					Master Site Plan Presentation
Forward Vision Team
May 19, 2002
In the vote to relocate, the church
charged the Forward Vision Team to:
  Create a ministry plan. (A Mission to
  Fulfill)

  Secure architectural services to develop
  a Master Site Plan for the new location.
  (Lifeway)
The Deacons gave additional
direction, including:
  We will build quality space – “First Baptist
  quality.”
  The space requirements recommended in the
  Rules of Thumb document produced by the
  architecture department of Lifeway Christian
  Resources will be strictly adhered to.
  Lifeway materials about teaching space will
  be consulted and considered authoritative.
The Deacons gave additional
direction, including:
  If money is an issue, we will sacrifice
  quantity for quality – we will build less
  space, but do it right.
  The Master Site Plan will allow for
  future growth.
  We will provide adequate and
  convenient parking and will build
  covered drive through entrances.
The input of the church was
taken into consideration:

  A church-wide survey was administered
  to 156 members by Glenn Akins in
  October 2001.

  There were 30 groups of questions with
  multiple options and space for written
  comments
Questions were asked about
the transition
  Six questions concerned what approaches
  people preferred as we transition to the new
  location.

Three options for preferences were given:
  Enthusiastic
  Sure, if needed
  Absolutely not
Whatever it takes…
Regardless of the option given, overwhelmingly, people
indicated that if it would help, they would do it.

   To the six questions most people
   replied, “Sure, if needed” These ranged
   from 51.5% to 69%

   The combined “Enthusiastic” and “Sure,
   if needed” votes ranged from 75% to
   91.5%
The option for which there was
the most reluctant response

I would be willing to drive or ride the
 church bus between Sunday Morning
 Bible Study and Worship Services.

     Enthusiastic – 10%
     Sure, if needed – 65%
     Absolutely not – 25%
The option with the second most
reluctant response
I want to worship in the permanent
 worship center (old or new location)
 even if I have to commute between
 Sunday Morning Bible Study and
 Worship.
     Enthusiastic – 13.1%
     Sure, if needed – 69.3%
     Absolutely not – 11.8%
The question with the highest
combined approval (91.5%):

I want to worship and attend Sunday
 morning Bible Study at the the same
 location, even if I have to worship in
 temporary worship space.
     Enthusiastic – 27%
     Sure, if needed – 64.5%
     Absolutely not – 8.5%
We heard you
This is “your” plan
Overview of Four Phases
Each new phase is built as new
growth comes
Phase One
20,090 square foot building includes:

   Worship Center (capacity: 499)
   Education space (capacity: 378)
   State of the art preschool space for 84
   Fellowship hall (dual purpose space)
   (Capacity: 325)
   Kitchen
   Offices (3 ministers & 2 secretaries,
   workroom)
   280 parking spaces
Advantages of Phase One
  It provides for everyone to be in
  Sunday Morning Bible Study AND
  Worship on the same campus.
  It provides more education and worship
  space than we presently have.
  It provides better space than we now
  have.
Advantages of Phase One:
More Quality Education Space

  Preschool    84
  Children     38
  Youth        45
  Adults      211
  Total       378
Advantages of Phase One:
More Quality Education Space

  Preschool: 35 s.f. per preschooler

  Children: 25 s.f. per child

  Youth or Adults: 12-15 s.f. per
  person
Advantages of Phase One
  Rest rooms are are conveniently located
  near the worship center and the
  educational facilities, on the same level.
  A covered drive-through is provided.
  Parking – More adequate and more
  convenient.
  State-of-the-art preschool space is
  provided to attract young families to
  our church (with age appropriate rest rooms).
  Designed for future growth and further
  expansion.
Advantages of Phase One
  The worship center has a center aisle.
  Much more room for musicians in worship:
     Choir loft seats 40+
     Room for piano, organ, and other instruments
  Baptistry located for good visibility with
  convenient dressing area.
  Large, inviting foyer with welcome center to
  greet guests. Obvious entrance.
  Existing stained glass windows can be
  installed in new worship center (cost
  permitting).
Phase One Fellowship Hall
  The west wing of the education building
  will double as a fellowship hall.
  It will have hotel banquet room-quality
  operable walls to provide good acoustic
  isolation between spaces.
  Capacity: up to 325 at tables.
  Adequate storage will be provided for
  tables and chairs in the fellowship area.
Phase Two
 Can be divided into Phases 2A, 2B, & 2C.
    Phase 2A: New adult education & office space
    Phase 2B: Additional preschool space
    Phase 2C: New Worship center & choir
     rehearsal space
  Phases 2A, 2B, & 2C can be built all at
 once – or one or two at a time.
Phase Two will ultimately:
  Convert Phase One Worship Center into
  education space
  New worship center capacity: 1000
  Education Capacity: 562 (681 in 2
  Sunday Schools)
  Now up to 427 parking spaces
Phase Three
  New 17,000 square foot recreation &
  education building
  New 5,200 square foot building for
  additional preschool space
  Education capacity now up to 984
  (1,193 with two Sunday School
  sessions)
  Now up to 746 parking spaces
Phase Four
  Expand Worship Center (built in Phase
  2C) to 1500 capacity
  46,530 square foot education expansion
  to create capacity for 1,875 people
  (2,278 in two Sunday School sessions)
  Parking now up to 1,125 spaces
Remember…
Each new phase is added as growth
warrants it. As we grow, there will
be more people to help pay for the
next phase.
Current Sunday School Averages:
Age group                 ss1 ss2 tot    %
Preschool   Birth-age 5    47    0 47    18%
Children    grade 1-6      22    0 22     8%
Youth       grade 7-12     20    0 20     8%
Adults      age 18-up     175    0 175   66%
Total                     264   0 264 100%
Where Growth Can Take Us
1600

1400

1200

1000                       2.50%
                           5%
 800
                           7.50%
 600                       10%

 400

 200

  0
   03
   05
   07
   09
   11
   13
   15
   17
   19
   21
   23
   25
   27
   29
   31
    ar
 Ye
 20
 20
 20
 20
 20
 20
 20
 20
 20
 20
 20
 20
 20
 20
 20
We Can Do This
How we will build
Sources of funds
  Building fund monies in hand
  Other church savings (NOT including reserve
  contingency fund)
  Capital fund drive (Challenge to Build)
  Sell of present properties
   Seven acres by elementary school
   “Rutland” house, Youth House

  Borrowing (rule of thumb: 2X last budget)
Where do we go from here?
What’s next…
Four Steps to Building:
 Master Site Plan
 Capital Fund Campaign
 Construction Documents
 Construction
According to the motion:
  After the completion of the Master Site
  Plan, the church shall begin a Capital
  Funds Campaign to begin raising
  monies to pay for the first phase of the
  proposed project.
  The church shall use the Challenge to
  Build Program from the State Board of
  Missions of the Alabama Baptist State
  Convention.
Challenge to Build:
  An Alabama Baptist capital funds
  program that produces financial
  and spiritual growth
The Basics of Challenge to Build

      Not equal gifts,
      equal sacrifice
Advantages of Challenge to Build

  A meaningful spiritual experience – it’s
  about more than money
  It promotes over and above regular
  budget giving (budget giving often
  increases during CTB)
  Not just a capital fund drive,
  stewardship education
The results we can expect

  The average church will raise one to
  two times last year’s non-designated
  income.
  Three times is not uncommon,
  especially for churches that haven’t built
  in a long time.
  A church will usually receive between
  92% and 115% of the amount
  committed by the members.

				