Acrobat PDF

Angels Flight Railway - Board Meeting Presentation

Click to download
Reviews
Shared by: NTSB
Stats
views:
35
rating:
not rated
reviews:
0
posted:
6/19/2008
language:
English
pages:
0
Uncontrolled Movement and Collision on the Angels Flight Railway Los Angeles, California February 1, 2001 Issues • • • • Safety oversight Design of the reconstructed system Braking system design and maintenance Maintenance and operating procedures Notification Launch Parties to the Investigation • California Public Utilities Commission • City of Los Angeles Community Redevelopment Agency • Angels Flight Railway Foundation Staff • • • • • • • • Dave Watson Ted Turpin Jim Ritter Alan Kushner Joseph Kolly Jim Wildey Rick Downs Meg Athey IIC and Report Writer Group Chair Technical Advisor Technical Advisor Technical Advisor Laboratory Funicular Advisor Editor Investigative Areas • Splines sheared within gearbox • Emergency brakes were nonfunctional • Cars not equipped with back-up stopping system • State regulator and railway owner allowed passenger operation with known safety concerns Funicular Railway Reconstruction • Owner • Project Advisor/ Specifications Designer • Construction Manager • General Contractor • Builder Redevelopment Agency Parsons Harris Pueblo Yantrak Operation • Reopened February 1996 • Maintenance and inspection Funicular Design Standards 1991 • • • • • No California funicular standards Multiple general engineering standards No ANSI funicular standards Some ANSI guidance Colorado funicular standards Gearbox Overheating • Overheating developed early on • Unscheduled stops between terminals • Oil cooler installed after 15 months Oil Testing and Analysis • • • • Required every 6 months or 18,000 cycles Actual testing 1997 – 1999 1999 test results Postaccident test results Emergency Brakes Nonfunctional • • • • Failed to apply during accident Inoperative solenoid Inoperative as designed Non-failsafe as implemented Brake Testing • Independent testing requirement • Testing performed Safety Stopping Device • Track brakes • Safety cable End Gates Emergency Walkway Evacuation Re-opening Issues • No track brakes or a 2nd safety cable • No end gates • No emergency walkway Acceptance • • • • • Parsons Brinckerhoff Quade and Douglas Pueblo Contracting Harris Engineering Community Redevelopment Agency California Public Utilities Commission

Related docs
Angels & Ministers
Views: 3  |  Downloads: 1
How to meet Angels
Views: 14  |  Downloads: 1
my business angels
Views: 24  |  Downloads: 2
Icon Angels Investor Presentation Outline
Views: 101  |  Downloads: 19
INTERVIEW QUESTIONS FOR ANGELS OF INDUSTRY
Views: 1  |  Downloads: 0
Dan Brown - Angels _ Demons
Views: 52  |  Downloads: 0
Angels land in Hub
Views: 0  |  Downloads: 0
RAGE OF ANGELS
Views: 126  |  Downloads: 6
premium docs
Other docs by NTSB
southgate-all
Views: 616  |  Downloads: 4
CorpDocs- List of Corporations Shareholders
Views: 207  |  Downloads: 1
Non-Discrimination Policy
Views: 286  |  Downloads: 23
Inst T (Timber) (PDF) Instructions
Views: 240  |  Downloads: 1
Goldman Sachs Group Inc Ammendments and Bylaws
Views: 553  |  Downloads: 15
CorpDocs-Audit Committee Charter
Views: 171  |  Downloads: 3
Employee Appraisal Form
Views: 1253  |  Downloads: 38
Notice of Directors Meeting
Views: 122  |  Downloads: 1