000-636
(Requirements Management with Use Cases)
Document version: 9.30.06
000-636: Requirements Management with Use Cases
Important Note, Please Read Carefully
techeXams’ 000-636 Exam is a comprehensive compilation of questions and answers that have been developed by our team of certified professionals. In order to prepare for the actual exam, all you need is to study the content of this exam questions. An average of approximately 10 to 15 hours should be spent to study these exam questions and you will surely pass your exam. It’s our guarantee.
Latest Version
We are constantly reviewing our products. New material is added and old material is revised. Free updates are available for 90 days after the purchase. You should check your member zone at techeXams and update 3-4 days before the scheduled exam date. Here is the procedure to get the latest version: 1. Go to http://www.techeXams.ws/ 2. Log in the User Center 3. The latest versions of all purchased products are downloadable from here. Just click the links.
Feedback
If you find any possible improvement, then please do let us know. We are always interested in improving the quality of this product. Feedback can be send at: customer.service@techeXams.ws
Explanations
This product does not include explanations for all questions at the moment. If you are interested in providing explanations for this exam, please contact customer.service@techeXams.ws.
Copyright
techeXams holds the copyright of this material. techeXams grants you a limited license to view and study this material, either for personal or commercial use. Unauthorized reproduction or distribution of this material, or any portion thereof, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under law.
Disclaimer
Neither this guide nor any material in this guide is sponsored, endorsed or affiliated with any of the respective vendor. All trademarks are properties of their respective owners.
1
© Copyright www.techeXams.ws 2008
Practice Exams, Printable, Audio Trainings, Study Guides
000-636: Requirements Management with Use Cases Question: 1
Given: A customer service system is being developed for a telephone company to record and answer questions about telephone installations. What would be considered a design constraint of the software?
A - It will run on the Windows 95 operating system. B - Both phone installers and phone installation schedulers will use it. C - One hundred phone installers can enter information simultaneously. D - The project will use the IBM Rational Unified Process. E - It will produce a status report. Answer: A Question: 2
How do actors help determine the boundary of a system?
A - By acting as stakeholders B - By using the system C - By being outside the system and interacting with it D - By representing the subsystems Answer: C Question: 3
According to the “1-10-100 rule,” the cost of finding defects during what stage is 100 times greater than the cost of finding defects during requirements gathering?
A - Integration testing B - Maintenance C - Design D - Coding Answer: B Question: 4
Which of the following are artifacts in the requirements process? (Select all that apply.)
A - Vision document B - Pareto principle C - Change control board D - Use-case model
2
© Copyright www.techeXams.ws 2008
Practice Exams, Printable, Audio Trainings, Study Guides
000-636: Requirements Management with Use Cases Answer: A, D Question: 5
What information about a proposed system is usually found in a Supplementary Specification?
A - Data values B - Sub-components C - Non-functional requirements D - Testing procedures Answer: C Question: 6
What term identifies a person who is materially affected by the outcomes of a system?
A - Actor B - Manager C - Stakeholder D - Customer Answer: C Question: 7
Which of the following entities can interact with the boundaries of a system? (Select all that apply.)
A - Systems that will interact with the product B - Legacy systems that will be replaced by the product C - Reports produced by the product D - Human users of the product Answer: A, D Question: 8
The glossary is started at the beginning of what phase?
A - Construction B - Elaboration C - Inception D - Transition
3
© Copyright www.techeXams.ws 2008
Practice Exams, Printable, Audio Trainings, Study Guides
000-636: Requirements Management with Use Cases Answer: C Question: 9
Why is a Requirements Specification also known as a “customer’s proxy”?
A - Customers vote on whether to include a particular requirement. B - Customers outline the Requirements Specification. C - Customers use the Requirements Specification to specify what they want. D - Customers pay to have the developers write the detailed Requirements Specification.
000-636 Demo Exam
Answer: C
Question: 10
What is the purpose of a glossary?
A - Establish common vocabulary B - Define universal constraints C - Establish a common vision D - Establish testable requirements
Answer: A
Question: 11
Which of the following are benefits of using a standard template for a Vision document? (Select all that apply.)
A - Authors can organize sections in the document to suit the individual project. B - Documents appear familiar. C - Users with update permission can change the document. D - Authors can reuse the work or others, rather than starting from a blank page. Answer: B, D
4
© Copyright www.techeXams.ws 2008
Practice Exams, Printable, Audio Trainings, Study Guides