									Cowra Shire Council
 Ordinary Council Meeting Agenda




       Cowra Council Chambers

       116 Kendal Street, Cowra

               5.00 pm




 Monday, 23rd March 2009
                Ordinary Council Meeting
                Monday. 23rd March 2009

AGENDA

APOLOGIES


OPEN FORUM


CONFIRMATION OF MINUTES

   1.   Ordinary Council Meeting held 23rd February 2009


COMMITTEE RECOMMENDATIONS

   2.   Corporate Committee
   3.   Operations Committee


MOTIONS WITHOUT NOTICE




                                        P. Devery
                                        Director – Corporate Services
                                        12 March 2009
MINUTES OF PREVIOUS
   MEETING TO BE
    CONFIRMED
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


PRESENT:                    Cr WJ West, Cr IM Brown, Cr BE Miller, Cr JN Mallon, Cr RG
                            Watt, Cr RT Bridges, Cr JA Smith, Cr RJ Walsh and Cr PB
                            Wright


OFFICERS PRESENT:           General Manager, Director - Environmental Services and
                            Director – Cowra Operations


APOLOGY:

27/09   Moved Cr BE Miller, Seconded Cr RT Bridges, That the apology submitted on
        behalf of the director – Corporate Services (work commitments) be
        accepted and leave of absence granted.

        CARRIED


OPEN FORUM:

Pauline Coe Park

Mr Colemane and Mr Horvarth addressed Council expressing their concerns with some
activities taking place in the Park and asking council to carefully consider the proposed
redevelopment of the area.

Cowra Golf Club

Mr Watmore addressed Council on behalf of the Club expressing that while the Club is
grateful for any assistance Council can offer, would Council consider increasing the amount
of the proposed donation to assist the Club’s endeavours in obtaining a 15 megalitre
allocation.

General Manager’s Resignation

Ms Michelle O’Donnell, Mr Alan Thompson and Mr Peter Riley addressed Council on the
subject of the General Manager’s resignation from Cowra Council expressing gratitude on
behalf of staff and ratepayers for the hard work and achievements accomplished by Council
during Mr Roncon’s term.




This is Page 1 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


CONFIRMATION OF MINUTES:

28/09   Moved Cr IM Brown, Seconded Cr RG Watt, That the Minutes of the ordinary
        Meeting of Council held on Tuesday 27th January 2009 be confirmed.

        CARRIED


MAYORAL MINUTE

General Manager’s Resignation

29/09   Moved Cr WJ West, Seconded Cr IM Brown, That:

        1.     Council receive the resignation of General Manager, James
               Roncon, with regret and wish him all the very best with his future
               endeavours.

        2.     Council appoint Mr Paul Devery to the position of Acting General
               Manager to be effective 14 March 2009.

        3.     Council engage the recruitment services of LGSA Employment
               Solutions to conduct the recruitment process of Cowra Council’s
               new General Manager.

        CARRIED

CORPORATE COMMITTEE

DIRECTOR – CORPORATE SERVICES

Cash & Investments

30/09   Moved Cr IM Brown, Seconded Cr PB Wright, That Council note the
        summaries of available cash and investments as at 29th December 2008

        CARRIED




This is Page 2 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


ACTING DIRECTOR - ENVIRONMENTAL SERVICES

Naming of the existing laneway that is east of and parallel to Stuart Street and between
Noyeau Street and Belmore Street in the Village of Woodstock

31/09   Moved Cr JN Mallon, Seconded Cr RG Watt, That:

        1.     Council supports the naming of the existing laneway that is located
               east of and parallel to Stuart Street and between Noyeau Street
               and Belmore Street in the Village of Woodstock as ‘Kirkman
               Lane’.

        2.     Council publishes notice of the name ‘Kirkman Lane’ in the NSW
               Government Gazette.

        CARRIED

Development Application No. 130/2008, for the construction of a dwelling-house and garage
on Lot 41 DP 826344, 50 Milburn Creek Road Woodstock lodged by R G Searle.

32/09   Moved Cr RG Watt, Seconded Cr JN Mallon, That Development Application
        No. 130/2008, for the construction of a dwelling-house and garage on Lot
        41 DP 826344 be approved subject to the following conditions:

        Approved Plans and Documentation

        1.    The development shall be carried out in accordance with:

               (a)    the approved plan(s) stamped by Cowra Shire Council and
                      attached to this consent; and

               (b)    the Statement of Environmental Effects lodged in respect of
                      Development Application No. 130/2008

               except where amended by any of the following conditions. A
               current and approved copy of the building approval/consent and
               stamped plans is to be maintained on site for constructional and
               reference purposes.

        Principal Certifier Requirements

        2.     The applicant is to submit to Cowra Shire Council, at least two
               days prior to the commencement of any works, a ‘Notice of
               Commencement of Building or Subdivision Works’ and
               ‘Appointment of Principal Certifying Authority’.


This is Page 3 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


       3.     A sign must be erected in a prominent position on any site on
              which building work, subdivision work or demolition work is being
              carried out:

              (a)    Showing the name, address and telephone number of the
                     principal certifying authority for the work;

              (b)    Showing the name of the principal contractor (if any) for
                     any building work and a telephone number on which that
                     person may be contacted outside working hours; and

              (c)    Stating that unauthorised entry to the work site is
                     prohibited.

              Any such sign is to be maintained while the building work,
              subdivision work or demolition work is being carried out, but must
              be removed when the work has been completed.

       4.     Prior to any construction work being carried out on the site, the
              Applicant shall:

              (a)    Inform the Principal Certifying Authority in writing of
                     whether the work is to be carried out by a licensed builder
                     or owner builder as defined under the Home Building Act
                     1989; and

              (b)    Submit a Home Building Insurance Certificate issued under
                     Part 6 of the Home Building Act 1989.

              Note 1:      Details of the licensee's number and contractor license
                           number and/or owner-builder's name and permit
                           number is required to be submitted to satisfy Clause (a)
                           of this condition.

              Note 2:      The submission of a copy of an insurance policy that
                           covers the construction work is sufficient evidence to
                           satisfy Clause (b) of this condition.

              Note 3:      The Principal Certifying Authority must be informed of
                           any change of builder undertaking the construction
                           work.




This is Page 4 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


       Inspections

       5.     The Applicant is to obtain a certificate from Council or an
              Accredited Certifying Authority, certifying compliance with the
              Building Code of Australia and any other relevant condition of
              consent for the stages of construction listed in Clause 162A of the
              Environmental Planning and Assessment Regulation 2000. For the
              purpose of obtaining a certificate the works must be inspected by
              the Accredited Certifying Authority at the time specified below:

              At the commencement of the building work;

              (b)    After excavation for, and prior to the placement of, any
                     footings;

              (c)    Prior to pouring any in-situ reinforced concrete building
                     element;

              (d)    Prior to covering of the framework for any floor, wall, roof
                     or other building element;

              (e)    Prior to covering waterproofing in any wet areas;

              (f)    Prior to covering any stormwater drainage connections; and

              (g)    After the building work has been completed and prior to
                     any Occupation Certificate being issued in relation to the
                     building.

              Note 1:      If Council is required to carry out compliance
                           inspections at least 24 hours notice shall be given to
                           Council to allow for the inspection.

              Note 2:      An Occupation Certificate in relation to the building
                           cannot be issued by Council or an Accredited
                           Certifying Authority until the certificates required by
                           this condition have been issued or registered with
                           Council.

       6.     The applicant is required to obtain a certificate from Cowra Shire
              Council, certifying that all works relating to the construction of
              access driveways have been constructed and completed in
              accordance with Cowra Operations Engineering Standards. For




This is Page 5 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


              the purposes of obtaining the certificate, the works must be
              inspected by Council at the times specified below:

              (a)    Pre-construction: Prior to construction of works on the
                     roadway and after all sediment control and traffic controls
                     are in place.

              (b)    Vehicular Access: When the vehicular access driveways to
                     the site from the proposed new access road have been
                     constructed and prior to sealing.

              (c)    Completion: When all vehicular accesses, internal
                     driveways, and stormwater works have been completed.

       Construction Works

       7.     All building work must be carried out in accordance with the
              provisions of the Environmental Planning and Assessment Act
              1979 and the Building Code of Australia.

       8.     The applicant is to obtain a construction certificate pursuant to
              Section 109C of the Environmental Planning and Assessment Act
              1979 from either Council or an accredited certifying authority,
              certifying that the proposed works are in accordance with the
              Building Code of Australia and applicable Council engineering
              standards prior to any building and or subdivision works
              commencing.

              Note 1:      No building, engineering or excavation work is to be
                           carried out in relation to this development until the
                           necessary construction certificates have been
                           obtained.

              Note 2:      It is the responsibility of the applicant to ensure that
                           the development complies with the Building Code of
                           Australia and applicable engineering standards in the
                           case of building work and the applicable Council
                           Engineering Standards in the case of subdivision
                           works. This may entail alterations to the proposal so
                           that it complies with these standards.




This is Page 6 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


       9.     The builder must maintain on the work site a legible copy of the
              plan and specification approved with the Development Consent.

       10.    All construction operations involving the use of electric or
              pneumatic tools or other noisy operations shall be carried out only
              between 7.00am and 6.00pm on weekdays and 8.00am and 1.00pm
              on Saturdays.    No work on Sundays or Public Holidays is
              permitted.

       11.    All building rubbish and debris, including that which can be wind
              blown, shall be contained on site in a suitable container for
              disposal at an approved Waste Landfill Depot. The container shall
              be erected on the building site prior to work commencing and
              shall be maintained for the term of the construction to the
              completion of the project.

              Note 1:      No building rubbish or debris shall be placed or
                           permitted to be placed on any adjoining public
                           reserve, footway or road.

              Note 2:      The waste container shall be regularly cleaned to
                           ensure proper containment of the building wastes
                           generated on the construction site.

       12.    Any damage caused to footpaths, roadways, utility installations
              and the like by reason of construction operations shall be made
              good and repaired to a standard equivalent to that existing prior
              to commencement of construction.

              Note: The full cost of restoration/repairs of property or services
                    damaged during the works shall be met by the applicant.

       13.    All loading, unloading and storage of goods shall be carried out
              within the confines of the property. No loading or unloading of
              goods on the public roadway system shall be permitted.

       Access, Traffic and Transport

       14.    Prior to the issue of a Certificate of Completion, the applicant
              shall upgrade and seal/concrete/pave the existing entrance to Lot
              41 DP 826344 from Milburn Creek Road in accordance with Cowra
              Shire Council’s Development Control Plan – Subdivision Code



This is Page 7 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


              1992 and Cowra Operations Rural Entrance Standard Drawings –
              CS00001A.DWG and CS00001B.DWG.

              Note: All costs associated with the upgrading of the access shall be
                    borne by the applicant and at no cost to Council.

       Stormwater

       15.    All roofed and paved areas are to be properly drained to comply
              with the following criteria:

              (a)    Discharge three metres clear of any building/structure in a
                     manner that does not cause soil erosion or nuisance to
                     adjoining properties; and/or

              (b)    Discharge to Council’s Stormwater Management System
                     where relevant.

       Plumbing and Drainage

       16.    The Applicant is to obtain all relevant approvals to carry out
              sewerage work and to carry out stormwater drainage work and to
              carry out water supply work from Cowra Shire Council prior to
              commencing works to and comply with any conditions of that
              permit.

              Note 1:      All work shall be carried out by a licensed plumber
                           and drainer and to the requirements of Australian
                           Standard 3500, 'National Plumbing and Drainage' and
                           the 'New South Wales Code of Practice; Plumbing
                           and Drainage'.

              Note 2:      The applicant is to obtain a Certificate from Council
                           certifying compliance with the conditions of any
                           relevant approval to carry out plumbing and drainage
                           work. For the purpose of obtaining a certificate the
                           works must be inspected by the Council at the time
                           specified below:

              (a)    Internal Drainage: When all internal drainage work is
                     installed and prior to concealment. Pipes should be under
                     water test.



This is Page 8 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


              (b)    External Drainage: When all external drainage work is
                     installed and prior to concealment. Pipes should be under
                     water test.

              (c)    Water Supply: Hot and cold water supply pipework when
                     the pipework is installed and prior to concealment. Pipes
                     should be under pressure test.

              (d)    Stormwater: When the stormwater and roof water
                     drainage system has been completed.

       On-Site Sewage Management

       17.    The Applicant is to obtain all relevant approvals to Install and
              Operate an On-Site Sewage Management System from Cowra
              Shire Council prior to commencing works to install the system of
              waste management and comply with any conditions of that
              permit.

              Note 1:      All work shall be carried out by a licensed plumber
                           and drainer and to the requirements of NSW
                           Environment and Health Protection Guidelines and
                           Australian    Standard/New     Zealand     Standard
                           1547:2000     On-Site     Domestic      Wastewater
                           Management, Australian Standard 3500, 'National
                           Plumbing and Drainage' and the 'New South Wales
                           Code of Practice; Plumbing and Drainage'.

              Note 2:      The applicant is to obtain a Certificate from Council
                           certifying compliance with the conditions of any
                           relevant approval to carry out plumbing and drainage
                           work. For the purpose of obtaining a certificate the
                           works must be inspected by the Council at the time
                           specified below:

              (a)    Internal Drainage: When all internal drainage work is
                     installed and prior to concealment. Pipes should be under
                     water test.

              (b)    External Drainage: When all external drainage work is
                     installed and prior to concealment. Pipes should be under
                     water test.



This is Page 9 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


              (c)      Absorption Trench: When void arching and stone void fill is
                       in place prior to covering.

       Water Supply Infrastructure

       18.    The applicant is required to provide a minimum of 25,000 litres of
              tanked water supply for domestic consumption throughout the
              dwelling-house or a larger volume of water supply in accordance
              with BASIX certificate commitments. In addition to the water
              supply required for domestic consumption and BASIX, an
              additional 10,000 litres of tanked water supply shall be reserved for
              fire fighting purposes in accordance with NSW Rural Fire Service
              requirements. Water tanks shall be generally located in close
              proximity to the dwelling-house and allow access for fire fighting
              vehicles.

              Note: Information relating to the location and design of water
                    tanks and emergency fire fighting requirements for water
                    tanks and connections can be downloaded from the NSW
                    Rural Fire Service website, www.rfs.nsw.gov.au.

       Erosion and Sediment Control

       19.    Prior to the commencement of work on the site, all erosion and
              sediment control measures identified in an Erosion and Sediment
              Control Plan (ESCP) shall be implemented and maintained prior
              to, during and after the construction phase of the development.
              The erosion and sediment control measures are to comply with
              Cowra Shire Council’s Soil Erosion and Sediment Control Plan
              2006 at all times.

       Occupation Certificate

       20.    Prior to the occupation or use of the dwelling-house and garage,
              an Interim or Final Occupation Certificate must be obtained from
              the Principal Certifying Authority for the subject development.

       CARRIED

       FOR:   Councillors WJ West, IM Brown, BE Miller, JN Mallon, RG Watt, RT Bridges, JA Smith, RJ
              Walsh and PB Wright.

       AGAINST: Nil.



This is Page 10 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


Record of Proceedings of Cowra Access Committee Meeting held on 17 December 2008

33/09   Moved Cr IM Brown, Seconded Cr RJ Walsh, That

        1.    Council endorse the resolutions made at the meeting of the
              Cowra Access Committee held on 17 December 2008.

        2.    Discussions be held with the Australian Chapter of the Peace Bell
              prior to any changes to the Peace Bell.

        CARRIED

LATE REPORT

GENERAL MANAGER

Inwards Correspondence - Cowra Golf Club Limited:

34/09   Moved Cr BE Miller, Seconded Cr RT Bridges, That Council donate the sum of
        $1,500.00 from section 356 expenses to the Cowra Golf Club to assist the
        Club in their endeavours to purchase 15 megalitres of water as part of
        course preparation for the Easter Golf Classic Tournament.

        CARRIED

MOTIONS WITHOUT NOTICE

Cowra Golf Club Limited

35/09   Moved Cr JA Smith, Seconded Cr RT Bridges, That Council encourage the
        Cowra Golf Club to investigate alternative water storage options to
        enhance their operations.

        CARRIED

Car Parking

36/09   Moved Cr BE Miller, Seconded Cr RG Watt, That Council write to the owners
        of private carparks used for general public access (shared access) in an




This is Page 11 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


         attempt to ensure appropriate maintenance is carried out on a routine
         basis.

         CARRIED

Access Liability

37/09    Moved Cr IM Brown, Seconded Cr RJ Walsh, That Council’s insurers be asked
         to advise the liability to Council for accidents between pedestrians and
         motor scooters with a copy to be forwarded to the Access Committee.

         CARRIED

Health Service

38/09    Moved Cr PB Wright, Seconded Cr JN Mallon, That Council write to the CEO
         of the Cowra Hospital inviting him/her to have dinner with Council after
         the March 2009 Ordinary meeting.

         CARRIED

OPERATIONS COMMITTEE

MAYORAL MINUTE

Victorian Bushfires

39/09    Moved Cr BE Miller, Seconded Cr WJ West, That:

         1.        Council provide the sum of $5,000.00 from section 356 donations
                   to the Municipal Association of Victoria (MAV) in support of the
                   local government of Victoria’s rebuilding program as a result of
                   the Victorian Bushfire Appeal.

         2.        The Mayor convene a meeting of all relevant community groups
                   and agencies with the emphasis to be on coordinating a structured
                   Cowra approach to assist the Victorian bushfire victims.

         CARRIED




This is Page 12 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


GENERAL MANAGER

Woodstock Volunteer Bushfire Brigade

40/09   Moved Cr JN Mallon, Seconded Cr JA Smith, That Council donate from the
        Section 356 budget the sum of $1,435 to the Woodstock Volunteer
        Bushfire Brigade to assist in the construction of fencing around the
        Brigade’s water tanks.

        CARRIED

Audio Interpretation at POW Camp Guard Tower

41/09   Moved Cr RJ Walsh, Seconded Cr IM Brown, That:

        1.     Council provide $10,000 from the POW Campsite Reserve and
               $4,000 to be loaned interest free and repaid over 2 years to the
               Cowra Breakout Association S.355 Committee for the installation
               of audio interpretation facilities on the Guard Tower at the Cowra
               Prisoner of War Campsite.

        2.     The Cowra Breakout Association S355 Committee be permitted
               to sell the remaining souvenir items from the 60th Anniversary of
               the Cowra Breakout with any funds so raised to be allocated to the
               POW Campsite reserve.

        CARRIED

DIRECTOR – COWRA OPERATIONS

Railway Lane Pedestrian Zone

42/09   Moved Cr BE Miller, Seconded Cr RG Watt, That:

        1.     The report presented by the Director - Cowra Operations relating
               to the proposed upgrade of Railway Lane be received and noted.

        2.     Council adopts in principal the design known as “Option 1A” as
               detailed on the plans presented and that “Option 1A” is placed on
               public exhibition for a period of twenty-one (21) working days.




This is Page 13 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


        3.     The public be informed that the plans are on display and invited to
               comment on the proposed design.

        4.     After the twenty-one (21) day exhibition period all comments be
               presented back to Council for consideration.

        5.     A meeting be convened of all land holders and tenants adjoining
               Railway Lane to discuss the proposed design options.

        CARRIED

MATTER ARISING

Railway Lane Pedestrian Zone

43/09   Moved Cr PB Wright, Seconded Cr IM Brown, That Council assess how many
        carparks are proposed to be lost as part of any planned development of
        Railway Lane with such assessment to include how they may be recouped
        elsewhere in Cowra.

        CARRIED

New/Replacement Street Tree Plantings

44/09   Moved Cr RJ Walsh, Seconded Cr RG Watt, That:

        1.     The Director - Cowra Operations’ report relating to the planting
               of trees to improve the appeal and visual amenity of Cowra’s
               streetscapes, be received and noted.

        2.     Senior Council staff be asked to consult with NRM Group.

        CARRIED

MATTER ARISING

New/Replacement Street Tree Plantings

45/09   Moved Cr RJ Walsh, Seconded Cr WJ West, That before any new tree




This is Page 14 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


        planting takes place, Council staff be asked to repair existing water
        reticulation infrastructure associated with the tree plantings.

        CARRIED

Cowra Sewerage Augmentation

46/09   Moved Cr RT Bridges, Seconded Cr JA Smith, That the Cowra Sewerage
        Treatment Plant Progress Report submitted by the Director - Cowra
        Operations be received and noted.

        CARRIED

DIRECTOR - ENVIRONMENTAL SERVICES
Development Application No. 145/2008, proposing the demolition of an existing dwelling-
house and the construction of a new dwelling-house on Lot 2 DP 1000117, 970 Grenfell
Road, Cowra, lodged by G W Rowe & P M Rowe.

47/09   Moved Cr BE Miller, Seconded Cr IM Brown, That Development Application
        No. 145/2008, for the demolition of an existing dwelling-house and the
        construction of a new dwelling-house on Lot 2 DP 1000117, 970 Grenfell
        Road Cowra, be approved subject to the following conditions:

        Approved Plans and Documentation

        1.     The development shall be carried out in accordance with:

               (a)   the approved plan(s) stamped by Cowra Shire Council and
                     attached to this consent; and

               (b)   the Statement of Environmental Effects lodged in respect of
                     Development Application No. 145/2008

               except where amended by any of the following conditions. A
               current and approved copy of the building approval/consent and
               stamped plans is to be maintained on site for constructional and
               reference purposes.

        Limitations on Consent

        2.     In the event that a new access is required to be built, it be at the
               cost of the proponent and constructed to Council specifications.




This is Page 15 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


       Principal Certifier Requirements

       3.     The applicant is to submit to Cowra Shire Council, at least two
              days prior to the commencement of any works, a ‘Notice of
              Commencement of Building or Subdivision Works’ and
              ‘Appointment of Principal Certifying Authority’.

       4.     A sign must be erected in a prominent position on any site on
              which building work, subdivision work or demolition work is being
              carried out:

              (a)    Showing the name, address and telephone number of the
                     principal certifying authority for the work;

              (b)    Showing the name of the principal contractor (if any) for
                     any building work and a telephone number on which that
                     person may be contacted outside working hours; and

              (c)    Stating that unauthorised entry to the work site is
                     prohibited.

              Any such sign is to be maintained while the building work,
              subdivision work or demolition work is being carried out, but must
              be removed when the work has been completed.

       5.     Prior to any construction work being carried out on the site, the
              Applicant shall:

              (a)    Inform the Principal Certifying Authority in writing of
                     whether the work is to be carried out by a licensed builder
                     or owner-builder as defined under the Home Building Act
                     1989; and

              (b)    Submit a Home Building Insurance Certificate issued under
                     Part 6 of the Home Building Act 1989.

              Note 1:       Details of the licensee's number and contractor license
                            number and/or owner-builder's name and permit
                            number is required to be submitted to satisfy Clause (a)
                            of this condition.




This is Page 16 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


              Note 2:       The submission of a copy of an insurance policy that
                            covers the construction work is sufficient evidence to
                            satisfy Clause (b) of this condition.

              Note 3:       The Principal Certifying Authority must be informed of
                            any change of builder undertaking the construction
                            work.

       Construction Certificate

       6.     The Applicant is to obtain a Construction Certificate from either
              Council or an Accredited Certifying Authority, certifying that the
              proposed works are in accordance with the Building Code of
              Australia and applicable Council Engineering Standards prior to
              any building and or subdivision works commencing.

              Note 1:       No building, engineering or excavation work is to be
                            carried out in relation to this development until the
                            necessary construction certificates have been
                            obtained.

              Note 2:       It is the responsibility of the Applicant to ensure that
                            the development complies with the Building Code of
                            Australia and applicable engineering standards in the
                            case of building work and the applicable Council
                            Engineering Standards in the case of subdivision
                            works. This may entail alterations to the proposal so
                            that it complies with these standards.

       Inspections

       7.     The Applicant is to obtain a certificate from Council or an
              Accredited Certifying Authority, certifying compliance with the
              Building Code of Australia and any other relevant condition of
              consent for the stages of construction listed in Clause 162A of the
              Environmental Planning and Assessment Regulation 2000. For the
              purpose of obtaining a certificate the works must be inspected by
              the Accredited Certifying Authority at the time specified below:

              (a)    At the commencement of the building work;




This is Page 17 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


              (b)    After excavation for, and prior to the placement of, any
                     footings;

              (c)    Prior to pouring any in-situ reinforced concrete building
                     element;

              (d)    Prior to covering of the framework for any floor, wall, roof
                     or other building element;

              (e)    Prior to covering waterproofing in any wet areas;

              (f)    Prior to covering any stormwater drainage connections; and

              (g)    After the building work has been completed and prior to
                     any Occupation Certificate being issued in relation to the
                     building.

              Note 1:       If Council is required to carry out compliance
                            inspections at least 24 hours notice shall be given to
                            Council to allow for the inspection.

              Note 2:       An Occupation Certificate in relation to the building
                            cannot be issued by Council or an Accredited
                            Certifying Authority until the certificates required by
                            this condition have been issued or registered with
                            Council.

       8.     The applicant is required to obtain a certificate from Council or an
              Accredited Certifying Authority, certifying that all works
              (including construction of access driveways) have been
              constructed and completed in accordance with Cowra Operations
              Engineering Standards.      For the purposes of obtaining the
              certificate, the works must be inspected by Council or an
              Accredited Certifying Authority at the times specified below:

              (a)    Pre-construction: Prior to construction of works on the
                     roadway and after all sediment control and traffic controls
                     are in place.

              (b)    Vehicular Access: When the vehicular access driveways to
                     the site from the proposed new access road have been
                     constructed and prior to sealing.



This is Page 18 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009



              (c)    Completion: When all vehicular accesses, internal
                     driveways, and stormwater works have been completed.

       Construction Works

       9.     All building work must be carried out in accordance with the
              provisions of the Environmental Planning and Assessment Act
              1979 and the Building Code of Australia.

       10.    The builder must maintain on the work site a legible copy of the
              plan and specification approved with the Development Consent.

       11.    All construction operations involving the use of electric or
              pneumatic tools or other noisy operations shall be carried out only
              between 7.00am and 6.00pm on weekdays and 8.00am and 1.00pm
              on Saturdays.    No work on Sundays or Public Holidays is
              permitted.

       12.    All building rubbish and debris, including that which can be wind
              blown, shall be contained on site in a suitable container for
              disposal at an approved Waste Landfill Depot. The container shall
              be erected on the building site prior to work commencing and
              shall be maintained for the term of the construction to the
              completion of the project.

              Note 1:       No building rubbish or debris shall be placed or
                            permitted to be placed on any adjoining public
                            reserve, footway or road.

              Note 2:       The waste container shall be regularly cleaned to
                            ensure proper containment of the building wastes
                            generated on the construction site.

       13.    Any damage caused to footpaths, roadways, utility installations
              and the like by reason of construction operations shall be made
              good and repaired to a standard equivalent to that existing prior
              to commencement of construction.

              Note: The full cost of restoration/repairs of property or services
                    damaged during the works shall be met by the applicant.




This is Page 19 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


       14.    All loading, unloading and storage of goods shall be carried out
              within the confines of the property. No loading or unloading of
              goods on the public roadway system shall be permitted.

       Plumbing and Drainage

       15.    The Applicant is to obtain all relevant approvals to carry out
              sewerage work, to carry out stormwater drainage work and to
              carry out water supply work from Cowra Shire Council prior to
              commencing works to and comply with any conditions of that
              permit.

              Note 1:       All work shall be carried out by a licensed plumber
                            and drainer and to the requirements of Australian
                            Standard 3500, 'National Plumbing and Drainage' and
                            the 'New South Wales Code of Practice; Plumbing
                            and Drainage'.

              Note 2:       The applicant is to obtain a Certificate from Council
                            certifying compliance with the conditions of any
                            relevant approval to carry out plumbing and drainage
                            work. For the purpose of obtaining a certificate the
                            works must be inspected by the Council at the time
                            specified below:

              (a)    Water Supply: Hot and cold water supply pipework when
                     the pipework is installed and prior to concealment. Pipes
                     should be under pressure test.

              (b)    Stormwater: When the stormwater and roof water
                     drainage system has been completed.

       16.    All roofed and paved areas are to be properly drained to comply
              with the following criteria:

              (a)    Discharge three metres clear of any building/structure in a
                     manner that does not cause soil erosion or nuisance to
                     adjoining properties; and/or

              (b)    Discharge to Council’s Stormwater Management System
                     where relevant.




This is Page 20 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


       17.    The Applicant is to obtain all relevant approvals to Install and
              Operate an On-Site Sewage Management System from Cowra
              Shire Council prior to commencing works to install the system of
              waste management and comply with any conditions of that
              permit.

              Note 1:       All work shall be carried out by a licensed plumber
                            and drainer and to the requirements of NSW
                            Environment and Health Protection Guidelines and
                            Australian Standard/ New Zealand Standard
                            1547:2000     On-Site     Domestic      Wastewater
                            Management, Australian Standard 3500, 'National
                            Plumbing and Drainage' and the 'New South Wales
                            Code of Practice; Plumbing and Drainage'.

              Note 2:       The applicant is to obtain a Certificate from Council
                            certifying compliance with the conditions of any
                            relevant approval to carry out plumbing and drainage
                            work. For the purpose of obtaining a certificate the
                            works must be inspected by the Council at the time
                            specified below:

              (a)    Internal Drainage: When all internal drainage work is
                     installed and prior to concealment. Pipes should be under
                     water test.

              (b)    External Drainage: When all external drainage work is
                     installed and prior to concealment. Pipes should be under
                     water test.

              (c)    Absorption Trench: When void arching and stone void fill is
                     in place prior to covering.

       Section 94A Contributions

       18.    Pursuant to Sections 80A(1) and 94A of the Environmental
              Planning and Assessment Act 1979 and Cowra Shire Council
              Section 94A Contributions Plan, the following monetary
              contribution towards public services and amenities is required:
              $1,660.




This is Page 21 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


              The above monetary contribution will be adjusted at the time of
              payment in accordance with the formula: Contribution (at time of
              payment) = C x CPI2
                             CPI1
              Where:

              C      =     the original contribution amount as shown in the
                           development consent;

              CPI2 =       the Consumer Price Index: All Groups Index for
                           Sydney (as currently available for the Australian
                           Bureau of Statistics at the time of payment)

              CPI1 =       the Consumer Price Index: All Groups Index for
                           Sydney which applied at the time of calculation as
                           shown on the development consent.

              Note 1:       The minimum payment will not be less than the
                            contribution amount stated on the consent.

              Note 2:       In accordance with Section 94EC of the Act and
                            Clause 146 of the Regulation, a certifying authority
                            must not issue a construction certificate for building
                            work or subdivision work under a development
                            consent unless it has verified that each condition
                            requiring the payment of monetary contributions has
                            been satisfied.

       Demolition

       19.    Demolition of all building structures shall take place in accordance
              with AS 2601-2001 “Demolition of Structures” and shall be carried
              out in such a manner that dust and noise are minimised as far as
              possible.

       20.    All handling, removal, transport and disposal of asbestos or other
              contaminated materials shall be controlled and in accordance with
              the Protection of the Environment Operations Act 1997 and the
              Occupation Health and Safety Act 2000.

       21.    All waste material in any form must be disposed of only at a
              landfill site that is licensed to receive the waste.



This is Page 22 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


       22.    Prior to any construction work being carried out on the site, the
              applicant shall inform the Principal Certifying Authority in writing,
              details of the approved demolition contractor.

       23.    Upon the completion of the demolition of the existing dwelling-
              house a clearance certificate from a suitably qualified occupational
              hygienist shall be submitted to Council. This certificate shall be
              provided, prior to the commencement of construction works on
              the new dwelling-house.

       Access, Traffic and Transport

       24.    Prior to the issue of a Final Occupation Certificate, the applicant
              shall upgrade and seal the vehicular access from Barrs Road to Lot
              182 DP 752948 in accordance with Cowra Shire Council’s
              Development Control Plan – Subdivision Code 1992 and Cowra
              Operations Rural Entrance Standard Drawings – CS00001A.DWG
              and CS00001B.DWG.

              Note 1:       All costs associated with the upgrading of the access
                            shall be borne by the applicant and at no cost to
                            Council.

       Water Supply Infrastructure

       25.    The applicant is required to provide a minimum of 25,000 litres of
              tanked water supply for domestic consumption throughout the
              dwelling-house or a larger volume of water supply in accordance
              with BASIX certificate commitments. In addition to the water
              supply required for domestic consumption and BASIX, an
              additional 10,000 litres of tanked water supply shall be reserved for
              fire fighting purposes in accordance with NSW Rural Fire Service
              requirements. Water tanks shall be generally located in close
              proximity to the dwelling-house and allow access for fire fighting
              vehicles.

              Note: Information relating to the location and design of water
                    tanks and emergency fire fighting requirements for water
                    tanks and connections can be downloaded from the NSW
                    Rural Fire Service website, www.rfs.nsw.gov.au.




This is Page 23 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


        Erosion and Sediment Control

        26.     Prior to the commencement of work on the site, all erosion and
                sediment control measures identified in an Erosion and Sediment
                Control Plan (ESCP) shall be implemented and maintained prior
                to, during and after the construction phase of the development.
                The erosion and sediment control measures are to comply with
                Cowra Shire Council’s Soil Erosion and Sediment Control Plan
                2006 at all times.

        Occupation Certificate

        27.     Prior to the occupation or use of the dwelling, an Interim or Final
                Occupation Certificate must be obtained from the Principal
                Certifying Authority for the subject development.

        CARRIED

        FOR:    Councillors WJ West, BE Miller, JN Mallon, RG Watt, RT Bridges, JA Smith, RJ Walsh, IM
                Brown and PB Wright.

        AGAINST: Nil.

ENVIRONMENTAL SERVICES

Development Application No. 111/2008, proposing the construction of a dwelling-house on
Lot 1 DP 602577, lodged by B J Delaney & M J Delaney.

Cr RJ Walsh declared a non-pecuniary interest (related to Delaney family) and vacated the
meeting during the debate and took no part in the determination. Cr Walsh returned to the
meeting following consideration of this item.

48/09   Moved Cr RG Watt, Seconded Cr PB Wright, That Development Application
        No. 111/2008, for the construction of a dwelling-house on Lot 1 DP
        602577 be approved subject to the following conditions:

        Approved Plans and Documentation

        1.     The development shall be carried out in accordance with:

                (a)     the approved plan(s) stamped by Cowra Shire Council and
                        attached to this consent; and




This is Page 24 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


              (b)    the Statement of Environmental Effects lodged in respect of
                     Development Application No. 111/2008

              except where amended by any of the following conditions. A
              current and approved copy of the building approval/consent and
              stamped plans is to be maintained on site for constructional and
              reference purposes.

       Principal Certifier Requirements

       2.     The applicant is to submit to Cowra Shire Council, at least two
              days prior to the commencement of any works, a ‘Notice of
              Commencement of Building or Subdivision Works’ and
              ‘Appointment of Principal Certifying Authority’.

       3.     A sign must be erected in a prominent position on any site on
              which building work, subdivision work or demolition work is being
              carried out:

              (a)    Showing the name, address and telephone number of the
                     principal certifying authority for the work;

              (b)    Showing the name of the principal contractor (if any) for
                     any building work and a telephone number on which that
                     person may be contacted outside working hours;

              (c)    Stating that unauthorised entry to the work site is
                     prohibited.

              Any such sign is to be maintained while the building work,
              subdivision work or demolition work is being carried out, but must
              be removed when the work has been completed.

       4.     Prior to any construction work being carried out on the site, the
              Applicant shall:

              (a)    Inform the Principal Certifying Authority in writing of
                     whether the work is to be carried out by a licensed builder
                     or owner builder as defined under the Home Building Act
                     1989; and




This is Page 25 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


              (b)    Submit a Home Building Insurance Certificate issued under
                     Part 6 of the Home Building Act 1989.

              Note 1:       Details of the licensee's number and contractor license
                            number and/or owner-builder's name and permit
                            number is required to be submitted to satisfy Clause (a)
                            of this condition.

              Note 2:       The submission of a copy of an insurance policy that
                            covers the construction work is sufficient evidence to
                            satisfy Clause (b) of this condition.

              Note 3:       The Principal Certifying Authority must be informed of
                            any change of builder undertaking the construction
                            work.

       Construction Certificate

       5.     The Applicant is to obtain a Construction Certificate from either
              Council or an Accredited Certifying Authority, certifying that the
              proposed works are in accordance with the Building Code of
              Australia and applicable Council Engineering Standards prior to
              any building and or subdivision works commencing.

              Note 1:       No building, engineering or excavation work is to be
                            carried out in relation to this development until the
                            necessary construction certificates have been
                            obtained.

              Note 2:       It is the responsibility of the Applicant to ensure that
                            the development complies with the Building Code of
                            Australia and applicable engineering standards in the
                            case of building work and the applicable Council
                            Engineering Standards in the case of subdivision
                            works. This may entail alterations to the proposal so
                            that it complies with these standards.

       Inspections

       6.     The Applicant is to obtain a certificate from Council or an
              Accredited Certifying Authority, certifying compliance with the
              Building Code of Australia and any other relevant condition of



This is Page 26 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


              consent for the stages of construction listed in Clause 162A of the
              Environmental Planning and Assessment Regulation 2000. For the
              purpose of obtaining a certificate the works must be inspected by
              the Accredited Certifying Authority at the time specified below:

              (a)    At the commencement of the building work;

              (b)    After excavation for, and prior to the placement of, any
                     footings;

              (c)    Prior to pouring any in-situ reinforced concrete building
                     element;

              (d)    Prior to covering of the framework for any floor, wall, roof
                     or other building element;

              (e)    Prior to covering waterproofing in any wet areas;

              (f)    Prior to covering any stormwater drainage connections; and

              (g)    After the building work has been completed and prior to
                     any Occupation Certificate being issued in relation to the
                     building.

              Note 1:       If Council is required to carry out compliance
                            inspections at least 24 hours notice shall be given to
                            Council to allow for the inspection.

              Note 2:       An Occupation Certificate in relation to the building
                            cannot be issued by Council or an Accredited
                            Certifying Authority until the certificates required by
                            this condition have been issued or registered with
                            Council.

       7.     The applicant is required to obtain a certificate from Council or an
              Accredited Certifying Authority, certifying that all works
              (including construction of access driveways) have been
              constructed and completed in accordance with Cowra Operations
              Engineering Standards.      For the purposes of obtaining the
              certificate, the works must be inspected by Council or an
              accredited certifying authority at the times specified below:




This is Page 27 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


              (a)    Pre-construction: Prior to construction of works on the
                     roadway and after all sediment control and traffic controls
                     are in place.

              (b)    Vehicular Access: When the vehicular access driveways to
                     the site from the proposed new access road have been
                     constructed and prior to sealing.

              (c)    Completion: When all vehicular accesses, internal
                     driveways, and stormwater works have been completed.

       Construction Works

       8.     All building work must be carried out in accordance with the
              provisions of the Environmental Planning and Assessment Act
              1979 and the Building Code of Australia.

       9.     The builder must maintain on the work site a legible copy of the
              plan and specification approved with the Development Consent.

       10.    All construction operations involving the use of electric or
              pneumatic tools or other noisy operations shall be carried out only
              between 7.00am and 6.00pm on weekdays and 8.00am and 1.00pm
              on Saturdays.    No work on Sundays or Public Holidays is
              permitted.

       11.    All building rubbish and debris, including that which can be wind
              blown, shall be contained on site in a suitable container for
              disposal at an approved Waste Landfill Depot. The container shall
              be erected on the building site prior to work commencing and
              shall be maintained for the term of the construction to the
              completion of the project.

              Note 1:       No building rubbish or debris shall be placed or
                            permitted to be placed on any adjoining public
                            reserve, footway or road.

              Note 2:       The waste container shall be regularly cleaned to
                            ensure proper containment of the building wastes
                            generated on the construction site.




This is Page 28 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


       12.    Any damage caused to footpaths, roadways, utility installations
              and the like by reason of construction operations shall be made
              good and repaired to a standard equivalent to that existing prior
              to commencement of construction.

              Note: The full cost of restoration/repairs of property or services
                    damaged during the works shall be met by the applicant.

       13.    All loading, unloading and storage of goods shall be carried out
              within the confines of the property. No loading or unloading of
              goods on the public roadway system shall be permitted.

       Plumbing and Drainage

       14.    The Applicant is to obtain all relevant approvals to carry out
              sewerage work, to carry out stormwater drainage work and to
              carry out water supply work from Cowra Shire Council prior to
              commencing works to and comply with any conditions of that
              permit.

              Note 1:       All work shall be carried out by a licensed plumber
                            and drainer and to the requirements of Australian
                            Standard 3500, 'National Plumbing and Drainage' and
                            the 'New South Wales Code of Practice; Plumbing
                            and Drainage'.

              Note 2:       The Applicant is to obtain a certificate from Council
                            certifying compliance with the conditions of any
                            relevant approval to carry out plumbing and drainage
                            work. For the purpose of obtaining a certificate the
                            works must be inspected by the Council at the time
                            specified below:

              (a)    Water Supply: Hot and cold water supply pipework when
                     the pipework is installed and prior to concealment. Pipes
                     should be under pressure test.

              (b)    Stormwater: When the stormwater and roof water
                     drainage system has been completed.

       15.    All roofed and paved areas are to be properly drained to comply
              with the following criteria:



This is Page 29 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


              (a)    Discharge three metres clear of any building/structure in a
                     manner that does not cause soil erosion or nuisance to
                     adjoining properties; and/or

              (b)    Discharge to Council’s Stormwater Management System
                     where relevant.

       On-Site Sewage Management

       16.    The Applicant is to obtain all relevant approvals to Install and
              Operate an On-Site Sewage Management System from Cowra
              Shire Council prior to commencing works to install the system of
              waste management and comply with any conditions of that
              permit.

              Note 1:       All work shall be carried out by a licensed plumber
                            and drainer and to the requirements of NSW
                            Environment and Health Protection Guidelines and
                            Australian Standard/ New Zealand Standard
                            1547:2000     On-Site     Domestic      Wastewater
                            Management, Australian Standard 3500, 'National
                            Plumbing and Drainage' and the 'New South Wales
                            Code of Practice; Plumbing and Drainage'.

              Note 2:       The applicant is to obtain a Certificate from Council
                            certifying compliance with the conditions of any
                            relevant approval to carry out plumbing and drainage
                            work. For the purpose of obtaining a certificate the
                            works must be inspected by the Council at the time
                            specified below:

              (a)    Internal Drainage: When all internal drainage work is
                     installed and prior to concealment. Pipes should be under
                     water test.

              (b)    External Drainage: When all external drainage work is
                     installed and prior to concealment. Pipes should be under
                     water test.

              (c)    Absorption Trench: When void arching and stone void fill is
                     in place prior to covering.




This is Page 30 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


       Access, Traffic and Transport

       17.    Prior to the issue of a Construction Certificate the applicant is
              required to upgrade the existing Crown Road from its intersection
              with Lachlan Valley Way to a point 20 metres east of the proposed
              access point to Lot 1 DP 602577, to comply with Council’s “Minor
              Gravel Road Standard” as detailed in Cowra Shire Council Road
              Asset Management Plan 1997.

       18.    Prior to the issue of a Construction Certificate that part of the
              Crown Road from the intersection of Lachlan Valley Way to a
              point 20 metres east of the existing entrance to Lot 1 DP 602577 is
              required to be transferred into the ownership of Cowra Shire
              Council.

       19.    Prior to the issue of a Final Occupation Certificate, the applicant
              shall upgrade the existing entrance to Lot 1 DP 602577 in
              accordance with Cowra Shire Council’s Development Control Plan
              – Subdivision Code 1992 and Cowra Operations Rural Entrance
              Standard Drawings – CS00001A.DWG and CS00001B.DWG.

              Note: All costs associated with the upgrading of the access shall be
                    borne by the applicant and at no cost to Council.

       Water Supply Infrastructure

       20.    The applicant is required to provide a minimum of 25,000 litres of
              tanked water supply for domestic consumption throughout the
              dwelling-house or a larger volume of water supply in accordance
              with BASIX certificate commitments. In addition to the water
              supply required for domestic consumption and BASIX, an
              additional 10,000 litres of tanked water supply shall be reserved for
              fire fighting purposes in accordance with NSW Rural Fire Service
              requirements. Water tanks shall be generally located in close
              proximity to the dwelling-house and allow access for fire fighting
              vehicles.

              Note: Information relating to the location and design of water
                    tanks and emergency fire fighting requirements for water
                    tanks and connections can be downloaded from the NSW
                    Rural Fire Service website, www.rfs.nsw.gov.au.




This is Page 31 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


        Erosion and Sediment Control

        21.     Prior to the commencement of work on the site, all erosion and
                sediment control measures identified in an Erosion and Sediment
                Control Plan (ESCP) shall be implemented and maintained prior
                to, during and after the construction phase of the development.
                The erosion and sediment control measures are to comply with
                Cowra Shire Council’s Soil Erosion and Sediment Control Plan
                2006 at all times.

        Occupation Certificate

        22.     Prior to the occupation or use of the dwelling, an Interim or Final
                Occupation Certificate must be obtained from the Principal
                Certifying Authority for the subject development.

        CARRIED

        FOR:    Councillors WJ West, BE Miller, JN Mallon, RG Watt, RT Bridges, JA Smith, IM Brown and
                PB Wright.

        AGAINST: Nil.

TRAFFIC COMMITTEE
B-Double Route Application – David Eggleton

49/09   Moved Cr RG Watt, Seconded Cr WJ West, That Council gazette the
        following roads as 25m B-Double routes:

        -     Lyall Street from William Street to Mees Street;
        -     Mees Street;
        -     Waratah Street from 318m west of Young Road to Mees Street;
        -     Un-named road circuit north of Waratah Street between Young;
              Road and Mees Street.
        -     That such be put out to appropriate public consultation.

        CARRIED

Webster Pastoral Co – Request for Stock Signs on Darby’s Falls Road

50/09   Moved Cr RG Watt, Seconded Cr RJ Walsh, That Webster Pastoral Co be
        authorised to install W5-38B signs permanently on Darby’s Falls Road




This is Page 32 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


        adjacent to their property, on the condition that the signs are hinged,
        and folded and locked when not in use.

        CARRIED

Macquarie St – Westpac Car Park

51/09   Moved Cr RT Bridges, Seconded Cr RJ Walsh, That pavement markings
        adjacent to Westpac Car park be adequately maintained to remain
        visible.

        CARRIED

Low Level Bridge

52/09   Moved Cr BE Miller, Seconded Cr RG Watt, That Council review the low level
        bridge signage to ensure it meets standards and is enforceable.

        CARRIED

CARS 1678/2008 – 20 Redfern Street – Parking across Driveway

53/09   Moved Cr RT Bridges, Seconded Cr JN Mallon, That a painted median be
        placed south of 20 Redfern Street driveway.

        CARRIED

Cowra Bus Service – Request for Bus Zone in Fitzroy Street

54/09   Moved Cr BE Miller, Seconded Cr PB Wright, That:-

        1.      Council consult with the owners and tenants adjacent to Aldi on
                their views to install a 15m long bus zone in Fitzroy Street, south
                of the Aldi driveway.

        2.      Following the consultation process, Council refer the matter back
                to the Traffic Committee.

        CARRIED

Darling Street Parking Bays

55/09   Moved Cr BE Miller, Seconded Cr WJ West, That Council change the signage




This is Page 33 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


        at the parking bays on the eastern side of Darling Street, from Kendal
        Street to Bartlett Street, from “No Stopping” to “No Parking”.

        CARRIED

Liverpool St School Zone

56/09   Moved Cr RJ Walsh, Seconded Cr JN Mallon, That Council request RTA’s
        School Safety Project Officer to review Liverpool Street School Zone
        with the view to making the crossing a permanent pedestrian crossing.

        CARRIED

Speeding along Tallarook Road.

57/09   Moved Cr BE Miller, Seconded Cr IM Brown, That the matter be referred
        back to the Traffic Committee for clarification.

        CARRIED

MOTION ARISING

58/09   Moved Cr RG Watt, Seconded Cr RJ Walsh, That the disabled car parks at the
        Cowra Post Office be repainted and maintained regularly.

        CARRIED

SALEYARDS COMMITTEE
Saleyards Report

59/09   Moved Cr BE Miller Seconded Cr PB Wright, That the Saleyards report as
        presented be noted.

        CARRIED

GENERAL MANAGER
Advertising on Cowra Community News Website

60/09   Moved Cr RG Watt, Seconded Cr RJ Walsh, That the matter be deferred and




This is Page 34 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


        Mr Starr be invited to address the March Information Session on 16th
        March.

        CARRIED

        Cr Mallon requested his vote be recorded against the motion.

Inwards Correspondence - Brooke White:

61/09   Moved Cr IM Brown, Seconded Cr RG Watt, That correspondence received
        from Brooke White thanking Council for its scholarship towards her
        Veterinary Science studies be received and noted.

        CARRIED

LATE REPORTS
GENERAL MANAGER

Notices of Motion x 2

62/09   Moved Cr BE Miller, Seconded Cr RG Watt, That Council confirm no further
        action required.

        CARRIED

        Cr JN Mallon requested his vote be recorded against the motion.

Second Quarter Review – 2008/09 Management Plan

63/09   Moved Cr RG Watt, Seconded Cr JA Smith, That the second quarter review of
        the 2008/09 Management Plan as presented at the information session
        held on Monday 16 February 2009 be received and noted.

        CARRIED

Budget Review – Second Quarter

64/09   Moved Cr BE Miller, Seconded Cr RG Watt, That the Second quarter budget
        review showing a revised estimated deficit of $206,113 be adopted.

        CARRIED




This is Page 35 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE COUNCIL
HELD IN THE COUNCIL CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


MOTION WITHOUT NOTICE:
Valley View

65/09   Moved Cr BE Miller, Seconded Cr RT Bridges, That the status of the land
        development known as Valley View be reported back to Council as soon
        as practicable.

        CARRIED

INTO CLOSED COUNCIL:-

66/09   Moved Cr BE Miller, Seconded IM Brown, That the meeting be closed to the
        public in accordance with Clause 10(A) of the Act to consider the
        following business:-

        Section:       10A(2)(c)
        Person:        Director – Cowra Operations
        Subject:       Tender 1-2009 DN375/450 Sewer Rehabilitation

        Reason:        Information that would, if disclosed, confer a commercial
                       advantage on a person with whom the Council is
                       conducting (or proposes to conduct) business.

        Section:       10A(2)(d)(i)
        Person:        Replacement of Plant 67 & 72 – Tipping Trucks
        Subject:       Director – Cowra Operations
        Reason:        Commercial information of a confidential nature that
                       would, if disclosed, prejudice the commercial position of
                       the person who supplied it.

        CARRIED




This is Page 36 of the Minutes of the Ordinary Meeting of Cowra Shire Council held on
Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on Monday 23rd
March 2009
MINUTES OF THE ORDINARY MEETING OF COWRA SHIRE
COUNCIL (IN CLOSED COUNCIL) HELD IN THE COUNCIL
CHAMBERS ON MONDAY, FEBRUARY 23RD 2009


DIRECTOR – COWRA OPERATIONS

Tender 1-2009 DN375/450 Sewer Rehabilitation

67/2009 Moved Cr IM Brown, Seconded Cr JA Smith, That:

         1.      Council accept the tender provided by Interflow Pty
                 Limited for $672 389.92.

         2.      Council approve an additional 300 metres of sewer main
                 to be rehabilitated by Interflow Pty Limited at a cost of
                 $90,000.00.

        CARRIED

Replacement of Plant 67 & 72 – Tipping Trucks

Cr RT Bridges declared a non-pecuniary interest (related to dealer) and vacated the
meeting during the debate and took no part in the determination. Cr Bridges
returned to the meeting following consideration of this item.

68/2009 Moved Cr RG Watt, Seconded Cr PB Wright, That:

         1.      Council purchase two Hino FS2845 Air cab chassis with
                 tipper bodies at $217,522 each and accept the trade-in
                 offer of $58,000 for plant 72 from West Orange Motors.
                 The change over price being $377,045.10 GST inclusive
                 ($306,477 nett).

         2.      West Orange Motors be notified of their successful offer
                 and the unsuccessful tenderers be notified.

        CARRIED

This concluded the business and the Meeting closed at 7.05 pm.

Chairman of the Meeting of Cowra Shire Council held on Monday 24th October
2005 at which Meeting the signature hereon was subscribed.



                                                         ............................................
                                                                       CHAIRMAN



This is Page 37 of the Minutes of the Ordinary Meeting of Cowra Shire Council held
on Monday 23rd February 2009 and confirmed at the Ordinary Meeting held on
Monday 23rd March 2009.
 RECOMMENDATIONS


CORPORATE COMMITTEE
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



Date of Meeting:           Monday 2nd March 2009.


Present:                   Cr WJ West, Cr IM Brown, Cr JN Mallon, Cr RG
                           Watt, Cr RT Bridges, Cr JA Smith, Cr RJ Walsh and Cr
                           PB Wright.
.

Also Present:              General Manager, Director – Corporate Services and
                           Director – Cowra Operations.


Apologies:                 Cr BE Miller and Director – Environmental Services.




RECOMMENDATIONS

GENERAL MANAGER
1.    Cash & Investments

      Moved Cr RG Watt, Seconded Cr IM Brown:

      That Council note the summaries of available cash and investments
      as at 19th February 2009.

2.    Lachlan Regional Transport Committee Inc

      Moved Cr RJ Walsh, Seconded Cr IM Brown:

      That Council rejoin the Lachlan Regional Transport Committee
      and offer support to the Committee.

DIRECTOR - ENVIRONMENTAL SERVICES
3.    Development Application No. 139/2008, proposes the subdivision of Lot 177
      DP 750410, 65 Keys Road, Woodstock into two allotments, lodged by P and
      B Ferguson.

      Cr RG Watt declared a pecuniary interest (applicants are clients) and vacated
      the meeting during the debate and took no part in the determination. Cr




                                                                            Page 1
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



     Watt returned to the meeting following consideration of this item.

     Moved Cr IM Brown, Seconded Cr RJ Walsh:

     That Council support DA 139/2008 proposing to subdivide Lot 177
     DP 750410, 65 Keys Road, Woodstock into two allotments and
     refer the application to the Director-General of the NSW
     Department of Planning for concurrence in accordance with State
     Environmental Planning Policy No. 1 – Development Standards.
     Further that the Director – Environmental Services be requested
     to amend the report to reflect appropriate dates.

     FOR:   Councillors WJ West, IM Brown, RT Bridges, JA Smith and RJ Walsh.

     AGAINST: PB Wright and JN Mallon.

     Moved Cr JA Smith, Seconded Cr PB Wright:

     That the Director – Environmental Services be requested to
     provide further information as to the purpose and intent of the first
     paragraph on page 5 of item 1 from the Director – Environmental
     Services to the March Corporate Committee meeting and
     repeated in other reports from the Director – Environmental
     Services in that business paper.

     FOR:   Councillors WJ West, IM Brown, JN Mallon, RT Bridges, JA Smith, RJ Walsh and PB
            Wright.

     AGAINST: Nil.

4.   Development Application No. 7/2009, proposing a boundary adjustment
     between Lot 2 DP 1013899 and Lot 128 DP 752947 Boorowa Road, Cowra,
     lodged by A, L, M and C Sutherland.

     Moved Cr IM Brown, Seconded Cr RG Watt:

     That Council support DA 7/2009 proposing the adjustment of the
     boundaries of Lot 2 DP 1012899 and Lot 128 DP 752947 Boorowa
     Road, Cowra and refer the application to the Director-General of
     the NSW Department of Planning for concurrence in accordance
     with State Environmental Planning Policy No. 1 – Development
     Standards. Further that the Director – Environmental Services be
     requested to amend the report to reflect the appropriate dates.

     FOR:   Councillors WJ West, IM Brown, JN Mallon, RG Watt, RT Bridges, JA Smith, RJ
            Walsh and PB Wright.

     AGAINST: Nil.




                                                                                   Page 2
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



5.   Development Application No. 132/2008, proposing the construction of a
     dwelling-house on Lot 35 DP 1051467, 43 Wianamatta Road, Canowindra,
     lodged by Bell River Homes Pty Ltd.

     Moved Cr RG Watt, Seconded Cr RJ Walsh:

     That Development Application No. 132/2008, for the construction
     of a dwelling-house on Lot 35 DP 1051467, 43 Wianamatta Road,
     Canowindra, be approved subject to the following conditions:

     Approved Plans and Documentation

     1.    The development shall be carried out in accordance with:

           (a)    the approved plan(s) stamped by Cowra Shire Council
                  and attached to this consent; and

           (b)    the Statement of Environmental Effects lodged in
                  respect of Development Application No. 132/2008

           except where amended by any of the following conditions. A
           current and approved copy of the building approval/consent
           and stamped plans is to be maintained on site for
           constructional and reference purposes.

     Principal Certifier Requirements

     2.    The applicant is to submit to Cowra Shire Council, at least
           two days prior to the commencement of any works, a
           ‘Notice of Commencement of Building or Subdivision
           Works’ and ‘Appointment of Principal Certifying Authority’.

     3.    A sign must be erected in a prominent position on any site
           on which building work, subdivision work or demolition work
           is being carried out:
           (a)    Showing the name, address and telephone number of
                  the principal certifying authority for the work;

           (b)    Showing the name of the principal contractor (if any)
                  for any building work and a telephone number on
                  which that person may be contacted outside working
                  hours; and

           (c)    Stating that unauthorised entry to the work site is
                  prohibited.

           Any such sign is to be maintained while the building work,
           subdivision work or demolition work is being carried out, but
           must be removed when the work has been completed.


                                                                    Page 3
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



    4.    Prior to any construction work being carried out on the site,
          the Applicant shall:

          (a)   Inform the Principal Certifying Authority in writing of
                whether the work is to be carried out by a licensed
                builder or owner-builder as defined under the Home
                Building Act 1989; and

          (b)   Submit a Home Building Insurance Certificate issued
                under Part 6 of the Home Building Act 1989.

          Note 1:     Details of the licensee's number and contractor
                      license number and/or owner-builder's name and
                      permit number is required to be submitted to
                      satisfy Clause (a) of this condition.

          Note 2:     The submission of a copy of an insurance policy
                      that covers the construction work is sufficient
                      evidence to satisfy Clause (b) of this condition.

          Note 3:     The Principal Certifying Authority must be
                      informed of any change of builder undertaking the
                      construction work.

    Construction Certificate

    5.    The Applicant is to obtain a Construction Certificate from
          either Council or an Accredited Certifying Authority,
          certifying that the proposed works are in accordance with
          the Building Code of Australia and applicable Council
          Engineering Standards prior to any building and or
          subdivision works commencing.
          Note 1:      No building, engineering or excavation work is
                       to be carried out in relation to this development
                       until the necessary construction certificates
                       have been obtained.

          Note 2:     It is the responsibility of the Applicant to ensure
                      that the development complies with the
                      Building Code of Australia and applicable
                      engineering standards in the case of building
                      work and the applicable Council Engineering
                      Standards in the case of subdivision works. This
                      may entail alterations to the proposal so that it
                      complies with these standards.




                                                                   Page 4
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



    Inspections

    6.    The Applicant is to obtain a certificate from Council or an
          Accredited Certifying Authority, certifying compliance with
          the Building Code of Australia and any other relevant
          condition of consent for the stages of construction listed in
          Clause 162A of the Environmental Planning and Assessment
          Regulation 2000. For the purpose of obtaining a certificate the
          works must be inspected by the Accredited Certifying
          Authority at the time specified below:

          (a)     At the commencement of the building work;

          (b)     After excavation for, and prior to the placement of,
                  any footings;

          (c)     Prior to pouring any in-situ reinforced concrete
                  building element;

          (d)     Prior to covering of the framework for any floor, wall,
                  roof or other building element;

          (e)     Prior to covering waterproofing in any wet areas;

          (f)     Prior to covering        any    stormwater     drainage
                  connections; and

          (g)     After the building work has been completed and prior
                  to any Occupation Certificate being issued in relation
                  to the building.

          Note 1:       If Council is required to carry out compliance
                        inspections at least 24 hours notice shall be given
                        to Council to allow for the inspection.

          Note 2:       An Occupation Certificate in relation to the
                        building cannot be issued by Council or an
                        Accredited Certifying Authority until the
                        certificates required by this condition have been
                        issued or registered with Council.

    7.    The applicant is required to obtain a certificate from Council
          or an Accredited Certifying Authority, certifying that all
          works (including construction of access driveways) have been
          constructed and completed in accordance with Cowra
          Operations Engineering Standards. For the purposes of
          obtaining the certificate, the works must be inspected by
          Council or an Accredited Certifying Authority at the times
          specified below:


                                                                      Page 5
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



          (a)   Pre-construction: Prior to construction of works on
                the roadway and after all sediment control and traffic
                controls are in place.

          (b)   Vehicular Access: When the vehicular access
                driveways to the site from the proposed new access
                road have been constructed and prior to sealing.

          (c)   Completion: When all vehicular accesses, internal
                driveways, and stormwater works have been
                completed.

    Construction Works

    8.    All building work must be carried out in accordance with the
          provisions of the Environmental Planning and Assessment
          Act 1979 and the Building Code of Australia.

    9.    The builder must maintain on the work site a legible copy of
          the plan and specification approved with the Development
          Consent.

    10.   All construction operations involving the use of electric or
          pneumatic tools or other noisy operations shall be carried
          out only between 7.00am and 6.00pm on weekdays and
          8.00am and 1.00pm on Saturdays. No work on Sundays or
          Public Holidays is permitted.

    11.   All building rubbish and debris, including that which can be
          wind blown, shall be contained on site in a suitable container
          for disposal at an approved Waste Landfill Depot. The
          container shall be erected on the building site prior to work
          commencing and shall be maintained for the term of the
          construction to the completion of the project.

          Note 1:     No building rubbish or debris shall be placed or
                      permitted to be placed on any adjoining public
                      reserve, footway or road.

          Note 2:     The waste container shall be regularly cleaned
                      to ensure proper containment of the building
                      wastes generated on the construction site.

    12.   Any damage caused to footpaths, roadways, utility
          installations and the like by reason of construction
          operations shall be made good and repaired to a standard
          equivalent to that existing prior to commencement of
          construction.



                                                                  Page 6
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



          Note: The full cost of restoration/repairs of property or
                services damaged during the works shall be met by the
                applicant.

    13.   All loading, unloading and storage of goods shall be carried
          out within the confines of the property. No loading or
          unloading of goods on the public roadway system shall be
          permitted.

    Plumbing and Drainage

    14.   The Applicant is to obtain all relevant approvals to carry out
          sewerage work, to carry out stormwater drainage work and
          to carry out water supply work from Cowra Shire Council
          prior to commencing works to and comply with any
          conditions of that permit.

          Note 1:     All work shall be carried out by a licensed
                      plumber and drainer and to the requirements of
                      Australian Standard 3500, 'National Plumbing
                      and Drainage' and the 'New South Wales Code
                      of Practice; Plumbing and Drainage'.

          Note 2:     The applicant is to obtain a Certificate from
                      Council certifying compliance with the conditions
                      of any relevant approval to carry out plumbing
                      and drainage work. For the purpose of obtaining
                      a certificate the works must be inspected by the
                      Council at the time specified below:

          (a)   Water Supply: Hot and cold water supply pipework
                when the pipework is installed and prior to
                concealment. Pipes should be under pressure test.

          (b)   Stormwater: When the stormwater and roof water
                drainage system has been completed.

    15.   All roofed and paved areas are to be properly drained to
          comply with the following criteria:

          (a)   Discharge three metres clear of any building/structure
                in a manner that does not cause soil erosion or
                nuisance to adjoining properties; and/or

          (b)   Discharge to Council’s Stormwater Management
                System where relevant.

    16.   The Applicant is to obtain all relevant approvals to Install
          and Operate an On-Site Sewage Management System from


                                                                  Page 7
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



          Cowra Shire Council prior to commencing works to install
          the system of waste management and comply with any
          conditions of that permit.

          Note 1:       All work shall be carried out by a licensed
                        plumber and drainer and to the requirements of
                        NSW Environment and Health Protection
                        Guidelines and Australian Standard/ New
                        Zealand Standard 1547:2000 On-Site Domestic
                        Wastewater Management, Australian Standard
                        3500, 'National Plumbing and Drainage' and the
                        'New South Wales Code of Practice; Plumbing
                        and Drainage'.

          Note 2:       The applicant is to obtain a Certificate from
                        Council certifying compliance with the conditions
                        of any relevant approval to carry out plumbing
                        and drainage work. For the purpose of obtaining
                        a certificate the works must be inspected by the
                        Council at the time specified below:

          (a)   Internal Drainage: When all internal drainage work is
                installed and prior to concealment. Pipes should be
                under water test.
          (b)   External Drainage: When all external drainage work is
                installed and prior to concealment. Pipes should be
                under water test.

          (c)   Absorption Trench: When void arching and stone void
                fill is in place prior to covering.

    Section 94A Contributions

    17.   Pursuant to Sections 80A(1) and 94A of the Environmental
          Planning and Assessment Act 1979 and Cowra Shire Council
          Section 94A Contributions Plan, the following monetary
          contribution towards public services and amenities is
          required: $12.60.

          The above monetary contribution will be adjusted at the
          time of payment in accordance with the formula:
          Contribution (at time of payment) = C x CPI2
                                                CPI1
          Where:

          C         =   the original contribution amount as shown in
                        the development consent;




                                                                   Page 8
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



          CPI2      =   the Consumer Price Index: All Groups Index
                        for Sydney (as currently available for the
                        Australian Bureau of Statistics at the time of
                        payment);

          CPI1      =   the Consumer Price Index: All Groups Index
                        for Sydney which applied at the time of
                        calculation as shown on the development
                        consent.

          Note 1:       The minimum payment will not be less than
                        the contribution amount stated on the consent.

          Note 2:       In accordance with Section 94EC of the Act
                        and Clause 146 of the Regulation, a certifying
                        authority must not issue a construction
                        certificate for building work or subdivision
                        work under a development consent unless it
                        has verified that each condition requiring the
                        payment of monetary contributions has been
                        satisfied.

    Water Supply Infrastructure

    18.   The applicant is required to provide a minimum of 25,000
          litres of tanked water supply for domestic consumption
          throughout the dwelling-house or a larger volume of water
          supply in accordance with BASIX certificate commitments.
          In addition to the water supply required for domestic
          consumption and BASIX, an additional 10,000 litres of
          tanked water supply shall be reserved for fire fighting
          purposes in accordance with NSW Rural Fire Service
          requirements. Water tanks shall be generally located in close
          proximity to the dwelling-house and allow access for fire
          fighting vehicles.

          Note: Information relating to the location and design of
                water tanks and emergency fire fighting requirements
                for water tanks and connections can be downloaded
                from the NSW Rural Fire Service website,
                www.rfs.nsw.gov.au.

    Erosion and Sediment Control

    19.   Prior to the commencement of work on the site, all erosion
          and sediment control measures identified in an Erosion and
          Sediment Control Plan (ESCP) shall be implemented and
          maintained prior to, during and after the construction phase
          of the development. The erosion and sediment control


                                                                 Page 9
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



            measures are to comply with Cowra Shire Council’s Soil
            Erosion and Sediment Control Plan 2006 at all times.

     Occupation Certificate

     20.    Prior to the occupation or use of the dwelling, an Interim or
            Final Occupation Certificate must be obtained from the
            Principal Certifying Authority for the subject development.

     FOR:   Councillors WJ West, IM Brown, JN Mallon, RG Watt, RT Bridges, JA Smith, RJ
            Walsh and PB Wright.

     AGAINST: Nil.

6.   Development Application No. 2/2009, proposing the change of use of an
     existing dwelling-house located on Lot 1 DP 609566, 35 Evans Street, Cowra
     for the purposes of a Cowra Special Needs Service (Respite Care), lodged by
     Cowra Special Needs Services Inc.

     Cr RJ Walsh declared a non-pecuniary interest (related to the property
     owners) and vacated the meeting during the debate and took no part in the
     determination. Cr Walsh returned to the meeting following consideration of
     this item.

     Moved Cr IM Brown, Seconded Cr RG Watt:

     That Development Application No. 2/2009 proposing the change of
     use of an existing dwelling-house located on Lot 1 DP 609566, 35
     Evans Street, Cowra for the purposes of a Cowra Special Needs
     Service (Respite Care) be approved subject to the following
     conditions:

     Approved Plans and Documentation

     1.     The development           shall   be    carried    out    generally     in
            accordance with:

            (a)      the approved plan(s) stamped by Cowra Shire Council
                     and attached to this consent; and

            (b)      the Statement of Environmental Effects lodged in
                     respect of Development Application No. 2/2009 and
                     stamped by Cowra Shire Council and attached to this
                     consent,

            except where amended by any of the following conditions. A
            current and approved copy of the building approval/consent
            and stamped plans is to be maintained on site for reference
            purposes.



                                                                              Page 10
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



    Principal Certifier Requirements

    2.    The applicant is to submit to Cowra Shire Council, at least
          two days prior to the commencement of any works, a
          ‘Notice of Commencement of Building or Subdivision
          Works’ and ‘Appointment of Principal Certifying Authority’.

    3.    All loading, unloading and storage of goods shall be carried
          out within the confines of the property. No loading or
          unloading of goods on the public roadway system shall be
          permitted.

    4.    A sign must be erected in a prominent position on any site
          on which building work, subdivision work or demolition work
          is being carried out:

          (a)     Showing the name, address and telephone number of
                  the principal certifying authority for the work;

          (b)     Showing the name of the principal contractor (if any)
                  for any building work and a telephone number on
                  which that person may be contacted outside working
                  hours; and

          (c)     Stating that unauthorised entry to the work site is
                  prohibited.

          Any such sign is to be maintained while the building work,
          subdivision work or demolition work is being carried out, but
          must be removed when the work has been completed.

    Inspections

    5.    The applicant is to obtain a certificate from Council or an
          accredited certifying authority, certifying compliance with
          the Building Code of Australia and any other relevant
          condition of consent for the stages of construction listed in
          Clause 162A of the Environmental Planning and Assessment
          Regulation 2000. For the purpose of obtaining a certificate
          the works must be inspected by the accredited certifying
          authority at the time specified below:

          (a)     At the commencement of the building work;

          (b)     Prior to covering       any   stormwater    drainage
                  connections; and




                                                                Page 11
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



         (c)   After the building work has been completed and prior
               to any occupation certificate being issued in relation to
               the building.

               Note 1:      If Council is required to carry out
                            compliance inspections it will require the
                            following    inspections      to     verify
                            compliance:

         (a)   At the commencement of the building work;

         (b)   After excavation for, and prior to the placement of,
               any footings;

         (c)   Prior to pouring any in-situ reinforced concrete
               building element;

         (d)   Prior to covering of the framework for any floor, wall,
               roof or other building element;

         (e)   Prior to covering waterproofing in any wet areas;

         (f)   Prior to covering         any   stormwater      drainage
               connections; and

         (g)   After the building work has been completed and prior
               to any occupation certificate being issued in relation to
               the building.

               Note 2:      If Council is required to carry out
                            compliance inspections at least 24 hours
                            notice shall be given to Council to allow
                            for the inspection.

               Note 3:      An occupation certificate in relation to
                            the building cannot be issued by Council
                            or an accredited certifying authority until
                            the certificates required by this condition
                            have been issued or registered with
                            Council.

    6.   The applicant is required to obtain a certificate from Cowra
         Shire Council or an accredited certifying authority, certifying
         that all works (including construction of access driveways)
         have been constructed and completed in accordance with
         Cowra Operations Engineering Standards. For the purposes
         of obtaining the certificate, the works must be inspected by
         Council or an accredited certifying authority at the times
         specified below:


                                                                 Page 12
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



          (a)   Pre-construction: Prior to construction of works on
                the roadway and after all sediment control and traffic
                controls are in place.

          (b)   Vehicular Access: When the vehicular access
                driveways to the site from the proposed new access
                road have been constructed and prior to sealing.

          (c)   Completion: When all vehicular accesses, internal
                driveways, and stormwater works have been
                completed.

    Construction Works

    7.    The Applicant is to obtain a Construction Certificate from
          either Council or an Accredited Certifying Authority,
          certifying that the proposed works are in accordance with
          the Building Code of Australia and applicable Council
          Engineering Standards prior to any building and or
          subdivision works commencing.

          Note 1:     No building, engineering or excavation work is
                      to be carried out in relation to this development
                      until the necessary construction certificates
                      have been obtained.

          Note 2:     It is the responsibility of the Applicant to ensure
                      that the development complies with the
                      Building Code of Australia and applicable
                      engineering standards in the case of building
                      work and the applicable Council Engineering
                      Standards in the case of subdivision works. This
                      may entail alterations to the proposal so that it
                      complies with these standards.

    8.    All building work must be carried out in accordance with the
          provisions of the Environmental Planning and Assessment
          Act 1979 and the Building Code of Australia.

    9.    The builder must maintain on the work site a legible copy of
          the plan and specification approved with the Development
          Consent.

    10.   All construction operations involving the use of electric or
          pneumatic tools or other noisy operations shall be carried
          out only between 7.00am and 6.00pm on weekdays and
          8.00am and 1.00pm on Saturdays. No work on Sundays or
          Public Holidays is permitted.



                                                                 Page 13
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



    11.   All building rubbish and debris, including that which can be
          wind blown, shall be contained on site in a suitable container
          for disposal at an approved Waste Landfill Depot. The
          container shall be erected on the building site prior to work
          commencing and shall be maintained for the term of the
          construction to the completion of the project.

          Note 1:     No building rubbish or debris shall be placed or
                      permitted to be placed on any adjoining public
                      reserve, footway or road.

          Note 2:     The waste container shall be regularly cleaned
                      to ensure proper containment of the building
                      wastes generated on the construction site.

    12.   Any damage caused to footpaths, roadways, utility
          installations and the like by reason of construction
          operations shall be made good and repaired to a standard
          equivalent to that existing prior to commencement of
          construction.

          Note: The full cost of restoration/repairs of property or
                services damaged during the works shall be met by the
                applicant.

    Plumbing and Drainage

    13.   The Applicant is to obtain all relevant approvals, permits
          and/or certificates required for any of the following prior to
          commencement of works in connection to the following:

          (a)   Connection/disconnection to the Cowra Shire Council
                Reticulated Sewerage System and to carry out
                sewerage work;

          (b)   Connection/disconnection to the Cowra Shire Council
                Reticulated Water Supply System and carry out water
                supply work;

          (c)   Connection to Council Stormwater Management
                System.

          Note: All work shall be carried out by a licensed plumber
                and drainer and to the requirements of Australian
                Standard 3500, 'National Plumbing and Drainage' and
                the 'New South Wales Code of Practice; Plumbing and
                Drainage'.




                                                                 Page 14
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



    14.   All stormwater from the rear patio must be properly drained
          to the existing stormwater system.

    Access, Traffic and Transport

    15.   Prior to the issue of an Occupation Certificate, car parking
          facilities including all internal driveways, parking and
          manoeuvring areas are to be constructed and sealed in
          accordance with AS 2890.1 Off-Street Car Parking and are to
          include all necessary line marking, directional arrows and
          signage to delineate parking spaces, traffic flow and traffic
          priority.

          Note: All costs associated with the construction of the
                parking area shall be borne by the applicant.

    16.   A minimum of one parking space for disabled persons is to
          be provided in the development. The disabled parking space
          is to be constructed and signposted in accordance with the
          requirements of AS 2890.1 Off-Street Car Parking.

          Note: All costs associated with the construction of the
                parking area shall be borne by the applicant.

    Fire Safety

    17.   A Final or Interim Fire Safety Statement issued in
          accordance with Clause 170 of the Environmental Planning
          and Assessment Regulation 2000 in form prescribed by
          Clause 174 of the Environmental Planning and Assessment
          Regulation 2000 shall be issued by the owner of the building
          and a copy provided to Council prior to the occupation of
          the building.

    18.   Hereafter at a period of at least once every 12 months the
          owner of the building shall cause to be furnished to Council
          and the Fire Commissioner, in accordance with Clause 177
          of the Environmental Planning and Assessment Regulation
          2000, an Annual Fire Safety Statement in the form
          prescribed in Clause 181 of the Environmental Planning and
          Assessment Regulation 2000, certifying that each Fire Safety
          Measure has been maintained in accordance with the
          provision of the relevant standard.

    Food Shop Compliance
    19.   All areas where food is stored, made, manufactured,
          produced, collected, extracted, processed, transported,
          delivered, prepared, treated, preserved, packed, cooked,


                                                                Page 15
RECOMMENDATIONS FROM THE CORPORATE COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



             thawed, served or displayed must comply with the ‘Food Act
             2003’, ‘Australian New Zealand Food Standards Code
             Standard 3.2.3 - Food Premises and Equipment’, and
             ‘Australian Standard 4674 – Construction and Fit-out of Food
             Premises’.

     Occupation Certificate
     20.     Prior to the occupation or use of the Special Needs Service,
             an Interim or Final Occupation Certificate must be obtained
             from the Principal Certifying Authority for the subject
             development.

     FOR:    Councillors WJ West, IM Brown, JN Mallon, RG Watt, RT Bridges, JA Smith and PB
             Wright.

     AGAINST: Nil.


MOTION WITHOUT NOTICE
7.   Peter Whitty Road

     Moved Cr JN Mallon, Seconded Cr RG Watt:
     That Council inspect Peter Whitty Road in due course.




Cr WJ West
Chairman
2/3/09




                                                                                  Page 16
 RECOMMENDATIONS


OPERATIONS COMMITTEE
RECOMMENDATIONS FROM THE OPERATIONS COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



Date of Meeting:          Monday 9th March 2009


Present:                  Cr WJ West, Cr BE Miller, Cr JN Mallon, Cr RG Watt,
                          Cr RT Bridges, Cr JA Smith, Cr RJ Walsh and Cr PB
                          Wright


Also Present:             General Manager, Director – Corporate Services,
                          Director - Environmental Services and Director –
                          Cowra Operations.


Apologies:                Cr IM Brown




RECOMMENDATIONS

GENERAL MANAGER

1.    Inwards Correspondence - Halenvy Pty Ltd re DA 104/2008 – Alterations
      and Extension to Existing Nursing Home Lot 1 DP 610054, 10 Comerford
      Street, Cowra:

      Moved Cr RG Watt, Seconded Cr JA Smith:

      That correspondence received from Halenvy Pty Ltd re DA
      104/2008 advising that it is not possible to establish a covered
      outside smoking area for residents and visitors due to their
      established policy “that our Nursing Homes and their grounds in
      total are smoke free” be noted.

2.    Inwards Correspondence - Shires Association of NSW:

      Moved Cr RT Bridges, Seconded Cr PB Wright:

      That correspondence received from the Shires Association of NSW
      advising of responses from the RFS concerning the Rural Fire
      Fighting Fund Program Charges and resolutions arising from the
      2008 Shires Association Annual Conference be received and noted.




                                                                       Page 1
RECOMMENDATIONS FROM THE OPERATIONS COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



DIRECTOR – COWRA OPERATIONS

3.   Burley Jacky Fencing

     Moved Cr JA Smith, Seconded Cr PB Wright:

     That the report from Director – Cowra Operations regarding the
     background to the erection of a fence along the top of Burley Jacky
     be received and noted and that Council write to the RTA urging
     removal of the fence.

4.   Cemetery Policy

     Moved Cr BE Miller, Seconded Cr RJ Walsh:

     That the draft Cemetery Policy be deferred for discussion at the
     March Information meeting.

5.   Information report on the 2008/09 pool season closure date

     Moved Cr BE Miller, Seconded Cr RJ Walsh:

     That Council investigate options for operating the Aquatic Centre
     throughout April for shorter opening hours in order to
     accommodate the key users of the facility.

6.   Staff Meals Room at MRF

     Moved Cr RJ Walsh, Seconded Cr JA Smith:

     That:

     1.      Council approve the purchase and installation of a
             transportable building to be used as a meals/staff room at
             the Materials Recycling Facility.

     2.      The $13,000.00 to fund the purchase and installation of the
             transportable building be funded from MRF Working
             Expenses.

7.   Unbudgeted Cost For Water Telemetry Antenna Fee

     Moved Cr RJ Walsh, Seconded Cr JA Smith:

     That:




                                                                  Page 2
RECOMMENDATIONS FROM THE OPERATIONS COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



     1.      The fee of $3,824.40 payable to the Department of Lands for
             new fees and charges being applied to the transmission
             tower located on Mt McDonald be paid and managed as part
             of the third quarter budget review.

     2.      Council write to the Departments of Lands:

             -   expressing Council’s extreme disappointment at the
                 imposition of charges;
             -   requesting a detailed breakdown of the retrospective
                 costs and any future projected costs; and
             -   seeking clarification of the term “Co User and Local
                 Government”.

     3.      A copy of the correspondence be forwarded to the Local
             Government and Shires Association.

8.   Reimbursement of tip fees for a Cowra Home Modification & Maintenance
     Service client.

     Moved Cr RJ Walsh, Seconded Cr BE Miller

     That:

     1.      Council reimburses the tip fees for a developmentally
             delayed older client that Cowra Home Modification &
             Maintenance Service has recently assisted.

     2.      Funds totalling $250.31 for the reimbursement be funded
             from 10832 – Donations-Domestic Waste Management
             Charge.

     3.      The Home Modification and Maintenance Service be advised
             that in the future they should clear the issue with the
             Director – Cowra Operations prior to incurring any fees.

9.   Transfer of Management for Crown Reserve 42919

     Moved Cr RG Watt, Seconded Cr PB Wright:

     That the Department of Lands be advised that Council wishes to
     relinquish management of Crown Reserve 42919.




                                                                    Page 3
RECOMMENDATIONS FROM THE OPERATIONS COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



10.   Installation of Storm Water Pit for Cowra High School in Dowell St

      Cr JA Smith declared a non-pecuniary interest (teacher at the school) and
      vacated the meeting during the debate and took no part in the determination.
      Cr Smith returned to the meeting following consideration of this item.

      Moved Cr BE Miller, Seconded Cr PB Wright:

      That:

      1.      Council fund the purchase and installation of a storm water
              pit, and that all associated costs be covered from the Works
              Function Drainage – Kerb Inlet Maintenance.

      2.      All costs associated with diverting the storm water from the
              pit to the tanks be at the full cost of the Cowra High School.

      3.      Council request written documentation from Cowra High
              School confirming the statement that the storm water does
              not present a health risk and will not be used as a potable
              water supply at any time.

DIRECTOR - ENVIRONMENTAL SERVICES

11.   Development Application No. 6/2009, proposing to change the use of an
      existing function centre on Lot 1 DP 789770 25 Chardonnay Road, Cowra to
      a dwelling-house lodged by Anthony Daintith Town Planning.

      Moved Cr RG Watt, Seconded Cr JA Smith:

      That Council support DA 6/2009 proposing to change the use of an
      existing function centre on Lot 1 DP 789770 25 Chardonnay Road,
      Cowra to a dwelling-house and refer the application to the
      Director-General of the NSW Department of Planning for
      concurrence in accordance with State Environmental Planning
      Policy No. 1 – Development Standards.

      FOR:    Councillors, WJ West, BE Miller, JN Mallon, RG Watt, RT Bridges, JA Smith, RJ
              Walsh and PB Wright.

      AGAINST: Nil.




                                                                                   Page 4
RECOMMENDATIONS FROM THE OPERATIONS COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



12.   Cowra and Gooloogong Floodplain Risk Management Study and Plan.

      Moved Cr BE Miller, Seconded Cr RG Watt:

      That Council:

      1.      Endorses the make-up of the Cowra and Gooloogong
              Floodplain Risk Management Working Party.

      2.      Appoint Councillor Ray Walsh to Chair the Cowra and
              Gooloogong Floodplain Risk Management Working Party.

      3.      Commit the sum of $15,000 through its 2009/2010 budget
              deliberations to employ a project officer on a temporary part
              time basis to support the ongoing implementation of the
              Cowra and Gooloogong Floodplain Risk Management Plan.

13.   Section 96 Modification of Development Application No. 40/2008 –
      proposing a number of minor alterations to the external features of a
      proposed new dwelling-house and relocation of a proposed new retaining
      wall and water tank on proposed Lot 2 approved in accordance with DA
      40/2008. The application has been lodged by David Le Lievre on behalf of
      Habitat for Humanity.

      Moved Cr BE Miller, Seconded Cr RT Bridges:

      That:

      1.      Council accedes to the request to modify Development
              Consent No. 40/2008 issued by Council on 29 October 2008
              by amending the external features of the proposed dwelling
              house and relocation of the retaining wall and water tank, in
              accordance with Section 96 of the Environmental Planning
              and Assessment Act 1979.

      2.      The modified development plans be stamped and approved.

      FOR:    Councillors, WJ West, BE Miller, JN Mallon, RG Watt, RT Bridges, JA Smith, RJ
              Walsh and PB Wright.

      AGAINST: Nil.




                                                                                   Page 5
RECOMMENDATIONS FROM THE OPERATIONS COMMITTEE TO
THE ORDINARY COUNCIL MEETING TO BE HELD ON MONDAY
23RD MARCH 2009



LATE REPORT

14.   Target Car Park

      Moved Cr BE Miller, Seconded Cr RT Bridges:

      That Council defer consideration of the General Manager’s report
      and an onsite meeting be arranged with the owners of the carpark
      to discuss all the relevant issues.


MOTIONS WITHOUT NOTICE

15.   Wyangala Dam Wall

      Moved Cr BE Miller, Seconded Cr WJ West:

      That:

      1.      Council seek clarification from State Water as to their
              intentions in closing the road across the dam wall and seek
              comment as to how they intend to facilitate access and
              movement of people from the southern to the northern side
              of the river, particularly emergency vehicles.

      2.      An urgent meeting be sought with the appropriate Minister
              to express Council’s extreme displeasure at finding out about
              the intentions of State Water at Wyangala by means of a
              press release.




Cr WJ West
Chairman
9/3/09