Docstoc

NA2-BENE071031CAREOK.ppt - CERN

Document Sample
NA2-BENE071031CAREOK.ppt - CERN Powered By Docstoc
					                    Beams for European
                    Neutrino Experiments
                           (BENE)
                                         subtitle:

A Network aiming at a consensual road map for accelerator based neutrino programs in Europe

               Null result from MiniBoone      February



                            International Design Study                        of a Neutrino Factory
                                                     (NF IDS) started March
     CNGS II                                   FP7 Design Study
                            of next European Accelerator Neutrino Facility approved August

A complex                                                 Euro-ν
multi-parameter                 CNGS first high intensity run October
problem                                                                   & theething problems
                                        Events in the OPERA bricks
     CARE07, 31 Oct 2007                CARE-Next on BENE Activities
                                         V. Palladino Report
                                                               Fermilab !!!
                                                               LBL/DUSEL

                                                                    MCTF




                                                                  FP7
                                                                Approved

                                                                  Subnit




CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
         Null result from MiniBoone
                  February
• LSD no more

 ie Large mass split transition




CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
             The matrix of neutrino transition probability

Pee=1- …..                    Pem=                                 Pet=




Pme =                         Pmm=1- …..                            P mt=




                                                                    Ptt=1- …..
Pte = …….                     Ptm= …..


        CARE07, 31 Oct 2007                V. Palladino Report on BENE Activities
       Charting the matrix of neutrino transition probability
                                                                                         Solar (SuperK,SNO)
                                                                                         LBL Reactors (Kamland)
Pee=1- …..                         Pem= - 4 Re Jem12sin2D12             Pet= - 4 Re Jet12sin2D12
                                        - 4 Re Jem13sin2D13                  - 4 Re Jet13sin2D13
                                        - 4 Re Jem23sin2D23                  - 4 Re Jet23sin2D23
      atmo                              ± 8J sinD12sinD23sinD13              ± 8J sinD12sinD23sinD13
  νe↔ νμ crucial
  T2K, NOʋA , longer term future

Pme = - 4 …                        Pmm=1- …..                            P mt= - 4 Re Jm t12sin2D12
      -4…                                                                     - 4 Re Jm t13sin2D13
      -4…                                                                     - 4 Re Jm t23sin2D23
      - (± 8J….                                                               ± 8J sinD12sinD23sinD13
                                              Atmo
                                              K2K, NuMI, CNGS

    T & CP violating term e-iδ
                      universal


Pte = …….                          Ptm= …..                              Ptt=1- …..

   ….. experiments ahead of us, for decades                           …….. a global endeavour
      CARE07, 31 Oct 2007                       V. Palladino Report on BENE Activities
CNGS first high intensity run October & theething problems




   CARE07, 31 Oct 2007               V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
                             CNGS II

        CNGS ……….. following repairs ….short hi inensity run
                                           from Mon Sep 17
                                      OPERA 50% up ….
                                     full steam run mid 08

                      ………… new plans (ICARUS)…..
                            5 Ktons ……

                                 Cryodet Workshop II
                                          mid June LNGS
                               SLICE LOI in preparation
                      Off axi new big Annex Lab
                      CNGSII 2016 ( AB Report )


CARE07, 31 Oct 2007                 V. Palladino Report on BENE Activities
              2002 2003 2004 2005 2006 2007 2008 2009 2010                                          2011       2012
Accelerator R&D




                                                                        Major Strategic decisions
  CARE                     Multipurpose (e,p,n)             ?       ?                                ?          ?
  CARE                         SRF
  CARE                        PHIN
  CARE                          HIPPI
  CARE                      NED
EUROTEV                      DS: ILC+CLIC           ?   ?       ?                     ?                    ?

EURISOL                      DS: Neutrino b-beam            ?       ?                                ?          ?
                              Scoping
 DS nFact
                               study
                                                ? DS nFact ?
EUROLEAP                            e in plasma?



  CARE07, 31 Oct 2007               V. Palladino Report on BENE Activities
                                                CARE-Next




CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
        Four years of BENE in a nutshell
                                                           CARE-Report-04-034-BENE.doc

• 2004 BENE established on the EU scene                    CARE-Report-05-021-BENE.doc



      • MMW workshop May 2004: the MMW frontier
                   Villars SPSC meeting Sep 04, where we cashed
           renewed attention to a Eu ν program (R&D)
           emergence of a ν “construction window” !!!!!!!!!!!
        Betabeam DS approved !
• 2005 BENE consolidated on the EU & international scene
           – NNN05 in April and NuFact05 in June
        physics case further established in the two workshops
        R&D advancing :HARP+MUSCAT data out, MERIT+MICE approved,
                       ISS launched, aiming resolutely to DS Proposal
                        making the ν case
   CARE07, 31 Oct 2007
                                    the strategic discussion
                                in Palladino Report on BENE Activities ahead
                                 V.
• 2006 BENE proved a driving force of the International Scoping Study
                                                    with   US+Japan+India and more
                   published a comprehensive Midterm Scientific Report
                                                                       CERN Yellow 2006-005 22 May 2006

                   scored in July a “formal” CERN Council recognition of
                                              its physics case, its R&D recommendations
                   started an intense period of preparation of FP7 proposals

• 2007 BENE Design Study Euro-ν approved in August
                      in a natural international context
             the International Design Stud(ies)
                         Neutrino Factory IDS CERN Mar 07, next Jan 08
             NuFact08 August, NNN08 October both in Japan this year
                          BENE‟s international collaborations
            setting up to start Euro-ν
                         starts Feb 5
            continuing preparation of FP7 proposals
                          CARE-Next NA, TA, JRAs

     CARE07, 31 Oct 2007             V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
BENE : the longer term plan                                           2012

                                                                                → CNGS II

2005       06         07   08         09        10        11                                 19
                                                                    Construction window
 Int. Scoping Study(*)
     Feasibility, NF&SB

                           Euro ʋ Design Study
                                Feasibility (no TPW)                                        Physics
                                                  CDRs … at the time of
                                                  end of LHC payment
HIPPI, HARP
                                                  first LHC results
 MERIT                                            ILC decision
    MICE                                    be ready to catch
              PRISM, EMMA                   any construction window
                                         CARE- Next ?
          NB Betabeam CDR0 End 2009 !

   CARE07, 31 Oct 2007                          V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
•
    Fixed Field Alternated Gradient (Mori, Machida …
•             Fast                    neutrino parents
              High power              proton
•   Medical synergy
•   Golden07       (and NuFact08 !) Valencia
•   MIND Mag Iron Neutrino Detector
•   TASD Totally Active Scintillator Detectr
•   ECC silver MECC platinum
•                           ….. ECFA Detector IA …
•                       Neutrino Detectors NA and JRA?




CARE07, 31 Oct 2007            V. Palladino Report on BENE Activities
9° Int. Workshop on Nutrino Factory
        Betabeam Superbeam




CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
• Upcoming Events Physics, p deacy astroneutrinos
             Megaton
                     I                                      besides beam neutrinos

•                            Upcoming Events I

  NNN07                           NNN07
                                    Megaton Physics


•              Megaton Physics           P-decay
                                     Astro Neutrinos
                                        Beam Ne
                                     Beam Neutrinos

•
•              P-decay
•              Astro Neutrinos
•              Beam Neutrinos

CARE07, 31 Oct 2007              V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
Pivot Target & Collection CERN PS Experiment
                                           can we digest the MMW?




   CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
Muon Ionization Cooling experiment at RAL
                        Experiment at RAL




   CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
                                BENE plans
                                 for 2008                                → 2008


− Feb 5                 Euro-ʋ first meeting                             → 2011


− February 29           submission of IA Proposals                       → 2012
                                         CARE Next
                                         HEP Detectors IA

− Summer                NuFact08 Valencia Jun 28-Jul 4


− Fall                  Care08
                        Euro-ʋ / NuFact IDS joint meeting

− Jan09                 Final Scientific Report (Main Deliverable)
                          road map of recommendations CARE/ECFA/CERN Yellow Report
                                  our next opportunity “to speak up”
                                      V. Palladino CARE GB, 30 Oct 07

  CARE07, 31 Oct 2007     V. Palladino Report on BENE Activities
            BENE Implementation Plan for the >12 months till completion


      1     2   3    4     5    6     7   8   9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Oct                                                                                                                       CARE07/BENE07
Nov
Dec


                                                   Annual Report 2007


Jan                                                                     NF IDS
                           Euro-ʋ
Feb                                                                                                                       Submission IAs
                         B ENE M eeting
Mar
Apr
May                                                                                              Neutrino2008, Christchurch
Jun                                                                                                                  NuFact08
Jul       Valencia
Aug
Sep                                                             NNN08
                                                                                                          CARE08/BENE08
Oct                                                                                                       Euro-ʋ Town Meeting
                                                                                                          NF IDS P lenary M eeting
Nov
Dec                                             Complete Draft of Final Scentific Report


                                              Being defined




      CARE07, 31 Oct 2007                                                V. Palladino Report on BENE Activities
                                                          Consumabl                                             Expected
                  Permanent                 Durable
                               Elligible                  es and Travel                                         costs
      Participant Staff direct              Equipment                                                                     Requested
                               Staff direct               Prototypin direct cost All direct Subcontrac Indirect including
 N2   (cost       cost                      direct cost                                                                   funding
                               cost ONLY                  g direct ONLY Cost                    t        cost indirect
      model) ONLY(Eur                       ONLY                                                                          (Euros)
                               (Euros)                    cost ONLY (Euros)                                     cost
                  os)                       (Euros)
                                                          (Euros)                                               (Euros)

 1     CEA(FC)         0            0           0             0         9.500     9.500       0        0,00      9.500,00    9.500
 2    UCLN(AC)         0            0           0             0         2.000     2.000       0       400,00     2.400,00    2.400
 3 CNRS(FCF)           0            0           0             0           0          0        0        0,00        0,00        0
 4      GSI(FC)        0            0           0             0          500       500        0        0,00       500,00      500
 7      FZJ(FC)        0            0           0             0        21.000     21.000      0        0,00     21.000,00   21.000
 8     TUM(AC)         0            0           0             0         3.000     3.000       0       600,00     3.600,00    3.600
 10 INFN(AC)           0            0           0             0        15.000     15.000      0      3.000,00   18.000,00   18.000
 16    CSIC(FC)        0            0           0             0         5.920     5.920       0        0,00      5.920,00    5.920
 17 CERN (AC)          0            0           0             0        15.000     15.000      0      3.000,00   18.000,00   18.000
 18 UNI-GE(AC)         0            0           0             0        23.900     23.900      0      4.780,00   28.680,00      0
 19     PSI(FC)        0            0           0             0         5.220     5.220       0        0,00      5.220,00      0
 20 STFC-RAL (FC)      0            0           0             0         8.000     8.000       0        0,00      8.000,00    8.000
 21    ICL(AC)         0            0           0             0       12.000,00   12.000      0      2.400,00   14.400,00   14.400
      Grand
      total            0            0           0             0        121.040    121.040     0     14.180,00 135.220,00 101.320

CARE07, 31 Oct 2007                                               V. Palladino Report on BENE Activities
                              BENE interests
                                   in the
                        CARE-Next Integrating Activity


− Three WGs at work since Spring 07



− The present proposals of the three WGs
                      and our interests in each of them



− Work towards the proposal (February 29)
                                                                 M. Meddahi
                                                                 V. Palladino
                                                                 BENE07, 29 Oct 07

  CARE07, 31 Oct 2007               V. Palladino Report on BENE Activities
       Today‟s snapshot of CARE-Next:
−   3 WGs  at work since Spring 07
                                      4 JRA‟s
−The Open Meeting on our next IA proposal (OMIA, CERN Sep 10-11)
                               Joint Research Activities
− ESGARD meeting Oct 15
          further definition of the content of the proposal, CrabWaist rescued              13.5 M from EC
          identification of the general coordinators Koutschouk & Lebrun                      1/3 total effort




                                               FFAG             CRAB




           Plus 1.5 M for                                                                          ʋ facility
                               NAs Networking Activities
                               TAs Trans-national Access programs

        CARE07, 31 Oct 2007                        V. Palladino Report on BENE Activities
The present proposal of WG1:                                          HIHEp         JRA


                                                & BENE „s interests in it
R. Garoby today
                                                                               15 M
Networking Activities                                                         roughly
-EURO-Lumi:           ….. the network for S-LHC
-NA on neutrinos:         …. “BENE-Next”                                      4,350 M EC


Joint Research Activities
Colmat: R&D for LHC collimators ie material hardness to heat, shock and
radiation.                          target & collection
HFM+ HTS_L: High field magnets + high temperature superconductors.
                                    driver&acceleration&storage

-and in addition
-SCPL1.355 ME construction of beta=1 cavities in Saclay in the SCRF JRA.
-                                    p-driver, acceleration?

Transnational acess program
-TAs CryoMagNet
-TA HiRadMat:                       ….. access to COLMAT facility
    CARE07, 31 Oct 2007              V. Palladino Report on BENE Activities
BENE-Next                            Proposal of an FP7 accelerator neutrino Networking Activity

The “European Strategy for Particle Physics” emphasizes the importance of accelerator-based neutrino experiments, and sets the milestone for the next major undertaking in
this field in 2012: Studies of the scientific case for future neutrino facilities and the R&D into associated technologies are required to be in a position to define the optimal
neutrino program based on the information available in around 2012.

A vigorous networking activity is necessary to ensure that the technical information on accelerator technologies and the scientific arguments are gathered,
developed, and discussed within and outside the neutrino community.
The NA intends to deliver at the end of 2012 an agreed programme                   of neutrino experiments, based on upgrades of existing infrastructures
and/or on the proposal of a new one.

Among the possibilities the following will be considered and evaluated.
-Upgrade of the existing Cern to Gran Sasso facility; understanding of the ultimate upgrade potential, by combination of improved neutrino flux, neutrino spectra,
flux monitoring abilities and far detector design and location.
-A new neutrino facility, such as a beta-beam or a neutrino factory complex, offering much higher rate and purer flavour content, allowing a more
ambitious programme of complete determination of the physical quantities governing neutrino oscillations: mass splits, flavour mixings and charge-parity violating phase.
The NA will be rooted in the FP6 BENE NA, active since 2004, itself born from the ECFA Study Groups active since 1998 . The existence of an organized
open discussion and dissemination forum joining the EU accelerator & particle physicists active or being attracted in the sector has proven decisive over almost a decade.
The European activity is embedded in an international effort; most remarkable are the yearly “NuFact” International Workshops on Neutrino Factory,
Superbeam and BetaBeam“. Started in 1999 in Europe and returning every three years, it is an extremely fruitful example of collaboration of accelerator and particle physics
from Europe, America and Asia..

Strengthened by FP6 support, BENE achieved the recognition in the Strategy Document of its physics case and of its plea for timely R&D. Its         3 main goals are also
being delivered as promised
 -first progress in community building and harmonization of national projects and interests.
 - preliminary road map towards the scientific & technical choice of the new facility
 -precious collaborative studies and R&D projects now under way, soon including the FP7 EuroNu DS and the International Design Study effort.

The objective of this NA represents the natural completion of this process. The NA will be able to integrate in its proposal the results of a CNGS upgrade study, of the EuroNu
design study of the Neutrino Factory, Superbeam and BetaBeam options, of the state of the art, coordinated R&D that will take place in the Integrating Activity and of other
R&D projects in progress. Its final proposal should be backed by the widest possible majority of the EU community active in on neutrino accelerator infrastructures worldwide,
at the CNGS, at the US (NuMI) and at the upcoming Japanese (T2K) facilities.

The NA funds will support participation of this community to
-the IA meetings and the NA own plenary meetings and parallel workshops
-the open meetings of the EuroNu DS
-the yearly international “NuFact” Workshop


             CARE07, 31 Oct 2007                                                    V. Palladino Report on BENE Activities
                                   Proposal of an FP7 accelerator neutrino Networking Activity
BENE-Next
The “European Strategy for Particle Physics” emphasizes the importance of accelerator-based neutrino experiments, and sets the milestone for the next major
undertaking in this field in 2012: Studies of the scientific case for future neutrino facilities and the R&D into associated technologies are required to be in a position to
define the optimal neutrino program based on the information available in around 2012.

A vigorous networking activity is necessary to ensure that the technical information on accelerator technologies and the scientific arguments are gathered,
developed, and discussed within and outside the neutrino community.
The NA intends to deliver at the end of 2012 an agreed programme                of neutrino experiments, based on upgrades of existing infrastructures
and/or on the proposal of a new one.

Among the possibilities the following will be considered and evaluated.
-Upgrade of the existing Cern to Gran Sasso facility; understanding of the ultimate upgrade potential, by combination of improved neutrino flux, neutrino spectra,
flux monitoring abilities and far detector design and location.
-A new neutrino facility, such as a beta-beam or a neutrino factory complex, offering much higher rate and purer flavour content, allowing a more
ambitious programme of complete determination of the physical quantities governing neutrino oscillations: mass splits, flavour mixings and charge-parity violating phase.
The NA will be rooted in the FP6 BENE NA, active since 2004, itself born from the ECFA Study Groups active since 1998 . The existence of an organized
open discussion and dissemination forum joining the EU accelerator & particle physicists active or being attracted in the sector has proven decisive over almost a decade.
The European activity is embedded in an international effort; most remarkable are the yearly “NuFact” International Workshops on
Neutrino Factory, Superbeam and BetaBeam“. Started in 1999 in Europe and returning every three years, it is an extremely fruitful
example of collaboration of accelerator and particle physics from Europe, America and Asia..

Strengthened by FP6 support, BENE achieved the recognition in the Strategy Document of its physics case and of its plea for timely R&D. Its    3 main goals are also
being delivered as promised
 -first progress in community building and harmonization of national projects and interests.
 - preliminary road map towards the scientific & technical choice of the new facility
 -precious collaborative studies and R&D projects now under way, soon including the FP7 EuroNu DS and the International Design Study effort.

The objective of this NA represents the natural completion of this process. The NA will be able to integrate in its proposal the results of a CNGS upgrade study,
of the EuroNu design study of the Neutrino Factory, Superbeam and BetaBeam options, of the state of the art, coordinated R&D that will take place in the Integrating
Activity and of other R&D projects in progress. Its final proposal should be backed by the widest possible majority of the EU community active in
on neutrino accelerator infrastructures worldwide, at the CNGS, at the US (NuMI) and at the upcoming Japanese (T2K) facilities.

The NA funds will support participation of this community to
-the IA meetings and the NA own plenary meetings and parallel workshops
-the open meetings of the EuroNu DS
-the yearly international “NuFact” Workshop

             CARE07, 31 Oct 2007                                                 V. Palladino Report on BENE Activities
Proposed Second Level
                                       Work Breakdown Structure for the NA

 WP1 Management & coordination

 WP2 Getting the most of existing neutrino facilities

          - CNGS intensity limits
          - possibility of adaptation of the CNGS neutrino spectrum and of flux monitoring to physics
            needs (link to JRAs in FP7-IA)
          - Evaluation of the physics potential of upgrades                                      !!!!!!
 WP3 Road map to the future

       - evaluation of the compatibility of future neutrino facilities to the accelerator upgrades in
         the interested European laboratories
        - evaluation of technological risks of the proposed options
       - evaluation of the synergies with other physics programs
       - upgrade path and flexibility
        - Choices of the facility(es) and proposal

A more detailed breakdown is in preparation


    CARE07, 31 Oct 2007                          V. Palladino Report on BENE Activities
  The present proposal of WG2 NCLC                                                  JRA


                                           & BENE „s interests in it
                                                                       E. Jensen Oct 26
Networking Activities
                                                                           15 M
Support for BENE Next
                                                                          roughly
                                next slide                                 4,350 M EC




Transnational acess program
Support for TA-MICE




      CARE07, 31 Oct 2007     V. Palladino Report on BENE Activities
                                NC Hi Gradient RF
                                                         Buncher
                                                         Phase Rotation
                                                         Ionisation Cooling
                                NB Atomic level breakdown simulation




                                                          To NAT (4th JRA)
                                                           with last minute
                                                             CRAB waist
                                                                 addition

CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
   The present proposal of WG3 SCRF                                                                     JRA


                                                             & BENE „s interests in it
                                                                                         O. Napoly Oct 26
Networking Activities
                                                                                             15 M
As generally planned
                                                                                            roughly
Joint Research Activities                acceleration in RLAs                              4,350 M EC
                                                        FFAGs
JRA1 SC RF Cavities                                                  p driver
Include SCPL 1.355 ME construction of beta=1 cavities in Saclay
                                                            ISOL ¼ wave
JRA2 Accelerator & Beam Studies

JRA3 RF test infrastructore at CERN                             all our SCRF needs


Transnational acess program
As generally planned



       CARE07, 31 Oct 2007                      V. Palladino Report on BENE Activities
 The present proposal of JRA4 NAT
                                                                             JRA


                                       & BENE „s interests in it
                                                                 E. Jensen Oct 26



EuroFFAG …. for EMMA … Meot, Edgecock, Berg
                                           380 KE from EC

Crab Waist …. M. Biagini …. for DAFNE

SHLC ?




  CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
                          Conclusions
Moving on with this
          23 Nov          WBS Schedule Cost Milestone
         end Nov          ESGARD + Directors again
          11 Jan          Draft Proposal
          29 Feb          Submission

Must write BENE-Next, EuroFFAG, TA-MICE sections
     grow systematically aware of how all JRAs evolve
             identify (create? )
                 & be ready to exploit their opportunities for us




    CARE07, 31 Oct 2007            V. Palladino Report on BENE Activities
                    Beams for European
                    Neutrino Experiments
                           (BENE)
                                         subtitle:

A Network aiming at a consensual road map for accelerator based neutrino programs in Europe

               Null result from MiniBoone      February



                            International Design Study                        of a Neutrino Factory
                                                     (NF IDS) started March
       CNGS II
                                               FP7 Design Study
                            of next European Accelerator Neutrino Facility approved August

A complex                                                 Euro-ν
multi-parameter                 CNGS first high intensity run October
problem                                                                   & theething problems
                                        Events in the OPERA bricks
     CARE07, 31 Oct 2007                CARE-Next on BENE Activities
                                         V. Palladino Report
                      THE END




CARE07, 31 Oct 2007     V. Palladino Report on BENE Activities
                  NuFact06
              NuFact high energy stategy
          .1 Mton magnetic detector
                few 1000 Km
                                               USNF ...... UKNF ..
                           NNN06
               Betabeam/SuperBeam low energy strategy
              0.5-1.0 Megaton Water(HyperK, UNO, Memphys)
                       .1 Megaton Li-Ar
                      T2HK, DUSEL ….. Frejus
                                      Gran Sasso Annex
CARE07, 31 Oct 2007          V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
                      European
                      Regional
                       Outlook


                        V. Palladino
                         NuFact06
                UC Irvine, Tue Aug 29, 2006


CARE07, 31 Oct 2007        V. Palladino Report on BENE Activities
                         what have we got in Europe?
the CNGS                       how much is that worth?
OPERA
Icarus
       BENE and HIPPI
        Betabeam DS
                   ISS Groups
                     SPL CDR2
                         HARP
                           MICE
                            MERIT
                                Laguna
                                 The CERN Council Strategy Document
   CARE07, 31 Oct 2007             V. Palladino Report on BENE Activities
                The CNGS has started




CARE07, 31 Oct 2007      V. Palladino Report on BENE Activities
                                                    μ/p just about right
                                                                   comparison measurement-simulation, horizontal pit1
               0.4

                                                                                                                                                                                     meas: nominal
              0.35                                                                                                                                                                   sim: nominal


               0.3



              0.25
charges/pot




               0.2



              0.15



               0.1



              0.05



                0
                 -157.5 -146.3   -135 -123.8 -112.5 -101.3   -90    -78.75 -67.5 -56.25   -45   -33.75 -22.5 -11.25   0    11.25   22.5   33.75   45   56.25   67.5   78.75   90   101.2 112.5 123.7   135   146.2 157.5
                                                                                                                                                                                     5           5             5
                                                                                                                      cm
                                                                                                                                                               Preliminary
                                                                                                                                                  Courtesy P. Sala and E. Gschwendtner
              High intensity mid october

                                                        Thanks, Malika & Konrad et al. !
                 CARE07, 31 Oct 2007                                                                        V. Palladino Report on BENE Activities
OPERA : it is worth silver (t detection)                           νμ/νe →νt t




    CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
                                                                 νμ→νe
ICARUS & beyond …. worth platinum




  CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
          BENE/CARE 2004-2008
      rooted in the Muon Study Groups, active since 1998


CERN                                                  worth travel money
France: CEA, CNRS-IN2P3
                                                      hopefully
Germany: TUM, GSI, FZJ                                the embryo of
                                                      a real continental
Spain : CSIC + Universities                           collaboration
Italy :INFN Labs & Universities
UK : CCLRC & Universities             the UKNF
                                       includes new Cockroft & Adams Institutes!

B : Louvain
CH : PSI & Universities                            NB : HIPPI is worth a lot
                                                      3.6 M from EC only

 CARE07, 31 Oct 2007          V. Palladino Report on BENE Activities
   A new accelerator neutrino facility?
                    CARE
               Coordinated Accelerator
Within         R&D in Europe
CARE
(ECFA)
  3
Networks



BENE
2004-2008




   and
4 “JRAs”
HIPPI
       CARE07, 31 Oct 2007               V. Palladino Report on BENE Activities
                        stronger BENE SG

PHYSICS Mezzetto (Padua) + Donini (Madrid)
DRIVER Zito (CEA)
TARGET Densham (RAL)
COLLECTION Dracos (IN2P3)
NOVEL BEAMS MUFRONT Long (IC London)
              MUEND         Meot (CEA/IN2P3)
              BETABEAM Lindroos (CERN)

  CARE07, 31 Oct 2007         V. Palladino Report on BENE Activities
Betabeam Design Study 2005-2008
             worth several M (1 from EU, within Eurisol)

   echo of progress at Nufact06 with Fabich’s plenary talk and




CARE07, 31 Oct 2007            V. Palladino Report on BENE Activities
Nobel class contribution:
superior production of Li & B parents

C. Rubbia




   CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
ISS Detector Group : worth gold?                                              νe → νμ
Blondel, Soler
                              Super Minos, INO ………..                    Hyper-CDHS




        CARE07, 31 Oct 2007          V. Palladino Report on BENE Activities
ISS Physics Group :
very solid: Long ….. Donini, Gomez-Cadenas, Hernandez, Huber,
King, Lindner, Mezzetto, Winter             & many more
        boosted the work of comparison, systematics included
              having it in place is a major asset


                         ISS Accelerator Group :
                         EU effort not yet adequate
                               UKNF, CEA ……
                                  we need the CERN divisions


   CARE07, 31 Oct 2007               V. Palladino Report on BENE Activities
Superconducting Proton Linac (SPL) : CDR2



                                                                     a
                                                                  4 MMW
                                                                 Backbone




                                                                    5 GeV
                                                                    appear
                                                                    possible

  CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
At last, large angle data from HARP




  CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
Pivot Target & Collection CERN PS Experiment
                                           can we digest the MMW?




   CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
  The CERN Council Strategy Process
Almost one year long

Two CERN task forces
PAF = proton accelerators for the future
POFPA = physics opportunities of future proton accelerators

……many other input from all sectors in Europe

Orsay Preparatory Open Symposium Jan 30-Feb1

Zeuthen Closed Meeting of the strategy group May 2-6

                   Special session of Council in Lisbon Jul 14
   CARE07, 31 Oct 2007             V. Palladino Report on BENE Activities
  BENE‟s document to Council


                                       outline and plea
                                              for
                                   a timely R&D program




                               CERN Yellow Report 2006-05
                               available at
                               http://bene.web.cern.ch/bene/


CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
                                 High power?




                                                               HIPPI
                                                               +FETS




CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
           the real task and challenge

   creation of a continental collaboration
      with a leading CERN kernel
          with regular and adequate
               participation & funding from each national lab
                                            and national agency


richness of options makes consensus more laborious
              NB legitimate different scientific interests do exist

     need an unprecedented level of coherence & good will
               otherwise ….. LHC upgrade, ILC, CLIC ….
     CARE07, 31 Oct 2007           V. Palladino Report on BENE Activities
         ISS (and IDS) in a nutshell
• Physics boosted comparison unprecedently,
  including systematics GLOBES !!!!!!!!! M. Lindner

• Accelerator updated NuFact Baseline,
  defined R&D priorities
  started exploring sinergies with Superbeams

• Detector
  rejuvenated simulations, established baselines
  for the few main options, defined R&D priorities

CARE07, 31 Oct 2007        V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
                                    Set one up in Europe!




                                             OK !!!


                                         FP7 EU ν Collaboration
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
A very high priority aim:

 a European Neutrino Oversight Body

  for BENE and future initiatives to report to

                to bring about the indispensable consensus

                        PAF shows the way
                          MMW Driver, Target, Collectors …..
                                     everybody needs them
 need advice & help of
                CARE & ESGARD
  CARE07, 31 Oct 2007             V. Palladino Report on BENE Activities
BENE efforts for FP7
Please contact us and join to help
NuFact&Superbeam Design Study
Rob Edgecock(RAL) and Marcos Dracos(IN2P3) have taken the responsibility to start a WG assembling a first skeleton of proposal to be
presented at CARE06 in Frascati (Nov14-17). This was given good priority by ESGARD and is at the moment the most promising immediate
option that we have.

Betabeam Design Study
A DS study is already in progress in the Eurisol framework. Mats Lindroos (CERN) has taken the task to explore within the present DS a first
skeleton of a second phase proposal. At the moment, however, it appears that we will have to delay this to the later FP7 DS call. Mats will
present his present thinking at CARE06

Several Joint Research Activities (JRA),

IA1- European proton accelerator R&D
      high power option for a proton driver sector JRA
      M. Zito/CEA and J. Pozimski /RAL will follow it
      target sector (a WP in a larger JRA? )
      C. Densham/RAL and M. Dracos/IN2P3 have taken the charge of establishing contacts
      A Networking Activity (NA) containing a fraction of BENE areas of interest could be accommodated in this IA.

IA2-Novel accelerating techniques
    Strengthening "our" new RAL muon facility could be part of it too. A MICE JRA is being prepared by K. Kyberd and A. Blondel.
    A JRA on FFAG’s. Francois Meot (IN2P3/CEA) has accepted the task, in collaboration with R. Edgecock, S. Machida
    No discussion on any Networking Activity (NA) nor Transnational Access has yet taken place in this IA.

IA3 Superconducting RF (SCRF) accelerators R&D:
     Rebecca Saviour of Lancaster has accepted to be BENE‟s RF expert that will foster BENE interests in this IA.
          CARE07, 31 Oct 2007                                      V. Palladino Report on BENE Activities
                       Immediate plans
            Design Study Proposal(s) NOW


December 1     Extended draft of Design Study description(s)

Up to Feb 19   Visit to all interested laboratories in Europe

Feb 19-21      International Meeting on ISS to IDSs transition
  CERN
                              harmonising FP7 and IDSs

Mid April?      DS Proposal(s) in


            IA Proposal(s) immediately later


 CARE07, 31 Oct 2007                 V. Palladino Report on BENE Activities
               Next 18 months




CARE07, 31 Oct 2007    V. Palladino Report on BENE Activities
                      THE END




CARE07, 31 Oct 2007     V. Palladino Report on BENE Activities
BENE efforts for FP7
Please contact us and join to help
FP7 is finally starting. A first FP7 call, for Design studies, is expected before the end of the year. Proposals will be due in April, a few months later. Approval could bring first funding at the beginnining of
2008 or so.
A second call, for Integrating Activities, is expected Nov 07, with Mar 08 as a deadline, with first funding early 2009. This must contain NAs, TAs, JRAs, see below
Next relevant calls 2009 !!! We should not be stalling for two more years !!
We need the largest possible consensus and coherence. It will clearly not be easy to assemble all the conditions, support from CERN and National agencies and Laboratories, for successful bids.
According to the recent ESGARD/CARE preliminary plan, see http://bene.web.cern.ch/bene/Working-groups_mandate.doc, BENE could file bids for
Two Design Studies (DS): DS‟s are studies of feasibility, to be carried out by a European collaboration, funded (presumably for about 1/3?) by EU and working in collaboration with international partners. Recent news
are that the contribution from EC could be larger than originally indicated, as large as 5 M Euros, and R&D work could be included in addition to feasibility studied.
NuFact&Superbeam Design Study
Rob Edgecock(RAL) and Marcos Dracos(IN2P3) have taken the responsibility to start a WG assembling a first skeleton of proposal to be presented at CARE06 in Frascati (Nov14-17). This was given good priority by
ESGARD and is at the moment the most promising immediate option that we have.
Betabeam Design Study
A DS study is already in progress in the Eurisol framework. Mats Lindroos (CERN) has taken the task to explore within the present DS a first skeleton of a second phase proposal. At the moment, however, it appears
that we will have to delay this to the later FP7 DS call. Mats will present his present thinking at CARE06 in Frascati (Nov14-17).
Several Joint Research Activities (JRA), JRA‟s are technical R&D projects on realization of key prototypes, demonstrations of performance
and the like, to be carried out by a European collaboration , funded (presumably for about 1/3?) by EU and working in collaboration with
international partners.
Bids for JRA‟s should take place within the framework of one of the Integrating Activities that ESGARD intends to promote. Many
LOI‟s have been received by ESGARD and more are coming. The task is now the one to select the ones to be actually proposed as JRA‟s
within Ia‟s. At the moment, three IA‟s are envisaged, but a different format is not excluded.
A first meeting of the task force preparing these proposals took place at CERN on Oct 30. A brief summary of the state of each follows
Presentations from the three coordinators will be presented at CARE06 on Thu Nov 16 afternoon.
IA1- European proton accelerator R&D
         R. Garoby is coordinating the preparation of this proposal. The general theme is proton accelerator R&D, strengthening LHC
and the CERN p complex. The total cost of related LOIs is well above 60 M, a reasonable goal is applying for 15 M from EU, with 45 M
as total budget. Activities relevant for future neutrino beams would take place in the high power proton driver sector (a JRA being
proposed in this area under the responsability of Garoby and collaborators). M. Zito/CEA and J. Pozimski /RAL and others will follow
this for BENE exploring also opportunities in the sector of Rapid Cycling Synchrothrons for neutrino applications (NB we need them to
be truly rapid, 50 Hz eventually, and therefore NC!).) and target sector (where a WP on high power targetry & collection can be envisaged
within a JRA on high power and radiation deposition in materials, chiefly motivated by the R&D for a high quality collimators for LHC).
C. Densham/RAL and M. Dracos/IN2P3 have taken the charge of establishing contacts with all EU experts, in and out of the particle physics
community, in particular the CERN CNGS and ISOLDE experts, and to try to define the content of such a WP. CARE06 in Frascati should
help these contacts. A Networking Activity (NA) containing a fraction of BENE areas of interest could be accommodated in this IA.
Transnational Access options have not yet been seriously considered yet.
IA2-Novel accelerating techniques
       E. Jensen is coordinating the preparation of this proposal. This is much less advanced than IA1
       The total cost of related LOIs is 85 M. It has to be reduced dramatically. The leitmotif of the IA is strenghtening CTF3.
       But strengthening "our" new RAL muon facility could be part of it too. A MICE JRA is being prepared by K. Kyberd and A. Blondel.
       A JRA on FFAG’s appears negotiable, if downsized. Francois Meot (IN2P3/CEA) has accepted the task, in collaboration with R. Edgecock,
      S. Machida and other experts of pushing this within the team preparing this IA proposal.
       Discussion at CARE06 should prove very instrumental.
       No discussion on any Networking Activity (NA) or Transnational Access has yet taken place in this IA.
IA3 Superconducting RF (SCRF) accelerators R&D:
       O. Napoly is coordinating the preparation of this proposal. This is also less advanced than IA1.
       The total cost of related LOIs is 31 M, with more big ones still coming. One is a JRA for a big RF testing facility.
              CARE07, 31 Oct 2007                                                                   V. Palladino Report on BENE Activities
       A JRA on 200 Mhz muon acceleration cavities could be accommodated in this. R&D on p acceleration cavity may instead go to WG1, will see
                      Reserves




CARE07, 31 Oct 2007     V. Palladino Report on BENE Activities
   A complete Euro-Neutrino                                            Design Study
                       physics, accelerators, detectors, baselines
is next natural step for accelerator ν                                    ISS & IDS/FP7 DS
   •   ISS= International Scoping Study … American and Asian collaborations as full partners              CDHS
                                                                                                       CHARM I/II
                                                                                                        CHORUS
                          June 2005 to late 2006: mostly neutrino factory & superbeams                   NOMAD
                                                                                                         OPERA
                          define priorities and ways of Design Study                                     ICARUS
                          consolidate regional & international collaboration
                                                                                                     BENE
                          us in EU, gain support of Council and ECFA

   •   IDS = International Design Study (neutrino factory & superbeams & betabeam)

                          start late 2006 or early 2007
                          achieve higher funding, start design effort
                          us in EU, prepare FP7 Proposal (March 2007, it seems)
                          structure EU collaboration, get CERN involved as much as possible

   •   FP7 DS = EC (support for EU effort in the) Design Study … CNGS & beyond

                          aiming at first EC funds Jan 1, 2008
                          inter-twined with IDS
                          keeping American and Asian collaborations as full partners …. T2K , Nova

   Goal: Conceptual Design Report
                      of a European Precision Neutrino Facility by end 2010

       CARE07, 31 Oct 2007                          V. Palladino Report on BENE Activities
                      guessing the      Content of the Design Study
conceptual feasibility study of the following components:
a high power proton driver of at least 4-5 GeV
the engineering of the handling, containment and safety aspects of a hi power target & collection station
a performing and cost effective muon phase rotation and cooling channel
non-scaling FFAGs for acceleration of muons (and possibly protons)
an optimised storage ring for muons
higher intensity and higher gamma beta beams


technical preparatory (R&D) projects, aiming at demonstrating
the existence of at least one adequate choice of target
an extended lifetime of the horn prototypes at high rate and radiation
muon ionization cooling, by completion of the MICE experimental program
operation of a non-scaling FFAG
RF cavities and kicker magnets for fast manipulation of muon beams


+ specific detector R&D and design efforts on :
photo detector development for very large far detectors
developments of the liquid argon technique including the presence of magnetic field
study and tests of a magnetic calorimeter susceptible to be built with a mass of up to 100 kton.
detectors dedicated for tau detection such as the emulsion cloud chamber
last but not least the necessary near detector concepts and beam instrumentation

        CARE07, 31 Oct 2007                   it now to ECFA/ESGARD
                               pre-submittingV. Palladino Report on BENE Activities scrutiny
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
Agenda of the BENE day at RAL

>> Fri Apr 28 Morning : general introduction
>>
>> 9:00 Status and prospect of the ISS, towards the IDS (Dornan)
>> 9:10 Address from ESFRI Chair (J. Wood)
>> 9:40 News from EC (R. Aleksan, tbc)
>> 10:00 FP7 (DS, JRA's) and general outlook in EU (Edgecock)
>> 10:30 US contributions to the IDS (A.Bross)
>>
>> 10:40 Break
>>
>> 11:00 Japan contribution to the IDS (Kuno)
>> 11:20 Other contributions to the IDS (Mondal, tbc)
>>
>> 12:00 General Discussion until lunch
>>
>>
>> Fri Apr 28 Afternoon : EU contributions to the IDS(*)
>
>> 1) Initiative in the Physics studies sector (Mezzetto/Donini 20')
>> 2) Initiative in the Proton driver sector(Cavata 10')
>> 3) Initiative in the Target sector (Bennett 10')
>> 4) Initiative in the Collection sector (Dracos 10')
>> 5) Initiative in the Muon Front End sector (Long 10')
>> 6) Initiative in the Muon Back End sector (Meot 10')
>> 7) Initiative in the Betabeam sector (Lindroos 15-20')
>> 8) Initiative in the Neutrino detector sector (Blondel 20')

  General Discussion on EU contributions to the IDS
          (introduced & chaired by R. Garoby)

(*) NB this will be match very closely our requests to FP7

     CARE07, 31 Oct 2007                                       V. Palladino Report on BENE Activities
    proud to have gotten this far
Matching our two crucial 2005 milestones

       • Physics case developped as far as possible today
               in the most international context possible
               becoming a polished BENE Interim Report
       • Design Study road traced by ISS


in spite of outstanding difficulties
   smaller size of our community & its core of active people
   CERN contribution being resurrected only now (very slowly)
   richness of options that makes consensus more laborious
                   NB legitimate different scientific interests do exist
   collapse       of FP6 calls                                        and more
   CARE07, 31 Oct 2007                   V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
            After a few nice forward jumps
                          1 step back and ½ step forward
2
0    approval of BENE
0   NA within I3 (CARE)
3
-
          MMW Workshop
2
0               Villars & beyond
0
4                     Nov 04   Niet!
                                                           Mar 05   Niet! I3ν?
            FP6 Design Study?
                 Mar 05
                                                 1 year
                                                   ISS        Jun 05-Aug 06

                                                                                 FP7&WDS
                                                                                Design Study
                                                                                  Mar 07?
    CARE07, 31 Oct 2007                V. Palladino Report on BENE Activities
Two main physics strategies
 use of the high neutrino rate (>1020/year) and energy (10-50 GeV) of
     Neutrino Factory + LMD (“Hyper-MINOS”)
      m  νe + νm     detector of large but not huge mass (50-100 Kt),
                           necessarily magnetic
                           (a dense magnetized Iron detector,
                                                     or, possibly, Li-Argon),
                           a few 1000 Km away.

 use of the lower neutrino rate (1018-19/year) and energy (sub-GeV) of
    Betabeam + Megaton (“Hyper-Kamioka”)
      b  νe       low density detector of very large mass (0.5-1 Mt)
                                            and volume      (0.5-1 Mm3)
                            non magnetic
                            (a Water Cerenkov detector,
                                                     or possibly, again Li-Argon),
                           a few 100 Km away.
     CARE07, 31 Oct 2007          V. Palladino Report on BENE Activities
Garoby
Haseroth
           EU Neutrino Complex
Lindroos
                           Muon Complex                          BetaRing




                                                                         G.Sasso
                                                                          LMD
                                                                         0.1 Mton



    Proton complex


                                                                       Frejus 1 Mton
     CARE07, 31 Oct 2007        V. Palladino Report on BENE Activities Water C
Superbeam (high power conventional beams)
   p  νm                                is less performing, per se
 but does have technical synergy with the NuFact
                              largely coincides with the front end of a Factory
                              solving the technical challenges of a several MegaWatt
                              proton driver and target & collection system,
                              on the way to build a factory,
                              yields a superbeam facility essentially for free
                                                     (not its detector, however!)
 and does have scientific synergy with the Betabeam
                              can use the same detector
                              combination has some truely unique features:
                              1) oscillation signal is νe→νμ in the first,
                                                       νμ→νe. in the second,
                                 one calibrates the signal (and background) of the other !
                              2) T-reversal and CPT asymmetries can be measured

                   likely to be integrated in both strategies
  CARE07, 31 Oct 2007                V. Palladino Report on BENE Activities
Esample of comparison of physics reach: θ13 and CP violating phase

                                                  Figure 7 : 99%CL d sensitivity of the beta-beam, of
                                                  the SPL-SuperBeam, and of their combination, see
                                                  text. Dotted line is the combined Superbeam+beta-
                                                  beam sensitivity computed for sign(Dm2)=-1.
                                                  Sensitivities are compared with a 50 GeV Neutrino
                                                  Factory      producing    2×1020m    decays/straight
                                                  section/year, and two 40 kton detectors at 3000 and
                                                  7000 km




 Comparable merits :
        NuFact somewhat better and more versatile for ν oscillations
        Megaton offers sinergy with N decay and more !!!
 NB conclusions highly preliminary
       based on still not well agreed yardsticks
            must now be re-scrutinized much more in depth (ISS)
     CARE07, 31 Oct 2007         V. Palladino Report on BENE Activities
                         A general remark
  Betabeam + Megaton                       and                     NuFact + LMD


                   are complementary !!!!!!!!!!!
             each has merits unaccesible to the other
       (matter effects, CP, T , CPT violation, p decay, astroph. & cosmology .. )




   !      by means of truely international collaboration
          we could and should aim at having both facilities                         !
                   we must push both very actively
                 catch opportunities wherever they emerge
seriously aim at building one in Europe in the “construction window”


   CARE07, 31 Oct 2007                    V. Palladino Report on BENE Activities
Further caveat
            Intermediate solutions also emerging !


Higher energy and higher rate betabeams
  heading to detectors at intermediate distances

 thou technically more difficult
          ( beta acceleration in new higher energy SPS
                                                or LHC !)

                       do deserve very careful attention


 CARE07, 31 Oct 2007               V. Palladino Report on BENE Activities
                                                                 HyperK
                                                                 UNO
                                                                 Memphys

                                                                  100
                                                               participants




CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
                                                     All aspects
                                                   of Megaton physics
                                                   revised and updated




                                                      state of the art
                                                      material for full
                                                      elaboration of
                                                      BENE physics case



CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
   …………………………………………………………




 Strong reinforcement of international cooperation achieved

CARE07, 31 Oct 2007         V. Palladino Report on BENE Activities
200 participants          All aspects of future ν physics revised and updated

  state of the art material for full elaboration of BENE physics case




    CARE07, 31 Oct 2007              V. Palladino Report on BENE Activities
         NuFact Scientific Program
• To be inserted




CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
                                                              Sunday June 26
                                                                 9:00-13:00



                                                          WW R&D
                                                           Session


1) Physics Studies : Status & priorities

1) Accelerator R&D : Status & priorities
2) Neutrino Detectors: Status & priorities
                    PANEL & OPEN DISCUSSION
 Launch International Scoping Study … to report at NuFact06
   CARE07, 31 Oct 2007           V. Palladino Report on BENE Activities
A Summer School accompanied the workshop: 22 students, 12 lecturers




  CARE07, 31 Oct 2007             V. Palladino Report on BENE Activities
                The
    International Scoping Study
               (ISS)
            on Neutrino Factories and Superbeams
               that must advance to same level of progress as Betabeams

  A joint venture, jointly set up by the coordinators of
                 S. Geer      the US Neutrino Factory Collaboration
                 Y. Kuno      the Japanese NuFact-J Work Group
                 V. Palladino the Eu BENE Network
                 K. Peach     and the host (RAL) UKNF Collaboration

to lay the foundation of a full blown International Design Study
     CARE07, 31 Oct 2007            V. Palladino Report on BENE Activities
All aspects included, except accelerator Betabeam studies

                                  started in March-April by RAL




CARE07, 31 Oct 2007          V. Palladino Report on BENE Activities
       International Scoping Study :
                      agenda for one year




                                                             Matching funds
22-24 Sep               CERN a success !!!
Late January            KEK
                                           + topical intermediate workshops
Mid April               RAL                           Physics, London, 14-21 Nov.
Late August             NuFact06 in Irvine

           hopefully, NuFact06 will          and FP7 Eu Design Study
             launch International Design Study

CARE07, 31 Oct 2007             V. Palladino Report on BENE Activities
Physics    (Y. Nagashima)                          The three sectors of SS (andDS)
compare performance of various options       NB BetaBeam included
on equal footing of
parameters and conventions                                Detectors (NEW!)            (A.Blondel)
and agreed standards of
resolutions, simulation etc.                              Water Cherenkov (1000kton)
                                                          Magnetized Iron Calorimeter (50kton)
identify tools needed to do so                            Low Z scintillator (100 kton)
(e.g. Globes upgraded?)                                   Liquid Argon TPC (100 kton)
                                                          Hybrid Emulsion (4 kton)
propose « best values » of
baselines, beam energies etc..                            Near detectors (and instrumentation)


                                            P. Dornan

                      Accelerator:
                                                                           (M. Zisman)
                      --    proton driver (energy, time structure and consequences)
                      --    target and capture (chose target and capture system)
                      --    phase rotation and cooling
                      --    acceleration and storage

                      evaluate economic interplays and risks
                      include a measure of costing and safety assessment


      CARE07, 31 Oct 2007                    V. Palladino Report on BENE Activities
BENE : the longer term plan

2005        06       07   08         09        10        11                               19
                                                                   Construction window
 Int. Scoping Study(*)
       feasibility

                           Design Study
                               Feasibility & TPW                                         Physics
                                                   CDR … at the time of
                                                   end of LHC payment
HIPPI, HARP
                                                   first LHC results
 MERIT                                             ILC decision
    MICE                                           be ready to catch
               PRISM, EMMA                         any construction window

          NB Betabeam CDR End 2009 !

   CARE07, 31 Oct 2007                         V. Palladino Report on BENE Activities
                   The HARP experiment



                          TPC




Total Acceptance
                                                        Scan
                  Forward                               CERN PS
                  Spectrometer                          energy range
    CARE07, 31 Oct 2007                                 … RCS is
                                 V. Palladino Report on BENE Activities an option
      The MERIT ( nTof 11) experiment

(US, Japan, CERN&RAL)
             holds the key to any superbeam !!!
               tests the single shot behavior at MMW driver
                     of target and collection (solenoid, horn?)

              can we master the MMW?
  should make that more known
                   better supported and manned

  should evolve that into a MMW target and collector Test Area?
 The most crucial experiment for the
           future of the ν
  CARE07, 31 Oct 2007             V. Palladino Report on BENE Activities
Liquid jet target in 15T mag. field




 CARE07, 31 Oct 2007                  V. Palladino Report on BENE Activities
MICE …. crucial demonstration esperiment
                              for the feasibility of a Neutrino Factory
                     muon ionisation cooling
Phase I completely funded by now- Datataking starts April 1 2007




   CARE07, 31 Oct 2007          V. Palladino Report on BENE Activities
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
                                                               Emma
CARE07, 31 Oct 2007   V. Palladino Report on BENE Activities
One crucial task of BENE in the ISS year

assemble a real EDS (Eu DesignStudy) collaboration !!!!!
                  that will sign
                  and provide the manpower & largest part of the funds,
                                              matching funds, for
                                 a FP7 bid able to have
                                 the blessing of ECFA and
                                 good odds of approval in Brussels.
find the synthesis of so far not obviously converging interests
    CERN, INFN, CCLRC, IN2P3, CEA, PPARC, CSIC, Germany?,
                             Belgium, NIKHEF, everybody

CERN positive attitude towards the ISS and BENE‟s initiative
     willingness to assemble a small ISS task force
                                    will no doubt greatly help
                                                a few fractions of FTE can make an impact
   CARE07, 31 Oct 2007             V. Palladino Report on BENE Activities
 Plans for the year ahead
Interim BENE Scientific Report, based on NNN05,NuFact05, ISS
             Draft http://people.na.infn.it/~palladin/BENEScientificInterimReport
                   input to the strategic discussion in progress
                   FPA, POFPA
                   Akesson/Peach Strategy group (Orsay Jan 30)

Conclude Scoping Study (NuFact06)

                            define the content of WDS and FP7 DS

Assemble FP7 Collaboration

                            prepare FP7 proposal

                            bridge over Aug 06 to FP7 funding (1Jan2008?)
      CARE07, 31 Oct 2007               V. Palladino Report on BENE Activities
      Milestones & Deliverables        BENE III period Jan 06 - Jun07
Jan
                            BENESG
Feb                         1/ month

Mar
Apr
May
Jun
Jul
Aug
Sep
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
      CARE07, 31 Oct 2007                        V. Palladino Report on BENE Activities
               Since CARESG Apr 11
Joint BENE & 3rd ISS meeting RAL 24-25 Apr
28 April LOI !!!!         BENE Midterm Report gets yellow in May


Open BENE SG 4 Jul CERN (FP7)

CERN Council Strategy Document

4th meeting of the ISS at UCI (21-23 Aug)
NuFact06 (24-30)
                      “End” of the ISS, next steps
    CARE07, 31 Oct 2007           V. Palladino Report on BENE Activities

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:3
posted:6/10/2011
language:English
pages:113