw materials

to make bricks, the kelp-head can be reused, and the living wastes can be brought into city cleanness-

transportation system.

      4. Fishy-gas produced during the fishy-elimination manufacturing process should be collected, after

acid-alkali spray and absorption, be drained out in high altitude.

      5. The construction unit should apply for experimental-manufacture in time to environment-protection

departments after the accomplishment of this project, when it has been examined and accepted, the project

can be put into normal function.

      Measures above are expected to be carried out carefully by the construction unit.

      We approve the Ningbo Chaoxing Marine Life Product Co. Ltd a construction project with an annual

production of kelp-powder 3000 tons, kelp sauce 1000 tons and kelp silk 2000 tons.

                                                       54
                                                               Xiangshan Environment-protection Bureau
                                               th
                                            13 Aug, 2003
    Analysis on Environmental Effect during Operation Period
               1. Waste Gas Treatment and Analysis on Environmental Effect
            < Boiler Flue Gas: the flue gas is dedusted and desulfurized through water film, so that
               the flue gas and sulfur dioxide can meet the specified standards before discharged to
               the atmosphere. So flue gas will not cause great effect on surrounding environment.
            =Oil smoke emitted from canteen: meet GWPB5-2000 “Oil Smoke Draining Standards
               for Catering Trade (for Trial Implementation)” by applying oil smoke
               decontaminating apparatus and then is piped to high sky and discharged to
               atmosphere. Therefore the oil smoke from canteen will have little effect on
               surrounding environment.
            >Fishy gas mainly comes from the fishy smell caused during production process.
               Fishy gas will be discharged in high sky after it is centrally collected and sprinkled
               with acid and alkaline liquid, so it has some influence on surrounding environment.
               2. Water Pollution Treatment and Analysis on Environmental Effect
      This project consumes 250,000T water a year, and about 223,180 T of wastewater will be
      drained a year, including domestic wastewater of about 3180T a year. The wastewater mainly
      contains CODcr, BOD5 and suspension etc. Empirical value of quality of various wastewater is
      shown in following table:

           Contaminant              CODcr                BOD5                 SS
     Wastewater Type
     Production                      500                  350                 300
     wastewater
     Domestic wastewater             400                  200                 100
       The wastewater produces 111.272 ton CODcr, 577.636 ton BOD and 66.318 ton SS.
       Production wastewater, domestic wastewater produced from employee living and wastewater
     produced from canteen is treated via primary physical chemistry treatment process such as bar
     rack and settling, and then is drained to the Park Sewage Treatment Plant after it meets the
     requirement for entering the network of this plant. This factory plans to apply the wastewater
     pre-treatment process below:

                             Chemicals         Wastewater
                                      e                             Drain to sewage piping
Wastewater        Bar rack      flocculator-        Settling
                  of treatment plant
                                setting tank        tank
                                    Mud



                                                     55
    Wastewater will be profoundly treated in the sewage treatment plant of the Industrial Park after
    pre-treatment. This sewage treatment plant is designed to treat the sewage jointly in physical
    chemistry method and biochemical method. For physical chemistry treatment, matured and
    reliable pressure vessel air-float system is used, and for biochemical treatment, CAST
    biochemical technique is applied. The detail flowchart is as follows:
                                                                                  Drain
                            Alkaline
Pre-treat                             Air float system      Facultative
                     Condition                                                CAST
                     ing
                         Fan
                                                                                         Transp
                                  Wet sludge tank        Box filter press
                                                                                           t



   In different stages, removal rate is expected to reach following values:
                      Item
                                        CODcr(mg/L)      BOD5(mg/L)         SS(mg/L)
   Treatment unit
   Designed inlet water quality             2000             1200              400
      Air float         Inlet water        2000              1200              400
       system          Outlet water         600               360              100
                      Removal rate
                                             70                70               75
                             %
     Facultative        Inlet water         600               360              100
     aerobe tank       Outlet water         420               288               95
                      Removal rate
                                             30                20                5
                             %
     CAST tank          Inlet water         420               288               95
                       Outlet water         120                29               60
                      Removal rate
                                             71                90               37
                             %
         Total removal rate %                94               97.6              85
           Class 2 Standards                150                30              150
   (Please refer to “Environmental Effect Report of First-stage Development Zone of Xiangshan
   Shipu Aquatic Product Industrial Park” for wastewater treatment process data)
   Through aforesaid process treatment, the sewage meets Class 2 Standard of GB8978-1996
   “Overall Sewage Draining Standards” and then is drained to the sea, so it will not exercise great
   influence on water quality in near waters.
   This project separates rainwater drain from sewage drain. Rainwater is drained to inland rivers
   after being collected in piping network, and will not exercise great influence on the environment.
               3. Solid Waste Treatment and Analysis on Environmental Effect


                                                    56
             a) Coal slag used for filling roads or used as raw materials for manufacturing bricks
                in brick and tile factories, which is a resource after treatment and will not exercise
                influence on surrounding environment.
             b) The mud and sands obtained after settling of cleaning wastewater, can be filled in
                the roads, and the foreign matters can be treated together with household refuse.
                Kelp ends and other wastes can be used as raw materials for producing the feedstuff
                ---pulverized kelp. So little effect is exercised on the surrounding environment.
             c) Household refuse to be cleared away by local environmental protection agency
                and is treated for harmless purpose in Shipu Town Rubbish Clearing and
                Transporting System. So it will not exercise great influence on environment.
             4. Noise Control Measures and Analysis on Environmental Effect
   The noise is mainly produced from pulverizing mills and other mechanical equipment. Sound
   barrier is applied and the houses result in noise attenuation, therefore the noise outside of the
   factory area will meet the specified standards and will not disturb the residents nearby.
5. Analysis on Environmental Risks
The raw material used for this project is fresh kelp, therefore there must be some marine breeding
base. As the farmers engaging kelp breed possibly will not cut their kelps in time or due to other
reasons, kelp maybe get rotten and cause damage to sea environment.




                                                  57
    Prevention & Treatment Actions and Expected Treatment Effect:
      Item           Emission            Name of           Prevention &
                                                                                Expected Treatment Effect      Con
Type             source Number           Pollutants      Treatment Actions
Atmospheric      Boiler                SO2 and soot     Dedusting and          Meet the specified              clusi
pollutants                                              desulphurization       standards and have little       on
                                                                               effect on the environment       and
                 Canteen               Oil smoke        Purifying and          meet the specified              Sugg
                                                        dedusting              standards and have little
                                                                                                               estio
                                                                               effect on the environment
                 Fresh kelp            Fishy gas        Sprinkling with        have some negative effect       ns
                                                         acid and alkaline     on the environment              Con
Water            Washing               CODcr,           Settling in physical   meet the specified standards    clusi
pollutants       wastewater            BOD5 and         chemistry methods      for sewage to entering the      on
                                       SS, etc                                 network of the sewage           This
                 Domestic sewage       CODcr and                               treatment plant of the Park,
                                                                                                               proje
                                        SS, etc                                and have little effect on the
                                                                               environment                     ct
Solid wastes     Boiler                Coal slag        Filling in roads or    Transferred into useful         will
                                                        as raw materials for   resource                        bene
                                                        production in brick                                    fit
                                                        and tile factory                                       the
                 Kelp processing         Mud slag, kelp Mud slag filling in Transferred into useful
                                                                                                               devel
                                         end, other     roads                 resource
                                         wastes         Kelp ends raw                                          opm
                                                        material for                                           ent
                                                        feedstuff –                                            of
                                                        pulverized kelp                                        kelp
                 Household refuse                       Treated in urban      Harmless                         bree
                                                        rubbish clearing
                                                        and transporting                                       ding
                                                        system                                                 secto
Noises           By taking insulation and attenuation measures, noises meet specified standards and has        r,
                 little effect on the environment.                                                             and
Others                                                                                                         lay a
Ecological Protection Measures and Expected Effect                                                             foun
The farmers engaging kelp breed should cut their kelps in time, prevent kelp from getting rotten and causing
damage to ecological environment of the sea.                                                                   datio
                                                                                                               n for
    fishers to change to other professions. Meanwhile, it will also protect marine wild fishery
    resources and ecological environment of the sea and promote sustainable development of marine
    fishery. If related environmental protection laws and regulations and standards can be strictly
    executed during construction of the project, and all environmental protection measures proposed
    in this report can be strictly implemented, this project is feasible from the angle of environmental
    protection.
    Suggestions

                                                            58
Execute clean production in an overall way, and ensure “three ‘same time’s ” (namely the project
and related environmental protection facility should be designed at the same time, constructed at
the same time and completed and put into use at the same time). Provide landscape within factory
area and borderlines, and beautify the environment, strengthen environmental protection view and
management of the whole staff, and do the best to ensure environmental protection while
developing economy.
The fresh kelps produced by the farmers should be purchased at any time, so that the farmers
engaging kelp breed would not cut their kelps in overdue time, causing kelp to get rotten in the
sea and causing damage to ecological environment in near waters.




     Sea Weed Aquatic Products Processing Project




                 Social Evaluation Report




                                               59
                      Ningbo Chaoxing Marine Life Product Co. Ltd.
                                               July 30th 2003



       Social Evaluation Report for Sea Weed Aquatic Products Processing Project

I.     Effect of project construction on local area

This project and the project company is located in Xiangshan, Zhejian, which is one of the six largest

central fishing harbors of our country, with 300000-mu bottomland and 800km coastline. This port

provides excellent growth environment for kelp cultivation. The peasants growing by sea have a long

history and rich experience in aquatic product cultivation, and supply kelps, purple laver and other

sea-weed products of 200,000 tons. But these products are processed simply, or even the coarse

products that are not processed and are sold at low prices. Let’s have a look at Xiangshan’s aquatic

product processing industry: 98% of the enterprises in this industry are the enterprises that process

aquatic animals (for example, fishes, shrimps and seashells), and there is one small enterprise

processing aquatic plants, such kelps and purple laver. Our company develops this project just based

on full market investigation. It will be very significance to increasing enthusiasm of cultivation fishers

and added value of products, and realizing sustainable development of marine ecology.



II.    Effect of the project on local revenue and tax


                                                      60
After its construction is completed, this project will have production capacity of 6000 ton kelp

products per year, and realize sales income of RMB61 million as well as profit and tax of RMB20.13

million in normal-operation years. In normal-operation years, the project’s income tax will reach

RMB3.2731 million at average based on 33%, and mean profit after income tax will amount to

RMB6.6455 million. Public welfare fund will amount to RMB332300 at average if it is calculated

based on 5% of after-tax profit and legal common reserve fund will amount to RMB 664600 if it is

calculated based on 10% of after-tax profit. Our company will pay the taxes according to related laws

and regulations and make due contribution to the development of local economy.

III.   Effect on local labor employment and women employment

After completion, this project can provide about 90 jobs, and can arrange for about 30 women to do

the jobs that require low labor intensity and careful work. It also can provide jobs with high safety

factor and simple operation to the disabled.

IV.    Effect on fisher settlement

According to the statistics in 1999, there were 4000 fishing boats of various sizes in Xiangshan,

including 1500 steel fishing boats with great horsepower. Xiangshan has 5335m2 sea area, and

because of unplanned excessive fishing, marine resource has been reduced with each passing day, and

there happens risks in survival of fishing sector, which forces some of the fishers to seek for other

way out for their living. Considering local characteristics and that kelp has features of improving

water quality,kelp cultivation is undoubtedly a project that does not require advanced technology and

high investment, have high return on investment, and can improve marine environment. Our company

can purchase the kelps cultivated by fishers through signing contracts with them, and make

contributions to the transformation of fisher production. After fishers cultivate kelp, the project, after

completion, will help 300 fishers to transform their production if every fisher can produce 290 ton

fresh kelp a year. Due to manpower demand, these fishers need to employ 200 workers. Thus, the

project can provide indirect job opportunities to 600 fishers and their family members. After the

contract takes effect, our company will purchase fishers’ kelps at protected prices. According to

                                                    61
approximate calculation, the fishers engaging kelp cultivation can earn more RMB48000 after

production transformation.

V.     Effect on local economic and social stability

We can say that sea-weed aquatic product development carried out by our company can both improve

marine environment and provide employments to the society, and offer assistance in the government

solving issues related with fisher production transformation. It is of much significance to the

improvement of local economy and upgrading of local processing level and grades and realization of

sustainable development of marine resources, and can produce apparent social, ecological and

economic benefits. Therefore, this project can be called a good thing that have favorable effects in

many fields and is good to the country and people.




                                                   62
 U. Developments item environment influence
                 V. report



             Project name:About Seafood Machining Use WB

                         International Loan Project
     Project undertaker:XIANSHAN HUYI SEAFOOD CO.,LTD.




                           Compiling Date:Aug.2003

     Supervised by State General Environment Protection Bureau




                                 Responsibility List

 Evaluation unit: Xiangshan Environmental Supervising and Protecting Station

Person in charge of Evaluation unit: Shi yaqin


                                           63
   Person in charge of the project: Shi yaqin (environment evaluation postNo.13844)



                         With regard to the assessor
      Name         specialty the title of Post No.                           signature
                                  a technical                   Duty
                                      post
                                                  Environment
    Ni        Environmental
                                   engineer      evaluation post Auditing
    Jianzhong  Supervising
                                                 No.C20150002
                                                  Environment
                 Environmental     assistant                      Report
    Si yeqin                                     evaluation post
                  Supervising      engineer                      compiling
                                                 No.C20150003




Compiling Basis:




                                                64
1. Environment Protection and Management regulations [1998]No. 253 by the State Council of
PRC.
2. General Technical Evaluating Rule of Environment Influence HJ/T2.1-2.3-93 HJ/T2.4-95
3. Reply to Environment Function Distribution of. Floor Water Environment of Zhejiang Province
issued by people’s government of Zhejiang province[1996]No.91
4. Reply to the plan of Ningbo Environmental Atmosphere Quality Function distribution No.67
[1997] Ningbo Municipal Government.
5. Feasibility Report on Project of Pellet Food Processing Based on the Loan of World Bank
authorized by Ningbo Xianglong Aquatic Food Co., Ltd.
6.Reply to the plan of Report on Project of Pellet Food Processing with Ningbo Xianglong Aquatic
Food Co., Ltd Is issued by Xiangshan County Development Planning Bureau No.50[2003]




                                                65
                            General Introduction to the Project
Project
                  About Seafood Finish Machining use WB International Loan Project
description
Construction unit      XIANGSHAN HUAYI SEAFOOD CO., LTD. Ningbo P.R. China
Project legal                               Person in
                  Yu fuchun                                 Yu yongchun
representative                              charge
Address           No .481 west road shanhe industrial demonstration area of Xiangshan
Telephone           13968363388    Fax      0574-65730123          Post       315700
Construction site  industrial demonstration area of Xiangshan
Project-           Xiangshan County
establishinG       Development Planning         Warrant file No.      NO.54[2003]
Dept.              Bureau
                        √
                   New□Rebuild
Construction style &continuation□               Line sort and code 1320
                   Technology innovation □
                                                Afforestation
Land area            20000M2                                          3400 M2
                                                area M2
                             Among which:
                                                            The rate of
 Totalinvest                 environmental
                   3399.45                        80        environmental      2.%
  (10000YUAN)                protection invest
                                                            protection invest
                             (10000YUAN)
    Evaluation                                   Estimated product
                                                                      Dec.2005 12
     expense                                            date




                                               66
Construction scale and content
 Background:
  Xiangshan County is a big fishery county in Zhejiang Province. As the offshore fishery
resource is in exhaustion in the recent years, the mudflat and cage culture is under fast
development. However, the culture of aquatic products develops very slowly because of the high
cost of the products for culture and the unstable supply. The fishery resource has been in
exhaustion and the efficiency is very low over years. In this background, a high-grade enterprise
engaged in the products for aquatic culture will be a golden key to the sustainable development
of aquatic culture in Xiangshan.
     Project description
1,the area of land: 20,000 ,the area of construct: 14591 .Cold store:5200
finish machining workshop:2,500 ,rough machining workshop: 2,000 ,adjunction and
others:4,891 .
2,forecast throughput: annual products 1,560MT. Thereinto:Sea bass800MT,Seasoned Partion
400MT,Dried Sea Bass Filets80MT,Cooked Sea Bass Filets80MT,Seabass Partion200MT.




Pollution and main environmental problems




                                                 67
General Introduction of nature, society environment in Construction site
   General conditions of nature
1. Geographical location China Aquatic Products Town schedule II Shipu Aquatic Products Processing Zone. It is near the
highway, the traffic and environment condition is quite good. Shipu town is close to the fishing ground of East Sea is one of the
famous fishery ports in China. She connects Xinqiao and Dingtang in the north, Sanmen gulf in the west, there are Hepu and
Gaotang at the other side of the harbor in the south, Damuyang and Maotouyang in the east.
2. Geology and physiognomy: The town belongs to low hilly land area, hilly land and island cover 70% of the total town area.
The old town locates at a narrow valley near gulf, houses are built at the foot of the mountain, and streets incline sloping ladder.
The altitude in the town ranges from 20-28 meters, along the harbor, the average altitude is 3-4 meters. The highest, 394 meters,
locates at the west of town, is named as Kingshan.
3. Climate: Xiangshan locates at the northern edge of subtropical zone, and it belongs to the typical subtropical monsoon
climate. It is warm and humid with distinct four seasons. In winter, under the influence of the cold air mass, the weather is
steady and most of the time it is sunny and cold; in spring the cold air mass weakens, the Pacific-sub-high atmosphere
strengthens, sometimes they move back and sometimes they move forward, so the weather is unsteady. In the early spring, the
sub-high atmosphere and the cold air mass are locked in a stalemate, thus the static peak forms, in some places there are
typhoon and other disastrous weather such as heavy storm and big spring tide, in spring the sub-high atmosphere weakens,
sometimes there will be continuous rain. It prevail southeast wind in summer and northeast in winter. Destructive atmospheric
conditions, such as frost, low temperature, storm, ice, drought typhoon, heavy rain, cold wave is familiar.
4.Meteorological character:
        Annual average temperature: 16.2 C Annual average temperature in January: 5.4
        Annual average temperature in July : 5.4      Annual lowest temperature : -7.5 (Jan.16,1961)
        Highest temperature: 38.8 (Aug.20,1971) Annual average wind speed: 5.5m/s
        Annual max rainfall: 1956.2mm Annual min rainfall: 770.6 mm
        Annual average rainfall:1308 mm Annual relative humidity:80%
        Annual average sunshine :1707.lhr Annual non-frost time:235d
l      Annual average rainfall:1392 mm Annual average rainy day:23d
    Max rainfall in the day: 281.6 mm Max rainy day: 23d
        Annual max rainfall: 1756.2mm(1976) Annual min rainfall: 770.6 mm(1967)
l      Annual relative humidity:80% Annual average sunshine : 2025.8.lhr
     Annual non-frost time:235d
l     Prevailing wind: north wind in winter and southeast wind in summer.
    Annual average wind speed: 5.5m/s Max instantaneous wind speed:58m/s
l      Annual average highest seawater temperature in the sea area of Shipu port:30 Lowest seawater temperature:8
5.Hydrogphic and tide:
l     The sewage disposal area in this evaluation project is the Shipu harbor. The port connects the continents in the northwest,
      and there are 5 islands around the harbor shaped line from northeast to southwest in the east. In the west, composed by 5
      wasterways, connects tightly with Sanmen Gulf. The main center liner of the harbor is 18 kilometers long, 0.4-3
      kilometers wide, covers about 27 square kilometers, water deep 4-33 meters.
l     The tide belongs to normal half-day tide. The average high tide is 2.14meters, and low tide -1.4m. Tide floods from
      southeast entrances, while the ebb-tide is on the contrary.




                                                                   68
Brief Introduction to the social environment (including social economic construction,
education, culture and culture relic protection etc.)
l Xiangshan locates between Xiangshan Port and Sanmen Port, north latitude 28°15’18”-
    29°39’42”, east longitude 121°34’03”-122°17’30”. The territory comprises east Xiangshan
    peninsula and 608 islands, the total land area is 1175Km2, the sea area is 5000Km2, the
    population is 5.28million. The capital locates at Dancheng town. Xiangshan is one of the
    main fishery regions in Zhejiang Province. She is teeming with hairtail, yellow croaker,
    pomfret, and cuttlefish. Shrimp, oyster, kelp, laver are also cultivated there. Transportation
    there is convenient, the main ports including Shipu port and Hepu port. Architecture is
    famous in Shanghai, Hangzhou, Ningbo and other middle and large cities.
l Shipu is 36 Km far from Dancheng, it covers 86.6 Km2 land area, 70 villages and 20
    residential area.
l The population is around 70,429 in 2000, among which, 26772 are town resident. Shipu is
    a main port in trading in this province. The port is flourishing with all kinds of aquatic
    products including hairtail, eel, cuttlefish, pomfret, yellow croaker, shuttle crab and
    shrimps. According to the statistics provided by the town government, the total output of
    industry and agriculture was 3.3billionRMB in 2000, among which, 2.1 billion was
    industrial output, and 1.2 billion was made by agriculture and fishery. Main industrial lines
    are marine products processing and built and repair of shipping vessels. The traffic in
    Shipu town is convenient in both land and water way. She can reach Liaoning province and
    Tianjin city in the north, Sha city in the west, Hainan and Guangdong province in the south
    by sea. Her passenger liners are directly sailing to Shanghai Jiaojiang Shengjiamen and
    other harbors along the sea. The harbor, famous for its calm space, covering 27 square
    kilometers, can berth 10,000 fish ships, big as 5000T ships, can also easily sail pass the
    harbor. There are many kinds of industries in Shipu, main industries are refrigerating and
    processing aquatic food. At present there are 200 refrigerating warehouses refrigerating
    capacity 30000tons daily refrigerating capacity 2000tons.
   With the development of economy, culture, education and sanitation are improved too. Now
   there are two complete high school, an vocational school of aquatic products, an adults’
   technical school, 2 junior middle schools, 31 elementary schools, The rate of compulsory
   education is up to 99%




Present Environment Quality Condition

                                                  69
Present Environment Quality Condition and major environment problem in project site
1.Water environment in sea area: Ningbo Environmental Supervising Center had convention
inspection to the region in 2001, and the inspected results compared to SEA WATER
QUALITY STANDARD GB1097-1997shows: except the inorganic nitrogen exceed the fourth
class water quality standard, other index all meet the third class sea water requirement in
Referring to The adjusted scheme of environmental functional distribution in the near sea in
Zhejiang province
2.Atmosphere: the atmosphere in Shipu town is quite good, according the supervision by
Xiangshan, meets the class II standard in ENVIRONMENTAL AIR QUALITY STANDARD
GB3095-1996
3.Noise: According the supervision by Xiangshan environmental supervising station in 2002,
the noise in the project site meet the third class of GB 3096-93 Environmental Noise Standard
in city area.
The main environment protection aim:
 1. Environment atmosphere protection class: the class II standard in ENVIRONMENTAL
AIR QUALITY STANDARD GB3095-1996
  2. The sea water quality aim: In referring to The adjusted scheme of environmental functional
  distribution in the near sea in Zhejiang province, sea water meet the class III in SEA WATER
  QUALITY STANDARD GB1097-1997shows.
  3. Environment noise protection class: the class III of GB 3096-93 Environmental Noise
Standard in city area.




Evaluation applicable Standard
                                                  70
71
                                  1.Environment atmosphere: the class II standard in ENVIRONMENTAL AIR
                               QUALITY STANDARD GB3095-1996

                                                      Unit : mg/m3
                                                              annual        daily          hourly
                                                             average       average        average
                                                    SO2        0.06         0.15            0.50
                                                    NO2        0.05         0.10            0.15
                                                    TSP         0.2          0.3              /

                                  2. Water environment in sea area: According to the adjusted scheme of
                               environmental functional distribution in the near sea in Zhejiang province, execute the
                               class IV in SEA WATER QUALITY STANDARD GB1097-1997shows.
                                                                          Unit mg/L
Environment quality standard




                                     Parameter                                            Inorgani    Active
                                                     PH       DO        CODMn     BOD5        c       Phosphate
                                                                                          Nitrogen
                                     Standard   6.8-         3    ≤5m       ≤5            ≤0.5   ≤0.045
                                                8.8
                                  Water environment in sea area: According to the adjusted scheme of environmental
                                 functional distribution in the near sea in Zhejiang province, execute the class IV in
                                 SEA WATER QUALITY STANDARD GB1097-1997shows.


                                  3. Environment noise: The noise in factory zone under this item is up to the third
                               class of GB 3096-93 Environmental Noise Standard in city area.
                                         Leq[dB A ]
                                                        Classification          Daytime         Night
                                                              3                   65             55




                                                                   72
                                    1.Waste gas     The oil smoke in dining room is up to Diet Industry Oily smoke
                                    Drainage Standard GW pb5-2000.
                                                  Scale                      Small           Middle           Large
                                      The number of cooking stove           ≥1, 3            ≥3, 6             ≥6
                                                                 8
                                    General power of stoves 10 J/h       1.67, 5.00        ≥5.00, 10           ≥10
                                     General project area of drainage
                                                                          ≥1.1, 3.3         ≥3.3, 6.6         ≥6.6
                                        of exhaust covers m2
                                     Max drainage density (mg/m3)                            2.0
                                         Min removing rate of
                                                                              60                75             85
                                         Cleaning machine (%)
                                      H2S (CH3)2NH execute the Class II standard in Foul Pollutant Drainage Standard
                                    GB 14554-93.
                                           Standard            Factory             waste water drainage standard
                                      Item                 standard mg/                   the length of tail
                                                                                      pipe:15m      mg/
Foul Pollutant Drainage Standard




                                      H2S                        0.06                           0.33
                                      (CH3)2NH                   0.08                           0.54

                                        2. Waste water is drained according to the third class of Waste Water
                                   Comprehensive Drainage GB8978-1996, but industrial district administration committee
                                   plans to deal with comprehensively waste water drainage, so each enterprise is allowed
                                   to drain off waste water according to internal standard. The chart below is part specific
                                   index. Unit mg/l
                                       Item             PH       CODcr        BOD5        SS      NH3-N animal and
                                                                                                              plant oil
                                     Standard(mg/l)     6-9       2000        1200        400      150           100
                                    The aquatic products processing zone sewage factory execute the second class in Waste
                                   Water Comprehensive Drainage GB8978-1996 shows: The chart below is part specific
                                   index. Unit: mg/l
                                           Item        PH        CODcr        BOD5         SS      NH3-N Phosphat
                                                                                                                   e
                                         Standard      6-9         150          30        150         25          1.0

                                         3.Noise:The noise in factory zone execute the Class III standard in Noise standard
                                   of the factory zone GB12348-90 ,that is Leq65dB during daytime ,Leq55dB at night
                                   The noise in construction area execute The Max Standard Of Noise In Construction
                                   Area GB12523-90
                                       Max standard of noise in construction area equal acoustics grade dB(A)]
                                          Constructio                                                Max noise
                                                               construction process
                                           n Process                                          Daytime         Night
                                          cubic earth     Bulldozer. Excavator. fork-lift
                                                                                                  75           55
                                           and stones                  truck
                                          pile driving         different pile-drivers             85       prohibited
                                            structure   blender, vibrator, electric-saw etc.      70           55
                                             fitment            crane, elevator etc.              65           55


                                                                      73
         polluter
         control
          index
t otal




Construction Project Engineering Analysis




                                     74
Processing Flow:
1, Frozen Weever filet techniques flow chart and harm analysis
, Sea bass filet processing techniques flow scheme
       Fish organs etc.   Waste water     Noise
 ,raw material purchase→ adding ice cleanout → classification→ putting on tray
→unit of freezing → grade→ packing → deepfreeze .
  ,Taking materials from warehouse to workshop→ thaw→ cut head→ cut open
filet→ mending side → cleanout →quick freezing →grade →unit of freezing
again →weigh →wrapping ice→ packing→ to detect metal →deepfreeze
2, Seasoned Partion techniques flow
,Taking materials from warehouse to workshop→ thaw→ cut head→ cut open
filet→ mending side→ cut segment→ grade→ cleanout →seasoning →quick
freezing →packing→ to detect metal →deepfreeze
34), Dried Sea Bass Filets techniques flow chart and harm analysis
3, Dried Sea Bass Filets processing techniques flow scheme
   ,raw material purchase→ adding ice cleanout → classification→ putting on tray
→unit of freezing → grade→ packing → deepfreeze .
   ,Taking materials from warehouse to workshop→ thaw→ cut head→ cut open
filet→ mending side → cleanout →condiment →lay open fillets →drying fillets
→lift down fillets→check up→weigh→ packing→deepfreeze
4, Cooked Sea Bass Filets techniques flow chart and harm analysis
1, Cooked Sea Bass Filets processing techniques flow scheme
 ,raw material purchase→ adding ice cleanout → classification→ putting on tray
→unit of freezing → grade→ packing → deepfreeze .
  ,Taking materials from warehouse to workshop→ thaw→ cut head→ cut open
filet→ mending side → cleanout →condiment →lay open fillets →drying fillets
→lift     down      fillets→firing→if    relax   filets→check up→weigh→
packing→deepfreeze
5, Sea bass Partion techniques flow scheme and harm analysis
1, Sea bass Partion techniques flow
 ,raw material purchase→ adding ice cleanout → classification→ putting on tray
→unit of freezing → grade→ packing → deepfreeze .
  ,Taking materials from warehouse to workshop→ thaw→ cut head→ cut open
filet→ mending side→ cut segment→ grade→ cleanout →seasoning →deep
fry→quick freezing →packing→ to detect metal →deepfreeze




                                         75
Main pollutant working procedure & output
       1.Waste water
       Industrial waste water The waste water consisted mostly of fish-washing wastewater and
a little raw material hogwash. The waste water drains off 67,500 tons annually
        Living waste water The waste water drains off 4,500 tons annually
       2.Waste gas
          odd smell The odd smell mainly comes from the anchovy erosion or in the course of
processing, and it causes H2S (CH3)2NH.
         The oil smoke in canteen: The waste gas drains off 4000m3/h annually 4000m3/h, the
       drainage density of oil smoke 14-20mg/m3.
       3.Solid trash:
         This project needs 7,500 tons fresh anchovies, 10% of which are solid trash.
         Living rubbish: This project requires 120 work staff, annual working day 200days,
       annual living rubbish will be 12 tons.
Main Producing Equipment
    Single freezing machine 1 set, Ice machines 3 sets, Refrigeration 1 unit Packing meat
machine 2sets, Metal detecting machine 2 sets, Blender 2 sets, Shaping machine 2 sets,
Vacuum packer 2 sets, Automatic packer 2 sets



Energy consumption:

   7.5 tons water per year, 1,200,000 degree electricity per year




Resource and let out of pollutant

     Descripti                                         Thickness and
                                                                           Let out thickness
on                Drainage(No.)     Pollutant          amount before
                                                                           and amount
Types                                                   disposal
                                                       Waste               Waste
                                                       gas 4000m3/h        gas 4000m3/h
                  Dinning room      Oil smoke
Atmosphere                                             Oil smoke:          Oil smoke 2.0mg
pollutant                                              14-20 mg /m3        /m3
                                                                           H2S:0.06 mg/L
                  Raw material      H2S
                                                                /          (CH3)2NH:0.08m
                  fish              (CH3)2NH
                                                                           g/L
                                                       Waster
                  Fish-washing      CODcr SS
                                                       water:63000T/Y
    Water         wastewater        etc.                                   Waster
                                                       CODcr:2130mg/L
   pollutant                                                               wate:6.75T/Y
                                                       Waster
                                    CODcr SS                               CODcr:150mg/L
                  living water                         wate:0.45T/Y
                                    etc.
                                                       CODcr:400mg/L

                                                  76
                   Feeding stuff     Fish organs
                   processing        and            206 Ton/y                   206T/Y
 Solid pollutant
                                     fish head etc.
                   Living rubbish            /           25.2T/Y                     25.2T/Y
     Noise             Single freezing machine Ice machines etc. caused
     Others
Main Ecology influence:
  Croplands and ponds will turn into industrial zone after the completion of this project, thus, it
will bring un-reserveable influence and change to the ecology of this area.

Environment influence analysis

Brief environment influence analysis during construction
  This project mainly includes stones, piling, framing, wall building, conveyance and pipe-lay.
The main pollutants are noise resulting from the revolving of the machine, construction rubbish
and rain water from the construction field. Besides, dust from the loading and unloading of sand,
stone, concrete, lime will also pollute the surroundings.

  1) The protection of atmosphere environment:
  Enclosing walls should be repaired around the construction site, safety netting should be laid
around the buildings being built, and waste and residue produced during construction should also
be prevented from influencing the environment. The excavated and abandoned earth in the
construction site should be explored and piled planningly, the building rubbish and abandoned
soil should be taken away in time. The road passed by different Transport vehicles should be
watered regularly, the building materials such as yellow-sand, pebbles, and cement should always
be watered preventing the form of dust.

  2) Prevention and cure of water environment:
  After being collecting and treated by precipitating tank, the clean water from rain sewage, mud
sewage and accumulated water should be flow into river via. Living waste water should be
treated properly, temporary facilities should be built, the oil-separating tank should be laid in the
temporary kitchen of the dinning room. And the toilet and septic tank should be built; the
pollutant can be flown into rivers after reach the standard.




                                                   77
 3) The prevention and cure of noise influence:
  Advanced machinery and technology is employed during construction period, noise reaches
The Noise Standard In Industrial Factory Zone. For the construction tasks that produce noise after
22:00 during night, if for special purpose, they should be checked and ratified by the
environmental executive responsible department, after examining and approving The License For
Night Construction they can be started.




                                                  78
Environment influence analysis in operation period
   1.Waste gas disposal and environment influence analysis
          Niff: niff under this project mainly comes from in the process of processing fish and the
    odd smell from the blet fish, after disposal to reach the standard of Foul Pollutant Drainage
    Standard GB14554-93
        Dinning oil and smoke: The oil and smoke from dinning room and kitchen should be
   Purified to the standard stipulated in oil and Smoke Drainage Standard in Catering Trade (trial
   edition ) GWpb5-2000, hereafter be discharged to upper air by purifying machine via pipes
   The waste gas caused under this project has little influence to its surroundings.
      2.Waste water disposal and Environment influence analysis
     The project has a total water consumption of 75,000 tons annually in operation. The waste
  water drains off 67,500 tons annually, 4,500 tons of which are living waste water. Waste water
  contains rich nutritious substances such as CODcr , suspended substances, organic compounds,
  nitrogen, phosphorous etc. The chart below is the average statistics of various water:
                 substances contained
                                              CODCr         BOD5                 SS

           Types of waste water
           Industrial waste water          2130          /                 1400
           Living waste water              400           200               100
       This project will result in 135.99 tons of CODcr, 0.90 tons of BOD5, 88.65 tons of SS
annually. Industrial waste water, living waste water and dinning waste water should, at first
undertake first class processing such as oil separating and precipitating etc, as soon as the waste
water after disposal reaches the standard of the sewage treatment plant, leads to the plant and
drains off to the sea when the waste water is up to the second class of The Standard Of Waste
Water Drainage GB 8978-1996.
   3.solid trash disposal and environment influence analysis
  The solid trash under this item mainly includes internal organs and remains of the fish made in
processing, sludge made after processing sewage and living rubbish .The internal organs and
remains of the fish can be used as the raw materials of fish powder, so it can be supplied to
powder factory. Sewage processing should be taken to a remote place. The sludge can serves as
fertilizer. Living rubbish will be disposed by local environmental and sanitary departments.
  4.Noise control measures and environment influence analysis
Noises mainly come from Dogmeat machine regerating equipments, quick-freezing equipment,
and they are also made in the process of production as well as by human being. In order to reduce
the influence to surroundings made by the noises, advanced sound insulating materials are used,
and greenbelt is developed around workshops.

    5.Environment risk analysis
    Big fishing of anchovies may result the decline of its resource, thus destroy the offshore
ecology balance.




                                                  79
Measures on Environment Protection and Expected results


  Description
                   Drainage(No.)       Pollution           Measures         Expected effect
Types
                                                           Purify and       Up to the standard,
 Atmosphere     Dinning room           Oil smoke           get rid of       small influence to
 pollutant                                                 the dust         surroundings.
                                                           Absorb after     Up to the standard,
                Raw material           H2S
                                                           filter in acid    small influence to
                fish                   (CH3)2NH            and alkali        Surroundings.
   Water        Fish-washing                                                Up to the standard,
                                       CODcr SS etc.
  pollutant     wastewater                                 Deposition        small influence to
                living water           CODcr SS etc.                         Surroundings.
                Feeding stuff          Fish organs and     To fish
                processing             fish head etc.      powder as
                                                                            Become resource
   Solid                                                   powder
  pollutant                                                material
                                                           To city
                Living rubbish                              sanitary        Innocuitified
                                                           system
   Noise        Small influence to surroundings after sound insulation.

   Others


Ecology protection measures and expected effects:

   Seasonal fishing of anchovies may prevent from the decline the of the anchovies resource.




                                                   80
Conclusion and suggestion

 Conclusion:
  The completion of this project will benefit to the development of aquatic products cultivation
of this county, and pave the way for the fish folk to change their work, in the meantime, this
project may protect ocean wildness fishery resource and ecology environment, move forward
the sustainable development of the ocean fishery.
  Suggestion: To wide spread clean production, enlarge greenbelt, beautify surrounding, and
improve the environment protection conscience of the work staff. To protect the environment
with heart and duty while develop economy.
   Seasonal fishing of anchovies may prevent from the decline the of the anchovies resource.




                                                 81
Approve suggestion:
   As to the suggestion on the project of pellet food processing of Ningbo Xianglong Aquatic
Products Co., Ltd. put forwarded by Xiangshan Enviroment Protection Inspection Station, we
mainly agree in principle. This is a new project, and the completion of which will be benefit to
the development of the aquatic raising line of our county, and move forward to the sustainable
development of ocean fishery.
    The construction unit must strictly abide by relevant system; carry out the environment
protection measures required in the suggestion. In the process of construction, the following
must be strictly carried out:
            1. To wide spread clean workcraft in order to reduce the consumption of water
                amount from the beginning. To recycle at most time so that reduces the drainage
                amount.
            2. Rainwater and waste water should be separately drained. Production and living
                waste water are supposed to reach standard II of Waste Water Letting out
                Standard GB8978-1996 after disposal.
            3. Solid trash must be placed in a fixed location, and carried to the fish powder
                factory periodically. Living rubbish should be send to City Environment and
                Sanitary Cleaning System.
            4. Foul smell from the feed stuff should be let out via pipe in high air after
                collection and spray by acid and alkali.
            5. The construction unit should apply to the environment protection department for
                trial production in time after the completion of the project. The project can only
                be put in run after acceptance.
   The A/M items must be carried out seriously.
    We hereby agree the project of Ningbo Xianglong Aquatic Products Co., Ltd., who put
forward to process pellet food with an annual output of 5000tons.



                          Xiangshan County Environment Protection Bureau
                                    Aug. 13, 2003




                                                  82
                                             Approval and Registry Form of Environment Protection on Construction Project
Registry Form unit                                                  Registry Form person                                                    Approval undertaker
                            Project           About Seafood Finish Machining use WB
                                                                                                                Construction site               industrial demonstration area of Xiangshan
                            description       International Loan Project
                                              The annual production volume of this project is
                            construction
                                                                                                               Construction style              √
                                                                                                                                               □New □Rebuild &continuation                  □Techno-build
                            scale             1930T.
                                                                                                               Environment Protection                           √
                                                                                                                                                □Compiling book □ Compiling form □Register
                            classification    1320
                                                                                                                  supervised style                                 form
                                                                                                                                                                              Environmental
                            Total                                                                                 environmental                                               protection
                            investment        33994500 RMB                                                          protection                             80                                            2
                                                                                                                                                                              invest
                            (10000YUAN)                                                                          invest(10000YUAN)                                            rate %
                            Project-                                                                                                                                          Project




     Construction Project
                                              Xiangshan County Development Planning
                            establishing                                                                        Approved file No.                    No.54[2003]              established          2003.3.28
                                Dept.         Bureau
                                                                                                                                                                              time
                            Report
                                              Xiangshan County Environment Protection                                                                                          Approved
                            Warrant                                                                             Approved file No.
                               Dept.
                                              Bureau                                                                                                                             time
                                                XIANGSHAN HUAYI                                                                                Xiangshan Environmental
                                                                                            1396836338
                            Name                SEAFOOD CO., LTD.                  Tel                                      Name               Supervising and Protecting     Tel                   65725923
                                                                                                               unit
                                                                                                              ation
                                                                                            8

                                                                                                              Evalu
                                                  Ningbo P.R. China                                                                                     Station
                                              Xiangshan County Shipu
                                                                                                                                              No.191 Xinhua Road
                            Address           Aquatic Products Processing       Post            315700                      Address                                           Post                    315700
                                                                                                                                              Xiangshan
                                              Zone
                                                                                                 Yu
                            Legal                                               Person in                                     Certificate                                     Evaluation




    unit
                                              Yu fuchun                                        yongchu                                                C20150001
                            representative                                      charge                                           No.                                          expense




  Construction-
                                                                                                  n
                            Environm
                                              Atmosphere Class              GB3095-1996     Surface water          Groundwater      Noise:    Type    GB3093-1993       Sea water Type III         GB9097-1997
                            ent quality                                                                              Soil      Others
                            class
                            Environm
                                               □ Drinking water source protection district □ Natural protection district    □ Famous scenery district         □ Plantation and park




  condition
  condition


 Project site
                            ent




environment
                                               □ Essential cropland protection district   □ Ecology protection district    □ Water and soil leave away protection area □ Ecology sensitive and fragile area
                            sensitivity        □ Population dense area                                                   √
                                                                                  □ Key cultural relic protection area □ Lake      □Reservoir
                            character
                                                               Built + under built                                               This project                                          Total project
                                                                                                                                                                                                       drainag   drainag
                                                                                                                                                           drainag               reducin   drainag
                                                                         drainag     general   drainag                drainag                                                                          e         e         decrease
                                                                                                                                   drainag                 e          drainage   g         e
                                                                         e           drainag   e         drainage     e                                                                                capacit   in-
                                          Contaminatio        drainage                                                                          reducing              capacity   capacit                                   amount in
                                                                         density     e         capacit   density      density      e                       capacit                         capacit     y         creasi-
                                          n                   density                                                                           capacity              allowed    y of                                      district balance
                                                                         allowe      capacit   y         predicted    allowe       capacit                 y                               y           allowe    ng
                                                              In fact                                                                                                            old and                                   replacement
                                                                         d           y         allowed                d               y                    predicte                        predicte    d         capacit
                                                                                                                                                                                 new
                                                                                     In fact                                                               d                                  d                  y
                                                                                                                                                                                 section

                                          w a s t e
                                                              -------    -------                           -------    -------      4 864                   4 864
                                          w a t e r
                                          Oxyen
                                          amount                                                                                   26 79
                                                                                                            551        100                      21 .932    4 864
                                           required *                                                                                6

                                          Ammonia and
                                           nitrogen*
                                          Suspend                                                                                  13 32
                                                                                                            274         70                       9 921     3 405
                                          substance                                                                                  6
                                          Waster gas          -------    --------                           -----      -----         720                       720

                                          Sulfur dioxide
                                          Smoke and
                                          dust
                                          Industrial
                                          powder dust
                                          Nitrogen and
                                          oxide




pollutant let out standard and control
                                          Industrial
                                          solid               -------    --------                          --------   --------      249 2         224       25 2
                                          trash




                                              project
                                         relation with this
                                         other pollutant in
                                                                                                                                    84
Unit y waste gas capacity x104 marked meter3/year wastewater ton/year mercury cadmium lead, arsenic chromium chloride kg/year other
units are all tons waste gas density milligram/liter Waste gas density milligram/lm
Notes This list is written by the evaluation unit and attached on the last page of the report. The last blank is the characteristic pollutant.
Among this       5 = 2 - 3 - 4            6 = 2 - 3 + 1 - 4


.




                                                                       85
            Project Environment Influence Report

Project name : Utilize Loan from World Bank to Develop Seafood Further Processing
Construct company ( sealed ) : Ningbo Feiri Marine Industrial Co.,LTD




Enact Date : July 27, 2003

Enacted by National Environmental Protection Bureau




 W.




 X.


                   Y.         Responsibility Sheet


Evaluated by : Xiangshan Environmental Protection inspection office
Evaluation company superinrtendent : Shi Yaqing
Project superinrtendent: Shi Yaqing



Evaluation Personnel Situation
Name          Profession     Title       Work No.   Responsibility Signature
Ni            Environmen Engineer        Environmen Censor
Jianzhong     t supervise                   t Evaluation
                                            No.
                                            C20150002
Shi Yaqing    Environmen Engineer           Environmen Report
              t supervise                   t Evaluation compile
                                            No.
                                            C20150001




Project Base information:
Project Name                Utilize loan from World Bank to develop seafood further processing
Construction Company        Ningbo Feiri Marine Industrial Co.,LTD
Proprietor                  Xie Dingfei                Contact person         Qian Shunxin
Address:                    No.1 Haining Road Shipu Xiangshan
Telephone:                  1350 6687 665              Fax     0574-          Post       315731
                                                               65975000       code
Construction Place          No.7 land of Shipu seafood processing industrial park Xiangshan
Project approval            Xiangshan Development Approval No.                Xiangshan Plan
Authority                   Plan Bureau                                       Investment
                                                                              Approval
                                                                              No.(2003) 52
Construciton Natural        New building               Trade Type & Code 1320
Occupied Area               39960(M2)                  Green Area             11988 (M2)
Total investment            RMB         Including :    RMB1.94mi Prop 2.6%
                            44.9418 Environment        llion         ortio
                            million     Investment                   n
                                                  87
Evaluation Expense                                      Expected operation     May,2006
                                                        Date
Project Scale and Content
                                     Project Background
Xiangshan county is rich of marine resource county, three directions surrounded by sea, with total
sea area 5335 square kilometers, waterfront area 30,000MU, and 4.96million MU shallow sea
within 20meters depth levels ( including 450000Mu within Bay ) . Xiangshan has 800 kilometers
coastal line and 608 islands. Xiangshan bay and Sanmen bay is located in north and south of
Xiangshan respectively and both of them are narrow and semi-closed bay. East seashore of
Xiangshan has several open bays provide good condition to farming seafood.
Shipu Harbor is one of national key harbors, located within East China Sea fishery ground, with
wide and open sea, flat and continual waterfront. So abundant marine resource of Shipu are
mainly coming from oversea catching, deep-water farming, and waterfront farming. Shipu is also
main harbor where fishing ships landed, so it is fresh seafood transaction center of East China.
Recent years, due to recession of fishery resource, farming developed quickly and had becoming
key industry coastal farmers adopted. With introducing more farming products, now we already
have 35 farming species. But most farming products sell as fresh , live products which restricted
further development of industry and lack of further processing plant. To speed up development of
farming industry, we must give priority to further processing industry; enhance its additional
value; source more raw material, maintain price for raw material and guide more fishermen to
invest into prospected farming industry; ensure more reliable income for those fishermen who
transfer from fishing into farming industry. So it is essential and vital to establish high standard
high level seafood further processing company.
Development of this project will play an important role in improving the whole level of china
seafood processing, speeding up moderanization of china marine industry, stimulating the
development of seafood farming industry and other relevant industry, creating more profession
opportunities especially for women and those transferred fishermen, protectingwild fishing
resource and environment, accelerating continual growth of marine industry..
Project content:
1. civil construction: total occupied area 65000 square meters, construction area 14900 square
    meters, including processing workshop 5000 square meters, cold storage room 2000 square
    meters, office building 3000 square meters, dorm and dinning room 2000 square meters,
    boiler room 300 square meters, machine room and power room 800 square meters, guard,
    garage ,warehouse 1000 square meters, sewage treatment center 800 square meters.
2. production capacity: annual processing seafood products 1396 tons, including export 1150
    tons( frozen dry seafood series 800 tons , IQF series production 350 tons ) and production for
    domestic market including frozen dry series production 100 tons and IQF series production
    146 tons )
Main product equipment
Freeze machine ( cold storage, IQF machine , Flat freeze machine ) , cooking facility , processing
system and product line , vacuum dry machine, vacuum packing machine, automatic packing
machine, disinfect facility, ozone disinfect machine, shell-on mussel cleaning machine, mussel
meat cleaning machine, automatic mixed machine, roast machine, sewage treatment system
etc.
Energy consuming situation
Annual power consuming expect to reach 2500000 KV, water consumption 103,000 cubic
meters, oil consumption 72000 tons.

                                                   88
Raw material consumption situation
Oyster 2500 tons, scallops 110 tons, frozen shrimp meat 800 tons, frozen shrimp 400 tons ,
frozen clam 400 tons, frozen mussel 2500 tons, frozen clam 350 tons, frozen laver 500 tons,
frozen bi-valves 800 tons
Original pollution and environment problem related to this project
Ningbo Feiri Marine Industrial Co.,LTD established in 1996, located in China Aquatic City(
No.1 Haining Road Shipu ), mainly handle seafood processing and trading business. At present,
company has fixed assets RMB 21.3million, with occupied area 15180 square meters and
construction area 8200 square meters. Company had established 2 plant with total 11 workshop,
includ: 5 workshops for surimi plant, 2 product lines, with 6 flat freeze machine, 1 set of IQF
machine; 6 workshops for frozen spanish mackerel fillets plant, 2 sets of IQF machine, form 2
product lines. In addition, we can fast freeze product 60 tons each time, and cold storage hold
2000tons product each time. Ningbo Feiri Marine Industrial Co.,LTD total process 5500 tons
seafood products in2002, including surimi 3900 tons, frozen spanish mackerel fillets 1200 tons,
small frozen products 400 tons , and generate RMB70million value, tax RMB9.5million, and
USD7.5million foreign exchange. Annual power consumption expected to reach 23000 degree,
water consumption 160000 cubic meters, water drainage 128000 cubic meters. Waster water will
be drained into sewage treatment system, through grille, condensation, sediment procedure to
pull out.
Seafood further processing project Ningbo Feiri Marine Industrial Co.,LTD plan to utilize loan
from World Bank to construct is located in Shipu seafood industrial park second stage,
surrounded by seafood processing plant nearby, convenient in transportation and well drainage.




                                                 89
                          Natural and social condition to develop project
Natural condition brief introduction ( Topography, geology, climate, weather, hydrology,
Vegetation, diversified animals etc) :
1. Location: Ningbo Feiri Marine Industrial Co., LTD is at Shipu seafood processing industrial
    park ( detail please refer to attachment). At East sea, Shipu is famous fishing harbor of china,
    north on Dongchen, Dingtang and Xiaotang town, West near sanmen bay, south to Hepu,
    Gaotang town, East to Damu ocean and Maotou Ocean.
2. Geology: Shipu is belong to seashore Hill belt, low hill and islands account for 70% of total
    county area. The old city developed from a narrow valley near seashore, so house is built base
    on slope and street follow as ladder. Above sea level of town is at 20-28meters,while above
    sea level of coastal area is at 3-4 meters. Dajin mountain in West of Shipu is the highest place
    with 394 meters above sea level.
    Base rock of bank of Shipu harbor is formed by millstone of last Jurassic period, and main
    ingredient is gray, dark gray lava and tuff. Most geology construct are rupture, and lay at
    North-east, north-west and also south-west direction . The outbeach area of Shipu is plain
    accumulated by sea, rock immerse at tens meters depth. At no. 2 dock, these rock are
    generally 4-7 meters deep.Shipu have no record of earthquake above 5 grade.
3. Climate: Shipu is located at Monsoon of Subtropical zone, so climate character is warm and
humid, clear change of four seasons, plentiful rainfall. Winter is cold and fine due to control by
cold air, Spring is changeable between cloudy and fine due to weaken of cold air. At the
beginning of summer its rainy continuous due to strengthen of subtropical high pressure, while at
the middle of summer its fine and hot, less of rain, at the same time typhoon will bring rainstorm
and flood; spring is south-east wind, while winter north-east wind. Disaster weather including
frost, low temperature, storm, drought, typhoon, rainfall and cold wave etc, especially typhoon,
storm , drought, low temperature.
4. Weather: average temperature of many years: 16.2 ;average temperature of January : 5.4 ;
average temperature of July: 27 ; lowest temperature in record : minus 7.5 (Jan.16,1961 ) ;
highest temperature in record 38.8 ( August 20,1971 ).
    Average rainfall; 1392mm; rainy days: 23d; daily maximum rainfall in record: 281.6mm; the
    longest continuous rainy days: 23d; annual maximum rainfall in record: 1756.2mm(in 1976);
    annual minimum rainfall in record: 770.6(in 1967).
    Average humidity: 80%; annual sunshine time: 2025.8hr; no frost day of year: 296.7d.
    Year leading wind direction: winter north wind, summer South-west wind. Annual average
    wind speed: 5.5m/s; moment fastest speed in record: 58m/s.
    Year highest ocean temperature of Shipu is 30 ,while lowest ocean temperature 8 .
5. hydrology and tide
 The body to hold pollution water of this project is Shipu harbor. Shipu harbor connect to land at
north-west, East to Shanbantouzui, Dongmen island, duimian hill, Nantian island and Gaotang
island from North-east to South-west to form a natural barrier line; west to Sanmen bay.
Shipu harbor from north to south , turn to south-west, form a curved moon , with total 18km long
center line , at 0.4-3km width and 4-33m depth , total ocean square meters 27km2 .
Shipu harbor current trend is traditional half a day tide. Average high tide is 2.14m, average low
tide negative 1.4m, average tide difference 3.54m. Rising tide begin from south-east entrance, on
the contract while ebb tide. Rising tide close to W direction,while ebb tide close to E direction,
current in back and forth , baisically turn in clock direction. The fastest current happen at 5hours
after high tide. The current is slow when rising tide, the surface speed is 0.55m/s while the lower
at 0.37m/s ; The rising tide period of surface will be 7hours and 7 minutes, while the rising tide
period of the lower 6hours and 24 minutes. The current of ebb tide is fast, the surface speed is
0.75m/s, whle the lower at 0.96m/s ; the rising tide period of surface will be 6hours 15minutes
and the lower 6hours 5minutes..
                                                     90
Wave of shipu harbor is mixed wave mainly formed by well up wave. Wave height generally less
then 8 meters. When typhoon is coming, the heightest wave of shipu can reach 1.5m.
Shipu minus current is NE direction, surface and the lower are consistent at same direction, with
0.1-0.2m/s speed.
Most wave of Shipu is mixed wave. The height of wave generally is less than 0.8 meters. While it
reach 1.5m when typhoon pass Shipu
Social Environment brief introduction ( social economy structure , education, culture, and culture
relic protection etc.
Xiangshan is between Xiangshan bay and Sanmen bay in East of Zhejiang, with east longitude
from 131° 34 – 122° 20 , north latitude 28° 45 - 29° 41 . Xiangshan is formed by Xiangshan
peninsula and 608 islands, with total land area 1175square kilometers, ocean area 5000 square
kilometers, and 528000 population. County government is at Dancheng town. Xiangshan is key
county of Zhejiang, rich of hairtail , yellow croaker, pomfret, cuttlefish and ocean farmin shrimp,
bi-valves, oyster, laver , and kelp etc. Xiangshan is convenient in ocean transportation, with Shipu
and Hepu main port.
Shipu town is 36 km far away from Dancheng town and total 83.6 square kilometers area, with 70
administrative village and 20 residential district.
In 2000, shipu has total 70429 population including 26772 residents. Shipu is main port of china
and Zhejiang to trade and receipt Taiwannese. Shipu is rich of marine resource, such as hairtail ,
eel ,flounder ,pomfret, yellow croaker, grouper and swimming crab ,prawn etc. According to data
provided by Shipu government, in 2000 among total output RMB3.3billion, including industrial
value RMB 2.1billion and agriculture marine value RMB 1.2billion. Main industry of shipu is
seafood processing, ship building and maintain industry. Shipu is convenient in transportation:
cargo transport north to Dalian,south to Hainan and canton , west to Shashi; passenger liner direct
to Shanghai, jiaojiang, shengjiamen etc;27 square kilometers calm ocean area, can hold 10000 ship
and 5000 tons vessels can pass her . Seafood processing industry is outstanding among other
industry of shipu. At presetn shipu has cold storage more than 200 with cold storage capacity
30000 tons, daily fast freezer capacity 2000 tons.
Education of shipu develop at the same rate of economy, at present, shipu has 1 marine profession
school, 1 adult profession school, 4 middle school and 31 primary school, compulsory education
rate at 99%.
Overall plan of Shipu town
Base on origial district of shipu , develop to south-west and north-east . South-west is to develop
seafood processing and machine processing industrial park. North–east is to develop residential
area, commercial and tourism.
Environment quality situation
Project construction area environment quality situation and main problem ( air condition, surface
water, ground water, noise and ecological environment )
1. Ocean water environment: In 2001, ningbo environment inspection center gave regular inspect
    to shipu harbor according to GB3097-1997 Ocean Water Quality Standard and found that only
    inorganic nitrogen beyond the standard, while other three index were in line with the
    requirement of Zhejiang coastal environment area adjust plan.
2. Air condition: Index from xiangshan environment inspection center indicated that air condition
    of shipu is favorable, up to grade 2 standard of GB3095-1996 AIR CONDITION STANDARD.
3. Noise: according to data provided by xiangshan environment inspection center , noise of shipu
    accord with third grade of GB3095-1996 city area noise standard
Key Environment Protection Target ( list and protection grade )
1. Air condition proteciton grade is 2 grade of GB3095-1996 Environment Air Condition Quality
   Standard
2. According to Zhjiang Coastal Environment Area Adjust Plan, shipu Ocean is four functional
                                                  91
    area and water quality is third grade of GB3097-1997 Ocean Water Standard
3. Environment noise standard is third grade of GB3093-1993 city area noise standard.
Envi
rom     1. Environment air condition: second grade of GB3095-1996 Environment
        air quality standard
ent
                                         Unit: mg/m3
Qual    SO2                            NO2                         TSP
ity     Year         Day     1 hour Year         Day      1 hour Yea Day
stan    average      averag averag averag average         averag r       averag
dard                 e       e         e                  e        aver e
                                                                   age
        0.06         0.15    0.50      0.05      0.10     0.15     0.2   0.3


        2. Ocean water environment: According to Zhejiang Coastal Environment
        Area Adjust Plan, Shipu Ocean is four functional area, carrying out Four
        standard of GB9097-1997 Ocean Water Standard.
                                        Unit: mg/l.
        Project      PH      DO     COMWN BOD5               Inorganic        Alertin
                                                             netrogen         g
                                                                              phosph
                                                                              ate
        Standard     6.8-8.8 >3     ≤5m         ≤5           ≤0.5             ≤0.045
        value



        3. Environment Noise: Plant carry out third grade of GB3093-1993 city area
        Environment Noise standard.
                                       Leg dB(A)
        Type                         day                             night

        III                          65                               55




                                                 92
Pollutio   . polluted air : carry out second grade II period standard of GB132712001 Boiler air
n          pollution exhaust standard . Below sheet is part of standard
drainag                                        Unit: mg /m3
e             project                      Smoke & dust Smoke black             SO2 drainage
standar    standard value                  drainage         density(black       density (mg/m3)
d                                          density          density, grade)
           Oil boiler                      100              1                   500
           Dinning room snot Execute GWPB5-2000 food industry snot exhaust standard ( trial )
           Scale                         small              middle            Large
           Basic ovens                   A1,<3              A3,<6             A6
           Correspond oven power         1.67,<5.00         A 5.00, <10       A 10
           Correspond oven exhaust A1.1, <3.3               A3.3,<6.6         A 6.6
           area
           Permit exhaust density (      2.0
           highest)
           Purify remove rate            60                 75                85

           2. polluted water: carry out III standard of GB8978-1996 Polluted water drainage
           standard, owing to polluted water will be handled by Management committee of
           Industrial park together, so each company are permitted to use internal standard.
                                                 Unit : mg/l
           Project             PH                CODCR BOD5 SS               NH3-N       Animal &
                                                                                         plant oil
           Standard value      6-9               2000        1200     400 150            100
           Polluted water treated plant of Industrial park carry out II standard of Sheet 4 of
           GB8978-1996 polluted water drainage standard , Below is part of standard
                                                unit : mg/l
           Project             PH                CODCR BOD5 SS               NH3-N       Animal &
                                                                                         plant oil
           Standard value      6-9               150         30       150 25             20
           . Noise : noise within plant carry out III standard of GB12348-90 industrial enterprise
           noise within plant standard.
                                               Leq [ dB(A) ]
           Type                                   Day                        night
           III                                    65                         55
           Noise of construction place carry out GB12523-90 Construction place noise limitation
                                                Leq [ dB(A) ]
           Construction        Key noise resources                           noise limitation
           period                                                            Day         Night
           Earth & stone       Bull-dozer, excavator, loader                 75          55
           Pile drive          Various pile driver                           85          Prohibit to
                                                                                         construct
           Construct           Kneading machine, electric saw etc            70          55
           decoration          Crane, elevator etc                           65          55
Volume
                                                   93
control
index


Processing Procedure Brief Introduction( chart )
1. Oyster Fillets
fresh oyster (eliminate sands ) ---->ocean water cleaning , remove impurity--à

                     polluted water, impurity

x ray detect ----->immerse in ice block---->classification --->fast freezer-
                    starch, corn

--->take off from model---->mixed with flour ---->IQF---->x ray detect---->package-


-->metal detect --->packing in carton---->cold storage
Choose raw material from farming area without being polluted, we will use clean water from sea to
washing to remove impurity, classify as grade after 3-5 minutes immersed in ice water. Then store it
into minus 30 degree freeze equipment till the temperature coming down to minus 18 degree. Then
take off from model, flavored, second classification, frozen, inspect, packing in carton, cold storage.
3. flavor scallops
                           oil boiler---->polluted air
                                   vapor
fresh scallops-->sea water cleaning --> remove shuck, separate meat ---.>

          polluted water
-------------> remove impurity, out of model --->washing---- ->flavor, packing—>


oil boiler-->polluted air impurity         polluted water
     vapor
--->cooking---->cool, frozen---->metal detect--->packing in cartons--->cold storage
choose raw material from farming area, after washing by clean water or 2-3% salted water, put flavor
and scallops in proportion into vacuum bags and sealed bags. Then put it into 100 degree water
cooking for 30 minutes, after cooling, put it into minus 30 degree freeze equipment till the
temperature coming down to minus 18 degree, inspecting, packing into cartons, store in cold storage.
3.Frozen dry shelled shrimp
fresh shrimp---->sea water cleaning---->fast freezer---->dehydrate---->classification,

                                                         94
        polluted water                  unqualified products
inspection--->package---->metal detect ---->cold in storage
choose fresh shrimp as raw material, after washing by clean sea water, fast freeze to minus 18 degree,
drying, classification, vacuum package, inspect eligible, packing into cartons and store in cold
storage.

4.Frozen dry shrimp
fresh shrimp-->cleaning-->fast freezer-->dehydrate-->classification inspection

         polluted water          unqualified products
--->package---->metal detect ---->cold in storage
choose shelled shrimp as raw material, after washing by clean sea water, fast freeze to minus 18
degree, drying, classification, vacuum package, inspect eligible, packing into cartons and store in cold
storage.
5.frozen dry mussel
                    vapor---->polluted air


fresh mussel---->sea water cleaning---->removeshuck, separate meat---->fast freezer-

       polluted water
--->dehydrate---->classification, inspection--->metal detect ---->cold storage
                 unqualified products
choose raw material from farming area without being polluted, cleaning by sea water, remove
impurity and shuck, get meat, classified as the specification, put into minus 30 degree freeze
equipment till the temperature coming down to minus 18 degree, then put it into drying room to dry,
classification and inspection, vacuum package, check up, packing into cartons, store in cold storage.
6.frozen dry clam
                   vapor---->polluted air


fresh clam---->sea water cleaning---->remove shuck, separate meat---->fast freezer
            polluted water

>dehydrate--->classification, inspection--->metal detect ---->cold storage
          unqualified product
choose raw material from farming area without being polluted, cleaning by sea water, remove
impurity and shuck, get meat, classified as the specification, put into minus 30 degree freeze


                                                    95
equipment till the temperature coming down to minus 18 degree, then put it into drying room to dry,
classification and inspection, vacuum package, check up, packing into cartons, store in cold storage.




7.frozen dry blood clam
            polluted water     vapor---->junk


fresh blood clam--->sea water cleaning--->remove shuck, separate meat--->


---> fast freezer--->dehydrate--->classification, inspection--->metal detect –
                          unqualified products
--->cold storage
choose raw material from farming area without being polluted, cleaning by sea water, remove
impurity and shuck, get meat, classified as the specification, put into minus 30 degree freeze
equipment till the temperature coming down to minus 18 degree, then put it into drying room to dry,
classification and inspection, vacuum package, check up, packing into cartons, store in cold storage.
8.frozen dry laver
fresh laver-->sea water cleaning->fast freezer->dehydrate-->classification ,inspection
            polluted water              unqualified products

---->package---->metal detect ---->cold in storage
choose raw material from farming area without being polluted , after washing by clean sea water, fast
freeze to minus 18 degree, drying, classification, vacuum package, inspect eligible, packing into
cartons and store in cold storage.
9.frozen dry bi-valves
                    vapor---->polluted air


fresh blood clam---->sea water cleaning, eliminate sands--->remove shuck, get meat-
               polluted water
                         unqualified products


                                                   96
---->fast freezer --->dehydrate----->classification, inspection---->package----->metal detect ---->

cold storage
choose raw material from farming area without being polluted, cleaning by sea water, remove
impurity and shuck, get meat, classified as the specification, put into minus 30 degree freeze
equipment till the temperature coming down to minus 18 degree, then put it into drying room to dry,
classification and inspection, vacuum package, check up, packing into cartons, store in cold storage.




Main polluted procedure
1. Polluted water
1) Processing polluted water is coming from seafood cleaning procedure. Base on annual products of
1396 tons, annual polluted water produce from this procedure will reach 69800 cubic meters,
including CODcr: 500 mg/l, ss:300mg/l.
2)Floor cleaning water : floor cleaning water 9000 cubic meters, including CODcr:300mg/l, SS: 200
mg/l.
3) Daily used water: calculated base on 487 employee, production date : 180 days, polluted water : 0.1
cubic meters/person each day, total 8760cubic meters, including CODcr:400mg/l, SS:150 mg/l.
2. Polluted air:
mainly from oil boiler, calculated at annual oil consumption 72 tons, annual polluted air exhaust
1014000 cubic meters, SO2: 432 kgs.
3. Solid Pollution
1) processing solid pollution : mainly coming from shell and visceral of shellfish. Shell annual
production: 2000 tons, while visceral of shellfish annual production 15tons
2) living garbage: calculated at 487 employee, production date : 180 days, solid pollution : 0.05 tons
per person each day, total 43.8 tons
4. Noise
mainly caused by ammonia machine
Project main pollution and exhaust situation
 project       Exhaust    Pollutio   Density and volume          Exhaust density
type           source (   n Name     before treatment            and volume
               No.)
Air            Boiler     Dust,      Pollutedair:1014000         Polluted
pollution                 SO2        cubic                       air:1014000
                                     meter, SO2:432kgs           cubicmeters,SO2:
                                                                 432kgs
                                                   97
            Snot from     snot       Polluted air: 4000m3/h       Polluted air:
            dinning                  Density:14-20mg/l            4000m3/h
            room                                                  Density:2.0mg/l
Water       Productio     CODcr,     Polluted water: 69800        Polluted water:
pollution   n             SS         cubic                        87560 cubic
                                     meter,CODcr:500mg/l          meter,
                                     SS:300mg/l                   CODcr:300mg/l,
            Floor         CODcr,     Polluted water: 9000         SS:200 MG/l
            cleaning      SS         cubic
            water                    meter,CODcr:300mg/l
                                     SS:200mg/l
            Living        CODcr,     Polluted water: 69800
                          SS         cubic
                                     Meter,CODcr:500mg/l
                                     SS:300mg/l
Solid       Separate      Visceral   15tons per year              15tons per year
pollution   shell meat
            Separate      Shell      2000 tons per year           2000 tons per
            shell meat                                            year
            Living        -----      43.8 tons per year           43.8 tons per year
            garbage
Noise
Other
Main Influence:
Main influence: after implement of this project, original farm land , pool will turn
into industrial park, and will definitely change land use type.


Construction period Environment influence brief analysis:
Construction period are including project as earth and stone, pile driving, structure, wall build ,
decorating, transportation, pipeline arrange etc. Pollution caused at this period are noise caused by
machine, and building garbage, water pollution and dust .
1) air treatment
surrounding of construction place shall build wall, and building shall be protected by safety net to
avoid any breakage to effect surrounding environment. Dig earth and Desert earth shall be explored
and placed by planed. and construction garbage and desert earth shall be prompt take care and
cleaned. Water shall be regular watered to road vehicles often passed and construction material to
avoid produce more dust.
2) water treatment
polluted water, mud water and floor water shall be collected and drained to special ditch after
sediment.
Daily using polluted water shall be proper handled and temporary living facility shall be constructed,
and polluted water from temporary dining room shall pass simple oil sediment pool , temporary
toiler shall be drain to river after treatment .
3) Noise treatment
Adopt advanced machine and technology to enable noise within limitation. Work during night cause
noise pollution shall be approved by Environment protection bureau if necessary.
Environment influence analysis during operation period:
                                                   98
1. Polluted air treatment and analysis on effect to environment
2 sets of 2 tons oil boiler, with good seashore diffusion condition, with little influence to surrounding.
2. water pollution treatment and analysis on effect to environment
processing polluted water and floor cleaning water will through grille, sediment, solid treatment then
drain to industrial park polluted water treatment center.
living polluted water will through manure pit then drain to industrial park polluted water treatment
center.
Polluted water through treatment of industrial park and reach II standard of GB8978-1996 polluted
water drainage standard then drain to Shipu harbor, with little influence to shipu harbor.
3.Solid pollution treatment and analysis on effect to environment
solid pollution of this project are visceral and shell of shellfish. Visceral can be processed as meal,
and shell can be made into shell powder.
living garbage can be cleaned by local sanitation bureau, and put in shipu garbage cleaning system,
through harmless treatment , influent little to environment.
4. Noise control measurement and analysis on effect to environment
Caused by ammonia machine, through sound insulation treatment, noise will not intervene with
resident outside plant .
5. Environment risk analysis
Liquid ammonia used during processing will run certain risk, especially during transportation , storage
and processing procedure.
risk from transportation including environment pollution caused by leak of raw

material , traffic accident.

Project protection measurement & expected achievement
    project       Exhaust source    Pollutio   Protection           Expect
type                                n Name     Treatment            Achievement
Air pollution     Boiler            SO2,dus    Choose qualified     Exhaust after
                                    t          oil boiler           treatment
                  Dinning room      snot       Purify machine       Exhaust after
                                                                    treatment
Water             Processing     CODcr I grade Solid                Exhaust as per
pollution         procedure      ,SS      treatment                 internal
                  Floor cleaning CODcr                              standard
                                 SS
                  Living         CODcr
                                 ,SS
Solid pollution   Separate shell Visceral Comprehensive      Resource
                  meat                    use
                  Separate shell Shell    Comprehensive      Resource
                  meat                    use
                  Living garbage -----                       Harmless
Noise             Ammonia machine and other machines from workshop.
Other



                                                    99
Environment protection measurement & expect achievement
Main influence: after implement of project, original farm land , pool will turn into
industrial park, and will definitely change land use type and influent environment
.
Conclusion and suggestion
1. This project is newly- build project, with total investment RMB44.9418 million . After implement
of this project, annual production expect to reach 1396 tons including export frozen dry products 800
tons , IQF products 350 tons, domestic consumption frozen dry products 100 tons and IQF products
146tons. farming seafood is material for all above mentioned products. we will conquer the
shortcoming of traditional processing industry material from ocean catching fish and play an
important role in protection of wild marine resource and development of waterfront farming industry,
stimulate marine industry continuous development .
2 pollution source of this project are polluted air from oil boiler, solid pollution from shellfish,
polluted water from processing and living . As indicated by this report, after reach of exhaust
standard, pollution will be little to environment.
3. Conclusion : this project will be a impulse , integration and improvement to shipu seafood
processing industry . Project is feasible from environment protection point in case all pollution source
reach exhaust standard.
4. suggestion: 1)Ningbo feiri marine Industrial Co.,LTD eliminate old processing technology step by
step to achieve protect marine resource 2)carry our clean processing , eliminate pollution through
control from beginning . 3) processing polluted water shall be recycled to comprehensive utilize 4 )
solid pollution shall be recycled to comprehensive utilize 5) steam supply by industrial park 6)
strengthen plant green belt construction , to reduce noise and foul smell.




                                                   100
Approval comments:
Basically we agree environment comments from Xiangshan Environment Protection and
inspectioncenter on utilize Loan from World bank to further develop seafood prcessing project
of Ningbo Feiri Marine Industrial Co.,LTd.This project is newly build project.Establishment of
this projectwill improve seafood processing level of Xiangshan county, stimulate development of
local economy.
 Construction company of this project must strictly carry out "3 same time " principle, apply all
required environment protection measurement.During implement of this project,
Company must ensure that :
1. carry out cleaning produce principle, control from source to reduce and eliminate pollution
 2. Rain must be drained separately from polluted water. After sediment, rain directly drain
into river nearby. produce polluted water and employee living water drain to industrial park
polluted water treatment center after I grade solid treatment within company, then drain to
Shipu harbor when water reach II grade of GB8978-1996 Polluted Water Drainage Standard
3.Visceral of solid pollution can be used as material for meal( fodder), while shell of solid
pollution can be turned into shell powder and be further utilized. Living garbage will be cleaned
by Sanitation Bureau.
4.strengthen green belt construction is to protect environment , to reduce noise and unpleasant
smell's influence to environment.
5.when project is implement, Company must received qualification from Environment
protection bureau then begin to operation.
 above-mentioned measurement shall be sincerely carried out by construction company.
 Ningbo Feiri Marine Industrial Co.,LTD processing 1396 tons seafood project had been agreed.


Xiangshan environment protection bureau
2003/8/13




                                               101
 Registry Form of Construction Project
Environmental Influence to Environment




 Project Description: Aquatic product processing
  Construction Unit: Ningbo Xianglong Aquatic Food Co., Ltd.



                      Compiling Date: Aug.29th, 2003
 Supervised by State General Environment Protection Bureau




                                        102
                                   Responsibility List

    Evaluation unit: Xiangshan Environment Supervision and testing Station

   Person in charge of Evaluation unit: Shi Yaqin

   Person in charge of the project: Shi Yaqin (environment evaluation postNo.13844)



                         With regard to the assessor
      Name         specialty the title of Post No.                            signature
                                  a technical                    Duty
                                      post
                                                   Environment
     Ni        Environmental
                                   engineer       evaluation post Auditing
     Jianzhong  Supervising
                                                  No.C20150002
                                                   Environment
                 Environmental     assistant                       Report
     Wu Wu        Supervising      engineer
                                                  evaluation post
                                                                  compiling
                                                  No.C20150003




Compiling Basis:

                                                103
1. Rules on Environment Protection and Administration of Construction Project [1998] No. 253 by
the State Council of PRC.
2. Technical Guidance for Evaluation of Environment Influence HJ/T2.1-2.3-93(HJ/T2.4-95) by
State General Environment Protection Bureau.
3. [1996] No.91 Approval on the Project of Functional Division of Ground Water Environment of
Zhejiang Province by the People’s Government.
4. No.67 [1997] Approval on the Project of Functional Division of Air Quality by Ningbo
Municipal Government.
5. Feasibility Report about utilization Loan from World Bank on develop New Project of Aquatic
Food Processing by Ningbo Xianglong Aquatic Food Co., Ltd.
6.Approval on the Construction of New Project of Aquatic Food Processing by Ningbo Xianglong
Aquatic Food Co., Ltd issued by Xiangshan Development and Planning Bureau No.50[2003]




                                                104
                             General Introduction to the Project
Project
                    Aquatic product processing
description
Construction unit Ningbo Xianglong Aquatic Food Co., Ltd.
Project legal                             Person in
                  Chen Zhenxiang                           Chen Mingyue
representative                            charge
Address           Xiangshan County Shipu Aquatic Products Processing Zone
Telephone           65725573        Fax      65723453           Post        315731
Construction site  Xiangshan County Shipu Aquatic Products Processing Zone
Project-           Xiangshan
establishing       Development and Planning Warrant file No.       NO.50[2003]
Dept.              Bureau
                   New□√
Construction style Rebuild&continuation □    Line sort and code 1320
                   Technology innovation □
                                             Afforestation
Occupied area       64.34 Mu                                       2000 M2
                                             area M2
                           Among which:
                                                         The rate of
 Total invest              environmental
                    3131                       60        environmental      1.8%
  (10000YUAN)              protection invest
                                                         protection invest
                           (10000YUAN)
    Evaluation                                Estimated Date of
                                                                   Oct.2005
     expense                                     Production




                                                 105
Brief Introduction to the Project
 Background to prose the project
  Xiangshan County is a big fishery county in Zhejiang Province. One wing of Xiangshan’s “one
main, two wings” strategy is to develop marine industry. The significant step to develop marine
industry is to give priority to cultivating aquatic food and let it be a new growth point of
economy. Cultivation will play an increasingly vital role in marine industry. With the implement
of “increase output and value” agriculture policy, cultivation by sea water, as an advantaged
industry and efficient agriculture, has developed rapidly: successfully introduced more than 50
species, upgraded cultivating patterns, cultivating land reaches 195,000mu, and annual output
exceeds 95,000tons. However, the offshore fishery resource is constantly decreasingly in the
recent years. As the implement of the policy of cutting down the number of fishing ships, more
and more fishermen turn to cultivating industry, which directly lead to the steady growth of the
output. But traditional sales methods to sell fresh and live aquatic foods seriously restrained the
development of cultivating scale. While in international market, price for further processed
products is dozens of that of raw materials. The added value being so attractive, therefore, to
establish a high standard seafood processing factory is a strong guarantee to the sustainable
development of cultivating industry of Xiangshan.
     Project Description
     1. Project Scale
  Frozen cultivated fish about 980 tons, shrimps (without head) 620 tons
   2.Civil Engineering
  a) Project occupied area: 64.34Mu.
  b) Construction area: 10792.3M2.
   i. Processing factory: 9332.3M2.
   ii. Cold storage warehouse: 1640M2.
 C) Afforestation area 2000 m2
 d) Roadway area 3237.6 m2
Pollution and main environmental problems




                                                  106
Brief Introduction to Natural and Social Environment
   Natural Environment (topography, landform, geology, climate, weather, hydrology, vegetation and biological
   variability etc.)
1. Geographic location: Zhejiang Aquatic City phase II project locates at Shipu Industrial Zone. (Detailed location refer to the
appendix) Near highway, the project enjoys convenient transportation and excellent environment. Near the east sea, Shipu
Town is one of the famous fishery ports in China. She connects Dongchen, Dingtang and Xiaotang to the north, Next to
Sanmen Bay to the west. There are Hepu and Gaotang at the opposite side of the harbor in the south, Damuyang and
Maotouyang in the east.
2. Geology and landform: Shipu is a coastal hilly town, low hills and islands cover 70% of the town’s land area. The old town
locates at a narrow valley near gulf. Houses are built along stream at the foot of hills, while streets and lanes wind like ladder.
The altitude in the town between 20-28 meters, the average altitude is only 3-4 meters along the harbor. To the west,
Dakingshan has the highest altitude of 394 meters in the town. The basic rocks exposed on the two sides of the port are mainly
gray and dark gray mountain rocks. Geological structures are mainly northeast, northwest and southwest tendency cracks. In
front of the harbor, there are coastal ladder land and plain. The depth of the basic rocks varies from 10 to 20 meters. Around
harbor II, the basic rocks are generally at 4-7 meters deep. So far, no earthquake above 5 scale happened in Shipu.
3. Climate: The city locates at subtropical monsoon belt. The weather is warm and humid with distinct four seasons and rich
rainfall. In winter, under the control of cold air mass, it is often sunny and cold; in spring, the cold air mass weakens, but the
weather is changeable. In early Summer, it is always rainy due to the sub-high pressure. While in hot Summer, controlled by
high pressure, it is sun-shining and hot with little rain. Typhoon is always the case, usually go together with torrential rain and
flood. The wind usually tends to southeast in Spring and northeast in Winter. Disastrous weather includes frost, low
temperature, heavy storm, ice, drought, typhoon, torrential rain and cold wave etc. Especially typhoon, torrential rain, drought
and low temperature are very often.
4. Weather
         Annual average temperature: 16.2         Annual average temperature in January: 5.4
         Annual average temperature in July : 5.4       Annual lowest temperature : -7.5 (Jan.16,1961)
         Highest temperature: 38.8 (Aug.20,1971)
l       Annual average rainfall:1392 mm Annual average rainy day:23d
      The max daily rainfall : 281.6 mm the longest successive rainy day: 23d
      The max annual rainfall: 1756.2mm(1976) the min annual rainfall: 770.6 mm(1967)
l       Annual relative humidity:80% Annual average sunshine hours: 2025.8.lhr
      Annual non-frost day:296.7d
l       Prevailing wind: north wind in winter and southeast wind in summer.
     Annual average wind speed: 5.5m/s Max sudden wind speed:58m/s
l       average highest water temperature:30 Lowest water temperature:8
5.Hydrology and tides:
l      Shipu port is the body to contain pollutants in this project. The port connects the continents in the northwest, and there
      are 5 islands around the harbor shaped a line as a natural barrier from northeast to southwest in the east, they are Shanban
      Touzui, Northeast Island, Duimianshan Island, Nantian Island and Gaotang Island. On the west, close to Sanmen Bay,
      composed of Venus shore and five water ways: Tongwamen, Dongmen, Xiawanmen, Linmen and Sanmen. The port
      extents from north to south, winds form west to south, lake a crescent moon, with the middle line of 18km, width of 0.4-
      3mm, water area of 27km and water depth of 4-33m.
l     Tides of Shipu port are regular half-day tide. The average high tide is 2.14m, low tide is-1.4m, average tide margin is
      3.54m. The rising tide enter form the southeast to the east and ebb from the opposite direction to the east, generally in
      counter-clockwise. The max flow speed is about five hours after tide. The rising tide is of small speed, 0.55m/s for 7
      hours and 7 minutes, and 0.37m/s below for 6 hours and 5 minutes. The aftertide is from north to east at 0.1-0.2m/s.
      Waves in Shipu port are mixed waves. Tide height is usually no more than 0.8m. during typhoon, the highest wave is
      about 1.5m.




                                                                  107
Brief Introduction to the social environment (including social economic construction,
education, culture and culture relic protection etc.)
l Xiangshan County locates between Xiangshan Port and Sanmen Port, at north latitude
    28°15’18”-29°39’42”, east longitude 121°34’03”-122°17’30”. The territory comprises east
    Xiangshan peninsula and other 608 small islands, the total land area is 1175Km2, while the
    sea area is 5000Km2. The population is about 5.28million. The capital locates at Dancheng
    town. Xiangshan is one of the main fishery regions in Zhejiang Province. She is teeming
    with hairtail, yellow croaker, pomfret, and cuttlefish. Shrimp, oyster, kelp, laver are also
    cultivated there. Transportation there is convenient, the main ports including Shipu port
    and Hepu port. Architecture is famous in Shanghai, Hangzhou, Ningbo and other middle
    and large cities.
l Shipu is 36 Km far from Dancheng, it covers 86.6 Km2 land area, including 70 villages and
    20 residential area.
l The population is around 70,429 in 2000, among which, 26772 are town resident. Shipu is
    a main port in trading in this province. The port is flourishing with all kinds of aquatic
    products including hairtail, eel, cuttlefish, pomfret, yellow croaker, shuttle crab and
    shrimps. According to the statistics provided by the town government, the total output of
    industry and agriculture was 3.3billionRMB in 2000, among which, 2.1 billion was
    industrial output, and 1.2 billion was made by agriculture and fishery. Main industrial lines
    are marine products processing and built and repair of shipping vessels. The traffic in
    Shipu town is convenient in both land and water way. She can reach Liaoning province and
    Tianjin city in the north, Sha city in the west, Hainan and Guangdong province in the south
    by sea. Her passenger liners are directly sailing to Shanghai Jiaojiang Shengjiamen and
    other harbors along the sea. The harbor, famous for its calm space, covering 27 square
    kilometers, can berth 10,000 fish ships, big as 5000T ships, can also easily sail pass the
    harbor. There are many kinds of industries in Shipu, main industries are refrigerating and
    processing aquatic food. At present there are 200 refrigerating warehouses refrigerating
    capacity 30000tons daily refrigerating capacity 2000tons.
   With the development of economy, culture, education and sanitation are improved too. Now
   there are two complete high schools, one vocational school of aquatic products, an adults’
   technical school, 2 junior middle schools and 31 elementary schools, The rate of
   compulsory education is above 99%




                                                 108
Current Environmental Quality


Current Environmental Quality and main environmental problems (air, ground water,
underground water, noise and ecological environment)
1.Ocean Water environment: In 2001, regular inspection was carried out at Shipu Port by
Ningbo Environment Supervision and Testing Center according to Ocean Water Quality
Standard No.GB3097-1997. The results shows that except the index of inorganic nitrogen
beyond class IV of water quality standard, other indexes are all in accordance with the Standard
of Class III for water quality stipulated in Project of Functional Division of Off Sea
Environment of Zhejiang Province.
2.Air: Of good quality and up to Standard II of GB3095-1996 Air and Environment Quality
3. Noise: Supervised and tested by Xiangshan Environment Supervision and Testing Station in
2002, the noise in the project is up to Standard III of GB3095-1996 Urban Environment Noise
Standard.
Main Environment Protection Objectives: (Name and Grade)
 1. Environment air,GB3095-1996 Standard II of Environment Quality
 2. According to Project of Functional Division of Off Sea Environment of Zhejiang Province,
Shippu Port is classified as class IV function zone. Water quality should up to Class III
GB3097-1997 Ocean Water Quality Standard.
  3. Environment noise: Standard III of GB3093-1993 Urban Environment Noise Standard.




                                                  109
Applicable Evaluation Standard




                                 110
                                 1. Air Quality: GB3095-1996 Standard II of Environment and Air Quality Standard.

                                                     Unit : mg/m3
                                                             annual         daily       hourly
                                                            average        average     average
                                                   SO2        0.06          0.15         0.50
                                                   NO2        0.05          0.10         0.15
                                                   TSP         0.2           0.3           /

                                 2. Ocean Water environment: According to Project of Functional Division of Off Sea
                               Environment Of Zhejiang Province, the ocean water should up to Class IV of GB3097-
                               1997 Ocean Water Quality Standard.
                                                                          Unit mg/L

                                     Parameter                                         Inorgani   Active
Environment quality standard




                                                   PH         DO     CODMn     BOD5        c      Phosphate
                                                                                       Nitrogen
                                     Standard     6.8-         3     ≤5m      ≤5       ≤0.5       ≤0.045
                                                  8.8

                                 3. Noise: Class III of GB3096-93 Urban Environment Noise Standard.
                                         Leq[dB A ]
                                                         Classification      Daytime        Night
                                                               3               65            55




                                                                   111
                                    1.Waste gas     The oil smoke in dining room should be disposed according to
                                    Catering Smoke Discharge Standard GWPB5-2000.
                                                  Scale                       Small             Middle         Large
                                      The number of cooking stove            ≥1, 3              ≥3, 6            ≥6
                                    General power of stoves 108J/h        1.67, 5.00         ≥5.00, 10           ≥10
                                     General project area of drainage
                                                                           ≥1.1, 3.3          ≥3.3, 6.6         ≥6.6
                                        of exhaust covers m2
                                     Max discharge density (mg/m3)                              2.0
                                          Min removing rate of
                                                                               60                 75             85
                                         Cleaning machine (%)
                                      The discharge of stench shall apply to the Class II of Stench Pollutant Discharge
                                    Standard GB 14554-93.
Foul Pollutant Drainage Standard




                                     2. Waste water: Apply to GB8978-1996 Standard III of sewage Disposal Standard, but
                                   the Administrative Committee of Industrial Zone plans to dispose comprehensively the
                                   discharge of waste water, so every enterprise is allowed to discharge waste water
                                   according to their own internal standard. The chart below is part of the index. Unit
                                   mg/l
                                        Item            PH      CODcr        BOD5         SS      NH3-N animal and
                                                                                                               plant oil
                                     Standard(mg/l)     6-9       2000        1200       400        150          100
                                    The Sewage Factory of the Industrial Zone applies to Class II of Waste Water
                                   Discharge Standard GB8978-1996. The chart below is part of the index. Unit: mg/l
                                            Item       PH        CODcr        BOD5        SS       NH3-N Phosphat
                                                                                                                   e
                                          Standard     6-9         150         30         150         25          1.0

                                        3. Noise: Noise in factory shall apply to Class III of Industrial Enterprise Noise
                                   Standard GB12348-90: Leq65dB during daytime and Leq55dB at night.
                                        Noise at construction site shall apply to Noise Limit at Construction Site GB12523-90
                                         Noise limit at construction site equal acoustics grade dB(A)]
                                         Constructio                                                  Max noise
                                                               Construction process
                                          n Process                                             Daytime        Night
                                         cubic earth       Bulldozer. Excavator. fork-lift
                                                                                                   75            55
                                         and stones                     truck
                                         pile driving          different pile-drivers              85        prohibited
                                          structure      blender, vibrator, electric-saw etc.      70            55
                                           fitment              crane, elevator etc.               65            55




                                                                      112
 total polluter
 control index




Construction Project Engineering Analysis




                                     113
1. Processing Flow of cultivated fish:

            Waste water .            squama



     Raw material → Cleaning →classify and select→scaling

        Fish organs




     → clear the organs→ cleaning → quick frozen → Packed in polybags

      → Metal detecting→ Refrigerating in ice box
To choose fresh fish as raw material from clean cultivating area without being polluted. Use ice
water to remove the impurities on the surface at first, then classify and select the qualified,
scaling and clear the organs, quick frozen after cleaning. After frozen, pack in polybags, store
in ice box after metal detecting.

2. Processing flow of Shrimps.


         Waste water head of shrimps



Raw material → Cleaning →get rid of the head→classify

→ quick frozen after packed in dish→ packing → Metal detecting→ Refrigerating in ice box
To choose white prawn as raw material from clean cultivating area without being polluted.
Clean with ice water at first, then classify according to detailed specification and quick frozen
after packed in dishes. After frozen, store in ice box after metal detecting.




                                                  114
Main pollutant procedure & discharge
    1.Waste water:
    Production waste water: It is mainly generated from fish-cleaning and raw material. The
annual discharge volume is about 63,000 tons.
     Life waste water Annual discharge volume is about 4,500 tons.
    2.Waste gas
       fishy smell The odd smell is mainly made in the course of processing.
        The oil smoke in canteen: Waste gas discharges at 4000m3/h, with discharge density
about 14-20mg/m3.
    3.Solid trash:
       This project needs 1,400 tons of fresh fish and 1000tons of white prawn, the finished
    products will be 1600tons after processing. Therefore, there will be 800tons of solid trash.
       Life rubbish: This project requires 120 work staff, annual working day around 200days.
    If every one leaves 0.5kg of waste every day, the annual life rubbish will be 12 tons.
Main Production Equipment
 Refrigeration 1 unit, IQF machine 2 sets, flat freezer 4 sets,
 metal detecting machine 2 sets, inspection and testing machine 1 set,
 Vacuum packer 2 sets, Automatic packer 2 sets



   Energy consumption:

   Water: 75,000 tons per year; Electricity: 2million KW. per year




Pollutants and their discharge
        Description                                      Density and amount        Discharge density
                      Drainage(No.)    Pollutant
Types                                                    before disposal           and amount
                                                                                   Waste
                                                         Waste gas 4000m3/h
                                                                                   gas 4000m3/h
                      Dinning room     Oil smoke         Oil smoke: 14-20 mg
   Atmosphere                                                                      Oil smoke 2.0mg
                                                         /m3
    pollutant                                                                      /m3
                      Raw material
                                       Fishy smell                   /
                      fish
                                                         Waster
                      Fish-cleaning    CODcr SS
                                                         water:63,000T/Y           Waste
  Water pollutant     wastewater       etc.
                                                         CODcr:2130mg/L            water:67500T/Y
                      life waste      CODcr SS           Waster wate:4500T/Y       CODcr:150mg/L
                      water           etc.               CODcr:400mg/L
                      Production      Fish organs
                      processing      and
                                                       800T/Y                      800T/Y
    Solid trash       trash           shrimp heads
                                      etc.
                      Living rubbish         /                  12T/Y                     12T/Y
        Noise             From freezing machine and refrigeration
                                                   115
      Others
Main Ecology influence:
  Croplands and ponds will turn into industrial zone upon the completion of this project. It has a
permanent effect and change on the ecology of this area.



Analysis of Environmental Effects
Brief analysis of environmental effects during construction
  This project mainly includes sand and stones, piling, framing, wall building, transportation
and pipe-pave. Main pollutants are noise resulting from the revolving of the machine, building
waste and rain water at the construction site. Besides, dust from loading and unloading of sand,
stone, concrete and lime also pollutes the surroundings.

  1) The protection of atmosphere environment:
  Walls should be built around the construction site and safety net around the buildings to
prevent broken stones from the surroundings. Mining and abandoning soil in the construction
site should be piled with plan. Building rubbish and abandoned soil should be taken away in
time. Road with regular transportation should be watered regularly, building materials such as
yellow-sand, pebbles, and cement should always be watered to prevent from dust.

  2) Water environment prevention
  Rainwater sewage, slurry sewage and deposited water on the site should be collected and then
discharge to drainage pipe. Life waste water should be treated properly, temporary living
facilities should be built, and oil-separating tank should be laid in the temporary kitchen of the
dinning room. Toilet and septic tank are also should be built; the pollutant should be drained off
through drainage pipe after disposed.


  3) Noise Prevention
  Advanced machinery and technology is employed during construction period, noise up to the
standard at construction site. If necessary, construction at night shall apply for approval from
environment protection administrative department.




                                                  116
117
Analysis of environmental effects during operation
    1.Waste gas disposal and analysis of environmental effects
     Stench: Mainly comes from in the process of processing fish and from blet fish. After
  disposal to reach the standard of Stench Pollutant Discharge Standard GB 14554-93.
        Dinning oil and smoke: The oil and smoke from dinning room and kitchen should be
   purified to the standard stipulated in Catering Smoke Discharge Standard GWPB5-2000, and
   then discharged to upper air via pipes
    The waste gas caused under this project has little influence to its surroundings.
      2.Waste water disposal and analysis of environmental effects
      The project has a total water consumption of 75,000 tons annually. The waste water drains
  off about 67,500 tons annually, 4,500 tons of which are life waste water. Waste water
  contains rich nutritious substances such as CODcr, suspended substances, organic compounds,
  nitrogen and phosphorous etc. The chart below is the average statistics of various waste
  water:
                 substances contained
           Types of waste water             CODCr           BOD5                 SS

          Production waste water          2130             /             1400
          Life waste water                400              200           100
      This project will produce 135.99 tons of CODcr, 0.90 tons of BOD5, 88.65 tons of SS
annually. Production waste water, life waste water and dinning waste water should, at first
undertake first class processing such as oil separating and precipitating etc, as soon as the
disposed waste water reaches the standard of the sewage treatment plant, leads to the plant. The
chart below is a flow of predisposal of waste water.

             Chemistry         waste water

waste water→grid→reaction pool→precipitation pool → to drainage pipe of the industrial

zone

                   sludge
      Waste water after predisposal drains to sewage disposal plant to undertake further
disposal. The plant is designed to adopt physical and chemical methods to deal with rubbish.
The chart below shows how it works:
               alkali         waste water               drain out

predisoposed waste water→adjusting pool→gas floating system→oxygen pool → CAST pool

                                            fan

                fan mud pool→pressure and filtration machine→dry mud transport out




                                                  118
  3. Solid trash disposal and analysis of environmental effects
  Fish organs and head of shrimps can be used as the raw materials of fish powder, so it can be
supplied to powder factory. And these trash are disposed every. Life rubbish will be disposed
by local environmental and sanitary departments. Mud comes from waste water predisposal is
transported to rubbish heap in order to avoid “the second pollution”
  4. Noise control measures and analysis of environmental effects
Noises mainly come from refrigerating equipments, quick-freezing equipment, and they are
also made in the process of production as well as by human being. Advanced sound insulating
materials are used to lower down the noise. Greenbelt is developed around workshops.

    5. Analysis of environment risk
Drainage of large amount of waste water will no doubt affects the quality of the off sea water.




                                                 119
Measures on Environment Protection and Expected results


  Description
                   Drainage(No.)       Pollution           Measures         Expected effect
Types
                                                           Purify and       Up to the standard,
 Atmosphere     Dinning room           Oil smoke           get rid of       small influence to
 pollutant                                                 the dust         surroundings.
                                                           Absorb after     Up to the standard,
                Raw material           H2S
                                                           filter in acid    small influence to
                fish                   (CH3)2NH            and alkali        Surroundings.
   Water        Fish-washing                                                Up to the standard,
                                       CODcr SS etc.
  pollutant     wastewater                                 Deposition        small influence to
                living water           CODcr SS etc.                         Surroundings.
                Feeding stuff          Fish organs and     To fish
                processing             fish head etc.      powder as
                                                                            Become resource
   Solid                                                   powder
  pollutant                                                material
                                                           To city
                Living rubbish                              sanitary        Innocuitified
                                                           system
   Noise        Small influence to surroundings after sound insulation.

   Others




                                                 120
Ecology protection measures and expected effects:

   The completion of this project will promote the development of off sea cultivation. But if

cultivation density becomes too dense, the water will be nitrified and thus break the balance of

micro-ecology system. Therefore, collection amount of raw material must be based on the

capacity of off sea cultivation.




Conclusion and suggestion




                                                 121
 Conclusion:
  The completion of this project will benefit to the development of aquatic products cultivation
of this county, and pave the way for fishermen to change their jobs. In the meantime, this
project may protect ocean wildness fishery resource and ecology environment, move forward
the sustainable development of the ocean fishery. This project is feasible in the view port of
environment protection so long as the enterprise carries out seriously relevant environment
protection principles and rules proposed in this evaluation in the course of construction.
  Suggestion: To wide spread clean production, enlarge greenbelt, beautify surrounding, and
improve the environment protection conscience of work staff. To protect the environment with
heart and duty while develop economy.




                                                 122
Approval suggestion:
   As to the suggestion on the project of aquatic product processing of Ningbo Xianglong
Aquatic Food Co., Ltd. put forwarded by Xiangshan Environment Protection Inspection
Station, we mainly agree in principle. This is a new project, and the completion of which will
be benefit to the development of the aquatic raising line of our county, and move forward to the
sustainable development of ocean fishery.
    The construction unit must strictly abide by relevant system; carry out the environment
protection measures required in the suggestion. In the process of construction, the following
must be strictly carried out:
             6. To wide spread clean production in order to reduce the consumption of water
                amount from the beginning. To recycle at most time so that reduces the drainage
                amount.
             7. Rainwater and waste water should be separately drained. Production and living
                waste water are supposed to reach standard II of Waste Water Letting out
                Standard GB8978-1996 after disposal.
             8. Solid trash must be placed in a fixed location, and carried to the fish powder
                factory periodically. Living rubbish should be send to City Environment and
                Sanitary Cleaning System.
             9. Smell from the fish and shrimp should be let out via pipe in high air after
                collection and spray by acid and alkali.
             10.        The construction unit should apply to the environment protection
                department for trial production in time after the completion of the project. The
                project can only be put in run after acceptance.
   The A/M items must be carried out seriously.
    We hereby agree the project of Ningbo Xianglong Aquatic Food Co., Ltd., who put forward
to set up a new project of processing aquatic food with an annual output of 5000tons.



                              Xiangshan Environment Protection Bureau
                                     Aug. 13, 2003




                                                123
                                                 Approval and Registry Form of Environment Protection on Construction Project
                              Registry Form unit                                           Registry Form person                                       Approval undertaker
                                Project
                                                   Aquatic product processing                                   Construction site              Xiangshan County Shipu Aquatic Products Processing Zone
                                description
                                                   980ton of frozen fish product; 620ton of
                                construction
                                                                                                            Construction style                √
                                                                                                                                              □New □Rebuild &continuation                □Techno-build
                                scale              frozen PDTO
                                                                                                                Environment Protection                         √
                                                                                                                                               □Compiling book □ Compiling form □Register
                                classification     1320
                                                                                                                   supervised style                               form
                                                                                                                                                                             Environmental
                                Total                                                                             environmental                                              protection
                                investment         3256.16                                                          protection                            60                                        1.8
                                                                                                                                                                             invest
                                (10000YUAN)                                                                      invest(10000YUAN)                                           rate %
                                Project-                                                                                                                                     Project




       Construction Project
                                                   Xiangshan County Development Planning
                                establishing                                                                    Approved file No.                   No.50[2003]              established        2003.3.28
                                    Dept.          Bureau
                                                                                                                                                                             time
                                Report
                                                   Xiangshan County Environment Protection                                                                                    Approved
                                Warrant                                                                         Approved file No.
                                   Dept.
                                                   Bureau                                                                                                                       time
                                                                                                                                               Xiangshan Environmental
                                                     Ningbo Xianglong Aquatic                   6572557
                                Name                                                Tel                                       Name             Supervising and Protecting    Tel                 65725923
                                                          Food Co., Ltd.                           3                                                    Station
                                                   Xiangshan County Shipu
                                                                                                                                             No.191 Xinhua Road
                                Address            Aquatic Products Processing      Post                                      Address                                        Post                 315700
                                                                                                                   unit


                                                                                                 315731                                      Xiangshan
                                                   Zone
                                                                                                                Evaluation




                 unit
                                Legal                                               Person in    Chen                          Certificate                                   Evaluation
                                                   Chen Zhengxiang




 Construction-
                                representative                                      charge      Mingyue                           No.                                        expense
                                Environm
                                                    Atmosphere Class             GB3095-1996    Surface water            Groundwater      Noise:   Type   GB3093-1993       Sea water Type III     GB9097-




  on
                                ent quality




enviro
nment
                                                                                                                  1997       Soil       Others




conditi
                                class
                                         Environm
                                                          □ Drinking water source protection district □ Natural protection district    □ Famous scenery district         □ Plantation and park
                                         ent              □ Essential cropland protection district   □ Ecology protection district    □ Water and soil leave away protection area □ Ecology sensitive and fragile area
                                         sensitivity      □ Population dense area                                                   √
                                                                                             □ Key cultural relic protection area □ Lake      □Reservoir
                                         character
                                                           Built + under built                                            This project                                      Total project
                                                                                                                                                                                            drainag   drainag
                                                                                                                                                drainag               reducin   drainag
                                                                     drainag     general   drainag   drainag    drainag                                                                     e         e         decrease
                                                                                                                           drainag              e          drainage   g         e
                                                                     e           drainag   e         e          e                                                                           capacit   in-
                                         Contaminatio     drainage                                                                   reducing              capacity   capacit                                   amount in
                                                                     density     e         capacit   density    density    e                    capacit                         capacit     y         creasi-
                                         n                density                                                                    capacity              allowed    y of                                      district balance
                                                                     allowe      capacit   y         predicte   allowe     capacit              y                               y           allowe    ng
                                                          In fact                                    d
                                                                                                                                                                      old and                                   replacement
                                                                     d           y         allowed              d             y                 predicte                        predicte    d         capacit
                                                                                                                                                                      new
                                                                                 In fact                                                        d                                  d                  y
                                                                                                                                                                      section

                                         w a s t e
                                                                                                                            6.75                    6.75
                                         w a t e r
                                         Oxyen
                                         amount
                                                                                                      2130       150       134.19                   9.45
                                          required *

                                         Ammonia and
                                          nitrogen*
                                         Suspend
                                         substance
                                         Waster gas                                                   1400       200        88.2                    12.6

                                         Sulfur dioxide




pollutant let out standard and control
                                         Smoke and
                                         dust
                                         Industrial
                                         powder dust
                                         Nitrogen and
                                         oxide




                                                                                                                             125
   Industrial
   solid                                                         750               0
   trash




       project
  relation with this
  other pollutant in
Unit y waste gas capacity x104 marked meter3/year wastewater ton/year mercury cadmium lead,
arsenic chromium chloride kg/year other units are all tons waste gas density milligram/liter Waste gas density milligram/lm
Notes This list is written by the evaluation unit and attached on the last page of the report. The last blank is the characteristic
   pollutant.
Among this     5 = 2 - 3 - 4              6 = 2 - 3 + 1 - 4




                                                                 126
Project Environment Influence Report


Project Name: Shipu Zhejiang Aquatic City Second Stage


Construction company (sealed): Zhejiang aquatic city Xiangshan
Fishing Trade and Develop Co. Ltd




Xiangshan Environment Protection Bureau
2003/8/2

Enacted by National Environment Protection Bureau
 Z.            Responsibility Sheet
Evaluated by: Xiangshan Environmental Protection inspection office
Evaluation company superintendent: Shi Yawing
Project superintendent: Ni Jian-zhong




Evaluation Personnel Situation
Name         Profession      Title         Work No.       Responsibility   Signature
Ni           Environment Engineer          Environmen     Censor
Jianzhong    supervise                     t Evaluation
                                           No.
                                           C20150002
Shi Yaqing   Environment    Engineer       Environmen     Report
             supervise                     t Evaluation   compile
                                           No.
                                           C20150001




                                         128
Project background:

  Zhejiang aquatic city located at Shipu Trade zone Taiwan oriented, occupied 92000
square meters, and construction 42500 square meters. Zhejiang aquatic city is formed by
fresh transaction area, economical fish transaction area, meal transaction area,
entertainment area and living area. Zhejiang aquatic city will set up 5350 square meters
office building, open transaction lobby 10550 square meters, fresh transaction area 11000
square meters, operation house (over 200 suites), 7000 square meters, parking area 2000
square meters, 4 docks with each 1000 tons and also 7 ships and offer space to 60 ships to
trade. Zhejiang aquatic city is a large comprehensive seafood wholesale market with
function of purchasing, parking, cold storage and fishing material supply. In 2002,
Zhejiang aquatic city seafood transaction volume reaches 286000 tons with total value
RMB1.378 million.

  With the development of China marine resource continuous development, it will be
essential to appropriately shrink catching scale and encourage ocean-farming industry.
Recent year, farming industry of Xiangshan had developed quickly, more and more
farming species are introduced, and farming scale are upgraded and perfect. At present,
Farming species of Xiangshan reach 50; laver, swimming crab, and yellow croaker had
been key farming products of Xiangshan.It had formed box and net farming, ocean or
pool farming, laver farming etc, total 6 farming base. Farming personnel are over 20,000,
farming area 23,000 MU, volume 100,000tons with total value RMB 1.1billion.

 Therefore, it is urgent to establish a farming seafood transaction market. So Zhejiang
aquatic city second stage will be on schedule.




                                           129
                   Shipu Zhejiang Aquatic city second stage project
Project Name
Constriction       Zhejiang aquatic city Xiangshan Fishing trade and develop
company            Co., Ltd
Proprietor         Zhang Zhi-hong             Contact person      Zhang Zhi-hong
Address            Zhejiang aquatic city Xiangshan fishing trade and develop Co.,
                   Ltd
Telephone          0575-65972078           Fax 0574-              Post     31573
                                                 65982942         code     1
Construction       Shipu Industrial Park
place
Project approval   Xiangshan development      Approval         2003 Xiangshan
authority          plan bureau                document No.     Plan investment
                                                               No 23
Construction       Newly build                Trade type       1320
nature                                        & code
Occupied area      35345                      Green space
(M2)                                          (M2)
Total investment   RMB       Including        RMB              Proportion 2.03
                    63.88    environment        1.3 million               %
                   million   protection
                             investment
Evaluation                                    Expected
expense                                       operation date




                                        130
        Project scale and content
  Zhejiang aquatic city second stage occupied 35345 square meters, with total
investment RMB 63.88million.
Build transaction lobby, business room, cold storage house, and management room
etc.
     1) Trading hall: 13156m2,
     2) Business room: 2882 m2
     3)
        Office building: 3000m2
     4) Ice making plant: 1000 m2
     5) Dock: 4
     6) Machine room and power room: 900m2

 After this project is built, it is expected that aquiculture volume of Zhejiang
aquatic city reach 45,500 tons with RMB 0.911billion value, and Ice making plant
will product the ice 30,000 ton.




                                        131
Original pollution related to this project and main environment problem




                                         132
         Natural and social condition to develop project
Natural condition brief introduction (Topography, geology, climate, weather,
hydrology, Vegetation, diversified animals etc):
4. Location: Zhejiang Aquatic City Second Stage is at Shipu seafood processing
     industrial park (detail please refer to attachment). At East sea , Shipu is famous
     fishing harbor of china, north on Dongchen, Dingtang and Xiaotang town, West
     near Sanmen bay, south to Hepu, Gaotang town , East to Damu ocean and
     Maotou Ocean.
5. Geology: Shipu is belong to seashore Hill belt, low hill and islands account for
     70% of total county area. The old city developed from a narrow valley near
     seashore, so house is built base on slope and street follow as ladder. Above sea
     level of town is at 20-28meters above sea level of coastal area is at 3-4 meters.
     Dajin Mountain in West of Shipu is the highest place with 394 meters above
     sea level.
     Base rock of bank of Shipu harbor is formed by millstone rock of last Jurassic
     period, and main ingredient is gray, dark gray tuff. Geologic construct are
     mainly rupture, and lay at northeast, northwest, and also southwest direction.
     The out beach area of Shipu is plain accumulated by sea, rock immerse at tens
     meters depth. At No.2 dock, these rocks are generally 4-7 meters deep. Shipu
     have no record of earthquake above 5 grades.
6. Climate: Shipu is located at Monsoon of Subtropical zone, so climate character
     is warm and humid, clear change of four seasons, plentiful rainfall. Winter is
     cold and fine due to control by cold air; spring is changeable between cloudy
     and fine due to weaken of cold air; at the beginning of summer its rainy
     continuous due to strengthen of subtropical high pressure; at the middle of
     summer its fine and hot, less of rain, at the same time typhoon will bring
     rainstorm and flood; spring is south-east wind, while winter north-east wind.
     Disaster weather including frost, low temperature, storm, drought, typhoon,
     rainfall and cold wave etc, especially typhoon, storm, drought, low temperature.
7. Weather: average temperature of many years: 16.2 ;average temperature of
     January : 5.4 ; average temperature of July: 33.8 ; lowest temperature in
     record : minus 7.5 (Jan.16,1961 ) ; highest temperature in record 38.8 (
     August 20,1971 ).
     Average rainfall; 1392mm; rainy days: 23d; daily maximum rainfall in record:
     281.6mm; the longest continuous rainy days: 23d; annual maximum rainfall in
     record: 1756.2mm(in 1976); annual minimum rainfall in record: 770.6(in
     1967).
     Average humidity: 80%; annual sunshine time: 2025.8hr; no frost day of year:
     296.7d.
     Year leading wind direction: winter north wind, summer southwest wind.
     Annual average wind speed: 5.5m/s; moment fastest speed in record: 58m/s.
     Year highest ocean temperature of Shipu is 30 ,while lowest ocean
     temperature 8 .
8. Hydrology and tide
 The body to hold pollution water of this project is Shipu harbor. Shipu harbor
connect to land at north-west, East to Shanbantouzui, Dongmen island, Duimian
hill, Nantian island and Gaotang island from North-east to South-west to form a
                                               133
natural barrier line; west to Sanmen bay Shipu harbor from north to south, turn to
south-west, form a curved moon, with total 18km long center line, at 0.4-3km
width and 4-33m depth, total ocean square meters 27km2.
Social Environment brief introduction (social economy structure, education,
culture, and culture relic protection etc.
Xiangshan is between Xiangshan bay and Sanmen bay in East of Zhejiang, with
east longitude from 131 34 – 122 20m, north latitude 28 45- 29 41. Xiangshan
peninsula and 608 islands, with total land area 1175square kilometers, ocean area
5000 square kilometers, and 528000 populations, form Xiangshan. County
government is at Dongchen town. Xiangshan is key county of Zhejiang, rich of
hairtail, yellow croaker, pomfret, cuttlefish and ocean farming shrimp, bi-valves,
oyster, laver, and kelp etc. Xiangshan is convenient in ocean transportation, with
Shipu and Hepu main port. Shipu town is 36 km far away from Dongchen town and
total 83.6 square kilometers area, with 70 administrative villages and 20 residential
districts.
2000, Shipu has total 70429 population including 26772 residents. Shipu is main
port of china and Zhejiang to trade and receipt Taiwanese. Shipu is rich of marine
resource, such as hairtail, eel, flounder, pomfret, yellow croaker, grouper and
swimming crab, prawn etc. According to data provided by Shipu government, in
2000 among total output RMB3.3billion, including industrial value RMB 2.1billion
and agriculture marine value RMB 1.2billion. Main industry of Shipu is seafood
processing, ship building and maintain industry. Shipu is convenient in
transportation: cargo transport north to Dalian, south to Hainan and canton, west to
Shashi; passenger liner direct to Shanghai, jiaojiang, Shengjiamen etc; 27 square
kilometers calm ocean area, can hold 10000 ship and 5000 tons vessels can pass
her. Seafood processing industry is outstanding among other industry of Shipu. At
present Shipu has cold storage more than 200 with cold storage capacity 30000
tons, daily fast freezer capacity 2000 tons.
Education of Shipu develop at the same rate of economy, at present, Shipu has 1
marine profession school, 1 adult profession school, 4 middle schools and 31
primary schools, compulsory education rate at 99%.
Environment quality situation
Project construction area environment quality situation and main problem (air
condition, surface water, ground water, noise and ecological environment)
4. Ocean water environment: In 2001, Ningbo environment inspection center gave
   regular inspect to Shipu harbor according to GB3097-1997 Ocean Water
   Quality Standard and found that only inorganic nitrogen beyond the standard,
   while other three index were in line with the requirement of Zhejiang coastal
   environment area adjust plan.
5. Air condition: Index from Xiangshan environment inspection center indicated
   that air condition of Shipu is favorable, up to grade 2 standard of GB3095-1996
   AIR CONDITION STANDARD.
6. Noise: according to data provided by Xiangshan environment inspection center,
   noise of Shipu accord with third grade of GB3095-1996 city area noise standard

Key environment protection target (list and protection grade)
3. Air condition protection grade is 2 grade of GB3095-1996 Environment Air
   Condition Quality Standard
4. According to Zhejiang Coastal Environment Area Adjust Plan, Shipu Ocean is
   four functional area and water quality is third grade of GB9097-1997 Ocean
   Water Standard. Environment             134
5. . Noise standard is third grade of GB3093-1993 city area noise standard.
        1. Environment air condition: second grade of GB3095-1996
        Environment air quality standard
                                                                  Unit: mg/m3
                    Annual average Daily average          1 hour average
            SO2     0.06                0.15              0.50
            NO2     0.05                0.10              0.15
Environ     TSP     0.2                 0.3               /
ment
Quality
Standard
           2. Ocean water environment: According to Zhejiang Coastal
           Environment Area Adjust Plan, Shipu Ocean is four functional area,
           carrying out Four standard of GB9097-1997 Ocean Water Standard.
                                                                      Unit: mg/l.
             Project    PH         DO     CO    BOD5 Inorgani Alerting
                                          MWN            c          phospha
                                                         nitrogen te



            Standard 6.8-8.8      >3     ≤5m    ≤5       ≤0.5       ≤0.045
            value




           3.Environment Noise: Plant carry out third grade of GB3093-1993 city
           area Environment Noise standard.

                                                                   Leg dB(A)
            Type                 Day                   Night
            III                  65                    55




                                         135
           1. Polluted air: carry out second grade II period standard of
           GB132712001 Boiler air pollution exhaust standard. Below sheet is part
           of standard
                                         Unit: mg /m3
                                Smoke & Smoke               SO2          NO2
                                dust         black          drainage     drainage
                     Project drainage        density        density      density
                                                                   3
                                density      (black         (mg/m )      (mg/m3)
                                             density,
                Standard                     grade)
                 Value
               Oil boiler      100            1           400           400
Pollutio
   n
drainag
   e
standar
   d         Dinning room snot Execute GWPB5-2000 food industry snot exhaust
           standard (trial)

            Scale                      Small         Middle        Large
            Basic ovens                A1,<3         A3,<6         A6
            Correspond oven power      1.67, <5.00   A 5.00, <10   A 10
            Correspond oven            A1.1, <3.3    A3.3,<6.6     A 6.6
            exhaust area
            Permit exhaust density     2.0
            (highest)
            Purify remove rate         60            75            85




           Unpleasant smell pollution standard figure shall follow detail
           requirement of GB14554-93 Unpleasant Smell Pollution Exhaust
           Standard, relevant Index refer below sheet

            Unpleasant smell (II grade, rebuild)     20




                                             136
           2. Polluted water:
            Carry out II standard of GB8978-1996 Polluted water drainage
           standard,
            Project         PH COD BOD SS NH3— Animal &
                                  cr     5            N         plant oil
            Standard        6— 150       30     15 25           10.0
            value           9                   0

             Polluted water will be handled by Management committee of
           Industrial park together, so each company are permitted to use internal
           standard
            Project      PH     CODCR BOD SS             NH3- Animal &
                                           5             N        plant oil
            Standard    6-9    2000       1200    400    150      100
            value

Pollutio   3. Noise: noise within plant carry out III standard of GB12348-90
n               industrial enterprise noise within plant standard.
drainage                                                              Lea [dB (A)]
standard    Type                     Day                    Night
            III                      65                     55

           Noise of construction place carry out GB12523-90 Construction place
           noise limitation
                                                                    Lea [dB (A)]
            Construction Key noise resources              Noise limitation
            period                                       Day       Day
            Earth & stone Bull-dozer, excavator,         75        55
                            loader
            Pile drive      Various pile driver          85        Forbid
                                                                   Constructio
                                                                   n
            Construct       Kneading machine, electric 70          55
                            saw etc
            Decoration      Crane, elevator etc          65        55




                                          137
             According to Xiangshan Shipu seafood industrial park first stage
             environment influence report, pollute water treatment center shall be
             built with daily 5000 tons water treat capacity.
              Project         PH     CODc BO           SS      NH3-N Animal &
 Volume                              r         D5                       plant oil
 control      Standard        6-9    2000      1200 400        150      100
 index        figure
              (mg/l)

             Drain of polluted water in industrial park carry out II grade GB8978-
             1996 polluted water drainage standard.



                                      Project analysis


Processing procedure and polluted procedure

1. Seafood transaction procedure



                           Ocean catching seafood, farming seafood
                         Transportation
           Aquatic city (dock, transaction lobby, cold storage house)

                              Simple processing

                Inspection and quarantine

                    Transportation
                Trade at transaction lobby
              Transportation
                Customer




 Transaction period whole years are 12 months, new add seafood transaction volume:
45,550 tons, annual transaction volume RMB 0.911 billion.
Three main pollution situation


                                             138
                                    Density      Annual production remarks
                                    (mg/l)       ( tons )
Polluted water     Polluted         ---------    91100             Refer to
                   volume                                          exhaust index
                   CODcr            1200         109.3             of Xiangshan
                   SS               270          24.6              main pollution
Polluted air ( fish’s unpleasant    Disorder exhaust               source
smell)
Solid pollution                     --------          455




2. Ice making plant:

                 Ammonia machine ---------------------à noise

                                           Vapor
                                          condenser

    Water --à ice storage ------à ice ------à Ice Grinder ------à sale




    Production period whole year are 9 months, each time (36 hours) produce ice: 180
    tons, annual produce ice: 30,000 tons, raw material consumption: water 31,500
    tons/year

                                    Density (mg/l)      Annual       Remarks
                                                        production
                                                        (tons)
Polluted water     Polluted         --------            1500         Refer to
                   volume                                            exhaust index
                   CODcr            --------            --------     of Xiangshan
                   SS               --------            --------     main pollution


                                                139
Polluted air       Ammonia air        Accident leak                               source
Solid pollution    ------             ---------             ------




3. Living area
Calculated at 5000 temporary person in the trading hall, 400 regular person, 150
supervisors and 50 workers in the ice making plant. Person in processing plant, there will
be 1400 regular personals and 1400 temporary personnel count by 300 workdays whole
year .It is 270 days to trading.
Polluted water: regular personnel calculated at 0.1cubic meters per person each day,
while temporary personnel calculated at 0.01 cubic meters per person each day
Solid pollution: living garbage calculated at 0.5kg per person each day

                                            Density      Annual                     Remarks
                                            (mg/l)       production (tons)
Polluted          Polluted volume                        29700                      Refer to
water             CODcr                     500          14.85                      Exhaust
                  SS                        200          5.94                       index of
Polluted air      Snot of dinning room      Exhaust volume 6000m3/h,                Xiangshan
                                            snot density 14-20mg/l                  main
                  Fish’s unpleasant         Disorder exhaust                        pollution
                  smell                                                             source
Solid             --------                                  32.4
pollution.


 Inspection monitor system equipment

  Name                                    Unit          Quantity     Unit price        Price
  Digital scale                           Set                1.0      12,000.0             12.00
  Quick Pestcide test equipment           Set                1.0       5,000.0              5.00
  Toxic Testing machine                   Set                1.0        4600.0              4.60
  Incubator                               Set                2.0        2740.0              5.48
  Autoclave                               Set                1.0        5000.0              5.00
  Acidity Testing Equipment               Set                1.0        2640.0              2.64
  Microscope                              Set                1.0        1870.0              1.87
  Analytical balance                      Set                1.0        1470.0              1.47
  Utravality Analyzer                     Set                1.0          950.0             0.95
  Refract meter                           Set                1.0          350.0             0.35
  Close electric cooker                   Set                1.0          225.0             0.23

                                                  140
  Close electric cooker               Set              1.0       225.0             0.23
  Adjustable siphon                   Set              1.0       100.0             0.10
  Deepfreeze                          Set              1.0      1600.0             1.60
  Magnetic mixer                      Set              1.0       350.0             0.35
  Constant temperature water
  tank                                Set              1.0       900.0             0.90
  Refrigerate                         Set              1.0      1700.0             1.70



 Producers’ equipment

  Name                               Unit         Quantity   Unit price   Price
                                                              (Yuan)    RMB’ 000
  8AS17 refrigerate compressor        Set              1.0   130,000.0      130.00
  8AS125 refrigerate compressor       Set              2.0     75,000.0     150.00
  Condenser                           Set              2.0     75,000.0     150.00
  Cooling tower                       Set              1.0     80,000.0      80.00
  2.2KWammonia pump                   Set              4.0      3,750.0      15.00
  Rotate evaporation machine          Set              1.0     80,000.0      80.00
  Ice Hoist                           Set              1.0   150,000.0      150.00
  Small Ice ginder                    Set             10.0      5,000.0      50.00
  Insulated Ice container             Set          1,200.0        200.0     240.00



 Water and electricity system

  Name                               Unit         Quantity   Unit price     Price
                                                              (Yuan)       RMB
                                                                         ’
                                                                          000
  Water purify machine                Set              2.0         100.0      200.00
  Disinfections facility              Set              2.0          50.0      100.00
  250KW electrical machines           Set              1.0     200,000.0      200.00




Main pollution Procedure

1. Polluted air analysis
                                  Polluted air        Polluted air        Exhaust type
                                  type



                                            141
Transaction lobby                   Fish’s            -----                Disorder
                                    unpleasant
                                    smell
Ice produce                         Fish’s            -----                Disorder
                                    unpleasant
                                    smell
Other (living)    Freeze facility   Ammonia           -------              Disorder
                  ammonia leak
                  Dinning room      Snot              Snot density         Exhaust at
                                                      14-20 mg/m3          high place


2. Polluted water analysis
                   Polluted                 CODcr                           SS
                   water            Density     Annual    Density                Annual
                   volume           (mg/l)      productio (mg/l)                 productio
                   (cubic                       n (mg/l)                         n (mg/l)
                   meter)
Transaction        91100            1200           109.3          270            24.6
lobby
Ice produce        1500             -----          -----          ------         -----

Others (living)      29700          500            14.9           200            5.9
Total                122300         -----          124.2          -----          30.5


3. Solid pollution
                              Solid pollution                   Annual production (ton)
Transaction lobby             Fish offal                        455
Ice produce                   ------                            -------

Others (living)               Living garbage                    32.4


4. Noise
                              Noise source                      Decibel
Transaction lobby             People’s noise                    80-90
Ice produce                   Ammonia machine                   80-90

Others (living)               Air conditioner                   60-70
                              Electrical machine                90-100



Main pollution and exhaust situtation

                                            142
         Exhaust     Pollution    Density & volume before           Exhaust density
         No.         name         treatment                         and volume

Air      Transactio Fish’s        Disorder exhaust                  -
pollut   n lobby    unpleasan                                       ----------
ion                 t smell

         Ammonia     Ammonia      ---------
         leak                                                       -------------
         accident


         Dinning     Snot         Snot density 14-20 mg/l           Snot density
         room                                                       2.0mg/l

         Trading     CODcr,       Polluted water volume:              Polluted
         hall        SS           91100 tons/year                    Water volume:
                                  CODcr: 1200mg/l                    199210 tons/year
                                  SS: 270mg/l                       CODcr<2000mg/
Water                                                               l
pollut                                                              SS<270mg/l
ion    Ice           CODcr,       Polluted water volume:
       making        SS           1500 tons/year
       plant

         Living      CODcr,S      Polluted water volume:
         polluted    S            29700tons/year
         water                    CODcr: 500mg/l
                                  SS: 200mg/l

         Transactio Fish                                            No exhaust
Solid    n lobby    visceral,
pollut              fish head     455 tons per year
ion                 etc.

         Living      Garbage      32.4tons per year                 204 tons per year
Noise    Coming from noise of transaction lobby, ammonia machine, and air
         conditioner.
Other
s
Main Ecologic influence: after implement of this project, original farming land, pool
will turn into industrial park, definitely change land use type and effect environment.



                                              143
Construciton period Environment influence brief analysis:

 Construction period are including project as earth and stone, pile driving, structure, wall
build, decorating, transportation, pipeline arrange etc. Pollution caused at this period is
noise caused by machine, and building garbage, water pollution and dust.
1) Noise treatment
 Adopt advanced machine and technology to enable noise within limitation. Work during
night cause noise pollution shall be approved by Environment protection bureau if
necessary

2) Air treatment
 Surrounding of construction place shall build wall, and building shall be protected by
safety net to avoid any breakage to effect surrounding environment. Dig earth and Desert
earth shall be explored and placed by planed. And construction garbage and desert earth
shall be prompt take care and cleaned. Water shall be regular watered to road vehicles
often passed and construction material to avoid produces more dust.

3) Water treatment
 Polluted water, mud water and floor water shall be collected and drained to special ditch
after sediment.




Environment influence analysis during operation period:

1.Polluted air treatment and analysis on effect to environment
  Choose qualified oil boiler, polluted air must meet GB13271-2001 Boiler air pollution
exhaust standard. Adopted measurement as reasonable layout, strengthen workshop
management and clean floor in time is to reduce or eliminate influence of unpleasant fish
smell.
  Dinning room will use snot purify machine to meet requirement of GWPB5-2000 food
industry snot exhaust standard (trial), influent little to Shipu harbor.

2. Noise control measurement and analysis on effect to environment



                                            144
 Adopted measurement, as reasonable layout and insulation of noise to reduce noise to
outside plant and ensure not intervene with outside resident, influent little to
environment.

3.Solid pollution treatment and analysis on effect to environment
  Solid pollution of this project is fish head, visceral and bone. Fish head, visceral, bone
can be processed as meal and further use of resource. influent little to environment.
Living garbage can be cleaned by local sanitation bureau, and put in Shipu garbage
cleaning system, through harmless treatment, influent little to environment.




                                             145
4.Water pollution treatment and analysis on effect to environment
 This project will add to 600 tons polluted water on daily average.
Pollute water of this project is coming from trading hall, ice making plant and living,
with composition of CODcr, SS, animal and plant oil etc. It can adapt to this
processing.

                                            Medicament



 Polluted →            Grill   →    The reaction            → Precipitation → Polluted
 water                              Coagulates                 pool                  water
                                    pool                                             pipes


                                                                       Polluted
                                                                       mud

Because design ability of the original sewage system is 5000 ton on everyday .If it
isn’t extended, sewage factory could not accept quantities of polluted water. Advise
Aquatic City processing Second Stage to adapt to this.

            Alkali                        Blower                                    Let



 Polluted              Adjustive           Air              Oxygenic               Cast
 water                 pool                float            Pool                   pool
                                           system


                                           Polluted            Compress             Carry
                                           mud                 and                  mud
                                                               filtrate
                                                               Machine

 After being dealt with through the grille, sediment etc to achieved II grade of
GB8978-1996 Polluted Water Drainage Standard, polluted water will be let in Shipu
harbor. There is little influence on Shipu harbor.

Sewage system
 Name                              Unit         Quantity        Unit price          Price
                                                                 (Yuan)           RMB ’000
 Physical treatment
 equipment                         Set                1.0       450,000.0          450.00
 Pipeline, water
 pump                                              146
                                                                      0.0          100.00
 Polluted water pool                                                  0.0          250.00
              Project protection measurement & expected achievement
  Project     Exhaust       Pollution Name Protection          Expect
Type          source                       Treatment           Achievement
Air           Trading hall Unpleasant fish
pollution                   smell          Reasonable layout, Influence little
                                           clean floor in time to environment

              Ammonia        Ammonia                Strengthen          Reduce accident
              accident                              maintenance         occurrence
              leak
              Dinning        Snot                   Snot purify         Meet standard
              room                                  machine             to exhaust
Water         Living
pollution     Trading hall   CODcr, SS              Polluted water      Influent little to
              Ice making                            treatment system    Shipu harbor
              plant
Solid         Trading hall   Fish head,             Meal material,
pollution                    visceral, bone         comprehensive use   Resource

              Living         Living garbage  Cleaned by              Harmless
                                             sanitation bureau
Noise         Insulation noise from ammonia machine and other machines from
              workshop and noise absorb board shall be equipped at transaction lobby.
Other

Environment protection measurement & expect achievement
Apply more green belt measurement to meet relevant green area stipulation of Ningbo
Government.



Conclusion and suggestion
  1. This project is rebuild project, with total investment RMB 63.88 million. Project
will build trading hall, business house, office building, ice making plant, docks and
machine/power room etc.
  2. As analyzed, polluted air, water, solid pollution and noise caused during processing
must be exhausted when all figures are meet relevant standard after treatment, influent
little to environment.
  3. Conclusion: this project will be an impulse, integration and improvement to Shipu
seafood processing industry. Project is feasible from environment protection point in case
all pollution source exhaust after meet standard.
  4.Suggestion: 1) carry our clean processing, eliminate pollution through control from
beginning. 2) Solid pollution shall be recycled to comprehensive utilize 3) strengthen


                                              147
plant green belt construction, to reduce noise and foul smell.4) intensify “ 3 same time”
management project.


Approval comments:

 Basically we agree environment comments from Xiangshan Environment Protection
and Inspection center on Shipu Zhejiang aquatic city Second stage project.

  Construction Company of this project must strictly carry out "3 same time " principle;
apply all required environment protection measurement. During implement of this
project, company must ensure that:
  1. Polluted water from transaction lobby, cold storage house, and processing plant must
be let through grille, sediment, chemical treatment to achieved II standard of GB8978-
1996 Polluted Water Drainage Standard then to drain to Shipu harbor. Daily-polluted
treatment capacity must reach 600 tons per day.
  2. Measurement such as reasonable layout and insulate equipment source of loud noise
shall be adopted to enable noise exhaust as per limitation at border of plant.
  3.solid pollution from transaction lobby such as fish head, visceral and bone will be
Further used by Meal Company. Sanitation Bureau will clean living garbage.
  4.When project is implement, Company must received qualification from Environment
protection bureau then begins to operation.
  Construction Company shall sincerely carry out above-mentioned measurement.
It is agree to approval of this project.




                                                  Xiangshan Environment Protection Bureau
                                                                                2003/8/13




                                            148
149
Project Environment Protection Approval Register List


Company(sealed ):            Fill form( signature)                  Project handling person(signature)
Project        Project        Zhejiang Aquatic City Second Stage                                                                 Construction place             Shipu Industrial Park
               name
               Content        Transaction Lobby13156M2, Business House 2882 M2, cold Storage 6649 M2, processing plant 6649      Construciton Nature            □New build
               and scale      M2                                                                                                                                □Rebuild
                                                                                                                                                                □Technical improvement
               Trade type     1320                                                                                               Environment Protection         □Report Enact
                                                                                                                                 Management Type                □Enact Report Sheet
                                                                                                                                                                □Fill Register
               Total          6388                                                                                               Environment investment         130               Proporti
               investment                                                                                                        (RMB10000)
               (RMB1000
               0)
               Proposed       Xiangshan Develop and Plan Bureau                                                                  Propose                        2003 Xiangshan     Propose
               by                                                                                                                Document No.                   plan investment    Date
                                                                                                                                                                No.23
               Approve        Xiangshan Environment Protection Bureau                                                            Approve document NO.                              Approve
               Authority                                                                                                                                                           Date
Construction   Company        Xiangshan fishing trade and develop Co. Ltd                   Telephone:           65972078        Evaluation       Company       Xiangshan          Tel:
Company        Name                                                                                                              Company          name          Environment
                                                                                                                                                                protection
                                                                                                                                                                Inspection
                                                                                                                                                                bureau
               ADD            Xiangshan Fishing Trade and develop Co., Ltd                  Post Code            315731                           Add           No.191 Xinhua      Post Co
                                                                                                                                                                road, Xiangshan
               Proprietor     Zhang Zhi-hong                                                Contact with         Zhang Zhi-                       Document                         Evaluati
                                                                                                                 hong                             No.                              expense
Environment    Environme      Air Environment: II Grade GB3095-1996 Surface Water: Groundwater:
situation of   nt quality     Noise Environment: II grade GB3093-1993 Ocean water: III GB9097-1997 Earth: Other:
surrounding     Grade
Construction
place          Environme      □Drink water source protection area □natural reserve area     □Scene spot □forest park □Basic farm land protection area □ecological protection area □ earth
               nt             key protection area  □ ecological sensitiveness and fragility area  □ Population dense area □ key cultural protection area □3 river ,3 lake, 2 control area □t
               sensitivene    reservoir area
               ss
                Character
Pollution         Pollution      Existing project (already constructed +             This project (plan)                                      Total project (existing + construction + plan to
Exhaust                          construing)                                                                                                  construction)
Standard and                     Actual      Permit       Actual           Permit    Expected    Permit       Produce     Self      Expect    Permit    New          Expect       Permit       Exhaust
Total                            exhaust     exhaust      exhaust          exhaust   exhaust     exhaust      volume      reduce    exhaust   exhaust   replace      exhaust      exhaust      increase
Volume                           density     density      total            total     density     density                  volume    volume    total     Old to       total        total        and
(Industry                                                 volume           volume                                                             volume     reduce      volume       volume       decrease
Construction                                                                                                                                            volume                                 volume
shall sign        Polluted       ____        ____                                    ____        _____        12.2                  12.2
detail)           water
                  Oxygen                                                             1000        <150         124.2       -105.9    18.3
                  chemical
                   demand *
                  Ammonia
                  nitrogen *
                  Petroleum
                  Polluted air   ____        ____                                                ____         ____
                  SO2 *
                  Dust *
                  Industrial
                  dust *
                  NO2
                  Industrial     ____        ____                                                ____         ____
                  solid
                   pollution
                  *
                  Other
                  pollution
                  related to
                  this project


Remarks: 1. * Is pollution exhaust volume stipulated at “ Tenth-five year plan”?
       2. Increase and decrease volume of Exhaust: (+) means increase, (-) means decrease
          3. Account Unit: polluted water exhaust: 10000tons per year, polluted air exhaust volume ----10000cubic meter per year, Solid pollution exhaust volume-10000tons
per,
                 Polluted water exhaust density: mg/l, polluted water exhaust volume: cubic meter per year, air pollution exhaust volume: ton per year.




                                                                                        1
EXIT                               ENTRY
                       OFFICE BUILDING

                       BUSSINESS ROOM




                           TRADING HALL
                                                       RK

                                           BUSSINESS




           BUSSINESS
                                                            PA




                                                              ICE
       SEWAGE                                               MAKING
                                                             PLANT
       SYSTEM

                               2
                                                         DOCKS


Zhejiang Aquatic City Project Second Stage Evaluation Report




                                                               3
                              Project Social Evaluation

  Implement of Zhejiang aquatic city project second stage will complete comprehensive function
of aquatic city, improve production efficiency of aquatic farming, as well as promote economy
development.

 1.Project will contribute to establish local fisher supply and service network and

basement integrate fishery, manufacturer and trade.

 Shipu marine industry started early and developed into large scale already. With

abundant marine resource, Shipu is fishing raw material supply and demand center

for East sea fishery. Zhejiang aquatic city located in Shipu town, through year’s

operation, has turned into main seafood trading market of Southeast China.

Development of Zhejiang Aquatic city will boost local fishery industry and local

economy’s development.

   This project will improve logistics and cargo dispatch capacity of Zhejiang

Aquatic city; turn it into large seafood logistics center with advanced transaction

style, complete in function and flexible in information. This project will also

improve transaction effectively, fasten transaction step and widen business field to

eventually solve the problem that fisherman difficult to selfish. This Project will

also play a positive role in marching Shipu seafood to international market and

further expend export and generate more foreign exchange. What’s more, enlarge

of aquatic city will guide and promote local fish catching, farming and processing

industry’s development, ease farming fisherman’s worry about marketing. This
project will propel to form mordent marine fishery system that seafood circulation,

catching, farming and processing will count on each other and develop

harmoniously.

   II. Promote local economy development and improve popularity of Shipu.

Abundant marine resource and developed marine industry will be Xiangshan’s

advantage and characteristic. Take this advantage, Xiangshan County had set up

strategy to flourish Xiangshan through marine industry and give priority to develop

marine industry consist of modern fishing and marine tourism, Implement of this

project will be another significant step Xiangshan adopted to propel marine

industry’s economy.

   In addition, Shipu is provincial leveled center town and aim to develop into

modern harbor with travel spot. Therefore, construction of aquatic city will

influence Shipu’s development, upgrade fishery harbor’s comprehensive function,

put forward marine industry’s development, meanwhile improve infrastructure of

Shipu and environment, and make best use of existing resource.

Implement of this project will increase Popularity of Shipu, enlarge city

frame, accelerate development of tertiary, speed up urbanize step lf ship.

III. This project will ease labor pressure and stabilize social order.

This project will accelerate economy development of Xiangshan country ,form

new economy district headquarter as Shipu harbor .This project will create more

                                           1
job opportunity for local people. As indicated by analysis, this project will

directly attract 260 people. This project will also promote local tertiary

development and will offer near 30,000 job opportunity in seafood processing,

food and beverage and service area, and also may bring out 10,000 or so farming

fisherman, greatly accelerate development of local economy and further improve

people’s living standard, stabilize social order.

IV. This project will increase tax revenue and improve economy efficiency.

Since the establishment, business scale of Zhejiang aquatic city have been

expanded, top daily seafood transaction volume reach 1000 tons and annual

transaction volume 300,000 tons. After second stage of china aquatic city put in

place, The water product trades will concentrate aquiculture .It is expected that

aquiculture volume of Zhejiang aquatic city reach 45,500 tons with RMB

0.911billion value .It is expected to add RMB 16.87million profit and        5.56

million tax income .It is of sound economical achievement.

Project finance evaluation

1.This project total invests RMB 63.88 million, convert to USD 7.7million.

Including: reserve current assets RMB5.72 million; actual net investment

RMB58.16 million, convert to USD 7million.

This project construction period is 1 years and will put in place in 2005 estimated

transaction value reach RMB 0.455 billion, operation income RMB22.9 million,


                                          2
convert to USD2.79 million, profit available for allocation RMB16.87 million

convert to USD2.03 million.

Investment profit rate: 29.01%

       RMB16.87 million

——––––———————            × 100 = 29.01%
RMB58.76 million

2.pay back capacity analysis

Pay back capacity analysis of this project is referred to pay back capacity analysis

for loan principal and interest from World Bank.

Principal from World Bank is USD3 million with 16years return period ,including

1 year construction period ,and 15 years pay back principal and interest period

.Therefore this project need to pay back principal USD 200,000 plus interest USD

54,500 total USD 254,500 annually .Under the guidance of principle FIRST

GUARANTEE TO PAY BACK LOAN FROM WORLD BANK ,Amount to pay

back loan principal and interest from World Bank is mainly coming from operation

years’s deduct depreciation funds and unallocated profit .It is expected that annual

unallocated profit reach USD 2.03million ,while amount to pay back

USD254,500,account for 12.53% of total unallocated profit ,and also decrease

accordingly each year .This is strong proved that this project can ensure to pay back


                                          3
loan principal and interest to World Bank .Detail please refer to pay back principal

and interest sheet .

3 Balance analysis

According to average figures of normal operation years from finance evaluation,

take BEP for example, if BEP is 72%, which indicated that if we design production

capacity to reach 72%, operation revenue would reach RMB 16.81 million, this

project will make no deficit. This illustrated that this project is of sound anti-risk

capacity.

4.Social achievement analysis

a. Second stage of Zhejiang aquatic city is one of 100main projects of Ningbo

   municipal, leading project of Xiangshan country. After implement of this

   project, it will complete fishing production and service system, of this project, it

   will complete fishing production and service system, integrated fishing,

   manufacturer and trade into product basement.

b. After implement of this project, it will create near 30,000 job opportunity in

   seafood processing, food and beverage industry, service industry and

   transportation field, bring out around 10,000 farming fisherman, boost local

   economy and improve people’s loving standard.




                                            4
c. Make best use of market’s function to congregate, dispatch and circulate

   seafood, to eventually solve farming fisherman’s problem to sell fish, clear up

   their worry and make them concentrate on seafood farming.

This project is of sound social achievement.




                  Shipu Seafood Industrial Park
                  Environment Influence Report
Responsibility Sheet
Evaluation Institution : Environment influence evaluation Research office of Zhejiang
University
Institution Director: Wang Dayun ( professor, Environment Evaluation Certificate No.05467)
Project Director: Zhou Weiming (senior engineer, Environment Evaluation certificate No.08761)
Enact by : Yang Xiaoqiu ( Engineer, Environment Evaluaiton certificate No.12051)
Participants : Yang Queping ( tutor,Environment Evaluation certificate No.08759)
        Yu Xiaoming (tutor,Environment Evaluation certificate No.12081)
              Shi Ganggang ( assistance engineer, Inspection and analysis )
              Zhuge Zhengyu(assistance engineer, Inspection and analysis)
              Tan Enting ( Engineer, Inspection and analysis)
Approval: Shi Huixiang ( vice professor, Environment Evaluation Certificate No.05466)
Cooperation institution: Xiangshan Environment Inspection Office




                                              5
Catalogue

Preface
AA.Part 1 Summary
 1.1 Evaluation intention
 1.2 Enact basis
 1.3 Evaluation standard and implement grade
 1.4 Evaluation grade , scope , emphasis and protection object

Part 2 Surrounding Environment Brief Introduction
 2.1 Geography location
 2.2 Natural environment
 2.3 Social envrionment
 2.4 Main pollution source
 2.5 Overall plan of Shipi

Part 3 Project Brief Introduction
3.1 Project name and construction nature
3.2 construction content
3.3 Project Investment
3.4 Production plan
3.5 First stage plan of Shipu seafood Industrial park
3.6 Public project
3.7 Employee
3.8 Construction progress

Part 4 Project Analysis
4.1 Comparison Survey Situation
4.2 Analysis on Pollution source
4.3 Pollution drainage list of this project

                                                6
Part 5 Evaluation on Water Quality Current Situation and Influence
     5.1 Evaluation on current water quality
     5.2 Evaluation and expectation on water environment
     5.3 Summary

Part 6 Evaluation on Air Quality Current Situation and Influence
    6.1 Air condition character
    6.2 Evaluation on current air quality situation
    6.3 Expectation on air quality environment
    6.4 Summary

Part 7 Evaluation on Noise and Solid Pollution
    7.1 Noise
    7.2 Soild pollution

Part 8 Analysis on Zoology Environment and Environment
Influence during Construction Period
    8.1 Analysis on Zoology environment
    8.2 Analysis on environment influence during construction period

Part 9 Public Participant
    9.1 Survey intention, method and content
    9.2 Survey scope and object
    9.3 Survey statistics, analysis and result
    9.4 Summary

Part 10 Environment Management and Inspection
    10.1 Complete Environment Protection Institution
    10.2 Strengthen Environment Protection Management
    10.3 Strengthen Environment Protection Inspection

Part 11 Pollution Treatment and Total Volume Control
    11.1 Pollution Treatment During Operation Period
    11.2 Analysis on Total Volume Control
    11.3 Pollution Treatment List

Part 12 Environment and Economy Profit and Loss Analysis
    12.1 Social Achievement


                                                 7
   12.2   Economical Achievement
   12.3   Environment Achievement
   12.4   Enviroment Investment
   12.5   Environment Investment and Proportion Analysis

Part 13 Summary and Suggestion
   13.1 Environment Quality Current Situation
   13.2 Pollution production of this project
   13.3 Pollution Treatment
   13.4 Drainage Volume of Pollution
   13.5 Evaluation and summary on Environment Influence
   13.6 Total Summary



Attached Drawing :
   1.   Project Location drawing
   2.   Project overall plan drawing
   3.   Surrouding drawing of this project
   4.   Wind direction and speed of Shipu
   5.   Water Quality Inspeciton Point


BB. Attachement
 Approval from Ningbo Government on Establishment of Shipu Trade Zone
CC.Attached Chart
  Environment Protection Register Sheet for construction project




                                              8
Preface
 Xiangshan Shipu located at middle coastal line of Zhejiang province, 120KM away from
Ningbo, is famous for fish habour and II opening harbor to the outside world, named “ Important
Town of middle Ocean of Zhejiang “. Economy is depend on marine industry,and most of
company in shipu are seafood frozen company, processing company.. At present, Shipu has more
than 200 company.Recent year, with the fast development of marine industry, especially
completement of China aquiatic city, seafood processin industry of Shipu developed quickly
accordingly.
In 1999, seafood processing value reach RMB1.13billion. To respond to new development trend ,
in Step. 2000, Shipu government had lauch a modern industrial park with clear industry
orientation and strong radiation , named Shipu Seafood Industrial Park , with toal 1KM2 square
meter, first stage of industrial park plan to acquisite 43.8ha ( 0.44 KM2 ).
 According to relevant environment protection rule, construction of Shipu seafood industrial park
shall analyze environment influence , so administrative committee of Seafood Insutrial park
entrust Zhejiang University to Evaluate environment influence of seafood industrial park first
stage ( below is call only Project for short). Base on primitive information , our office will work
with Xiangshan Environment Inspection office to analysis , research and prove up , then work out
Plan on environment influence evaluation of Shipu seafood industrial park first stage.
With agreement of Xiangshan Environment Protediton bureau , our office will work with
Xiangshan Environment Inspection bureau to inspect air , water, noise etc environment current
situaiton and also compare with relevant existing company, enact this environment influence
report base on collection , sort out and statistics of relevant information.
During cooperation time, we had obtained support and guidance from Xiangshan Environment
Protection Bureau , and also strong assistance and close cooperation from Shipu government,
We will take this opportunity to thanks for all your help.




                                                 9
Part 1 Summary
1.1 Evaluation intention
Through comparison investigation, we make sure that possible pollution this project may bring
and the degree it may effect environment,also predict possible area and extent pollution may
exhaust. Base on knowledge, we can propose reasonable pollution treatment, provide evidence
for decision of environment protection bureau and company.
1.2 Evidence to Enact
 1. [1998]no.253 rule of State Council of PRC on Construction project Environment Protection
and Management rule
 2. Environment Influence Evaluation Technical Guidance of Nationa Environment Protection


                                              10
Bureau) HJ/T2.1-2.3-93)(HJ/T2.4-95)
  3. [1999]No.165 of Environment Protection Bureau of Zhejiang province on Notice for
comments
on carry on constructon project environment protection management rules
  4. [1994]No.191 of Ningbo municipal government on approval of Establishment of Shipu trade
zone orient to Taiwannese
  5. [2000]Shipu seafood Industrial Park first stage detail plan enacted by Ningbo scheme
&design
research institution
  6. [1999]Xiangshan Town System Scheme enacted by Xiangshan government
  7. [2001]Environment Evaluation and implement plan of Shipu Seafood Industiral Park first
stage enacted by Environment influence evaluation and research office of Zhejiang University.
  8. [2001] Environment Influence Technical Consulation Contract of Shipu seafood industrial
park first stage
 is signed by administrative committeE OF shipu Industrial park adnd Zhejiang University.

1.3 Evaluation standard and implement grade
1. According to [2001] no.242 Notice of Regulate Zhejiang coastal environment function area
issued by Zhejiang development and plan committee, Zhejiang Environment protection burea,
Shipu harbor is 4grade function area, so water quality standad of Shipu will carry on
4 grade standard of Ocean Water Quality Standard (GB3097-1997). Detail please refer to Chart
1-1
       Chart 1-1 Ocean water quality standard value( unit: mg/l, except for PH)
           Index           PH      CODmn BOD5 DO Total chrome Abio-azote
 four kinds standard value 6.8-8.8 ≤5    ≤5   ≥3 ≤0.5         ≤0.5

2. Each company in industrial park shall carry on III grade standard of polluted water drainage
standard ( GB8978-1996), but since industiral park will handle unite treatment of polluted water
,so each company are allowed to carry on internal standard of drainage polluted water ( refer
to chart1-2) . Index of flow in Polluted water of treatment center in industrial park is based
on this internal standard. Through unite treatment, polluted water from treatment center will
drain as per II standard (GB8978-1996). Detail please see chart 1-2.
    Chart 1-2 polluted water drainage standard value ( unit: mg/l, except for PH)
        parameter          PH CODcr BOD5 SS    NH3-N propagation oil
  second standard value    6~9 ≤150  ≤30  ≤150 ≤25   ≤15
   third standard value    6~9 ≤2000 ≤120 ≤400 ≤150  ≤100


3. Air condition of Evaluation area will carry on II standard of Environment air quality standard

                                               11
(GB3095-1996). Detail please refer to Chart 1-3.
Chart 1-3 air enviroment quality standard (unit: mg/m3)
 No.       pollution name    Inspection time       second grade standard
                            year average                                0.06
  1      sulfur dioxide SO2 day average                                 0.15
                            1 hour average                              0.5
                            year average                                 0.2
            Total suspend
  2
           products TSP
                            day average                                 0.3
                              year average                              0.08
          nitrogen dioxide
                NO2           day average                               0.12
  3                           1 hour average                            0.24



4. Air from Boiler in industrial park will carry on 2nd area and II time standard of Exhaust
standard of
Air pollution from boiler ( GWPB3-1999). Detail please see chart 1-4.
           Chart 1-4 boiler pollution permitted drainage chroma(unit: mg/nm3)
boiler type applying area period of time soot SO2             Lingemaidi black degree

 coal boiler   sencond type                        250 1200             1 grade
                   area                            200 900              2 grade


5.Noise will carry on 3 grade standard of City area noise standard (GB3096-93). Detail please
refer to Chart 1-5.
    Chart 1-5 city area noisy enviroment standard value (equivalent noise grade dB(A))
                       applying area                         day             night
                      third type area                         65              55


6. Noise of each company in industrial park shall carry on III grade standard of Industrial
compnay noise standard ( GB12348-90). Detail please refer to Chart1-6.
   Chart 1-6 industrial enterprises noise standard value(equivalent nonse grade dB(A))
                        type                             day                night
                       type area                          65                 65




                                                12
7.Noise during construction period shall carry on noise limitation of construction area ( gb12523-
90).
Detail plese refer to chart 1-7.
                 Chart 1-7 construction noise limitted value(equivalent dB(A))
                                                                            noise limitation
   construction period                  key noise resources             Day           Night
      erath&stone          Bull-dozer, excavator, loader                75             55
                                                                                   prohibit to
        pile drive                      Various pile driver             85          construct
      constructure              Kneading machine, electric saw etc      70             55
       decroration                      Crane, elevator etc             65             55
1.4 Evaluation grade, scope , emphasis and protection object
1.4.1 Evaluation grade and scope
 Water: Polluted water drainage volume in this project is 2633m3/d , and drain to shipu harbor.
function area is 4 grade area, ocean water quality carry on 4 standard of GB3097-1997.
According to environment influence evaluation technical guidance ( HJ/T2.3-1993) , water
environment evaluation of this project is III grade. Evaluation scope is core as drainage point ,
with 1.5km radius half round ocean area.
Air: According to Environmnet Influence Evaluation Technical Guidance (HJ/T2.2-93),aire
environment evaluation is third grade, . Evaluation scope is core as boiler chimney with
4kmx4km area.
Noise : According to Environment Influence Evaluation Technical Guidance ( HJ/T2.4-1995),
noise
evaluation is third grade. Evaluation scope is 1m away from plant edge.

1.4.2 Evaluation Emphasis
Main content of Environment influence evaluation of Shipu seafood industial park first stage
including:
 1. Through investigation and inspection of character on local current social , economy,
zoomlogy and nature
environment, we get a general idea about construction place current situation.
 2.Through analysis and comparison of this project, we can figure out pollution source of
this project and degree of pollution.
 3. we can also predict degree and scope of potential environment influence to surrounding
after completion of this project
 4.Base on above mentioned information, we can propose correspond pollution treatment and
give feedback to construction of this project under control total exhaust volume,improve
environment and accelerate development principle.Treatment emphasis shall lay on point 2&4,
focus on water, combine with air,noise and solid pollution.


                                                13
1.4.3 Protection object
 Water environment: shipu harbor. Water quality of shipu harbor shall be maintain at present
level, avoid influent to west farming area.
 Air : Air quality of village mentioned in Chart1-8 shall meet standard.
 Noise: Noise at plant edge shall not beyond standard. Village mentioned in chart 1-8 and A
resident area on the north shall not be affected. Detail location please refer to Attached drawing
1.
                                     Chart 1-8 main protect object
 No.               Name                 position distance(m)        householder       total population
  1          Dongbian village              N            100              192                 638
  2           Beishan village             NE            150              188                 635
  3          Zhongxin village              N            100              163                 550
  4            Xibian village             NW            150              137                 434
  5           Xiatang village              W             25              198                 663
  6          A dewelling area              N             70              100                 300
  7        Shipu construture area         NE           1000            23000               70249
                                                                   Farming crab, area 6MU, the scoop
  8       breeding aquatics fields         W            150           of the water in the west of the
                                                                                  project

Remarks : *distance measure is based on edge of industrial park
** A resident area is refered to resident area at north of Nangang road.

Part 2 Surrounding Environment Bbrief Introduction
2.1 Location
Shipu is at the south end of xiangshan penisular, north latitude 29 12' , east longtitude
at 121 56', 36km away from Dencheng town. North is Changguo town, Dingtang town and
Xiaotang
town. South is Shipu harbor and Liyu ocean. Detail please refer to Attached drawing 1.
 This project is at south-west of shipi town. East is Geshi hill, south Shipu harbor , west Xiatang
village
north Xiban village, Center village and Beishan village. Detail please refer to Attached drawing
1.

2.2 Natural Environment
2.2.1 Topography and geology
Shipu town is combine by Tantou island, Dongmen island, Yushan islands and earth area,total
86.06km2 , including Islands area 18.18km2.


                                                 14
Shipu is belong lto coastal hills area, low hill and islands account for 70% of total area.
Old town of shipu is built base on slope and street follow as ladder. Above sealevl of twon is at
20-28meters,
sea level of coastal area is at 3-4 meters,Danjin mountain in west of Shipu is the highest place
with
394meters above sea level.
Base rock of Shipu harbor bank is formed by millstone of last Jurassic period, and main
ingredient
is gray, dark lava and tuff. Most geology construct are rupture. and lay at north-east ,north-west
and also south-west direction. The outbeach area of shipu is plain accumulated by sea, rock
immerse at tens meters depth. At No.2 dock, these rock are genreally 4-7 meters deep. Shipu
have no
record of earthquake above 5 grade.

2.2.2 Climate
Shipu is located at Monsoon of subtropical zone, so climate character is warm and humid. clear
change of four seasons, plentiful rainfall.Winter is cold and find due to control by cold air,
Spring is changeable between cloudy and find due to weaken of cold air. At the begining of
summer
its fine and hot, less of rain, at the same time typhoon will bring rainstrom and flood; spring is
south-east wind, while winter north-east wind. Disaster weather including frost, low temperature,
storm , drought, typhoon , rainfall and cold wave etc, and typhoon cause lots of destruction.
 Main wind direction : winter wind is north direction, summer is south-east direction. Annual
average speed at 5.5m/s, fastest speed at 58m/s.
Basic climate character of Shipu as below:
Annual average temperature: 16.2
January average temperature : 5.4
July average temperature: 27.0
Topest temperature : 38.8( August 20,1971)
Lowest temperature: -7.5 ( Jan.16,1961)
Average rainfall: 1392mm
Rainfall day:163d
longest continuous rain day : 22d
Annual maximum rainfall: 1756.2mm(1976)
Annual minimun rainfall: 770.6mm(1967)
Average comparative humidity: 80%
Annual sunshine time: 2025.8h
frostless time of whole year:296.7d




                                                 15
2.2.3 Hydrology and tide
 The body to hold pollution water of this project is Shipu harbor. Shipu harbor connect to
land at north-east, east to Shanbantouzui ,Dongmen island, duimian hill, Nantian island and
Gaotang island from north-east to South-east to form a natural barrier line; west to Sanmen bay.
Shipu harbor from north to south, turn to south-west, form a curved moon, with total 18km long
center line
, at 0.4-3km width and 4-33 depth,total ocean square meter 27km2. Covered ocean area is around
100km2, can hold tens of thousands ships, and allow 8,000 tons steamer pass shipu harbor.
Shipu harbor current trend is traditional half a day tide. Average tide is 2.14m, average
low tide is negative 1.4m , average tide difference 3.54m. Rising tide begin from south-east
entrance , on the contract while ebb tide. Rising tide close to W direction,while ebb tide close
to E direction, current in back and forth, basicaly turn in clock direction. The fastest current
happen at 5 hours after high tide.The current is slow when rising tide, the surface speed is
0.55m/s
while the lower at 0.37m/s;The rising tide period of surface will be 7 hours and 7 minustes,
while
the rising tide period of the lower 6 hours and 24 minutes. The current of ebb tide is fast
, the surface speed is 0.75m/s, while the lower at 0.96m/s; the ebb tide period of surface
will be 6 hours and 15 minutes , hwile the lower 6 hours 5 mmonites.
Minus current of Shipu harbor is NE direction, surface and the lower are consistent, speed at 0.1-
0.2m/s.
Wave of shipu harbor is mixed wave mainly formed by well up wave. Wave height generally
less
then 8 meters. When typhoon is coming, the highest wave of shipu harbor can reach 1.5m.

2.3 Social Environment
 Xiangshan is between Xiangshan bay and Sanmen Bay at east of Zhejing provinc, with east
longitude from 1210 34'-122 020', north latitude 280 45'-290 41'. Xiangshan is formed by
Xianghan
penisula and 608 islands, with total land area 1175 km2, ocean are 5000 km2 and 528,000
population.
County government is at Dancheng town. Xiangshan is key marine county of Zhejiang, rich of
haritail,yelow croaker, pomfret, cuttlefish and ocean farming prawn, razor clam , oystr, laver,and
kelp etc.Xiangshan is convenient in ocean transportation, with shipu and hepu harbor.
 Shipu town is 36km away from Dancheng town and total 83.06km2, with administrative village
and 20 residential district.In 2000, Ship has total 70429 population including 26772 town
residents. Shipu is main port of Zhejiang and even China to trade and orient to Taiwannese.
Shipu is rich of marine resource, such as hairtail, eel , flounder, pomfret, yellow croaker
grouper, and swimming crab, prawn etc. According to data provided by Shipu government, in


                                                16
2000 among total output RMB3.3billion, including industrial revenue RMB2.1 billion and marine
value of agriculture
RMB1.2billion. Main industry of Shipu is seafood processing , ship building and maintenance
industry. Shipu is convenient in transportation: cargo transportation north can reach Dalian
, south to Qionghai, west to Xisu , passenger steamer can direct to Shanghai, jiaojiang ,
Shengjiamen etc.27 km2 clam ocean area, can hold tens of thousands of ships and 5000 Tons
vessel
can pass here. Seafood processing industry is outstanding among other industry of shipu.
At present, Shipu had cold storage plant more thand 200 , with total cold storage capacity
over 30,000 tons, daily fast freezer capacity 2000 tons.

2.4 Surrounding Pollution source
Main pollution source of this project is Ningbo JInghai aquatic food co.,ltd ,
process frozen spanish mackerel . In 2000, polluted water drainage volume reach
60,000 m3/a, CODcr exhaust volume 9t/a. Detail location please refer to Attached drawing 4 .
2.5 Overall plan of Shipu Town
2.5.1 development Aim
 Shipu town is south economy, culture center of Xiangshan county, ocean economy basement of
Zhejiang province,at the same time Shipu is a modern harbor and scenic spot with long history.
2.5.2 Land utilization direction
Center development area is focus on existing Shipu town , expand to south-west, and north-east.
South-west is to develop industrial park with seafood processing , machine processing industry.
North-east is to develop resident, commercial and scenic spot area. Overall plan of Shipu town
please refer to Attached drawing 2.
2.5.3 Development emphasis
Shipu will completely carry on " rely on harbor to develop export oriented economy, give priority
to infrastructure and boom marine industry with technology support " strategy, and take
advantage of superior harbor and strengthen infrastructure construction, improve city and harbor
traffic ,
expand more service field and upgrade harbor function.
Steps such as Fasten step to boom marine industry with technology support, increase technology
investment, and further develop marine economy, encourage far ocean catching and ocean
farming and seafood further processing will be adopted to turn shipy into marine base, processing
base and ocean protect base. Depend on private economy, shipu shall fasten development of new
technology industrial park and lauch relevant favorable policy to encourgae company from
nearby town such Changguo, Xiangtang move to industrial park.
Shipu will take endeavour to develop trade and finance , set up area commodity and prodcution
element circulation network, strengthen harbor service function; Shipu will also make effort to
develop education and culture career, creat sound environment to cultivate and attract more


                                               17
technology personnel and maintain long term economy and social development and flourish of
city .Shipu will sort out and explore more marine culture and exert its culture resource to play a
positive role in economy and culture development. This project choose south-west of shipu to
develop industrial park focus on seafood processing and machine processing, so land this project
choose is complied with Shipu land utilization plan.
This project is a modern industrial park with higher level industry layer, attrace more seafood
processing company move into industrial park, accelerate economy development of Shipu,
in line with Overall develop plan of shipu. In a word, development of this project is in line
with overall plan of shipu.



Part 3 Project Brief Introduction
3.1 project name and construction nature
Project name : First stage of Shipu seafood industrial park
Construction nature: new building
3.2 construction content
This project east to Junming Road, South to west Xinggang road, west to Xixia road,
north to Nangang road, total occupy 43.8ha( 0.44km2 ) , including industrial land 21.9ha.
Detail please refer to 3-1 chart, company in industrial park must be II tpye industy ( i.e.
seafood or food processing industry ), III tpye industry company are forbiddened to enter
industrial park.
                                  Chart 3-1 using land gathering chart
 No.                  using land property                    using land area(ha)      proportion
  1                  dewelling using land                       0.78(11.7MU)                 1.83
  2                   business using land                       0.50(7.5MU)                 1.17
  3                 second type using land                    21.90(328.5MU)                51.42
  4                public green using land                     7.04(105.6MU)                16.54
  5                road&square using land                      9.38(140.7MU)                22.02
  6            enviroment facilities using land                0.71(10.65MU)                 1.67
  7                   reserved using land                       2.28(34.2MU)                 5.35
           Total construction using land area                   42.59(638.85)                100
                        water area                             1.21(18.15MU)                   \
                           total                                43.8(657MU)

3.3 Project Investment
Planned total investment reach RMB57.2million, detail please refer to Chart 3-2

                           chart 3-2 project invested fee budget

                                                 18
No.                     project name                         total invest(RMB 10,000)
 1                all kinds of constructure                             3430
 2            infrastructure as road, pipeline                          2010
 3                       land scaping                                    280
 4                           total                                      5720

3.4 Production Plan
Most of company in industrial park are seafood processing company. At present, company in
industrial park including shell processing plant, meal processing plant, seafood procesing plant
and ocean microorganism plant.Detail please refer to chart3-3 and exact location please refer to
attachement 3.
                                     Enterprise Name List

                                               total     production     year
No. enterprises name           Area                                                     remarks
                                       invest(RMB10,000)   content  production(t)

      Ningbo Chaoxing
      Ocean Biological                                   Ocean
  1   Products Co.,LTD          21.9                1500 Biological       1700      constructing
      Ningbo Ningda Ocean
      Biological Technical                               Ocean
  2   Co.,LTD                   14.1                1000 Biological       1300      constructing
      Xiangshan Ocean Heli                               Shell
  3 Co.,LTd                     8.45                 300 processing        250      constructing
      Xiangshan Kehai                                    Shell
  4 Biological Co.,LTd          7.95                 300 processing        250      constructing
      Ningbo Nanfang                                     seafood
  5 Aquatic food Co.,LTD         7.5                 400 processing       1000      constructing
      Xiangshan Honghai                                  seafood
  6 Food Co.,Ltd               12.45                 300 processing       1500      constructing
      Xiangshan Marine                                   seafood
  7 Foodstuff Co.,LTd            7.2                 450 processing       1500      constructing
      Xiangshan Shipu
      Guolong Marine                                    seafood
  8   Co.,LTd                   18.9                200 processing        1000      constructing
      Shipu Yongfang Freezer                            seafood
  9 company                     5.85                600 processing        1200      constructing
      Ningbo Hongda Green                               seafood
 10 Seafood Co.,Ltd            11.85                500 processing        1000      constructing
      Xiangshan Shipu                                   seafood
 11 Dongfang Co,LTd             100               12000 processing       35000      constructing
      Shipu Dongbian Meal                               meal
 12 Plant                        4.2                150 processing        1500      put in place

                                                   19
      Ningbo Haishan Feida                            meal
 13 Seafood CO.,Ltd             9                 700 processing         3000       put in place
      Xiangshan Shipu
      Dongyang Seafood                               meal
 14   Co.,LTD                   3                200 processing          1000       put in place
      Xiangshan Shipu                                meal
 15 Fatfree Meal Plant        2.85               200 processing          1200       put in place
          total              235.2             19000

3.5 First stage layout of seafood industrial park
 overall layout drawming of first stage of seafood industrial park please refer to Attachemnt 3.
structure of first stage of seafood industrial park is 2 axis and 3 district.
2 axis is refer to scenery axis and center service axis. 3 district is refered to east and west
industrial land and resident land . West Xinggang road will through whole industrial park ,
and is axis for scenery . two axis is connect at " T" , separate industrial land of this project as
east and west part.Planned industrial park are only for II type industry ( food processing
industry).
III type industry are strictly forbiddened. Planned industrial land reach 328.5 Mu.
Industrial park will along west Xinggang road , set up a main entrance square at conjunctionpoint
of Geshi shan and Jiashishan, outstand it as memorial archway, and also put a stainless steel
status
to symbolize fast develop industry.
 Planned public service of this project is refered to office and commercial service related to
this project. Public service layout adopt center and block style. 30m land scaping will be put
between
industrial part and resident part .
3.6 Public project
Water supply. Water is supplied by Shipu Water plant, connect from Junming road. with DN400
pipeline. Daily water consumption of tHis project is expected to reach 3000M3/d.
water drainge. It will adopt rain and polluted water separation system. Rain will be drained
directly to river nearby. Polluted water must drain to treatment center of industrial park through
special pipeline . Daily polluted water drainage volume is expected to reach 2633m3/d. It will be
drained to Shipu harbor after meet drainage standard through treatment.power supply. This
district will be equipped with power control house. 10KV power line will introduce from west
Xinggang road. Power line will be supply from high place, and reserve space for more power
supply.
Transportation.Transportation in industrial park are quite convenient. West Xinggang road in
south will be 36 meters width, expect to be main road for industrial park , and in east- west
direction, east extend to Shipu town, west to Jinxing town. Junming road in east and Guard road
in middle both will be 18 meters width.expect to be second main road for industrial park and in
south-north direction, connet to west xinggang road to link outside.Xixiang road in west is 18

                                                20
meters width, for passengers use instead of for car.Fire Extinguish. adopt low pressure system
connect to resident livng water. water pipeline must over 200mm diameter for fire extinguish
switch. distance between each fire extinguish switch must less than 120m.
3.7 Employee
this project plan to enroll 3300 employee, 300 annual working day .
3.8 Construction step
This project plan to finish within 4 years, from 2000-2003 .




                                                21
Part 4 Project Analysis
4.1 Comparison Survey Situation
4.1.1 Xiangshan Huayi seafood co.,ltd
4.1.1.1 Company brief introduction
 Xiangshan Huayi seafood co.,Ltd located at Dancheng,Xiangshan, established in 1996, with
total 10 MU area, is agriculture key company in Xiangshan . Now company has more than 300
employee and 300 annual workding day, main product frozen spanish mackerel fillests. In 2000,
company had fulfiled annual sales revenue RMB50million.
4.1.1.2 product plan
In 2000, company annual production volume reach 6000tons .
4.1.1.3 raw material consumption
Raw material conjsumption please refer to chart 4-1
           chart 4-1 Raw Material Consumption sheet
  No.              name                   consumption(t/a)
   1         spanish mackerel                 8000t/a
  2               water                     67500m3/a
  3               power                   1280000kw.h/a

4.1.1.4 processing line
company has 2 workshop, one is for fish classification and the other is for processing.
processing line is as below:
1. fish classification workshop
                    Polluted water from classification
spanish mackerel washing fast freeze classification , ice and packing cold storage
processsing workshop
2.processing workshop
frozen spanish fish defrozen classificaiton          IQF   classification,ice packing   cold
storage     transportation

4.1.1.5 main product equipment


                                               22
refer to chart 4-2

chart 4-2Main manufacture equipments of Xiangshan Huayi aquaitic
food Co., Ltd
 No.        equipments name          type & specification quantity
  1       cold storage machince              300t            3 pc
  2          deepfreeze room                200t/d           1set
  3     tunnel deepfreeze machine     24m long 900kg/h       1 pc

4.1.1.6 pollution treatment and drainage situation
1. polluted water : coming from fish classification, polluted water volume is 225m3/d
(675000m3/a). According to Inspection report on factory's polluted water treatment center
from Xiangshan Environment protection, detail index for water quality please refer to chart4-3.
Base on these index, CODcr exhaust volume is 47.3t/a, BOD5 exhaust volume is 27t/a, SS
exhaust volume is 27t/a
        chart 4-3 water quality of seawage treatment's volume
                                        CODcr       BOD5    SS
     water quality of coming into        2133       1000   1400
     water quality of coming out         700         400    400
      acturallly wiping off rate          67          60     71


Company annual production volume is 6000t, polluted water factor for seafood processing plant
is 11.25m3 polluted water per ton production.
Polluted treatment center of this company goes like below:
                    Add Drug

Polluted water      Grille     Sediment     Drainage
                    Mud
                     Filter      Dry mud send outside
Design treatment capacity is expected to 300m3/d, actual treatment volume is 225m3/d.
Through reaction ,sediment treatment, polluted water drain into Xiangshan Industrial park
to further treated.
2. polluted air: company use no gas, no boiler, so there is no boiler air pollution .
unfavorable smell will exhaust during processing.
3. solid pollution: come from 2 parts, one is from fish classification, the other is mud from
polluted water treatment. the first one is mainly fish head,visceral, tail and so on, with total
2000 t/a, which will all sent to meal processing plant as raw material.
mud volume is 1130kg/d(338t/a), through dehydrate treatment and sell to brick processing plant.


                                               23
4. noise : coming from ammonia machine, ammonia pump, power supply machine, cooling tank.
             Chart 4-4 main equipment noise sources degree
    No.        noise resources      noise resources intention
     1       ammoniac machine                  82
     2        ammoniac pump                    90
     3           dynamotor                    100
     4          cooling tower                  85

4.1.2 Ningbo Chaoxing ocean biology products co.,ltd
4.1.2.1 company brief introduction
Due to no existing ocean biology company to compare, this environment reprot is based on
environment
influence register sheet of ningbo chaoxing ocean biology products co.,ltd enacted by Xiangshan
environment protection and inspection bureau(2001). company plan to build plant in west of
industrial park,
detail location please refer to attachment 3. Compnay will occupy 21.9MU land, 300 annual
working day .
Company business scope cover seafood proecessing, focus on solid pollution from fish
classification to produce
meal and defrozen fish
4.1.2.2 production plan refer to chart 4-5
             Chart 4-5 Production
                      plan
    No.           Production          Capacity ( t/a)
     1               meal                 1000
     2            dry seafood              500
     3         defrozen protein            200

4.1.2.3 raw material consumption
raw material consumption please refer to chart 4-6



          chart 4-6 raw material consumption volume
No.              name                  consuming capacity
 1        carp solid pollution              4500t/a
 2             fresh fish                   1500t/a
  3              water                       6000m3/a
  4              power                     60000 kw.h/a


                                               24
  5               coal                        500t/a

4.1.2.3 processing line
1. meal processing line
Fish classification solid pollution cooking fatfree filter dry crush meal

                                               Polluted water form meal
                   Use as material of defrozen protein


2. defrozen protein processing line
           filter residue use to process meal
                                filter residue
Polluted water from meal oil and water separator       filter liquid   biological enzyme


              Oil refine refined oil
Liquid condensation defrozen protein

Polluted water

3. Dry seafood processing line
Fresh fish washing classification dry dry seafood

     Polluted water Solid pollution use to process meal
4.1.2.4 main product equipment
main product equipment please refer to chart 4-7
            Chart 4-7 Equipment List
    No          Equipment name            type    quantity
     1       Oil and water separator SAHO5036 1 set
     2            beverage filter        GL400      1set
     3            roast machine                    1 set
     4            crush machine                     1set
               Filter and compress
     5               machine                       1 set
     6             reaction axe                     1set

4.1.2.5 pollution treatment and drainage situation
1. polluted air: coming from washing procedure of dry seafood processing line and


                                              25
            , volume expect to reach 65000m3/a(21.7m3/d) . water quality index is :
CODcr 1200 mg/l, BOD5 500 mg/l, SS 300 mg/l( refer to index of environment report on this
company environment
influence register ), pollution production volume is CODcr 7.8t/a, BOD5 3.25t/a ,SS 1.95t/a.
Annual production capacity is 1700 t/a, and production factor of ocean microorganism company
is polluted water 3.8 M3 per ton production.
polluted water pretreatment processing line as below :

Polluted water grille      condensation pool sediment pool
polluted water
    Pipeline to treatment center   chemical drug  mud

pollluted water through pretreatment then drain to industrial park to further treated.
2. polluted air : coming from boiler . Company plan to set up 1 set boiler with 2t/h, annual
coal consumption volume expect to 500t/a. Company production capacity is 1700t/a, so
production
coal consumption rate is 0.31tcoal per ton production . air pollution from boiler is expected to
4,900,000Nm3/a, SO2 volume 10T/a, dust volume 18.75t/a.
through spiral treatment on pollute air from boiler, SO2 exhaust volume is 10t/a,dust 7.5t/a .
3. solid pollution: coming from coal residue. base on 30% of total coal consumption volume,
coal residue reach 150t, as material to construct road
4. Noise : coming from air blower of boiler , source degree is 92dB(A)
4.1.3 Xiangshan kehai biological compant
4.1.3.1 Comapany Brief introduction
Due to no existing shell procesing company nearby to compare, so this environment report
base on data from Envrionment Influence register of Xiangshan Kehai Biological Comapany
enacted
by Xiangshan environment protection and inspection office in 2001 . This company plan to build
at wet of industrial park. Company will occupy 7.95MU, 300 annual working day.
This company will mainly handle shell process.
4.1.3.2 Production plan
Shell processing capacity 250t/a
4.1.3.3 raw material consumption
raw material consumption detail please refer to chart4-8
        chart 4-8 raw material consumption volume
 No.             name              consumption volume
  1          shrimp.crab                   7500t/a
  2      muriatic acid(30%)                2000t/a
  3           slip alkali                  125t/a


                                               26
 4               water                   10000m3/a
 5                coal                     100t/a
 6               power                   2500kw.h/a

4.1.3.4 processing line

       water          acid liquid       water        alkali
           filter residue     filter residue    filter residue
Shelll washing pool I         acid pool      washing pool II     Protein separate

Water Polluted water                    Polluted water
       Filter residue
Washing pool III filter         Dry     Shell protein

Polluted water

processing line display :
1. shell through washing pool , to acid pool at 6% density acid liquid for 15-20 hours , then
    filter. Filter liquid remain in acid pool , can be reused after regulation of acid density. Filter
    residue will to protein separate.
2. NaOh density is at 30% in protein separate, get rid of filter residue after cooking . filter liquid
    can be reused after regulater alkali density. Filter residue will to washing pool III.
3. Use water to flush filter residue in washing pool III, solid material of filter screen is shell
    protein
4.1.3.5 Main equipment
Main equipment list refer to chart 4-9
chrt 4-9 main equipment
 No.            equipment name             quantity
   1                  boiler                 1 pc
   2                   oven                  1 pc
   3                 tension                 1 pc
   4                 wash vat                1 pc
   5                 acid vat                1 pc
   6                  alkali                 1 pc
   7            filtering netting            1 pc


4.1.3.6 Pollution treatment and drainage situation



                                                   27
1. Polluted water: 3 main cleaning water , as per chart 4-8, Cleaning water volume 10,000
    m3/a , drainage volume calculated 90% of this figure, it will be 9000 m3/a( 30M3/d).
Water quality of this plant is CODcr 3000mg/l, BOD5 700mg/l, SS 600mg/l, Ph2-4.
Polution volume is CODcr 27t/a ( 90kg/d) , BOD5 6.3t/a(21kg/d), Ss 5.4t/a( 18kg/d).
Annual shelll protein production capacity is 250t/a, while polluted water volume 9000m3/a, so
polluted water factor for shell proceesing plant is 36m3 per ton production.
2. Polluted air: Coming from boiler . This compnay plan to set up a 1T/h boiler, annual coal
    consumption volume is 100t, while shell protein prodcution capacity is 250t/a, so unit
    production coal consumption is 0.4t/a. Polluted air from boiler is 970,000 m3/a, SO2 volume
    1.125t/a, dust volume 1.25t/a. Through spiral treatment to ,SO2 exhaust volume is 1.125t/a,
    dust exhaust volume 0.25t/a.
3. solid pollution : coming from coal residue of boiler. Calculated at 30% of total coal quantity,
    it will be 30t/a. this solid pollution will be used to construction road.
4. Noise : coming from air blower of boiler house, source degree is 92dB(A).

4.1.4 Ningbo Haishan Feida Meal Processing Co.,LTD
4.1.4.1 Brief Introduction
Ningbo Haishan Feida Meal Processing Co.,LTD is united at 1994 by Ningbo Haishan meal
procesisng co.,Ltd and Ningbo Feida Meal processing Co.,LTd., located at east of industrial park
, near Geshishan . Company occupied 9MU land, with 27 employee, 300 annual working day.
Company main produce meal .
4.1.4.2 Production plan
In 2000 , meal annual production capacity is 800t/a.
4.1.4.3 Raw material consumption
Detail please refer to Chart 4-10
       chart 4-10 raw material consumption volume
  No.         Name                consumption volume
       clearing-fish solid
  1         pollution                   3000t/a
  2           Coal                       400t/a

4.1.4.1 Processing line
Solid pollution from fish classification through filter and dry procedure of meal processing
equiment, it will turn into meal .
3000t sold pollution will produce 1500t meal polluted water during filter procedure., and 700tons
will be vapored during dry step, and finally produce 800t meal production.
Detail as follows:

Solid pollution   cooking     fatfree filter   dry     crush   meal


                                                  28
                 Polluted water

4.1.4.5 Main Equipment
Main Equipment refer to chart 4-11

chart 4-11 main manufacturing equipment
No.                equipment name                     quantity
 1                     4 t boiler                     2 pc
 2       a complete set of fishmeal equimpent         2 set


4.1.4.6 Pollution treatment and exhaust situation
1. Polluted water: mianly coming from fatfree filter step,in 2000, polluted water drainage
    volume is 1500m3/a. We entrust Xiangshan Environment protection and inspection bureau to
    inspect local water quality on June 12, 2001, result is CODcr 54400mg/l, Bod5 16300 MG/l,
    Ss 3000mg/l, Ph2.76. Polluted water direct drain into shipu harbor.
In 2000, meal production reach 800t, so polluted water factor is 1.875m3 per ton production.
2. Polluted air: Coming from boiler . This compnay plan to set up a 2 set 4T/h boiler, one is for
spare, annual coal consumption volume is 400t, while annual meal prodcution capacity is
800t/a, so unit production coal consumption is 0.5t/a. Polluted air from boiler is 3,880,000 m3/a,
SO2 volume 8t/a, dust volume 15t/a. Through spiral treatment to ,SO2 exhaust volume is 8 t/a,
dust exhaust volume 15t/a.
3.solid pollution : coming from coal residue of boiler. Calculated at 30% of total coal quantity, it
will be 120t/a.
5. Noise : Noise source are air blower of boiler and equipment in workshop. Noise source
    degree please refer to chart 4-12.

NO.            Noise source                  Source degree ( dB(A))
1              Boiler                        92
2              Processing equipmetn of       80
               meal


4.1.5 Polluted water factor and Coal consumption figure subtotal
Through comparison investigation, polluted water factor , coal consumption figure please refer to
Chart 4-13.

                              consumption coal        producing pollution
 No.     Enterprises sort       index(t coal/t         index of polluted    CODcr       BOD5           SS

                                                 29
                                 product)               water

  1    seafoods processing             \                11.25            2133       1000          1400
  2      ocean biological             0.3                3.8             1200       500           300
  3      Shell processing             0.4                 36             3000       700            600
  4         fishmeal                  0.5               1.875           54400      16300          3000

4.2 Pollution Source Degree Analysisi
4.2.1 Foreword
 As per Chart 3-3,Industrial park cover 4 meal processing company, 2 new build shell processing
company, 2 ocean biololgical proceesing company and 7 seafood processing company. This 15
company will occupy 235.2MU . First stage of Industrial park will be 657 mu , including 328.5
Mu industrial land, therefore, there will be 93.3 Mu idle land.
4.2.2 Polluted water
Polluted water in industrial park including livng polluted water, existing company produciton
polluted water, new build company production polluted water, and futer company production
polluted water.
4.2.2.1 Living polluted water
Total employee of this project will be 3300, average water consumtion volume at 100l. total
living water demand is 330m3/d(99,000 m3/a). Drinage volume calculated at 80% of total water
consumption is 264m3/d( 7.92m3/a). Water quality as follows: CODcr 400mg/l, BOD5 200mg/l,
SS 100mg/l. Pollution production volume is CODcr 105.6kg/d(31.68t/a), Bod5 52.8kg/d(
15.84t/a),SS 26.4kg/d(7.92t/a).
4.2.2.2 Existing Company Production polluted water Existing company has 4 meal processing
company, meal capacity total 6700t/a. As per chart 4-15, pollution factor of meal processing
company is 1.875m3/ per ton production, total pollution volume is 41.9m3/d(12560m3/a).
Water quality as follows : CODcr54400mg/l, BOD5 16300mg/l, SS 300mg/l.Pollution
production volume is Codcr 2279kg/d( 683t/a), Bod5 683kg/d(250t/a) , SS 126kg/d(38t/a).
4.2.2.3 New build company production polluted water
New build company can be devided into shell processing company, ocean biologicla processing
company and seafood processing company.
Shell processing compnay has 2 company, with 500t/a production capacity , as per pollution
factor in chart 4-13, polluted water from shell processing compnay will be 18000m3/a( 60m3/d).
Water quality as follows : CODcr 3000mg/l, Bod5 700mg/l, SS 600mg/l,while pollution
production volume is CODcr15t/a( 50kg/d), Bod5 3.5t/a(12kg/d), SS 3t/a ( 10kg/d).
Base on same principle, we can figure out detial figure for ocean processing company and
seafood processing company, detail as per chart 4-14
                         chart 4-14



                                              30
                                                quantity of
                                  producing       polluted
     enterprises sort     quantity capacity        water      CODcr    BOD5        SS
                                              10,000
                         unit         t/a      m3/d m3/d mg/l kg/d mg/l kg/d mg/l kg/d
shell processing company   2          500        1.8     60 3000 180 700  42   600    36
  ocean microorganism      2         3000       1.14     38 1200  46 500  19  300     11
   seafoods processing     7        41500      46.68 1556 2133 3319 1000 1556 1400 2178
          Total           11        45000      49.62 1654 2140 3545 980 1617 1350 2225


As per chart,polluted water total volume for new build company is 1654m3/d, CODcr is
3545kg/d(1060t/a), Bod5 1617kg/d(485t/a),SS 2225kg/d(668t/a).
4.2.2.4 Future company production polluted water
Future company enter industrial park will have similar situation with existing company,
therefore, base on square comparison method to calculate pollution volume, please refer to chart
4-14.




chart 4-14
                             occupying polluted
                                area  water voluem         CODcr          BOD5            SS
                                (MU)        (m3/d)      mg/l    kg/d mg/l kg/d mg/l kg/d
existing enterprises             19.1         42        3000     180 700   42   600 36
new enterprises                 216.1        1654       1200      46  500  19   300 11
Total                           235.2        1696       2133    3319 1000 1556 1400 2178
Future enterprises               93.3         673       2140    3545 980 1617 1350 2225


As per chart 4-14, Expected pollution volume is 673m3( 201,900m3/a), polluted water quality
CODcr 3460mg/l,BOD5 1360 mg/l, SS1390 mg/l. Production pollution volume CODcr
2308kg/d(692t/a), BOD5 915kg/d(275t/a), Ss 935 kg/d(281t/a).

4.2.2.5 Production polluted water



                                               31
Polluted water volume as per chart 3-15 . Polluted water total volume is 2633m3/d(789900m3/a),
pollution volume Codcr 8244kg/d(2473t/a), Bod5 3270kg/d(981t./a) ,SS 3312kg/d ( 994t/a).
chart 4-15
                                 quantity of polluted
                                        water                CODcr          BOD5         SS
                                  m3/d      10,000 m3/d    mg/l    kg/d    mg/l   kg/d   mg/l kg/d
living polluted water             264           7.92       400     106     200     53    100 26
forthcoming enterprises
polluted water                     42          1.26       54400 2285 16300 685 3000 126
new enterprises polluted water    1654         49.62       2140 3545 980 1617 1350 2225
new enterprises entering park
polluted water                     673         20.19     3430 2308 1360 915 1390 935
Total                                2633          78.99 3130 8244 1240 3270 1260 3312


Company in industrial park pretreated polluted water then drain to treatment plant, meet standard
of Shipu harbor. According to relevant environment protection rule, drain water quality carry
on II standard , polluted water pollution volume : total polluted water volume
2633m3/d(78990m3/a), pollution exhaust volume CODcr 395kg/d(118t/a), BOD579kg/d(24t/a),
SS 395kg/d(118t/a).

3.5.3 Polluted air
Polluted air is coming from boiler.
Polluted air is mainly produced by shell processing company, ocean biological company, and
meal processing company. To reduce effect to surrounding, this project will build hot and steam
supply center ( detail location please refer to attached drawing 3 ). Original company boiler shall
be knocked down. Coal consumption of each company please refer to chart 4-16.




chart 4-16
                                  unit products of      product        coal        needing air
No.            enterprises sort   coal comsumption      capacity   consumption       volume
                                  index


                                                 32
                                  (t coal /t products)   (t/a)           (t)          (t/h)
    1      ocean microorganism                     0.3   3000           900            2.3
    2                                              0.4   500            200            0.5
    3       fishmeal enterprises                   0.5   6700          3350            8.4
                 new enterprisin entering park                         1750            4.4
                              total                                    6200           15.6

As per chart 4-16, steam this project need is 15.6t/h, so it shall equip with 1set10t/h boiler, 2set
6t/h boiler. According to relevant regulation of 2nd area II time Polluted air exhaust standard
(GWPB3-1999) , So2 density is 900mg/m3. exhaust volume 54t/a, TSP density 200mg/m3,
exhaust volume `12t/a.
3.5.4 Solid pollution
 Solid pollution of this project including mud , coal residue etc.
Hot and steam supply center annual coal consumption volume is 6200t, according to experience,
there will be 30% coal residue of total coal consumption. So we can figure out that annual coal
residue is 1860t/a.
Living garbage of each empolyee calculated at 0.2 kg/d, total garbage volume will be
0.2 X 3300 X 365 = 240t/a.
Design daily polluted water treat capacity of treatment center is 3000t/d ,calculated at 5kg mud /t
polluted water, it will bring total 4500t/a mud.
Solid pollution of this project please refer to chart 4-17.
Total solid pollution will be 6600t/a,coal residue can be reused.
No.      Type                    Production volume(t/a)         Exhaust volume(t/a)
1        Coal residue            1860                           1860
2        Living garbage          240                            240
3        Mud                     4500                           4500
Total Volume                     6600                           6600

3.5.3 Noise
Noise source degree refer to chart 4-18.
chart 4-18
                                     noise resources degree(dB(A))
No. name
 1 Ammonia machine                                       82
 2 Ammonia pump                                          90
 3 Power supply machine                                 100
 4 Cooling tank                                          85
 5 Boiler                                                92
      Whole line equipment for
 6 meal                                                  80


                                                 33
4.3 Pollution Exhaust list
Pollution exhaust list please refer to chart 4-19.
chart 4-19
                    project                               drainage volume

             polluted water volume                    789900 m3/a(2633m3/d)
 polluted
                           CODcr                          118t/a(3.95t/d)
   water
                           BOD5                             24t/a(0.08t/d)
                             SS                            118t/a(3.95t/d)
             boiler polluted air                 60,140,000 m3/a(20,050,000m3/d)
polluted air                SO2                            54t/a(0.18t/d)
                           TSP                             12t/a(0.04t/d)
                        coal residue                       1860t/a(6.20t/d)
   solid
 pollution             daily garbage                       240t/a(0.80t/d)
                       polluted mud                       4500t/a(30.00t/d)
noise                                  details see 4-18




                                                     34
Part 5 Evluation on Water Quality Current Situation and Influence
5.1 Water quality current situation
5.1.1 Current Inspection
To collect information of water quality of shipu harbor, our office entrust Xiangshan
Environment Protection office to Inspect .
Inspection location : 1500m vertical away from drainage point , detail location please refer to
Attached drawing 6.
Inspection project: water temperature, Ph value, CODmn, DO, Nh3-N, Chrome.
Inspection tiem: June 12 ,2001 and June 21 2001, rise tide and ebb tide each time .
Sample and inspection analyze method. as per relevant stipulaiton of Water and poluted water
inspection analyze method ( third edition) enacted by National Environment Protection Bureau.
Inspection Bureau . Refer to chart 5-1.
                                 Chart5-1 Water Environment Current Situation
                                 Ocean water
Period        Sample time                    Temperature DO         CODmn NH3-N            chrome
                                 Ph value
low & ebb                 6.12          7.89 24                 8.93         1.9      0.47 <0.004
tide          proportion value         0.494 -                 0.095        0.38      0.94 <0.008
low & rise                6.12          7.89 24                 8.98        1.86      0.45 <0.004
tide          proportion value         0.494 -                 0.104       0.372       0.9 0.008
high & ebb                6.12          7.91 25                 9.13        1.72      0.51 <0.004
tide          proportion value         0.506 -                 0.164       0.344      1.02 0.008


                                                  35
high & ebb                 6.12         7.91 24                    9.04       1.7       0.5 <0.004
tide           proportion value        0.506 -                    0.115      0.34         1 0.008
largest proportion value               0.506 -                    0.164      0.38      1.02 0.008



5.1.2 Current situation
Evaluation standard : According to [2001] no.242 Notice on Zhejiang Coastal Function Area
Regulation issued by Zhejiang development and pland committee and Zhejiang province
Enivronment Protection Bureau , Shipu is belong to 4 grade function area, so Evaluation water
quality of Shipu harbor shall base on 4 grade standard of Ocean Water Quality Standard.
Standard please refer to Chart 1-1.
 Evaluation method : according to method recommended from Environment Influence Evaluation
Techinical Guidance- floor water environment ( HJ/T2.3-93) and1999 National Environment
Standard Testbook, which will evlauated each pollution source respectively . If pamater of
water quality over 1, it is mean that water quality is beyong standard, can’t meet requirement for
functional area.
Evaluation Result and debate: Evaluation result refer to chart 5-1. As per chart, dwater qua
     the water qualiy of Shipu harbor near to the drainage point, the index of PH value, CODmn,
DO, tempreature and total chrome are up to par, except for the NH3-N. And the PH max. is
0.506, CODmn is 0.380, DO is 0.164, total chrome is 0.008, NH3-N ID 1.02. The overrun of
NH3-N is general phenomenon of the sea water quality in Shipu harbor meatus, due to living
polluted water direct drain to shipu harbor and industrial polluted water drained beyong
standardand .For the structure of Shipu town is focus on seafood processing industrial, the
chroma of NH3-N are upper. Current inspection result indicated that water quality of Shipu
harbor can’t meet the requirement of 4th kind area ocean water quality GB3097-1997.
     5.2 Water Environment influence prediction and Evaluation
     5.2.1 Predict mode
     According to formula,

    Cr=Ch + ( Cp-Ch)[1-exp(-ФQp/dMvR)]
    Cr----average dentsity of pollution of radian, mg/l
    Ch---- Current density of ocean pollution, mg/l.
    Cp---- Drainage density of pollution , mg/l
    Qp---- Drainage density of polluted water, m3/s
    Ф----Mixed angel , radian
    d---- mixed depth, m
    Mv---- mixed speed, m/s
    r---- distance between inspection site and drainage point,m



                                                  36
5.2.2 Relevant parameter
1) Hydrology
According to coastal form and current situation : Ф= , d=2, Mv=0.005m/s.
2) Current density of ocean pollution
Take CODmn as predicted paramter, CODmn current figure is 1.9mg/l when ebb tide .
3) Pollution source degree
As analysis by this project, pollution drainage volume is 2633m3/d(0.0305m3/s).
Polluted water shall drain within standard. So normal drained Cp(Cr) 150mg/l, accident drainage
Cp( Cr) will be up to 3130mg/l. Due to ocean water quality adopt CODmn to measure , so it shall
turn to CODmn to be calculated.
If CODcr: CODmn=3,then normal drained Cp(mn) will be 50mg.l, accident drainage Cp(mn)
will be 1040mg/l.
5.2.3 Calculation result
Calculation result detail please refer to chart 5-2.
         Chart 5-2 Water Environment Current Inspection
         Result
Distance to Drainage point      50   100   200        300   400   600   1000 1500
CODmn standard drainage      2.822 2.363 2.132 2.055 2.016 1.978 1.947 1.931
mg/l  accident drainage          22.81 12.4 7.164 5.412 4.536 3.657 2.955 2.572
As per chart 5-2, when drainage meet standard, CODmn density of ocean water quality shall
meet IV standard of Ocean Water Standard ( GB3097-1997). When accident drainage, CODmn
density 300m away from drainage point will over the standard (GB3097-1997).
5.2.4 Prediction and Result analysis
When low tide and polluted water in this project drain under stardard,CODmn density at 50m far
  away from drainage point will be 2.822mg/l, under standard limitation 56.44%, in line with
  Ocean Water Quality ( GB3097-1997).
If accident drainage , CODmn density at 300m within drainage point will be IV grade of Ocean
  Water Quality ( GB3095-1997), effect surrounding .
Therefore, it must eliminate possibility of accident drainage.
Feed water point of farming base is rivers. Polluted water will be drainaged into shipu harbor
  instead of rivers, so it will not effect water quality of farming base .
5.3 Summary
5.3.1 Water quality current situation
     Water quality of drainage point of Shipu harbor except NH3-N, PH value , CODmn, Do ,
temperature and chrome all meet standarde . The overrun of NH3-N is general phenomenon of
the sea water quality in Shipu harbor meatus, due to living polluted water direct drain to shipu
harbor and industrial polluted water drained beyong standardand .For the structure of Shipu
town is focus on seafood processing industrial, the chroma of NH3-N are upper. Current



                                                 37
inspection result indicated that water quality of Shipu harbor can’t meet the requirement of 4th
kind area ocean water quality GB3097-1997.
     5.3.2 Water Quality Evaluation
When low tide and polluted water in this project drain under stardard,CODmn density at 50m far
  away from drainage point will be 2.822mg/l, under standard limitation 56.44%, in line with
  Ocean Water Quality ( GB3097-1997).
If accident drainage , CODmn density at 300m within drainage point will be IV grade of Ocean
  Water Quality ( GB3095-1997), effect surrounding .
Therefore, it must eliminate possibility of accident drainage.
Feed water point of farming base is rivers. Polluted water will be drainaged into shipu harbor
  instead of rivers, so it will not effect water quality of farming base .

Part 6 Current Air Condition and Influence Evaluation
6.1 Polluted Air Character
6.1.1 Average speed, trend to wind direction frequency .
According to data supplied by weather station , average wind speed , wind direction frequency of
 four seasons please refer to chart 6-1& 6-2. Also attached drawing 5.




             Chart 6-1 Average wind speed of Shipu
   Wind
             Jan. April July      October     Whole year
 direction
     N        6.7   6.4    4.5      6.4             6.5
   NNE        6.7   6.1    6.4      7.1             6.5
    NE        5.5   5.1    5.5      6.9             5.8
   ENE        5.2   4.5    5.3      5.6             5.3
     E        2.3   3.3    4.6      4.7             4.1
   ESE        3.4   3.3    5.2      3.1             4.1
    SE         4    4.3    4.9       4              4.6
   SSE        2.6   4.9    6.2      3.7              5
     S         2    4.3    7.6      3.7             4.6
   SSW        3.8   6.5    7.1      3.6             6.4
    SW        4.1   6.2     5       4.7             5.8
  WSW          4    5.2    4.3      3.1             4.4
     W         3    4.4    5.5      2.2             3.5
  WNW         4.3   4.6    5.5      5.2             4.1


                                               38
    NW       6.1      6      5.2     5.4             5.5
   NNW       7.2     6.8     11      6.3             6.8
all direcion 5.7     5.2     5.3     5.8             5.5

             Chart 6-2 Wind frequency of Shipu
   Wind
              Jan. April July       October   Whole year
 direction
     N        25     10        1      28             16
   NNE        10      7        1       8              7
    NE         9     15        4      16             12
   ENE         5     11        6      13             10
     E         1      3        2       2              3
   ESE       0.01     2        2      1              1
    SE         1      6        6      2              4
   SSE       0.01     3       4       1              2
     S        0.1     3        5      1               2
   SSW         0      4       16      1              5
    SW         9     17       41      4              15
  WSW          7      8        7       3              6
     W         3      1        1       1              1
  WNW          1    0.01     0.01    0.01             1
   NW          8      2      0.01      4              3
  NNW         17      4      0.01     11              8
     C         3    0.01       4      4               5


As per chart 6-1 & 6-2, main wind direction of shipu is N direction, frequency at 16%, Sw
 direction, frequency at 15%; 2nd main wind direction is NE, at 12%, ENE wind direction, at
 10%. Quiet wind frequency is at 5%, annual average speed at 5.5m/s.
6.1.2 Polluted parameter
polluted parameter give full consideration to wind direction and speed, which can full present
pollution degree, formula of polluted parameter as below:




       Fi /Ui
   Pi= 16           x 100%
        ∑ Fi/Ui
      i=1

                                                39
Pi , Fi, Ui present I wind direciton polluted parameter, wind direction frequencey, average speed
( m/s)

Chart 6-3 give all figures of annual pollution , including Jan, April, July, and October.
As per chart 6-3, sevious polluted parameter whole year is SW wind.




              Chart 6-3 Wind direciton polution parameter
    Wind
               Jan.   April   July    October   Whole year
  direction
      N        23.9    8.48    1.41    25.8           14.1
    NNE        9.43    6.26    1.03     6.66           6.19
     NE       10.51   15.99    4.68    13.66          11.87
    ENE        6.16   13.28    7.25    13.66          10.72
      E        2.76    4.95    2.76    2.53           4.19
    ESE        0.01    3.32    2.44    1.88           1.38
     SE        1.6     7.62    7.81    2.94           4.99
    SSE       0.01    3.32     4.17    1.59           2.29
      S       0.01     3.81    4.23    1.59            2.47
    SSW       1.67    3.37    14.42    1.65           6.25
     SW       14.11   14.91   38.17    5.01           14.85
   WSW        11.23    8.38   10.45    5.71            7.8
      W        6.41    1.25    1.15    2.65           1.66
   WNW         1.48    1.01    0.01    0.01           1.38
    NW          8.4     1.8    0.01    4.36           3.15
   NNW         2.31    3.25    0.01     10.3           6.71

6.1.3 Air stability degree
Due to unable to collect air stability degree of shipu town, so this evaluation is based on data of
near place ( ningbo downtown ) .
Air stability degree indicate polluted air expand capacity within air .Air stability degree detail
please refer to chart 6-4.
      Chart 6-4Air stability frequency of ningbo downtown (%)
     Stability       A         B       C        D       E      F
       Jan.          0       1.78    13.14    65.17    16.8   3.02

                                                 40
     April             1      5.03    14.21      59.2    16.04     4.52
     July            3.08    18.02    12.5      43.18    19.81     3.41
    October          0.97    16.48    17.69     37.96    17.45     9.45
   Whole year        1.26    10.33    14.36     51.38    17.58     5.1

Whole year shipu town is D type, with 51.38 % frequency, E type sencond it , 17.58%, A is
minus , 1.26%.

6.2 Current situation and Evaluation
6.2.1 Air condition current inspection
To get information of surrounding air condition, we entrust Xiangshan Environment and
Inspection office to inspect .
Inspection location: near road junction of planned Garden road , detail please refer to attached
drawing 3.
Inspect project : SO2, NO2, TSP.
Inspection time and frequency : From June 20, 2001 to June 22, 2001 at time 7:00, 14:00, 19:00..
Inspect method : see chart 6-5.


Chart 6-5
Inspection project          Inspection Method
TSP                         weight measurement (GB/T15432)
SO2                         Spectro method by chemical material ( GB/T15262-94)
NO2                         Saltzman method (gb/t15436-95)

Insepction result : see chart 6-6 and summary please refer to chatt 6-7.
Chart 6-6 SO2 ,NO2,TSP inspection result ( Unit : mg/m3)
         Time                  June 20 June 21 June 22
         7:00-7:30                  0.002     0.003      0.003
         14:00-14:30                0.007     0.006      0.005
SO2
         19:00-19:30                0.003     0.003      0.004
         Daily average              0.004     0.004      0.004
NO2      7:00-7:30                  0.004     0.002      0.002
         14:00-14:30                  0.01    0.002      0.004
         19:00-19:30                0.007     0.002      0.002
         Daily average              0.007     0.002      0.003
TSP      Daily average                0.16    0.021      0.054

Chart 6-7 Air inspection result and summary ( June 20,2001-June22,2001)


                                                 41
                              Daily average     Daily largest  one time largest
 Project    density range
                              density range   proportion value proportion value
   SO2      0.002-0.007          0.004               0.026            0.014
   NO2      0.002-0.010       0.002-0.007            0.058            0.042
   TSP           -            0.021-0.160            0.533              /

6.2.2 Air environment current situation
Evaluation standard: please refer to chart 1-1
Evaluation method: according to Environment influence evaluation technical guidance –air
condition ( HJ/t2.2-93), evaluated each pollution factor .
Evaluation result : according to chart 6-6 and chart 6-7, that the one time and day value of SO2,
NO2, TSP are up to standard, and the maximum daily value of SO2 is 0.026, one time value is
0.014, maximum daily value of NO2 is 0.058, one time value is 0.042, the maximal daily value
of TSP is 0.533. So air quality of Shipu is sound, in line with 2nd grade Air quality standard
(GB3095-1996). 6.3 influece predict and evaluaiton
6.3.1 Predict mode
Choose source expand mode to calculate

         Q            Y2        H2e
      C= лµбyбZ      Exp ( - 2б2y ) exp(- 2б2z )

     бy =γ1Xa1     бZ=γ2Xa2
     He =H + ∆H
Wind direction of air exhaust point is largest floor density Cm( mg/m3) and distance to air
exhaust point Xm( m) :

    2Q
Cm = eлUH2eP1



     ( He ) 1/2α2    (    α1 ) –1/2α2
Xm= γ2                   α2

 6.3.2 Relevant Parameter
1. predicted project and sensetive point
predicted project : SO2, TSP
sensetive point: According to inevestigation of surrounding , sensetive point of surrounding refer
to chart 6-8.


                                                42
         Chart 6-8 Sensetive point of air pollution
                                               distance to hot and
                              Influence wind
  No.      Sensetive point                        steam supply
                                 direction
                                                    center (m)
   1       Dongbian village         SW                 700
   2       Beishan village         WSW                 800
   3        Center village         SSW                 600
   4        Xibian village         SSE                 600
   5        Xiatang village          E                 500
   6        A resident area          S                 400
   7         Shipu town            WSW                1500

2. Weather condition
Wind direction : from total layout drawing, wind direction to each sensetive point as follows :
 S direction to Dongbian village, SSE direction to Center village, SSW to Beishan village, SE
direction to Xibian village, E direction to Xiatang village, S directio to A resident area, SW to
Shipu town.
Air stability degree: D grade , frequency 51.38%. so air stability of this project is stable.
 Wind speed : average speed of whole year, exhaust point will calculated as per below formula:


µ2 =µ1 ( Z2/Z1)P

µ1,µ2 -------average speed at 10 high from Z1(m ) and Z2(m), m/s
P-------- speed height index, detail figure refer to chart 6-9.
Chart 6-9 P value under different air stability
     Area       Stability      A       B     C      D       E.F
             city             0.1 0.15 0.2 0.25              0.3
          rural area          0.07 0.07 0.1 0.15            0.25


Chimney height is 45m, so speed at chimney can be calculated . Detail data please refer to chart
6-10.




                                                43
Chart 6-10 wind direction and speed at
chimney

                                     speed at
             wind      speed at      drainage
   No.
             direction 10m           point
                                     (m/s)

      1         SW             5.8         7.27
      2        WSW               6         7.52
      3        SSW             6.7          8.4
      4        SSE               5         6.27
      5          E             4.1         5.14
      6          S             4.6         5.76


Expand parameter please check HJ/T2.2-93, source from industrial park and town, shall first
upgrade air stability data then fix expand parameter . A , B grade will not be upgrade, then C
grade shall upgrade to B grade, D.E.F shall upgrade 1 grade to air unstability. Detail refer to chart
5-11.
Chart 5-11 Expand parameter ( sample time 0.5h)
Stability distance α1             γ1          α1           γ1
           0-1000        0.92428 0.177154
C                                               0.917595 0.106803
           >1000         0.88516 0.232123

Chart 5-12 Air raise degree of sensetive point

          Wind direction of   Raise        Chimney
 No.
           Sensetive point    height      height (m)

  1             SW            2.95          47.95
  2            WSW            2.86          47.86
  3            SSW            2.56          47.56
  4            SSE            3.43          48.43
  5              E            4.18          49.18
  6              S            3.73          48.73

3. pollution source degree



                                                    44
According to project analysis, total coal consumption is 6200t, air exhaust volume 60,140,000
m3/a(6.961m3/s). SO2 exhaust density 900mg/m3,exhaust volume 6265mg/s; TSP exhaust
density 200mg/m3, exhaust volume 1392mg/s. Chimney height is 45m. Polluted air meet 2nd
grade II time standard of Polluted Air from Boiler Exhaust Standard ( GWPB3-1999).
4. Predict result and analysis
Largest floor density. Largest floor density under different wind direction and calcualtion result
of distance appeared.




          Chart 6-13 Floor density land distance
                              Largest
                                floor        Distance
  Wind                        density appear largest
direction     Pollution     Cm(mg/m3)        density
                 SO2          0.05075
   SW            TSP          0.01128         531.49
                 SO2          0.04924
                                               530.4
 WSW             TSP          0.0109
                 SO2          0.04465
  SSW                                         526.78
                 TSP          0.00992
                 SO2          0.05768
  SSE                                         537.29
                 TSP          0.01281
                 SO2          0.06821
    E                                         546.37
                 TSP          0.01516
                 SO2          0.06201
                                              540.92
    S            TSP          0.01378

  Chart 6-14 D grade stability air polluted density of sensetive point
                                          Influence floor density (mg/m3)
                         distance to
 No.    Sensetive point                   wind
                         chimney ( m)
                                          direction SO2             TSP
  1   Dongbian village          700           SW             0.0455 0.01011
  2     Beishan village         800          WSW           0.03931 0.00873
  3     Center village          600          SSW           0.04348 0.00966
  4     Xibian village          600           SSE          0.05657 0.01257
  5     Xiatang village         500            E           0.06727 0.01495


                                                 45
  6     A resident area        400          S            0.05144 0.01143
  7      Shipu town           1500         WSW           0.01733 0.00385

6.3.3 Unfavorable smell influence to surrounding
each company of this project has unfavorable fish smell, especially for meal processing company
in summer. So , comparison investigation must be handled to meal processing solid pollution
stock. Detail please refer to chart 6-15.




  Chart 6-15 Distance influence to unfavorable smell
         Distance to stock
 No.                             unfavorable smell
               place
  1              5                  strong smell
  2              10                 strong smell
  3             20           comparative strong smell
  4             30           comparative strong smell
  5             40           comparative strong smell
  6              50                obvious smell
  7              60                obvious smell
  8              70                obvious smell
  9              80                 slight smell
 10              90                 slight smell
 11             100                 slight smell
 12             120              basically no smell

unfavorable smell of meal processing plant have no influence to area 120m away from plant.
Shipu fatfree meal processing plant is 200m away from closed Dongbian village , 150m away


                                              46
from A resident area, so meal processing plant will few influence to surrounding.Given the
situation that A resident area is only 50m away from Nangang road , it is suggested that meal
processing company shall not allow to establish at 70m away fron Nangang road in future plan to
ensure 120m distance. Unfavorable smell have few influence to surrounding .
6.4 summary
6.4.1 Air Environment current situation
According to air environment current situation , So2, No2, TSP all meet standard during
inspection day from June 20,2001 to June 22, 2001. So air environment of shipu is good,
satisifed II standard of Air Environment Standard ( GB3095-1996).
6.4.2 Influence Prediciton and conclusion
Main air polluted source is boiler. According to influence prediction, polluted air from boiler
exhaust under standard will not effect surrounding village.
Unfavorable smell of this project , through 120m distance, it will not effect surrounding nearby
village and A resident area.
Above all, Air pollution of this project will not effect nearby resident area and village.




Part 7 Evaluation on Noise and Solid Pollution Influence
7.1 Noise
7.1.1 surrounding




                                               47
 This project located at south-west of shipu town, middle of trade zone oriented to Taiwannese,
.east to Geshishan hill, south to shipu harbor, west to xiatang village, north to Xibian village,
Center village, Dongbian village and Beishan village. This project cover west Xingang road,
Junming road, Xixia road, and Nangang road. Garden road devided this project into east block
and west block. Detail please refer to attached drawing 3.
7.1.2 Noise current situation and evluation
7.1.2.1 Noise current situation
Inspection point : to make clear noise current situation at surrounding of this project, our office
entrust Xiangshan environment protection and inspection office to test normal noise. Inspeciton
point detail please refer to attached drawing 3.
Inspection method: As per City Noise Measurement Method ( GB/T14623-93) and Environment
Inspection Technical Regulation ( noise part)
Inspection time and frequencey : June 16,2001 , day and night each time.
Inspeciton result : Noise inspection result detail please refer to Chart 7-1.
7.1.2.2 Evaluation on current noise situation
Evaluation standard and method: noise standard of this project carry on III type of Noise
Standard of Industrial company( GB/T12348-90) , i.e. day at 65dB(A) , night at 50dB(A).
         Chart 7-1 Noise current situation ad Evaluation list ( unti : dB( A)
                           Day                                     Night
Inspection
    site              Inspection Standard beyong                Inspection Standard beyong
               Time                                     Time
                         figure     figure standard               figure    figure standard
    1#       10:00      59.2        65         0        22:12   45.7        55        0
    2#       10:37      63.9        65         0        22:28   42.7        55        0
    3#       11:10      51.1        65         0        22:46   53.7        55        0
    4#       11:24      52.6        65         0        22:52    47         55        0
    5#       11:01      52.3        65         0        22:40   43.4        55        0
    6#       10;15      59.3        65         0        22:27   41.6        55        0
    7#       10:45      52.8        65         0        22:34    46         55        0


Evaluation conclusion: Evaluation conclusion please refer to chart 7-1.Day and night noise of
inspeciton point of this project meet standard.
7.1.3 Noise Influence Analysis
After completion of this project, predict influence of noise from each company to surrounding
residents shall base on comparison company noise influence to surrounding residents.
So we entrust Xiangshan environment proteciton and inspection office to measure plant noise of
Ningbo Haishan Feida meal aquatic industrial co.,ltd and Ningbo Jinhai Aquatic Food Co.,Ltd.
Detail figure please refer to chart 7-2.


                                                   48
                Chart 7-2 Noise inspeciton figure with plant edge
                                          Day                      Night
 Plant name    Inspection Site inspeciton standard inspeciton standard
                                   figure       figure      figure       figure
  Ningbo          East edge         59.7          65         51.2          55
  Haishan        South edge         55.6          65         50.8          55
 Feida Meal
                 West edge          54.4          65         50.6          55
 Processing
  Co.,LTD        North edge          57.8            65       51           55
                  East edge          55.2            65      51.1          55
  Ningbo
   Jinhai        South edge          54.7            65      53.1          55
  Aquatic        West edge           54.2            65      50.1          55
Food Co.,Ltd     North edge          54.9            65      49.8          55

For noise source degree of each company are close, noise at plant edge is close accordingly.
Chart 7-2 show that loudest day noise at plant edge is 59.9dB(A), while loudest night noise at
53.1dB(A). Company north edge is more than 60m away from A resident area , through middle
30m width green belt ,day noise to A resident area will at 52 dB(A) while night at 45dB(A).
Normal day noise is at 52.3dB(A), normal night noise 43.4dB(A), through increasing, day at
60.1dB(A), night at 52.8dB(A), in line with III grade of City Noise Standard ( GB3096-93) .
So noise will not effect nearby sensitive point.
7.2 Evaluation on Solid Pollution Influence
After completion of this project, Solid pollution including coal residue, living rubbish and mud
from water treatment . Detial figure and treatment please refer to chart 7-3.
Solid pollution will not effect surrounding through treatment show in chart 7-3.
Chart 7-3 Solid Pollution Treatment
Solid Pollution Name Quantity ( t/a)                 Treatment
    Coal residue            1860          to construct road and make brick
   Living garbage            240      sent to rubbish treatment center of shipu
        mud                 4500      sent to rubbish treatment center of shipu



                                                49
Part 8 Zoology Environment and Environment Influence Analysis
during Construction Period
8.1 Zoology Envrionment influence analysis
This project will occupy 43.8 ha( 0.44km2) land to build workshop, warehouse, office and public
service room total 38.08 ha .
New acquisition land is heath without large area vegetation.
Benefit factor to zoology environment after completion of this project:
1.Increase land resource utilization rate. Use block land to develop industrial park is best mode
to make best use of land , gather original scattered company at industrial park , improve land
utilization rate and protect farming land.
2. Control environment pollution and improve environment quality. Company scattered before
they enter industrial park , so three pollution treatment of each company are different, some are
qualified to exhaust meet standard , while some exhaust direct to outside without any treatment,
which do worse to environment.
After those company move into industrial park, treatment center will be built and unite all
pollution from each company and handle together, which will efficent control toal exhaust
volume of pollution and improve local environment .
Negative part to zoology environmetn after completion of this project :
1. Influence to vegetation. After completion of this project, original farming land will turn into
industrial park ; farming land will be replace by concrete structure and most of original
vegetation will disappear. During construciton period, Geshishan hill will be exploded to pave
road name west Xinggang road, which will lead to vegetaiton of Geshishan hill disappera. This
will effect air condition of shipu town , so it shall plant more trees to protect air environment of
shipu.
2. Influence to environment of nearby area.After completion of this project, with the increase of
population ad normal production, water and energy consumption will increase accordingly. At
the same time, Polluted water, polluted air and solid pollution caused by production will also
increased.
If accident occur at that time or umproper treatment, or pollution accident exhaust, it will bring
certian pollution to surrounding and influence shall not be neglect.
3. Influence to maintain earth . During construction of this project, it involve in lots of works as
dig earth , fill earth and pile earth, and even more explode Geshishan hill to pave road for
convenient traffic, if handle unproperly, it will not only destroy vegetation and zoology in this
area,cause earth lapse , also destroy original natural landscape.




                                                 50
In a word, construction of this project will inevitable change and influence to zoology
environment and land utilization type. So during construction of this project, it must under the
guidance of natural rule , well coordinate relationship between project and environment . Method
adopted as follow;
1. increse land scaping wihtin plant. land scaping rate shall over 30%, and uncovered earth shall
not be found .
2. use turf to protect embankment ; plant turf and low green bush in barrier belt between left and
right road, such as pine and cypress.
3. Land scaping tree are combined by grass and        ,
4. Earth source place shall carry on environment protection method.
5. Strengthen management during cosntruction, reduce earth lapse during construction period.
6. Exploded place of Geshishan hill shall be covered by block stone and place water ditch on the
slope to guide water from top to the floor ,to avoid breakdown caused by erosion.


8.2 Environment influence analysis during construction period
8.2.1 Dust
During whole construction period, procedure to cause dust including earth dig, and refill , road
construction, material transportation and unload, kneadig etc, if it happen to drought and no
rainfall with large wind, dust in construction place will be more sevious.
Dust caused by transportation truck account for 60% of total volume. Dust volume on road is
related to factor as speed of truck, weight , connection area of tire to floor, comparative humidity
etc.
To effecient control dust volume caused by truck, method as sealed transportation, speed
limitation, maintain clean road, and spray water ( 4-5 times each day ) etc. shall be adopted.
 Dust in construction place may from exposed pile and site by wind . Reduce material exposure
and ensure certain moisture is good method to deal with this kind of dust.
Attention shall be laid on dust protection issue during construction period. Necessary protection
method shall be raised to reduce dust influence to surrounding.
8.2.2 Noise
Noise during construction can be devided into machine noise, processing noise, and noise from
truck .Machine noise coming from operation machines such as exvacation machine, and
concrete kneading machine, elevator etc, are belong to point noise source; Processing noise are
including knock noise, yelp sound, are belong to temperary noise ; Noise from truck are belong
to traffic noise. Among those noise, machine noise is of most influence to surrounding.
Chart 8-1 indicate noise source degree. When several machine is on at same time, noise from
those machine will louder, according to comparison investigation, louder noise will be 3-8dB(A).
Among those machines, noise from concrete vibration machine, exvacation machine and
concrete kneading machine is most louder, at 80dB(A).Chart 8-2 show that noise fade away with


                                                 51
different distance from noise source. It shall be well arranged about machines working timetable.
especially pile driver are forbiddend to work at night to reduce noise influence to surrounding
residents.At same time, control noise within construction area according to chart 1-8
Construction Area Noise Limitation ( GB12523-90) depend on different construction phrase.
Chart 8-1 Equipment Noise Grade
No. Construction machine           Inspected noise (dB(A)) inspection distance
 1             Excavator                       79                     15
 2            Road roller                      73                     10
 3           Earth Scraper                     75                     15
 4     automatic unload trunk                  70                     15
 5 concret kneading machine                    79                     15
 6 concret vibration machine                   80                     12
 7              elevator                       72                     15

                  Chart 8-2 Construction machine recess distance
   No.                                                     noise grade ( dB(A))
                     Construction machine                55     60 65 70 75
    1                       Excavator                   190 120 75 40 22
    2              Concret kneading machine             190 120 75 42 25
    3              Concret vibration machine            200 110 66 37 21
    4                        Elevator                    80     44 25 14 10


8.2.3 Living Polluted Water
 During construction period, employess will produce cetain volume living polluted water, if
handle unproperly, it will cause pollution to surrounding. So management to living polluted water
is necessary , Toilet and relevant facility shall be set up temperary.
Well management on material and remain materials can prevent polluted water from second
pollution.It is suggested that polluted water shall through sediment nearby construction place.
8.2.4 Desert earth and living rubbish
Construction of this project need earth , except some of construction rubblish left by moved
farmer , there is no desert earth. After completion of this project, few of construction material
will be deserted, if handle unproperly, it will pollute water when it rains .So each company shall
regulate transportation rule for construction part that material shall not be desert unorganized.
Remain and deserted material shall be cleaned in time after construction is over.
During constrution period, livng pollution of construction part shall be collected in time, and sent
to rubbish treatment center of local Environment and healthy burea.




                                                 52
Part 9 The Public Participation
9.1 survey intention, method and content
9.1.1 survey intention
The public participation is to make the public well aware of environment and economic
achievement of
this project, to obtain full support and understand from the public, to reduce misunderstanding
between
the public and this project. Give consideration to positive suggestion from the public, it
will make design and layout of this project more reasonable and perfect, to make the best use of
company's advantage and achieve long term effect. At the same time, it will also benefit local
environment protection,and give sound basement to regulate structure of this project, overall
layout
and environment protection treatment.
9.1.2 survey method
dispatch survey sheet , random check will be adopted to obtain the public comments and
suggestion
to this project.
9.1.3 survey content
according to character of this project, the public will participate in following items:
1. know the public's idea about shipu existing environment problem
2. personal benefit or damage and acceptable level of the public after implement of this project.
3. benefit side on local economy, resident career situation after this project completed.
4. attitude and suggestion from nearby resident , the public and organization toward ths project.



9.2 survey scope and research object
Participant in this survey must representative the public of Shipu,so they must be local resident
living
near industrial park. Shipu relevant authority such as shipu government , county environment
protection bureau,
county bureau ) shall also take part in this survey accordingly.
personal participant in this survey must be worker, farmer, student, group participant in this
survey is
local government, social organzation, and company.

9.3 survey statistics , analysis and result


                                                 53
this survey dispatch total 100 survey sheet, and receive total 100 sheet. participant in this
survey statistics as chart 9-1




         Chart 9-1 Public Participants list
              Type                 Persons Rate(%)
                   Cadre               36      36
                  worker               11      11
  status          Farmer                4       4
                 Students              17      17
                   Other               32      32
                   Male                63      63
    Sex
                  Female               37      37
                    ,20                30      30
                   20-40               46      46
   Age
                   40-60               20      20
                    >60                 4       4
              primary school            6       6
Education Junior middle school         38      38
 situaton Senior Middle School         47      47
                University              9       9

 the public participant survey report statistics please refer chart 9-2. According to chart, we know
that 52% of participant among 100 participants thought that most serious pollution problem is
water,
air and noise account for 37% & 11 % respectively.Base on polluted water influence to local
living surrounding
from existing company, 64 % thought that it is common, while 24% concern it seriously.
in view of necessity of this project, 66% thought that it is necessary, whilte only 9% veto .
in view of benefit to local economy to resident, most of participant give positive answer , account
for 74%,

                                                  54
21% thought they know little about this project. Most participant concern to environment
pollution.
31% for air pollution, 57% for water pollution , and 13% for noise. Attitude to this project ,
73% thought that project can be right on schedule when meet drainage standard after treatment.
14% thought that it can't be put in operation right now, while 13% have no idea.




                     Chart 9-2 Public survey result
 No.               Survey Content                Persons Proportion( %)
                                     Air            37        37
     Big pollution problem
  1                                 water           52        52
     shipu exist at present
                                    Noise           11        11
      Influence degree of          Severe           24        24
  2   polluted water from        not severe         12        12
       existing company           common            64        64
                                     yes            66        66
       Necessity to build
  3                                  no              9         9
          new project
                                   no idea          25        25
        Benefit to local           benefit          74        74
         residents after           damage            5         5
  4
       completion of this
             project               no idea          21        21
  5     Most concerned           poluted air        30        30


                                              55
             pollution           polluted water       57          57
                                      Noise           13          13
                                        No            14          14
  6   Attitude to this project Yes if meet standard   73          73
                                     abstainer        13          13


9.4 conclusion
know from above mentioned survey content and result, construction of this project had got
positive comments and support from the public. When we implement three pollution treatment
and
ensure meet drainage standard before drain , this project will get support from the public.

Part 10 Environment Management and inspection
10.1 complete environment protection structure
function and nature of first stage of shipu seafood industrial park is focus on market, take
seafood processing as main body, equip with techology information, management service,
turn to be seafood industrial park with competitiveness and strong radiation to nearby place
on economy field. Therefore, it must require proper environment protection method and
management.
at same time, administrative committee of industrial park must give priority to environment
protection . It is suggested that special employee shall responsible for environment protection
work in industrial park, coordinate work with Xiangshan environment protection bureau on detail
issue
in industrial park.

10.2 strengthen environment protection management
momentunm of economy harmonize develop with environment request that environment
protection
management bureau must move their strategy , control whole processing line of industrial
pollution, control from beginning of processing instead of the end point and control in-line
processing.
2. separate environment evaluation of each company must be strictly carry on in industrial park,
base on requirement of this project,and give detail requirement to different company.
3. existing company in this project must knock down their own boiler , new established company
are not allowed to set up boiler. Industrial park will offer hot and air , use clean energy .
dinning hall shall use gas , snot and polluted air shall be treated by snot machine then exhauted to
outside.


                                                 56
4. each compnay in industrial park must first pretreated pollution as per internal stipulation for
company then drain to treatment center of industrial park.



10.3 strengthen environment inspection
Xiangshan environment proteciton and inspection bureau shall be entrusted to take regular
inspection to this project during construciton period and operation period.
noise , dust shall be inspected during construciton period. During operation period, inspection
must be given on PH,SS, NH3-N, CODcr and BOD 5 of polluted water drain from each
company and from
treatment center, and at least each month inspect one time, each time one day.
Set up a regular inspection point in Shipu harbor ( located at least 1500m from drainage exit
place of this project ). Each season plan to inspect a time for PH,SS, NH3-n, CODcr and BOD5
retearch influence of this project to Shipu harbor at random time.




Part 11 Pollution Treatment and total volume control
11.1 Pollution Treatment Method
11.1.1 Clean production
Clean production is refered to production method not only meet the public demand but also
reasonable utilize resource and energy , and also a effective management to use the less natural
material , to reduce pollution volume and harmless pollution and recircul this pollution.In a
word,clean production is demand of development, in line with world industry development trend,
a challenge to traditional rough industry, an important method to coordinate development
between environment and economy , to support continuous develop, therefore, clean production
shall be encouraged during processing
to completely control produce in line.
This project covered company of seafood rough processsing, seafood further processing, ocean
biologyical processing, shell processing ,meal processing etc., CODcr of pollution water above
mentioned company drained is higher dense, with massive volume, so control and treatment at
end point will require high investment and operation cost.
Therefore,treatment and suggestion of this project on clean production as below:
1. Pollution water of this project is coming from raw material cleaning of seafood processing .So
each company in industrial park must control pollution water volume to save water resource,
upgrade washing equipment and raise efficient of cleaning.


                                                 57
2. Shell processing company must pay attention to water of washing pool to reuse of those water.
3. refuel shall use low SS superior quality coal or coal cause no dust, while boiler shall use

to raise refuel efficency and reduce air pollution . company existing boiler shall be knocked
down, and all hot and steam will supply by treatment center which will unite treat dust and SS.
11.1.2 Polluted water
1. As analyzed, polluted water from shell processing company, meal processing company, and
seafood processing company are not meet internal standard of industrial park, so it is essential to
give some pretreatment to polluted water.
Suggested processing line as below:
Polluted water grille       condensation pool air floating sediment pool
polluted water
    Pipeline to treatment center     chemical drug           mud

Polluted water from shell processing company:
Feed water quality: CODcr 3000mg/l, BOD5 700mg/l, SS 600mg/l;
Drainage water requirement : CODcr 2000mg/l, BOD5 1400mg/l, SS400mg/l.
Polluted water from meal processing company: coming from defrozen step, expected drainage
water quality meet CODcr 1200mg/l, BOD5 500mg/l, SS300mg/l, meet internal drainage
standard of industrial park.
Polluted water from seafood rough proceesing:

Polluted water grille      condensation pool sediment pool
polluted water
    Pipeline to treatment center   chemical drug  mud

Feed water quality : CODcr 2133mg/l, BOD5 1000mg/l, SS1400mg/l;
Drainage water requirement: CODcr 2000mg/l, BOD5 1200mg/l, SS400mg/l.

2. Rain and polluted water shall be drained separately.Pipeline network to drain rain and polluted
water shall
be paved to avoid polluted water mixed with rain to drain direct to the outside. Through pipeline,
rain will be
drained direct to rivers nearby this project, while polluted water polluted water treatment center
of this project.
Water after treatment must meed II standard of Polluted water drainage standard GB8978-1996
3. As analysised, total pollution water volume of this project is 2633m3/d,so designed capacity of
treatment center will




                                                 58
be 3000m3/d.Treatment center will collect all polluted water in this project , designed enter water
quality is CODcr 2000
mg/l,BOD5 1200mg/l, SS400mg/l,Cl-2000mg/l,Nh3-N 150mg/l,animal and vegetation oil
100mg/l,Ph6-9.
Accordiing to design principle and enter and exit water quality, consider season and intermission
character of drainage polluted water of each company ,treatment center will adopt solidation and
chemical method . Solidation will adopt air floating system ,while chemical method will use
CAST biological method. Detail processing line as below:
      Alkali                           Air blower

Water     regulate pool   air floating system   oxygen pool Cast pool      drainage

        Air blower wet mud        filter and compress machine    dry mud

Design plan of building , construction of pollution treatment center please refer to chart 11-1
                 Chart 11-1 Main building & construction list
 No.             Name                     Dimension       Unit Quantity           Remarks
  1              Grille                0.6 x 1.0x 0.8m
                                                          set       1
  2          Regulate pool              25x 12x4.0m                        build together
  3             Mud Pool                  12x4x4m                   1
                                                          set
  4             Cast Pool                40x10x5.5m                 2
  5           Oxygen pool                20x5x5.5m                  1      build together
                                                          set
  6        Mud Condensation            6.0x3.0x5.0xm                2

  7     dehydrate & drug add house                                         including lab,
                                       15x6.5x4.2m         set   1         power control room
  8           Air floating pool         10x5x2.5m                1
Through above-mentioned procedure , polluted water can meet II standard of Pollution water
drainage standard ,
CODcr150mg/l,BOD5 30mg/l,SS 150mg/l.Technical and economy index as below:
Treatment Scale: 3000m3/d
Project total investment : RMB2.484million
Operation expense :RMB1.2/ton polluted water
Employee: 4 persons
Reduce efficency of each step please refer to chart 11-2

          Chart 11-2 Polluted Water Elimination rate of each step
         Project
                                                                 SS(mg/l)
Treatment unit              CODcr( mg/l)      BOD5 ( mg/l)
  Flow in water quality        2000                1200            400


                                                 59
    Air         Flow in          2000                 1200            400
 floating         Exit            600                  360            100
   pool      Eliminate rate        70                   70             75
                Flow in           600                  360            100
 Oxygen
                  Exit            420                  288             96
   pool
             Eliminate rate        30                   20              5
                Flow in           420                  288             95
  CAST
                  Exit            120                  29              60
   pool
             Eliminate rate        71                   90             37
   Total eliminate rate            94                 97.6             85
        II standard               150                   30            150

Polluted water treatment center located at west of this porject, please refer to Attached drawing 3.
Eventually polluted water through treatment will be drained to Shipu harbor.
11.1.3 Polluted air treatment
1.All hot and steam will supply by industrial park unitedly. All existing boiler of each company
shall be knocked down.
air from boiler shall pass dust and SS treatment and exhaust from chimney with 4.5meters highth
to the outside.
Wenqiuli cleaning machine is suggested to remove dust, efficency rate must over 95%, while
TSP exhaust dense must less than
200mg/m3, in line with 2nd indsutry II time Exhaust Standard of Polluted Air from boiler
GWPB3-1999.
SS remove method will use alkali , principle is to use NaOH liquid to attract SO2 in tank, to form
Na2SO3 and flow to sediment pool reaction with lime to form CaSO3 sediment and NaOH
liquid which will reused in tank. Below is the processing line :

Pollute air    attraction tank    warm up machine clean air to exhaust out chimney

     Na2SO3     NaOh
Lime   sediment and reuse          CaSO3

Through treatment on dust from boiler, TSP density will less than 200mg/m3, SO2 less than
900mg/ m3. As analyze in chapter 3 of Part 6, dust from boiler will not effect surrounding.
2.To unfavorable smell from meal processing plant, more trees shall be planted to eliminate
influence to edge of plant and surrounding , improve workding condition for employee.
3. Miscellaneous : land scaping beside main road shall protect air pollution from car . Snot
machine shall be oil free , and exhaust through treatment.
11.1.4 Solid pollution Treatment


                                                 60
1.Mosit solid pollution is coming from water treatment .Mud is contained some chemical
compound which may casue second pollution to environment, so it shall pass harmless treatment
first. According to current technology, it is feasible to sent those mud to Fantouao rubbish
treatment center. Before send to rubbish treatment center, it shall be piled up to prevent infiltrate
and lapse, and set up water proof facility to avoid second pollution. At same time mud
transportation shall be well arranged.
2. Due to solid pollution from fish classification can be reused, it shall adopt produce and clean
at same day method to avoid decay and bring unfavorable smell.
3. To build a rubbish transshipment site in this project. As indicated at Chart 4-17, total living
rubbish production of this project will be 240t/a,so it is required to set up a 3tons rubbish
transshipment site, clean up 3 times each day, then transport to rubbish treatment center by
sealed rubblish cleaning van .
11.1.5 Noise treatment
1.Production area and living area shall be placed reasonably. Noise source shall be placed at
center ,
closed by warehouse and other assistance house. Workshop , polluted water treatment facility
shall keep certain distance to resident area in north of this project, to avoid influence. Equipment
with low noise shall be selected , and equipment installation shall consider method as reduce
vibration and noise isolation.
2. 30m width green belt shall be set up between resident area and this project.
3. traffic speed on road of this project shall less than 20KM/h, no horn when passing the road.
4. Car shall from north to south through Garden road and Junming road ,then west Xinggang
road to go through industrial park. Nangang road is for passenger.
11.1.6 Land Scaping
Increase land scaping. Land scaping rate shall over 30%, below is detail methods:
1. 30m width green belt shall be placed at north side of Nangang road , to eliminate environment
pollution to resident area.
2.15m width river green belt shall be placed near river at west of this project.
3. small garden will be placed at current existing plant of Geshi hill.
4. Block greenland will be placed at the enterance of this project.
5. Green belt shall be placed at both sides of road, barrier between left and right shall plant some
low green bush , to eliminate dust and noise influence to surrounding.

11.21 Total volume control
As per requirment of [1996] Ninth-five years Zhejiang province Environment protection Aim
and 2010 future aim from Zhejiang Environment protection bureau and province plan bureau,it
is focus on control 12 pollution exhaust volume : CODcr, petroleum, mercury, dust and
indutrial dust, SO2 etc. As analyzed , pollution in this project shall control exhaust volume are
CODcr, dust and SO2.


                                                  61
It shall base on clean production and pollution treatment exhaust after meet standard to control
total
exhaust volume.
 Polluted water in this project must meet II standard of Polluted water drainage standard (
GB8978-1996), i.e. CODcr 150mg/l, BOD5 30mg/l, SS 150mg/l.
Total drainage volume of polluted water is suggested to control within CODcr 395t/a.
Polluted air in this project must meet 2nd area II time standard of Polluted air from boiler exhaust
standard ( GWPB3-1999) , i.e. SO2 900mg/m3, TSP 200mg/m3, it is suggested that total
polluted air exhaust volume shall within SO2 54t/a, TSp 12t/a.
This project is new established project and alrealy meet drainage standard, so total exhaust
volume need to coordinated with town total exhaust volume by local environment protection
bureau.
11.3 Pollution protection method list




                      Chart 11-3 Pollution Treatment List
    Project    Treatment name              Main facility and illustration
 Management Clean production                   Detail refer to 11.1.1
                                    Rain and polluted water will be separated.
               Pipeline network Polluted water through treatment center then to
Polluted water                                      Shipu harbor

               Treatment center Design scale must at 3000m3/d, drainage water
                                       must at II standard of GB8978-1996
                                     living garbage and mud will be sent to rubbish
Solid Pollution                                     treatment center
                   Elimination           reasonable design and choose low noise
   Noise                                      equipment and isolation noise
Land Scaping                           increase land scaping , rate must over 30%




                                                 62
Part 12 Environment Economy Profit and Loss Analysis
12.1 Social achievement


                               63
Since the reform and opening to outside, marine industry of shipu start from scratch,
develop from small to big , now had formed economy structrue take marine industry as base, give
priority to
marine, industry and commercial ,other economical part existing at same time.
With China take part in WTO, marine industry of Shipu will face competitive challenge , at same
time more
business opportunity available.Therefore, it is necessary to fasten step to develop marine
industry of Shipu and face challenge of WTO with an upgrade feature.
attract straggling seafood company to this industrial park , will not only convenient to
strength management and supervision on each company, but also accelerate further develop of
company, fast and matep toward industrialize and urbanlize of shipu. Implement of this project
will
promote development of shipu marine industry and relief labor pressure to some extent.
Therefore,
construction of this project will be of obvious social achievement.
12.2 Economy achievement
some of shipu company had finished capital primitive accumulation since the reform and opening
to the outside, with comparatively strong capital resource,at same time they are qualified to
expand and reproduction.Some of company had formed certain scales and occupied space in keen
competition market, they are not satisfied with existing market and scale, and start to pursue
larger scale , improve occupation rate of domestic market and international market .
Completence of this project will attract more capital to marine industry and more new company,
offer sound surrounding and opportunity to further development of company with potential and
advantage.. Through industrial park, it will create a space for company to exchange more
information , technology innovation, enlarge production, offer solid base for company to
competitive at domestic market. Therefore, construction of this project is of obvious economy
achievement.
12.3 Social Achievement
Due to history and plan factor, some of plant is small scale , and difficult to expand at original
place , and also the sturcture is not compact which cause lots of production problems such as
unable to make full use of resource, increase operation cost of company, low utilization rate of
material , not easy to control evnironment etc. This project will attract more company to invest,
meet the demand of company 2nd expansion, share with other companies on land, water, power
and pollution treatment at comparativly wide place, guarantee safety production of each
company, make company organization more compact, improve material utilization rate, and
breakdown company operation cost.
12.4 Environment investment




                                                64
Environment investment cover polluted water treatment plant, solid pollution treatment, polluted
air treatment, pipeline network for polluted water. Detail environment investment please refer to
chart 12-1




             Chart 12-1 Environmnet protection
                       Investment list
   No.                    Content                    Investment ( RMB1000)
             Polluted water treatment center of
     1                 industrial park                       2,500
           Polluted water treatment center of each
     2                    company                             5,000
     3       Polluted water drain to sea system                 70
     4           Pipeline for polluted water                  1,100
     5         Rubbish Transshipment center                     30
     6       Dust& SS elimination equipment                    200
     7                 Noise isolation                         300
     8                  land scaping                          2,800
     9                       total                           12,000

12.5 Environment investment and proportion analysis
Proportion Environment investment accout for project total investment and total output value
can be calculated as below formula :
HJ=ET/JTx100%
Remarks: HJ- proportion total environment investment accout for infrastructure investment of
this project
ET- Environment protection facility investment , unit RMB10,000
JT- Infrasturcture investment of this project, unit RMB10,000
HZ=ET/CEx100%
Remarks: HZ: Proportion environment protection investment accout for total output value
      CE: Total output value , RMB 10,000
Environment facility investment ET=RMB 12million; infrastructure investment of project
JT=RMB 322million; total output value RMB 400million, so :
HJ=12/322 X 100%=3.73%
HZ=12/400 X 100%=3.00%
Environment investment accout for total investment is 3.73%


                                                65
Part 13. Summary and suggestion
13.1 Environment Quality Current Situation
     Water environment : according to current inspeciton result of this enviroment evaluation,
      the water qualiy of Shipu harbor near to the drainage point, the index of PH value, CODmn,
DO, tempreature and total chrome are up to par, except for the NH3-N. And the PH max. is
0.506, CODmn is 0.380, DO is 0.164, total chrome is 0.008, NH3-N ID 1.02. The overrun of
NH3-N is general phenomenon of the sea water quality in Shipu harbor meatus, due to living
polluted water direct drain to shipu harbor and industrial polluted water drained beyong
standardand .For the structure of Shipu town is focus on seafood processing industrial, the
chroma of NH3-N are upper. Current inspection result indicated that water quality of Shipu
harbor can’t meet the requirement of 4th kind area ocean water quality GB3097-1997.
     Air environment: according to current inspection result of this enviroment evaluation, that
the one time and day value of SO2, NO2, TSP are up to standard, and the maximum daily value
of SO2 is 0.026, one time value is 0.014, maximum daily value of NO2 is 0.058, one time value
is 0.042, the maximal daily value of TSP is 0.533. So air quality of Shipu is sound, in line with
2nd grade Air quality standard (GB3095-1996).
    Noise environment: according to current inspection resuly, that noise at all inspection site of
nearby meet standard at day and ninght.



13.2 Pollution production of this project
    Pollution production of this project, details please refer to followinig chart 13-1:

                   Chart 13-1 Pollution production list
               Pollution                             Volume
                      Volume                789900m3/a(2633m3/d)
 Polluted             CODcr                      2473t/a(8.24t/a)
  water               BOD5                       981t/a93.27t/d0
                         SS                       994t/a(3.31t/d)
                   total volume          60140000m3/a( 200500 m3/d)
 Polluted
                       SO2                        124t/a(0.41t/d)
   air
                        dust                      233t/a(0.78t/d)
                   Coal residue                  1860t/a(6.20t/d)
  Solid
                  living garbage                  240t/a(0.80t/d)
 pollution
                       mud                      4500t/a(30.00t/d)
  Noise                          refer to chart 4-18



                                                 66
    13.3 Pollution Treatment
    Pollution Treatment of this project , detail please refer to chart 13-2
    Project Treatment Name Main facility and illustrationPolluted water
                       Chart 11-3 Pollution Treatment List
    Project     Treatment name                 Main facility and illustration
 Management Clean production                       Detail refer to 11.1.1
                                       Rain and polluted water will be separated.
                Pipeline network Polluted water through treatment center then to
Polluted water                                         Shipu harbor

                  Treatment center Design scale must at 3000m3/d, drainage water
                                        must at II standard of GB8978-1996
                                    living garbage and mud will be sent to rubbish
Solid Pollution                                    treatment center
                    Elimination         reasonable design and choose low noise
   Noise                                     equipment and isolation noise
Land Scaping                          increase land scaping , rate must over 30%


    13.4 Drainage Volume of Pollution
    Pollution drainage volume
                   Chart 13-3 Pollution production list
              Pollution                             Volume
                     Volume                 789900m3/a(2633m3/d)
 Polluted            CODcr                      118t/a(3.95t/a)
  water              BOD5                        24t/a(0.08t/d)
                        SS                      118t/a(3.95t/d)
 Polluted         total volume           60140000m3/a( 200500 m3/d)
   air                SO2                        54t/a(0.18t/d)


                                               67
                       dust                           12t/a(0.04t/d)
                   Coal residue                     1860t/a(6.20t/d)
  Solid
                  living garbage                     240t/a(0.80t/d)
 pollution
                       mud                         4500t/a(30.00t/d)
  Noise                             refer to chart 4-18

     13.5 Evaluation and summary on Environment Influence
     13.5.1 Water Environment
     Shipu harbor been evaluated at low tide, CODmn of inspection site 50m away from
drainage is 2.822mg/l , account for 56.44% of standard figure , which will met 4 grade ocean
water quality standard ( GB3097-1997) if polluted water of this project drained within
standard.On the contract, CODmn of ocean area within 300m away from drainage point will
beyond 4 grade ocean water quality ( GB3095-1997) , which will effect nearby ocean area
seviously.So it is essential to eliminate occurrence possibility of accident drainage .
     Water feed point of nearby seafood farming base is rivers near this project, while polluted
water of this project drain into shipu harbor instead of nearby rivers,so it will not effect water
quality of farming base.
     13.5.2 Air Environment
     Under normal condition, village will be sevious effect by polluted air from boiler is xiatang
village ,at west of this project.Supposed under D grade stability effected by E direction wind,
SO2 floor dense is 0.06727mg/m3, tsp 0.01495 mg/m3, plus original figure of air, SO2 floor
dense will be 0.07427 mg/m3, TSP 0.1795mg/m3, in line with II grade of Air Quality Standard (
GB3095-1996), it is obviously that polluted air from boiler will not influence surrounding
village, A resident area and Shipu town.
      unfavorable smell of meal processing plant have no influence to area 120m away from
plant. Shipu fatfree meal processing plant is 200m away from closed Dongbian village , 150m
away from A resident area, so meal processing plant will few influence to surrounding.Given the
situation that A resident area is only 50m away from Nangang road , it is suggested that meal
processing company shall not allow to establish at 70m away fron Nangang road in future plan to
ensure 120m distance. Unfavorable smell have few influence to surrounding .
     13.5.3 Noise Environment
     As analysis and predicted, Noise will not effect A resident area and nearby village.
     13.5.4 Solid Pollution
             After completion of this project , solid pollution wil including coal residue, living pollution and
             mud from water treatment center. When all pollution treatment put in place, solid pollution will
             not effect nearby sorrounding.
    13.6 Summary
    Construction of this project will accelerate development of seafood processing industry, with
obvious economical and social achievement . During whole implement of this project, it must be


                                                     68
strictly carry on “3 same time “policy and protection treatment this evaluation report proposed,
make efforts to reduce pollution volume. In view of environment protection , ths project is
feasible at choosed place.




                                                69
           Project Plant for Shipu Polluted Water Center Treatment



Location: No.3 block land of first stage shipu Industrial park
Occupy area : 15 Mu land ( convert to 9900 square meters)
Investment : RMB10 milllion , convert to USD1.205million
Daily treat capacity : 5000 cubic meter polluted water
Project Agenda:
Prestage work such as Design , environment evaluation shall be all completed.
Dec 2003, Tender invitation complete
Jan – June 2004, civil work complete
June –Sept. 2004, equipment installation and debug
Nov 2004, trial operation shall performed. It is accepted only if performance reach design
requirement. Treatment center will put in place and begin to operate.
Treatment method: Biological and chemical treatment system, meet standard before exhausted.




                                             70
                  Fangchenggang, Guangxi Autonomous Region




Coastal Fishery Resources and Environmental Monitoring Management Center

Jiaye Aquaculture Synthetically Exploiture Ltd. [Marine fish hatchery]
    i. Annex 1. Monitoring Report of Environmental Monitoring Station of
       Fangchenggang for Fish Hatchery

Yuanyi Integrated Agricultural Co., Ltd. [Marine fish cage culture]

Yuanyi Integrated Agricultural Co., Ltd. [Seafood freezing]




                                            71
                                       No         D200320




   REGISTRATION FORM FOR ENVIRONMENTAL IMPACT OF THE

                             PROPOSED PROJECT
                             ( Tentative )




Project Title: Coastal Fishery Resources and Environmental Monitoring Management
             Center, Fangchenggang Municipality, Guangxi

Implementing Agency: Fishery and Animal Husbandry Bureau, Fangchenggang Municipal
                 Government




                       Date of Preparation: November 28, 2003


                                             72
                            Formulated by: National Environmental Protection Agency




  Project title    Coastal Fishery Resources and Environmental Monitoring Management
                                 Center,
                         Fangchenggang Municipality, Guangxi
 Implementing      Fishery and Animal Husbandry Bureau, Fangchenggang Municipal
   Agency          Government, Guangxi
 Legal Person      Qin Huiyi                          Liaison Officer                Zhong Mingyuan
    Address        Fangchenggang Municipality, Guangxi Zhuang Autonomous Region
   Telephone       0770-2822353              Fax             0770-2831882         Postalcode 538001
  Construction     Central Administrative District, Fangchenggang Municipality
      Site
                   Newly Built■Rebuilding or Enlarging          Industry Type
  Construction
                    Built    Technical Rebuilding                 and Code
      Type
    Coverage       6000                                       Floor Space            4000
            2                                                       2
  Space m                                                       m
      Total        16.33          Of which investment for     36                       Investment     2.2%
   Investment                     environmental protection                              proportion
 (million yuan RMB)               (million yuan RMB)
    Anticipated      December 2005                      Estimated Annual 250
       Date of                                         Operational Days
    Operation
I. Project components and size:
   to build an office building for the proposed coastal zone management with a building space of
                 4,800 m2
plus an auxiliary building space of 410 m2
II. Building materials and major facilities (including boilers and power generators, etc.): to be
specified
III. Water and power consumption
Item                 Consumption                Item                            Consumption
Water (ton/yr.)      20,000                     Fuel (ton/yr.)                  --
Electricity (Kw/yr.) 150,000                    Gas (m3/yr.)                    --
Coal (ton/yr.)       --                         Others                          --




                                                                   73
IV. Waste water, discharge rate and discharging arrangement:
   Domestic sewage of 18,000 tons per annum will be discharged in to the municipal sewage-
                 discharging
network..
V. Brief description of the surroundings:
   The Center is to be built at the central administrative district of the municipality, witch is about
                 16 Km.s
away from the harbor and 12 Km.s apart from the neighboring Fangcheng District. Geological
feature at this area is represented by multi-deck denuded bedrocks formed by sandstones,
arenaceous rocks and mudstones. The surrounding hills have good man-made vegetations
dominated by masson pines, pines, eucalyptus and dwarf shrubs, with average vegetative
diversity. The nearby sea has a good variety of planktons. The coastal environment is of average.
No concentrated urban dwellers or factories exist nearby.
VI. Brief description of the technological flow to be employed (must specify waste water, waste
                 gas and waste
residue to be discharged and/or noises if available):
   The project is a public utility project mainly for monitoring and management of the coastal
fishery resources and environment. Domestic sewage is to be discharged into the municipal
network and no other wastes are available.




                                                         74
VII. Pollution control measures to be undertaken (including both the construction period and
                 operational
stage):
    Major risks to affect the environmental surroundings are from the dusts, noises and refuses
                 during
 construction period, including slight soil and water erosion and dusting due to civil
 construction, and noises from building, transportation and assembling operations during
 construction period. A certain amount of sewage water is also generated during the operational
 stage.
    Building refuses from civil construction will be transported and placed to the designated site
                 to avoid
affection to the surroundings. The nude ground appeared due to civil construction will be
                 watered in time to
avoid dusting and paved or turfed subsequently. Replanting is planned to cover 2,000 m2,
                 accounting for one
third of the total area occupied by the project.
   Affection during construction period on the surrounding atmosphere and sound environment
                 will
disappear when the civil construction is completed.
   Sewage water discharged at the operational stage will be led to the sewage treatment plants


                                                     75
               before finally
discharging into the municipal network..




VIII. Comments by the supervision agency:
      1. Agree to build the project;
      2. Construction execution unit must submit a report to the undersigned and record in its
         file the noise displacement during civil construction 15 days prior to the
         commencement of the construction;
      3. Sewage water discharged during the operational period must be treated before it enters
         into the municipal network.




Processing officer (signature): Jin Yan          Fangchenggang Municipal Environment
                              Protection Bureau (seal)
                              November 28, 2003




                         Registry Form of Construction Project
                       Environmental Influence to Environment




                                                   76
Project Name The Marine Fish Hatchery Of Fangchenggang Guangxi



Construction Unit: Jiaye Aquaculture Synthetically Exploiture Ltd.




                         Compiling Date: Aug. 11,2003
      Supervised by State General Environment Protection Bureau



                                   Responsibility List

  Evaluation unit: Fangchengguang Environmental Scientific Graduate School

 Post No.:National Environmental Estimating Certificate Second No.2916

 Person in charge of Evaluation unit: Lanyan

 Person in charge of the project: Jiangchaowei (environment evaluation post No.13844)


                                            77
                           With regard to the assessor
         Name           specialty the title  Post No.                                signature
                                          of a
                                       technical
                                                                             Duty
                                          post
                                                     Environment
                      Environmental
     Lan Yan                        engineer        evaluation post     Auditing
                       Supervising
                                                    No.C29160004
                      Environmental   High           Environment
     Huang Xianqun    Supervising   engineer        evaluation post     Auditing
                                                    No.C29160005
                      Environmental assistant        Environment         Report
     Li Li            Supervising   engineer        evaluation post     compiling
                                                    No.C29160015
                                                     Environment
                      Environmental assistant                            Report
     Jiang Chaowei    Supervising   engineer
                                                    evaluation post
                                                                        compiling
                                                    No.C29160016




      General Introduction to the Project
   Project
                  The Marine Fish Hatchery Of Fangchenggang Guangxi
 description
Construction
                  Jiaye Aquaculture Integrative Exploiture Ltd.
    unit
  Project legal
                      Qin Yaliu       Linkman                         Qin Yaliu
 representative
    Address       Postal Road No.20 Fangchenggang Guangxi
   Telephone       0770-2827927      Fax.       0770-2827927          Post          538001
Construction site Yushitan Seaboard of Fangchenggang Qisha town


                                               78
Project- stablishing
                          Agricultural. Department Warrant file No. No.(2001)16
  Dept.
                                                       Line sort and
  Construction kind                 New                                        Marine culture 0411
                                                           code
   Occupied area                                       Afforestation
                                    167000                                            3000
        (m2)                                            area M2
     Total invest                Among which:
 (10000Yuan RMB)                 environmental                               The rate of
                          1623.8 protection invest           66.0          environmental        4.1%
                                 (10000YUANRM                             protection invest
                                         B)
Evaluation expense                Estimated Date
                                                            Jan.2005
 (10000Yuan RMB                    of Production

Project Content And Dimensions:
  The project will be plan to build in Yushitan seacoast of Qisha town Gangkou district
Fangchenggang. It’s total invest have 1504.5ten thousand yuan RMB and occupied area have 300
Mu. The task of the project is mostly hatching economic oceanic fish of autochthonic offing
artificially, and provide fries to breed aquatics. The project will be plan to producing 850 ten thousand
oceanic fish fries, include 80 ten thousand Epinephelies fries and 770 ten thousand sea-bream fries.
     Project Content:
    A/ Civil Engineering
         1   Breeding pond for ripe fish and fries: 15ha.
         2   Hatching plant: 2400m2.
         3 Plant for cultivating bait: 800 m2.
         4 Office and laboratory: 200 m2.
         5 Assistant building: total 380 m2, include dorm and warehouse and repairing plant ect.
    B/ Accessorial Engineering
     1 3000m of road out the hatchery, 1000m of road in the hatchery, 2000m2 of virescence.
     2 Power supply , include 4000m of power supply circuitry and transformer.
     3 Water supply.




                                                      79
    4 Fixing a boiler of 0.5t/h for heat supply.
                  5 Engineering for protecting environment include 600m3 of sewage disposal pond.
     C/ Equipments
     The equipments include water supply of hatching pond , and oxygen supply for cultivating
             pond and hatching pond, and generate electricity, and official equipments, and laboratory
             equipments, and vehicle, and sewage disposal equipments and material.
                D/ Work days and employee
             There are 300 work days of six period . There are thirty two employees.




               Existing Pollution and Main Environmental Problems.
   A/ Existing pollution
   The project will be plan to build in Yushitan seacoast of Qisha town Gangkou district
Fangchenggang. The area is sandlot–salina, and planting paddy and peanut and red-potato and
more. There are few ponds of cultivating prawn near the area, and not cultivating at inshore beach.
There is not other industrial pollution sources. There are few fishers anchoring in shore, and let few
oiliness sewage and domestic sewage from fishers, but pollution is very less. The water quality
index are itemized in the annex one.
             B/ Main environmental problems.
   1 The pollution from cultivating marine product.
   2 The fishers let few oiliness sewage and domestic sewage to influencing water quality near
maritime space.




                                                     80
Brief Introduction to Natural and Social Environment
 Natural Environment (topography, landform, geology, climate, weather, hydrology,
 vegetation and biological variability etc.)
    The project will be plan to build in Yushitan seacoast of Qisha town Gangkou
district the distance from the area and Qisha are 9km , and the distance from Qisha and
Fangchenggang are 31km Qisha town locate in the south Qiguang peninsula, and faces sea
with three orientation. The physiognomy of land is seashore hill area, and hypsography tend
towards from northeast to southwest. Geologic conformation in the area is the fourth
alternating aggradation layer of sea and land, and the cladding is singleness, there are gravel
and mix gravel and shell mostly, and local interlayer is sludge soil. The soil state is a bit
dense, and containing water is saturation.

   The district locate in the south tropic of cancer, and have subtropical climate characteristic,
and the weather is tepid and more rain, longer summer and short winter. There are 1763.3
hours of sunlight whole year, and not frost. Perennial average air temperature is 22.3        ,the
highest air temperature past years is 35 ,and lowest air temperature past years is 0.9 .The air
pressure be affected mostly by height altitude and atmosphere circumfluence, and average air
pressure past years is 1008.0hPa, average air pressure of every month have discrepancy not
too. The district is close to sea, and relative humidity is bigger, annual average relative
humidity is 81%.The district locate in the south Asia landmass and monsoon weather area, and
is affected by monsoon circumfluence of south Pacific Ocean, tropic cyclone move frequently,
the wind orientation is seasonal changed obviously. The wind orientation is mostly the north
wind in September every year and March next year, and is mostly southwest and southeaster
wind from April to August every year, and the tropic cyclone move frequently, average wind


                                                  81
speed past years is 3.1m/s.The wind power of the tropic storm is mostly 7 9 grade, and the
most wind power is upwards 12grade.The tide of the sea area belong to normal all-day tide,
The tide flows into North Gulf by the gulf doorway after the Pacific tide flowing into South
China Sea mostly, and the tidal range is more, the most tidal range is 5.56m,average tidal
range is 2.39 m, average high tide-curve past years is 3.07 m, average flood tide takes a period
of eleven hours, average tidal fall takes a period of eight hours.
   There are perennial windbreak of conifers and pinasters and eucalyptus and more. in the
area of the project, and the vegetation have mostly fern and ruderal and shrubbery and more.
There are more kinds of plankton in the sea area, and there are more five hundred kinds of fish
and tow hundred kinds of shrimp and fifty kinds of cephalopod and twenty kinds of crab in the
alongshore water area. There are mostly economical halobios of weever and Epinephelies and
prawn and clam and oyster and more.




                                                  82
Brief Introduction to the social environment (including social economic construction,
education, culture and culture relic protection etc.)
    Qisha town is the biggest coastal town. Qisha fishery harbor that the town government be

stationed is second bigger fishery harbor of Guangxi and is a national first-class border port

for trading. There are eight administrative villages and three fishery villages and one

inhabitant committee, the total land area is 77.2km2 among which, 3.2km2 is the city zone.

The population is around 2.9 ten thousand in 2002. There are one high school and thirteen

grade schools and one hospital. There are 3900 students in the school, among which, there are

2585 students in the grade school and 1315 students in the high school.

     Qisha fishery harbor is old-line of more two hundred years , there are seven berth of

2000ton in the harbor ,it is the biggest of fishery production base and fishery goods

distributing center, marine product output is more 17 ten thousand ton. The economic structure

of the town is mostly ocean fishing, and seafood processing and trading and seawater breed

aquatics salt industry and agriculture have be possessed of bigger proportion in the economic

structure of the town. GDP of the town is 2.7 hundred million yuan RMB in 2002.




                                                 83
Current Environmental Quality
Current Environmental Quality and main environmental problems (air, ground water,
underground water, noise and ecological environment)
    A. Current Air Quality
    According to the investigating information for the project area,the
Air quality is all right, and up to Criterion II of GB3095-1996 Air and Environment Quality.
   B. Current Seawater Quality of alongshore maritime space
     According to the information monitoring the nearby sea area of the project area by the
city Environment Supervision and testing Station, main indexes is conformed to the standards
of the Second Criterion of The Quality of Seawater( GB3097-1997).
    C. Current quality of noise environment
   According to the investigating information for the project area, the area
is quiet, and current quality of noise environment is all right, all indexes is conformed to the
Criterion of The Criterion of Urban Environment Noise GB3096—93 .
    D Current quality of the biological environment
   The natural vegetation of the project area is good enough, the vegetable includes
windbreak of conifers and pinasters and eucalyptus and more, the resource of halobios is
abundant.
The main environment protection targets ( list the targets and its protection grades)
   In this area, there are not important cultural relics. The main environment protection
targets nearby sea and the fish hatchery are listed as follows.
   1 The environment of shelter belt and sea beach near the project area.
   2 The seawater environment of sea area near bank.
   Environment protection level
   Air quality is conformed to criterion II of The Air Environment Quality Criterion
(GB3095-1996), seawater quality of sea area near bank is conformed to the criterion II of The
Seawater Quality Criterion (GB3097-1997),groundwater quality is conformed to the criterion
  of The Groundwater Quality Criterion (GB/T14848—93), quality of noise environment is
conformed to the criterion   of The Criterion of Urban Environment Noise GB3096—93 .



                                                  84
                                                    Applicable Evaluation Standard
                                 1 Air Environment Quality Criterion GB3095—1996 criterion II,
Environment quality



                                 2 The Seawater Quality Criterion GB3097—1997 criterion II,
                                 3 The Fishery Water Quality Criterion GB11607—89 ,
                      standard




                                 4 The Groundwater Quality Criterion GB/T14848—93 criterion ,
                                 5 The Criterion of Urban Environment Noise GB3096—93 criterion 1.




                                                                  85
                                     1.Atmosphere Pollutant Synthetical Drainage Criterion (GB16297—1996) criterion
drainage standard
                                   II,
     Pollutant


                                     2.Wastewater Synthetical Drainage Criterion GB8978—1996 criterion 1,
                                     3.Atmosphere Pollutant of Boiler Drainage Criterion GWPB3—1999 criterion II
                                   period of time in second kind area,
                                     4.Noise Limit in The Building Site GB12523—90
                                    5.Noise Criterion of Industrial Corporation Area GB12348—90 criterion .
                                                       Total controlling index of pollutant in 2002
                                                                                        Letting
                                                                       Actual letting  amount of    Residual
                                                       Plan amount
                                    Pollutant name                       amount           the       amount
                                                           ton
    Total polluter control index




                                                                            ton       project ton     ton

                                    COD                    1400            86.23           146.49          1167.28
                                    NH3-N                   20             19.56            31.03           -30.59
                                    So2                     650           680.39            0.14            -30.53
                                    Smoke                   550            85.42            0.54            464.04
                                    Solid waste             770             390             17.3             362.7
                                       The main polluter letting amount will be forecasted COD 146.49 t/a smoke 0.54
                                   t/a SO2 0.14 t/a solid waste17.3 t/a According to the total amount controlling plan
                                   of polluter letting of Gangkou section in 2003.After the project put into production, the
                                   main polluter including COD and smoke and solid waste and more. will be in the
                                   bounds of the total amount controlling. The environment quality of the project area is
                                   all right, and have more environment capability.




                                                                             86
Engineering Analysis of The Constructing Project
The brief of technical process
                                 Cultivate adult fish in pond



                                  Spawning in indoor pond

                                       Natural or using hormone
                                 Fecundation and hatching

                                   Cultivating young fish
                                           Feeding with rotifer ect.

                                 Young fish of 10mm length



                                 Middle cultivating in pond
                                           Freeding with meaty crumb of
                                           smallfish and seashell and shellfish
                             Young fish of 30-40mm length




                                               87
Main pollutant procedure & discharge
      A. Constructing period
   1 Destroing vegetation in constructing period ,and part water and soil erosion by
 excavating earthwork, a few living waste water during constructing.
   2 A few construction garbage and a few living garbage will be brought during
constructing.
   3 Dust engendered by constructing and transporting vehicle will bring on part
atmosphere pollution.
   4 Noise engendered by constructing machine of grab and beater and transporting vehicle
will affect ambient environment.
   B. Producing period
   1.Production waste water. It is mainly generated in the process of hatching, and
there are more organic compound and NH3-N and more. in it.
   2.Soild waste of remnants feed and fish dejecta and sludge and more during hatching.
   3.Noise generated from equipment of water pump and increasing oxygen machine.
     4.Exhaust gas and waste residue be generated by burning coal boiler.
     5.Living garbage and domestic sewage be generated by employee living.




Main pollutant procedure & discharge
                Discharging                         Thickness and          Thickness and
    content                    Contamination
                  fountain                           producing              discharging
types                              name
                    No.                            amount Unit            amount Unit
                    Constructing     Smoke              ——                     ——
    contamination
     Atmosphere




                                   Smoking        68 ten thousand      68 ten thousand
                                    amount             m3/a              m3/a
                    Burning coal
                                      SO2         800mg/m3 0.54t/       800mg/m3 0.54t/a
                       boiler
                                                           a
                                      Soot        1000mg/m3 0.68        200mg/m3 0.14t/a
                                                  t/a
    Water                          Discharging          1920t/a               1920t/a
 contaminatio                        amount
      n               Living          COD         200mg/L 0.38t/a        100mg/L 0.19t/a
                      sewage
                                     NH3-N         30mg/L 0.06t/a         15mg/L 0.03t/a
                                       SS         200mg/L 0.38t/a        70mg/L 0.13t/a
                    Waste water    discharging        209 m3/a              209 m3/a
                    of hatchery      amount


                                             88
                                      COD            70 mg/L 146.30        70 mg/L 146.30t/a
                                                            t/a
                                Suspending thing           150             70 mg/L 146.30 t/a
                                     NH3-N              /L 313 5t/
                                                     15 mg/L 31 t/a          15 mg/L 31 t/a
                                   Phosphate         0.5mg/L 1.0 t/a        0.5 mg/L 1.0 t/a
                                Construction and
                 Constructing                              ——                     ——
                                 living rubbish
                                   remnants feed
                 Hatching and
 Solid rubbish                    and fish dejecta          5t/a                   ——
                  cultivating
                                     and sludge
                    Boiler             Cinder             21.91 t/a                ——
                    Living        Living garbage           17.3t/a                17.3t/a
                1.In the constructing period, noise engendered by constructing machine of grab
                 and beater will be restricted within max.87dB(A) and be attenuated to 55
     Noise       dB(A)in 200m and 47 dB(A) in 500m.
                2.Max.noise of fan and pumb and increasing oxygen machine is 80dB(A) in
                10m and be attenuated to 54dB(A)in 200m and 46dB(A) in 500m.
Main Ecology influence:
 1. Constructing hatching plant and pond will destroying natural environment and original
vegetable and tree and engender water and soil erosion.
 2. Dust be produced during constructing will affect nearby sea area environment transitorily by
rain water forming runoff .
 3. Wastewater of hatching and breeding with using feed and disinfectant will affect nearby sea
area environment.




Analysis of Environmental Effects




                                              89
Brief analysis of environmental effects during construction
  1. During constructing and transporting, more dust and noise will be produced. But the dust
and the noise will stop along with the construction ending.
  2. During constructing ponds and plant and house and road and more will destroy
vegetation and engender water and soil erosion. Thus, we should scleroses and make
afforestation.
  3. During constructing ,must intensify management for waste water and
domestic sewage , set up collect system of sewage, to avoid constructing in rain day and
reduce the waste water and domestic sewage during constructing.
   4. Castoff be produced during constructing will be carried to appointed place
and collected to dispose, and affect environment not too.

Analysis of environmental effects during operation
    1. Exhaust gas and waste residue. Because the coal amount of the boiler using is 85t,and
uses the anthracite with containing sulfur under 1%.After eliminating dust, the exhaust gas of
boiler will be discharged by way of chimney (20m high).Amount of cinder is 21.91t/a and
the cinder will be used to pave road and making brick for constructing, and affect
environment not too.
    2. After the project put into production, waste water containing organic compound and
NH3-N ect . will be produced during raising seedling raise, the waste water will be imported
to the sewage disposal pond by way of raceway, and be discharged in the ebb tide period after
deposition and degradation and disinfection. Because the tide of Fangchenggang
circumlittoral belong to normal diurnal tide, tide range is bigger and exchanging ability is
strong, the sewerage of the project will be discharged by stages, and affect environment not
too. Domestic sewage of employee be produced about 1920t and be discharged after
disposing in the cesspool, affect environment not too.
    3. Using medicament cautiously during raising seedling, If needing to use medicament
,must strictly prohibit to use the medicament be prohibited by nation, insure the sea area and
environment against pollution.
    4. Remnants feed and fish dejecta and sludge and more. should be made muck for crop by
leaching and sunning.
    5.Fixed number of persons of the project is 32 person amount of living garbage is about
 annually. Garbage will be collected to stack, and will be sent to the refuse dump or choosing
 condign place to bury.
      6.Noise be produced during blower and water pump and increasing oxygen machine
running, above machine must select lower noise equipment or fixing muffler to reduce noise.
The base of the equipment take damping measure to reduce noise, and noise will not affect
existence environment around denizen after the noise reduce naturally.




                                                90
Measures on Environment Protection and Expected results
 Description     Drainage      Pollution                 Measures                   Expected effect
Types
                   (No.)
Atmospher                                                    Indurating and         Controlling
               Constructing            TSP
    e                                                      afforestation duly       effectively
 pollutant                             SO2                Eliminating dust and        Up to criterion
                  Boiler
                                      Smoke                 decontaminating             and letting
                                       COD
                 Domestic                                Importing to the sewage
  Water                               NH3-N
                  sewage                                 disposal pond, and
                                        SS                                          Up to criterion and
 pollutant                                               letting after depositing
               Waste water         Seston,NH3-                                            letting
                                                         and degradation and
               of hatching        N,ect.eutrophy         disinfecting
                  plant               matter
                                    Garbage of   Carrying to the refuse
                                                                            Controlling
               Constructing      constructing and dump and collecting
                                                                            effectively
                                      living           to dispose
                                remnants feed and  Making farmyard
               Hatching and                                               Comprehensive
                                 fish dejecta and     manure after
  Solid         breeding                                                     utilization
                                      sludge           disposing
 pollutant
                                                   Using to pave road     Comprehensive
                  Boiler           Cinder
                                                    and make brick           utilization
                                                 Carrying to the refuse
                  Living                                                    Controlling
                               Living garbage     dump and collecting
                 garbage                                                    availability
                                                       to dispose
               Noise be produced during blower and water pump and increasing oxygen
               machine running, above machine must select lower noise equipment or fixing
  Noise        muffler to reduce noise. The base of the equipment take damping measure to
               reduce noise, and noise will not affect existence environment of residential area
               all around after the noise reduce naturally.

  Others         ——




                                                    91
Ecology protection measures and expected effects:
 1. During construct the hatchery, must shunning to hag quondam trees, and protect quondam
shelter forest and other vegetation.
 2.Controlling to use disinfectant and other medicament, waste water be produced during
hatching and breeding will be let after disinfecting in sewage disposal ,prevent to produce
seawater pollution and affect seawater environment.
 3. Planting flowers and grasses in the living area, and afforestation properly around the
hatchery.
 4. Take effective method to protect affect environment of Yushi beach during constructing
and producing.


 Conclusion and Suggestion




                                               92
Examine and Approve Idea
  1. The content of the report accord with technical criterion ,and evaluation criterion is
reasonable, evaluation conclusion is believable. The measure of pollution prevention and
cure were brought forward in the report , it is used a gist of environmental design and
environmental intendance of the project construction.
  2.The project unit must carry out every measure of pollution prevention and cure
be brought forward in the report, and insure contamination letting out to accord with
national ordaining letting out standard.
  3.Gangkou District Environment Protection Bureau must strengthen supervising and
management for environment protection of the project construction. The project
environment protection engineering will be went into using formally after checking and
accepting and to measure up by Fangchenggang Environment Protection Bureau.
  4. Agree the project to construct.




                                                      Fangchenggang Environment
                             Protection Bureau
                                                      (Cachet)
                          Transactor Qin Yan
                                                                      Aug.13,2003




                                               93
94
95
                                                                      Approval and Registry Form of Environment Protection on Construction Project
 Registry Form unit Fangchengguang Environmental Scientific Graduate School Registry Form person Li Li Approval undertaker
            Projectdescription The Marine Fish Hatchery Of Fangchenggang Guangxi        Construction site  Yushitan seacoast of Fangchenggang Qisha town
                               Hatchery plant of 3200 m2, pond of 15 ha., produce fries
            constructionscale                                                           Construction style ■New Rebuild &continuation          Techno-build
                               of 850 ten thousand.
                                                                                                                                         EnvironmentProtectionsupervised
                                           Industrysort    Seawater aquiculture 0411                                                                                                      Compiling book ■Compiling form                    Register form
                                                                                                                                                     style
                                                                                                                                                                                                                                 Environmental
                                         Totalinvestment                                                                                environmental protection
                                                           1623..8                                                                                                                                     66.0                      protectioninvest                   4.1
                                          (10000YUAN)                                                                                       invest(10000YUAN)
                                                                                                                                                                                                                                 rate %
                                             Project-                                                                                                                                                                            Project




        Construction Project
                                           establishing    Agricultural. Department                                                           Approved file No.                                    No.16[2003]                   established                 Jun.26,2003
                                              Dept.                                                                                                                                                                              time
                                         ReportWarrant
                                                           Fangchenggang City Environment Protection Bureau                                   Approved file No.                                                                  Approved time
                                             Dept.
                                                           Jiaye Aquaculture Integrative                                    0770-                                                           FangchengguangEnvironmental
                                        Name                                                        Tel                                                        Name                                                              Tel                          0770-2825351
                                                                  Exploiture Ltd.                                          2827927                                                             ScientificGraduateSchool




                                                                                                                                              unit
                                        Address            No.20 PostalRoad                         Post                   538001                              Address                  No.3xingangRoad                          Post                              538001




                                                                                                                                            Evaluation
                                        Legal                                                       Personin                                                                                                                     Evaluation




                  unit
                                                           Qinyaliu                                                        Qinyaliu                                 CertificateNo.




  Construction-
                                        representative                                              charge                                                                                                                       expense
                                        Environmen
                                                                        Atmosphere Class            GB3095-1996       Surface water        Groundwater          Noise: Type           GB3093-1993   Sea water Type II GB9097-1997             Soil        Others
                                        tquality class
                                        Environmen         □ Drinkingwatersourceprotectiondistrict □ Naturalprotectiondistrict □ Famous scenerydistrict    □ Plantationandpark




   condition
   condition
 environment
                                                           □ Essentialcroplandprotection district □ Ecologyprotection district □ Waterandsoilleaveawayprotection area □Ecologysensitiveandfragilearea




Project site
                                        tsensitivity
                                        character          □ Population densearea                                            √
                                                                                         □ Keyculturalrelic protectionarea □ Lake □Reservoir
                                                            Built +underbuilt                                                           Thisproject                                                               Totalproject
                                                                                                                                                                                        drainage     reducing                    drainage    drainage       decreaseamount in
                                                                        drainage   general      drainage       drainage      drainage
                                                           drainage                                                                                      reducing         drainage      capacity     capacityof     drainage     capacity    in-creasi-
                                        Contamination      density      density    drainage     capacity       density       density    drainage                                                                                                            districtbalance
                                                                                                                                                         capacity         capacity      allowed      old and        capacity     allowed     ng
                                                                        allowed    capacity     allowed        predicted     allowed     capacity                                                                                                           replacement
                                                           Infact                                                                                                         predicted                  new             predicted               capacity
                                                                                   Infact
                                                                                                                                                                                                     section
                                        waste water                                                                                       209                                209




                  and control
                                        Oxyenamount




           pollutant let out standard
                                        required*                                                                 100          100       146.49                            146.49
          Ammonia and
                                                               15       15     31.06              31.06
          nitrogen*
          Suspendsubstance
          Waster gas                                                            68                 68

          Sulfur dioxide                                      800      800      0.54               0.54
          Smoke and
                                                              200      200      0.68     0.54      0.14
          dust
          Industrial
          powder dust
          Nitrogen and
          oxide

          Industrialsolid
          trash




                                           thisproject
           otherpollutant inrelationwith
Unit y waste gas capacity x104 marked meter3/year wastewater ton/year mercury cadmium lead, arsenic chromium chloride kg/year other units are all tons waste gas
density milligram/liter Waste gas density milligram/lm
Notes This list is written by the evaluation unit and attached on the last page of the report. The last blank is the characteristic pollutant.
Among this 5 = 2 - 3 - 4                      6 = 2 - 3 + 1 - 4




Registry Form of Basic Date of Environmental Management Examine and Approve on The Construction Project
Project name The Marine Fish Hatchery Of Fangchenggang Guangxi
                                                                                97
  Sort Forecast Year 2003 Project kind New constructing Environmental estimate                         FangchengguangEnvironmentalScientificGraduateSchool

  Examine and approve District Industry sort Other Environmental estimate sort Report form
  Administrative precinct Fangchenggang city Acid rain controlling area No
Total invest of environment     Thereinto           Thereinto        Thereinto            Thereinto             Thereinto                     Total invest      Environmental estimate
protection 10000’ yuan         Waste water         Exhaust gas      Noise disposal        Virescence          Other invest of               100000000’yuan      expense 10000’yuan
                                disposal            disposal                                                  environment
                                                                                                                protection
        66.0                       21.0                                                     45.0                      0                             0.16                 0.8
Main contamination            Original letting   Newly increased Amount scissored by Newlyincreased Contamination letting                   Scissoring amount    Adding and reducing
                                 amount           letting amount  newdrivingold      disposingamount                                             disposed          letting amount
Sewerage amount                     0                 209                 0                   0                       0                               0                 209
ten thousand ton/year
COD                                 0               146.49                0                   0                   146.49                              0                146.49
ten thousand ton/year
NH3-N                               0                31.06                0                   0                    31.06                              0                31.06
ten thousand ton/year
Petroleum                           0                  0                  0                   0                       0                               0                   0
 ten thousand ton/year
SO2                                 0                0.54                 0                                         0.54                              0                 0.54
ten thousand ton/year
Smoke                               0                0.68                 0                 0.54                    0.14                            0.54                0.14
ten thousand ton/year
Dust                                0                  0                  0                   0                       0                               0                   0
ten thousand ton/year
Nitric oxide                         0                 0                  0                   0                       0                               0                   0
                                                                                     98
 ten thousand ton/year
Solid castoff            0   0   0        0   0   0   0
ten thousand ton/year

  Assessor: Li Li




                                     99
Annex one




     Monitoring Report of Environmental
     Monitoring Station Fangchenggang
                  Guangxi
             Fang Environment Monitoring water No.073[2003]




Task name Seawater actuality monitoring of the marine fish hatchery

Consignor Jiaye Aquaculture Integrative Exploiture Ltd.

Monitoring sort Entrusting monitor

Report date Aug.10,2003




          Fangchenggang Environmental Monitoring Station


                                                                      100
  Be entrusted with Jiaye Aquaculture Integrative Exploiture Ltd. , Fangchenggang
Environmental Monitoring Station monitor the current coastwise seawater quality of
Qisah town Yushitan seacoast in Aug. 10, 2003.

    A. Monitoring site
   Selected a monitoring site at coastwise water area of Yushitan seacoast and
 sampling a water sample of surface water.

    B. Sample state
  The sample is not any color and smell.

    C. Monitoring item and according to technology
  Monitoring item include water temperature, PH, turbidity, chromaticity , dissolved
oxygen, NH3-N, nitrite-N, nitrate-N chloride Cu plumbum cadmium total
cyanide volatilization hydroxybenzene petroleum activity phosphate total
arsenic Hg Sexivalent chromium(Cr6+) ect..
   Every monitoring item according to criterion and using equipment in table 1.




                                                                                  101
Table 1 Monitoring according to technology and using equipment

     Sampling   1.Oceanic Monitoring Criterion (GB17378-1998)
 according as   2.Surface Water and Sewerage Monitoring Technical Criterion (HJ/T91-20020)
                      Analyzing               Lowest                 Using equipment
  Analyzing
                                             detection     Equipment name     Type        Serial
                    method(source)                                                       number
       item
    water         Thermometer method                        Thermometer        Stick         045
                                               0.1
 temperature         (GB13195-91)
PH               Glass electrode method                    Exact PH meter    PHS-3C          006
                                              0.01PH
                       (GB6920-86
Turbidity           Eye comparative
                  Turbidity Water and        0.1degree          ——             ——            ——
                 waste water monitoring
                analyzing method Third
                        edition
Chromaticity       Platinum and cobalt
                 colorimetry Water and        1degree           ——             ——            ——
                 waste water monitoring
                analyzing method Third
                        edition
NH3-N           Hypo-bromate oxidation                         Grating
                                                  -3
                         method            0.4X10 mg/L    spectrophotomete      722          010
                    GB17378.4-1998                                r
Nitrite-N       Naphthyl second diamine                        Grating
                  spectrophotometry        0.3X10-3mg/L   spectrophotomete      722          010
                  (GB17378.4-1998)                                r
Nitrate-N       Cadmium pole reduction                         Grating
                method(GB17378.4-1998)     0.6X10-3mg/L   spectrophotomete      722          010
                                                                  r
DO              Iodimetry GB7489-87          0.2mg/L            Buret          25ml          126
Pb                   Atom absorption         0.01 mg/L    WFX—1E2Atom         WFX—           093
                spectrophotometry GB74                       absorption        1E2
                         75-87                            spectrophotomete
                                                                  r

                                                                              102
Cu                    Atom absorption          0.001 mg/L    WFX—1E2 Atom        WFX—    093
                 spectrophotometry GB74                         absorption        1E2
                          75-87                              spectrophotomete
                                                                     r
Cr                    Atom absorption          0.001 mg/L    WFX—1E2 Atom        WFX—    093
                 spectrophotometry GB74                         absorption        1E2
                          75-87                              spectrophotomete
                                                                     r
Cr6+                two benzene and two        0.004 mg/L           UV            752C   012
                     hydrazine of acyl of
                                                             spectrophotomete
                           carbon
                 spectrophotometry GB74                              r
                          67-87
Total arsenic     Base sulphurses take the     0.007 mg/L        Grating           722   010
                 place of the amino formic                   spectrophotomete
                   acid silver photometry                            r
                   method GB7485-87
Hg                        cold atom           0.00005 mg/L   Intelligence cold   SYG—I   024
                  fluorescence Water and
                                                             atom fluorescence
                   waste water monitoring
                 analyzing method Fourth                       measure Hg
                          edition                               instrument
Total            Different nicotinic acid—     0.001 mg/L        Grating           722   010
                 barbitone acid photometry
cyanide                                                      spectrophotomete
                 method Water and waste
                      water monitoring                               r
                 analyzing method Fourth
                          edition
volatilization       4—amido antipyrine        0.002 mg/L           UV            752C   012
                    extraction photometry
hydroxybenze                                                 spectrophotomete
                   method GB7490-87
ne                                                                   r
petroleum         Non-dispersion infrared      0.02 mg/L      Daojin oil titer   POC—    028
                 method GB/T16488-89
                                                                  meter            100
Chloride           Silver nitrate titration     10 mg/L           Buret           50ml   125
                  method GB11896-89
Activity          Molybdenum Stibium           0.01 mg/L            UV            752C   012
                    spectrophotometry
phosphate                                                    spectrophotomete
                  method GB11893-89
                                                                     r
                  Weather chromatogram              -6
                                              1.0X10 mg/L
                   method GB17378
DDT               Weather chromatogram        3.8X10-6mg/L
                   method GB17378

                                                                                 103
Malathion            Weather chromatogram      6.4X10-6mg/L
                      method GB17378



    D. Quality controlling
   1 Analyzing personnel must have eligible certificate with the item.
   2 The monitoring equipment are all verified up to grade, and in the verification
 period of validity.
   3 Analyzing personnel take out discretionarily sample upwards of ten percent to
 add mark reclaiming and parallel sample analyzing , quality controlling and passing
 rate all arrive at normative request.




    E. Monitoring Result




Table 2 Detection of seawater collected from the Yushitan coastal area in Qisha
        town,
         Fangchenggang city, Guangxi Province
 Number                Index                            Standard value
    1           water temperature                                  22.5
    2           PH                                                 6.94
    3           DO                                                  7.0
    4           Turbidity                                           2.0
    5                  color, smell, flavor,        No special color and peculiar smell
    6           NH3-N mg/L                                        0.039
    7           Nitrite-N mg/L                                   0 001
    8           Nitrate-N mg/L                                   0 066
    9           Chloride mg/L                                   1 77X104
    10          Activity phosphate mg/L                          0 01L
    11             total coliform number/L                      < 500 /L
    12             feacal coliform number/L                     < 140 /L


                                                                                      104
    13              Mercury(Hg) mg/L                        0.000051L

    14            Cadmium(Cd) mg/L                          0.001L

    15               Lead(Pb) mg/L                          0.01L

    16                  sexavalent                          0.0041L
                 chromium(Cr6+) mg/L

    17         Total chromium (Cr) mg/L

    18              Arsenic(As) mg/L                          0.007L

    19              Copper(Cu) mg/L                           0.001L

    20               Zinc(Zn) mg/L                            *0.047

    21              Silicon(Si) mg/L                          *
    22                Cyanide mg/L                            0.001L
    23            Volatile phenol mg/L                        0.002L
    24               Petroleum mg/L                           0.02
    25         Benzene hexachloride mg/L

    26              Dichloro-diphenyl-
                  trichloroethane mg/L
    27               Malathion, mg/L
    28            Methyl thiophos mg/L

    29                  Rogor mg/L

    30       Polychlorobiphenyl mg/L

Note: L indicated the data is lower than the minimum value with the detected method
   * cited from Guangxi Marine Research Institute
     undetectable



    F. Evaluating Result
   The hatchery ground should be built in the coastal areas without any serious
seawater pollution, and without any industrial and residential area nearby. The surface
seawater was collected from Fangchenggang city environmental monitoring stations,
and the analyzed result are showed in table1. Comparing with the issued standard of
national cultivation using seawater quality (table 2), it is indicated that monitoring
indexes of the analysis seawater quality are lower than the standard seawater quality

                                                                                         105
promulgated by nation. Generally say, the seawater quality in this sea area is up to the
national seawater standard (table 3), and it can be used for seawater fish hatchery.




Table 3 The Seawater Quality Criterion for Aquiculture                   NY5052—

2001
 Number              Index                                     Standard value
    1                  color, smell, flavor             it should no be with special color and
                                                                    peculiar smell
    2               total coliform, number/L            ≤5000, it should be lower than 500 for
                                                            aquatic product for fresh food
    3              feacal coliform number/L            ≤2000, it should be lower than 140 for
                                                            aquatic product for fresh food
    4                  Mercury(Hg) mg/L                                ≤0.0002
    5               Cadmium(Cd) mg/L                                     ≤0.005
    6                  Lead(Pb) mg/L                                     ≤0.05
    7         Sexivalent chromium(Cr6+) mg/L                             ≤0.01
    8            Total chromium (Cr) mg/L                         ≤0.1
    9                 Arsenic(As) mg/L                            ≤0.03
    10                Copper(Cu) mg/L                             ≤0.01
    11                 Zinc(Zn) mg/L                              ≤0.1
    12                Silicon(Si) mg/L                            ≤0.02
    13                  Cyanide mg/L                              ≤0.005
    14               Volatile phenol mg/L                         ≤0.005
    15                 Petroleum mg/L                             ≤0.05
    16           Benzene hexachloride mg/L                        ≤0.001
    17                Dichloro-diphenyl-                          ≤0.00005
                    trichloroethane mg/L
    18                  Malathion, mg/L                           ≤0.0005
    19              Methyl thiophos mg/L                          ≤0.0005



                                                                                       106
20         Rogor mg/L          ≤0.1
21   Polychlorobiphenyl mg/L   ≤0.00002




                                          107
                                          NO   D200217




REGISTRATION FORM FOR ENVIRONMENTAL IMPACT OF

                    THE PROPOSED PROJECT
                         (Tentative )




   Project Title:   Marine Cage Aquiculture,
                       Fangchenggang Municipality, Guangxi
   Implementing Agency: Yuanyi Integrated Agricultural Development Co,
                  Ltd, Fangchenggang Municipality, Guangxi




              Date of Preparation: November 11, 2003
      Formulated by: National Environmental Protection Agency




                                                                    108
   Project title     Deep-water Cage Aquiculture, Fangchenggang Municipality,
                     Guangxi
 Implementing        Yuanyi Integrated Agricultural Development Co Ltd,
     Agency          Fangchenggang Municipality, Guangxi
  Legal Person       Wei Linzhen                             Liaison          Shi Yongjian
                                                             Officer
    Address          Jingang Road Fangchenggang Municipality, Guangxi Zhuang Autonomous Region

   Telephone         0770-2827927             Fax       0770-2827927          Postalcode           538001
Construction Site    Inshore area adjacent to Tiantangpo, Qisha Town, Fangchenggang Municipality
                     Newly Built■Rebuilding or
  Construction                                                  Business Type              Marine
                     Enlarging Built   Technical
      Type           Rebuilding                                   and Code           aquiculture 0411
   Coverage                                                      Floor Space
            2
 Space m                                                               m2
Total Investment     6.969        Of which investment for                             Investment
(million yuan RMB)                environmental protection                             proportion
                                  (million yuan RMB)
Anticipated Date     October 2004                             Estimated Annual       360
   of Operation                                    Operational Days
I. Project components and size:
     to build 20 cages for marine aquiculture, each cage is 40 m. in perimeter and 6 – 8
                m. in
depth. A marine surface area of about 7,000 m2 will be employed.




II. Building materials and major facilities (including boilers and power generators, etc.):
               to be
specified




III. Water and power consumption
Item               Consumption             Item                             Consumption
Water (ton/yr.)                            Fuel (ton/yr.)
Electricity                                Gas (m3/yr.)
(Kw/yr.)
Coal (ton/yr.)                             Others


                                                                                                       109
IV. Waste water, discharge rate and discharging arrangement:




  V. Brief description of the surroundings:
     The project is to be built at the inshore area with the 10 m. deep contour line along
  Tiantangpo, Qisha Town. This area has the subtropical inshore hydrological features,
  with an annual averaged water temperature of 23 ‘c, and regular whole day tide with
  a fluctuation of 2.2 m. A small sized marine aquiculture is existing in this area. Water
  quality conforms with Grade A specifications.

  VI. Brief description of the technological flow to be employed (must specify waste
                 water, waste
  gas and waste residue to be discharged and/or noises if available):
      Figurines to be nursed at water ponds or inshore small cages before caging culture
                 -à
  Fed with low value small fishes plus manufactured feed             à
      Individual body weight of 200 ~250g. à
      Access to cage culture à
      Fed with formulated feed plus low value small fishes à
      Marketing body weight à
      Harvest and marketing



  VII. Pollution control measures to be undertaken (including both the construction
                 period and
  operational stage):
     Major risks to affect the environmental surroundings are from the feeds and drugs.
                 Therefore,
  a strict sampling and test system is to be established to ensure that each batch of the
  purchased feed and drug is good enough and those with problems will be rejected.
    A rational feeding program will also be established to avoid over feeding.

  VIII. Comments by the supervision agency:
   Agree to build the project; Drugs prohibited by the state are strictly prohibited
  during culture.




  Processing officer (signature): Jin Yan          Fangchenggang Municipal
                                            Environment
                                Protection Bureau (seal)
                                August 13, 2003


                                                                                        110
111
         FORMALIZED REPORT ON ENVIRONMENTAL

             IMPACT BY THE PROPOSED PROJECT




Project Title: Aquatic Deep Freezing Processing Factory, Fangchenggang
             Municipality, Guangxi
Implementing Agency: Yuanyi Integrated Agricultural Development Co. Ltd,
                   Fangchenggang Municipality, Guangxi




                 Date of Preparation: August 11, 2003

      Formulated by: National Environment Protection Agency




                                                                           112
                              Responsibility List

Evaluation unit: Fangchengguang Environmental Scientific Graduate School

Post No.:National Environmental Estimating Certificate Second No.2916

Person in charge of Evaluation unit: Lanyan

Person in charge of the project: Jiangchaowei (environment evaluation post
                                          No.13844)


                List of Evaluators
Name      Professional Specialty          No. Of professional    Responsibility
          title                           certificate
Lan Yan   Engineer        Environmental   Huanpinggangzhenzi     Check and
                          impact          B29160004              examine
                          evaluation
Zheng     Engineer        Environmental   Huanpinggangzhenzi     Check and
Lihua                     impact          B29160007              examine
                          evaluation
Jiang     Assistant       Environmental   Huanpinggangzhenzi     Preparation
Chaowei   engineer        impact          B29160016
                          evaluation
Li Li     Assistant       Environmental   Huanpinggangzhenzi     Preparation
          engineer        impact          B29160015
                          evaluation




                                                                               113
       General Introduction to the Project
    Project
               Aquatic deep-freezing processing plant, Fangchenggang Municipality, Guangxi
  description
 Construction Yuanyi Integrated Agricultural Development Co. Ltd, Fangchenggang
     unit     Municipality, Guangxi
   Project legal
                       Wei Linzhen        Linkman                     Shi Yongjian
  representative
                    Jngang Road No.20 Fangchenggang Guangxi, Yuanyi Integrated Agricultural
     Address
                   Development Co. Lted
    Telephone        0770-2827927        Fax.       0770-2827927       Post          538001
Construction site Industrial Park, Yuzhouping, the Harbor District, Fangchenggang Municipality
Project- stablishing
                       Ministry of Agriculture Warrant file No. Nong (weijing) yubianzi (2001) 16
   Dept.
                                                   Line sort and         Aquatic deep freezing
  Construction kind              New
                                                       code                processing 0411
    Occupied area                                  Afforestation
                                  30000                                          4200
          (m2)                                      area M2
      Total invest             Among which:
  (10000Yuan RMB)              environmental                            The rate of
                      5337.8 protection invest         98.6           environmental         1.8%
                               (10000YUANRM                          protection invest
                                       B)
Evaluation expense              Estimated Date
                        1.6                          Dec.2005
 (10000Yuan RMB                  of Production




                                                                                      114
Project Components and Size
 1.Project size:
     The project is planned to make a total investment of RMB. 53.378 million yuan
     to build an aquatic deep freezing processing plant with a designed annual
     capacity of 6,500 tons for deep freezing, 550 tons for frozen drying and 9,000
     tons for ice making. The plant will employ 235 permanent staff and 1,000 part
     time workers during busy seasons.
 2.Major components:
     Pre-treatment workshops: 720 m2;
     Processing workshops: 600 m2;
     Instant freezing workshop: 610 m2;
     Sterilizing workshop for packing materials: 234 m2;
     Packaging workshop: 400 m2;
     Cool storage with capacity of 1,600 tons: 2,000 m2;
     Constant temperature storage with capacity of 200 tons: 240 m2;
     Ice storage: 350 m2;
     Ice making workshop: 105 m2;
     Frozen drying workshop: 600 m2;
     Warehouse: 143 m2;
     Boiler room and power switching room: 70 m2;
     Machine room: 300 m2;
     Sewage treatment facility: aseptic pond of 360 m2;
     Office building with laboratory rooms: 360 m2;
     Clothes changing and sterilizing rooms: 480 m2;
     Staff dormitories: 180 m2;
     Other buildings: 1,408 m2;
     Power supply facilities, road within plant campus and landscaping;
     Other auxiliary facilities;
     Equipment installation.




                                                                                  115
Existing pollution problems and major environmental risks
 The proposed project is to be built within the Yuzhouping Industrial Park of the Harbor
               District. It neighbors with the Fangchenggang Bay at the East side. 2 Km
               apart at the West site the Nanling Chemical Co. Ltd and other two
               factories under construction, i.e. the Hengshun Furniture Factory
and the Zhonggang Fiberglass Processing Factory. North of the Nanling Chemical Co.
               exists
the Yuzhouping Plastic Factory. 2.5 Km apart at the Southwest sits the Fangchenggang
               Municipal High School and the Harbor District Hospital. Within 500 m
               around the proposed site, there lives no permanent urban dwellers.
Major environmental risks include:
    1. The Nanling Chemical Co. Ltd generates acidic wastewater in its production. The
       company has employed the waste water recycling technology with treatment.
       Under normal conditions, no acidic waster water is discharged. However, there
       exist accident risks.
    2. The Hengshen Furniture Factory and Zhonggang Fiberglass Factory may
       generate dusts and noises during construction period.
    3. The plastic factory makes noises and odor during operation.




                                                                                     116
  Brief Introduction to Natural and Social Environment
A.Natural conditions (topography, geomorphology, geology, climate, meteorology,
hydrology, vegetation and bio-diversity)
   1. Geographic location: The proposed project seats within Fangcenggang
      Municipality which is located at the southwest end of the nation’s coastal line at
      108 degrees 20 seconds east longitude and 21 degrees 37 seconds north latitude.
      It faces the North Bay at the south, adjacent with Nannin Prefecture at the north,
      links with Qinzhou Municipality at the east and neighbors with Vietnam at the
      southwest.
   2. Topography, geomorphology and geology: The project site is surrounded by hills
      with landforms leaning from northwest to southeast. The appeared stratum is
      dominated by the Jurassic system formed by sandstones and mudstones. Major
      soils include coastal sediment, clay and sandy clay.
   3. Climate and meteorology: The Harbor District is at the southern foot of the
      Shiwan Mountains facing the North Bay. It sees the typical subtropical monsoon
      climate with abundant rainfall and solar energy. Annual temperature is rather
      high with moderate variation between seasons. Relative humidity is high,
      averaged at 81%. The annual mean temperature is averaged at 22.6’ while the
      annual mean rainfall at 2,314.5 mm. Annual dominant wind comes from NNE
      followed by SSW. The strongest wind comes from E with the maximum velocity
      of 34 m/s. Yearly mean velocity is averaged at 3.1 m/s. The visiting tropical
      storms are always accompanied by strong wind, rainstorm, high tide and strong
      waves, which may cause natural calamities.
   4. marine hydrology: Tide at the Fangchenggang Bay is the regular whole day tide.
      Irregular half-day tide only appears during lesser tidal period. The maximum tidal
      height is 5.54 m and the minimum is –0.29 m with the average of 2.27 m.
   5. Bio-diversity: The project site is surrounded by small hills with good vegetations
      formed by pines, eucalyptus and Chinese silvergrass, etc.. About 2 Km apart at
      northwest sits a small reservoir where carps are cultured. The southern coastal
      area sees a vigorous mangrove plantation of about 500 mu (not in the designated
      mangrove reserve zone). The adjacent marine waters have a good variety of
      plankton and phytoplankton including more than 500 species of fishes, 200 some
      species of shrimps and over 20 species of crabs. In addition, the coastal beach
      also has rich bio-resources including oysters and clans.

B.Socio-environmental conditions
     Fangchenggang covers a total area of 6,181 Km2, of which the city proper occupies
   about 17 Km2. It has a total population of 780,000 people, of whom the urban
   dwellers account for 130,000.In 2002, its GDP was RMB. 7.09 billion yuan, of which
   the primary industry accounts for an added value of 2.088 billion yuan, the secondary
   industry for 2.163 billion yuan and the tertiaryindustry for 2.839 billion yuan. The
   Harbor District where the proposed project is to be seated has a total area of 37,762
   hectares with a city proper of 5 Km2. Its population is 107,000 and GDP was 670.89
   million yuan in 2002 including a gross industry output of 22.46 million yuan.
     Fangchenggang is a deep water port at the southwest end of the nation’s coastal
   line. It is the




                                                                                    117
  largest port in Guangxi and one of the nation’s 19 most important ports. It has 27
 docks of which 11 is deep enough for 10,000 tonnage vessels and larger. Its
 warehouses have a total floor space of over 700,000 m2. Its annual loading and
 unloading capacity exceeds 12 million tons, that fulfilled 11.16 million tons in 2002.
  Major industries in Fangchenggang include communication, transportation, tourism,
 storage, ship building and repair, marine fishing, marine aquiculture, aquatic
 processing, agriculture, building materials, timber, sugar refinery, foodstuff and
 beverage. Side occupations include rubber,grass waving, tea processing, animal
 husbandry and fresh water aquiculture.
  Fangchenggang has 5 research institutions, 59 middle schools and 320 primary
 schools, of which 9 middle and primary schools are located within the Harbor
 District. The municipality has fairly good economic situation and living conditions,
 rather well developed infrastructures, medical care, education and public health
 utilities. Major scenic spots include the CelestialMountain, Paradise Beach, General’s
 Ridge, Saddle Shaped Mountain and Ancient Fortress.
  Within the evaluated area, there exist no historical relics to be protected.


Current status of environmental quality
Current quality status of the surrounding environment at the project site and major
problems ( atmosphere, ground surface water, underground water, sound and
ecological environment )
  1.Air quality of the environmental atmosphere
     Data from the municipal environment monitoring stations proves that concentration
     of the total suspending granules, sulphur oxidite and nitrogen oxidite at the
     environmental atmosphere reaches to Grade II standards of the National
     Environmental Air Quality Standard ( GB3095-1996 ), that means the
     environmental atmosphere is in good condition.
  2.Nearby inshore marine water quality
     Data from the municipal environment monitoring stations indicates that test results
     on PH value, SS, soluble oxygen, non-organic nitrogen, non-organic phosphate,
     hexachromium, petroleum oils, heavy metals, arsenium, mercury etc. reach to
     Category II standards of the National Marine Water Quality Standard ( GB3097-
     1997), which conforms that the requirements by the nearby regional functions can
     be met.
  3.Surface and ground water quality
     Data from the municipal environment monitoring stations indicates that the major
     elements and factors subject to monitor and test reach to Category III standards of
     the National Environmental Surface Water Standard ( GB 3838-2002 ) and
     Category III standards of the National Ground Water Quality Standard ( GB/T
     14848-93 ) for the surface water and ground water respectively.
  4.Sound environment quality
     Data from the municipal environment monitoring stations indicates that quality
     control on environmental noises reaches to Category II standards of the National
     Urban Environmental Noise Standard (GB 3096-93 ).
  5.Ecological environment
     The site is located within an industrial development zone. The surrounding hills are
     dominated by man-made vegetations. The nearby sea has an average ecological
     environment

                                                                                   118
  with a rather limited variety of plankton but a good variety of phytoplankton. In
addition, at the nearby beach there exist about 500 mu of mangrove.

 Major targets in environment protection
  1.Environmental atmosphere and noises
     Surrounding environment for the municipal high school and urban dwellers
     should have atmospheric air in quality of Grade II standards of the National
     Environmental Air Quality Standard ( GB 3095-96 ) and environmental noises
     controlled to Category II standards of the National Urban Environmental Noise
     Standard ( GB 3096-93 ).
  2.Environmental water
     Nearby inshore marine water should be in conformity of Category II standards
     of the National Marine Water Quality Standard (GB 3097-1997 ).
  3.Ecological system formed by the nearby mangrove should be well protected.




                                                                                      119
  Applicable Standards in Evaluation
 For environmental quality:
      1.National Environmental Air Quality Standard ( GB 3095-96 ), Grade II
      2.National Marine Water Quality Standard ( GB 3097-1997), Category II
      3.National Environmental Surface Water Quality Standard ( GB 3838-2002 ),
          Category III
      4.National Ground Water Quality Standard ( GB/T 14848-93 ), Category III
      5.National Urban Environmental Noise Standard ( GB 3096-93 ), Category II
  For waste displacement:
      1.National Atmospheric Pollutants from Boilers Release Standard (GB 13271-
          2001 ), Category II, Timing Section II
      2.National Aggregate Waste Water Discharge Standard (GB 8978-1996 ), Grade
          I
      3.National Noise Control Standard for Industrial Enterprises within Factory
          Campus ( GB 12348-90 ), Category II
      4.National Noise Limiting Values for Civil Construction Site ( GB 12523-90 )

Aggregate control targets:
Controlled pollutants displacement targets and release amount ( Harbor District, 2002)

Pollutants             Controlled      Actual release in   Release by the     Balance
                       targets         2002(ton)           project (ton)      (ton)
Chemical oxygen         1400            86.23               1.0                1312.77
requirement
Ammonia nitride           20              19.56                1.52               -1.08
Smoke dust               550              85.42                0.14              464.44
Industrial solid         770             390                  30                 350
refuses
   Major pollutants released by the proposed project are predicted to be 1.0 t/a of COD,
 1.52 t/a of ammonia nitride, 0.14 t/a of smoke dust and 0.87 t/a of SO2. According to
 the controlled pollutant displacement targets set by the Harbor District government set
 in 2003, the major pollutants released by the project including COD, smoke dust and
 SO2 are all well controlled within the limitation of the targets. Ammonia nitride
 displacement goes beyond the limitation of the district but still remains in control
 target of the municipality.




                                                                                     120
 Engineering Analysis of the Project
    Briefing on technological flow
   1.Aquatic processing technological flow
   Raw materials are fed into the fully enclosed pre-treatment workshop with
temperature of 15’c, where they are tested, rinsed and graded before feeding into the
pre-cooling storage with temperature below 15’c. The pre-cooled raw materials are fed
to different processing lines. Fishes are delivered to the fish processing line for scale
and viscera removal before individual freezing or for head, scale and viscera removal,
and cutting before instant freezing.Shrimps are delivered to the shrimp processing line
for individual freezing, or for frozen headless shrimps or frozen peeled shrimps. Crabs
are delivered to the crab processing line for cleaning and rinsing, shell removal, cutting
and cooking before instant freezing. Squid and cuttlefish are processed in the pre-
treatment workshop by removal of head, skin and viscera and then cutting before
instant freezing and vacuum packing. Deep frozen products are checked and packed
before cold storage.
   According to the designed production scheme, major production technological flows
are divided into two parts as follows:
        1.1 Technological flow for instant freezing:
            Raw fish/shrimp/crab à Raw material receiving workshop à washing and
            rinsing ( waste water disposal ) à Rinse by spray of ozone water ( 1 – 2
            minutes) à Grading à Removal of heads/shells/scales/viscera à Cutting (
            fish/crab ) à Pre-cooling à Instant freezing à Weighing à Ice coating à
            Packing à Sampling à Storage
        1.2 Technological flow for freezing drying:
   Raw material receiving à washing and rinsing ( waste water disposal ) à Removal
of shell, head and skin à Rinsing by ozone water à Grading à Instant freezing à
Placing in dry tray à Freezing drying à Weighing à Packing à Storage
   2.Technological flow for ice making:
   Fresh water à Container filling à Placing in ice making pond à Cooling à Ice à
Dumping out à Storage
   3.Technological flow for sewage treatment:
   Wastewater from the plant is largely discharged at the stations of pre-treatment,
washing, rinsing and cutting. Such sewage contains meat, shell and bone scraps, fat and
protein with high concentration of SS and organic matters. Taking into consideration
the situation of COD and variable rate of flow, recovery and/or disposal of the rejected
substances need to be well arranged while the final treatment of the sewage employs
the technology of anaerobic treatment and contact oxidization. The whole process is
formed by the grizzly screen pond, primary precipitation pond, contact oxidization
pond, secondary precipitation pond, sterilizing pond and waste mud pond. The sewage
treatment ground is separate from the processing plant, which will be built into the
semi-underground type. Its operation causes no affection to the surroundings. Removal
rate of BOD5 is targeted at not less than 80% (reduced from 200 mg/L at inlet to 50
mg/L at outlet) and the rate of COD and SS at not less than 81% and 80% respectively.




                                                                                      121
 Technological flow for sewage treatment is designed by the environment protection agency
as follows:
                                      40% back flow
                            ------------------------------------------------- V
                            V

Sewage à grizzly screen pond à Primary precipitation à Contact oxidization àSecondary
                            pond             pond precipitation
                                                                           Pond
                                                                             V
                                     ----------------------------------------------
                                                         V                    V
                                                        Mud drying              Sterilizing
                                                          V                pond
                                                        Shipment                 V
                                                                          Release
  Civil works for sewage treatment include the grizzly screen pond, primary precipitation
 pond, contact oxidization pond, secondary precipitation pond, sterilizing pond and waste
 mud pond. Equipment to be employed includes pumps, grizzly screens, filtration screen
 and materials, pipes, air blowers, noise silencers and mud moisture separators.

 Critical pollution points:
 1.During construction period
  1.1 Execution of construction and transportation operations cause increase of SS in partial
       atmosphere to affect the air quality;
  1.2 Building operations and equipment installation make mechanical noises while various
       machines are operated;
  1.3 Civil construction generates certain amount of building refuses.
 2.During operational period
  2.1 waste air: Boilers consume diesel oil and generate smoke and sulphur oxydite;
  2.2 waste water:
   2.2.1 Aquatic processing consumes about 100,000 tons of water per annum;
   2.2.2 Domestic sewage from the employees is about 0.35 ton per day;
  2.3 Solid refuses
    2.3.1 Mud and sand from pre-treatment of the aquatic products is about 0.1 ton. per day;
    2.3.2 Domestic garbage from the employees is about 0.5 ton per day;
    2.3.3 Aquatic processing generates about 12,000 tons of residues such as shells, heads
            and viscera etc. per annum, which will be sold to local fish meal mills;
  2.4 Noises: Machines like dryers, freezers and air compressors make noises during
       operation with the maximum value of 95 dB (A);
  2.5 Odor: Residues and waste water from processing generates awful smell;
  2.6 Liquid ammonia is used as the cooling agent during the operational period. About 20
       tons of liquid ammonia needs to be stored. Such a dangerous chemical implies
       potential safety risks.




                                                                                    122
 Output of the major pollutants and the estimated release rate
1.     Air borne pollutants
   Source             Pollutant       Concentration and          Releasing
                                      output prior to treatment concentration and
                                                                 rate
   Construction       Dust            Small amount               Small amount
   period
   Boilers            Displacement 173,000 m3                    173,000 m3
                      Smoke           80 mg/m3 & 0.14 t/a        80 mg/m3 & 0.14
                                                                 t/a or less
                      Sulphur         500 mg/m3 & 0.87 t/a       500 mg/m3 & 0.87
                      oxydite                                    t/a or less
2.     Water borne pollutants
   Source               Pollutants    Concentration and          Releasing
                                      output Prior to            concentration and
                                      treatment                  rate
   Waste water          Amount        100,000 t/a                100,000t/a
   from production
                        COD           400 mg/L & 40 t/a          100 mg/L & 10 t/a
                                                                 or less
                        Ammonia       60 mg/L & 6 t/a            15 mg/L & 1.5 t/a
                        nitride                                  or less
                        SS            300 mg/L & 30 t/a          70 mg/L & 0.7 t/a
                                                                 or less
   Domestic             Amount        1,518 t/a                  1,518 t/a
   sewage
                        COD           300 mg/L & 0.46 t/a        100 mg/L & 0.15
                                                                 t/a or less
                        Ammonia       30 mg/L & 0.05 t/a         15 mg/L & 0.02 t/a
                        nitride                                  or less
                        SS            200 mg/L & 0.3 t/a         70 mg/L & 0.11 t/a
3.     Solid refuses
   Sources            Pollutants    Concentration and output Releasing
                                    prior to treatment          concentration and
                                                                rate
   Construction       Building          --                         --
   period             refuses
   Workshops          Mud and       30 t/a                      30 t/a
                      sand
   Living quarters garbage          105 t/a                     105 t/a
4.     Noises
       During construction, machines and vehicles make noises to affect the
       environment with the maximum of 100 dB(A) but it diminishes to 60 dB(A)
       apart from 500 m.s.
       During the operational stage, operation of the machines makes noises with the
       maximum of 95 dB(A). It diminishes to 61 dB(A) by a distance of 50 m and
       further to 51 dB(A) by 150 m.s.

                                                                                   123
5.   Dangerous chemicals
     Liquid ammonia used as the cooling agent is a dangerous chemical. It’s
     flammable with strong odor. It generates heat when solutes into water. It’s
     alkali and can react radically with acids. It’s corrosive to aluminum, copper,
     zinc and their alloys. It’s very dangerous to eyes, skins and respiratory tract.
     Liquid ammonia evaporates very fast and over dosage of its steam entered into
     human body can cause areo-emphysema. Therefore, once it emerges any
     leakage, it will cause heavy affection on the surrounding environment and even
     endanger people’s health and life.

Major ecological impact:
   1. Wastewater from production is discharged to the nearby sea and can
       contaminate to some extent marine water. Thus the nearby marine environment
       and water quality are affected.
   2. Without proper disposal, mud from production process and domestic garbage
       can cause affection on ecological environment.
   3. Once leakage accident emerges, liquid ammonia is very dangerous to the
       surrounding environment.


Environmental Impact Analysis




                                                                                   124
Environmental impact during construction period:
       1. The project site is the implementing agency’s own land which has already been
          leveled.. During construction, there would be no great amount of earth works.
          However, operations like foundation construction and transport would cause
          slight soil erosion and dusting, which make some affection to the surrounding
          environment. Therefore, during construction, any naked ground should be
          watered in time and subsequently be paved or green covered in order to relieve
          such environmental impact.
       2. Noise analysis: Noise largely comes from such operations as piling for
          foundation building and transport vehicles. Commonly used machines in civil
          construction include loaders, bulldozers and mixers. Noises made under full
          capacity at different distances are summarized as follows [ unit: dB(A)]:
      Items         5     10     20     40m 60         80    100     150     200     300
                    m     m      m             m       m     m       m       m       m
      Loader       90 84         78     72     68.5 66       64.5    60.5    58      54.5
      Bulldozer 86 80            74     68     64.5 62       60.5    56.5    54      50.5
      Mixer         87 81        75     69     65.5 63       61.5    57.5    55      51.5
   The national standard on noise limitation at the construction site (GB 12523-90)
  specifies that the maximum noise value cannot exceed 70 dB(A) during daytime and 55
  dB(A) at night. Piling is not allowed at night . It can be seen from the above table that
  noise made by the construction machines will be within the limitation if the distance is
  60 m away from the site during day time and 300 m apart at night. Since the project
  site selected keeps a good distance from the urban dwellers’ living quarters, noise made
  during construction will not cause apparent affection to the environment provided that
  piling operation ceases at night.
       3. Solid refuses from construction operation needs to be disposed in time in order
          to avoid any
  impact on environment. It is planned to ship those solid refuses to the designated site
for piling or burying. Impact from construction on the surrounding atmosphere and
sound environment will disappear as the construction is completed.




                                                                                     125
Environmental impact at the operational stage:
      1. Mechanical noises from those machines like air compressors, dryers, motors
         and freezers can reach to a maximum value of 95 dB(A). Analysis proves
         that the noise can diminish to 51 dB(A) by a distance of 150 m, that basically
         conforms with the limitation value set by the national noise limitation
         standard on industrial enterprises ( GB 12348-90 ) in category II, i.e. less
         than 60 dB(A) during day time and 50 dB(A) at night. Therefore, in
         preparation of the general layout of the project, facilities that make much
         noise are located farthest away from the sensitive spots. In addition, housing
         will be partially sealed, equipment making less noises be selected and green
         belt be established to surround the buildings. The noises will be controlled
         within the limitation, i.e. less than 60 dB(A) during daytime and 50 dB(A) at
         night. Impact from noises on the surrounding environment will be
         minimized.
      2. Liquid ammonia is a dangerous chemical and must be very well protected
         against any possible accident during transport, storage and usage. Therefore,
         Rules on Safety Control of Dangerous Chemicals issued by the State Council
         will be strictly followed. Liquid ammonia will be kept and stored at a good
         distance from the neighboring surroundings. Every measure will be taken to
         protect against accidents such as leakage, seepage and self-burning.
      3. Boilers use diesel oil as fuel and the annual consumption is 173 tons. It is
         planned to release the smoke through a 25 m high chimney after treatment by
         a dust remover. Evaluation on a similar case with same type of boilers proves
         that major pollutants from the smoke will be controlled within the limitation
         set by the national standard on boilers for release of air borne pollutants ( GB
         13271-2001 ), that would not cause significant affection on atmospheric
         environment.
      4. The aquatic processing produces some 10,000 tons of wastewater
         contaminated by organic pollutants. The contaminated water will be
         collected by the treatment system. Solid residues will be separated out
         through screening and the water be oxidized after primary precipitation.
         Through the secondary precipitation, sterilization and mud separation, the
         treated water will be clean enough to reach to the grade I standard set by the
         national aggregated sewage release standard ( GB 8978-1996 ). Mud after
         drying will be used as organic fertilizer. In general, the discharged water by
         the project will not cause significant affection to the nearby seawaters.
      5. Impact on the nearby mangrove eco-system by the discharged water: There
         exists about 500 mu of mangrove trees along the coastal beach east of the
         project. Mangroves are the unique trees growing at the transitional belt
         between upland and sea, which also forms one of the four most productive
         eco-system for sea. The mangrove trees themselves together with the
         attached plants, algae and phytoplankton absorb inorganic and mineral
         nutrients to conduct photosynthesis. According to the findings by Dr. Fan
         Hangqin of the Guangxi Mangrove Research Center, the mangrove eco-
         system has certain purifying capability to pollutants, which is realized
         through the underneath soils, root systems and release of tannic acid. The top
         part including the stem and leaves of the mangrove tree does not absorb
         much of the pollutants. The marsh land grown mangrove trees has abundant
         silt mud and well developed root system, which has rather high absorbing,
         trapping and accumulating capability to the pollutants such as heavy metals,

                                                                                   126
agro-chemicals, oils and sewage water. And thus concentration of the
pollutants can be reduced. Moreover, some soil borne microorganisms




                                                                       127
6. are able to decompose organic pollutants. The vigorously growing trees
   demand a large supply of nitrides and phosphates from the soils where there is
   no such ample supply. Therefore sea water becomes another supply source. Lin
   Peng and others have found out that mangrove trees in Guangxi absorb
   nitrogen and phosphate averaged at 13 g and 1.3 g per m2 per annum
   respectively. The nearby sea water bears phosphate at about 0.16 umol/L and
   ammonia nitride at 4.1 umol/L. Soils underneath the beach holds an organic
   matter content of 0.054 – 1.06 mg/Kg. Compared with the demand by the trees
   and their attached plants, algae and phytoplankton, supply from these sources
   lags far behind. The project releases 101,518 tons of discharged water,
   carrying 40.46 tons of COD, 6.05 tons of ammonia nitride and 30.3 tons of SS.
   The treated discharged water has the concentration of 100 mg/L, 15 mg/L and
   70 mg/L or less for COD, ammonia nitride and SS respectively. The annual
   release of COD, ammonia nitride and SS is 10.15 tons, 1.52 tons and 0.81 tons
   respectively, averaged at 406 Kg, 60.8 Kg and 3.24 Kg per day, assuming the
   processing plant operates 250 working days a year. In addition, the project is
   adjacent to an open bay with a tide speed of 70 –80 Cm/sec.. With such a tide
   speed, sea water exchanges very fast. The discharged water from the project
   can be spread over 25 Km. away in 10 hours. Therefore, some of the organic
   matters from the discharged water will be taken by the marine plankton and
   some be sedimented into the beach soil and discomposed by the
   microorganisms, becoming the nutrients to the plants. In this connection, the
   discharged water from the project will not cause significant affection to the
   existing mangrove eco-system.
7. Mechanical noises from machines like dryers, air compressors, motors,
   generators and freezers can result into a maximum value of 95 dB(A). By
   keeping a good space and partial sealed housing, plus low noise-making
   machines are selected, and vibration and sound proof measures are taken, the
   noises within the project border will be controlled to less than 65 dB(A) during
   day time and less than 55 dB(A) at night. Mechanical noises are not significant
   to the surrounding environment.
8. In preparation and pre-treatment of the raw materials, about 12,000 tons of
   solid refuses will be generated out, including the fish scales and heads, shells,
   viscera and shrimp heads. These wastes will be collected and sold to the local
   fish meal mills and will not affect the environment.
9. Mud and sands from processing operations and mud from waste water
   treatment will be cleared in time and shipped to the designated garbage ground
   or used as organic fertilizer, resulting in no significant affection on
   environment.
10. Without prompt disposal, the solid refuses from processing operations
   would produce awful odor. By prompt collection and shipment of these solid
   refuses to the fishmeal mills, the odor can be controlled within the limitation
   specified by the National Foul-smelling Pollutant Release Standard (GB
   14554-93 ), Grade II.
11. Domestic sewage will be collected by aseptic tanks and gone through the
   treatment system before discharging. It causes non-significant but slight
   affection to the marine environment.




                                                                            128
 Pollution Control Measures to Be Taken and the Expected Results

     1. Air borne pollutants:
    Sources (No.) Pollutants            Control measures           Expected results
    Construction     Dusts              Watering, paving and       Efficient control
    period                              green cover
    Drying           Smoke, dust &      Release through a 25 m     In conformity with
    workshop         sulphur oxydite    high chimney after dust    controlled
                                        collection                 limitation

     2. Water borne pollutants
    Sources (No.)       Pollutants     Control measures        Expected results
    Waste water from COD, AM,          Anaerobic and bio-      In conformity with
    processing          SS             oxidizing treatment     controlled limitation
    Domestic sewage COD, AM,           Anaerobic and bio-      In conformity with
                        SS             oxidizing treatment     controlled limitation

     3. Solid refuses
Sources (No)      Pollutants           Control measures                  Expected
                                                                         results
Civil            Building refuses      Clear in time and ship away       Proper
construction                                                             disposal
Workshops       Mud, sands,            Collect and ship to the           Proper
                foreign matters        designated garbage ground         disposal
Living quarters Domestic garbage       Collect and ship to the           Proper
                                       designated garbage ground         disposal

       4. Noises: Mechanical noises reach to 90 dB(A) as maximum during
          construction. Piling is prohibited at night.
    During operational stage, low noise-making machines are selected. Much noise
    making machines are set into sealed housing. Vibration and sound proof measures
    are taken. Noises within the project boundary are to be controlled within 65 dB(A)
    during day and 55 dB(A) at night.
       5. Dangerous chemicals: Liquid ammonia is flammable. Fire, spark and
          smoking are strictly prohibited. Containers must be kept 100% sealed. Liquid
          ammonia is always stored away from fire, oxidants and acids.
       6. Eco-systems:
 6.1 After completion of the foundations, the naked grounds must be paved or green
covered promptly to protect the surroundings from dusting and avoid soil erosion. The
plant campus must be green covered up to the standard set by the state to the food
processing enterprises to protect the hygiene of the finished products and avoid
affection on the surrounding environment.
 6.2 Waste water will be screened, precipitated and oxidized up to the standard set by
the state before discharging to minimize the affection on the nearby sea waters. Small

                                                                                       129
amount of the organic matters in the discharged water will be partially taken by
plankton and partially discomposed by microorganisms in the beach soils. Wastewater
disposal will not cause affection to the mangrove eco-system.
 6.3 Waste water will be treated in closed ponds to avoid foul-smelling to affect the
neigh borers.
 6.4 Building refuses and domestic garbages will be collected, cleared and properly
disposed to avoid affection on eco-environment.
 6.5 Solid refuses will be shipped to the designated garbage ground, which will not
cause affection to environment.


Conclusions and Recommendations




                                                                                  130
Conclusions:
          1. Current status of environmental quality:
   Atmospheric, water and sound environment within the project area is of good
   quality and meets the requirements of various functional zones.
          2. Analysis on Environmental impact:
   Major pollutants during construction period are noises, dusts and solid refuses.
   Due to the fact that the project site is about 500 m.s away from the dwellers’
   living quarters, Noises and dusts do not cause significant affection on the
   surrounding environment including the critical points. Solid refuses will be
   shipped to the designated garbage grounds, so they would not cause significant
   affection either.
   Major pollutants at the operational stage are waste water, noises and displaced
   air. Waste water through treatment by the proposed system will be clean enough
   with major pollutants within the controlled limitation specified by the National
   Aggregated Sewage Release Standard (GB 8978-1996), Grade I. Mud from the
   waste water treatment system and domestic garbage from the project will be
   shipped to the designated garbage grounds and waste residues from processing
   operations will be used as raw materials for fish meal production. By doing that,
   no significant affection will happen.
   Mechanical noises will be minimized through soundproof measures to the extent
   lower than the allowances specified by the National Noise Control Standard on
   Industrial Enterprises (GB 12348-90), Grade II.
   Atmospheric pollutants (smoke and sulphur oxidite) from diesel fuel of the
   boilers are of small amount and the release concentration after dust removal by
   dust collectors can be controlled to the extent within limitations set by the
   National Release Standard on Atmospheric Pollutants from Boilers (GB 13271-
   2001), Grade II, Timing II.
   Liquid ammonia used as the cooling agent is a dangerous chemical which implies
   risks to environment by accidents. Such accidental risks can be sufficiently
   controlled provided effective control measures are taken according to the Rule of
   Safety Control of Dangerous Chemicals set by the State Council.
          3. General conclusions:
   The project conforms to the national industry development policies and is of great
   importance to the local economic development by integrated utilization of fishery
   resources, enhancing added value of the aquatic products, restructuring local
   fishery sector, promoting sustainable fishery development and creation of more
   job opportunities.
   After completion of the construction, the project will not cause significant impact
   on the




                                                                                  131
     surrounding environment when corresponding environment management and
     pollution control measures are taken against the atmospheric, sound and water
     environment.
     Evaluation through consolidated analysis proves that the project will offer good
     economic and social benefits. The project is well located. Construction of the
     project is feasible in terms of environment protection.

  Recommendations
1.   To strictly implement the regulations set under the Rule on Safety Control of
   Dangerous Chemicals by the State Council by installation of necessary equipment,
   application of sufficient and effective rules and regulations, and preparation of
   emergency reaction scheme which should be submitted for endorsement and recorded
   in files of the departments concerned.
2. To mobilize pertinent staff and workers to learn the knowledge of safety control of
   dangerous chemicals and master the operational procedures on safety control to avoid
   any potential accidents.
3. To prepare and strictly follow a sound management system on safety control and
   environment protection.
4. Once an accident emerges from the dangerous chemical, the emergence reaction
   scheme must be implemented immediately and the departments concerned must be
   informed promptly in order to minimize the loss and affection on the environment.
5. To entrust the local qualified environmental monitoring departments to monitor and
   test the surrounding water environment and timely learn the impact of the released
   pollutants on the quality of the surrounding environment.




                                                                                    132
Approval Comments
1. This report meets the requirements by pertinent technical codes with reliable
   evaluation conclusions through application of rational evaluation criteria. Pollution
   control measures proposed in the report are eligible for project design on
   environment protection and monitoring.
2. The implementing agency must really undertake the pollution control measures
   proposed in this report. The pollution control component and the principal body of
   the project must be designed, constructed and put into operation simultaneously to
   ensure that the released pollutants are controlled within the limitation.
3. The Environment Protection Bureau of the Harbor District must intensify
   supervision and management on the aspect of environment protection of the project.
   Only as the environment protection component is proven to be qualified by the said
   bureau when the construction is completed, the project is allowed to be put into
   operation.
4. It is agreed to construct the project.



                      Environment Protection Bureau
                      Fangchenggang Municipal Government
                       ( Seal)

                      Processing Officer: Jin Yan

                      On the date of August 13, 2003




                                                                                  133
                                                             Approval and Registry Form of Environment Protection on Construction Project
 Registry Form unit Fangchengguang Environmental Scientific Graduate School Registry Form person Jiang Zhaowei Approval undertaker
                                                                                                          Industrial Park, Yuzhouping, the Harbor District, Fangchenggang
            Projectdescription TheSeafoodFrozenProcessing PlantOf FangchenggangGuangxi Construction site
                                                                                                          Municipality
                                                        2
                               Plant area of 8800 m , deepfreeze processing of 6500
            constructionscale ton, low temperature processing of 550 ton , making ice  Construction style ■New Rebuild &continuation            Techno-build
                               of 9000 ton.
                                                                                                                                  Environment Protectionsupervised
                                  Industrysort    Aquatic deep freezing processing 0411                                                                                            Compiling book ■Compiling form                  Register form
                                                                                                                                               style
                                                                                                                                                                                                                        Environmental
                                Totalinvestment                                                                                   environmental protection
                                                  5337.8                                                                                                                                         98.6                   protectioninvest                 1.8
                                 (10000YUAN)                                                                                          invest(10000YUAN)                                                                 rate %




        Construction Project
                                    Project-                                                                                                                                                                            Project
                                  establishing    Agricultural. Department                                                              Approved file No.                                  No.16[2003]                  established               Jun.26,2003
                                     Dept.                                                                                                                                                                              time
                                ReportWarrant
                                                  Fangchenggang City Environment Protection Bureau                                      Approved file No.                                                               Approved time
                                    Dept.
                                                       Yuanyi Integrated
                                                    Agricultural Development                                       0770-                                                            FangchengguangEnvironmental
                               Name                                                        Tel                                                           Name                                                            Tel                       0770-2825351
                                                    Co. Ltd, Fangchenggang                                        2827927                                                              ScientificGraduateSchool


                                                                                                                                        unit
                                                     Municipality, Guangxi

                                                                                                                                      Evaluation
                               Address            JingangRoadFangchenggang                 Post                   538001                                 Address                No.3xingangRoad                          Post                          538001
                                                                                                                    Shi




                  unit
                               Legal                                                       Personin                                                                                                                          Evaluation
                                                  WeiLinzhen                                                                                                  CertificateNo.                                                                             1.6




  Construction-
                               representative                                              charge                 Yongjian                                                                                               expense(10000YUAN)
                               Environmen
                                                             Atmosphere Class           GB3095-1996 Surface water              Type   Groundwater       Type         Noise: Type     GB3093-1993 Sea water         Type II GB9097-1997 Soil       Others
                               tquality class
                               Environmen         □ Drinkingwatersourceprotectiondistrict □ Naturalprotectiondistrict □ Famous scenerydistrict    □ Plantationandpark




   condition
   condition
 environment
                                                  □ Essentialcroplandprotection district □ Ecologyprotection district □ Waterandsoilleaveawayprotection area □Ecologysensitiveandfragilearea




Project site
                               tsensitivity
                               character          □ Population densearea        □ Keyculturalrelic protectionarea     □Reservoir
                                                                   Built +under built                                             Thisproject                                                            Totalproject
                                                                                                                                                                                drainage                                drainage    drainage
                                                               drainage     general     drainage      drainage      drainage                                                                reducing                                             decreaseamount in
                                                  drainage                                                                                         reducing         drainage    capacity                   drainage     capacity    in-creasi-
                               Contamination                   density      drainage    capacity      density       density      drainage                                                   capacityof                                           districtbalance
                                                  density                                                                                          capacity         capacity    allowed                    capacity     allowed     ng




         control
                                                               allowed      capacity    allowed       predicted     allowed       capacity                                                  oldandnew                                            replacement




      standard and
                                                  Infact                                                                                                            predicted                               predicted               capacity




     pollutant let out
                                                                            Infact                                                                                                          section
          waste water                                                        13.1                10

          Oxyenamount                                        100     100     40        30        10
          required*

          Ammonia and                                        15      15      6         4.5       15
          nitrogen*
          Suspendsubstance

          Waster gas                                                         17.3                17.3

          Sulfur dioxide                                     500     500     0.87                0.87
          Smoke and                                          80      80      0.14      0.14      0.14
          dust
          Industrial
          powder dust
          Nitrogen and
          oxide

          Industrialsolid
                                                                                  30                  30
          trash




                                          thisproject
           otherpollutantinrelationwith
Unit y waste gas capacity x104 marked meter3/year wastewater ton/year mercury cadmium lead, arsenic chromium chloride kg/year other units are all tons waste gas
density milligram/liter Waste gas density milligram/lm
Notes This list is written by the evaluation unit and attached on the last page of the report. The last blank is the characteristic pollutant.
Among this 5 = 2 - 3 - 4                      6 = 2 - 3 + 1 - 4




                                                                                                                                                                   135
  Registry Form of Basic Date of Environmental Management Examine and Approve on The Construction Project
  Project name The Seafood Frozen Processing Plant Of Fangchenggang Guangxi

  Sort Forecast Year 2003 Project kind New constructing Environmental estimate Fangchengguang Environmental Scientific Graduate School

  Examine and approve District Industry sort Other Environmental estimate sort Report form

  Administrative precinct Fangchenggang city Acid rain controlling area No
Total invest of environment     Thereinto           Thereinto        Thereinto         Thereinto           Thereinto          Total invest      Environmental estimate
protection 10000’ yuan         Waste water         Exhaust gas      Noise disposal     Virescence        Other invest of    100000000’yuan      expense 10000’yuan
                                disposal            disposal                                             environment
                                                                                                           protection
            98.6                   65.0                                                    33.6             0                    0.53378                 1.6
Main contamination            Original letting   Newly increased Amount scissored by Newlyincreased Contamination letting   Scissoring amount    Adding and reducing
                                 amount           letting amount  newdrivingold      disposingamount                             disposed          letting amount
Sewerage amount ten                  0                 10                 0                10                  10                  0                     209
thousand ton/year
COD                                  0                 40                 0                30                  10                  30                    10
ten thousand ton/year
NH3-N                                0                 6                  0                4.5                1.5                 4.5                    1.5
ten thousand ton/year
Petroleum                            0                 0                  0                0                   0                   0                      0
ten thousand ton/year
SO2                                  0                0.87                0                                   0.87                 0                     0.87
ten thousand ton/year
                                                                                                                                                                 136
Smoke                       0   0.14    0   0   0.14    0   0.14
ten thousand ton/year
Dust                        0    0      0   0    0      0    0
ten thousand ton/year
Nitric oxide                0    0      0   0    0      0    0
ten thousand ton/year
Solid castoff               0   0.003   0   0   0.003   0   0.003
ten thousand ton/year


  Assessor: Jiang Zhaowei




                                                                    137
138

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:5
posted:6/16/2011
language:English
pages:453